Analisa Harga Satuan Pekerjaan Persiapan Diposkan : 31 Mei 2014 Oleh : Endang Kusman No. URAIAN SATUAN VOLUME HARGA SATUAN (Rp) A-01 - Dolken Kayu Ø 8-10 / 400 cm Btg 1.25 28,000.00 - Semen Portland Kg 2.5 1,406.00 - Pasir beton M3 0.005 255,400.00 - Koral Beton 2/3 M3 0.009 211,100.00 - Kayu balok terentang M3 0.072 2 ,640,000.00 - Paku Biasa 2" - 5" Kg 0.06 23,400.00 - Residu Kg 0.4 8,100.00 - Pekerja Oh 0.4 42,000.00 - Tukang Kayu Oh 0.2 65,000.00 - Kepala Tukang Oh 0.02 75,000.00 - Mandor Oh 0.02 80,000.00 Jumlah A-02 - Dolken Kayu Ø 8-10 / 400 cm Btg 1.25 28,000.00 - Semen Portland Kg 2.5 1,406.00 - Seng Gelombang BJLS-30 Lbr 1.2 62,900.00 - Pasir beton M3 0.005 255,400.00 - Koral Beton 2/3 M3 0.009 211,100.00 - Kayu balok terentang M3 0.072 2 ,640,000.00 - Paku Biasa 2" - 5" Kg 0.06 23,400.00 - Meni Besi Kg 0.45 30,400.00 - Pekerja Oh 0.4 42,000.00 - Tukang Kayu Oh 0.2 65,000.00 - Kepala Tukang Oh 0.02 75,000.00 - Mandor Oh 0.02 80,000.00 Jumlah A-03 - Dolken Kayu Ø 8-10 / 400 cm Btg 1 28,000.00 1 M' Pagar Sementara Dari Kayu Tinggi 2 m Dibulatkan 1 M' Pagar Sementara Seng Gelombang Tinggi 2 m Dibulatkan 1 M' Pagar SementaraKawat Duri Tinggi 1,80 m

Upload: gun-ardi

Post on 09-Oct-2015

460 views

Category:

Documents


50 download

DESCRIPTION

AHS

TRANSCRIPT

Pekerjaan PersiapanAnalisa Harga Satuan Pekerjaan PersiapanDiposkan : 31 Mei 2014Oleh : Endang Kusman

No.URAIANSATUANVOLUMEHARGA SATUANHARGA(Rp)(Rp)A-011 M' Pagar Sementara Dari Kayu Tinggi 2 m-Dolken Kayu 8-10 / 400 cmBtg1.2528,000.0035,000.00-Semen PortlandKg2.51,406.003,515.00-Pasir betonM30.005255,400.001,277.00-Koral Beton 2/3M30.009211,100.001,899.90-Kayu balok terentangM30.0722,640,000.00190,080.00-Paku Biasa 2" - 5"Kg0.0623,400.001,404.00-ResiduKg0.48,100.003,240.00-PekerjaOh0.442,000.0016,800.00-Tukang KayuOh0.265,000.0013,000.00-Kepala TukangOh0.0275,000.001,500.00-MandorOh0.0280,000.001,600.00Jumlah269,315.90Dibulatkan269,316.00A-021 M' Pagar Sementara Seng Gelombang Tinggi 2 m-Dolken Kayu 8-10 / 400 cmBtg1.2528,000.0035,000.00-Semen PortlandKg2.51,406.003,515.00-Seng Gelombang BJLS-30Lbr1.262,900.0075,480.00-Pasir betonM30.005255,400.001,277.00-Koral Beton 2/3M30.009211,100.001,899.90-Kayu balok terentangM30.0722,640,000.00190,080.00-Paku Biasa 2" - 5"Kg0.0623,400.001,404.00-Meni BesiKg0.4530,400.0013,680.00-PekerjaOh0.442,000.0016,800.00-Tukang KayuOh0.265,000.0013,000.00-Kepala TukangOh0.0275,000.001,500.00-MandorOh0.0280,000.001,600.00Jumlah355,235.90Dibulatkan355,236.00A-031 M' Pagar SementaraKawat Duri Tinggi 1,80 m-Dolken Kayu 8-10 / 400 cmBtg128,000.0028,000.00-Semen PortlandKg21,406.002,812.00-Kawat DuriKg2.563,500.00158,750.00-Pasir betonM30.005255,400.001,277.00-Koral Beton 2/3M30.009211,100.001,899.90-Paku Biasa 2" - 5"Kg0.0623,400.001,404.00-PekerjaOh0.342,000.0012,600.00-Tukang KayuOh0.265,000.0013,000.00-Kepala TukangOh0.0275,000.001,500.00-MandorOh0.0280,000.001,600.00Jumlah222,842.90Dibulatkan222,843.00A-041 M2 Pengukuran Dan Pasang Bouwplank-Kayu kaso 5/7M30.0121,870,500.0022,446.00-Paku Biasa 2" - 5"Kg0.0223,400.00468-Kayu papan albasiaM30.0072,071,700.0014,501.90-PekerjaOh0.142,000.004,200.00-Tukang KayuOh0.165,000.006,500.00-Kepala TukangOh0.0175,000.00750-MandorOh0.00580,000.00400Jumlah49,265.90Dibulatkan49,266.00A-051 M2 Pembuatan Kantor Sementara dgn Lantai Diplester-Dolken Kayu 8-10 / 400 cmBtg1.2528,000.0035,000.00-Kayu Balok terentangM30.182,640,000.00475,200.00-Paku BiasaKg0.8523,400.0019,890.00-Besi StripKg1.126,800.0029,480.00-Semen PortlandKg351,406.0049,210.00-Pasir PasangM30.15233,400.0035,010.00-Pasir betonM30.1255,400.0025,540.00-Koral Beton2/3M30.15211,100.0031,665.00-Bata MerahBh3077523,250.00-Seng Platm'0.2515,815.003,953.75-Kawat harmonikaM2235,900.0071,800.00-Kaca Polos 3mmM20.0887,400.006,992.00-Kunci TanamBh0.1594,500.0014,175.00-Plywood 120 x 240 x 0,4 cmLbr0.06140,000.008,400.00-PekerjaOh242,000.0084,000.00-Tukang KayuOh265,000.00130,000.00-Tukang BatuOh165,000.0065,000.00-Kepala TukangOh0.375,000.0022,500.00-MandorOh0.0580,000.004,000.00Jumlah1,135,065.75Dibulatkan1,135,066.00A-061 M2 Pembuatan Gudang Semen dan Alat-alat-Dolken Kayu 8-10 / 400 cmBtg1.728,000.0047,600.00-Kayu balok terentangM30.212,640,000.00554,400.00-Paku BiasaKg0.323,400.007,020.00-Semen PortlandKg10.51,406.0014,763.00-Pasir BetonM30.03255,400.007,662.00-Koral Beton 2/3M30.05211,100.0010,555.00-Seng Gelombang BJLS 30Lbr1.562,900.0094,350.00-PekerjaOh142,000.0042,000.00-Tukang KayuOh265,000.00130,000.00-Kepala TukangOh0.275,000.0015,000.00-MandorOh0.0580,000.004,000.00Jumlah927,350.00Dibulatkan927,350.00A-071 M2 Pembuatan Bedeng Buruh-Dolken Kayu 8-10 / 400 cmBtg1.2528,000.0035,000.00-Kayu balok terentangM30.1862,640,000.00491,040.00-Paku BiasaKg0.323,400.007,020.00-Semen PortlandKg181,406.0025,308.00-Pasir BetonM30.03255,400.007,662.00-Koral Beton 2/3M30.05211,100.0010,555.00-Seng Gelombang BJLS 30Lbr1.562,900.0094,350.00-PekerjaOh142,000.0042,000.00-Tukang KayuOh265,000.00130,000.00-Kepala TukangOh0.275,000.0015,000.00-MandorOh0.0580,000.004,000.00Jumlah861,935.00Dibulatkan861,935.00A-081 M2 Membersihkan Lapangan dan Perataan-PekerjaOh0.142,000.004,200.00-MandorOh0.0580,000.004,000.00Jumlah8,200.00Dibulatkan8,200.00A-091M2 Pembuatan Jalan Sementara-Batu Belah 15/20M30.15205,500.0030,825.00-Batu Pecah 5/7M30.09196,000.0017,640.00-Pasir PasangM30.01233,400.002,334.00-PekerjaOh142,000.0042,000.00-MandorOh0.0580,000.004,000.00Jumlah96,799.00Dibulatkan96,799.00A-101 M3 Bongkaran Beton Bertulang-PekerjaOh6.66742,000.00280,014.00-MandorOh0.33380,000.0026,640.00Jumlah306,654.00Dibulatkan306,654.00A-111 M3 Bongkaran Dinding Tembok Bata Merah-PekerjaOh6.66742,000.00280,014.00-MandorOh0.03380,000.002,640.00Jumlah282,654.00Dibulatkan282,654.00A-121 M Pagar beton Pracetak ( 5 x 50 x 213 ) cm-Panel Beton PracetakLbr0.986199,200.00196,411.20-Kolom Beton PracetakBtg0.525264,000.00138,600.00-Pasir BetonM30.074255,400.0018,899.60-Koral 2/3M30.146211,100.0030,820.60-Semen abu - abuKg451,406.0063,270.00-PekerjaOh0.37542,000.0015,750.00-Tukang BatuOh0.12565,000.008,125.00-Kepala TukangOh0.01275,000.00900-MandorOh0.01980,000.001,520.00Jumlah474,296.40Dibulatkan474,296.00A-131 M Pagar kawat ayam tiang besi L50.50.5, tinggi 1 m'-Kawat ram ayamLbr0.43414,900.006,466.60-Besi siku L 50.50.5Kg6.78618,300.00124,183.80-Besi pelat (1,2 x 3) mmKg0.042418,300.00775.92-Bautbh46002,400.00-Semen PortlandKg2.51,406.003,515.00-Pasir betonM30.005255,400.001,277.00-Koral Beton 2/3M30.009211,100.001,899.90-PekerjaOh0.37542,000.0015,750.00-Tukang BatuOh0.12565,000.008,125.00-Kepala TukangOh0.01275,000.00900-MandorOh0.01980,000.001,520.00Jumlah166,813.22Dibulatkan166,813.00A-141 M2 Pagar BRC lengkap dengan tiang-BRC lengkap dengan tiangLbr0.434171,300.0074,344.20-Semen PortlandKg21,406.002,812.00-Kawat DuriKg2.563,500.00158,750.00-Pasir betonM30.005255,400.001,277.00-Koral Beton 2/3M30.009211,100.001,899.90-PekerjaOh0.37542,000.0015,750.00-Tukang BatuOh0.12565,000.008,125.00-Kepala TukangOh0.01275,000.00900-MandorOh0.01980,000.001,520.00Jumlah265,378.10Dibulatkan265,378.00A-151 M2 Steiger Werk / perancah dari Bambu-Bambu 6 - 10 (600) cmbtng125,000.0025,000.00-Tali ijukkg0.2523,400.005,850.00-Pekerjaorg0.2542,000.0010,500.00-Tukang kayuorg0.01765,000.001,105.00-Kepala tukangorg0.00275,000.00150-Mandororg0.01380,000.001,040.00Jumlah43,645.00Dibulatkan43,645.00A-161 M' Cerucuk Bambu-Bambu 7 -10 (400) cmbtng1.2525,000.0031,250.00-Pekerjaorg0.542,000.0021,000.00-Mandororg0.02580,000.002,000.00Jumlah54,250.00Dibulatkan54,250.00

Kembali ke Analisa AHS SNI

Pekerjaan TanahAnalisa Harga Satuan Pekerjaan Tanah

Berkut ini adalah contoh Analisa Harga Satuan (AHS) SNI tahun 2011 untuk pekerjaan tanah yang sering digunakan untuk pekerjaan bangunan rumah.

