1 DAFTAR HARGA SATUAN PEKERJAAN PROYEK : SOLIA BOUTIQUE HOTEL LOKASI : JL. DR. RAJIMAN 525 LAWEYAN-SURAKARTA PEKERJAAN : STRUKTURE-ARSITEKTURE-MEP NO URAIAN PEKERJAAN SAT HARGA SATUAN (Rp) HARGA SATUAN PEKERJAAN PERSIAPAN LS 480,000,000.00 HARGA SATUAN PEKERJAAN STRUKTURE 1 Pekerjaan balok beton 965,250.00 besi (Material Besi SBO) kg 1,500.00 115,000.00 2 Pekerjaan kolom beton 1,015,250.00 besi (Material Besi SBO) kg 1,500.00 bekesting 115,000.00 3 Pekerjaan plat beton 965,250.00 besi (material besi SBO) kg 1,500.00 bekesting 115,000.00 4 Pekerjaan tangga beton 965,250.00

Upload: others

Post on 31-Oct-2020

22 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: DAFTAR HARGA SATUAN PEKERJAANrepository.untag-sby.ac.id/4287/121/LAMPIRAN.pdf · DAFTAR HARGA SATUAN PEKERJAAN PROYEK : SOLIA BOUTIQUE HOTEL LOKASI : JL. DR. RAJIMAN 525 LAWEYAN-SURAKARTA

1

DAFTAR HARGA SATUAN PEKERJAAN PROYEK : SOLIA BOUTIQUE HOTEL

LOKASI : JL. DR. RAJIMAN 525 LAWEYAN-SURAKARTA

PEKERJAAN : STRUKTURE-ARSITEKTURE-MEP

NO URAIAN PEKERJAAN SAT HARGA

SATUAN (Rp)

HARGA SATUAN PEKERJAAN PERSIAPAN LS 480,000,000.00

HARGA SATUAN PEKERJAAN STRUKTURE 1 Pekerjaan balok

beton m³ 965,250.00

besi (Material Besi SBO) kg 1,500.00

m² 115,000.00

2 Pekerjaan kolom beton m³ 1,015,250.00

besi (Material Besi SBO) kg 1,500.00

bekesting m² 115,000.00

3 Pekerjaan plat beton m³ 965,250.00

besi (material besi SBO) kg 1,500.00

bekesting m² 115,000.00

4 Pekerjaan tangga

beton m³ 965,250.00

Page 2: DAFTAR HARGA SATUAN PEKERJAANrepository.untag-sby.ac.id/4287/121/LAMPIRAN.pdf · DAFTAR HARGA SATUAN PEKERJAAN PROYEK : SOLIA BOUTIQUE HOTEL LOKASI : JL. DR. RAJIMAN 525 LAWEYAN-SURAKARTA

2

besi (material besi SBO) kg 1,500.00

bekesting m² 115,000.00

5 Pekerjaan shearwall beton m³ 1,015,250.00

besi (material besi SBO) kg 1,500.00

bekesting m² 115,000.00

6 Pekerjaan Atap Galvalum

Pekerjaan IWF (Material WF SBO) m2 246,972.00

Penutup Atap Galvalum m2 145,000.00

HARGA SATUAN PEKERJAAN PASANGAN DINDING

1 Pasangan dinding bata trassram m² 120,000.00

2 Pasangan dinding bata m² 105,000.00

HARGA SATUAN PEKERJAAN FINISHING DINDING

1 Plesteran dinding bata trassram m² 47,510.00

2 Plesteran dinding bata m² 38,224.20

3 Acian dinding bata m² 23,153.40

4 Finish Keramik dinding L-1 m² 114,660.00

5 Finishing Keramik dinding toilet m² 154,123.00

6 Keramik dinding Kitchen m² 124,660.00

7 Pekerjaan pengecatan dinding m² 23,746.20

8 Marmer Lift m² 750,000.00

HARGA SATUAN PEKERJAAN PINTU DAN JENDELA

1 D2 unit 2,198,500.00

Page 3: DAFTAR HARGA SATUAN PEKERJAANrepository.untag-sby.ac.id/4287/121/LAMPIRAN.pdf · DAFTAR HARGA SATUAN PEKERJAAN PROYEK : SOLIA BOUTIQUE HOTEL LOKASI : JL. DR. RAJIMAN 525 LAWEYAN-SURAKARTA

3

2 D7 unit 10,890,700.00

3 D14 unit 4,417,100.00

4 D15 unit 11,843,200.00

5 D16 unit 5,277,100.00

6 W1 unit 3,975,600.00

7 D4 unit 10,052,500.00

8 D6 unit 3,850,800.00

9 D8 unit 3,609,300.00

10 D9 unit 2,724,200.00

11 D10 unit 2,757,700.00

12 D14 unit 4,417,100.00

13 D17 unit 10,890,700.00

14 D18 unit 4,077,300.00

15 D20 unit 2,979,000.00

16 DW1 unit 44,828,900.00

17 DW2 unit 40,727,100.00

18 CW1 m2 1,150,050.00

19 CW2 m2 1,150,050.00

20 CW3 m2 1,150,050.00

21 Pintu & Jendela Kaca Ballroom unit 31,963,400.00

22 Pintu & Jendela Kaca Prefunction unit 27,914,000.00

23 D12 unit 5,949,400.00

24 D18 unit 4,077,300.00

HARGA SATUAN PEKERJAAN PLAFOND

1 Ceiling Gypsum Board 9 mm m² 81,909.00

2 Cat plafond m² 18,150.00

3 Shadow line. m² 16,701.00

Page 4: DAFTAR HARGA SATUAN PEKERJAANrepository.untag-sby.ac.id/4287/121/LAMPIRAN.pdf · DAFTAR HARGA SATUAN PEKERJAAN PROYEK : SOLIA BOUTIQUE HOTEL LOKASI : JL. DR. RAJIMAN 525 LAWEYAN-SURAKARTA

4

HARGA SATUAN PEKERJAAN LANTAI

1 Keramik Roman 40x40 m² 155,000.00

2 Homogeneus Tile Area Public 60x60 m² 203,500.00

3 Marmer Area Lobby m² 824,700.00

4 Karpet Vynil beserta lantai kerja m² 310,000.00

5 Keramik Kamar Mandi m² 203,500.00

6 Floor Hardener m² 27,500.00

7 Karpet Tile beserta lantai kerja m² 363,774.00

8 Plint m' 40,051.00

9 Waterproofing m² 37,370.00

10 Dek kolam renang beserta lantai kerja m² 874,240.00

HARGA SATUAN PEKERJAAN RAILING

1 Railing m' 513,690.00

HARGA SATUAN PEKERJAAN FASAD 1 GRC Trawangan m² 855,000.00

2 GRC list m² 456,000.00

3 Curtain Wall m² 1,750,000.00

HARGA SATUAN PEKERJAAN BAJA (Material Baja WF , SBO) 1 WF 350.150 KG 7,500.00

2 WF 150.100 KG 7,500.00

3 BASE PLATE 15 MM KG 7,500.00

4 BASE PLATE 10 MM KG 7,500.00

Page 5: DAFTAR HARGA SATUAN PEKERJAANrepository.untag-sby.ac.id/4287/121/LAMPIRAN.pdf · DAFTAR HARGA SATUAN PEKERJAAN PROYEK : SOLIA BOUTIQUE HOTEL LOKASI : JL. DR. RAJIMAN 525 LAWEYAN-SURAKARTA

5

5 ANGKUR M19 TITIK 159,619.50

6 ANGKUR M16 TITIK 65,175.00

7 MUR BAUT M16 BH 7,702.50

8 PLAT SAMBUNG 10 MM KG 21,330.00

9 CAT ZINCROMATE KG 1,422.00

HARGA SATUAN PEKERJAAN FINISHING

1 ACP M2 744,180.00

2 KACA LAMINATED 2x6 MM TEMPERED M2 1,592,640.00

HARGA SATUAN PEKERJAAN SANITAIR

1 Wastafel ex Toto TOTO TX115LRS+TOTO LW649CJ lengkap dengan meja Unit 1,606,380.00

2 Towel Shelf & Towel Bar TX726AE Unit 57,000.00

3 Paper Holder TX720AB Unit 39,310.00

4 Shoap Holder ex Toto AR15 Unit 39,310.00

5 Closet Jongkok ex Toto CE7 Unit 152,750.00

6 Closet ex Toto CW637J/SW637JP Unit 193,780.00

7 Shower ex Toto TX493SRR Unit 127,230.00

8 Floor Drain ex Toto TX1BV1N Unit 45,170.00

9 Kran Dinding ex Toto Unit 27,580.00

10 Roob Hook ex Toto Unit 27,580.00

HARGA SATUAN PEKERJAAN PENERANGAN & STOP KONTAK

1 Instalasi Penerangan dg Kabel NYM 3 x 2.5 mm dlm Pipa Conduit dia. 20 mm2 titik 134,550.00

2 Instalasi Kotak kontak Biasa dg Kabel NYM 3 x 2.5 mm dlm Pipa Conduit dia. 20

mm2 titik 134,550.00

3 Balk LED Tube 1 x 20 W bh 473,265.00

4 Kotak Kontak Biasa bh 20,475.00

Page 6: DAFTAR HARGA SATUAN PEKERJAANrepository.untag-sby.ac.id/4287/121/LAMPIRAN.pdf · DAFTAR HARGA SATUAN PEKERJAAN PROYEK : SOLIA BOUTIQUE HOTEL LOKASI : JL. DR. RAJIMAN 525 LAWEYAN-SURAKARTA

6

5 Saklar Ganda bh 46,215.00

6 Saklar Grid 8 Gang set 119,925.00

7 Saklar Grid 12 Gang set 187,785.00

HARGA SATUAN PEKERJAAN KABEL TRAY & LADDER

1 Kabel Ladder ukuran 300 mm x 100 mm m1 172,500.00

2 Kabel Tray ukuran 300 mm x 100 mm m1 172,500.00

3 Tee Tray ukuran 300 mm x 100 mm bh 172,500.00

4 Elbow ukuran 300 mm x 100 mm bh 172,500.00

HARGA SATUAN PEKERJAAN FIRE ALARM

1 Instalasi ROR Heat Detector & EORL dgn kabel NYA 2 (1x1.5) mm2 titik 159,705.00

2 Instalasi Smoke detector dgn kabel NYA 2 (1x1.5) mm2 titik 159,705.00

3 Instalasi Flow & Temper Switch dgn kabel NYA 2 (1x1.5) mm2 titik 159,705.00

4 Instalasi Manual Push Button dgn kabel NYA 2 (1x1.5) mm2 titik 159,705.00

5 Instalasi Alarm Bell dgn kabel NYA 2 (1x1.5) mm2 titik 159,705.00

6 Instalasi Indicating lamp dgn kabel NYA 2 (1x1.5) mm2 titik 159,705.00

7 ROR Heat Detector bh 253,305.00

8 Smoke Detector bh 194,805.00

9 Flow Switch bh 838,305.00

10 Temper Switch bh 955,305.00

11 Manual Push Button bh 136,305.00

12 Alarm Bell bh 165,555.00

13 Indicating Lamp bh 124,605.00

14 End of line resistor bh 9,009.00

15 Terminal Box Fire Alarm (TB-FA) bh 780,975.00

Page 7: DAFTAR HARGA SATUAN PEKERJAANrepository.untag-sby.ac.id/4287/121/LAMPIRAN.pdf · DAFTAR HARGA SATUAN PEKERJAAN PROYEK : SOLIA BOUTIQUE HOTEL LOKASI : JL. DR. RAJIMAN 525 LAWEYAN-SURAKARTA

7

16 Kabel Feeder fire alarm m1 22,932.00

HARGA SATUAN PEKERJAAN TATA SUARA/ SOUND SYSTEM

1 Instalasi Ceiling speaker dgn kabel NYMHY 3 x 1,5mm dlm pipa conduit PVC dia. 20

mm2 titik 200,655.00

2 Celling Speaker 3 W bh 177,255.00

3 Horn Speaker 15 W bh 311,805.00

4 Volume Kontrol bh 311,805.00

5 Sound Terminal Box (STB) bh 569,205.00

6 Kabel Feeder sound system m1 26,325.00

HARGA SATUAN PEKERJAAN CCTV 1 Instalasi CCTV dg kabel RG 59 + Power dlm pipa conduit PVC dia. 20 mm2 titik 235,755.00

2 In door Camera CCTV IR type Fixed bh 962,910.00

3 Color Dome type camera bh 669,825.00

4 Box CCD Camera ls 585,000.00

HARGA SATUAN PEKERJAAN INSTALASI AIR KOTOR/ BEKAS DAN VENT

CUP

1 Memasang Pipa PVC dia. 150 mm kelas AW m1 235,755.00

2 Memasang Pipa PVC dia. 100 mm kelas AW m1 118,755.00

3 Memasang Pipa PVC dia. 75 mm kelas AW m1 80,145.00

4 Memasang Pipa PVC dia. 75 mm kelas AW m1 80,145.00

5 Memasang Pipa PVC dia. 50 mm kelas AW m1 49,140.00

6 Memasang Clean Out dia. 150 mm m1 234,819.00

7 Pre Treatment lemak/ grease trap kap. 2 m3 Unit 7,488,000.00

8 Resapan Unit 2,340,000.00

9 Pompa Submersible Sewage Unit 23,400,000.00

Page 8: DAFTAR HARGA SATUAN PEKERJAANrepository.untag-sby.ac.id/4287/121/LAMPIRAN.pdf · DAFTAR HARGA SATUAN PEKERJAAN PROYEK : SOLIA BOUTIQUE HOTEL LOKASI : JL. DR. RAJIMAN 525 LAWEYAN-SURAKARTA

8

10 Fitting + Supporting termasuk hanger dan u-trap ls 1,755,000.00

HARGA SATUAN PEKERJAAN INSTALASI AIR BERSIH DINGIN 1 Memasang Pipa PPR PN 10 dia. 25 mm m1 40,131.00

2 Memasang Pipa PPR PN 10 dia. 20 mm m1 29,103.75

3 Memasang Pipa PPR PN 10 dia. 15 mm m1 21,937.50

4 Memasang Gate Valve dia. 20 mm bh 377,471.25

5 Fitting + Supporting termasuk hanger ls 201,649.50

HARGA SATUAN PEKERJAAN INSTALASI PENGKONDISIAN UDARA

1 Instalasi Power AC dg Kabel NYM 3 x 2.5 mm dlm Pipa Conduit dia. 20 mm2 titik 346,539.38

2 Kabel Power Kontrol NYM 3 x 2.5 mm2 dari Indoor s/d Outdoor unit m1 20,182.50

3 Air Conditioner Split Wall 18.000 Btu/h Unit 4,387,500.00

4 Air Conditioner Split Wall 5.000 Btu/h Unit 3,925,000.00

5 Instalasi Pipa Refrigerant uk. 1/4" m1 65,000.00

6 Instalasi Pipa Refrigerant uk. 1/2" m1 77,000.00

7 Memasang Pipa PVC dia. 20 mm kelas AW m1 24,716.25

8 Fitting + Supporting dan material bantu ls 64,350.00

HARGA SATUAN PEKERJAAN INSTALASI HYDRANT DAN SPRINKLER

1 Memasang Pipa BS sch-40 dia. 150 mm m1 422,370.00

2 Memasang Pipa BS sch-40 dia. 80 mm m1 202,410.00

3 Memasang Pipa BS sch-40 dia. 50 mm m1 124,546.50

4 Memasang Pipa BS sch-40 dia. 40 mm m1 88,881.39

5 Memasang Pipa BS sch-40 dia. 32 mm m1 77,512.50

6 Memasang Pipa BS sch-40 dia. 25 mm m1 62,595.00

Page 9: DAFTAR HARGA SATUAN PEKERJAANrepository.untag-sby.ac.id/4287/121/LAMPIRAN.pdf · DAFTAR HARGA SATUAN PEKERJAAN PROYEK : SOLIA BOUTIQUE HOTEL LOKASI : JL. DR. RAJIMAN 525 LAWEYAN-SURAKARTA

9

7 Memasang Pipa BS sch-40 dia. 20 mm m1 50,602.50

8 Memasang Head Sprinkler Tipe Pendant bh 105,300.00

9 Memasang Brach Control Valve dia. 80 mm bh 5,444,010.00

10 Memasang Gate Valve 10 K with Flanges dia. 80 mm bh 2,571,660.00

11 Memasang Gate Valve 10 K with Flanges dia. 50 mm bh 2,135,250.00

12 In door Hydrant Box dgn Hose,Hose Rack, Nozel, Landing Valve dan Gate Valve unit 4,128,579.00

13 Memasang Portable Fire Extinguisher type ABC 3.5 kg unit 438,165.00

14 Fitting dan assesories termasuk hanger ls 772,200.00

15 Instalasi Exshaust FAN dg kabel NYM 2 x 2.5 mm2 dlm Pipa Conduit dia. 20 mm2 titik 141,570.00

16 Memasang Exshaust FAN 12 W bh 409,500.00

HARGA SATUAN PEKERJAAN INSTALASI PENERANGAN DAN KOTAK

KONTAK

1 Instalasi Penerangan dg Kabel NYM 3 x 2.5 mm dlm Pipa Conduit dia. 20 mm2 titik 134,550.00

2 Instalasi Kotak kontak Biasa dg Kabel NYM 3 x 2.5 mm dlm Pipa Conduit dia. 20

mm2 titik 134,550.00

3 Instalasi Kotak kontak Lantai dg Kabel NYM 3 x 2.5 mm dlm Pipa Conduit dia. 20

mm2 titik 134,550.00

4 Downlight LED 19 W bh 277,875.00

5 Downlight LED 13 W bh 272,025.00

6 Downlight LED 7 W bh 252,135.00

7 RM LED Tube 2 x 10 W bh 90,090.00

8 RM LED Tube 3 x 10 W Arcylic Cover bh 970,515.00

9 Balk LED Tube 1 x 20 W bh 473,265.00

10 Lampu Strip LED 3 m/ 14.4 W/ m set 321,165.00

11 Lampu Strip LED 26.5 m/ 14.4 W/ m set 1,283,490.00

12 Lampu Strip LED 48 m/ 14.4 W/ m set 2,163,915.00

13 Lampu Strip LED 33 m/ 14.4 W/ m set 1,549,665.00

Page 10: DAFTAR HARGA SATUAN PEKERJAANrepository.untag-sby.ac.id/4287/121/LAMPIRAN.pdf · DAFTAR HARGA SATUAN PEKERJAAN PROYEK : SOLIA BOUTIQUE HOTEL LOKASI : JL. DR. RAJIMAN 525 LAWEYAN-SURAKARTA

10

14 Kotak Kontak Lantai bh 371,475.00

15 Kotak Kontak Biasa bh 20,475.00

16 Saklar Ganda bh 46,215.00

17 Saklar Tunggal bh 39,195.00

18 Saklar Hotel Ganda bh 53,235.00

19 Saklar Grid 14 Gang set 172,575.00

HARGA SATUAN PEKERJAAN INSTALASI KABEL TRAY DAN LADDER

1 Kabel Ladder ukuran 300 mm x 100 mm m1 172,500.00

2 Kabel Tray ukuran 300 mm x 100 mm m1 172,500.00

3 Tee Tray ukuran 300 mm x 100 mm bh 172,500.00

4 Elbow ukuran 300 mm x 100 mm bh 172,500.00

HARGA SATUAN PEKERJAAN INSTALASI TELEPON

1 Instalasi Telephone dg Kabel ITC 2x2x0.6 mm dlm Pipa Conduit 20 mm titik 185,445.00

2 Direct Outlet bh 61,425.00

3 Direct Outlet Lantai bh 374,283.00

4 Direct Outlet Fax bh 61,425.00

5 Operator console bh 1,547,325.00

6 Handset single Telephone unit 1,547,325.00

7 Main Distrubution Fram Telepon (MDF-TP) unit 2,717,325.00

8 Private Automatic Branch eXchange (PABX),10 Co, 140 Ext. unit 64,376,325.00

9 Power Surge Arester 15 KA unit 1,540,305.00

10 Terminal Box Telepon (TTB) unit 435,825.00

11 Kabel Feeder ITC 10 pairs m1 36,270.00

12 Kabel Feeder ITC 150 pairs m1 187,785.00

Page 11: DAFTAR HARGA SATUAN PEKERJAANrepository.untag-sby.ac.id/4287/121/LAMPIRAN.pdf · DAFTAR HARGA SATUAN PEKERJAAN PROYEK : SOLIA BOUTIQUE HOTEL LOKASI : JL. DR. RAJIMAN 525 LAWEYAN-SURAKARTA

