Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI
NO URAIAN PEKERJAAN BOBOT
I PEKERJAAN PERSIAPAN1 Persiapan Lokasi 0.47%2 Uitzet / Pasang Bouwplank 0.45%3 Air Kerja/Listrik Kerja 0.46%
Sub Total I 1.39%II PEKERJAAN TANAH
1 Galian Tanah Pondasi 0.70%2 Urugan Tanah Kembali 0.06%3 Pembuangan Tanah 0.46%4 Lantai Kerja T. 5 cm 0.18%
Sub Total II 1.41%III PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps 7.02%2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps 0.19%
Sub Total III 7.21%IV PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps 2.65%2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps 0.00%3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 2.30%4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps 0.51%5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps 0.14%6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 0.40%7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 0.59%8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps 1.99%
Sub Total IV 8.58%V PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps 9.77%2 Plesteran Dinding 1 Pc : 6 Ps 4.64%3 Pekerjaan Benangan 0.91%4 Acian Dinding Bang. Utama 3.00%5 Pengecatan Dinding Dalam ex. Catylac/setara 1.99%6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara 1.32%
Sub Total V 21.63%VI PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara 1.52%2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara 2.16%3 Kusen Alluminium + Seaalant ex. Alexindo/setara 5.00%4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara 0.44%5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara 0.44%
-
Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI
NO URAIAN PEKERJAAN BOBOT
6 Pek. Daun Jendela J1, Polos 5mm ex. Alexindo/setara 0.33%7 Pek. Daun Jendela J2, Polos 5mm ex. Alexindo/setara 0.33%8 Pek. Daun Jendela J3, Polos 5mm ex. Alexindo/setara 0.33%9 Pek. Daun Jendela J4, Polos 5mm ex. Alexindo/setara 0.33%
10 Pintu Kamar Mandi 0.33%Sub Total VI 11.22%
VII PEKERJAAN ATAP DAN PLAFOND1 Rangka Atap Galvalum ex. EKG/setara 4.93%2 Penutup Atap Genteng Beton ex. Varia/setara 4.27%3 Bubungan ex. Varia/setara 0.32%4 Siku Atap ex. Varia/setara 0.99%5 Woodplank 20 cm + Cat ex. Elephant/setara 0.91%6 Waterprofing Atap Dak Beton ex. Propan/setara 0.35%7 Plafond Gypsum Board 9 mm ex. Jayaboard/setara 1.61%8 Plafond Kalsiboard 9 mm ex. Jayaboard/setara 0.60%9 Listprofil Plafond ex. Taiwan/setara 0.54%
10 Pengecatan Plafond ex. Catylac/setara 0.84%Sub Total VII 15.34%
VIII PEKERJAAN PENUTUP LANTAI1 Urugan Pasir Bawah Lantai T. 2 cm 0.13%2 Pasang Granite Tile 60/60 ex China/setara 4.14%3 Pasang Plint Granite Tile 10/60 ex. Brada/setara 4.76%4 Pasang Granite Tile Teras 60/60 ex China/setara 0.63%5 Pasang Keramik 40/40 KM ex Roman/setara 0.23%6 Keramik Dinding KM/WC 20/40 cm KM ex. Roman/setara 1.06%
10.95%
-
Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI
NO URAIAN PEKERJAAN BOBOT
IX PEKERJAAN INSTALASI LISTRIK1 Instalasi Listrik Kabel NYY ex. Eterna/setara 5.43%2 Pasang Lampu SL Fitting Standart ex. Panasonic/setara 0.18%3 Lampu Barret ex. China/setara 0.18%4 Saklar Ganda ex. Panasonic/setara 0.07%5 Saklar Tunggal ex. Panasonic/setara 0.07%6 Pasang Stop Kontak ex. Panasonic/setara 0.20%7 Pasang Stop Kontak AC ex. Panasonic/setara 0.28%8 Pasang Saluran TV ex. Panasonic/setara 0.31%9 MCB ex. MG/setara 0.13%
10 Pemasangan Kabel Power PLN 0.54%11 Ground 0.17%
Sub Total IX 7.56%X PEKERJAAN PLUMBING DAN SANITASI
1 Instalasi Air Bersih PVC 3/4" Type AW ex. Wavin/setara 0.23%2 Pipa Saluran Air Buangan PVC 3" D ex. Wavin/setara 0.32%3 Pipa Saluran Limbah WC PVC 4" D ex. Wavin/setara 0.22%4 Bak Kontrol + Tutup 0.24%5 Septictank + Resapan 1.77%6 Closed Duduk + Jet Washer ex. Toto/setara 1.57%7 Kran Dinding ex. Taiwan/setara 0.03%8 Shower ex. Lokal/setara 0.24%9 Tandon Beton + Keramik dan Tutup uk. 1 m3 0.82%
10 Floor Drain ex Lokal/setara 0.19%Sub Total X 5.63%
XI PEKERJAAN LAIN-LAIN1 Rabatan Carport + Batu Sikat 0.72%2 Pas. Batu Alam Palimanan 2.79%3 Pagar Belakang (t = 1,8 m) 1.99%4 Pagar Samping (t = 1 m) 1.35%5 Pengeboran Air Sumur + Pipa (t = 8 m) 0.99%6 Pompa Shimitzu + Acc. + Rumah Pompa 1.14%7 Pembersihan Akhir 0.10%
Sub Total XI 9.08%
Total Biaya (A)PEMBULATAN 100.00%Harga Per m2 Tipe 70
-
Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI
NO URAIAN PEKERJAAN BOBOT
Diperiksa Oleh,PT. Adhi Persada Properti
KuscahyonoConstruction Manager
-
Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI
NO URAIAN PEKERJAAN BOBOT
I PEKERJAAN PERSIAPAN1 Persiapan Lokasi 0.47%2 Uitzet / Pasang Bouwplank 0.45%3 Air Kerja/Listrik Kerja 0.46%
Sub Total I 1.39%II PEKERJAAN TANAH
1 Galian Tanah Pondasi 0.70%2 Urugan Tanah Kembali 0.06%3 Pembuangan Tanah 0.46%4 Lantai Kerja T. 5 cm 0.18%
Sub Total II 1.41%III PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps 7.02%2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps 0.19%
Sub Total III 7.21%IV PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps 2.65%2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps 0.00%3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 2.30%4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps 0.51%5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps 0.14%6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 0.40%7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 0.59%8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps 1.99%
Sub Total IV 8.58%V PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps 9.77%2 Plesteran Dinding 1 Pc : 6 Ps 4.64%3 Pekerjaan Benangan 0.91%4 Acian Dinding Bang. Utama 3.00%5 Pengecatan Dinding Dalam ex. Catylac/setara 1.99%6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara 1.32%
Sub Total V 21.63%VI PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara 1.52%2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara 2.16%3 Kusen Alluminium + Seaalant ex. Alexindo/setara 5.00%4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara 0.44%5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara 0.44%
No.
100.00%100.00%
5.00%
100.00%100.00%
0.00%100.00%
100.00%0.00%
0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
0.00%0.00%0.00%0.00%0.00%0.00%
0.00%0.00%0.00%0.00%0.00%
PERSETASE MGG LALU
-
Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI
NO URAIAN PEKERJAAN BOBOT
6 Pek. Daun Jendela J1, Polos 5mm ex. Alexindo/setara 0.33%7 Pek. Daun Jendela J2, Polos 5mm ex. Alexindo/setara 0.33%8 Pek. Daun Jendela J3, Polos 5mm ex. Alexindo/setara 0.33%9 Pek. Daun Jendela J4, Polos 5mm ex. Alexindo/setara 0.33%
10 Pintu Kamar Mandi 0.33%Sub Total VI 11.22%
VII PEKERJAAN ATAP DAN PLAFOND1 Rangka Atap Galvalum ex. EKG/setara 4.93%2 Penutup Atap Genteng Beton ex. Varia/setara 4.27%3 Bubungan ex. Varia/setara 0.32%4 Siku Atap ex. Varia/setara 0.99%5 Woodplank 20 cm + Cat ex. Elephant/setara 0.91%6 Waterprofing Atap Dak Beton ex. Propan/setara 0.35%7 Plafond Gypsum Board 9 mm ex. Jayaboard/setara 1.61%8 Plafond Kalsiboard 9 mm ex. Jayaboard/setara 0.60%9 Listprofil Plafond ex. Taiwan/setara 0.54%
10 Pengecatan Plafond ex. Catylac/setara 0.84%Sub Total VII 15.34%
VIII PEKERJAAN PENUTUP LANTAI1 Urugan Pasir Bawah Lantai T. 2 cm 0.13%2 Pasang Granite Tile 60/60 ex China/setara 4.14%3 Pasang Plint Granite Tile 10/60 ex. Brada/setara 4.76%4 Pasang Granite Tile Teras 60/60 ex China/setara 0.63%5 Pasang Keramik 40/40 KM ex Roman/setara 0.23%6 Keramik Dinding KM/WC 20/40 cm KM ex. Roman/setara 1.06%
10.95%
No.
PERSETASE MGG LALU
0.00%0.00%0.00%0.00%0.00%
0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
0.00%0.00%0.00%0.00%0.00%0.00%
-
Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI
NO URAIAN PEKERJAAN BOBOT
IX PEKERJAAN INSTALASI LISTRIK1 Instalasi Listrik Kabel NYY ex. Eterna/setara 5.43%2 Pasang Lampu SL Fitting Standart ex. Panasonic/setara 0.18%3 Lampu Barret ex. China/setara 0.18%4 Saklar Ganda ex. Panasonic/setara 0.07%5 Saklar Tunggal ex. Panasonic/setara 0.07%6 Pasang Stop Kontak ex. Panasonic/setara 0.20%7 Pasang Stop Kontak AC ex. Panasonic/setara 0.28%8 Pasang Saluran TV ex. Panasonic/setara 0.31%9 MCB ex. MG/setara 0.13%
10 Pemasangan Kabel Power PLN 0.54%11 Ground 0.17%
Sub Total IX 7.56%X PEKERJAAN PLUMBING DAN SANITASI
1 Instalasi Air Bersih PVC 3/4" Type AW ex. Wavin/setara 0.23%2 Pipa Saluran Air Buangan PVC 3" D ex. Wavin/setara 0.32%3 Pipa Saluran Limbah WC PVC 4" D ex. Wavin/setara 0.22%4 Bak Kontrol + Tutup 0.24%5 Septictank + Resapan 1.77%6 Closed Duduk + Jet Washer ex. Toto/setara 1.57%7 Kran Dinding ex. Taiwan/setara 0.03%8 Shower ex. Lokal/setara 0.24%9 Tandon Beton + Keramik dan Tutup uk. 1 m3 0.82%
10 Floor Drain ex Lokal/setara 0.19%Sub Total X 5.63%
XI PEKERJAAN LAIN-LAIN1 Rabatan Carport + Batu Sikat 0.72%2 Pas. Batu Alam Palimanan 2.79%3 Pagar Belakang (t = 1,8 m) 1.99%4 Pagar Samping (t = 1 m) 1.35%5 Pengeboran Air Sumur + Pipa (t = 8 m) 0.99%6 Pompa Shimitzu + Acc. + Rumah Pompa 1.14%7 Pembersihan Akhir 0.10%
Sub Total XI 9.08%
Total Biaya (A)PEMBULATAN 100.00%Harga Per m2 Tipe 70
No.
PERSETASE MGG LALU
0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
0.00%0.00%5.00%0.00%0.00%0.00%0.00%
-
Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI
NO URAIAN PEKERJAAN BOBOT
Diperiksa Oleh,PT. Adhi Persada Properti
KuscahyonoConstruction Manager
No.
