RENCANA ANGGARAN BIAYAKEGIATAN LOKASI TAHUN ANGGARAN A. TENAGA AHLI NO 1 1 2 3 4 5 6 URAIAN 2 Ahli Arsitek / Tata Letak (Team Leader) Ahli Perenc. Wilayah dan Kota Ahli Teknik Sipil Ahli Geodesi / Pemetaan Ahli Sosial Budaya / Hukum Ahli Ekonomi Pembangunan J u m l a h Sub Total B. TENAGA PENDUKUNG / PENUNJANG NO 1 1 2 3 4 5 6 URAIAN 2 Office Manager Surveyor / Juru Ukur Drafter / Juru Gambar Operator Komputer Sekretaris / Administrasi Office Boy J u m l a h Sub Total JUMLAH (ORANG) 3 1 2 1 1 1 1 ORANG/ BULAN 4 3.00 1.00 2.00 2.00 3.00 2.00 HARGA SATUAN Rp. 5 4,000,000.00 3,000,000.00 3,000,000.00 2,000,000.00 2,000,000.00 1,500,000.00 JUMLAH Rp. 6 12,000,000.00 6,000,000.00 6,000,000.00 4,000,000.00 6,000,000.00 3,000,000.00 37,000,000.00 JUMLAH (ORANG) 3 1 1 1 1 1 1 ORANG/ BLN HARGA SATUAN Rp. 5 3.00 1.00 2.00 2.00 1.00 1.00 7,000,000.00 6,000,000.00 5,500,000.00 5,500,000.00 5,500,000.00 5,500,000.00 JUMLAH Rp. 6 21,000,000.00 6,000,000.00 11,000,000.00 11,000,000.00 5,500,000.00 5,500,000.00 60,000,000.00 : PENYUSUNAN RENCANA TATA BANGUNAN DAN LINGKUNGAN (RTBL) KAWASAN IBUKOTA KABUPATEN PADANG PARIAMAN : KECAMATAN ENAM LINGKUNG : 2011

4

C. BIAYA TRANSPORTASI NO 1 1 2 URAIAN 2 Kendaraan Roda 4 Kendaraan Roda 2 J u m l a h Sub Total D. BIAYA PENGGANDAAN DOKUMEN / LAPORAN / PRESENTASI NO 1 1 2 3 URAIAN 2 Dokumen Kontrak dan Berita Acara Biaya Penggandaan Dokumen : - Laporan Akhir / Rencana Penggandaan Album Peta Rencana - Album Peta Besar (A1) Skala 1:5.000 - Album Peta Besar (A3) Skala 1:5.000 Biaya Presentasi & Makan / Minum serta Transportasi Summary Report Compact Disk (CD) Kegiatan J u m l a h Sub Total SATUAN 4 Examp Examp Album Album Lumpsum Examp Keping VOLUME 5 7.00 10.00 5.00 5.00 3.00 10.00 10.00 HARGA SATUAN (Rp) 6 200,000.00 300,000.00 700,000.00 250,000.00 1,000,000.00 100,000.00 9,000.00 JUMLAH Rp. 7 1,400,000.00 3,000,000.00 3,500,000.00 1,250,000.00 3,000,000.00 1,000,000.00 90,000.00 13,240,000.00 SATUAN 3 1.00 1.00 UNIT/BULA N 4 3 3 HARGA SATUAN 5 4,500,000.00 1,000,000.00 JUMLAH Rp. 7 13,500,000.00 3,000,000.00 16,500,000.00

4 5 6

E. BIAYA PERLENGKAPAN KANTOR NO 1 1 2 3 4 5 6 7 8 9 10 11 Infokus Laptop Komputer Scanner A3 Plotter Printer A3 Printer A4 Mesin Fax Theodolit Digital Camera Lemari Arsip J u m l a h Sub Total F. BIAYA BAHAN DAN MATERIAL NO 1 1 2 3 4 5 URAIAN 2 Alat Tulis Kantor (ATK) Bahan Komputer Photo Copy Bahan, dll Biaya Pengolahan dan Interpretasi Peta Biaya Dokumentasi J u m l a h Sub Total SATUAN 4 Bulan Bulan Ls Ls Ls VOLUME 5 3.00 3.00 1.00 1.00 1.00 HARGA SATUAN 6 300,000.00 300,000.00 700,000.00 1,000,000.00 300,000.00 JUMLAH Rp. 7 900,000.00 900,000.00 700,000.00 1,000,000.00 300,000.00 3,800,000.00 URAIAN 2 VOLUME 3 1 3 3 2 3 3 3 3 1 3 2 SATUAN 4 Lumpsum Unit Perbulan Unit Perbulan Unit Perbulan Unit Perbulan Unit Perbulan Unit Perbulan Unit Perbulan Lumpsum Unit Perbulan Unit Perbulan HARGA SATUAN Rp. 5 500,000.00 1,000,000.00 300,000.00 300,000.00 750,000.00 300,000.00 200,000.00 300,000.00 500,000.00 200,000.00 300,000.00 JUMLAH Rp. 6 500,000.00 3,000,000.00 900,000.00 600,000.00 2,250,000.00 900,000.00 600,000.00 900,000.00 500,000.00 600,000.00 600,000.00 11,350,000.00

G. BIAYA KOMUNIKASI, LISTRIK DAN AIR NO 1 1 2 3 URAIAN 2 Biaya Komunikasi dan Telepon Biaya Listrik Biaya air J u m l a h Sub Total SATUAN 4 Bulan Bulan Bulan VOLUME 5 3.00 3.00 3.00 HARGA SATUAN (Rp) 6 400,000.00 400,000.00 400,000.00 JUMLAH Rp. 7 1,200,000.00 1,200,000.00 1,200,000.00 3,600,000.00

REKAPITULASIKEGIATAN LOKASI TAHUN ANGGARAN : PENYUSUNAN RENCANA TATA BANGUNAN DAN LINGKUNGAN (RTBL) KAWASAN IBUKOTA KABUPATEN PADANG PARIAMAN : KECAMATAN ENAM LINGKUNG : 2011 JUMLAH Rp.

No

URAIAN PEKERJAAN

A B C D E F G

TENAGA AHLI TENAGA PENDUKUNG / PENUNJANG BIAYA TRANSPORTASI BIAYA PENGGANDAAN DOKUMEN / LAPORAN / PRESENTASI BIAYA PERLENGKAPAN KANTOR BIAYA BAHAN DAN MATERIAL BIAYA KOMUNIKASI, LISTRIK DAN AIR JUMLAH PPN TOTAL DIBULATKAN TERBILANG 10%

60,000,000.00 37,000,000.00 16,500,000.00 13,240,000.00 11,350,000.00 3,800,000.00 3,600,000.00 145,490,000.00 14,549,000.00 160,039,000.00 160,035,600.00

: SERATUS ENAM PULUH JUTA EMPAT PULUH ENAM RIBU ENAM RATUS RUPIAH

PARIAMAN,

JANUARI 2012

Diperiksa Oleh : KABID TATA RUANG TATA BANGUNAN DINAS PEKERJAAN UMUM KABUPATEN PADANG PARIAMAN

DIHITUNG OLEH :

Ir. FERI ANDRI, MTNIP. 19660225 199403 1 006

MARWANDI, ST NIP. 19790316 200604 1 021

Diketahui Oleh : KEPALA DINAS PEKERJAAN UMUM KABUPATEN PADANG PARIAMAN

ZAINIR KOTO, STNIP. 19590722 198103 1 004