Download - CIREBON A3-1

Transcript
Page 1: CIREBON A3-1

7/17/2019 CIREBON A3-1

http://slidepdf.com/reader/full/cirebon-a3-1 1/1

GAMBAR YANG ADA PADA SETIAP LEMBAR

JANGAN DIUKUR DENGAN PENGGARIS, IKUTI

UKURAN YANG TERCANTUM DALAM GAMBAR.

 APABILA ADA PERBEDAAN UKURAN ANTARA

UKURAN DIGAMBAR DENGAN DILAPANGAN

HARAP DIKONFIRMASI TERLEBIH DAHULU

KEPADA TEAM PROJECT VHS KAI.

GAMBAR AS BUILT DRAWING INI DIBUAT

SEBAGAI DOKUMEN KERJA AGAR MEM-

PERMUDAH PEKERJAAN DILAPANGAN

 APABILA TERJADI PERBAIKAN ATAU

PEMBONGKARAN DI LOKASI.

SCALE :

NUMBERDRAWING TITLE :

PROJECT :

LOCATION :

PT POST ENERGY INDONESIAPermata Building, 8th floor, Suite 0801

 Jl. MH. Thamrin no 57, Jakarta 10350, IndonesiaTELP: +62 (21) 3907919 FAX: +62 (21) 3908382

SIZE IN :

DATE :

DRAWN BY :

CHECKED APPROVED

DATE : DATE :

PT PERTAMINA PATRA NIAGAGedung Wisma Tugu II Lt. 2

 Jl. HR. Rasuna Said Kav. C7-9 Setiabudi, Kuningan, Jakarta Selatan

TELP: +62 (21) 5209009 FAX: +62 (21) 5209005

CHECKED APPROVED

DATE : DATE :

PT KERETA API INDONESIA

 Jalan Perintis Kemerdekaan No.1, Bandung, West Java 40117TELP: +62 (22) 4230031 FAX: +62 (22) 42083342

CHECKED APPROVED

DATE : DATE :

PERTAMINAPATRA NIAGA

PT.KERETA APIINDONESIA (PERSERO)

KERETA API

BALL VALVE

STRAINER

FLOW METER (Tokico)

GATE VALVE

PUMP

REDUCER

FLANGE

LEGEND :

PEI PIPE

KAI PIPE

HIDDEN PEI PIPE

HIDDEN KAI PIPE

NOTE :

TEE

ELBOW

CHECK VALVE

Tk

CIREBON

VHS KAI

LAYOUT03

01

AS BUILT DRAWING

DIPO LOK CIREBON

 YUSRON

SKALA BATANG

20 JUNI 2014MILIMETER

LAYOUT DIPO LOK CIREBON