B. ANALISA HARGA SATUAN PEKERJAAN TANAH

No.URAIANSATUANVOLUMEHARGA SATUANHARGA(Rp)(Rp)B-011 M3 Galian Tanah Biasa sedalam 1 m-PekerjaOh0.442,000.0016,800.00-MandorOh0.0480,000.003,200.00Jumlah20,000.00Dibulatkan20,000.00B-021 M3 Galian Tanah Biasa Sedalam 2 m-PekerjaOh0.52642,000.0022,092.00-MandorOh0.05280,000.004,160.00Jumlah26,252.00Dibulatkan26,252.00B-031 M3 Galian Tanah Biasa Sedalam 3 m-PekerjaOh0.73542,000.0030,870.00-MandorOh0.07380,000.005,840.00Jumlah36,710.00Dibulatkan36,710.00B-041 M3 Galian Tanah Keras Sedalam 1 m-PekerjaOh0.62542,000.0026,250.00-MandorOh0.06280,000.004,960.00Jumlah31,210.00Dibulatkan31,210.00B-051 M3 Galian Tanah Lumpur Sedalam 1 m-PekerjaOh0.82342,000.0034,566.00-MandorOh0.08380,000.006,640.00Jumlah41,206.00Dibulatkan41,206.00

Materi Terkait :

Analisa Harga Satuan Pekerjaan KonstruksiAnalisa Pekerjaan TanahAnalisa Pekerjaan PondasiAnalisa Pekerjaan BetonAnalisa Pekerjaan DindingAnalisa Pekerjaan Plesteran-AcianAnalisa HArga Satuan Pekerjaan Penutup AtapAnalisa Harga Satuan Pekerjaan Tutup PlapondAnalisa Harga Satuan Pekerjaan LantaiAnalisa Harga Satuan Pekerjaan Kayu

Pekerjaan PondasiAnalisa Harga Satuan Pekerjaan Pondasi(AHS SNI 2011)Untuk menghitung biaya pekerjaan pondasi bagunan rumah Anda diperlukan Analisa Harga Satuan Pekerjaaan Pondasi. Berikut adalah contoh analisa pekerjaan pondasi (AHS SNI tahun 2011). Pada dasarnya yang selalu berubah setiap tahun pada analisa harga satuan, adalah harga bahan dan upah, sedangkan koefisien (volume pek.) tetap.

C. ANALISA HARGA SATUAN PEKERJAAN PONDASI

No.URAIANSATUANVOLUMEHARGA SATUANHARGA(Rp)(Rp)C-011 M3 Pasanag Pondasi batu Kali adk 1pc : 3 ps-Batu BelahM31.1205,500.00226,050.00-Semen PortlandKg2021,406.00284,012.00-Pasir PasangM30.485233,400.00113,199.00-PekerjaOh1.542,000.0063,000.00-Tukang BatuOh0.665,000.0039,000.00-Kepala TukangOh0.0675,000.004,500.00-MandorOh0.07580,000.006,000.00Jumlah735,761.00Dibulatkan735,761.00C-021 M3 Pasang Pondasi Batu kali adk 1pc : 4ps-Batu BelahM31.1205,500.00226,050.00-Semen PortlandKg1631,406.00229,178.00-Pasir PasangM30.52233,400.00121,368.00-PekerjaOh1.542,000.0063,000.00-Tukang BatuOh0.665,000.0039,000.00-Kepala TukangOh0.0675,000.004,500.00-MandorOh0.07580,000.006,000.00Jumlah689,096.00Dibulatkan689,096.00C-031 M3 Pasang Pondasi Batu kali adk 1pc : 5ps-Batu BelahM31.1205,500.00226,050.00-Semen PortlandKg1361,406.00191,216.00-Pasir PasangM30.544233,400.00126,969.60-PekerjaOh1.542,000.0063,000.00-Tukang BatuOh0.665,000.0039,000.00-Kepala TukangOh0.0675,000.004,500.00-MandorOh0.07580,000.006,000.00Jumlah656,735.60Dibulatkan656,736.00C-041 M3 Pasang Pondasi Batu Kosong (aanstamping)-Batu BelahM31.2205,500.00246,600.00-Pasir UrugM30.3175,300.0052,590.00-PekerjaOh0.7842,000.0032,760.00-Tukang BatuOh0.3965,000.0025,350.00-Kepala TukangOh0.03975,000.002,925.00-MandorOh0.03980,000.003,120.00Jumlah363,345.00Dibulatkan363,345.00Materi Terkait :

Analisa Harga Satuan Pekerjaan KonstruksiAnalisa Pekerjaan TanahAnalisa Pekerjaan PondasiAnalisa Pekerjaan BetonAnalisa Pekerjaan DindingAnalisa Pekerjaan Plesteran-AcianAnalisa HArga Satuan Pekerjaan Penutup AtapAnalisa Harga Satuan Pekerjaan Tutup PlapondAnalisa Harga Satuan Pekerjaan LantaiAnalisa Harga Satuan Pekerjaan Kayu

Pekerjaan BetonAnalisa Harga Satuan Pekerjaan Beton

Untuk menghitung biaya pekerjaan beton diperlukan analisa harga satuan beton. Berikut adalah tabel analisa hargasatuan beton (penggalan AHS SNI 2011).

NOURAIANSATVOLUMEHRG.SATJUMLAHD-17r21 M3 Sloof Beton Tulang 15/20 (180 kg besi + bekisting) 4dia. 12 ring 8-15Kayu papan terentangM30.272,850,000769,500Paku Biasa 2" - 5"Kg223,40046,800Besi BetonKg18016,5002,970,000Kawat BetonKg327,70083,100Semen PortlandKg3231,200387,600Pasir BetonM30.52225,000117,000Koral Beton 2/3M30.78200,000156,000PekerjaOh4.8555,000266,750Tukang BatuOh0.3570,00024,500Tukang KayuOh1.5670,000109,200Tukang BesiOh1.470,00098,000Kepala TukangOh0.33180,00026,480MandorOh0.1785,00014,450Jumlah5,069,380Dibulatkan5,069,380

1 M3 Kolom Beton Tulang 15/20 (180 kg besi + bekisting) 4dia.12 8-15Kayu papan terentangM30.42,850,0001,140,000Paku Biasa 2" - 5"Kg423,40093,600Minyak BekistingLtr40,500-Besi BetonKg18016,5002,970,000Kawat BetonKg1.827,70049,860Semen PortlandKg3231,200387,600Pasir BetonM30.52225,000117,000Koral Beton 2/3M30.78200,000156,000Kayu Balok TerentangM30.152,640,000396,000Dolken -8-10/4mBtg2015,000300,000PekerjaOh7.355,000401,500Tukang BatuOh0.3570,00024,500Tukang KayuOh3.370,000231,000Tukang BesiOh2.170,000147,000Kepala TukangOh0.5780,00045,600MandorOh0.2585,00021,250Jumlah6.480.910Dibulatkan6.481.000

1 M3 Balok Beton Tulang 15/20 sofi-sofi, ring balk + balok poratl (180 kg besi + bekisting) 4dia. 12, 8-15Kayu papan terentangM30.322,850,000912,000Paku Biasa 2" - 5"Kg3.223,40074,880Besi BetonKg18016,5002,970,000Kawat BetonKg2.2527,70062,325Semen PortlandKg3231,200387,600Pasir BetonM30.52225,000117,000Koral Beton 2/3M30.78200,000156,000Kayu Balok TerentangM30.142,640,000369,600Dolken -8-10/4mBtg1615,000240,000PekerjaOh5.9655,000327,800Tukang BatuOh0.3570,00024,500Tukang KayuOh2.870,000196,000Tukang BesiOh1.470,00098,000Kepala TukangOh0.45580,00036,400MandorOh0.20885,00017,680Jumlah6.412.865Dibulatkan6,413,000D-291 M3 Tangga Beton Tulang (90 kg besi + bekisting)Kayu papan terentangM30.252,850,000712,500Paku Biasa 2" - 5"Kg323,40070,200Minyak BekistingLtr1.240,50048,600Besi BetonKg9016,5001,485,000Kawat BetonKg327,70083,100Semen PortlandKg3231,200387,600Pasir BetonM30.52225,000117,000Koral Beton 2/3M30.78200,000156,000Kayu Balok TerentangM30.1052,640,000277,200Dolken -8-10/4mBtg1415,000210,000PekerjaOh5.655,000308,000Tukang BatuOh0.3570,00024,500Tukang KayuOh2.370,000161,000Tukang BesiOh1.470,00098,000Kepala TukangOh0.40580,00032,400MandorOh0.20285,00017,170Jumlah4,188,720Dibulatkan4,189,00031 M3 Membuat Plat Lantai Tb. 10 Cm Beton Bertulang ( 90 Kg Besi + Bekisting )Kayu TerentangM30.42,850,0001,140,000Paku Biasa 2" - 5"Kg423,40093,600Minyak BekistingLtr240,50081,000Besi Beton PolosKg9016,5001,485,000Kawat BetonKg327,70083,100Kayu Balok TerentangM30.105151,10015,866Plywood Tebal 9 mmLbr3.5151,100528,850Dolken kayu Galam o - 8-10/4 mBtg6015,000900,000Semen PortlandKg3231,200387,600Pasir BetonM30.52225,000117,000Koral Beton 2/3M30.78200,000156,000PekerjaOh5.255,000286,000Tukang BatuOh0.3570,00024,500Tukang KayuOh3.370,000231,000Kepala TukangOh0.36580,00029,200MandorOh1.0685,00090,100Jumlah5,648,816Dibulatkan5,649,000