PERSETASE MGG LALU
-
Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI
NO URAIAN PEKERJAAN BOBOT
I PEKERJAAN PERSIAPAN1 Persiapan Lokasi 0.47%2 Uitzet / Pasang Bouwplank 0.45%3 Air Kerja/Listrik Kerja 0.46%
Sub Total I 1.39%II PEKERJAAN TANAH
1 Galian Tanah Pondasi 0.70%2 Urugan Tanah Kembali 0.06%3 Pembuangan Tanah 0.46%4 Lantai Kerja T. 5 cm 0.18%
Sub Total II 1.41%III PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps 7.02%2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps 0.19%
Sub Total III 7.21%IV PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps 2.65%2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps 0.00%3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 2.30%4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps 0.51%5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps 0.14%6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 0.40%7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 0.59%8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps 1.99%
Sub Total IV 8.58%V PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps 9.77%2 Plesteran Dinding 1 Pc : 6 Ps 4.64%3 Pekerjaan Benangan 0.91%4 Acian Dinding Bang. Utama 3.00%5 Pengecatan Dinding Dalam ex. Catylac/setara 1.99%6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara 1.32%
Sub Total V 21.63%VI PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara 1.52%2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara 2.16%3 Kusen Alluminium + Seaalant ex. Alexindo/setara 5.00%4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara 0.44%5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara 0.44%
No.
0.47%0.45%0.02%0.95%
0.70%0.06%0.00%0.18%0.94%
7.02%0.00%7.02%
0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
0.00%0.00%0.00%0.00%0.00%0.00%0.00%
0.00%0.00%0.00%0.00%0.00%
BOBOT MGG LALU
-
Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI
NO URAIAN PEKERJAAN BOBOT
6 Pek. Daun Jendela J1, Polos 5mm ex. Alexindo/setara 0.33%7 Pek. Daun Jendela J2, Polos 5mm ex. Alexindo/setara 0.33%8 Pek. Daun Jendela J3, Polos 5mm ex. Alexindo/setara 0.33%9 Pek. Daun Jendela J4, Polos 5mm ex. Alexindo/setara 0.33%
10 Pintu Kamar Mandi 0.33%Sub Total VI 11.22%
VII PEKERJAAN ATAP DAN PLAFOND1 Rangka Atap Galvalum ex. EKG/setara 4.93%2 Penutup Atap Genteng Beton ex. Varia/setara 4.27%3 Bubungan ex. Varia/setara 0.32%4 Siku Atap ex. Varia/setara 0.99%5 Woodplank 20 cm + Cat ex. Elephant/setara 0.91%6 Waterprofing Atap Dak Beton ex. Propan/setara 0.35%7 Plafond Gypsum Board 9 mm ex. Jayaboard/setara 1.61%8 Plafond Kalsiboard 9 mm ex. Jayaboard/setara 0.60%9 Listprofil Plafond ex. Taiwan/setara 0.54%
10 Pengecatan Plafond ex. Catylac/setara 0.84%Sub Total VII 15.34%
VIII PEKERJAAN PENUTUP LANTAI1 Urugan Pasir Bawah Lantai T. 2 cm 0.13%2 Pasang Granite Tile 60/60 ex China/setara 4.14%3 Pasang Plint Granite Tile 10/60 ex. Brada/setara 4.76%4 Pasang Granite Tile Teras 60/60 ex China/setara 0.63%5 Pasang Keramik 40/40 KM ex Roman/setara 0.23%6 Keramik Dinding KM/WC 20/40 cm KM ex. Roman/setara 1.06%
10.95%
No.
BOBOT MGG LALU
0.00%0.00%0.00%0.00%0.00%0.00%
0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
0.00%0.00%0.00%0.00%0.00%0.00%0.00%
-
Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI
NO URAIAN PEKERJAAN BOBOT
IX PEKERJAAN INSTALASI LISTRIK1 Instalasi Listrik Kabel NYY ex. Eterna/setara 5.43%2 Pasang Lampu SL Fitting Standart ex. Panasonic/setara 0.18%3 Lampu Barret ex. China/setara 0.18%4 Saklar Ganda ex. Panasonic/setara 0.07%5 Saklar Tunggal ex. Panasonic/setara 0.07%6 Pasang Stop Kontak ex. Panasonic/setara 0.20%7 Pasang Stop Kontak AC ex. Panasonic/setara 0.28%8 Pasang Saluran TV ex. Panasonic/setara 0.31%9 MCB ex. MG/setara 0.13%
10 Pemasangan Kabel Power PLN 0.54%11 Ground 0.17%
Sub Total IX 7.56%X PEKERJAAN PLUMBING DAN SANITASI
1 Instalasi Air Bersih PVC 3/4" Type AW ex. Wavin/setara 0.23%2 Pipa Saluran Air Buangan PVC 3" D ex. Wavin/setara 0.32%3 Pipa Saluran Limbah WC PVC 4" D ex. Wavin/setara 0.22%4 Bak Kontrol + Tutup 0.24%5 Septictank + Resapan 1.77%6 Closed Duduk + Jet Washer ex. Toto/setara 1.57%7 Kran Dinding ex. Taiwan/setara 0.03%8 Shower ex. Lokal/setara 0.24%9 Tandon Beton + Keramik dan Tutup uk. 1 m3 0.82%
10 Floor Drain ex Lokal/setara 0.19%Sub Total X 5.63%
XI PEKERJAAN LAIN-LAIN1 Rabatan Carport + Batu Sikat 0.72%2 Pas. Batu Alam Palimanan 2.79%3 Pagar Belakang (t = 1,8 m) 1.99%4 Pagar Samping (t = 1 m) 1.35%5 Pengeboran Air Sumur + Pipa (t = 8 m) 0.99%6 Pompa Shimitzu + Acc. + Rumah Pompa 1.14%7 Pembersihan Akhir 0.10%
Sub Total XI 9.08%
Total Biaya (A)PEMBULATAN 100.00%Harga Per m2 Tipe 70
No.
BOBOT MGG LALU
0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
0.00%0.00%0.10%0.00%0.00%0.00%0.00%0.10%
9.01%
-
Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI
NO URAIAN PEKERJAAN BOBOT
Diperiksa Oleh,PT. Adhi Persada Properti
KuscahyonoConstruction Manager
No.
BOBOT MGG LALU
-
Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI
NO URAIAN PEKERJAAN BOBOT
I PEKERJAAN PERSIAPAN1 Persiapan Lokasi 0.47%2 Uitzet / Pasang Bouwplank 0.45%3 Air Kerja/Listrik Kerja 0.46%
Sub Total I 1.39%II PEKERJAAN TANAH
1 Galian Tanah Pondasi 0.70%2 Urugan Tanah Kembali 0.06%3 Pembuangan Tanah 0.46%4 Lantai Kerja T. 5 cm 0.18%
Sub Total II 1.41%III PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps 7.02%2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps 0.19%
Sub Total III 7.21%IV PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps 2.65%2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps 0.00%3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 2.30%4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps 0.51%5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps 0.14%6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 0.40%7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 0.59%8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps 1.99%
Sub Total IV 8.58%V PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps 9.77%2 Plesteran Dinding 1 Pc : 6 Ps 4.64%3 Pekerjaan Benangan 0.91%4 Acian Dinding Bang. Utama 3.00%5 Pengecatan Dinding Dalam ex. Catylac/setara 1.99%6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara 1.32%
Sub Total V 21.63%VI PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara 1.52%2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara 2.16%3 Kusen Alluminium + Seaalant ex. Alexindo/setara 5.00%4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara 0.44%5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara 0.44%
No.
0.00%0.00%0.00%
0.00%0.00%0.00%0.00%
0.00%0.00%
0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
0.00%0.00%0.00%0.00%0.00%0.00%
0.00%0.00%0.00%0.00%0.00%
PERSETASE MGG INI
-
Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI
NO URAIAN PEKERJAAN BOBOT
6 Pek. Daun Jendela J1, Polos 5mm ex. Alexindo/setara 0.33%7 Pek. Daun Jendela J2, Polos 5mm ex. Alexindo/setara 0.33%8 Pek. Daun Jendela J3, Polos 5mm ex. Alexindo/setara 0.33%9 Pek. Daun Jendela J4, Polos 5mm ex. Alexindo/setara 0.33%
10 Pintu Kamar Mandi 0.33%Sub Total VI 11.22%
VII PEKERJAAN ATAP DAN PLAFOND1 Rangka Atap Galvalum ex. EKG/setara 4.93%2 Penutup Atap Genteng Beton ex. Varia/setara 4.27%3 Bubungan ex. Varia/setara 0.32%4 Siku Atap ex. Varia/setara 0.99%5 Woodplank 20 cm + Cat ex. Elephant/setara 0.91%6 Waterprofing Atap Dak Beton ex. Propan/setara 0.35%7 Plafond Gypsum Board 9 mm ex. Jayaboard/setara 1.61%8 Plafond Kalsiboard 9 mm ex. Jayaboard/setara 0.60%9 Listprofil Plafond ex. Taiwan/setara 0.54%
10 Pengecatan Plafond ex. Catylac/setara 0.84%Sub Total VII 15.34%
VIII PEKERJAAN PENUTUP LANTAI1 Urugan Pasir Bawah Lantai T. 2 cm 0.13%2 Pasang Granite Tile 60/60 ex China/setara 4.14%3 Pasang Plint Granite Tile 10/60 ex. Brada/setara 4.76%4 Pasang Granite Tile Teras 60/60 ex China/setara 0.63%5 Pasang Keramik 40/40 KM ex Roman/setara 0.23%6 Keramik Dinding KM/WC 20/40 cm KM ex. Roman/setara 1.06%
10.95%
No.
PERSETASE MGG INI
0.00%0.00%0.00%0.00%0.00%
0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
0.00%0.00%0.00%0.00%0.00%0.00%
-
Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI
NO URAIAN PEKERJAAN BOBOT
IX PEKERJAAN INSTALASI LISTRIK1 Instalasi Listrik Kabel NYY ex. Eterna/setara 5.43%2 Pasang Lampu SL Fitting Standart ex. Panasonic/setara 0.18%3 Lampu Barret ex. China/setara 0.18%4 Saklar Ganda ex. Panasonic/setara 0.07%5 Saklar Tunggal ex. Panasonic/setara 0.07%6 Pasang Stop Kontak ex. Panasonic/setara 0.20%7 Pasang Stop Kontak AC ex. Panasonic/setara 0.28%8 Pasang Saluran TV ex. Panasonic/setara 0.31%9 MCB ex. MG/setara 0.13%
10 Pemasangan Kabel Power PLN 0.54%11 Ground 0.17%
Sub Total IX 7.56%X PEKERJAAN PLUMBING DAN SANITASI
1 Instalasi Air Bersih PVC 3/4" Type AW ex. Wavin/setara 0.23%2 Pipa Saluran Air Buangan PVC 3" D ex. Wavin/setara 0.32%3 Pipa Saluran Limbah WC PVC 4" D ex. Wavin/setara 0.22%4 Bak Kontrol + Tutup 0.24%5 Septictank + Resapan 1.77%6 Closed Duduk + Jet Washer ex. Toto/setara 1.57%7 Kran Dinding ex. Taiwan/setara 0.03%8 Shower ex. Lokal/setara 0.24%9 Tandon Beton + Keramik dan Tutup uk. 1 m3 0.82%
10 Floor Drain ex Lokal/setara 0.19%Sub Total X 5.63%
XI PEKERJAAN LAIN-LAIN1 Rabatan Carport + Batu Sikat 0.72%2 Pas. Batu Alam Palimanan 2.79%3 Pagar Belakang (t = 1,8 m) 1.99%4 Pagar Samping (t = 1 m) 1.35%5 Pengeboran Air Sumur + Pipa (t = 8 m) 0.99%6 Pompa Shimitzu + Acc. + Rumah Pompa 1.14%7 Pembersihan Akhir 0.10%
Sub Total XI 9.08%
Total Biaya (A)PEMBULATAN 100.00%Harga Per m2 Tipe 70
No.
