 PERBANDINGAN METODE PELAKSANAAN PLA T PRECAST DENGAN PLAT CAST IN SITU DITINJAU DARI W AKTU DAN BIA Y A P ADA GEDUNG SEKOLAH TINGGI KESEHA T AN DAN AKADEMI KEBIDANAN SIDOARJO Ol eh:  AGUSTINA DWI AT MAJI NRP. 3107 030 023 DAHNIAR ADE AYU R NRP. 3107 030 025

Upload: rosivasabrina

Post on 10-Jul-2015

73 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ITS NonDegree 14837 3107030023 Presentation

5/10/2018 ITS NonDegree 14837 3107030023 Presentation - slidepdf.com

http://slidepdf.com/reader/full/its-nondegree-14837-3107030023-presentation 1/34

 

PERBANDINGAN METODE PELAKSANAAN PLAT

PRECAST DENGAN PLAT CAST IN SITU DITINJAU

DARI WAKTU DAN BIAYA PADA GEDUNG SEKOLAH

TINGGI KESEHATAN DAN AKADEMI KEBIDANAN

SIDOARJO

Ole h : AGUSTINA DW I ATMAJI

NRP. 3107 030 023

DAHNIAR ADE AYU R 

NRP. 3107 030 025

Page 2: ITS NonDegree 14837 3107030023 Presentation

5/10/2018 ITS NonDegree 14837 3107030023 Presentation - slidepdf.com

http://slidepdf.com/reader/full/its-nondegree-14837-3107030023-presentation 2/34

 

1• PENDAHULUAN

2 • TINJAUAN PUSTAKA 

3• METODOLOGI

4

• DATA PROYEK 

5• GAMBAR 

6• TAHAPAN PEKERJAAN SISTEM CAST IN SITU PADA BALOK DAN PLAT

7• HASIL PERHITUNGAN

8• KESIMPULAN

Page 3: ITS NonDegree 14837 3107030023 Presentation

5/10/2018 ITS NonDegree 14837 3107030023 Presentation - slidepdf.com

http://slidepdf.com/reader/full/its-nondegree-14837-3107030023-presentation 3/34

 

PENDAHULUAN

Page 4: ITS NonDegree 14837 3107030023 Presentation

5/10/2018 ITS NonDegree 14837 3107030023 Presentation - slidepdf.com

http://slidepdf.com/reader/full/its-nondegree-14837-3107030023-presentation 4/34

 

LATAR BELAKANG

Metode pelaksanaan yang kami gunakan sebagai contoh adalah

pada sistem pengecoran beton. Sistem pengecoran beton memilikidua sistem, yaitu sistem cast in situ dan sistem precast. Dari keduasistem tersebut, beberapa aspek tentunya berbeda, baik untuk 

 waktu, alat maupun proses yang akan dilakukan. Dan dari hal-haltersebut nantinya akan dapat diketahui sistem pengecoran mana

 yang lebih efisien dalam segi waktu, biaya, peralatan maupun faktorpendukung.

Page 5: ITS NonDegree 14837 3107030023 Presentation

5/10/2018 ITS NonDegree 14837 3107030023 Presentation - slidepdf.com

http://slidepdf.com/reader/full/its-nondegree-14837-3107030023-presentation 5/34

 

• Dengan mengacu pada permasalahan diatas, maka proyek pembangunan “Sekolah Tinggi Kesehatan dan Akademi Kebidanan”

kami jadikan penelitian untuk membandingkan antara pengaruh beton cast in situ dengan beton precast. Bangunan ini terdiri dariempat lantai dengan luas bangunan + 1320m2. Pada bagian struktur

 bangunan bagian balok dan kolom menggunakan beton cast in situ,sedangkan pada plat menggunakan beton precast. Dari datatersebut, kami akan melakukan perbandingan pada bagian pelat.Sehingga seluruh bangunan ini menggunakan sistem cast in situ.

Page 6: ITS NonDegree 14837 3107030023 Presentation

5/10/2018 ITS NonDegree 14837 3107030023 Presentation - slidepdf.com

http://slidepdf.com/reader/full/its-nondegree-14837-3107030023-presentation 6/34

 

TUJUAN :• Membandingkan metode pelaksanaan antara penggunaan

sistem beton cast in situ dengan sistem beton precast.