Materi Terkait :

Analisa Harga Satuan Pekerjaan KonstruksiAnalisa Pekerjaan TanahAnalisa Pekerjaan PondasiAnalisa Pekerjaan BetonAnalisa Pekerjaan DindingAnalisa Pekerjaan Plesteran-AcianAnalisa HArga Satuan Pekerjaan Penutup AtapAnalisa Harga Satuan Pekerjaan Tutup PlapondAnalisa Harga Satuan Pekerjaan LantaiAnalisa Harga Satuan Pekerjaan Kayu

Pekerjaan DindingAnalisa Harga Satuan Pekerjaan Dinding(AHS-SNI 2011)Berikut adalah penggalan analisa harga satuan (AHS-SNI 2011) untuk pekerjaan dinding yang biasa digunakan untuk menghitung biaya pekerjaan dinding pada rumah tinggal. Keseluruhan analisa pekerjaan dinding untuk berbagai ukuran ketebalan dinding dan komposisi adukan pada AHS-SNI ada sekitar 40 analisa. E. ANALISA HARGA SATUAN PEKERJAAN DINDINGNo.URAIANSATUANVOLUMEHARGA SATUANHARGA(Rp)(Rp)E-011M2 Pasang Bata Merah Tebal 1 Bata, 1pc : 3ps-Bata MerahBh140775108,500.00-Semen PortlandKg32.951,406.0046,327.70-Pasir PasangM30.091233,400.0021,239.40-PekerjaOh0.6542,000.0027,300.00-Tukang BatuOh0.265,000.0013,000.00-Kepala TukangOh0.0275,000.001,500.00-MandorOh0.0380,000.002,400.00Jumlah220,267.10Dibulatkan220,267.00E-021M2 Pasang Bata Merah Tebal 1 Bata, 1pc : 4ps-Bata MerahBh140775108,500.00-Semen PortlandKg26.551,406.0037,329.30-Pasir PasangM30.093233,400.0021,706.20-PekerjaOh0.6542,000.0027,300.00-Tukang BatuOh0.265,000.0013,000.00-Kepala TukangOh0.0275,000.001,500.00-MandorOh0.0380,000.002,400.00Jumlah211,735.50Dibulatkan211,736.00E-031M2 Pasang Bata Merah Tebal 1 Bata, 1pc : 5ps-Bata MerahBh140775108,500.00-Semen PortlandKg22.21,406.0031,213.20-Pasir PasangM30.102233,400.0023,806.80-PekerjaOh0.6542,000.0027,300.00-Tukang BatuOh0.265,000.0013,000.00-Kepala TukangOh0.0275,000.001,500.00-MandorOh0.0380,000.002,400.00Jumlah207,720.00Dibulatkan 207,720.00E-041M2 Pasang Bata Merah Tebal 1/2 Bata, 1pc : 3ps-Bata MerahBh7077554,250.00-Semen PortlandKg14.371,406.0020,204.22-Pasir PasangM30.04233,400.009,336.00-PekerjaOh0.3242,000.0013,440.00-Tukang BatuOh0.165,000.006,500.00-Kepala TukangOh0.0175,000.00750-MandorOh0.01580,000.001,200.00Jumlah105,680.22Dibulatkan 105,680.00E-051M2 Pasang Bata Merah Tebal 1/2 Bata, 1pc : 4ps-Bata MerahBh7077554,250.00-Semen PortlandKg11.51,406.0016,169.00-Pasir PasangM30.043233,400.0010,036.20-PekerjaOh0.3242,000.0013,440.00-Tukang BatuOh0.165,000.006,500.00-Kepala TukangOh0.0175,000.00750-MandorOh0.01580,000.001,200.00Jumlah102,345.20Dibulatkan 102,345.00E-061M2 Pasang Bata Merah Tebal 1/2 Bata, 1pc : 5ps-Bata MerahBh7077554,250.00-Semen PortlandKg9.681,406.0013,610.08-Pasir PasangM30.045233,400.0010,503.00-PekerjaOh0.3242,000.0013,440.00-Tukang BatuOh0.165,000.006,500.00-Kepala TukangOh0.0175,000.00750-MandorOh0.01580,000.001,200.00Jumlah100,253.08Dibulatkan 100,253.00Materi Terkait :

Analisa Harga Satuan Pekerjaan KonstruksiAnalisa Pekerjaan TanahAnalisa Pekerjaan PondasiAnalisa Pekerjaan BetonAnalisa Pekerjaan DindingAnalisa Pekerjaan Plesteran-AcianAnalisa HArga Satuan Pekerjaan Penutup AtapAnalisa Harga Satuan Pekerjaan Tutup PlapondAnalisa Harga Satuan Pekerjaan LantaiAnalisa Harga Satuan Pekerjaan Kayu

Pekerjaan PlesteranAnalisa Harga Satuan Pekerjaan Plesteran(AHS SNI 2011)Inilah penggalan analisa pekerjaan plesteran yang paling banyak digunakan untuk menghitung biaya bangunan rumah tinggal.

F. ANALISA HARGA SATUAN PEKERJAAN PLESTERANNo.URAIANSATUANVOLUMEHARGA SATUANHARGA(Rp)(Rp)F-011 M2 Plesteran adk. 1pc : 2ps Tebal 15 mm-Semen PortlandKg8.521,406.0011,979.12-Pasir PasangM30.017233,400.003,967.80-PekerjaOh0.242,000.008,400.00-Tukang BatuOh0.1565,000.009,750.00-Kepala TukangOh0.01575,000.001,125.00-MandorOh0.0180,000.00800Jumlah36,021.92Dibulatkan 36,022.00F-021 M2 Plesteran adk. 1pc : 3ps Tebal 15 mm-Semen PortlandKg6.481,406.009,110.88-Pasir PasangM30.019233,400.004,434.60-PekerjaOh0.242,000.008,400.00-Tukang BatuOh0.1565,000.009,750.00-Kepala TukangOh0.01575,000.001,125.00-MandorOh0.0180,000.00800Jumlah33,620.48Dibulatkan 33,620.00F-031 M2 Plesteran adk. 1pc : 4ps Tebal 15 mm-Semen PortlandKg5.21,406.007,311.20-Pasir PasangM30.02233,400.004,668.00-PekerjaOh0.242,000.008,400.00-Tukang BatuOh0.1565,000.009,750.00-Kepala TukangOh0.01575,000.001,125.00-MandorOh0.0180,000.00800Jumlah32,054.20Dibulatkan 32,054.00F-041 M2 Plesteran adk. 1pc : 3ps Tebal 20 mm-Semen PortlandKg10.81,406.0015,184.80-Pasir PasangM30.026233,400.006,068.40-PekerjaOh0.2542,000.0010,500.00-Tukang BatuOh0.265,000.0013,000.00-Kepala TukangOh0.0275,000.001,500.00-MandorOh0.012580,000.001,000.00Jumlah47,253.20Dibulatkan 47,253.00F-051 M2 Plesteran adk. 1pc : 4ps Tebal 20 mm-Semen PortlandKg8.681,406.0012,204.08-Pasir PasangM30.028233,400.006,535.20-PekerjaOh0.2542,000.0010,500.00-Tukang BatuOh0.265,000.0013,000.00-Kepala TukangOh0.0275,000.001,500.00-MandorOh0.012580,000.001,000.00Jumlah44,739.28Dibulatkan 44,739.00F-061 M2 Plesteran adk. 1pc:5ps tebal 20 mm-Semen PortlandKg7.291,406.0010,249.74-Pasir PasangM30.026233,400.006,068.40-PekerjaOh0.2542,000.0010,500.00-Tukang BatuOh0.265,000.0013,000.00-Kepala TukangOh0.0275,000.001,500.00-MandorOh0.012580,000.001,000.00Jumlah42,318.14Dibulatkan 42,318.00F-111 M2 Acian Plesteran-Semen PortlandKg41,406.005,624.00-PekerjaOh0.14342,000.006,006.00-Tukang batuOh0.10765,000.006,955.00-Kepala TukangOh0.010575,000.00787.5-MandorOh0.010580,000.00840Jumlah20,212.50Dibulatkan 20,213.00Materi Terkait :

Analisa Harga Satuan Pekerjaan KonstruksiAnalisa Pekerjaan TanahAnalisa Pekerjaan PondasiAnalisa Pekerjaan BetonAnalisa Pekerjaan DindingAnalisa Pekerjaan Plesteran-AcianAnalisa HArga Satuan Pekerjaan Penutup AtapAnalisa Harga Satuan Pekerjaan Tutup PlapondAnalisa Harga Satuan Pekerjaan LantaiAnalisa Harga Satuan Pekerjaan Kayu

Penutup AtapPenggalan Analisa Harga Satuan Penutup Atap(AHS SNI 2011)Untuk menghitung pekerjaan penutup atap seperti genting plentong, genting morando, genting keramik, genting beton dll. diperlukan analisa harga satuan penutup atap. Berikut adalah penggalan AHS SNI 2011 penutup atap yang biasa digunakan untuk menghitung RAB Rumah tinggal.

