PERBANDINGAN METODE PELAKSANAAN PLAT
PRECAST DENGAN PLAT CAST IN SITU DITINJAU
DARI WAKTU DAN BIAYA PADA GEDUNG SEKOLAH
TINGGI KESEHATAN DAN AKADEMI KEBIDANAN
SIDOARJO
Ole h : AGUSTINA DW I ATMAJI
NRP. 3107 030 023
DAHNIAR ADE AYU R
NRP. 3107 030 025
5/10/2018 ITS NonDegree 14837 3107030023 Presentation - slidepdf.com
http://slidepdf.com/reader/full/its-nondegree-14837-3107030023-presentation 2/34
1• PENDAHULUAN
2 • TINJAUAN PUSTAKA
3• METODOLOGI
4
• DATA PROYEK
5• GAMBAR
6• TAHAPAN PEKERJAAN SISTEM CAST IN SITU PADA BALOK DAN PLAT
7• HASIL PERHITUNGAN
8• KESIMPULAN
5/10/2018 ITS NonDegree 14837 3107030023 Presentation - slidepdf.com
http://slidepdf.com/reader/full/its-nondegree-14837-3107030023-presentation 3/34
PENDAHULUAN
5/10/2018 ITS NonDegree 14837 3107030023 Presentation - slidepdf.com
http://slidepdf.com/reader/full/its-nondegree-14837-3107030023-presentation 4/34
LATAR BELAKANG
Metode pelaksanaan yang kami gunakan sebagai contoh adalah
pada sistem pengecoran beton. Sistem pengecoran beton memilikidua sistem, yaitu sistem cast in situ dan sistem precast. Dari keduasistem tersebut, beberapa aspek tentunya berbeda, baik untuk
waktu, alat maupun proses yang akan dilakukan. Dan dari hal-haltersebut nantinya akan dapat diketahui sistem pengecoran mana
yang lebih efisien dalam segi waktu, biaya, peralatan maupun faktorpendukung.
5/10/2018 ITS NonDegree 14837 3107030023 Presentation - slidepdf.com
http://slidepdf.com/reader/full/its-nondegree-14837-3107030023-presentation 5/34
• Dengan mengacu pada permasalahan diatas, maka proyek pembangunan “Sekolah Tinggi Kesehatan dan Akademi Kebidanan”
kami jadikan penelitian untuk membandingkan antara pengaruh beton cast in situ dengan beton precast. Bangunan ini terdiri dariempat lantai dengan luas bangunan + 1320m2. Pada bagian struktur
bangunan bagian balok dan kolom menggunakan beton cast in situ,sedangkan pada plat menggunakan beton precast. Dari datatersebut, kami akan melakukan perbandingan pada bagian pelat.Sehingga seluruh bangunan ini menggunakan sistem cast in situ.
5/10/2018 ITS NonDegree 14837 3107030023 Presentation - slidepdf.com
http://slidepdf.com/reader/full/its-nondegree-14837-3107030023-presentation 6/34
TUJUAN :• Membandingkan metode pelaksanaan antara penggunaan
sistem beton cast in situ dengan sistem beton precast.
• Mengetahui jenis peralatan yang digunakan pada sistem castin situ.• Menganalisa biaya yang diperlukan pada kedua sistem
tersebut.• Menganalisa pengaruh waktu pelaksanaan sistem cast in situ
pada plat terhadap biaya dan tenaga kerja dengan meninjau
metode pelaksanaannya.
BATASAN MASALAH• Menyusun metode pelaksanaan sistem cast in situ untuk
pekerjaan balok dan plat.• Peralatan berat yang digunakan adalah
▫ Concrete pump▫ Truck mixer▫ Mobile Crane
• Membandingkan pelaksanaan plat cast in situ dengan platprecast ditinjau dari segi waktu dan biaya.
5/10/2018 ITS NonDegree 14837 3107030023 Presentation - slidepdf.com
http://slidepdf.com/reader/full/its-nondegree-14837-3107030023-presentation 7/34
TINJAUAN
PUSTAKA
5/10/2018 ITS NonDegree 14837 3107030023 Presentation - slidepdf.com
http://slidepdf.com/reader/full/its-nondegree-14837-3107030023-presentation 8/34
BETON PRECAST
Beton precast atau pracetak adalah Seluruh atau sebagian darielemen struktur yang dicetak pada satu tempat tertentu baik yang
berada dilingkungan proyek maupun jauh dari proyek (pabrik) yang
kemudian akan dipasang pada strukturnya.
