NO NAMA KEGIATAN BIAYA BOBOT KONTROL 1 Pek. Persiapan Rp 5,000,000 1.8% 1 1.8% 1 1.8% 2 Pek. Pondasi Rp 30,000,000 10.9% 2 10.9% 3 10.9% 3 Pek. Pemasangan sloof Rp 10,000,000 3.6% 1 3.6% 1 3.6% 4 Pek. Kolom Rp 20,000,000 7.3% 2 7.3% 2 7.3% 5 Pek. Pasangan dinding Rp 20,000,000 7.3% 3 7.3% 3 7.3% 6 Pek. Pemasangan kusen Rp 30,000,000 10.9% 2 10.9% 2 10.9% 7 Pek. Ring balk Rp 20,000,000 7.3% 1 7.3% 1 7.3% 8 Pek. Atap Rp 70,000,000 25.5% 2 25.5% 3 25.5% 9 Pek plafon Rp 15,000,000 5.5% 2 5.5% 2 3.0% 10 Pek. Plesteran dinding Rp 15,000,000 5.5% 3 5.5% 2 2.0% 11 Pek. Lantai Rp 30,000,000 10.9% 2 10.9% 2 0.0% 12 Pek. Finishing Rp 10,000,000 3.6% 2 3.6% 1 0.0% Rp275,000,000 100.0% 46 Progres rencana Progres kumulatif rencana Progres realisasi Progres kumulatif realisasi DURASI (minggu)

Upload: bettergrace

Post on 14-Feb-2016

227 views

Category:

Documents


2 download

DESCRIPTION

penjadwalan proyek menggunakan microsoft excel

TRANSCRIPT

Page 1: penjadwalan proyek

NO NAMA KEGIATAN BIAYA BOBOT KONTROL WAKTU PENYELESAIAN PROYEK (minggu)1 2

1 Pek. Persiapan Rp 5,000,000 1.8%1 1.8% 1.8%1 1.8% 1.8%

2 Pek. Pondasi Rp 30,000,000 10.9%2 10.9% 5.5% 5.5%3 10.9% 5.0% 3.6%

3 Pek. Pemasangan sloof Rp 10,000,000 3.6%1 3.6% 3.6%1 3.6%

4 Pek. Kolom Rp 20,000,000 7.3%2 7.3%2 7.3%

5 Pek. Pasangan dinding Rp 20,000,000 7.3%3 7.3%3 7.3%

6 Pek. Pemasangan kusen Rp 30,000,000 10.9%2 10.9%2 10.9%

7 Pek. Ring balk Rp 20,000,000 7.3%1 7.3%1 7.3%

8 Pek. Atap Rp 70,000,000 25.5%2 25.5%3 25.5%

9 Pek plafon Rp 15,000,000 5.5%2 5.5%2 3.0%

10 Pek. Plesteran dinding Rp 15,000,000 5.5%3 5.5%2 2.0%

11 Pek. Lantai Rp 30,000,000 10.9%2 10.9%2 0.0%

12 Pek. Finishing Rp 10,000,000 3.6%2 3.6%1 0.0%

Rp 275,000,000 100.0% 46Progres rencana 7.3% 9.1%

Progres kumulatif rencana 7.3% 16.4%Progres realisasi 6.8% 3.6%

Progres kumulatif realisasi 6.8% 10.4%

DURASI (minggu)

Page 2: penjadwalan proyek

WAKTU PENYELESAIAN PROYEK (minggu)3 4 5 6 7 8 9 10 11 12 13 14 15

2.3%

3.6%3.6% 3.6%

3.6% 3.6%2.4% 2.4% 2.4%3.0% 2.3% 2.0%

5.5% 5.5%6.0% 4.9%

7.3%7.3%

12.7% 12.7%10.0% 10.0% 5.5%

2.7% 2.7%3.0%1.8% 1.8% 1.8%2.0%

5.5% 5.5%

1.8% 1.8%

3.6% 6.1% 7.9% 7.9% 7.3% 12.7% 12.7% 4.5% 4.5% 7.3% 5.5% 1.8% 1.8%20.0% 26.1% 33.9% 41.8% 49.1% 61.8% 74.5% 79.1% 83.6% 90.9% 96.4% 98.2% 100%

