LAPORAN TUGAS AKHIR ANALISIS PERHITUNGAN SISA MATERIAL (WASTE) TULANGAN KOLOM DAN BALOK PADA PROYEK PEMBANGUNAN GEDUNG FKM-SAINTEK KAMPUS IV UIN SU Diajukan Oleh: HERNI JULITAWATI ZALUKHU NIM: 1605141062 PROGRAM STUDI MANAJEMEN REKAYASA KONSTRUKSI GEDUNG JURUSAN TEKNIK SIPIL POLITEKNIK NEGERI MEDAN 2020

Upload: others

Post on 05-Oct-2021

14 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: LAPORAN TUGAS AKHIR ANALISIS PERHITUNGAN SISA …

LAPORAN TUGAS AKHIR

ANALISIS PERHITUNGAN SISA MATERIAL (WASTE) TULANGAN

KOLOM DAN BALOK PADA PROYEK PEMBANGUNAN

GEDUNG FKM-SAINTEK KAMPUS IV UIN SU

Diajukan Oleh:

HERNI JULITAWATI ZALUKHU

NIM: 1605141062

PROGRAM STUDI MANAJEMEN REKAYASA KONSTRUKSI GEDUNG

JURUSAN TEKNIK SIPIL

POLITEKNIK NEGERI MEDAN

2020

Page 2: LAPORAN TUGAS AKHIR ANALISIS PERHITUNGAN SISA …

i

KATA PENGANTAR

Dengan Rahmat Tuhan Yang Maha Esa, penulis telah menyelesaikan

Laporan Tugas Akhir ini dengan baik. Laporan Tugas Akhir ini berjudul

“Analisis Perhituungan Sisa Material (Waste) Tulangan Kolom Dan Balok

pada Proyek Pembangunan Gedung FKM-SAINTEK Kampus IV UIN SU”.

Laporan Tugas Akhir ini merupakan salah satu syarat untuk

menyelesaikan jenjang pendidikan Diploma IV Program Studi Manajemen

Rekayasa Konstruksi Gedung Jurusan Teknik Sipil di Politeknik Negeri Medan.

Dalam penulisan laporan Tugas Akhir ini, penulis banyak menghadapi kendala,

namun berkat dan bimbingan dari berbagai pihak baik berupa waktu,

tenaga,materi dan berupa informasi, sehingga Laporan Tugas Akhir ini dapat

selesai dengan baik dan tepat waktu.

Dengan selesainya Tugas Akhir ini tidak terlepas dari bantuan banyak

pihak yang telah memberikan masukan-masukan kepada penulis. Untuk itu

penulis mengucapkan banyak terimakasih kepada :

1. Bapak Abdul Rahman, S.E.,Ak., M.Si. Direktur Politeknik Negeri Medan;

2. Bapak Ir. Samsudin Silaen, M.T. Ketua Jurusan Teknik Sipil Politeknik

Negeri Medan,sekaligus selaku Ketua Penguji Sidang Tugas Akhir;

3. Bapak Palghe Tobing, S.T.,M.T. Kepala Program Studi Manajemen

Rekayasa Konstruksi Gedung,sekaligus selaku Penguji Sidang Tugas

Akhir ;

4. Bapak Jon Desron Damanik, S.T., M.T.Ars wali kelas MRKG-8C;

5. Bapak Dohar Sinabutar, S.T.,M.T. dosen pembimbing yang telah

membantu memberikan bimbingan, pengarahan, dan bersedia meluangkan

waktunya untuk penulis sehingga Tugas Akhir ini dapat diselesaikan;

Page 3: LAPORAN TUGAS AKHIR ANALISIS PERHITUNGAN SISA …

ii

6. Seluruh staf pengajar dan pegawai Jurusan Teknik Sipil Politeknik Negeri

Medan;

7. Bapak dan Ibu,kakak-kakak tercinta serta keluarga atas do’a dan dukungan

yang telah diberikan sehingga penulis mampu melaksanakan dan

menyelesaikan Tugas Akhir ini dengan baik;

8. Seluruh rekan-rekan kelas MRKG HASAMBUA, yang sudah berjuang

bersama-sama dalam suka duka perkuliahan selama kurang lebih 4 tahun

ini,kalian semua orang-orang yang luar biasa.