• Mengetahui jenis peralatan yang digunakan pada sistem castin situ.• Menganalisa biaya yang diperlukan pada kedua sistem

tersebut.• Menganalisa pengaruh waktu pelaksanaan sistem cast in situ

pada plat terhadap biaya dan tenaga kerja dengan meninjau

metode pelaksanaannya.

BATASAN MASALAH• Menyusun metode pelaksanaan sistem cast in situ untuk 

pekerjaan balok dan plat.• Peralatan berat yang digunakan adalah

▫ Concrete pump▫ Truck mixer▫ Mobile Crane

• Membandingkan pelaksanaan plat cast in situ dengan platprecast ditinjau dari segi waktu dan biaya.

Page 7: ITS NonDegree 14837 3107030023 Presentation

5/10/2018 ITS NonDegree 14837 3107030023 Presentation - slidepdf.com

http://slidepdf.com/reader/full/its-nondegree-14837-3107030023-presentation 7/34

TINJAUAN

PUSTAKA 

 

Page 8: ITS NonDegree 14837 3107030023 Presentation

5/10/2018 ITS NonDegree 14837 3107030023 Presentation - slidepdf.com

http://slidepdf.com/reader/full/its-nondegree-14837-3107030023-presentation 8/34

BETON PRECAST

Beton precast atau pracetak adalah Seluruh atau sebagian darielemen struktur yang dicetak pada satu tempat tertentu baik yang

 berada dilingkungan proyek maupun jauh dari proyek (pabrik) yang

kemudian akan dipasang pada strukturnya.

Proses beton precast dilakukan di pabrik biasanya dengan melaluiproduksi masal secara berulang dengan bentuk dan ukuran sesuaidengan pemesanan. Harga beton precast cenderung mahal karena

harga cetakannya yang terbuat dari plat baja yang biasanya dapatdigunakan + 80 kali untuk setiap cetakan.

 

Page 9: ITS NonDegree 14837 3107030023 Presentation

5/10/2018 ITS NonDegree 14837 3107030023 Presentation - slidepdf.com

http://slidepdf.com/reader/full/its-nondegree-14837-3107030023-presentation 9/34

Pada pelaksanaan system precast terdiri dari beberapa tahap, yaitu:

• Tahap pengiriman.

• Tahap penurunan/penumpukkan beton di lokasi proyek.

• Tahap penyusunan/ pemasangan beton pada struktur.

• Tahap penyambungan dengan pengecoran dan pengelasan.

 Yang harus diperhatikan dalam tahap pengangkutan beton precastdari pabrik sampai ke lokasi proyek :

• Lama waktu yang dibutuhkan untuk ke lokasi proyek.

• Merencanakan jalan alternatif, apabila ada hambatan pada jalur awal.

• Menyesuaikan daya tampung lokasi proyek dengan volume betonprecast yang dibutuhkan.

• Menentukan alat berat sesuai dengan kebutuhan angkut.

BETON PRECAST

 

Page 10: ITS NonDegree 14837 3107030023 Presentation

5/10/2018 ITS NonDegree 14837 3107030023 Presentation - slidepdf.com

http://slidepdf.com/reader/full/its-nondegree-14837-3107030023-presentation 10/34

• Beton cast in situ adalah Pemindahan campuran beton cair dari mixer ketempat dimana beton

akan dicor yaitu bekisting atau acuan padastruktur yang akan dikerjakan.

BETON CAST IN SITU

 

Page 11: ITS NonDegree 14837 3107030023 Presentation

5/10/2018 ITS NonDegree 14837 3107030023 Presentation - slidepdf.com

http://slidepdf.com/reader/full/its-nondegree-14837-3107030023-presentation 11/34

Tahapan pelaksanaan beton cast in situ, sebagai berikut :• Tahap pembersihan, memastikan papan bekisting dalam keadaan

bersih dari kotoran.• Tahap pembuatan bekisting untuk balok dan plat dilakukan terlebih

dahulu sebelum tahap pembesian. Sedangkan untuk kolom tahapbekisting dilakukan setelah tahap pembesian. Sebelum melakukantahap pengecoran, bekisting diolesi oleh oli. Bekisting dapatdilepas apabila beton mulai mengeras dan berbentuk.