5.9% 6.6% 11.9% 6.9% 7.3% 10.0% 10.0% 10.5% 0.0% 0.0% 0.0% 0.0% 0.0%16.3% 23.0% 34.9% 41.8% 49.1% 59.1% 69.1% 79.6% 79.6% 79.6% 79.6% 79.6% 79.6%

Page 3: penjadwalan proyek

Kontrol

Page 4: penjadwalan proyek

NO NAMA KEGIATAN BIAYA BOBOT KONTROL WAKTU PENYELESAIAN PROYEK (minggu)1 2

1 Pek. Persiapan Rp 5,000,000 1.8%1 1.8% 1.8%1 1.8% 1.8%

2 Pek. Pondasi Rp 30,000,000 10.9%2 10.9% 5.5% 5.5%3 10.9% 5.0% 3.6%

3 Pek. Pemasangan sloof Rp 10,000,000 3.6%1 3.6% 3.6%1 3.6%

4 Pek. Kolom Rp 20,000,000 7.3%2 7.3%2 7.3%

5 Pek. Pasangan dinding Rp 20,000,000 7.3%3 7.3%3 7.3%

6 Pek. Pemasangan kusen Rp 30,000,000 10.9%2 10.9%2 10.9%

7 Pek. Ring balk Rp 20,000,000 7.3%1 7.3%1 7.3%

8 Pek. Atap Rp 70,000,000 25.5%2 25.5%3 20.0%

9 Pek plafon Rp 15,000,000 5.5%2 5.5%2 0.0%

10 Pek. Plesteran dinding Rp 15,000,000 5.5%3 5.5%2 0.0%

11 Pek. Lantai Rp 30,000,000 10.9%2 10.9%2 0.0%

12 Pek. Finishing Rp 10,000,000 3.6%2 3.6%1 0.0%

Rp 275,000,000 100.0% 46Progres rencana 7.3% 9.1%

Progres kumulatif rencana 7.3% 16.4%Progres realisasi 6.8% 3.6%

Progres kumulatif realisasi 6.8% 10.4%

DURASI (minggu)

Page 5: penjadwalan proyek

WAKTU PENYELESAIAN PROYEK (minggu)3 4 5 6 7 8 9 10 11 12 13 14 15

2.3%

3.6%3.6% 3.6%

3.6% 3.6%2.4% 2.4% 2.4%3.0% 2.3% 2.0%

5.5% 5.5%6.0% 4.9%

7.3%7.3%

12.7% 12.7%10.0% 10.0%

2.7% 2.7%

1.8% 1.8% 1.8%

5.5% 5.5%

1.8% 1.8%

3.6% 6.1% 7.9% 7.9% 7.3% 12.7% 12.7% 4.5% 4.5% 7.3% 5.5% 1.8% 1.8%20.0% 26.1% 33.9% 41.8% 49.1% 61.8% 74.5% 79.1% 83.6% 90.9% 96.4% 98.2% 100%

5.9% 6.6% 11.9% 6.9% 7.3% 10.0% 10.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%16.3% 23.0% 34.9% 41.8% 49.1% 59.1% 69.1% 69.1% 69.1% 69.1% 69.1% 69.1% 69.1%