8. Seluruh rekan-rekan mahasiswa Teknik Sipil prodi MRKG angkatan 2016,

yang telah membantu dalam penyusunan Tugas Akhir ini.

Penulis menyadari bahwa masih banyak kekurangan dari Laporan Tugas

Akhir ini, baik dari materi maupun teknik penyajiannya, mengingat kurangnya

pengetahuan dan pengalaman penulis. Oleh karena itu, kritik dan saran yang

membangun sangat penulis harapkan,terimakasih.

Mahasiswa

HERNI JULITAWATI ZALUKHU

NIM. 1605141062

Page 4: LAPORAN TUGAS AKHIR ANALISIS PERHITUNGAN SISA …

iii

ABSTRAK

ANALISIS PERHITUNGAN SISA MATERIAL (WASTE) TULANGAN

KOLOM DAN BALOK PADA PROYEK PEMBANGUNAN

GEDUNG FKM-SAINTEK KAMPUS IV UIN SU

Oleh

HERNI JULITAWATI ZALUKHU

NIM : 1605141062

Salah satu parameter keberhasilan dalam pelaksanaan suatu proyek konstruksi adalah penggunaan

material yang efisien. Material merupakan salah satu komponen penting yang memiliki pengaruh

cukup signifikan terhadap biaya suatu proyek konstruksi. Material baja tulangan atau besi besi

beton merupakan salah satu komponen struktur yang memiliki waste level paling tinggi. Penelitian

ini dilakukan untuk mengetetahui seberapa besar waste tulangan pada kolom dan balok dimana

proyek yang ditinjau adalah Pembangunan Gedung FKM-SAINTEK Kampus IV UIN SU di kota

Medan. Pada proses perhitungan berat tulangan menggunakan SNI 2052:2017 dan untuk standart

penulangan menggunakan SNI 03-2847-2002. Metode penelitian yang digunakan pada tugas akhir

ini untuk menghitung kebutuhan tulangan dan sisa (waste) tulangan dengan menggunakan BBS

(Bar Bending Schedule) dengan cara manual menggunakan program Microsoft Exel. Dari hasil

analisa diperoleh berat total kebutuhan tulangan adalah 243.413,82 kg,berat waste tulangan adalah

49.756,03 kg,banyak nya batang utuh yang dipakai adalah 293.193 kg,dan persentase dari waste

yang tidak terpakai adalah sebesar 16,97%.

Kata kunci : Analisis, tulangan, kebutuhan, waste

Page 5: LAPORAN TUGAS AKHIR ANALISIS PERHITUNGAN SISA …

iv

ABSTRACT

ANALYSIS OF THE CALCULATION OF WASTE OF COLUMNS AND BEAMS IN THE

BUILDING CONSTRUCTION PROJECT FKM-SAINTEK CAMPUS IV UIN SU

By

HERNI JULITAWATI ZALUKHU

NIM : 1605141062

One of the parameters of success in the implementation of a construction project is the efficient

use of materials. Materials are one of the important components that have a significant influence

on the cost of a construction project. Reinforcing steel material or concrete iron is one of the

components of the structure that has the highest waste level. This research was conducted to

determine how much waste the bones in the columns and beams where the project was reviewed

was the Construction of FKM-SAINTEK Building Campus IV UIN SU in Medan city. In the

process of calculating the weight of the bones using SNI 2052:2017 and for the standard of

repatriation using SNI 03-2847-2002. . The research method used in this final task is to calculate

the need for bone and waste (waste) of the bone by using bbs (Bar Bending Schedule) by manual

using the Microsoft Exel program. From the results of the analysis obtained the total weight of the

bone needs is 243,413.82 kg, the weight of the bone waste is 49,756.03 kg, the amount of whole

rod used is 293,193 kg, and the percentage of unused waste is 16.97%.

