analisa harga satuan
DESCRIPTION
AnalisaTRANSCRIPT
HARGA SATUAN BAHAN DAN UPAH
WILAYAH PEMERINTAH KOTA MAKASSAR - TAHUN 2016
No. URAIAN SATUAN HARGA
I TENAGA KERJA (HARI)
1 Kepala Tukang O.H 90,000.00
2 Mandor O.H 100,000.00
3 Pekerja O.H 75,000.00
4 Tukang Batu O.H 75,000.00
5 Tukang Besi O.H 75,000.00
6 Tukang Cat O.H
7 Tukang Kayu O.H 65,000.00
8 Operator Jam 25,000.00
9 Pembantu Operator Jam 10,000.00
II BAHAN MENGGUNAKAN BATU/PASIR DAN SEMEN
1 Batu Pecah Mesin 2-3 Cm M3 300,000.00
2 Beton Readymix K,225 M3 1,120,000.00
3 Beton Readymix K,300 M3 1,100,000.00
4 Pasir Pasang M3 176,000.00
5 Pasir Untuk Beton / Cor M3 150,000.00
6 Pasir Uruk / Timbun M3 125,000.00
7 Semen Pc Kg 66,000.00
III BAHAN PRA CETAK (U-DITCH & PENUTUP U-DITCH)
1 U-Ditch B800 x H800 x L1200; Tebal = 70 mm BH 837,334.00
2 U-Ditch B600 x H600 x L1200; Tebal = 70 mm BH 637,586.00
3 Box Culvert B500 x H500 x L1000; Tebal = 80 mm BH 1,110,005.00
4 Penutup U-Ditch B800 x L600; Tebal = 70 mm BH 267,100.00
5 Penutup U-Ditch B600 x L600; Tebal = 70 mm BH 200,100.00
IV BAHAN PENUTUP
1 Multiplek Tebal 9 Mm (1.22 X 2.44) Lembar
2 Seng Datar BJLS 35 lebar 30 x 180 Lembar 31,030.00
3 Triplek Tebal 4 Mm (1.22 X 2.44) Lembar 70,560.00
4 Plastik alas cor tebal 0,05 M2 4,800.00
5 Sterefom tebal 100 x 200 x 1 cm Lembar
6 Aspalt Kg
7 Pipa PVC dia 1,5 m1
8 Pipa PVC dia 3 m1
V BAHAN MENGGUNAKAN KAYU
1 Dolken Kayu Meranti D8-10 / 600 Cm Bt
2 Kayu Meranti ( Balok ) M3 3,140,000.00
3 Kayu Meranti ( Papan ) m3 3,360,000.00
4 Minyak Bekesting Liter
5 Karung goni Lbr
6 Kayu Kelas III Lbr 3,450,000.00
VI BAHAN MENGGUNAKAN BESI/LOGAM/KACA
1 Besi Beton Polos Kg 11,500.00
2 Kawat Ikat Beton Kg 17,000.00
VII BAHAN JENIS PAKU
1 Paku Kg 17,000.00
VIII BAHAN BAKAR
Solar Ltr 6,000.00
IX PERALATAN
Excavator Jam 400,000.00