Page 6: penjadwalan proyek

Kontrol

Page 7: penjadwalan proyek

NO NAMA KEGIATAN BIAYA BOBOT KONTROL WAKTU PENYELESAIAN PROYEK (minggu)1 2

1 Pek. Persiapan Rp 5,000,000 1.8%1 1.8% 1.8%1 1.8% 1.8%

2 Pek. Pondasi Rp 30,000,000 10.9%2 10.9% 5.5% 5.5%3 10.9% 5.0% 3.6%

3 Pek. Pemasangan sloof Rp 10,000,000 3.6%1 3.6% 3.6%1 3.6%

4 Pek. Kolom Rp 20,000,000 7.3%2 7.3%2 7.3%

5 Pek. Pasangan dinding Rp 20,000,000 7.3%3 7.3%3 7.3%

6 Pek. Pemasangan kusen Rp 30,000,000 10.9%2 10.9%2 10.9%

7 Pek. Ring balk Rp 20,000,000 7.3%1 7.3%1 7.3%

8 Pek. Atap Rp 70,000,000 25.5%2 25.5%3 10.0%

9 Pek plafon Rp 15,000,000 5.5%2 5.5%2 0.0%

10 Pek. Plesteran dinding Rp 15,000,000 5.5%3 5.5%2 0.0%

11 Pek. Lantai Rp 30,000,000 10.9%2 10.9%2 0.0%

12 Pek. Finishing Rp 10,000,000 3.6%2 3.6%1 0.0%

Rp 275,000,000 100.0% 46Progres rencana 7.3% 9.1%

Progres kumulatif rencana 7.3% 16.4%Progres realisasi 6.8% 3.6%

Progres kumulatif realisasi 6.8% 10.4%

DURASI (minggu)

Page 8: penjadwalan proyek

WAKTU PENYELESAIAN PROYEK (minggu)3 4 5 6 7 8 9 10 11 12 13 14 15

2.3%

3.6%3.6% 3.6%

3.6% 3.6%2.4% 2.4% 2.4%3.0% 2.3% 2.0%

5.5% 5.5%6.0% 4.9%

7.3%7.3%

12.7% 12.7%10.0%

2.7% 2.7%

1.8% 1.8% 1.8%

5.5% 5.5%

1.8% 1.8%

3.6% 6.1% 7.9% 7.9% 7.3% 12.7% 12.7% 4.5% 4.5% 7.3% 5.5% 1.8% 1.8%20.0% 26.1% 33.9% 41.8% 49.1% 61.8% 74.5% 79.1% 83.6% 90.9% 96.4% 98.2% 100%

5.9% 6.6% 11.9% 6.9% 7.3% 10.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%16.3% 23.0% 34.9% 41.8% 49.1% 59.1% 59.1% 59.1% 59.1% 59.1% 59.1% 59.1% 59.1%

Page 9: penjadwalan proyek

Kontrol

Page 10: penjadwalan proyek

NO NAMA KEGIATAN BIAYA BOBOT KONTROL WAKTU PENYELESAIAN PROYEK (minggu)1 2

1 Pek. Persiapan Rp 5,000,000 1.8%1 1.8% 1.8%1 1.8% 1.8%

2 Pek. Pondasi Rp 30,000,000 10.9%2 10.9% 5.5% 5.5%3 10.9% 5.0% 3.6%

3 Pek. Pemasangan sloof Rp 10,000,000 3.6%1 3.6% 3.6%1 3.6%

4 Pek. Kolom Rp 20,000,000 7.3%2 7.3%2 7.3%

5 Pek. Pasangan dinding Rp 20,000,000 7.3%3 7.3%3 7.3%

6 Pek. Pemasangan kusen Rp 30,000,000 10.9%2 10.9%2 10.9%

7 Pek. Ring balk Rp 20,000,000 7.3%1 7.3%1 7.3%

8 Pek. Atap Rp 70,000,000 25.5%2 25.5%3 0.0%

9 Pek plafon Rp 15,000,000 5.5%2 5.5%2 0.0%

10 Pek. Plesteran dinding Rp 15,000,000 5.5%3 5.5%2 0.0%

11 Pek. Lantai Rp 30,000,000 10.9%2 10.9%2 0.0%

12 Pek. Finishing Rp 10,000,000 3.6%2 3.6%1 0.0%

Rp 275,000,000 100.0% 46Progres rencana 7.3% 9.1%

Progres kumulatif rencana 7.3% 16.4%Progres realisasi 6.8% 3.6%

Progres kumulatif realisasi 6.8% 10.4%

DURASI (minggu)