• Tahap pembesian. Pekerjaan pembesian meliputi pemotongan besitulangan, pembengkokan besi tulangan, perakitan tulangan.

• Tahap pengecoran. Semua bahan beton harus diaduk secara meratadan harus dituangkan seluruhnya sebelum pencampur diisi kembali.Pengecoran beton harus dikerjakan sedekat mungkin ke tujuanterakhir untuk mencegah bahan-bahan jatuh di luar tempat kerjaakibat pemindahan adukan didalam cetakan, pengecoran balok danplat dilakukan secara bersamaan setelah pengecoran kolom.

BETON CAST IN SITU

 

Page 12: ITS NonDegree 14837 3107030023 Presentation

5/10/2018 ITS NonDegree 14837 3107030023 Presentation - slidepdf.com

http://slidepdf.com/reader/full/its-nondegree-14837-3107030023-presentation 12/34

METODOLOGI

 

Page 13: ITS NonDegree 14837 3107030023 Presentation

5/10/2018 ITS NonDegree 14837 3107030023 Presentation - slidepdf.com

http://slidepdf.com/reader/full/its-nondegree-14837-3107030023-presentation 13/34

START

STUDI LAPANGAN

STUDI PUSTAKA

PENGUMPULAN DATA

ANALISIS MASALAH

DATA PROYEK

Pelat precast 

ANALISA

Pelat konvensional 

DATA KONTRAKTOR

RAB, kurva S

PERHITUNGAN

RAB, kurva S

KESIMPULAN DAN SARAN

FINISH

 

Page 14: ITS NonDegree 14837 3107030023 Presentation

5/10/2018 ITS NonDegree 14837 3107030023 Presentation - slidepdf.com

http://slidepdf.com/reader/full/its-nondegree-14837-3107030023-presentation 14/34

GAMBAR 

 

Page 15: ITS NonDegree 14837 3107030023 Presentation

5/10/2018 ITS NonDegree 14837 3107030023 Presentation - slidepdf.com

http://slidepdf.com/reader/full/its-nondegree-14837-3107030023-presentation 15/34

TAMPAK DEPAN 

JIHGFEDCBA

 

Page 16: ITS NonDegree 14837 3107030023 Presentation

5/10/2018 ITS NonDegree 14837 3107030023 Presentation - slidepdf.com

http://slidepdf.com/reader/full/its-nondegree-14837-3107030023-presentation 16/34

TAMPAK BELAKANG 

J I H G F E D C B A

 

Page 17: ITS NonDegree 14837 3107030023 Presentation

5/10/2018 ITS NonDegree 14837 3107030023 Presentation - slidepdf.com

http://slidepdf.com/reader/full/its-nondegree-14837-3107030023-presentation 17/34

TAMPAK SAMPING KIRI 

7 6 5 4 3 2 1

 

Page 18: ITS NonDegree 14837 3107030023 Presentation

5/10/2018 ITS NonDegree 14837 3107030023 Presentation - slidepdf.com

http://slidepdf.com/reader/full/its-nondegree-14837-3107030023-presentation 18/34

TAMPAK SAMPING KANAN 

7654321

 

Page 19: ITS NonDegree 14837 3107030023 Presentation

5/10/2018 ITS NonDegree 14837 3107030023 Presentation - slidepdf.com

http://slidepdf.com/reader/full/its-nondegree-14837-3107030023-presentation 19/34

DENAH LANTAI 01 

A B C D E F G H I J

1

 

Page 20: ITS NonDegree 14837 3107030023 Presentation

5/10/2018 ITS NonDegree 14837 3107030023 Presentation - slidepdf.com

http://slidepdf.com/reader/full/its-nondegree-14837-3107030023-presentation 20/34

DATA 

PROYEK 

 

Page 21: ITS NonDegree 14837 3107030023 Presentation

5/10/2018 ITS NonDegree 14837 3107030023 Presentation - slidepdf.com

http://slidepdf.com/reader/full/its-nondegree-14837-3107030023-presentation 21/34

