kemajuan pelaksanaan kegiatan pembangunan...

79
KEMAJUAN PELAKSANAAN KEGIATAN PEMBANGUNAN DI LINGKUNGAN DITJEN CIPTA KARYA STATUS : 29 JULI 2010 KEMENTERIAN PEKERJAAN UMUM DIREKTORAT JENDERAL CIPTA KARYA

Upload: dinhduong

Post on 06-Feb-2018

232 views

Category:

Documents


10 download

TRANSCRIPT

Page 1: KEMAJUAN PELAKSANAAN KEGIATAN PEMBANGUNAN …ciptakarya.pu.go.id/dok/progress/progress_20100729.pdf · 5 Review DED 0 Percepatan Review ... Pembangunan Jalan Poros Lokasi Kws

KEMAJUAN PELAKSANAAN KEGIATAN

PEMBANGUNAN DI LINGKUNGAN

DITJEN CIPTA KARYA

STATUS : 29 JULI 2010

KEMENTERIAN PEKERJAAN UMUM

DIREKTORAT JENDERAL CIPTA KARYA

Page 2: KEMAJUAN PELAKSANAAN KEGIATAN PEMBANGUNAN …ciptakarya.pu.go.id/dok/progress/progress_20100729.pdf · 5 Review DED 0 Percepatan Review ... Pembangunan Jalan Poros Lokasi Kws

RPM PHLN TOTAL

1 Direktorat PAM 1,387,145,845 97,195,500 1,484,341,345 196,733,782 9,377,517 1,197,707,546 80,522,500 1,278,230,046 - 1,484,341,345 195 600 795 3 2 2 - 2 2 1 3 47 733 1,116,865,527

2 Direktorat PPLP 633,610,238 607,359,000 1,240,969,238 83,319,986 15,169,511 535,220,741 607,259,000 1,142,479,741 - 1,240,969,238 211 188 399 28 12 3 1 5 1 - 1 - 348 1,038,091,517

3 Direktorat Bangkim 899,323,660 24,000,000 923,323,660 87,359,847 31,515,239 780,448,574 24,000,000 804,448,574 - 923,323,660 163 532 695 21 2 - - 21 - 11 1 6 633 452,261,725

4 Direktorat PBL 532,249,922 637,874,300 1,170,124,222 588,261,996 12,995,424 417,933,522 150,933,280 568,866,802 - 1,170,124,222 328 200 528 12 2 5 3 13 1 1 3 8 480 456,543,516

5 Direktorat Bina Program 540,942,532 148,471,500 689,414,032 517,450,606 1,058,900 68,866,506 102,038,020 170,904,526 - 689,414,032 110 2 112 2 - 13 - - 2 - - - 95 141,264,367

6 Setditjen Cipta Karya 114,266,503 1,000,000 115,266,503 78,441,953 490,143 35,334,407 1,000,000 36,334,407 - 115,266,503 6 14 20 - 4 - - - - - 2 - 14 16,244,090

7 Pemberdayaan Masyarakat 1,192,891,000 886,400,000 2,079,291,000 - - - - - 2,079,291,000 2,079,291,000 - - - - - - - - - - - - - -

-P2KP 817,891,000 61,800,000 879,691,000 - - - - - 879,691,000 879,691,000 - - - - - - - - - - - - - -

-PPIP 375,000,000 150,000,000 525,000,000 - - - - - 525,000,000 525,000,000 - - - - - - - - - - - - - -

-PAMSIMAS - 255,100,000 255,100,000 - - - - - 255,100,000 255,100,000 - - - - - - - - - - - - - -

-RISE - 419,500,000 419,500,000 - - - - - 419,500,000 419,500,000 - - - - - - - - - - - - - -

TOTAL 5,300,429,700 2,402,300,300 7,702,730,000 1,551,568,170 70,606,734 3,035,511,296 965,752,800 4,001,264,096 2,079,291,000 7,702,730,000 1,013 1,536 2,549 66 22 23 4 41 6 13 10 61 2,303 3,221,270,742

Keterangan :

1 Penyiapan Dokumen Lelang

2 Pengumuman Lelang/Prakualifikasi

3 Penyusunan shortlist

4 Undangan Pelelangan

5 Penjelasan Pekerjaan Aanwyzing

6 Pemasukan Penawaran

7 Usulan Pemenang

8 Penetapan Pemenang

9 Penerbitan Surat Perintah Mulai Kerja

10 Penandatangan Kontrak

NILAI KONTRAK

(Rp. x 1.000) 8TOTAL 2

PAGU (Rp)

REKAPITULASI LAPORAN PELAKSANAAN PELELANGAN BARANG/JASA TA 2010

DIREKTORAT JENDERAL CIPTA KARYA

STATUS : 29 JULI 2010, JAM 08.00 WIB

NO NAMA SATUAN KERJA

PAGU PAKET KONTRAK

SWAKELOLA +

APBLMRUPIAH MURNI PLN

JUMLAH PAKET DALAM PROSES PRA KONTRAK

TOTAL 1

PAKET > RP 100 JUTA

KONTRAKTUAL

≤ 100 JT9 10

KONTRAKTUAL > 100 JT3 4 5 6 7

NON

FISIK FISIK TOTAL

Page 3: KEMAJUAN PELAKSANAAN KEGIATAN PEMBANGUNAN …ciptakarya.pu.go.id/dok/progress/progress_20100729.pdf · 5 Review DED 0 Percepatan Review ... Pembangunan Jalan Poros Lokasi Kws

NO. URAIAN PERMASALAHAN PAKET TINDAK LANJUT KETERANGAN

1 Persiapan Lelang 57 Percepatan Proses Lelang

2 Proses Lelang 179 Percepatan Proses Evaluasi Penawaran

3 Sanggah Banding 0 Dilakukan evaluasi ulang

4 Tender Ulang 0 Percepatan Proses Pelelangan

5 Review DED 0 Percepatan Review DED

6 Diblokir (Tanda Bintang) oleh Ditjen Anggaran 10 Mengajukan pembukaan blokir

a. Loan belum efektif 4

b. Menunggu Penandatanganan Loan Agreement 1

c. Tanggap Darurat 0

d. Revisi Kegiatan 4

e. Belum tersedia dokumen RPIJM 0

f. Menunggu persyaratan pembuktian BMN 1

7 Pemindahan Lokasi 0 Mempercepat proses revisi lokasi

246TOTAL

RINGKASAN PERMASALAHAN PROGRES PELELANGAN TA.2010

DI LINGKUNGAN DITJEN CIPTA KARYA

STATUS: 29 JULI 2010, 08.00 WIB

Page 4: KEMAJUAN PELAKSANAAN KEGIATAN PEMBANGUNAN …ciptakarya.pu.go.id/dok/progress/progress_20100729.pdf · 5 Review DED 0 Percepatan Review ... Pembangunan Jalan Poros Lokasi Kws

NO. DIREKTORATJUMLAH

PAKETNAMA PAKET BELUM LELANG PERKIRAAN MULAI LELANG

1 Dit. PAM 3 Pelaksanaan Pilot Project Corporate Social Responsibility (CSR) Bidang Air Minum 16 Agustus 2010

Perbaikan Rumah Dinas (PKPAM Kalteng) Minggu II Agustus 2010

Consultant For Bali Southtern Water Supply Project Lelang Tidak Dilaksanakan

2 Dit. PPLP 28 Pembangunan PS Sampah Terpadu 3R Kota Medan Minggu II Agustus 2010

Pembangunan PS Sampah Terpadu 3R Kab. Asahan Minggu II Agustus 2010

Supervisi Pembangunan PS Air Limbah Terpusat Kota Medan Awal September 2010

Pembangunan PS Sampah Terpadu 3R Kota Padang Minggu II Agustus 2010

Pembangunan PS Sampah Terpadu 3R Kota Payakumbuh Minggu II Agustus 2010

Pembangunan PS Sampah terpadu 3R (PPLP Sumsel) Minggu II Agustus 2010

Pembangunan Prasarana Pengelolaan Sampah Terpadu 3R Kota tangerang Selatan Minggu II Agustus 2010

Pembangunan Prasarana Pengelolaan sampah terpadu 3R Kab. Tangerang Minggu II Agustus 2010

Pembangunan Prasarana Pengelolaan sampah Terpadu 3R Citra Gading Serang Minggu II Agustus 2010

Pembangunan Prasarana Pengelolaan Sampah Terpadu 3R Sepang Serang Minggu II Agustus 2010

Jakarta Urban Flood Management Project (JUFMP) Loan belum efektif

Pembangunan Prasarana dan Sarana Sampah Terpadu 3R Kabupaten Garut Minggu II Agustus 2010

Pembangunan Air Limbah Terpusat Skala Kawasan (RSH Tenjoresmi) Kabupaten Sukabumi 30 Juli 2010

Pembangunan Tempat Pengolahan Sampah Terpadu Kota Magelang Minggu II Agustus 2010

Penyediaan PS Pengolah Sampah Kota Magelang Minggu II Agustus 2010

Pembangunan Tempat Pengolahan Sampah Terpadu Kab Klaten Minggu II Agustus 2010

DAFTAR PAKET BELUM LELANG TA.2010DI LINGKUNGAN DITJEN CIPTA KARYA

STATUS: 29 JULI 2010

Page 5: KEMAJUAN PELAKSANAAN KEGIATAN PEMBANGUNAN …ciptakarya.pu.go.id/dok/progress/progress_20100729.pdf · 5 Review DED 0 Percepatan Review ... Pembangunan Jalan Poros Lokasi Kws

NO. DIREKTORATJUMLAH

PAKETNAMA PAKET BELUM LELANG PERKIRAAN MULAI LELANG

Penyediaan PS Pengolah Sampah Kab. Klaten Minggu II Agustus 2010

Semarang Urban Drainage (Package C2: Semarang Pumping Station and Retarding Pond,

Mechanical and Electrical Works)

Menunggu Persetujuan NOL

JICA

Pembangunan PS Air Limbah Terpusat Paket AL - 1 Awal September 2010

Penyediaan Prasarana dan Sarana Pengolah Sampah Sistem 3R Kota Entikong Kab. Sanggau Minggu II Agustus 2010

Penyediaan Prasarana dan Sarana Pengolah Sampah Sistem 3R Kota Sanggau Kab. Sanggau Minggu II Agustus 2010

Pengembangan TPA Regional MamminasataMenunggu Proses Review

Desain

Pembangunan PS Persampahan 3R Pupuan, kec. Pupuan Kab.Tabanan Minggu II Agustus 2010

Pembangunan Pengelolaan Sampah Terpadu Skala Kawasan 3R di Besakih, Karangasem. Minggu II Agustus 2010

Pembangunan Pengelolaan Sampah Terpadu Skala Kawasan (3R) di Tukad Mungga,

Singaraja.Minggu II Agustus 2010

Pengadaan Mobil Penyuluhan Kampanye dan Edukasi 3R Bidang PLP Revisi DIPA ditolak DJA

Pembangunan Pengelolaan Sampah Terpadu 3R Kab. Biak Minggu III Agustus 2010

Pembangunan Pengelolaan Sampah Terpadu 3R Kab. Merauke Minggu III Agustus 2010

3 Dit. Bangkim 21 Pembangunan Rususnawa Lokasi Padang Akhir Juli 2010

Pembangunan Rusunawa Lokasi Rempoa Akhir Juli 2010

Page 6: KEMAJUAN PELAKSANAAN KEGIATAN PEMBANGUNAN …ciptakarya.pu.go.id/dok/progress/progress_20100729.pdf · 5 Review DED 0 Percepatan Review ... Pembangunan Jalan Poros Lokasi Kws

NO. DIREKTORATJUMLAH

PAKETNAMA PAKET BELUM LELANG PERKIRAAN MULAI LELANG

Pembangunan Rusunawa Lokasi Surabaya Akhir Juli 2010

Perbaikan Rusunawa di Bandar Lampung Awal Agustus 2010

Perbaikan Rusunawa di Bogor Awal Agustus 2010

Perbaikan Rusunawa di Medan Awal Agustus 2010

Perbaikan Rusunawa di Bandung Awal Agustus 2010

Perbaikan Rusunawa di Sleman Awal Agustus 2010

Perbaikan Rusunawa di Yogyakarta Awal Agustus 2010

Perbaikan rusunawa di Cilacap Awal Agustus 2010

Perbaikan Rusunawa di Sumsel Awal Agustus 2010

Perbaikan Rusunawa di Bengkulu Awal Agustus 2010

Perbaikan Rusunawa di Solo Awal Agustus 2010

Perbaikan Rusunawa di Padang Awal Agustus 2010

Pembangunan PSDdan Pengadaan Perlengkapan Sarana Gedung di Kws Rusunawa Kendari

SultraAkhir Juli 2010

Pembuatan Sewage Treatmen Plant di Kws Rusunami Pulo Gebang Jakarta Timur Akhir Juli 2010

Pembangunan PSD di Kws Rusunawa Bau-Bau Sultra Akhir Juli 2010

Pembuatan MCK di Kws Kumuh Rel Kereta Api di Tanjung Priok Jakarta Utara Akhir Juli 2010

Pembangunan PSD di Kws Rusunawa Pringwulung Condongcatur Kota Sleman Jogyakarta Akhir Juli 2010

Pembangunan PSD di Kws Rusunawa Sidoarjo Ngelom Jawa Timur Akhir Juli 2010

Pembangunan Jalan Poros Lokasi Kws.Membalong Kab.Belitung Awal Agustus 2010

Page 7: KEMAJUAN PELAKSANAAN KEGIATAN PEMBANGUNAN …ciptakarya.pu.go.id/dok/progress/progress_20100729.pdf · 5 Review DED 0 Percepatan Review ... Pembangunan Jalan Poros Lokasi Kws

NO. DIREKTORATJUMLAH

PAKETNAMA PAKET BELUM LELANG PERKIRAAN MULAI LELANG

4 Dit. PBL 12 Supervisi Penataan dan Revitalisasi Kawasan Kota Pacitan Menunggu Arahan Menteri PU

Pelaksanaan Penataan dan Revitalisasi Kawasan Kota Pacitan Menunggu Arahan Menteri PU

Evaluation Consultant - Baseline ND Minggu I Oktober 2010

Evaluation Consultant - Impact PAKET Minggu I Oktober 2010

Evaluation Consultant - Kelembagaan BKM Indikator Pengukuran Kinerja Minggu I Oktober 2010

Konsultan Evaluasi IDB PNPM 2 Minggu I Oktober 2010

Good and Service Advance21 Juli 2010 (belum update

eMon)

Lanjutan Revitalisasi Kompleks Perkantoran Cipta Karya Werdha Pura Sanur Bali Menunggu Revisi DIPA

Rehabilitasi Gedung Kantor Cipta Karya (Ruang Kerja Subdit PGRN) dan Rumah Dinas 03 Agustus 2010

DUKUNGAN PSD KWS. TRADISIONAL KEL. KUTO PANJI KEC. BELINYU

PENDAMPINGAN FISIK TRADISIONAL

DUKUNGAN PRASARANA DAN SARANA RUANG TERBUKA HIJAU KEL. SRI MENANTI KEC.

SUNGAILIAT

5 Dit. Bina Program 2 Presentation Room Direktorat Bina Program 02 Agustus 2010

LED and Business Plan 01 September 2010

TOTAL 66

Penetapan Lokasi Diputuskan

Bupati Bangka pada 4 Agustus

2010

Page 8: KEMAJUAN PELAKSANAAN KEGIATAN PEMBANGUNAN …ciptakarya.pu.go.id/dok/progress/progress_20100729.pdf · 5 Review DED 0 Percepatan Review ... Pembangunan Jalan Poros Lokasi Kws

NO. DIREKTORATJUMLAH

PAKETNAMA PAKET PROSES LELANG PERKIRAAN TERKONTRAK

1 Dit. PAM 1 SPAM IKK Tanjungsiang (AM-Sbg-01) di Kec. Tanjungsiang Kab. Subang 05 Agustus 2010

2 Dit. Bina Program 10 TA. Program Development Advisory Minggu II Agustus 2010

TA. Procurement/Safe Guard Specialist Minggu II Agustus 2010

TA-MPA/PHAST and Sustainabality Specialist Minggu II Agustus 2010

TA-CLTS Specialist Minggu II Agustus 2010

TA-Advocacy Minggu II Agustus 2010

Konsulltan NMC RIS-PNPM 2 Minggu II Agustus 2010

Konsultan RMC (Lampung) RIS-PNPM 2 Minggu II Agustus 2010

Konsulltan RMC (Sumatera Selatan) RIS-PNPM 2 Minggu II Agustus 2010

Konsultan RMC (Jambi dan Riau) RIS-PNPM 2 Minggu II Agustus 2010

Konsultan untuk Training Coach Team RIS-PNPM 2010 Minggu II Agustus 2010

TOTAL 11

DAFTAR PAKET PROSES LELANG TA.2010

DI LINGKUNGAN DITJEN CIPTA KARYASTATUS: 29 JULI 2010

Page 9: KEMAJUAN PELAKSANAAN KEGIATAN PEMBANGUNAN …ciptakarya.pu.go.id/dok/progress/progress_20100729.pdf · 5 Review DED 0 Percepatan Review ... Pembangunan Jalan Poros Lokasi Kws

RPM PHLN TOTAL

1 Direktorat PAM 1,387,145,845 97,195,500 1,484,341,345 196,733,782 9,377,517 1,197,707,546 80,522,500 1,278,230,046 - 1,484,341,345 1,137,484,986 72,073,500 1,209,558,486 1,044,792,027 72,073,500 1,116,865,527 92,692,959 - 92,692,959

2 Direktorat PLP 633,610,238 607,359,000 1,240,969,238 83,319,986 15,169,511 535,220,741 607,259,000 1,142,479,741 - 1,240,969,238 502,139,403 598,259,000 1,100,398,403 439,833,097 598,258,420 1,038,091,517 62,306,306 580 62,306,886

3 Direktorat Bangkim 899,323,660 24,000,000 923,323,660 87,359,847 31,515,239 780,448,574 24,000,000 804,448,574 - 923,323,660 490,862,370 24,000,000 514,862,370 428,261,725 24,000,000 452,261,725 62,600,645 - 62,600,645

4 Direktorat PBL 532,249,922 637,874,300 1,170,124,222 588,261,996 12,995,424 417,933,522 150,933,280 568,866,802 - 1,170,124,222 357,011,397 128,544,905 485,556,302 327,998,611 128,544,905 456,543,516 29,012,786 - 29,012,786

5 Direktorat Bina Program 540,942,532 148,471,500 689,414,032 517,450,606 1,058,900 68,866,506 102,038,020 170,904,526 - 689,414,032 64,186,940 83,622,963 147,809,903 57,666,099 83,622,963 141,264,367 6,520,841 - 6,520,841

6 Setditjen 114,266,503 1,000,000 115,266,503 78,441,953 490,143 35,334,407 1,000,000 36,334,407 - 115,266,503 19,352,947 - 19,352,947 16,244,090 - 16,244,090 3,108,857 - 3,108,857

7 Pemberdayaan Masyarakat 1,192,891,000 886,400,000 2,079,291,000 - - - - - 2,079,291,000 2,079,291,000 - - - - - - - - -

-P2KP 817,891,000 61,800,000 879,691,000 - - - - - 879,691,000 879,691,000 - - - - - - - - -

-PPIP 375,000,000 150,000,000 525,000,000 - - - - - 525,000,000 525,000,000 - - - - - - - - -

-PAMSIMAS - 255,100,000 255,100,000 - - - - - 255,100,000 255,100,000 - - - - - - - - -

-RISE - 419,500,000 419,500,000 - - - - - 419,500,000 419,500,000 - - - - - - - - -

TOTAL 5,300,429,700 2,402,300,300 7,702,730,000 1,551,568,170 70,606,734 3,035,511,296 965,752,800 4,001,264,096 2,079,291,000 7,702,730,000 2,571,038,043 906,500,368 3,477,538,411 2,314,795,649 906,499,788 3,221,270,742 256,242,394 580 256,242,974

PHLNTOTAL RPM PHLN TOTAL RPM

REKAPITULASI LAPORAN SISA PAGU PELELANGAN BARANG/JASA TA 2010

DIREKTORAT JENDERAL CIPTA KARYA

STATUS : 29 JULI 2010, JAM 08.00 WIB( x Rp. 1.000 )

NO NAMA SATUAN KERJA

PAGU

SWAKELOLA

+ AP

KONTRAKTUAL > 100 JTBLM TOTAL

PAGU TERKONTRAK NILAI KONTRAK SISA PAGU KONTRAK

RPM PHLNTOTAL

PAGU (Rp)

RUPIAH MURNI PLN TOTAL KONTRAKTUAL

≤ 100 JT

Page 10: KEMAJUAN PELAKSANAAN KEGIATAN PEMBANGUNAN …ciptakarya.pu.go.id/dok/progress/progress_20100729.pdf · 5 Review DED 0 Percepatan Review ... Pembangunan Jalan Poros Lokasi Kws

KEU. FISIK

(RP) % % % (RP) %

1 Direktorat Pengembangan Air Minum 1,387,145,845 97,195,500 1,484,341,345 812,885,997 54.76 59.48 520,079,887 10,232,976 530,312,863 35.73 44.41 (282,573,134) (19.04)

2 Direktorat Pengembangan PLP 633,610,238 607,359,000 1,240,969,238 590,341,362 47.57 51.55 191,110,692 236,329,906 427,440,598 34.44 35.11 (162,900,764) (13.13)

3 Direktorat Pengembangan Permukiman 899,323,660 24,000,000 923,323,660 279,128,748 30.23 32.01 240,325,913 13,273,079 253,598,992 27.47 37.25 (25,529,756) (2.76)

4 Direktorat Penataan Bangunan dan Lingkungan 532,249,922 637,874,300 1,170,124,222 464,526,030 39.70 60.00 150,898,753 227,378,362 378,277,115 32.33 36.33 (86,248,915) (7.37)

5 Direktorat Bina Program 540,942,532 148,471,500 689,414,032 169,866,134 24.64 24.64 88,791,971 40,340,008 129,131,979 18.73 22.70 (40,734,155) (5.91)

6 Sekretariat Jenderal Cipta Karya 114,266,503 1,000,000 115,266,503 62,193,118 53.96 55.96 45,840,133 - 45,840,133 39.77 40.87 (16,352,985) (14.19)

7 Program Pemberdayaan Masyarakat 1,192,891,000 886,400,000 2,079,291,000 754,592,000 36.29 34.90 121,867,450 234,897,859 356,765,309 17.16 13.22 (325,346,691) (15.65)

-P2KP 817,891,000 61,800,000 879,691,000 284,380,000 32.33 32.33 121,867,450 14,780,000 136,647,450 15.53 6.10 (147,732,550) (16.79)

-PPIP 375,000,000 150,000,000 525,000,000 219,600,000 41.83 36.31 - - - - - (147,120,000) (28.02)

-PAMSIMAS - 255,100,000 255,100,000 25,487,000 9.99 9.99 - 7,390,823 7,390,823 2.90 3.14 (18,096,177) (7.09)

-RISE - 419,500,000 419,500,000 225,125,000 53.67 53.67 - 212,727,036 212,727,036 50.71 50.85 (12,397,964) (2.96)

5,300,429,700 2,402,300,300 7,702,730,000 3,133,533,388 40.68 45.18 1,358,914,799 762,452,190 2,121,366,989 27.54 30.41 (939,686,399) (12.20)

DEVIASIREALISASI

PHLN TOTALTOTAL RUPIAH

MURNI

FISIK

(%)

DIREKTORAT JENDERAL CIPTA KARYA

STATUS : 29 JULI 2010, JAM 08.00 WIB( x Rp. 1.000 )

REKAPITULASI LAPORAN PELAKSANAAN BULANAN TA 2010

Total

NO NAMA SATUAN KERJA

PAGU

KEUANGAN KEUANGAN

RENCANA PENYERAPAN

AKHIR BULAN JULI

RUPIAH MURNI PLN

Page 11: KEMAJUAN PELAKSANAAN KEGIATAN PEMBANGUNAN …ciptakarya.pu.go.id/dok/progress/progress_20100729.pdf · 5 Review DED 0 Percepatan Review ... Pembangunan Jalan Poros Lokasi Kws

7,702,730

- 28,907 132,054 308,139

702,454

1,244,885

2,121,673

3,133,533

4,303,291

5,571,570

6,538,451

7,184,918

7,702,720

-3,947 7,894 27,141

46,845 98,330

211,344 271,230

452,196

660,025

837,038

1,127,995

1,458,874

1,690,926

2,121,367

-

1,000,000

2,000,000

3,000,000

4,000,000

5,000,000

6,000,000

7,000,000

8,000,000

9,000,000

JAN FEB MAR APR MEI JUN JUL AGT SEP OKT NOP DES

DA

LA

M J

UT

AA

N R

UP

IAH

BULAN

RENCANA DAN REALISASI PENYERAPAN DITJEN CIPTA KARYA

TAHUN ANGGARAN 2010

PAGU

RENCANA

REALISASI

Page 12: KEMAJUAN PELAKSANAAN KEGIATAN PEMBANGUNAN …ciptakarya.pu.go.id/dok/progress/progress_20100729.pdf · 5 Review DED 0 Percepatan Review ... Pembangunan Jalan Poros Lokasi Kws

RPM PHLN TOTAL

Satker Pusat 159,190,845 - 159,190,845 38,081,350 - 121,109,495 - 121,109,495 - 159,190,845 24 16 40 1 1 - - - - - - - 38 114,489,181

1 466178 Dit. PAM 57,090,845 57,090,845 33,194,936 - 23,895,909 - 23,895,909 - 57,090,845 20 3 23 1 1 21 19,066,650

2 448311 PSPAM IKK 102,100,000 102,100,000 4,886,414 - 97,213,586 - 97,213,586 - 102,100,000 4 13 17 - 17 95,422,531

Satker Propinsi 1,227,955,000 97,195,500 1,325,150,500 158,652,432 9,377,517 1,076,598,051 80,522,500 1,157,120,551 - 1,325,150,500 171 584 755 2 1 2 - 2 2 1 3 47 695 1,002,376,346

Wilayah 1 631,063,200 52,518,500 683,581,700 87,573,061 7,463,462 552,123,677 36,421,500 588,545,177 - 683,581,700 80 366 446 - 1 2 - 2 2 1 3 40 395 496,494,331

1 501380 PKPAM NAD 33,830,500 33,830,500 1,134,550 653,050 32,042,900 - 32,042,900 - 33,830,500 5 10 15 - 15 29,262,418

2 494931 PKPAM Sumut 53,452,000 53,452,000 2,365,300 - 51,086,700 - 51,086,700 - 53,452,000 6 30 36 - 36 49,785,083

3 494993 PKPAM Sumbar 48,475,100 11,850,000 60,325,100 14,036,538 260,000 35,258,562 10,770,000 46,028,562 - 60,325,100 9 16 25 - 1 1 1 1 21 38,877,739

4 495044 PKPAM Riau 34,464,000 4,628,000 39,092,000 7,067,585 480,000 26,916,415 4,628,000 31,544,415 - 39,092,000 1 10 11 - 1 1 9 29,102,905

5 495364 PKPAM Kepri 22,954,700 22,954,700 1,524,500 189,400 21,240,800 - 21,240,800 - 22,954,700 5 12 17 - 17 20,052,016

6 495081 PKPAM Jambi 29,731,700 29,731,700 1,116,050 610,050 28,005,600 - 28,005,600 - 29,731,700 3 11 14 - 14 26,276,327

7 495260 PKPAM Bengkulu 28,912,100 28,912,100 1,579,460 215,920 27,116,720 - 27,116,720 - 28,912,100 5 17 22 - 22 26,465,298

8 495163 PKPAM Sumsel 54,136,100 6,444,000 60,580,100 14,815,779 40,422 45,723,899 - 45,723,899 - 60,580,100 4 10 14 - 1 13 43,823,832

9 495302 PKPAM Babel 27,183,300 27,183,300 1,629,435 723,218 24,830,647 - 24,830,647 - 27,183,300 5 11 16 - 2 14 20,985,685

10 495220 PKPAM Lampung 26,497,700 26,497,700 1,614,090 400,000 24,483,610 - 24,483,610 - 26,497,700 2 8 10 - 10 23,883,442

11 496055 PKPAM Banten 25,723,800 25,723,800 3,392,600 679,202 21,651,998 - 21,651,998 - 25,723,800 4 19 23 - 23 20,782,555

12 495596 PKPAM Jawa Barat 57,705,300 6,319,000 64,024,300 12,205,122 - 51,819,178 - 51,819,178 - 64,024,300 5 14 19 - 1 2 16 38,316,109

13 495684 PKPAM Jawa Tengah 89,198,300 22,901,500 112,099,800 20,835,977 2,970,256 67,552,067 20,741,500 88,293,567 - 112,099,800 9 89 98 - 3 26 69 60,064,996

14 495741 PKPAM D.I.Y 32,433,000 32,433,000 2,153,475 - 30,279,525 - 30,279,525 - 32,433,000 5 30 35 - 35 20,856,546

15 495817 PKPAM Jawa Timur 66,365,600 376,000 66,741,600 2,102,600 241,944 64,115,056 282,000 64,397,056 - 66,741,600 12 79 91 - 1 1 8 81 47,959,380

Wilayah 2 596,891,800 44,677,000 641,568,800 71,079,371 1,914,055 524,474,374 44,101,000 568,575,374 - 641,568,800 91 218 309 2 - - - - - - - 7 300 505,882,015

16 495879 PKPAM Kalbar 49,879,400 49,879,400 1,875,400 - 48,004,000 - 48,004,000 - 49,879,400 5 27 32 - 32 46,583,863

17 495920 PKPAM Kalteng 28,216,200 28,216,200 1,153,770 63,780 26,998,650 - 26,998,650 - 28,216,200 4 15 19 1 1 17 24,762,250

18 495967 PKPAM Kalsel 39,308,200 6,302,000 45,610,200 8,874,300 - 31,009,900 5,726,000 36,735,900 - 45,610,200 4 9 13 - 4 9 22,918,990

19 496002 PKPAM Kaltim 32,549,300 32,549,300 2,062,330 - 30,486,970 - 30,486,970 - 32,549,300 10 7 17 - 17 29,990,971

20 496112 PKPAM Sulut 28,497,584 28,497,584 1,885,473 - 26,612,111 - 26,612,111 - 28,497,584 2 12 14 - 14 22,439,099

21 496752 PKPAM Gorontalo 25,771,600 6,989,000 32,760,600 4,893,290 20,000 20,858,310 6,989,000 27,847,310 - 32,760,600 3 5 8 - 2 6 23,972,790

22 496174 PKPAM Sulteng 32,054,100 5,763,000 37,817,100 8,400,700 - 23,653,400 5,763,000 29,416,400 - 37,817,100 12 8 20 - 20 26,731,170

23 496240 PKPAM Sulsel 53,378,200 8,593,000 61,971,200 9,194,045 900,000 43,284,155 8,593,000 51,877,155 - 61,971,200 3 19 22 - 22 45,165,353

24 466235 PKPAM Sulbar 20,995,500 20,995,500 4,543,188 - 16,452,312 - 16,452,312 - 20,995,500 6 6 12 - 12 15,721,141

25 496313 PKPAM Sultra 27,854,400 27,854,400 1,995,975 349,425 25,509,000 - 25,509,000 - 27,854,400 3 14 17 - 17 25,443,363

26 496441 PKPAM Bali 26,892,200 8,449,000 35,341,200 1,960,557 50,000 24,881,643 8,449,000 33,330,643 - 35,341,200 11 10 21 1 20 19,740,764

27 496539 PKPAM NTB 38,927,500 38,927,500 1,617,500 181,000 37,129,000 - 37,129,000 - 38,927,500 4 5 9 - 9 31,513,615

28 496582 PKPAM NTT 46,741,300 8,581,000 55,322,300 9,774,300 310,000 36,657,000 8,581,000 45,238,000 - 55,322,300 11 14 25 - 25 42,564,773

29 496369 PKPAM Maluku 34,558,500 34,558,500 3,370,234 - 31,188,266 - 31,188,266 - 34,558,500 2 24 26 - 26 29,121,915

30 496709 PKPAM Maluku Utara 45,377,916 45,377,916 4,876,109 - 40,501,807 - 40,501,807 - 45,377,916 5 17 22 22 39,364,620

31 496642 PKPAM Papua 36,098,000 36,098,000 1,505,600 39,850 34,552,550 - 34,552,550 - 36,098,000 4 14 18 - 18 33,722,658

32 496828 PKPAM Papua Barat 29,791,900 29,791,900 3,096,600 - 26,695,300 - 26,695,300 - 29,791,900 2 12 14 - 14 26,124,680

TOTAL 1,387,145,845 97,195,500 1,484,341,345 196,733,782 9,377,517 1,197,707,546 80,522,500 1,278,230,046 - 1,484,341,345 195 600 795 3 2 2 - 2 2 1 3 47 733 1,116,865,527

Keterangan : 6. Pemasukan Penawaran

1 Penyiapan Dokumen Lelang 7. Usulan Pemenang

2 Pengumuman Lelang/Prakualifikasi 8. Penetapan Pemenang

3 Penyusunan shortlist 9. Penerbitan Surat Perintah Mulai Kerja

4 Undangan Pelelangan 10. Penandatangan Kontrak

5 Penjelasan Pekerjaan Aanwyzing

NILAI KONTRAK

(Rp. x 1.000) 8 9TOTAL FISIK 2 3 4 5 6 NON

FISIK

SWAKELOLA +

AP

KONTRAKTUAL > 100 JTBLM 7TOTAL

KONTRAKTUAL

≤ 100 JT

PAGU (Rp)

LAPORAN PELAKSANAAN PELELANGAN BARANG/JASA TA 2010

DIREKTORAT PENGEMBANGAN AIR MINUM

STATUS : 29 JULI 2010, JAM 08.00 WIB

NOKODE

SATKERNAMA SATUAN KERJA

PAGU PAKET KONTRAK JUMLAH PAKET DALAM PROSES PRA KONTRAK

TOTAL PLNRUPIAH

MURNI101

PAKET > RP 100 JUTA

Page 13: KEMAJUAN PELAKSANAAN KEGIATAN PEMBANGUNAN …ciptakarya.pu.go.id/dok/progress/progress_20100729.pdf · 5 Review DED 0 Percepatan Review ... Pembangunan Jalan Poros Lokasi Kws

NO. URAIAN PERMASALAHAN PAKET TINDAK LANJUT KETERANGAN

1 Persiapan Lelang 1 Penetapan lokasi final CSR

2 Proses Lelang 59

3 Sanggah Banding 0

4 Tender Ulang 0

5 Review DED 0

6 Diblokir (Tanda Bintang) oleh Ditjen Anggaran

a. Loan belum efektif 1 Diusulkan untuk direvisi DIPA untuk pengurangan pagu DIPA ke DJA

melalui surat Dirjen CK.

