HARGA SATUAN BAHAN DAN UPAH WILAYAH PEMERINTAH KOTA MAKASSAR - TAHUN 2016 No. URAIAN SATUAN HARGA I TENAGA KERJA (HARI) 1 Kepala Tukang O.H 90,000.00 2 Mandor O.H 100,000.00 3 Pekerja O.H 75,000.00 4 Tukang Batu O.H 75,000.00 5 Tukang Besi O.H 75,000.00 6 Tukang Cat O.H 7 Tukang Kayu O.H 65,000.00 8 Operator Jam 25,000.00 9 Pembantu Operator Jam 10,000.00 II BAHAN MENGGUNAKAN BATU/PASIR DAN SEMEN 1 Batu Pecah Mesin 2-3 Cm M3 300,000.00 2 Beton Readymix K,225 M3 1,120,000.00 3 Beton Readymix K,300 M3 1,100,000.00 4 Pasir Pasang M3 176,000.00 5 Pasir Untuk Beton / Cor M3 150,000.00 6 Pasir Uruk / Timbun M3 125,000.00 7 Semen Pc Kg 66,000.00 III BAHAN PRA CETAK (U-DITCH & PENUTUP U-DITCH) 1 U-Ditch B800 x H800 x L1200; Tebal = 70 mm BH 837,334.00 2 U-Ditch B600 x H600 x L1200; Tebal = 70 mm BH 637,586.00 3 Box Culvert B500 x H500 x L1000; Tebal = 80 mm BH 1,110,005.00 4 Penutup U-Ditch B800 x L600; Tebal = 70 mm BH 267,100.00 5 Penutup U-Ditch B600 x L600; Tebal = 70 mm BH 200,100.00 IV BAHAN PENUTUP 1 Multiplek Tebal 9 Mm (1.22 X 2.44) Lembar 2 Seng Datar BJLS 35 lebar 30 x 180 Lembar 31,030.00 3 Triplek Tebal 4 Mm (1.22 X 2.44) Lembar 70,560.00 4 Plastik alas cor tebal 0,05 M2 4,800.00 5 Sterefom tebal 100 x 200 x 1 cm Lembar 6 Aspalt Kg 7 Pipa PVC dia 1,5 m1 8 Pipa PVC dia 3 m1 V BAHAN MENGGUNAKAN KAYU 1 Dolken Kayu Meranti D8-10 / 600 Cm Bt 2 Kayu Meranti ( Balok ) M3 3,140,000.00 3 Kayu Meranti ( Papan ) m3 3,360,000.00 4 Minyak Bekesting Liter

Upload: ryan-ds

Post on 15-Jul-2016

852 views

Category:

Documents


58 download

DESCRIPTION

Analisa

TRANSCRIPT

Page 1: Analisa Harga Satuan

HARGA SATUAN BAHAN DAN UPAH

WILAYAH PEMERINTAH KOTA MAKASSAR - TAHUN 2016

No. URAIAN SATUAN HARGA

I TENAGA KERJA (HARI)

1 Kepala Tukang O.H 90,000.00

2 Mandor O.H 100,000.00

3 Pekerja O.H 75,000.00

4 Tukang Batu O.H 75,000.00

5 Tukang Besi O.H 75,000.00

6 Tukang Cat O.H

7 Tukang Kayu O.H 65,000.00

8 Operator Jam 25,000.00

9 Pembantu Operator Jam 10,000.00

II BAHAN MENGGUNAKAN BATU/PASIR DAN SEMEN

1 Batu Pecah Mesin 2-3 Cm M3 300,000.00

2 Beton Readymix K,225 M3 1,120,000.00

3 Beton Readymix K,300 M3 1,100,000.00

4 Pasir Pasang M3 176,000.00

5 Pasir Untuk Beton / Cor M3 150,000.00

6 Pasir Uruk / Timbun M3 125,000.00

7 Semen Pc Kg 66,000.00

III BAHAN PRA CETAK (U-DITCH & PENUTUP U-DITCH)

1 U-Ditch B800 x H800 x L1200; Tebal = 70 mm BH 837,334.00

2 U-Ditch B600 x H600 x L1200; Tebal = 70 mm BH 637,586.00

3 Box Culvert B500 x H500 x L1000; Tebal = 80 mm BH 1,110,005.00

4 Penutup U-Ditch B800 x L600; Tebal = 70 mm BH 267,100.00

5 Penutup U-Ditch B600 x L600; Tebal = 70 mm BH 200,100.00

IV BAHAN PENUTUP

1 Multiplek Tebal 9 Mm (1.22 X 2.44) Lembar

2 Seng Datar BJLS 35 lebar 30 x 180 Lembar 31,030.00

3 Triplek Tebal 4 Mm (1.22 X 2.44) Lembar 70,560.00

4 Plastik alas cor tebal 0,05 M2 4,800.00

5 Sterefom tebal 100 x 200 x 1 cm Lembar

6 Aspalt Kg

7 Pipa PVC dia 1,5 m1

8 Pipa PVC dia 3 m1

V BAHAN MENGGUNAKAN KAYU

1 Dolken Kayu Meranti D8-10 / 600 Cm Bt

2 Kayu Meranti ( Balok ) M3 3,140,000.00

3 Kayu Meranti ( Papan ) m3 3,360,000.00

4 Minyak Bekesting Liter

Page 2: Analisa Harga Satuan

5 Karung goni Lbr

6 Kayu Kelas III Lbr 3,450,000.00

VI BAHAN MENGGUNAKAN BESI/LOGAM/KACA

1 Besi Beton Polos Kg 11,500.00

2 Kawat Ikat Beton Kg 17,000.00

VII BAHAN JENIS PAKU

1 Paku Kg 17,000.00

VIII BAHAN BAKAR

Solar Ltr 6,000.00

IX PERALATAN

Excavator Jam 400,000.00