Proses beton precast dilakukan di pabrik biasanya dengan melaluiproduksi masal secara berulang dengan bentuk dan ukuran sesuaidengan pemesanan. Harga beton precast cenderung mahal karena
harga cetakannya yang terbuat dari plat baja yang biasanya dapatdigunakan + 80 kali untuk setiap cetakan.
5/10/2018 ITS NonDegree 14837 3107030023 Presentation - slidepdf.com
http://slidepdf.com/reader/full/its-nondegree-14837-3107030023-presentation 9/34
Pada pelaksanaan system precast terdiri dari beberapa tahap, yaitu:
• Tahap pengiriman.
• Tahap penurunan/penumpukkan beton di lokasi proyek.
• Tahap penyusunan/ pemasangan beton pada struktur.
• Tahap penyambungan dengan pengecoran dan pengelasan.
Yang harus diperhatikan dalam tahap pengangkutan beton precastdari pabrik sampai ke lokasi proyek :
• Lama waktu yang dibutuhkan untuk ke lokasi proyek.
• Merencanakan jalan alternatif, apabila ada hambatan pada jalur awal.
• Menyesuaikan daya tampung lokasi proyek dengan volume betonprecast yang dibutuhkan.
• Menentukan alat berat sesuai dengan kebutuhan angkut.
BETON PRECAST
5/10/2018 ITS NonDegree 14837 3107030023 Presentation - slidepdf.com
http://slidepdf.com/reader/full/its-nondegree-14837-3107030023-presentation 10/34
• Beton cast in situ adalah Pemindahan campuran beton cair dari mixer ketempat dimana beton
akan dicor yaitu bekisting atau acuan padastruktur yang akan dikerjakan.
BETON CAST IN SITU
5/10/2018 ITS NonDegree 14837 3107030023 Presentation - slidepdf.com
http://slidepdf.com/reader/full/its-nondegree-14837-3107030023-presentation 11/34
Tahapan pelaksanaan beton cast in situ, sebagai berikut :• Tahap pembersihan, memastikan papan bekisting dalam keadaan
bersih dari kotoran.• Tahap pembuatan bekisting untuk balok dan plat dilakukan terlebih
dahulu sebelum tahap pembesian. Sedangkan untuk kolom tahapbekisting dilakukan setelah tahap pembesian. Sebelum melakukantahap pengecoran, bekisting diolesi oleh oli. Bekisting dapatdilepas apabila beton mulai mengeras dan berbentuk.
• Tahap pembesian. Pekerjaan pembesian meliputi pemotongan besitulangan, pembengkokan besi tulangan, perakitan tulangan.
• Tahap pengecoran. Semua bahan beton harus diaduk secara meratadan harus dituangkan seluruhnya sebelum pencampur diisi kembali.Pengecoran beton harus dikerjakan sedekat mungkin ke tujuanterakhir untuk mencegah bahan-bahan jatuh di luar tempat kerjaakibat pemindahan adukan didalam cetakan, pengecoran balok danplat dilakukan secara bersamaan setelah pengecoran kolom.
