ANALISA SARINGAN (SIEVE ANALISIS) Tanggal Praktikum : 01-10-2010 Dikerjakan Oleh : Kelompok V Jenis Material : Pasir Lokasi Pengambilan : Botu Hasil Pengamatan : Persenta Tertahan 3/4 19.00 0 0 0.00 1/2 12.70 0 0 0.00 3/8 9.50 0 0 0.00 4 4.75 58.5 58.5 4.68 8 2.36 471.7 530.2 42.43 16 1.18 448.3 978.5 78.31 30 0.600 199.3 1177.8 94.26 50 0.30 47 1224.8 98.02 100 0.15 5.4 1230.2 98.46 200 0.075 7.3 1237.5 99.04 pan 12 1249.5 100.00 No. Saringan Ukuran Butir (mm) Berat Tertahan Saringan (Gr) Jumlah Berat Tertahan Saringan (Gr) 0.01 0.10 1.00 10.00 0 10 20 30 40 50 60 70 80 90 100 Ukuran Butir (mm) Lolos Saringan (%)

Upload: rifky

Post on 27-Oct-2015

1.539 views

Category:

Documents


265 download

DESCRIPTION

TEST 2435877777777777777

TRANSCRIPT

Page 1: Pengolahan Data CBR

ANALISA SARINGAN (SIEVE ANALISIS)

Tanggal Praktikum : 01-10-2010Dikerjakan Oleh : Kelompok V Jenis Material : PasirLokasi Pengambilan : Botu

Hasil Pengamatan :

No. SaringanPersentase (%)

Tertahan Lolos

3/4 19.00 0 0 0.00 100.001/2 12.70 0 0 0.00 100.003/8 9.50 0 0 0.00 100.004 4.75 58.5 58.5 4.68 95.328 2.36 471.7 530.2 42.43 57.57

16 1.18 448.3 978.5 78.31 21.6930 0.600 199.3 1177.8 94.26 5.7450 0.30 47 1224.8 98.02 1.98100 0.15 5.4 1230.2 98.46 1.54200 0.075 7.3 1237.5 99.04 0.96pan 12 1249.5 100.00 0.00

Ukuran Butir (mm)

Berat Tertahan Saringan

(Gr)

Jumlah Berat Tertahan Saringan

(Gr)

0.01 0.10 1.00 10.00 100.000

10

20

30

40

50

60

70

80

90

100

Ukuran Butir (mm)

Lo

los

Sa

rin

ga

n (

%)

Page 2: Pengolahan Data CBR

CALIFORNIA BEARING RATIO (Tak Direndam)

Ukuran Silinder : Standar/Modified Jumlah Lapisan : 5 Lapis

Diameter : 15.24 cm Jumlah Tumbukan Tiap Lapis : 10 X

Tinggi : 11.63 cm Tanggal Percobaan : 5/4/2011

Volume Kadar air Optimum : 20%

Tipe Pengujian : Tidak Direndam Material : Lempung

Hasil Pengamatan :

PENETRASIBeban (lbs)

mm inch

0.00 0.00 0.00 36.33 0.000.9 0.64 0.03 36.33 33.421.2 1.27 0.05 36.33 43.602.0 1.91 0.08 36.33 72.662.2 2.54 0.10 36.33 79.932.9 3.18 0.13 36.33 105.363.2 3.81 0.15 36.33 116.264.0 4.45 0.18 36.33 145.324.5 5.04 0.20 36.33 163.485.0 5.72 0.23 36.33 181.655.5 6.35 0.25 36.33 199.825.9 6.99 0.28 36.33 214.356.1 7.62 0.30 36.33 221.616.7 8.26 0.33 36.33 243.417.0 8.89 0.35 36.33 254.317.2 9.53 0.38 36.33 261.587.9 10.16 0.40 36.33 287.018.0 10.80 0.43 36.33 290.648.1 11.43 0.45 36.33 294.278.5 12.07 0.48 36.33 308.81