PERSETASE MGG INI
0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
0.00%0.00%0.00%0.00%0.00%0.00%0.00%
-
Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI
NO URAIAN PEKERJAAN BOBOT
Diperiksa Oleh,PT. Adhi Persada Properti
KuscahyonoConstruction Manager
No.
PERSETASE MGG INI
-
Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI
NO URAIAN PEKERJAAN BOBOT
I PEKERJAAN PERSIAPAN1 Persiapan Lokasi 0.47%2 Uitzet / Pasang Bouwplank 0.45%3 Air Kerja/Listrik Kerja 0.46%
Sub Total I 1.39%II PEKERJAAN TANAH
1 Galian Tanah Pondasi 0.70%2 Urugan Tanah Kembali 0.06%3 Pembuangan Tanah 0.46%4 Lantai Kerja T. 5 cm 0.18%
Sub Total II 1.41%III PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps 7.02%2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps 0.19%
Sub Total III 7.21%IV PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps 2.65%2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps 0.00%3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 2.30%4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps 0.51%5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps 0.14%6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 0.40%7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 0.59%8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps 1.99%
Sub Total IV 8.58%V PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps 9.77%2 Plesteran Dinding 1 Pc : 6 Ps 4.64%3 Pekerjaan Benangan 0.91%4 Acian Dinding Bang. Utama 3.00%5 Pengecatan Dinding Dalam ex. Catylac/setara 1.99%6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara 1.32%
Sub Total V 21.63%VI PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara 1.52%2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara 2.16%3 Kusen Alluminium + Seaalant ex. Alexindo/setara 5.00%4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara 0.44%5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara 0.44%
1
0.00%0.00%0.00%0.00%
0.00%0.00%0.00%0.00%0.00%
0.00%0.00%0.00%
0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
0.00%0.00%0.00%0.00%0.00%0.00%0.00%
0.00%0.00%0.00%0.00%0.00%
BOBOT MGG INI
-
Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI
NO URAIAN PEKERJAAN BOBOT
6 Pek. Daun Jendela J1, Polos 5mm ex. Alexindo/setara 0.33%7 Pek. Daun Jendela J2, Polos 5mm ex. Alexindo/setara 0.33%8 Pek. Daun Jendela J3, Polos 5mm ex. Alexindo/setara 0.33%9 Pek. Daun Jendela J4, Polos 5mm ex. Alexindo/setara 0.33%
10 Pintu Kamar Mandi 0.33%Sub Total VI 11.22%
VII PEKERJAAN ATAP DAN PLAFOND1 Rangka Atap Galvalum ex. EKG/setara 4.93%2 Penutup Atap Genteng Beton ex. Varia/setara 4.27%3 Bubungan ex. Varia/setara 0.32%4 Siku Atap ex. Varia/setara 0.99%5 Woodplank 20 cm + Cat ex. Elephant/setara 0.91%6 Waterprofing Atap Dak Beton ex. Propan/setara 0.35%7 Plafond Gypsum Board 9 mm ex. Jayaboard/setara 1.61%8 Plafond Kalsiboard 9 mm ex. Jayaboard/setara 0.60%9 Listprofil Plafond ex. Taiwan/setara 0.54%
10 Pengecatan Plafond ex. Catylac/setara 0.84%Sub Total VII 15.34%
VIII PEKERJAAN PENUTUP LANTAI1 Urugan Pasir Bawah Lantai T. 2 cm 0.13%2 Pasang Granite Tile 60/60 ex China/setara 4.14%3 Pasang Plint Granite Tile 10/60 ex. Brada/setara 4.76%4 Pasang Granite Tile Teras 60/60 ex China/setara 0.63%5 Pasang Keramik 40/40 KM ex Roman/setara 0.23%6 Keramik Dinding KM/WC 20/40 cm KM ex. Roman/setara 1.06%
10.95%
1
BOBOT MGG INI
0.00%0.00%0.00%0.00%0.00%0.00%
0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
0.00%0.00%0.00%0.00%0.00%0.00%0.00%
-
Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI
NO URAIAN PEKERJAAN BOBOT
IX PEKERJAAN INSTALASI LISTRIK1 Instalasi Listrik Kabel NYY ex. Eterna/setara 5.43%2 Pasang Lampu SL Fitting Standart ex. Panasonic/setara 0.18%3 Lampu Barret ex. China/setara 0.18%4 Saklar Ganda ex. Panasonic/setara 0.07%5 Saklar Tunggal ex. Panasonic/setara 0.07%6 Pasang Stop Kontak ex. Panasonic/setara 0.20%7 Pasang Stop Kontak AC ex. Panasonic/setara 0.28%8 Pasang Saluran TV ex. Panasonic/setara 0.31%9 MCB ex. MG/setara 0.13%
10 Pemasangan Kabel Power PLN 0.54%11 Ground 0.17%
Sub Total IX 7.56%X PEKERJAAN PLUMBING DAN SANITASI
1 Instalasi Air Bersih PVC 3/4" Type AW ex. Wavin/setara 0.23%2 Pipa Saluran Air Buangan PVC 3" D ex. Wavin/setara 0.32%3 Pipa Saluran Limbah WC PVC 4" D ex. Wavin/setara 0.22%4 Bak Kontrol + Tutup 0.24%5 Septictank + Resapan 1.77%6 Closed Duduk + Jet Washer ex. Toto/setara 1.57%7 Kran Dinding ex. Taiwan/setara 0.03%8 Shower ex. Lokal/setara 0.24%9 Tandon Beton + Keramik dan Tutup uk. 1 m3 0.82%
10 Floor Drain ex Lokal/setara 0.19%Sub Total X 5.63%
XI PEKERJAAN LAIN-LAIN1 Rabatan Carport + Batu Sikat 0.72%2 Pas. Batu Alam Palimanan 2.79%3 Pagar Belakang (t = 1,8 m) 1.99%4 Pagar Samping (t = 1 m) 1.35%5 Pengeboran Air Sumur + Pipa (t = 8 m) 0.99%6 Pompa Shimitzu + Acc. + Rumah Pompa 1.14%7 Pembersihan Akhir 0.10%
Sub Total XI 9.08%
Total Biaya (A)PEMBULATAN 100.00%Harga Per m2 Tipe 70
1
BOBOT MGG INI
0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
0.00%
-
Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI
NO URAIAN PEKERJAAN BOBOT
Diperiksa Oleh,PT. Adhi Persada Properti
KuscahyonoConstruction Manager
1
BOBOT MGG INI
Sidoarjo, 22 Agustus 2015
PT. Yofa Bangun Abadi
Project Manager
-
Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI
NO URAIAN PEKERJAAN BOBOT
I PEKERJAAN PERSIAPAN1 Persiapan Lokasi 0.47%2 Uitzet / Pasang Bouwplank 0.45%3 Air Kerja/Listrik Kerja 0.46%
Sub Total I 1.39%II PEKERJAAN TANAH
1 Galian Tanah Pondasi 0.70%2 Urugan Tanah Kembali 0.06%3 Pembuangan Tanah 0.46%4 Lantai Kerja T. 5 cm 0.18%
Sub Total II 1.41%III PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps 7.02%2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps 0.19%
Sub Total III 7.21%IV PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps 2.65%2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps 0.00%3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 2.30%4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps 0.51%5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps 0.14%6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 0.40%7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 0.59%8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps 1.99%
Sub Total IV 8.58%V PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps 9.77%2 Plesteran Dinding 1 Pc : 6 Ps 4.64%3 Pekerjaan Benangan 0.91%4 Acian Dinding Bang. Utama 3.00%5 Pengecatan Dinding Dalam ex. Catylac/setara 1.99%6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara 1.32%
Sub Total V 21.63%VI PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara 1.52%2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara 2.16%3 Kusen Alluminium + Seaalant ex. Alexindo/setara 5.00%4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara 0.44%5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara 0.44%
1
100.00%100.00%
5.00%
100.00%100.00%
0.00%100.00%
100.00%0.00%
0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
0.00%0.00%0.00%0.00%0.00%0.00%
0.00%0.00%0.00%0.00%0.00%
PERSETASE S/D MGG INI
-
Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI
NO URAIAN PEKERJAAN BOBOT
6 Pek. Daun Jendela J1, Polos 5mm ex. Alexindo/setara 0.33%7 Pek. Daun Jendela J2, Polos 5mm ex. Alexindo/setara 0.33%8 Pek. Daun Jendela J3, Polos 5mm ex. Alexindo/setara 0.33%9 Pek. Daun Jendela J4, Polos 5mm ex. Alexindo/setara 0.33%
10 Pintu Kamar Mandi 0.33%Sub Total VI 11.22%
VII PEKERJAAN ATAP DAN PLAFOND1 Rangka Atap Galvalum ex. EKG/setara 4.93%2 Penutup Atap Genteng Beton ex. Varia/setara 4.27%3 Bubungan ex. Varia/setara 0.32%4 Siku Atap ex. Varia/setara 0.99%5 Woodplank 20 cm + Cat ex. Elephant/setara 0.91%6 Waterprofing Atap Dak Beton ex. Propan/setara 0.35%7 Plafond Gypsum Board 9 mm ex. Jayaboard/setara 1.61%8 Plafond Kalsiboard 9 mm ex. Jayaboard/setara 0.60%9 Listprofil Plafond ex. Taiwan/setara 0.54%
10 Pengecatan Plafond ex. Catylac/setara 0.84%Sub Total VII 15.34%
VIII PEKERJAAN PENUTUP LANTAI1 Urugan Pasir Bawah Lantai T. 2 cm 0.13%2 Pasang Granite Tile 60/60 ex China/setara 4.14%3 Pasang Plint Granite Tile 10/60 ex. Brada/setara 4.76%4 Pasang Granite Tile Teras 60/60 ex China/setara 0.63%5 Pasang Keramik 40/40 KM ex Roman/setara 0.23%6 Keramik Dinding KM/WC 20/40 cm KM ex. Roman/setara 1.06%
10.95%
1
PERSETASE S/D MGG INI
0.00%0.00%0.00%0.00%0.00%
0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
0.00%0.00%0.00%0.00%0.00%0.00%
-
Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI
NO URAIAN PEKERJAAN BOBOT
IX PEKERJAAN INSTALASI LISTRIK1 Instalasi Listrik Kabel NYY ex. Eterna/setara 5.43%2 Pasang Lampu SL Fitting Standart ex. Panasonic/setara 0.18%3 Lampu Barret ex. China/setara 0.18%4 Saklar Ganda ex. Panasonic/setara 0.07%5 Saklar Tunggal ex. Panasonic/setara 0.07%6 Pasang Stop Kontak ex. Panasonic/setara 0.20%7 Pasang Stop Kontak AC ex. Panasonic/setara 0.28%8 Pasang Saluran TV ex. Panasonic/setara 0.31%9 MCB ex. MG/setara 0.13%
10 Pemasangan Kabel Power PLN 0.54%11 Ground 0.17%
Sub Total IX 7.56%X PEKERJAAN PLUMBING DAN SANITASI