Keywords : Analysis, bones, needs, waste

Page 6: LAPORAN TUGAS AKHIR ANALISIS PERHITUNGAN SISA …

v

DAFTAR ISI

KATA PENGANTAR ............................................................................................ i

ABSTRAK ............................................................................................................ iii

ABSTRACK.......................................................................................................... iv

DAFTAR ISI ........................................................................................................... v

DAFTAR TABEL............................................................................................... viii

DAFTAR GAMBAR .............................................................................................. x

DAFTAR LAMPIRAN ........................................................................................ xi

BAB 1 PENDAHULUAN

1.1 Latar Belakang .......................................................................................... 1

1.2 Rumusan Masalah..................................................................................... 2

1.3 Batasan Masalah ....................................................................................... 3

1.4 Tujuan Penelitian ...................................................................................... 3

1.5 Manfaat Penelitian .................................................................................... 4

1.6 Sistematika Laporan ................................................................................. 4

BAB 2 TINJAUAN PUSTAKA

2.1 Struktur Bangunan Atas ............................................................................ 6

2.1.1 Struktur kolom ................................................................................ 6

2.1.2 Struktur balok ................................................................................. 7

2.2 Manajemen Material Konstruksi ............................................................. 9

2.3 Material Besi Tulangan.......................................................................... 10

2.3.1 Jenis-jenis tulangan ...................................................................... 10

2.3.2 Beton bertulang ............................................................................ 11

2.4 Standard Penulangan Kolom dan Balok ................................................ 12

2.4.1 Kait dan bengkokan tulangan ....................................................... 12

2.4.2 Sambungan ................................................................................... 14

2.4.3 Ukuran dan berat tulangan ............................................................ 14

2.4.4 Menghitung koefisien kebutuhan tulangan................................... 17

2.5 Teori Waste Tulangan ........................................................................... 17

2.5.1 Faktor-faktor Penyebab Waste Tulangan ..................................... 18

2.5.2 Perhitungan waste tulangan (%) ................................................... 18

Page 7: LAPORAN TUGAS AKHIR ANALISIS PERHITUNGAN SISA …

vi

2.6 Bar Bending Schedule ........................................................................... 19

BAB 3 METODOLOGI PENELITIAN

3.1 Metode Penelitian .................................................................................. 23

3.2 Tempat penelitian .................................................................................. 23

3.3 Jenis dan Sumber Data .......................................................................... 24

3.4 Metode Pengumpulan Data ................................................................... 24

3.5 Metode Pengolahan Data ....................................................................... 25

3.6 Diagram Alir Analisa Data .................................................................... 25

BAB 4 HASIL DAN PEMBAHASAN

4.1 Deskripsi Proyek.................................................................................... 27

4.2 Pengelompokkan Pekerjaan Struktur Beton Bertulang Berdasarkan

Tipe Penulangan .................................................................................... 27