11

HARGA SATUAN PEKERJAAN INSTALASI FIRE ALARM

1 Instalasi ROR Heat Detector & EORL dgn kabel NYA 2 (1x1.5) mm2 titik 159,705.00

2 Instalasi Smoke detector dgn kabel NYA 2 (1x1.5) mm2 titik 159,705.00

3 Instalasi Fix detector dgn kabel NYA 2 (1x1.5) mm2 titik 159,705.00

4 Instalasi Flow & Temper Switch dgn kabel NYA 2 (1x1.5) mm2 titik 159,705.00

5 Instalasi Manual Push Button dgn kabel NYA 2 (1x1.5) mm2 titik 159,705.00

6 Instalasi Alarm Bell dgn kabel NYA 2 (1x1.5) mm2 titik 159,705.00

7 Instalasi Indicating lamp dgn kabel NYA 2 (1x1.5) mm2 titik 159,705.00

8 ROR Heat Detector bh 253,305.00

9 Smoke Detector bh 194,805.00

10 Fix Temperature Head Detector bh 253,305.00

11 Flow Switch bh 838,305.00

12 Temper Switch bh 955,305.00

13 Manual Push Button bh 136,305.00

14 Alarm Bell bh 165,555.00

15 Indicating Lamp bh 124,605.00

16 End of line resistor bh 9,009.00

17 Terminal Box Fire Alarm (TB-FA) bh 780,975.00

18 Kabel Feeder fire alarm m1 22,932.00

19 Announciator 10 zone Unit 9,380,475.00

20 MC-FA intelegent fire alarm 1 loop 300 device 20 Zone Unit 111,150,000.00

HARGA SATUAN PEKERJAAN INSTALASI TATA SUARA/ SOUND SYSTEM

1

Instalasi Ceiling speaker dgn kabel NYMHY 3 x 1,5mm dlm pipa conduit PVC dia. 20

mm2 titik 200,655.00

2 Celling Speaker 3 W bh 177,255.00

3 Column Speaker 10 W Emergency bh 224,055.00

Page 12: DAFTAR HARGA SATUAN PEKERJAANrepository.untag-sby.ac.id/4287/121/LAMPIRAN.pdf · DAFTAR HARGA SATUAN PEKERJAAN PROYEK : SOLIA BOUTIQUE HOTEL LOKASI : JL. DR. RAJIMAN 525 LAWEYAN-SURAKARTA

12

4 Volume Kontrol bh 311,805.00

5 Sound Terminal Box (STB) bh 569,205.00

6 Amplifier 240 Watt unit 4,488,705.00

7 Amplifier 60 Watt unit 1,797,705.00

8 Emergency Amplifier 240 Watt unit 4,488,705.00

9 Paging Microphone unit 4,137,705.00

10 Selector Swicth 10 zone unit 4,137,705.00

11 CD/VCD/DVD/MP3+ Radio tuner unit 2,967,705.00

12 Mixer power amplifier 240 Watt unit 2,967,705.00

13 Cabinet Rack w/ Accessories. unit 7,647,705.00

14 Main Distrubution Fram (MDF) Sound System unit 920,205.00

15 Power Surge Arester 15 KA unit 1,540,305.00

16 Kabel Feeder sound system m1 26,325.00

HARGA SATUAN PEKERJAAN INSTALASI CCTV

1 Instalasi CCTV dg kabel RG 59 + Power dlm pipa conduit PVC dia. 20 mm2 titik 235,755.00

2 Color Dome type camera bh 669,825.00

3 In door Camera CCTV IR type Fixed unit 962,910.00

4 DVR kap 32 channel, hardisc 4 T unit 16,423,875.00

5 Monitor LED 32" unit 4,121,325.00

6 Power Surge Arester 15 KA unit 1,755,000.00

7 Box CCD Camera ls 585,000.00

HARGA SATUAN PEKERJAAN INSTALASI DATA KOMPUTER

Page 13: DAFTAR HARGA SATUAN PEKERJAANrepository.untag-sby.ac.id/4287/121/LAMPIRAN.pdf · DAFTAR HARGA SATUAN PEKERJAAN PROYEK : SOLIA BOUTIQUE HOTEL LOKASI : JL. DR. RAJIMAN 525 LAWEYAN-SURAKARTA

13

1 Instalasi Data komputer dg kabel UTP Cath 6 dlm pipa conduit PVC dia. 20 mm2 titik 219,726.00

2 Outlet Data bh 99,333.00

3 Outlet Data Lantai bh 99,333.00

4 Outlet Wifi/ Acces Point bh 99,333.00

5 Antena Wiffi/ Acces Point bh 99,333.00

6 Switch hub 24 port unit 1,129,050.00

7 19" Close Rack 42U Depth 1100mm unit 1,404,000.00

8 Fitting & Supporting ls 175,500.00

HARGA SATUAN PEKERJAAN INSTALASI MATV

1 Instalasi MATV dg kabel Coaxial RG 6 dlm pipa conduit PVC dia. 20 mm2 titik 209,430.00

2 Outlet Antena TV bh 73,125.00

3 Splitter 2 Way bh 163,800.00

4 Indoortap 4 Way bh 146,250.00

5 Kabel feeder coaxcial RG 11 m1 16,965.00

6 Kabel feeder coaxcial RG 11 m1 16,965.00

7 Combiner 16 chanel unit 2,925,000.00

8 Modulator unit 1,053,000.00

9 Splitter 6 way unit 193,050.00

10 Boster unit 187,200.00

11 VCD/ DVD Player unit 877,500.00

12 Power Suplay 12 VDC unit 292,500.00

13 Antenna UHF/VHF unit 175,500.00

14 Antenna Parabola 6 Feet unit 2,925,000.00

15 TV Monitor unit 4,095,000.00

16 Rack Mounting unit 1,755,000.00

17 Pengkabelan di Head End MATV ls 585,000.00

Page 14: DAFTAR HARGA SATUAN PEKERJAANrepository.untag-sby.ac.id/4287/121/LAMPIRAN.pdf · DAFTAR HARGA SATUAN PEKERJAAN PROYEK : SOLIA BOUTIQUE HOTEL LOKASI : JL. DR. RAJIMAN 525 LAWEYAN-SURAKARTA

14

HARGA SATUAN PEKERJAAN INSTALASI PENGKONDISIAN UDARA

1 Instalasi Power AC dg Kabel NYM 3 x 2.5 mm dlm Pipa Conduit dia. 20 mm2 titik 346,539.38

2 kabel NYY 4 x 16 mm2 m1 141,570.00

3 Out Door Unit kap. 311.620 BTU/h Unit 153,036,000.00

4 Air Conditioner Ceiling Mounted Duct 100.000 BTU/h Unit 30,069,000.00

5 Air Conditioner Ceiling Mounted Duct 80.000 BTU/h Unit 24,219,000.00

6 Indoor Ceiling Wall Mounted 9.000 BTU/h Unit 5,150,000.00

7 Air Conditioner Ceiling Wall Mounted 5.000 BTU/h Unit 4,592,250.00

8 Instalasi Pipa Refrigerant uk. 1 3/8" m1 115,830.00

9 Instalasi Pipa Refrigerant uk. 7/8" m1 98,280.00

10 Instalasi Pipa Refrigerant uk. 3/4" m1 90,090.00

11 Instalasi Pipa Refrigerant uk. 3/8" m1 87,000.00

12 Instalasi Pipa Refrigerant uk. 1/2" m1 83,655.00

13 Instalasi Pipa Refrigerant uk. 1/4" m1 70,200.00

14 Memasang Pipa PVC dia. 50 mm kelas AW m1 49,140.00

15 Memasang Pipa PVC dia. 32 mm kelas AW m1 35,538.75

16 Memasang Pipa PVC dia. 25 mm kelas AW m1 28,080.00

17 Memasang Pipa PVC dia. 20 mm kelas AW m1 24,716.25

18 Fitting + Supporting dan material bantu ls 64,350.00

19 Pekerjaan Ducting

20 Ducting PU uk. 750 x 200 mm m2 146,250.00

21 Ducting PU uk. 600 x 250 mm m2 146,250.00

22 Ducting PU uk. 550 x 200 mm m2 146,250.00

Page 15: DAFTAR HARGA SATUAN PEKERJAANrepository.untag-sby.ac.id/4287/121/LAMPIRAN.pdf · DAFTAR HARGA SATUAN PEKERJAAN PROYEK : SOLIA BOUTIQUE HOTEL LOKASI : JL. DR. RAJIMAN 525 LAWEYAN-SURAKARTA

15

23 Ducting PU uk. 350 x 200 mm m2 146,250.00

24 Ducting PU uk. 300 x 200 mm m2 146,250.00

25 Round Ducting dia. 200 mm m2 146,250.00

26 Memasang Grill 27 Linear Air Diffuser 508 cfm bh 292,500.00

28 Suplay Air Grill uk. 500 x 500/ 1060 cfm bh 292,500.00

29 Return Air Grill uk. 650 x 650/ 2033 cfm bh 146,250.00

30 Return Air Grill uk. 650 x 650/ 1700 cfm bh 292,500.00

31 Louvre Air Grill 300 x 300 bh 146,250.00

HARGA SATUAN PEKERJAAN INSTALASI AIR KOTOR/ BEKAS DAN VENT

CUP 1 Memasang Pipa PVC dia. 100 mm kelas AW m1 118,755.00

2 Memasang Pipa PVC dia. 75 mm kelas AW m1 80,145.00

3 Memasang Pipa PVC dia. 50 mm kelas AW m1 49,140.00

4 Memasang Pipa PVC dia. 32 mm kelas AW m1 35,538.75

5 Memasang Clean Out dia. 80 mm m1 152,100.00

6 Fitting + Supporting termasuk hanger dan u-trap ls 526,500.00

7 Memasang Pipa PPR PN 10 dia. 32 mm m1 53,966.25

8 Memasang Pipa PPR PN 10 dia. 25 mm m1 40,131.00

9 Memasang Pipa PPR PN 10 dia. 20 mm m1 29,103.75

10 Memasang Pipa PPR PN 10 dia. 15 mm m1 21,937.50

11 Memasang Gate Valve dia. 15 mm bh 267,637.50

12 Memasang Gate Valve dia. 25 mm bh 467,415.00

13 Memasang Gate Valve dia. 32 mm bh 471,948.75

14 Fitting + Supporting termasuk hanger ls 345,094.43

HARGA SATUANPEKERJAAN INSTALASI HYDRANT DAN SPRINKLER

Page 16: DAFTAR HARGA SATUAN PEKERJAANrepository.untag-sby.ac.id/4287/121/LAMPIRAN.pdf · DAFTAR HARGA SATUAN PEKERJAAN PROYEK : SOLIA BOUTIQUE HOTEL LOKASI : JL. DR. RAJIMAN 525 LAWEYAN-SURAKARTA

16

1 Memasang Pipa BS sch-40 dia. 150 mm m1 422,370.00

2 Memasang Pipa BS sch-40 dia. 80 mm m1 202,410.00

3 Memasang Pipa BS sch-40 dia. 50 mm m1 124,546.50

4 Memasang Pipa BS sch-40 dia. 40 mm m1 88,881.39

5 Memasang Pipa BS sch-40 dia. 32 mm m1 77,512.50

6 Memasang Pipa BS sch-40 dia. 25 mm m1 62,595.00

7 Memasang Pipa BS sch-40 dia. 20 mm bh 50,602.50

8 Memasang Head Sprinkler Tipe Pendant bh 105,300.00

9 Memasang Brach Control Valve dia. 80 mm bh 5,444,010.00

10 Memasang Gate Valve 10 K with Flanges dia. 150 mm bh 2,571,660.00

11 Memasang Gate Valve 10 K with Flanges dia. 50 mm bh 2,135,250.00

12 In door Hydrant Box dgn Hose,Hose Rack, Nozel, Landing Valve dan Gate Valve unit 4,128,579.00

13 Memasang Portable Fire Extinguisher type ABC 3.5 kg unit 438,165.00

14 Out door Hydrant Box dgn Hose,Hose Rack, Nozel, Landing Valve dan Gate Valve unit 4,062,825.00

15 Memasang Pillar hydrant unit 3,551,652.00

16 Memasang Seamese connection 100 mm unit 2,894,580.00

17 Fitting dan assesories termasuk hanger ls 912,600.00

HARGA SATUAN PEKERJAAN INSTALASI GAS KITCHEN

1 Memasang Pipa Galvanis medium dia. 20 mm m1 71,077.50

2 Memasang Selenoid valve dia. 20 mm bh 456,592.50

3 Memasang Pressure Gauge bh 793,552.50

4 Memasang Pressure Switch bh 1,144,552.50

5 Memasang Regulator Yamato bh 877,500.00

6 Memasang Ball Valve dia. 20 mm bh 328,331.25

7 Memasang Check Valve dia. 20 mm bh 439,042.50

Page 17: DAFTAR HARGA SATUAN PEKERJAANrepository.untag-sby.ac.id/4287/121/LAMPIRAN.pdf · DAFTAR HARGA SATUAN PEKERJAAN PROYEK : SOLIA BOUTIQUE HOTEL LOKASI : JL. DR. RAJIMAN 525 LAWEYAN-SURAKARTA

17

8 Memasang Pipa Fleksibel GAS m1 29,250.00

9 Tabung Gas LPG 50 kg set 1,696,500.00

10 Fitting + Supporting termasuk hanger ls 5,850,000.00

11 Instalasi Exshaust FAN dg kabel NYM 2 x 2.5 mm2 dlm Pipa Conduit dia. 20 mm2 titik 424,710.00

12 Memasang Exshaust FAN 12 W bh 1,228,500.00

HARGA SATUAN PEKERJAAN INSTALASI PENERANGAN DAN KOTAK

KONTAK 1 Instalasi Penerangan dg Kabel NYM 3 x 2.5 mm dlm Pipa Conduit dia. 20 mm2 titik 134,550.00

2 Instalasi Kotak kontak Biasa dg Kabel NYM 3 x 2.5 mm dlm Pipa Conduit dia. 20

mm2 titik 134,550.00

3 Downlight LED 13 W bh 272,025.00

4 Downlight LED 7 W bh 252,135.00

5 RM LED Tube 2 x 10 W bh 90,090.00

6 RM LED Tube 2 x 20 W bh 853,515.00

7 RM LED Tube 3 x 10 W bh 912,015.00

8 Barret LED 16 W bh 490,815.00

9 Emergency Exit LED 8 W bh 760,500.00

10 Kotak Kontak Biasa bh 20,475.00

11 Saklar Ganda bh 46,215.00

12 Saklar Tunggal bh 39,195.00

13 Saklar Hotel Ganda bh 53,235.00

HARGA SATUAN PEKERJAAN INSTALASI KABEL TOUVUR DAN PANEL

DAYA

1 BUSDUCT 1.000 A ( 3P + N + E) m1 172,500.00

2 A. Busduct Riser 1.000 A, 3P + 100% N + 50% IGB/ BM/ IP54/ 50 KA m1 172,500.00

3 1. Total Length/ Panjang bh 172,500.00

4 2. Flatewise Elbow bh 172,500.00

Page 18: DAFTAR HARGA SATUAN PEKERJAANrepository.untag-sby.ac.id/4287/121/LAMPIRAN.pdf · DAFTAR HARGA SATUAN PEKERJAAN PROYEK : SOLIA BOUTIQUE HOTEL LOKASI : JL. DR. RAJIMAN 525 LAWEYAN-SURAKARTA

18

5 3. Joint titik 185,445.00

6 4. Hanger Vertical (spring - w/o additional support) bh 61,425.00

7 5. Hanger horizontal unit 201,825.00

8 B. TAP OFF BOX c/w MCCB unit 435,825.00

9 1. TOB 160 A m1 36,270.00

10 C. Reduser Busduct 1.000 A s/d 800 A titik 159,705.00

11 BUSDUCT 8.000 A ( 3P + N + E) titik 159,705.00

12 A. Busduct Riser 8.00 A, 3P + 100% N + 50% IGB/ BM/ IP54/ 50 KA titik 159,705.00

13 1. Total Length/ Panjang titik 159,705.00

14 2. Joint titik 159,705.00

15 5. Hanger Vertical (spring - w/o additional support) titik 159,705.00

16 B. TAP OFF BOX c/w MCCB bh 253,305.00

17 1. TOB 160 A bh 194,805.00

18 Kabel NYY 4 x 50 mm2 bh 838,305.00

19 Kabel NYY 4 x 50 mm2 bh 955,305.00

20 Kabel NYY 4 x 16 mm2 bh 136,305.00

21 Kabel NYY 4 x 25 mm2 bh 165,555.00

22 Kabel NYY 4 x 50 mm2 bh 124,605.00

23 Kabel NYY 4 x 16 mm2 bh 9,009.00

24 Kabel NYY 4 x 25 mm2 bh 780,975.00

25 Kabel NYY 4 x 16 mm2 titik 200,655.00

26 Kabel NYY 4 x 25 mm2 bh 177,255.00

27 Kabel NYY 4 x 10 mm2 bh 224,055.00

28 Kabel NYY 4 x 50 mm2 bh 311,805.00

29 Kabel NYY 4 x 16 mm2 bh 569,205.00

30 Kabel NYY 4 x 25 mm2 m1 26,325.00

Page 19: DAFTAR HARGA SATUAN PEKERJAANrepository.untag-sby.ac.id/4287/121/LAMPIRAN.pdf · DAFTAR HARGA SATUAN PEKERJAAN PROYEK : SOLIA BOUTIQUE HOTEL LOKASI : JL. DR. RAJIMAN 525 LAWEYAN-SURAKARTA

19

31 Kabel NYY 4 x 50 mm2 titik 235,755.00

32 Kabel NYY 4 x 16 mm2 bh 669,825.00

33 Kabel NYY 4 x 25 mm2 ls 585,000.00

34 Kabel NYM 3 x 4 mm2 35 Kabel NYY 4 x 50 mm2 titik 219,726.00

36 Kabel NYY 4 x 16 mm2 bh 99,333.00

37 Kabel NYY 4 x 25 mm2 unit 1,017,900.00

38 Kabel NYM 3 x 4 mm2 ls 117,000.00

39 Kabel NYY 4 x 25 mm2 titik 141,570.00

40 Kabel NYM 3 x 4 mm2 bh 409,500.00

41 Kabel NYY 4 x 50 mm2 titik 693,078.75

42 Kabel NYY 4 x 16 mm2 m1 85,410.00

43 Kabel NYY 4 x 25 mm2 Unit 71,019,000.00

44 Kabel NYM 3 x 4 mm2 Unit 21,206,250.00

45 Kabel NYY 4 x 50 mm2 Unit 15,122,250.00

46 Kabel NYY 4 x 16 mm2 Unit 6,084,000.00

47 Kabel NYY 4 x 25 mm2 Unit 5,791,500.00

48 Kabel NYY 4 x 50 mm2 m1 76,050.00

49 Kabel NYY 4 x 16 mm2 m1 70,200.00

50 Kabel NYY 4 x 25 mm2 m1 83,655.00

51 Kabel NYY 4 x 16 mm2 m1 90,090.00

52 Kabel NYY 4 x 10 mm2 m1 91,260.00

53 Kabel NYY 4 x 10 mm2 m1 106,470.00

54 Kabel NYY 4 x 16 mm2 m1 112,320.00

55 Memasang Panel Penerangan Lantai Basement set 1,593,000.00

56 Memasang Panel Penerangan Lantai 1 m1 35,538.75

57 Memasang Panel AC Lantai 1 m1 28,080.00

58 Memasang Panel Elektronik m1 24,716.25

Page 20: DAFTAR HARGA SATUAN PEKERJAANrepository.untag-sby.ac.id/4287/121/LAMPIRAN.pdf · DAFTAR HARGA SATUAN PEKERJAAN PROYEK : SOLIA BOUTIQUE HOTEL LOKASI : JL. DR. RAJIMAN 525 LAWEYAN-SURAKARTA