G. ANALISA HARGA SATUAN PEKERJAAN PENUTUP ATAPNo.URAIANSATUANVOLUMEHARGA SATUANHARGA(Rp)(Rp)G-011M2 Pasang Atap Genteng Palentong-Genteng palentongBh251,900.0047,500.00-PekerjaOh0.1542,000.006,300.00-Tukang kayuOh0.07565,000.004,875.00-Kepala tukangOh0.00875,000.00600-MandorOh0.00880,000.00640Jumlah59,915.00Dibulatkan59,915.00G-021 M2 Pasang Genteng Bubung Palentong-Genteng bubung palentongBh56,000.0030,000.00-Semen PortlandKg81,406.0011,248.00-Pasir pasangM30.032233,400.007,468.80-PekerjaOh0.442,000.0016,800.00-Tukang kayuOh0.265,000.0013,000.00-Kepala tukangOh0.0275,000.001,500.00-MandorOh0.00280,000.00160Jumlah80,176.80Dibulatkan80,177.00G-031 M2 Pasang Roof Light Fibreglass ( 180 x 90 ) cm-Roof light fibreglassLbr0.6100,000.0060,000.00-Paku biasa " - 1"Kg0.0523,800.001,190.00-PekerjaOh0.1442,000.005,880.00-Tukang kayuOh0.06765,000.004,355.00-Kepala tukangOh0.00775,000.00525-MandorOh0.00780,000.00560Jumlah72,510.00Dibulatkan72,510.00G-041 M2 Pasang Atap Asbes Gelombang ( 3,00 x 1,05 m ) x 4 mm-Asbes gelombangLbr0.3580,000.0028,000.00-Paku sengKg0.1223,800.002,856.00-PekerjaOh0.1442,000.005,880.00-Tukang kayuOh0.0765,000.004,550.00-Kepala tukangOh0.00775,000.00525-MandorOh0.00780,000.00560Jumlah42,371.00Dibulatkan 42,371.00G-051 M2 Pasang Atap Asbes Gelombang ( 2,70 x 1,05 m ) x 4 mm-Asbes gelombangLbr0.4273,300.0030,786.00-Paku sengKg0.1223,800.002,856.00-PekerjaOh0.1442,000.005,880.00-Tukang kayuOh0.0765,000.004,550.00-Kepala tukangOh0.00775,000.00525-MandorOh0.00780,000.00560Jumlah45,157.00Dibulatkan45,157.00G-061 M2 Pasang Atap Asbes Gelombang ( 2,40 x 1,05 m ) x 4 mm-Asbes gelombangLbr0.4465,900.0028,996.00-Paku sengKg0.1223,800.002,856.00-PekerjaOh0.1442,000.005,880.00-Tukang kayuOh0.06765,000.004,355.00-Kepala tukangOh0.00775,000.00525-MandorOh0.00780,000.00560Jumlah43,172.00Dibulatkan43,172.00G-071M2 Pasang Atap Asbes Gelombang ( 2,10 x 1,05 m ) x 4 mm-Asbes gelombangLbr0.5158,500.0029,835.00-Paku sengKg0.1223,800.002,856.00-PekerjaOh0.1442,000.005,880.00-Tukang kayuOh0.06765,000.004,355.00-Kepala tukangOh0.00775,000.00525-MandorOh0.00780,000.00560Jumlah44,011.00Dibulatkan44,011.00G-081 M2 Pasang Atap Asbes Gelombang ( 1,50 x 1,05 m ) x 4 mm-Asbes gelombangLbr0.842,300.0033,840.00-Paku sengKg0.1223,800.002,856.00-PekerjaOh0.1442,000.005,880.00-Tukang kayuOh0.06765,000.004,355.00-Kepala tukangOh0.00775,000.00525-MandorOh0.00780,000.00560Jumlah48,016.00Dibulatkan48,016.00G-091 M Pasang Nok Stel Gelombang 1,05 m-Nok stel gelombangLbr2.138,100.0080,010.00-Paku sekrup 3,5"Bh68004,800.00-PekerjaOh0.08442,000.003,528.00-Tukang kayuOh0.12565,000.008,125.00-Kepala tukangOh0.01375,000.00975-MandorOh0.00480,000.00320Jumlah97,758.00Dibulatkan97,758.00G-101 M2 Pasang Atap Genteng Beton-Genteng betonbh118,500.0093,500.00-Paku biasa 2" - 5"Kg0.0323,400.00702-PekerjaOh0.242,000.008,400.00-Tukang kayuOh0.165,000.006,500.00-Kepala tukangOh0.0175,000.00750-MandorOh0.0180,000.00800Jumlah110,652.00Dibulatkan 110,652.00G-111 M2 Pasang Atap Genteng Murando Natural-Genteng murando naturalbh182,700.0048,600.00-PekerjaOh0.1542,000.006,300.00-Tukang kayuOh0.07565,000.004,875.00-Kepala tukangOh0.00875,000.00600-MandorOh0.00880,000.00640Jumlah61,015.00Dibulatkan61,015.00G-121 M2 Pasang Atap Genteng Murando Glazur-Genteng murando glazurbh184,000.0072,000.00-PekerjaOh0.1542,000.006,300.00-Tukang kayuOh0.07565,000.004,875.00-Kepala tukangOh0.00875,000.00600-MandorOh0.00880,000.00640Jumlah84,415.00Dibulatkan84,415.00Materi Terkait :

Analisa Harga Satuan Pekerjaan KonstruksiAnalisa Pekerjaan TanahAnalisa Pekerjaan PondasiAnalisa Pekerjaan BetonAnalisa Pekerjaan DindingAnalisa Pekerjaan Plesteran-AcianAnalisa HArga Satuan Pekerjaan Penutup AtapAnalisa Harga Satuan Pekerjaan Tutup PlapondAnalisa Harga Satuan Pekerjaan LantaiAnalisa Harga Satuan Pekerjaan Kayu

Pekerjaan Penutup PlapondAnalisa Harga Satuan Pekerjaan Penutup Langit-langit(AHS SNI 2011)Berikut ini adalah penggalan Analisa Harga Satuan Pekerjaan untuk menghitung biaya pekerjaan langit-langit: asbes, akustik, tekwood, gypsum, dan GRC.

H. ANALISA HARGA SATUAN PEKERJAAN PENUTUP LANGIT-LANGITNo.URAIANSATUANVOLUMEHARGA SATUANHARGA(Rp)(Rp)(Rp)(Rp)H-011 M2 Langit-langit Asbes ( 1,00 x 1,00 ) m, tebal 5 mm-Pelat asbes tebal 4 mmm21.122,500.0024,750.00-Paku sengKg0.0123,800.00238-PekerjaOh0.0342,000.001,260.00-Tukang kayuOh0.0765,000.004,550.00-Kepala tukangOh0.00775,000.00525-MandorOh0.001580,000.00120Jumlah31,443.00Dibulatkan31,443.00H-021 M2 Langit-langit Asbes ( 1,00 x 1,00 ) m, tebal 3,5 mm-Pelat asbes tebal 3,5 mmLbr1.119,500.0021,450.00-Paku sengKg0.0123,800.00238-PekerjaOh0.0342,000.001,260.00-Tukang kayuOh0.0765,000.004,550.00-Kepala tukangOh0.00775,000.00525-MandorOh0.001580,000.00120Jumlah28,143.00Dibulatkan28,143.00H-031 M2 Langit-langit Akustik ( 60 x 120 ) cm-Akustik 600 x 1200Lbr1.5132,800.00199,200.00-PakuKg0.0523,800.001,190.00-PekerjaOh0.0642,000.002,520.00-Tukang kayuOh0.165,000.006,500.00-Kepala tukangOh0.0175,000.00750-MandorOh0.00380,000.00240Jumlah210,400.00Dibulatkan210,400.00H-041 M2 Langit-langit Akustik ( 60 x 120 ) cm + Rangka Alluminium-Profil Alluminium "T"M3.612,200.0043,920.00-Kawat f 4 mmKg0.1528,200.004,230.00-Ramset / dina boltBh1.057,200.007,560.00-Akustik 600 x 1200Lbr1.5132,800.00199,200.00-PekerjaOh0.1542,000.006,300.00-Tukang kayuOh0.565,000.0032,500.00-Kepala tukangOh0.0575,000.003,750.00-MandorOh0.007580,000.00600Jumlah298,060.00Dibulatkan298,060.00H-051 M2 Langit-langit teakwood (60 x 120) cm, t = 4 mm + rangka kayu borneo super-Kayu Balok Borneo SuperM30.0232,640,000.0060,720.00-Paku biasa 2" - 5"Kg0.0623,400.001,404.00-Teakwood 120 cm x 240 cm x 0,4 cmLbr0.39131,700.0051,363.00-PekerjaOh0.2742,000.0011,340.00-Tukang kayuOh0.465,000.0026,000.00-Kepala tukangOh0.0475,000.003,000.00-MandorOh0.013580,000.001,080.00Jumlah154,907.00Dibulatkan154,907.00H-061 M2 Langit-langit Teakwood 3 mm + Rangka Kayu Borneo Super-Kayu Balok Borneo SuperM30.0232,640,000.0060,720.00-Paku biasa 2" - 5"Kg0.0623,400.001,404.00-Teakwood (120 x 240x 0,3) cmLbr0.39129,100.0050,349.00-PekerjaOh0.2742,000.0011,340.00-Tukang kayuOh0.465,000.0026,000.00-Kepala tukangOh0.0475,000.003,000.00-MandorOh0.013580,000.001,080.00Jumlah153,893.00Dibulatkan153,893.00H-071 M2 Langit-langit Triplek 4 mm + Rangka Kayu Borneo Super-Kayu Balok Borneo SuperM30.0232,640,000.0060,720.00-Paku biasa 2" - 5"Kg0.0623,800.001,428.00-Triplek 120 cm x 240 cm x 0,4 cmLbr0.3964,400.0025,116.00-PekerjaOh0.2742,000.0011,340.00-Tukang kayuOh0.465,000.0026,000.00-Kepala tukangOh0.0475,000.003,000.00-MandorOh0.013580,000.001,080.00Jumlah128,684.00Dibulatkan128,684.00H-081 M2 Langit-langit Gypsum Board, tebal 9 mm + rangka besi hollow-Hollow 4/4 ZincromateBtg0.41529,200.0012,118.00-Hollow 2/4 ZincromateBtg0.1522,600.003,390.00-Gypsum board ( 120 x 240 x 9 ) mmLbr0.36479,800.0029,047.20-Paku gypsumkg0.1117,500.001,925.00-Ramset / dina boltBh47,200.0028,800.00-Cotton plasterBh0.07215,000.001,080.00-CompounZak0.12575,000.009,375.00-PekerjaOh0.142,000.004,200.00-Tukang kayuOh0.0565,000.003,250.00-Kepala tukangOh0.00575,000.00375-MandorOh0.00580,000.00400Jumlah93,960.20Dibulatkan93,960.00H-091 M2 Langit-langit GRC t = 4 mm + rangka besi hollow-Hollow 4/4 ZincromateBtg0.41529,200.0012,118.00-Hollow 2/4 ZincromateBtg0.1522,600.003,390.00-GRC ( 120 x 240 x 4 ) mmLbr0.36467,500.0024,570.00-Paku GRCkg0.1135,000.003,850.00-Ramset / dina boltBh47,200.0028,800.00-Cotton plasterBh0.07215,000.001,080.00-CompounZak0.12575,000.009,375.00-PekerjaOh0.142,000.004,200.00-Tukang kayuOh0.0565,000.003,250.00-Kepala tukangOh0.00575,000.00375-MandorOh0.00580,000.00400Jumlah91,408.00Dibulatkan91,408.00H-101 M2 Langit-langit gypsum t = 9 mm + Rangka Kayu Borneo Super-Kayu Balok Borneo SuperM30.0232,640,000.0060,720.00-Paku biasa 2" - 5"Kg0.0623,800.001,428.00-Gypsum board ( 120 x 240 x 9 ) mmLbr0.3979,800.0031,122.00-Paku sekrupkg0.1117,500.001,925.00-PekerjaOh0.2742,000.0011,340.00-Tukang kayuOh0.465,000.0026,000.00-Kepala tukangOh0.0475,000.003,000.00-MandorOh0.013580,000.001,080.00Jumlah136,615.00Dibulatkan136,615.00H-111 M2 Langit-langit GRC t = 4 mm + Rangka Kayu Borneo Super-Kayu Balok Borneo SuperM30.0232,640,000.0060,720.00-Paku biasa 2" - 5"Kg0.0623,800.001,428.00-GRC ( 120 x 240 x 4 ) mmLbr0.3967,500.0026,325.00-Paku GRCkg0.1135,000.003,850.00-PekerjaOh0.2742,000.0011,340.00-Tukang kayuOh0.465,000.0026,000.00-Kepala tukangOh0.0475,000.003,000.00-MandorOh0.013580,000.001,080.00Jumlah133,743.00Dibulatkan133,743.00H-121 M List Langit-langit Kayu Profil 10 cm-List Kayu profilM1.0529,400.0030,870.00-PakuKg0.0123,800.00238-PekerjaOh0.0542,000.002,100.00-Tukang kayuOh0.0565,000.003,250.00-Kepala tukangOh0.00575,000.00375-MandorOh0.00380,000.00240Jumlah37,073.00Dibulatkan37,073.00H-131 M List Langit-langit Gypsum 10 cm-List gypsumM1.058,500.008,925.00-Tepung gypsumKg0.1512,500.001,875.00-PekerjaOh0.0542,000.002,100.00-Tukang kayuOh0.0565,000.003,250.00-Kepala tukangOh0.00575,000.00375-MandorOh0.00380,000.00240Jumlah16,765.00Dibulatkan16,765.00Materi Terkait :