4.2.1 Pengelompokan pekerjaan struktur kolom ................................... 28

4.2.2 Pekerjaan Struktur Balok .............................................................. 29

4.3 Perhitungan Kebutuhan Tulangan .......................................................... 30

4.3.1 Perhitungan Kebutuhan Tulangan Kolom .................................... 30

4.3.2 Perhitungan Kebutuhan Tulangan Balok ...................................... 35

4.4 Berat Tulangan Yang Digunakan ........................................................... 41

4.4.1 Berat tulangan kolom yang digunakan ......................................... 41

4.4.2 Berat tulangan balok yang digunakan .......................................... 42

4.5 Rekapitulasi Kebutuhan Tulangan .......................................................... 44

4.5.1 Rekapitulasi kebutuhan tulangan kolom....................................... 44

4.5.2 Rekapitulasi kebutuhan tulangan Balok ....................................... 45

4.6 Waste Tulangan Yang Tidak Digunakan ................................................ 46

4.6.1 Waste tulangan kolom yang tidak digunakan ............................... 46

4.6.2 Waste tulangan balok yang tidak digunakan ................................ 47

4.7 Rekapitulasi Berat Waste Tulangan ........................................................ 49

4.7.1 Rekapitulasi Berat waste tulangan kolom .................................... 49

4.7.2 Rekapitulasi berat waste tulangan balok ...................................... 50

4.8 Rekapitulasi Kebutuhan Batang Utuh Pada Balok dan Kolom .............. 51

4.8.1 Rekapitulasi kebutuhan batang utuh pada kolom ......................... 51

4.8.2 Rekapitulasi kebutuhan batang utuh pada balok .......................... 53

Page 8: LAPORAN TUGAS AKHIR ANALISIS PERHITUNGAN SISA …

vii

4.9 Perhitungan Persen Waste Tulangan (%) Balok dan Kolom .................. 56

BAB 5 KESIMPULAN DAN SARAN

5.1 Kesimpulan ............................................................................................. 58

5.2 Saran ....................................................................................................... 59

DAFTAR PUSTAKA ........................................................................................... 60

LAMPIRAN

Page 9: LAPORAN TUGAS AKHIR ANALISIS PERHITUNGAN SISA …

viii

DAFTAR TABEL

Tabel 2.1 Kait dan Bengkokan Baku untuk Tulangan Utama dan

Tulangan Sengkang ......................................................................... 13

Tabel 2.2 Diameter Minimum Bengkokan...................................................... 14

Tabel 2.3 Ukuran Baja Tulangan Beton Polos ................................................ 15

Tabel 2.4 Ukuran Baja Tulangan Beton Ulir/Sirip ......................................... 16

Tabel 2.5 Model Bar Bending Schedule ......................................................... 21

Tabel 4.1 Tipe- tipe Penulangan pada Kolom Lantai Dasar .......................... 28

Tabel 4.2 Tipe- tipe Penulangan pada Kolom Lantai 2 ................................ 28

Tabel 4.3 Tipe- tipe Penulangan pada Kolom Lantai 2 ................................. 28

Tabel 4.4 Tipe- tipe Penulangan pada Balok Lantai 1 ................................... 29

Tabel 4.5 Tipe- tipe Penulangan pada Balok Lantai 2 ................................... 30

Tabel 4.6 Kebutuhan Tulangan Kolom Pada Lantai Dasar ............................. 41

Tabel 4.7 Kebutuhan Tulangan Kolom Pada Lantai 1 .................................... 42

Tabel 4.8 Kebutuhan Tulangan Kolom Pada Lantai 2 .................................... 42

Tabel 4.9 Kebutuhan Tulangan Balok Pada Lantai 1 ..................................... 43

Tabel 4.10 Kebutuhan Tulangan Balok Pada Lantai 1 ..................................... 44

Tabel 4.11 Rekapitulasi Kebutuhan Tulangan Kolom ...................................... 45

Tabel 4.12 Rekapitulasi Kebutuhan Tulangan Balok ....................................... 45

Tabel 4.13 Total Kebutuhan Tulangan ............................................................. 46

Tabel 4.14 Waste Tulangan Kolom Lantai dasar ............................................. 46

Tabel 4.15 Waste Kebutuhan Tulangan Kolom Lantai 1 .................................. 47

Tabel 4.16 Waste Kebutuhan Tulangan Kolom Lantai 2 .................................. 47

Tabel 4.17 Waste Tulangan Balok Lantai 1 ...................................................... 48

Tabel 4.18 Waste Tulangan Balok Lantai 2 ...................................................... 49

Tabel 4.19 Total Berat Waste Tulangan Kolom .............................................. 50

Tabel 4.20 Total Berat Waste Tulangan Balok ................................................. 50

Tabel 4.21 Kebutuhan Batang Utuh Pada Kolom Lantai Dasar ....................... 51