20

59 Memasang Panel SDP Mezzanin ls 39,487.50

60 Memasang Panel SDP 2 m1 118,755.00

61 Memasang Panel Penerangan Lantai 2 m1 80,145.00

62 Memasang Panel AC Lantai 2 m1 49,140.00

63 Memasang PP- Kitchen lantai 2 m1 190,125.00

64 Memasang Panel SDP 3 m1 152,100.00

65 Memasang Panel Penerangan Lantai 3 ls 526,500.00

66 Memasang Panel SDP 4 m1 53,966.25

67 Memasang Panel Penerangan Lantai 4 m1 29,103.75

68 Memasang Panel AC Lantai 4 m1 21,937.50

69 Memasang Panel SDP 5 bh 377,471.25

70 Memasang Panel Penerangan Lantai 5 bh 471,948.75

71 Memasang Panel AC Lantai 5 ls 541,812.38

72 Memasang Panel AC Lantai 6 m1 202,410.00

73 Memasang Panel SDP 7 m1 124,546.50

74 Memasang Panel Penerangan Lantai 7 m1 88,881.39

75 Memasang Panel AC Lantai 7 m1 77,512.50

76 Memasang Panel SDP 8 m1 62,595.00

77 Memasang Panel Penerangan Lantai 8 m1 50,602.50

78 Memasang Panel AC Lantai 8 bh 105,300.00

79 Memasang Panel SDP 9 bh 5,444,010.00

80 Memasang Panel Penerangan Lantai 9 bh 2,571,660.00

81 Memasang Panel AC Lantai 9 bh 2,135,250.00

82 Memasang PP- Kitchen lantai 9 unit 4,128,579.00

83 Memasang DP- Heat Pump unit 438,165.00

84 Memasang PP- Boster Pump ls 323,700.00

Page 21: DAFTAR HARGA SATUAN PEKERJAANrepository.untag-sby.ac.id/4287/121/LAMPIRAN.pdf · DAFTAR HARGA SATUAN PEKERJAAN PROYEK : SOLIA BOUTIQUE HOTEL LOKASI : JL. DR. RAJIMAN 525 LAWEYAN-SURAKARTA

21

85 Memasang DP- Pessurized Fan

86 Memasang DP- Lift

87 Grounding System titik 134,550.00

88 Sumuran Grounding Arus Lemah tahanan max. 1 ohm c/w peralatan titik 134,550.00

89 Sumuran Grounding Arus Kuat tahanan max. 5 ohm c/w SDP s/d Panel sub distribusi bh 277,875.00

90 Kabel NYA 2 x 150 mm2 bh 272,025.00

91 Kabel BC 50 mm2 bh 252,135.00

92 Kabel BC 16 mm2 bh 90,090.00

93 Kabel NYA 25 mm2 bh 853,515.00

94 Kabel NYA 16 mm2 bh 1,116,765.00

95 Kabel NYA 10 mm2 set 853,515.00

HARGA SATUAN PEKERJAAN INSTALASI PENYALUR PETIR 1 Head terminal type KURN Radius proteksi 120-150 meter set 996,840.00

2 Tiang penyangga penangkal petir 5 meter lengkap terpasang dg obstruction lamp set 1,385,865.00

3 Kabel NYY 1x70 mm2 set 1,406,340.00

4 Kabel BC 1x50 mm2 set 1,508,715.00

5 Instalasi Pentanahan/ grounding lengkap dengan baut Coupling/Join Conector set 1,590,615.00

6 Bak Kontrol Uk. 40x40 Cm lengkap dengan elektroda tanah set 1,836,315.00

7 Fitting + Supporting bh 490,815.00

HARGA SATUAN PEKERJAAN INSTALASI KABEL TRAY DAN LADDER 1 Kabel Ladder ukuran 300 mm x 100 mm bh 20,475.00

2 Kabel Tray ukuran 300 mm x 100 mm bh 46,215.00

3 Tee Tray ukuran 300 mm x 100 mm bh 39,195.00

4 Elbow ukuran 300 mm x 100 mm bh 53,235.00

HARGA SATUAN PEKERJAAN INSTALASI TELEPON

Page 22: DAFTAR HARGA SATUAN PEKERJAANrepository.untag-sby.ac.id/4287/121/LAMPIRAN.pdf · DAFTAR HARGA SATUAN PEKERJAAN PROYEK : SOLIA BOUTIQUE HOTEL LOKASI : JL. DR. RAJIMAN 525 LAWEYAN-SURAKARTA

22

1 Instalasi Telephone dg Kabel ITC 2x2x0.6 mm dlm Pipa Conduit 20 mm set 166,725.00

2 Direct Outlet

3 Handset single Telephone m1 172,500.00

HARGA SATUAN PEKERJAAN INSTALASI CARD LOCK

1 Card Lock magnetik bh 172,500.00

2 System Soft Ware + RF Encoding bh 172,500.00

HARGA SATUAN PEKERJAAN INSTALASI TATA SUARA/ SOUND SYSTEM

1

Instalasi Ceiling speaker dgn kabel NYMHY 3 x 1,5mm dlm pipa conduit PVC dia. 20

mm2 bh 61,425.00

2 Celling Speaker 3 W unit 201,825.00

3 Volume Kontrol unit 435,825.00

4 Column Speaker 10 W Emergency m1 36,270.00

5 Kabel Feeder sound system titik 159,705.00

HARGA SATUAN PEKERJAAN INSTALASI CCTV 1 Instalasi CCTV dg kabel RG 59 + Power dlm pipa conduit PVC dia. 20 mm2 titik 159,705.00

2 Color Dome type camera titik 159,705.00

3 Fitting & Supporting titik 159,705.00

HARGA SATUAN PEKERJAAN INSTALASI DATA KOMPUTER 1 Instalasi Data komputer dg kabel UTP Cath 6 dlm pipa conduit PVC dia. 20 mm2 titik 159,705.00

2 Outlet Wifi/ Acces Point bh 253,305.00

3 Antena Wiffi/ Acces Point bh 194,805.00

4 Switch hub 4 port bh 253,305.00

Page 23: DAFTAR HARGA SATUAN PEKERJAANrepository.untag-sby.ac.id/4287/121/LAMPIRAN.pdf · DAFTAR HARGA SATUAN PEKERJAAN PROYEK : SOLIA BOUTIQUE HOTEL LOKASI : JL. DR. RAJIMAN 525 LAWEYAN-SURAKARTA

23

5 Fitting & Supporting bh 838,305.00

HARGA SATUAN PEKERJAAN INSTALASI AIR KOTOR/ BEKAS DAN VENT

CUP

1 Memasang Pipa PVC dia. 100 mm kelas AW bh 165,555.00

2 Memasang Pipa PVC dia. 75 mm kelas AW bh 124,605.00

3 Memasang Pipa PVC dia. 50 mm kelas AW bh 9,009.00

4 Memasang Pipa PVC dia. 32 mm kelas AW bh 780,975.00

5 Memasang Clean Out dia. 100 mm m1 22,932.00

6 Fitting + Supporting termasuk hanger dan u-trap titik 200,655.00

7 Pipa Riser bh 177,255.00

8 Memasang Pipa PVC dia. 150 mm kelas AW bh 224,055.00

9 Memasang Pipa PVC dia. 100 mm kelas AW bh 311,805.00

10 Memasang Pipa PVC dia. 50 mm kelas AW bh 569,205.00

11 Fitting + Supporting termasuk hanger dan u-trap m1 26,325.00

HARGA SATUAN PEKERJAAN INSTALASI AIR BERSIH DINGIN 1 Memasang Pipa PPR PN 10 dia. 32 mm titik 235,755.00

2 Memasang Pipa PPR PN 10 dia. 25 mm bh 669,825.00

3 Memasang Pipa PPR PN 10 dia. 20 mm ls 585,000.00

4 Memasang Gate Valve dia. 25 mm titik 219,726.00

5 Memasang Gate Valve dia. 20 mm bh 99,333.00

6 Fitting + Supporting termasuk hanger bh 99,333.00

7 Lantai Atap bh 99,333.00

8 Memasang Pipa PPR PN 10 dia. 50 mm unit 1,129,050.00

9 Memasang Rooftank FRP kap 12 m3 ls 117,000.00

10 Pengkabelan dari panel kontrol s/d unit pompa titik 693,078.75

11 Memasang Gate Valve dia. 100 mm m1 85,410.00

Page 24: DAFTAR HARGA SATUAN PEKERJAANrepository.untag-sby.ac.id/4287/121/LAMPIRAN.pdf · DAFTAR HARGA SATUAN PEKERJAAN PROYEK : SOLIA BOUTIQUE HOTEL LOKASI : JL. DR. RAJIMAN 525 LAWEYAN-SURAKARTA

24

12 Memasang Gate Valve dia. 50 mm Unit 235,462,500.00

13 Memasang Header dia. 100 mm Unit 30,069,000.00

14 Fitting + Supporting termasuk hanger Unit 21,206,250.00

15 Memasang Pipa PPR PN 10 dia. 50 mm m1 141,570.00

16 Fitting + Supporting termasuk hanger m1 129,870.00

HARGA SATUAN PEKERJAAN INSTALASI AIR BERSIH PANAS

1 Lantai Atap m1 98,280.00

2 Memasang Heat Pump Kap. 2000 liter m1 91,260.00

3 Fitting + Supporting termasuk hanger m1 90,090.00

4 Memasang Header 4" (Air Panas) m1 83,655.00

5 Memasang Selenoid valve dia. 50 mm m1 70,200.00

6 Memasang Selenoid valve dia. 40 mm m1 76,050.00

7 Memasang Gate valve dia. 50 mm set 1,593,000.00

9 Memasang Strainer dia. 50 mm m1 35,538.75

10 Memasang Strainer dia. 40 mm m1 28,080.00

11 Fitting + Supporting termasuk hanger ls 39,487.50

13 Fitting + Supporting termasuk hanger m2 146,250.00

HARGA SATUAN PEKERJAAN INSTALASI AIR HUJAN m2 146,250.00

1 Memasang Roofdrain dia. 100 mm m2 146,250.00

2 Memasang Pipa PVC dia. 100 mm kelas AW m2 146,250.00

3 Memasang Pipa PVC dia. 50 mm kelas AW m2 146,250.00

4 Bak Kontrol Air Hujan m2 146,250.00

5 Sumur Peresapan Air Hujan (SPAH) m2 146,250.00

6 Bak Sumpit m2 146,250.00

Page 25: DAFTAR HARGA SATUAN PEKERJAANrepository.untag-sby.ac.id/4287/121/LAMPIRAN.pdf · DAFTAR HARGA SATUAN PEKERJAAN PROYEK : SOLIA BOUTIQUE HOTEL LOKASI : JL. DR. RAJIMAN 525 LAWEYAN-SURAKARTA

25

7 Fitting dan assesories termasuk hanger bh 146,250.00

HARGA SATUAN PEKERJAAN INSTALASI HYDRANT DAN SPRINKLER 1 Memasang Pipa BS sch-40 dia. 80 mm bh 146,250.00

2 Memasang Pipa BS sch-40 dia. 50 mm bh 146,250.00

3 Memasang Pipa BS sch-40 dia. 40 mm bh 146,250.00

4 Memasang Pipa BS sch-40 dia. 25 mm titik 141,570.00

5 Memasang Pipa BS sch-40 dia. 20 mm bh 409,500.00

6 Memasang Head Sprinkler Tipe Pendant m1 118,755.00

7 Memasang Brach Control Valve dia. 80 mm m1 80,145.00

8 Memasang Gate Valve 10 K with Flanges dia. 80 mm m1 49,140.00

9 Memasang Gate Valve 10 K with Flanges dia. 50 mm m1 190,125.00

10 In door Hydrant Box dgn Hose,Hose Rack, Nozel, Landing Valve dan Gate Valve m1 152,100.00

11 Memasang Portable Fire Extinguisher type ABC 3.5 kg ls 409,500.00

12 Fitting dan assesories termasuk hanger m1 53,966.25

13 RISER m1 29,103.75

14 Memasang Pipa BS sch-40 dia. 150 mm m1 21,937.50

15 Memasang Pipa BS sch-40 dia. 100 mm bh 377,471.25

16 Memasang Pipa BS sch-40 dia. 50 mm bh 471,948.75

17 Fitting dan assesories termasuk hanger ls 541,812.38

HARGA SATUAN PEKERJAAN INSTALASI PENGKONDISIAN UDARA 1 Instalasi Power AC dg Kabel NYM 3 x 2.5 mm dlm Pipa Conduit dia. 20 mm2 m1 202,410.00

2 Kabel NYY 4 x 16 mm2 m1 124,546.50

3 Out Door Unit kap. 300.000 BTU/h m1 88,881.39

4 Air Conditioner Ceiling Mounted Duct 100.000 BTU/h m1 77,512.50

5 Air Conditioner Ceiling Mounted Duct 45.000 BTU/h m1 62,595.00

6 Pekerjaan Instalasi Pipa Refrigerant lengkap dgn material bantu dan accessories m1 50,602.50

Page 26: DAFTAR HARGA SATUAN PEKERJAANrepository.untag-sby.ac.id/4287/121/LAMPIRAN.pdf · DAFTAR HARGA SATUAN PEKERJAAN PROYEK : SOLIA BOUTIQUE HOTEL LOKASI : JL. DR. RAJIMAN 525 LAWEYAN-SURAKARTA

26

7 Instalasi Pipa Refrigerant uk. 1 3/8" bh 105,300.00

8 Instalasi Pipa Refrigerant uk. 7/8" bh 5,444,010.00

9 Instalasi Pipa Refrigerant uk. 3/4" bh 2,571,660.00

10 Instalasi Pipa Refrigerant uk. 3/8" bh 2,135,250.00

11 Instalasi Ref net unit 4,128,579.00

12 Pekerjaan Instalasi Pipa U-Drain lengkap dengan material bantu dan accessories unit 438,165.00

13 Memasang Pipa PVC dia. 32 mm kelas AW ls 393,900.00

14 Pekerjaan Ducting m1 71,077.50

15 Ducting PU uk. 900 x 200 mm m1 29,250.00

16 Ducting PU uk. 750 x 200 mm bh 793,552.50

17 Ducting PU uk. 450 x 200 mm bh 328,331.25

18 Ducting PU uk. 200 x 200 mm bh 439,042.50

19 Round Ducting dia. 200 mm ls 5,850,000.00

20 Memasang Grill m1 71,077.50

21 Suplay Air Grill uk. 400 x 400/ 635 cfm ls 1,755,000.00

22 Suplay Air Grill uk. 250 x 250/ 318 cfm ls 1,755,000.00

23 Return Air Grill uk. 650 x 650/ 2033 cfm titik 134,550.00

24 Louvre Air Grill 300 x 300 titik 134,550.00

25 ACCESSORIES bh 277,875.00

26 Wired Remocom bh 272,025.00

27 Wireless Remocom bh 272,025.00

28 Riser U-Drain bh 473,265.00

29 Memasang Pipa PVC dia. 50 mm kelas AW bh 490,815.00

30 Fitting + Supporting dan material bantu set 760,500.00

31 Ruang Lift set 894,465.00

32 Instalasi Power AC dg Kabel NYM 3 x 2.5 mm dlm Pipa Conduit dia. 20 mm2 bh 20,475.00

Page 27: DAFTAR HARGA SATUAN PEKERJAANrepository.untag-sby.ac.id/4287/121/LAMPIRAN.pdf · DAFTAR HARGA SATUAN PEKERJAAN PROYEK : SOLIA BOUTIQUE HOTEL LOKASI : JL. DR. RAJIMAN 525 LAWEYAN-SURAKARTA

27

33 Air Conditioner Split Wall 18.000 Btu/h bh 46,215.00

34 Instalasi Pipa Refrigerant uk. 1/4" bh 39,195.00

35 Instalasi Pipa Refrigerant uk. 1/2" bh 53,235.00

36 Memasang Pipa PVC dia. 20 mm kelas AW titik 134,550.00

37 Fitting + Supporting dan material bantu titik 134,550.00

38 Exshaust FAN bh 272,025.00

39 Instalasi Exshaust FAN dg kabel NYM 2 x 2.5 mm2 dlm Pipa Conduit dia. 20 mm2 bh 252,135.00

40 Memasang Exshaust FAN 12 W bh 272,025.00

41 Lantai Roof top set 362,115.00

42 Memasang Pressurized Air Fan 10.428 CMH bh 20,475.00

43 Memasang Suplay Air Grill 500 mm x 500 mm bh 73,125.00

bh 59,085.00

HARGA SATUASN PEKERJAAN PUMP ROOM 1 Pompa lengkap terkopel dengan diesel engine diatas baseplate, lengkap dgn Radiator, bh 97,695.00

2 Electric Fire Pump (EFP) Lengkap dengan panel kontrol comply NFPA bh 318,825.00

3 Diesel Fire Pump (DFP) Lengkap dengan panel kontrol comply NFPA bh 39,195.00

4 Jockey Pump (JP) Lengkap dengan panel kontrol comply NFPA bh 53,235.00

5 yang diperlukan sesuai dengan gambar perencanaan dan spesifikasi teknis Unit 573,300.00

6 Memasang Gate Valve 10 K with Flanges dia. 150 mm m1 172,500.00

7 Memasang Gate Valve 10 K with Flanges dia. 50 mm m1 172,500.00

8 Memasang Strainer dia. 100 mm bh 172,500.00

9 Memasang Strainer dia. 50 mm bh 172,500.00

10 Memasang Check Valve dia. 100 mm titik 185,445.00

11 Memasang Flexible Joint dia. 100 mm bh 61,425.00

12 Memasang Flexible Joint dia. 50 mm unit 201,825.00

13 Memasang Foot Valve dia. 100 mm unit 435,825.00

14 Memasang Foot Valve dia. 50 mm m1 36,270.00

15 Pipa Black Stell Medium A dia. 50 mm titik 159,705.00

Page 28: DAFTAR HARGA SATUAN PEKERJAANrepository.untag-sby.ac.id/4287/121/LAMPIRAN.pdf · DAFTAR HARGA SATUAN PEKERJAAN PROYEK : SOLIA BOUTIQUE HOTEL LOKASI : JL. DR. RAJIMAN 525 LAWEYAN-SURAKARTA

28

16 Memasang Header dia. 200 mm titik 159,705.00

17 Memasang Pressure Gauge titik 159,705.00

18 Memasang Pressure Switch titik 159,705.00

19 Memasang Pressure Tank kap 500 L titik 159,705.00

20 Sumur bor kedalaman 120 meter Lengkap dengan pompa Deep weel, pemipaan titik 159,705.00

21 Pompa Transfer titik 111,150.00

22 Centrifugal pump bh 253,305.00

23 Dosing Pump bh 194,805.00

24 Sand Filter bh 838,305.00

25 Carbon Filter bh 955,305.00

26 Memasang Gate Valve 10 K Drat dia. 32 mm bh 136,305.00

27 Memasang Gate Valve dia. 50 mm bh 165,555.00

28 Memasang Check Valve dia. 32 mm bh 124,605.00

29 Memasang Foot Valve dia. 32 mm bh 545,805.00

30 Memasang Flexible Joint dia. 32 mm bh 9,009.00

31 Memasang Pipa PPR PN 10 dia. 20 mm bh 780,975.00

32 Memasang Pipa PPR PN 10 dia. 32 mm m1 22,932.00

33 Memasang Pipa PPR PN 10 dia. 50 mm titik 200,655.00

34 Memasang Header dia. 100 mm bh 177,255.00

35 Memasang Pressure Gauge bh 224,055.00

36 Memasang Pressure Switch bh 569,205.00

37 Memasang Automatic Air Vant 25 GV m1 26,325.00

38 Fitting + Supporting titik 235,755.00

39 - System Filterasi Kolam Renang bh 669,825.00

40 - Pemipaan Kolam Renang ls 585,000.00

41 - Accessories titik 219,726.00

Page 29: DAFTAR HARGA SATUAN PEKERJAANrepository.untag-sby.ac.id/4287/121/LAMPIRAN.pdf · DAFTAR HARGA SATUAN PEKERJAAN PROYEK : SOLIA BOUTIQUE HOTEL LOKASI : JL. DR. RAJIMAN 525 LAWEYAN-SURAKARTA