1 Instalasi Air Bersih PVC 3/4" Type AW ex. Wavin/setara 0.23%2 Pipa Saluran Air Buangan PVC 3" D ex. Wavin/setara 0.32%3 Pipa Saluran Limbah WC PVC 4" D ex. Wavin/setara 0.22%4 Bak Kontrol + Tutup 0.24%5 Septictank + Resapan 1.77%6 Closed Duduk + Jet Washer ex. Toto/setara 1.57%7 Kran Dinding ex. Taiwan/setara 0.03%8 Shower ex. Lokal/setara 0.24%9 Tandon Beton + Keramik dan Tutup uk. 1 m3 0.82%
10 Floor Drain ex Lokal/setara 0.19%Sub Total X 5.63%
XI PEKERJAAN LAIN-LAIN1 Rabatan Carport + Batu Sikat 0.72%2 Pas. Batu Alam Palimanan 2.79%3 Pagar Belakang (t = 1,8 m) 1.99%4 Pagar Samping (t = 1 m) 1.35%5 Pengeboran Air Sumur + Pipa (t = 8 m) 0.99%6 Pompa Shimitzu + Acc. + Rumah Pompa 1.14%7 Pembersihan Akhir 0.10%
Sub Total XI 9.08%
Total Biaya (A)PEMBULATAN 100.00%Harga Per m2 Tipe 70
1
PERSETASE S/D MGG INI
0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
0.00%0.00%5.00%0.00%0.00%0.00%0.00%
-
Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI
NO URAIAN PEKERJAAN BOBOT
Diperiksa Oleh,PT. Adhi Persada Properti
KuscahyonoConstruction Manager
1
PERSETASE S/D MGG INI
Sidoarjo, 22 Agustus 2015Dibuat Oleh,
PT. Yofa Bangun Abadi
Mas Dedi P.Project Manager
-
Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI
NO URAIAN PEKERJAAN BOBOT
I PEKERJAAN PERSIAPAN1 Persiapan Lokasi 0.47%2 Uitzet / Pasang Bouwplank 0.45%3 Air Kerja/Listrik Kerja 0.46%
Sub Total I 1.39%II PEKERJAAN TANAH
1 Galian Tanah Pondasi 0.70%2 Urugan Tanah Kembali 0.06%3 Pembuangan Tanah 0.46%4 Lantai Kerja T. 5 cm 0.18%
Sub Total II 1.41%III PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps 7.02%2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps 0.19%
Sub Total III 7.21%IV PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps 2.65%2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps 0.00%3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 2.30%4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps 0.51%5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps 0.14%6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 0.40%7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 0.59%8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps 1.99%
Sub Total IV 8.58%V PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps 9.77%2 Plesteran Dinding 1 Pc : 6 Ps 4.64%3 Pekerjaan Benangan 0.91%4 Acian Dinding Bang. Utama 3.00%5 Pengecatan Dinding Dalam ex. Catylac/setara 1.99%6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara 1.32%
Sub Total V 21.63%VI PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara 1.52%2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara 2.16%3 Kusen Alluminium + Seaalant ex. Alexindo/setara 5.00%4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara 0.44%5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara 0.44%
1
0.47%0.45%0.02%0.95%
0.70%0.06%0.00%0.18%0.94%
7.02%0.00%7.02%
0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
0.00%0.00%0.00%0.00%0.00%0.00%0.00%
0.00%0.00%0.00%0.00%0.00%
BOBOT S/D MGG INI
-
Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI
NO URAIAN PEKERJAAN BOBOT
6 Pek. Daun Jendela J1, Polos 5mm ex. Alexindo/setara 0.33%7 Pek. Daun Jendela J2, Polos 5mm ex. Alexindo/setara 0.33%8 Pek. Daun Jendela J3, Polos 5mm ex. Alexindo/setara 0.33%9 Pek. Daun Jendela J4, Polos 5mm ex. Alexindo/setara 0.33%
10 Pintu Kamar Mandi 0.33%Sub Total VI 11.22%
VII PEKERJAAN ATAP DAN PLAFOND1 Rangka Atap Galvalum ex. EKG/setara 4.93%2 Penutup Atap Genteng Beton ex. Varia/setara 4.27%3 Bubungan ex. Varia/setara 0.32%4 Siku Atap ex. Varia/setara 0.99%5 Woodplank 20 cm + Cat ex. Elephant/setara 0.91%6 Waterprofing Atap Dak Beton ex. Propan/setara 0.35%7 Plafond Gypsum Board 9 mm ex. Jayaboard/setara 1.61%8 Plafond Kalsiboard 9 mm ex. Jayaboard/setara 0.60%9 Listprofil Plafond ex. Taiwan/setara 0.54%
10 Pengecatan Plafond ex. Catylac/setara 0.84%Sub Total VII 15.34%
VIII PEKERJAAN PENUTUP LANTAI1 Urugan Pasir Bawah Lantai T. 2 cm 0.13%2 Pasang Granite Tile 60/60 ex China/setara 4.14%3 Pasang Plint Granite Tile 10/60 ex. Brada/setara 4.76%4 Pasang Granite Tile Teras 60/60 ex China/setara 0.63%5 Pasang Keramik 40/40 KM ex Roman/setara 0.23%6 Keramik Dinding KM/WC 20/40 cm KM ex. Roman/setara 1.06%
10.95%
1
BOBOT S/D MGG INI
0.00%0.00%0.00%0.00%0.00%0.00%
0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
0.00%0.00%0.00%0.00%0.00%0.00%0.00%
-
Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI
NO URAIAN PEKERJAAN BOBOT
IX PEKERJAAN INSTALASI LISTRIK1 Instalasi Listrik Kabel NYY ex. Eterna/setara 5.43%2 Pasang Lampu SL Fitting Standart ex. Panasonic/setara 0.18%3 Lampu Barret ex. China/setara 0.18%4 Saklar Ganda ex. Panasonic/setara 0.07%5 Saklar Tunggal ex. Panasonic/setara 0.07%6 Pasang Stop Kontak ex. Panasonic/setara 0.20%7 Pasang Stop Kontak AC ex. Panasonic/setara 0.28%8 Pasang Saluran TV ex. Panasonic/setara 0.31%9 MCB ex. MG/setara 0.13%
10 Pemasangan Kabel Power PLN 0.54%11 Ground 0.17%
Sub Total IX 7.56%X PEKERJAAN PLUMBING DAN SANITASI
1 Instalasi Air Bersih PVC 3/4" Type AW ex. Wavin/setara 0.23%2 Pipa Saluran Air Buangan PVC 3" D ex. Wavin/setara 0.32%3 Pipa Saluran Limbah WC PVC 4" D ex. Wavin/setara 0.22%4 Bak Kontrol + Tutup 0.24%5 Septictank + Resapan 1.77%6 Closed Duduk + Jet Washer ex. Toto/setara 1.57%7 Kran Dinding ex. Taiwan/setara 0.03%8 Shower ex. Lokal/setara 0.24%9 Tandon Beton + Keramik dan Tutup uk. 1 m3 0.82%
10 Floor Drain ex Lokal/setara 0.19%Sub Total X 5.63%
XI PEKERJAAN LAIN-LAIN1 Rabatan Carport + Batu Sikat 0.72%2 Pas. Batu Alam Palimanan 2.79%3 Pagar Belakang (t = 1,8 m) 1.99%4 Pagar Samping (t = 1 m) 1.35%5 Pengeboran Air Sumur + Pipa (t = 8 m) 0.99%6 Pompa Shimitzu + Acc. + Rumah Pompa 1.14%7 Pembersihan Akhir 0.10%
Sub Total XI 9.08%
Total Biaya (A)PEMBULATAN 100.00%Harga Per m2 Tipe 70
1
BOBOT S/D MGG INI
0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
0.00%0.00%0.10%0.00%0.00%0.00%0.00%0.10%
9.01%
-
Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI
NO URAIAN PEKERJAAN BOBOT
Diperiksa Oleh,PT. Adhi Persada Properti
KuscahyonoConstruction Manager
1
BOBOT S/D MGG INI
Sidoarjo, 22 Agustus 2015
PT. Yofa Bangun Abadi
Project Manager
-
Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI
NO URAIAN PEKERJAAN BOBOT
I PEKERJAAN PERSIAPAN1 Persiapan Lokasi 0.47%2 Uitzet / Pasang Bouwplank 0.45%3 Air Kerja/Listrik Kerja 0.46%
Sub Total I 1.39%II PEKERJAAN TANAH
1 Galian Tanah Pondasi 0.70%2 Urugan Tanah Kembali 0.06%3 Pembuangan Tanah 0.46%4 Lantai Kerja T. 5 cm 0.18%
Sub Total II 1.41%III PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps 7.02%2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps 0.19%
Sub Total III 7.21%IV PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps 2.65%2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps 0.00%3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 2.30%4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps 0.51%5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps 0.14%6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 0.40%7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 0.59%8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps 1.99%
Sub Total IV 8.58%V PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps 9.77%2 Plesteran Dinding 1 Pc : 6 Ps 4.64%3 Pekerjaan Benangan 0.91%4 Acian Dinding Bang. Utama 3.00%5 Pengecatan Dinding Dalam ex. Catylac/setara 1.99%6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara 1.32%
Sub Total V 21.63%VI PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara 1.52%2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara 2.16%3 Kusen Alluminium + Seaalant ex. Alexindo/setara 5.00%4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara 0.44%5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara 0.44%
No.
100.00%100.00%
5.00%
100.00%100.00%
0.00%100.00%
100.00%0.00%
0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
0.00%0.00%0.00%0.00%0.00%0.00%
0.00%0.00%0.00%0.00%0.00%
PERSETASE MGG LALU
-
Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI
NO URAIAN PEKERJAAN BOBOT
6 Pek. Daun Jendela J1, Polos 5mm ex. Alexindo/setara 0.33%7 Pek. Daun Jendela J2, Polos 5mm ex. Alexindo/setara 0.33%8 Pek. Daun Jendela J3, Polos 5mm ex. Alexindo/setara 0.33%9 Pek. Daun Jendela J4, Polos 5mm ex. Alexindo/setara 0.33%
10 Pintu Kamar Mandi 0.33%Sub Total VI 11.22%
VII PEKERJAAN ATAP DAN PLAFOND1 Rangka Atap Galvalum ex. EKG/setara 4.93%2 Penutup Atap Genteng Beton ex. Varia/setara 4.27%3 Bubungan ex. Varia/setara 0.32%4 Siku Atap ex. Varia/setara 0.99%5 Woodplank 20 cm + Cat ex. Elephant/setara 0.91%6 Waterprofing Atap Dak Beton ex. Propan/setara 0.35%7 Plafond Gypsum Board 9 mm ex. Jayaboard/setara 1.61%8 Plafond Kalsiboard 9 mm ex. Jayaboard/setara 0.60%9 Listprofil Plafond ex. Taiwan/setara 0.54%
10 Pengecatan Plafond ex. Catylac/setara 0.84%Sub Total VII 15.34%
VIII PEKERJAAN PENUTUP LANTAI1 Urugan Pasir Bawah Lantai T. 2 cm 0.13%2 Pasang Granite Tile 60/60 ex China/setara 4.14%3 Pasang Plint Granite Tile 10/60 ex. Brada/setara 4.76%4 Pasang Granite Tile Teras 60/60 ex China/setara 0.63%5 Pasang Keramik 40/40 KM ex Roman/setara 0.23%6 Keramik Dinding KM/WC 20/40 cm KM ex. Roman/setara 1.06%
10.95%
No.
