REKAPITULASI ANGGARAN RENOVASI RUANG KAMAR RUMAH JABATAN BUPATI KAB. NO JENIS PEKERJAAN JUMLAH HARGA PEKERJAAN FISIK I. PEK. PERSIAPAN 4,548,652.50 II. PEKERJAAN KAMAR TIDUR 28,579,800.00 III. PEKERJAAN KAMAR MANDI 32,897,906.25 IV. PEKERJAAN PLAFOND 15,806,750.00 V. PEKERJAAN MEKANIKAL 7,101,250.00 VI. PEKERJAAN PINTU 1,955,000.00 TOTAL COST 90,889,358.75 REAL COST 2 UNIT KAMAR 181,778,717.50 PPN (10%) 18,177,871.75 TOTAL COST (A+B) 199,956,589.25 PEMBULATAN 200,000,000.00 KONSULTAN PERENCANAAN 12,500,000.00 KONSULTAN PENGAWASAN 7,500,000.00 TOTAL ANGGARAN 220,000,000.00

Upload: alan

Post on 15-Feb-2016

23 views

Category:

Documents


0 download

DESCRIPTION

rab

TRANSCRIPT

Page 1: Anggaran Kamar Fix d

REKAPITULASI ANGGARAN RENOVASI RUANG KAMAR RUMAH JABATAN BUPATI KAB. MAMUJU UTARA

NO JENIS PEKERJAAN JUMLAH HARGAPEKERJAAN FISIK

I. PEK. PERSIAPAN 4,548,652.50 II. PEKERJAAN KAMAR TIDUR 28,579,800.00 III. PEKERJAAN KAMAR MANDI 32,897,906.25 IV. PEKERJAAN PLAFOND 15,806,750.00 V. PEKERJAAN MEKANIKAL 7,101,250.00 VI. PEKERJAAN PINTU 1,955,000.00

TOTAL COST 90,889,358.75 REAL COST 2 UNIT KAMAR 181,778,717.50 PPN (10%) 18,177,871.75 TOTAL COST (A+B) 199,956,589.25 PEMBULATAN 200,000,000.00

KONSULTAN PERENCANAAN 12,500,000.00 KONSULTAN PENGAWASAN 7,500,000.00 TOTAL ANGGARAN 220,000,000.00

Page 2: Anggaran Kamar Fix d

REKAPITULASI ANGGARAN RENOVASI RUANG KAMAR RUMAH JABATAN BUPATI KAB. MAMUJU UTARA

Page 3: Anggaran Kamar Fix d

REKAPITULASI ANGGARAN RENOVASI RUANG KAMAR RUMAH JABATAN BUPATI KAB. MAMUJU UTARA

NO JENIS PEKERJAAN VOLUME SATUANI. PEK. PERSIAPAN

1. Pek. Bongkar Plafond 24.002. Pek. Bongkar dinding WC 22.503. Pek. Bongkar lantai WC 8.004. Pek. Bongkar Lantai kamar 16.005. Pek. Bongkaran Pintu & Jendela 6.736. Pembersihan 24.00TOTAL + (Overhead 15%)

II. PEKERJAAN KAMAR TIDUR1. Pas. Bata Fin. Aci, Cat 1.352. Pas. Rangka Hollow 40x40x0.8mm 35.00 Btg

3. Pas. Multipleks 15mm 48.004. Pas. Wallpaper Totem(M2502) 18.005. Pas. Wallpaper Totem(M228) 30.006. Sekrup 5cm 4.00 Pcs7. Sekrup 2.5cm 4.00 Pcs

8. Pas. Keramik 60x60 16.009. Upah pek. Dinding 48.0010. Upah Keramik 24.00TOTAL + (Overhead 15%)

III. PEKERJAAN KAMAR MANDI1. Westafel Toto 1.00 Bh2. Kloset Duduk Toto 1.00 Bh3. Bathub Toto 1.00 Bh

4. Pas. Batu Alam 12.005. Pas. Dinding Kaca Tempered 10mm 6.006. Kran Air Toto Panas Dingin 1.00 Bh7. Kran Shower Kloset 1.00 Bh8. Kran Shower Set Toto 1.00 Bh9. Floor Drain 2.00 Bh10. Tempat Sabun 1.00 Bh11. Tempat Tissu 1.00 Bh

12. Pipa PVC 3/4" 8.0013. Pipa PVC 3" 12.0015. Pas. Lantai Keramik Wc 40x40cm 8.0016. Keramik Dinding Cream 40x40cm 18.00

