bq paket 2

127
DAFTAR HARGA SATUAN UPAH NO KEAHLIAN SATUAN 1 Tukang batu org/hr 2 Tukang kayu org/hr 3 Tukang Alumunium org/hr 4 Tukang cat org/hr 5 Tukang listrik org/hr 6 Kepala tukang org/hr 7 Tukang gali org/hr 8 Pekerja org/hr 9 Mandor org/hr DAFTAR HARGA SATUAN BAHAN BANGUNAN NO JENIS BAHAN SATUAN I. BAHAN DASAR 1 BATU KALI bulat belah m3 Pecah 10/15 m3 Pecah 5/7 m3 Pecah 3/5 m3 2 BATU PECAH Beton 0,5/1 m3 Beton 1/2 m3 Beton 2/3 m3 3 BATU BATA ex lokal bh 4 PASIR Urug m3 Pasang m3 Beton m3 Sirtu m3 5 TANAH Padas m3 Urug m3 6 KAPUR Pasang m3 7 PORTLAND CEMENT Tiga Roda 40 kg zak

Upload: azwar

Post on 11-Sep-2015

309 views

Category:

Documents


25 download

DESCRIPTION

kb

TRANSCRIPT

harga bahanDAFTAR HARGA SATUAN UPAHNOKEAHLIANSATUANHARGA (Rp.)KETERANGAN1Tukang batuorg/hr40,000.002Tukang kayuorg/hr40,000.003Tukang Alumuniumorg/hr40,000.004Tukang catorg/hr40,000.005Tukang listrikorg/hr40,000.006Kepala tukangorg/hr42,500.007Tukang galiorg/hr35,000.008Pekerjaorg/hr30,000.009Mandororg/hr42,500.00DAFTAR HARGA SATUAN BAHAN BANGUNANNOJENIS BAHANSATUANHARGA (Rp.)KETERANGANbina margaI. BAHAN DASARkalibelah1BATU KALIbulat belahm3115,000.0011400099,200.00Pecah 10/15m3120,000.00Pecah 5/7m3120,000.00Pecah 3/5m3135,000.00146,400.002BATU PECAHBeton 0,5/1m3225,000.00Beton 1/2m3225,000.00Beton 2/3m3210,000.00$250,0003BATU BATAex lokalbh510.004PASIRUrugm370,000.00109,800.00Pasangm3110,000.00121200Betonm3115,000.00151,600.00Sirtum365,000.00112,100.005TANAHPadasm335,000.00Urugm335,000.00300006KAPURPasangm3120,000.007PORTLAND CEMENTTiga Roda 40 kgzak50,000.001,250.00Tiga Roda 50 kgzak62,500.0062,500.00Semen Putihkg6,500.00Semen warna AMkg10,000.00Gresik 40 kgzak50,000.001,250.00Gresik 50 kgzak62,500.0062,500.00semenkg1,250.00II. BAHAN PENUTUP ATAP1GENTENG BETONGenteng beton naturalbh2,800.009 bh/m2flat garuda minimalis3,350.00n9/m2Genteng beton flat minimalis naturalbh3,350.009 bh/m24,350.00Genteng beton warnabh2,900.009 bh/m2Genteng beton flat minimalis warnabh4,350.009 bh/m2flat3,350.00Kerpus beton naturalbh5,000.00Kerpus beton warnabh6,000.003GENTENG TANAH LIATGenteng kodok "sokka"bh1,400.0025 bh/m2Genteng Plenthong / Vlampress kecil kebumenbh1,300.0025 bh/m2Genteng Plenthong / Vlampress besar kebumenbh2,000.0018 bh/m2morando naturalGenteng Plenthong / Vlampress kecil jatiwangibh1,300.0025 bh/m2Genteng Plenthong / Vlampress besar jatiwangibh1,650.0018 bh/m2Nok genteng kodokbh5,000.00Nok Genteng Plenthong / Vlampress kebumenbh5,000.00Nok Genteng Plenthong / Vlampress jatiwangibh5,000.004GENTENG KACAVlam tebal 3 mmbh10,000.00kodok15,000.00$13,000Vlam tebal 5 mmbh12,500.00vlam12,500.00$10,000Kodok tebal 3 mmbh13,000.00beton50,000.00Kodok tebal 5 mmbh15,000.00morando 5 mm17,500.00Morando tebal 5 mmbh17,500.00M Klas tebal 5 mmbh55,000.00Beton tebal 5 mmbh50,000.00m klas55,000.005GENTENG KERAMIKGenteng keramik glasur KIAbh6,800.0014 bh/m2m kls6,650.00Genteng keramik glasur M Klasbh6,650.0014 bh/m2Genteng keramik glasur morandobh2,650.00Genteng keramik bubungan KIA/M Klasbh19,000.00Genteng keramik bubungan glasur Morandobh7,000.006ASBES GELOMBANG BESAR200 cm x 102 cm x 5 mmlbr57,000.00225 cm x 102 cm x 5 mmlbr64,000.00250 cm x 102 cm x 5 mmlbr71,000.00200 cm x 102 cm x 6 mmlbr68,000.00225 cm x 102 cm x 6 mmlbr72,500.00250 cm x 102 cm x 6 mmlbr85,000.007ASBES GELOMBANG KECIL150 cm x 105 cm x 4 mmlbr34,000.00180cm x 105 cm x 4 mmlbr41,000.00210 cm x 105 cm x 4 mmlbr48,000.00240 cm x 105 cm x 4 mmlbr55,000.00300 cm x 105 cm x 4 mmlbr67,000.008ASBES PLAT100 cm x 100 cm x 3 mmlbr11,500.009Nok Asbes Gelombang Kecillbr27,500.0010Nok Asbes Gelombang besarlbr47,500.0011FIBER GLAS180 x 80 cmlbr42,000.00200 x 80 cmlbr49,000.00250 x 80 cmlbr57,000.0012SENG PLATBJLS 0,20 lebar 60 cmm'18,000.00BJLS 0,30 lebar 60 cmm'20,000.00BJLS 0,20 lebar 70 cmm'21,000.00BJLS 0,30 lebar 70 cmm'24,000.00BJLS 0,30 lebar 90 cmm'27,000.0013SENG GELOMBANGBJLS 0,20 panjang 180 cmlbr36,000.00BJLS 0,30 panjang 180 cmlbr63,000.0014ATAP POLYKARBONATTosca 6 x 2100 x 11800 mmrol3,000,000.00Twinlite 5 x 2100 x 11800 mmrol1,250,000.00Global 5 x 2100 x 11800 mmrol1,500,000.0015FIBER SELULOSAOnduvilla (106x40x0,3 cm)lbr55,000.00Onduline (95x200x0,3 cm)lbr137,500.00Nok (50x90x0,3 cm)lbr75,000.0016GENTENG METALSakura roof80 x 80 cmm241,000.00III. BAHAN KAYU1JATI PERHUTANIPapanm327,500,000.00Balokm321,500,000.002JATI LOKALPapanm36,750,000.00Balokm35,000,000.003KAMPERPapanm39,500,000.00Balokm37,750,000.004KRUINGPapanm36,400,000.00Balokm34,750,000.005MERANTIPapanm35,500,000.00Balokm34,250,000.006BENGKIRAIPapanm310,500,000.00Balokm38,250,000.007TAHUNPapanm31,187,500.00Balokm3850,000.008DOLKENSedang 8 x 10 x 400 cmbt40,000.00Kecil 6 x 7 x 400 cmbt25,000.00Besar 10 x 12 x 400 cmbt55,000.00Kayu cetakanm3700,000.00Bambubt7,000.00Panjang 4 mIV. BAHAN PENUTUP DINDING / LANTAI1KERAMIKAsia Tile Motif Warna Muda40 x 40 cmdos37,000.0030 x 30 cmdos33,500.0020 x 20 cmdos37,000.0020 x 25 cmdos39,000.00Asia Tile Motif Warna Tua40 x 40 cmdos43,500.0030 x 30 cmdos40,000.0020 x 20 cmdos39,000.0020 x 25 cmdos41,000.00Asia Tile Putih Polos40 x 40 cmdos37,000.0030 x 30 cmdos30,000.0020 x 25 cmdos40,000.00Mulia Motif Warna Muda40 x 40 cmdos36,000.0030 x 30 cmdos33,000.0020 x 20 cmdos37,000.0020 x 25 cmdos38,000.00Mulia Motif Warna Tua40 x 40 cmdos43,000.0030 x 30 cmdos39,000.00Mulia Putih Polos40 x 40 cmdos37,000.0030 x 30 cmdos28,000.0020 x 20 cmdos35,000.0020 x 25 cmdos38,000.00Arwana Motif Warna Muda40 x 40 cmdos36,000.0030 x 30 cmdos30,000.0020 x 20 cmdos35,000.0020 x 25 cmdos37,000.00Arwana Motif Warna Tua40 x 40 cmdos36,000.0030 x 30 cmdos30,000.0020 x 20 cmdos35,000.0020 x 25 cmdos37,000.00Arwana Putih Polos40 x 40 cmdos32,000.0030 x 30 cmdos28,000.0020 x 20 cmdos35,000.0020 x 25 cmdos35,000.00Platinum60 x 60 cmdos100,000.0050 x 50 cmdos77,000.0040 x 40 cmdos45,000.00KIA Motif Warna Muda40 x 40 cmdos44,000.0030 x 30 cmdos40,000.0020 x 20 cmdos40,000.0020 x 25 cmdos40,000.00KIA Motif Warna Tua40 x 40 cmdos49,000.0030 x 30 cmdos44,000.0020 x 20 cmdos43,000.0020 x 25 cmdos42,000.00Roman Motif Warna Muda60 x 60 cmdos116,500.0040 x 40 cmdos82,500.0030 x 30 cmdos64,000.0020 x 20 cmdos67,500.0020 x 25 cmdos67,500.00Roman Motif Warna Tua60 x 60 cmdos175,000.0040 x 40 cmdos90,000.0030 x 30 cmdos70,000.0020 x 20 cmdos69,000.0020 x 25 cmdos70,000.00Platinum Motif Warna Muda50 x 50 cmdos46,000.00Platinum Motif Warna Tua50 x 50 cmdos62,500.00Centro40 x 40 cmdos75,000.00Hercules Motif Warna Muda40 x 40 cmdos45,000.00Hercules Motif Warna Tua40 x 40 cmdos49,000.00Hercules Putih Polos40 x 40 cmdos43,000.00Milan Motif Warna Muda40 x 40 cmdos45,000.00Milan Motif Warna Tua40 x 40 cmdos49,500.002GRANITGranito60 x 60 cmdos185,000.004 bh/dos40 x 40 cmdos150,000.006 bh /dosImpero60 x 60 cmdos160,000.0040 x 40 cmdos140,000.00Niro60 x 60 cmdos160,000.0040 x 40 cmdos140,000.00Essenza60 x 60 cmdos160,000.0040 x 40 cmdos140,000.003BATU ALAMBatu Andesit Alur10 x 20 cmm2120,000.0015 x 30 cmm2125,000.0020 x 40 cmm2135,000.00Batu Andesit Napoli10 x 20 cmm2125,000.0015 x 30 cmm2130,000.0020 x 40 cmm2140,000.00Batu Andesit Bakar10 x 20 cmm2120,000.0015 x 30 cmm2125,000.0020 x 40 cmm2130,000.00Batu Candi10 x 20 cmm275,000.0020 x 20 cmm275,000.0015 x 30 cmm280,000.0020 x 40 cmm280,000.00Batu Candi Alur10 x 20 cmm2120,000.0020 x 40 cmm2130,000.00Batu Palimanan10 x 20 cmm275,000.0020 x 20 cmm275,000.0015 x 30 cmm280,000.0020 x 40 cmm280,000.00Batu Lempengm240,000.004Lis Profil Betonm'15,000.005Lis keramik 7,5/20bh7,500.00V. BAHAN CETAK1BUIS BETON 80 cm - 50 cmbh75,000.00 100 cm - 50 cmbh135,000.00U 20 cm - 100 cmbh13,000.00U 30 cm - 100 cmbh19,000.002LUBANG ANGIN (ROSTER) PC + PASIR20 x 20 cmbh5,000.0015 x 30 cmbh5,000.00VI. BAHAN BESI1BESI BETONbesi beton, SNIkg8,750.00Besi Beton Polos 6 mm, SNIbtg20,500.000.22kg/m2.6407,765.15Besi Beton Polos 8 mm, SNIbtg37,500.000.393kg/m4.7167,951.65Besi Beton Polos 10 mm, SNIbtg59,500.000.62kg/m7.4407,997.31Besi Beton Polos 12 mm, SNIbtg83,000.000.887kg/m10.6447,797.8231,511.947,877.98Besi Beton Ulir 16 mm, SNIbtg136,000.001.56kg/m18.7207,264.96Besi Beton Ulir 13 mm, SNIbtg92,500.000.995kg/m11.9407,747.0715,012.037,506.012BESI PLATBesi stripkg8,000.0015,384.003BESI PROFILbesi profil IWFkg9,600.007,692.004BESI SIKUbesi sikukg7,000.005KAWATIkat beton / bendratkg18,000.00Ikat beton / bendratrol375,000.00Kawat galvanis No.10 s/d 16kg20,000.00Ayakan1/2 x 100m20,000.001/4 x 90m17,500.001/2 x 125m25,000.00Kawat Nyamukm2Kawat las listrik Kobekg25,000.001250006Besi HolloWHollow 20 x 40 menibtg13,500.00Hollow 40 x 40 menibtg18,000.00Hollow 20 x 40 galvanis tebal 0,3 mmbtg16,000.00Hollow 20 x 40 galvanis tebal 0,4 mmbtg18,000.00Hollow 20 x 40 galvanis tebal 0,5 mmbtg23,000.00Hollow 40 x 40 galvanis tebal 0,3 mmbtg21,000.00Hollow 40 x 40 galvanis tebal 0,4 mmbtg23,000.00Hollow 40 x 40 galvanis tebal 0,5 mmbtg30,000.00VII. BAHAN PIPA1Pipa Medium B Galvanis - SII1Pipa Galvanis medium (GIP) 1/2"btg120,000.002Pipa Galvanis medium (GIP) 3/4"btg144,000.003Pipa Galvanis medium (GIP) 1"btg186,000.004Pipa Galvanis medium (GIP) 1 1/4"btg240,000.005Pipa Galvanis medium (GIP) 1 1/2"btg270,000.006Pipa Galvanis medium (GIP) 2"btg348,000.007Pipa Galvanis medium (GIP) 2 1/2"btg450,000.008Pipa Galvanis medium (GIP) 3"btg828,000.002Pipa PVC Class AW "MASPION"Pipa PVC class AW 1/2"btg21,100.00Pipa PVC class AW 3/4"btg25,700.00Pipa PVC class AW 1"btg32,300.00Pipa PVC class AW 1 1/4"btg45,700.00Pipa PVC class AW 1 1/2"btg59,500.00Pipa PVC class AW 2"btg88,400.00Pipa PVC class AW 2 1/2"btg113,400.00Pipa PVC class AW 3"btg161,700.00Pipa PVC class AW 4"btg235,700.00Pipa PVC class AW 5"btg372,000.00Pipa PVC class AW 6"btg491,500.00Pipa PVC class AW 8"btg764,200.003Pipa PVC Class AW "WAVIN"Pipa PVC class AW 1/2"btg14,200.00Pipa PVC class AW 3/4"btg19,500.00Pipa PVC class AW 1"btg26,700.00Pipa PVC class AW 1 1/4"btg40,000.00Pipa PVC class AW 1 1/2"btg46,000.00Pipa PVC class AW 2"btg58,700.00Pipa PVC class AW 2 1/2"btg85,700.00Pipa PVC class AW 3"btg115,600.00Pipa PVC class AW 4"btg191,600.00Pipa PVC class AW 5"btg317,500.00Pipa PVC class AW 6"btg445,500.00Pipa PVC class AW 8"btg760,500.004Pipa PVC Class AW "RUCIKA"Pipa PVC class AW 1/2"btg26,000.00Pipa PVC class AW 3/4"btg31,300.00Pipa PVC class AW 1"btg45,300.00Pipa PVC class AW 1 1/4"btg61,000.00Pipa PVC class AW 1 1/2"btg79,700.00Pipa PVC class AW 2"btg113,000.00Pipa PVC class AW 2 1/2"btg145,700.00Pipa PVC class AW 3"btg222,000.00Pipa PVC class AW 4"btg343,200.00Pipa PVC class AW 5"btg449,500.00Pipa PVC class AW 6"btg675,000.00Pipa PVC class AW 8"btg1,020,000.005Pipa PVC Class D "MASPION"Pipa PVC clasc D 1 1/4"btg28,500.00Pipa PVC clasc D 1 1/2"btg32,300.00Pipa PVC clasc D 2"btg42,200.00Pipa PVC clasc D 2 1/2"btg62,400.00Pipa PVC clasc D 3"btg91,000.00Pipa PVC clasc D 4"btg127,500.00Pipa PVC clasc D 5"btg208,100.00Pipa PVC clasc D 6"btg252,700.00Pipa PVC clasc D 8"btg447,000.006Pipa PVC Class D "WAVIN"Pipa PVC clasc D 1 1/4"btg25,500.00Pipa PVC clasc D 1 1/2"btg28,300.00Pipa PVC clasc D 2"btg36,300.00Pipa PVC clasc D 2 1/2"btg49,000.00Pipa PVC clasc D 3"btg62,200.00Pipa PVC clasc D 4"btg98,000.00Pipa PVC clasc D 5"btg158,500.00Pipa PVC clasc D 6"btg206,000.00Pipa PVC clasc D 8"btg358,000.007Pipa PVC Class D "RUCIKA"Pipa PVC clasc D 1 1/2"btg42,000.00Pipa PVC clasc D 2"btg53,000.00Pipa PVC clasc D 2 1/2"btg83,500.00Pipa PVC clasc D 3"btg116,700.00Pipa PVC clasc D 4"btg175,200.00Pipa PVC clasc D 5"btg276,000.00Pipa PVC clasc D 6"btg396,500.00Pipa PVC clasc D 8"btg661,600.00VIII. BAHAN LANGIT-LANGIT1GRC Bord120 x 240 x 0,4 cmlbr47,500.00120 x 240 x 0,6 cmlbr110,000.002GypsumElephant (120 x 240 x 0,9 cm)lbr51,000.00Knauf (120 x 240 x 0,9 cm)lbr48,000.00Jaya board (120 x 240 x 0,9 cm)lbr53,000.00APlus (120 x 240 x 0,9 cm)lbr45,000.003Blockteak120 x 240 x 1,8 cmlbr250,000.004Teakwood120 x 240 x 0,3 cmlbr77,500.00120 x 240 x 1,8 cmlbr245,000.005Triplek120 x 240 x 0,3 cmlbr38,500.00120 x 240 x 0,4 cmlbr53,500.00120 x 240 x 0,6 cmlbr67,500.006Multiplek120 x 240 x 0,9 cmlbr110,000.00120 x 240 x 1,2 cmlbr135,000.00120 x 240 x 1,8 cmlbr195,000.007Kalsiboard120 x 240 x 0,35 cmlbr47,500.00120 x 240 x 0,6 cmlbr110,000.008WoodplankPolos 0,8 x 20 x 400 cmlbr47,500.00Motif 0,8 x 20 x 400 cmlbr47,500.00Polos 0,8 x 30 x 400 cmlbr90,000.00Motif 0,8 x 30 x 400 cmlbr90,000.009NusaplankPolos 0,8 x 20 x 400 cmlbr47,500.00Motif 0,8 x 20 x 400 cmlbr47,500.00Polos 0,8 x 30 x 400 cmlbr90,000.00Motif 0,8 x 30 x 400 cmlbr90,000.0010Lis profil kayu jadi 5 cmbtg8,500.0011Lis gypsum 10 cmm8,500.00Lis gypsum 8 cmm7,500.00Lis gypsum 5 cmm5,500.0012Cornis gypsumkg3,700.0013Lakbanrol13,000.00IX. BAHAN FINISHING1Cat Tembok dan CoatingDinding DalamDulux (2,5 ltr) warna putihgln146,000.00Dulux (2,5 ltr) warna standargln158,000.00Dulux (2,5 ltr) warna khususgln170,000.00Dulux (20 ltr) warna putihpil1,080,000.00Dulux (20 ltr) warna standarpil1,165,000.00Dulux (20 ltr) warna khususpil1,240,000.00Mowilex (2,5 ltr)gln123,000.00Mowilex (20 ltr)pil896,500.00Kem Tone (3,75 ltr) warna putihgln200,000.00Kem Tone (3,75 ltr) warna standargln204,000.00Kem Tone (3,75 ltr) warna khususgln246,000.00Kem Tone (18,9 ltr) warna putihpil950,000.00Kem Tone (18,9 ltr) warna standarpil972,500.00Kem Tone (18,9 ltr) warna khususpil1,140,000.00Catylac (5 Kg)gln90,000.00Catylac (25 Kg)pil425,000.00Maxilite (5 Kg)gln60,000.00Maxilite (25 Kg)pil225,000.00Vinilex (5 Kg)gln87,500.00Vinilex (25 Kg)pil420,000.00Decolith (5 Kg)65,000.00Decolith (25 Kg)pil315,000.00Propaint (5 Kg)gln67,500.00Niponpaint (25 Kg)pil325,000.00125.00Decolithkg13,000.000.0Dinding LuarDulux (2,5 ltr)gln240,000.00Dulux (2,5 ltr) warna khususgln268,000.00Mowilex (2,5 ltr)gln185,000.007,400.00Kem Tone (3,75 ltr) warna putihgln295,000.00Kem Tone (3,75 ltr) warna standargln300,000.00Kem Tone (3,75 ltr) warna khususgln320,000.00Kem Tone (18,9 ltr) warna putihpil1,430,000.00Kem Tone (18,9 ltr) warna standarpil1,460,000.00Kem Tone (18,9 ltr) warna khususpil1,550,000.00Undercoat/AlkaliPrimer Dulux (2,5 ltr)gln124,000.00Watersilt Dulux (2,5 ltr)gln115,000.00Primer Dulux (20 ltr)pil930,000.00Watersilt Dulux (20 ltr)pil863,000.00Mowilex (2,5 ltr)gln95,000.00Mowilex (20 ltr)pil724,000.00CoatingCP-27kg55,000.00Accurakg45,000.00Mowilexkg54,000.00Stone Coatkg50,000.00Plamir Tembokkg9,200.002Cat Kayu dan BesiDuluxWarna standarkg40,000.00Warna khususkg45,000.00MowilexWarna standarkg60,000.00Warna khususkg65,000.00AvianWarna standarkg43,000.00Warna khususkg48,500.00Warna spesialkg56,500.00Bee Brandkg41,000.00MenieAltekkg22,500.00Bungakg17,500.00Dempul/Plamirkg22,500.00Minyak Catltr15,000.003Cat gentengKuputex (5 kg)gln80,000.00Tamitex (5 kg) warna standargln125,000.00Tamitex (5 kg) warna khususgln135,000.00Mowilex (2,5 ltr)gln145,000.00Mowilex (20 ltr)pil1,020,000.00Dulux (2,5 ltr)gln167,000.00Dulux (20 ltr)pil1,270,000.004Soda Apikg15,000.00Ampelaslbr1,800.00Teak OilLtr20,000.00Politur JadiLtr37,500.00PernisLtr25,000.00Residu/terLtr21,000.00Kuas 2,5 "bh4,500.00X. BAHAN KACA1Polos3 mmm265,000.005 mmm275,000.006 mmm290,000.008 mmm2135,000.0010 mmm2190,000.002Es3 mmm265,000.005 mmm285,000.003Ray band3 mmm260,000.005 mmm280,000.008 mmm2290,000.004Cermin2 mmm255,000.003 mmm290,000.005 mmm2140,000.00XI. BAHAN INSTALASI LISTRIK1KABEL LISTRIKNYA/Enterna1 x 1,5 (50 m)rol95,000.001 x 2,5 (50 m)rol155,000.00NYM2 x 1,5 (50 m)rol275,000.00Eterna2 x 2,5 (50 m)rol395,000.003 x 1,5 (50 m)rol350,000.003 x 2,5 (50 m)rol505,000.00Atlanta2 x 1,5 (50 m)rol95,000.002 x 2,5 (50 m)rol145,000.003 x 1,5 (50 m)rol130,000.003 x 2,5 (50 m)rol185,000.002SAKELARTempel BrocoSeribh13,000.00Engkelbh9,000.00Tanam BrocoSeribh17,500.00Engkelbh12,500.003FUSE BOX (SEKERING KASA)1 group Brocobh29,000.002 group Brocobh45,000.003 group Brocobh87,500.004STEKERbiasabh3,000.00ardebh10,000.00T biasa hitambh4,000.00T dengan arde Broco putihbh15,000.005FITTINGFlaon Brocobh5,000.00Gantung Brocobh4,500.00Kap proselinbh15,000.00Kombinasi Brocobh7,000.006STOP KONTAKArde Outbow putih Brocobh13,000.00Arde Outbow hitam Brocobh13,000.00XII. ALAT-ALAT PENGUNCI DANPENGGANTUNG1Kunci PintuKunci Pintu BesarMullerbh175,000.00Saphirebh100,000.00SESbh350,000.00Radiusbh125,000.00Cavelbh200,000.00Belamourbh150,000.00Kodaibh85,000.00Belucibh150,000.00Ferzacebh100,000.00Belezabh175,000.00Mavenbh100,000.00Kunci Pintu KecilMullerbh125,000.00Brabusbh100,000.00Eastbh50,000.00Mavenbh80,000.00Belamourbh85,000.00Radiusbh100,000.002Pegangan PintuCavelps350,000.00Mulerps250,000.00Nirwana besarps125,000.00Nirwana sedangps100,000.00Nirwana kecilps75,000.00BLZps125,000.003Engsel 4"Mullerps30,000.00Cavelps30,000.00BLZps45,000.00IGMps17,500.00TJps15,000.00Cobraps27,500.00CABps18,000.00SSps9,000.00Mavenps20,000.00Engsel 3"Mullerps22,500.00Cavelps25,000.00BLZps35,000.00IGMps13,500.00TJps10,000.00Cobraps16,000.00CABps12,500.00SSps7,500.00Mavenps16,000.004Grendel PintuEast 12"bh20,000.00East 10"bh15,000.00East 8"bh10,000.00East 6"bh8,500.00East 4"bh7,500.00East 3"bh6,500.00East 2"bh5,000.00Cavel 4"bh20,000.00Cavel 3"bh15,000.005Grendel JendelaEast 2"bh5,000.00Brabosbh6,000.00Brabos kotakbh10,000.00BLZbh15,000.00YSKbh3,000.00Solidbh18,000.006EspagnoledYSKPs30,000.00BertroliPs55,000.00CavelPs75,000.007Door Sloserps125,000.008Rel Pintu GeserMuler J4bh210,000.00Muler J3bh175,000.00Horizon J3bh90,000.009Kait AnginCrocodile (Kotak)bh10,000.00Dolpin (Segi)bh7,500.00KZK (Bulat)Bh4,000.00XIII. BAHAN SANITAIR1Kloset Duduk LengkapTOTO Warna Mudabh1,500,000.00TOTO Warna Tuabh1,750,000.00INA Warna Mudabh850,000.00INA Warna Tuabh1,250,000.00American Standart Warna Mudabh1,400,000.00American Standart Warna Tuabh1,650,000.002Kloset Jongkok LengkapTOTO Warna Mudabh160,000.00TOTO Warna Tuabh175,000.00INA Warna Mudabh95,000.00INA Warna Tuabh125,000.00American Standart Warna Mudabh135,000.00American Standart Warna Tuabh160,000.003Wastafel MejaTOTO Warna Mudabh600,000.00TOTO Warna Tuabh700,000.00Felakebh375,000.00Bestbh425,000.00American Standart Warna Mudabh500,000.00American Standart Warna Tuabh600,000.00Huidabh375,000.004Wastafel GantungTOTO Warna Mudabh275,000.00TOTO Warna Tuabh300,000.00INA Warna Mudabh225,000.00INA Warna Tuabh275,000.00American Standart Warna Mudabh275,000.00American Standart Warna Tuabh300,000.005WashbakFrestilebh400,000.00Royal kecilbh175,000.00Royal besarbh210,000.00Bancobh140,000.006Kran WastafelOndabh70,000.00Exelbh125,000.00Frizonbh75,000.00Silver Starbh50,000.00Extrabh40,000.007SifonExelbh85,000.00Frizonbh50,000.00Silver Starbh25,000.008Kran AirExelbh75,000.00Frizonbh100,000.00Silver Starbh30,000.00HZRbh60,000.00Ondabh30,000.00Extrabh20,000.009FlexibelHZRbh35,000.00Ondabh25,000.00Extrabh15,000.0010Kran Air Bak Cuci DapurWaserbh25,000.00Exelbh140,000.00Isanobh150,000.00Ondabh75,000.00Silver Starbh50,000.00Extrabh30,000.0011Shower MandiDuponbh100,000.00Fridalbh40,000.00Waserbh210,000.0012Tandon Air FiberglassPinguin (500 ltr)bh650,000.00Pinguin (1000 ltr)bh1,050,000.00Paus (500 ltr)bh475,000.00Paus (1000 ltr)bh875,000.0013Tandon Air AlumuniumTirta (500 ltr) tanpa kakibh1,600,000.00Tirta (500 ltr) dengan kakibh1,750,000.00Tirta (1000 ltr) tanpa kakibh2,200,000.00Tirta (1000 ltr) dengan kakibh2,400,000.0014Bak Mandi FiberKecilbh175,000.00Besarbh285,000.0015Pintu PVCStandarbh175,000.00Motif sederhanabh285,000.00Motif moderenbh350,000.00Motif exclusivebh625,000.0016Floor Drain StainlessOndabh110,000.00Silver Strarbh55,000.00Rosibh40,000.00CABbh15,000.0017Floor Drain PlastikAlincobh12,000.00Kotak Bulatbh4,000.00Kotakbh2,500.0018Tempat Sabunbh20,000.0019Water drain + asesorisset35,000.0020Sealtape kecilbh4,500.0021Urinoir INAbh1,200,000.00XIV. ALAT PENGIKAT KAYU1Paku - ukuran 1"kg15,000.002Paku - ukuran 1,5" s/d 4"kg13,000.003Paku payungkg22,500.004Paku payung ulirkg27,500.005Paku gypsumkg20,000.006Skrupkg22,000.00skrup fixerbuah150.007Paku betondos30,000.008Mur baut (kuda-kuda)kg17,500.009Angkur bautbh3,000.0010Lem kayukg12,000.0011Ijukikat7,500.0075,000.0012Paku ramset / dinaboltbh1,000.0013Baut ondouvila dan ondoulinbh750.00XV. POMPA AIR1sanyo125 wattbh335,000.002Panasonic200 wattbh575,000.003Panasonic125 wattbh330,000.004Shimizu125 wattbh310,000.00250 wattbh1,500,000.00Shimizu Otomatisbh450,000.005Dab125 wattbh225,000.00XVI. PAVING BLOCK1Holland Pres Mesinm240,000.00Holland Pres Masnualm229,000.002Hexagonal Pres Mesinm236,000.00Hexagonal Pres Manualm229,000.003Grass Blockm245,000.004Paving Kawungm245,000.005Kansteen 10/20/50bh6,500.006Kansteen 15/20/60bh32,500.007Kansteen 20/30/60bh65,000.002.00XVII. LAIN-LAIN1Kusen Alumunium 4" Alexsindo naturalm'63,000.002Kusen Alumunium 3" Alexsindo naturalm'45,000.003Kusen Alumunium 4" Alexsindo coklatm'70,000.004Kusen Alumunium 3" Alexsindo coklatm'60,000.005Kusen Alumunium 4" Alko naturalm'55,000.006Kusen Alumunium 3" Alko naturalm'40,000.007Kusen Alumunium 4" Alko coklatm'65,000.008Kusen Alumunium 3" Alko coklatm'55,000.009Kusen Alumunium 4" YKK naturalm'120,000.0010Kusen Alumunium 3" YKK naturalm'90,000.0011Kusen Alumunium 4" YKK coklatm'140,000.0012Kusen Alumunium 3" YKK coklatm'120,000.0013Casement naturalm'70,000.0014Casement coklatm'80,000.0015Rangka pintu alumunium ukuran standar (80x200 cm)unit700,000.0016Rolling door besim2170,000.0017Rolling door alluminiumm2250,000.0018Pintu Lipat (Foolding gate) ketebalan 0,8 mm UNP 1,8 mmm2500,000.0019Pintu Lipat (Foolding gate) ketebalan 0,5 mm UNP 1,8 mmm2450,000.0020Minyak beton & bekestingltr20,000.0021Alluminium foil (1,40x50) m/ double foilrol750,000.00275000satu sisi kertas3,928.5722Alluminium foil (1,40x50) m/ satu sisi kertasrol275,000.0023Alluminium foil (1,40x50) m/ satu sisi bagorrol375,000.0024airltr5.00375000satu sisi bagr5,357.1425Cornice adesive (tepung gypsum) @ 20 kgzak74,000.00750000double foil10,714.2926solarltr8,000.0027minyak pelumasLtr25,000.0028jendel nako (rangka + kaca 5 mm)daun11,000.0029besi Stripkg7,000.00XI.24 UNTUK PEMASANGAN NAKO30Sunscreen alluminiumm2175,000.0031Sealanttube35,000.0032venetions blinds dan vertical blinds (tirai)m2125,000.00Semarang, 13 Juli 2012Penyedia,CV. NASAMI AGUNGUMI KUSUMA LESTARI, SEDirektur