Consultant For Bali

Southtern Water Supply

Project

b. Menunggu Penandatanganan Loan Agreement

c. Tanggap Darurat

d. Revisi Kegiatan 1 Mempercepat proses pelepasan tanda bintang ke DJA. Perbaikan Rumah Dinas

e. Belum tersedia dokumen RPIJM

f. Menunggu persyaratan pembuktian BMN

7 Pemindahan Lokasi 0

62

RINGKASAN PERMASALAHAN PROGRES PELELANGAN TA.2010

DI LINGKUNGAN DIREKTORAT PENGEMBANGAN AIR MINUM

STATUS: 29 JULI 2010

TOTAL

Page 14: KEMAJUAN PELAKSANAAN KEGIATAN PEMBANGUNAN …ciptakarya.pu.go.id/dok/progress/progress_20100729.pdf · 5 Review DED 0 Percepatan Review ... Pembangunan Jalan Poros Lokasi Kws

1 DIREKTORAT

PENGEMBANGAN AIR

MINUM

1 1 Pelaksanaan Pilot Project Corporate Social Responsibility (CSR) Bidang Air Minum 2,552,166 Persiapan lelang. Rencana pengumuman : 16

Agustus 2010. Rencana tanda

tangan kontrak : 3 Nopember

2010.

2 1 1 Perbaikan Rumah Dinas 350,000

3 1 1 Consultant For Bali Southtern Water Supply Project 8,449,000 Loan belum efektif.

TOTAL 3 11,351,166

PENJELASAN BELUM LELANG TINDAK LANJUT

PENGEMBANGAN

KINERJA PENGELOLAAN

AIR MINUM KALIMANTAN

TENGAH

Belum dapat ditender karena

masih terdapat tanda bintang

dikarenakan salah peruntukan dan

sedang dalam proses revisi

pelepasan tanda bintang ke DJA.

Mempercepat proses

pelepasan tanda bintang

ke DJA.

PENGEMBANGAN

KINERJA PENGELOLAAN

AIR MINUM BALI

Diusulkan untuk direvisi DIPA

untuk pengurangan pagu

DIPA ke DJA melalui surat

Dirjen CK.

NO SATKER/PROVINSI

JML

PAKET

BELUM

LELANG

PAKET KONTRAK/RINCIAN KEGIATANPAGU

(X Rp.1000)

PERMASALAHAN PAKET BELUM LELANGDIREKTORAT PENGEMBANGAN AIR MINUM

STATUS : 29 JULI 2010

Page 15: KEMAJUAN PELAKSANAAN KEGIATAN PEMBANGUNAN …ciptakarya.pu.go.id/dok/progress/progress_20100729.pdf · 5 Review DED 0 Percepatan Review ... Pembangunan Jalan Poros Lokasi Kws

RPM PHLN TOTAL

Satker Pusat 159,190,845 - 159,190,845 38,081,350 - 121,109,495 - 121,109,495 - 159,190,845 117,729,254 - 117,729,254 114,489,181 - 114,489,181 3,240,073 - 3,240,073

466178 Dit. PAM 57,090,845 - 57,090,845 33,194,936 - 23,895,909 23,895,909 57,090,845 20,515,668 - 20,515,668 19,066,650 19,066,650 1,449,018 - 1,449,018

448311 PSPAM IKK 102,100,000 - 102,100,000 4,886,414 - 97,213,586 97,213,586 102,100,000 97,213,586 97,213,586 95,422,531 95,422,531 1,791,055 - 1,791,055

Satker Propinsi 1,227,955,000 97,195,500 1,325,150,500 158,652,432 9,377,517 1,076,598,051 80,522,500 1,157,120,551 - 1,325,150,500 1,019,755,732 72,073,500 1,091,829,232 930,302,846 72,073,500 1,002,376,346 89,452,886 - 89,452,886

Wilayah 1 631,063,200 52,518,500 683,581,700 87,573,061 7,463,462 552,123,677 36,421,500 588,545,177 - 683,581,700 508,284,738 36,421,500 544,706,238 460,072,831 36,421,500 496,494,331 48,211,907 - 48,211,907

501380 PKPAM NAD 33,830,500 - 33,830,500 1,134,550 653,050 32,042,900 - 32,042,900 - 33,830,500 32,042,900 32,042,900 29,262,418 29,262,418 2,780,482 - 2,780,482

494931 PKPAM Sumut 53,452,000 - 53,452,000 2,365,300 - 51,086,700 - 51,086,700 - 53,452,000 51,086,700 51,086,700 49,785,083 49,785,083 1,301,617 - 1,301,617

494993 PKPAM Sumbar 48,475,100 11,850,000 60,325,100 14,036,538 260,000 35,258,562 10,770,000 46,028,562 - 60,325,100 33,898,562 10,770,000 44,668,562 28,107,739 10,770,000 38,877,739 5,790,823 - 5,790,823

495044 PKPAM Riau 34,464,000 4,628,000 39,092,000 7,067,585 480,000 26,916,415 4,628,000 31,544,415 39,092,000 24,742,415 4,628,000 29,370,415 24,474,905 4,628,000 29,102,905 267,510 - 267,510

495364 PKPAM Kepri 22,954,700 - 22,954,700 1,524,500 189,400 21,240,800 - 21,240,800 - 22,954,700 21,240,800 21,240,800 20,052,016 20,052,016 1,188,784 - 1,188,784

495081 PKPAM Jambi 29,731,700 - 29,731,700 1,116,050 610,050 28,005,600 - 28,005,600 - 29,731,700 28,005,600 28,005,600 26,276,327 26,276,327 1,729,273 - 1,729,273

495260 PKPAM Bengkulu 28,912,100 - 28,912,100 1,579,460 215,920 27,116,720 - 27,116,720 - 28,912,100 27,116,720 27,116,720 26,465,298 26,465,298 651,422 - 651,422

495163 PKPAM Sumsel 54,136,100 6,444,000 60,580,100 14,815,779 40,422 45,723,899 - 45,723,899 - 60,580,100 44,323,899 44,323,899 43,823,832 43,823,832 500,067 - 500,067

495302 PKPAM Babel 27,183,300 - 27,183,300 1,629,435 723,218 24,830,647 - 24,830,647 - 27,183,300 22,155,814 22,155,814 20,985,685 20,985,685 1,170,129 - 1,170,129

495220 PKPAM Lampung 26,497,700 - 26,497,700 1,614,090 400,000 24,483,610 - 24,483,610 - 26,497,700 24,483,610 24,483,610 23,883,442 23,883,442 600,168 - 600,168

496055 PKPAM Banten 25,723,800 - 25,723,800 3,392,600 679,202 21,651,998 - 21,651,998 - 25,723,800 21,651,998 21,651,998 20,782,555 20,782,555 869,443 - 869,443

495596 PKPAM Jawa Barat 57,705,300 6,319,000 64,024,300 12,205,122 - 51,819,178 - 51,819,178 - 64,024,300 41,160,256 41,160,256 38,316,109 38,316,109 2,844,147 - 2,844,147

495684 PKPAM Jawa Tengah 89,198,300 22,901,500 112,099,800 20,835,977 2,970,256 67,552,067 20,741,500 88,293,567 - 112,099,800 54,967,327 20,741,500 75,708,827 39,323,496 20,741,500 60,064,996 15,643,831 - 15,643,831

495741 PKPAM D.I.Y 32,433,000 - 32,433,000 2,153,475 - 30,279,525 - 30,279,525 - 32,433,000 30,279,525 30,279,525 20,856,546 20,856,546 9,422,979 - 9,422,979

495817 PKPAM Jawa Timur 66,365,600 376,000 66,741,600 2,102,600 241,944 64,115,056 282,000 64,397,056 - 66,741,600 51,128,612 282,000 51,410,612 47,677,380 282,000 47,959,380 3,451,232 - 3,451,232

Wilayah 2 596,891,800 44,677,000 641,568,800 71,079,371 1,914,055 524,474,374 44,101,000 568,575,374 - 641,568,800 511,470,994 35,652,000 547,122,994 470,230,015 35,652,000 505,882,015 41,240,979 - 41,240,979

495879 PKPAM Kalbar 49,879,400 - 49,879,400 1,875,400 - 48,004,000 - 48,004,000 - 49,879,400 48,004,000 48,004,000 46,583,863 46,583,863 1,420,137 - 1,420,137

495920 PKPAM Kalteng 28,216,200 - 28,216,200 1,153,770 63,780 26,998,650 - 26,998,650 - 28,216,200 25,348,650 25,348,650 24,762,250 24,762,250 586,400 - 586,400

495967 PKPAM Kalsel 39,308,200 6,302,000 45,610,200 8,874,300 - 31,009,900 5,726,000 36,735,900 - 45,610,200 23,372,900 5,726,000 29,098,900 17,192,990 5,726,000 22,918,990 6,179,910 - 6,179,910

496002 PKPAM Kaltim 32,549,300 - 32,549,300 2,062,330 - 30,486,970 - 30,486,970 - 32,549,300 30,486,970 30,486,970 29,990,971 29,990,971 495,999 - 495,999

496112 PKPAM Sulut 28,497,584 - 28,497,584 1,885,473 - 26,612,111 - 26,612,111 - 28,497,584 26,612,111 26,612,111 22,439,099 22,439,099 4,173,012 - 4,173,012

496752 PKPAM Gorontalo 25,771,600 6,989,000 32,760,600 4,893,290 20,000 20,858,310 6,989,000 27,847,310 - 32,760,600 17,141,930 6,989,000 24,130,930 16,983,790 6,989,000 23,972,790 158,140 - 158,140

496174 PKPAM Sulteng 32,054,100 5,763,000 37,817,100 8,400,700 - 23,653,400 5,763,000 29,416,400 - 37,817,100 23,653,400 5,763,000 29,416,400 20,968,170 5,763,000 26,731,170 2,685,230 - 2,685,230

496240 PKPAM Sulsel 53,378,200 8,593,000 61,971,200 9,194,045 900,000 43,284,155 8,593,000 51,877,155 - 61,971,200 43,284,155 8,593,000 51,877,155 36,572,353 8,593,000 45,165,353 6,711,802 - 6,711,802

466235 PKPAM Sulbar 20,995,500 - 20,995,500 4,543,188 - 16,452,312 - 16,452,312 - 20,995,500 16,452,312 16,452,312 15,721,141 15,721,141 731,171 - 731,171

496313 PKPAM Sultra 27,854,400 - 27,854,400 1,995,975 349,425 25,509,000 - 25,509,000 - 27,854,400 25,509,000 25,509,000 25,443,363 25,443,363 65,637 - 65,637

496441 PKPAM Bali 26,892,200 8,449,000 35,341,200 1,960,557 50,000 24,881,643 8,449,000 33,330,643 - 35,341,200 24,881,643 24,881,643 19,740,764 19,740,764 5,140,879 - 5,140,879

496539 PKPAM NTB 38,927,500 - 38,927,500 1,617,500 181,000 37,129,000 - 37,129,000 - 38,927,500 37,129,000 37,129,000 31,513,615 31,513,615 5,615,385 - 5,615,385

496582 PKPAM NTT 46,741,300 8,581,000 55,322,300 9,774,300 310,000 36,657,000 8,581,000 45,238,000 - 55,322,300 36,657,000 8,581,000 45,238,000 33,983,773 8,581,000 42,564,773 2,673,227 - 2,673,227

496369 PKPAM Maluku 34,558,500 - 34,558,500 3,370,234 - 31,188,266 - 31,188,266 - 34,558,500 31,188,266 31,188,266 29,121,915 29,121,915 2,066,351 - 2,066,351

496709 PKPAM Maluku Utara 45,377,916 - 45,377,916 4,876,109 - 40,501,807 - 40,501,807 - 45,377,916 40,501,807 40,501,807 39,364,620 39,364,620 1,137,187 - 1,137,187

496642 PKPAM Papua 36,098,000 - 36,098,000 1,505,600 39,850 34,552,550 - 34,552,550 - 36,098,000 34,552,550 34,552,550 33,722,658 33,722,658 829,892 - 829,892

496828 PKPAM Papua Barat 29,791,900 - 29,791,900 3,096,600 - 26,695,300 - 26,695,300 - 29,791,900 26,695,300 26,695,300 26,124,680 26,124,680 570,620 - 570,620

TOTAL 1,387,145,845 97,195,500 1,484,341,345 196,733,782 9,377,517 1,197,707,546 80,522,500 1,278,230,046 - 1,484,341,345 1,137,484,986 72,073,500 1,209,558,486 1,044,792,027 72,073,500 1,116,865,527 92,692,959 - 92,692,959

LAPORAN SISA PAGU PELELANGAN BARANG/JASA TA 2010

DIREKTORAT PENGEMBANGAN AIR MINUM

STATUS : 29 JULI 2010, JAM 08.00 WIB( x Rp. 1.000 )

KODE

SATKERNAMA SATUAN KERJA

PAGU

RUPIAH MURNI PLN TOTAL SWAKELOLA +

AP

KONTRAKTUAL > 100 JTBLM

PAGU TERKONTRAK

RPM PHLN TOTALTOTAL

PAGU (Rp) NILAI KONTRAK

RPMKONTRAKTUAL

≤ 100 JT TOTAL

SISA PAGU KONTRAK

PHLN TOTAL RPM PHLN

Page 16: KEMAJUAN PELAKSANAAN KEGIATAN PEMBANGUNAN …ciptakarya.pu.go.id/dok/progress/progress_20100729.pdf · 5 Review DED 0 Percepatan Review ... Pembangunan Jalan Poros Lokasi Kws

KEU. FISIK

(RP) % % % (RP) %

Satker Pusat 159,190,845 - 159,190,845 49,954,323 31.38 31.38 66,623,099 - 66,623,099 41.85 46.27 16,668,776 10.47

1 466178 Direktorat Pengembangan Air Minum 57,090,845 57,090,845 25,674,943 44.97 44.97 18,453,544 - 18,453,544 32.32 34.16 (7,221,399) (12.65)

2 448311 Pengembangan Sistem Penyediaan AM IKK 102,100,000 102,100,000 24,279,380 23.78 23.78 48,169,555 - 48,169,555 47.18 53.04 23,890,175 23.40

Satker Propinsi 1,227,955,000 97,195,500 1,325,150,500 762,931,674 57.57 62.86 453,456,788 10,232,976 463,689,764 34.99 44.19 (299,241,910) (22.58)

Wilayah 1 631,063,200 52,518,500 683,581,700 381,432,035 55.80 63.88 203,381,787 6,845,252 210,227,039 30.75 36.75 (171,204,996) (25.05)

1 501380 Pengembangan Kinerja Pengelolaan AM NAD 33,830,500 33,830,500 18,473,401 54.61 27.97 10,385,200 - 10,385,200 30.70 46.57 (8,088,201) (23.91)

2 494931 Pengembangan Kinerja Pengelolaan AM Sumut 53,452,000 53,452,000 24,621,497 46.06 45.31 11,082,164 - 11,082,164 20.73 17.91 (13,539,333) (25.33)

3 494993 Pengembangan Kinerja Pengelolaan AM Sumbar 48,475,100 11,850,000 60,325,100 34,734,106 57.58 53.40 12,027,193 1,046,581 13,073,774 21.67 22.65 (21,660,332) (35.91)

4 495044 Pengembangan Kinerja Pengelolaan AM Riau 34,464,000 4,628,000 39,092,000 21,142,310 54.08 88.64 6,256,647 1,005,676 7,262,323 18.58 9.67 (13,879,987) (35.51)

5 495364 Pengembangan Kinerja Pengelolaan AM Kepri 22,954,700 22,954,700 7,987,276 34.80 23.19 7,221,396 - 7,221,396 31.46 36.21 (765,880) (3.34)

6 495081 Pengembangan Kinerja Pengelolaan AM Jambi 29,731,700 29,731,700 9,701,858 32.63 69.19 7,378,880 - 7,378,880 24.82 35.46 (2,322,978) (7.81)

7 495260 Pengembangan Kinerja Pengelolaan AM Bengkulu 28,912,100 28,912,100 17,124,017 59.23 71.98 15,283,604 - 15,283,604 52.86 50.29 (1,840,413) (6.37)

8 495163 Pengembangan Kinerja Pengelolaan AM Sumsel 54,136,100 6,444,000 60,580,100 19,857,851 32.78 59.05 16,480,551 2,037,745 18,518,296 30.57 38.18 (1,339,555) (2.21)

9 495302 Pengembangan Kinerja Pengelolaan AM Babel 27,183,300 27,183,300 11,248,807 41.38 68.52 6,535,251 - 6,535,251 24.04 16.89 (4,713,556) (17.34)

10 495220 Pengembangan Kinerja Pengelolaan AM Lampung 26,497,700 26,497,700 16,067,117 60.64 60.64 15,924,976 - 15,924,976 60.10 67.05 (142,141) (0.54)

11 496055 Pengembangan Kinerja Pengelolaan AM Banten 25,723,800 25,723,800 15,757,875 61.26 67.46 8,617,076 - 8,617,076 33.50 41.05 (7,140,799) (27.76)

12 495596 Pengembangan Kinerja Pengelolaan AM Jawa Barat 57,705,300 6,319,000 64,024,300 32,027,264 50.02 73.62 11,543,258 42,000 11,585,258 18.10 16.24 (20,442,006) (31.93)

13 495684 Pengembangan Kinerja Pengelolaan AM Jawa Tengah 89,198,300 22,901,500 112,099,800 72,702,686 64.86 66.66 35,791,104 2,713,250 38,504,354 34.35 58.11 (34,198,332) (30.51)

14 495741 Pengembangan Kinerja Pengelolaan AM D.I.Y 32,433,000 32,433,000 26,074,722 80.40 80.40 11,038,628 - 11,038,628 34.04 54.95 (15,036,094) (46.36)

15 495817 Pengembangan Kinerja Pengelolaan AM Jawa Timur 66,365,600 376,000 66,741,600 53,911,248 80.78 80.45 27,815,859 - 27,815,859 41.68 38.40 (26,095,389) (39.10)

Wilayah 2 596,891,800 44,677,000 641,568,800 381,499,639 59.46 61.77 250,075,001 3,387,724 253,462,725 39.51 52.12 (128,036,914) (19.96)

16 495879 Pengembangan Kinerja Pengelolaan AM Kalbar 49,879,400 49,879,400 31,658,455 63.47 40.72 23,315,333 - 23,315,333 46.74 42.92 (8,343,122) (16.73)

17 495920 Pengembangan Kinerja Pengelolaan AM Kalteng 28,216,200 28,216,200 19,438,140 68.89 89.62 12,582,652 - 12,582,652 44.59 55.12 (6,855,488) (24.30)

18 495967 Pengembangan Kinerja Pengelolaan AM Kalsel 39,308,200 6,302,000 45,610,200 29,299,992 64.24 64.24 6,037,001 1,952,796 7,989,797 17.52 25.32 (21,310,195) (46.72)

19 496002 Pengembangan Kinerja Pengelolaan AM Kaltim 32,549,300 32,549,300 28,080,281 86.27 83.23 12,056,073 - 12,056,073 37.04 51.76 (16,024,208) (49.23)

20 496112 Pengembangan Kinerja Pengelolaan AM Sulut 28,497,584 28,497,584 15,363,048 53.91 69.28 6,545,953 - 6,545,953 22.97 40.84 (8,817,095) (30.94)

21 496752 Pengembangan Kinerja Pengelolaan AM Gorontalo 25,771,600 6,989,000 32,760,600 18,889,762 57.66 57.66 5,196,121 - 5,196,121 15.86 26.81 (13,693,641) (41.80)

22 496174 Pengembangan Kinerja Pengelolaan AM Sulteng 32,054,100 5,763,000 37,817,100 22,017,116 58.22 67.16 8,550,409 144,000 8,694,409 22.99 25.20 (13,322,707) (35.23)

23 496240 Pengembangan Kinerja Pengelolaan AM Sulsel 53,378,200 8,593,000 61,971,200 35,565,272 57.39 62.91 26,777,007 - 26,777,007 43.21 57.02 (8,788,265) (14.18)

24 466235 Pengembangan Kinerja Pengelolaan AM Sulbar 20,995,500 20,995,500 5,759,066 27.43 25.59 11,982,196 - 11,982,196 57.07 76.42 6,223,130 29.64

25 496313 Pengembangan Kinerja Pengelolaan AM Sultra 27,854,400 27,854,400 6,150,252 22.08 20.16 19,185,276 - 19,185,276 68.88 75.77 13,035,024 46.80

26 496441 Pengembangan Kinerja Pengelolaan AM Bali 26,892,200 8,449,000 35,341,200 25,254,822 71.46 72.46 7,626,317 - 7,626,317 21.58 48.05 (17,628,505) (49.88)

27 496539 Pengembangan Kinerja Pengelolaan AM NTB 38,927,500 38,927,500 20,635,468 53.01 53.09 12,213,834 - 12,213,834 31.38 55.84 (8,421,634) (21.63)

28 496582 Pengembangan Kinerja Pengelolaan AM NTT 46,741,300 8,581,000 55,322,300 37,608,100 67.98 80.44 22,753,293 1,290,928 24,044,221 43.46 63.26 (13,563,879) (24.52)

29 496369 Pengembangan Kinerja Pengelolaan AM Maluku 34,558,500 34,558,500 32,585,210 94.29 94.29 20,290,150 - 20,290,150 58.71 82.14 (12,295,060) (35.58)

30 496709 Pengembangan Kinerja Pengelolaan AM Maluku Utara 45,377,916 45,377,916 24,467,772 53.92 56.92 11,098,593 - 11,098,593 24.46 25.44 (13,369,179) (29.46)

31 496642 Pengembangan Kinerja Pengelolaan AM Papua 36,098,000 36,098,000 16,056,390 44.48 49.49 24,733,188 - 24,733,188 68.52 78.24 8,676,798 24.04

32 496828 Pengembangan Kinerja Pengelolaan AM Papua Barat 29,791,900 29,791,900 12,670,495 42.53 44.37 19,131,605 - 19,131,605 64.22 82.81 6,461,110 21.69

TOTAL 1,387,145,845 97,195,500 1,484,341,345 812,885,997 54.76 59.48 520,079,887 10,232,976 530,312,863 35.73 44.41 (282,573,134) (19.04)

RENCANA PENYERAPAN DAN PROGRES KEUANGAN

DIREKTORAT PENGEMBANGAN AIR MINUM

STATUS : 29 JULI 2010, JAM 08.00 WIB( X Rp. 1000 )

PAGU REALISASI RENCANA PENYERAPAN

AKHIR BULAN JULINO

RUPIAH

MURNIPHLN

KODE

SATKERNAMA SATUAN KERJA

DEVIASI

KEUANGAN KEUANGAN RUPIAH MURNI PLN TOTAL TOTAL

FISIK

(%)

Page 17: KEMAJUAN PELAKSANAAN KEGIATAN PEMBANGUNAN …ciptakarya.pu.go.id/dok/progress/progress_20100729.pdf · 5 Review DED 0 Percepatan Review ... Pembangunan Jalan Poros Lokasi Kws

Keu (%) Fisik (%)

1. Provinsi Sumatera Utara 20.73 17.91 Percepatan pelaksanaan melalui :

- Penarikan uang muka paling lambat

sampai dengan akhir bulan Juli 2010

diperkirakan senilai Rp 7.812.736.572,-

(15.90 %)

- Pengadaan pipa diupayakan akan

selesai seluruhnya pada akhir bulan

Agustus 2010 sehingga progres fisik

mencapai 61 % dan progres

keuangan sebesar Rp

22.026.010.000,- (56.92 %).

2. Provinsi Sumatera Barat 21.67 22.65 Terdapat 2 paket kontrak (Bantek : FasilitasiPerencanaan Teknis

Pengembangan SPAM dan Pembuatan Profil PDAM masih dalam tahap

proses lelang

Percepatan proses lelang dan

diperkirakan sebelum tanggal 10

Agustus 2010 sudah tanda tangan

kontrak

3. Provinsi Riau 18.58 9.67 - Provinsi Riau termasuk yang harus melaksanakan pelelangan semi e-

proc plus berdasarkan Surat Edaran Menteri Pekerjaan Umum nomor :

12/SE/2009 tanggal 28 Desember 2009, sehingga proses pelelangan

yang semula direncanakan akan dimulai pada bulan Januari 2010

terpaksa ditunda sampai dengan awal bulan Maret 2010 dikarenakan

harus menunggu pelatihan semi e-proc yang dilaksanakan tanggal 23 -

25 Februari 2010 di Kota Batam

Percepatan pengiriman material oleh

Penyedia Jasa IPA sehingga pada

akhir Agustus 2010 diharapkan

progres fisik mencapai 71 % dan

realisasi keuangan mencapai Rp

16.492.914.000 (66.11 %). Hal ini juga

memperhatikan kemungkinan adanya

larangan penyebrangan Truk

mengingat waktu Hari Raya Idul Fitri

tanggal 11 September 2010

- Pembebasan tanah untuk lokasi IPA IKK Tampan terkendala karena

pembebasan lahan dilakukan seluas 5 Ha (termasuk lokasi untuk IPA

Pekanbaru Selatan), saat ini belum ada kesepakatan harga antara Tim

Pengadaan Tanah Kab. Kampar, Tim Appraisal (Independen), dan

pemilik lahan dimana Tim Appraisal memperkirakan Rp 40.000/M2

sementara pemilik lahan mengajukan penawaran Rp 70.000/M2

Kepala Dinas PU Provinsi Riau

menjanjikan akan segera

menyelesaikan masalah ini sehingga

pada akhir bulan Juli 2010 lahan

tersebut sudah dapat digunakan.

Terlambat dimulainya proses tender (baru bisa dimulai bulan April 2010)

dikarenakan proses review DED & RAB yang disebabkan oleh : DED

yang disusun oleh Pemerintah Kabupaten/Kota perlu penyesuaian

dengan kondisi lapangan, masalah tanah yang mengakibatkan adanya

pergeseran penempatan sarana dan prtasarana yang akan dibangun.

Sehingga kontrak baru ditandatangani akhir bulan Juni 2010 dan awal

bulan Juli 2010.

PERMASALAHAN DAN RENCANA TINDAK LANJUT PERCEPATAN PROGRES

DIREKTORAT PENGEMBANGAN AIR MINUM

STATUS 29 JULI 2010

No Satker PKPAMProgres

Permasalahan Tindak Lanjut Ket

Page 18: KEMAJUAN PELAKSANAAN KEGIATAN PEMBANGUNAN …ciptakarya.pu.go.id/dok/progress/progress_20100729.pdf · 5 Review DED 0 Percepatan Review ... Pembangunan Jalan Poros Lokasi Kws

Keu (%) Fisik (%)

4. Provinsi Jawa Barat 18.1 16.24 1. Terlambat proses pelelangan sehingga kontrak baru ditandatangani

bulan akhir Juni dan awal Juli 2010. Keterlambatan pada umumnya

terjadi karena perlu dilakukan review desain khususnya review desain

IPA Beton

Asisten perencanaan agar melakukan

review untuk persiapan TA 2011.

Konsultan supervisi sekaligus

mengerjakan review DED.

2. Masih terdapat 2 paket kegiatan (dengan total nilai pagu sebesar

Rp.6.973.922.000) yang belum tanda tangan kontrak yaitu:

a) IKK Tanjung Siang Kab. Subang

Pengumuman lelang terlambat karena ada perubahan lokasi dari IKK

Sindang Barang Kab. Cianjur yang tidak jadi dilaksanakan karena DDUB

dan kelembagaan pengelola tidak siap sampai batas waktu yang

ditetapkan.

Memonitor proses lelang sesuai

alokasi waktu. Status lelang: masa

sanggah (akhir masa sanggah:

30/7/2010). Rencana tanda tangan

kontrak: Kamis, 5-Agustus-2010

b) Konsultan Supervisi UWSSP (Kota Bogor)

Pengumuman lelang terlambat karena menyesuaikan dengan jadwal

proses lelang paket kegiatan fisik yang dilaksanakan APBD Kota Bogor

Memonitor proses lelang sesuai

alokasi waktu. Status lelang:

pembukaan dokumen biaya. Rencana

tanda tangan kontrak: Minggu II

Agustus 2010.

3. Revisi POK untuk perubahan lokasi Percepatan proses revisi POK. Status:

sudah masuk ke Dit. Bina Program.

4. Revisi DIPA untuk pelatihan fasilitator PAMSIMAS Percepatan proses revisi DIPA.

Status: sudah masuk ke Dit. Bina

Program

5. Provinsi Kalimantan Selatan 17.52 25.32 Paket Fisik:

- Paket fisik (Pengadaan IPA Paket 20 l/dtk di lokasi Tanah Bumbu),

tanda tangan kontrak pada tanggal 29 Juli 2010 dan penarikan uang

muka senilai Rp 626 juta baru diproses.

Penarikan uang muka sebesar Rp 626

juta akan selesai pada tanggal 1

Agustus 2010

- Pake fisik (Pengadaan dan pemasangan pipa di lokasi Martapura Barat

senilai Rp 1,050 M dari pagu Rp 1,5 M) baru tanda tangan kontrak

tanggal 26 Juli 2010. Jaminan pelaksanaan telah selesai namun uang

muka sedang proses.

Proses jaminan pelaksanaan selesai

tanggal 31 Juli 2010 sebesar 800 juta

- Pake fisik (pekerjaan rehabilitasi sumur dalam senilai Rp 975 juta dari

pagu Rp 1 M belum menarik uang muka.

Penarikan uang muka sebesar Rp 195

juta pada tanggal 5 Agustus 2010

- Paket fisik (pekerjaan pembuatan SPAM air gambut senilai Rp 2,480 M

dari pagu Rp 3,19 M belum menarik uang muka

Penarikan uang muka sebesar Rp 496

juta pada tanggal 5 Agustus 2010

No Satker PKPAMProgres

Permasalahan Tindak Lanjut Ket

Page 19: KEMAJUAN PELAKSANAAN KEGIATAN PEMBANGUNAN …ciptakarya.pu.go.id/dok/progress/progress_20100729.pdf · 5 Review DED 0 Percepatan Review ... Pembangunan Jalan Poros Lokasi Kws

Keu (%) Fisik (%)

- Pake fisik (Pengadaan dan pemasangan pipa di lokasi Banjar Baru,

RSH senilai Rp 1,050 M dari pagu Rp 1,5 M) baru tanda tangan kontrak

tanggal 26 Juni 2010. Kontraktor belum mengambil uang muka

Penarikan uang muka sebesar Rp 210

juta pada tanggal 5 Agustus 2010

- Pake fisik (Pengadaan dan pemasangan pipa di lokasi Martapura Barat

senilai Rp .... M dari pagu Rp 5,197 M) baru tanda tangan kontrak

tanggal 26 Juli 2010. Kontraktor belum mengambil uang muka.