Analisa Harga Satuan Pekerjaan KonstruksiAnalisa Pekerjaan TanahAnalisa Pekerjaan PondasiAnalisa Pekerjaan BetonAnalisa Pekerjaan DindingAnalisa Pekerjaan Plesteran-AcianAnalisa HArga Satuan Pekerjaan Penutup AtapAnalisa Harga Satuan Pekerjaan Tutup PlapondAnalisa Harga Satuan Pekerjaan LantaiAnalisa Harga Satuan Pekerjaan Kayu

Pekerjaan Penutup LantaiDindingAnalisa Harga Satuan Pekerjaan Penutup Lantai dan Dinding(AHS SNI 2011)Berikut adalah analisa harga satuan pekerjaan penutup landat dan dinding untuk menghitung biaaya penutup lantai per meter persegi, seperti lantai keramik, lantai marmer dll.

No.URAIANSATUANVOLUMEHARGA SATUANHARGA(Rp)(Rp)I-011 M2 Lantai Ubin Granito ukuran 40 x 40 cm Setara Essenza-Granito 40 x 40 cmm21.05345,000.00362,250.00-Semen portlandKg9.81,406.0013,778.80-Pasir pasangM30.0215233,400.005,018.10-Semen warnaKg1.315,700.0020,410.00-PekerjaOh0.2542,000.0010,500.00-Tukang batuOh0.1265,000.007,800.00-Kepala tukangOh0.01275,000.00900-MandorOh0.012580,000.001,000.00Jumlah421,656.90Dibulatkan421,657.00I-021 M2 Lantai Ubin Granito ukuran 30 x 30 cm Setara Essenza-Granito 30 x 30 cmm21.05322,800.00338,940.00-Semen portlandKg101,406.0014,060.00-Pasir pasangM30.0215233,400.005,018.10-Semen warnaKg1.515,700.0023,550.00-PekerjaOh0.2642,000.0010,920.00-Tukang batuOh0.12565,000.008,125.00-Kepala tukangOh0.012575,000.00937.5-MandorOh0.01380,000.001,040.00Jumlah402,590.60Dibulatkan402,591.00I-031 M Plint Ubin Granito ukuran 10 x 40 cm Setara Essenza-Plint granito 10 x 40 cmBh2.6527,600.0073,140.00-Semen portlandKg1.21,406.001,687.20-Pasir pasangM30.003233,400.00700.2-Semen warnaKg0.115,700.001,570.00-PekerjaOh0.0642,000.002,520.00-Tukang batuOh0.0365,000.001,950.00-Kepala tukangOh0.00375,000.00225-MandorOh0.00380,000.00240Jumlah82,032.40Dibulatkan82,032.00I-041 M Plint Ubin Granito ukuran 10 x 30 cm Setara Essenza-Plint granito 10 x 30 cmBh3.3325,900.0086,247.00-Semen portlandKg1.651,406.002,319.90-Pasir pasangM30.0032233,400.00746.88-Semen warnaKg0.115,700.001,570.00-PekerjaOh0.0942,000.003,780.00-Tukang batuOh0.0965,000.005,850.00-Kepala tukangOh0.00975,000.00675-MandorOh0.004580,000.00360Jumlah101,548.78Dibulatkan101,549.00I-051 M2 Lantai Keramik Corak 10 x 20 cm setara Mulia-Keramik corak 10 x 20 cmm2156,000.0056,000.00-Semen portlandKg81,406.0011,248.00-Pasir pasangM30.0215233,400.005,018.10-Semen warnaKg0.01315,700.00204.1-PekerjaOh0.2542,000.0010,500.00-Tukang batuOh0.1265,000.007,800.00-Kepala tukangOh0.01275,000.00900-MandorOh0.012580,000.001,000.00Jumlah92,670.20Dibulatkan92,670.00I-061 M2 Lantai Keramik corak 20 x 20 cm setara Mulia-Keramik corak 20 x 20 cmm2162,500.0062,500.00-Semen portlandKg81,406.0011,248.00-Pasir pasangM30.0215233,400.005,018.10-Semen warnaKg0.01315,700.00204.1-PekerjaOh0.2542,000.0010,500.00-Tukang batuOh0.1265,000.007,800.00-Kepala tukangOh0.01275,000.00900-MandorOh0.012580,000.001,000.00Jumlah99,170.20Dibulatkan99,170.00I-071 M2 Lantai Keramik polos 30 x 30 cm setara Mulia-Keramik polos 30 x 30 cmm2153,000.0053,000.00-Semen portlandKg81,406.0011,248.00-Pasir pasangM30.0215233,400.005,018.10-Semen warnaKg0.01315,700.00204.1-PekerjaOh0.2542,000.0010,500.00-Tukang batuOh0.1265,000.007,800.00-Kepala tukangOh0.01275,000.00900-MandorOh0.012580,000.001,000.00Jumlah89,670.20Dibulatkan89,670.00I-081 M2 Lantai Keramik corak 30 x 30 cm Setara Mulia-Keramik corak 30 x 30 cmm2158,000.0058,000.00-Semen portlandKg81,406.0011,248.00-Pasir pasangM30.0215233,400.005,018.10-Semen warnaKg0.01315,700.00204.1-PekerjaOh0.2542,000.0010,500.00-Tukang batuOh0.1265,000.007,800.00-Kepala tukangOh0.01275,000.00900-MandorOh0.012580,000.001,000.00Jumlah94,670.20Dibulatkan94,670.00I-091 M2 Lantai Keramik polos 40 x 40 cm Setara Mulia-Keramik polos 40 x 40 cmm2156,800.0056,800.00-Semen portlandKg81,406.0011,248.00-Pasir pasangM30.0215233,400.005,018.10-Semen warnaKg0.01315,700.00204.1-PekerjaOh0.2542,000.0010,500.00-Tukang batuOh0.1265,000.007,800.00-Kepala tukangOh0.01275,000.00900-MandorOh0.012580,000.001,000.00Jumlah93,470.20Dibulatkan93,470.00I-101 M2 Lantai Keramik corak 40 x 40 cm Setara Mulia-Keramik corak 40 x 40 cmm2165,500.0065,500.00-Semen portlandKg81,406.0011,248.00-Pasir pasangM30.0215233,400.005,018.10-Semen warnaKg0.01315,700.00204.1-PekerjaOh0.2542,000.0010,500.00-Tukang batuOh0.1265,000.007,800.00-Kepala tukangOh0.01275,000.00900-MandorOh0.012580,000.001,000.00Jumlah102,170.20Dibulatkan102,170.00I-111 M2 Lantai Keramik Corak 10 x 20 cm setara Roman-Keramik corak 10 x 20 cmm2172,200.0072,200.00-Semen portlandKg81,406.0011,248.00-Pasir pasangM30.0215233,400.005,018.10-Semen warnaKg0.01315,700.00204.1-PekerjaOh0.2542,000.0010,500.00-Tukang batuOh0.1265,000.007,800.00-Kepala tukangOh0.01275,000.00900-MandorOh0.012580,000.001,000.00Jumlah108,870.20Dibulatkan108,870.00I-121 M2 Lantai Keramik corak 20 x 20 cm setara Roman-Keramik corak 20 x 20 cmm2175,200.0075,200.00-Semen portlandKg81,406.0011,248.00-Pasir pasangM30.0215233,400.005,018.10-Semen warnaKg0.01315,700.00204.1-PekerjaOh0.2542,000.0010,500.00-Tukang batuOh0.1265,000.007,800.00-Kepala tukangOh0.01275,000.00900-MandorOh0.012580,000.001,000.00Jumlah111,870.20Dibulatkan111,870.00I-131 M2 Lantai Keramik polos 30 x 30 cm setara Roman-Keramik polos 30 x 30 cmm2168,900.0068,900.00-Semen portlandKg81,406.0011,248.00-Pasir pasangM30.0215233,400.005,018.10-Semen warnaKg0.01315,700.00204.1-PekerjaOh0.2542,000.0010,500.00-Tukang batuOh0.1265,000.007,800.00-Kepala tukangOh0.01275,000.00900-MandorOh0.012580,000.001,000.00Jumlah105,570.20Dibulatkan105,570.00I-141 M2 Lantai Keramik corak 30 x 30 cm Setara Roman-Keramik corak 30 x 30 cmM2176,600.0076,600.00-Semen portlandKg81,406.0011,248.00-Pasir pasangM30.0215233,400.005,018.10-Semen warnaKg0.01315,700.00204.1-PekerjaOh0.2542,000.0010,500.00-Tukang batuOh0.1265,000.007,800.00-Kepala tukangOh0.01275,000.00900-MandorOh0.012580,000.001,000.00Jumlah113,270.20Dibulatkan113,270.00I-151 M2 Lantai Keramik polos 40 x 40 cm setara Roman-Keramik polos 40 x 40 cmm2172,500.0072,500.00-Semen portlandKg81,406.0011,248.00-Pasir pasangM30.0215233,400.005,018.10-Semen warnaKg0.01315,700.00204.1-PekerjaOh0.2542,000.0010,500.00-Tukang batuOh0.1265,000.007,800.00-Kepala tukangOh0.01275,000.00900-MandorOh0.012580,000.001,000.00Jumlah109,170.20Dibulatkan109,170.00I-161 M2 Lantai Keramik corak 40 x 40 cm Setara Roman-Keramik corak 40 x 40 cmm2177,000.0077,000.00-Semen portlandKg81,406.0011,248.00-Pasir pasangM30.0215233,400.005,018.10-Semen warnaKg0.01315,700.00204.1-PekerjaOh0.2542,000.0010,500.00-Tukang batuOh0.1265,000.007,800.00-Kepala tukangOh0.01275,000.00900-MandorOh0.012580,000.001,000.00Jumlah113,670.20Dibulatkan113,670.00I-171 M2 Lantai Marmer-Marmerm21.06550,000.00583,000.00-Semen portlandKg8.191,406.0011,515.14-Pasir pasangM30.045233,400.0010,503.00-Semen warnaKg0.6515,700.0010,205.00-PekerjaOh0.742,000.0029,400.00-Tukang batuOh0.3565,000.0022,750.00-Kepala tukangOh0.03575,000.002,625.00-MandorOh0.03580,000.002,800.00Jumlah672,798.14Dibulatkan672,798.00I-181 M2 Lantai Parquet Jati-Parquet jatiM21.05375,400.00394,170.00-Lem vinylKg0.644,000.0026,400.00-PekerjaOh0.6542,000.0027,300.00-TukangOh0.3565,000.0022,750.00-Kepala tukangOh0.03575,000.002,625.00-MandorOh0.032580,000.002,600.00Jumlah475,845.00Dibulatkan475,845.00Materi Terkait :