RAB TMPT PARKIRBILL OF QUANTITY (BQ)RENCANA ANGGARAN DAN BIAYAPekerjaan:Pemeliharaan Tempat Parkir KaryawanLokasi:RS. Paru dr. Ario Wirawan SalatigaTahun:2012NOURAIAN PEKERJAANVOLUMEKODE ANALISAHARGAJUMLAHSATUAN( Rp )( Rp )IPEKERJAAN TANAH DAN PASIR1Uitzet dan pengukuran1.00lsls500,000.00500,000.002Keprasan tanah66.79m3II.817,125.001,143,778.753Perataan dan pemadatan222.65m2II.118,550.001,903,657.504Galian tanah pondasi rolag25.80m3II.223,562.50607,912.505Urugan tanah kembali8.60m3II.107,852.7567,533.656Urugan pasir bawah paving33.39m3II.1293,425.003,119,460.757Tebang pohon dan gali akar - akarnya 4.65 m1.00btgls750,000.00750,000.00JUMLAH I8,092,343.15IIPEKERJAAN BETON DAN PASANGAN1Pasang pondasi rolag pasangan bata 1pc : 4ps97.00m2V.3142,942.5013,865,422.502Cor beton sloof 15 x 25 cm , 1pc : 2 ps : 3 kr besi 134 kg0.56m3IV.162,634,434.311,475,283.213Cor beton kolom 15 x 15 cm , 1pc : 2 ps : 3 kr besi 134 kg2.21m3IV.184,391,840.519,705,967.524Cor beton ring 15 x 20 cm , 1pc : 2 ps : 3 kr besi 134 kg0.45m3IV.184,391,840.511,976,328.235Pasang dinding bata merah 1pc : 6 ps60.00m2V.1165,552.503,933,150.006Plesteran beton 1 pc : 3 ps29.70m2VI.225,525.00758,092.507Plesteran dinding tembok 1 pc : 6 ps222.35m2VI.521,765.004,839,447.758Acian dinding beton dan tembok252.05m2VI.1913,327.503,359,196.389Sponengan sudut234.00m2VI.1420,707.504,845,555.0010Pasang steiger / andang30.00mdihit10,000.00300,000.0011Pasang keramik lantai 20 x 20 cm roman9.00m2VIII.35126,212.501,135,912.5012Pasang keramik dinding 20 x 25 cm roman42.00m2VIII.35a122,762.505,156,025.0013Pasang paving segi 6 , t : 6 cm222.65m2XVI.573,900.0016,453,835.00JUMLAH II67,804,215.59IIIPEKERJAAN KUSEN , SANITASI , INSTALASI LISTRIK1Kusen alumunium 4" silver36.50mX.975,582.002,758,743.002Daun pintu blok alu,unium atas kaca es6.78m2X.21584,477.603,962,758.163Kaca bening 5 mm4.50m2XIII.4489,619.38403,287.194Pasang closet jongkok toto2.00bhXII.2211,775.00423,550.005Pasang kran tembok SAN EI4.00bhXII.3980,050.00320,200.006Pasang instalasi air bersih1.00lsls1,500,000.001,500,000.007Pasang instalasi air kotor1.00lsls1,250,000.001,250,000.008Pasang wastafel komplit toto1.00unitdihit396,125.00396,125.009Pasang floordrain2.00bhdihit59,937.50119,875.0010Buat Septictank + peresapan1.00unitdihit3,500,000.003,500,000.0011Instalasi titik lampu9.00bhdihit200,000.001,800,000.0012Pasang lampu PLC 18 W + Fitting9.00bhdihit50,000.00450,000.0013Pasang saklar broco6.00bhdihit13,000.0078,000.0014Penarikan Kabel Over spaning1.00ttkdihit1,000,000.001,000,000.00JUMLAH III17,962,538.34IVPEKERJAAN ATAP1Tiang 2 x CNP 125.50.2,3441.98kgX.215,142.506,692,682.152Span 2 x CNP 125.50.2,3220.99kgX.215,142.503,346,341.083Gording CNP 100.50.2,3432.60kgX.215,142.506,550,645.504Angkur baut 12 x 30 cm56.00bhdihit3,000.00168,000.005Mur baut 12 mm x 4 cm56.00bhdihit2,000.00112,000.006Mur baut 10 mm x 3 cm85.00bhdihit2,000.00170,000.007Trekstang besi beton 10 mm45.00kgX.215,142.50681,412.508Ikatan angin besi beton 12 mm53.40kgX.215,142.50808,609.509Pasang atap galvalum 0.35155.00m2XI.2741,090.006,368,950.0010Pasang talang galvalum 0.3526.00mXI.27a20,545.00534,170.0011Pasang lisplank galvalum rangka hollow 2 x 4 cm86.00mXI.27a20,545.001,766,870.0012Baut roffing442.00bhdihit750.00331,500.0013Plat ezer # 6 + 10 mm183.00kgdihit15,142.502,771,077.5014Pasang span skrup 12 mm10.00bhdihit30,000.00300,000.00JUMLAH IV30,602,258.23VPEKERJAAN FINISHING1Pasang plafond KM gypsumboard t: 9 mm rangka 60 x 12016.00m2IX.677,144.501,234,312.002Pasang Lis gypsum 10 cm48.00mIX.1113,227.50634,920.003Cat tembok catylac252.05m2XIV. 1610,534.002,655,094.704Cat plafon catylac16.00m2XIV. 1610,534.00168,544.005Cat besi rangka atap AVIAN152.32m2XIV. 1029,186.254,445,649.606Pembersihan akhir222.65m2I.35,125.001,141,081.25JUMLAH V10,279,601.55JUMLAH I + II + III + IV + V134,740,956.86

RKP PARKIRBILL OF QUANTITY (BQ)REKAPITULASIPekerjaan:Pemeliharaan Tempat Parkir KaryawanLokasi:RS. Paru dr. Ario Wirawan SalatigaTahun:2012NOURAIAN PEKERJAANSUB JUMLAHJUMLAHPEMELIHARAAN TEMPAT PARKIR KARYAWANIPEKERJAAN TANAH DAN PASIRRp8,092,343.15IIPEKERJAAN BETON DAN PASANGANRp67,804,215.59IIIPEKERJAAN KUSEN , SANITASI , INSTALASI LISTRIKRp17,962,538.34IVPEKERJAAN ATAPRp30,602,258.23VPEKERJAAN FINISHINGRp10,279,601.55JUMLAHRp134,740,956.86PPN 10%Rp13,474,095.69JUMLAH TOTALRp148,215,052.54DIBULATKANRp 148,215,000.00Terbilang :Seratus Empat Puluh delapan Juta Dua Ratus Lima Belas Ribu RupiahSemarang, 13 Juli 2012Penyedia,CV. NASAMI AGUNGUMI KUSUMA LESTARI, SEDirektur

REKAP DAHLIABILL OF QUANTITY (BQ)REKAPITULASIPekerjaan:Pemeliharaan Ruang Tunggu DahliaLokasi:RS. Paru dr. Ario Wirawan SalatigaTahun:2012NOURAIAN PEKERJAANSUB JUMLAHJUMLAHPEMELIHARAAN RUANG TUNGGU DAHLIAIPEKERJAAN PASANGANRp20,187,461.66IIPEKERJAAN DINDING PARTISIRp22,038,669.00IIIPEKERJAAN TALANG & ATAPRp25,056,072.59JUMLAHRp67,282,203.24PPN 10%Rp6,728,220.32JUMLAH TOTALRp74,010,423.57DIBULATKANRp 74,010,000.00Terbilang : Tujuh Puluh Empat Juta Sepuluh Ribu RupiahSemarang, 13 Juli 2012Penyedia,CV. NASAMI AGUNGUMI KUSUMA LESTARI, SEDirektur

RAB DAHLIABILL OF QUANTITY (BQ)RENCANA ANGGARAN DAN BIAYAPekerjaan:Pemeliharaan Ruang Tunggu DahliaLokasi:RS. Paru dr. Ario Wirawan SalatigaTahun:2012NOURAIAN PEKERJAANVOLUMEKODE ANALISAHARGAJUMLAHSATUAN( Rp )( Rp )IPEKERJAAN PASANGAN1Urugan tanah mendatangkan3.54mII.12a51,425.00182,044.502Perataan tanah dan dipadatkan3.54mII.118,550.0030,267.003Cor beton rabat 1pc : 3 ps : 5 kr1.31mIV.1600,787.14787,031.164Pasang keramik lantai 30 x 30 cm ROMAN142.00m2VIII.13123,969.5017,603,669.005Pasang list keramik 2 x 10 cm20.00mVIII.5879,222.501,584,450.00JUMLAH I20,187,461.66IIPEKERJAAN DINDING PARTISI1Pasang alumunium 4" silver rangka partisi162.00mX.975,582.0012,244,284.002Pasang triplek 9 mm54.00m2IV.23123,005.006,642,270.003Cat dinding triplek AVIAN108.00m2XIV. 1029,186.253,152,115.00JUMLAH II22,038,669.00IIIPEKERJAAN TALANG & ATAP1Pasang lisplank kayu bangkirai 3 x 30 cm24.19m2VII.44117,312.502,837,789.382Pasang talang galvalum 0.35 lebar 90 cm62.50m2II.1220,545.001,284,062.503Pasang talang tegak pipa PVC 4" AW24.00mXII.34100,721.752,417,322.004Atap polycarbonat rangka hollow 2 x 4 cm70.00m2XI.27a208,942.0414,625,942.945Cat kayu listpank AVIAN108.38m2XIV. 1029,186.253,163,205.786Pembersihan akhir142.00m2I.35,125.00727,750.00JUMLAH III25,056,072.59JUMLAH I + II + III67,282,203.24