Penarikan uang muka sebesar Rp 210

juta pada tanggal 5 Agustus 2010

Paket Konsultan:

- 2 paket Konsultan (Rencana Induk dan Air Baku) masih pada tahap

masa sanggah.

Masa sanggah selesai tanggal 30 Juli

2010 dan tanda tangan kontrak

tanggal 4 Agustus 2010. Uang muka

akan ditarik pada tanggal 9 Agustus

sebesar Rp. 140 juta.

Kegiatan PAMSIMAS :

Kotabaru :

- DIPA Satker PPIP TA 2009 tidak cukup untuk membiayai tahap III untuk

3 desa sebesar Rp. 77 juta x 3 desa = Rp. 220 juta, sehingga dana

sebesar Rp 220 juta tersebut akan dibayarkan pada TA 2010, dengan

syarat harus dibuat kontrak baru dan cara pembayarannya harus

dilakukan dalam 3 tahap. Akibat dari luncuran tahun 2009 ini adalah

target kegiatan Pamsimas TA 2010 akan berkurang 3 desa.

Pencairan tahap III untuk 3 desa

pada TA 2009 tsb akan diselesaikan

pada akhir bulan 9 Agustus 2010

(kesepakatan dengan KPPN).

Satker PPIP harus memproses

tambahan pagu dana TA 2010 untuk 3

desa sebesar 220 juta

Kab. Tanah Bumbu

- DIPA Satker PPIP TA 2009 tidak cukup untuk membiayai tahap II dan III

untuk 3 desa sebesar Rp.154 juta x 3 desa = Rp. 462 juta, sehingga

dana sebesar Rp 462 juta tersebut akan dibayarkan pada TA 2010,

dengan syarat harus dibuat kontrak baru dan cara pembayarannya

harus dilakukan dalam 3 tahap. Akibat dari luncuran tahun 2009 ini

adalah target kegiatan Pamsimas TA 2010 akan berkurang 3 desa.

Pencairan tahap II dan III untuk 3

desa pada TA 2009 tsb akan

diselesaikan pada akhir bulan 9

Agustus 2010 (kesepakatan dengan

KPPN).

Satker PPIP harus memproses

tambahan pagu dana TA 2010 untuk 3

desa sebesar 462 juta

6. Provinsi Gorontalo 15.86 26.81 Paket Fisik:

Paket fisik (Pengadaan dan pemasangan IPA Paket dan pipa 5 l/dtk di

lokasi desa Manano) senilai Rp 3,184 M dari pagu Rp 3,31 M baru tanda

tangan kontrak pada tanggal 21 Juli 2010 akibat adanya tender ulang.

- Penambahan tenaga kerja dan jam

kerja sampai jam 8. Sehingga pada

akhir Agustus progres akan mencapai

fisik 7.14 % , keuangan 20 %

No Satker PKPAMProgres

Permasalahan Tindak Lanjut Ket

Page 20: KEMAJUAN PELAKSANAAN KEGIATAN PEMBANGUNAN …ciptakarya.pu.go.id/dok/progress/progress_20100729.pdf · 5 Review DED 0 Percepatan Review ... Pembangunan Jalan Poros Lokasi Kws

Keu (%) Fisik (%)

Paket Konsultan:

Paket Konsultan (Pendampingan Rencana Induk SPAM senilai Rp 361

juta dari pagu Rp 400 juta) baru tanda tangan kontrak pada tanggal 21

Juli 2010 karena adanya tender ulang.

Laporan pendahuluan akan

diselesaikan tanggal 28 Agustus 2010

sehingga pada tanggal 30 Agustus

bisa mengadakan penarikan termin

pertama sebesar 20% (Rp 72,2 juta)

Kegiatan PAMSIMAS :

Progres fisik Paket PMAC baru mencapai 35% dan belum ada progres

keuangan karena terdapat kesalahan pada nomer register loan dan saat

ini sedang proses revisi di ditjen anggaran Kementerian Keuangan.

- Revisi PAMSIMAS diperkirakan

selesai tanggal 18 Agustus 2010

sehingga pada tanggal 30 Agustus

bisa mencairkan dana sebesar Rp 4

M.

7. Provinsi Bali 21.58 48.05 - Kegiatan konsultan penyusunan DED Southterm Bali Water Suply

project dengan pagu sebesar Rp 8,449 M belum bisa ditenderkan

karena "Loan JICA' untuk Southterm Bali Water Suply project belum

ditandatangi (rencana penandatanganan tanggal 31 Maret 2011). Bobot

kegiatan ini adalah sebesar 23,9 % dari pagu anggaran.

- Kegiatan tersebut diusulkan direvisi

dihilangkan dari DIPA .Surat usulan

revisi DIPA dari Satker PK PAM Bali

telah diserahkan pada tgl 5 juli 2010.

Rekomendasi revisi dari Ditpam

tanggal 30 Juli 2010, diharapkan revisi

DIPA bisa disetujui oleh kementerian

Keuangan pada tanggal 30 Agustus

2010

- Terdapat sisa lelang dari paket kontraktual sebesar Rp.5,03 M dengan

bobot 14,20%.

- Sisa dana itu diusulkan untuk

dimanfaatkan dengan revisi POK.

Usulan revisi dari Satker Bali

direncanakan tanggal 2 Agustus 2010

dan diharapkan disetujui tanggal 15

Agustus 2010. Persiapan proses

prakontrak sudah dilaksanakan.

Paket fisik (Banpro Penyehatan PDAM Kab. Bangli senilai Rp 0,698 M

dari pagu Rp 1,071 M) yang tanda tangan kontrak tanggal 1 Juni 2010.

Progres saat ini fisik 73% dan keuangan 20%.

- Tanggal 13 Agustus diperkirakan akan

menyerap dana sebesar Rp 0,803 M.

Sehingga tanggal 31 Agustus progres

fisik 100 % dan keuangan 95 %

Paket fisik (Banpro Penyehatan PDAM Kab.Jembrana senilai Rp 1,198

M dari pagu Rp 1,508 M) yang tanda tangan kontrak tanggal 1 Juni

2010. Progres saat ini fisik 65% dan keuangan 20%.

Tanggal 13 Agustus diperkirakan akan

menyerap dana sebesar Rp 0,803 M.

Sehingga diperkirakan tanggal 31

Agustus progres fisik 100 % dan

keuangan 95 %

No Satker PKPAMProgres

Permasalahan Tindak Lanjut Ket

Page 21: KEMAJUAN PELAKSANAAN KEGIATAN PEMBANGUNAN …ciptakarya.pu.go.id/dok/progress/progress_20100729.pdf · 5 Review DED 0 Percepatan Review ... Pembangunan Jalan Poros Lokasi Kws

Keu (%) Fisik (%)

Paket fisik (Pembangunan SPAM desa rawan air Desa Sibetan

Kab.Karang Asem senilai Rp 3,211 M dari pagu Rp 4,953 M) yang

tanda tangan kontrak tanggal 1 Juni 2010. Progres saat ini fisik 55%

dan keuangan 20%.

Tanggal 13 Agustus diperkirakan akan

menyerap dana sebesar Rp 1.79 M.

Sehingga diperkirakan tanggal 31

Agustus progres fisik 80% dan

keuangan 76 %

Paket fisik (Pembangunan SPAM kumuh nelayan Candi Dasan

Kab.Karang Asem senilai Rp 1,658 M dari pagu Rp 2,448 M) yang

tanda tangan kontrak tanggal 1 Juni 2010. Progres saat ini fisik 50%

dan keuangan 20%.

Tanggal 13 Agustus diperkirakan akan

menyerap dana sebesar Rp 1.01 M.

Sehingga diperkirakan tanggal 31

Agustus progres fisik 90% dan

keuangan 81 %

Paket fisik (Pembangunan SPAM Desa Kurikub Kab.Gianyar senilai Rp

1,15 M dari pagu Rp 1,49 M) yang tanda tangan kontrak tanggal 20 Mei

2010. Progres saat ini fisik 50 % dan keuangan 20%.

Tanggal 13 Agustus diperkirakan akan

menyerap dana sebesar Rp 0,4025 M.

Sehingga diperkirakan tanggal 31

Agustus progres fisik 65% dan

keuangan 55 %

Paket fisik (Pembangunan SPAM desa Brangblang Kab.Jembrana

senilai Rp 2,27 M dari pagu Rp 3,028 M) yang tanda tangan kontrak

tanggal 20 Mei 2010. Progres saat ini fisik 50% dan keuangan 20%.

Tanggal 13 Agustus diperkirakan akan

menyerap dana sebesar Rp0,7945 M.

Sehingga diperkirakan tanggal 31

Agustus progres fisik 65% dan

keuangan 55 %

No Satker PKPAMProgres

Permasalahan Tindak Lanjut Ket

Page 22: KEMAJUAN PELAKSANAAN KEGIATAN PEMBANGUNAN …ciptakarya.pu.go.id/dok/progress/progress_20100729.pdf · 5 Review DED 0 Percepatan Review ... Pembangunan Jalan Poros Lokasi Kws

1,484,341

- 15,311 45,064

102,244

242,805

414,142

589,536

812,886

998,101

1,193,059

1,344,747

1,420,536

1,484,331

- -

27.90 12,541

22,693 46,640 52,260

85,623

178,722

240,874

295,147

371,781

428,836

530,313

-

200,000

400,000

600,000

800,000

1,000,000

1,200,000

1,400,000

1,600,000

JAN FEB MAR APR MEI JUN JUL AGT SEP OKT NOP DES

DA

LA

M J

UT

AA

N R

UP

IAH

BULAN

RENCANA DAN REALISASI PENYERAPANDIREKTORAT PENGEMBANGAN AIR MINUM

TAHUN ANGGARAN 2010

PAGU

RENCANA

REALISASI

Page 23: KEMAJUAN PELAKSANAAN KEGIATAN PEMBANGUNAN …ciptakarya.pu.go.id/dok/progress/progress_20100729.pdf · 5 Review DED 0 Percepatan Review ... Pembangunan Jalan Poros Lokasi Kws

RPM PHLN TOTAL

a. Satker Pusat 69,247,123 22,000,000 91,247,123 19,766,468 100,000 49,380,655 22,000,000 71,380,655 - 91,247,123 27 2 29 - 1 - - 1 1 - - - 26 57,197,615

1 466190 Direktorat PPLP 69,247,123 22,000,000 91,247,123 19,766,468 100,000 49,380,655 22,000,000 71,380,655 - 91,247,123 27 2 29 1 1 1 26 57,197,615

b. Satker Propinsi 564,363,115 585,359,000 1,149,722,115 63,553,518 15,069,511 485,840,086 585,259,000 1,071,099,086 - 1,149,722,115 184 186 370 28 11 3 1 4 - - 1 - 322 980,893,902

1 494880 PPLP NAD 13,180,232 385,388,200 398,568,432 3,410,220 292,900 9,577,112 385,288,200 394,865,312 - 398,568,432 14 11 25 1 24 394,237,486

2 494956 PPLP Sumatera Utara 17,315,451 2,000,000 19,315,451 1,817,851 400,000 15,097,600 2,000,000 17,097,600 - 19,315,451 4 8 12 3 1 8 14,401,787

3 495007 PPLP Sumatera Barat 26,759,831 - 26,759,831 4,164,711 814,000 21,781,120 - 21,781,120 - 26,759,831 4 10 14 2 12 19,586,504

4 495050 PPLP Riau 11,016,721 - 11,016,721 1,127,588 739,155 9,149,978 - 9,149,978 - 11,016,721 1 5 6 1 5 4,713,617

5 495370 PPLP Kepulauan Riau 9,373,631 - 9,373,631 1,141,704 300,000 7,931,927 - 7,931,927 - 9,373,631 7 2 9 9 7,069,111

6 495090 PPLP Jambi 9,605,750 - 9,605,750 1,183,895 1,125,930 7,295,925 - 7,295,925 - 9,605,750 4 2 6 6 6,674,557

7 495276 PPLP Bengkulu 9,920,452 - 9,920,452 1,296,007 280,000 8,344,445 - 8,344,445 - 9,920,452 4 4 8 1 7 7,735,400

8 495188 PPLP Sumatera Selatan 16,391,415 - 16,391,415 3,782,515 385,000 12,223,900 - 12,223,900 - 16,391,415 4 4 8 1 7 11,564,476

9 495311 PPLP Bangka Belitung 12,242,231 - 12,242,231 1,478,756 500,000 10,263,475 - 10,263,475 - 12,242,231 9 4 13 13 9,812,973

10 495239 PPLP Lampung 8,115,231 - 8,115,231 1,158,246 740,000 6,216,985 - 6,216,985 - 8,115,231 5 5 10 10 6,127,263

11 496061 PPLP Banten 11,881,531 - 11,881,531 1,608,836 357,850 9,914,845 - 9,914,845 - 11,881,531 9 6 15 4 11 8,120,891

12 448333 PPLP DKI 12,206,900 1,000,000 13,206,900 704,900 274,500 11,227,500 1,000,000 12,227,500 - 13,206,900 11 3 14 1 13 9,114,788

13 495616 PPLP Jawa Barat 43,445,475 - 43,445,475 1,486,475 500,000 41,459,000 - 41,459,000 - 43,445,475 4 6 10 2 8 30,532,901

14 495704 PPLP Jawa Tengah 30,229,431 40,000,000 70,229,431 5,103,531 1,426,900 23,699,000 40,000,000 63,699,000 - 70,229,431 7 14 21 5 16 54,572,105

15 495750 PPLP DIY 7,768,731 2,000,000 9,768,731 1,124,931 - 6,643,800 2,000,000 8,643,800 - 9,768,731 3 5 8 1 7 5,910,141

16 495832 PPLP Jawa Timur 92,339,350 - 92,339,350 2,690,825 1,100,000 88,548,525 - 88,548,525 - 92,339,350 9 15 24 6 18 66,941,881

17 495885 PPLP Kalimantan Barat 8,803,031 - 8,803,031 1,277,449 299,250 7,226,332 - 7,226,332 - 8,803,031 4 4 8 2 6 6,621,542

18 495936 PPLP Kalimantan Tengah 9,941,831 - 9,941,831 1,329,516 200,000 8,412,315 - 8,412,315 - 9,941,831 5 4 9 9 8,235,957

19 495973 PPLP Kalimantan Selatan 29,526,031 - 29,526,031 3,432,626 787,310 25,306,095 - 25,306,095 - 29,526,031 8 8 16 1 15 22,800,839

20 496018 PPLP KalimantanTimur 17,229,931 - 17,229,931 1,492,906 400,000 15,337,025 - 15,337,025 - 17,229,931 7 3 10 10 13,593,929

21 496137 PPLP Sulawesi Utara 12,762,231 - 12,762,231 1,027,791 300,000 11,434,440 - 11,434,440 - 12,762,231 2 3 5 5 10,920,770

22 496761 PPLP Gorontalo 7,281,975 - 7,281,975 1,181,975 - 6,100,000 - 6,100,000 - 7,281,975 8 3 11 1 2 2 6 3,912,950

23 496180 PPLP Sulawesi Tengah 6,851,231 - 6,851,231 1,304,185 100,000 5,447,046 - 5,447,046 - 6,851,231 1 3 4 4 4,235,006

24 496262 PPLP Sulawesi Selatan 20,079,599 1,000,000 21,079,599 3,269,611 1,654,201 15,155,787 1,000,000 16,155,787 - 21,079,599 7 12 19 1 2 16 13,956,473

25 466229 PPLP Sulawesi Barat 7,103,059 - 7,103,059 1,068,519 539,800 5,494,740 - 5,494,740 - 7,103,059 1 3 4 4 5,337,147

26 496322 PPLP Sulawesi Tenggara 7,912,331 - 7,912,331 1,207,406 747,560 5,957,365 - 5,957,365 - 7,912,331 3 6 9 9 5,900,253

27 496472 PPLP Bali 42,213,562 153,970,800 196,184,362 3,980,728 100,000 38,132,834 153,970,800 192,103,634 - 196,184,362 16 9 25 3 2 20 182,011,724

28 496545 PPLP NTB 20,465,131 - 20,465,131 4,028,681 177,000 16,259,450 - 16,259,450 - 20,465,131 6 5 11 11 12,457,422

29 496591 PPLP NTT 10,762,531 - 10,762,531 1,232,096 233,000 9,297,435 - 9,297,435 - 10,762,531 3 4 7 7 8,374,334

30 496375 PPLP Maluku 9,942,631 - 9,942,631 1,215,856 - 8,726,775 - 8,726,775 - 9,942,631 6 6 12 12 8,558,031

31 496715 PPLP Maluku Utara 7,147,231 - 7,147,231 977,231 200,000 5,970,000 - 5,970,000 - 7,147,231 2 3 5 1 4 5,703,240

32 496658 PPLP Papua 7,180,031 - 7,180,031 918,456 - 6,261,575 - 6,261,575 - 7,180,031 3 3 6 2 4 5,243,757

33 496834 PPLP Papua Barat 7,368,385 - 7,368,385 1,327,495 95,155 5,945,735 - 5,945,735 - 7,368,385 3 3 6 6 5,914,647

TOTAL 633,610,238 607,359,000 1,240,969,238 83,319,986 15,169,511 535,220,741 607,259,000 1,142,479,741 - 1,240,969,238 211 188 399 28 12 3 1 5 1 - 1 - 348 1,038,091,517

Keterangan :

1 Penyiapan Dokumen Lelang 6 Pemasukan Penawaran

2 Pengumuman Lelang/Prakualifikasi 7 Usulan Pemenang

3 Penyusunan shortlist 8 Penetapan Pemenang

4 Undangan Pelelangan 9 Penerbitan Surat Perintah Mulai Kerja

5 Penjelasan Pekerjaan Aanwyzing 10 Penandatangan Kontrak

FISIK

LAPORAN PELAKSANAAN PELELANGAN BARANG/JASA TA 2010

DIREKTORAT PENGEMBANGAN PENYEHATAN LINGKUNGAN PERMUKIMAN

NOKODE

SATKERNAMA SATUAN KERJA

PAGU PAKET KONTRAK

STATUS : 29 JULI 2010, JAM 08.00 WIB

SWAKELOLA +

AP

KONTRAKTUAL > 100 JTTOTAL PLN TOTAL

PAKET > RP 100 JUTA

JUMLAH PAKET DALAM PROSES PRA KONTRAK

BLMRUPIAH

MURNI

NON

FISIK

KONTRAKTUAL

≤ 100 JT

PAGU (Rp) NILAI KONTRAK

(Rp. x 1.000) 109871TOTAL 65432

Page 24: KEMAJUAN PELAKSANAAN KEGIATAN PEMBANGUNAN …ciptakarya.pu.go.id/dok/progress/progress_20100729.pdf · 5 Review DED 0 Percepatan Review ... Pembangunan Jalan Poros Lokasi Kws

NO. URAIAN PERMASALAHAN JUMLAH PAKET KETERANGAN

1 Persiapan Lelang 23 21 paket 3R (pemberdayaan),

sedang penyusunan RAB; 1

paket IPAL RSH

(pemberdayaan)

2 Proses Lelang 23

3 Sanggah Banding -

4 Tender Ulang -

5 Review DED -

6 Diblokir (Tanda Bintang) oleh Ditjen Anggaran

a. Loan belum efektif 3 1. Sumatera Utara: Supervisi Pembangunan PS Air Limbah Terpusat Kota Medan

2. DKI Jakarta: Jakarta Urban Flood Management Project (JUFMP)

3. Sulawesi Selatan: Pengembangan TPA Regional Mamminasata

b. Menunggu Penandatanganan Loan Agreement 1 1. DI Yogyakarta: Pembangunan PS Air Limbah Terpusat (MSMHP)

c. Tanggap Darurat -

d. Revisi Kegiatan -

e. Belum tersedia dokumen RPIJM -

f. Menunggu persyaratan pembuktian BMN 1 1. Maluku Utara: Pengadaan Mobil Penyuluhan Kampanye dan Edukasi 3R Bidang

PLP

7 Pemindahan Lokasi -

51TOTAL

RINGKASAN PERMASALAHAN PROGRES PELELANGAN TA.2010

DI LINGKUNGAN DIREKTORAT PENGEMBANGAN PENYEHATAN LINGKUNGAN PERMUKIMAN

STATUS: 29 JULI 2010

TINDAK LANJUT

Page 25: KEMAJUAN PELAKSANAAN KEGIATAN PEMBANGUNAN …ciptakarya.pu.go.id/dok/progress/progress_20100729.pdf · 5 Review DED 0 Percepatan Review ... Pembangunan Jalan Poros Lokasi Kws

1 PPLP SUMATERA UTARA 3 1. Pembangunan PS Sampah Terpadu 3R Kota Medan 204,300 Proses pemberdayaan masih

berlangsung dan menunggu hasil

rencana dari konsultan perencanaan

Pemberdayaan

2. Pembangunan PS Sampah Terpadu 3R Kab. Asahan 204,300 Proses pemberdayaan masih

berlangsung dan menunggu hasil

rencana dari konsultan perencanaan

Pemberdayaan

3. Supervisi Pembangunan PS Air Limbah Terpusat Kota Medan 109,600 Loan belum efektif

2 PPLP SUMATERA BARAT 2 1. Pembangunan PS Sampah Terpadu 3R Kota Padang 200,000 Proses pemberdayaan masih

berlangsung dan menunggu hasil

rencana dari konsultan perencanaan

Pemberdayaan

2. Pembangunan PS Sampah Terpadu 3R Kota Payakumbuh 200,000 Proses pemberdayaan masih

berlangsung dan menunggu hasil

rencana dari konsultan perencanaan

Pemberdayaan

3 PPLP SUMATERA SELATAN 1 1. Pembangunan PS Sampah terpadu 3R 500,000 Proses pemberdayaan masih

berlangsung dan menunggu hasil

rencana dari konsultan perencanaan

Pemberdayaan

4 PPLP BANTEN 4 1. Pembangunan Prasarana Pengelolaan Sampah Terpadu 3R Kota tangerang

Selatan

400,000 Proses pemberdayaan masih

berlangsung dan menunggu hasil

rencana dari konsultan perencanaan

Pemberdayaan

2. Pembangunan Prasarana Pengelolaan sampah terpadu 3R Kab. Tangerang 400,000 Proses pemberdayaan masih

berlangsung dan menunggu hasil

rencana dari konsultan perencanaan

Pemberdayaan

3. Pembangunan Prasarana Pengelolaan sampah Terpadu 3R Citra Gading Serang 400,000 Proses pemberdayaan masih

berlangsung dan menunggu hasil

rencana dari konsultan perencanaan

Pemberdayaan

4. Pembangunan Prasarana Pengelolaan Sampah Terpadu 3R Sepang Serang 400,000 Proses pemberdayaan masih

berlangsung dan menunggu hasil

rencana dari konsultan perencanaan

Pemberdayaan

PERMASALAHAN DAN TINDAK LANJUT PAKET BELUM LELANG TA. 2010

DIREKTORAT PENGEMBANGAN PENYEHATAN LINGKUNGAN PERMUKIMAN

STATUS: 29 JULI 2010

NO SATKER/PROVINSIJML PAKET

BELUM LELANG

PAGU

(X Rp.1000)PENJELASAN BELUM LELANGPAKET KONTRAK TINDAK LANJUT KETERANGAN

Page 26: KEMAJUAN PELAKSANAAN KEGIATAN PEMBANGUNAN …ciptakarya.pu.go.id/dok/progress/progress_20100729.pdf · 5 Review DED 0 Percepatan Review ... Pembangunan Jalan Poros Lokasi Kws

5 PPLP DKI JAKARTA 1 1. Jakarta Urban Flood Management Project (JUFMP) 1,000,000 Loan belum efektif: Kelengkapan

perencanaan (termasuk dokumen

AMDAL) belum selesai

6 PPLP JAWA BARAT 2 1. Pembangunan Air Limbah Terpusat Skala Kawasan (RSH Tenjoresmi) Kabupaten

Sukabumi

1,029,000 Pemberdayaan

2. Pembangunan Prasarana dan Sarana Sampah Terpadu 3R Kabupaten Garut 450,000 Proses pemberdayaan masih

berlangsung dan menunggu hasil

rencana dari konsultan perencanaan

Pemberdayaan

7 PPLP JAWA TENGAH 5 1. Pembangunan Tempat Pengolahan Sampah Terpadu Kota Magelang 130,000 Proses pemberdayaan masih

berlangsung dan menunggu hasil

rencana dari konsultan perencanaan

Pemberdayaan

2. Penyediaan PS Pengolah Sampah Kota Magelang 120,000 Proses pemberdayaan masih

berlangsung dan menunggu hasil

rencana dari konsultan perencanaan

Pemberdayaan

3. Pembangunan Tempat Pengolahan Sampah Terpadu Kab Klaten 130,000 Proses pemberdayaan masih

berlangsung dan menunggu hasil

rencana dari konsultan perencanaan

Pemberdayaan

4. Penyediaan PS Pengolah Sampah Kab. Klaten 120,000 Proses pemberdayaan masih

berlangsung dan menunggu hasil

rencana dari konsultan perencanaan

Pemberdayaan

5. Semarang Urban Drainage (Package C2: Semarang Pumping Station and

Retarding Pond, Mechanical and Electrical Works)

1,000,000 Menunggu persetujuan JICA

8 PPLP D.I. YOGYAKARTA 1 1. Pembangunan PS Air Limbah Terpusat Paket AL - 1 2,000,000 Loan Agreement belum efektif Persiapan pemaketan pelelangan

9 PPLP KALIMANTAN BARAT 2 1. Penyediaan Prasarana dan Sarana Pengolah Sampah Sistem 3R Kota Entikong

Kab. Sanggau

248,380 Proses pemberdayaan masih

berlangsung dan menunggu hasil

rencana dari konsultan perencanaan

Pemberdayaan

2. Penyediaan Prasarana dan Sarana Pengolah Sampah Sistem 3R Kota Sanggau

Kab. Sanggau

248,380 Proses pemberdayaan masih

berlangsung dan menunggu hasil

rencana dari konsultan perencanaan

Pemberdayaan

10 PPLP SULAWESI SELATAN 1 1. Pengembangan TPA Regional Mamminasata 1,000,000 Tanda tangan Loan Agreement pada

akhir Maret 2010. Rencana

Pengumuman Lelang/Prakualifikasi pada

tanggal 5 Juli 2010

Mempercepat proses lelang

NO SATKER/PROVINSIJML PAKET

BELUM LELANG

PAGU

(X Rp.1000)PENJELASAN BELUM LELANGPAKET KONTRAK TINDAK LANJUT KETERANGAN

Page 27: KEMAJUAN PELAKSANAAN KEGIATAN PEMBANGUNAN …ciptakarya.pu.go.id/dok/progress/progress_20100729.pdf · 5 Review DED 0 Percepatan Review ... Pembangunan Jalan Poros Lokasi Kws

11 PPLP BALI 3 1. Pembangunan PS Persampahan 3R Pupuan, kec. Pupuan Kab.Tabanan 200,000 Proses pemberdayaan masih

berlangsung dan menunggu hasil

rencana dari konsultan perencanaan

Pemberdayaan

2. Pembangunan Pengelolaan Sampah Terpadu Skala Kawasan 3R di Besakih,

Karangasem.

500,000 Proses pemberdayaan masih

berlangsung dan menunggu hasil

rencana dari konsultan perencanaan

Pemberdayaan

3. Pembangunan Pengelolaan Sampah Terpadu Skala Kawasan (3R) di Tukad

Mungga, Singaraja.

200,000 Proses pemberdayaan masih

berlangsung dan menunggu hasil

rencana dari konsultan perencanaan

Pemberdayaan

12 PPLP MALUKU UTARA 1 1. Pengadaan Mobil Penyuluhan Kampanye dan Edukasi 3R Bidang PLP 250,000 Bintang pada DIPA Revisi DIPA Revisi DIPA ditolak DJA

13 PPLP PAPUA 2 1. Pembangunan Pengelolaan Sampah Terpadu 3R Kab. Biak 416,800 Proses pemberdayaan masih

berlangsung dan menunggu hasil

rencana dari konsultan perencanaan

Pemberdayaan

2. Pembangunan Pengelolaan Sampah Terpadu 3R Kab. Merauke 476,800 Proses pemberdayaan masih

berlangsung dan menunggu hasil

rencana dari konsultan perencanaan

Pemberdayaan

28 12,537,560

NO SATKER/PROVINSIJML PAKET

BELUM LELANG

PAGU

(X Rp.1000)PENJELASAN BELUM LELANGPAKET KONTRAK TINDAK LANJUT KETERANGAN

TOTAL

Page 28: KEMAJUAN PELAKSANAAN KEGIATAN PEMBANGUNAN …ciptakarya.pu.go.id/dok/progress/progress_20100729.pdf · 5 Review DED 0 Percepatan Review ... Pembangunan Jalan Poros Lokasi Kws

RPM PHLN TOTAL

Satker Pusat 69,247,123 22,000,000 91,247,123 19,766,468 100,000 49,380,655 22,000,000 71,380,655 - 91,247,123 47,280,655 20,000,000 67,280,655 37,197,615 20,000,000 57,197,615 10,083,040 - 10,083,040

1 466190 Direktorat PPLP 69,247,123 22,000,000 91,247,123 19,766,468 100,000 49,380,655 22,000,000 71,380,655 91,247,123 47,280,655 20,000,000 67,280,655 37,197,615 20,000,000 57,197,615 10,083,040 - 10,083,040

Satker Propinsi 564,363,115 585,359,000 1,149,722,115 63,553,518 15,069,511 485,840,086 585,259,000 1,071,099,086 - 1,149,722,115 454,858,748 578,259,000 1,033,117,748 402,635,482 578,258,420 980,893,902 52,223,266 580 52,223,846

1 494880 PPLP NAD 13,180,232 385,388,200 398,568,432 3,410,220 292,900 9,577,112 385,288,200 394,865,312 398,568,432 9,342,112 385,288,200 394,630,312 8,949,866 385,287,620 394,237,486 392,246 580 392,826

2 494956 PPLP Sumatera Utara 17,315,451 2,000,000 19,315,451 1,817,851 400,000 15,097,600 2,000,000 17,097,600 19,315,451 14,689,000 - 14,689,000 14,401,787 - 14,401,787 287,213 - 287,213

3 495007 PPLP Sumatera Barat 26,759,831 - 26,759,831 4,164,711 814,000 21,781,120 - 21,781,120 26,759,831 21,381,120 - 21,381,120 19,586,504 - 19,586,504 1,794,616 - 1,794,616

4 495050 PPLP Riau 11,016,721 - 11,016,721 1,127,588 739,155 9,149,978 - 9,149,978 11,016,721 5,247,000 - 5,247,000 4,713,617 - 4,713,617 533,383 - 533,383

5 495370 PPLP Kepulauan Riau 9,373,631 - 9,373,631 1,141,704 300,000 7,931,927 - 7,931,927 9,373,631 7,931,927 - 7,931,927 7,069,111 - 7,069,111 862,816 - 862,816

6 495090 PPLP Jambi 9,605,750 - 9,605,750 1,183,895 1,125,930 7,295,925 - 7,295,925 9,605,750 7,295,925 - 7,295,925 6,674,557 - 6,674,557 621,368 - 621,368

7 495276 PPLP Bengkulu 9,920,452 - 9,920,452 1,296,007 280,000 8,344,445 - 8,344,445 9,920,452 7,944,445 - 7,944,445 7,735,400 - 7,735,400 209,045 - 209,045

8 495188 PPLP Sumatera Selatan 16,391,415 - 16,391,415 3,782,515 385,000 12,223,900 - 12,223,900 16,391,415 11,723,900 - 11,723,900 11,564,476 - 11,564,476 159,424 - 159,424

9 495311 PPLP Bangka Belitung 12,242,231 - 12,242,231 1,478,756 500,000 10,263,475 - 10,263,475 12,242,231 10,263,475 - 10,263,475 9,812,973 - 9,812,973 450,502 - 450,502

10 495239 PPLP Lampung 8,115,231 - 8,115,231 1,158,246 740,000 6,216,985 - 6,216,985 8,115,231 6,216,985 - 6,216,985 6,127,263 - 6,127,263 89,722 - 89,722

11 496061 PPLP Banten 11,881,531 - 11,881,531 1,608,836 357,850 9,914,845 - 9,914,845 11,881,531 8,314,845 - 8,314,845 8,120,891 - 8,120,891 193,954 - 193,954

12 448333 PPLP DKI 12,206,900 1,000,000 13,206,900 704,900 274,500 11,227,500 1,000,000 12,227,500 13,206,900 11,227,500 - 11,227,500 9,114,788 - 9,114,788 2,112,712 - 2,112,712

13 495616 PPLP Jawa Barat 43,445,475 - 43,445,475 1,486,475 500,000 41,459,000 - 41,459,000 43,445,475 39,980,000 - 39,980,000 30,532,901 - 30,532,901 9,447,099 - 9,447,099