Tabel 4.22 Kebutuhan Batang Utuh Pada Kolom Lantai 1 ............................... 52

Tabel 4.23 Kebutuhan Batang Utuh Pada Kolom Lantai 2 ............................... 52

Tabel 4.24 Total Kebutuhan Batang Utuh Pada Kolom .................................. 53

Page 10: LAPORAN TUGAS AKHIR ANALISIS PERHITUNGAN SISA …

ix

Tabel 4.25 Kebutuhan Batang Utuh Pada Balok Lantai 1 ................................ 54

Tabel 4.26 Kebutuhan Batang Utuh Pada Balok Lantai 2 ................................ 55

Tabel 4.27 Total Kebutuhan Batang Utuh Pada Balok .................................... 56

Tabel 4.28 Rekapitulasi Kebutuhan Batang Utuh pada

Balok dan Kolom ............................................................................ 56

Page 11: LAPORAN TUGAS AKHIR ANALISIS PERHITUNGAN SISA …

x

DAFTAR GAMBAR

Gambar 3.1 Lokasi Proyek ................................................................................. 23

Gambar 3.2 Bagan Alir Analisa Data .......................................................... 26

Gambar 4.1 Kolom K1 Lantai Dasar ................................................................. 31

Gambar 4.2 Detail Tulangan Utama Kolom K1 Lantai Dasar ........................... 31

Gambar 4.3 Sengkang kolom K1 lantai dasar .................................................... 32

Gambar 4.4 Tulangan Kait K1 Lantai Dasar ..................................................... 33

Gambar 4.5 Tulangan Utama Balok B1 lantai 1 ................................................ 36

Gambar 4.6 Tulangan sengkang Balok B1 Lantai 1 .......................................... 38

Gambar 4.7 Tulangan Extra Bar Balok B1 Lantai 1 ......................................... 40

Page 12: LAPORAN TUGAS AKHIR ANALISIS PERHITUNGAN SISA …

xi

DAFTAR LAMPIRAN

Lampiran 1 Bar Bending Schedule Kolom Lantai Dasar s/d Lantai 3

Lampiran 2 Bar Bending Schedule Balok Lantai 1 s/d Lantai 2

Lampiran 3 Denah Kolom Lantai Dasar

Lampiran 4 Denah Kolom Lantai 1

Lampiran 5 Denah Kolom Lantai 2

Lampiran 6 Detai Tulangan Kolom 1

Lampiran 7 Detai Tulangan Kolom 2

Lampiran 8 Denah Balok Lantai 1

Lampiran 9 Denah Balok Lantai 2

Lampiran 10 Tipe-Tipe Penulangan Balok

Page 13: LAPORAN TUGAS AKHIR ANALISIS PERHITUNGAN SISA …

BAB 1

PENDAHULUAN

Page 14: LAPORAN TUGAS AKHIR ANALISIS PERHITUNGAN SISA …

1

BAB 1

PENDAHULUAN

1. 1 Latar Belakang

Besi beton merupakan besi yang digunakan untuk penulangan konstruksi

beton atau yang lebih dikenal sebagai beton bertulang. Beton bertulang yang

mengandung batang tulangan dan direncanakan berdasarkan anggapan bahwa

bahan tersebut bekerja sama dalam memikul gaya-gaya. Beton bertulang bersifat

unik dimana dua jenis bahan yaitu besi tulangan dan beton dipakai secara

bersamaan. Tulangan menyediakan gaya tarik yang tidak dimiliki beton dan

mampu menahan gaya tekan. Secara umum besi beton tulangan mengacu pada

dua bentuk yaitu besi polos dan besi ulir. Besi polos adalah besi yang memiliki

penampang bundar dengan permukaan licin atau tidak bersirip. Besi ulir adalah

batang besi dengan bentuk permukaan khusus berbentuk sirip melintang

(puntir/sirip ikan) atau rusuk memanjang (sirip teratur/bambu) dengan pola

tertentu atau batang tulangan yang dipilih pada proses produksinya.