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m1

m1

m2

m2

Page 4: Anggaran Kamar Fix d

17. Keramik Dinding Gelap 40x40cm 12.0018. Water heating 15 liter 1.00 Bh

19. Upah Batu Alam 12.0020. Upah Kaca Tempered 6.0021. Upah Keramik 24.0018. Upah Plumbing 1.00 LsTOTAL + (Overhead 15%)

IV. PEKERJAAN PLAFOND1. Pas.Rangka Hollow WC 40x40x0.8mm 36.00 Btg2. Pas.Rangka Hollow WC 20x40x0.8mm 34.00 Btg

3. Pas. Gypsum 9mm 33.004. Pek. Finishing Cat Putih Mowilex 33.006. Sekrup 5cm 4.00 Pcs7. Sekrup 2.5cm 4.00 Pcs

8. Upah 33.00TOTAL + (Overhead 15%)

V. PEKERJAAN MEKANIKAL1. Pas. Lampu Philips 7 Watt 4.00 Titik2. Pas. Lampu Philips 9 Watt 6.00 Titik3. Pas. Saklar Ilmunasi B Wide Panasonic 5.00 Titik4. Pas. Lampu Led warm white 1.00 Bh5. Pas. Stop Kontak Panasonic 5.00 Titik

6. Kabel listrik 50.007. Upah 1.00 LsTOTAL + (Overhead 15%)

VI. PEKERJAAN PINTU & JENDELA1. Pek. Pintu Kayu 1.00 bh2. Pek. Pintu PVC 1.00 bhTOTAL + (Overhead 15%)

TOTAL COST 90,889,358.75 REAL COST 2 UNIT KAMAR 181,778,717.50

PPN (10%) 18,177,871.75 TOTAL COST (A+B) 199,956,589.25

PEMBULATAN 200,000,000.00

KONSULTAN PERENCANAAN 12,500,000 KONSULTAN PENGAWASAN 7,500,000

TOTAL ANGGARAN 220,000,000

m2

m2

m2

m2

m2

m2

m2

m1

Page 5: Anggaran Kamar Fix d

REKAPITULASI ANGGARAN RENOVASI RUANG KAMAR RUMAH JABATAN BUPATI KAB. MAMUJU UTARA

HARGA SATUAN JUMLAH

45,000.00 1,080,000.00 45,000.00 1,012,500.00 45,000.00 360,000.00 45,000.00 720,000.00 45,000.00 302,850.00 20,000.00 480,000.00

4,548,652.50

380,000.00 513,000.00 105,000.00 3,675,000.00 148,000.00 7,104,000.00 95,000.00 1,710,000.00 95,000.00 2,850,000.00 50,000.00 200,000.00 50,000.00 200,000.00 155,000.00 2,480,000.00 85,000.00 4,080,000.00 85,000.00 2,040,000.00

28,579,800.00

1,307,000.00 1,307,000.00 2,356,500.00 2,356,500.00 6,210,000.00 6,210,000.00 135,000.00 1,620,000.00 210,000.00 1,260,000.00 90,875.00 90,875.00 97,500.00 97,500.00 1,550,000.00 1,550,000.00 115,000.00 230,000.00 30,000.00 30,000.00 30,000.00 30,000.00 75,000.00 600,000.00 75,000.00 900,000.00 105,000.00 840,000.00 105,000.00 1,890,000.00

Page 6: Anggaran Kamar Fix d

105,000.00 1,260,000.00 2,575,000.00 2,575,000.00 30,000.00 360,000.00 80,000.00 480,000.00 80,000.00 1,920,000.00 3,000,000.00 3,000,000.00

32,897,906.25

96,000.00 3,456,000.00 88,000.00 2,992,000.00 95,000.00 3,135,000.00 34,000.00 1,122,000.00 50,000.00 200,000.00 50,000.00 200,000.00 80,000.00 2,640,000.00

15,806,750.00

100,000.00 400,000.00 110,000.00 660,000.00 150,000.00 750,000.00 265,000.00 265,000.00 150,000.00 750,000.00

350,000.00 3,000,000.00 3,000,000.00

7,101,250.00

1,250,000.00 1,250,000.00 450,000.00 450,000.00

1,955,000.00

Page 7: Anggaran Kamar Fix d

NO JENIS PEKERJAAN VOLUME SATUANI. PEK. PERSIAPAN

1. Pek. Bongkar Plafond 24.002. Pek. Bongkar dinding WC 22.503. Pek. Bongkar lantai WC 8.004. Pek. Bongkar Lantai kamar 16.005. Pek. Bongkar Pintu & Jendela 6.736. Pembersihan 24.00TOTAL

