   K   a   r    t   a  .    1    5    J   u   n    i    2    0    1    3    BLASTING BLASTING    P    N    V   e    t   e   r   a   n    Y   o   g   y   a    k     T   e    k   n   o    l   o   g    i    M    i   n   e   r   a    l  Y ogyakarta 15 Juni 2013 Seminar Nasional Peledakan   u    t    B    l   a   s    t    i   n   g    F   a    k   u    l    t   a  Pada Penambangan Bahan Galian Himpunan Mahasiswa T eknik Pertambangan   o   u   n    d    B   r   e   a    k    i   n   g   w    i    t    h  Universitas Pembangunan Nasional “VETERAN” Yogyakarta    G   r  President of Indonesian Rock Mechanics Society President of Indonesian Rock Mechanics Society Manajer Laboratorium Geomekanika dan Peralatan Tambang ITB Manajer Laboratorium Geomekanika dan Peralatan Tambang ITB PT. Bumi Resources Minerals Tbk PT. Bumi Resources Minerals Tbk

Upload: maurit-francius-simanjuntak

Post on 25-Feb-2018

237 views

Category:

Documents


0 download

TRANSCRIPT

7/25/2019 Pak Suseno Kramadibrata

http://slidepdf.com/reader/full/pak-suseno-kramadibrata 1/52

   K

  a  r   t  a .

   1   5   J  u  n   i   2   0   1   3  -  

BLASTINGBLASTING

   P   N   V  e   t  e  r  a  n   Y  o  g  y  a   k

    T  e   k  n  o   l  o  g   i   M   i  n  e  r  a   l

 Yogyakarta 15 Juni 2013

Seminar Nasional Peledakan

  u   t   B   l  a  s   t   i  n  g   F  a   k  u   l   t  a

 

Pada Penambangan Bahan Galian

Himpunan Mahasiswa Teknik Pertambangan

  o  u  n   d   B  r  e  a   k   i  n  g  w   i   t   h

 Universitas Pembangunan Nasional “VETERAN” Yogyakarta

   G  r  

President of Indonesian Rock Mechanics SocietyPresident of Indonesian Rock Mechanics Society

Manajer Laboratorium Geomekanika dan Peralatan Tambang ITBManajer Laboratorium Geomekanika dan Peralatan Tambang ITB

PT. Bumi Resources Minerals TbkPT. Bumi Resources Minerals Tbk

7/25/2019 Pak Suseno Kramadibrata

http://slidepdf.com/reader/full/pak-suseno-kramadibrata 2/52

   K

Klasifikasi Ground Breaking Tambang TerbukaKlasifikasi Ground Breaking Tambang Terbuka

Strong & Compact

  a  r   t  a .

   1   5   J  u  n   i   2   0   1   3  -

Soft - Strong

   P   N   V  e   t  e  r  a  n   Y  o  g  y  a   k

    T  e   k  n  o   l  o  g   i   M   i  n  e  r  a   l

  u   t   B   l  a  s   t   i  n  g   F  a   k  u   l   t  a

  o  u  n   d   B  r  e  a   k   i  n  g  w   i   t   h

   G  r

222

7/25/2019 Pak Suseno Kramadibrata

http://slidepdf.com/reader/full/pak-suseno-kramadibrata 3/52

   K

Ground BreakingGround Breaking

  a  r   t  a .

   1   5   J  u  n   i   2   0   1   3  -

Mechanical Ground Breaking

Free Di in

   P   N   V  e   t  e  r  a  n   Y  o  g  y  a   k

Ripping

Rock Cutting

    T  e   k  n  o   l  o  g   i   M   i  n  e  r  a   l  

  u   t   B   l  a  s   t   i  n  g   F  a   k  u   l   t  a

-

Rock Cutting

Machines

  o  u  n   d   B  r  e  a   k   i  n  g  w   i   t   h

No-Blasting

   G  r

No-Loading

No-Crushing

7/25/2019 Pak Suseno Kramadibrata

http://slidepdf.com/reader/full/pak-suseno-kramadibrata 4/52

   K

Perbandingan Penggalian Mekanis vs.Perbandingan Penggalian Mekanis vs.

  a  r   t  a .

   1   5   J  u  n   i   2   0   1   3  -  

Keuntungan Kerugian

   P   N   V  e   t  e  r  a  n   Y  o  g  y  a   k

Umumnya memberikan kemajuan lebih cepat daripada pemboran peledakan pada batuan soft –

medium hard rock

Tidak mampu menggali material sangat keras kecualimenggunakan TBM khusus

    T  e   k  n  o   l  o  g   i   M   i  n  e  r  a   l

Lebih sedikit menggunakan peralatan operasi Biaya modal tinggi

Profile penggalian halus, seragam & tetap untuk

full face machines (TBM) Membutuhkan perawatan khusus

  u   t   B   l  a  s   t   i  n  g   F  a   k  u   l   t  a Tidak ada kerusakan retakan atau hancuran akibat

getaran peledakanTidak flexible

Inherently safer Perlu konsistensi jenis batuan, sifat geomekanik,

eolo i struktur & hidro eolo i

  o  u  n   d   B  r  e  a   k   i  n  g  w   i   t   h

 

Banyak variasi aplikasiKeausan gigi gali meningkat drastis saat menggali

batuan kuat & abrasif 

Gaya reaksi tinggi untuk konvensional disc cutter

   G  r

44

 

7/25/2019 Pak Suseno Kramadibrata

http://slidepdf.com/reader/full/pak-suseno-kramadibrata 5/52

   K

Tipe Gigi Gali Penggalian MekanisTipe Gigi Gali Penggalian Mekanis

  a  r   t  a .

   1   5   J  u  n   i   2   0   1   3  -

Drag bit atau pick. Keduanya menggunakan gaya yang tegak lurus terhadap permukaan

batuan – tensile cracking leading to rock failure

Indenter. Alat ini memecah batuan dengan menggunakan sebuah gaya yang pada

   P   N   V  e   t  e  r  a  n   Y

  o  g  y  a   k umumnya ega urus er a ap mu a a uan – ens e crac ng ea ng o roc a ure

    T  e   k  n  o   l  o  g   i   M   i  n  e  r  a   l

  u   t   B   l  a  s   t   i  n  g   F  a   k  u   l   t  a

  o  u  n   d   B  r  e  a   k   i  n  g  w   i   t

   h

   G  r

7/25/2019 Pak Suseno Kramadibrata

http://slidepdf.com/reader/full/pak-suseno-kramadibrata 6/52

   K

Klasifikasi Penggalian Mekanik Kontinu BawahKlasifikasi Penggalian Mekanik Kontinu Bawah

  a  r   t  a .