14 495704 PPLP Jawa Tengah 30,229,431 40,000,000 70,229,431 5,103,531 1,426,900 23,699,000 40,000,000 63,699,000 70,229,431 23,199,000 39,000,000 62,199,000 15,572,105 39,000,000 54,572,105 7,626,895 - 7,626,895

15 495750 PPLP DIY 7,768,731 2,000,000 9,768,731 1,124,931 - 6,643,800 2,000,000 8,643,800 9,768,731 6,643,800 - 6,643,800 5,910,141 - 5,910,141 733,659 - 733,659

16 495832 PPLP Jawa Timur 92,339,350 - 92,339,350 2,690,825 1,100,000 88,548,525 - 88,548,525 92,339,350 79,548,525 - 79,548,525 66,941,881 - 66,941,881 12,606,644 - 12,606,644

17 495885 PPLP Kalimantan Barat 8,803,031 - 8,803,031 1,277,449 299,250 7,226,332 - 7,226,332 8,803,031 6,729,572 - 6,729,572 6,621,542 - 6,621,542 108,030 - 108,030

18 495936 PPLP Kalimantan Tengah 9,941,831 - 9,941,831 1,329,516 200,000 8,412,315 - 8,412,315 9,941,831 8,412,315 - 8,412,315 8,235,957 - 8,235,957 176,358 - 176,358

19 495973 PPLP Kalimantan Selatan 29,526,031 - 29,526,031 3,432,626 787,310 25,306,095 - 25,306,095 29,526,031 25,010,695 - 25,010,695 22,800,839 - 22,800,839 2,209,856 - 2,209,856

20 496018 PPLP KalimantanTimur 17,229,931 - 17,229,931 1,492,906 400,000 15,337,025 - 15,337,025 17,229,931 15,337,025 - 15,337,025 13,593,929 - 13,593,929 1,743,096 - 1,743,096

21 496137 PPLP Sulawesi Utara 12,762,231 - 12,762,231 1,027,791 300,000 11,434,440 - 11,434,440 12,762,231 11,434,440 - 11,434,440 10,920,770 - 10,920,770 513,670 - 513,670

22 496761 PPLP Gorontalo 7,281,975 - 7,281,975 1,181,975 - 6,100,000 - 6,100,000 7,281,975 4,580,000 - 4,580,000 3,912,950 - 3,912,950 667,050 - 667,050

23 496180 PPLP Sulawesi Tengah 6,851,231 - 6,851,231 1,304,185 100,000 5,447,046 - 5,447,046 6,851,231 5,447,046 - 5,447,046 4,235,006 - 4,235,006 1,212,040 - 1,212,040

24 496262 PPLP Sulawesi Selatan 20,079,599 1,000,000 21,079,599 3,269,611 1,654,201 15,155,787 1,000,000 16,155,787 21,079,599 14,755,787 - 14,755,787 13,956,473 - 13,956,473 799,314 - 799,314

25 466229 PPLP Sulawesi Barat 7,103,059 - 7,103,059 1,068,519 539,800 5,494,740 - 5,494,740 7,103,059 5,494,740 - 5,494,740 5,337,147 - 5,337,147 157,593 - 157,593

26 496322 PPLP Sulawesi Tenggara 7,912,331 - 7,912,331 1,207,406 747,560 5,957,365 - 5,957,365 7,912,331 5,957,365 - 5,957,365 5,900,253 - 5,900,253 57,112 - 57,112

27 496472 PPLP Bali 42,213,562 153,970,800 196,184,362 3,980,728 100,000 38,132,834 153,970,800 192,103,634 196,184,362 29,432,834 153,970,800 183,403,634 28,040,924 153,970,800 182,011,724 1,391,910 - 1,391,910

28 496545 PPLP NTB 20,465,131 - 20,465,131 4,028,681 177,000 16,259,450 - 16,259,450 20,465,131 16,259,450 - 16,259,450 12,457,422 - 12,457,422 3,802,028 - 3,802,028

29 496591 PPLP NTT 10,762,531 - 10,762,531 1,232,096 233,000 9,297,435 - 9,297,435 10,762,531 9,297,435 - 9,297,435 8,374,334 - 8,374,334 923,101 - 923,101

30 496375 PPLP Maluku 9,942,631 - 9,942,631 1,215,856 - 8,726,775 - 8,726,775 9,942,631 8,726,775 - 8,726,775 8,558,031 - 8,558,031 168,744 - 168,744

31 496715 PPLP Maluku Utara 7,147,231 - 7,147,231 977,231 200,000 5,970,000 - 5,970,000 7,147,231 5,720,000 - 5,720,000 5,703,240 - 5,703,240 16,760 - 16,760

32 496658 PPLP Papua 7,180,031 - 7,180,031 918,456 - 6,261,575 - 6,261,575 7,180,031 5,367,975 - 5,367,975 5,243,757 - 5,243,757 124,218 - 124,218

33 496834 PPLP Papua Barat 7,368,385 - 7,368,385 1,327,495 95,155 5,945,735 - 5,945,735 7,368,385 5,945,735 - 5,945,735 5,914,647 - 5,914,647 31,088 - 31,088

TOTAL 633,610,238 607,359,000 1,240,969,238 83,319,986 15,169,511 535,220,741 607,259,000 1,142,479,741 - 1,240,969,238 502,139,403 598,259,000 1,100,398,403 439,833,097 598,258,420 1,038,091,517 62,306,306 580 62,306,886

TOTAL

PAGU (Rp)

TOTAL RPM

PAGU TERKONTRAK NILAI KONTRAK SISA PAGU KONTRAK

RPM PHLN TOTALPHLN TOTAL RPM

LAPORAN SISA PAGU PELELANGAN BARANG/JASA TA 2010

DIREKTORAT PENGEMBANGAN PENYEHATAN LINGKUNGAN PERMUKIMAN

STATUS : 29 JULI 2010, JAM 08.00 WIB( x Rp. 1.000 )

NOKODE

SATKERNAMA SATUAN KERJA

PAGU

RUPIAH MURNI PLN TOTAL SWAKELOLA +

AP

KONTRAKTUAL > 100 JTBLM

KONTRAKTUAL

≤ 100 JTPHLN

Page 29: KEMAJUAN PELAKSANAAN KEGIATAN PEMBANGUNAN …ciptakarya.pu.go.id/dok/progress/progress_20100729.pdf · 5 Review DED 0 Percepatan Review ... Pembangunan Jalan Poros Lokasi Kws

KEU. FISIK

(RP) % % % (RP) %

Satker Pusat 69,247,123 22,000,000 91,247,123 33,811,730 37.06 40.56 11,097,699 3,011,365 14,109,064 15.46 24.00 (19,702,666) (21.59)

1 466190 Direktorat Pengembangan Penyehatan Lingkungan Permukiman 69,247,123 22,000,000 91,247,123 33,811,730 37.06 40.56 11,097,699 3,011,365 14,109,064 15.46 24.00 (19,702,666) (21.59)

Satker Propinsi 564,363,115 585,359,000 1,149,722,115 556,529,632 48.41 52.43 180,012,993 233,318,541 413,331,534 35.95 35.99 (143,198,098) (12.46)

1 494880 Pengembangan PLP NAD 13,180,232 385,388,200 398,568,432 173,327,803 43.49 48.49 3,204,037 190,738,973 193,943,010 48.66 40.74 20,615,207 5.17

2 494956 Pengembangan PLP Sumatera Utara 17,315,451 2,000,000 19,315,451 7,015,197 36.32 39.82 7,164,418 - 7,164,418 37.09 42.74 149,221 0.77

3 495007 Pengembangan PLP Sumatera Barat 26,759,831 - 26,759,831 9,935,303 37.13 40.63 14,631,069 - 14,631,069 54.68 58.05 4,695,766 17.55

4 495050 Pengembangan PLP Riau 11,016,721 - 11,016,721 4,030,433 36.58 40.08 3,211,175 - 3,211,175 29.15 34.34 (819,258) (7.44)

5 495370 Pengembangan PLP Kepulauan Riau 9,373,631 - 9,373,631 3,442,131 36.72 40.22 2,161,874 - 2,161,874 23.06 34.60 (1,280,257) (13.66)

6 495090 Pengembangan PLP Jambi 9,605,750 - 9,605,750 3,577,532 37.24 40.74 2,806,692 - 2,806,692 29.22 23.97 (770,840) (8.02)

7 495276 Pengembangan PLP Bengkulu 9,920,452 - 9,920,452 3,644,095 36.73 40.23 4,217,940 - 4,217,940 42.52 37.25 573,845 5.78

8 495188 Pengembangan PLP Sumatera Selatan 16,391,415 - 16,391,415 6,196,904 37.81 41.31 4,606,074 - 4,606,074 28.10 28.88 (1,590,830) (9.71)

9 495311 Pengembangan PLP Bangka Belitung 12,242,231 - 12,242,231 4,469,353 36.51 40.01 5,401,518 - 5,401,518 44.12 47.41 932,165 7.61

10 495239 Pengembangan PLP Lampung 8,115,231 - 8,115,231 2,998,072 36.94 40.44 4,432,832 - 4,432,832 54.62 60.77 1,434,760 17.68

11 496061 Pengembangan PLP Banten 11,881,531 - 11,881,531 5,504,744 46.33 49.83 2,919,481 - 2,919,481 24.57 23.31 (2,585,263) (21.76)

12 448333 Pengembangan PLP DKI 12,206,900 1,000,000 13,206,900 7,362,949 55.75 59.25 1,482,746 - 1,482,746 11.23 13.00 (5,880,203) (44.52)

13 495616 Pengembangan PLP Jawa Barat 43,445,475 - 43,445,475 22,751,147 52.37 55.87 6,599,770 - 6,599,770 15.19 2.93 (16,151,377) (37.18)

14 495704 Pengembangan PLP Jawa Tengah 30,229,431 40,000,000 70,229,431 38,686,004 55.09 58.59 8,384,589 10,607,627 18,992,216 27.04 48.21 (19,693,788) (28.04)

15 495750 Pengembangan PLP DIY 7,768,731 2,000,000 9,768,731 6,087,990 62.32 65.82 1,284,704 - 1,284,704 13.15 15.97 (4,803,286) (49.17)

16 495832 Pengembangan PLP Jawa Timur 92,339,350 - 92,339,350 64,296,129 69.63 73.13 21,345,548 - 21,345,548 23.12 15.56 (42,950,581) (46.51)

17 495885 Pengembangan PLP Kalimantan Barat 8,803,031 - 8,803,031 6,116,320 69.48 72.98 3,491,368 - 3,491,368 39.66 50.59 (2,624,952) (29.82)

18 495936 Pengembangan PLP Kalimantan Tengah 9,941,831 - 9,941,831 5,561,746 55.94 59.44 4,448,360 - 4,448,360 44.74 74.05 (1,113,386) (11.20)

19 495973 Pengembangan PLP Kalimantan Selatan 29,526,031 - 29,526,031 19,730,005 66.82 70.32 9,985,623 - 9,985,623 33.82 42.96 (9,744,382) (33.00)

20 496018 Pengembangan PLP KalimantanTimur 17,229,931 - 17,229,931 9,850,476 57.17 60.67 7,770,713 - 7,770,713 45.10 56.67 (2,079,763) (12.07)

21 496137 Pengembangan PLP Sulawesi Utara 12,762,231 - 12,762,231 8,654,637 67.81 71.31 4,037,731 - 4,037,731 31.64 30.20 (4,616,906) (36.18)

22 496761 Pengembangan PLP Gorontalo 7,281,975 - 7,281,975 5,005,448 68.74 72.24 1,436,338 - 1,436,338 19.72 21.71 (3,569,110) (49.01)

23 496180 Pengembangan PLP Sulawesi Tengah 6,851,231 - 6,851,231 2,045,624 29.86 33.36 1,388,069 - 1,388,069 20.26 60.05 (657,555) (9.60)

24 496262 Pengembangan PLP Sulawesi Selatan 20,079,599 1,000,000 21,079,599 14,130,899 67.04 70.54 10,210,697 - 10,210,697 48.44 54.85 (3,920,202) (18.60)

25 466229 Pengembangan PLP Sulawesi Barat 7,103,059 - 7,103,059 4,784,554 67.36 70.86 1,448,785 - 1,448,785 20.40 29.40 (3,335,769) (46.96)

26 496322 Pengembangan PLP Sulawesi Tenggara 7,912,331 - 7,912,331 5,434,157 68.68 72.18 3,295,995 - 3,295,995 41.66 53.47 (2,138,162) (27.02)

27 496472 Pengembangan PLP Bali 42,213,562 153,970,800 196,184,362 74,717,479 38.09 41.59 17,087,597 31,971,941 49,059,538 25.01 29.60 (25,657,941) (13.08)

28 496545 Pengembangan PLP NTB 20,465,131 - 20,465,131 12,373,887 60.46 63.96 7,157,688 - 7,157,688 34.98 49.50 (5,216,199) (25.49)

29 496591 Pengembangan PLP NTT 10,762,531 - 10,762,531 5,841,455 54.28 57.78 2,499,886 - 2,499,886 23.23 21.50 (3,341,569) (31.05)

30 496375 Pengembangan PLP Maluku 9,942,631 - 9,942,631 7,740,006 77.85 81.35 3,545,567 - 3,545,567 35.66 47.51 (4,194,439) (42.19)

31 496715 Pengembangan PLP Maluku Utara 7,147,231 - 7,147,231 2,252,364 31.51 35.01 1,525,772 - 1,525,772 21.35 30.52 (726,592) (10.17)

32 496658 Pengembangan PLP Papua 7,180,031 - 7,180,031 3,892,833 54.22 57.72 3,163,507 - 3,163,507 44.06 62.07 (729,326) (10.16)

33 496834 Pengembangan PLP Papua Barat 7,368,385 - 7,368,385 5,071,957 68.83 72.33 3,664,830 - 3,664,830 49.74 51.97 (1,407,127) (19.10)

TOTAL 633,610,238 607,359,000 1,240,969,238 590,341,362 47.57 51.55 191,110,692 236,329,906 427,440,598 34.44 35.11 (162,900,764) (13.13)

RENCANA PENYERAPAN

AKHIR BULAN JULI

KEUANGAN PHLN

DEVIASIREALISASI

RUPIAH

MURNI

KEUANGAN

RENCANA PENYERAPAN DAN PROGRES KEUANGAN

DIREKTORAT PENGEMBANGAN PENYEHATAN LINGKUNGAN PERMUKIMAN

STATUS : 29 JULI 2010, JAM 08.00 WIB( X Rp. 1000 )

RUPIAH MURNI

NO

TOTALPLN

NAMA SATUAN KERJAKODE

SATKER

TOTAL

PAGU

FISIK

(%)

Page 30: KEMAJUAN PELAKSANAAN KEGIATAN PEMBANGUNAN …ciptakarya.pu.go.id/dok/progress/progress_20100729.pdf · 5 Review DED 0 Percepatan Review ... Pembangunan Jalan Poros Lokasi Kws

KEU FISIK

(%) (%)

1 Dit. PPLP (Pusat) 15.46 24.00 1. 3 paket pendampingan penyusunan Strategi Sanitasi Kota (SSK) terlambat menarik

uang muka

Percepatan proses penagihan termin I

2. Paket penyusunan Masterplan Air Limbah Kota Balikpapan gagal tender Usulan revisi DIPA (bersama dana sisa

lelang) untuk kegiatan sosialisasi DAK SLBM,

Pelatihan TFL DAK/Sanimas, Operasional

PMU/PIU/Satgas

3. Supervisi Semarang Urban Drainage belum ada penyerapan menunggu addendum

kontrak

Penyelesaian addendum kontrak dan proses

penagihan

Saat ini sedang

pengajuan ke

KPPN menunggu

Withdrawal

Aplication

4 Pekerjaan Peningkatan Kapasitas SDM/Outbond (Swakelola) belum dilaksanakan.

Penyedian akomodasi harus melalui pelelangan

Penyediaan dokumen lelang untuk

penyediaan akomodasi (hotel)

5. WASAP-D masih dalam proses lelang Revisi DIPA untuk pencantuman nomor

register

2 DKI Jakarta 11.23 13.00 1. Ada sanggah banding untuk pembangunan Tempat Pengolahan Sampah Terpadu

(TPST). Kontrak minggu ke 3 Juli 2010.

Rencana penarikan uang muka + 600 Juta

Rupiah (SPM 30/07/2010)

2. Jakarta Urgent Flood & Mitigation Project (JUFMP) Loan belum efektif

3 Jawa Barat 15.19 2.93 1. DED yang ada tidak sesuai dengan kondisi lapangan dan Evaluasi lelang

bertambah 2 bulan untuk paket pembangunan Land Fill TPA Regional Nambo

Kabupaten Bogor

Review DED dengan berkoordinasi dengan

BPSR (Badan Pengelola Sampah Regional)

Sudah dalam masa

pelaksanaan

kontrak

2. DED yang ada tidak sesuai dengan lapangan untuk paket peningkatan Prasarana

dan Sarana TPA Pecuk Kabupaten Indramayu

Review DED dikerjakan oleh Dinas

Kebersihan dan Pertamanan Kab. Indramayu

TA. 2010

Sudah dalam masa

pelaksanaan

kontrak

SATKER/PROVINSI TINDAK LANJUT KETERANGAN

PERMASALAHAN DAN TINDAK LANJUT PROGRES KEGIATAN TA. 2010

DIREKTORAT PENGEMBANGAN PENYEHATAN LINGKUNGAN PERMUKIMAN

STATUS: 29 JULI 2010

ALASAN KETERLAMBATAN

PROGRES

NO

Page 31: KEMAJUAN PELAKSANAAN KEGIATAN PEMBANGUNAN …ciptakarya.pu.go.id/dok/progress/progress_20100729.pdf · 5 Review DED 0 Percepatan Review ... Pembangunan Jalan Poros Lokasi Kws

KEU FISIK

(%) (%)

3 Jawa Barat 15.19 2.93 3. Perlu Koordinasi dan Pembahasan dengan Pemeritah Kota Depok dalam

pembuatan TOR dan evaluasi lelang lama (5 bulan) untuk paket penyusunan

Master Plan dan DED Drainase Perkotaan Kota Depok

Dilakukan koordinasi dengan Walikota dan

unsur terkait dalam penyusunan TOR

Sudah dalam masa

pelaksanaan

kontrak

4. Dana yang ada tidak cukup untuk satu kota (perlu foto udara) dan evaluasi untuk

penyusunan Master Plan dan DED Drainase Perkotaan Kota Bekasi lelang lama (5

bulan)

Dilaksanakan 1/2 kota Sudah dalam masa

pelaksanaan

kontrak

5. Perpindahan lokasi pada paket pembangunan Air Limbah Terpusat Skala Kawasan

(RSH Tenjoresmi ) Kabupaten Sukabumi

Dilakukan survey ulang muli tg 8 Juli 2010

dan akan dibuatkan DED oleh satker PLP

Pengumuman

lelang 30 Juli 2010

6. Pada paket pembangunan PS. Air Limbah Terpusat Kota Bandung (Lanjutan) :

- DED belum siap dilelang (waktu pengumuman lelang mundur 2 bln) Diperbaiki/direview oleh PDAM Kota Bandung Sudah dalam masa

pelaksanaan

kontrak

- Proses perijinan pelintasan sungai terlambat Tgl 23 Juli 2010 kordinasi dengan BBWS

Citarum/Dirjen SDA. Tanggal 30 Juli 2010

Pembahasan Rekomendasi Teknis

Ada permintaan

rekomendasi teknis

dari Dirjen SDA

kepada BBWS

Citarum

- Ijin penggunaan rumija dari Dirjen Bina Marga sudah ada th 2008, Untuk

pelaksanaan TA 2010 menunggu persetujuan Balai Besar Pelaksana Jalan

Nasional IV

Tgl. 26 Juli 2010 kordinasi dan mengirim

surat perihal permohonan percepatan

perijinan dari BBPJN IV. Tanggal 31 juli 2010

Peninjauan Lapangan

Ada permintaan

rekomendasi teknis

dari Dirjen SDA

kepada BBWS

Citarum

- Ada Pengaduan dari Masyarakat yang perlu dikonsultasikan ke BPKSDM dan

dikonfirmasi ke KPPU

Dilakukan konsultasi ke BPKSDM dan sudah

melayangkan surat ke KPPU

Menunggu surat

balasan dari KPPU

sebagai dasar

dalam

menandatangani

kontrak

- Kepolisian minta untuk lokasi Jl. Soekarno Hatta dikerjakan setelah lebaran Penyesuain jadwal, dan penambahan alat

SATKER/PROVINSI TINDAK LANJUT KETERANGANALASAN KETERLAMBATAN

PROGRES

NO

Page 32: KEMAJUAN PELAKSANAAN KEGIATAN PEMBANGUNAN …ciptakarya.pu.go.id/dok/progress/progress_20100729.pdf · 5 Review DED 0 Percepatan Review ... Pembangunan Jalan Poros Lokasi Kws

KEU FISIK

(%) (%)

3 Jawa Barat 15.19 2.93 7. Pada paket pembangunan PS. Air Limbah Terpusat Kota Cirebon :

- DED dari PDAM Kota Cirebon belum siap dilelang Pembuatan DED oleh PDAM Kota Cirebon Sudah dalam

pelaksanaan

kontrak

- Perijinan pelintasan rel Kereta Api dan surat pernyataan dari Dinas LH Kt. Cirebon

(tgl. 2 Agustus 2010)

Perijinan pelintasan rel Kereta Api diproses

oleh PDAM Kota Cirebon

Menunggu

persetujuan dari

Direktora

Perkeretaapian

Kementrian

Perhubungan

- Perlu proses perijinan jalan Nasional Tgl. 26 Juli 2010 koordinasi dengan BBPJN

IV dan menyampaikan surat permohonan ijin

dari Satker PPLP

Menunggu

perijinan dan

Rekomendasi

Teknis dari BBPJN

IV

4 D.I. Yogyakarta 13.15 15.97 1. Menunggu penyelesaian DED untuk pekerjaan pembangunan TPST UGM Penyelesaian DED Sudah

dilaksanakan

2 Tender ulang dan dan menunggu kesepakatan Pemkab dan masyarakat untuk

ujicoba pengelolaan TPA Kulonprogo

Percepatan proses tender ulang

3 Pembangunan PS Air Limbah Terpusat (MSMHP) belum ditanda tangani Loan

Agreementnya (Loan belum efektif)

Persiapan pemaketan pelelangan

4 Tender ulang untuk pekerjaan masterplan dan DED TPA Gunung Kidul Percepatan proses tender ulang

5 Gorontalo 19.72 21.71 1. 2 paket pembangunan 3R dalam proses lelang (Kab. Pahuwato & Kab. Gorontalo

Utara)

Akan mempercepat proses evaluasi lelang

2. Tender ulang pada paket bantuan perencanaan PS sampah terpadu 3R Kab.

Gorontalo Utara dan Kab. Pohuwato

Akan mempercepat proses tender ulang Status lelang

sudah sampai

evaluasi

penawaran usulan

teknis

3 Ada sanggah pada paket pembangunan TPA sampah Polohungo Kab. Boalemo Penyelesaiaan sanggahan Tidak ada sanggah

banding, paket

sudah terkontrak

SATKER/PROVINSI TINDAK LANJUT KETERANGANALASAN KETERLAMBATAN

PROGRES

NO

Page 33: KEMAJUAN PELAKSANAAN KEGIATAN PEMBANGUNAN …ciptakarya.pu.go.id/dok/progress/progress_20100729.pdf · 5 Review DED 0 Percepatan Review ... Pembangunan Jalan Poros Lokasi Kws

KEU FISIK

(%) (%)

4 MoU antara Kota, Kab. dan Provinsi Gorontalo baru selesai, dan tender ulang pada

paket bantuan teknis penyiapan kelembagaan UPTD yang akan menerapkan PPK

BLUD pada TPA Regional Talumelito

Akan mempercepat proses tender ulang Status lelang

sudah sampai

penetapan hasil

prakualifikasi

6 Sulawesi Tengah 20.26 60.05 Keterlambatan kontraktor melakukan penagihan untuk pekerjaan peningkaan

kinerja TPA Kota Palu

Akan mempercepat proses penagihan

7 Sulawesi Barat 20.40 29.40 1. Paket pemberdayaan, pembangunan 3R belum lelang Mempercepat penyusunan DED

8 Maluku Utara 21.35 30.52 1. Bintang di DIPA pada paket pengadaan mobil penyuluhan kampanye dan edukasi

3R bidang PLP

Revisi DIPA Revisi DIPA ditolak

DJA

2. DED TPA Marabose yang belum valid Mereview kembali DED TPA Marabose

3. Perubahan lokasi pembangunan PS Sampah Terpadu 3R Koordinasi dengan Pemda setempat

4. Terlambatnya menemukan lokasi untuk pembangunan PS Sampah Terpadu 3R Penambahan Tenaga Kerja untuk pembangunan

PS Sampah Terpadu 3R

SATKER/PROVINSI TINDAK LANJUT KETERANGANALASAN KETERLAMBATAN

PROGRES

NO

Page 34: KEMAJUAN PELAKSANAAN KEGIATAN PEMBANGUNAN …ciptakarya.pu.go.id/dok/progress/progress_20100729.pdf · 5 Review DED 0 Percepatan Review ... Pembangunan Jalan Poros Lokasi Kws

1,240,969

- 4,054 19,316 38,158

105,066

219,814

398,758

590,341

788,455

977,078

1,104,924

1,179,442

1,240,969

- -

199 868 4,458

46,627

54,688 109,724

145,087 155,717

198,635

281,632

295,132

427,441

-

200,000

400,000

600,000

800,000

1,000,000

1,200,000

1,400,000

JAN FEB MAR APR MEI JUN JUL AGT SEP OKT NOP DES

DA

LA

M J

UT

AA

N R

UP

IAH

BULAN

RENCANA DAN REALISASI PENYERAPANDIREKTORAT PENYEHATAN LINGKUNGAN DAN PERMUKIMAN

TAHUN ANGGARAN 2010

PAGU

RENCANA

REALISASI

Page 35: KEMAJUAN PELAKSANAAN KEGIATAN PEMBANGUNAN …ciptakarya.pu.go.id/dok/progress/progress_20100729.pdf · 5 Review DED 0 Percepatan Review ... Pembangunan Jalan Poros Lokasi Kws

RPM PHLN TOTAL

a. Satker Pusat 345,524,135 24,000,000 369,524,135 35,334,980 899,000 309,290,155 24,000,000 333,290,155 - 369,524,135 47 50 97 20 2 - - 18 - 7 - - 50 57,298,759

1 452771 Dit. Bangkim 36,263,947 36,263,947 24,030,573 - 12,233,374 - 12,233,374 - 36,263,947 14 - 14 - - 14 11,187,149

2 488822 Penyediaan PS Agropolitan 6,791,452 6,791,452 3,641,452 - 3,150,000 - 3,150,000 - 6,791,452 4 4 - - 4 2,927,883

3 493181 Pelak. Bangkim (Rusunawa) 300,468,736 300,468,736 5,662,955 899,000 293,906,781 - 293,906,781 - 300,468,736 28 50 78 20 2 - 18 7 31 19,183,727

4 487760 NUSSP 2,000,000 24,000,000 26,000,000 2,000,000 - - 24,000,000 24,000,000 - 26,000,000 1 - 1 1 24,000,000

b. Satker Propinsi 553,799,525 - 553,799,525 52,024,867 30,616,239 471,158,419 - 471,158,419 - 553,799,525 116 482 598 1 - - - 3 - 4 1 6 583 394,962,966

Wilayah 1 62 206 268 1 - - - 2 - 3 - 3 259 189,016,732

1 486479 Bangkim NAD 16,015,681 16,015,681 1,397,256 910,000 13,708,425 - 13,708,425 - 16,015,681 5 14 19 19 11,521,634

2 486485 Bangkim Sumatera Utara 19,694,531 19,694,531 1,361,167 1,026,259 17,307,105 - 17,307,105 - 19,694,531 3 19 22 22 16,013,960

3 486491 Bangkim Sumatera Barat 19,807,195 19,807,195 1,397,360 1,369,580 17,040,255 - 17,040,255 - 19,807,195 3 17 20 2 18 11,345,172

4 486505 Bangkim Riau 17,695,426 17,695,426 1,511,311 1,257,000 14,927,115 - 14,927,115 - 17,695,426 4 13 17 1 16 11,199,467

5 493336 Bangkim Kepulauan Riau 17,666,453 17,666,453 2,201,583 1,946,000 13,518,870 - 13,518,870 - 17,666,453 3 7 10 10 11,849,816

6 486511 Bangkim Jambi 12,400,907 12,400,907 1,181,327 605,700 10,613,880 - 10,613,880 - 12,400,907 3 12 15 15 10,283,675

7 486686 Bangkim Bengkulu 14,506,843 14,506,843 2,456,323 780,805 11,269,715 - 11,269,715 - 14,506,843 2 18 20 20 11,106,928

8 486520 Bangkim Sumatera Selatan 19,016,673 19,016,673 1,353,908 1,409,500 16,253,265 - 16,253,265 - 19,016,673 3 14 17 1 16 13,955,095

9 487723 Bangkim Bangka Belitung 12,343,747 12,343,747 1,309,487 1,181,380 9,852,880 - 9,852,880 - 12,343,747 6 5 11 1 10 7,858,885

10 486536 Bangkim Lampung 14,831,581 14,831,581 1,157,926 1,945,031 11,728,624 - 11,728,624 - 14,831,581 3 9 12 12 11,467,575

11 487732 Bangkim Banten 15,064,735 15,064,735 1,242,175 883,125 12,939,435 - 12,939,435 - 15,064,735 4 12 16 16 12,699,735

12 486432 Bangkim Jawa Barat 21,344,247 21,344,247 1,321,234 935,000 19,088,013 - 19,088,013 - 21,344,247 5 15 20 1 19 14,830,044

13 486448 Bangkim Jawa Tengah 27,775,972 27,775,972 1,752,852 1,185,000 24,838,120 - 24,838,120 - 27,775,972 9 26 35 3 32 18,215,434

14 486454 Bangkim D.I.Yogyakarta 13,543,216 13,543,216 1,119,560 900,000 11,523,656 - 11,523,656 - 13,543,216 2 10 12 12 8,315,310

15 486460 Bangkim Jawa Timur 26,324,870 26,324,870 2,393,500 2,730 23,928,640 - 23,928,640 - 26,324,870 7 15 22 22 18,354,002

Wilayah 2 54 276 330 - - - - 1 - 1 1 3 324 205,946,234

16 486542 Bangkim Kalimantan Barat 28,503,078 28,503,078 2,010,848 1,525,000 24,967,230 - 24,967,230 - 28,503,078 2 22 24 24 23,567,969

17 486551 Bangkim Kalimantan Tengah 16,187,052 16,187,052 1,069,593 450,000 14,667,459 - 14,667,459 - 16,187,052 5 17 22 22 14,507,267

18 486567 Bangkim Kalimantan Selatan 16,309,887 16,309,887 1,222,642 1,328,500 13,758,745 - 13,758,745 - 16,309,887 2 14 16 3 13 6,652,536

19 486573 Bangkim Kalimantan Timur 15,987,138 15,987,138 1,645,258 850,000 13,491,880 - 13,491,880 - 15,987,138 3 8 11 11 11,324,458

20 486582 Bangkim Sulawesi Utara 17,405,359 17,405,359 1,740,969 855,000 14,809,390 - 14,809,390 - 17,405,359 - 25 25 25 12,995,146

21 487748 Bangkim Gorontalo 12,910,704 12,910,704 2,069,254 147,282 10,694,168 - 10,694,168 - 12,910,704 2 11 13 1 1 11 6,626,379

22 486598 Bangkim Sulawesi Tengah 15,364,778 15,364,778 1,389,378 1,223,867 12,751,533 - 12,751,533 - 15,364,778 2 30 32 32 11,810,747

23 486602 Bangkim Sulawesi Selatan 23,813,207 23,813,207 2,933,302 219,930 20,659,975 - 20,659,975 - 23,813,207 4 35 39 39 17,265,193

24 452796 Bangkim Sulawesi Barat 13,778,243 13,778,243 1,376,384 1,650,000 10,751,859 - 10,751,859 - 13,778,243 1 15 16 16 9,377,969

25 486618 Bangkim Sulawesi Tenggara 18,469,102 18,469,102 2,357,802 375,000 15,736,300 - 15,736,300 - 18,469,102 2 13 15 15 15,569,109

26 486649 Bangkim Bali 20,534,704 20,534,704 1,113,289 825,000 18,596,415 - 18,596,415 - 20,534,704 12 18 30 30 13,410,328

27 486655 Bangkim Nusa Tenggara Barat 17,595,022 17,595,022 1,615,022 2,125,000 13,855,000 - 13,855,000 - 17,595,022 2 16 18 18 8,846,499