II. PEKERJAAN KAMAR TIDUR1. Pas. Bata Fin. Aci, Cat (penutup jendela) 1.352. Pas. Rangka Hollow 40x40x0.8mm 35.00 Btg

3. Pas. Multipleks 15mm 48.004. Pas. Wallpaper Totem(M2502) 18.005. Pas. Wallpaper Totem(M228) 30.006. Sekrup 5cm 4.00 Pcs7. Sekrup 2.5cm 4.00 Pcs

8. Pas. Keramik 60x60 16.009. Upah pek. Dinding 48.0010. Upah Keramik 24.00TOTAL

III. PEKERJAAN KAMAR MANDI1. Westafel Toto 1.00 Bh2. Kloset Duduk Toto 1.00 Bh3. Bathub Toto 1.00 Bh

4. Pas. Batu Alam 12.005. Pas. Dinding Kaca Tempered 10mm 6.006. Kran Air Toto Panas Dingin 1.00 Bh7. Kran Shower Kloset 1.00 Bh8. Kran Shower Set Toto 1.00 Bh9. Floor Drain 2.00 Bh10. Tempat Sabun 1.00 Bh11. Tempat Tissu 1.00 Bh

12. Pipa PVC 3/4" 8.0013. Pipa PVC 3" 12.0015. Pas. Lantai Keramik Wc 40x40cm 8.0016. Keramik Dinding Cream 40x40cm 18.00

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m1

m1

m2

m2

Page 8: Anggaran Kamar Fix d

17. Keramik Dinding Gelap 40x40cm 12.0018. Water heating 15 liter 1.00 Bh

19. Upah Batu Alam 12.0020. Upah Kaca Tempered 6.0021. Upah Keramik 24.0018. Upah Plumbing 1.00 LsTOTAL

IV. PEKERJAAN PLAFOND1. Pas.Rangka Hollow WC 40x40x0.8mm 36.00 Btg2. Pas.Rangka Hollow WC 20x40x0.8mm 34.00 Btg

3. Pas. Gypsum 9mm 33.004. Pek. Finishing Cat Putih Mowilex 33.006. Sekrup 5cm 4.00 Pcs7. Sekrup 2.5cm 4.00 Pcs

8. Upah 33.00TOTAL

V. PEKERJAAN MEKANIKAL1. Pas. Lampu Philips 7 Watt 4.00 Titik2. Pas. Lampu Philips 9 Watt 6.00 Titik3. Pas. Saklar Ilmunasi B Wide Panasonic 5.00 Titik4. Pas. Lampu Led warm white 1.00 Bh5. Pas. Stop Kontak Panasonic 5.00 Titik

6. Kabel listrik 50.007. Upah 1.00 LsTOTAL

VI. PEKERJAAN PINTU1. Pek. Pintu 1.00 bh2. Pek. Pintu PVC 1.00 bhTOTAL

TOTAL COST 90,889,358.75 REAL COST 2 UNIT KAMAR 181,778,717.50

PPN (10%) 18,177,871.75 TOTAL COST (A+B) 199,956,589.25

PEMBULATAN 200,000,000.00

KONSULTAN PERENCANAAN 12,500,000 KONSULTAN PENGAWASAN 7,500,000

TOTAL ANGGARAN 220,000,000

m2

m2

m2

m2

m2

m2

m2

m1

Page 9: Anggaran Kamar Fix d

HARGA SATUAN JUMLAH

45,000.00 1,080,000.00 45,000.00 1,012,500.00 45,000.00 360,000.00 45,000.00 720,000.00 45,000.00 302,850.00 20,000.00 480,000.00

3,955,350.00 overhead 15% 4,548,652.50

380,000.00 513,000.00 105,000.00 3,675,000.00 148,000.00 7,104,000.00 95,000.00 1,710,000.00 95,000.00 2,850,000.00 50,000.00 200,000.00 50,000.00 200,000.00 155,000.00 2,480,000.00 85,000.00 4,080,000.00 85,000.00 2,040,000.00

24,852,000.00 overhead 15% 28,579,800.00

1,307,000.00 1,307,000.00 2,356,500.00 2,356,500.00 6,210,000.00 6,210,000.00 135,000.00 1,620,000.00 210,000.00 1,260,000.00 90,875.00 90,875.00 97,500.00 97,500.00 1,550,000.00 1,550,000.00 115,000.00 230,000.00 30,000.00 30,000.00 30,000.00 30,000.00 75,000.00 600,000.00 75,000.00 900,000.00 105,000.00 840,000.00 105,000.00 1,890,000.00

Page 10: Anggaran Kamar Fix d

105,000.00 1,260,000.00 2,575,000.00 2,575,000.00 30,000.00 360,000.00 80,000.00 480,000.00 80,000.00 1,920,000.00 3,000,000.00 3,000,000.00