Salah satu parameter keberhasilan dalam pelaksanaan suatu proyek

konstruksi adalah penggunaan material yang efisien. Material merupakan salah

satu komponen penting yang memiliki pengaruh cukup signifikan terhadap biaya

suatu proyek konstruksi. Material baja tulangan atau besi besi beton merupakan

salah satu komponen struktur yang memiliki waste level paling tinggi. Pekerjaan

penulangan tersebut meliputi pemotongan besi bertulang, pembengkokan, dan

perakitan. Munculnya limbah material baja tulangan atau besi beton ini

disebabkan oleh pola pemotongan yang tidak optimal, serta kesalahan pada saat

proses pabrikasi baja tulangan. Strategi yang dilakukan untuk menanggulangi

serta meminimalkan sisa baja tulangan yang muncul di lapangan yaitu dengan

membuat Bar Bending Schedule (BBS).

BBS adalah daftar kebutuhan baja tulangan yang dibutuhkan dalam

beberapa tipe baja tulangan yang meliputi data diameter, bentuk, panjang dan

jumlah tulangan. Untuk dapat membuat bar bending schedule maka dibutuhkan

Page 15: LAPORAN TUGAS AKHIR ANALISIS PERHITUNGAN SISA …

`

2

data sebagai gambar teknis dari pihak konsultan, data-data mengenai jumlah dan

ukuran baja tulangan yang digunakan, data mengenai jumlah dan dimensi bagian

yang dikerjakan, serta tabel-tabel yang dibutuhkan. Pembuatan bar bending

schedule dapat dibuat dengan menggunakan bantuan program Microsoft Excel.

Karena memiliki pengaruh yang sangat signifikan terhadap biaya pada

pelaksanaan proyek, dimana persentase tulangan ini nilai nya mencapai 25% dari

biaya total proyek. Maka peneliti tertarik untuk menjadikan masalah tersebut

sebagai objek penelitian, dimana tempat penelitian nya dilakukan pada Proyek

Pembangunan Gedung FKM-SAINTEK Kampus IV UIN SU yang berlokasi di

Jalan Lapangan Golf, Kampung Tengah, Pancur Batu, Kabupaten Deli Serdang,

Kecamatan Medan Tuntungan Kota Medan. Dalam pembangunan proyek ini

memiliki beberapa tahapan pekerjaan diantaranya adalah pekerjaan balok dan

kolom yang didesain dengan konstruksi beton bertulang yang terdiri dari besi

tulangan dan beton.

Dalam konteks ini adalah menghitung kebutuhan dan waste tulangan

menurut shop drawing, serta efisiensi penggunaan tulangan dengan metode BBS

yang berpedoman pada SNI 2847-2002 dan untuk menghitung berat besi

berpedoman pada SNI 2052-2017.

1. 2 Rumusan Masalah

Rumusan masalah dalam tugas akhir ini adalah:

1. Berapa efisiensi kebutuhan tulangan balok dan kolom yang

diperlukan pada Pembangunan Gedung FKM-SAINTEK Kampus IV

UIN SU berdasarkan shop drawing dengan menggunakan metode

bar bending schedule?

2. Berapa total waste (%) tulangan balok dan kolom yang tidak

digunakan pada Pembangunan Gedung FKM-SAINTEK Kampus IV

UIN SU berdasarkan shop drawing dengan menggunakan metode

bar bending schedule?

.

Page 16: LAPORAN TUGAS AKHIR ANALISIS PERHITUNGAN SISA …

`

3

1. 3 Batasan Masalah

Penelitian dilakukan pada proyek pembangunan konstruksi gedung

bertingkat. Adapun Batasan masalah pada penelitian ini adalah :

1. Peninjauan tulangan dilakukan pada tulangan balok dan kolom lantai

1 s/d lantai 3 Pembangunan Gedung FKM-SAINTEK Kampus IV

UIN SU berdasarkan shp drawing. .