29

42 Perijinan, Testing dan Commissioning bh 99,333.00

HARGA SATUAN PEKERJAAN POWER HOUSE 1 PEKERJAAN PASANG DAYA LISTRIK 690 KVA Transformator 800 KVA , 20/ 11.55 KV-400/ 231 V, 3 Phasa, 50 HZ, indoor type bh 99,333.00

2 PEKERJAAN PANEL MVMDP

Incoming LBS, 24kV, busbar 630A, 16kA unit 783,900.00

- Casing Cubicle 24 kV ls 117,000.00

Trafo Protection, tipe QM- SM6 titik 209,430.00

3 PEKERJAAN PANEL DAN KABEL TOUVUR

Kabel N2XSEFGbY 3 x 70 mm2 bh 73,125.00

Kabel N2XSY 3 x 1 x 70 mm2 bh 193,050.00

1. BUSDUCT 1.350 A bh 146,250.00

2. BUSDUCT 1.350 A ( 3P + N + E) m1 16,965.00

Kabel NYY 2 (4 x 1c x 150 mm2) m1 16,965.00

Kabel NYY 2 (4 x 1c x 150 mm2) m1 235,755.00

Kabel FRC 4 x 35 mm2 m1 118,755.00

Kabel FRC 4 x 70 mm2 m1 49,140.00

Kabel FRC 4 x 6 mm2 m1 35,538.75

Kabel FRC 4 x 25 mm2 m1 234,819.00

Kabel NYY 4 x 10 mm2 m1 190,125.00

Kabel NYY 4 x 6 mm2 m1 119,925.00

Memasang Panel In-Trafo ls 803,873.36

Memasang Panel Genset Synhcron 350 KVA m1 21,937.50

Memasang Kapasitor Bank 193 KVAR/ 415 V bh 267,637.50

Memasang Panel LVMDP ls 244,032.75

Memasang DP. Pompa Air kotor m1 131,040.00

Memasang DP- Hydrant bh 35,743.50

Page 30: DAFTAR HARGA SATUAN PEKERJAANrepository.untag-sby.ac.id/4287/121/LAMPIRAN.pdf · DAFTAR HARGA SATUAN PEKERJAAN PROYEK : SOLIA BOUTIQUE HOTEL LOKASI : JL. DR. RAJIMAN 525 LAWEYAN-SURAKARTA

30

Memasang Pipa PVC dia. 150 mm kelas AW bh 267,637.50

Checkered Plate penutup pit kabel di Power House 0,8 x 15 m ls 151,725.60

4 GROUNDING SYSTEM Sumuran Grounding Arus Kuat tahanan max. 5 ohm c/w TM, LVMDP, Travo, genset m1 202,410.00

Kabel NYA 150 mm2 m1 124,546.50

Kabel NYA 2 x (1c x 150 mm2) m1 88,881.39

Kabel BC 2 x (1c x 150 mm2) m1 77,512.50

Kabel BC 70 mm2 m1 62,595.00

Kabel BC 16 mm2 m1 50,602.50

Grounding CU BAR uk. 20 x 5 mm2 bh 105,300.00

Rekolit (dudukan CU BAR Grounding) bh 117,000.00

PEKERJAAN INSTALASI GENSET 2 x 350 KVA

5 Intake Louvre sound attenuator bh 5,444,010.00

Tanki bahan bakar mingguan bh 2,571,660.00

Tanki bahan bakar bulanan bh 2,135,250.00

Pompa Bahan bakar 10 LPM ( Pompa Elektrik ) unit 4,128,579.00

Pemipaan Bahan Bakar lengkap dengan Gate Valve unit 438,165.00

Instalasi Cerobong Asap dari Genset ke area luar /pembuangan dan Silincer ls 429,000.00

Instalasi Pengedap/ Peredam Suara Ruangan Genset titik 141,570.00

Testing & Commisioning dan Perijinan bh 409,500.00

Page 31: DAFTAR HARGA SATUAN PEKERJAANrepository.untag-sby.ac.id/4287/121/LAMPIRAN.pdf · DAFTAR HARGA SATUAN PEKERJAAN PROYEK : SOLIA BOUTIQUE HOTEL LOKASI : JL. DR. RAJIMAN 525 LAWEYAN-SURAKARTA

N0 URAIAN SATUAN KOOFESIEN HARGA SATUAN JUMLAH HARGA

PEKERJAAN STRUKTUR

1 1M3 Pekerjaan Balok beton K 300TENAGApekerja oh 0.6100 80,000.00 48,800.00 tukang batu oh 0.1800 95,000.00 17,100.00 kepala tukang oh 0.3400 110,000.00 37,400.00 mandor oh 0.3400 150,000.00 51,000.00

154,300.00

bahanbeton redy mik k 300 m3 1.0250 760,000.00 779,000.00 beton decking bh 15.0000 1,500.00 22,500.00 curing beton m3 1.0000 9,450.00 9,450.00

810,950.00

harga satuan m3 beton 965,250.00

2 1 kg pekerjaan besi (material sbo )TENAGApekerja oh 0.0040 80,000.00 320.00 tukang besi oh 0.0080 95,000.00 760.00 kepala tukang oh 0.0020 110,000.00 220.00 mandor oh 0.0010 150,000.00 150.00 alat ls 0.0010 50,000.00 50.00

1,500.00

3 1 m2 pekerjaan begestengTENAGApekerja oh 0.0400 80,000.00 3,200.00 tukang besi oh 0.0700 95,000.00 6,650.00 kepala tukang oh 0.0200 110,000.00 2,200.00 mandor oh 0.0100 150,000.00 1,500.00 alat ls 0.1000 50,000.00 5,000.00

18,550.00

bahanmultiplek 18 mm m2 1.0000 80,250.00 80,250.00 skrup bh 30.0000 150.00 4,500.00 alat bantu ls 1.0000 11,700.00 11,700.00

96,450.00

ANALISA HARGA SATUAN

jumlah harga tenaga

jumlah harga bahan

jumlah harga tenaga

jumlah harga tenaga

jumlah harga bahan

Page 32: DAFTAR HARGA SATUAN PEKERJAANrepository.untag-sby.ac.id/4287/121/LAMPIRAN.pdf · DAFTAR HARGA SATUAN PEKERJAAN PROYEK : SOLIA BOUTIQUE HOTEL LOKASI : JL. DR. RAJIMAN 525 LAWEYAN-SURAKARTA

harga satuan m2 begesteng 115,000.00

4 1M3 Pekerjaan plat tangga beton K 300TENAGApekerja oh 0.6100 80,000.00 48,800.00 tukang batu oh 0.1800 95,000.00 17,100.00 kepala tukang oh 0.3400 110,000.00 37,400.00 mandor oh 0.3400 150,000.00 51,000.00

154,300.00

bahanbeton redy mik k 300 m3 1.0250 760,000.00 779,000.00 beton decking bh 15.0000 1,500.00 22,500.00 curing beton m3 1.0000 9,450.00 9,450.00

810,950.00

harga satuan m3 beton 965,250.00

PEKERJAAN PASANGAN DINDING

1M2 PEKERJAAN PASANG BATA TRASRAMTENAGApekerja oh 0.0200 80,000.00 1,600.00 tukang batu oh 0.0900 95,000.00 8,550.00 kepala tukang oh 0.0300 110,000.00 3,300.00 mandor oh 0.0250 150,000.00 3,750.00

17,200.00

bahanbata bh 97.0000 750.00 72,750.00 pasir m3 0.1000 135,000.00 13,500.00 semen zak 0.3000 55,000.00 16,500.00

102,750.00

harga 1m2 pasangan bata dibulatkan 120,000.00

PASANGAN DINDING BATA

1m2 pangan bata TENAGApekerja oh 0.0200 80,000.00 1,600.00 tukang batu oh 0.0900 95,000.00 8,550.00 kepala tukang oh 0.0300 110,000.00 3,300.00 mandor oh 0.0200 150,000.00 3,000.00

16,450.00

jumlah harga bahan

jumlah harga tenaga

jumlah harga tenaga

jumlah harga bahan

jumlah harga tenaga

Page 33: DAFTAR HARGA SATUAN PEKERJAANrepository.untag-sby.ac.id/4287/121/LAMPIRAN.pdf · DAFTAR HARGA SATUAN PEKERJAAN PROYEK : SOLIA BOUTIQUE HOTEL LOKASI : JL. DR. RAJIMAN 525 LAWEYAN-SURAKARTA

bahanbata bh 95.0000 750.00 71,250.00 pasir m3 0.0900 135,000.00 12,150.00 semen zak 0.0900 55,000.00 4,950.00

88,350.00

harga 1m2 pasangan bata dibulatkan 105,000.00

PEKERJAAN PLESTERAN 1m2 PLESTERAN TRASRAM

TENAGApekerja oh 0.0200 80,000.00 1,600.00 tukang batu oh 0.0900 95,000.00 8,550.00 kepala tukang oh 0.0210 110,000.00 2,310.00 mandor oh 0.0200 150,000.00 3,000.00

15,460.00

bahanpasir m3 0.2000 135,000.00 27,000.00 semen zak 0.1000 55,000.00 5,500.00

32,500.00

harga 1m2 pasangan bata dibulatkan 47,500.00

PEKERJAAN PLESTERAN 1m2 PLESTERAN

TENAGApekerja oh 0.0200 80,000.00 1,600.00 tukang batu oh 0.0900 95,000.00 8,550.00 kepala tukang oh 0.0210 110,000.00 2,310.00 mandor oh 0.0200 150,000.00 3,000.00

15,460.00

bahanpasir m3 0.0800 135,000.00 10,800.00 semen zak 0.2000 55,000.00 11,000.00

21,800.00

harga 1m2 pasangan bata dibulatkan 38,224.00

PEKERJAAN KERAMIK DINDING1m2 KERAMIK

jumlah harga bahan

jumlah harga tenaga

jumlah harga bahan

jumlah harga tenaga

jumlah harga bahan

Page 34: DAFTAR HARGA SATUAN PEKERJAANrepository.untag-sby.ac.id/4287/121/LAMPIRAN.pdf · DAFTAR HARGA SATUAN PEKERJAAN PROYEK : SOLIA BOUTIQUE HOTEL LOKASI : JL. DR. RAJIMAN 525 LAWEYAN-SURAKARTA

TENAGApekerja oh 0.2200 80,000.00 17,600.00 tukang batu oh 0.0900 95,000.00 8,550.00 kepala tukang oh 0.0200 110,000.00 2,200.00 mandor oh 0.0200 150,000.00 3,000.00

31,350.00

bahanpasir m3 0.0800 135,000.00 10,800.00 semen zak 0.3000 55,000.00 16,500.00 KERAMIK DOS 1.0000 95,440.00 95,440.00 SEMEN WARNA KG 1.3000 25.0000 32.5000

122,772.50 154,122.50

PEKERJAAN MARMER1m2 KERAMIK

TENAGApekerja oh 0.2500 80,000.00 20,000.00 tukang batu oh 0.0900 95,000.00 8,550.00 kepala tukang oh 0.0200 110,000.00 2,200.00 mandor oh 0.0200 150,000.00 3,000.00

33,750.00

bahanpasir m3 0.2000 135,000.00 27,000.00 semen zak 0.3000 55,000.00 16,500.00 SEMEN WARNA KG 1.3000 25.0000 32.5000

43,532.50 77,282.50

jumlah harga tenaga

jumlah harga bahan

jumlah harga tenaga

jumlah harga bahan

Page 35: DAFTAR HARGA SATUAN PEKERJAANrepository.untag-sby.ac.id/4287/121/LAMPIRAN.pdf · DAFTAR HARGA SATUAN PEKERJAAN PROYEK : SOLIA BOUTIQUE HOTEL LOKASI : JL. DR. RAJIMAN 525 LAWEYAN-SURAKARTA

(965,250.00)

1500 -

Page 36: DAFTAR HARGA SATUAN PEKERJAANrepository.untag-sby.ac.id/4287/121/LAMPIRAN.pdf · DAFTAR HARGA SATUAN PEKERJAAN PROYEK : SOLIA BOUTIQUE HOTEL LOKASI : JL. DR. RAJIMAN 525 LAWEYAN-SURAKARTA

115000 -

1,015,000.00 #REF!

Page 37: DAFTAR HARGA SATUAN PEKERJAANrepository.untag-sby.ac.id/4287/121/LAMPIRAN.pdf · DAFTAR HARGA SATUAN PEKERJAAN PROYEK : SOLIA BOUTIQUE HOTEL LOKASI : JL. DR. RAJIMAN 525 LAWEYAN-SURAKARTA

47,500 -

38,224.20 0.20

Page 38: DAFTAR HARGA SATUAN PEKERJAANrepository.untag-sby.ac.id/4287/121/LAMPIRAN.pdf · DAFTAR HARGA SATUAN PEKERJAAN PROYEK : SOLIA BOUTIQUE HOTEL LOKASI : JL. DR. RAJIMAN 525 LAWEYAN-SURAKARTA

95,440.0000

154,123.00 0.50

750,000.00 672,717.50

Page 39: DAFTAR HARGA SATUAN PEKERJAANrepository.untag-sby.ac.id/4287/121/LAMPIRAN.pdf · DAFTAR HARGA SATUAN PEKERJAAN PROYEK : SOLIA BOUTIQUE HOTEL LOKASI : JL. DR. RAJIMAN 525 LAWEYAN-SURAKARTA

N0 URAIAN SATUAN KOOFESIEN HARGA SATUAN

PEKERJAAN PASANGAN DINDING

1M2 PEKERJAAN PASANG BATA TRASRAMTENAGApekerja oh 0.0200 80,000.00 tukang batu oh 0.0900 95,000.00 kepala tukang oh 0.0300 110,000.00 mandor oh 0.0250 150,000.00

bahanbata bh 97.0000 750.00 pasir m3 0.1000 135,000.00 semen zak 0.3000 55,000.00

harga 1m2 pasangan bata dibulatkan

PASANGAN DINDING BATA

1m2 pangan bata TENAGApekerja oh 0.0200 80,000.00 tukang batu oh 0.0900 95,000.00 kepala tukang oh 0.0300 110,000.00 mandor oh 0.0200 150,000.00

bahanbata bh 95.0000 750.00 pasir m3 0.0900 135,000.00 semen zak 0.0900 55,000.00

harga 1m2 pasangan bata dibulatkan

ANALISA HARGA SATUAN

jumlah harga tenaga

jumlah harga bahan

jumlah harga tenaga

jumlah harga bahan

Page 40: DAFTAR HARGA SATUAN PEKERJAANrepository.untag-sby.ac.id/4287/121/LAMPIRAN.pdf · DAFTAR HARGA SATUAN PEKERJAAN PROYEK : SOLIA BOUTIQUE HOTEL LOKASI : JL. DR. RAJIMAN 525 LAWEYAN-SURAKARTA
Page 41: DAFTAR HARGA SATUAN PEKERJAANrepository.untag-sby.ac.id/4287/121/LAMPIRAN.pdf · DAFTAR HARGA SATUAN PEKERJAAN PROYEK : SOLIA BOUTIQUE HOTEL LOKASI : JL. DR. RAJIMAN 525 LAWEYAN-SURAKARTA
Page 42: DAFTAR HARGA SATUAN PEKERJAANrepository.untag-sby.ac.id/4287/121/LAMPIRAN.pdf · DAFTAR HARGA SATUAN PEKERJAAN PROYEK : SOLIA BOUTIQUE HOTEL LOKASI : JL. DR. RAJIMAN 525 LAWEYAN-SURAKARTA
Page 43: DAFTAR HARGA SATUAN PEKERJAANrepository.untag-sby.ac.id/4287/121/LAMPIRAN.pdf · DAFTAR HARGA SATUAN PEKERJAAN PROYEK : SOLIA BOUTIQUE HOTEL LOKASI : JL. DR. RAJIMAN 525 LAWEYAN-SURAKARTA

JUMLAH HARGA

1,600.00 8,550.00 3,300.00 3,750.00

17,200.00

72,750.00 13,500.00 16,500.00

102,750.00

120,000.00

1,600.00 8,550.00 3,300.00 3,000.00

16,450.00

71,250.00 12,150.00

4,950.00 88,350.00

105,000.00

Page 44: DAFTAR HARGA SATUAN PEKERJAANrepository.untag-sby.ac.id/4287/121/LAMPIRAN.pdf · DAFTAR HARGA SATUAN PEKERJAAN PROYEK : SOLIA BOUTIQUE HOTEL LOKASI : JL. DR. RAJIMAN 525 LAWEYAN-SURAKARTA
Page 45: DAFTAR HARGA SATUAN PEKERJAANrepository.untag-sby.ac.id/4287/121/LAMPIRAN.pdf · DAFTAR HARGA SATUAN PEKERJAAN PROYEK : SOLIA BOUTIQUE HOTEL LOKASI : JL. DR. RAJIMAN 525 LAWEYAN-SURAKARTA
Page 46: DAFTAR HARGA SATUAN PEKERJAANrepository.untag-sby.ac.id/4287/121/LAMPIRAN.pdf · DAFTAR HARGA SATUAN PEKERJAAN PROYEK : SOLIA BOUTIQUE HOTEL LOKASI : JL. DR. RAJIMAN 525 LAWEYAN-SURAKARTA

105000 -

Page 47: DAFTAR HARGA SATUAN PEKERJAANrepository.untag-sby.ac.id/4287/121/LAMPIRAN.pdf · DAFTAR HARGA SATUAN PEKERJAAN PROYEK : SOLIA BOUTIQUE HOTEL LOKASI : JL. DR. RAJIMAN 525 LAWEYAN-SURAKARTA

Kabel tray SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA

A tenaga kerja pekerja OH 0.0100tukang listrik OH 0.0100kepala tukang OH 0.0020mandor OH 0.0002

B bahankabel tray 300 x 100 mm M1 1.0000

C

Page 48: DAFTAR HARGA SATUAN PEKERJAANrepository.untag-sby.ac.id/4287/121/LAMPIRAN.pdf · DAFTAR HARGA SATUAN PEKERJAAN PROYEK : SOLIA BOUTIQUE HOTEL LOKASI : JL. DR. RAJIMAN 525 LAWEYAN-SURAKARTA

NO URAIAN PEKERJA SATUAN HARGA SATUAN NO1 Mandor Orang/Hari Rp150,000 12 Pekerja Orang/Hari Rp80,000 23 Tukang Batu Orang/Hari Rp95,000 34 Tukang Besi Orang/Hari Rp95,000 45 Kepala Tukang Orang/Hari Rp110,000 5

6789

10111213141516171819202122232425262728293031323334353637383940414243444546474849

Page 49: DAFTAR HARGA SATUAN PEKERJAANrepository.untag-sby.ac.id/4287/121/LAMPIRAN.pdf · DAFTAR HARGA SATUAN PEKERJAAN PROYEK : SOLIA BOUTIQUE HOTEL LOKASI : JL. DR. RAJIMAN 525 LAWEYAN-SURAKARTA

5051525354555657585960616263646566676869707172737475767778798081828384858687888990919293949596979899