RKP TOTBILL OF QUANTITY (BQ)REKAPITULASI TOTALPekerjaan:Pemeliharaan Bangsal Anak Kenanga, Ruang Tunggu Dahlia dan Tempat Parkir KaryawanLokasi:RS. Paru dr. Ario Wirawan SalatigaTahun:2012NOURAIAN PEKERJAANSUB JUMLAHJUMLAHIPEMELIHARAAN BANGSAL ANAK KENANGARp98,379,607.56IIPEMELIHARAAN RUANG TUNGGU DAHLIARp67,282,203.24IIIPEMELIHARAAN TEMPAT PARKIR KARYAWANRp134,740,956.86JUMLAHRp300,402,767.66PPN 10%Rp30,040,276.77JUMLAH TOTALRp330,443,044.43DIBULATKANRp 330,443,000.00Terbilang :Tiga Ratus Tiga Puluh Juta Empat Ratus Empat Puluh Tiga Ribu Rupiah$378,469,0000.873Semarang, 13 Juli 2012$48,026,000Penyedia,CV. NASAMI AGUNGUMI KUSUMA LESTARI, SEDirektur

timeJADWAL WAKTU PELAKSANAAN (TIME SCHEDULE)Pekerjaan:Pemeliharaan Bangsal Anak Kenanga, Ruang Tunggu Dahlia dan Tempat Parkir KaryawanLokasi:RS. Paru dr. Ario Wirawan SalatigaTahun:2012NOURAIAN PEKERJAANJUMLAH HARGA (Rp)BOBOT (%)Bulan ke-KET12Minggu ke-Minggu ke-1234567897 hari7 hari7 hari7 hari7 hari7 hari7 hari7 hari4 hariHari ke-Hari ke-71421283542495660APemeliharaan Bangsal Anak Kenanga100%21IPEKERJAAN BONGKARANRp1,495,916.000.500.500.5020IIPEKERJAAN TANAH DAN PASIRRp2,262,417.880.750.750.7519IIIPEKERJAAN PONDASI , BETON & PASANGANRp65,189,081.3421.7021.707.237.237.2318IVPEKERJAAN SANITASI DAN INSTALASI LISTRIKRp11,628,800.003.873.871.291.291.2917VPEKERJAAN ATAPRp4,578,453.001.521.520.510.510.5116VIPEKERJAAN FINISHINGRp13,224,939.354.404.402.182.180.051514JUMLAHRp80,576,215.2113BPEMELIHARAAN RUANG TUNGGU DAHLIA12IPEKERJAAN PASANGANRp20,187,461.666.726.722.242.242.2450%11IIPEKERJAAN DINDING PARTISIRp22,038,669.007.347.341.831.831.831.8310IIIPEKERJAAN TALANG & ATAPRp25,056,072.598.348.342.782.782.7898JUMLAHRp42,226,130.667CPEMELIHARAAN TEMPAT PARKIR KARYAWAN6IPEKERJAAN TANAH DAN PASIRRp8,092,343.150.02.692.691.351.355IIPEKERJAAN BETON DAN PASANGANRp67,804,215.590.022.5722.577.527.527.524IIIPEKERJAAN KUSEN , SANITASI , INSTALASI LISTRIKRp17,962,538.340.05.985.982.992.993IVPEKERJAAN ATAPRp30,602,258.230.010.1910.193.403.403.402VPEKERJAAN FINISHINGRp10,279,601.550.03.423.421.691.690.050%1JUMLAHRp93,859,097.08Rp300,402,767.66100.00100.00RENCANA BOBOT PRESTASI MINGGUAN20.341.844.3419.7823.6824.5710.029.985.700.10RENCANA BOBOT PRESTASI MINGGUAN KUMULATIF0.00.01.846.1825.9649.6474.2184.2394.2099.90100.00REALISASI BOBOT PRESTASI MINGGUANREALISASI BOBOT PRESTASI MINGGUAN KUMULATIFSemarang, 13 Juli 2012Penyedia,CV. NASAMI AGUNGUMI KUSUMA LESTARI, SEDirektur

time

time (2)JADWAL WAKTU PELAKSANAAN (TIME SCHEDULE)Pekerjaan:Pemeliharaan Bangsal Anak Kenanga, Ruang Tunggu Dahlia dan Tempat Parkir KaryawanLokasi:RS. Paru dr. Ario Wirawan SalatigaTahun:2012NOURAIAN PEKERJAANJUMLAH HARGA (Rp)BOBOT (%)MULAI PELAKSANAAN HARI KE : (earliest event time)AKHIR PELAKSANAAN HARI KE : (last even time)WAKTU PELAKSANAAN (HARI) (duration)Pemeliharaan Bangsal Anak Kenanga21IPEKERJAAN BONGKARANRp1,495,916.000.500.0017720IIPEKERJAAN TANAH DAN PASIRRp2,262,417.880.750.00814719IIIPEKERJAAN PONDASI , BETON & PASANGANRp65,189,081.3421.700.0015352118IVPEKERJAAN SANITASI DAN INSTALASI LISTRIKRp11,628,800.003.870.0029492117VPEKERJAAN ATAPRp4,578,453.001.520.0022422116VIPEKERJAAN FINISHINGRp13,224,939.354.400.004360181514JUMLAHRp80,576,215.2113PEMELIHARAAN RUANG TUNGGU DAHLIA12IPEKERJAAN PASANGANRp20,187,461.666.720.008282111IIPEKERJAAN DINDING PARTISIRp22,038,669.007.340.0028562910IIIPEKERJAAN TALANG & ATAPRp25,056,072.598.340.0015352198JUMLAHRp42,226,130.661777PEMELIHARAAN TEMPAT PARKIR KARYAWAN6IPEKERJAAN TANAH DAN PASIRRp8,092,343.150.02.690.00114145IIPEKERJAAN BETON DAN PASANGANRp67,804,215.590.022.570.001535214IIIPEKERJAAN KUSEN , SANITASI , INSTALASI LISTRIKRp17,962,538.340.05.980.003649143IVPEKERJAAN ATAPRp30,602,258.230.010.190.002242212VPEKERJAAN FINISHINGRp10,279,601.550.03.420.004360181JUMLAHRp93,859,097.08Rp300,402,767.66100.000.00

REKAP BANGSAL ANAKBILL OF QUANTITY (BQ)REKAPITULASIPekerjaan:Pemeliharaan Bangsal Anak KenangaLokasi:RS. Paru dr. Ario Wirawan SalatigaTahun:2012NOURAIAN PEKERJAANSUB JUMLAHJUMLAHPemeliharaan Bangsal Anak KenangaIPEKERJAAN BONGKARANRp1,495,916.00IIPEKERJAAN TANAH DAN PASIRRp2,262,417.88IIIPEKERJAAN PONDASI , BETON & PASANGANRp65,189,081.34IVPEKERJAAN SANITASI DAN INSTALASI LISTRIKRp11,628,800.00VPEKERJAAN ATAPRp4,578,453.00VIPEKERJAAN FINISHINGRp13,224,939.35JUMLAHRp98,379,607.56PPN 10%Rp9,837,960.76JUMLAH TOTALRp108,217,568.32DIBULATKANRp 108,217,000.00Terbilang :Seratus Delapan Juta Dua Ratus Tujuh Belas Ribu RupiahSemarang, 13 Juli 2012Penyedia,CV. NASAMI AGUNGUMI KUSUMA LESTARI, SEDirektur