   1   5   J  u  n   i   2   0   1   3  -  

   P   N   V  e   t  e  r  a  n   Y

  o  g  y  a   k

    T  e   k  n  o   l  o  g   i   M   i  n  e  r  a   l

  u   t   B   l  a  s   t   i  n  g   F  a   k  u   l   t  a

  o  u  n   d   B  r  e  a   k   i  n  g  w   i   t

   h

   G  r

7/25/2019 Pak Suseno Kramadibrata

http://slidepdf.com/reader/full/pak-suseno-kramadibrata 7/52

   K

Skematik Diagram Penggalian di TambangSkematik Diagram Penggalian di Tambang

Terbuka & Bawah TanahTerbuka & Bawah Tanah

  a  r   t  a .

   1   5   J  u  n   i   2   0   1   3  - www.slideshare.net/sankarsulimellawww.slideshare.net/sankarsulimella

   P   N   V  e   t  e  r  a  n   Y

  o  g  y  a   k

    T  e   k  n

  o   l  o  g   i   M   i  n  e  r  a   l

  u   t   B   l  a  s   t   i  n  g   F  a   k  u   l   t  a

  o  u  n   d   B  r  e  a   k   i  n  g  w   i   t

   h

   G  r

77

7/25/2019 Pak Suseno Kramadibrata

http://slidepdf.com/reader/full/pak-suseno-kramadibrata 8/52

   K

Aplikasi Alat Gali Mekanik Kontinyu vs. UCSAplikasi Alat Gali Mekanik Kontinyu vs. UCS

  a  r   t  a .

   1   5   J  u  n   i   2   0   1   3  -

TBM Tunnel Boring Machine

   P   N   V  e   t  e  r  a  n   Y

  o  g  y  a   k

MTM Mobile

 Tunnel

 Miner

T‐3 Heavy Duty Road Header > 100 t

    T  e   k  n

  o   l  o  g   i   M   i  n  e  r  a   l

T‐2 Medium sized roadheader 70‐90 t

T‐1 Compact roadheader 40‐65 t

  u   t   B   l  a  s   t   i  n  g   F  a   k  u   l   t  a   CM  Cont nuous M ner

Unconfined Compressive Strength (MPa) 0 50 100 150 200 250

  o  u  n   d   B  r  e  a   k   i  n  g  w   i   t   h

   G  r

88

7/25/2019 Pak Suseno Kramadibrata

http://slidepdf.com/reader/full/pak-suseno-kramadibrata 9/52

   K

Klasifikasi Alat Gali Mekanis KontinyuKlasifikasi Alat Gali Mekanis Kontinyu

  a  r   t  a .

   1   5   J  u  n   i   2   0   1   3  -

Surface Miner 

   P   N   V  e   t  e  r  a  n   Y

  o  g  y  a   k

Tambang Terbuka

 Auger Miner 

    T  e   k  n

  o   l  o  g   i   M   i  n  e  r  a   l

Tambang Bawah Tanah

Hard Rock Soft Rock

  u   t   B   l  a  s   t   i  n  g   F  a   k  u   l   t  a

Roadheader Roadheader  

  o  u  n   d   B  r  e  a   k   i  n  g  w   i   t   h

on nuous ner 

Mobile Miner Shearer  

   G  r

99

Raise Borer 

7/25/2019 Pak Suseno Kramadibrata

http://slidepdf.com/reader/full/pak-suseno-kramadibrata 10/52

   K

Surface MinersSurface MinersLimestone quarry

UCS 40 - 110 MPa, 187 t/h

  a  r   t  a .

   1   5   J  u  n   i   2   0   1   3  -

   P   N   V  e   t  e  r  a  n   Y

  o  g  y  a   k

Middle Front Cutting Front Cutting

    T  e   k  n

  o   l  o  g   i   M   i  n  e  r  a   l Drum Boom Wheel

Cutting width [mm] 250 - 4200 5250 7100

Cutting depth/height

[mm]0 - 800 1000/5500 0 - 2900

Capacity related to material characteristics

  u   t   B   l  a  s   t   i  n  g   F  a   k  u   l   t  a

Weight [t] 40 - 190 135 540

Installed power [kW] 450 - 1200 750 3340

Manufacturer Wirtgen/

Bitelli /HuronVoest Alpin

Krupp

Fördertechnik

  o  u  n   d   B  r  e  a   k   i  n  g  w   i   t   h ospor e

UCS 50 MPa, 700 t/h

   G  r

7/25/2019 Pak Suseno Kramadibrata

http://slidepdf.com/reader/full/pak-suseno-kramadibrata 11/52

   K

Auger Mining vs. Stripping RatioAuger Mining vs. Stripping Ratio

  a  r   t  a .

   1   5   J  u  n   i   2   0   1   3  -

 Aplikasi Auger saat SR tinggi, ekonomi, jenis batuan, geoteknik, geologi

   P   N   V  e   t  e  r  a  n   Y

  o  g  y  a   k  

Teknologi Auger: Single Augers

    T  e   k  n

  o   l  o  g   i   M   i  n  e  r  a   l

 

Rigid Module Continue Highwall Miners

Single Spiral Auger adalah teknologi50 tahun terakhir dan dikenalkan di

  u   t   B   l  a  s   t   i  n  g   F  a   k  u   l   t  a

 

US dan Australia

Cutting head auger tunggal

berdiameter 0,7 m - 1,9 m

  o  u  n   d   B  r  e  a   k   i  n  g  w   i   t   h

Berat Auger bisa mencapai lebih dari75 ton

   G  r

1111

7/25/2019 Pak Suseno Kramadibrata

http://slidepdf.com/reader/full/pak-suseno-kramadibrata 12/52

   K

PenerowonganPenerowongan

  a  r   t  a .

   1   5   J  u  n   i   2   0   1   3  -

   P   N   V  e   t  e  r  a  n   Y

  o  g  y  a   k

    T  e   k  n

  o   l  o  g   i   M   i  n  e  r  a   l

  u   t   B   l  a  s   t   i  n  g   F  a   k  u   l   t  a

  o  u  n   d   B  r  e  a   k   i  n  g  w   i   t   h

   G  r

1212

7/25/2019 Pak Suseno Kramadibrata

http://slidepdf.com/reader/full/pak-suseno-kramadibrata 13/52

   K

Penerowongan Konstruksi SipilPenerowongan Konstruksi Sipil

  a  r   t  a .

   1   5   J  u  n   i   2   0   1   3  -

   P   N   V  e   t  e  r  a  n   Y

  o  g  y  a   k

    T  e   k  n

  o   l  o  g   i   M   i  n  e  r  a   l

  u   t   B   l  a  s   t   i  n  g   F  a   k  u   l   t  a

  o  u  n   d   B  r  e  a   k   i  n  g  w   i   t   h

   G  r

1313

7/25/2019 Pak Suseno Kramadibrata

http://slidepdf.com/reader/full/pak-suseno-kramadibrata 14/52

   K

Nusantara TunnelNusantara Tunnel

  a  r   t  a .