Page 11: penjadwalan proyek

WAKTU PENYELESAIAN PROYEK (minggu)3 4 5 6 7 8 9 10 11 12 13 14 15

2.3%

3.6%3.6% 3.6%

3.6% 3.6%2.4% 2.4% 2.4%3.0% 2.3% 2.0%

5.5% 5.5%6.0% 4.9%

7.3%7.3%

12.7% 12.7%

2.7% 2.7%

1.8% 1.8% 1.8%

5.5% 5.5%

1.8% 1.8%

3.6% 6.1% 7.9% 7.9% 7.3% 12.7% 12.7% 4.5% 4.5% 7.3% 5.5% 1.8% 1.8%20.0% 26.1% 33.9% 41.8% 49.1% 61.8% 74.5% 79.1% 83.6% 90.9% 96.4% 98.2% 100%

5.9% 6.6% 11.9% 6.9% 7.3% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%16.3% 23.0% 34.9% 41.8% 49.1% 49.1% 49.1% 49.1% 49.1% 49.1% 49.1% 49.1% 49.1%

Page 12: penjadwalan proyek

Kontrol

Page 13: penjadwalan proyek

NO NAMA KEGIATAN BIAYA BOBOT KONTROL WAKTU PENYELESAIAN PROYEK (minggu)1 2

1 Pek. Persiapan Rp 5,000,000 1.8%1 1.8% 1.8%1 1.8% 1.8%

2 Pek. Pondasi Rp 30,000,000 10.9%2 10.9% 5.5% 5.5%3 10.9% 5.0% 3.6%

3 Pek. Pemasangan sloof Rp 10,000,000 3.6%1 3.6% 3.6%1 3.6%

4 Pek. Kolom Rp 20,000,000 7.3%2 7.3%2 7.3%

5 Pek. Pasangan dinding Rp 20,000,000 7.3%3 7.3%3 7.3%

6 Pek. Pemasangan kusen Rp 30,000,000 10.9%2 10.9%2 10.9%

7 Pek. Ring balk Rp 20,000,000 7.3%1 7.3%1 0.0%

8 Pek. Atap Rp 70,000,000 25.5%2 25.5%3 0.0%

9 Pek plafon Rp 15,000,000 5.5%2 5.5%2 0.0%

10 Pek. Plesteran dinding Rp 15,000,000 5.5%3 5.5%2 0.0%

11 Pek. Lantai Rp 30,000,000 10.9%2 10.9%2 0.0%

12 Pek. Finishing Rp 10,000,000 3.6%2 3.6%1 0.0%

Rp 275,000,000 100.0% 46Progres rencana 7.3% 9.1%

Progres kumulatif rencana 7.3% 16.4%Progres realisasi 6.8% 3.6%

Progres kumulatif realisasi 6.8% 10.4%

DURASI (minggu)

Page 14: penjadwalan proyek

WAKTU PENYELESAIAN PROYEK (minggu)3 4 5 6 7 8 9 10 11 12 13 14 15

2.3%

3.6%3.6% 3.6%

3.6% 3.6%2.4% 2.4% 2.4%3.0% 2.3% 2.0%

5.5% 5.5%6.0% 4.9%

7.3%

12.7% 12.7%

2.7% 2.7%

1.8% 1.8% 1.8%

5.5% 5.5%

1.8% 1.8%

3.6% 6.1% 7.9% 7.9% 7.3% 12.7% 12.7% 4.5% 4.5% 7.3% 5.5% 1.8% 1.8%20.0% 26.1% 33.9% 41.8% 49.1% 61.8% 74.5% 79.1% 83.6% 90.9% 96.4% 98.2% 100%

5.9% 6.6% 11.9% 6.9% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%16.3% 23.0% 34.9% 41.8% 41.8% 41.8% 41.8% 41.8% 41.8% 41.8% 41.8% 41.8% 41.8%