ANALISA DAFTAR ANALISA HARGA SATUANI.PEKERJAAN PERSIAPAN SNI 03-2835-2002II.81 m2Stripping tanah setinggi 1 [email protected],000.00=Rp.1,[email protected],500.00=Rp.212.50Rp.1,712.501 m3Stripping tanahRp.17,125.00II.21 m3Keprasan [email protected],000.00=Rp.22,[email protected],500.00=Rp.1,062.50Rp.23,562.50II.21 m3Galian tanah biasa kedalaman 1 [email protected],000.00=Rp.22,[email protected],500.00=Rp.1,062.50Rp.23,562.50I.31 m21 M2 Membersihkan lapangan dan [email protected],000.00=Rp.3,[email protected],500.00=Rp.2,125.00Rp.5,125.00Rp.5,125.00II.111 m3Perataan dan pemadatkan [email protected],000.00=Rp.15,[email protected],500.00=Rp.2,125.00Rp.3,425.001 M2 perataan dan pemadatanRp.8,550.00IV.11 m3cor rabat 1pc:3psr:5kr / membuat beton mutu F'c = 7,4 Mpa (K100), slump (12+2) cm, w/c= 0.87Bahan247.0000kgSemen [email protected],250.00=Rp.308,750.00869.0000kgPasir [email protected]=Rp.71,382.14999.0000kgKerikil (maksimum 30 mm)@Rp.155.56=Rp.155,[email protected]=Rp.1,075.00Rp.536,[email protected],000.00=Rp.49,500.000.2750OhTukang [email protected],000.00=Rp.11,000.000.0280OhKepala tukang [email protected],500.00=Rp.1,[email protected],000.00=Rp.2,490.00Rp.64,180.00Rp.600,787.14II.101 m3Timbunan tanah kembali (tanah biasa dalam 1 m3)[email protected],000.00=Rp.7,[email protected],500.00=Rp.352.75Rp.7,852.75II.121 m3Urugan pasir urugBahan1.2000m3Pasir [email protected],000.00=Rp.84,000.00Rp.84,[email protected],000.00=Rp.9,[email protected],500.00=Rp.425.00Rp.9,425.00Rp.93,425.00II.12a1 m3Urugan tanah mendatangkanBahan1.2000m3Tanah [email protected],000.00=Rp.42,000.00Rp.42,[email protected],000.00=Rp.9,[email protected],500.00=Rp.425.00Rp.9,425.00Rp.51,425.00V.31 m2Memasang dinding bata merah uk (5x11x22) cm campuran spesl 1Pc: 4Pp tebal 1 BataBahan140.0000m3Batu [email protected]=Rp.71,400.0026.5500kgSemen [email protected],250.00=Rp.33,187.500.0930m3Pasir [email protected],000.00=Rp.10,230.00Rp.114,[email protected],000.00=Rp.18,000.000.2000OhTukang [email protected],000.00=Rp.8,000.000.0200OhKepala tukang [email protected],[email protected],500.00=Rp.1,275.00Rp.28,125.00Rp.142,942.50XV. 41 m21 M2 Membongkar lantai [email protected],000.00=Rp.6,[email protected],500.00=Rp.425.00Rp.6,425.00Rp.6,425.00II.91 m3Membuang paving [email protected],000.00=Rp.9,[email protected],500.00=Rp.425.00Rp.10,325.00XV. 4+II.91 m21 M2 Membongkar lantai paving dan membuang keluar1 M2 Membongkar lantai pavingRp.6,425.00Membuang paving keluarRp.6,425.00Rp.12,850.00XV. 31 m31 M3 Membongkar dinding tembok bata merah dan [email protected],000.00=Rp.3,000.00-2.0000OhTukang [email protected],000.00=Rp.80,000.00Rp.83,000.00Rp.83,000.00IV.11 m3Cor rabat bawah keramik 1pc:3psr:5kr (beton mutu F'c = 7,4 Mpa (K100), slump (12+2) cm, w/c= 0.87)Bahan247.0000kgSemen [email protected],250.00=Rp.308,750.00869.0000kgPasir [email protected]=Rp.71,382.14999.0000kgKerikil (maksimum 30 mm)@Rp.155.56=Rp.155,[email protected]=Rp.1,075.00Rp.536,[email protected],000.00=Rp.49,500.000.2750OhTukang [email protected],000.00=Rp.11,000.000.0280OhKepala tukang [email protected],500.00=Rp.1,[email protected],500.00=Rp.3,527.50Rp.65,217.50Rp.601,824.64V.51 m2Memasang dinding bata merah uk (5x11x22) cm campuran spesl 1Pc: 6Pp tebal 1 BataBahan140.0000m3Batu [email protected]=Rp.71,400.0018.5000kgSemen [email protected],250.00=Rp.23,125.000.1220m3Pasir [email protected],000.00=Rp.13,420.00Rp.107,[email protected],000.00=Rp.18,000.000.2000OhTukang [email protected],000.00=Rp.8,000.000.0200OhKepala tukang [email protected],[email protected],500.00=Rp.1,275.00Rp.28,125.00Rp.136,070.00V.111 m2Memasang dinding bata merah uk (5x11x22) cm campuran spesl 1Pc: 6Pp tebal 1/2 BataBahan70.0000m3Batu [email protected]=Rp.35,700.008.3200kgSemen [email protected],250.00=Rp.10,400.000.0490m3Pasir [email protected],000.00=Rp.5,390.00Rp.51,[email protected],000.00=Rp.9,000.000.1000OhTukang [email protected],000.00=Rp.4,000.000.0100OhKepala tukang [email protected],[email protected],500.00=Rp.637.50Rp.14,062.50Rp.65,552.50VI.21 m2Plesteran dinding tebal 15 mm dengan 1Pc : 3PpBahan7.7760kgSemen [email protected],250.00=Rp.9,720.000.0230m3Pasir [email protected],000.00=Rp.2,530.00Rp.12,[email protected],000.00=Rp.6,000.000.1500OhTukang [email protected],000.00=Rp.6,000.000.0150OhKepala [email protected],[email protected],500.00=Rp.637.50Rp.13,275.00Rp.25,525.00VI.51 m2Plesteran dinding tebal 15 mm dengan 1Pc : 6PpBahan4.4160kgSemen [email protected],250.00=Rp.5,520.000.0270m3Pasir [email protected],000.00=Rp.2,970.00Rp.8,[email protected],000.00=Rp.6,000.000.1500OhTukang [email protected],000.00=Rp.6,000.000.0150OhKepala [email protected],[email protected],500.00=Rp.637.50Rp.13,275.00Rp.21,765.00VI.191 m2Memasang acianBahan3.2500kgPortland [email protected],250.00=Rp.4,062.50Rp.4,[email protected],000.00=Rp.4,500.000.1000Tukang [email protected],000.00=Rp.4,000.000.0100Kepala Tukang [email protected],[email protected],500.00=Rp.340.00Rp.9,265.00Rp.13,327.50V.141 m2Memasang dinding terawang (roster) ukuran (20x20) cm campuran spesl 1Pc: 3PpBahan30.0000bhTerawang (roster)@Rp.5,000.00=Rp.150,000.0014.0000kgSemen [email protected],250.00=Rp.17,500.000.0320m3Pasir [email protected],000.00=Rp.3,520.00Rp.171,[email protected],000.00=Rp.9,000.000.1000OhTukang [email protected],000.00=Rp.4,000.000.0100OhKepala [email protected],[email protected],500.00=Rp.637.50Rp.14,062.50Rp.185,082.50VI.51 m2Plesteran dinding tebal 15 mm dengan 1Pc : 6PpBahan4.4160kgSemen [email protected],250.00=Rp.5,520.000.0270m3Pasir [email protected],000.00=Rp.2,970.00Rp.8,[email protected],000.00=Rp.6,000.000.1500OhTukang [email protected],000.00=Rp.6,000.000.0150OhKepala [email protected],[email protected],500.00=Rp.637.50Rp.13,275.00Rp.21,765.00VIII.491 m2Pasang dinding batu ANDESIT ALUR 20 x 40 cmBahan1.1000m2Batu Andesit Alur 20 x 40 [email protected],000.00=Rp.148,[email protected],250.00=Rp.14,[email protected],000.00=Rp.3,850.00Rp.167,[email protected],000.00=Rp.18,600.000.3500OhTukang [email protected],000.00=Rp.14,000.000.0350OhKepala [email protected],500.00=Rp.1,[email protected],500.00=Rp.1,275.00Rp.35,362.50Rp.202,400.00II.61 m3Galian tanah [email protected],000.00=Rp.30,[email protected],500.00=Rp.1,360.00Rp.31,360.00Galian hotmix cadas m2Rp.4,704.00XV. 41 m1Membongkar [email protected],000.00=Rp.12,[email protected],500.00=Rp.850.00Rp.12,850.00Rp.12,850.00II.91 m3Membuang paving [email protected],000.00=Rp.9,[email protected],500.00=Rp.425.00Rp.10,325.00II.51 m3Galian tanah keras kedalaman 1 [email protected],000.00=Rp.30,[email protected],500.00=Rp.1,360.00Rp.31,360.00II.121 m3Urugan pasir urugBahan1.2000m3Pasir [email protected],000.00=Rp.84,000.00Rp.84,[email protected],000.00=Rp.9,[email protected],500.00=Rp.425.00Rp.9,425.00Rp.93,425.00XVI.31 m21 M2 Pasang paving block - Holland Pres MesinBahan-1.0000m2Holland Pres [email protected],000.00=Rp.40,000.00-0.1000M3Pasir pasang (kaliworo)@Rp.110,000.00=Rp.11,000.00Rp.51,[email protected],500.00=Rp.850.00-0.0200OhKepala Tukang [email protected],500.00=Rp.850.00-0.2000OhTukang [email protected],000.00=Rp.8,[email protected],000.00=Rp.12,000.00Rp.21,700.00Rp.72,700.00XVI.21 m'1 M' Pasang kanstin 20/30/601 M' Pasang kanstin 15/20/[email protected],000.00=Rp.108,333.33Rp.108,333.33Tenaga-0.2000OhTukang [email protected],000.00=Rp.8,000.00-0.4000OhKepala Tukang [email protected],500.00=Rp.17,[email protected],500.00=Rp.850.00Rp.25,850.00Rp.134,183.33II.91 m3Membuang tanah sisa [email protected],000.00=Rp.9,[email protected],500.00=Rp.425.00Rp.10,325.00III.31 m3Memasang batu belah campuran 1 PC : 4 PPBahan1.2000m3Batu belah 15 cm/20 [email protected],000.00=Rp.144,000.00163.0000kgPortl'and [email protected],250.00=Rp.203,750.000.5200m3Pasir [email protected],000.00=Rp.57,200.00Rp.404,[email protected],000.00=Rp.45,000.000.6000OhTukang [email protected],000.00=Rp.24,000.000.0600OhKepala tukang [email protected],500.00=Rp.2,[email protected],500.00=Rp.3,187.50Rp.74,737.50Rp.479,687.50III.51 m3Memasang batu belah campuran 1 PC : 6 PPBahan1.2000m3Batu belah 15 cm/20 [email protected],000.00=Rp.144,000.00117.0000kgPortl'and [email protected],250.00=Rp.146,250.000.5610m3Pasir [email protected],000.00=Rp.61,710.00Rp.351,[email protected],000.00=Rp.45,000.000.6000OhTukang [email protected],000.00=Rp.24,000.000.0600OhKepala tukang [email protected],500.00=Rp.2,[email protected],500.00=Rp.3,187.50Rp.74,737.50Rp.426,697.50VI.181 m2Finishing siar pasangan batu kali adukan 1Pc : 2PpBahan6.3400kgPortland [email protected],250.00=Rp.7,925.000.0120m3Pasir [email protected],000.00=Rp.1,320.00Rp.9,[email protected],000.00=Rp.9,000.000.1400OhTukang [email protected],000.00=Rp.5,600.000.0140OhKepala tukang [email protected],[email protected],500.00=Rp.637.50Rp.15,832.50Rp.25,077.50VI.21 m2Plesteran dinding tebal 15 mm dengan 1Pc : 3PpBahan7.7760kgSemen [email protected],250.00=Rp.9,720.000.0230m3Pasir [email protected],000.00=Rp.2,530.00Rp.12,[email protected],000.00=Rp.6,000.000.1500OhTukang [email protected],000.00=Rp.6,000.000.0150OhKepala [email protected],[email protected],500.00=Rp.637.50Rp.13,275.00Rp.25,525.00VI.141 m1Plesteran skoning 1Pc : 2Pp, lebar 10 mmBahan0.5000kgSemen [email protected],250.00=Rp.625.000.0130m3Pasir [email protected],000.00=Rp.1,430.00Rp.2,[email protected],000.00=Rp.1,710.000.3800OhTukang [email protected],000.00=Rp.15,200.000.0380OhKepala tukang [email protected],500.00=Rp.1,[email protected],500.00=Rp.127.50Rp.18,652.50Rp.20,707.50VIII.351 m2Pasang lantai keramik ukuran (20x20) cm, RomanBahan1.0500dosKeramik Roman [email protected],000.00=Rp.72,[email protected],250.00=Rp.13,[email protected],000.00=Rp.4,950.001.6200kgSemen [email protected],000.00=Rp.450.00Rp.90,[email protected],000.00=Rp.18,600.000.3500OhTukang [email protected],000.00=Rp.14,000.000.0350OhKepala [email protected],500.00=Rp.1,[email protected],500.00=Rp.1,275.00Rp.35,362.50Rp.126,212.50VIII.35a1 m2Pasang lantai keramik ukuran (20x25) cm, RomanBahan1.0500dosKeramik Roman [email protected],000.00=Rp.73,[email protected],250.00=Rp.13,[email protected],000.00=Rp.450.001.6200kgSemen [email protected],000.00=Rp.450.00Rp.87,[email protected],000.00=Rp.18,600.000.3500OhTukang [email protected],000.00=Rp.14,000.000.0350OhKepala [email protected],500.00=Rp.1,[email protected],500.00=Rp.1,275.00Rp.35,362.50Rp.122,762.50VIII.131 m2Pasang lantai keramik ukuran (30x30) cm,Bahan1.0101dosKeramik "Roman"@Rp.70,000.00=Rp.70,[email protected],250.00=Rp.12,[email protected],000.00=Rp.4,950.001.5000kgSemen [email protected],000.00=Rp.450.00Rp.88,[email protected],000.00=Rp.18,600.000.3500OhTukang [email protected],000.00=Rp.14,000.000.0350OhKepala [email protected],500.00=Rp.1,[email protected],500.00=Rp.1,275.00Rp.35,362.50Rp.123,969.50VIII.271 m2Pasang lantai keramik ukuran (40 x 40) cm, Motif Warna Tua "ROMAN"Bahan1.0417dosKeramik "ROMAN" Motif Warna [email protected],000.00=Rp.93,[email protected],250.00=Rp.12,[email protected],000.00=Rp.4,950.001.3000kgSemen [email protected],000.00=Rp.450.00Rp.111,[email protected],000.00=Rp.18,600.000.3500OhTukang [email protected],000.00=Rp.14,000.000.0350OhKepala [email protected],500.00=Rp.1,[email protected],500.00=Rp.1,275.00Rp.35,362.50Rp.146,765.50XVI.51 m21 M2 Pasang paving block - Hexagonal Pres MesinBahan-1.0000m2Hexagonal Pres [email protected],000.00=Rp.36,000.00-0.1000M3Pasir pasang (kaliworo)@Rp.110,000.00=Rp.11,000.00Rp.47,[email protected],000.00=Rp.600.00-0.0200OhKepala Tukang [email protected],000.00=Rp.800.00-0.2000OhTukang [email protected],500.00=Rp.8,[email protected],500.00=Rp.17,000.00Rp.26,900.00Rp.73,900.00IV.21 m3Membuat beton mutu F'c = 9,8 Mpa (K125), slump (12+2) cm, w/c= 0.78Bahan276.0000kgSemen [email protected],250.00=Rp.345,000.00828.0000kgPasir [email protected]=Rp.68,014.291,012.0000kgKerikil (maksimum 30 mm)@Rp.155.56=Rp.157,[email protected]=Rp.1,075.00Rp.571,[email protected],000.00=Rp.49,500.000.2750OhTukang [email protected],000.00=Rp.11,000.000.0280OhKepala tukang [email protected],500.00=Rp.1,[email protected],500.00=Rp.3,527.50Rp.65,217.50Rp.636,729.01IV.131 kgPekerjaan pembesian dengan besi polosBahan1.050kgBesi beton [email protected],750.00=Rp.9,187.500.015kgKawat [email protected],000.00=Rp.270.00Rp.9,[email protected],000.00=Rp.210.000.0070OhTukang [email protected],000.00=Rp.280.000.0007OhKepala tukang [email protected],[email protected],500.00=Rp.170.00Rp.689.75Rp.10,147.25IV.151 m2Pekerjaan bekisting untuk pelatBahan0.020m3Kayu kelas III (kayu cetakan) 2x [email protected],000.00=Rp.14,000.000.300kgPaku 2" - 5"@Rp.13,000.00=Rp.3,900.00Rp.17,[email protected],000.00=Rp.15,600.000.2600OhTukang [email protected],000.00=Rp.10,400.000.0260OhKepala tukang [email protected],500.00=Rp.1,[email protected],500.00=Rp.1,105.00Rp.28,210.00Rp.46,110.00IV.161 m2Pekerjaan bekisting untuk sloofBahan0.023m3Kayu kelas III (kayu cetakan) 2x [email protected],000.00=Rp.15,750.000.300kgPaku 2" - 5"@Rp.13,000.00=Rp.3,900.00Rp.19,[email protected],000.00=Rp.15,600.000.2600OhTukang [email protected],000.00=Rp.10,400.000.0260OhKepala tukang [email protected],500.00=Rp.1,[email protected],500.00=Rp.1,105.00Rp.28,210.00Rp.47,860.00IV.16aCor beton sloof 15 x 25 cm , 1pc : 2 ps : 3 kr besi 134 kg1 m3Membuat beton mutu F'c = 9,8 Mpa (K125), slump (12+2) cm, w/c= 0.78 (1pc:2ps:3kr)Rp.636,729.01134 kgPekerjaan pembesian dengan besi polosRp.1,359,731.5013,33 m2Pekerjaan bekisting untuk sloof26.6666666667Rp.637,973.80Rp.2,634,434.31Cor beton sloof 15 x 20 cm , 1pc : 2 ps : 3 kr besi 134 kg1 m3Membuat beton mutu F'c = 9,8 Mpa (K125), slump (12+2) cm, w/c= 0.78 (1pc:2ps:3kr)Rp.636,729.01134 kgPekerjaan pembesian dengan besi polosRp.1,359,731.5013,33 m2Pekerjaan bekisting untuk sloof33.3333333333Rp.637,973.80Rp.2,634,434.31IV.181 m2Pekerjaan bekisting untuk kolom menggunakan cetakan kayu tahun dan perancah bambuBahan0.020m3Kayu kelas III (kayu cetakan), 2x [email protected],000.00=Rp.14,000.000.400kgPaku 2" - 5"@Rp.13,000.00=Rp.5,200.000.008m3Balok kayu tahun, 2x [email protected],000.00=Rp.6,375.002.500lbrPapan kayu tahun 2/20x200 cm, 2x [email protected],500.00=Rp.23,750.000.00801.000btgBambu/4m, 2x [email protected],000.00=Rp.7,000.00833,333.333Rp.56,325.001,187,[email protected],000.00=Rp.19,800.000.3300OhTukang [email protected],000.00=Rp.13,200.000.0330OhKepala tukang [email protected],500.00=Rp.1,[email protected],500.00=Rp.1,402.50Rp.35,805.00Rp.92,130.00Cor beton kolom 15 x 15 cm , 1pc : 2 ps : 3 kr besi 134 kg1 m3Membuat beton mutu F'c = 9,8 Mpa (K125), slump (12+2) cm, w/c= 0.78 (1pc:2ps:3kr)Rp.636,729.01134 kgPekerjaan pembesian dengan besi polosRp.1,359,731.5026 m2Pekerjaan bekisting untuk kolomRp.2,395,380.00Rp.4,391,840.51VI.191 m2Memasang acianBahan3.2500kgPortland [email protected],250.00=Rp.4,062.50Rp.4,[email protected],000.00=Rp.4,500.000.1000Tukang [email protected],000.00=Rp.4,000.000.0100Kepala Tukang [email protected],[email protected],500.00=Rp.340.00Rp.9,265.00Rp.13,327.50X.91 m'Memasang 1 m kusen pintu alluminium - "Kusen Alumunium 4" Alexsindo naturalBahan1.1000m'Kusen Alumunium 4" Alexsindo [email protected],000.00=Rp.69,300.006.0000buahskrup [email protected][email protected],000.00=Rp.2,100.00Rp.72,[email protected],000.00=Rp.1,290.000.0430OhTukang Alumunium [email protected],000.00=Rp.1,720.000.0043OhKepala [email protected],[email protected],500.00=Rp.89.25Rp.3,282.00Rp.75,582.00X.211 unitMemasang 1 unit rangka pintu alluminium (80x200) cm, panil kaca es dan alumuniumBahan1.0000unitProfil rangka [email protected],000.00=Rp.700,000.0014.6000buahAlluminium [email protected],500.00=Rp.21,900.000.4200m2Kaca es 5 [email protected],000.00=Rp.35,700.001.1200m2Pelat [email protected],666.67=Rp.130,666.67Rp.888,[email protected],000.00=Rp.7,500.000.8500OhTukang [email protected],000.00=Rp.34,000.000.0850OhKepala [email protected],500.00=Rp.3,[email protected],500.00=Rp.1,785.00Rp.46,897.50Memasang 1 m2 rangka pintu alluminium (80x200) cm, rangka kaca dan alumuniumRp.584,477.60IV.231 m2Pekerjaan Pasang triplek 9 mmBahan0.720lbrTeakwood tebal 9 [email protected],000.00=Rp.79,200.004.000bhFornite/penjaga jarak/spacer (alat bantu)@Rp.2,000.00=Rp.8,000.00Rp.87,[email protected],000.00=Rp.19,800.000.3300OhTukang [email protected],000.00=Rp.13,200.000.0330OhKepala tukang [email protected],500.00=Rp.1,[email protected],500.00=Rp.1,402.50Rp.35,805.00Rp.123,005.00XIII.441 m21 M2 pasang kaca, tebal 5 mmBahan-1.1000M2Kaca bening 5 [email protected],000.00=Rp.82,500.00Rp.82,[email protected],000.00=Rp.450.00-0.1500OhTukang [email protected],000.00=Rp.6,000.00-0.0150OhKepala Tukang [email protected],[email protected],500.00=Rp.31.88Rp.7,119.38Rp.89,619.38XIII.441 m21 M2 pasang kaca, tebal 6 mmBahan-1.1000M2Kaca bening 6 [email protected],000.00=Rp.148,500.00Rp.148,[email protected],000.00=Rp.450.00-0.1500OhTukang [email protected],000.00=Rp.6,000.00-0.0150OhKepala Tukang [email protected],[email protected],500.00=Rp.31.88Rp.7,119.38Rp.155,619.38XII.21 bhMemasang 1 buah kloset jongkokBahan-1.0000BhCloset jongkok standard [email protected],000.00=Rp.160,000.00-6.0000KgSemen PC ( Portland Cement ) 40 [email protected],250.00=Rp.7,500.00-0.0100M3Pasir pasang (kaliworo)@Rp.110,000.00=Rp.1,100.00Rp.168,[email protected],000.00=Rp.16,500.00-0.5500OhTukang [email protected],000.00=Rp.22,000.00-0.0550OhKepala Tukang [email protected],500.00=Rp.2,[email protected],500.00=Rp.2,337.50Rp.43,175.00Rp.211,775.00XII.391 bhMemasang 1 bh kran air - "San Ei"Bahan-1.0000BhKran air - [email protected],000.00=Rp.75,000.00-0.0250BhSealtape [email protected],500.00=Rp.112.50Rp.75,[email protected],[email protected],000.00=Rp.4,000.00-0.0100OhKepala [email protected],[email protected],500.00=Rp.212.50Rp.4,937.50Rp.80,050.00XII.11 bhMemasang 1 buah kloset duduk/monoblokBahan-1.0000BhCloset duduk standar INA lengkap warna [email protected],500,000.00=Rp.1,500,[email protected],500,000.00=Rp.90,000.00Rp.1,590,[email protected],000.00=Rp.33,000.00-1.1000OhTukang [email protected],000.00=Rp.44,000.00-0.1100OhKepala Tukang [email protected],500.00=Rp.4,[email protected],500.00=Rp.4,675.00Rp.86,350.00Rp.1,676,350.00XII.101 bhMemasang 1 buah wastafel Gantung - "TOTO Warna Muda"Bahan-1.0000BhWastafel - "TOTO Warna Muda"@Rp.275,000.00=Rp.275,[email protected],000.00=Rp.16,500.00Rp.291,[email protected],000.00=Rp.36,000.00-1.4500OhTukang [email protected],000.00=Rp.58,000.00-0.1500OhKepala Tukang [email protected],500.00=Rp.6,[email protected],500.00=Rp.4,250.00Rp.104,625.00Rp.396,125.00XII.501 bhMemasang 1 bh Floor drain Stainless "Silver Strar"Bahan-1.0000BhFloor drain stainless "Silver Strar"@Rp.55,000.00=Rp.55,000.00Rp.55,[email protected],[email protected],000.00=Rp.4,000.00-0.0100OhKepala [email protected],[email protected],500.00=Rp.212.50Rp.4,937.50Rp.59,937.50X.211 unitMemasang 1 unit rangka pintu alluminium (80x200) cm, panil triplekBahan1.0000unitProfil rangka [email protected],000.00=Rp.700,000.0014.6000buahAlluminium [email protected],000.00=Rp.14,600.000.4200m2Triplek 6 [email protected],500.00=Rp.28,350.001.1200m2Pelat [email protected],000.00=Rp.168,000.00Rp.910,[email protected],000.00=Rp.7,500.000.8500OhTukang [email protected],000.00=Rp.34,000.000.0850OhKepala [email protected],500.00=Rp.3,[email protected],500.00=Rp.1,785.00Rp.46,897.50Memasang 1 m2 rangka pintu alluminium , panil triplekRp.598,654.69$957,848XIV. 161 m21 M2 Pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup) - "Catilac"Bahan-0.1000KgPlamur [email protected],200.00=Rp.920.00-0.1000KgCat [email protected],000.00=Rp.1,700.00-0.2600KgCat tembok "Catylach" warna [email protected],000.00=Rp.4,420.00Rp.7,[email protected],000.00=Rp.600.00-0.0630OhTukang [email protected],000.00=Rp.2,520.00-0.0063OhKepala Tukang [email protected],[email protected],500.00=Rp.106.25Rp.3,494.00Rp.10,534.00XIV. 101 m21 M2 Pengecatan bidang kayu baru (1 lapis plamir), 1 lapis cat dasar, 2 lapis cat penutup - "Avian"Bahan-0.2000KgCat Meni Kayu "altex"@Rp.22,500.00=Rp.4,[email protected],500.00=Rp.3,375.00-0.1700KgCat dasar "Avian"@Rp.43,000.00=Rp.7,310.00-0.2600KgCat Besi/ Kayu "Avian" warna [email protected],000.00=Rp.11,180.00Rp.26,[email protected],000.00=Rp.2,100.00-0.0090OhTukang [email protected],000.00=Rp.360.00-0.0060OhKepala Tukang [email protected],[email protected],500.00=Rp.106.25Rp.2,821.25Rp.29,186.25IX.61 m2Pasang langit-langit gypsum board "Jaya Board" ukuran (120x240x0,9) cm, tebal 9 mm rangka Hollow 20/40 dan 40/40 galvanis tebal 4 mmBahan0.3470lbrGypsum board "Jaya board"@Rp.53,000.00=Rp.18,391.000.5000btgHollow 40/40 galvanis tebal 5 [email protected],000.00=Rp.15,000.000.6250btgHollow 20/40 galvanis tebal 4 [email protected],000.00=Rp.11,250.000.1500kgkawat diameter 4 [email protected],000.00=Rp.3,[email protected],000.00=Rp.2,[email protected],[email protected],000.00=Rp.26.00Rp.50,[email protected],000.00=Rp.4,500.000.5000OhTukang [email protected],000.00=Rp.20,000.000.0500OhKepala [email protected],500.00=Rp.2,[email protected],500.00=Rp.340.00Rp.26,965.00Rp.77,144.50IX.111 m'List langit-langit gypsum 10 cmBahan1.0500m'List gypsum 10 [email protected],500.00=Rp.8,[email protected],700.00=Rp.462.50Rp.9,[email protected],000.00=Rp.1,500.000.0500OhTukang [email protected],000.00=Rp.2,000.000.0050OhKepala [email protected],[email protected],500.00=Rp.127.50Rp.3,840.00Rp.13,227.50X.21 kgPasang rangka kuda-kuda baja CNPBahan1.1000kgBesi baja [email protected],600.00=Rp.10,560.00Rp.10,[email protected],000.00=Rp.1,800.000.0600OhTukang [email protected],000.00=Rp.2,400.000.0060OhKepala [email protected],[email protected],500.00=Rp.127.50Rp.4,582.50Rp.15,142.50I.31 m2Pembersihan akhir dalam [email protected],000.00=Rp.3,[email protected],500.00=Rp.2,125.00Rp.5,125.00Rp.5,125.00XII.341 m'Memasang 1 M' pipa PVC tipe AW diameter 4" MaspionBahan-1.2000M'Pipa PVC class AW 4"@Rp.58,925.00=Rp.70,[email protected],925.00=Rp.20,623.75Rp.91,333.75Tenaga-0.0810OhTukang [email protected],000.00=Rp.3,[email protected],000.00=Rp.5,400.00-0.0135OhKepala [email protected],[email protected],500.00=Rp.174.25Rp.9,388.00Rp.100,721.75VII.441 m1Memasang lisplank ukuran 3/30, kayu bengkiraiBahan0.0099m3Papan kayu [email protected],500,000.00=Rp.103,950.000.1000kgPaku 5 cm dan 7 [email protected],000.00=Rp.1,300.00Rp.105,[email protected],000.00=Rp.3,000.000.2000Tukang [email protected],000.00=Rp.8,000.000.0200Kepala [email protected],[email protected],500.00=Rp.212.50Rp.12,062.50Rp.117,312.50VII.441 m1Memasang lisplank ukuran 3/30, kayu KamperBahan0.0099m3Papan kayu [email protected],500,000.00=Rp.94,050.000.1000kgPaku 5 cm dan 7 [email protected],000.00=Rp.1,300.00Rp.95,[email protected],000.00=Rp.3,000.000.2000Tukang [email protected],000.00=Rp.8,000.000.0200Kepala [email protected],[email protected],500.00=Rp.212.50Rp.12,062.50Rp.107,412.50VIII.581 m'Pasang lis dinding keramik ukuran (10x30) cm asia tile motif warna mudaBahan3.5000bhKeramik 10x30 motif warna [email protected],500.00=Rp.26,[email protected],250.00=Rp.11,[email protected],000.00=Rp.1,980.0027.00002.7500kgSemen [email protected],000.00=Rp.180.001.2963Rp.40,[email protected],000.00=Rp.18,000.000.4500OhTukang [email protected],000.00=Rp.18,000.000.0450OhKepala [email protected],500.00=Rp.1,[email protected],500.00=Rp.1,275.00Rp.39,187.50Rp.79,222.50XV. 81 m21 M2 Membongkar partisi kaca rangka [email protected],000.00=Rp.6,000.00-0.0600OhTukang [email protected],000.00=Rp.2,400.00-0.0060OhKepala Tukang [email protected],[email protected],500.00=Rp.425.00Rp.9,080.00Rp.9,080.00XV. 31 m31 M3 Membongkar dinding tembok bata merah dan [email protected],000.00=Rp.3,000.00-2.0000OhTukang [email protected],000.00=Rp.80,000.00Rp.83,000.00Rp.83,000.00XV. 41 m21 M2 Membongkar lantai [email protected],000.00=Rp.6,[email protected],500.00=Rp.425.00Rp.6,425.00Rp.6,425.00VII.281 m3Memasang konstruksi gording kayu bengkiraiBahan1.1000m3Balok kayu [email protected],500,000.00=Rp.11,550,000.003.0000kgPaku 12 [email protected],000.00=Rp.39,000.00Rp.11,589,[email protected],000.00=Rp.72,000.007.2000Tukang [email protected],000.00=Rp.288,000.000.7200Kepala [email protected],500.00=Rp.30,[email protected],500.00=Rp.5,100.00Rp.395,700.00Rp.11,984,700.00VII.301 m2Memasang rangka atap genteng beton, kayu kruingBahan0.0105m3Usuk kayu kruing 5/[email protected],750,000.00=Rp.49,875.000.01050.250.0054m3Reng kayu kruing 3/[email protected],750,000.00=Rp.25,650.000.00480.2500kgPaku 5 cm dan 10 [email protected],000.00=Rp.3,250.00Rp.78,[email protected],000.00=Rp.3,000.000.1000Tukang [email protected],000.00=Rp.4,000.000.0100Kepala [email protected],[email protected],500.00=Rp.212.50Rp.7,637.50Rp.86,412.50XI.61 m2Pasang atap genteng beton naturalBahan-9.0000BhGenteng beton [email protected],800.00=Rp.25,200.00Rp.25,[email protected],000.00=Rp.6,000.00-0.1000OhTukang [email protected],000.00=Rp.4,000.00-0.0100OhKepala Tukang [email protected],[email protected],500.00=Rp.425.00Rp.10,850.00Rp.36,050.00XI.271 m21 M2 Pasang atap Galvalum 0,35Bahan-0.8300LbrAtap Galvalum 0,[email protected],000.00=Rp.34,030.00-0.0200KgPaku [email protected],500.00=Rp.550.00Rp.34,[email protected],000.00=Rp.3,600.00-0.0600OhTukang [email protected],000.00=Rp.2,400.00-0.0060OhKepala Tukang [email protected],[email protected],500.00=Rp.255.00Rp.6,510.00Rp.41,090.00XI.27a1 m2Pasang atap policarbonat rangka hollow 2x4 cmBahan-0.0404LbrAtap [email protected],000,000.00=Rp.121,065.38-7.7778kgRangka [email protected],600.00Rp.74,666.67-0.0200KgPaku [email protected],000.00=Rp.6,700.00Rp.202,[email protected],000.00=Rp.3,600.00-0.0600OhTukang [email protected],000.00=Rp.2,400.00-0.0060OhKepala Tukang [email protected],[email protected],500.00=Rp.255.00Rp.6,510.00Rp.208,942.04Semarang, 13 Juli 2012Penyedia,CV. NASAMI AGUNGUMI KUSUMA LESTARI, SEDirektur