Page 50: DAFTAR HARGA SATUAN PEKERJAANrepository.untag-sby.ac.id/4287/121/LAMPIRAN.pdf · DAFTAR HARGA SATUAN PEKERJAAN PROYEK : SOLIA BOUTIQUE HOTEL LOKASI : JL. DR. RAJIMAN 525 LAWEYAN-SURAKARTA

100101102103104105106107108109110111112113114115116117118119120

Page 51: DAFTAR HARGA SATUAN PEKERJAANrepository.untag-sby.ac.id/4287/121/LAMPIRAN.pdf · DAFTAR HARGA SATUAN PEKERJAAN PROYEK : SOLIA BOUTIQUE HOTEL LOKASI : JL. DR. RAJIMAN 525 LAWEYAN-SURAKARTA

JENIS MATERIAL/BAHANbeton redy mik k 300 beton deckingcuring betonmultiplek 18 mmskrupalat bantubatapasirsemenWF 350.150WF 150.100BASE PLATE 15 MMBASE PLATE 10 MMANGKUR M19ANGKUR M16MUR BAUT M16PLAT SAMBUNG 10 MMCAT ZINCROMATEWastafel ex Toto TOTO TX115LRS+TOTO LW649CJ lengkap dengan mejaTowel Shelf & Towel Bar TX726AEPaper Holder TX720ABShoap Holder ex Toto AR15Closet Jongkok ex Toto CE7Closet ex Toto CW637J/SW637JPShower ex Toto TX493SRRFloor Drain ex Toto TX1BV1NKran Dinding ex TotoRoob Hook ex TotoInstalasi Penerangan dg Kabel NYM 3 x 2.5 mm dlm Pipa Conduit dia. 20 mm2Instalasi Kotak kontak Biasa dg Kabel NYM 3 x 2.5 mm dlm Pipa Conduit dia. 20 mm2Balk LED Tube 1 x 20 WKotak Kontak BiasaSaklar GandaSaklar Grid 8 GangSaklar Grid 12 GangKabel Ladder ukuran 300 mm x 100 mmKabel Tray ukuran 300 mm x 100 mmTee Tray ukuran 300 mm x 100 mmElbow ukuran 300 mm x 100 mmInstalasi ROR Heat Detector & EORL dgn kabel NYA 2 (1x1.5) mm2Instalasi Smoke detector dgn kabel NYA 2 (1x1.5) mm2Instalasi Flow & Temper Switch dgn kabel NYA 2 (1x1.5) mm2Instalasi Manual Push Button dgn kabel NYA 2 (1x1.5) mm2Instalasi Alarm Bell dgn kabel NYA 2 (1x1.5) mm2Instalasi Indicating lamp dgn kabel NYA 2 (1x1.5) mm2ROR Heat Detector Smoke DetectorFlow SwitchTemper Switch

Page 52: DAFTAR HARGA SATUAN PEKERJAANrepository.untag-sby.ac.id/4287/121/LAMPIRAN.pdf · DAFTAR HARGA SATUAN PEKERJAAN PROYEK : SOLIA BOUTIQUE HOTEL LOKASI : JL. DR. RAJIMAN 525 LAWEYAN-SURAKARTA

Manual Push Button Alarm Bell Indicating LampEnd of line resistorTerminal Box Fire Alarm (TB-FA)Kabel Feeder fire alarmInstalasi Ceiling speaker dgn kabel NYMHY 3 x 1,5mm dlm pipa conduit PVC dia. 20 mm2Celling Speaker 3 WHorn Speaker 15 WVolume KontrolSound Terminal Box (STB) Kabel Feeder sound systemInstalasi CCTV dg kabel RG 59 + Power dlm pipa conduit PVC dia. 20 mm2In door Camera CCTV IR type Fixed Color Dome type cameraBox CCD CameraMemasang Pipa PVC dia. 150 mm kelas AWMemasang Pipa PVC dia. 100 mm kelas AWMemasang Pipa PVC dia. 75 mm kelas AWMemasang Pipa PVC dia. 75 mm kelas AWMemasang Pipa PVC dia. 50 mm kelas AWMemasang Clean Out dia. 150 mmPre Treatment lemak/ grease trap kap. 2 m3ResapanPompa Submersible SewageFitting + Supporting termasuk hanger dan u-trapMemasang Pipa PPR PN 10 dia. 25 mmMemasang Pipa PPR PN 10 dia. 20 mmMemasang Pipa PPR PN 10 dia. 15 mmMemasang Gate Valve dia. 20 mmFitting + Supporting termasuk hangerInstalasi Power AC dg Kabel NYM 3 x 2.5 mm dlm Pipa Conduit dia. 20 mm2Kabel Power Kontrol NYM 3 x 2.5 mm2 dari Indoor s/d Outdoor unitAir Conditioner Split Wall 18.000 Btu/hAir Conditioner Split Wall 5.000 Btu/hInstalasi Pipa Refrigerant uk. 1/4"Instalasi Pipa Refrigerant uk. 1/2"Memasang Pipa PVC dia. 20 mm kelas AWFitting + Supporting dan material bantuMemasang Pipa BS sch-40 dia. 150 mmMemasang Pipa BS sch-40 dia. 80 mmMemasang Pipa BS sch-40 dia. 50 mmMemasang Pipa BS sch-40 dia. 40 mmMemasang Pipa BS sch-40 dia. 32 mmMemasang Pipa BS sch-40 dia. 25 mmMemasang Pipa BS sch-40 dia. 20 mmMemasang Head Sprinkler Tipe Pendant Memasang Brach Control Valve dia. 80 mmMemasang Gate Valve 10 K with Flanges dia. 80 mmMemasang Gate Valve 10 K with Flanges dia. 50 mm

Page 53: DAFTAR HARGA SATUAN PEKERJAANrepository.untag-sby.ac.id/4287/121/LAMPIRAN.pdf · DAFTAR HARGA SATUAN PEKERJAAN PROYEK : SOLIA BOUTIQUE HOTEL LOKASI : JL. DR. RAJIMAN 525 LAWEYAN-SURAKARTA

In door Hydrant Box dgn Hose,Hose Rack, Nozel, Landing Valve dan Gate ValveMemasang Portable Fire Extinguisher type ABC 3.5 kgFitting dan assesories termasuk hangerInstalasi Exshaust FAN dg kabel NYM 2 x 2.5 mm2 dlm Pipa Conduit dia. 20 mm2Memasang Exshaust FAN 12 WDownlight LED 19 WDownlight LED 13 WDownlight LED 7 WRM LED Tube 2 x 10 WRM LED Tube 3 x 10 W Arcylic CoverBalk LED Tube 1 x 20 WLampu Strip LED 3 m/ 14.4 W/ mLampu Strip LED 26.5 m/ 14.4 W/ mLampu Strip LED 48 m/ 14.4 W/ mLampu Strip LED 33 m/ 14.4 W/ mKotak Kontak LantaiKotak Kontak BiasaSaklar GandaSaklar TunggalSaklar Hotel GandaSaklar Grid 14 Gang

Page 54: DAFTAR HARGA SATUAN PEKERJAANrepository.untag-sby.ac.id/4287/121/LAMPIRAN.pdf · DAFTAR HARGA SATUAN PEKERJAAN PROYEK : SOLIA BOUTIQUE HOTEL LOKASI : JL. DR. RAJIMAN 525 LAWEYAN-SURAKARTA

SATUAN HARGA SATUANm3 760,000.00 bh 1,500.00 m3 9,450.00 m2 80,250.00 bh 150.00 ls 11,700.00 bh 750.00 m3 135,000.00 zak 55,000.00 KG 7,500.00 KG 7,500.00 KG 7,500.00 KG 7,500.00

TITIK 159,619.50 TITIK 65,175.00

BH 7,702.50 KG 21,330.00 KG 1,422.00 Unit 1,606,380.00 Unit 57,000.00 Unit 39,310.00 Unit 39,310.00 Unit 152,750.00 Unit 193,780.00 Unit 127,230.00 Unit 45,170.00 Unit 27,580.00 Unit 27,580.00 titik 134,550.00 titik 134,550.00 bh 473,265.00 bh 20,475.00 bh 46,215.00 set 119,925.00 set 187,785.00 m1 172,500.00 m1 172,500.00 bh 172,500.00 bh 172,500.00

titik 159,705.00 titik 159,705.00 titik 159,705.00 titik 159,705.00 titik 159,705.00 titik 159,705.00 bh 253,305.00 bh 194,805.00 bh 838,305.00 bh 955,305.00

Page 55: DAFTAR HARGA SATUAN PEKERJAANrepository.untag-sby.ac.id/4287/121/LAMPIRAN.pdf · DAFTAR HARGA SATUAN PEKERJAAN PROYEK : SOLIA BOUTIQUE HOTEL LOKASI : JL. DR. RAJIMAN 525 LAWEYAN-SURAKARTA

bh 136,305.00 bh 165,555.00 bh 124,605.00 bh 9,009.00 bh 780,975.00 m1 22,932.00 titik 200,655.00 bh 177,255.00 bh 311,805.00 bh 311,805.00 bh 569,205.00 m1 26,325.00 titik 235,755.00 bh 962,910.00 bh 669,825.00 ls 585,000.00

m1 235,755.00 m1 118,755.00 m1 80,145.00 m1 80,145.00 m1 49,140.00 m1 234,819.00

Unit 7,488,000.00 Unit 2,340,000.00 Unit 23,400,000.00

ls 1,755,000.00 m1 40,131.00 m1 29,103.75 m1 21,937.50 bh 377,471.25 ls 201,649.50

titik 346,539.38 m1 20,182.50

Unit 4,387,500.00 Unit 3,925,000.00 m1 65,000.00 m1 77,000.00 m1 24,716.25 ls 64,350.00

m1 422,370.00 m1 202,410.00 m1 124,546.50 m1 88,881.39 m1 77,512.50 m1 62,595.00 m1 50,602.50 bh 105,300.00 bh 5,444,010.00 bh 2,571,660.00 bh 2,135,250.00

Page 56: DAFTAR HARGA SATUAN PEKERJAANrepository.untag-sby.ac.id/4287/121/LAMPIRAN.pdf · DAFTAR HARGA SATUAN PEKERJAAN PROYEK : SOLIA BOUTIQUE HOTEL LOKASI : JL. DR. RAJIMAN 525 LAWEYAN-SURAKARTA

unit 4,128,579.00 unit 438,165.00 ls 772,200.00

titik 141,570.00 bh 409,500.00 bh 277,875.00 bh 272,025.00 bh 252,135.00 bh 90,090.00 bh 970,515.00 bh 473,265.00 set 321,165.00 set 1,283,490.00 set 2,163,915.00 set 1,549,665.00 bh 371,475.00 bh 20,475.00 bh 46,215.00 bh 39,195.00 bh 53,235.00 set 172,575.00

Page 57: DAFTAR HARGA SATUAN PEKERJAANrepository.untag-sby.ac.id/4287/121/LAMPIRAN.pdf · DAFTAR HARGA SATUAN PEKERJAAN PROYEK : SOLIA BOUTIQUE HOTEL LOKASI : JL. DR. RAJIMAN 525 LAWEYAN-SURAKARTA

0,468 0,395

MASTER TIME SCHEDULEPROYEK PEMBANGUNAN HOTEL "SOLIA BOUTIQUE "

Jl. Dr. Radjiman-Surakarta

8sd13 14sd20 21sd 27 28sd4 5sd11 12sd18 19sd25 26sd31 1sd8 9sd15 16sd22 23sd29 31sd6 7sd13 14sd20 21sd27 28sd3 4sd10 11sd16 18sd24 25sd31 1sd7 8sd14 15sd21 22sd281 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25II III IV I II III IV V I II III IV I II III IV I II III IV V I II III IV

LIB

UR

HA

RI R

AYA

I PEKERJAAN PERSIAPAN 1,184 0,028 0,028 0,028 0,028 0,028 0,028 0,028 0,028 0,028 0,028 0,028 0,028 0,028 0,028 0,028 0,028 0,028 0,028 0,028 0,028 0,028 0,028 0,028

II PEKERJAAN STRUKTURE

1 LANTAI 1 0,333 0,167 0,167

2 LANTAI MEZANINE 0,228 0,114 0,114

3 LANTAI-2 0,814 0,271 0,271 0,271

4 LANTAI-3 1,353 0,451 0,451 0,451

5 LANTAI-4 1,253 0,418 0,418 0,418

6 LANTAI-5 1,249 0,416 0,416 0,416

7 LANTAI-6 1,251 0,417 0,417 0,417

8 LANTAI-7 1,243 0,414 0,414 0,414

9 LANTAI-8 1,180 0,393 0,393 0,393

10 LANTAI-9 1,161 0,387 0,387 0,387

11 LANTAI ATAP 0,918 0,306 0,306 0,306

III PEKERJAAN ARSITEKTURE

1 BATA & KOLOM PRAKTIS 6,700 0,064 0,258 0,348 0,498 0,498 0,583 0,540 0,450 0,450 0,600 0,450 0,450 0,537 0,387 0,243

2 PLESTERAN & ACIAN 5,942 0,277 0,277 0,486 0,486 0,418 0,461 0,461 0,252 0,504 0,504 0,252 0,460

3 KERAMIK DINDING 2,316 0,141 0,141 0,212 0,071 0,071 0,212 0,141 0,141 0,282

4 PLAFOND 2,343 0,143 0,143 0,143 0,208 0,065 0,093 0,223 0,158

5 MARMER LIFT 0,348 0,031 0,031 0,040 0,009 0,009 0,024 0,015 0,015 0,031

6 WATERPROOFING 0,188 0,022 0,022 0,021 0,021 0,021 0,027 0,006 0,006 0,012

7 KERAMIK HT, VYNIL & SCREED 5,567 0,166 0,191 0,247 0,247 0,425 0,233

8 MARMER LANTAI 2,366

9 POOL DECK 0,155

10 PENGECATAN 2,285 0,132 0,132

11 PINTU 5,907 0,165 0,165 0,165

12 JENDELA 1,972 0,255 0,255 0,255

13 GRC TRAWANGAN & GRC LIST 1,919 0,174 0,174 0,174

14 CURTAIN WALL 0,915 0,046 0,046 0,046

15 RAILLING 0,742 0,017 0,017 0,017 0,045

16 RAILLING KACA 0,029

17 CANOPY 0,486

18 SANITARY 0,824 0,015 0,015 0,015 0,025

19 KARPET TILE 1,315 0,021

IV MEP

1 PENERANGAN & STOPKONTAK 2,792 0,019 0,030 0,047 0,066 0,066 0,065 0,072 0,055 0,054 0,072 0,054 0,169 0,181

2 KABEL TRAY & LEADER 0,517 0,024 0,049 0,045 0,021 0,024 0,048 0,023 0,023 0,047 0,023 0,023 0,047 0,023 0,023 0,048 0,024

3 FIRE ALARM 0,835 0,020 0,022 0,024 0,028 0,028 0,012 0,015 0,013 0,013 0,018 0,013 0,098 0,098

4 TATA SUARA & SOUND SYSTEM 0,409 0,009 0,011 0,012 0,014 0,014 0,007 0,007 0,006 0,006 0,008 0,006 0,048 0,049

5 CCTV 0,246 0,009 0,009 0,010 0,010 0,010 0,003 0,003 0,002 0,002 0,003 0,002 0,037 0,038

6 TELEPHONE 0,400 0,014 0,014 0,016 0,017 0,017 0,005 0,007 0,005 0,005 0,007 0,005 0,058 0,058

7 MATV 0,262 0,005 0,005 0,005 0,007 0,007 0,003 0,005 0,005 0,005 0,007 0,005 0,026 0,026

8 DATA WIFI 0,069 0,001 0,001 0,002 0,002 0,002 0,002 0,002 0,001 0,001 0,001 0,001 0,006 0,006

9 PENGKONDISIAN UDARA 9,185 0,219 0,219 0,219 0,283 0,064 0,310 0,440 0,376

10 CARD LOCK 0,623 0,006 0,006 0,012 0,019 0,019 0,019 0,025 0,019 0,019 0,019

11 PENANGKAL PETIR 0,094 0,023 0,023

12 KABEL TOVUR 1,887 0,129 0,129 0,129 0,172 0,043 0,100 0,186 0,143

13 POWER HOUSE 4,771

14 AIR BERKAS & KOTOR 0,701 0,068 0,068 0,076 0,076 0,030 0,050 0,020 0,020 0,041 0,022

15 AIR BERSIH DINGIN 0,545 0,013 0,013 0,021 0,009 0,009 0,025 0,015 0,015 0,040 0,024

16 HYDRANT & SPLINKER 1,504 0,112 0,112 0,112 0,144 0,032 0,103 0,159 0,127 0,056

17 AIR PANAS 1,201 0,016 0,016 0,016 0,026 0,010 0,010 0,019 0,010

18 AIR HUJAN 0,299 0,048 0,048 0,020 0,020

19 PUMP ROOM 2,572 0,193 0,193

APRIL JUNI JULI SEPTEMBER BOBOT

(%) URAIAN PEKERJAANNO

MEI AGUSTUS

15,13

17,07

19,01

21,08

23,28

25,22

27,28

30,33

34,21

37,89

15,078000

17,074000 17,895000

19,431000

21,693000

23,658000

25,273000

28,544000

31,025697

32,801106

Page 58: DAFTAR HARGA SATUAN PEKERJAANrepository.untag-sby.ac.id/4287/121/LAMPIRAN.pdf · DAFTAR HARGA SATUAN PEKERJAAN PROYEK : SOLIA BOUTIQUE HOTEL LOKASI : JL. DR. RAJIMAN 525 LAWEYAN-SURAKARTA

20 GAS KITCHEN 0,135 0,025 0,025

V FF&E

1 HOUSE KEEPING

EQUIPMENT 1,280

ROOM 13,032

2 FOOD & BEVERAGE DEPT 0,293

3 OPERATION EQUIPMENT 0,123

4 KITCHEN OPERATION EQUIPMENT 1,042

5 KITCHEN SET 0,697

JUMLAH 100,000 0,028 0,194 0,308 0,413 0,299 0,750 0,921 1,361 - - 1,388 1,554 1,701 2,136 2,027 2,046 1,946 1,939 2,070 2,198 1,945 2,054 3,057 3,881 3,676

KOMULATIF 100,000 0,028 0,222 0,530 0,942 1,241 1,991 2,912 4,273 4,273 4,273 5,661 7,215 8,916 11,052 13,079 15,125 17,071 19,010 21,080 23,278 25,222 27,277 30,333 34,215 37,891

KOMULATIF TERCAPAI - - 1,949 3,009 4,242 5,482 6,680 6,680 6,680 6,680 6,680 6,680 10,279 11,743 12,234 15,078 17,074 17,895 19,431 21,693 23,658 25,273 28,544 31,026 32,801

OWNER MANAGEMENT KONSTRUKTIONPT. HAILAI SINAR CEMERLANG PT. HAILAI SINAR CEMERLANG

Leotine Ierma Agustina S Ir. Pongky P.B SupangkatDirektur Utama Team Leader

287,649

28,437

242,332

197,088

755,506

0,03 0,22 0,53 0,94 1,241,99

2,91

4,27 4,27 4,27

5,66

7,21

8,92

11,05

13,08

15,13

- -

1,949

3,009000

4,242000

5,482000

6,680000 6,680 6,680000 6,680000 6,680000 6,680000

10,279000

11,743000 12,234000

15,078000

Page 59: DAFTAR HARGA SATUAN PEKERJAANrepository.untag-sby.ac.id/4287/121/LAMPIRAN.pdf · DAFTAR HARGA SATUAN PEKERJAAN PROYEK : SOLIA BOUTIQUE HOTEL LOKASI : JL. DR. RAJIMAN 525 LAWEYAN-SURAKARTA

29sd5 6sd12 13sd19 20sd26 27sd2 3sd9 10sd16 17sd23 24sd30 1sd7 8sd14 15sd21 22sd28 29sd4 5sd11 12sd18 19 sd 25 26sd1 2sd8 9sd15