PERSETASE MGG LALU
0.00%0.00%0.00%0.00%0.00%
0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
0.00%0.00%0.00%0.00%0.00%0.00%
-
Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI
NO URAIAN PEKERJAAN BOBOT
IX PEKERJAAN INSTALASI LISTRIK1 Instalasi Listrik Kabel NYY ex. Eterna/setara 5.43%2 Pasang Lampu SL Fitting Standart ex. Panasonic/setara 0.18%3 Lampu Barret ex. China/setara 0.18%4 Saklar Ganda ex. Panasonic/setara 0.07%5 Saklar Tunggal ex. Panasonic/setara 0.07%6 Pasang Stop Kontak ex. Panasonic/setara 0.20%7 Pasang Stop Kontak AC ex. Panasonic/setara 0.28%8 Pasang Saluran TV ex. Panasonic/setara 0.31%9 MCB ex. MG/setara 0.13%
10 Pemasangan Kabel Power PLN 0.54%11 Ground 0.17%
Sub Total IX 7.56%X PEKERJAAN PLUMBING DAN SANITASI
1 Instalasi Air Bersih PVC 3/4" Type AW ex. Wavin/setara 0.23%2 Pipa Saluran Air Buangan PVC 3" D ex. Wavin/setara 0.32%3 Pipa Saluran Limbah WC PVC 4" D ex. Wavin/setara 0.22%4 Bak Kontrol + Tutup 0.24%5 Septictank + Resapan 1.77%6 Closed Duduk + Jet Washer ex. Toto/setara 1.57%7 Kran Dinding ex. Taiwan/setara 0.03%8 Shower ex. Lokal/setara 0.24%9 Tandon Beton + Keramik dan Tutup uk. 1 m3 0.82%
10 Floor Drain ex Lokal/setara 0.19%Sub Total X 5.63%
XI PEKERJAAN LAIN-LAIN1 Rabatan Carport + Batu Sikat 0.72%2 Pas. Batu Alam Palimanan 2.79%3 Pagar Belakang (t = 1,8 m) 1.99%4 Pagar Samping (t = 1 m) 1.35%5 Pengeboran Air Sumur + Pipa (t = 8 m) 0.99%6 Pompa Shimitzu + Acc. + Rumah Pompa 1.14%7 Pembersihan Akhir 0.10%
Sub Total XI 9.08%
Total Biaya (A)PEMBULATAN 100.00%Harga Per m2 Tipe 70
No.
PERSETASE MGG LALU
0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
0.00%0.00%5.00%0.00%0.00%0.00%0.00%
-
Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI
NO URAIAN PEKERJAAN BOBOT
Diperiksa Oleh,PT. Adhi Persada Properti
KuscahyonoConstruction Manager
No.
PERSETASE MGG LALU
-
Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI
NO URAIAN PEKERJAAN BOBOT
I PEKERJAAN PERSIAPAN1 Persiapan Lokasi 0.47%2 Uitzet / Pasang Bouwplank 0.45%3 Air Kerja/Listrik Kerja 0.46%
Sub Total I 1.39%II PEKERJAAN TANAH
1 Galian Tanah Pondasi 0.70%2 Urugan Tanah Kembali 0.06%3 Pembuangan Tanah 0.46%4 Lantai Kerja T. 5 cm 0.18%
Sub Total II 1.41%III PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps 7.02%2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps 0.19%
Sub Total III 7.21%IV PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps 2.65%2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps 0.00%3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 2.30%4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps 0.51%5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps 0.14%6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 0.40%7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 0.59%8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps 1.99%
Sub Total IV 8.58%V PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps 9.77%2 Plesteran Dinding 1 Pc : 6 Ps 4.64%3 Pekerjaan Benangan 0.91%4 Acian Dinding Bang. Utama 3.00%5 Pengecatan Dinding Dalam ex. Catylac/setara 1.99%6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara 1.32%
Sub Total V 21.63%VI PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara 1.52%2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara 2.16%3 Kusen Alluminium + Seaalant ex. Alexindo/setara 5.00%4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara 0.44%5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara 0.44%
No.
0.47%0.45%0.02%0.95%
0.70%0.06%0.00%0.18%0.94%
7.02%0.00%7.02%
0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
0.00%0.00%0.00%0.00%0.00%0.00%0.00%
0.00%0.00%0.00%0.00%0.00%
BOBOT MGG LALU
-
Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI
NO URAIAN PEKERJAAN BOBOT
6 Pek. Daun Jendela J1, Polos 5mm ex. Alexindo/setara 0.33%7 Pek. Daun Jendela J2, Polos 5mm ex. Alexindo/setara 0.33%8 Pek. Daun Jendela J3, Polos 5mm ex. Alexindo/setara 0.33%9 Pek. Daun Jendela J4, Polos 5mm ex. Alexindo/setara 0.33%
10 Pintu Kamar Mandi 0.33%Sub Total VI 11.22%
VII PEKERJAAN ATAP DAN PLAFOND1 Rangka Atap Galvalum ex. EKG/setara 4.93%2 Penutup Atap Genteng Beton ex. Varia/setara 4.27%3 Bubungan ex. Varia/setara 0.32%4 Siku Atap ex. Varia/setara 0.99%5 Woodplank 20 cm + Cat ex. Elephant/setara 0.91%6 Waterprofing Atap Dak Beton ex. Propan/setara 0.35%7 Plafond Gypsum Board 9 mm ex. Jayaboard/setara 1.61%8 Plafond Kalsiboard 9 mm ex. Jayaboard/setara 0.60%9 Listprofil Plafond ex. Taiwan/setara 0.54%
10 Pengecatan Plafond ex. Catylac/setara 0.84%Sub Total VII 15.34%
VIII PEKERJAAN PENUTUP LANTAI1 Urugan Pasir Bawah Lantai T. 2 cm 0.13%2 Pasang Granite Tile 60/60 ex China/setara 4.14%3 Pasang Plint Granite Tile 10/60 ex. Brada/setara 4.76%4 Pasang Granite Tile Teras 60/60 ex China/setara 0.63%5 Pasang Keramik 40/40 KM ex Roman/setara 0.23%6 Keramik Dinding KM/WC 20/40 cm KM ex. Roman/setara 1.06%
10.95%
No.
BOBOT MGG LALU
0.00%0.00%0.00%0.00%0.00%0.00%
0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
0.00%0.00%0.00%0.00%0.00%0.00%0.00%
-
Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI
NO URAIAN PEKERJAAN BOBOT
IX PEKERJAAN INSTALASI LISTRIK1 Instalasi Listrik Kabel NYY ex. Eterna/setara 5.43%2 Pasang Lampu SL Fitting Standart ex. Panasonic/setara 0.18%3 Lampu Barret ex. China/setara 0.18%4 Saklar Ganda ex. Panasonic/setara 0.07%5 Saklar Tunggal ex. Panasonic/setara 0.07%6 Pasang Stop Kontak ex. Panasonic/setara 0.20%7 Pasang Stop Kontak AC ex. Panasonic/setara 0.28%8 Pasang Saluran TV ex. Panasonic/setara 0.31%9 MCB ex. MG/setara 0.13%
10 Pemasangan Kabel Power PLN 0.54%11 Ground 0.17%
Sub Total IX 7.56%X PEKERJAAN PLUMBING DAN SANITASI
1 Instalasi Air Bersih PVC 3/4" Type AW ex. Wavin/setara 0.23%2 Pipa Saluran Air Buangan PVC 3" D ex. Wavin/setara 0.32%3 Pipa Saluran Limbah WC PVC 4" D ex. Wavin/setara 0.22%4 Bak Kontrol + Tutup 0.24%5 Septictank + Resapan 1.77%6 Closed Duduk + Jet Washer ex. Toto/setara 1.57%7 Kran Dinding ex. Taiwan/setara 0.03%8 Shower ex. Lokal/setara 0.24%9 Tandon Beton + Keramik dan Tutup uk. 1 m3 0.82%
10 Floor Drain ex Lokal/setara 0.19%Sub Total X 5.63%
XI PEKERJAAN LAIN-LAIN1 Rabatan Carport + Batu Sikat 0.72%2 Pas. Batu Alam Palimanan 2.79%3 Pagar Belakang (t = 1,8 m) 1.99%4 Pagar Samping (t = 1 m) 1.35%5 Pengeboran Air Sumur + Pipa (t = 8 m) 0.99%6 Pompa Shimitzu + Acc. + Rumah Pompa 1.14%7 Pembersihan Akhir 0.10%
Sub Total XI 9.08%
Total Biaya (A)PEMBULATAN 100.00%Harga Per m2 Tipe 70
No.
BOBOT MGG LALU
0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
0.00%0.00%0.10%0.00%0.00%0.00%0.00%0.10%
9.01%
-
Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI
NO URAIAN PEKERJAAN BOBOT
Diperiksa Oleh,PT. Adhi Persada Properti
KuscahyonoConstruction Manager
No.
BOBOT MGG LALU
-
Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI
NO URAIAN PEKERJAAN BOBOT
I PEKERJAAN PERSIAPAN1 Persiapan Lokasi 0.47%2 Uitzet / Pasang Bouwplank 0.45%3 Air Kerja/Listrik Kerja 0.46%
Sub Total I 1.39%II PEKERJAAN TANAH
1 Galian Tanah Pondasi 0.70%2 Urugan Tanah Kembali 0.06%3 Pembuangan Tanah 0.46%4 Lantai Kerja T. 5 cm 0.18%
Sub Total II 1.41%III PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps 7.02%2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps 0.19%
Sub Total III 7.21%IV PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps 2.65%2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps 0.00%3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 2.30%4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps 0.51%5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps 0.14%6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 0.40%7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 0.59%8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps 1.99%
Sub Total IV 8.58%V PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps 9.77%2 Plesteran Dinding 1 Pc : 6 Ps 4.64%3 Pekerjaan Benangan 0.91%4 Acian Dinding Bang. Utama 3.00%5 Pengecatan Dinding Dalam ex. Catylac/setara 1.99%6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara 1.32%
Sub Total V 21.63%VI PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara 1.52%2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara 2.16%3 Kusen Alluminium + Seaalant ex. Alexindo/setara 5.00%4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara 0.44%5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara 0.44%
No.
0.00%0.00%0.00%
0.00%0.00%0.00%0.00%
0.00%0.00%
0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
0.00%0.00%0.00%0.00%0.00%0.00%
0.00%0.00%0.00%0.00%0.00%
PERSETASE MGG INI
-
Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI
NO URAIAN PEKERJAAN BOBOT
6 Pek. Daun Jendela J1, Polos 5mm ex. Alexindo/setara 0.33%7 Pek. Daun Jendela J2, Polos 5mm ex. Alexindo/setara 0.33%8 Pek. Daun Jendela J3, Polos 5mm ex. Alexindo/setara 0.33%9 Pek. Daun Jendela J4, Polos 5mm ex. Alexindo/setara 0.33%
10 Pintu Kamar Mandi 0.33%Sub Total VI 11.22%
VII PEKERJAAN ATAP DAN PLAFOND1 Rangka Atap Galvalum ex. EKG/setara 4.93%2 Penutup Atap Genteng Beton ex. Varia/setara 4.27%3 Bubungan ex. Varia/setara 0.32%4 Siku Atap ex. Varia/setara 0.99%5 Woodplank 20 cm + Cat ex. Elephant/setara 0.91%6 Waterprofing Atap Dak Beton ex. Propan/setara 0.35%7 Plafond Gypsum Board 9 mm ex. Jayaboard/setara 1.61%8 Plafond Kalsiboard 9 mm ex. Jayaboard/setara 0.60%9 Listprofil Plafond ex. Taiwan/setara 0.54%
10 Pengecatan Plafond ex. Catylac/setara 0.84%Sub Total VII 15.34%
VIII PEKERJAAN PENUTUP LANTAI1 Urugan Pasir Bawah Lantai T. 2 cm 0.13%2 Pasang Granite Tile 60/60 ex China/setara 4.14%3 Pasang Plint Granite Tile 10/60 ex. Brada/setara 4.76%4 Pasang Granite Tile Teras 60/60 ex China/setara 0.63%5 Pasang Keramik 40/40 KM ex Roman/setara 0.23%6 Keramik Dinding KM/WC 20/40 cm KM ex. Roman/setara 1.06%
10.95%
No.