RAB BANGSAL ANAKBILL OF QUANTITY (BQ)RENCANA ANGGARAN DAN BIAYAPekerjaan:Pemeliharaan Bangsal Anak KenangaLokasi:RS. Paru dr. Ario Wirawan SalatigaTahun:2012NOURAIAN PEKERJAANVOLUMEKODE ANALISAHARGAJUMLAHSATUAN( Rp )( Rp )IPEKERJAAN BONGKARAN1Bongkar dinding partisi148.25m2XV. 89,080.001,346,110.002Bongkar dinding tembok1.26m3XV. 383,000.00104,580.003Bongkar lantai keramik4.50m2XV. 46,425.0028,912.504Buang bekas bongkaran1.58m3II.910,325.0016,313.50JUMLAH I1,495,916.00IIPEKERJAAN TANAH DAN PASIR1Galian tanah keras5.67m3II.631,360.00177,811.202Urugan pasir bawah lantai & pondasi21.60m2II.1293,425.002,017,980.003Urugan tanah kembali1.70m3II.107,852.7513,349.684Buang tanah bekas galian5.16m3II.910,325.0053,277.00JUMLAH II2,262,417.88IIIPEKERJAAN PONDASI , BETON & PASANGAN1Pasang pondasi batu kali 1pc : 6ps7.29m3III.5426,697.503,110,624.782Cor beton slof , kolom & ring 15 x 20 cm 1 pc : 2 ps : 3 kr , besi 134 kg2.82m3IV.16a2,634,434.317,429,104.753Pasang dinding bata merah 1 pc : 6 ps49.80m2V.5136,070.006,776,286.004Plesteran beton 1 pc : 3 ps26.80m2VI.225,525.00684,070.005Plesteran dinding tembok 1 pc : 6 ps93.60m2VI.521,765.002,037,204.006Acian beton dan dinding tembok126.40m2VI.1913,327.501,684,596.007Sponengan sudut48.00mVI.1420,707.50993,960.008Pasang steiger / andang27.00mdihit10,000.00270,000.009Pasang keramik lantai 30 x 30 cm ROMAN9.00m2VIII.35126,212.501,135,912.5010Pasang keramik lantai 20 x 20 cm ROMAN6.00m2VIII.35126,212.50757,275.0011Pasang keramik dinding 20 x 25 cm ROMAN22.05m2VIII.35a122,762.502,706,913.1312Pasang alumunium 4" silver rangka partisi195.00mVIII.13123,969.5024,174,052.5013Pasang triplek 9 mm30.50m2IV.23123,005.003,751,652.5014Pasang kaca 6 mm bening30.50m2XIII.44155,619.384,746,390.9415Pasang daun pintu block alumunium atas kaca5.28m2X.21584,477.603,086,041.7516Pasang plafond gypsum rangka kayu 60 x 12015.00m2IX.677,144.501,157,167.5017Pasang list gybsum 10 cm52.00mIX.1113,227.50687,830.00JUMLAH III65,189,081.34IVPEKERJAAN SANITASI DAN INSTALASI LISTRIK1Pasang monoblock TOTO2.00unitXII.11,676,350.003,352,700.002Pasang jet shower2.00bhdihit150,000.00300,000.003Pasang kran tembok2.00bhXII.3980,050.00160,100.004Pasang instalasi air bersih & kotor1.00lsdihit2,000,000.002,000,000.005Buat Septictank + peresapan1.00unitdihit3,750,000.003,750,000.006Pasang floordrain2.00bhXII.5059,937.50119,875.007Pasang wastafel komplit toto1.00unitXII.10396,125.00396,125.008Pasang instalasi titik lampu3.00ttkdihit200,000.00600,000.009Pasang instalasi stop kontak2.00ttkdihit200,000.00400,000.0010Pasang lampu PLC 18 W + Fitting5.00bhdihit50,000.00250,000.0011Pasang saklar broco4.00bhdihit50,000.00200,000.0012Pasang stop kontak broco2.00bhdihit50,000.00100,000.00JUMLAH IV11,628,800.00VPEKERJAAN ATAP1Pasang gording kayu BK 6 x 120.09m3VII.2811,984,700.001,078,623.002Pasang usuk 5 x 7 dan reng 3 x 4 kruing27.00m2VII.3086,412.502,333,137.503Pasang genteng27.00m2XI.636,050.00973,350.004Pasang listplank kayu kamper 3 x 301.80m2VII.44107,412.50193,342.50JUMLAH V4,578,453.00VIPEKERJAAN FINISHING1Pasang meja counter5.20mdihit1,750,000.009,100,000.002Cat tembok catylac126.40m2XIV. 1610,534.001,331,497.603Cat plafon catylac15.00m2XIV. 1610,534.00158,010.004Cat kayu avian64.60m2XIV. 1029,186.251,885,431.755Pembersihan akhir1.00lsdihit750,000.00750,000.00JUMLAH VI13,224,939.35JUMLAH I + II + III + VI98,379,607.56