Page 15: penjadwalan proyek

Kontrol

Page 16: penjadwalan proyek

NO NAMA KEGIATAN BIAYA BOBOT KONTROL WAKTU PENYELESAIAN PROYEK (minggu)1 2

1 Pek. Persiapan Rp 5,000,000 1.8%1 1.8% 1.8%1 1.8% 1.8%

2 Pek. Pondasi Rp 30,000,000 10.9%2 10.9% 5.5% 5.5%3 10.9% 5.0% 3.6%

3 Pek. Pemasangan sloof Rp 10,000,000 3.6%1 3.6% 3.6%1 3.6%

4 Pek. Kolom Rp 20,000,000 7.3%2 7.3%2 7.3%

5 Pek. Pasangan dinding Rp 20,000,000 7.3%3 7.3%3 5.3%

6 Pek. Pemasangan kusen Rp 30,000,000 10.9%2 10.9%2 6.0%

7 Pek. Ring balk Rp 20,000,000 7.3%1 7.3%1 0.0%

8 Pek. Atap Rp 70,000,000 25.5%2 25.5%3 0.0%

9 Pek plafon Rp 15,000,000 5.5%2 5.5%2 0.0%

10 Pek. Plesteran dinding Rp 15,000,000 5.5%3 5.5%2 0.0%

11 Pek. Lantai Rp 30,000,000 10.9%2 10.9%2 0.0%

12 Pek. Finishing Rp 10,000,000 3.6%2 3.6%1 0.0%

Rp 275,000,000 100.0% 46Progres rencana 7.3% 9.1%

Progres kumulatif rencana 7.3% 16.4%Progres realisasi 6.8% 3.6%

Progres kumulatif realisasi 6.8% 10.4%

DURASI (minggu)

Page 17: penjadwalan proyek

WAKTU PENYELESAIAN PROYEK (minggu)3 4 5 6 7 8 9 10 11 12 13 14 15

2.3%

3.6%3.6% 3.6%

3.6% 3.6%2.4% 2.4% 2.4%3.0% 2.3%

5.5% 5.5%6.0%

7.3%

12.7% 12.7%

2.7% 2.7%

1.8% 1.8% 1.8%

5.5% 5.5%

1.8% 1.8%

3.6% 6.1% 7.9% 7.9% 7.3% 12.7% 12.7% 4.5% 4.5% 7.3% 5.5% 1.8% 1.8%20.0% 26.1% 33.9% 41.8% 49.1% 61.8% 74.5% 79.1% 83.6% 90.9% 96.4% 98.2% 100%

5.9% 6.6% 11.9% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%16.3% 23.0% 34.9% 34.9% 34.9% 34.9% 34.9% 34.9% 34.9% 34.9% 34.9% 34.9% 34.9%

Page 18: penjadwalan proyek

Kontrol

Page 19: penjadwalan proyek

NO NAMA KEGIATAN BIAYA BOBOT KONTROL WAKTU PENYELESAIAN PROYEK (minggu)1 2

1 Pek. Persiapan Rp 5,000,000 1.8%1 1.8% 1.8%1 1.8% 1.8%

2 Pek. Pondasi Rp 30,000,000 10.9%2 10.9% 5.5% 5.5%3 10.9% 5.0% 3.6%

3 Pek. Pemasangan sloof Rp 10,000,000 3.6%1 3.6% 3.6%1 3.6%

4 Pek. Kolom Rp 20,000,000 7.3%2 7.3%2 3.6%

5 Pek. Pasangan dinding Rp 20,000,000 7.3%3 7.3%3 3.0%

6 Pek. Pemasangan kusen Rp 30,000,000 10.9%2 10.9%2 0.0%

7 Pek. Ring balk Rp 20,000,000 7.3%1 7.3%1 0.0%

8 Pek. Atap Rp 70,000,000 25.5%2 25.5%3 0.0%

9 Pek plafon Rp 15,000,000 5.5%2 5.5%2 0.0%

10 Pek. Plesteran dinding Rp 15,000,000 5.5%3 5.5%2 0.0%

11 Pek. Lantai Rp 30,000,000 10.9%2 10.9%2 0.0%

12 Pek. Finishing Rp 10,000,000 3.6%2 3.6%1 0.0%

Rp 275,000,000 100.0% 46Progres rencana 7.3% 9.1%

Progres kumulatif rencana 7.3% 16.4%Progres realisasi 6.8% 3.6%

Progres kumulatif realisasi 6.8% 10.4%

DURASI (minggu)