Nama Proyek : Sekolah Tinggi Kesehatan dan Akademi Kebidanan

Pemilik Proyek: Pimpinan Wilayah Muhammadiyah Jawa Timur

Lokasi Proyek : Sidoarjo

Rencana penyelesaian: 182 hari

Struktur bangunan atas :

Lantai 1 s.d. 4 menggunakan konstruksi beton bertulang dan konstruksi atap

menggunakan atap baja

Struktur bangunan bawah :Pondasi Tiang Pancang

DATA PROYEK

 

Page 22: ITS NonDegree 14837 3107030023 Presentation

5/10/2018 ITS NonDegree 14837 3107030023 Presentation - slidepdf.com

http://slidepdf.com/reader/full/its-nondegree-14837-3107030023-presentation 22/34

TAHAPAN PEKERJAANSISTEM CAST IN SITU

PADA BALOK DAN PLAT

 

Page 23: ITS NonDegree 14837 3107030023 Presentation

5/10/2018 ITS NonDegree 14837 3107030023 Presentation - slidepdf.com

http://slidepdf.com/reader/full/its-nondegree-14837-3107030023-presentation 23/34

TAHAPAN PEKERJAAN SISTEM CAST IN

SITU PADA BALOK DAN PLAT

• Pengangkatan Material

• Pekerjaan Scaffolding

• Pekerjaan Bekisting• Pekerjaan Pembesian

• Pekerjaan Pengecoran

 

Page 24: ITS NonDegree 14837 3107030023 Presentation

5/10/2018 ITS NonDegree 14837 3107030023 Presentation - slidepdf.com

http://slidepdf.com/reader/full/its-nondegree-14837-3107030023-presentation 24/34

PENGANGKATAN MATERIALPada pekerjaan pengangkatan material untuk pekerjaan balok dan plat dibagi menjadi tiga segmen untuk setiap lantai 2sampai lantai atap dengan menggunakan mobile crane.

Dimana pekerjaan pengangkatan yang dilakukan adalahPengangkatan scaffolding, bekisting dan tulangan.

Untuk scaffolding dilakukan pengangkatan di lantaisebelumnya, dikarenakan dilantai atas tidak ada tempatpenempatan material. Pekerjaan pemasangan scaffolding

dilakukan hampir bersamaan dengan pekerjaan bekisting.Setelah bekisting terpasang maka dilakukan pekerjaanpengangkatan tulangan.

 

Page 25: ITS NonDegree 14837 3107030023 Presentation

5/10/2018 ITS NonDegree 14837 3107030023 Presentation - slidepdf.com

http://slidepdf.com/reader/full/its-nondegree-14837-3107030023-presentation 25/34

PEKERJAAN SCAFFOLDING

• Pekerjaan scaffolding dilakukan untuk mendukung perencanaan pembuatan bekisting

 balok dan pelat dan dilakukan secara manualsesuai persegmen yaitu segmen A, segmen B dansegmen C.

 

Page 26: ITS NonDegree 14837 3107030023 Presentation

5/10/2018 ITS NonDegree 14837 3107030023 Presentation - slidepdf.com

http://slidepdf.com/reader/full/its-nondegree-14837-3107030023-presentation 26/34

PEKERJAAN BEKISTING

• Pada pembuatan balok dan pelat, bekistingterlebih dahulu dikerjakan. Bekisting memiliki

fungsi dalam bangunan untuk membuat bentuk dan dimensi pada suatu konstruksi beton, danmampu memikul beban sendiri yang baru dicorsampai konstruksi tersebut dapat dipikul

seluruh beban yang ada. Pelaksanaan pekerjaan bekisting pada pembuatan balok baru dapatdilakukan setelah pekerjaan scaffolding selesai.

 

Page 27: ITS NonDegree 14837 3107030023 Presentation

5/10/2018 ITS NonDegree 14837 3107030023 Presentation - slidepdf.com

http://slidepdf.com/reader/full/its-nondegree-14837-3107030023-presentation 27/34

PEKERJAAN PEMBESIAN

• Pekerjaan pembesian balok dan plat dilakukansetelah pekerjaan bekisting secara manual

dimana dilakukan sesuai urutan pekerjaan bekisting yaitu segmen A, segmen B, dan segmenC.