28 486661 Bangkim Nusa Tenggara Timur 14,757,214 14,757,214 2,436,839 (700,000) 13,020,375 - 13,020,375 - 14,757,214 9 8 17 1 16 10,085,656

29 486624 Bangkim Maluku 15,863,485 15,863,485 1,541,470 914,550 13,407,465 - 13,407,465 - 15,863,485 2 12 14 14 13,243,588

30 486630 Bangkim Maluku Utara 12,259,539 12,259,539 1,438,329 300,000 10,521,210 - 10,521,210 - 12,259,539 2 11 13 13 10,090,263

31 486670 Bangkim Papua 13,326,883 13,326,883 1,501,443 885,000 10,940,440 - 10,940,440 - 13,326,883 3 8 11 11 10,654,223

32 493769 Bangkim Papua Barat 12,702,053 12,702,053 1,406,076 1,305,000 9,990,977 - 9,990,977 - 12,702,053 1 13 14 14 9,918,904

TOTAL 899,323,660 24,000,000 923,323,660 87,359,847 31,515,239 780,448,574 24,000,000 804,448,574 - 923,323,660 163 532 695 21 2 - - 21 - 11 1 6 633 452,261,725

Keterangan :

1 Penyiapan Dokumen Lelang 6 Pemasukan Penawaran

2 Pengumuman Lelang/Prakualifikasi 7 Usulan Pemenang

3 Penyusunan shortlist 8 Penetapan Pemenang

4 Undangan Pelelangan 9 Penerbitan Surat Perintah Mulai Kerja

5 Penjelasan Pekerjaan Aanwyzing 10 Penandatangan Kontrak

STATUS : 29 JULI 2010, JAM 08.00 WIB

NILAI

KONTRAK

(Rp. x 1.000) 7654

NON

FISIK PLN

RUPIAH

MURNI321BLM FISIK 8TOTALTOTAL

LAPORAN PELAKSANAAN PELELANGAN BARANG/JASA TA 2010

DIREKTORAT PENGEMBANGAN PERMUKIMAN

NOKODE

SATKERNAMA SATUAN KERJA

PAGU PAKET KONTRAK JUMLAH PAKET DALAM PROSES PRA KONTRAK

SWAKELOLA +

AP

KONTRAKTUAL > 100 JT109TOTAL

PAKET > RP 100 JUTA

PAGU (Rp)

KONTRAKTUAL

≤ 100 JT

Page 36: KEMAJUAN PELAKSANAAN KEGIATAN PEMBANGUNAN …ciptakarya.pu.go.id/dok/progress/progress_20100729.pdf · 5 Review DED 0 Percepatan Review ... Pembangunan Jalan Poros Lokasi Kws

NO. URAIAN PERMASALAHAN TINDAK LANJUT KETERANGAN

1 Persiapan Lelang 21 Perincian paket terlampir.

2 Proses Lelang 41

3 Proses Sanggah Banding -

4 Proses Tender Ulang -

5 Review DED -

6 Diblokir (Tanda Bintang) oleh Ditjen Anggaran

a. Loan belum efektif -

b. Menunggu Penandatanganan Loan Agreement -

c. Tanggap Darurat -

d. Revisi Kegiatan -

e. Belum tersedia dokumen RPIJM -

f. Menunggu persyaratan pembuktian BMN -

7 Pemindahan Lokasi

62

RINGKASAN PERMASALAHAN PROGRES PELELANGAN TA.2010

DIREKTORAT PENGEMBANGAN PERMUKIMAN

STATUS : 29 JULI 2010

JUMLAH

PAKET

TOTAL

Page 37: KEMAJUAN PELAKSANAAN KEGIATAN PEMBANGUNAN …ciptakarya.pu.go.id/dok/progress/progress_20100729.pdf · 5 Review DED 0 Percepatan Review ... Pembangunan Jalan Poros Lokasi Kws

1 RUSUNAWA 20 45,756,781

1 Perbaikan Rusunawa di Medan 600,000 Dilelang pada awal Agustus Menginventarisir data-data Kerusakan Pasca

Gempa & Persiapan Dok. Lelang

2 Perbaikan Rusunawa di Bandar Lampung 400,000 Dilelang pada awal Agustus Menginventarisir data-data Kerusakan Pasca

Gempa & Persiapan Dok. Lelang

3 Perbaikan Rusunawa di Bogor 400,000 Dilelang pada awal Agustus Menginventarisir data-data Kerusakan Pasca

Gempa & Persiapan Dok. Lelang

4 Perbaikan Rusunawa di Jogja 400,000 Dilelang pada awal Agustus Menginventarisir data-data Kerusakan Pasca

Gempa & Persiapan Dok. Lelang

5 Perbaikan Rusunawa di Sumsel 200,000 Dilelang pada awal Agustus Menginventarisir data-data Kerusakan Pasca

Gempa & Persiapan Dok. Lelang

6 Perbaikan Rusunawa di Bengkulu 300,000 Dilelang pada awal Agustus Menginventarisir data-data Kerusakan Pasca

Gempa & Persiapan Dok. Lelang

7 Perbaikan rusunawa di Padang 500,000 Dilelang pada awal Agustus Menginventarisir data-data Kerusakan Pasca

Gempa & Persiapan Dok. Lelang

8 Perbaikan Rusunawa di Cingised, Bandung 900,000 Dilelang pada awal Agustus Menginventarisir data-data Kerusakan Pasca

Gempa & Persiapan Dok. Lelang

9 Perbaikan Rusunawa di Solo 400,000 Dilelang pada awal Agustus Menginventarisir data-data Kerusakan Pasca

Gempa & Persiapan Dok. Lelang

10 Perbaikan Rusunawa di Sleman 300,000 Dilelang pada awal Agustus Menginventarisir data-data Kerusakan Pasca

Gempa & Persiapan Dok. Lelang

11 Perbaikan Rusunawa di Cilacap 400,000 Dilelang pada awal Agustus Menginventarisir data-data Kerusakan Pasca

Gempa & Persiapan Dok. Lelang

12 Pembuatan Sewage Treatmen Plant di Kws Rusunami Pulo Gebang Jakarta Timur 3,600,000 Dilelang pada akhir Juli Menginventarisir lahan-lahan yang siap &

Persiapan Dok. Lelang

13 Pembangunan PSD di Kawasan Rusunawa Sidoarjo Ngelom, Jawa Timur 1,000,000 Dilelang pada akhir Juli Menginventarisir lahan-lahan yang siap &

Persiapan Dok. Lelang

14 Pembuatan MCK di Kws Kumuh Rel Kereta Api di Tanjung Priok Jakarta Utara 550,000 Dilelang pada akhir Juli Menginventarisir lahan-lahan yang siap &

Persiapan Dok. Lelang

15 Pembuatan PSD di Kws Rusunawa Pringwulung Condongcatur Kota Sleman Jogyakarta 1,000,000 Dilelang pada akhir Juli Menginventarisir lahan-lahan yang siap &

Persiapan Dok. Lelang

16 Pembangunan PSD dan Pengadaan Perlengkapan Sarana Gedung di Kws Rusunawa Kendari,

Sulawesi Tenggara

578,252 Dilelang pada akhir Juli Menginventarisir lahan-lahan yang siap &

Persiapan Dok. Lelang

17 Pembangunan PSD di Kws Rusunawa Bau Bau, Sulawesi Tenggara 1,000,000 Dilelang pada akhir Juli Menginventarisir lahan-lahan yang siap &

Persiapan Dok. Lelang

18 Pembangunan Rusunawa Lokasi Rempoa 13,628,529

19 Pembangunan Rusunawa Lokasi Surabaya 5,950,000

20 Pembangunan Rusunawa Lokasi Padang 13,650,000

2 BANGKA BELITUNG 1 1,474,505

- Pembangunan Jalan Poros Lokasi Kws.Salepliat Kabupaten Bangka Selatan 1,474,505 Revisi ulang POK sudah selesai, tetapi belum

dilelangkan karena sedang dalam proses ex-

officio

21 47,231,286

KETERANGANPENJELASAN BELUM DILELANGKAN TINDAK LANJUTPAKET KONTRAK/RINCIAN KEGIATANNO

PERMASALAHAN PAKET BELUM LELANG

TOTAL

PAGU

(X Rp.1000)SATKER/PROVINSI

JML PAKET

BELUM

LELANG

DIREKTORAT PENGEMBANGAN PERMUKIMAN

STATUS : 29 JULI 2010

Page 38: KEMAJUAN PELAKSANAAN KEGIATAN PEMBANGUNAN …ciptakarya.pu.go.id/dok/progress/progress_20100729.pdf · 5 Review DED 0 Percepatan Review ... Pembangunan Jalan Poros Lokasi Kws

RPM PHLN TOTAL

Satker Pusat 345,524,135 24,000,000 369,524,135 35,334,980 899,000 309,290,155 24,000,000 333,290,155 - 369,524,135 35,483,374 24,000,000 59,483,374 33,298,759 24,000,000 57,298,759 2,184,615 - 2,184,615

1 452771 Dit. Bangkim 36,263,947 - 36,263,947 24,030,573 - 12,233,374 12,233,374 36,263,947 12,233,374 - 12,233,374 11,187,149 - 11,187,149 1,046,225 - 1,046,225

2 488822 Penyediaan PS Agropolitan 6,791,452 - 6,791,452 3,641,452 - 3,150,000 3,150,000 6,791,452 3,150,000 - 3,150,000 2,927,883 - 2,927,883 222,117 - 222,117

3 493181 Pelak. Bangkim (Rusunawa) 300,468,736 - 300,468,736 5,662,955 899,000 293,906,781 293,906,781 300,468,736 20,100,000 - 20,100,000 19,183,727 - 19,183,727 916,273 - 916,273

4 487760 NUSSP 2,000,000 24,000,000 26,000,000 2,000,000 - 24,000,000 24,000,000 26,000,000 - 24,000,000 24,000,000 - 24,000,000 24,000,000 - - -

SATKER PROPINSI 553,799,525 - 553,799,525 52,024,867 30,616,239 471,158,419 - 471,158,419 - 553,799,525 455,378,996 - 455,378,996 394,962,966 - 394,962,966 60,416,030 - 60,416,030

Wilayah 1 268,032,077 - 268,032,077 23,156,969 16,337,110 228,537,998 - 228,537,998 - 268,032,077 221,393,493 - 221,393,493 189,016,732 - 189,016,732 32,376,761 - 32,376,761

1 486479 Bangkim NAD 16,015,681 - 16,015,681 1,397,256 910,000 13,708,425 13,708,425 16,015,681 13,708,425 13,708,425 11,521,634 11,521,634 2,186,791 - 2,186,791

2 486485 Bangkim Sumatera Utara 19,694,531 - 19,694,531 1,361,167 1,026,259 17,307,105 17,307,105 19,694,531 17,307,105 17,307,105 16,013,960 16,013,960 1,293,145 - 1,293,145

3 486491 Bangkim Sumatera Barat 19,807,195 - 19,807,195 1,397,360 1,369,580 17,040,255 17,040,255 19,807,195 15,090,255 15,090,255 11,345,172 11,345,172 3,745,083 - 3,745,083

4 486505 Bangkim Riau 17,695,426 - 17,695,426 1,511,311 1,257,000 14,927,115 14,927,115 17,695,426 13,977,115 13,977,115 11,199,467 11,199,467 2,777,648 - 2,777,648

5 493336 Bangkim Kepulauan Riau 17,666,453 - 17,666,453 2,201,583 1,946,000 13,518,870 13,518,870 17,666,453 13,518,870 13,518,870 11,849,816 11,849,816 1,669,054 - 1,669,054

6 486511 Bangkim Jambi 12,400,907 - 12,400,907 1,181,327 605,700 10,613,880 10,613,880 12,400,907 10,613,880 10,613,880 10,283,675 10,283,675 330,205 - 330,205

7 486686 Bangkim Bengkulu 14,506,843 - 14,506,843 2,456,323 780,805 11,269,715 11,269,715 14,506,843 11,269,715 11,269,715 11,106,928 11,106,928 162,787 - 162,787

8 486520 Bangkim Sumatera Selatan 19,016,673 - 19,016,673 1,353,908 1,409,500 16,253,265 16,253,265 19,016,673 14,303,265 14,303,265 13,955,095 13,955,095 348,170 - 348,170

9 487723 Bangkim Bangka Belitung 12,343,747 - 12,343,747 1,309,487 1,181,380 9,852,880 9,852,880 12,343,747 8,378,375 8,378,375 7,858,885 7,858,885 519,490 - 519,490

10 486536 Bangkim Lampung 14,831,581 - 14,831,581 1,157,926 1,945,031 11,728,624 11,728,624 14,831,581 11,728,624 11,728,624 11,467,575 11,467,575 261,049 - 261,049

11 487732 Bangkim Banten 15,064,735 - 15,064,735 1,242,175 883,125 12,939,435 12,939,435 15,064,735 12,939,435 12,939,435 12,699,735 12,699,735 239,700 - 239,700

12 486432 Bangkim Jawa Barat 21,344,247 - 21,344,247 1,321,234 935,000 19,088,013 19,088,013 21,344,247 18,818,013 18,818,013 14,830,044 14,830,044 3,987,969 - 3,987,969

13 486448 Bangkim Jawa Tengah 27,775,972 - 27,775,972 1,752,852 1,185,000 24,838,120 24,838,120 27,775,972 24,288,120 24,288,120 18,215,434 18,215,434 6,072,686 - 6,072,686

14 486454 Bangkim D.I.Yogyakarta 13,543,216 - 13,543,216 1,119,560 900,000 11,523,656 11,523,656 13,543,216 11,523,656 11,523,656 8,315,310 8,315,310 3,208,346 - 3,208,346

15 486460 Bangkim Jawa Timur 26,324,870 - 26,324,870 2,393,500 2,730 23,928,640 23,928,640 26,324,870 23,928,640 23,928,640 18,354,002 18,354,002 5,574,638 - 5,574,638

Wilayah 2 285,767,448 - 285,767,448 28,867,898 14,279,129 242,620,421 - 242,620,421 - 285,767,448 233,985,503 - 233,985,503 205,946,234 - 205,946,234 28,039,269 - 28,039,269

16 486542 Bangkim Kalimantan Barat 28,503,078 - 28,503,078 2,010,848 1,525,000 24,967,230 24,967,230 28,503,078 24,967,230 24,967,230 23,567,969 23,567,969 1,399,261 - 1,399,261

17 486551 Bangkim Kalimantan Tengah 16,187,052 - 16,187,052 1,069,593 450,000 14,667,459 14,667,459 16,187,052 14,667,459 14,667,459 14,507,267 14,507,267 160,192 - 160,192

18 486567 Bangkim Kalimantan Selatan 16,309,887 - 16,309,887 1,222,642 1,328,500 13,758,745 13,758,745 16,309,887 8,585,745 8,585,745 6,652,536 6,652,536 1,933,209 - 1,933,209

19 486573 Bangkim Kalimantan Timur 15,987,138 - 15,987,138 1,645,258 850,000 13,491,880 13,491,880 15,987,138 13,491,880 13,491,880 11,324,458 11,324,458 2,167,422 - 2,167,422

20 486582 Bangkim Sulawesi Utara 17,405,359 - 17,405,359 1,740,969 855,000 14,809,390 14,809,390 17,405,359 14,809,390 14,809,390 12,995,146 12,995,146 1,814,244 - 1,814,244

21 487748 Bangkim Gorontalo 12,910,704 - 12,910,704 2,069,254 147,282 10,694,168 10,694,168 12,910,704 8,082,250 8,082,250 6,626,379 6,626,379 1,455,871 - 1,455,871

22 486598 Bangkim Sulawesi Tengah 15,364,778 - 15,364,778 1,389,378 1,223,867 12,751,533 12,751,533 15,364,778 12,751,533 12,751,533 11,810,747 11,810,747 940,786 - 940,786

23 486602 Bangkim Sulawesi Selatan 23,813,207 - 23,813,207 2,933,302 219,930 20,659,975 20,659,975 23,813,207 20,659,975 20,659,975 17,265,193 17,265,193 3,394,782 - 3,394,782

24 452796 Bangkim Sulawesi Barat 13,778,243 - 13,778,243 1,376,384 1,650,000 10,751,859 10,751,859 13,778,243 10,751,859 10,751,859 9,377,969 9,377,969 1,373,890 - 1,373,890

25 486618 Bangkim Sulawesi Tenggara 18,469,102 - 18,469,102 2,357,802 375,000 15,736,300 15,736,300 18,469,102 15,736,300 15,736,300 15,569,109 15,569,109 167,191 - 167,191

26 486649 Bangkim Bali 20,534,704 - 20,534,704 1,113,289 825,000 18,596,415 18,596,415 20,534,704 18,596,415 18,596,415 13,410,328 13,410,328 5,186,087 - 5,186,087

27 486655 Bangkim Nusa Tenggara Barat 17,595,022 - 17,595,022 1,615,022 2,125,000 13,855,000 13,855,000 17,595,022 13,855,000 13,855,000 8,846,499 8,846,499 5,008,501 - 5,008,501

28 486661 Bangkim Nusa Tenggara Timur 14,757,214 - 14,757,214 2,436,839 (700,000) 13,020,375 13,020,375 14,757,214 12,170,375 12,170,375 10,085,656 10,085,656 2,084,719 - 2,084,719

29 486624 Bangkim Maluku 15,863,485 - 15,863,485 1,541,470 914,550 13,407,465 13,407,465 15,863,485 13,407,465 13,407,465 13,243,588 13,243,588 163,877 - 163,877

30 486630 Bangkim Maluku Utara 12,259,539 - 12,259,539 1,438,329 300,000 10,521,210 10,521,210 12,259,539 10,521,210 10,521,210 10,090,263 10,090,263 430,947 - 430,947

31 486670 Bangkim Papua 13,326,883 - 13,326,883 1,501,443 885,000 10,940,440 10,940,440 13,326,883 10,940,440 10,940,440 10,654,223 10,654,223 286,217 - 286,217

32 493769 Bangkim Papua Barat 12,702,053 - 12,702,053 1,406,076 1,305,000 9,990,977 9,990,977 12,702,053 9,990,977 9,990,977 9,918,904 9,918,904 72,073 - 72,073

TOTAL 899,323,660 24,000,000 923,323,660 87,359,847 31,515,239 780,448,574 24,000,000 804,448,574 - 923,323,660 490,862,370 24,000,000 514,862,370 428,261,725 24,000,000 452,261,725 62,600,645 - 62,600,645

TOTAL

PAGU (Rp)

TOTAL RPM

PAGU TERKONTRAK NILAI KONTRAK SISA PAGU KONTRAK

RPM PHLN TOTALPHLN TOTAL RPM

LAPORAN SISA PAGU PELELANGAN BARANG/JASA TA 2010

DIREKTORAT PENGEMBANGAN PERMUKIMAN

STATUS : 29 JULI 2010, JAM 08.00 WIB( x Rp. 1.000 )

NOKODE

SATKERNAMA SATUAN KERJA

PAGU

RUPIAH MURNI PLN TOTAL SWAKELOLA +

AP

KONTRAKTUAL > 100 JTBLM

KONTRAKTUAL

≤ 100 JTPHLN

Page 39: KEMAJUAN PELAKSANAAN KEGIATAN PEMBANGUNAN …ciptakarya.pu.go.id/dok/progress/progress_20100729.pdf · 5 Review DED 0 Percepatan Review ... Pembangunan Jalan Poros Lokasi Kws

KEU. FISIK

(RP) % % % (RP) %

Satker Pusat 345,524,135 24,000,000 369,524,135 66,792,183 18.08 20.68 21,432,455 13,273,079 34,705,534 9.39 9.11 (32,086,649) (8.68)

1 452771 Pengembangan Permukiman 36,263,947 36,263,947 15,493,298 42.72 42.74 15,384,033 - 15,384,033 42.42 46.83 (109,265) (0.30)

2 488822 Penyediaan PS Agropolitan 6,791,452 6,791,452 2,733,916 40.26 27.45 1,754,686 - 1,754,686 25.84 26.71 (979,230) (14.42)

3 493181 Pelaksanaan Pengembangan Permukiman (Rusunawa) 300,468,736 300,468,736 33,395,959 11.11 15.26 3,385,473 - 3,385,473 1.13 0.22 (30,010,486) (9.99)

4 487760 Pembinaan Teknis Penataan Lingkungan Permukiman (NUSSP) 2,000,000 24,000,000 26,000,000 15,169,010 58.34 50.73 908,263 13,273,079 14,181,342 54.54 54.63 (987,668) (3.80)

SATKER PROPINSI 553,799,525 - 553,799,525 212,336,565 38.34 39.57 218,893,458 - 218,893,458 39.53 56.03 6,556,893 1.18

Wilayah 1 268,032,077 - 268,032,077 93,142,762 34.75 35.56 104,239,842 - 104,239,842 38.89 55.80 11,097,080 4.14

1 486479 Pengembangan Kawasan Permukiman & Perbatasan NAD 16,015,681 16,015,681 5,449,927 34.03 34.53 5,223,223 - 5,223,223 32.61 66.20 (226,704) (1.42)

2 486485 Pengembangan Kawasan Permukiman & Perbatasan Sumatera Utara 19,694,531 19,694,531 6,543,451 33.22 33.72 7,808,290 - 7,808,290 39.65 45.09 1,264,839 6.42

3 486491 Pengembangan Kawasan Permukiman Sumatera Barat 19,807,195 19,807,195 6,727,433 33.96 34.46 5,141,839 - 5,141,839 25.96 37.62 (1,585,594) (8.01)

4 486505 Pengembangan Kawasan Permukiman & Perbatasan Riau 17,695,426 17,695,426 6,075,988 34.34 34.84 5,582,090 - 5,582,090 31.55 32.24 (493,898) (2.79)

5 493336 Pengembangan Kawasan Permukiman & Perbatasan Kepulauan Riau 17,666,453 17,666,453 6,943,196 39.30 39.80 6,493,706 - 6,493,706 36.76 56.62 (449,490) (2.54)

6 486511 Pengembangan Kawasan Permukiman Jambi 12,400,907 12,400,907 4,134,798 33.34 33.84 6,801,391 - 6,801,391 54.85 63.80 2,666,593 21.50

7 486686 Pengembangan Kawasan Permukiman Bengkulu 14,506,843 14,506,843 5,005,836 34.51 38.62 6,296,130 - 6,296,130 43.40 70.34 1,290,294 8.89

8 486520 Pengembangan Kawasan Permukiman Sumatera Selatan 19,016,673 19,016,673 6,418,728 33.75 34.25 3,778,992 - 3,778,992 19.87 38.17 (2,639,736) (13.88)

9 487723 Pengembangan Kawasan Permukiman Bangka Belitung 12,343,747 12,343,747 4,630,361 37.51 38.01 3,851,077 - 3,851,077 31.20 46.46 (779,284) (6.31)

10 486536 Pengembangan Kawasan Permukiman Lampung 14,831,581 14,831,581 5,813,702 39.20 39.70 10,903,152 - 10,903,152 73.51 86.03 5,089,450 34.31

11 487732 Pengembangan Kawasan Permukiman Banten 15,064,735 15,064,735 5,189,103 34.45 34.95 10,557,964 - 10,557,964 70.08 74.26 5,368,861 35.64

12 486432 Pengembangan Kawasan Permukiman Jawa Barat 21,344,247 21,344,247 7,708,800 36.12 36.62 10,760,767 - 10,760,767 50.42 67.36 3,051,967 14.30

13 486448 Pengembangan Kawasan Permukiman Jawa Tengah 27,775,972 27,775,972 9,546,559 34.37 34.87 8,266,826 - 8,266,826 29.76 48.17 (1,279,733) (4.61)

14 486454 Pengembangan Kawasan Permukiman D.I.Yogyakarta 13,543,216 13,543,216 4,728,377 34.91 35.41 6,830,988 - 6,830,988 50.44 86.35 2,102,611 15.53

15 486460 Pengembangan Kawasan Permukiman Jawa Timur 26,324,870 26,324,870 8,226,505 31.25 32.87 5,943,407 - 5,943,407 22.58 47.10 (2,283,098) (8.67)

Wilayah 2 285,767,448 - 285,767,448 119,193,802 41.71 43.34 114,653,616 - 114,653,616 40.12 56.25 (4,540,186) (2)

16 486542 Pengembangan Kawasan Permukiman & Perbatasan Kalimantan Barat 28,503,078 28,503,078 7,502,909 26.32 26.92 7,717,342 - 7,717,342 27.08 47.61 214,433 0.75

17 486551 Pengembangan Kawasan Permukiman Kalimantan Tengah 16,187,052 16,187,052 9,440,507 58.32 59.65 10,173,372 - 10,173,372 62.85 86.94 732,865 4.53

18 486567 Pengembangan Kawasan Permukiman Kalimantan Selatan 16,309,887 16,309,887 5,999,033 36.78 37.62 2,207,761 - 2,207,761 13.54 15.99 (3,791,272) (23.25)

19 486573 Pengembangan Kawasan Permukiman & Perbatasan Kalimantan Timur 15,987,138 15,987,138 8,247,552 51.59 52.76 4,904,919 - 4,904,919 30.68 48.49 (3,342,633) (20.91)

20 486582 Pengembangan Kawasan Permukiman & Perbatasan Sulawesi Utara 17,405,359 17,405,359 6,075,949 34.91 35.70 9,693,346 - 9,693,346 55.69 73.73 3,617,397 20.78

21 487748 Pengembangan Kawasan Permukiman Gorontalo 12,910,704 12,910,704 7,159,937 55.46 60.23 1,910,219 - 1,910,219 14.80 21.62 (5,249,718) (40.66)

22 486598 Pengembangan Kawasan Permukiman Sulawesi Tengah 15,364,778 15,364,778 7,603,013 49.48 50.61 6,240,306 - 6,240,306 40.61 61.02 (1,362,707) (8.87)

23 486602 Pengembangan Kawasan Permukiman Sulawesi Selatan 23,813,207 23,813,207 11,501,108 48.30 52.82 14,462,643 - 14,462,643 60.73 78.24 2,961,535 12.44

24 452796 Pengembangan Kawasan Permukiman Sulawesi Barat 13,778,243 13,778,243 4,480,862 32.52 33.26 745,705 - 745,705 5.41 - (3,735,157) (27.11)

25 486618 Pengembangan Kawasan Permukiman Sulawesi Tenggara 18,469,102 18,469,102 6,174,611 33.43 35.69 9,583,396 - 9,583,396 51.89 61.39 3,408,785 18.46

26 486649 Pengembangan Kawasan Permukiman Bali 20,534,704 20,534,704 10,850,060 52.84 54.04 6,963,535 - 6,963,535 33.91 65.37 (3,886,525) (18.93)

27 486655 Pengembangan Kawasan Permukiman Nusa Tenggara Barat 17,595,022 17,595,022 6,665,090 37.88 38.74 4,871,604 - 4,871,604 27.69 61.18 (1,793,486) (10.19)

28 486661 Pengembangan Kawasan Permukiman & Perbatasan NTT 14,757,214 14,757,214 5,949,671 40.32 43.91 3,513,580 - 3,513,580 23.81 30.79 (2,436,091) (16.51)

29 486624 Pengembangan Kawasan Permukiman & Perbatasan Maluku 15,863,485 15,863,485 6,287,052 39.63 40.53 11,936,159 - 11,936,159 75.24 91.27 5,649,107 35.61

30 486630 Pengembangan Kawasan Permukiman & Perbatasan Maluku Utara 12,259,539 12,259,539 3,368,858 27.48 28.10 4,884,885 - 4,884,885 39.85 32.67 1,516,027 12.37

31 486670 Pengembangan Kawasan Permukiman & Perbatasan Papua 13,326,883 13,326,883 6,908,432 51.84 53.02 8,593,168 - 8,593,168 64.48 70.93 1,684,736 12.64

32 493769 Pengembangan Kawasan Permukiman & Perbatasan Papua Barat 12,702,053 12,702,053 4,979,156 39.20 40.09 6,251,676 - 6,251,676 49.22 87.45 1,272,520 10.02

TOTAL 899,323,660 24,000,000 923,323,660 279,128,748 30.23 32.01 240,325,913 13,273,079 253,598,992 27.47 37.25 (25,529,756) (2.76)

RENCANA PENYERAPAN DAN PROGRES KEUANGAN

DIREKTORAT PENGEMBANGAN PERMUKIMAN

STATUS : 29 JULI 2010, JAM 08.00 WIB( X Rp. 1000 )

PAGU REALISASI RENCANA PENYERAPAN

AKHIR BULAN JULINO

RUPIAH

MURNIPHLN

KODE

SATKERNAMA SATUAN KERJA

DEVIASI

KEUANGAN KEUANGAN RUPIAH MURNI PLN TOTAL TOTAL

FISIK

(%)

Page 40: KEMAJUAN PELAKSANAAN KEGIATAN PEMBANGUNAN …ciptakarya.pu.go.id/dok/progress/progress_20100729.pdf · 5 Review DED 0 Percepatan Review ... Pembangunan Jalan Poros Lokasi Kws

NO. KEU FISIK ALASAN KETERLAMBATAN TINDAK LANJUT KETERANGAN

% %

1 Pelaksanaan Pengembangan

Permukiman

1.13 0.22 - Pekerjaan Fisik Rusunawa Kupang (1TB) mengalami

ketelambatan dalam proses kontrak sehingga mengalami deviasi

dari rencana penyerapan.

- Satker melakukan percepatan dan reschedule ulang rencana

penyerapan.

Sudah Terkontrak

- Pekerjaan Fisik Rusunawa Padang (2TB) mengalami

ketelambatan dalam proses kontrak sehingga mengalami deviasi

dari rencana penyerapan.

- Satker melakukan percepatan dan reschedule ulang rencana

penyerapan.

- Proses Multiyears dari Ditjen Anggaran yang memakan waktu

lama

- Dalam proses pengajuan kembali untuk proses Multiyears

2 Sumatera Selatan 19.87 38.17 - Terdapat 1 paket kegiatan fisik (kumuh perkotaan) yang belum

terkontrak: Pembangunan jalan poros dan saluran kawasan

kumuh Kel. 3-4, kec. Sebrang Ulu 1, Palembang pagu Rp

1.950.000

- Mempercepat proses kontrak dan pengambilan uang muka

3 Kalimantan Selatan 13.54 15.99 - Dari 14 paket fisik, 11 paket baru terkontrak (sudah mengambil

uang muka) dan 3 paket fisik (kumuh perkotaan) masih proses

lelang.

- Mempercepat proses kontrak dan pengambilan uang muka 11 Paket fisik sudah terkontrak 2 Juli

2010 (selesai masa sanggah per 25

Juni 2010 surat BPKSDM Tanggal 25

Juni 2010 ; Nomor : HK.0202-KK/960)

- 20 paket non fisik (DED & Supervisi) sudah kontrak tetapi belum

ada penyerapan (termin)

- Segera melakukan pengambilan uang muka dan termin

4 Gorontalo 14.80 21.62 - 1 Paket fisik (kumuh Perkotaan) belum terkontrak: pembangunan

jalan lingkungan dan MCK di Desa Moluo, Kec. Kwandang, Kab.

Gorontalo Utara, pagu Rp 1.909.200.000

Lelang ulang karena peserta tidak memenuhi syarat (hanya 2

peserta)

- 1 Paket fisik Agropolitan sedang proses SKPA: peningkatan jalan

usaha tani Ds. Tolango Kws. Anggrek Kab. Gorontalo Utara, pagu

Rp 902.918.000

5 Sulawesi Barat 5.41 0.00 Proses "Evaluasi Ulang" sudah selesai dan 15 paket fisik sudah

terkontrak

13 paket sudah mengambil uang

muka.