Page 20: penjadwalan proyek

WAKTU PENYELESAIAN PROYEK (minggu)3 4 5 6 7 8 9 10 11 12 13 14 15

2.3%

3.6%3.6% 3.6%

3.6%2.4% 2.4% 2.4%3.0%

5.5% 5.5%

7.3%

12.7% 12.7%

2.7% 2.7%

1.8% 1.8% 1.8%

5.5% 5.5%

1.8% 1.8%

3.6% 6.1% 7.9% 7.9% 7.3% 12.7% 12.7% 4.5% 4.5% 7.3% 5.5% 1.8% 1.8%20.0% 26.1% 33.9% 41.8% 49.1% 61.8% 74.5% 79.1% 83.6% 90.9% 96.4% 98.2% 100%

5.9% 6.6% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%16.3% 23.0% 23.0% 23.0% 23.0% 23.0% 23.0% 23.0% 23.0% 23.0% 23.0% 23.0% 23.0%

Page 21: penjadwalan proyek

Kontrol

Page 22: penjadwalan proyek

NO NAMA KEGIATAN BIAYA BOBOT KONTROL WAKTU PENYELESAIAN PROYEK (minggu)1 2

1 Pek. Persiapan Rp 5,000,000 1.8%1 1.8% 1.8%1 1.8% 1.8%

2 Pek. Pondasi Rp 30,000,000 10.9%2 10.9% 5.5% 5.5%3 10.9% 5.0% 3.6%

3 Pek. Pemasangan sloof Rp 10,000,000 3.6%1 3.6% 3.6%1 3.6%

4 Pek. Kolom Rp 20,000,000 7.3%2 7.3%2 0.0%

5 Pek. Pasangan dinding Rp 20,000,000 7.3%3 7.3%3 0.0%

6 Pek. Pemasangan kusen Rp 30,000,000 10.9%2 10.9%2 0.0%

7 Pek. Ring balk Rp 20,000,000 7.3%1 7.3%1 0.0%

8 Pek. Atap Rp 70,000,000 25.5%2 25.5%3 0.0%

9 Pek plafon Rp 15,000,000 5.5%2 5.5%2 0.0%

10 Pek. Plesteran dinding Rp 15,000,000 5.5%3 5.5%2 0.0%

11 Pek. Lantai Rp 30,000,000 10.9%2 10.9%2 0.0%

12 Pek. Finishing Rp 10,000,000 3.6%2 3.6%1 0.0%

Rp 275,000,000 100.0% 46Progres rencana 7.3% 9.1%

Progres kumulatif rencana 7.3% 16.4%Progres realisasi 6.8% 3.6%

Progres kumulatif realisasi 6.8% 10.4%

DURASI (minggu)

Page 23: penjadwalan proyek

WAKTU PENYELESAIAN PROYEK (minggu)3 4 5 6 7 8 9 10 11 12 13 14 15

2.3%

3.6%3.6% 3.6%

2.4% 2.4% 2.4%

5.5% 5.5%

7.3%

12.7% 12.7%

2.7% 2.7%

1.8% 1.8% 1.8%

5.5% 5.5%

1.8% 1.8%

3.6% 6.1% 7.9% 7.9% 7.3% 12.7% 12.7% 4.5% 4.5% 7.3% 5.5% 1.8% 1.8%20.0% 26.1% 33.9% 41.8% 49.1% 61.8% 74.5% 79.1% 83.6% 90.9% 96.4% 98.2% 100%

5.9% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%16.3% 16.3% 16.3% 16.3% 16.3% 16.3% 16.3% 16.3% 16.3% 16.3% 16.3% 16.3% 16.3%