   1   5   J  u  n   i   2   0   1   3  -

   P   N   V  e   t  e  r  a  n   Y

  o  g  y  a   k

    T  e   k  n

  o   l  o  g   i   M   i  n  e  r  a   l

  u   t   B   l  a  s   t   i  n  g   F  a   k  u   l   t  a

  o  u  n   d   B  r  e  a   k   i  n  g  w   i

   t   h

   G  r

7/25/2019 Pak Suseno Kramadibrata

http://slidepdf.com/reader/full/pak-suseno-kramadibrata 15/52

   K

Bangkok Metro Blue LineBangkok Metro Blue Line

http://www.tunnels.mottmac.com/projectshttp://www.tunnels.mottmac.com/projects

  a  r   t  a .

   1   5   J  u  n   i   2   0   1   3  -

   P   N   V  e   t  e  r  a  n   Y

  o  g  y  a   k

    T  e   k  n

  o   l  o  g   i   M   i  n  e  r  a   l

Kapasitas

250 000 orang/hari Se an an 20 km berada dibawah wila ah adat

  u   t   B   l  a  s   t   i  n  g   F  a   k  u   l   t  a

KonstruksiTwin tunnel 17 km panjang, dia 5.7m

Tantangan Geoteknik

  o  u  n   d   B  r  e  a   k   i  n  g  w   i

   t   h 

Timbul “ground settlement” akibat penggalian terowonganMRT

Deformasi horison batuan saat “Earth Pressure Balanced

”   G  r  

7/25/2019 Pak Suseno Kramadibrata

http://slidepdf.com/reader/full/pak-suseno-kramadibrata 16/52

   K

  a  r   t  a .

   1   5   J  u  n   i   2   0   1   3  -

PenerowonganPenerowongan

Tambang BijihTambang Bijih

   P   N   V  e   t  e  r  a  n   Y

  o  g  y  a   k awa anaawa ana

    T  e   k  n

  o   l  o  g   i   M   i  n  e  r  a   l

Lower Kalamazo copper ore body (San Manuel, Arizona USA) ore

body development 12800 m by TBM (Cigla, Yagiz, Ozdemir)

  u   t   B   l  a  s   t   i  n  g   F  a   k  u   l   t  a

  o  u  n   d   B  r  e  a   k   i  n  g  w   i   t   h

   G  r

1616

7/25/2019 Pak Suseno Kramadibrata

http://slidepdf.com/reader/full/pak-suseno-kramadibrata 17/52

   K

Klasifikasi Roadheader Klasifikasi Roadheader (Nuh BILGIN, Cemal BALCI, Istanbul(Nuh BILGIN, Cemal BALCI, Istanbul – – 2005)2005)

  a  r   t  a .

   1   5   J  u  n   i   2   0   1   3  -

   P   N   V  e   t  e  r  a  n   Y

  o  g  y  a   k

Tipe Berat (ton)

Cutterhead

Power (kW)

uas

Penggalian(m2)

UCS

(MPa) RQD (%)

    T  e   k  n

  o   l  o  g   i   M   i  n  e  r  a   l   - - – -

Medium Duty 40-70 160 – 230 30 60 – 90 -

  u   t   B   l  a  s   t   i  n  g   F  a   k  u   l   t  a

Heavy Duty 70-110 250 – 300 40 90 – 110 < 80

Extra Heavy> 110 350 – 400 45 110 - 140 < 60

  o  u  n   d   B  r  e  a   k   i  n  g  w   i   t   h u y

   G  r

1717

7/25/2019 Pak Suseno Kramadibrata

http://slidepdf.com/reader/full/pak-suseno-kramadibrata 18/52

   K

Road HeadersRoad Headers

  a  r   t  a .

   1   5   J  u  n   i   2   0   1   3  -

 Aplikasi RH:

Variasi jenis batuan, sifat geomekanik, struktur geologi dan hidrogeologi mengijinkan

   P   N   V  e   t  e  r  a  n   Y  o  g  y  a   k  

Meningkatkan safety

Berkurang kebutuhan ground support dan tenaga kerja

Penggalian dengan RH:

   T  e   k  n

  o   l  o  g   i   M   i  n  e  r  a   l

Underground partial-face excavation machines pada batuan lunak hingga sedang

Development & production di non underground hard rock mining; main haluge drifts, roadway, cross cut

Konstruksi sipil; pembuatan jalan KA, roadway, sewer, diversion tunnel atau untuk memperbesar

struktur bawah tanah

  u   t   B   l  a  s   t   i  n  g   F  a   k  u   l   t  a Karakteristik umum RH saat kini:

Berat mesin s/d 120 ton – lebih stabil dan kaku

Cutter head power 500 kW bisa menggali batuan UCS 100 MPa dan bahkan hingga 160 MPa asalkan

 joint spacing sekitar 30 cm

  o  u  n   d   B  r  e  a   k   i  n  g  w   i   t   h

Luas penampang penggalian hingga 100 m2

Pemuatan dan pengangkutan material hasil galian

Remote control dan laser guide alignment

Bisa dilen ka i den an alat rock boltin dan dust su ression   G  r

Roadheader menjadi tidak ekonomis jika konsumsi gigi gali mencapai 1 pick/m3

1818

7/25/2019 Pak Suseno Kramadibrata

http://slidepdf.com/reader/full/pak-suseno-kramadibrata 19/52

   K

Cutting ModeCutting Mode TransversalTransversal Roadheader Roadheader 

  a  r   t  a .

   1   5   J  u  n   i   2   0   1   3  -

   P   N   V  e   t  e  r  a  n   Y  o  g  y  a   k

    T  e   k  n  o   l  o  g   i   M   i  n  e  r  a   l

(Peng, 1978)

  u   t   B   l  a  s   t   i  n  g   F  a   k  u   l   t  a

  o  u  n   d   B  r  e  a   k   i  n  g  w   i   t   h

   G  r

1919

7/25/2019 Pak Suseno Kramadibrata

http://slidepdf.com/reader/full/pak-suseno-kramadibrata 20/52

   K

Cutting Mode AxialCutting Mode Axial

Roadheader Roadheader 

  a  r   t  a .

   1   5   J  u  n   i   2   0   1   3  -

   P   N   V  e   t  e  r  a  n   Y  o  g  y  a   k

    T  e   k  n  o   l  o  g   i   M   i  n  e  r  a   l

  u   t   B   l  a  s   t   i  n  g   F  a   k  u   l   t  a

(Peng, 1978)

  o  u  n   d   B  r  e  a   k   i  n  g  w   i   t   h

   G  r

2020

7/25/2019 Pak Suseno Kramadibrata

http://slidepdf.com/reader/full/pak-suseno-kramadibrata 21/52

   K

Continuous Miner DiContinuous Miner Di

  a  r   t  a .

   1   5   J  u  n   i   2   0   1   3  -  

Bawah TanahBawah Tanah

   P   N   V  e   t  e  r  a  n   Y  o  g  y  a   k

(Peng, 1978)

    T  e   k  n  o   l  o  g   i   M   i  n  e  r  a   l

  u   t   B   l  a  s   t   i  n  g   F  a   k  u   l   t  a

  o  u  n   d   B  r  e  a   k   i  n  g  w   i   t   h

   G  r

2121

7/25/2019 Pak Suseno Kramadibrata

http://slidepdf.com/reader/full/pak-suseno-kramadibrata 22/52

   K

Penggunaan TBMPenggunaan TBM

(Gunnar Nord, 2006)(Gunnar Nord, 2006)

  a  r   t  a .