PERMASALAHAN DAN TINDAK LANJUT PROGRES KEGIATAN TA 2010

DIREKTORAT PENGEMBANGAN PERMUKIMAN

STATUS : 29 JULI 2010

SATKER/PROVINSI

PROGRES

Page 41: KEMAJUAN PELAKSANAAN KEGIATAN PEMBANGUNAN …ciptakarya.pu.go.id/dok/progress/progress_20100729.pdf · 5 Review DED 0 Percepatan Review ... Pembangunan Jalan Poros Lokasi Kws

923,324

- 1,023 6,464 22,779

39,713

86,530

168,293

279,129

424,591

587,157

695,250

802,035

923,324

-287 574 1,499 1,766 9,453 18,333

37,958

62,468

89,929 107,498

154,348

192,259 215,805

253,599

-

100,000

200,000

300,000

400,000

500,000

600,000

700,000

800,000

900,000

1,000,000

JAN FEB MAR APR MEI JUN JUL AGT SEP OKT NOP DES

DA

LA

M J

UT

AA

N R

UP

IAH

BULAN

RENCANA DAN REALISASI PENYERAPANDIREKTORAT PENGEMBANGAN PERMUKIMAN

TAHUN ANGGARAN 2010

PAGU

RENCANA

REALISASI

Page 42: KEMAJUAN PELAKSANAAN KEGIATAN PEMBANGUNAN …ciptakarya.pu.go.id/dok/progress/progress_20100729.pdf · 5 Review DED 0 Percepatan Review ... Pembangunan Jalan Poros Lokasi Kws

RPM PHLN TOTAL

Satker Pusat 88,003,156 150,933,280 238,936,436 38,297,556 1,412,500 48,293,100 150,933,280 199,226,380 - 238,936,436 72 7 79 9 1 - 2 2 1 - 1 1 62 155,512,639 1 452780 Dit PBL 40,754,374 - 40,754,374 22,152,599 500,000 18,101,775 - 18,101,775 - 40,754,374 27 - 27 27 16,559,221 2 483690 Penataan & Revitalisasi Kawasan 22,493,537 22,493,537 3,648,212 400,000 18,445,325 - 18,445,325 - 22,493,537 7 4 11 2 1 2 2 1 3 1,353,200 3 493217 P2KP-PNPM 9,688,600 135,368,280 145,056,880 7,748,600 - 1,940,000 135,368,280 137,308,280 - 145,056,880 30 - 30 5 1 1 23 114,919,905 4 505137 Rehab. Bangunan Gedung Negara 10,350,000 10,350,000 1,381,500 412,500 8,556,000 - 8,556,000 - 10,350,000 1 3 4 2 2 5,865,313 5 449582 Rehab./Rekon DIY & Jateng 4,716,645 15,565,000 20,281,645 3,366,645 100,000 1,250,000 15,565,000 16,815,000 - 20,281,645 7 - 7 7 16,815,000

Satker PropinsiPBL Wilayah I 216,204,253 376,395,260 592,599,513 407,454,718 5,680,200 179,464,595 - 179,464,595 - 592,599,513 129 101 230 3 1 5 1 11 - 1 - 3 205 132,569,780

1 493342 PBL NAD 10,036,964 19,746,710 29,783,674 21,813,565 170,109 7,800,000 - 7,800,000 - 29,783,674 5 4 9 9 6,779,706 2 493351 PBL Sumatera Utara 11,585,680 23,038,700 34,624,380 25,154,271 140,000 9,330,109 - 9,330,109 - 34,624,380 9 8 17 17 9,092,056 3 493367 PBL Sumatera Barat 15,000,156 21,657,500 36,657,656 23,834,987 240,000 12,582,669 - 12,582,669 - 36,657,656 9 6 15 1 1 13 7,584,310 4 493373 PBL Riau 16,350,616 3,951,580 20,302,196 5,810,087 420,000 14,072,109 - 14,072,109 - 20,302,196 7 5 12 1 1 10 9,307,111 5 493382 PBL Kepulauan Riau 9,131,613 3,450,830 12,582,443 5,312,334 - 7,270,109 - 7,270,109 - 12,582,443 8 4 12 1 11 5,829,976 6 493398 PBL Jambi 15,655,301 2,449,650 18,104,951 4,284,842 320,000 13,500,109 - 13,500,109 - 18,104,951 8 6 14 14 13,053,431 7 493424 PBL Bengkulu 17,690,241 6,551,010 24,241,251 8,586,142 315,000 15,340,109 - 15,340,109 - 24,241,251 8 12 20 20 15,178,929 8 493482 PBL Sumatera Selatan 11,583,567 8,763,520 20,347,087 10,626,978 220,000 9,500,109 - 9,500,109 - 20,347,087 9 6 15 15 9,312,948 9 493418 PBL Bangka Belitung 11,124,789 5,748,420 16,873,209 7,403,100 45,000 9,425,109 - 9,425,109 - 16,873,209 9 3 12 3 9 6,051,128

10 493430 PBL Lampung 8,448,092 6,767,480 15,215,572 8,535,463 243,000 6,437,109 - 6,437,109 - 15,215,572 7 3 10 10 6,301,061 11 493552 PBL Banten 8,275,863 14,750,500 23,026,363 16,556,254 505,109 5,965,000 - 5,965,000 - 23,026,363 7 4 11 11 5,735,683 12 493543 PBL DKI Jakarta 10,309,066 4,336,990 14,646,056 5,631,056 - 9,015,000 - 9,015,000 - 14,646,056 4 4 8 4 4 1,413,434 13 493568 PBL Jawa Barat 19,712,853 57,050,300 76,763,153 59,193,044 1,500,000 16,070,109 - 16,070,109 - 76,763,153 11 9 20 3 2 15 7,098,381 14 493574 PBL Jawa Tengah 21,058,483 110,179,660 131,238,143 112,666,780 683,246 17,888,117 - 17,888,117 - 131,238,143 9 12 21 7 14 8,717,997 15 493580 PBL D.I.Yogyakarta 15,306,616 39,445,200 54,751,816 41,344,361 362,736 13,044,719 - 13,044,719 - 54,751,816 9 8 17 17 10,371,625 16 493599 PBL Jawa Timur 14,934,353 48,507,210 63,441,563 50,701,454 516,000 12,224,109 - 12,224,109 - 63,441,563 10 7 17 1 16 10,742,004

PBL Wilayah II 228,042,513 110,545,760 338,588,273 142,509,722 5,902,724 190,175,827 - 190,175,827 - 338,588,273 127 92 219 - - - - - - - 2 4 213 168,461,097 17 493600 PBL Kalimantan Barat 13,949,149 6,305,340 20,254,489 8,284,380 345,000 11,625,109 - 11,625,109 - 20,254,489 7 5 12 12 11,471,907 18 493625 PBL Kalimantan Tengah 18,152,334 2,103,550 20,255,884 3,906,815 280,000 16,069,069 - 16,069,069 - 20,255,884 10 6 16 16 15,178,089 19 493619 PBL Kalimantan Selatan 15,447,817 13,329,120 28,776,937 15,014,828 533,000 13,229,109 - 13,229,109 - 28,776,937 8 6 14 14 10,339,176 20 493631 PBL Kalimantan Timur 12,088,156 9,715,010 21,803,166 11,583,057 595,109 9,625,000 - 9,625,000 - 21,803,166 8 4 12 12 8,982,705 21 493775 PBL Sulawesi Utara 10,417,304 9,385,380 19,802,684 11,332,575 1,009,311 7,460,798 - 7,460,798 - 19,802,684 7 10 17 17 7,255,385 22 493781 PBL Gorontalo 11,923,411 3,667,430 15,590,841 5,473,471 270,109 9,847,261 - 9,847,261 - 15,590,841 7 5 12 1 11 8,374,072 23 493790 PBL Sulawesi Tengah 12,939,961 3,212,900 16,152,861 5,075,752 170,109 10,907,000 - 10,907,000 - 16,152,861 7 4 11 11 10,618,034 24 493801 PBL Sulawesi Selatan 15,322,796 18,836,370 34,159,166 20,939,057 360,000 12,860,109 - 12,860,109 - 34,159,166 9 5 14 14 11,176,898 25 452800 PBL Sulawesi Barat 9,156,627 1,952,430 11,109,057 3,638,948 179,109 7,291,000 - 7,291,000 - 11,109,057 7 5 12 12 6,912,158 26 493810 PBL Sulawesi Tenggara 14,796,317 10,266,910 25,063,227 12,001,598 403,759 12,657,870 - 12,657,870 - 25,063,227 7 6 13 13 12,514,833 27 493826 PBL Bali 13,757,857 4,212,900 17,970,757 5,933,648 787,000 11,250,109 - 11,250,109 - 17,970,757 5 6 11 11 8,498,766 28 493832 PBL NTB 12,854,000 13,010,960 25,864,960 14,894,851 245,000 10,725,109 - 10,725,109 - 25,864,960 7 5 12 2 10 6,068,948 29 493841 PBL NTT 14,821,959 4,107,330 18,929,289 6,201,223 260,000 12,468,066 - 12,468,066 - 18,929,289 8 5 13 13 12,002,231 30 493857 PBL Maluku 8,907,780 3,026,570 11,934,350 4,964,241 170,109 6,800,000 - 6,800,000 - 11,934,350 7 4 11 11 6,704,912 31 493863 PBL Maluku Utara 9,724,390 4,915,900 14,640,290 6,670,181 170,109 7,800,000 - 7,800,000 - 14,640,290 7 4 11 3 8 3,256,269 32 493872 PBL Papua 19,286,865 1,280,650 20,567,515 3,402,406 - 17,165,109 - 17,165,109 - 20,567,515 8 8 16 16 16,786,523 33 493888 PBL Papua Barat 14,495,790 1,217,010 15,712,800 3,192,691 125,000 12,395,109 - 12,395,109 - 15,712,800 8 4 12 12 12,320,191

TOTAL 532,249,922 637,874,300 1,170,124,222 588,261,996 12,995,424 417,933,522 150,933,280 568,866,802 - 1,170,124,222 328 200 528 12 2 5 3 13 1 1 3 8 480 456,543,516

Keterangan :

1 Penyiapan Dokumen Lelang 6 Pemasukan Penawaran

2 Pengumuman Lelang/Prakualifikasi 7 Usulan Pemenang

3 Penyusunan shortlist 8 Penetapan Pemenang

4 Undangan Pelelangan 9 Penerbitan Surat Perintah Mulai Kerja

5 Penjelasan Pekerjaan Aanwyzing 10 Penandatangan Kontrak

7 5 6 4 3

LAPORAN PELAKSANAAN PELELANGAN BARANG/JASA TA 2010

DIREKTORAT PENATAAN BANGUNAN DAN LINGKUNGAN

PAGU PAKET KONTRAK JUMLAH PAKET DALAM PROSES PRA KONTRAK

STATUS : 29 JULI 2010, JAM 08.00 WIB

PAKET > RP 100 JUTA

NILAI

KONTRAK

(Rp. x 1.000) RUPIAH

MURNI

NAMA SATUAN KERJAKODE

SATKERNO

10 9 8 TOTAL 2 SWAKELOLA +

APPLN

KONTRAKTUAL > 100 JT

PAGU (Rp)

FISIK NON

FISIK 1 TOTALTOTAL

KONTRAKTUAL

≤ 100 JTBLM

Page 43: KEMAJUAN PELAKSANAAN KEGIATAN PEMBANGUNAN …ciptakarya.pu.go.id/dok/progress/progress_20100729.pdf · 5 Review DED 0 Percepatan Review ... Pembangunan Jalan Poros Lokasi Kws

NO. URAIAN PERMASALAHAN PAKET KETERANGAN

> 100 Juta

1 Persiapan Lelang 10 -

2 Proses Lelang 35 -

3 Sanggah Banding 0 -

4 Tender Ulang 0 -

5 Review DED 0 -

6 Diblokir (Tanda Bintang) oleh Ditjen Anggaran

a. Loan belum efektif 0

b. Menunggu Penandatanganan Loan Agreement 0

c. Tanggap Darurat 0

d. Revisi Kegiatan 3

1 Supervisi Penataan dan Revitalisasi Kawasan Kota Pacitan

2 Pelaksanaan Penataan dan Revitalisasi Kawasan Kota Pacitan

3 Penataan dan Revitalisasi Kawasan Kota Lama Sawahlunto No. 3 : Sedang dalam

proses lelang, posisi

aanwizjin (no.5).

e. Belum tersedia dokumen RPIJM 0 -

f. Menunggu persyaratan pembuktian BMN 0 -

7 Pemindahan Lokasi 0 -

48TOTAL

RINGKASAN PERMASALAHAN PROGRES PELELANGAN TA.2010

DI LINGKUNGAN DIREKTORAT PENATAAN BANGUNAN DAN LINGKUNGAN

STATUS : 29 JULI 2010, JAM 08.00

TINDAK LANJUT

Penataan dan Revitalisasi Kawasan :

No 1 dan 2 : Menunggu

arahan Menteri Pekerjaan

Page 44: KEMAJUAN PELAKSANAAN KEGIATAN PEMBANGUNAN …ciptakarya.pu.go.id/dok/progress/progress_20100729.pdf · 5 Review DED 0 Percepatan Review ... Pembangunan Jalan Poros Lokasi Kws

1

PENATAAN DAN

REVITALISASI KAWASAN 2

1 Supervisi Penataan dan Revitalisasi Kawasan Kota

Pacitan

160.000 No. 1 s/d 2 : telah dikirimkan memo dinas Direktur

Jenderal Cipta Karya kepada Menteri Pekerjaan

Umum perihal Galeri Kota Pacitan, Nomor : 46/MD-

DC/2010, tanggal 7 Juli 2010.

Menunggu arahan

Menteri Pekerjaan Umum.

2 Pelaksanaan Penataan dan Revitalisasi Kawasan

Kota Pacitan

5,220.000

2 51 Evaluation Consultant - Baseline ND 1,150.402

2 Evaluation Consultant - Impact PAKET 1,134.568

3 Evaluation Consultant - Kelembagaan BKM -

Indikator Pengukuran Kinerja

2,347.371

4 Konsultan Evaluasi IDB PNPM 2 500.000 No. 4 : Berdasarkan midterm yang baru akan

dilaksanakan setelah 6 bulan masa pelaksanaan,

diperkirakan lelang dilaksanakan di bulan November

2010.

No.4 : Berdasarkan hasil

supervisi IDB, disepakati

kegiatan ini masuk dalam

lingkup pekerjaan

baseline survey yang

statusnya saat ini adalah

penetapan pemenang

(no.8).

5 Good and Service Advance 10,000.000 No. 5 : Menunggu WB mengumumkan di UNDP dan

DG's Market.

No. 5 : Sudah

pengumuman lelang,

tinggal update

emonitoring (masuk no.2)

3 3

1 DUKUNGAN PSD KWS. TRADISIONAL KEL.

KUTO PANJI KEC. BELINYU

2.000.000

2 DUKUNGAN PRASARANA DAN SARANA RUANG

TERBUKA HIJAU KEL. SRI MENANTI KEC.

SUNGAILIAT

750.000

3 PENDAMPINGAN FISIK TRADISIONAL 125.109 Mengikuti pekerjaan fisik

PAKET KONTRAK/RINCIAN KEGIATAN PAGU (X Rp.1000)

No. 1 dan 2 : Masih menunggu kesepakatan lokasi

dengan Pemda (Bappeda Kab. Bangka), dimana

lokasi yang ditetapkan oleh Bappeda kab. Bangka

tidak masuk dalam 4 pilihan lokasi perencanaan RTH

dan tidak memenuhi kriteria kawasan tradisional.

Pada tanggal 13 Juli

2010, Kepala Dinas

Pekerjaan Umum Prov.

Bangka Belitung telah

melayangkan surat ke

Bupati Bangka untuk

menjelaskan

permasalahan tersebut.

PERMASALAHAN PAKET BELUM LELANG

DIREKTORAT PENATAAN BANGUNAN DAN LINGKUNGAN

> 100 JUTA

STATUS : 29 JULI 2010, JAM 08.00

NO SATKER/PROVINSI

JML

PAKET

BELUM

LELANG

PENJELASAN BELUM LELANG TINDAK LANJUT

PENANGGULANGAN

KEMISKINAN DI

PERKOTAAN

No. 1 s/d 3 :Berdasarkan hasil diskusi dengan WB, 3

kajian evaluasi ini akan menggunakan perusahaan

survey untuk pengumpulan data dan konsultan

individual untuk analisa sampai pelaporan lelang

hanya untuk perusahaan survey dengan rencana

lelang di bulan Oktober.

No. 1 s/d 3 :Percepatan

penyelesaian dan

pembahasan TOR dan

dokumen lelang dengan

WB.

PENATAAN BANGUNAN

DAN LINGKUNGAN

BANGKA BELITUNG

Page 45: KEMAJUAN PELAKSANAAN KEGIATAN PEMBANGUNAN …ciptakarya.pu.go.id/dok/progress/progress_20100729.pdf · 5 Review DED 0 Percepatan Review ... Pembangunan Jalan Poros Lokasi Kws

4 2 1 Lanjutan Revitalisasi Kompleks Perkantoran Cipta

Karya Werdha Pura Sanur Bali

2.200.000 No. 1 : Menunggu revisi DIPA

2 Rehabilitasi Gedung Kantor Cipta Karya (Ruang

Kerja Subdit PGRN) dan Rumah Dinas

489.500 No. 2 : Minggu ke-4 Juni akan dilakukan

pengumuman lelang.

PAKET KONTRAK/RINCIAN KEGIATAN PAGU (X Rp.1000)NO SATKER/PROVINSI

JML

PAKET

BELUM

LELANG

REHABILITASI DAN

PEMBANGUNAN

GEDUNG NEGARA

TOTAL 12 21,876.950

PENJELASAN BELUM LELANG TINDAK LANJUT

Page 46: KEMAJUAN PELAKSANAAN KEGIATAN PEMBANGUNAN …ciptakarya.pu.go.id/dok/progress/progress_20100729.pdf · 5 Review DED 0 Percepatan Review ... Pembangunan Jalan Poros Lokasi Kws

RPM PHLN TOTAL

Satker Pusat 88,003,156 150,933,280 238,936,436 38,297,556 1,412,500 48,293,100 150,933,280 199,226,380 - 238,936,436 28,848,100 128,544,905 157,393,005 26,967,734 128,544,905 155,512,639 1,880,366 - 1,880,366 1 452780 Dit PBL 40,754,374 - 40,754,374 22,152,599 500,000 18,101,775 - 18,101,775 - 40,754,374 18,101,775 - 18,101,775 16,559,221 - 16,559,221 1,542,554 - 1,542,554 2 483690 Penataan & Revitalisasi Kawasan 22,493,537 - 22,493,537 3,648,212 400,000 18,445,325 - 18,445,325 - 22,493,537 1,525,325 - 1,525,325 1,353,200 - 1,353,200 172,125 - 172,125 3 493217 P2KP-PNPM 9,688,600 135,368,280 145,056,880 7,748,600 - 1,940,000 135,368,280 137,308,280 - 145,056,880 1,940,000 112,979,905 114,919,905 1,940,000 112,979,905 114,919,905 - - - 4 505137 Rehab. Bangunan Gedung Negara 10,350,000 - 10,350,000 1,381,500 412,500 8,556,000 - 8,556,000 - 10,350,000 6,031,000 - 6,031,000 5,865,313 - 5,865,313 165,687 - 165,687 5 449582 Rehab./Rekon DIY & Jateng 4,716,645 15,565,000 20,281,645 3,366,645 100,000 1,250,000 15,565,000 16,815,000 - 20,281,645 1,250,000 15,565,000 16,815,000 1,250,000 15,565,000 16,815,000 - - -

Satker PropinsiPBL Wilayah I 216,204,253 376,395,260 592,599,513 407,454,718 5,680,200 179,464,595 - 179,464,595 - 592,599,513 145,996,470 - 145,996,470 132,569,780 - 132,569,780 13,426,690 - 13,426,690

1 493342 PBL NAD 10,036,964 19,746,710 29,783,674 21,813,565 170,109 7,800,000 - 7,800,000 - 29,783,674 7,800,000 - 7,800,000 6,779,706 - 6,779,706 1,020,294 - 1,020,294 2 493351 PBL Sumatera Utara 11,585,680 23,038,700 34,624,380 25,154,271 140,000 9,330,109 - 9,330,109 - 34,624,380 9,330,109 - 9,330,109 9,092,056 - 9,092,056 238,053 - 238,053 3 493367 PBL Sumatera Barat 15,000,156 21,657,500 36,657,656 23,834,987 240,000 12,582,669 - 12,582,669 - 36,657,656 9,148,812 - 9,148,812 7,584,310 - 7,584,310 1,564,502 - 1,564,502 4 493373 PBL Riau 16,350,616 3,951,580 20,302,196 5,810,087 420,000 14,072,109 - 14,072,109 - 20,302,196 10,650,109 - 10,650,109 9,307,111 - 9,307,111 1,342,998 - 1,342,998 5 493382 PBL Kepulauan Riau 9,131,613 3,450,830 12,582,443 5,312,334 - 7,270,109 - 7,270,109 - 12,582,443 6,770,109 - 6,770,109 5,829,976 - 5,829,976 940,133 - 940,133 6 493398 PBL Jambi 15,655,301 2,449,650 18,104,951 4,284,842 320,000 13,500,109 - 13,500,109 - 18,104,951 13,500,109 - 13,500,109 13,053,431 - 13,053,431 446,678 - 446,678 7 493424 PBL Bengkulu 17,690,241 6,551,010 24,241,251 8,586,142 315,000 15,340,109 - 15,340,109 - 24,241,251 15,340,109 - 15,340,109 15,178,929 - 15,178,929 161,180 - 161,180 8 493482 PBL Sumatera Selatan 11,583,567 8,763,520 20,347,087 10,626,978 220,000 9,500,109 - 9,500,109 - 20,347,087 9,500,109 - 9,500,109 9,312,948 - 9,312,948 187,161 - 187,161 9 493418 PBL Bangka Belitung 11,124,789 5,748,420 16,873,209 7,403,100 45,000 9,425,109 - 9,425,109 - 16,873,209 6,550,000 - 6,550,000 6,051,128 - 6,051,128 498,872 - 498,872

10 493430 PBL Lampung 8,448,092 6,767,480 15,215,572 8,535,463 243,000 6,437,109 - 6,437,109 - 15,215,572 6,437,109 - 6,437,109 6,301,061 - 6,301,061 136,048 - 136,048 11 493552 PBL Banten 8,275,863 14,750,500 23,026,363 16,556,254 505,109 5,965,000 - 5,965,000 - 23,026,363 5,865,000 - 5,865,000 5,735,683 - 5,735,683 129,317 - 129,317 12 493543 PBL DKI Jakarta 10,309,066 4,336,990 14,646,056 5,631,056 - 9,015,000 - 9,015,000 - 14,646,056 1,550,000 - 1,550,000 1,413,434 - 1,413,434 136,566 - 136,566 13 493568 PBL Jawa Barat 19,712,853 57,050,300 76,763,153 59,193,044 1,500,000 16,070,109 - 16,070,109 - 76,763,153 8,036,000 - 8,036,000 7,098,381 - 7,098,381 937,619 - 937,619 14 493574 PBL Jawa Tengah 21,058,483 110,179,660 131,238,143 112,666,780 683,246 17,888,117 - 17,888,117 - 131,238,143 10,450,067 - 10,450,067 8,717,997 - 8,717,997 1,732,070 - 1,732,070 15 493580 PBL D.I.Yogyakarta 15,306,616 39,445,200 54,751,816 41,344,361 362,736 13,044,719 - 13,044,719 - 54,751,816 13,044,719 - 13,044,719 10,371,625 - 10,371,625 2,673,094 - 2,673,094 16 493599 PBL Jawa Timur 14,934,353 48,507,210 63,441,563 50,701,454 516,000 12,224,109 - 12,224,109 - 63,441,563 12,024,109 - 12,024,109 10,742,004 - 10,742,004 1,282,105 - 1,282,105

PBL Wilayah II 228,042,513 110,545,760 338,588,273 142,509,722 5,902,724 190,175,827 - 190,175,827 - 338,588,273 182,166,827 - 182,166,827 168,461,097 - 168,461,097 13,705,730 - 13,705,730 17 493600 PBL Kalimantan Barat 13,949,149 6,305,340 20,254,489 8,284,380 345,000 11,625,109 - 11,625,109 - 20,254,489 11,625,109 - 11,625,109 11,471,907 - 11,471,907 153,202 - 153,202 18 493625 PBL Kalimantan Tengah 18,152,334 2,103,550 20,255,884 3,906,815 280,000 16,069,069 - 16,069,069 - 20,255,884 16,069,069 - 16,069,069 15,178,089 - 15,178,089 890,980 - 890,980 19 493619 PBL Kalimantan Selatan 15,447,817 13,329,120 28,776,937 15,014,828 533,000 13,229,109 - 13,229,109 - 28,776,937 13,229,109 - 13,229,109 10,339,176 - 10,339,176 2,889,933 - 2,889,933 20 493631 PBL Kalimantan Timur 12,088,156 9,715,010 21,803,166 11,583,057 595,109 9,625,000 - 9,625,000 - 21,803,166 9,625,000 - 9,625,000 8,982,705 - 8,982,705 642,295 - 642,295 21 493775 PBL Sulawesi Utara 10,417,304 9,385,380 19,802,684 11,332,575 1,009,311 7,460,798 - 7,460,798 - 19,802,684 7,360,798 - 7,360,798 7,255,385 - 7,255,385 105,413 - 105,413 22 493781 PBL Gorontalo 11,923,411 3,667,430 15,590,841 5,473,471 270,109 9,847,261 - 9,847,261 - 15,590,841 9,347,261 - 9,347,261 8,374,072 - 8,374,072 973,189 - 973,189 23 493790 PBL Sulawesi Tengah 12,939,961 3,212,900 16,152,861 5,075,752 170,109 10,907,000 - 10,907,000 - 16,152,861 10,907,000 - 10,907,000 10,618,034 - 10,618,034 288,966 - 288,966 24 493801 PBL Sulawesi Selatan 15,322,796 18,836,370 34,159,166 20,939,057 360,000 12,860,109 - 12,860,109 - 34,159,166 12,860,109 - 12,860,109 11,176,898 - 11,176,898 1,683,211 - 1,683,211 25 452800 PBL Sulawesi Barat 9,156,627 1,952,430 11,109,057 3,638,948 179,109 7,291,000 - 7,291,000 - 11,109,057 7,291,000 - 7,291,000 6,912,158 - 6,912,158 378,842 - 378,842 26 493810 PBL Sulawesi Tenggara 14,796,317 10,266,910 25,063,227 12,001,598 403,759 12,657,870 - 12,657,870 - 25,063,227 12,657,870 - 12,657,870 12,514,833 - 12,514,833 143,037 - 143,037 27 493826 PBL Bali 13,757,857 4,212,900 17,970,757 5,933,648 787,000 11,250,109 - 11,250,109 - 17,970,757 11,250,109 - 11,250,109 8,498,766 - 8,498,766 2,751,343 - 2,751,343 28 493832 PBL NTB 12,854,000 13,010,960 25,864,960 14,894,851 245,000 10,725,109 - 10,725,109 - 25,864,960 7,975,109 - 7,975,109 6,068,948 - 6,068,948 1,906,161 - 1,906,161 29 493841 PBL NTT 14,821,959 4,107,330 18,929,289 6,201,223 260,000 12,468,066 - 12,468,066 - 18,929,289 12,468,066 - 12,468,066 12,002,231 - 12,002,231 465,835 - 465,835 30 493857 PBL Maluku 8,907,780 3,026,570 11,934,350 4,964,241 170,109 6,800,000 - 6,800,000 - 11,934,350 6,800,000 - 6,800,000 6,704,912 - 6,704,912 95,088 - 95,088 31 493863 PBL Maluku Utara 9,724,390 4,915,900 14,640,290 6,670,181 170,109 7,800,000 - 7,800,000 - 14,640,290 3,300,000 - 3,300,000 3,256,269 - 3,256,269 43,731 - 43,731 32 493872 PBL Papua 19,286,865 1,280,650 20,567,515 3,402,406 - 17,165,109 - 17,165,109 - 20,567,515 17,006,109 - 17,006,109 16,786,523 - 16,786,523 219,586 - 219,586 33 493888 PBL Papua Barat 14,495,790 1,217,010 15,712,800 3,192,691 125,000 12,395,109 - 12,395,109 - 15,712,800 12,395,109 - 12,395,109 12,320,191 - 12,320,191 74,918 - 74,918

TOTAL 532,249,922 637,874,300 1,170,124,222 588,261,996 12,995,424 417,933,522 150,933,280 568,866,802 - 1,170,124,222 357,011,397 128,544,905 485,556,302 327,998,611 128,544,905 456,543,516 29,012,786 - 29,012,786

TOTAL

PAGU (Rp)

TOTAL RPM

PAGU TERKONTRAK NILAI KONTRAK SISA PAGU KONTRAK

RPM PHLN TOTAL PHLN TOTAL RPM

LAPORAN SISA PAGU PELELANGAN BARANG/JASA TA 2010

DIREKTORAT PENATAAN BANGUNAN DAN LINGKUNGAN

STATUS : 29 JULI 2010, JAM 08.00 WIB( x Rp. 1.000 )

NOKODE

SATKERNAMA SATUAN KERJA

PAGU

RUPIAH

MURNIPLN TOTAL

SWAKELOLA +

AP

KONTRAKTUAL > 100 JTBLM

KONTRAKTUAL

≤ 100 JTPHLN

Page 47: KEMAJUAN PELAKSANAAN KEGIATAN PEMBANGUNAN …ciptakarya.pu.go.id/dok/progress/progress_20100729.pdf · 5 Review DED 0 Percepatan Review ... Pembangunan Jalan Poros Lokasi Kws

KEU. FISIK

(RP) % % % (RP) %

Satker Pusat 88,003,156 150,933,280 238,936,436 83,084,732 34.77 48.74 18,978,974 58,669,852 77,648,826 32.50 33.36 (5,435,906) (2.28) 1 452780 Direktorat Penataan Bangunan & Lingkungan 40,754,374 - 40,754,374 13,815,965 33.90 44.90 10,986,100 - 10,986,100 26.96 29.41 (2,829,865) (6.94) 2 483690 Penataan & Revitalisasi Kawasan 22,493,537 22,493,537 5,629,644 25.03 60.03 701,484 - 701,484 3.12 6.25 (4,928,160) (21.91) 3 493217 Penanggulangan Kemiskinan di Perkotaan (P2KP-PNPM) 9,688,600 135,368,280 145,056,880 53,232,560 36.70 46.73 3,738,419 53,235,490 56,973,909 39.28 39.28 3,741,349 2.58 4 505137 Rehabilitasi dan Pembangunan Gedung Negara 10,350,000 10,350,000 2,416,990 23.35 56.35 2,046,305 - 2,046,305 19.77 20.10 (370,685) (3.58) 5 449582 Rehab./Rekon Rumah Pasca Gempa Bumi DIY & Jateng 4,716,645 15,565,000 20,281,645 7,989,573 39.39 54.40 1,506,666 5,434,362 6,941,028 34.22 35.79 (1,048,545) (5.17)

Satker PropinsiPBL Wilayah I 216,204,253 376,395,260 592,599,513 236,719,794 39.95 64.11 57,338,776 135,444,704 192,783,480 32.53 35.50 (43,936,314) (7.41)

1 493342 Penataan Bangunan & Lingkungan NAD 10,036,964 19,746,710 29,783,674 10,928,149 36.69 61.69 2,046,136 5,853,714 7,899,850 26.52 32.59 (3,028,299) (10.17) 2 493351 Penataan Bangunan & Lingkungan Sumatera Utara 11,585,680 23,038,700 34,624,380 16,667,783 48.14 64.79 6,898,346 8,608,535 15,506,881 44.79 45.20 (1,160,902) (3.35) 3 493367 Penataan Bangunan & Lingkungan Sumatera Barat 15,000,156 21,657,500 36,657,656 13,150,149 35.87 61.05 2,831,974 4,814,234 7,646,208 20.86 21.30 (5,503,941) (15.01) 4 493373 Penataan Bangunan & Lingkungan Riau 16,350,616 3,951,580 20,302,196 9,147,358 45.06 70.06 3,143,239 1,657,300 4,800,539 23.65 23.96 (4,346,819) (21.41) 5 493382 Penataan Bangunan & Lingkungan Kepulauan Riau 9,131,613 3,450,830 12,582,443 5,296,701 42.10 67.10 2,060,151 1,459,800 3,519,951 27.98 30.23 (1,776,750) (14.12) 6 493398 Penataan Bangunan & Lingkungan Jambi 15,655,301 2,449,650 18,104,951 8,235,243 45.49 70.49 6,074,605 918,013 6,992,618 38.62 43.74 (1,242,625) (6.86) 7 493424 Penataan Bangunan & Lingkungan Bengkulu 17,690,241 6,551,010 24,241,251 10,562,096 43.57 68.49 6,536,398 1,670,400 8,206,798 33.85 40.90 (2,355,298) (9.72) 8 493482 Penataan Bangunan & Lingkungan Sumatera Selatan 11,583,567 8,763,520 20,347,087 8,482,110 41.69 66.69 3,201,381 3,275,144 6,476,525 31.83 32.13 (2,005,585) (9.86) 9 493418 Penataan Bangunan & Lingkungan Bangka Belitung 11,124,789 5,748,420 16,873,209 6,583,762 39.02 64.02 2,275,398 1,078,394 3,353,792 19.88 20.62 (3,229,970) (19.14)