tkdnFOMULIR REKAPITULASI PERHITUNGAN TINGKAT KOMPONEN DALAM NEGERI (TKDN)PEKERJAAN: Pemeliharaan Kantin, Kelas III Bangsal Bougenvile dan Jalan Masuk / ME UtamaL O K A S I: RS. Paru dr. Ario Wirawan SalatigaTH. ANGG.: 2012NOURAIAN PEKERJAANNILAI GABUNGAN BARANG / JASA Rp.1000TKDNDNLNTOTALBARANG/JASAGABUNGAN300,402,767.66Rp. 1000% KDNJASA0.35105,140,968.68abcdefghTTL BARANG0.6180,241,660.60BARANGBRANG LN87,394.58IMaterial langsung (bahan baku)180,154,266.0270,394.58180,224,660.6059.99180,224,660.6059.99BRANG DN180,154,266.02IIPeralatan (barang jadi)583,997.5417,000.00600,997.540.200.200.00ALAT0.0515,020.14ASub total barang180,738,263.5687,394.58180,825,658.1460.19180,224,660.8059.99JASAIIIManagemen proyek dan rekayasaIVAlat/ Fasilitas kerja15,020.140.0015,020.140.0115,020.140.01VKonstruksi & fabrikasi0.000.000.000.000.000.00180,840,678.28VIJasa umum0.000.000.000.000.00119,562,089.39BSub total jasa15,020.140.0015,020.140.0115,020.140.01CTOTAL BIAYA (A+B)180,753,283.6987,394.58180,840,678.2860.20180,239,680.9460.0060,080,553.53FORMULASI PERHITUNGAN:=180,840,678.28-87,394.58Semarang, 13 Juli 2012180,840,678.28Penyedia,CV. NASAMI AGUNG=180,753,283.69180,840,678.28=99.95%UMI KUSUMA LESTARI, SEDirektur

MPUDAFTAR MATA PEMBAYARAN UTAMAPekerjaan:Pemeliharaan Bangsal Anak Kenanga, Ruang Tunggu Dahlia dan Tempat Parkir KaryawanLokasi:RS. Paru dr. Ario Wirawan SalatigaTahun:2012NOU R A I A NPROSENTASEHARGATOTALPEKERJAANSATUANHARGA(%)( Rp.)( Rp.)C.2PEKERJAAN BETON DAN PASANGAN TEMPAT PARKIR22.570.00.0A.IIIPEKERJAAN PONDASI , BETON & PASANGAN21.700.00.0C.IVPEKERJAAN ATAP TEMPAT PARKIR10.19B.IIIPEKERJAAN TALANG & ATAP R. DAHLIA8.34B.IIPEKERJAAN DINDING PARTISI R. DAHLIA7.34B.IPEKERJAAN PASANGAN R. DAHLIA6.72C.3PEKERJAAN KUSEN , SANITASI , INSTALASI LISTRIK TEMPAT PARKIR5.98JUMLAH82.84Semarang, 13 Juli 2012Semarang, 13 Juli 2012Penyedia,Penyedia,CV. NASAMI AGUNGCV. NASAMI AGUNGUMI KUSUMA LESTARI, SEUMI KUSUMA LESTARI, SEDirekturDirektur.......