Analisa Harga Satuan Pekerjaan KonstruksiAnalisa Pekerjaan TanahAnalisa Pekerjaan PondasiAnalisa Pekerjaan BetonAnalisa Pekerjaan DindingAnalisa Pekerjaan Plesteran-AcianAnalisa HArga Satuan Pekerjaan Penutup AtapAnalisa Harga Satuan Pekerjaan Tutup PlapondAnalisa Harga Satuan Pekerjaan LantaiAnalisa Harga Satuan Pekerjaan Kayu

Pekerjaan KayuAnalisa Harga Satuan Pekerjaan Kayu - AHS SNI 2011Berikut adalah penggalan analisa harga satuan pekerjaan kayu, untuk menghitung harga satuan pekerjaan kayu per m3, seperti pekerjaan kusen dan jendela, pekerjaan plapond, dan pekerjaan atap.J. ANALISA HARGA SATUAN PEKERJAAN KAYUNo.URAIANSATUANVOLUMEHARGA SATUANHARGAJ-011 M3 Kusen Pintu & jendela kayu Kamper Samarinda-Kayu Balok Kamper Samarindam31.28,633,700.0010,360,440.00-PekerjaOh642,000.00252,000.00-Tukang KayuOh1865,000.001,170,000.00-Kepala TukangOh275,000.00150,000.00-MandorOh0.380,000.0024,000.00Jumlah11,956,440.00Dibulatkan11,956,440.00J-021M3 Kusen Pintu & jendela kayu Kamper Medan/Kruing-Kayu Balok Kamper MedanM31.25,692,600.006,831,120.00-PekerjaOh642,000.00252,000.00-Tukang KayuOh1865,000.001,170,000.00-Kepala TukangOh275,000.00150,000.00-MandorOh0.380,000.0024,000.00Jumlah8,427,120.00Dibulatkan8,427,120.00J-031M3 Kusen Pintu & jendela kayu Borneo Super-Kayu Borneo Balok SuperM31.25,280,000.006,336,000.00-PekerjaOh642,000.00252,000.00-Tukang KayuOh1865,000.001,170,000.00-Kepala TukangOh275,000.00150,000.00-MandorOh0.380,000.0024,000.00Jumlah7,932,000.00Dibulatkan7,932,000.00J-041 M2 Pintu Panel Kayu Kamper Samarinda-Kayu Papan Kamper SamarindaM30.048,633,700.00345,348.00-Paku Biasa 2" - 5"Kg0.0523,400.001,170.00-PekerjaOh142,000.0042,000.00-Tukang KayuOh2.565,000.00162,500.00-Kepala TukangOh0.2575,000.0018,750.00-MandorOh0.0580,000.004,000.00Jumlah573,768.00Dibulatkan573,768.00J-051 M2 Pintu Panel Kayu Kamper Medan/Kruing-Kayu Papan Kamper MedanM30.045,692,600.00227,704.00-Paku Biasa 2" - 5"Kg0.0523,400.001,170.00-PekerjaOh142,000.0042,000.00-Tukang KayuOh2.565,000.00162,500.00-Kepala TukangOh0.2575,000.0018,750.00-MandorOh0.0580,000.004,000.00Jumlah456,124.00Dibulatkan456,124.00J-061 M2 Pintu & Jendela Kaca Kayu Kamper Medan-Kayu Papan Kamper MedanM30.0355,692,600.00199,241.00-PekerjaOh0.842,000.0033,600.00-Tukang KayuOh265,000.00130,000.00-Kepala TukangOh0.275,000.0015,000.00-MandorOh0.0480,000.003,200.00Jumlah381,041.00Dibulatkan381,041.00J-071M2 Pintu & Jendela Kaca Kayu Borneo-Kayu Papan Borneo SuperM30.0355,595,800.00195,853.00-PekerjaOh0.842,000.0033,600.00-Tukang KayuOh265,000.00130,000.00-Kepala TukangOh0.275,000.0015,000.00-MandorOh0.0480,000.003,200.00Jumlah377,653.00Dibulatkan377,653.00J-081M2 Pintu & Jendela Jalusi Kayu Kamper Medan-Kayu Papan Kamper MedanM30.0645,692,600.00364,326.40-PekerjaOh142,000.0042,000.00-Tukang KayuOh365,000.00195,000.00-Kepala TukangOh0.375,000.0022,500.00-MandorOh0.580,000.0040,000.00Jumlah663,826.40Dibulatkan663,826.00J-091M2 Pintu Triplek Rangkap, Rangka Tertutup Kayu Kamper Medan-Kayu Papan Kamper MedanM30.01965,692,600.00111,574.96-Paku Biasa " - 1"Kg0.0323,800.00714-Lem KayuLtr0.323,900.007,170.00-Triplek 120 x 240 x 0,4 cmLbr164,400.0064,400.00-PekerjaOh0.642,000.0025,200.00-Tukang KayuOh265,000.00130,000.00-Kepala TukangOh0.275,000.0015,000.00-MandorOh0.0380,000.002,400.00Jumlah356,458.96Dibulatkan356,459.00J-101 M2 Jalusi Mati Kusen Kayu kamper Medan-Kayu Papan Kamper MedanM30.065,692,600.00341,556.00-Paku Biasa " - 1"Kg0.1523,800.003,570.00-PekerjaOh0.542,000.0021,000.00-Tukang KayuOh265,000.00130,000.00-Kepala TukangOh0.275,000.0015,000.00-MandorOh0.02580,000.002,000.00Jumlah513,126.00Dibulatkan513,126.00J-111 M2 Pintu Triplek Rangkap, Rangka Kayu Borneo Super-Kayu Papan Borneo SuperM30.01965,595,800.00109,677.68-Paku Biasa " - 1"Kg0.0323,800.00714-Lem KayuLtr0.323,900.007,170.00-Triplek 120 x 240 x 0,4 cmLbr164,400.0064,400.00-PekerjaOh0.642,000.0025,200.00-Tukang KayuOh265,000.00130,000.00-Kepala TukangOh0.275,000.0015,000.00-MandorOh0.0380,000.002,400.00Jumlah354,561.68Dibulatkan354,562.00J-121M2 Pintu Teakwood Rangkap, rangka Kayu Kamper Medan-Kayu Papan Kamper MedanM30.01965,692,600.00111,574.96-Paku Biasa " - 1"Kg0.323,800.007,140.00-Lem KayuLtr0.323,900.007,170.00-Teakwood 4 mmLbr1131,700.00131,700.00-PekerjaOh0.642,000.0025,200.00-Tukang KayuOh265,000.00130,000.00-Kepala TukangOh0.275,000.0015,000.00-MandorOh0.0380,000.002,400.00Jumlah430,184.96Dibulatkan430,185.00J-131M2 Pintu Triplek & Formika, Rangka Kayu Kamper Medan-Kayu Papan Kamper MedanM30.01965,692,600.00111,574.96-Paku Biasa " - 1"Kg0.323,800.007,140.00-Lem KayuLtr0.823,900.0019,120.00-Triplek 120 x 240 x 0,4 cmLbr164,400.0064,400.00-Formica 3" x 6"Lbr0.5132,900.0066,450.00-PekerjaOh0.842,000.0033,600.00-Tukang KayuOh2.565,000.00162,500.00-Kepala TukangOh0.2575,000.0018,750.00-MandorOh0.0480,000.003,200.00Jumlah486,734.96Dibulatkan486,735.00J-141M2 Pintu Teakwood & Formika, Rangka Kayu Kamper Medan (dipolitur)-Kayu Papan Kamper MedanM30.01965,692,600.00111,574.96-Paku Biasa " - 1"Kg0.323,800.007,140.00-Lem KayuLtr0.823,900.0019,120.00-Teakwood 120 x 240 x 0,4 cmLbr1131,700.00131,700.00-Formica 4" x 8"Lbr0.5238,100.00119,050.00-PekerjaOh0.842,000.0033,600.00-Tukang KayuOh2.565,000.00162,500.00-Kepala TukangOh0.2575,000.0018,750.00-MandorOh0.0480,000.003,200.00Jumlah606,634.96Dibulatkan606,635.00J-151 M3 Kuda-kuda Kayu Kamper Medan-Kayu Balok Kamper MedanM31.15,692,600.006,261,860.00-Besi StripKg1526,800.00402,000.00-Paku Biasa 2" - 5"Kg0.823,800.0019,040.00-PekerjaOh442,000.00168,000.00-Tukang KayuOh1265,000.00780,000.00-Kepala TukangOh1.275,000.0090,000.00-MandorOh0.280,000.0016,000.00Jumlah7,736,900.00Dibulatkan7,736,900.00J-161M3 Kuda-kuda Kayu Borneo Super-Kayu balok Borneo superM31.15,280,000.005,808,000.00-Besi StripKg1526,800.00402,000.00-Paku Biasa 2" - 5"Kg0.823,800.0019,040.00-PekerjaOh442,000.00168,000.00-Tukang KayuOh1265,000.00780,000.00-Kepala TukangOh1.275,000.0090,000.00-MandorOh0.280,000.0016,000.00Jumlah7,283,040.00Dibulatkan7,283,040.00J-171M2 Kaso + Reng Genteng Plentong Kayu Borneo Super-Kayu balok Borneo superm30.0125,280,000.0063,360.00-Paku Biasa 2" - 5"Kg0.1523,800.003,570.00-PekerjaOh0.142,000.004,200.00-Tukang KayuOh0.165,000.006,500.00-Kepala TukangOh0.0175,000.00750-MandorOh0.00580,000.00400Jumlah78,780.00Dibulatkan78,780.00J-181M2 Kaso + Reng Genteng Beton Kayu Borneo Super-Kayu balok Borneo superM30.0145,280,000.0073,920.00-Paku Biasa 2" - 5"Kg0.1523,800.003,570.00-PekerjaOh0.142,000.004,200.00-Tukang KayuOh0.165,000.006,500.00-Kepala TukangOh0.0175,000.00750-MandorOh0.00580,000.00400Jumlah89,340.00Dibulatkan89,340.00J-191M' Lisplang uk (3x20)cm, Kayu Kamper Medan-Kayu Papan Kamper MedanM30.00725,823,400.0041,928.48-Paku Biasa 2" - 5"Kg0.0523,800.001,190.00-PekerjaOh0.142,000.004,200.00-Tukang KayuOh0.265,000.0013,000.00-Kepala TukangOh0.0275,000.001,500.00-MandorOh0.00580,000.00400Jumlah62,218.48Dibulatkan62,218.00J-201 M' Lisplang uk (3x30)cm, Kayu Kamper Medan-Kayu Papan Kamper MedanM30.0115,692,600.0062,618.60-Paku Biasa 2" - 5"Kg0.0523,800.001,190.00-PekerjaOh0.1142,000.004,620.00-Tukang KayuOh0.2265,000.0014,300.00-Kepala TukangOh0.02275,000.001,650.00-MandorOh0.00580,000.00400Jumlah84,778.60Dibulatkan84,779.00J-211 M List Plafond + kayu Profil 10 cm-Kayu Profil 10 cmM'1.0529,400.0030,870.00-PekerjaOh0.02142,000.00882-Tukang KayuOh0.02165,000.001,365.00-Kepala TukangOh0.00275,000.00150-MandorOh0.00180,000.0080Jumlah33,347.00Dibulatkan33,347.00Materi Terkait :