PERSETASE MGG INI
0.00%0.00%0.00%0.00%0.00%
0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
0.00%0.00%0.00%0.00%0.00%0.00%
-
Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI
NO URAIAN PEKERJAAN BOBOT
IX PEKERJAAN INSTALASI LISTRIK1 Instalasi Listrik Kabel NYY ex. Eterna/setara 5.43%2 Pasang Lampu SL Fitting Standart ex. Panasonic/setara 0.18%3 Lampu Barret ex. China/setara 0.18%4 Saklar Ganda ex. Panasonic/setara 0.07%5 Saklar Tunggal ex. Panasonic/setara 0.07%6 Pasang Stop Kontak ex. Panasonic/setara 0.20%7 Pasang Stop Kontak AC ex. Panasonic/setara 0.28%8 Pasang Saluran TV ex. Panasonic/setara 0.31%9 MCB ex. MG/setara 0.13%
10 Pemasangan Kabel Power PLN 0.54%11 Ground 0.17%
Sub Total IX 7.56%X PEKERJAAN PLUMBING DAN SANITASI
1 Instalasi Air Bersih PVC 3/4" Type AW ex. Wavin/setara 0.23%2 Pipa Saluran Air Buangan PVC 3" D ex. Wavin/setara 0.32%3 Pipa Saluran Limbah WC PVC 4" D ex. Wavin/setara 0.22%4 Bak Kontrol + Tutup 0.24%5 Septictank + Resapan 1.77%6 Closed Duduk + Jet Washer ex. Toto/setara 1.57%7 Kran Dinding ex. Taiwan/setara 0.03%8 Shower ex. Lokal/setara 0.24%9 Tandon Beton + Keramik dan Tutup uk. 1 m3 0.82%
10 Floor Drain ex Lokal/setara 0.19%Sub Total X 5.63%
XI PEKERJAAN LAIN-LAIN1 Rabatan Carport + Batu Sikat 0.72%2 Pas. Batu Alam Palimanan 2.79%3 Pagar Belakang (t = 1,8 m) 1.99%4 Pagar Samping (t = 1 m) 1.35%5 Pengeboran Air Sumur + Pipa (t = 8 m) 0.99%6 Pompa Shimitzu + Acc. + Rumah Pompa 1.14%7 Pembersihan Akhir 0.10%
Sub Total XI 9.08%
Total Biaya (A)PEMBULATAN 100.00%Harga Per m2 Tipe 70
No.
PERSETASE MGG INI
0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
0.00%0.00%0.00%0.00%0.00%0.00%0.00%
-
Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI
NO URAIAN PEKERJAAN BOBOT
Diperiksa Oleh,PT. Adhi Persada Properti
KuscahyonoConstruction Manager
No.
PERSETASE MGG INI
-
Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI
NO URAIAN PEKERJAAN BOBOT
I PEKERJAAN PERSIAPAN1 Persiapan Lokasi 0.47%2 Uitzet / Pasang Bouwplank 0.45%3 Air Kerja/Listrik Kerja 0.46%
Sub Total I 1.39%II PEKERJAAN TANAH
1 Galian Tanah Pondasi 0.70%2 Urugan Tanah Kembali 0.06%3 Pembuangan Tanah 0.46%4 Lantai Kerja T. 5 cm 0.18%
Sub Total II 1.41%III PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps 7.02%2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps 0.19%
Sub Total III 7.21%IV PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps 2.65%2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps 0.00%3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 2.30%4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps 0.51%5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps 0.14%6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 0.40%7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 0.59%8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps 1.99%
Sub Total IV 8.58%V PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps 9.77%2 Plesteran Dinding 1 Pc : 6 Ps 4.64%3 Pekerjaan Benangan 0.91%4 Acian Dinding Bang. Utama 3.00%5 Pengecatan Dinding Dalam ex. Catylac/setara 1.99%6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara 1.32%
Sub Total V 21.63%VI PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara 1.52%2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara 2.16%3 Kusen Alluminium + Seaalant ex. Alexindo/setara 5.00%4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara 0.44%5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara 0.44%
2
0.00%0.00%0.00%0.00%
0.00%0.00%0.00%0.00%0.00%
0.00%0.00%0.00%
0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
0.00%0.00%0.00%0.00%0.00%0.00%0.00%
0.00%0.00%0.00%0.00%0.00%
BOBOT MGG INI
-
Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI
NO URAIAN PEKERJAAN BOBOT
6 Pek. Daun Jendela J1, Polos 5mm ex. Alexindo/setara 0.33%7 Pek. Daun Jendela J2, Polos 5mm ex. Alexindo/setara 0.33%8 Pek. Daun Jendela J3, Polos 5mm ex. Alexindo/setara 0.33%9 Pek. Daun Jendela J4, Polos 5mm ex. Alexindo/setara 0.33%
10 Pintu Kamar Mandi 0.33%Sub Total VI 11.22%
VII PEKERJAAN ATAP DAN PLAFOND1 Rangka Atap Galvalum ex. EKG/setara 4.93%2 Penutup Atap Genteng Beton ex. Varia/setara 4.27%3 Bubungan ex. Varia/setara 0.32%4 Siku Atap ex. Varia/setara 0.99%5 Woodplank 20 cm + Cat ex. Elephant/setara 0.91%6 Waterprofing Atap Dak Beton ex. Propan/setara 0.35%7 Plafond Gypsum Board 9 mm ex. Jayaboard/setara 1.61%8 Plafond Kalsiboard 9 mm ex. Jayaboard/setara 0.60%9 Listprofil Plafond ex. Taiwan/setara 0.54%
10 Pengecatan Plafond ex. Catylac/setara 0.84%Sub Total VII 15.34%
VIII PEKERJAAN PENUTUP LANTAI1 Urugan Pasir Bawah Lantai T. 2 cm 0.13%2 Pasang Granite Tile 60/60 ex China/setara 4.14%3 Pasang Plint Granite Tile 10/60 ex. Brada/setara 4.76%4 Pasang Granite Tile Teras 60/60 ex China/setara 0.63%5 Pasang Keramik 40/40 KM ex Roman/setara 0.23%6 Keramik Dinding KM/WC 20/40 cm KM ex. Roman/setara 1.06%
10.95%
2
BOBOT MGG INI
0.00%0.00%0.00%0.00%0.00%0.00%
0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
0.00%0.00%0.00%0.00%0.00%0.00%0.00%
-
Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI
NO URAIAN PEKERJAAN BOBOT
IX PEKERJAAN INSTALASI LISTRIK1 Instalasi Listrik Kabel NYY ex. Eterna/setara 5.43%2 Pasang Lampu SL Fitting Standart ex. Panasonic/setara 0.18%3 Lampu Barret ex. China/setara 0.18%4 Saklar Ganda ex. Panasonic/setara 0.07%5 Saklar Tunggal ex. Panasonic/setara 0.07%6 Pasang Stop Kontak ex. Panasonic/setara 0.20%7 Pasang Stop Kontak AC ex. Panasonic/setara 0.28%8 Pasang Saluran TV ex. Panasonic/setara 0.31%9 MCB ex. MG/setara 0.13%
10 Pemasangan Kabel Power PLN 0.54%11 Ground 0.17%
Sub Total IX 7.56%X PEKERJAAN PLUMBING DAN SANITASI
1 Instalasi Air Bersih PVC 3/4" Type AW ex. Wavin/setara 0.23%2 Pipa Saluran Air Buangan PVC 3" D ex. Wavin/setara 0.32%3 Pipa Saluran Limbah WC PVC 4" D ex. Wavin/setara 0.22%4 Bak Kontrol + Tutup 0.24%5 Septictank + Resapan 1.77%6 Closed Duduk + Jet Washer ex. Toto/setara 1.57%7 Kran Dinding ex. Taiwan/setara 0.03%8 Shower ex. Lokal/setara 0.24%9 Tandon Beton + Keramik dan Tutup uk. 1 m3 0.82%
10 Floor Drain ex Lokal/setara 0.19%Sub Total X 5.63%
XI PEKERJAAN LAIN-LAIN1 Rabatan Carport + Batu Sikat 0.72%2 Pas. Batu Alam Palimanan 2.79%3 Pagar Belakang (t = 1,8 m) 1.99%4 Pagar Samping (t = 1 m) 1.35%5 Pengeboran Air Sumur + Pipa (t = 8 m) 0.99%6 Pompa Shimitzu + Acc. + Rumah Pompa 1.14%7 Pembersihan Akhir 0.10%
Sub Total XI 9.08%
Total Biaya (A)PEMBULATAN 100.00%Harga Per m2 Tipe 70
2
BOBOT MGG INI
0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
0.00%
-
Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI
NO URAIAN PEKERJAAN BOBOT
Diperiksa Oleh,PT. Adhi Persada Properti
KuscahyonoConstruction Manager
2
BOBOT MGG INI
Sidoarjo, 22 Agustus 2015
PT. Yofa Bangun Abadi
Project Manager
-
Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI
NO URAIAN PEKERJAAN BOBOT
I PEKERJAAN PERSIAPAN1 Persiapan Lokasi 0.47%2 Uitzet / Pasang Bouwplank 0.45%3 Air Kerja/Listrik Kerja 0.46%
Sub Total I 1.39%II PEKERJAAN TANAH
1 Galian Tanah Pondasi 0.70%2 Urugan Tanah Kembali 0.06%3 Pembuangan Tanah 0.46%4 Lantai Kerja T. 5 cm 0.18%
Sub Total II 1.41%III PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps 7.02%2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps 0.19%
Sub Total III 7.21%IV PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps 2.65%2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps 0.00%3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 2.30%4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps 0.51%5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps 0.14%6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 0.40%7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 0.59%8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps 1.99%
Sub Total IV 8.58%V PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps 9.77%2 Plesteran Dinding 1 Pc : 6 Ps 4.64%3 Pekerjaan Benangan 0.91%4 Acian Dinding Bang. Utama 3.00%5 Pengecatan Dinding Dalam ex. Catylac/setara 1.99%6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara 1.32%
Sub Total V 21.63%VI PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara 1.52%2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara 2.16%3 Kusen Alluminium + Seaalant ex. Alexindo/setara 5.00%4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara 0.44%5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara 0.44%
2
100.00%100.00%
5.00%
100.00%100.00%
0.00%100.00%
100.00%0.00%
0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
0.00%0.00%0.00%0.00%0.00%0.00%
0.00%0.00%0.00%0.00%0.00%
PERSETASE S/D MGG INI
-
Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI
NO URAIAN PEKERJAAN BOBOT
6 Pek. Daun Jendela J1, Polos 5mm ex. Alexindo/setara 0.33%7 Pek. Daun Jendela J2, Polos 5mm ex. Alexindo/setara 0.33%8 Pek. Daun Jendela J3, Polos 5mm ex. Alexindo/setara 0.33%9 Pek. Daun Jendela J4, Polos 5mm ex. Alexindo/setara 0.33%
10 Pintu Kamar Mandi 0.33%Sub Total VI 11.22%
VII PEKERJAAN ATAP DAN PLAFOND1 Rangka Atap Galvalum ex. EKG/setara 4.93%2 Penutup Atap Genteng Beton ex. Varia/setara 4.27%3 Bubungan ex. Varia/setara 0.32%4 Siku Atap ex. Varia/setara 0.99%5 Woodplank 20 cm + Cat ex. Elephant/setara 0.91%6 Waterprofing Atap Dak Beton ex. Propan/setara 0.35%7 Plafond Gypsum Board 9 mm ex. Jayaboard/setara 1.61%8 Plafond Kalsiboard 9 mm ex. Jayaboard/setara 0.60%9 Listprofil Plafond ex. Taiwan/setara 0.54%
10 Pengecatan Plafond ex. Catylac/setara 0.84%Sub Total VII 15.34%
VIII PEKERJAAN PENUTUP LANTAI1 Urugan Pasir Bawah Lantai T. 2 cm 0.13%2 Pasang Granite Tile 60/60 ex China/setara 4.14%3 Pasang Plint Granite Tile 10/60 ex. Brada/setara 4.76%4 Pasang Granite Tile Teras 60/60 ex China/setara 0.63%5 Pasang Keramik 40/40 KM ex Roman/setara 0.23%6 Keramik Dinding KM/WC 20/40 cm KM ex. Roman/setara 1.06%
10.95%
2
PERSETASE S/D MGG INI
0.00%0.00%0.00%0.00%0.00%
0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