26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45I II III IV V I II III IV I II III IV I II III IV V I II

0,028 0,028 0,028 0,028 0,028 0,028 0,028 0,028 0,028 0,028 0,028 0,028 0,028 0,028 0,028 0,028 0,028 0,028 0,028 0,028 -

0,243 0,093 0,006 0,006

0,460 0,213 0,213 0,213 0,005

0,141 0,141 0,261 0,120 0,120 0,120

0,131 0,261 0,131 0,131 0,226 0,096 0,096 0,096

0,015 0,015 0,039 0,024 0,024 0,024

0,006 0,006 0,009 0,003 0,003 0,003

0,178 0,533 0,355 0,355 0,710 0,355 0,355 0,566 0,216 0,216 0,216

0,150 0,150 0,252 0,252 0,252 0,344 0,344 0,344 0,092 0,092 0,092

0,019 0,019 0,019 0,019 0,019 0,019 0,019 0,019

0,132 0,178 0,046 0,046 0,165 0,118 0,118 0,237 0,118 0,118 0,272 0,154 0,158 0,158

0,242 0,077 0,077 0,465 0,389 0,389 0,777 0,389 0,389 0,846 0,458 0,458 0,458

0,328 0,073 0,073 0,107 0,035 0,035 0,060 0,025 0,025 0,131 0,106 0,106 0,106

0,241 0,068 0,068 0,112 0,044 0,044 0,089 0,044 0,044 0,194 0,150 0,150 0,150

0,069 0,023 0,023 0,069 0,046 0,046 0,092 0,046 0,046 0,114 0,069 0,069 0,069

0,028 0,028 0,083 0,055 0,055 0,110 0,055 0,055 0,085 0,030 0,030 0,030

0,005 0,005 0,005 0,005 0,005 0,005

0,122 0,122 0,122 0,122

0,010 0,010 0,068 0,058 0,058 0,116 0,058 0,058 0,116 0,058 0,072 0,072

0,021 0,021 0,089 0,068 0,068 0,129 0,061 0,061 0,122 0,061 0,061 0,179 0,118 0,118 0,118

0,163 0,098 0,098 0,080 0,143 0,143 0,143 0,139 0,139 0,139 0,186 0,186 0,186 2,792 -

0,517 -

0,094 0,011 0,011 0,007 0,034 0,034 0,034 0,035 0,035 0,035 0,035 0,035 0,035 0,835 -

0,047 0,008 0,008 0,006 0,015 0,015 0,015 0,015 0,015 0,015 0,019 0,019 0,019 0,409 -

0,037 0,004 0,004 0,003 0,006 0,006 0,006 0,006 0,006 0,006 0,008 0,008 0,008 0,246 -

0,056 0,006 0,006 0,006 0,013 0,013 0,013 0,013 0,013 0,013 0,007 0,007 0,007 0,400 -

0,025 0,002 0,002 0,013 0,013 0,013 0,013 0,013 0,013 0,013 0,013 0,013 0,262 -

0,006 0,003 0,003 0,003 0,002 0,002 0,002 0,002 0,002 0,002 0,003 0,003 0,003 0,069 -

0,642 0,532 0,412 0,716 0,585 0,455 0,749 0,445 0,304 0,782 0,477 0,477 0,477 9,185 -

0,012 0,006 0,006 0,048 0,048 0,048 0,048 0,048 0,048 0,048 0,048 0,048 0,623 -

0,023 0,023 0,094 -

0,086 0,172 0,086 0,086 0,172 0,086 0,086 0,086 1,887 -

0,358 0,358 0,358 0,358 0,835 0,835 0,835 0,835 4,771 -

0,022 0,068 0,047 0,047 0,047 0,701 -

0,024 0,102 0,078 0,078 0,078 0,545 -

0,113 0,056 0,056 0,123 0,067 0,067 0,067 1,504 -

0,010 0,192 0,182 0,182 0,182 0,166 0,166 1,201 -

0,014 0,027 0,014 0,014 0,027 0,014 0,014 0,020 0,007 0,007 0,007 0,299 -

0,193 0,193 0,450 0,450 0,450 0,450 2,572 -

DESEMBER FEBRUARIJANUARINOVEMBEROKTOBER

37,89

41,90

45,35

48,64

52,58

57,49

61,74

66,43

70,39

73,58

77,85

82,00

85,82

89,35

91,84

93,3494,67

96,0097,34

98,67100,00

32,801106

33,977705

39,921735

45,627928

Page 60: DAFTAR HARGA SATUAN PEKERJAANrepository.untag-sby.ac.id/4287/121/LAMPIRAN.pdf · DAFTAR HARGA SATUAN PEKERJAAN PROYEK : SOLIA BOUTIQUE HOTEL LOKASI : JL. DR. RAJIMAN 525 LAWEYAN-SURAKARTA

0,025 0,034 0,009 0,009 0,009 0,135 -

0,183 0,183 0,183 0,183 0,183 0,183 0,183

0,815 0,815 0,815 0,815 0,815 0,815 0,815 0,815 0,815 0,815 0,815 0,815 0,815 0,815 0,815 0,815

0,042 0,042 0,042 0,042 0,042 0,042 0,042

0,018 0,018 0,018 0,018 0,018 0,018 0,018

0,149 0,149 0,149 0,149 0,149 0,149 0,149

0,100 0,100 0,100 0,100 0,100 0,100 0,100

4,011 3,453 3,290 3,938 4,904 4,255 4,685 3,968 3,183 4,268 4,153 3,817 3,532 2,492 1,499 1,333 1,333 1,333 1,333 1,333

41,902 45,355 48,644 52,582 57,487 61,741 66,426 70,394 73,577 77,845 81,998 85,815 89,347 91,838 93,337 94,670 96,003 97,335 98,668 100,00

33,978 39,922 45,628 46,990

KONTRAKTOR PELAKSANAPT. TATA BUMI RAYA

Ir. M. SamsuriProject Manager

Page 61: DAFTAR HARGA SATUAN PEKERJAANrepository.untag-sby.ac.id/4287/121/LAMPIRAN.pdf · DAFTAR HARGA SATUAN PEKERJAAN PROYEK : SOLIA BOUTIQUE HOTEL LOKASI : JL. DR. RAJIMAN 525 LAWEYAN-SURAKARTA

1sd8 9sd15 16sd22 23sd29 31sd6 7sd13 14sd20 21sd27 28sd3 4sd10 11sd16 18sd24 25sd31 1sd7 8sd14 15sd21

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

I II III IV I II III IV I II III IV V I II III

1 BATA & KOLOM PRAKTIS

Lantai basement 0,129 0,129 0,026 0,026 0,026 0,026 0,026

Lantai-1 0,192 0,192 0,038 0,038 0,038 0,038 0,038

Lantai mezanine 0,967 0,967 0,193 0,193 0,193 0,193 0,193

Lantai -2 0,449 0,449 0,090 0,090 0,090 0,090 0,090

Lantai -3 0,750 0,750 0,150 0,150 0,150 0,150 0,150

Lantai -4 0,750 0,750 0,150 0,150 0,150 0,150 0,150

Lantai -5 0,750 0,750 0,150 0,150 0,150 0,150 0,150

Lantai -6 0,750 0,750 0,150 0,150 0,150 0,150 0,150

Lantai -7 0,750 0,750 0,150 0,150 0,150 0,150 0,150

Lantai -8 0,750 0,750 0,150 0,150 0,150

Lantai -9 0,435 0,435 0,087 0,087

Lantai atap 0,028 0,028

2 PLESTER & ACIAN

Lantai basement 0,113 0,113 0,028 0,028 0,028 0,028

Lantai-1 0,160 0,160 0,040 0,040 0,040 0,040

Lantai mezanine 1,043 1,043 0,209 0,209 0,209 0,209 0,209

Lantai -2 0,417 0,417 0,083 0,083 0,083 0,083 0,083

Lantai -3 0,630 0,630 0,126 0,126 0,126 0,126 0,126

Lantai -4 0,630 0,630 0,126 0,126 0,126 0,126 0,126

Lantai -5 0,630 0,630 0,126 0,126 0,126 0,126 0,126

Lantai -6 0,630 0,630 0,126 0,126 0,126

Lantai -7 0,630 0,630 0,126 0,126 0,126

Lantai -8 0,630 0,630

Lantai -9 0,410 0,410

Lantai atap 0,021 0,021

3 KERAMIK DINDING

Lantai-1 0,131 0,131 0,044 0,044 0,044

Lantai mezanine 0,082 0,082 0,027 0,027 0,027

Lantai -2 0,211 0,211 0,070 0,070 0,070

Lantai -3 0,282 0,282 0,071 0,071 0,071 0,071

Lantai -4 0,282 0,282 0,071 0,071 0,071

Lantai -5 0,282 0,282 0,071 0,071 0,071

Lantai -6 0,282 0,282

Lantai -7 0,282 0,282

Lantai -8 0,282 0,282

Lantai -9 0,198 0,198

4 PLAFOND & SHADOWLINE

Basement 0,082 0,082 0,027 0,027

Lantai-1 0,129 0,129 0,032 0,032 0,032 0,032

Mezanine 0,116 0,116 0,029 0,029 0,029 0,029

Lantai-2 0,328 0,328 0,082 0,082 0,082 0,082

Lantai-3 0,261 0,261 0,065 0,065 0,065 0,065

Lantai-4 0,261 0,261 0,065

Lantai-5 0,261 0,261 0,065

Lantai-6 0,261 0,261

Lantai-7 0,261 0,261

Lantai-8 0,261 0,261

Lantai-9 0,121 0,121

Lantai-atap 0,001 0,001

5 MARMER LIFT

Basement 0,036 0,036 0,012 0,012 0,012

Lantai-1 0,031 0,031 0,010 0,010 0,010

Mezanine 0,027 0,027 0,009 0,009 0,009

SCHEDULE PEKERJAAN ARSITEKTUREPROYEK : "SOLIA BOUTIQUE HOTEL" LAWEYAN-SURAKARTA

AGUSTUS SEPTEMBER

NO URAIAN PEKERJAAN ARSITEKTURE

JULIJUNIBOBOT

(%)

Page 62: DAFTAR HARGA SATUAN PEKERJAANrepository.untag-sby.ac.id/4287/121/LAMPIRAN.pdf · DAFTAR HARGA SATUAN PEKERJAAN PROYEK : SOLIA BOUTIQUE HOTEL LOKASI : JL. DR. RAJIMAN 525 LAWEYAN-SURAKARTA

1sd8 9sd15 16sd22 23sd29 31sd6 7sd13 14sd20 21sd27 28sd3 4sd10 11sd16 18sd24 25sd31 1sd7 8sd14 15sd21

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

I II III IV I II III IV I II III IV V I II III

AGUSTUS SEPTEMBER

NO URAIAN PEKERJAAN ARSITEKTURE

JULIJUNIBOBOT

(%)

Lantai-2 0,036 0,036 0,009 0,009 0,009 0,009

Lantai-3 0,031 0,031 0,008 0,008 0,008

Lantai-4 0,031 0,031 0,008 0,008 0,008

Lantai-5 0,031 0,031

Lantai-6 0,031 0,031

Lantai-7 0,031 0,031

Lantai-8 0,031 0,031

Lantai-9 0,033 0,033

6 WATERPROOFING

Basement 0,090 0,090 0,015 0,015 0,015 0,015 0,015 0,015

Lantai-1 0,008 0,008 0,004 0,004

Mezanine 0,002 0,002 0,001 0,001

Lantai-2 0,003 0,003 0,002 0,002

Lantai-3 0,012 0,012 0,003 0,003 0,003 0,003

Lantai-4 0,012 0,012 0,003 0,003 0,003 0,003

Lantai-5 0,012 0,012 0,003 0,003 0,003

Lantai-6 0,012 0,012 0,003 0,003 0,003

Lantai-7 0,012 0,012

Lantai-8 0,012 0,012

Lantai-9 0,004 0,004

Lantai-atap 0,009 0,009

7 KERAMIK, HT, HARDENER & VINYL

Basement 0,223 0,223 0,056 0,056 0,056

Lantai-1 0,102 0,102 0,025 0,025 0,025 0,025

Mezanine 0,228 0,228 0,046 0,046 0,046 0,046 0,046

Lantai-2 0,602 0,602 0,120 0,120 0,120 0,120 0,120

Lantai-3 0,710 0,710 0,178

Lantai-4 0,710 0,710

Lantai-5 0,710 0,710

Lantai-6 0,710 0,710

Lantai-7 0,710 0,710

Lantai-8 0,710 0,710

Lantai-9 0,133 0,133

Lantai-atap 0,017 0,017

8 MARMER LANTAI

Lantai-1 0,613 0,613

Lantai-2 1,200 1,200

Lantai-9 0,553 0,553

9 POOL-DECK

Lantai-9 0,155 0,155

10 PENGECATAN

Basement 0,057 0,057 0,014

Lantai-1 0,073 0,073 0,018

Mezanine 0,397 0,397 0,099

Lantai-2 0,186 0,186

Lantai-3 0,237 0,237

Lantai-4 0,237 0,237

Lantai-5 0,237 0,237

Lantai-6 0,237 0,237

Lantai-7 0,237 0,237

Lantai-8 0,237 0,237

Lantai-9 0,142 0,142

Lantai-atap 0,008 0,008

11 PINTU

Basement 0,136 0,136 0,034 0,034

Lantai-1 0,224 0,224 0,056 0,056

Mezanine 0,302 0,302 0,075 0,075

Lantai-2 0,306 0,306

Page 63: DAFTAR HARGA SATUAN PEKERJAANrepository.untag-sby.ac.id/4287/121/LAMPIRAN.pdf · DAFTAR HARGA SATUAN PEKERJAAN PROYEK : SOLIA BOUTIQUE HOTEL LOKASI : JL. DR. RAJIMAN 525 LAWEYAN-SURAKARTA

1sd8 9sd15 16sd22 23sd29 31sd6 7sd13 14sd20 21sd27 28sd3 4sd10 11sd16 18sd24 25sd31 1sd7 8sd14 15sd21

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

I II III IV I II III IV I II III IV V I II III

AGUSTUS SEPTEMBER

NO URAIAN PEKERJAAN ARSITEKTURE

JULIJUNIBOBOT

(%)

Lantai-3 0,777 0,777

Lantai-4 0,777 0,777

Lantai-5 0,777 0,777

Lantai-6 0,777 0,777

Lantai-7 0,777 0,777

Lantai-8 0,777 0,777

Lantai-9 0,276 0,276

12 JENDELA

Basement 0,039 0,039 0,010 0,010

Lantai-1 0,826 0,826 0,206 0,206

Mezanine 0,154 0,154 0,039 0,039

Lantai-2 0,291 0,291

Lantai-3 0,050 0,050

Lantai-4 0,089 0,089

Lantai-5 0,050 0,050

Lantai-6 0,050 0,050

Lantai-7 0,050 0,050

Lantai-8 0,050 0,050

Lantai-9 0,288 0,288

Lantai-atap 0,035 0,035

13 GRC TRAWANGAN & GRC LIS

Lantai-1 0,358 0,358 0,090 0,090

Mezanine 0,336 0,336 0,084 0,084

Lantai-2 0,271 0,271

Lantai-3 0,089 0,089

Lantai-4 0,089 0,089

Lantai-5 0,089 0,089

Lantai-6 0,089 0,089

Lantai-7 0,089 0,089

Lantai-8 0,089 0,089

Lantai-9 0,257 0,257

Lantai-atap 0,165 0,165

14 CURTAINWALL

Lantai-1 0,092 0,092 0,023 0,023

Mezanine 0,092 0,092 0,023 0,023

Lantai-2 0,092 0,092

Lantai-3 0,092 0,092

Lantai-4 0,092 0,092

Lantai-5 0,092 0,092

Lantai-6 0,092 0,092

Lantai-7 0,092 0,092

Lantai-8 0,092 0,092

Lantai-9 0,092 0,092

15 RAILLING

Lantai-1 0,011 0,011 0,003 0,003 0,003

Mezanine 0,038 0,038 0,010 0,010 0,010

Lantai-2 0,021 0,021 0,005 0,005 0,005

Lantai-3 0,110 0,110

Lantai-4 0,110 0,110

Lantai-5 0,110 0,110

Lantai-6 0,110 0,110

Lantai-7 0,110 0,110

Lantai-8 0,110 0,110

Lantai-9 0,011 0,011

16 RAILLING KACA

Lantai-1 0,029 0,029

17 CANOPY 0,486 0,486

Page 64: DAFTAR HARGA SATUAN PEKERJAANrepository.untag-sby.ac.id/4287/121/LAMPIRAN.pdf · DAFTAR HARGA SATUAN PEKERJAAN PROYEK : SOLIA BOUTIQUE HOTEL LOKASI : JL. DR. RAJIMAN 525 LAWEYAN-SURAKARTA

1sd8 9sd15 16sd22 23sd29 31sd6 7sd13 14sd20 21sd27 28sd3 4sd10 11sd16 18sd24 25sd31 1sd7 8sd14 15sd21

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

I II III IV I II III IV I II III IV V I II III

AGUSTUS SEPTEMBER

NO URAIAN PEKERJAAN ARSITEKTURE

JULIJUNIBOBOT

(%)

18 SANITARY

Basement 0,010 0,010 0,003 0,003 0,003

Lantai-1 0,028 0,028 0,007 0,007 0,007

Mezanine 0,022 0,022 0,005 0,005 0,005

Lantai-2 0,039 0,039

Lantai-3 0,116 0,116

Lantai-4 0,116 0,116

Lantai-5 0,116 0,116

Lantai-6 0,116 0,116

Lantai-7 0,116 0,116

Lantai-8 0,116 0,116

Lantai-9 0,028 0,028

19 KARPET TILE

Lantai-1 0,085 0,085

Lantai-2 0,271 0,271

Lantai-3 0,122 0,122

Lantai-4 0,122 0,122

Lantai-5 0,122 0,122

Lantai-6 0,122 0,122

Lantai-7 0,122 0,122

Lantai-8 0,122 0,122

Lantai-9 0,226 0,226

TOTAL 42,320 0,064 0,258 0,348 0,774 0,774 1,069 1,221 1,206 1,328 1,471 1,202 1,562 2,215 2,253

KOMULATIF 42,320 0,064 0,322 0,670 1,444 2,218 3,288 4,508 5,714 7,042 8,513 9,715 11,277 13,492 15,745

OWNER MANAGEMENT KONSTRUKTIONPT. HAILAI SINAR CEMERLANG PT. HAILAI SINAR CEMERLANG

Leontine Ierma Agustina S Ir. Totok SudarmantoDirektur Utama Team Leader

1sd8 9sd15 16sd22 23sd29 31sd6 7sd13 14sd20 21sd27 28sd3 4sd10 11sd16 18sd24 25sd31 1sd7 8sd14 15sd21

BATA & KOLOM PRAKTIS 6,700 0,064 0,258 0,348 0,498 0,498 0,583 0,540 0,450 0,450 0,600 0,450 0,450 0,537 0,387

PLESTERAN & ACIAN 5,942 0,277 0,277 0,486 0,486 0,418 0,461 0,461 0,252 0,504 0,504 0,252

KERAMIK DINDING 2,316 0,141 0,141 0,212 0,071 0,071 0,212 0,141 0,141

PLAFOND 2,343 0,143 0,143 0,143 0,208 0,065 0,093 0,223

MARMER LIFT 0,348 0,031 0,031 0,040 0,009 0,009 0,024 0,015 0,015

WATERPROOFING 0,188 0,022 0,022 0,021 0,021 0,021 0,027 0,006 0,006

KERAMIK HT, VYNIL & SCREED 5,567 0,166 0,191 0,247 0,247 0,425

MARMER LANTAI 2,366

POOL DECK 0,155

PENGECATAN 2,285 0,132

PINTU 5,907 0,165 0,165

JENDELA 1,972 0,255 0,255

GRC TRAWANGAN & GRC LIST 1,919 0,174 0,174

CURTAIN WALL 0,915 0,046 0,046

RAILLING 0,742 0,017 0,017 0,017

RAILLING KACA 0,029

CANOPY 0,486

SANITARY 0,824 0,015 0,015 0,015

JUNI JULI AGUSTUS SEPTEMBER

Page 65: DAFTAR HARGA SATUAN PEKERJAANrepository.untag-sby.ac.id/4287/121/LAMPIRAN.pdf · DAFTAR HARGA SATUAN PEKERJAAN PROYEK : SOLIA BOUTIQUE HOTEL LOKASI : JL. DR. RAJIMAN 525 LAWEYAN-SURAKARTA