Analisa Harga Satuan Pekerjaan KonstruksiAnalisa Pekerjaan TanahAnalisa Pekerjaan PondasiAnalisa Pekerjaan BetonAnalisa Pekerjaan DindingAnalisa Pekerjaan Plesteran-AcianAnalisa HArga Satuan Pekerjaan Penutup AtapAnalisa Harga Satuan Pekerjaan Tutup PlapondAnalisa Harga Satuan Pekerjaan LantaiAnalisa Harga Satuan Pekerjaan Kayu

Pek Penutup Besi AlmuniumAnalisa Harga Satuan Pekerjaan Penutup Besi dan AluminiumDiposkan : 01 Juni 2014Oleh : Endang Kusman

No.URAIANSATVOLUMEHARGA SATHARGA(Rp)(Rp)K-011 KgBesi profil-Besi profil WFKg1.124,000.0026,400.00-Meni besiKg0.0830,400.002,432.00-PekerjaOh0.0642,000.002,520.00-Tukang besiOh0.00665,000.00390-Kepala tukangOh0.00675,000.00450-MandorOh0.000380,000.0024Jumlah32,216.00Dibulatkan32,216.00K-021 KgPerakitan baja-Solarm'0.017,150.0071.5-Minyak pelumasm'0.00155,000.0055-Sewa alatjam0.008100,000.00800-PekerjaOh0.00142,000.0042-Tukang besiOh0.0000165,000.000.65-Kepala tukangOh0.0000175,000.000.75-MandorOh0.0000580,000.004Jumlah973.9Dibulatkan974K-031 Cm Pengelasan dengan las listrik-kawat laskg0.0423,600.00944-Solarltr0.037,150.00214.5-Minyak pelumasltr0.00455,000.00220-Sewa alatjam0.017100,000.001,700.00-Pekerjaorg0.00442,000.00168-Tukangorg0.00265,000.00130-Kepala Tukangorg0.000275,000.0015-Mandororg0.000280,000.0016Jumlah2,463.50Dibulatkan2,464.00K-041 m2 Pintu Rolling Door-Rolling doorM21306,600.00306,600.00-PekerjaOh1.0542,000.0044,100.00-Tukang besiOh1.565,000.0097,500.00-Kepala tukangOh0.10575,000.007,875.00-MandorOh0.005280,000.00416Jumlah456,491.00Dibulatkan456,491.00K-051 m2 Pintu Alluminium Natural-Pintu alluminium naturalm21211,800.00211,800.00-PekerjaOh1.0542,000.0044,100.00-Tukang besiOh1.0565,000.0068,250.00-Kepala tukangOh0.10575,000.007,875.00-MandorOh0.005280,000.00416Jumlah332,441.00Dibulatkan332,441.00K-061 m2 Terali Besi-Besi strip 2 x 3m'11.55,500.0063,250.00-PekerjaOh1.242,000.0050,400.00-Tukang lasOh1.265,000.0078,000.00-Kepala tukangOh0.01275,000.00900-MandorOh0.000680,000.0048Jumlah192,598.00Dibulatkan192,598.00K-071 m2 Kawat Harmonika 4 cm-Kawat harmonikaM21.135,900.0039,490.00-Paku biasa " - 1"kg0.0223,800.00476-Papan kayu kamperM20.00185,692,600.0010,246.68-PekerjaOh0.142,000.004,200.00-Tukang kayuOh0.165,000.006,500.00-Kepala tukangOh0.0175,000.00750-MandorOh0.00580,000.00400Jumlah62,062.68Dibulatkan62,063.00K-081 m' Talang Datar, Seng BJLS 28 lebar 90 cm-Seng plat 3' x 6' BJLS 30m'1.0520,801.0021,841.05-Paku biasa " - 1"Kg0.01523,800.00357-Kayu papan borneo superM30.00965,595,800.0053,719.68-Flincote / meni besiKg0.2530,400.007,600.00-PekerjaOh0.1542,000.006,300.00-Tukang kayuOh0.465,000.0026,000.00-Kepala tukangOh0.02575,000.001,875.00-MandorOh0.001380,000.00104Jumlah117,796.73Dibulatkan117,797.00K-091 m' Talang Miring, Seng BJLS 28 lebar 90 cm-Seng plat 3' x 6' BJLS 30m'1.0520,801.0021,841.05-Paku biasa " - 1"Kg0.01523,800.00357-Kayu papan borneo superM30.0195,595,800.00106,320.20-Flincote / meni besiKg0.330,400.009,120.00-PekerjaOh0.242,000.008,400.00-Tukang kayuOh0.465,000.0026,000.00-Kepala tukangOh0.02575,000.001,875.00-MandorOh0.001380,000.00100Jumlah174,013.25Dibulatkan174,013.00K-101 m' Talang 1/2 lingkaran D-15 cm, seng pelat BJLS 28 lebar 90 cm-Seng plat 3' x 6' BJLS 30m'1.0520,801.0021,841.05-Paku biasa " - 1"Kg0.123,800.002,380.00-Kayu papan borneo superkg0.0195,595,800.00106,320.20-Besi stripKg0.526,800.0013,400.00-PekerjaOh0.1542,000.006,300.00-Tukang kayuOh0.365,000.0019,500.00-Kepala tukangOh0.0375,000.002,250.00-MandorOh0.00880,000.00640Jumlah172,631.25Dibulatkan172,631.00K-111 m' Pasang kusen pintu/jendela alluminium natural 4"-Alumunium profil natural 4"m'1.1151,100.00166,210.00-Skrup fixerbh2250500-Sealantm'17,500.007,500.00-PekerjaOh0.04342,000.001,806.00-Tukang kayuOh0.04365,000.002,795.00-Kepala tukangOh0.004375,000.00322.5-MandorOh0.002180,000.00168Jumlah179,301.50Dibulatkan179,302.00K-121 m' Pasang kusen pintu/jendela alluminium warna 4"-Alumunium profil warna 4"m'1.1163,000.00179,300.00-Skrup fixerbh2250500-Sealantm'17,500.007,500.00-PekerjaOh0.04342,000.001,806.00-Tukang kayuOh0.04365,000.002,795.00-Kepala tukangOh0.004375,000.00322.5-MandorOh0.002180,000.00168Jumlah192,391.50Dibulatkan192,392.00K-131 m' Pasang kusen pintu/jendela alluminium natural 3"-Alumunium profil natural 3"m'1.181,000.0089,100.00-Skrup fixerbh2250500-Sealantm'17,500.007,500.00-PekerjaOh0.04342,000.001,806.00-Tukang kayuOh0.04365,000.002,795.00-Kepala tukangOh0.004375,000.00322.5-MandorOh0.002180,000.00168Jumlah102,191.50Dibulatkan102,192.00K-141 m' Pasang kusen pintu/jendela alluminium warna 3"-Alumunium profil warna 3"m'1.1102,000.00112,200.00-Skrup fixerbh2250500-Sealantm'17,500.007,500.00-PekerjaOh0.04342,000.001,806.00-Tukang kayuOh0.04365,000.002,795.00-Kepala tukangOh0.004375,000.00322.5-MandorOh0.002180,000.00168Jumlah125,291.50Dibulatkan125,292.00K-151 m2 Pintu alluminium strip lebar 8 cm-Alumunium profil 4" naturalm'4.4151,100.00664,840.00-Alumunium strip 6mmm21.05171,800.00180,390.00-PekerjaOh0.08542,000.003,570.00-Tukang kayuOh0.08565,000.005,525.00-Kepala tukangOh0.008575,000.00637.5-MandorOh0.004280,000.00336Jumlah855,298.50Dibulatkan855,299.00K-161 m2 Pintu/jendela kaca rangka alluminium natural 4"-Alumunium profil natural 4"m'4.4151,100.00664,840.00-Profil alluminium Tm'4.512,200.0054,900.00-Sealanttube0.277,500.002,025.00-PekerjaOh0.08542,000.003,570.00-Tukang kayuOh0.08565,000.005,525.00-Kepala tukangOh0.008575,000.00637.5-MandorOh0.00580,000.00400Jumlah731,897.50Dibulatkan731,898.00K-171 m2 Pintu/jendela kaca rangka alluminium warna 4"-Alumunium profil warna 4"m'4.4163,000.00717,200.00-Profil alluminium Tm'4.512,200.0054,900.00-Sealanttube0.277,500.002,025.00-PekerjaOh0.08542,000.003,570.00-Tukang kayuOh0.08565,000.005,525.00-Kepala tukangOh0.008575,000.00637.5-MandorOh0.00580,000.00400Jumlah784,257.50Dibulatkan784,258.00K-181 m2 Jendela nako & teralis (10 klips)-Jendela nako (rangka + kaca 5 mm)m21.1300,000.00330,000.00-Paku skrup 1cm - 2,5cmbh102502,500.00-Besi stripm'75,500.0038,500.00-PekerjaOh0.242,000.008,400.00-Tukang kayuOh0.265,000.0013,000.00-Kepala tukangOh0.0275,000.001,500.00-MandorOh0.00180,000.0080Jumlah393,980.00Dibulatkan393,980.00K-191 m2 Pintu pelat baja tebal 2mm rangkap, rangka baja siku-Besi siku L 30.30.3Kg1524,000.00360,000.00-Baja pelatKg32.824,000.00787,200.00-kawat lasKg0.0523,600.001,180.00-PekerjaOh0.242,000.008,400.00-Tukang kayuOh0.265,000.0013,000.00-Kepala tukangOh0.0275,000.001,500.00-MandorOh0.00180,000.0080Jumlah1,171,360.00Dibulatkan1,171,360.00K-201 m2 Rangka jendela besi square tube (5 x 5) cm-Besi square tubeM4.767,300.0034,748.00-Besi lis kaca (1 x 1) cmKg4.52224,000.00108,528.00-PengelasanCm202,464.0049,280.00-PekerjaOh0.6542,000.0027,300.00-Tukang kayuOh0.6565,000.0042,250.00-Kepala tukangOh0.06575,000.004,875.00-MandorOh0.03280,000.002,560.00Jumlah269,541.00Dibulatkan269,541.00K-211 m2 Pintu lipat (folding door) bahan besi-Pintu lipatM21501,700.00501,700.00-PekerjaOh1.0542,000.0044,100.00-Tukang kayuOh1.0565,000.0068,250.00-Kepala tukangOh0.10575,000.007,875.00-MandorOh0.005280,000.00416Jumlah622,341.00Dibulatkan622,341.00K-221 m2 Tirai (venetions blinds and vertical blinds)-TiraiM21537,300.00537,300.00-PekerjaOh0.3542,000.0014,700.00-Tukang kayuOh0.3565,000.0022,750.00-Kepala tukangOh0.03575,000.002,625.00-MandorOh0.001880,000.00144Jumlah577,519.00Dibulatkan577,519.00