Sheet1SPESIFIKASIPEKERJAANPemeliharaan Bangsal Anak Kenanga, Ruang Tunggu Dahlia dan Tempat Parkir KaryawanL O K A S IRS. Paru dr. Ario Wirawan SalatigaTH. ANGG.: 2012UMUM1RINGKASAN SPESIFIKASI TEKNIS1.1UraianSpesifikasi untuk kontrak ini didasarkan atas sistim kontrak harga satuan pekerjaan / unit price, oleh karenanya kuantitas yang tercantum dalam dokumen kontrak merupakan perkiraan awal dan dapat / dimungkinkan berubah.PPK akan mengeluarkan detil konstruksi mutakhir dan merevisi perkiraan kuantitas konstruksi setelah peninjauan kembali awal (mutual cek awak / MC-0) terhadap seluruh desain, maupun peninjauan kembali / mutual cek dalam masa pelaksanaan.PPK adalah pembantu KPA atau pejabat yang mewakilinya dan dibantu oleh Konsultan Pengawas / Supervisi bila ada.MC-0 dibuat oleh kontraktor yang didasarkan informasi survey lapangan bersama PPK dan Surveyor dari Dinas yang bersangkutan.Dalam setiap langkah tahapan pekerjaan kontraktor mengajukan permohonan pelaksanaan pekerjaan (request of work) yang telah disetujui PPK.1.2Survey lapangan kontraktorSelama periode mobilisasi pada saat dimulai kontrak, kontraktor wajib melaksanakan survey lapangan yang blengkap terhadap kondisi fisik & struktur yang akan dikerjakan dan semua yang mendukung lainnya.Selanjutnya hasil pengukuran diserahkan kepada PPK tak lebih dari tanggal yang ditentukan; tanggal penyerahan merupakan acuan yang sangan penting bagi terselenggaranya pekerjaan kontrak secara dini dan berhasil.1.3Pembayaran pekerjaanKontraktor melaksanakan semua pekerjaan sesuai detil, yang diberikan dalam gambar kontrak menurut PPK dan sebagian besar menurut sistim harga kontrak / unit price.Pembayaran kepada kontraktor harus dibuat b erdasarkan kuantitas sesungguhnya yang diukur pada tiap pos kegiatan pekerjaan yang telah dilaksanakan menurut pekerjaan yang bersangkutan dari spesifikasi teknik ini.Sebagian pembayaran juga dibuat berdasarkan pembayaran Lumsum.Pembayaran yang diberikan kepada kontraktor harus mencakup konpensasi penuh untuk untuk seluruh biaya dikeluarkan meliputi upah tenaga, material/ bahan, peralatan konstruksi, peralatan penunjang lainnya, organisasi pekerjaan, bikaya administrasi, keuntungan, asuransi, royalti, pajak, pengamanan pekerjaan baik selama pekerjaan berlangsung dan yang telah selesai, pembayaran kepada pihak ke tiga, kerusakan harta masyarakat maupun untuk biaya pekerjaan tambahan yang tidak dibayar secara terpisah.2PELAYANAN PENGUJIAN LABORATORIUM2.1UraianKontrktor bertanggungjawab untuk pelaksanaan semua pekerjaan pengujian mutu / pengujian laboratorium dibawah perintah dan pengawasan PPK2.2Fasilitas laboratorium atau pengujian mutuKontraktor harus menyediakan pelayanan pengujian mutu seperti yang dipersyaratkan untuk memenuhi seluruh ketentuan pengendalian mutu dari spesifikasi ini.Pengujian mutu / pengujian laboratorium bisa dilakukan dilaboratorium milik kontraktor atau tempat pengujian lain yang disepakati oleh PPK.2.3Pelaksanaan pengujian2.3.1PemberitahuanKontraktor harus memberitahu pihak PPK mengenai rencana waktu pelaksanaan pengujian sebelum pengujian dilaksanakan, dengan demikian memberi waktu kepada PPK atau wakilnya untuk menyaksikan setiap pengujian.2.3.2DistribusiHasil pengujian segera diolah dan distribusikan, sehingga kemungkinan untuk melaksanakan pengujian ulang atau penggantian bahan dapat dilaksanakan secepatnya dengan demikian mengurangi keterlambatan penanganan pekerjaan.2.4Pengukuran dan pembayaranBiaya untuk pelaksanaan pengujian ditanggung kontraktor dan seluruh biaya tersebut sudah deimasukkan dalam perhitungan "Harga Satuan Pekerjaan" yang bersangkutan.3TRANSPORTASI & JALAN KERJA3.1UraianApabila menurut PPK kegiatan pengangkutan yang dilakukan kontraktor akan mengakibatkan kerusakan pada jalan umum atau bangunan-bangunan struktur atau lingkungan atau dapan memicu terjadinya banjir, genangan air mendadak hingga dapat mengakibatkan terhentinya aktifitas masayarakat pada kegiatan pelaksanaan tersebut dsb maka PPK dapat memerintahkan kontraktor untuk dapat menggunakan jalan alternanif dan kontraktor tidak diperkenankan mengajukan klaim untuk kompensasi tambahan sebagai akibat dari perintah PPK tersebut.Bila diperlukan PPK dapat mengatur batas muatan atau metode yang diusulkan kontraktor.Kontraktor bertanggung jawab atas kerusakan jalan maupun jembatan yang disebabkan oleh kegiatan-kegiatan operasi yang dilakukan.Apabila ada bahan yang hendak dibuang dilokasi pekerjaan, kontraktor harus sebelumnya harus mendapat ijin tertulis dari loksai dimana buangan ntersebut hendak ditempatkan.4MUTUAL CEK4.1UraianDalam masa pelaksanaan senantiasa diadakan mutual cek atau rekayasa lapangan terhadap kondisi mutakhir lapangan sehingga kegiatan pelaksanaan dapat dilaksanakan secara optimum dan dapat dipertanggungjawabkan.Kontraktor harus menyediakan tenaga ahli, alat dan biaya untuk menangani pekerjaan.Menetukan / memetapkan titik duga dan pekerjaan pengukuran proyek, unutk pekerjaan penelitian, pengujian bahan & campuranya.Pengukuran harus diadakan secara lengkap dan melaporkan hasil survei. Dengan demikian akan memungkinkan PPK melaksanakan peninjauan kembali rancangan / mutual cek dan menyelesaikan dan mengeluarkan detil konstruksi ebelum pekerjaan konstruksi dimulai.Mutuak cek pada awal pelaksanaan pekerjaan (MC-O) mutlak perlu dilaksanakan agar diperoleh kesamaan persepsi dalam segala hal atara PPK dan kontraktor.4.2Persiapan gambar rencanaPihak kontraktor harus mempelajari copy atau blue print Gambar rencana dalam ukuran aslinya yang dapat diperoleh dari PPK dan segera konsultasi dengan PPK sebelum survei atau pengukuran dimulai dan harus menunjukkan dan memperbaiki setiap kesalahan atau perbedaan, kehilangan/ pengurangan atau tambahan yang ditemui dilapangan.Kontraktor dan PPK harus mencapai kesepakatan terhadap ketepatan atas setiap perubahan yang diambil / dibuat terhadap gambar-gambar rencana asli.4.3Dasar pembayaran.Penyiapan semua tenaga kerja, material dan peralatan yang dibutuhkan untuk pelaksanaan mutual cek dengan nbaik, untuk membuat penampang memenjang dan gambar-gambar lainnya yang diisyaratkan dan untuk membuat dan menyediakan laporan survei lapangan harus dipenui tanpa pembayaran tambahan dan semua biaya dianggap sudah termasuk dalam harga satuan pekerjaan yang masuk dalam berbagai mata pembayaran yang tercantum dalam penawaran.5PENGADAAN MATERIAL & PENYIMAPANNYA.5.1UmumKontraktor harus menunjukkan dan menyerahkan saplke bahan kepada PPK contoh-contoh untuk disetijui dari rencana pesanan, tempat asal bahan, bersama dengan nperincian data atau brosur dari tempat sumber bahan.Kontraktor harus mengatur seluruh rencana penempatan, pemilihan dan pengolahan bahan/ material/ produk tersebut sesuai dengan spesifikasi atau gambar rencana.5.2Penyediaan material/ bahanPPK dapat memerintahkan untuk melaksanakan pengadaan material/ bahan/ produk dari sebagian sumber bahan dan mungkin menolak bagain lain.5.3Penyimpanan material/ bahanMaterial harus disimpan sedemikian rupa sehingga mutunya terjamin dan terpelihara serta siap untuk dipergunakan, dan mudah untuk diperiksa oleh PPK.5.4PembayaranKeperluan -keperluan untuk biaya pengadaan material/ bahan/ produk sudah terhitung didalam harga satuan pekerjaan yang dimasukkan dalam penawaran.6TIME SCHEDULE / JADWAL PELAKSANAAN PEKERJAAN6.1UmumTime schedule konstruksi merupakan alat utama yang diperlukan untuk perencanaan pelaksanaan pekerjaan dan pemantauan atau pengendalian waktu pelaksanaan pekerjaan.Selambatnya 7 hari setelah terbit SPMK, kontraktor harus menyerahkan jadwal pelaksanaan untuk disyahkan oleh PPK.Secara teratur pada akhir bulan kontraktor harus memperbarui Time schedule untuk menggambarkan seteliti mungkin kemajuan aktual sampai hari terakhir bulan yang bersangkutan.6.2Detil Time scheduleTime schedule dibuat dalam format bagan balok mendatar dan digabungkan dengan kurva "S".7.PERUBAHAN PELAKSANAAN PEKERJAAN/ CONSTRUCTION CHANGE ORDER (CCO)7.1UraianPerubahan-perubahan dapat terjadi atas prakarsa dari PPK atau kontraktor, dan persetujuan dituangkan dalam melalui CCO dan ditanda tangani kedua belah pihak.Jika dasar pembayaran yang ditetapkan dalam CCO ini mernyebabkan terjadinya variasi dalam jumlah harga kontrak, maka CCO tersebut harus dinegoisasi dan dibuat dalam bentuk Addendum Kontrak. Dan CCO & Addendum harus memenuhi ketetapan sebagai berikut :7.1.1Change Orderadalah suatu perintah tertulis yang diterbitkan PPK dan disetujui dan diterima oleh kontraktor mengenai perubahan-perubahan atas dokumen kontrak, dasar pembayaran, penyesuaian waktu (bila ada).Dituangkan dalam format standar yang mencakup semua perintah oleh PPK yang akan mempengaruhi perubahan Dokumen Kontrak atau perintah sebelumnya yang dikeluarkan PPK.Pelaksanaan Change OrderCCO berisi uraian perubahan dalamm pekerjaan baik penmbahan maupun penghapusan, dengan lampiran Dokumen Kontrak yang direvisi seperlunya untuk menentukan perincian perubahan.Kontraktor harus mennandatangani dan memberi tanggal CCO, untuk menunjukkan bahwa kontraktor setuju atas detail isi dalam CCO.7.1.2Addendum Kontrakadalah suatu perjanjian tertulis antara pemilik dan kontraktor yang mensyahkan perubahan dalam pekerjaan-pekerjaan adau dalam dokumen kontrak, yang mengakibatkan terjadinya variasi dalam struktur harga satuan mata pembayaran dan diperkirakan akan menyebabkan terjadinya variasi jumlah nilai kontrak dan sudah pernah dinegoisasi sebelumnya, dan disepakati dalam CCO, Addendum harus juga dibuat pada saat penutupan kontrak dan untuk semua perubahan kontraktual atau perubahan teknis penting lainnya, tanpa memendang apakah terjadi variasi struktur harga atau terhadap jumlah harga kontrak.Pelaksanaan Addendum kontrakPelaksanaan Addendum bisa terjadi karena:a. Karena adanya perubahan perkiraan kuantitas yang berakibat menimbulkan variasi dalam jumlah harga kontrak, yang berarti merubah jumlah harga kontrak yang tercantum sebelumnya dalam surat perjanjian pemborongan atau pada Addendum sebelumnya/ terdahulu.b. Perhitungan kuantitas akhir pekerjaan yang disebut Addendum Penutup atau Addendum Akhir.8PEKERJAAN PEMBERSIHAN8.1UraianSelama masa pelaksanaan kontraktor harus memelihara pekerjaan sehingga terbebas dari sisa bangunan, kotoran dan sampah yang dihasilkan sebagai akibat adanya kegiatan pekerjaan.Pada saat selesainya pekerjaan, kontraktor berkewajiban menyingkirkan seluruh sisa / kelebihan bahan sampah, perlengkapan, peralatan dan mesin-mesin dari lokasi, seluruh permukaan hasil penanganan harus tampak bersih dan pekerjan yanmg diserahkan harus sudah siap pakai dan diterima dengan memuaskan oleh PPK.8.2Pemebersihan selama pelaksanaanKontraktor berkewajiban melakukan pembersihan rutin untuk menjamin daerah lokasi pekerjaan, jembatan, kantor darurat dan hunian harus bebas dari sisa bahan, sampah, kotoran yang dihasilkan akibat pengoperasian pekerjaan.8.3Pemebersihan akhirPada saat selesainya pekerjaan, kontraktor berkewajiban menyingkirkan seluruh sisa / kelebihan bahan sampah, perlengkapan, peralatan dan mesin-mesin dari lokasi, seluruh permukaan hasil penanganan harus tampak bersih dan pekerjan yang diserahkan harus memulihkan daerah kerja yang tidak merupakan bagian pekerjaan untuk memperbaiki sesuai aslinya.8.4Dasar pembayaranKontraktor tidak menerima pembayaran terpisah terhadap operasi pembersihan yang dilakukan.9PERSIAPAN & PENGUKURAN9.1Pekerjaan persiapan atau mobilisasiCakupan kegiatan persiapan atau mobilisasi tergantung pada jenis dan volume pekerjaan yang harus dilaksanakan antara lain:- Kegiatan atau proses pembelian atau sewa tanah/ bangunan untuk base camp kontraktor dan Kegiatan pelaksanaan. (bila ditentukan dan diisyaratkan)- Mobilisasi semua staf kontraktor dan semua pekerja yang diperlukan untuk penyelesaikan pekerjaan- Menyediakan dam memelihara kantor lapangan dan akomodasi staff dengan kelengkapan sesuai dengan persayaratan.Persiapan atau mobilisasi harus diselesaikan selama 14 hari terhitung diterbitkannya SPKM kecuali untuk item administrasi & dokumentasi yang harus mengikuti sesuai berjalannya pelaksanaan pekerjaan yang berachir hingga selesainya pekerjaan.9.1.1PelaporanKontraktor harus menyerahkan kepada PPK suatu program mobilisasi menurut detil kuantitas dan waktu9.1.2Program mobilisasiKontraktor harus menyerahkan, menyiapkan dan mendapat persetujuan dari PPK perihal program mobilisasi.dalam waktu yang ditentukan.9.2Pekerjaan pengukuran9.2.1Uraianyang dimaksud pekerjaan pengukuran adalah plotting perencanaan dari gambar disain ke lapangan yang dilaksanakan pada masa awal pelaksanaan mobilisasi.Tata cara pengukuran- Untuk memulai pengukuran, kontraktor harus berpedoman pada gambar disain / gambar rencana ukuran asli.- Kontraktor bersama pengawas lapangan, perencana dan konsultan supervisi (bila ada) melakukan peninjauan lapangan/ lokasi untuk menentukan titik ikat.- Kontraktor melakukan pengukuran awal pekerjaan dilokasi pekerjaan dengan peralatan ukur yang memnuhi syarat disaksikan oleh PPK- Kontraktor membuat berita acara hasil pengukuran yang disyahkan oleh perencana untuk pedoman pelaksanaan selanjutnya.9.3Pembayarana.Tata cara pembayaran- Pekerjaan persiapan dan pengukuran harus dilaksanakan dan pembayaran dihitung berdasarkan satuan lumpsum untuk volume realisasi pekerjaan yang telah diselesaikan.- Pembayaran bisa ditagihkan 100% setelah pekerjaan selesai dan diterima oleh PPK.- Berlebihan dari pekerjaan dari volume teoritis tidak dibayarb. Dasar pembayaranKuantitas & kualitas sebagaimana ditetapkan diatas, harus dibayarkan sesuai harga kontrak persatuan pengukuran dari mata pembayaran yang tercantum dalam daftar penawaran harga, serta pembayarannya harus sudah mencakup seluruh persiapan dan biaya yang lazim untuk penyelesaian pekerjaan ini.c. Satuam pengukuranLumpsum10BARAK10.1UraianKontraktor mengadakan, melengkapi, memasang, memelihara, menjaga barak/ gudang untuk tempat pekerjaan.Pada saat selesainya kontrak, kontraktor harus memindahkan atau membuang, semua gudang darurat, gudang penyimpanan, barak pekerja dan bengkel yang dibutukhan dalam pelaksanaan, pengendalian, pengawasan kegiatan (bila ada dan ditentukan)Penempatan barak sedekat mungkin dengan lokasi kerja, didalam lokasi umum pada daerah kerja dan disetujui PPKSesuai pilihan kontraktor bangunan dapat berupa konstruksi semi permanen yang dibuat atau dapat berupa sewa bangunan.10.2Barak harus dilengkapi perabot sesuai petunjuk PPKBarak harus dilengkapi papn nama kegiatan yang dipasang dibagian luar dan mudah dibaca sesuai petunjuk PPK.10.3Tata cara pembayaranTidak ada pembayaran khusus untuk pos pekerjaan ini. Pekerjaan ini harus sudah termasuk dalam pos pekerjaan prsiapan.11ADMINISTRASI & DOKUMENTASI11.1UraianYang dimaksud dengan pekerjaan administrasi dan dokumentasi adalah meliputi pengadaan, pembuatan maupun penggadaan untuk:a. Buku kontrak, lampiran maupun addendumnyab. Laporan harian & mingguanc. Rekaman foto kegiatan pelaksanaan )5, 50% dan 100% pada lokasi pengambilan gambar sesuai petunjuk.d. Request of work (permohonan pelaksanaan pekerjaan)e. Berkas penagihan pembayaran besrta backup pendukungnya.f. Buku direksig. As built drawingh. Berkas serah terima pekerjaan beserta backup pendukungnya.i. Rekaman digital / soft copy kegiatan pelaksanaan dalam CDj. Berkas-berkas penting lainnya, sesuai kondisi dan macam kegiatan pelaksanaan.11.2Tata cara pembayaranPembayaran untuk pos pekerjaan ini dilakukan dalam 2 tahapan:- 25% (dua puluh lima prosen) dari harga kontrak apabila buku kontrak beserta lampirannya sudah selesai dibuat dan digandakan beserta segala persyaratan yang disetujui PPK.- 75% (tujuhpuluh lima prosen) dari harga kontrak apabila realisasi keseluruhan kegiatan sudah diserah terimakan untuk yang pertama.11.3PembayaranPekerjaan administrasi dan dokumentasi ini akan dibayarkan menurut pembayaran lumpsum, dimana pembayaran harus dianggap kompensasi secara penuh baik untuk biaya upah/ personil, pembayaran dengan pihak ketiga, biaya revisi/ koreksi maupun penyempurnaan berkas.11.4Satuan pembayaranLumpsumMaterialNoJenis bahanStandar mutuLokasi pengambilanAPasangan batu belah 1pc:6psrPekerjaan galian telah selesai sesuai dimensi rencana, dan bouwpalng & profil telah dipasang, bebas genangan air.Bentuk dan dimensi sesuai gambar rencanaPengadukan mortar memakai mesinCampuran adukan sesuai rencana 1Pc:5psMenunjukkan kepada pengawas akan bahan yang akan dipakai, batu, pasir, semen dan air kerja yang akan dipakai.Mortar dibuat hanya dalam kuantitas yang diperlukan untuk penggunaan langsung.1Plesteran 1pc:3psCampuran adukan sesuai rencana 1Pc:5psSiar 1pc:2psPasir diayak sebelum diadukAcianPermukaan dibersihkan dan disiram airSponengan/ benanganMemasang kepala plestera jarak 1-2mMemakai benang sipat untuk pedoman kerjaDibiarkan kering terlebih dulu sebelum diaciDigosok kertas semen sebagai finishing2Pasir urugHasil desintegrasi alami batuanLokal SalatigaKeras, tajam bersih dari benda organik,Berasal dari Kali / sungai atau gunung3Batu belahUkuran batu belah 15/20 ,belah min 3 mukabatu alam,keras, tidak porius, tidak retakKaliworobersih dari lumpur & kotoran yang menempelKab Boyolali4Pasir muntilanHasil desintegrasi alami batuanMagelangKeras, tajam bersih dari benda organik,Merapitidak mengandung lumpur dan max 5%MuntilanAASHTO M 455Porland CementSNI -8Tiga rodaAASHTO M 85Holcimbelum mengeras / kedalu warsaGresik6Batu pecah betonBerasal dari batu alam, hasil dari pecah mesinLokalKeras dan tajamSalatigaTidak menggandung lumpur, dan kotoranPBI 19797Pasangan bata merahuntuk dinding campuran 1:5untuk rollag campuran 1:38Bata merahUkuran seragam, kerasLokalMatang pembakaranSalatiga5x10x209Airbersih, tak mengandung lumpur,Lokaltak mengandung zat organikSalatigatidak mengandung gula, asam, minyakAASHTO T 2610Buis betonU-20, U30, U-40, U-50StandarFabrikan11Paving blocktebal = 6 cm & 8cm, K-300Waringi putih12Kansteenukuran 20x10x50 K-200Waringi putih13Besi profil LBesi profil siku (L)SNIFabrikasi14Besi betonBesi beton polosSNI, PBI 1979FabrikasiBee Brand15Cat dinding dasarKhusus untuk catb dasarTidak kedalu warsaCatylacExterior, anti jamurSNI16Cat dinding penutupExterior, anti jamur MowilexCatylacGording kayu kruing 6/12 cmInterior & Exterior17Cat meni besiStandarAvianListplank kayu 2/2518Cat besi penutupStandarAvian19Rangka atap besibesi IWFFabrikan20Gordingbesi C 125.50.20.2,3Fabrikanbangkirai21Usuk & rengkruingFabrikan22Penutup atapGalvalum tebal 0,35FabrikanPolicarbonat23Kosen pintu & jendela alumuniumUkuran 4" tebal min 2mmAleksindoPlint lantai keramikwarna coklat24Jendela alumuniumUkuran 2" tebal min 2mmAleksindowarna coklat25KacaBening tebal 5mmFabrikan26Pipa PVCuntuk pembuangan 4"untuk instalasi air bersih 2"MaspionUntuk ditribusi air bersih 3/4"27Kloset dudukTotoFabrikan28Flor drainToto24Keramik lantai & plintukuran 20x20, 30x30 polosRoman25Kabel instalasi listrikminimal 2mmPrima26Stop kontak, sakelar, vitingStandarBroco27LampuStandarPhillip/ Artalite28Kabel, NYY, NYM 0,6-1,0 KVPrima/ clipsal29Pipa pelindungpipa PVCclipsalSalatiga, 13 Juli 2012CV. NASAMI AGUNGUMI KUSUMA LESTARI, SEDirektur