   1   5   J  u  n   i   2   0   1   3  -

1956 James Robbins - disc cutter full face boring machine menggali terowongan panjang

dalam waktu relatif singkat

 

   P   N   V  e   t  e  r  a  n   Y  o  g  y  a   k era : - ; aya: - ; ; , - me er; cu er ea orce: cu er  

Kinerja di tanah – batuan keras (UCS = 200 MPa): 50 - 1000 m/bulan

    T  e   k  n  o   l  o  g   i   M   i  n  e  r  a   l

( )0.33

an ang unne mKriteria Aplikasi TBM > 1.5

Diameter Tunnel [m] xc

σ

  u   t   B   l  a  s   t   i  n  g   F  a   k  u   l   t  a

 Aplikasi: steep inclines, short connection holes antara main

haulage level dan stope, ventilasi, lubang saluran air, kabel dll.

Investasi mahal sehin a harus efisien an an & kecil dan

Small Boring Unit: Casing diameter

600 mm - 1.8 m, UCS 25-170MPa,

panjang~100 m

  o  u  n   d   B  r  e  a   k   i  n  g  w   i   t   h

perlu studi detil geologi, geomekanik & hidrogeologi

Tidak berlaku untuk kondisi geologi massa batuan buruk &

sangat abrasif    G  r

2222

Rule Of Thumb: φ = 3,5 m, UCS = 150 MPa, maka ± 3 km, & jika

φ = 7 m, maka ±> 6 km

7/25/2019 Pak Suseno Kramadibrata

http://slidepdf.com/reader/full/pak-suseno-kramadibrata 23/52

   K

  a  r   t  a .

   1   5   J  u  n   i   2   0   1   3  -

TBMTBM

   P   N   V  e   t  e  r  a  n   Y  o  g  y  a   k e ec one ec on

GuidelinesGuidelines

    T  e   k  n  o   l  o  g   i   M   i  n  e  r  a   l

  u   t   B   l  a  s   t   i  n  g   F  a   k  u   l   t  a

  o  u  n   d   B  r  e  a   k   i  n  g  w

   i   t   h

   G  r

2323

7/25/2019 Pak Suseno Kramadibrata

http://slidepdf.com/reader/full/pak-suseno-kramadibrata 24/52

   K

Tipe Tunnel Boring MachineTipe Tunnel Boring Machine(Bilgin & Balci, 2005)(Bilgin & Balci, 2005)

  a  r   t  a .

   1   5   J  u  n   i   2   0   1   3  -

   P   N   V  e   t  e  r  a  n   Y  o  g  y  a   k

    T  e   k  n  o   l  o  g   i   M   i  n  e  r  a   l

  u   t   B   l  a  s   t   i  n  g   F  a   k  u   l   t  a

  o  u  n   d   B  r  e  a   k   i  n  g  w

   i   t   h

   G  r

2424

7/25/2019 Pak Suseno Kramadibrata

http://slidepdf.com/reader/full/pak-suseno-kramadibrata 25/52

7/25/2019 Pak Suseno Kramadibrata

http://slidepdf.com/reader/full/pak-suseno-kramadibrata 26/52

   K

TBM Working CyclesTBM Working Cycles

  a  r   t  a .

   1   5   J  u  n   i   2   0   1   3  -

   P   N   V  e   t  e  r  a  n

   Y  o  g  y  a   k  

Shield Machines

Double Shield Machines.

    T  e   k

  n  o   l  o  g   i   M   i  n  e  r  a   l

In solid rock the tunnelling is

made with open machines

without an shield.

  u   t   B   l  a  s   t   i  n  g   F  a   k  u   l   t  a

Under good conditions an open TBM can operate with a constant advance rate,

as the rock support will be installed independent from the excavation from the

L2 area on the back up system.

  o  u  n   d   B  r  e  a   k   i  n  g  w

   i   t   h

   G  r

2626

7/25/2019 Pak Suseno Kramadibrata

http://slidepdf.com/reader/full/pak-suseno-kramadibrata 27/52

   K

Robbins Mobile Miner diRobbins Mobile Miner di

Tambang Pb Zn BawahTambang Pb Zn Bawah

  a  r   t  a .

   1   5   J  u  n   i   2   0   1   3  -

Tanah Mt. Isa MineTanah Mt. Isa Mine

   P   N   V  e   t  e  r  a  n

   Y  o  g  y  a   k

Mount Isa Mine Versi-1

Tambang bawah tanah Pb & Zn di

   T  e   k

  n  o   l  o  g   i   M   i  n  e  r  a   l ustra a - a

Pasminco Mine Versi-2

Men ali hin a lebih dari ada 1.4

  u   t   B   l  a  s   t   i  n  g   F  a   k  u   l   t  a

 

km (UCS 150 - 250 MPa)

Kemajuan rata-rata 1.4m/jam

  o  u  n   d   B  r  e  a   k   i  n  g  w

   i   t   h

Lebar penggalian bervariasi

Konsumsi disc cukup tinggi

   G  r  

sangat besar 

7/25/2019 Pak Suseno Kramadibrata

http://slidepdf.com/reader/full/pak-suseno-kramadibrata 28/52

   K

Aplikasi Raise Boring Machine UntukAplikasi Raise Boring Machine Untuk

  a  r   t  a .

   1   5   J  u  n   i   2   0   1   3  -

 

   P   N   V  e   t  e  r  a  n

   Y  o  g  y  a   k

    T  e   k

  n  o   l  o  g   i   M   i  n  e  r  a   l

  u   t   B   l  a  s   t   i  n  g   F  a   k  u   l   t  a

Tamrock

  o  u  n   d   B  r  e  a   k   i  n  g  w

   i   t   h

   G  r

2828

7/25/2019 Pak Suseno Kramadibrata

http://slidepdf.com/reader/full/pak-suseno-kramadibrata 29/52

   K

Faktor Faktor--Faktor Penentu Penggalian MekanisFaktor Penentu Penggalian Mekanis

  a  r   t  a .

   1   5   J  u  n   i   2   0   1   3  -

   P   N   V  e   t  e  r  a  n

   Y  o  g  y  a   k

Sifat

MassaBatuan

dan Sifat Batuan

   T  e   k

  n  o   l  o  g   i   M   i  n  e  r  a   l u

  u   t   B   l  a  s   t   i  n  g   F  a   k  u   l   t  a

Informasi Mesin

Gali

  o  u  n   d   B  r  e  a   k   i  n  g  w

   i   t   h

Karakteristik

Kinerja Mesin   G  r

Informasi Teknikal & Operasional

a

7/25/2019 Pak Suseno Kramadibrata

http://slidepdf.com/reader/full/pak-suseno-kramadibrata 30/52

   K

Parameter Dimensi Interaksi Gigi Gali BatuanParameter Dimensi Interaksi Gigi Gali Batuan

  a  r   t  a .

