PT. PLN (PERSERO) UNIT INDUK PEMBANGUNAN IX UNIT PELAKSANA KONSTRUKSI PEMBANGKIT KALIMANTAN 5 Alamat : Jl. Rajawali No. 11 Muara Teweh, Kalimantan Tengah Telp : Fax : - Email : [email protected] Number : 138 /KON.01.02/UIP.IX.UPK KITKAL 5/2015 Attachment : 1 (one) Set Subject : Condition at Site Attn. Mr. Kari Hanninen Site Manager With refer to Consotim letter No.CON-PLN-L-PM-0147 dated October 21 st 2015 we would like to inform that since October 26 th 2015 the condition of air pollution index is in healthy condition. Today we got official letter from “Badan Lingkungan Hidup – Enviromental Agency of Barito Utara” that the Air Condition is in normal condition. With regard to this, all activity outside and working hour can be done usual (attached). Thus provided, Thank you for your kind attention and cooperation. Cc : 1. General Manager PLN UIP IX 2. Consortium Manager Wartsila – PP Model No. 1003 29 th October 2015 To Consortium Wartsila Finland OY – PT. PP (Persero) Tbk Project PLTMG Bangkanai 155 MW MANAGER DIDI

Upload: dannidan

Post on 16-Feb-2016

218 views

Category:

Documents


0 download

DESCRIPTION

site pltmg

TRANSCRIPT

Page 1: Condition at Site

PT. PLN (PERSERO)UNIT INDUK PEMBANGUNAN IXUNIT PELAKSANA KONSTRUKSI PEMBANGKIT KALIMANTAN 5

Alamat: Jl. Rajawali No. 11 Muara Teweh, Kalimantan TengahTelp : Fax : - Email : [email protected]

Number : 138 /KON.01.02/UIP.IX.UPK KITKAL 5/2015Attachment : 1 (one) SetSubject : Condition at Site

Attn. Mr. Kari HanninenSite Manager

With refer to Consotim letter No.CON-PLN-L-PM-0147 dated October 21 st 2015 we would

like to inform that since October 26 th 2015 the condition of air pollution index is in healthy

condition. Today we got official letter from “Badan Lingkungan Hidup – Enviromental

Agency of Barito Utara” that the Air Condition is in normal condition. With regard to this, all

activity outside and working hour can be done usual (attached).

Thus provided, Thank you for your kind attention and cooperation.

Cc :1. General Manager PLN UIP IX2. Consortium Manager Wartsila – PP3. Assistant Consortium Manager Wartsila – PP

Model No. 1003

29th October 2015

ToConsortium Wartsila Finland OY – PT. PP (Persero) TbkProject PLTMG Bangkanai 155 MWKarendan – Barito Utara

MANAGER

DIDI

Page 2: Condition at Site

PT. PLN (PERSERO)UNIT INDUK PEMBANGUNAN IXUNIT PELAKSANA KONSTRUKSI PEMBANGKIT KALIMANTAN 5

Alamat: Jl. Rajawali No. 11 Muara Teweh, Kalimantan TengahTelp : Fax : - Email : [email protected]

Number : 139 /KON.01.02/UIP.IX.UPK KITKAL 5/2015Attachment : 1 (one) SetSubject : Installation and Commissioning of Transformer

Attn. Mr. Kari HanninenSite Manager

In relation with process construction of Bangkanai Project, hereby we inform that the Main

Transformer and Town Feeder Transformer already on foundation since July 2015 but until

the date of this letter we still never got the schedule of Transformation Installation due to

schedule of arrival Siemens Transformer Supervisor still not yet available.

With regard to the above and as per our target during last meeting to start power evacuation

on end of november 2015, hereby we instruct consortium to submit schedule of Installation,

Procedure and do the process of Installation immediately.

Thus provided, Thank you for your kind attention and cooperation.

Cc :1. General Manager PLN UIP IX2. Consortium Manager Wartsila – PP3. Assistant Consortium Manager Wartsila – PP

Model No. 1003

29th October 2015

ToConsortium Wartsila Finland OY – PT. PP (Persero) TbkProject PLTMG Bangkanai 155 MWKarendan – Barito Utara

MANAGER

DIDI