BETON CAST IN SITU
5/10/2018 ITS NonDegree 14837 3107030023 Presentation - slidepdf.com
http://slidepdf.com/reader/full/its-nondegree-14837-3107030023-presentation 12/34
METODOLOGI
5/10/2018 ITS NonDegree 14837 3107030023 Presentation - slidepdf.com
http://slidepdf.com/reader/full/its-nondegree-14837-3107030023-presentation 13/34
START
STUDI LAPANGAN
STUDI PUSTAKA
PENGUMPULAN DATA
ANALISIS MASALAH
DATA PROYEK
Pelat precast
ANALISA
Pelat konvensional
DATA KONTRAKTOR
RAB, kurva S
PERHITUNGAN
RAB, kurva S
KESIMPULAN DAN SARAN
FINISH
5/10/2018 ITS NonDegree 14837 3107030023 Presentation - slidepdf.com
http://slidepdf.com/reader/full/its-nondegree-14837-3107030023-presentation 14/34
GAMBAR
5/10/2018 ITS NonDegree 14837 3107030023 Presentation - slidepdf.com
http://slidepdf.com/reader/full/its-nondegree-14837-3107030023-presentation 15/34
TAMPAK DEPAN
JIHGFEDCBA
5/10/2018 ITS NonDegree 14837 3107030023 Presentation - slidepdf.com
http://slidepdf.com/reader/full/its-nondegree-14837-3107030023-presentation 16/34
TAMPAK BELAKANG
J I H G F E D C B A
5/10/2018 ITS NonDegree 14837 3107030023 Presentation - slidepdf.com
http://slidepdf.com/reader/full/its-nondegree-14837-3107030023-presentation 17/34
TAMPAK SAMPING KIRI
7 6 5 4 3 2 1
5/10/2018 ITS NonDegree 14837 3107030023 Presentation - slidepdf.com
http://slidepdf.com/reader/full/its-nondegree-14837-3107030023-presentation 18/34
TAMPAK SAMPING KANAN
7654321
5/10/2018 ITS NonDegree 14837 3107030023 Presentation - slidepdf.com
http://slidepdf.com/reader/full/its-nondegree-14837-3107030023-presentation 19/34
DENAH LANTAI 01
A B C D E F G H I J
1
5/10/2018 ITS NonDegree 14837 3107030023 Presentation - slidepdf.com
http://slidepdf.com/reader/full/its-nondegree-14837-3107030023-presentation 20/34
DATA
PROYEK
5/10/2018 ITS NonDegree 14837 3107030023 Presentation - slidepdf.com
http://slidepdf.com/reader/full/its-nondegree-14837-3107030023-presentation 21/34
Nama Proyek : Sekolah Tinggi Kesehatan dan Akademi Kebidanan
Pemilik Proyek: Pimpinan Wilayah Muhammadiyah Jawa Timur
Lokasi Proyek : Sidoarjo
Rencana penyelesaian: 182 hari
Struktur bangunan atas :
Lantai 1 s.d. 4 menggunakan konstruksi beton bertulang dan konstruksi atap
menggunakan atap baja
Struktur bangunan bawah :Pondasi Tiang Pancang
DATA PROYEK
5/10/2018 ITS NonDegree 14837 3107030023 Presentation - slidepdf.com
http://slidepdf.com/reader/full/its-nondegree-14837-3107030023-presentation 22/34
TAHAPAN PEKERJAANSISTEM CAST IN SITU
PADA BALOK DAN PLAT
5/10/2018 ITS NonDegree 14837 3107030023 Presentation - slidepdf.com
http://slidepdf.com/reader/full/its-nondegree-14837-3107030023-presentation 23/34
TAHAPAN PEKERJAAN SISTEM CAST IN
SITU PADA BALOK DAN PLAT
• Pengangkatan Material
• Pekerjaan Scaffolding
• Pekerjaan Bekisting• Pekerjaan Pembesian
• Pekerjaan Pengecoran
5/10/2018 ITS NonDegree 14837 3107030023 Presentation - slidepdf.com
http://slidepdf.com/reader/full/its-nondegree-14837-3107030023-presentation 24/34
PENGANGKATAN MATERIALPada pekerjaan pengangkatan material untuk pekerjaan balok dan plat dibagi menjadi tiga segmen untuk setiap lantai 2sampai lantai atap dengan menggunakan mobile crane.
Dimana pekerjaan pengangkatan yang dilakukan adalahPengangkatan scaffolding, bekisting dan tulangan.
Untuk scaffolding dilakukan pengangkatan di lantaisebelumnya, dikarenakan dilantai atas tidak ada tempatpenempatan material. Pekerjaan pemasangan scaffolding
dilakukan hampir bersamaan dengan pekerjaan bekisting.Setelah bekisting terpasang maka dilakukan pekerjaanpengangkatan tulangan.
5/10/2018 ITS NonDegree 14837 3107030023 Presentation - slidepdf.com
http://slidepdf.com/reader/full/its-nondegree-14837-3107030023-presentation 25/34
PEKERJAAN SCAFFOLDING
• Pekerjaan scaffolding dilakukan untuk mendukung perencanaan pembuatan bekisting
balok dan pelat dan dilakukan secara manualsesuai persegmen yaitu segmen A, segmen B dansegmen C.