9.0 12.70 0.50 36.33 326.97

10 x Tumbukan Material

Berat tanah +Mold gr 10026

Berat Mold + Kaki gr 7039

Volume Mold gr 2120.4

Berat tanah basah gr 2987

Berat volume basah 1.41

Kadar air % 23.94

Berat volume kering 1.14

Kadar Air Sebelum SesudahBerat Cawan Kosong (Gr) 20.95 74.78

Berat Cawan + Tanah Basah (Gr) 18.15 71.50

Berat Cawan + Tanah Kering (Gr) 4.00 55.00

Berat Air (Gr) 2.80 3.28

Berat Tanah Kering (Gr) 14.15 16.50

Kadar Air (%) 19.79 19.88

Rata-rata 19.83

NILAI CBR

0,1" 0,2"80

x 100%155

x 100%3000 4500

2.67 3.44

Nilai CBR yang diambil yaitu nilai CBR pada penetrasi 0.1 Inch, Apabila Nilai CBR pada penetrasi 0.1" lebih kecil Dari penetrasi 0.2" maka perlu dilakukan pengujian kembali. Jika setelah dilakukan pengujian ulang hasilnya tetap sama maka Nilai CBR yang diambil adalah nilai CBR yang terbesar. (AASHTO)

: 2122.9 cm3

Angka KalibrasiPembacaan

Arloji

t/m3

t/m3

-0.1 0.0 0.1 0.2 0.3 0.4 0.5 0.60

100

200

300

Grafik CBR

Penetrasi (inch)

Beban (

Lbs)

Page 3: Pengolahan Data CBR

CALIFORNIA BEARING RATIO (Tak Direndam)

Ukuran Silinder : Standar/Modified Jumlah Lapisan : 5 Lapis

Diameter : 15.24 cm Jumlah Tumbukan Tiap Lapis : 25 X

Tinggi : 11.63 cm Tanggal Percobaan : 8 Mei 2011

Volume : 2122.9 cm3 Kadar air Optimum : 20%

Tipe Pengujian : Tidak Direndam Material : Lempung

Hasil Pengamatan :

PENETRASIBeban (lbs)

mm inch

0.00 0.00 0.00 36.33 0.001.2 0.64 0.03 36.33 43.603.1 1.27 0.05 36.33 112.623.8 1.91 0.08 36.33 138.054.2 2.54 0.10 36.33 152.594.8 3.18 0.13 36.33 174.385.0 3.81 0.15 36.33 181.655.9 4.45 0.18 36.33 214.356.2 5.04 0.20 36.33 225.257.0 5.72 0.23 36.33 254.317.2 6.35 0.25 36.33 261.588.0 6.99 0.28 36.33 290.648.2 7.62 0.30 36.33 297.918.9 8.26 0.33 36.33 323.349.1 8.89 0.35 36.33 330.609.9 9.53 0.38 36.33 359.6710.2 10.16 0.40 36.33 370.5710.6 10.80 0.43 36.33 385.1011.0 11.43 0.45 36.33 399.6311.2 12.07 0.48 36.33 406.90

11.8 12.70 0.50 36.33 428.69

Kadar Air Sebelum Sesudah

Berat Cawan Kosong (Gr) 22.22 64.54

Berat Cawan + Tanah Basah (Gr) 19.20 62.87

Berat Cawan + Tanah Kering (Gr) 4.00 54.30

Berat Air (Gr) 3.02 1.67

Berat Tanah Kering (Gr) 15.20 8.57

Kadar Air (%) 19.87 19.49

Rata-rata 19.68

25 x Tumbukan Material

Berat tanah +Mold gr 10260 Berat Mold + Kaki gr 7039

Volume Mold gr 2120.4 Berat tanah basah gr 3221

Berat volume basah 1.52 Kadar air % 19.68

Berat volume kering 1.27

NILAI CBR

0,1" 0,2"130 x 100% 225 x 100%

3000 45004.33 5.00

Nilai CBR yang diambil yaitu nilai CBR pada penetrasi 0.1 Inch,

Apabila Nilai CBR pada penetrasi 0.1" lebih kecil Dari penetrasi 0.2"