1sd8 9sd15 16sd22 23sd29 31sd6 7sd13 14sd20 21sd27 28sd3 4sd10 11sd16 18sd24 25sd31 1sd7 8sd14 15sd21

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

I II III IV I II III IV I II III IV V I II III

AGUSTUS SEPTEMBER

NO URAIAN PEKERJAAN ARSITEKTURE

JULIJUNIBOBOT

(%)

KARPET TILE 1,315

42,320

Page 66: DAFTAR HARGA SATUAN PEKERJAANrepository.untag-sby.ac.id/4287/121/LAMPIRAN.pdf · DAFTAR HARGA SATUAN PEKERJAAN PROYEK : SOLIA BOUTIQUE HOTEL LOKASI : JL. DR. RAJIMAN 525 LAWEYAN-SURAKARTA

22sd28 29sd5 6sd12 13sd19 20sd26 27sd2 3sd9 10sd16 17sd23 24sd30 1sd7 8sd14 15sd21 22sd28 29sd4 5sd11

25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

IV I II III IV V I II III IV I II III IV I II

0,150 0,150

0,087 0,087 0,087

0,006 0,006 0,006 0,006 0,006

0,126 0,126

0,126 0,126

0,126 0,126 0,126 0,126 0,126

0,082 0,082 0,082 0,082 0,082

0,005 0,005 0,005 0,005

0,071

0,071

0,071 0,071 0,071 0,071

0,071 0,071 0,071 0,071

0,071 0,071 0,071 0,071

0,049 0,049 0,049 0,049

0,027

0,065 0,065 0,065

0,065 0,065 0,065

0,065 0,065 0,065 0,065

0,065 0,065 0,065 0,065

0,065 0,065 0,065 0,065

0,030 0,030 0,030 0,030

0,000 0,000 0,000 0,000

SCHEDULE PEKERJAAN ARSITEKTUREPROYEK : "SOLIA BOUTIQUE HOTEL" LAWEYAN-SURAKARTA

SEPTEMBER OKTOBER NOVEMBER DESEMBER JANUARI

Page 67: DAFTAR HARGA SATUAN PEKERJAANrepository.untag-sby.ac.id/4287/121/LAMPIRAN.pdf · DAFTAR HARGA SATUAN PEKERJAAN PROYEK : SOLIA BOUTIQUE HOTEL LOKASI : JL. DR. RAJIMAN 525 LAWEYAN-SURAKARTA

22sd28 29sd5 6sd12 13sd19 20sd26 27sd2 3sd9 10sd16 17sd23 24sd30 1sd7 8sd14 15sd21 22sd28 29sd4 5sd11

25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

IV I II III IV V I II III IV I II III IV I II

SEPTEMBER OKTOBER NOVEMBER DESEMBER JANUARI

0,008

0,008

0,008 0,008 0,008 0,008

0,008 0,008 0,008 0,008

0,008 0,008 0,008 0,008

0,008 0,008 0,008 0,008

0,008 0,008 0,008 0,008

0,003

0,003

0,003 0,003 0,003 0,003

0,003 0,003 0,003 0,003

0,001 0,001 0,001 0,001

0,002 0,002 0,002 0,002

0,056

0,178 0,178 0,178

0,178 0,178 0,178 0,178

0,178 0,178 0,178 0,178

0,178 0,178 0,178 0,178

0,178 0,178 0,178 0,178

0,178 0,178 0,178 0,178

0,033 0,033 0,033 0,033

0,006 0,006 0,006

0,102 0,102 0,102 0,102 0,102 0,102

0,150 0,150 0,150 0,150 0,150 0,150 0,150 0,150

0,092 0,092 0,092 0,092 0,092 0,092

0,019 0,019 0,019 0,019 0,019 0,019 0,019 0,019

0,014 0,014 0,014

0,018 0,018 0,018

0,099 0,099 0,099

0,046 0,046 0,046 0,046

0,059 0,059 0,059 0,059

0,059 0,059 0,059 0,059

0,059 0,059 0,059 0,059

0,059 0,059 0,059 0,059

0,059 0,059 0,059232 0,059

0,059 0,059 0,059232 0,059

0,036 0,036 0,035534 0,036

0,003976 0,004

0,034 0,034

0,056 0,056

0,075 0,075

0,077 0,077 0,077 0,077

Page 68: DAFTAR HARGA SATUAN PEKERJAANrepository.untag-sby.ac.id/4287/121/LAMPIRAN.pdf · DAFTAR HARGA SATUAN PEKERJAAN PROYEK : SOLIA BOUTIQUE HOTEL LOKASI : JL. DR. RAJIMAN 525 LAWEYAN-SURAKARTA

22sd28 29sd5 6sd12 13sd19 20sd26 27sd2 3sd9 10sd16 17sd23 24sd30 1sd7 8sd14 15sd21 22sd28 29sd4 5sd11

25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

IV I II III IV V I II III IV I II III IV I II

SEPTEMBER OKTOBER NOVEMBER DESEMBER JANUARI

0,194 0,194 0,194 0,194

0,194 0,194 0,194 0,194

0,194 0,194 0,194 0,194

0,194 0,194 0,194 0,194

0,194 0,194 0,194 0,19427

0,194 0,194 0,194 0,19427

0,069 0,069 0,069 0,069075

0,010 0,010

0,206 0,206

0,039 0,039

0,073 0,073 0,073 0,073

0,012 0,012 0,012 0,012

0,022 0,022 0,022 0,022

0,012 0,012 0,012 0,012

0,012 0,012 0,012 0,012

0,012 0,012 0,012 0,012498

0,012 0,012 0,012 0,012498

0,072 0,072 0,072 0,072012

0,009 0,009 0,009 0,008696

0,090 0,090

0,084 0,084

0,068 0,068 0,068 0,068

0,022 0,022 0,022 0,022

0,022 0,022 0,022 0,022

0,022 0,022 0,022 0,022

0,022 0,022 0,022 0,022

0,022 0,022 0,022 0,022142

0,022 0,022 0,022 0,022142

0,064 0,064 0,064 0,064317

0,041 0,041 0,041 0,041331

0,023 0,023

0,023 0,023

0,023 0,023 0,023 0,023

0,023 0,023 0,023 0,023

0,023 0,023 0,023 0,023

0,023 0,023 0,023 0,023

0,023 0,023 0,023 0,023

0,023 0,023 0,023 0,022876

0,023 0,023 0,023 0,022876

0,023 0,023 0,023 0,022876

0,003

0,010

0,005

0,028 0,028 0,028 0,028

0,028 0,028 0,028 0,028

0,028 0,028 0,028 0,028

0,028 0,028 0,028 0,028

0,028 0,028 0,028 0,028

0,028 0,028 0,028 0,028

0,003 0,003 0,003 0,003

0,005 0,005 0,005 0,005 0,005 0,005

0,122 0,122 0,122 0,122

Page 69: DAFTAR HARGA SATUAN PEKERJAANrepository.untag-sby.ac.id/4287/121/LAMPIRAN.pdf · DAFTAR HARGA SATUAN PEKERJAAN PROYEK : SOLIA BOUTIQUE HOTEL LOKASI : JL. DR. RAJIMAN 525 LAWEYAN-SURAKARTA

22sd28 29sd5 6sd12 13sd19 20sd26 27sd2 3sd9 10sd16 17sd23 24sd30 1sd7 8sd14 15sd21 22sd28 29sd4 5sd11

25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

IV I II III IV V I II III IV I II III IV I II

SEPTEMBER OKTOBER NOVEMBER DESEMBER JANUARI

0,003

0,007

0,005

0,010 0,010 0,010 0,010

0,029 0,029 0,029 0,029

0,029 0,029 0,029 0,029

0,029 0,029 0,029 0,029

0,029 0,029 0,029 0,029

0,029 0,029 0,029 0,029

0,029 0,029 0,029 0,029

0,014 0,014

0,021 0,021 0,021 0,021

0,068 0,068 0,068 0,068

0,031 0,031 0,031 0,031

0,031 0,031 0,031 0,031

0,031 0,031 0,031 0,031

0,031 0,031 0,031 0,031

0,031 0,03055 0,031 0,03055

0,031 0,03055 0,031 0,03055

0,056 0,056456 0,056 0,056456

2,281 2,393 1,889 1,792 2,104 2,220 1,949 2,129 1,945 1,400 2,008 1,672 1,343 1,057 0,276 0,118

18,026 20,419 22,308 24,100 26,204 28,423 30,372 32,501 34,446 35,846 37,854 39,526 40,869 41,927 42,202 42,320

SURAKARTA, 29 MEI 2019PT. TATA BUMI RAYA

Ir. M. SyamsuriProject Manager

22sd28 29sd5 6sd12 13sd19 20sd26 27sd2 3sd9 10sd16 17sd23 24sd30 1sd7 8sd14 15sd21 22sd28 29sd4 5sd11

0,243 0,243 0,093 0,006 0,006

0,460 0,460 0,213 0,213 0,213 0,005

0,282 0,141 0,141 0,261 0,120 0,120 0,120

0,158 0,131 0,261 0,131 0,131 0,226 0,096 0,096 0,096

0,031 0,015 0,015 0,039 0,024 0,024 0,024

0,012 0,006 0,006 0,009 0,003 0,003 0,003

0,233 0,178 0,533 0,355 0,355 0,710 0,355 0,355 0,566 0,216 0,216 0,216

0,150 0,150 0,252 0,252 0,252 0,344 0,344 0,344 0,092 0,092 0,092

0,019 0,019 0,019 0,019 0,019 0,019 0,019 0,019

0,132 0,132 0,178 0,046 0,046 0,165 0,118 0,118 0,237 0,118 0,118 0,272 0,154 0,158 0,158

0,165 0,242 0,077 0,077 0,465 0,389 0,389 0,777 0,389 0,389 0,846 0,458 0,458 0,458

0,255 0,328 0,073 0,073 0,107 0,035 0,035 0,060 0,025 0,025 0,131 0,106 0,106 0,106

0,174 0,241 0,068 0,068 0,112 0,044 0,044 0,089 0,044 0,044 0,194 0,150 0,150 0,150

0,046 0,069 0,023 0,023 0,069 0,046 0,046 0,092 0,046 0,046 0,114 0,069 0,069 0,069

0,045 0,028 0,028 0,083 0,055 0,055 0,110 0,055 0,055 0,085 0,030 0,030 0,030

0,005 0,005 0,005 0,005 0,005 0,005

0,122 0,122 0,122 0,122

0,025 0,010 0,010 0,068 0,058 0,058 0,116 0,058 0,058 0,116 0,058 0,072 0,072

NOVEMBER DESEMBER JANUARISEPTEMBER OKTOBER

Page 70: DAFTAR HARGA SATUAN PEKERJAANrepository.untag-sby.ac.id/4287/121/LAMPIRAN.pdf · DAFTAR HARGA SATUAN PEKERJAAN PROYEK : SOLIA BOUTIQUE HOTEL LOKASI : JL. DR. RAJIMAN 525 LAWEYAN-SURAKARTA

22sd28 29sd5 6sd12 13sd19 20sd26 27sd2 3sd9 10sd16 17sd23 24sd30 1sd7 8sd14 15sd21 22sd28 29sd4 5sd11

25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

IV I II III IV V I II III IV I II III IV I II

SEPTEMBER OKTOBER NOVEMBER DESEMBER JANUARI

0,021 0,021 0,021 0,089 0,068 0,068 0,129 0,061 0,061 0,122 0,061 0,061 0,179 0,118 0,118 0,118

Page 71: DAFTAR HARGA SATUAN PEKERJAANrepository.untag-sby.ac.id/4287/121/LAMPIRAN.pdf · DAFTAR HARGA SATUAN PEKERJAAN PROYEK : SOLIA BOUTIQUE HOTEL LOKASI : JL. DR. RAJIMAN 525 LAWEYAN-SURAKARTA

19sd25 26sd31 1sd8 9sd15 16sd22 23sd29 31sd6 7sd13 14sd20 21sd27 28sd3 4sd10 11sd16 18sd24 25sd31 1sd7 8sd14 15sd21

7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

IV V I II III IV I II III IV I II III IV V I II III

1 PENERANGAN & STOPKONTAK

Lantai basement 0,113 0,007 0,007 0,007 0,007 0,007 0,026

Lantai 1 0,206 0,012 0,012 0,012 0,012 0,012 0,048

Lantai mezanine 0,175 0,010 0,010 0,010 0,010 0,010 0,041

Lantai 2 0,292 0,018 0,018 0,018 0,018 0,018

Lantai 3 0,316 0,019 0,019 0,019 0,019 0,019

Lantai 4 0,298 0,018 0,018 0,018 0,018 0,018

Lantai 5 0,298 0,018 0,018 0,018 0,018 0,018

Lantai 6 0,298 0,018 0,018 0,018 0,018

Lantai 7 0,298 0,018 0,018 0,018

Lantai 8 0,298 0,018

Lantai 9/ kolam renang 0,200

2 KABEL TRAY & LEADER

Lantai basement 0,049 0,024 0,024

Lantai 1 0,049 0,024 0,024

Lantai mezanine 0,042 0,021 0,021

Lantai 2 0,049 0,024 0,024

Lantai 3 0,047 0,023 0,023

Lantai 4 0,047 0,023 0,023

Lantai 5 0,047 0,023 0,023

Lantai 6 0,047 0,023 0,023

Lantai 7 0,047 0,023 0,023

Lantai 8 0,047 0,023 0,023

Lantai 9/ kolam renang 0,049 0,024 0,024

3 FIRE ALARM

Lantai basement 0,027 0,002 0,002 0,002 0,002 0,002 0,006

Lantai 1 0,313 0,019 0,019 0,019 0,019 0,019 0,073

Lantai mezanine 0,024 0,001 0,001 0,001 0,001 0,001 0,006

Lantai 2 0,028 0,002 0,002 0,002 0,002 0,002

Lantai 3 0,073 0,004 0,004 0,004 0,004 0,004

Lantai 4 0,074 0,004 0,004 0,004 0,004 0,004

Lantai 5 0,074 0,004 0,004 0,004 0,004 0,004

Lantai 6 0,074 0,004 0,004 0,004 0,004

Lantai 7 0,074 0,004 0,004 0,004

Lantai 8 0,074 0,004

4 TATA SUARA/ SOUND SYSTEM

Lantai basement 0,014 0,001 0,001 0,001 0,001 0,001 0,003

Lantai 1 0,136 0,008 0,008 0,008 0,008 0,008 0,032

Lantai mezanine 0,028 0,002 0,002 0,002 0,002 0,002 0,007

Lantai 2 0,020 0,001 0,001 0,001 0,001 0,001

Lantai 3 0,032 0,002 0,002 0,002 0,002 0,002

Lantai 4 0,032 0,002 0,002 0,002 0,002 0,002

Lantai 5 0,032 0,002 0,002 0,002 0,002 0,002

Lantai 6 0,032 0,002 0,002 0,002 0,002

Lantai 7 0,032 0,002 0,002 0,002

Lantai 8 0,033 0,002

Lantai 9/ kolam renang 0,015

5 CCTV

Lantai basement 0,021 0,001 0,001 0,001 0,001 0,001 0,005

Lantai 1 0,121 0,007 0,007 0,007 0,007 0,007 0,028

Lantai mezanine 0,008 0,000 0,000 0,000 0,000 0,000 0,002

Lantai 2 0,010 0,001 0,001 0,001 0,001 0,001

Lantai 3 0,013 0,001 0,001 0,001 0,001 0,001

Lantai 4 0,013 0,001 0,001 0,001 0,001 0,001

SCHEDULE PEKERJAAN MEPPROYEK : SOLIA BOUTIQUE HOTEL, LAWEYAN-SURAKARTA

BOBOT

(%)NO URAIAN PEKERJAAN MEP

MEI JUNI JULI AGUSTUS SEPTEMBER

Page 72: DAFTAR HARGA SATUAN PEKERJAANrepository.untag-sby.ac.id/4287/121/LAMPIRAN.pdf · DAFTAR HARGA SATUAN PEKERJAAN PROYEK : SOLIA BOUTIQUE HOTEL LOKASI : JL. DR. RAJIMAN 525 LAWEYAN-SURAKARTA

19sd25 26sd31 1sd8 9sd15 16sd22 23sd29 31sd6 7sd13 14sd20 21sd27 28sd3 4sd10 11sd16 18sd24 25sd31 1sd7 8sd14 15sd21

7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

IV V I II III IV I II III IV I II III IV V I II III

BOBOT

(%)NO URAIAN PEKERJAAN MEP

MEI JUNI JULI AGUSTUS SEPTEMBER

Lantai 5 0,013 0,001 0,001 0,001 0,001 0,001

Lantai 6 0,013 0,001 0,001 0,001 0,001

Lantai 7 0,013 0,001 0,001 0,001

Lantai 8 0,013 0,001

Lantai 9/ kolam renang 0,010

6 TELPON

Lantai basement

Lantai 1 0,214 0,013 0,013 0,013 0,013 0,013 0,050

Lantai mezanine 0,013 0,001 0,001 0,001 0,001 0,001 0,003

Lantai 2 0,006 0,000 0,000 0,000 0,000 0,000 0,001

Lantai 3 0,026 0,002 0,002 0,002 0,002 0,002

Lantai 4 0,027 0,002 0,002 0,002 0,002 0,002

Lantai 5 0,028 0,002 0,002 0,002 0,002 0,002

Lantai 6 0,028 0,002 0,002 0,002 0,002 0,002

Lantai 7 0,028 0,002 0,002 0,002 0,002

Lantai 8 0,029 0,002 0,002 0,002

Lantai 9/ kolam renang 0,001 0,000

7 MATV

Lantai 1 0,091 0,005 0,005 0,005 0,005 0,005 0,021

Lantai 3 0,028 0,002 0,002 0,002 0,002 0,002

Lantai 4 0,028 0,002 0,002 0,002 0,002 0,002

Lantai 5 0,028 0,002 0,002 0,002 0,002 0,002

Lantai 6 0,028 0,002 0,002 0,002 0,002

Lantai 7 0,028 0,002 0,002 0,002

Lantai 8 0,029 0,002

8 DATA/WFI

Lantai 1 0,012 0,001 0,001 0,001 0,001 0,001 0,003

Lantai mezanine 0,010 0,001 0,001 0,001 0,001 0,001 0,002

Lantai 2 0,010 0,001 0,001 0,001 0,001 0,001

Lantai 3 0,005 0,000 0,000 0,000 0,000 0,000

Lantai 4 0,005 0,000 0,000 0,000 0,000 0,000

Lantai 5 0,005 0,000 0,000 0,000 0,000 0,000

Lantai 6 0,005 0,000 0,000 0,000 0,000

Lantai 7 0,005 0,000 0,000 0,000

Lantai 8 0,005 0,000

Lantai 9/ kolam renang 0,004

9 PEKERJAAN INSTALASI PENGKONDISIAN UDARA

Lantai basement 0,059 0,006 0,006

Lantai 1 0,789 0,059 0,059 0,059 0,059 0,138 0,138

Lantai mezanine 0,582 0,044 0,044 0,044 0,044 0,102 0,102

Lantai 2 1,550 0,116 0,116 0,116 0,116

Lantai 3 0,855 0,064 0,064 0,064 0,064

Lantai 4 0,883 0,066

Lantai 5 0,855 0,064

Lantai 6 0,883

Lantai 7 0,855

Lantai 8 0,883

Lantai 9/ kolam renang 0,990

10 INSTALASI CARD LOCK

Lantai 3 0,104 0,006 0,006 0,006 0,006 0,006

Lantai 4 0,104 0,006 0,006 0,006 0,006 0,006

Lantai 5 0,104 0,006 0,006 0,006 0,006 0,006

Lantai 6 0,104 0,006 0,006 0,006 0,006

Lantai 7 0,104 0,006 0,006 0,006

Lantai 8 0,104 0,006

11 PENANGKAL PETIR 0,094 0,023

12 KABEL TOUVUR

Page 73: DAFTAR HARGA SATUAN PEKERJAANrepository.untag-sby.ac.id/4287/121/LAMPIRAN.pdf · DAFTAR HARGA SATUAN PEKERJAAN PROYEK : SOLIA BOUTIQUE HOTEL LOKASI : JL. DR. RAJIMAN 525 LAWEYAN-SURAKARTA