10 493430 Penataan Bangunan & Lingkungan Lampung 8,448,092 6,767,480 15,215,572 5,757,675 37.84 62.84 3,988,245 1,756,050 5,744,295 37.75 54.34 (13,380) (0.09) 11 493552 Penataan Bangunan & Lingkungan Banten 8,275,863 14,750,500 23,026,363 8,352,463 36.27 61.28 2,579,263 5,070,976 7,650,239 33.22 47.94 (702,224) (3.05) 12 493543 Penataan Bangunan & Lingkungan DKI Jakarta 10,309,066 4,336,990 14,646,056 6,567,943 44.84 69.85 265,805 3,990,786 4,256,591 29.06 29.35 (2,311,352) (15.78) 13 493568 Penataan Bangunan & Lingkungan Jawa Barat 19,712,853 57,050,300 76,763,153 34,239,691 44.60 58.94 2,318,824 19,625,812 21,944,636 28.59 29.01 (12,295,055) (16.02) 14 493574 Penataan Bangunan & Lingkungan Jawa Tengah 21,058,483 110,179,660 131,238,143 46,179,273 35.19 64.14 2,862,476 28,733,025 31,595,501 24.07 25.27 (14,583,772) (11.11) 15 493580 Penataan Bangunan & Lingkungan D.I.Yogyakarta 15,306,616 39,445,200 54,751,816 17,285,499 31.57 69.87 4,010,439 23,201,164 27,211,603 49.70 55.16 9,926,104 18.13 16 493599 Penataan Bangunan & Lingkungan Jawa Timur 14,934,353 48,507,210 63,441,563 29,283,898 46.16 61.11 6,246,096 23,731,357 29,977,453 47.25 49.61 693,555 1.09

PBL Wilayah II 228,042,513 110,545,760 338,588,273 144,721,504 42.74 60.74 74,581,003 33,263,806 107,844,809 31.85 39.87 (36,876,695) (10.89) 17 493600 Penataan Bangunan & Lingkungan Kalimantan Barat 13,949,149 6,305,340 20,254,489 8,157,456 40.27 60.28 4,751,530 2,679,900 7,431,430 36.69 39.06 (726,026) (3.58) 18 493625 Penataan Bangunan & Lingkungan Kalimantan Tengah 18,152,334 2,103,550 20,255,884 9,103,443 44.94 64.94 6,025,032 606,720 6,631,752 32.74 58.96 (2,471,691) (12.20) 19 493619 Penataan Bangunan & Lingkungan Kalimantan Selatan 15,447,817 13,329,120 28,776,937 10,713,058 37.23 47.23 2,962,691 3,345,326 6,308,017 21.92 33.12 (4,405,041) (15.31) 20 493631 Penataan Bangunan & Lingkungan Kalimantan Timur 12,088,156 9,715,010 21,803,166 8,362,790 38.36 58.36 2,749,766 1,779,887 4,529,653 20.78 23.34 (3,833,137) (17.58) 21 493775 Penataan Bangunan & Lingkungan Sulawesi Utara 10,417,304 9,385,380 19,802,684 9,592,750 48.44 59.39 4,232,714 4,380,916 8,613,630 43.50 50.19 (979,120) (4.94) 22 493781 Penataan Bangunan & Lingkungan Gorontalo 11,923,411 3,667,430 15,590,841 6,396,613 41.03 61.03 2,772,349 899,032 3,671,381 23.55 27.74 (2,725,232) (17.48) 23 493790 Penataan Bangunan & Lingkungan Sulawesi Tengah 12,939,961 3,212,900 16,152,861 6,746,331 41.77 61.77 4,547,177 911,950 5,459,127 33.80 31.28 (1,287,204) (7.97) 24 493801 Penataan Bangunan & Lingkungan Sulawesi Selatan 15,322,796 18,836,370 34,159,166 14,525,432 42.52 51.12 3,451,719 5,600,058 9,051,777 26.50 27.15 (5,473,655) (16.02) 25 452800 Penataan Bangunan & Lingkungan Sulawesi Barat 9,156,627 1,952,430 11,109,057 4,792,034 43.14 63.14 2,328,187 502,400 2,830,587 25.48 33.08 (1,961,447) (17.66) 26 493810 Penataan Bangunan & Lingkungan Sulawesi Tenggara 14,796,317 10,266,910 25,063,227 9,446,261 37.69 57.69 3,546,870 1,816,015 5,362,885 21.40 31.62 (4,083,376) (16.29) 27 493826 Penataan Bangunan & Lingkungan Bali 13,757,857 4,212,900 17,970,757 8,155,994 45.38 65.44 3,494,625 1,345,200 4,839,825 26.93 47.49 (3,316,169) (18.45) 28 493832 Penataan Bangunan & Lingkungan NTB 12,854,000 13,010,960 25,864,960 10,814,462 41.81 56.08 3,170,506 3,490,988 6,661,494 25.75 27.81 (4,152,968) (16.06) 29 493841 Penataan Bangunan & Lingkungan NTT 14,821,959 4,107,330 18,929,289 8,336,404 44.04 64.04 2,982,048 1,569,321 4,551,369 24.04 26.05 (3,785,035) (20.00) 30 493857 Penataan Bangunan & Lingkungan Maluku 8,907,780 3,026,570 11,934,350 4,983,341 41.76 61.76 3,663,623 1,229,858 4,893,481 41.00 66.67 (89,860) (0.75) 31 493863 Penataan Bangunan & Lingkungan Maluku Utara 9,724,390 4,915,900 14,640,290 6,169,625 42.14 62.14 1,506,589 2,059,785 3,566,374 24.36 25.13 (2,603,251) (17.78) 32 493872 Penataan Bangunan & Lingkungan Papua 19,286,865 1,280,650 20,567,515 10,466,467 50.89 66.74 8,928,626 566,000 9,494,626 46.16 66.54 (971,841) (4.73) 33 493888 Penataan Bangunan & Lingkungan Papua Barat 14,495,790 1,217,010 15,712,800 7,959,043 50.65 96.87 13,466,951 480,450 13,947,401 88.76 91.24 5,988,358 38.11

TOTAL 532,249,922 637,874,300 1,170,124,222 464,526,030 39.70 60.00 150,898,753 227,378,362 378,277,115 32.33 36.33 (86,248,915) (7.37)

RENCANA PENYERAPAN DAN PROGRES KEUANGANDIREKTORAT PENATAAN BANGUNAN DAN LINGKUNGAN

STATUS : 29 JULI 2010, JAM 08.00 WIB( X Rp. 1000 )

PAGU REALISASI RENCANA PENYERAPAN

AKHIR BULAN JULINO

RUPIAH

MURNIPHLN

KODE

SATKERNAMA SATUAN KERJA

DEVIASI

KEUANGAN KEUANGAN RUPIAH MURNI PLN TOTAL TOTAL

FISIK

(%)

Page 48: KEMAJUAN PELAKSANAAN KEGIATAN PEMBANGUNAN …ciptakarya.pu.go.id/dok/progress/progress_20100729.pdf · 5 Review DED 0 Percepatan Review ... Pembangunan Jalan Poros Lokasi Kws

KEU FISIK

% %

1 Penataan dan Revitalisasi

Kawasan

3.12 6.25 1 3 paket pekerjaan DED Sawahlunto, Design Kawasan

Pacitan dan Fisik Masjid Surabaya lelang ulang.

Dokumen tagihan siap, setalah revisi

POK, langsung proses.

2 Revisi POK sudah di Dit. Bina Program.

2 Rehabilitasi dan

Pembangunan Gedung

Negara

19.77 20.10 Status tanggal 29 Juli 2010

jam , keuangan

3 Penataan Bangunan &

Lingkungan Bangka Belitung

19.88 20.62 Akan diadakan rapat dengan pihak

Pemda, jika masih mengalami

kendala kemungkinan akan ada

pemindahan lokasi

4 Penataan Bangunan &

Lingkungan Kalimantan

Selatan

21.92 33.12 DDUB untuk PAKET dalam proses

ABT di kab/Kota-nya.

5 Penataan Bangunan &

Lingkungan Kalimantan Timur

20.78 23.34 1 Status per tanggal 29 Juli 2010 jam 11.26 sudah

mencapai keuangan 29,18, dan fisik 31,04.

2 Pembayaran Fixed cost P2KP yang direncanakan cair

pada bulan Juli 2010 terkendala dengan belum

terbitnya SK yang memuat perhitungan dana fixed cost.

Fixed Cost akan diproses setelah infentarisasi laporan

fixed cost 2009 diselesaikan.

Menunggu proses inventarisasi

laporan fixed cost.

6 Penataan Bangunan &

Lingkungan Sulawesi

Tenggara

21.40 31.62 Untuk PAKET, menunggu

rekomendasi pencairan dari Satker

P2KP Pusat.

Dana P2KP untuk PAKET dan ND baru bisa cair bulan

November (lebih kurang 6,8M)

PAKET dan ND P2KP belum cair. Khusus untuk ND,

pencairan baru bisa dilaksanakan bulan September.

PERMASALAHAN DAN TINDAK LANJUT PROGRES KEGIATAN TA 2010DIREKTORAT PENATAAN BANGUNAN DAN LINGKUNGAN

STATUS : 29 JULI 2010, JAM 08.00 WIB

NO SATKER

PROGRES

ALASAN KETERLAMBATAN TINDAK LANJUT KETERANGAN

Penetapan Lokasi RTH dan Tradisional masih mengalami

hambatan, belum adanya kesepakatan dengan pemerintah

daerah (Bappeda)

Page 49: KEMAJUAN PELAKSANAAN KEGIATAN PEMBANGUNAN …ciptakarya.pu.go.id/dok/progress/progress_20100729.pdf · 5 Review DED 0 Percepatan Review ... Pembangunan Jalan Poros Lokasi Kws

1,170,124

- -30,072

72,030

130,482

217,864

334,251

464,526

654,685

809,843

954,704

1,110,097

1,170,124

-418 837 17,998

21,219 47,037 73,717

96,536 128,269

160,172

206,967

258,717 286,090

331,015

378,277

-

200,000

400,000

600,000

800,000

1,000,000

1,200,000

1,400,000

JAN FEB MAR APR MEI JUN JUL AGT SEP OKT NOP DES

DA

LA

M J

UT

AA

N R

UP

IAH

BULAN

RENCANA DAN REALISASI PENYERAPANDIREKTORAT PENATAAN BANGUNAN DAN LINGKUNGAN

TAHUN ANGGARAN 2010

PAGU

RENCANA

REALISASI

Page 50: KEMAJUAN PELAKSANAAN KEGIATAN PEMBANGUNAN …ciptakarya.pu.go.id/dok/progress/progress_20100729.pdf · 5 Review DED 0 Percepatan Review ... Pembangunan Jalan Poros Lokasi Kws

RPM PHLN TOTAL

a. Satker Pusat 397,375,532 148,471,500 545,847,032 397,857,324 467,500 45,484,188 102,038,020 147,522,208 - 545,847,032 80 2 82 2 - 13 - - 2 - - - 65 119,943,595

1 466162 Dit Bina Program 66,532,332 10,000,000 76,532,332 42,289,224 300,000 24,043,108 9,900,000 33,943,108 - 76,532,332 32 1 33 2 - - - - 2 - - - 29 26,516,954

2 505138 Pembinaan Infrastruktur Perdesaan 330,843,200 138,471,500 469,314,700 355,568,100 167,500 21,441,080 92,138,020 113,579,100 - 469,314,700 48 1 49 - - 13 - - - - - - 36 93,426,641

b. Satker Propinsi 143,567,000 - 143,567,000 119,593,282 591,400 23,382,318 - 23,382,318 - 143,567,000 30 - 30 - - - - - - - - - 30 21,320,772

1 505730 PIP Nanggroe Aceh Darussalam 2,916,000 - 2,916,000 2,316,000 - 600,000 - 600,000 - 2,916,000 1 - 1 - - - - - - - - - 1 572,950

2 505749 PIP Sumatera Utara 1,910,000 - 1,910,000 1,870,000 40,000 - - - - 1,910,000 - - - - - - - - - - - - - -

3 505755 PIP Sumatera Barat 3,649,152 - 3,649,152 2,832,912 - 816,240 - 816,240 - 3,649,152 1 - 1 - - - - - - - - - 1 815,914

4 505761 PIP Riau 16,343,000 - 16,343,000 16,303,000 40,000 - - - - 16,343,000 - - - - - - - - - - - - - -

5 505097 PIP Kepri 1,036,000 - 1,036,000 1,036,000 - - - - - 1,036,000 - - - - - - - - - - - - - -

6 505786 PIP Sumatera Selatan 14,612,288 - 14,612,288 14,612,288 - - - - - 14,612,288 - - - - - - - - - - - - - -

7 505100 PIP Bangka Belitung 1,213,000 - 1,213,000 1,213,000 - - - - - 1,213,000 - - - - - - - - - - - - - -

8 505770 PIP Jambi 7,263,000 - 7,263,000 7,223,000 40,000 - - - - 7,263,000 - - - - - - - - - - - - - -

9 505792 PIP Bengkulu 2,917,000 - 2,917,000 2,067,000 40,000 810,000 - 810,000 - 2,917,000 1 - 1 - - - - - - - - - 1 769,835

10 505821 PIP Lampung 12,503,000 - 12,503,000 12,503,000 - - - - - 12,503,000 - - - - - - - - - - - - - -

11 505840 PIP Banten 2,442,000 - 2,442,000 1,804,000 - 638,000 - 638,000 - 2,442,000 1 - 1 - - - - - - - - - 1 576,605

12 505837 PIP Jawa Barat 6,823,000 - 6,823,000 4,461,350 - 2,361,650 - 2,361,650 - 6,823,000 3 - 3 - - - - - - - - 3 2,260,315

13 505843 PIP Jawa Tengah 5,941,000 - 5,941,000 4,181,000 - 1,760,000 - 1,760,000 - 5,941,000 2 - 2 - - - - - - - - - 2 1,351,933

14 505868 PIP Jawa Timur 7,545,000 - 7,545,000 5,030,000 40,000 2,475,000 - 2,475,000 - 7,545,000 3 - 3 - - - - - - - - 3 2,215,994

15 505101 PIP DI Yogyakarta 941,000 - 941,000 941,000 - - - - - 941,000 - - - - - - - - - - - - - -

16 505106 PIP Bali 1,077,000 - 1,077,000 1,037,000 40,000 - - - - 1,077,000 - - - - - - - - - - - - - -

17 505993 PIP Nusa Tenggara Timur 5,676,000 - 5,676,000 4,031,600 40,000 1,604,400 - 1,604,400 - 5,676,000 2 - 2 - - - - - - - - - 2 1,582,845

18 505107 PIP NTB 2,806,000 - 2,806,000 2,046,000 40,000 720,000 - 720,000 - 2,806,000 1 - 1 - - - - - - - - - 1 496,719

19 505874 PIP Kalimantan Barat 3,844,000 - 3,844,000 2,960,800 - 883,200 - 883,200 - 3,844,000 1 - 1 - - - - - - - - - 1 769,037

20 505880 PIP Kalimantan Tengah 3,036,424 - 3,036,424 2,316,424 - 720,000 - 720,000 - 3,036,424 1 - 1 - - - - - - - - - 1 715,864

21 505899 PIP Kalimantan Selatan 3,738,136 - 3,738,136 2,599,216 191,400 947,520 - 947,520 - 3,738,136 1 - 1 - - - - - - - - - 1 911,190

22 505900 PIP Kalimantan Timur 3,753,000 - 3,753,000 2,825,000 - 928,000 - 928,000 - 3,753,000 1 - 1 - - - - - - - - - 1 887,480

23 505104 PIP Sulawesi Barat 2,294,000 - 2,294,000 1,613,000 40,000 641,000 - 641,000 - 2,294,000 1 - 1 - - - - - - - - - 1 612,500

24 505940 PIP Sulawesi Selatan 6,851,000 - 6,851,000 4,656,300 - 2,194,700 - 2,194,700 - 6,851,000 3 - 3 - - - - - - - - - 3 2,030,386

25 505931 PIP Sulawesi Tengah 2,718,000 - 2,718,000 1,624,000 - 1,094,000 - 1,094,000 - 2,718,000 1 - 1 - - - - - - - - - 1 665,070

26 505102 PIP Sulawesi Utara 3,243,000 - 3,243,000 2,443,000 - 800,000 - 800,000 - 3,243,000 1 - 1 - - - - - - - - 1 766,590

27 505105 PIP Sulawesi Tenggara 3,353,000 - 3,353,000 2,533,000 - 820,000 - 820,000 - 3,353,000 1 - 1 - - - - - - - - - 1 816,750

28 505103 PIP Gorontalo 2,434,000 - 2,434,000 1,794,000 40,000 600,000 - 600,000 - 2,434,000 1 - 1 - - - - - - - - - 1 562,170

29 505108 PIP Maluku 3,612,000 - 3,612,000 2,638,392 - 973,608 - 973,608 - 3,612,000 2 - 2 - - - - - - - - - 2 959,400

30 505110 PIP Maluku Utara 1,120,000 - 1,120,000 1,120,000 - - - - - 1,120,000 - - - - - - - - - - - - - -

31 506022 PIP Papua 4,518,000 - 4,518,000 3,523,000 - 995,000 - 995,000 - 4,518,000 1 - 1 - - - - - - - - - 1 981,225

32 506038 PIP Papua Barat 1,439,000 - 1,439,000 1,439,000 - - - - - 1,439,000 - - - - - - - - - - - - - -

TOTAL 540,942,532 148,471,500 689,414,032 517,450,606 1,058,900 68,866,506 102,038,020 170,904,526 - 689,414,032 110 2 112 2 - 13 - - 2 - - - 95 141,264,367

Keterangan :

1 Penyiapan Dokumen Lelang 6 Pemasukan Penawaran

2 Pengumuman Lelang/Prakualifikasi 7 Usulan Pemenang

3 Penyusunan shortlist 8 Penetapan Pemenang

4 Undangan Pelelangan 9 Penerbitan Surat Perintah Mulai Kerja

5 Penjelasan Pekerjaan Aanwyzing 10 Penandatangan Kontrak

PAGU (Rp)

PAKET > RP 100 JUTA

STATUS : 29 JULI 2010, JAM 08.00 WIB

LAPORAN PELAKSANAAN PELELANGAN BARANG/JASA TA 2010

DIREKTORAT BINA PROGRAM

NOKODE

SATKERNAMA SATUAN KERJA

PAGU

9

PAKET KONTRAK

10

JUMLAH PAKET DALAM PROSES PRA KONTRAK

RUPIAH

MURNIPLN TOTAL FISIK

SWAKELOLA

+ AP

KONTRAKTUAL > 100 JTBLM TOTAL

NON

FISIK

KONTRAKTUAL

≤ 100 JT

NILAI

KONTRAK

(Rp. x 1.000) 5 6 7 8TOTAL 1 2 3 4

Page 51: KEMAJUAN PELAKSANAAN KEGIATAN PEMBANGUNAN …ciptakarya.pu.go.id/dok/progress/progress_20100729.pdf · 5 Review DED 0 Percepatan Review ... Pembangunan Jalan Poros Lokasi Kws

NO. URAIAN PERMASALAHAN PAKET KETERANGAN

1 Persiapan Lelang 2 Satker Bina Program

1. Paket Persentation Room, Adanya perubahan layout

desain ruangan

Saat ini sedang proses akan memasuki

pengumuman lelang

2. Paket LED and Business Plan, KAK baru saja disetujui

oleh World Bank

Saat ini sedang mengajukan Draft

Pengumuman untuk lelang

2 Proses Lelang 15

3 Sanggah Banding -

4 Tender Ulang -

5 Review DED -

6 Diblokir (Tanda Bintang) oleh Ditjen Anggaran -

a. Loan belum efektif

b. Menunggu Penandatanganan Loan Agreement

c. Tanggap Darurat

d. Revisi Kegiatan

e. Belum tersedia dokumen RPIJM

f. Menunggu persyaratan pembuktian BMN

7 Pemindahan Lokasi -

17

RINGKASAN PERMASALAHAN PROGRES PELELANGAN TA.2010

DI LINGKUNGAN DIREKTORAT BINA PROGRAM

STATUS: 29 JULI 2010

TOTAL

TINDAK LANJUT

Page 52: KEMAJUAN PELAKSANAAN KEGIATAN PEMBANGUNAN …ciptakarya.pu.go.id/dok/progress/progress_20100729.pdf · 5 Review DED 0 Percepatan Review ... Pembangunan Jalan Poros Lokasi Kws

1. DIREKTORAT BINA PROGRAM 2 1. Paket Persentation Room, 350,000 Adanya perubahan layout

desain ruangan

Saat ini sedang proses akan memasuki

pengumuman lelang

2. Paket LED and Business Plan, 350,000 Baru mendapatkan persetujuan

KAK dari Worldbank

Sekarang sedang mengajukan draft

pengumuman untuk lelang

2 700,000 T O T A L

TINDAK LANJUT

PERMASALAHAN PAKET BELUM LELANG

DIREKTORAT BINA PROGRAM

STATUS : 29 JULI 2010

NO SATKER/PROVINSI

JML

PAKET

BELUM

LELANG

PAKET KONTRAK/RINCIAN KEGIATANPAGU

(X Rp.1000)PERMASALAHAN

Page 53: KEMAJUAN PELAKSANAAN KEGIATAN PEMBANGUNAN …ciptakarya.pu.go.id/dok/progress/progress_20100729.pdf · 5 Review DED 0 Percepatan Review ... Pembangunan Jalan Poros Lokasi Kws

RPM PHLN TOTAL

a. Satker Pusat 397,375,532 148,471,500 545,847,032 397,857,324 467,500 45,484,188 102,038,020 147,522,208 - 545,847,032 40,804,622 83,622,963 124,427,585 36,320,632 83,622,963 119,943,595 4,483,990 - 4,483,990 1 466162 Dit Bina Program 66,532,332 10,000,000 76,532,332 42,289,224 300,000 24,043,108 9,900,000 33,943,108 - 76,532,332 19,363,542 9,550,000 28,913,542 16,966,954 9,550,000 26,516,954 2,396,588 - 2,396,588 2 505138 Pembinaan Infrastruktur Perdesaan 330,843,200 138,471,500 469,314,700 355,568,100 167,500 21,441,080 92,138,020 113,579,100 - 469,314,700 21,441,080 74,072,963 95,514,043 19,353,678 74,072,963 93,426,641 2,087,402 - 2,087,402

- b. Satker Propinsi 143,567,000 - 143,567,000 119,593,282 591,400 23,382,318 - 23,382,318 - 143,567,000 23,382,318 - 23,382,318 21,345,467 - 21,320,772 2,036,851 - 2,036,851

1 505730 PIP Nanggroe Aceh Darussalam 2,916,000 - 2,916,000 2,316,000 600,000 - 600,000 - 2,916,000 600,000 - 600,000 572,950 - 572,950 27,050 - 27,050

2 505749 PIP Sumatera Utara 1,910,000 - 1,910,000 1,870,000 40,000 - - - - 1,910,000 - - - - - - - -

3 505755 PIP Sumatera Barat 3,649,152 - 3,649,152 2,832,912 - 816,240 - 816,240 - 3,649,152 816,240 - 816,240 815,914 - 815,914 326 - 326 4 505761 PIP Riau 16,343,000 - 16,343,000 16,303,000 40,000 - - - - 16,343,000 - - - - - - - - - 5 505097 PIP Kepri 1,036,000 - 1,036,000 1,036,000 - - - - - 1,036,000 - - - - - - - - - 6 505786 PIP Sumatera Selatan 14,612,288 - 14,612,288 14,612,288 - - - - - 14,612,288 - - - - - - - - - 7 505100 PIP Bangka Belitung 1,213,000 - 1,213,000 1,213,000 - - - - - 1,213,000 - - - - - - - - - 8 505770 PIP Jambi 7,263,000 - 7,263,000 7,223,000 40,000 - - - - 7,263,000 - - - - - - - - - 9 505792 PIP Bengkulu 2,917,000 - 2,917,000 2,067,000 40,000 810,000 - 810,000 - 2,917,000 810,000 - 810,000 769,835 - 769,835 40,165 - 40,165

10 505821 PIP Lampung 12,503,000 - 12,503,000 12,503,000 - - - - - 12,503,000 - - - - - - - - - 11 505840 PIP Banten 2,442,000 - 2,442,000 1,804,000 - 638,000 - 638,000 - 2,442,000 638,000 - 638,000 576,605 - 576,605 61,395 - 61,395 12 505837 PIP Jawa Barat 6,823,000 - 6,823,000 4,461,350 - 2,361,650 - 2,361,650 - 6,823,000 2,361,650 - 2,361,650 2,260,315 - 2,260,315 101,335 - 101,335 13 505843 PIP Jawa Tengah 5,941,000 - 5,941,000 4,181,000 - 1,760,000 - 1,760,000 - 5,941,000 1,760,000 - 1,760,000 1,376,628 - 1,351,933 383,372 - 383,372 14 505868 PIP Jawa Timur 7,545,000 - 7,545,000 5,030,000 40,000 2,475,000 - 2,475,000 - 7,545,000 2,475,000 - 2,475,000 2,215,994 - 2,215,994 259,006 - 259,006 15 505101 PIP DI Yogyakarta 941,000 - 941,000 941,000 - - - - - 941,000 - - - - - - - - - 16 505106 PIP Bali 1,077,000 - 1,077,000 1,037,000 40,000 - - - - 1,077,000 - - - - - - - - - 17 505993 PIP Nusa Tenggara Timur 5,676,000 - 5,676,000 4,031,600 40,000 1,604,400 - 1,604,400 - 5,676,000 1,604,400 - 1,604,400 1,582,845 - 1,582,845 21,555 - 21,555 18 505107 PIP NTB 2,806,000 - 2,806,000 2,046,000 40,000 720,000 - 720,000 - 2,806,000 720,000 - 720,000 496,719 - 496,719 223,281 - 223,281 19 505874 PIP Kalimantan Barat 3,844,000 - 3,844,000 2,960,800 - 883,200 - 883,200 - 3,844,000 883,200 - 883,200 769,037 - 769,037 114,163 - 114,163 20 505880 PIP Kalimantan Tengah 3,036,424 - 3,036,424 2,316,424 - 720,000 - 720,000 - 3,036,424 720,000 - 720,000 715,864 - 715,864 4,136 - 4,136

21 505899 PIP Kalimantan Selatan 3,738,136 - 3,738,136 2,599,216 191,400 947,520 - 947,520 - 3,738,136 947,520 - 947,520 911,190 - 911,190 36,330 - 36,330

22 505900 PIP Kalimantan Timur 3,753,000 - 3,753,000 2,825,000 - 928,000 - 928,000 - 3,753,000 928,000 - 928,000 887,480 - 887,480 40,520 - 40,520 23 505104 PIP Sulawesi Barat 2,294,000 - 2,294,000 1,613,000 40,000 641,000 - 641,000 - 2,294,000 641,000 - 641,000 612,500 - 612,500 28,500 - 28,500 24 505940 PIP Sulawesi Selatan 6,851,000 - 6,851,000 4,656,300 - 2,194,700 - 2,194,700 - 6,851,000 2,194,700 - 2,194,700 2,030,386 - 2,030,386 164,314 - 164,314 25 505931 PIP Sulawesi Tengah 2,718,000 - 2,718,000 1,624,000 - 1,094,000 - 1,094,000 - 2,718,000 1,094,000 - 1,094,000 665,070 - 665,070 428,930 - 428,930 26 505102 PIP Sulawesi Utara 3,243,000 - 3,243,000 2,443,000 - 800,000 - 800,000 - 3,243,000 800,000 - 800,000 766,590 - 766,590 33,410 - 33,410 27 505105 PIP Sulawesi Tenggara 3,353,000 - 3,353,000 2,533,000 - 820,000 - 820,000 - 3,353,000 820,000 - 820,000 816,750 - 816,750 3,250 - 3,250 28 505103 PIP Gorontalo 2,434,000 - 2,434,000 1,794,000 40,000 600,000 - 600,000 - 2,434,000 600,000 - 600,000 562,170 - 562,170 37,830 - 37,830 29 505108 PIP Maluku 3,612,000 - 3,612,000 2,638,392 - 973,608 - 973,608 - 3,612,000 973,608 - 973,608 959,400 - 959,400 14,208 - 14,208 30 505110 PIP Maluku Utara 1,120,000 - 1,120,000 1,120,000 - - - - - 1,120,000 - - - - - - - - - 31 506022 PIP Papua 4,518,000 - 4,518,000 3,523,000 - 995,000 - 995,000 - 4,518,000 995,000 - 995,000 981,225 - 981,225 13,775 - 13,775 32 506038 PIP Papua Barat 1,439,000 - 1,439,000 1,439,000 - - - - - 1,439,000 - - - - - - - - -

TOTAL 540,942,532 148,471,500 689,414,032 517,450,606 1,058,900 68,866,506 102,038,020 170,904,526 - 689,414,032 64,186,940 83,622,963 147,809,903 57,666,099 83,622,963 141,264,367 6,520,841 - 6,520,841

TOTAL RPM PHLN TOTAL RPM

PAGU TERKONTRAK NILAI KONTRAK SISA PAGU KONTRAK

RPM

LAPORAN SISA PAGU PELELANGAN BARANG/JASA TA 2010

DIREKTORAT BINA PROGRAM

STATUS : 29 JULI 2010, JAM 08.00 WIB( x Rp. 1.000 )

NOKODE

SATKERNAMA SATUAN KERJA

PAGU

RUPIAH

MURNIPHLN TOTALPHLNTOTAL

PAGU (Rp)

PLN TOTAL SWAKELOLA +

AP

KONTRAKTUAL > 100 JTBLM

KONTRAKTUAL

≤ 100 JT

Page 54: KEMAJUAN PELAKSANAAN KEGIATAN PEMBANGUNAN …ciptakarya.pu.go.id/dok/progress/progress_20100729.pdf · 5 Review DED 0 Percepatan Review ... Pembangunan Jalan Poros Lokasi Kws

KEU. FISIK

(RP) % % % (RP) %

Satker Pusat 397,375,532 148,471,500 545,847,032 120,172,897 22.02 22.02 41,672,177 40,340,008 82,012,185 15.02 19.19 (38,160,712) (6.99)

1 466162 Direktorat Bina Program 66,532,332 10,000,000 76,532,332 37,815,529 49.41 49.41 25,667,984 3,645,758 29,313,742 38.30 38.69 (8,501,787) (11.11)

2 505138 Pembinaan Pembangunan Infrastruktur Perdesaan 330,843,200 138,471,500 469,314,700 82,357,368 17.55 17.55 16,004,193 36,694,250 52,698,443 11.23 16.01 (29,658,925) (6.32)

Satuan Propinsi 143,567,000 - 143,567,000 49,693,237 34.61 34.61 47,119,794 - 47,119,794 32.82 36.06 (2,573,443) (1.79)

1 505730 Pembangunan IP Nanggroe Aceh Darussalam 2,916,000 - 2,916,000 1,020,600 35.00 35.00 1,315,230 - 1,315,230 45.10 45.53 294,630 10.10

2 505749 Pembangunan IP Sumatera Utara 1,910,000 - 1,910,000 668,500 35.00 35.00 409,343 - 409,343 21.43 21.43 (259,157) (13.57)

3 505755 Pembangunan IP Sumatera Barat 3,649,152 - 3,649,152 1,277,203 35.00 35.00 1,173,622 - 1,173,622 32.16 33.12 (103,581) (2.84)

4 505761 Pembangunan IP Riau 16,343,000 - 16,343,000 5,556,620 34.00 34.00 3,426,298 - 3,426,298 20.96 20.97 (2,130,322) (13.04)

5 505097 Pembangunan IP Kepri 1,036,000 - 1,036,000 362,600 35.00 35.00 495,868 - 495,868 47.86 47.87 133,268 12.86

6 505786 Pembangunan IP Sumatera Selatan 14,612,288 - 14,612,288 4,968,178 34.00 34.00 2,692,964 - 2,692,964 18.43 20.32 (2,275,214) (15.57)

7 505100 Pembangunan IP Bangka Belitung 1,213,000 - 1,213,000 424,550 35.00 35.00 581,624 - 581,624 47.95 47.95 157,074 12.95

8 505770 Pembangunan IP Jambi 7,263,000 - 7,263,000 2,542,050 35.00 35.00 2,087,309 - 2,087,309 28.74 28.94 (454,741) (6.26)

9 505792 Pembangunan IP Bengkulu 2,917,000 - 2,917,000 1,020,950 35.00 35.00 1,358,453 - 1,358,453 46.57 49.07 337,503 11.57

10 505821 Pembangunan IP Lampung 12,503,000 - 12,503,000 4,251,020 34.00 34.00 3,558,084 - 3,558,084 28.46 28.46 (692,936) (5.54)

11 505840 Pembangunan IP Banten 2,442,000 - 2,442,000 854,700 35.00 35.00 592,262 - 592,262 24.25 24.88 (262,438) (10.75)

12 505837 Pembangunan IP Jawa Barat 6,823,000 - 6,823,000 2,388,050 35.00 35.00 3,076,786 - 3,076,786 45.09 48.27 688,736 10.09

13 505843 Pembangunan IP Jawa Tengah 5,941,000 - 5,941,000 2,079,350 35.00 35.00 2,666,650 - 2,666,650 44.89 52.53 587,300 9.89