Page 24: penjadwalan proyek

Kontrol

Page 25: penjadwalan proyek

NO NAMA KEGIATAN BIAYA BOBOT KONTROL WAKTU PENYELESAIAN PROYEK (minggu)1 2

1 Pek. Persiapan Rp 5,000,000 1.8%1 1.8% 1.8%1 1.8% 1.8%

2 Pek. Pondasi Rp 30,000,000 10.9%2 10.9% 5.5% 5.5%3 8.6% 5.0% 3.6%

3 Pek. Pemasangan sloof Rp 10,000,000 3.6%1 3.6% 3.6%1 0.0%

4 Pek. Kolom Rp 20,000,000 7.3%2 7.3%2 0.0%

5 Pek. Pasangan dinding Rp 20,000,000 7.3%3 7.3%3 0.0%

6 Pek. Pemasangan kusen Rp 30,000,000 10.9%2 10.9%2 0.0%

7 Pek. Ring balk Rp 20,000,000 7.3%1 7.3%1 0.0%

8 Pek. Atap Rp 70,000,000 25.5%2 25.5%3 0.0%

9 Pek plafon Rp 15,000,000 5.5%2 5.5%2 0.0%

10 Pek. Plesteran dinding Rp 15,000,000 5.5%3 5.5%2 0.0%

11 Pek. Lantai Rp 30,000,000 10.9%2 10.9%2 0.0%

12 Pek. Finishing Rp 10,000,000 3.6%2 3.6%1 0.0%

Rp 275,000,000 100.0% 46Progres rencana 7.3% 9.1%

Progres kumulatif rencana 7.3% 16.4%Progres realisasi 6.8% 3.6%

Progres kumulatif realisasi 6.8% 10.4%

DURASI (minggu)

Page 26: penjadwalan proyek

WAKTU PENYELESAIAN PROYEK (minggu)3 4 5 6 7 8 9 10 11 12 13 14 15

3.6% 3.6%

2.4% 2.4% 2.4%

5.5% 5.5%

7.3%

12.7% 12.7%

2.7% 2.7%

1.8% 1.8% 1.8%

5.5% 5.5%

1.8% 1.8%

3.6% 6.1% 7.9% 7.9% 7.3% 12.7% 12.7% 4.5% 4.5% 7.3% 5.5% 1.8% 1.8%20.0% 26.1% 33.9% 41.8% 49.1% 61.8% 74.5% 79.1% 83.6% 90.9% 96.4% 98.2% 100%

0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%10.4% 10.4% 10.4% 10.4% 10.4% 10.4% 10.4% 10.4% 10.4% 10.4% 10.4% 10.4% 10.4%

Page 27: penjadwalan proyek

Kontrol

Page 28: penjadwalan proyek

NO NAMA KEGIATAN BIAYA BOBOT KONTROL WAKTU PENYELESAIAN PROYEK (minggu)1 2

1 Pek. Persiapan Rp 5,000,000 1.8%1 1.8% 1.8%1 1.8% 1.8%

2 Pek. Pondasi Rp 30,000,000 10.9%2 10.9% 5.5% 5.5%3 5.0% 5.0%

3 Pek. Pemasangan sloof Rp 10,000,000 3.6%1 3.6% 3.6%1 0.0%

4 Pek. Kolom Rp 20,000,000 7.3%2 7.3%2 0.0%

5 Pek. Pasangan dinding Rp 20,000,000 7.3%3 7.3%3 0.0%

6 Pek. Pemasangan kusen Rp 30,000,000 10.9%2 10.9%2 0.0%

7 Pek. Ring balk Rp 20,000,000 7.3%1 7.3%1 0.0%

8 Pek. Atap Rp 70,000,000 25.5%2 25.5%3 0.0%

9 Pek plafon Rp 15,000,000 5.5%2 5.5%2 0.0%

10 Pek. Plesteran dinding Rp 15,000,000 5.5%3 5.5%2 0.0%

11 Pek. Lantai Rp 30,000,000 10.9%2 10.9%2 0.0%

12 Pek. Finishing Rp 10,000,000 3.6%2 3.6%1 0.0%

Rp 275,000,000 100.0% 46Progres rencana 7.3% 9.1%

Progres kumulatif rencana 7.3% 16.4%Progres realisasi 6.8% 0.0%

Progres kumulatif realisasi 6.8% 6.8%

DURASI (minggu)