28,606,875.00 overhead 15% 32,897,906.25

96,000.00 3,456,000.00 88,000.00 2,992,000.00 95,000.00 3,135,000.00 34,000.00 1,122,000.00 50,000.00 200,000.00 50,000.00 200,000.00 80,000.00 2,640,000.00

13,745,000.00 overhead 15% 15,806,750.00

100,000.00 400,000.00 110,000.00 660,000.00 150,000.00 750,000.00 265,000.00 265,000.00 150,000.00 750,000.00

350,000.00 3,000,000.00 3,000,000.00

6,175,000.00 overhead 15% 7,101,250.00

1,250,000.00 1,250,000.00 450,000.00 450,000.00

1,700,000.00 overhead 15% 1,955,000.00

Page 11: Anggaran Kamar Fix d

26.4019.80

8.8017.6026.40

1.490 38.500 52.800 19.800 33.000 6.000 6.000 17.600 52.800 26.400000 1.000 1.000 1.000 13.200 6.600 1.000 1.000 1.000 2.000 1.000 1.000 8.800 13.200 8.800 19.800 13.20

Page 12: Anggaran Kamar Fix d

0 1.000 13.200 6.600 41.800 1.000000 39.600 37.400 36.300 36.300 4.000 4.000 36.300000 4.000 6.000 5.000 2.000 5.000 55.000 1.000000 1.350 4.500 1.35

2.00

Page 13: Anggaran Kamar Fix d

I. PEKERJAAN PERSIAPAN

7.2000 Tukang @Rp. 100,000.00 Rp. 720,000.00

2.4000 Mandor @Rp. 150,000.00 Rp. 360,000.00

Rp. 1,080,000.00

Rp. 45,000.00

6.7500 Tukang @Rp. 100,000.00 Rp. 675,000.00

2.2500 Mandor @Rp. 150,000.00 Rp. 337,500.00

Rp. 1,012,500.00

Rp. 45,000.00

2.4000 Tukang @Rp. 100,000.00 Rp. 240,000.00

0.8000 Mandor @Rp. 150,000.00 Rp. 120,000.00

Rp. 360,000.00

Rp. 45,000.00

4.8000 Tukang @Rp. 100,000.00 Rp. 480,000.00

1.6000 Mandor @Rp. 150,000.00 Rp. 240,000.00

Rp. 720,000.00

Rp. 45,000.00

5. Analisa Pembongkaran Pintu dan Jendela2.0190 Tukang @Rp. 100,000.00 Rp. 201,900.00

0.6730 Mandor @Rp. 150,000.00 Rp. 100,950.00

Rp. 302,850.00

Rp. 45,000.00

4.8000 Tukang @Rp. 100,000.00 Rp. 480,000.00

0.0000 Mandor @Rp. 150,000.00 Rp. -

Rp. 480,000.00

Rp. 20,000.00

II. PEKERJAAN PERSIAPAN

60.0000 Bh Batu Bata merah @Rp. 600.00 Rp. 36,000.00

1.5000 Zak Semen Portland (PC) @Rp. 58,000.00 Rp. 87,000.00

1.3500 Pasir Pasang @Rp. 153,000.00 Rp. 206,550.00

0.2700 Tukang @Rp. 100,000.00 Rp. 27,000.00

0.1890 Kepala Tukang @Rp. 125,000.00 Rp. 23,625.00

1. Analisa 24 m2 Pembersihan Plafon

Untuk 1 M2 = 1/24

2. Analisa 22.5 m2 Pembongkaran Dinding WC

Untuk 1 M2 = 1/22.5

3. Analisa 8 m2 Pembongkaran Lantai WC

Untuk 1 M2 = 1/8

4. Analisa 16 m2 Pembongkaran Lantai Kamar

Untuk 1 M2 = 1/16

Untuk 1 M2 = 1/6.73

6. Analisa 24 m2 Pembersihan Kamar

Untuk 1 M2 = 1/24

1. Analisa 1.35 M2 Pasangan Dinding Batu Bata ad. 1 : 4

M3

Page 14: Anggaran Kamar Fix d

0.0000 Pekerja @Rp. - Rp. -

0.0000 Mandor @Rp. - Rp. -

Rp. 380,175.00

2. Analisa Pasangan Rangka Hollow 40x40x0.81.4583 Btg Besi Hollow @Rp. 69,000.00 Rp. 100,625.00

2.0000 Pcs Baut Sekrup @Rp. 50,000.00 Rp. 100,000.00

4.8000 Tukang @Rp. 100,000.00 Rp. 480,000.00

2.4000 Kepala Tukang @Rp. 125,000.00 Rp. 300,000.00

4.8000 Pekerja @Rp. - Rp. -

0.0000 Mandor @Rp. - Rp. -

Rp. 980,625.00

Rp. 1,961,250.00

Page 15: Anggaran Kamar Fix d

DAFTAR HARGA SATUAN UPAH DAN BAHANRENOVASI KAMAR RUMAH JABATAN BUPATI KAB. MAMUJU TENGAH

Tahun 2015

SATUAN HARGANO. U R A I A N SATUAN NO.