2. Perhitungan dilakukan dengan metode Bar Bending Schedule dengan

program Microsoft Excel

3. Hanya menghitung kebutuhan dan waste tulangan yang tidak dapat

digunakan lagi karena karakteristik desain penulangan.

4. Peraturan yang digunakan berpedoman pada SNI 03-2847-2002

tentang standard penulangan dan untuk menghitung berat besi

berpedoman pada SNI 2052:2017

1. 4 Tujuan Penelitian

Tujuan pembahasan dalam laporan Tugas Akhir ini adalah sebagai

berikut:

1. Mengetahui efisiensi kebutuhan tulangan balok dan kolom yang

diperlukan pada Pembangunan Gedung FKM-SAINTEK Kampus IV

UIN SU berdasarkan shop drawing.

2. Mengetahui total waste (%) tulangan balok dan kolom yang tidak

digunakan pada Pembangunan Gedung FKM-SAINTEK Kampus

IV UIN SU berdasarkan shop drawing.

Page 17: LAPORAN TUGAS AKHIR ANALISIS PERHITUNGAN SISA …

`

4

1. 5 Manfaat Penelitian

Adapun manfaat penelitian yang dilakukan oleh penulis yaitu:

1. Manfaat untuk kontraktor/pelaksana yaitu menambah wawasan

tentang pengaplikasian kebutuhan dan waste tulangan pada

pelaksanaan suatu proyek dengan menggunakan metode bar bending

schedule, sehingga dapat meminimalkan terjadinya waste pada

kondisi yang akan datang.

2. Manfaat untuk pembaca Sebagai bahan refrensi bagi penelitian

berikutnya dan merupakan wahana untuk memperluas pengetahuan

khususnya mengenai teknologi konstruksi, cara menghitung

kebutuhan tulangan dan waste tulangan yang tidak digunakan lagi.

3. Untuk penulis sendiri dapat menambah pengetahuan, pengalaman,

dan menambah wawasan mengenai penggunaan metode bar bending

schedule.

1. 6 Sistematika Laporan

Sistematika Penulisan ini bertujuan untuk memberikan gambaran secara

garis besar setiap bab yang dibahas pada tugas akhir ini yaitu sebagai berikut:

BAB 1 PENDAHULUAN

Berisi tentang latar belakang, rumusan masalah, batasan masalah,

tujuan penelitian, manfaat penelitian, dan sistematika penulisan pada

tugas akhir.

BAB 2 TINJAUAN PUSTAKA

Berisi uraian tentang alur pikir dan perkembangan keilmuan topik

kajian yang berhubungan dengan permasalahan yang diajukan.

Page 18: LAPORAN TUGAS AKHIR ANALISIS PERHITUNGAN SISA …

`

5

BAB 3 METODOLOGI

Berisi tentang tahapan kegiatan tugas akhir yang dimulai dari

tahapan persiapan, pengumpulan dan pengolahan data, analisis dan

pembahasan serta perumusan kesimpulan dan saran yang akan

diberikan.

BAB 4 ANALISIS DAN PEMBAHASAN

Berisi tentang data umum proyek, hasil pengumpulan dan

pengolahan data yang telah dilakukan dan analisis mengenai data

yang didapat dan melakukan pembahasan terhadap hasil yang

diperoleh.

BAB 5 KESIMPULAN DAN SARAN

Berisi tentang rincian kesimpulan yang dituliskan pada abstrak dan

saran yang dapat ditindaklanjuti terhadap hasil dari tugas akhir.

DAFTAR PUSTAKA

Berisi sumber referensi dalam penulisan teori-teori yang menjadi acuan dalam

tugas akhir, sumber referensi dapat berupa buku, peraturan, pedoman, jurnal,

majalah ilmiah dan sebagainya.

LAMPIRAN

Berisi dokumen-dokumen yang dianggap perlu dalam penyusunan laporan, tetapi

tidak ditampilkan dalam bagian inti laporan.