Angka KalibrasiPembacaan

Arloji

t/m3

t/m3

0.0 0.1 0.2 0.3 0.4 0.5 0.60

100

200

300

400

500

Grafik CBR

Penetrasi (inch)

Beban (

Lbs)

Page 4: Pengolahan Data CBR

maka perlu dilakukan pengujian kembali. Jika setelah dilakukan pengujian ulang hasilnya tetap sama maka Nilai CBR yang diambil adalah nilai CBR yang terbesar. (AASHTO)

CALIFORNIA BEARING RATIO (Tak Direndam)

Ukuran Silinder : Standar / Modified Jumlah Lapisan : 5 Lapis

Diameter : 15.24 cm Jumlah Tumbukan Tiap Lapis : 56 X

Tinggi : 11.63 cm Tanggal Percobaan : 5/4/2011

Volume Kadar air Optimum : 20%

Tipe Pengujian : Tidak Direndam Material : Lempung

Hasil Pengamatan :

PENETRASIBeban (lbs)

mm inch

0.00 0.00 0.00 36.33 0.003.5 0.64 0.03 36.33 127.164.4 1.27 0.05 36.33 159.855.0 1.91 0.08 36.33 181.656.0 2.54 0.10 36.33 217.987.2 3.18 0.13 36.33 261.587.8 3.81 0.15 36.33 283.378.2 4.45 0.18 36.33 297.919.0 5.04 0.20 36.33 326.979.2 5.72 0.23 36.33 334.249.2 6.35 0.25 36.33 334.249.5 6.99 0.28 36.33 345.1410.5 7.62 0.30 36.33 381.4711.0 8.26 0.33 36.33 399.6311.8 8.89 0.35 36.33 428.6912.4 9.53 0.38 36.33 450.4913.0 10.16 0.40 36.33 472.2913.5 10.80 0.43 36.33 490.4614.2 11.43 0.45 36.33 515.8914.6 12.07 0.48 36.33 530.42

15.4 12.70 0.50 36.33 559.48

Kadar Air Sebelum SesudahBerat Cawan + Tanah Basah (Gr) 22.22 64.54

Berat Cawan + Tanah Kering (Gr) 19.20 62.87

Berat Cawan (Gr) 4.00 54.30

Berat Air (Gr) 3.02 1.67

Berat Tanah Kering (Gr) 15.20 8.57

Kadar Air (%) 19.87 19.49

Rata-rata 19.68

56 x Tumbukan Material Berat tanah +Mold gr 10470

Berat Mold + Kaki gr 7039

Volume Mold gr 2120.4

Berat tanah basah gr 3431

Berat volume basah 1.62

Kadar air % 23.67

Berat volume kering 1.31

NILAI CBR

0,1" 0,2"180 x 100% 300 x 100%

3000 4500

6.00 6.67

: 2122.9 cm3

Angka KalibrasiPembacaan

Arloji

t/m3

t/m3

0.0 0.1 0.2 0.3 0.4 0.5 0.60

100

200

300

400

500

Grafik CBR

Penetrasi (inch)

Beban (

Lbs)

Page 5: Pengolahan Data CBR

Nilai CBR yang diambil yaitu nilai CBR pada penetrasi 0.1 Inch,

Apabila Nilai CBR pada penetrasi 0.1" lebih kecil Dari penetrasi 0.2"

maka perlu dilakukan pengujian kembali. Jika setelah dilakukan pengujian ulang hasilnya tetap sama maka Nilai CBR yang diambil adalah nilai CBR yang terbesar. (AASHTO)

CALIFORNIA BEARING RATIO (Rendaman)

Ukuran Silinder : Standar/Modified Jumlah Lapisan : 5 Lapis

Diameter : 15.24 cm Jumlah Tumbukan Tiap Lapis : 10 X

Tinggi : 11.63 cm Tanggal Percobaan : 5/4/2011

Volume Kadar air Optimum : 20%

Tipe Pengujian : Direndam Material : Lempung

Hasil Pengamatan :