19sd25 26sd31 1sd8 9sd15 16sd22 23sd29 31sd6 7sd13 14sd20 21sd27 28sd3 4sd10 11sd16 18sd24 25sd31 1sd7 8sd14 15sd21

7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

IV V I II III IV I II III IV I II III IV V I II III

BOBOT

(%)NO URAIAN PEKERJAAN MEP

MEI JUNI JULI AGUSTUS SEPTEMBER

Lantai basement 0,172 0,057 0,057

Lantai 1 0,172 0,043 0,043 0,043 0,043

Lantai mezanine 0,172 0,043 0,043 0,043 0,043

Lantai 2 0,172 0,043 0,043 0,043 0,043

Lantai 3 0,172 0,043 0,043 0,043 0,043

Lantai 4 0,172 0,043

Lantai 5 0,172 0,043

Lantai 6 0,172

Lantai 7 0,172

Lantai 8 0,172

Lantai 9/ kolam renang 0,172

13 POWER HOUSE 4,771

14 AIR BEKAS & KOTOR

Lantai basement 0,186 0,046 0,046 0,046 0,046

Lantai 1 0,015 0,007 0,007

Lantai mezanine 0,014 0,007 0,007

Lantai 2 0,016 0,008 0,008

Lantai 3 0,081 0,020 0,020 0,020 0,020

Lantai 4 0,039 0,010 0,010 0,010 0,010

Lantai 5 0,039 0,010 0,010 0,010 0,010

Lantai 6 0,039 0,010 0,010 0,010 0,010

Lantai 7 0,039 0,010

Lantai 8 0,047 0,012

Lantai 9/ kolam renang 0,186

15 AIR BERSIH DINGIN

Lantai basement 0,005 0,002 0,002 0,002

Lantai 1 0,011 0,004 0,004 0,004

Lantai mezanine 0,015 0,005 0,005 0,005

Lantai 2 0,015 0,005 0,005 0,005

Lantai 3 0,031 0,008 0,008 0,008 0,008

Lantai 4 0,031 0,008 0,008 0,008 0,008

Lantai 5 0,031 0,008 0,008 0,008 0,008

Lantai 6 0,066 0,017

Lantai 7 0,031 0,008

Lantai 8 0,066

Lantai 9/ kolam renang 0,244

16 PEKERJAAN INSTALASI HYDRANT DAN SPRINKLER

Lantai basement 0,213 0,071 0,071 0,071

Lantai 1 0,227 0,057 0,057 0,057 0,057

Lantai mezanine 0,096 0,024 0,024 0,024 0,024

Lantai 2 0,124 0,031 0,031 0,031 0,031

Lantai 3 0,127 0,032 0,032 0,032 0,032

Lantai 4 0,098 0,025 0,025

Lantai 5 0,127 0,032 0,032

Lantai 6 0,098

Lantai 7 0,127

Lantai 8 0,098

Lantai 9/ kolam renang 0,168

17 PEKERJAAN INSTALASI AIR BERSIH PANAS

Lantai 3 0,065 0,016 0,016 0,016 0,016

Lantai 4 0,019 0,005 0,005 0,005 0,005

Lantai 5 0,019 0,005 0,005 0,005 0,005

Lantai 6 0,019 0,005

Lantai 7 0,019 0,005

Lantai 8 0,065

Lantai 9/ kolam renang 0,995

18 PEKERJAAN INSTALASI AIR HUJAN

Lantai basement 0,027 0,007 0,007 0,007

Page 74: DAFTAR HARGA SATUAN PEKERJAANrepository.untag-sby.ac.id/4287/121/LAMPIRAN.pdf · DAFTAR HARGA SATUAN PEKERJAAN PROYEK : SOLIA BOUTIQUE HOTEL LOKASI : JL. DR. RAJIMAN 525 LAWEYAN-SURAKARTA

19sd25 26sd31 1sd8 9sd15 16sd22 23sd29 31sd6 7sd13 14sd20 21sd27 28sd3 4sd10 11sd16 18sd24 25sd31 1sd7 8sd14 15sd21

7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

IV V I II III IV I II III IV I II III IV V I II III

BOBOT

(%)NO URAIAN PEKERJAAN MEP

MEI JUNI JULI AGUSTUS SEPTEMBER

Lantai 1 0,027 0,014 0,014

Lantai mezanine 0,027 0,014 0,014

Lantai 2 0,027 0,014 0,014

Lantai 3 0,027 0,007

Lantai 4 0,027 0,007

Lantai 5 0,027

Lantai 6 0,027

Lantai 7 0,027

Lantai 8 0,027

Lantai 9/ kolam renang 0,027

19 PUMP ROOM 2,572 0,193

20 GAS KITCHEN

Lantai 1 0,101 0,025

Lantai 2 0,034

TOTAL 29,046 0,024 0,049 - - 0,045 0,021 0,101 0,140 0,139 0,256 0,392 0,706 0,714 0,700 0,715 0,465 0,814 1,601

KOMULATIF 29,046 0,024 0,073 0,073 0,073 0,118 0,139 0,240 0,379 0,518 0,774 1,166 1,872 2,586 3,286 4,001 4,466 5,280 6,880

OWNER MANAGEMENT KONSTRUKTION

PT. HAILAI SINAR CEMERLANG PT. HAILAI SINAR CEMERLANG

Leontine Ierma Agustina S Ir. Totok SudarmantoDirektur Utama Team Leader

19sd25 26sd31 1sd8 9sd15 16sd22 23sd29 31sd6 7sd13 14sd20 21sd27 28sd3 4sd10 11sd16 18sd24 25sd31 1sd7 8sd14 15sd21

PENERANGAN & STOPKONTAK 2,792 0,019 0,030 0,047 0,066 0,066 0,065 0,072 0,055 0,054 0,072 0,054 0,169

KABEL TRAY & LEADER 0,517 0,024 0,049 0,045 0,021 0,024 0,048 0,023 0,023 0,047 0,023 0,023 0,047 0,023 0,023 0,048 0,024

FIRE ALARM 0,835 0,020 0,022 0,024 0,028 0,028 0,012 0,015 0,013 0,013 0,018 0,013 0,098

TATA SUARA & SOUND SYSTEM 0,409 0,009 0,011 0,012 0,014 0,014 0,007 0,007 0,006 0,006 0,008 0,006 0,048

CCTV 0,246 0,009 0,009 0,010 0,010 0,010 0,003 0,003 0,002 0,002 0,003 0,002 0,037

TELEPHONE 0,400 0,014 0,014 0,016 0,017 0,017 0,005 0,007 0,005 0,005 0,007 0,005 0,058

MATV 0,262 0,005 0,005 0,005 0,007 0,007 0,003 0,005 0,005 0,005 0,007 0,005 0,026

DATA WIFI 0,069 0,001 0,001 0,002 0,002 0,002 0,002 0,002 0,001 0,001 0,001 0,001 0,006

PENGKONDISIAN UDARA 9,185 0,219 0,219 0,219 0,283 0,064 0,310 0,440

CARD LOCK 0,623 0,006 0,006 0,012 0,019 0,019 0,019 0,025 0,019 0,019

PENANGKAL PETIR 0,094 0,023

KABEL TOVUR 1,887 0,129 0,129 0,129 0,172 0,043 0,100 0,186

POWER HOUSE 4,771

AIR BERKAS & KOTOR 0,701 0,068 0,068 0,076 0,076 0,030 0,050 0,020 0,020 0,041

AIR BERSIH DINGIN 0,545 0,013 0,013 0,021 0,009 0,009 0,025 0,015 0,015 0,040

HYDRANT & SPLINKER 1,504 0,112 0,112 0,112 0,144 0,032 0,103 0,159 0,127

AIR PANAS 1,201 0,016 0,016 0,016 0,026 0,010 0,010 0,019

AIR HUJAN 0,299 0,048 0,048 0,020

PUMP ROOM 2,572 0,193

GAS KITCHEN 0,135 0,025

29,046

MEI JUNI JULI AGUSTUS SEPTEMBER

Page 75: DAFTAR HARGA SATUAN PEKERJAANrepository.untag-sby.ac.id/4287/121/LAMPIRAN.pdf · DAFTAR HARGA SATUAN PEKERJAAN PROYEK : SOLIA BOUTIQUE HOTEL LOKASI : JL. DR. RAJIMAN 525 LAWEYAN-SURAKARTA

22sd28 29sd5 6sd12 13sd19 20sd26 27sd2 3sd9 10sd16 17sd23 24sd30 1sd7 8sd14 15sd21 22sd28 29sd4 5sd11

25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

IV I II III IV V I II III IV I II III IV I II

0,026 0,026

0,048 0,048

0,041 0,041

0,068 0,068 0,068

0,074 0,074 0,074

0,070 0,070 0,070

0,070 0,070 0,070

0,018 0,070 0,070 0,070

0,018 0,018 0,070 0,070 0,070

0,018 0,018 0,018 0,018 0,070 0,070 0,070

0,012 0,012 0,012 0,012 0,012 0,047 0,047 0,047

0,006 0,006

0,073 0,073

0,006 0,006

0,007 0,007 0,007

0,017 0,017 0,017

0,017 0,017 0,017

0,017 0,017 0,017

0,004 0,017 0,017 0,017

0,004 0,004 0,017 0,017 0,017

0,004 0,004 0,004 0,004 0,017 0,017 0,017

0,003 0,003

0,032 0,032

0,007 0,007

0,005 0,005 0,005

0,007 0,007 0,007

0,008 0,008 0,008

0,008 0,008 0,008

0,002 0,008 0,008 0,008

0,002 0,002 0,008 0,008 0,008

0,002 0,002 0,002 0,002 0,008 0,008 0,008

0,001 0,001 0,001 0,001 0,001 0,004 0,004 0,004

0,005 0,005

0,028 0,028

0,002 0,002

0,002 0,002 0,002

0,003 0,003 0,003

0,003 0,003 0,003

JANUARI

SCHEDULE PEKERJAAN MEPPROYEK : SOLIA BOUTIQUE HOTEL, LAWEYAN-SURAKARTA

SEPTEMBER OKTOBER NOVEMBER DESEMBER

Page 76: DAFTAR HARGA SATUAN PEKERJAANrepository.untag-sby.ac.id/4287/121/LAMPIRAN.pdf · DAFTAR HARGA SATUAN PEKERJAAN PROYEK : SOLIA BOUTIQUE HOTEL LOKASI : JL. DR. RAJIMAN 525 LAWEYAN-SURAKARTA

22sd28 29sd5 6sd12 13sd19 20sd26 27sd2 3sd9 10sd16 17sd23 24sd30 1sd7 8sd14 15sd21 22sd28 29sd4 5sd11

25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

IV I II III IV V I II III IV I II III IV I II

JANUARISEPTEMBER OKTOBER NOVEMBER DESEMBER

0,003 0,003 0,003

0,001 0,003 0,003 0,003

0,001 0,001 0,003 0,003 0,003

0,001 0,001 0,001 0,001 0,003 0,003 0,003

0,001 0,001 0,001 0,001 0,001 0,002 0,002 0,002

0,050 0,050

0,003 0,003

0,001 0,001

0,006 0,006 0,006

0,006 0,006 0,006

0,007 0,007 0,007

0,007 0,007 0,007

0,002 0,007 0,007 0,007

0,002 0,002 0,007 0,007 0,007

0,000 0,000 0,000 0,000 0,000 0,000 0,000

0,021 0,021

0,007 0,007 0,007

0,007 0,007 0,007

0,007 0,007 0,007

0,002 0,007 0,007 0,007

0,002 0,002 0,007 0,007 0,007

0,002 0,002 0,002 0,002 0,007 0,007 0,007

0,003 0,003

0,002 0,002

0,002 0,002 0,002

0,001 0,001 0,001

0,001 0,001 0,001

0,001 0,001 0,001

0,000 0,001 0,001 0,001

0,000 0,000 0,001 0,001 0,001

0,000 0,000 0,000 0,000 0,001 0,001 0,001

0,000 0,000 0,000 0,000 0,000 0,001 0,001 0,001

0,006 0,010 0,010 0,010 0,010

0,138 0,138

0,102 0,102

0,271 0,271 0,271 0,271

0,150 0,150 0,150 0,150

0,066 0,066 0,066 0,155 0,155 0,155 0,155

0,064 0,064 0,064 0,150 0,150 0,150 0,150

0,066 0,066 0,066 0,066 0,155 0,155 0,155 0,155

0,064 0,064 0,064 0,064 0,150 0,150 0,150 0,150

0,066 0,066 0,066 0,066 0,155 0,155 0,155 0,155

0,074 0,074 0,074 0,074 0,173 0,173 0,173 0,173

0,024 0,024 0,024

0,024 0,024 0,024

0,024 0,024 0,024

0,006 0,024 0,024 0,024

0,006 0,006 0,024 0,024 0,024

0,006 0,006 0,006 0,006 0,024 0,024 0,024

0,023 0,023 0,023

Page 77: DAFTAR HARGA SATUAN PEKERJAANrepository.untag-sby.ac.id/4287/121/LAMPIRAN.pdf · DAFTAR HARGA SATUAN PEKERJAAN PROYEK : SOLIA BOUTIQUE HOTEL LOKASI : JL. DR. RAJIMAN 525 LAWEYAN-SURAKARTA

22sd28 29sd5 6sd12 13sd19 20sd26 27sd2 3sd9 10sd16 17sd23 24sd30 1sd7 8sd14 15sd21 22sd28 29sd4 5sd11

25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

IV I II III IV V I II III IV I II III IV I II

JANUARISEPTEMBER OKTOBER NOVEMBER DESEMBER

0,057

0,043 0,043 0,043

0,043 0,043 0,043

0,043 0,043 0,043 0,043

0,043 0,043 0,043 0,043

0,043 0,043 0,043 0,043

0,043 0,043 0,043 0,043

0,358 0,358 0,358 0,358 0,835 0,835 0,835 0,835

0,010 0,010 0,010

0,012 0,012 0,012

0,047 0,047 0,047 0,047

0,017 0,017 0,017

0,008 0,008 0,008

0,017 0,017 0,017 0,017

0,061 0,061 0,061 0,061

0,025 0,025

0,032 0,032

0,025 0,025 0,025 0,025

0,032 0,032 0,032 0,032

0,025 0,025 0,025 0,025

0,042 0,042 0,042 0,042

0,005 0,005 0,005

0,005 0,005 0,005

0,016 0,016 0,016 0,016

0,166 0,166 0,166 0,166 0,166 0,166

0,007

Page 78: DAFTAR HARGA SATUAN PEKERJAANrepository.untag-sby.ac.id/4287/121/LAMPIRAN.pdf · DAFTAR HARGA SATUAN PEKERJAAN PROYEK : SOLIA BOUTIQUE HOTEL LOKASI : JL. DR. RAJIMAN 525 LAWEYAN-SURAKARTA

22sd28 29sd5 6sd12 13sd19 20sd26 27sd2 3sd9 10sd16 17sd23 24sd30 1sd7 8sd14 15sd21 22sd28 29sd4 5sd11

25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

IV I II III IV V I II III IV I II III IV I II

JANUARISEPTEMBER OKTOBER NOVEMBER DESEMBER

0,007 0,007 0,007

0,007 0,007 0,007

0,007 0,007 0,007 0,007

0,007 0,007 0,007 0,007

0,007 0,007 0,007 0,007

0,007 0,007 0,007 0,007

0,007 0,007 0,007 0,007

0,193 0,193 0,193 0,450 0,450 0,450 0,450

0,025 0,025 0,025

0,009 0,009 0,009 0,009

1,368 1,590 1,536 1,470 1,807 1,843 1,464 1,714 1,181 0,941 1,418 1,639 1,632 1,632 0,883 0,048

8,248 9,838 11,375 12,844 14,652 16,494 17,958 19,672 20,853 21,793 23,212 24,851 26,483 28,115 28,998 29,046

SURAKARTA, 29 MEI 2019

PT. TATA BUMI RAYA

Ir. M. SyamsuriProject Manager

22sd28 29sd5 6sd12 13sd19 20sd26 27sd2 3sd9 10sd16 17sd23 24sd30 1sd7 8sd14 15sd21 22sd28 29sd4 5sd11

0,181 0,163 0,098 0,098 0,080 0,143 0,143 0,143 0,139 0,139 0,139 0,186 0,186 0,186

0,098 0,094 0,011 0,011 0,007 0,034 0,034 0,034 0,035 0,035 0,035 0,035 0,035 0,035

0,049 0,047 0,008 0,008 0,006 0,015 0,015 0,015 0,015 0,015 0,015 0,019 0,019 0,019

0,038 0,037 0,004 0,004 0,003 0,006 0,006 0,006 0,006 0,006 0,006 0,008 0,008 0,008

0,058 0,056 0,006 0,006 0,006 0,013 0,013 0,013 0,013 0,013 0,013 0,007 0,007 0,007

0,026 0,025 0,002 0,002 0,013 0,013 0,013 0,013 0,013 0,013 0,013 0,013 0,013

0,006 0,006 0,003 0,003 0,003 0,002 0,002 0,002 0,002 0,002 0,002 0,003 0,003 0,003

0,376 0,642 0,532 0,412 0,716 0,585 0,455 0,749 0,445 0,304 0,782 0,477 0,477 0,477

0,019 0,012 0,006 0,006 0,048 0,048 0,048 0,048 0,048 0,048 0,048 0,048 0,048

0,023 0,023 0,023

0,143 0,086 0,172 0,086 0,086 0,172 0,086 0,086 0,086

0,358 0,358 0,358 0,358 0,835 0,835 0,835 0,835

0,022 0,022 0,068 0,047 0,047 0,047

0,024 0,024 0,102 0,078 0,078 0,078

0,056 0,113 0,056 0,056 0,123 0,067 0,067 0,067

0,010 0,010 0,192 0,182 0,182 0,182 0,166 0,166

0,020 0,014 0,027 0,014 0,014 0,027 0,014 0,014 0,020 0,007 0,007 0,007

0,193 0,193 0,193 0,450 0,450 0,450 0,450

0,025 0,025 0,034 0,009 0,009 0,009

OKTOBER NOVEMBER DESEMBER JANUARISEPTEMBER

Page 79: DAFTAR HARGA SATUAN PEKERJAANrepository.untag-sby.ac.id/4287/121/LAMPIRAN.pdf · DAFTAR HARGA SATUAN PEKERJAAN PROYEK : SOLIA BOUTIQUE HOTEL LOKASI : JL. DR. RAJIMAN 525 LAWEYAN-SURAKARTA

6

7

7 20 april 298

7

7

7

7

6 34 mei

0

0

7

7 14 juni

7

7

7

7 28 juli

7

7

6

7

7 34 agustus

7

7

7

7 28 september

7

7

7

7

7 35 oktober

7

7

7

7 28 november

7

7

7

7 28 desember

7

7

7

7

7 35 januari

7

Page 80: DAFTAR HARGA SATUAN PEKERJAANrepository.untag-sby.ac.id/4287/121/LAMPIRAN.pdf · DAFTAR HARGA SATUAN PEKERJAAN PROYEK : SOLIA BOUTIQUE HOTEL LOKASI : JL. DR. RAJIMAN 525 LAWEYAN-SURAKARTA

7 14 februari