(RP.)A U P A H : 34

1 Tukang 125,000 35

2 Kepala Tukang 125,000 36

3 Pekerja 50,000 37

4 Mandor 35,000 38B B A H A N / M A T E R I A L : 391 Amplas Biasa lbr. 2,500 402 Amplas Niken lbr. 3,000 413 Batu Bata Merah bh. 150 424 Batu Kali m3 225,000 435 Besi Beton kg. 10,000 446 Bubungan Genteng Beton bh. 12,740 457 Cat Dasar kg. 36,000 468 Cat Kilat kg. 45,000 479 Cat Meni Nippon kg. 37,500 48

10 Cat Tembok kg. 20,000 4911 Genteng Beton Lokal bh. 10,790 5012 Grendel bh. 10,000 5113 Kawat Pengikat kg. 15,000 5214 Bambu btg 15,000 5315 Kayu Klas II m3 1,200,000 5416 Kayu Klas III m3 750,000 5517 Keramik 40 x 40 cm bh. 6,333 5618 Keramik 30 x 30 cm bh. 3,182 5719 Koral Beton m3 225,000 5820 List Profil N/K 1 m' - 5921 Minyak Cat ltr. 25,000 6022 Paku Gypsum/Asbes/ bh. 40 6123 Paku Galvanis/ Sekrup Atap bh. 75 6224 Paku Beton bh. 75 6325 Paku Biasa kg. 15,000 6426 Paku Plywood kg. 20,000 6527 Paku Seng kg. 25,000 6628 Pasir Pasang m3 125,000 6729 Pasir Urug m3 15,000 6830 Perekat/Adukan/Spesi m3 2,400 6931 Bubungan akhiran m 17,654 7032 Lisplank Kiri/Kanan m 12,740 7133 Pipa dia 1/2 inch AW m 7,500 72

m2

m2

m2

m2

Page 16: Anggaran Kamar Fix d

7374757677

Page 17: Anggaran Kamar Fix d

DAFTAR HARGA SATUAN UPAH DAN BAHANRENOVASI KAMAR RUMAH JABATAN BUPATI KAB. MAMUJU TENGAH

Tahun 2015

SATUAN HARGAU R A I A N SATUAN

(RP.)m' 13,750

m' 25,833

Plamir Kayu kg. 15,000

Plamir Tembok kg. 17,500

Plywood 3 mm m2 14,754 Plywood 4 mm m2 20,492 S p l i t m3 225,000 Semen Portland (PC) zak 40,000 Semen Mortar / Acian zak 80,000 Seng Gelombang kk 6,000 Seng Plat m2 45,000 Tanah Urug m3 25,000 Ter / Residu ltr. 4,500 Thinner ltr. 6,600 Baja Ringan C75 btg 15,000 Gording V50 btg 12,500 Seng 7 Kaki lbr 42,000 Tanah urug m3 25,000 Pintu Jendela (PJ1)

lsm 11,000,000

Pintu Jendela (PJ2) Pintu (P1) Pintu KM/AWC (P2) Pintu (P3) Jendela (J1) Jendela (J2) Jendela (J1) Boven Ornamen (BVO) Floor drain bh 25,000 Kran air TOTO bh 25,000 Washtafel TOTO bh 125,000 Closed Duduk TOTO bh 450,000

Meteran PDAM bh 1,500,000 Kabel NYM 3x2,5 mm m 9,000 Kabel NYM 2x2,5 mm m 8,000 Stop Kontak bh 25,000 Saklar Ganda bh 35,000 Saklar Tunggal bh 45,000 Sekering MCB bh 65,000 Meteran PLN bh 4,000,000

Pipa PVC f 3"

Pipa PVC f 4"

Page 18: Anggaran Kamar Fix d

Lampu Down Light RD x 18 watt bh 95,000.00 Gypsum 9mm lbr 50,000.00 Rangka Holo Galvanis 2x4 mm m 5,000 Gantungan Plafon Holo Galv. 4x4 mm m 6,250 Gorong dia 80 cm bh 150,000