   1   5   J  u  n   i   2   0   1   3  -  

 Arah Penggalian

   P   N   V  e   t  e  r  a  n

   Y  o  g  y  a   k

Front Rake Angle

    T  e   k

  n  o   l  o  g   i   M   i  n  e  r  a   l α

βd

FC

Gaya Potong (Fc)

  u   t   B   l  a  s   t   i  n  g   F  a   k  u   l   t  a

Break Out

S

 

 AngleFNF

Gaya Normal (Fn)

Gaya Lateral (Fs)

  o  u  n   d   B  r  e  a   k   i  n  g  w

   i   t   h

θ θGaya Resultan

ra

Penggalian

   G  r

3030

w w

7/25/2019 Pak Suseno Kramadibrata

http://slidepdf.com/reader/full/pak-suseno-kramadibrata 31/52

   K

Mekanisme Indenter Mekanisme Indenter 

(Rastami & Ozdemir, 1993)

  a  r   t  a .

   1   5   J  u  n   i   2   0   1   3  -

Penetrasi pick menimbulkan tegangan geser

   P   N   V  e   t  e  r  a  n

   Y  o  g  y  a   k se ngga c p ter ong ar e uar  

Tegangan-tegangan geser dibangkitkan oleh

   T  e   k

  n  o   l  o  g   i   M   i  n  e  r  a   l  

geometrik pasak gigi gali

Hampir semua gaya tegaklurus muka batuan

FN FN

  u   t   B   l  a  s   t   i  n  g   F  a   k  u   l   t  a

dan membentuk fraktur

Fraktur diinduksi akibat kombinasi

  o  u  n   d   B  r  e  a   k   i  n  g  w

   i   t   h

pembebanan

Spasi antara cutter menentukan ukuran chip

   G  r

3131

batuan

31

7/25/2019 Pak Suseno Kramadibrata

http://slidepdf.com/reader/full/pak-suseno-kramadibrata 32/52

   K

Penentuan Gaya Potong dan Kinerja Mesin GaliPenentuan Gaya Potong dan Kinerja Mesin Gali

  a  r   t  a .

   1   5   J  u  n   i   2   0   1   3  -

 

   P   N   V  e   t  e  r  a  n

   Y  o  g  y  a   k

Kriteria Brittle FractureKriteria Brittle Fracture – – Fracture MechanicsFracture Mechanics

    T  e   k

  n  o   l  o  g   i   M   i  n  e  r  a   l

1. Medan tegangan dekat ujung rekahan awal

2. Keseimbangan energi pada rekahan awal

  u   t   B   l  a  s   t   i  n  g   F  a   k  u   l   t  a

Persamaan EmpirikPersamaan Empirik

  o  u  n   d   B  r  e  a   k   i  n  g  w

   i   t   h .

2. Sifat Mekanik, massa batuan & karakteristik mesin gali

   G  r

3232

7/25/2019 Pak Suseno Kramadibrata

http://slidepdf.com/reader/full/pak-suseno-kramadibrata 33/52

   K

Fracture MechanicsFracture Mechanics

  a  r   t  a .

   1   5   J  u  n   i   2   0   1   3  -

Secara tradisional keruntuhan

material karena stress > strength

(Soo-Ho Chang, Chung-In

Lee, Seokwon Jeon, 2001)

   P   N   V  e   t  e  r  a  n

   Y  o  g  y  a   k

Tahun 1920-an, Griffith &

selanjutnya Irwin menginisiasi“energy concept for crack growth”

“ ”

    T  e   k

  n  o   l  o  g   i   M   i  n  e  r  a   l n en er pa a penge oran

penggalian mekanis menimbulkan

rekahan & ber-propagasi searah

& tegaklurus

  u   t   B   l  a  s   t   i  n  g   F  a   k  u   l   t  a

Propagasi rekahan membentuk

chips sehingga memberikan

peluang indenter (pick/mata bor)

  o  u  n   d   B  r  e  a   k   i  n  g  w

   i   t   h untu terus ma u

   G  r

7/25/2019 Pak Suseno Kramadibrata

http://slidepdf.com/reader/full/pak-suseno-kramadibrata 34/52

   K

Stress Intensity FactorsStress Intensity Factors

  a  r   t  a .

   1   5   J  u  n   i   2   0   1   3  -

3 Modes (KI, KII, KIII), pengeboran dan penggalian

   P   N   V  e   t  e  r  a  n

   Y  o  g  y  a   k

mekanis memanfaatkan Mode I

Pada dasarnya batuan cenderung untuk pecah dalam

Specimen

    T  e   k

  n  o   l  o  g   i   M   i  n  e  r  a   l

Mode I – bagaimanapun bentuk pembebanannya

  u   t   B   l  a  s   t   i  n  g   F  a   k  u   l   t  a

CSIRO Geomechanics Division -

Melbourne

ang,

  o  u  n   d   B  r  e  a   k   i  n  g  w

   i   t   h

   G  r

Mode I:

Opening

Mode II:

In-plane shear 

Mode III:

Out-of-plane shear 

7/25/2019 Pak Suseno Kramadibrata

http://slidepdf.com/reader/full/pak-suseno-kramadibrata 35/52

   K

Stress Intensity Factors (SIF)Stress Intensity Factors (SIF)

  a  r   t  a .

   1   5   J  u  n   i   2   0   1   3  -

y

 x

  y y

SIF adalah sebuah kriteria propagasi rekahan

   P   N   V  e   t  e  r  a  n

   Y  o  g  y  a   k

 

θ 

KI < KIC tidak terjadi propagasi crack

KIC adalah fracture toughness, sebuah sifat

material an da at diukur di Laboratorium

    T  e   k  n  o   l  o  g   i   M   i  n  e  r  a   l a I    π σ =

 

Indiana limestone KIC = 0.99 MPa√m

Tennessee sandstone KIC = 0.54 MPa√m

  u   t   B   l  a  s   t   i  n  g   F  a   k  u   l   t  a

aK  I   π σ =  2π   ijijr 

  o  u  n   d   B  r  e  a   k   i  n  g  w

   i   t   h

KI berhubungan dengan stress field sekitar sebuah ujung rekahan (crack tip) terhadap farfield boundary conditions

Dalam kondisi ini tegangan pada crack tip tsb menjadi tak terbatas

   G  r   ,

SFI merupakan solusi perhitungan untuk sebuah crack dalam kondisi tegangan tarik

Solusi numerik analitik menggunakan KI

St

7/25/2019 Pak Suseno Kramadibrata

http://slidepdf.com/reader/full/pak-suseno-kramadibrata 36/52

   K

Strength failure D

StressL AV 2StrainVolumetric   ε ε ε  +==

PerilakuPerilaku

KonstitutifKonstitutif

  a  r   t  a .