PENETRASIBeban (lbs)

mm inch

0.00 0.00 0.00 36.33 0.000.4 0.80 0.03 36.33 14.530.8 1.40 0.06 36.33 29.061.2 1.91 0.08 36.33 43.601.6 2.60 0.10 36.33 58.132.0 3.18 0.13 36.33 72.662.2 3.81 0.15 36.33 79.932.6 4.45 0.18 36.33 94.462.9 5.04 0.20 36.33 105.363.1 5.72 0.23 36.33 112.623.5 6.35 0.25 36.33 127.164.1 6.99 0.28 36.33 148.95

4.3 7.62 0.30 36.33 156.224.6 8.26 0.33 36.33 167.124.7 8.89 0.35 36.33 170.755.0 9.53 0.38 36.33 181.655.2 10.16 0.40 36.33 188.925.4 10.80 0.43 36.33 196.185.7 11.43 0.45 36.33 207.085.9 12.07 0.48 36.33 214.35

6.0 12.70 0.50 36.33 217.98

Kadar Air Sebelum direndam Sesudah direndamBerat Cawan Kosong (Gr) 2.9 3.3

Berat Cawan + Tanah Basah (Gr) 20.19 18.17

Berat Cawan + Tanah Kering (Gr) 17.34 15.3Berat Air (Gr) 2.85 2.87Berat Tanah Kering (Gr) 14.44 12Kadar Air (%) 19.74 23.92

10 x Tumbukan Sebelum Sesudah Berat tanah +Mold gr 10020 10020 Berat Mold gr 7039 7039 Volume Mold gr 2120.4 2120.4 Berat tanah basah gr 2981 2981

Berat volume basah 1.41 1.41 Kadar air % 23.50 29.30

Berat volume kering 1.14 1.09

NILAI CBR0,1" 0,2"

50 x 100% 110 x 100%

: 2122.9 cm3

Angka KalibrasiPembacaan

Arloji

t/m3

t/m3

-0.1 0.0 0.1 0.2 0.3 0.4 0.5 0.60

20

40

60

80

100

120

140

160

180

200

Grafik CBR

Penetrasi (inch)

Bebanh (

Lbs)

Page 6: Pengolahan Data CBR

3000 45001.67 2.44

Nilai CBR yang diambil yaitu nilai CBR pada penetrasi 0.1 Inch, Apabila Nilai CBR pada penetrasi 0.1" lebih kecil Dari penetrasi 0.2" maka perlu dilakukan pengujian kembali. Jika setelah dilakukan

pengujian ulang hasilnya tetap sama maka Nilai CBR yang diambil

adalah nilai CBR yang terbesar. (AASHTO)

CALIFORNIA BEARING RATIO (Rendaman)

Ukuran Silinder : Standar/Modified Jumlah Lapisan : 5 Lapis

Diameter : 15.24 cm Jumlah Tumbukan Tiap Lapis : 25 X

Tinggi : 11.63 cm Tanggal Percobaan : 5/4/2011

Volume Kadar air Optimum : 20%

Tipe Pengujian : Direndam Material Lempung

Hasil Pengamatan :

PENETRASIBeban (lbs)

mm inch

0.00 0.00 0.00 36.33 0.001.0 0.64 0.03 36.33 36.331.2 1.27 0.05 36.33 43.601.6 1.91 0.08 36.33 58.132.0 2.54 0.10 36.33 72.662.2 3.18 0.13 36.33 79.932.5 3.81 0.15 36.33 90.823.0 4.45 0.18 36.33 108.993.5 5.04 0.20 36.33 127.163.8 5.72 0.23 36.33 138.054.3 6.35 0.25 36.33 156.22

4.5 6.99 0.28 36.33 163.484.7 7.62 0.30 36.33 170.755.0 8.26 0.33 36.33 181.655.2 8.89 0.35 36.33 188.925.6 9.53 0.38 36.33 203.455.8 10.16 0.40 36.33 210.716.0 10.80 0.43 36.33 217.986.3 11.43 0.45 36.33 228.886.5 12.07 0.48 36.33 236.14