0.00%0.00%0.00%0.00%0.00%0.00%
-
Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI
NO URAIAN PEKERJAAN BOBOT
IX PEKERJAAN INSTALASI LISTRIK1 Instalasi Listrik Kabel NYY ex. Eterna/setara 5.43%2 Pasang Lampu SL Fitting Standart ex. Panasonic/setara 0.18%3 Lampu Barret ex. China/setara 0.18%4 Saklar Ganda ex. Panasonic/setara 0.07%5 Saklar Tunggal ex. Panasonic/setara 0.07%6 Pasang Stop Kontak ex. Panasonic/setara 0.20%7 Pasang Stop Kontak AC ex. Panasonic/setara 0.28%8 Pasang Saluran TV ex. Panasonic/setara 0.31%9 MCB ex. MG/setara 0.13%
10 Pemasangan Kabel Power PLN 0.54%11 Ground 0.17%
Sub Total IX 7.56%X PEKERJAAN PLUMBING DAN SANITASI
1 Instalasi Air Bersih PVC 3/4" Type AW ex. Wavin/setara 0.23%2 Pipa Saluran Air Buangan PVC 3" D ex. Wavin/setara 0.32%3 Pipa Saluran Limbah WC PVC 4" D ex. Wavin/setara 0.22%4 Bak Kontrol + Tutup 0.24%5 Septictank + Resapan 1.77%6 Closed Duduk + Jet Washer ex. Toto/setara 1.57%7 Kran Dinding ex. Taiwan/setara 0.03%8 Shower ex. Lokal/setara 0.24%9 Tandon Beton + Keramik dan Tutup uk. 1 m3 0.82%
10 Floor Drain ex Lokal/setara 0.19%Sub Total X 5.63%
XI PEKERJAAN LAIN-LAIN1 Rabatan Carport + Batu Sikat 0.72%2 Pas. Batu Alam Palimanan 2.79%3 Pagar Belakang (t = 1,8 m) 1.99%4 Pagar Samping (t = 1 m) 1.35%5 Pengeboran Air Sumur + Pipa (t = 8 m) 0.99%6 Pompa Shimitzu + Acc. + Rumah Pompa 1.14%7 Pembersihan Akhir 0.10%
Sub Total XI 9.08%
Total Biaya (A)PEMBULATAN 100.00%Harga Per m2 Tipe 70
2
PERSETASE S/D MGG INI
0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
0.00%0.00%5.00%0.00%0.00%0.00%0.00%
-
Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI
NO URAIAN PEKERJAAN BOBOT
Diperiksa Oleh,PT. Adhi Persada Properti
KuscahyonoConstruction Manager
2
PERSETASE S/D MGG INI
Sidoarjo, 22 Agustus 2015Dibuat Oleh,
PT. Yofa Bangun Abadi
Mas Dedi P.Project Manager
-
Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI
NO URAIAN PEKERJAAN BOBOT
I PEKERJAAN PERSIAPAN1 Persiapan Lokasi 0.47%2 Uitzet / Pasang Bouwplank 0.45%3 Air Kerja/Listrik Kerja 0.46%
Sub Total I 1.39%II PEKERJAAN TANAH
1 Galian Tanah Pondasi 0.70%2 Urugan Tanah Kembali 0.06%3 Pembuangan Tanah 0.46%4 Lantai Kerja T. 5 cm 0.18%
Sub Total II 1.41%III PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps 7.02%2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps 0.19%
Sub Total III 7.21%IV PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps 2.65%2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps 0.00%3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 2.30%4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps 0.51%5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps 0.14%6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 0.40%7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 0.59%8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps 1.99%
Sub Total IV 8.58%V PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps 9.77%2 Plesteran Dinding 1 Pc : 6 Ps 4.64%3 Pekerjaan Benangan 0.91%4 Acian Dinding Bang. Utama 3.00%5 Pengecatan Dinding Dalam ex. Catylac/setara 1.99%6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara 1.32%
Sub Total V 21.63%VI PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara 1.52%2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara 2.16%3 Kusen Alluminium + Seaalant ex. Alexindo/setara 5.00%4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara 0.44%5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara 0.44%
2
0.47%0.45%0.02%0.95%
0.70%0.06%0.00%0.18%0.94%
7.02%0.00%7.02%
0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
0.00%0.00%0.00%0.00%0.00%0.00%0.00%
0.00%0.00%0.00%0.00%0.00%
BOBOT S/D MGG INI
-
Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI
NO URAIAN PEKERJAAN BOBOT
6 Pek. Daun Jendela J1, Polos 5mm ex. Alexindo/setara 0.33%7 Pek. Daun Jendela J2, Polos 5mm ex. Alexindo/setara 0.33%8 Pek. Daun Jendela J3, Polos 5mm ex. Alexindo/setara 0.33%9 Pek. Daun Jendela J4, Polos 5mm ex. Alexindo/setara 0.33%
10 Pintu Kamar Mandi 0.33%Sub Total VI 11.22%
VII PEKERJAAN ATAP DAN PLAFOND1 Rangka Atap Galvalum ex. EKG/setara 4.93%2 Penutup Atap Genteng Beton ex. Varia/setara 4.27%3 Bubungan ex. Varia/setara 0.32%4 Siku Atap ex. Varia/setara 0.99%5 Woodplank 20 cm + Cat ex. Elephant/setara 0.91%6 Waterprofing Atap Dak Beton ex. Propan/setara 0.35%7 Plafond Gypsum Board 9 mm ex. Jayaboard/setara 1.61%8 Plafond Kalsiboard 9 mm ex. Jayaboard/setara 0.60%9 Listprofil Plafond ex. Taiwan/setara 0.54%
10 Pengecatan Plafond ex. Catylac/setara 0.84%Sub Total VII 15.34%
VIII PEKERJAAN PENUTUP LANTAI1 Urugan Pasir Bawah Lantai T. 2 cm 0.13%2 Pasang Granite Tile 60/60 ex China/setara 4.14%3 Pasang Plint Granite Tile 10/60 ex. Brada/setara 4.76%4 Pasang Granite Tile Teras 60/60 ex China/setara 0.63%5 Pasang Keramik 40/40 KM ex Roman/setara 0.23%6 Keramik Dinding KM/WC 20/40 cm KM ex. Roman/setara 1.06%
10.95%
2
BOBOT S/D MGG INI
0.00%0.00%0.00%0.00%0.00%0.00%
0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
0.00%0.00%0.00%0.00%0.00%0.00%0.00%
-
Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI
NO URAIAN PEKERJAAN BOBOT
IX PEKERJAAN INSTALASI LISTRIK1 Instalasi Listrik Kabel NYY ex. Eterna/setara 5.43%2 Pasang Lampu SL Fitting Standart ex. Panasonic/setara 0.18%3 Lampu Barret ex. China/setara 0.18%4 Saklar Ganda ex. Panasonic/setara 0.07%5 Saklar Tunggal ex. Panasonic/setara 0.07%6 Pasang Stop Kontak ex. Panasonic/setara 0.20%7 Pasang Stop Kontak AC ex. Panasonic/setara 0.28%8 Pasang Saluran TV ex. Panasonic/setara 0.31%9 MCB ex. MG/setara 0.13%
10 Pemasangan Kabel Power PLN 0.54%11 Ground 0.17%
Sub Total IX 7.56%X PEKERJAAN PLUMBING DAN SANITASI
1 Instalasi Air Bersih PVC 3/4" Type AW ex. Wavin/setara 0.23%2 Pipa Saluran Air Buangan PVC 3" D ex. Wavin/setara 0.32%3 Pipa Saluran Limbah WC PVC 4" D ex. Wavin/setara 0.22%4 Bak Kontrol + Tutup 0.24%5 Septictank + Resapan 1.77%6 Closed Duduk + Jet Washer ex. Toto/setara 1.57%7 Kran Dinding ex. Taiwan/setara 0.03%8 Shower ex. Lokal/setara 0.24%9 Tandon Beton + Keramik dan Tutup uk. 1 m3 0.82%
10 Floor Drain ex Lokal/setara 0.19%Sub Total X 5.63%
XI PEKERJAAN LAIN-LAIN1 Rabatan Carport + Batu Sikat 0.72%2 Pas. Batu Alam Palimanan 2.79%3 Pagar Belakang (t = 1,8 m) 1.99%4 Pagar Samping (t = 1 m) 1.35%5 Pengeboran Air Sumur + Pipa (t = 8 m) 0.99%6 Pompa Shimitzu + Acc. + Rumah Pompa 1.14%7 Pembersihan Akhir 0.10%
Sub Total XI 9.08%
Total Biaya (A)PEMBULATAN 100.00%Harga Per m2 Tipe 70
2
BOBOT S/D MGG INI
0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
0.00%0.00%0.10%0.00%0.00%0.00%0.00%0.10%
9.01%
-
Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI
NO URAIAN PEKERJAAN BOBOT
Diperiksa Oleh,PT. Adhi Persada Properti
KuscahyonoConstruction Manager
2
BOBOT S/D MGG INI
Sidoarjo, 22 Agustus 2015
PT. Yofa Bangun Abadi
Project Manager
-
Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI
NO URAIAN PEKERJAAN BOBOT
I PEKERJAAN PERSIAPAN1 Persiapan Lokasi 0.47%2 Uitzet / Pasang Bouwplank 0.45%3 Air Kerja/Listrik Kerja 0.46%
Sub Total I 1.39%II PEKERJAAN TANAH
1 Galian Tanah Pondasi 0.70%2 Urugan Tanah Kembali 0.06%3 Pembuangan Tanah 0.46%4 Lantai Kerja T. 5 cm 0.18%
Sub Total II 1.41%III PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps 7.02%2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps 0.19%
Sub Total III 7.21%IV PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps 2.65%2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps 0.00%3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 2.30%4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps 0.51%5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps 0.14%6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 0.40%7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 0.59%8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps 1.99%
Sub Total IV 8.58%V PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps 9.77%2 Plesteran Dinding 1 Pc : 6 Ps 4.64%3 Pekerjaan Benangan 0.91%4 Acian Dinding Bang. Utama 3.00%5 Pengecatan Dinding Dalam ex. Catylac/setara 1.99%6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara 1.32%
Sub Total V 21.63%VI PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara 1.52%2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara 2.16%3 Kusen Alluminium + Seaalant ex. Alexindo/setara 5.00%4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara 0.44%5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara 0.44%
No.
100.00%100.00%
5.00%
100.00%100.00%
0.00%100.00%
100.00%0.00%
0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
0.00%0.00%0.00%0.00%0.00%0.00%
0.00%0.00%0.00%0.00%0.00%
PERSETASE MGG LALU
-
Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI
NO URAIAN PEKERJAAN BOBOT
6 Pek. Daun Jendela J1, Polos 5mm ex. Alexindo/setara 0.33%7 Pek. Daun Jendela J2, Polos 5mm ex. Alexindo/setara 0.33%8 Pek. Daun Jendela J3, Polos 5mm ex. Alexindo/setara 0.33%9 Pek. Daun Jendela J4, Polos 5mm ex. Alexindo/setara 0.33%
10 Pintu Kamar Mandi 0.33%Sub Total VI 11.22%
VII PEKERJAAN ATAP DAN PLAFOND1 Rangka Atap Galvalum ex. EKG/setara 4.93%2 Penutup Atap Genteng Beton ex. Varia/setara 4.27%3 Bubungan ex. Varia/setara 0.32%4 Siku Atap ex. Varia/setara 0.99%5 Woodplank 20 cm + Cat ex. Elephant/setara 0.91%6 Waterprofing Atap Dak Beton ex. Propan/setara 0.35%7 Plafond Gypsum Board 9 mm ex. Jayaboard/setara 1.61%8 Plafond Kalsiboard 9 mm ex. Jayaboard/setara 0.60%9 Listprofil Plafond ex. Taiwan/setara 0.54%
10 Pengecatan Plafond ex. Catylac/setara 0.84%Sub Total VII 15.34%
VIII PEKERJAAN PENUTUP LANTAI1 Urugan Pasir Bawah Lantai T. 2 cm 0.13%2 Pasang Granite Tile 60/60 ex China/setara 4.14%3 Pasang Plint Granite Tile 10/60 ex. Brada/setara 4.76%4 Pasang Granite Tile Teras 60/60 ex China/setara 0.63%5 Pasang Keramik 40/40 KM ex Roman/setara 0.23%6 Keramik Dinding KM/WC 20/40 cm KM ex. Roman/setara 1.06%
10.95%
No.