14 505868 Pembangunan IP Jawa Timur 7,545,000 - 7,545,000 2,565,300 34.00 34.00 2,087,461 - 2,087,461 27.67 42.19 (477,839) (6.33)

15 505101 Pembangunan IP DI Yogyakarta 941,000 - 941,000 329,350 35.00 35.00 440,904 - 440,904 46.85 46.85 111,554 11.85

16 505106 Pembangunan IP Bali 1,077,000 - 1,077,000 376,950 35.00 35.00 335,652 - 335,652 31.17 43.50 (41,298) (3.83)

17 505993 Pembangunan IP Nusa Tenggara Timur 5,676,000 - 5,676,000 1,986,600 35.00 35.00 2,507,776 - 2,507,776 44.18 47.37 521,176 9.18

18 505107 Pembangunan IP Nusa Tenggara Barat 2,806,000 - 2,806,000 982,100 35.00 35.00 852,347 - 852,347 30.38 33.00 (129,753) (4.62)

19 505874 Pembangunan IP Kalimantan Barat 3,844,000 - 3,844,000 1,345,400 35.00 35.00 1,167,967 - 1,167,967 30.38 45.48 (177,433) (4.62)

20 505880 Pembangunan IP Kalimantan Tengah 3,036,424 - 3,036,424 1,062,748 35.00 35.00 1,077,527 - 1,077,527 35.49 37.91 14,779 0.49

21 505899 Pembangunan IP Kalimantan Selatan 3,738,136 - 3,738,136 1,308,348 35.00 35.00 1,163,217 - 1,163,217 31.12 32.93 (145,131) (3.88)

22 505900 Pembangunan IP Kalimantan Timur 3,753,000 - 3,753,000 1,313,550 35.00 35.00 908,899 - 908,899 24.22 23.65 (404,651) (10.78)

23 505104 Pembangunan IP Sulawesi Barat 2,294,000 - 2,294,000 802,900 35.00 35.00 1,052,067 - 1,052,067 45.86 46.44 249,167 10.86

24 505940 Pembangunan IP Sulawesi Selatan 6,851,000 - 6,851,000 2,397,850 35.00 35.00 2,573,835 - 2,573,835 37.57 38.50 175,985 2.57

25 505931 Pembangunan IP Sulawesi Tengah 2,718,000 - 2,718,000 951,300 35.00 35.00 1,197,439 - 1,197,439 44.06 52.31 246,139 9.06

26 505102 Pembangunan IP Sulawesi Utara 3,243,000 - 3,243,000 1,135,050 35.00 35.00 1,620,350 - 1,620,350 49.96 50.48 485,300 14.96

27 505105 Pembangunan IP Sulawesi Tenggara 3,353,000 - 3,353,000 1,173,550 35.00 35.00 1,346,492 - 1,346,492 40.16 40.20 172,942 5.16

28 505103 Pembangunan IP Gorontalo 2,434,000 - 2,434,000 851,900 35.00 35.00 1,097,171 - 1,097,171 45.08 45.14 245,271 10.08

29 505108 Pembangunan IP Maluku 3,612,000 - 3,612,000 1,264,200 35.00 35.00 1,622,935 - 1,622,935 44.93 52.92 358,735 9.93

30 505110 Pembangunan IP Maluku Utara 1,120,000 - 1,120,000 392,000 35.00 35.00 435,548 - 435,548 38.89 38.89 43,548 3.89

31 506022 Pembangunan IP Papua 4,518,000 - 4,518,000 1,536,120 34.00 34.00 1,208,386 - 1,208,386 26.75 43.66 (327,734) (7.25)

32 506038 Pembangunan IP Papua Barat 1,439,000 - 1,439,000 503,650 35.00 35.00 989,328 - 989,328 68.75 68.75 485,678 33.75

TOTAL 540,942,532 148,471,500 689,414,032 169,866,134 24.64 24.64 88,791,971 40,340,008 129,131,979 18.73 22.70 (40,734,155) (5.91)

RENCANA PENYERAPAN

AKHIR BULAN JULI

FISIK

(%)

KEUANGAN

RENCANA PENYERAPAN DAN PROGRES KEUANGAN

DIREKTORAT BINA PROGRAM

STATUS : 29 JULI 2010, JAM 08.00 WIB( X Rp. 1000 )

NO

REALISASI KODE

SATKER

RUPIAH MURNI TOTAL

PAGU

PLN

DEVIASI

NAMA SATUAN KERJA

TOTALRUPIAH

MURNIPHLN

KEUANGAN

Page 55: KEMAJUAN PELAKSANAAN KEGIATAN PEMBANGUNAN …ciptakarya.pu.go.id/dok/progress/progress_20100729.pdf · 5 Review DED 0 Percepatan Review ... Pembangunan Jalan Poros Lokasi Kws

BINA PROGRAM

NO. SATKER KEU FISIK ALASAN KETERLAMBATAN TINDAK LANJUT KETERANGAN

% %

1 Pembinaan Pembangunan

Infrastruktur Perdesaan

11.23 16.01

- PAMSIMAS Rp. 6.308.000.000,-

- PPIP Rp. 225.000.000.000,-

2 Pembangunan IP Sumatera

Utara

21.43 21.43

3 Pembangunan IP Riau 20.96 20.97

4 Pembangunan IP Sumatera

Selatan

18.43 20.32

PERMASALAHAN DAN TINDAK LANJUT PROGRES KEGIATAN TA 2010

DI LINGKUNGAN DITJEN CIPTA KARYA

STATUS : 29 JULI 2010

PROGRES

Kegiatan penyerapan dana BLM yang dialokasikan pada

DIPA Satker PPIP Pusat baru saja selesai pembukan tanda

(*), dan saat ini masih menunggu proses SKPA yang saat ini

masih berada di Ditjen Anggaran sebesar :

Mempercepat persetujuan penerbitan SKPA,

sehingga akan meningkatkan penyerapan

mengakibatkan tertundanya pelaksanaan Bantuan Langsung

Masyarakat pada desa-desa sasaran

sedang di proses penyerapannya, akan terserap

kurang lebih Rp. 200 juta di akhir juli

Akan terserap dari gaji Fasilitator Masyarakat (FM)

sebesar Rp 571 Juta pada pertengahan Agustus

2010.

Pertengahan Agustus akan terserap gaji fasilitator

sebesar 1 Milyar.

Baru direkrut sebanyak 206 org dari total 390 orang

Fasilitator Masyarakat (FM). yang terkontrak 1 Juni 2010.

sisanya akan terkontrak 1 Agustus 2010

Fasilitator baru di Kontrak fasilitator awal Mei 2010, dan baru

dibayarkan gaji 1 bulan.

Baru selesai melaksanakan Workshop Perencanaan dan

pengendalian

Page 56: KEMAJUAN PELAKSANAAN KEGIATAN PEMBANGUNAN …ciptakarya.pu.go.id/dok/progress/progress_20100729.pdf · 5 Review DED 0 Percepatan Review ... Pembangunan Jalan Poros Lokasi Kws

689,414

- 2,484 11,702

31,016

56,109

86,865

123,128

169,866

361,951

487,093

617,223

661,096

689,414

458 916 1,850 2,090 5,171 11,733 15,295

39,172 45,114 61,493

84,263 99,560

111,338 129,132

-

100,000

200,000

300,000

400,000

500,000

600,000

700,000

800,000

JAN FEB MAR APR MEI JUN JUL AGT SEP OKT NOP DES

DA

LA

M J

UT

AA

N R

UP

IAH

BULAN

RENCANA DAN REALISASI PENYERAPANDIREKTORAT BINA PROGRAM

TAHUN ANGGARAN 2010

PAGU

RENCANA

REALISASI

Page 57: KEMAJUAN PELAKSANAAN KEGIATAN PEMBANGUNAN …ciptakarya.pu.go.id/dok/progress/progress_20100729.pdf · 5 Review DED 0 Percepatan Review ... Pembangunan Jalan Poros Lokasi Kws

RPM PHLN TOTAL

1 622213 SETDITJEN 114,266,503 1,000,000 115,266,503 78,441,953 490,143 35,334,407 1,000,000 36,334,407 - 115,266,503 6 14 20 4 2 14 16,244,090

TOTAL 114,266,503 1,000,000 115,266,503 78,441,953 490,143 35,334,407 1,000,000 36,334,407 - 115,266,503 6 14 20 - 4 - - - - - 2 - 14 16,244,090

Keterangan :

1 Penyiapan Dokumen Lelang

2 Pengumuman Lelang/Prakualifikasi

3 Penyusunan shortlist

4 Undangan Pelelangan

5 Penjelasan Pekerjaan Aanwyzing

6 Pemasukan Penawaran

7 Usulan Pemenang

8 Penetapan Pemenang

9 Penerbitan Surat Perintah Mulai Kerja

10 Penandatangan Kontrak

PAKET > RP 100 JUTA

10RUPIAH

MURNIPLN TOTAL 5 6 7 8 9TOTAL 1

PAGU (Rp)

3BLM TOTAL FISIK

LAPORAN PELAKSANAAN PELELANGAN BARANG/JASA TA 2010

SEKRETARIAT JENDERAL CIPTA KARYA

STATUS : 29 JULI 2010, JAM 08.00 WIB

NOKODE

SATKER

NAMA

SATUAN KERJA

PAGU PAKET KONTRAK JUMLAH PAKET DALAM PROSES PRA KONTRAK NILAI

KONTRAK

(Rp. x 1.000) SWAKELOLA +

AP

KONTRAKTUAL > 100 JT2

NON

FISIK 4

KONTRAKTUAL

≤ 100 JT

Page 58: KEMAJUAN PELAKSANAAN KEGIATAN PEMBANGUNAN …ciptakarya.pu.go.id/dok/progress/progress_20100729.pdf · 5 Review DED 0 Percepatan Review ... Pembangunan Jalan Poros Lokasi Kws

NO. URAIAN PERMASALAHAN JUMLAH PAKET KETERANGAN

1 Persiapan Lelang -

2 Proses Lelang 6

3 Sanggah Banding -

4 Tender Ulang -

5 Review DED -

6 Diblokir (Tanda Bintang) oleh Ditjen Anggaran

a. Loan belum efektif -

b. Menunggu Penandatanganan Loan Agreement -

c. Tanggap Darurat -

d. Revisi Kegiatan -

e. Belum tersedia dokumen RPIJM -

f. Menunggu persyaratan pembuktian BMN -

7 Pemindahan Lokasi -

6

RINGKASAN PERMASALAHAN PROGRES PELELANGAN TA.2010

DI LINGKUNGAN SEKRETARIAT DIREKTORAT JENDERAL CIPTA KARYA

STATUS: 29 JULI 2010

TOTAL

TINDAK LANJUT

Page 59: KEMAJUAN PELAKSANAAN KEGIATAN PEMBANGUNAN …ciptakarya.pu.go.id/dok/progress/progress_20100729.pdf · 5 Review DED 0 Percepatan Review ... Pembangunan Jalan Poros Lokasi Kws

RPM PHLN TOTAL

1 622213 SETDITJEN 114,266,503 1,000,000 115,266,503 78,441,953 490,143 35,334,407 1,000,000 36,334,407 - 115,266,503 19,352,947 19,352,947 16,244,090 16,244,090 3,108,857 - 3,108,857

TOTAL 114,266,503 1,000,000 115,266,503 78,441,953 490,143 35,334,407 1,000,000 36,334,407 - 115,266,503 19,352,947 - 19,352,947 16,244,090 - 16,244,090 3,108,857 - 3,108,857

LAPORAN SISA PAGU PELELANGAN BARANG/JASA TA 2010

SEKRETARIAT JENDERAL CIPTA KARYA

STATUS : 29 JULI 2010, JAM 08.00 WIB

PLN

( x Rp. 1.000 )

NOKODE

SATKER RPM

PAGUNAMA

SATUAN KERJA PHLN TOTAL RPM

NILAI KONTRAK SISA PAGU KONTRAK

PHLN TOTALRPMRUPIAH

MURNI

PAGU TERKONTRAK

PHLN TOTALTOTAL SWAKELOLA +

AP

KONTRAKTUAL > 100 JTBLM TOTAL

PAGU (Rp)

KONTRAKTUAL

≤ 100 JT

Page 60: KEMAJUAN PELAKSANAAN KEGIATAN PEMBANGUNAN …ciptakarya.pu.go.id/dok/progress/progress_20100729.pdf · 5 Review DED 0 Percepatan Review ... Pembangunan Jalan Poros Lokasi Kws

KEU. FISIK

(RP) % % % (RP) %

Satker Pusat 114,266,503 1,000,000 115,266,503 62,193,118 53.96 55.96 45,840,133 - 45,840,133 39.77 40.87 (16,352,985) (14.19)

1 622213 Sekretariat Direktorat Jenderal

Cipta Karya114,266,503 1,000,000 115,266,503 62,193,118 53.96 55.96 45,840,133 - 45,840,133 39.77 40.87 (16,352,985) (14.19)

TOTAL 114,266,503 1,000,000 115,266,503 62,193,118 53.96 55.96 45,840,133 - 45,840,133 39.77 40.87 (16,352,985) (14.19)

FISIK

(%)

RENCANA PENYERAPAN DAN PROGRES KEUANGAN

SEKRETARIAT JENDERAL CIPTA KARYA

STATUS : 29 JULI 2010, JAM 08.00 WIB( X Rp. 1000 )

KEUANGAN KEUANGAN NO

TOTAL

PAGUKODE

SATKERNAMA SATUAN KERJA

RUPIAH MURNI PLN TOTAL

DEVIASIRENCANA PENYERAPAN

AKHIR BULAN JULI

PHLN

REALISASI

RUPIAH

MURNI

Page 61: KEMAJUAN PELAKSANAAN KEGIATAN PEMBANGUNAN …ciptakarya.pu.go.id/dok/progress/progress_20100729.pdf · 5 Review DED 0 Percepatan Review ... Pembangunan Jalan Poros Lokasi Kws

115,267

-

4,302

9,696

16,426

24,562

33,719

47,666

62,193

76,616

88,468

102,659

110,612

115,267

2,783 5,566 5,566

8,362 9,518 14,293

14,494 20,759

22,798 24,912

30,326

39,362

41,949 45,840

-

20,000

40,000

60,000

80,000

100,000

120,000

140,000

JAN FEB MAR APR MEI JUN JUL AGT SEP OKT NOP DES

DA

LA

M J

UT

AA

N R

UP

IAH

BULAN

RENCANA DAN REALISASI PENYERAPANSETDITJEN

TAHUN ANGGARAN 2010

PAGU

RENCANA

REALISASI

Page 62: KEMAJUAN PELAKSANAAN KEGIATAN PEMBANGUNAN …ciptakarya.pu.go.id/dok/progress/progress_20100729.pdf · 5 Review DED 0 Percepatan Review ... Pembangunan Jalan Poros Lokasi Kws

KEU. FISIK

(RP) % % % (RP) %

1 P2KP 817,891,000 61,800,000 879,691,000 284,380,000 32.33 32.33 121,867,450 14,780,000 136,647,450 15.53 6.10 (147,732,550) (16.79)

2 PPIP 375,000,000 150,000,000 525,000,000 219,600,000 41.83 36.31 - - - - - (147,120,000) (28.02)

3 PAMSIMAS - 255,100,000 255,100,000 25,487,000 9.99 9.99 - 7,390,823 7,390,823 2.90 3.14 (18,096,177) (7.09)

4 RISE - 419,500,000 419,500,000 225,125,000 53.67 53.67 - 212,727,036 212,727,036 50.71 50.85 (12,397,964) (2.96)

TOTAL 1,192,891,000 886,400,000 2,079,291,000 754,592,000 36.29 34.90 121,867,450 234,897,859 356,765,309 17.16 13.22 (325,346,691) (15.65)

REALISASI

TOTAL

RENCANA PENYERAPAN

AKHIR BULAN JULI

PHLN

DEVIASI

KEUANGAN KEUANGAN

RENCANA PENYERAPAN DAN PROGRES KEUANGAN

SATKER KABUPATEN/KOTA

STATUS : 29 JULI 2010, JAM 08.00 WIB( X Rp. 1000 )

RUPIAH

MURNI

PAGU

NAMA SATUAN KERJA

PLN

NO

TOTAL RUPIAH

MURNI

FISIK

(%)

Page 63: KEMAJUAN PELAKSANAAN KEGIATAN PEMBANGUNAN …ciptakarya.pu.go.id/dok/progress/progress_20100729.pdf · 5 Review DED 0 Percepatan Review ... Pembangunan Jalan Poros Lokasi Kws

2,079,291

- 1,733 9,741 25,487

103,717

185,952

460,042

754,592

998,892

1,428,872

1,718,944

1,901,100

2,079,291

- - - -- -

-

-

6,182 18,202 39,576

106,558

188,190

266,850

356,765

-

500,000

1,000,000

1,500,000

2,000,000

2,500,000

JAN FEB MAR APR MEI JUN JUL AGT SEP OKT NOP DES

DA

LA

M J

UT

AA

N R

UP

IAH

BULAN

RENCANA DAN REALISASI PENYERAPANSATKER KABUPATEN/KOTA

TAHUN ANGGARAN 2009

PAGU

RENCANA

REALISASI

Page 64: KEMAJUAN PELAKSANAAN KEGIATAN PEMBANGUNAN …ciptakarya.pu.go.id/dok/progress/progress_20100729.pdf · 5 Review DED 0 Percepatan Review ... Pembangunan Jalan Poros Lokasi Kws

525,000

- - - - -9,600

147,180

219,600

282,680

420,000

525,000 525,000 525,000

- -- -

0

0

00 0 0 0 0 0-

100,000

200,000

300,000

400,000

500,000

600,000

JAN FEB MAR APR MEI JUN JUL AGT SEP OKT NOP DES

DA

LA

M J

UT

AA

N R

UP

IAH

BULAN

RENCANA DAN REALISASI PENYERAPANPROGRAM PPIP KABUPATEN/KOTA

TAHUN ANGGARAN 2010

PAGU

RENCANA

REALISASI

Page 65: KEMAJUAN PELAKSANAAN KEGIATAN PEMBANGUNAN …ciptakarya.pu.go.id/dok/progress/progress_20100729.pdf · 5 Review DED 0 Percepatan Review ... Pembangunan Jalan Poros Lokasi Kws

879,691 879,691

- - - - - - -26,240

70,485

121,095

219,040

342,940

505,180

658,700

752,691

838,266

- -- -

0

0

100 1,705 8,055

37,550 65,764

97,180

136,647

-

100,000

200,000

300,000

400,000

500,000

600,000

700,000

800,000

900,000

1,000,000

JAN FEB MAR APR MEI JUN JUL AGT SEP OKT NOP DES

DA

LA

M J

UT

AA

N R

UP

IAH

BULAN

RENCANA DAN REALISASI PENYERAPANPROGRAM P2KP KABUPATEN/KOTA

TAHUN ANGGARAN 2010

PAGU

RENCANA

REALISASI

Page 66: KEMAJUAN PELAKSANAAN KEGIATAN PEMBANGUNAN …ciptakarya.pu.go.id/dok/progress/progress_20100729.pdf · 5 Review DED 0 Percepatan Review ... Pembangunan Jalan Poros Lokasi Kws

255,100

- 866 1,733 5,737

9,741 17,614 25,487 25,487 25,487 25,487

25,487 25,487

45,696

65,904

112,832

159,759

207,430

255,100

- -- -

-

-

193 193 988 3,545 3,822 4,872

7,391 -

50,000

100,000

150,000

200,000

250,000

300,000

JAN FEB MAR APR MEI JUN JUL AGT SEP OKT NOP DES

DA

LA

M J

UT

AA

N R

UP

IAH

BULAN

RENCANA DAN REALISASI PENYERAPANPROGRAM PAMSIMAS KABUPATEN/KOTA

TAHUN ANGGARAN 2010

PAGU

RENCANA

REALISASI

Page 67: KEMAJUAN PELAKSANAAN KEGIATAN PEMBANGUNAN …ciptakarya.pu.go.id/dok/progress/progress_20100729.pdf · 5 Review DED 0 Percepatan Review ... Pembangunan Jalan Poros Lokasi Kws

419,500

- - - - - - -12,875

25,750

44,063

62,375

98,025

133,675

179,400

225,125

257,175

289,225

331,875

374,525

397,013

419,500 419,500 419,500

- -- -

-

-

5,889

16,305

30,532

65,463

118,604

164,798

212,727

-

50,000

100,000

150,000

200,000

250,000

300,000

350,000

400,000

450,000

JAN FEB MAR APR MEI JUN JUL AGT SEP OKT NOP DES

DA

LA

M J

UT

AA

N R

UP

IAH

BULAN

RENCANA DAN REALISASI PENYERAPANPROGRAM RISE KABUPATEN/KOTA

TAHUN ANGGARAN 2010

PAGU

RENCANA

REALISASI

Page 68: KEMAJUAN PELAKSANAAN KEGIATAN PEMBANGUNAN …ciptakarya.pu.go.id/dok/progress/progress_20100729.pdf · 5 Review DED 0 Percepatan Review ... Pembangunan Jalan Poros Lokasi Kws

Pelaksanaan Kegiatan Inpres No. 1 Tahun 2010

PENANGGUNG JAWAB INSTANSI TERKAIT

• Kementerian Pekerjaan Kab/Kota Terkait

a. 314 Lokasi SPAM Perdesaan Umum

b. 9 Kab/Kota Pemb. Sanitasi dan 10 Kab/Kota Pemb. Drainase

• Kementerian Pekerjaan Daerah terkait

a. 8,230 Kelurahan P2KP Umum

b. 237 Kecamatan PISEW

• Kementerian Pekerjaan Daerah terkait

a. 23 Kawasan Sanimas Umum

b. 1,320 Desa Pamsimas

• Kementerian Pekerjaan Kementerian Perumahan

a. Rusunawa 37 TB selesai 40% Umum

• Kementerian Pekerjaan Kab/Kota Terkait,

Umum Daerah terkait

a. 6 TPA Regional di 17 Kabupaten

b. 49 Kabupaten Sanitary Landfill

c. 50 Lokasi 3R

(N6P30A1) Pembangunan rumah susun sederhana sewa

(N9P49A1) Peningkatan pembangunan Tempat Pembuangan Akhir (TPA)

dengan menerapkan sanitary land fill dan mengoptimalkan program 3R

(reduce, reuse, recycle)

PROGRAM PRIORITAS DITJEN CIPTA KARYA (4 Program Prioritas, 5 Rencana Aksi, dan 10 Sub Rencana Aksi)

RENCANA AKSI

Program Prioritas 3 (N3): Bidang Kesehatan

Program Prioritas 4 (N4): Bidang Penanggulangan Kemiskinan

Program Prioritas 6 (N6): Bidang Infrastruktur

Program Prioritas 9 (N9): Bidang Lingkungan Hidup dan Pengelolaan Bencana

(N3P12A5) Peningkatan Pelayanan Air Minum dan Sanitasi

(N4P19A2) Pemantapan pelaksanaan PNPM Inti

(N4P19A3) Peningkatan integrasi PNPM Penguatan

Page 69: KEMAJUAN PELAKSANAAN KEGIATAN PEMBANGUNAN …ciptakarya.pu.go.id/dok/progress/progress_20100729.pdf · 5 Review DED 0 Percepatan Review ... Pembangunan Jalan Poros Lokasi Kws

(Status Rapat 15 Juli 2010 dengan Bapak Wakil Menteri PU)

Page 70: KEMAJUAN PELAKSANAAN KEGIATAN PEMBANGUNAN …ciptakarya.pu.go.id/dok/progress/progress_20100729.pdf · 5 Review DED 0 Percepatan Review ... Pembangunan Jalan Poros Lokasi Kws

(Status Rapat 15 Juli 2010 dengan Bapak Wakil Menteri PU)

Page 71: KEMAJUAN PELAKSANAAN KEGIATAN PEMBANGUNAN …ciptakarya.pu.go.id/dok/progress/progress_20100729.pdf · 5 Review DED 0 Percepatan Review ... Pembangunan Jalan Poros Lokasi Kws

(Status Rapat 15 Juli 2010 dengan Bapak Wakil Menteri PU)

Page 72: KEMAJUAN PELAKSANAAN KEGIATAN PEMBANGUNAN …ciptakarya.pu.go.id/dok/progress/progress_20100729.pdf · 5 Review DED 0 Percepatan Review ... Pembangunan Jalan Poros Lokasi Kws

(Status Rapat 15 Juli 2010 dengan Bapak Wakil Menteri PU)

Page 73: KEMAJUAN PELAKSANAAN KEGIATAN PEMBANGUNAN …ciptakarya.pu.go.id/dok/progress/progress_20100729.pdf · 5 Review DED 0 Percepatan Review ... Pembangunan Jalan Poros Lokasi Kws

(Status Rapat 15 Juli 2010 dengan Bapak Wakil Menteri PU)

Page 74: KEMAJUAN PELAKSANAAN KEGIATAN PEMBANGUNAN …ciptakarya.pu.go.id/dok/progress/progress_20100729.pdf · 5 Review DED 0 Percepatan Review ... Pembangunan Jalan Poros Lokasi Kws

(Status Rapat 15 Juli 2010 dengan Bapak Wakil Menteri PU)

Page 75: KEMAJUAN PELAKSANAAN KEGIATAN PEMBANGUNAN …ciptakarya.pu.go.id/dok/progress/progress_20100729.pdf · 5 Review DED 0 Percepatan Review ... Pembangunan Jalan Poros Lokasi Kws

(Status Rapat 15 Juli 2010 dengan Bapak Wakil Menteri PU)

Page 76: KEMAJUAN PELAKSANAAN KEGIATAN PEMBANGUNAN …ciptakarya.pu.go.id/dok/progress/progress_20100729.pdf · 5 Review DED 0 Percepatan Review ... Pembangunan Jalan Poros Lokasi Kws

(Status Rapat 15 Juli 2010 dengan Bapak Wakil Menteri PU)

Page 77: KEMAJUAN PELAKSANAAN KEGIATAN PEMBANGUNAN …ciptakarya.pu.go.id/dok/progress/progress_20100729.pdf · 5 Review DED 0 Percepatan Review ... Pembangunan Jalan Poros Lokasi Kws

Pelaksanaan Kegiatan Inpres No.3 Tahun 2010

PENANGGUNG JAWAB INSTANSI TERKAIT

• Kementerian Pekerjaan

Umum

Pemda Terkait

a. 314 Lokasi SPAM Perkotaan dan Perdesaan

b. 1320 desa PAMSIMAS

• Kementerian Pekerjaan

Umum

Pemda Terkait

a. 9 Kab/Kota infrastruktur air limbah off-site

b. 23 Kab/Kota infratstruktur air limbah on-site

Program Pembangunan yang Berkeadilan Direktorat Jenderal Cipta Karya

RENCANA AKSI

D3P39 : Program Pembinaan dan Pengembangan Infrastruktur Permukiman

D3P39A95: Pengaturan, pembinaan, pengawasan, pengembangan sumber

pembiayaan dan pola investasi, serta pengembangan sistem penyediaan air

minum

D3P39A96: Pengaturan, pembinaan, pengawasan, pengembangan sumber

pembiayaan dan pola investasi, serta pengelolaan pengembangan infrastruktur

sanitasi dan persampahan

Page 78: KEMAJUAN PELAKSANAAN KEGIATAN PEMBANGUNAN …ciptakarya.pu.go.id/dok/progress/progress_20100729.pdf · 5 Review DED 0 Percepatan Review ... Pembangunan Jalan Poros Lokasi Kws

D3 - PENCAPAIAN MILLENIUM DEVELOPMENT GOALS

RENCANA AKSIPENANGGUNG

JAWAB

INSTANSI

TERKAIT

KRITERIA

KEBERHASILAN

UKURAN

KEBERHASILAN

UKURAN KEBERHASILAN B07, B08,

B10, B12% CAPAIAN KETERANGAN

1 2 3 4 5 6 7 8

Kementerian

Pekerjaan Umum

Pemerintah

Daerah Provinsi

Terkait

TARGET B07:

Penandatanganan kontrak 306 lokasi

dan pembangunan fisik telah

mencapai 5% pada 94 lokasi

B07: > 100% Penandatanganan

kontrak telah seselasi

untuk 306 lokasi dan

pembangunan fisik

telah mencapai rata-

rata 62,48% pada 232

lokasi

TARGET B08:

Penandatanganan kontrak 314 lokasi

dan pembangunan fisik telah

mencapai 20% pada 300 lokasi

B08: XX%

TARGET B10:

Pembangunan fisik telah mencapai

60% pada 314 lokasi

B10: XX%

TARGET B12:

Pembangunan fisik telah mencapai

100% pada 314 lokasi

B12: XX%

TARGET B07:

Penyusunan Rencana Kerja

Masyarakat (RKM) pada 654 desa

B07: > 100% RKM telah tersusun

untuk 658 desa

TARGET B08:

Pembayaran Tahap I pada 654 desa

B08: XX%

TARGET B10:

Pembayaran Tahap II pada 1.220

desa

B10: XX%

TARGET B12:

Pembayaran Tahap III pada 1.320

desa

B12: XX%

Terfasilitasinya

kawasan perkotaan

dan perdesaan yang

terlayani air minum

D3P39 : Program Pembinaan dan Pengembangan Infrastruktur Permukiman

TARGET:

Terfasilitasinya 314

kawasan perkotaan dan

perdesaan yang terlayani

air minum

TARGET:

Terfasilitasinya 1.320

desa yang terlayani air

minum berbasis

masyarakat

D3P39A95:

Pengaturan, pembinaan,

pengawasan,

pengembangan sumber

pembiayaan dan pola

investasi, serta

pengembangan sistem

penyediaan air minum

(Status 22 Juli 2010

Page 79: KEMAJUAN PELAKSANAAN KEGIATAN PEMBANGUNAN …ciptakarya.pu.go.id/dok/progress/progress_20100729.pdf · 5 Review DED 0 Percepatan Review ... Pembangunan Jalan Poros Lokasi Kws

D3 - PENCAPAIAN MILLENIUM DEVELOPMENT GOALS

RENCANA AKSIPENANGGUNG

JAWAB

INSTANSI

TERKAIT

KRITERIA

KEBERHASILAN

UKURAN

KEBERHASILAN

UKURAN KEBERHASILAN B07, B08,

B10, B12% CAPAIAN KETERANGAN

1 2 3 4 5 6 7 8

TARGET B07:

Penandatanganan kontrak pada 5

lokasi/ kawasan dan penyiapan

dokumen lelang pada 4

lokasi/kawasan yang dibiayai

Pinjaman Luar Negeri

B07: 100%

TARGET B08:

Pembangunan fisik telah mencapai

10% pada 5 lokasi/kawasan dan

proses pelelangan pada 4

lokasi/kawasan yang dibiayai

Pinjaman Luar Negeri

B08: XX%

TARGET B10:

Pembangunan fisik telah mencapai

50% pada 5 lokasi/kawasan, dan

proses pelelangan pada 4

lokasi/kawasan yang dibiayai

Pinjaman Luar Negeri

B10: XX%

TARGET B12:

Pembangunan fisik telah mencapai

100% sesuai target 2010 pada 5

lokasi/kawasan dan

penandatanganan kontrak pada 4

lokasi/kawasan yang dibiayai

Pinjaman Luar Negeri

B12: XX%

Penandatanganan

kontrak selesai

apabila persetujuan

donor sesuai dengan

jadwal

TARGET B07:

Proses pemberdayaan selesai 100%

pada 22 lokasi/kawasan

B07: 100%

TARGET B08:

Penandatanganan kontrak 100%

pada 23 lokasi/kawasan

B08: XX%

TARGET B10:

Pembangunan fisik mencapai 50%

pada 23 lokasi/kawasan

B10: XX%

TARGET B12:

Pembangunan fisik mencapai 100%

pada 23 lokasi/kawasan

B12: XX%

D3P39A96:

Pengaturan, pembinaan,

pengawasan,

pengembangan sumber

pembiayaan dan pola

investasi, serta

pengelolaan

pengembangan

infrastruktur sanitasi dan

persampahan

Kementerian

Pekerjaan Umum

Pemerintah

Daerah Provinsi:

Sumbar, Riau,

Kepri, Bengkulu,

Sumsel, Babel,

Banten, Jabar,

Jateng, Jatim,

Kalteng, Sulsel,

Sultra, Maluku,

Papua Barat,

Sumut,

Yogyakarta,

Kalsel, Kaltim,

Sulteng, Bali

Terlayaninya

kawasan dengan

infrastruktur air

limbah melalui

sistem off-site

TARGET:

9 kabupaten/kota

Terlayaninya

kawasan dengan

infrastruktur air

limbah melalui

sistem on-site

TARGET:

23 kabupaten/kota

D3P39 : Program Pembinaan dan Pengembangan Infrastruktur Permukiman

(Status 22 Juli 2010