lampiran 9 crane inspection form nk
DESCRIPTION
Lampiran 9 Crane Inspection Form NKTRANSCRIPT
PT. MENARA GADING PUTIH
SBU 1 - TLD - N - CP - 002CHECKLIST PEMERIKSAAN CRANE
TANGGAL INSPEKSI : TIM INSPEKSI JABATAN PARAFTIPE : 1.NO. SERI : 2.SERTIFIKAT CRANE : 3.MASA BERLAKU : 4.KAPASITAS : 5.LOKASI : OPERATOR :
SIO / SIM NO. :MASA BERLAKU :
NO DESKRIPSI PERLENGKAPANKONDISI
KETERANGANBAIK BURUK TIDAK ADA
1
2
3
4
5 BOOM
6
7 ANTI TWO BLOCK
8 PLAY JIB
9
10
11
12
13
14
15 DRUM
16 DRUM BREAK
17
18
19
20
21
22
23
24
25 OUT RIGGER
26
27 GEARBOX TRACKS
28
29
30
31 AIR CONDITIONER
32 WIPER
33
34
35
36
37
38
39
40
REKOMENDASI
Diinspeksi Oleh, Disetujui Oleh, Diketahui Oleh,
MENARA GADING PUTIH HSE MGP PGN / PMC
SBU DISTRIBUSI WILAYAH 1 JAWA BAGIAN BARATPLTG Talang Duku Gas Distribution Project
ENGINE EMISSION (MESIN DAN EMISI)
ELECTRIC SYSTEM (SISTEM KELISTRIKAN)
CABLE / WIRE SLING (KABEL SLING)
HYDRAULIC SYSTEM (SISTEM HIDROLIK)
BOOM HOIST (KATROL BOOM)
LOAD ANGLE INDICATOR (INDIKATOR SUDUT BOOM)
LIMIT SWITCH (INDIKATOR PEMBATAS)
LIMIT SWITCH ALARM (ALARM INDIKATOR PEMBATAS)
HOOK (PENGAIT)
MAIN AND AUXILIARY HOIST (KATROL INTI DAN PENDUKUNG)
WIRE CLIP (PENJEPIT KAWAT)
SWING (PUTARAN / ROTASI)
SWING ALARM (ALARM ROTASI)
REVERSING ALARM (ALARM MUNDUR)
HORN (KLAKSON)
BRAKE / HAND BRAKE / HYDRAULIC BRAKE (REM / REM TANGAN /REM HIDROLIK)
BREAK LIGHT (LAMPU REM)
LIGHT (LAMPU UTAMA)
LIGHT SIGNAL ( L / R ) (LAMPU SEN L / R)
TIRES / CRAWLER (BAN / CRAWLER)
LOAD CHART (DIAGRAM BEBAN)
CABIN (KABIN)
OPERATOR SEAT (KURSI OPERATOR)
MIRROR (KACA SPION)
WINDOW GLASS (KACA JENDELA)
SPARE OF TIRE (BAN CADANGAN)
HOUSEKEEPING (KEBERSIHAN DAN PENATAAN)
FIRE EXTINGUISHER (ALAT PEMADAM API RINGAN)
PERSONAL PROTECTIVE EQUIPMENT (ALAT PELINDUNG DIRI)
COMMUNICATION EQUIPMENT (PERALATAN KOMUNIKASI)
OTHER (LAINNNYA)