6.8 12.70 0.50 36.33 247.04

Kadar Air Sebelum direndam Sesudah direndam

Berat Cawan Kosong (Gr) 3.3 4

Berat Cawan + Tanah Basah (Gr) 22.2 22.6Berat Cawan + Tanah Kering (Gr) 19.08 19.2Berat Air (Gr) 3.12 3.4Berat Tanah Kering (Gr) 15.78 15.2Kadar Air (%) 19.77 22.37

25 x Tumbukan Sebelum Sesudah

Berat tanah +Mold gr 10265 10262 Berat Mold + Kaki gr 7039 7039 Volume Mold gr 2120.4 2120.4 Berat tanah basah gr 3226 3223 Berat volume basah 1.52 1.52 Kadar air % 19.77 22.37

Berat volume kering 1.27 1.24

: 2122.9 cm3

Angka KalibrasiPembacaan

Arloji

t/m3

t/m3

-0.1 0.0 0.1 0.2 0.3 0.4 0.5 0.60

50

100

150

200

250

Grafik CBR

Penetrasi (inch)

Beban (

Lbs)

Page 7: Pengolahan Data CBR

NILAI CBR

0,1" 0,2"60 x 100% 130 x 100%

3000 45002.00 2.89

Nilai CBR yang diambil yaitu nilai CBR pada penetrasi 0.1 Inch, Apabila Nilai CBR pada penetrasi 0.1" lebih kecil Dari penetrasi 0.2" maka perlu dilakukan pengujian kembali. Jika setelah dilakukan pengujian ulang hasilnya tetap sama maka Nilai CBR yang diambil adalah nilai CBR yang terbesar. (AASHTO)

CALIFORNIA BEARING RATIO (Rendaman)

Ukuran Silinder : Standar/Modified Jumlah Lapisan : 5 Lapis

Diameter : 15.24 cm Jumlah Tumbukan Tiap Lapis : 56 X

Tinggi : 11.63 cm Tanggal Percobaan : 5/4/2011

Volume Kadar air Optimum : 20%

Tipe Pengujian : Direndam Material : Lempung

Hasil Pengamatan :

PENETRASIBeban (lbs)

mm inch

0.00 0.00 0.00 31.67 0.001.2 0.64 0.03 31.67 38.011.6 1.27 0.05 31.67 50.672.0 1.91 0.08 31.67 63.342.4 2.54 0.10 31.67 76.012.8 3.18 0.13 31.67 88.683.0 3.81 0.15 31.67 95.013.5 4.45 0.18 31.67 110.854.0 5.04 0.20 31.67 126.684.2 5.72 0.23 31.67 133.02

4.6 6.35 0.25 31.67 145.69

5.0 6.99 0.28 31.67 158.36

5.2 7.62 0.30 31.67 164.69

5.8 8.26 0.33 31.67 183.696.0 8.89 0.35 31.67 190.036.5 9.53 0.38 31.67 205.867.0 10.16 0.40 31.67 221.707.2 10.80 0.43 31.67 228.037.4 11.43 0.45 31.67 234.377.8 12.07 0.48 31.67 247.03

8.0 12.70 0.50 36.33 290.64

Kadar Air Sebelum direndam Sesudah direndamBerat Cawan Kosong (Gr) 3.1 3.3Berat Cawan + Tanah Basah (Gr) 23.2 22.59Berat Cawan + Tanah Kering (Gr) 19.9 18.9Berat Air (Gr) 3.3 3.69Berat Tanah Kering (Gr) 16.8 15.6Kadar Air (%) 19.64 23.65

56 x Tumbukan Sebelum Sesudah Berat tanah +Mold gr 10472 10472 Berat Mold + Kaki gr 7032 7032 Volume Mold gr 2120.4 2120.4 Berat tanah basah gr 3440 3440

: 2122.9 cm3

Angka KalibrasiPembacaan

Arloji

-0.1 0.0 0.1 0.2 0.3 0.4 0.5 0.60

50

100

150

200

250

300

Grafik CBR

Penetrasi (inch)