   1   5   J  u  n   i   2   0   1   3  - .Critical energy release (long term strength) C

3. Stable crack propagation

Fracture initiation B

Yield pointBatuanBatuan

   P   N   V  e   t  e  r  a  n

   Y  o  g  y  a   k

2. Perfectly elastic deformation

Crack closure A

εaεl   ε v 

    T  e   k  n  o   l  o  g   i   M   i  n  e  r  a   l

1. Closing cracks

O

εl= lateral strain;

  ε v= volumetric strain; εa= axial strain

Strain

  u   t   B   l  a  s   t   i  n  g   F  a   k  u   l   t  a

  o  u  n   d   B  r  e  a   k   i  n  g  w

   i   t   h

   G  r

Lecture WB3413/OE4626 Dredging ProcessesLecture WB3413/OE4626 Dredging Processes

Cutting Of Rock (Vlasblom, 2007)Cutting Of Rock (Vlasblom, 2007)

7/25/2019 Pak Suseno Kramadibrata

http://slidepdf.com/reader/full/pak-suseno-kramadibrata 37/52

   K

Roadheader Performance Prediction From Lab SERoadheader Performance Prediction From Lab SE(Nuh BILGIN, Cemal BALCI, Istanbul(Nuh BILGIN, Cemal BALCI, Istanbul -- 2005)2005)

  a  r   t  a .

   1   5   J  u  n   i   2   0   1   3  -

   P   N   V  e   t  e  r  a  n

   Y  o  g  y  a   k

    T  e   k  n  o   l  o  g   i   M   i  n  e  r  a   l

  u   t   B   l  a  s   t   i  n  g   F  a   k  u   l   t  a s ma on o e spec c es ruc on wor

Wz from the stress-strain curve of a rock

sample under unconfined compression

  o  u  n   d   B  r  e  a   k   i  n  g  w

   i   t   h

Excavation performance vs. 26 rocksamples UCS (argillaceous slates &

quarzites, Zeulenroda sewage tunnel).   G  r

3737

7/25/2019 Pak Suseno Kramadibrata

http://slidepdf.com/reader/full/pak-suseno-kramadibrata 38/52

   K Drillin rates vs. UCSDrillin rates vs. UCS

  a  r   t  a .

   1   5   J  u  n   i   2   0   1   3  -

& vs. Destruction& vs. Destruction

WorkWork

   P   N   V  e   t  e  r  a  n

   Y  o  g  y  a   k ass ca on o as opcoass ca on o as opco

14401440 -- 20 kW. (Thuro, 1997)20 kW. (Thuro, 1997)

    T  e   k  n  o   l  o  g   i   M   i  n  e  r  a   l

  u   t   B   l  a  s   t   i  n  g   F  a   k  u   l   t  a

  o  u  n   d   B  r  e  a   k   i  n  g  w

   i   t   h

   G  r

3838

7/25/2019 Pak Suseno Kramadibrata

http://slidepdf.com/reader/full/pak-suseno-kramadibrata 39/52

   K

Angle of Foliation vs. UTS & vs. Drilling RateAngle of Foliation vs. UTS & vs. Drilling RateAtlas Copco COP 1440Atlas Copco COP 1440 -- 20 kW. (Thuro, 1997)20 kW. (Thuro, 1997)

  a  r   t  a .

   1   5   J  u  n   i   2   0   1   3  -

   P   N   V  e   t  e  r  a  n

   Y  o  g  y  a   k

    T  e   k  n  o   l  o  g   i   M   i  n  e  r  a   l

  u   t   B   l  a  s   t   i  n  g   F  a   k  u   l   t  a

  o  u  n   d   B  r  e  a   k   i  n  g  w

   i   t   h

   G  r

3939

7/25/2019 Pak Suseno Kramadibrata

http://slidepdf.com/reader/full/pak-suseno-kramadibrata 40/52

   K

  a  r   t  a .

   1   5   J  u  n   i   2   0   1   3  - Drilling rates vs.Drilling rates vs.

Joint Spacing & vs.Joint Spacing & vs.

   P   N   V  e   t  e  r  a  n

   Y  o  g  y  a   k  

Classification of Atlas Copco COPClassification of Atlas Copco COP14401440 -- 20 kW. (Thuro, 1997)20 kW. (Thuro, 1997)

    T  e   k  n  o   l  o  g   i   M   i  n  e  r  a   l

  u   t   B   l  a  s   t   i  n  g   F  a   k  u   l   t  a

  o  u  n   d   B  r  e  a   k   i  n  g  w   i   t   h

   G  r

4040

7/25/2019 Pak Suseno Kramadibrata

http://slidepdf.com/reader/full/pak-suseno-kramadibrata 41/52

   K

Rock Cuttability IndexRock Cuttability Index -- Drag PickDrag Pick

  a  r   t  a .

   1   5   J  u  n   i   2   0   1   3  - Front Rake Angle

Rock Cutting Laboratory UNSW

   P   N   V  e   t  e  r  a  n

   Y  o  g  y  a   k

βd

Back Clearance

 Angle F

FC

    T  e   k  n  o   l  o  g   i   M   i  n  e  r  a   l

Tool width 12.7 mm

Depth of cut 5 mm

Front Rake Angle (-5°),

Back Clearance Angle 5°

N

Laboratorium Geomeknika & Peralatan Tambang ITB

  u   t   B   l  a  s   t   i  n  g   F  a   k  u   l   t  a

Grafik FLC Terhadap Distance (DOC = 7 mm)

2.00

Data

  o  u  n   d   B  r  e  a   k   i  n  g  w   i   t   h

0.50

1.00

.

   F   C    (

   k   N

   )

   G  r

0.00

0 2 4 6 8 10 12 14 16

Distance (cm)

Tipikal Gaya Potong & Energi Potong Batuan

aya o ong nerg o ong a uan as r  

AplikasiAplikasi RRoadheadersoadheaders Sebagai Fungsi KSebagai Fungsi Kekarekar &&

7/25/2019 Pak Suseno Kramadibrata

http://slidepdf.com/reader/full/pak-suseno-kramadibrata 42/52

   K

AplikasiAplikasi RRoadheadersoadheaders Sebagai Fungsi KSebagai Fungsi Kekarekar &&Energi SpesifikEnergi Spesifik

  a  r   t  a .

   1   5   J  u  n   i   2   0   1   3  - c eac ea -- m ,m ,

   P   N   V  e   t  e  r  a  n

   Y  o  g  y  a   k   .

Kinerja umum penggalian (Mc Feat-Smith, 1978)

MesinBerat

MesinMedium

    T  e

   k  n  o   l  o  g   i   M   i  n  e  r  a   l

32 MJ/m3 20 MJ/m3 Mesin hanya dapat memotong batuan ini secara ekonomis bila berbentuk

perlapisan setebal kurang dari 0.3 m. Modifikasi mungkin diperlukan.

3 3

Kinerja penggalian buruk. Pergantian pick aus secara regular akan membantu

kebutuhan energi gali & me-ngurangi bagian aus. Lebih baik pakai point attack

  u   t   B   l  a  s   t   i  n  g   F  a   k  u   l   t  a

 pick dengan kecepatan rendah dan besi sangga samping akan memperbaiki

stabilitas.