Page 29: penjadwalan proyek

WAKTU PENYELESAIAN PROYEK (minggu)3 4 5 6 7 8 9 10 11 12 13 14 15

3.6% 3.6%

2.4% 2.4% 2.4%

5.5% 5.5%

7.3%

12.7% 12.7%

2.7% 2.7%

1.8% 1.8% 1.8%

5.5% 5.5%

1.8% 1.8%

3.6% 6.1% 7.9% 7.9% 7.3% 12.7% 12.7% 4.5% 4.5% 7.3% 5.5% 1.8% 1.8%20.0% 26.1% 33.9% 41.8% 49.1% 61.8% 74.5% 79.1% 83.6% 90.9% 96.4% 98.2% 100%

0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%6.8% 6.8% 6.8% 6.8% 6.8% 6.8% 6.8% 6.8% 6.8% 6.8% 6.8% 6.8% 6.8%

Page 30: penjadwalan proyek

Kontrol

Page 31: penjadwalan proyek

NO NAMA KEGIATAN BIAYA BOBOT KONTROL WAKTU PENYELESAIAN PROYEK (minggu)1 2

1 Pek. Persiapan Rp 5,000,000 1.8%1 1.8% 1.8%1 1.8% 1.8%

2 Pek. Pondasi Rp 30,000,000 10.9%2 10.9% 5.5% 5.5%3 10.9% 5.0% 3.6%

3 Pek. Pemasangan sloof Rp 10,000,000 3.6%1 3.6% 3.6%1 3.6%

4 Pek. Kolom Rp 20,000,000 7.3%2 7.3%2 7.3%

5 Pek. Pasangan dinding Rp 20,000,000 7.3%3 7.3%3 7.3%

6 Pek. Pemasangan kusen Rp 30,000,000 10.9%2 10.9%2 10.9%

7 Pek. Ring balk Rp 20,000,000 7.3%1 7.3%1 7.3%

8 Pek. Atap Rp 70,000,000 25.5%2 25.5%3 25.5%

9 Pek plafon Rp 15,000,000 5.5%2 5.5%2 5.5%

10 Pek. Plesteran dinding Rp 15,000,000 5.5%3 5.5%2 5.5%

11 Pek. Lantai Rp 30,000,000 10.9%2 10.9%2 10.9%

12 Pek. Finishing Rp 10,000,000 3.6%2 3.6%1 3.6%

Rp 275,000,000 100.0% 46Progres rencana 7.3% 9.1%

Progres kumulatif rencana 0 7.3% 16.4%Progres realisasi 6.8% 3.6%

Progres kumulatif realisasi 0 6.8% 10.4%Deviasi tiap minggu 0.5% 5.5%

Deviasi kumulatif 0.5% 6.0%

DURASI (minggu)

Page 32: penjadwalan proyek

WAKTU PENYELESAIAN PROYEK (minggu)3 4 5 6 7 8 9 10 11 12 13 14 15

2.3%

3.6%3.6% 3.6%

3.6% 3.6%2.4% 2.4% 2.4%3.0% 2.3% 2.0%

5.5% 5.5%6.0% 4.9%

7.3%7.3%

12.7% 12.7%10.0% 10.0% 5.5%

2.7% 2.7%3.0% 2.5%1.8% 1.8% 1.8%2.0% 2.0% 1.5%

5.5% 5.5%7.0% 3.9%

1.8% 1.8%3.6%

3.6% 6.1% 7.9% 7.9% 7.3% 12.7% 12.7% 4.5% 4.5% 7.3% 5.5% 1.8% 1.8%20.0% 26.1% 33.9% 41.8% 49.1% 61.8% 74.5% 79.1% 83.6% 90.9% 96.4% 98.2% 100%

5.9% 6.6% 11.9% 6.9% 7.3% 10.0% 10.0% 10.5% 4.5% 8.5% 3.9% 0.0% 3.6%16.3% 23.0% 34.9% 41.8% 49.1% 59.1% 69.1% 79.6% 84.1% 92.6% 96.5% 96.5% 100%-2.3% -0.6% -4.1% 1.0% 0.0% 2.7% 2.7% -6.0% 0.0% -1.2% 1.6% 1.8% -1.8%3.7% 3.1% -1.0% 0.0% 0.0% 2.7% 5.4% -0.5% -0.5% -1.7% -0.1% 1.7% -0.1%

Page 33: penjadwalan proyek

100%

50%

0%