5/10/2018 ITS NonDegree 14837 3107030023 Presentation - slidepdf.com
http://slidepdf.com/reader/full/its-nondegree-14837-3107030023-presentation 26/34
PEKERJAAN BEKISTING
• Pada pembuatan balok dan pelat, bekistingterlebih dahulu dikerjakan. Bekisting memiliki
fungsi dalam bangunan untuk membuat bentuk dan dimensi pada suatu konstruksi beton, danmampu memikul beban sendiri yang baru dicorsampai konstruksi tersebut dapat dipikul
seluruh beban yang ada. Pelaksanaan pekerjaan bekisting pada pembuatan balok baru dapatdilakukan setelah pekerjaan scaffolding selesai.
5/10/2018 ITS NonDegree 14837 3107030023 Presentation - slidepdf.com
http://slidepdf.com/reader/full/its-nondegree-14837-3107030023-presentation 27/34
PEKERJAAN PEMBESIAN
• Pekerjaan pembesian balok dan plat dilakukansetelah pekerjaan bekisting secara manual
dimana dilakukan sesuai urutan pekerjaan bekisting yaitu segmen A, segmen B, dan segmenC.
5/10/2018 ITS NonDegree 14837 3107030023 Presentation - slidepdf.com
http://slidepdf.com/reader/full/its-nondegree-14837-3107030023-presentation 28/34
PEKERJAAN PENGECORAN
• Pekerjaan pembesian balok dan plat dilakukansetelah pekerjaan bekisting secara manual
dimana dilakukan sesuai urutan pekerjaan bekisting yaitu segmen A, segmen B, dan segmenC.
• Pada pekerjaan ini, balok dan plat menggunakan
mutu beton K-225.
5/10/2018 ITS NonDegree 14837 3107030023 Presentation - slidepdf.com
http://slidepdf.com/reader/full/its-nondegree-14837-3107030023-presentation 29/34
HASIL
PERHITUNGAN
5/10/2018 ITS NonDegree 14837 3107030023 Presentation - slidepdf.com
http://slidepdf.com/reader/full/its-nondegree-14837-3107030023-presentation 30/34
HASIL PERHITUNGAN• Perbandingan harga balok dan plat antara sistem precast
dengan cast in situ
No. JenisPekerjaan Precast Cast In Situ Pem bahasan
1 Lantai 1 1,240,312,756 1,026,445,20317,24%
Lebih murah
2 Lantai 2 1,353,174,793 868,091,87435,85 %
Lebih murah
3 Lantai 3 1,020,749,822 947,116,199 7,2 %Lebih murah
4 Lantai 4 402,761,329 399.403.1470,5 %
Lebih murah
5/10/2018 ITS NonDegree 14837 3107030023 Presentation - slidepdf.com
http://slidepdf.com/reader/full/its-nondegree-14837-3107030023-presentation 31/34
• Perbandingan waktu pelaksanaan antara sistem
cast in situ dengan precast.
No. JenisPekerjaan
Precast Cast In Situ Pem bahasan
1 Lantai 136 hari 42 hari
16,67 %
Lebih lama
2 Lantai 2 30 hari 30 hari 0%
3 Lantai 3 30 hari 30hari 0%
4 Lantai 4 18 hari 18 hari 0%
5/10/2018 ITS NonDegree 14837 3107030023 Presentation - slidepdf.com
http://slidepdf.com/reader/full/its-nondegree-14837-3107030023-presentation 32/34
KESIMPULAN
5/10/2018 ITS NonDegree 14837 3107030023 Presentation - slidepdf.com
http://slidepdf.com/reader/full/its-nondegree-14837-3107030023-presentation 33/34
KESIMPULAN
• Dilihat dari sisi biaya, pekerjaan proyek dengan sistem plat precastmemerlukan biaya Rp. 8,629,547,000.00. Sedangkan denganpekerjaan proyek dengan sistem cast in situ memerlukan biaya
sebesar Rp. 8,196,080,000.00. Jadi biaya pelaksanaan dengansystem cast in situ lebih murah Rp.433.067.000,00.
• Pengaruh sistem cast in situ dalam proyek dari segi biaya lebihmurah Rp.433,067.000,00 dari pada sistem precast, waktu yangdibutuhkan pelaksanaan system precast adalah 26 minggu,
sedangkan system csat in situ membutuhkan waktu 31 minggu,lebih lama 5 minggu dari system cast in situ.
5/10/2018 ITS NonDegree 14837 3107030023 Presentation - slidepdf.com
http://slidepdf.com/reader/full/its-nondegree-14837-3107030023-presentation 34/34
TER IM A K A SIH
SEKIAN