20 MJ/m3 12 MJ/m3 Kinerja penggalian sedang. Untuk batuan abrasive perlu sering periksa pick,

karena ick ta am akan mem erbaiki kiner a.

  o  u  n   d   B  r  e  a   k   i  n  g  w   i   t   h

17 MJ/m3 8 MJ/m3 Kinerja sedang - baik dengan keausan rendah. Pick diganti regular untuk batuan

abrasiv.

   G  r

4242

8 MJ/m3 5 MJ/m3   . .

pada batas minimum lebih baik digaru, dan laju gali tinggi.

Penentuan Gaya Potong Point Attack PickPenentuan Gaya Potong Point Attack Pick

7/25/2019 Pak Suseno Kramadibrata

http://slidepdf.com/reader/full/pak-suseno-kramadibrata 43/52

   K

Penentuan Gaya Potong Point Attack PickPenentuan Gaya Potong Point Attack Pick

Menurut Evans ModelMenurut Evans Model

  a  r   t  a .

   1   5   J  u  n   i   2   0   1   3  -

Evan (1946): Analisis

mekanisme penggalian

dengan point-attack pick

R O A Q

   P   N   V  e   t  e  r  a  n

   Y  o  g  y  a   k

Pick berkerucut dengan shank

berbentuk lingkaran

Shank berbentuk lin karan

d

γPICK

2r 

β/2Tensile stress

β/2σt d/cosβ

Ft β

   T  e

   k  n  o   l  o  g   i   M   i  n  e  r  a   l

memungkinkan berputarnya

pick pada pemegangnya dan

Fc

 stress

C

  u   t   B   l  a  s   t   i  n  g   F  a   k  u   l   t  a

memastikan seluruh bagian

tip digunakan216

d F    t  σ σ π 

=

  o  u  n   d   B  r  e  a   k   i  n  g  w   i   t   h

Cos   cσ γ  Fc = Gaya gali pada saat hancur (MN)σt = UTS (MPa)

σc = UCS (MPa)

   G  r

4343

d = Kedalaman penggalian (m)

γ = Tool edge angle

7/25/2019 Pak Suseno Kramadibrata

http://slidepdf.com/reader/full/pak-suseno-kramadibrata 44/52

   K

Prediksi KinerjaPrediksi Kinerja

  a  r   t  a .

   1   5   J  u  n   i   2   0   1   3  -  (Kramadibrata, 1996)(Kramadibrata, 1996)

   P   N   V  e   t  e  r  a  n

   Y  o  g  y  a   k

[REI] = [RMF] [BI]-1

[RCI] = 0.23 + 141 [REI]

    T  e

   k  n  o   l  o  g   i   M   i  n  e  r  a   l

γδ 

[ ] sIndexBrittlenesBI ==t 

c

σ 

σ 

  u   t   B   l  a  s   t   i  n  g   F  a   k  u   l   t  a ac orassoc==

cσ 

IndexyCuttabilitRockL

 N]RCI[ ==

σ  Power & Height vs Time BL160CM1

  o  u  n   d   B  r  e  a   k   i  n  g  w   i   t   h   c

300

400

500

600

700

  w  e  r   (   k   W   )

2

3

4

5

6

  e   i  g   h   t   (  m   )

   G  r

4444

0

100

200

0 10 20 30 40 50 60 70Time (s)

   P  o

-1

0

1   H

7/25/2019 Pak Suseno Kramadibrata

http://slidepdf.com/reader/full/pak-suseno-kramadibrata 45/52

   K

Prediksi KinerjaPrediksi Kinerja SSurfaceurface MMineriner

  a  r   t  a .

   1   5   J  u  n   i   2   0   1   3  -  PT.PT. Indocement Tunggal PrakasaIndocement Tunggal Prakasa – – PalimananPalimanan

(Rezandi Laksana & Kramadibrata, 2012)(Rezandi Laksana & Kramadibrata, 2012)

   P   N   V  e   t  e  r  a  n   Y  o  g  y  a   k

350

    T  e

   k  n  o   l  o  g   i   M   i  n  e  r  a   l

250

   j  a  m

   )

  u   t   B   l  a  s   t   i  n  g   F  a   k  u   l   t  a

150

   P  r  o   d  u   k  s   i   (  m   3   /

Lapangan

  o  u  n   d   B  r  e  a   k   i  n  g  w   i   t   h

50

100Dey & Ghoose

Kramadibrata

Gehring

   G  r

4545

0

10 12 14 16 18 20 22 24

UCS (MPa)

7/25/2019 Pak Suseno Kramadibrata

http://slidepdf.com/reader/full/pak-suseno-kramadibrata 46/52

   K

PrediksiPrediksi Kinerja RoadheaderKinerja Roadheader

  a  r   t  a .

   1   5   J  u  n   i   2   0   1   3  -

Gehring (1992)

k1 = Relatif cuttability batuan utuh: 6 – 15k xk xk  321* =

   P   N   V  e   t  e  r  a  n   Y  o  g  y  a   k

k2 = Pengaruh kekar/bidang perlapisan: 1 – 2.5

k3 = Pengaruh kondisi cutting spesifik: 3.5 – 4.5

σc

    T  e

   k  n  o   l  o  g   i   M   i  n  e  r  a   l

3

2

RMCI

R D

(0.974) N0.28ICR =

  u   t   B   l  a  s   t   i  n  g   F  a   k  u   l   t  a

c100

σ

 ⎠⎝ =

Bilgin & Balci (2005)

  o  u  n   d   B  r  e  a   k   i  n  g

  w   i   t   h ICR = Instantaneous Cutting Rate (m3/jam)

RMCI = Rock Mass Cuttability Index

σC = UCS (MPa)

N = Cuttin head ower HP   G  r

4646

P ilih TBM & R dh dP ilih TBM & R dh d

7/25/2019 Pak Suseno Kramadibrata

http://slidepdf.com/reader/full/pak-suseno-kramadibrata 47/52

   K

Pemilihan TBM & RoadheaderPemilihan TBM & Roadheader

  a  r   t  a .

   1   5   J  u  n   i   2   0   1   3  -  Cuttability IndexCuttability Index -- VARCIVARCI

(Gehring, 1980)(Gehring, 1980)

   P   N   V  e   t  e  r  a  n   Y  o  g  y  a   k

VARCI

[mm]Cuttability with TBM Cuttability with Roadheader 

    T  e

   k  n  o   l  o  g   i   M   i  n  e  r  a   l <0.5 Moderate performance Not applicable

0.5 – 0.8 Fair to good performance Applicable only when rock

occurs in thin single layer 

0.8 – 1.5 Best ran e of a lication Cuttable with heavy machines

  u   t   B   l  a  s   t   i  n  g   F  a   k  u   l   t  a

 an s rong con ca p c s

1.5 – 2.5 Only TBM with disc cuttersMedium weight machines with

conical picks

Medium and light weight

Rock Cutting Laboratory Colorado School of Mines

  o  u  n   d   B  r  e  a   k   i  n  g

  w   i   t   h 2.5 – 5.0

  ,

disc cutter for abrasive rock

,

type picks, best range of

application

5.0 – 10.0

 Application of TBM only in

shielded version with drag

Medium and light weight

machines, slim conical and

   G  r

4747

 

P dik i Ki j TBMP dik i Ki j TBM

7/25/2019 Pak Suseno Kramadibrata

http://slidepdf.com/reader/full/pak-suseno-kramadibrata 48/52

   K

Prediksi Kinerja TBMPrediksi Kinerja TBM

  a  r   t  a .