PERSETASE MGG LALU
0.00%0.00%0.00%0.00%0.00%
0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
0.00%0.00%0.00%0.00%0.00%0.00%
-
Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI
NO URAIAN PEKERJAAN BOBOT
IX PEKERJAAN INSTALASI LISTRIK1 Instalasi Listrik Kabel NYY ex. Eterna/setara 5.43%2 Pasang Lampu SL Fitting Standart ex. Panasonic/setara 0.18%3 Lampu Barret ex. China/setara 0.18%4 Saklar Ganda ex. Panasonic/setara 0.07%5 Saklar Tunggal ex. Panasonic/setara 0.07%6 Pasang Stop Kontak ex. Panasonic/setara 0.20%7 Pasang Stop Kontak AC ex. Panasonic/setara 0.28%8 Pasang Saluran TV ex. Panasonic/setara 0.31%9 MCB ex. MG/setara 0.13%
10 Pemasangan Kabel Power PLN 0.54%11 Ground 0.17%
Sub Total IX 7.56%X PEKERJAAN PLUMBING DAN SANITASI
1 Instalasi Air Bersih PVC 3/4" Type AW ex. Wavin/setara 0.23%2 Pipa Saluran Air Buangan PVC 3" D ex. Wavin/setara 0.32%3 Pipa Saluran Limbah WC PVC 4" D ex. Wavin/setara 0.22%4 Bak Kontrol + Tutup 0.24%5 Septictank + Resapan 1.77%6 Closed Duduk + Jet Washer ex. Toto/setara 1.57%7 Kran Dinding ex. Taiwan/setara 0.03%8 Shower ex. Lokal/setara 0.24%9 Tandon Beton + Keramik dan Tutup uk. 1 m3 0.82%
10 Floor Drain ex Lokal/setara 0.19%Sub Total X 5.63%
XI PEKERJAAN LAIN-LAIN1 Rabatan Carport + Batu Sikat 0.72%2 Pas. Batu Alam Palimanan 2.79%3 Pagar Belakang (t = 1,8 m) 1.99%4 Pagar Samping (t = 1 m) 1.35%5 Pengeboran Air Sumur + Pipa (t = 8 m) 0.99%6 Pompa Shimitzu + Acc. + Rumah Pompa 1.14%7 Pembersihan Akhir 0.10%
Sub Total XI 9.08%
Total Biaya (A)PEMBULATAN 100.00%Harga Per m2 Tipe 70
No.
PERSETASE MGG LALU
0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
0.00%0.00%5.00%0.00%0.00%0.00%0.00%
-
Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI
NO URAIAN PEKERJAAN BOBOT
Diperiksa Oleh,PT. Adhi Persada Properti
KuscahyonoConstruction Manager
No.
PERSETASE MGG LALU
-
Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI
NO URAIAN PEKERJAAN BOBOT
I PEKERJAAN PERSIAPAN1 Persiapan Lokasi 0.47%2 Uitzet / Pasang Bouwplank 0.45%3 Air Kerja/Listrik Kerja 0.46%
Sub Total I 1.39%II PEKERJAAN TANAH
1 Galian Tanah Pondasi 0.70%2 Urugan Tanah Kembali 0.06%3 Pembuangan Tanah 0.46%4 Lantai Kerja T. 5 cm 0.18%
Sub Total II 1.41%III PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps 7.02%2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps 0.19%
Sub Total III 7.21%IV PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps 2.65%2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps 0.00%3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 2.30%4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps 0.51%5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps 0.14%6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 0.40%7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 0.59%8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps 1.99%
Sub Total IV 8.58%V PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps 9.77%2 Plesteran Dinding 1 Pc : 6 Ps 4.64%3 Pekerjaan Benangan 0.91%4 Acian Dinding Bang. Utama 3.00%5 Pengecatan Dinding Dalam ex. Catylac/setara 1.99%6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara 1.32%
Sub Total V 21.63%VI PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara 1.52%2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara 2.16%3 Kusen Alluminium + Seaalant ex. Alexindo/setara 5.00%4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara 0.44%5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara 0.44%
No.
0.47%0.45%0.02%0.95%
0.70%0.06%0.00%0.18%0.94%
7.02%0.00%7.02%
0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
0.00%0.00%0.00%0.00%0.00%0.00%0.00%
0.00%0.00%0.00%0.00%0.00%
BOBOT MGG LALU
-
Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI
NO URAIAN PEKERJAAN BOBOT
6 Pek. Daun Jendela J1, Polos 5mm ex. Alexindo/setara 0.33%7 Pek. Daun Jendela J2, Polos 5mm ex. Alexindo/setara 0.33%8 Pek. Daun Jendela J3, Polos 5mm ex. Alexindo/setara 0.33%9 Pek. Daun Jendela J4, Polos 5mm ex. Alexindo/setara 0.33%
10 Pintu Kamar Mandi 0.33%Sub Total VI 11.22%
VII PEKERJAAN ATAP DAN PLAFOND1 Rangka Atap Galvalum ex. EKG/setara 4.93%2 Penutup Atap Genteng Beton ex. Varia/setara 4.27%3 Bubungan ex. Varia/setara 0.32%4 Siku Atap ex. Varia/setara 0.99%5 Woodplank 20 cm + Cat ex. Elephant/setara 0.91%6 Waterprofing Atap Dak Beton ex. Propan/setara 0.35%7 Plafond Gypsum Board 9 mm ex. Jayaboard/setara 1.61%8 Plafond Kalsiboard 9 mm ex. Jayaboard/setara 0.60%9 Listprofil Plafond ex. Taiwan/setara 0.54%
10 Pengecatan Plafond ex. Catylac/setara 0.84%Sub Total VII 15.34%
VIII PEKERJAAN PENUTUP LANTAI1 Urugan Pasir Bawah Lantai T. 2 cm 0.13%2 Pasang Granite Tile 60/60 ex China/setara 4.14%3 Pasang Plint Granite Tile 10/60 ex. Brada/setara 4.76%4 Pasang Granite Tile Teras 60/60 ex China/setara 0.63%5 Pasang Keramik 40/40 KM ex Roman/setara 0.23%6 Keramik Dinding KM/WC 20/40 cm KM ex. Roman/setara 1.06%
10.95%
No.
BOBOT MGG LALU
0.00%0.00%0.00%0.00%0.00%0.00%
0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
0.00%0.00%0.00%0.00%0.00%0.00%0.00%
-
Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI
NO URAIAN PEKERJAAN BOBOT
IX PEKERJAAN INSTALASI LISTRIK1 Instalasi Listrik Kabel NYY ex. Eterna/setara 5.43%2 Pasang Lampu SL Fitting Standart ex. Panasonic/setara 0.18%3 Lampu Barret ex. China/setara 0.18%4 Saklar Ganda ex. Panasonic/setara 0.07%5 Saklar Tunggal ex. Panasonic/setara 0.07%6 Pasang Stop Kontak ex. Panasonic/setara 0.20%7 Pasang Stop Kontak AC ex. Panasonic/setara 0.28%8 Pasang Saluran TV ex. Panasonic/setara 0.31%9 MCB ex. MG/setara 0.13%
10 Pemasangan Kabel Power PLN 0.54%11 Ground 0.17%
Sub Total IX 7.56%X PEKERJAAN PLUMBING DAN SANITASI
1 Instalasi Air Bersih PVC 3/4" Type AW ex. Wavin/setara 0.23%2 Pipa Saluran Air Buangan PVC 3" D ex. Wavin/setara 0.32%3 Pipa Saluran Limbah WC PVC 4" D ex. Wavin/setara 0.22%4 Bak Kontrol + Tutup 0.24%5 Septictank + Resapan 1.77%6 Closed Duduk + Jet Washer ex. Toto/setara 1.57%7 Kran Dinding ex. Taiwan/setara 0.03%8 Shower ex. Lokal/setara 0.24%9 Tandon Beton + Keramik dan Tutup uk. 1 m3 0.82%
10 Floor Drain ex Lokal/setara 0.19%Sub Total X 5.63%
XI PEKERJAAN LAIN-LAIN1 Rabatan Carport + Batu Sikat 0.72%2 Pas. Batu Alam Palimanan 2.79%3 Pagar Belakang (t = 1,8 m) 1.99%4 Pagar Samping (t = 1 m) 1.35%5 Pengeboran Air Sumur + Pipa (t = 8 m) 0.99%6 Pompa Shimitzu + Acc. + Rumah Pompa 1.14%7 Pembersihan Akhir 0.10%
Sub Total XI 9.08%
Total Biaya (A)PEMBULATAN 100.00%Harga Per m2 Tipe 70
No.
BOBOT MGG LALU
0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
0.00%0.00%0.10%0.00%0.00%0.00%0.00%0.10%
9.01%
-
Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI
NO URAIAN PEKERJAAN BOBOT
Diperiksa Oleh,PT. Adhi Persada Properti
KuscahyonoConstruction Manager
No.
BOBOT MGG LALU
-
Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI
NO URAIAN PEKERJAAN BOBOT
I PEKERJAAN PERSIAPAN1 Persiapan Lokasi 0.47%2 Uitzet / Pasang Bouwplank 0.45%3 Air Kerja/Listrik Kerja 0.46%
Sub Total I 1.39%II PEKERJAAN TANAH
1 Galian Tanah Pondasi 0.70%2 Urugan Tanah Kembali 0.06%3 Pembuangan Tanah 0.46%4 Lantai Kerja T. 5 cm 0.18%
Sub Total II 1.41%III PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps 7.02%2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps 0.19%
Sub Total III 7.21%IV PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps 2.65%2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps 0.00%3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 2.30%4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps 0.51%5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps 0.14%6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 0.40%7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps 0.59%8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps 1.99%
Sub Total IV 8.58%V PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps 9.77%2 Plesteran Dinding 1 Pc : 6 Ps 4.64%3 Pekerjaan Benangan 0.91%4 Acian Dinding Bang. Utama 3.00%5 Pengecatan Dinding Dalam ex. Catylac/setara 1.99%6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara 1.32%
Sub Total V 21.63%VI PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara 1.52%2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara 2.16%3 Kusen Alluminium + Seaalant ex. Alexindo/setara 5.00%4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara 0.44%5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara 0.44%
No.
0.00%0.00%0.00%
0.00%0.00%0.00%0.00%
0.00%0.00%
10.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
2.50%0.00%0.00%0.00%0.00%0.00%
0.00%0.00%0.00%0.00%0.00%
PERSETASE MGG INI
-
Kontraktor : PT. YOFA BANGUN ABADINama Proyek : RUMAH TIPE 36 / 91, CLUSTER ANJASMORO, BLOK A.11Lokasi : PERUMAHAN THE TAMAN DHIKA SIDOARJO KOTAPemilik : PT. ADHI PERSADA PROPERTI
NO URAIAN PEKERJAAN BOBOT
6 Pek. Daun Jendela J1, Polos 5mm ex. Alexindo/setara 0.33%7 Pek. Daun Jendela J2, Polos 5mm ex. Alexindo/setara 0.33%8 Pek. Daun