 

Page 28: ITS NonDegree 14837 3107030023 Presentation

5/10/2018 ITS NonDegree 14837 3107030023 Presentation - slidepdf.com

http://slidepdf.com/reader/full/its-nondegree-14837-3107030023-presentation 28/34

PEKERJAAN PENGECORAN

• Pekerjaan pembesian balok dan plat dilakukansetelah pekerjaan bekisting secara manual

dimana dilakukan sesuai urutan pekerjaan bekisting yaitu segmen A, segmen B, dan segmenC.

• Pada pekerjaan ini, balok dan plat menggunakan

mutu beton K-225.

 

Page 29: ITS NonDegree 14837 3107030023 Presentation

5/10/2018 ITS NonDegree 14837 3107030023 Presentation - slidepdf.com

http://slidepdf.com/reader/full/its-nondegree-14837-3107030023-presentation 29/34

HASIL

PERHITUNGAN

 

Page 30: ITS NonDegree 14837 3107030023 Presentation

5/10/2018 ITS NonDegree 14837 3107030023 Presentation - slidepdf.com

http://slidepdf.com/reader/full/its-nondegree-14837-3107030023-presentation 30/34

HASIL PERHITUNGAN• Perbandingan harga balok dan plat antara sistem precast

dengan cast in situ

No. JenisPekerjaan Precast Cast In Situ Pem bahasan

1 Lantai 1 1,240,312,756 1,026,445,20317,24%

Lebih murah

2 Lantai 2 1,353,174,793 868,091,87435,85 %

Lebih murah

3 Lantai 3 1,020,749,822 947,116,199 7,2 %Lebih murah

4 Lantai 4 402,761,329 399.403.1470,5 %

Lebih murah

 

Page 31: ITS NonDegree 14837 3107030023 Presentation

5/10/2018 ITS NonDegree 14837 3107030023 Presentation - slidepdf.com

http://slidepdf.com/reader/full/its-nondegree-14837-3107030023-presentation 31/34

• Perbandingan waktu pelaksanaan antara sistem

cast in situ dengan precast.

No. JenisPekerjaan

Precast Cast In Situ Pem bahasan

1 Lantai 136 hari 42 hari

16,67 %

Lebih lama

2 Lantai 2 30 hari 30 hari 0%

3 Lantai 3 30 hari 30hari 0%

4 Lantai 4 18 hari 18 hari 0%

 

Page 32: ITS NonDegree 14837 3107030023 Presentation

5/10/2018 ITS NonDegree 14837 3107030023 Presentation - slidepdf.com

http://slidepdf.com/reader/full/its-nondegree-14837-3107030023-presentation 32/34

KESIMPULAN

 

Page 33: ITS NonDegree 14837 3107030023 Presentation

5/10/2018 ITS NonDegree 14837 3107030023 Presentation - slidepdf.com

http://slidepdf.com/reader/full/its-nondegree-14837-3107030023-presentation 33/34

KESIMPULAN

• Dilihat dari sisi biaya, pekerjaan proyek dengan sistem plat precastmemerlukan biaya Rp.  8,629,547,000.00. Sedangkan denganpekerjaan proyek dengan sistem cast in situ memerlukan biaya

sebesar Rp. 8,196,080,000.00. Jadi biaya pelaksanaan dengansystem cast in situ lebih murah Rp.433.067.000,00.

• Pengaruh sistem cast in situ dalam proyek dari segi biaya lebihmurah Rp.433,067.000,00 dari pada sistem precast, waktu yangdibutuhkan pelaksanaan system precast adalah 26 minggu,

sedangkan system csat in situ membutuhkan waktu 31 minggu,lebih lama 5 minggu dari system cast in situ.

 

Page 34: ITS NonDegree 14837 3107030023 Presentation

5/10/2018 ITS NonDegree 14837 3107030023 Presentation - slidepdf.com

http://slidepdf.com/reader/full/its-nondegree-14837-3107030023-presentation 34/34

TER IM A K A SIH

SEKIAN