   1   5   J  u  n   i   2   0   1   3  -

1.2 N.n6FPR =

   P   N   V  e   t  e  r  a  n   Y  o  g  y  a   k

Hughes (1986)

PR = Penetration Rate (m/jam)

..

c r σ

    T  e

   k  n  o   l  o  g   i   M   i  n  e  r  a   l

F = Thrust per disk periphery (kN)

N = Speed cutting head (rev/detik)

n = Average number disk per kerf 

σc = UCS (MPa)

  u   t   B   l  a  s   t   i  n  g   F  a   k  u   l   t  a r = Average radius disks (m)

Kemajuan full-face tunneling

  o  u  n   d   B  r  e  a   k   i  n  g

  w   i   t   h  

fungsi dari jumlah disc, lajupemotongan, jumlah disc rata-rata

per kerf, jari-jari rata-rata dan UCS (Cigla & Ozdemir)

   G  r

4848

7/25/2019 Pak Suseno Kramadibrata

http://slidepdf.com/reader/full/pak-suseno-kramadibrata 49/52

   K

Prediction Model of TBM Penetration Using RMi based on NTH ModelPrediction Model of TBM Penetration Using RMi based on NTH Model

Norwe ian Institute of Technolo 1994 & Palmström 1995Norwe ian Institute of Technolo 1994 & Palmström 1995

  a  r   t  a .

   1   5   J  u  n   i   2   0   1   3  -

   P   N   V  e   t  e  r  a  n   Y  o  g  y  a   k

    T  e

   k  n  o   l  o  g   i   M   i  n  e  r  a   l

  u   t   B   l  a  s   t   i  n  g   F  a   k  u   l   t  a

  o  u  n   d   B  r  e  a   k   i  n  g

  w   i   t   h

   G  r

4949

Prediksi Kinerja TBM vsPrediksi Kinerja TBM vs

7/25/2019 Pak Suseno Kramadibrata

http://slidepdf.com/reader/full/pak-suseno-kramadibrata 50/52

   K

Prediksi Kinerja TBM vs.Prediksi Kinerja TBM vs.

  a  r   t  a .

   1   5   J  u  n   i   2   0   1   3  -

 (Sapignia dkk, 2002)(Sapignia dkk, 2002)

   P   N   V  e   t  e  r  a  n   Y  o  g  y  a   k

    T  e

   k  n  o   l  o  g   i   M   i  n  e  r  a   l

  u   t   B   l  a  s   t   i  n  g   F  a   k  u   l   t  a

  o  u  n   d   B  r  e  a   k   i  n  g

  w   i   t   h

   G  r

5050

Prediksi Kinerja Raise Boring Pada Pembuatan VentilationPrediksi Kinerja Raise Boring Pada Pembuatan Ventilation

7/25/2019 Pak Suseno Kramadibrata

http://slidepdf.com/reader/full/pak-suseno-kramadibrata 51/52

   K

Shaft di Tambang Emas Cut & Fill PongkorShaft di Tambang Emas Cut & Fill Pongkor –– AntamAntam

  a  r   t  a .

   1   5   J  u  n   i   2   0   1   3  -   ,,

10

   P   N   V  e   t  e  r  a  n   Y  o  g  y  a   k

4

6

    (  m   3   /   h  r

   )

Depth-mLevel 40

m

Level 70

m

Level 100

m

    T  e

   k  n  o   l  o  g   i   M   i  n  e  r  a   l

y = 2.51x-0.47

R2 = 0.99

0

2

UCSi

(MPa)15.31 [2] 25.93 [4] 47.61 [4]

RQD (%) 80 [17] 95 [20] 100 [20]

  u   t   B   l  a  s   t   i  n  g   F  a   k  u   l   t  a

. . . . . . .

 cm

2 /Em

8

10Joint

condition[10] [10] [10]

Joint

spacing 0.12 [8] 0.28 [10] 20 [20]

  o  u  n   d   B  r  e  a   k   i  n  g

  w   i   t   h

y = 26454.50x-2.13

R2 = 1.004

6

   Q   (  m   3   /   h  r   )

(m)

Water

conditionWet [7] Wet [7] Wet [7]

   G  r

0

2

40 45 50 55 60 65RMR

Terimakasih & PenghargaanTerimakasih & Penghargaan

7/25/2019 Pak Suseno Kramadibrata

http://slidepdf.com/reader/full/pak-suseno-kramadibrata 52/52

   K

Terimakasih & PenghargaanTerimakasih & Penghargaan

  a  r   t  a .

   1   5   J  u  n   i   2   0   1   3  -

Seminar Nasional Peledakan

DIKLAT TEKNIK PEMBERAIAN BATUAN

Perusahaan Tambang

1. PT Bukit Asam

   P   N   V  e   t  e  r  a

  n   Y  o  g  y  a   k

Pada Penambangan bahan Galian

Himpunan Mahasiswa Teknik Pertambangan

Fakultas Teknologi Mineral

2. PT Aneka Tambang Pongkor 

3. PT Freeport Indonesia4. PT Bumi Resources

   T  e   k  n  o   l  o  g   i   M   i  n  e  r  a   l  

Badan Penelitian Kementrian Pendidikan Nasional RI

.

6. Voest Alpine Fordertechnik – Zeltweg Austria

7. Krupp Fordertechnik – Rheinhausen Germany

8. Brodie Hall Research Centre – Perth Australia

  u   t   B   l  a  s   t   i  n  g   F  a   k  u   l   t  a LPPM ITB (Board Reviewer) 9. PT Indocement Tunggal Prakasa – Palimanan

  o  u  n   d   B  r  e  a   k   i  n  g

  w   i   t   h

Semua material yang berada di dalam presentasi ini diperoleh oleh penulis seorang dan bersama kolega darihasil penelitian laboratorium, penelitian lapangan, literatur survey dari makalah, website dan brosur dan juga

hasil penelitian para kolega Staf Akademik, mantan mahasiswa S1, S2 dan S3 di Laboratorium Geomekanika   G  r

5252

dan Peralatan Tambang ITB. Pekerjaan penelitian selalu dibantu oleh para Teknisi dan Mekanik di

Laboratorium. Material presentasi ini tidak akan dapat dibuat dengan baik tanpa bantuan mereka semua.