Beban (

Lbs)

Page 8: Pengolahan Data CBR

Berat volume basah 1.62 1.62 Kadar air % 19.64 23.65

Berat volume kering 1.36 1.31

NILAI CBR

0,1" 0,2"60 x 100% 110 x 100%

3000 45002.00 2.44

t/m3

t/m3

Page 9: Pengolahan Data CBR

PENGUJIAN STANDARD PENETRATION TEST (SPT)

Tanggal Praktikum : 26-11-2009Dikerjakan Oleh : Kelompok VILokasi Pengujian : Jalan baru menuju pembangunan RUSUNAWA

Hasil Pengamatan :

Titik Nilai N Jenis Tanah Warna Tanah Sifat TanahGRAFIK STANDARD PENETRATION TEST

(SPT)

A

N1 0.15 2

5

Lempung Abu-abu Sangat Lunak Nilai N

N2 0.30 3 Lempung Abu-abu kehitaman Sangat Lunak (Jumlah Pukulan)

N3 0.45 3 Lempung Abu-abu kehitaman Sangat Lunak 0.45 2

B

N1 0.60 2

10

Lempung Abu-abu kehitaman Sangat Lunak 0.90 3

N2 0.75 2 Lempung Abu-abu kehitaman Sangat Lunak 1.35 2

N3 0.90 6 Lempung Abu-abu kehitaman Sangat Lunak 1.80 32

C

N1 1.05 5

8

Lempung Abu-abu kehitaman Sangat Lunak 2.25 26

N2 1.20 3 Lempung Abu-abu kehitaman Sangat Lunak 2.70 30

N3 1.35 5 Lempung Abu-abu kehitaman Sangat Lunak 3.15 25

D

N1 1.50 10

32

Lempung Abu-abu kehitaman Sangat Lunak 3.60 63

N2 1.65 15 Lempung Abu-abu kehitaman Sangat Lunak Keterangan :N3 1.80 17 Lempung Abu-abu kehitaman Sangat Lunak

E

N1 1.95 12

26

Lempung Abu-abu kehitaman Sangat Lunak Karena jumlah pukulan

N2 2.10 10 Lempung Abu-abu kehitaman Sangat Lunak (N > 60) maka pengujian ini

N3 2.25 16 Lempung Abu-abu plastis dihentikan.

F

N1 2.40 10

30

Lempung Abu-abu plastis

N2 2.55 13 Lempung Abu-abu plastis

N3 2.70 17 Lempung Abu-abu plastis

G

N1 2.85 8

25

Lempung Abu-abu plastis

N2 3.00 11 Lempung Abu-abu plastis

N3 3.15 14 Lempung kepasiran Abu-abu plastis

H

N1 3.30 18

63

Lempung kepasiran Abu-abu Kasar

Kedalaman (m)

Jumlah Pukulan/15 Cm

N = N2 + N3 (Pukulan)

Kedalaman (m)

0 30 60 900.00

0.45

0.90

1.35

1.80

2.25

2.70

3.15

3.60

Nilai N (Jumlah Pukulan)

Ked

alam

an (m

)

Page 10: Pengolahan Data CBR

H N2 3.45 25 63 Lempung kepasiran Abu-abu Kasar

N3 3.60 38 Lempung kepasiran Abu-abu Kasar

0 30 60 900.00

0.45

0.90

1.35

1.80

2.25

2.70

3.15

3.60

Nilai N (Jumlah Pukulan)

Ked

alam

an (m

)

Page 11: Pengolahan Data CBR

PENGUJIAN BORING

Tanggal Praktikum : -12-2009Dikerjakan Oleh : Kelompok VI Lokasi Pengujian : Jalan baru menuju pembangunan RUSUNAWA

Hasil Pengamatan :

ProfilDeskripsi Tanah

Jenis Warna Sifat

20 Lempung coklat lunak

40 Lempung coklat keras

60 Lempung coklat keras

80 Lempung kepasiran coklat keras

100 Lempung kepasiran coklat muda sangat keras

Kedalaman (cm)