Kembali Ke Analisa AHS SNI

Pekerjaan Kusen AluminiumAnalisa Harga Satuan Pekerjaan Kusen AluminiumDiposkan : 02 Juni 2014Oleh : Endang Kusman

11 UNIT Pasang partisi Alumunium, Daun partisi Multiplek rangka kayu KamperBahan7.62m'Kusen Alumunium Natural Uk 4" + upah 20%181,320.001,381,658.401.35lbrMultiplek 9 mm151,100.00203,985.000.03m3Kayu papan kamper medan5,823,400.00174,702.0011.7m'List kayu profil 1 cm8,900.00104,130.000.1kgPaku biasa " - 1"23,800.002,380.000.25kgLem putih FOX23,900.005,975.004bhGrendel jendela 2"5,500.0022,000.002bhHandle partisi33,000.0066,000.001.54m2Cat kayu39,790.0061,276.604.86m2Cat tembok17,608.0085,574.88Jumlah I2,107,681.88

Tenaga0.3OhPekerja Terampil42,000.0012,600.001.3OhTukang kayu Terampil65,000.0084,500.000.13OhKepla Tukang Kayu75,000.009,750.000.013OhMandor80,000.001,040.00Jumlah II107,890.00Jumlah I + II2,215,571.88

21 UNIT Pek. Kusen Jendela Alumunium uk. 2 X 1,50 M' ( 3 lubang ) dgn 2 Daun JendelaBahan12m'Profil aluminium 4" natural + upah 20%181,320.002,175,840.005.4m'Profil daun jendela alm. + upah 20%118,560.00640,224.001.81m2Kaca polos 5 mm111,000.00200,910.002psEngsel jendela 3"15,000.0030,000.002bhSlot Handle jendela33,000.0066,000.002bhHak Kait angin jendela biasa7,100.0014,200.000lsAcesories ( 5 % )150,848.70150,848.703,278,022.70

31 UNIT Pek. Kusen Pintu Jendela Alumunium uk. 2,2 X 2,70 M' ( 2 lb. Jendela + 1 lb. Pintu )Bahan14.1m'Profil aluminium 4" natural + upah 20%181,320.002,556,612.002.7m'Profil daun jendela alm. + upah 20%118,560.00320,112.001.65m2Kaca polos 5 mm111,000.00183,150.001.68m2Daun pintu panel Multiplek 9 mm356,459.00598,851.12rangka ky. Kamper Medan/Kruing1psEngsel jendela 3"15,000.0015,000.001bhSlot Handle jendela33,000.0033,000.002bhHak Kait angin jendela biasa7,100.0014,200.001.5psEngsel pintu 4"21,000.0031,500.001bhGrendel pintu 2"5,500.005,500.001bhKunci tanam 2 slaagh (Royal)126,500.00126,500.000lsAcesories ( 5 % )152,993.70152,993.704,037,418.82

41 UNIT Pekerjaan Kusen Pintu Alumunium uk. 0,8 X 2,70 M'Bahan7m'Profil aluminium 4" natural + upah 20%181,320.001,269,240.000.37m2Kaca polos 5 mm111,000.0041,070.001.68m2Daun pintu panel Multiplek 9 mm356,459.00598,851.12rangka ky. Kamper Medan/Kruing1.5psEngsel pintu 4"21,000.0031,500.001bhGrendel pintu 2"5,500.005,500.001bhKunci tanam 2 slaagh (Royal)126,500.00126,500.000lsAcesories ( 5 % )95,458.0695,458.062,168,119.18

51 UNIT Pek. Kusen Jendela Alumunium uk. 2,65 X 1,50 M' ( 4 lubang ) dgn 2 Daun JendelaBahan15.45m'Profil aluminium 4" natural + upah 20%181,320.002,801,394.005.4m'Profil daun jendela alm. + upah 20%118,560.00640,224.002.55m2Kaca polos 5 mm111,000.00283,050.002psEngsel jendela 3"15,000.0030,000.002bhSlot Handle jendela33,000.0066,000.002bhHak Kait angin jendela biasa7,100.0014,200.000lsAcesories ( 5 % )186,233.40186,233.404,021,101.40

61 UNIT Pek. Kusen Pintu & Jendela Alumunium uk. 2,85 X 2,70 M' ( 3 lb. Jendela + 1 lb. Pintu )Bahan17.55m'Profil aluminium 4" natural + upah 20%181,320.003,182,166.005.4m'Profil daun jendela alm. + upah 20%118,560.00640,224.002.4m2Kaca polos 5 mm111,000.00266,400.001.68m2Daun pintu panel Multiplek 9 mm356,459.00598,851.12rangka ky. Kamper Medan/Kruing2psEngsel jendela 3"15,000.0030,000.002bhSlot Handle jendela33,000.0066,000.002bhHak Kait angin jendela biasa7,100.0014,200.001.5psEngsel pintu 4"21,000.0031,500.001bhGrendel pintu 2"5,500.005,500.001bhKunci tanam 2 slaagh (Royal)126,500.00126,500.000lsAcesories ( 5 % )204,439.50204,439.505,165,780.62

71 UNIT Pek. Kusen Pintu Alumunium + Kaca uk. 1,30 X 2,80 M' ( 2 Daun Pintu )Bahan8.9m'Profil aluminium 4" natural + upah 20%181,320.001,613,748.000.65m2Kaca polos 5 mm111,000.0072,150.002.73m2Daun pintu panel Multiplek 9 mm356,459.00973,133.07rangka ky. Kamper Medan/Kruing1.5psEngsel pintu 4"21,000.0031,500.001psspagnolet tanam51,600.0051,600.001bhKunci tanam 2 slaagh (Royal)126,500.00126,500.000lsAcesories ( 5 % )132,951.55132,951.553,001,582.62

81 UNIT Pek. Kusen Pintu Alumunium + Kaca uk. 1,50 X 2,70 M' ( 2 Daun Pintu )Bahan8.8m'Profil aluminium 4" natural + upah 20%181,320.001,595,616.000.7m2Kaca polos 5 mm111,000.0077,700.002.94m2Daun pintu panel Multiplek 9 mm356,459.001,047,989.46rangka ky. Kamper Medan/Kruing1.5psEngsel pintu 4"21,000.0031,500.001psspagnolet tanam51,600.0051,600.001bhKunci tanam 2 slaagh (Royal)126,500.00126,500.000lsAcesories ( 5 % )136,065.27136,065.273,066,970.73

91 UNIT Pek. Kusen Pintu & Jendela Alumunium uk.1,55 X 2,70 M' ( 1 lb. Jendela + 1 lb. Pintu )Bahan10.75m'Profil aluminium 4" natural + upah 20%181,320.001,949,190.001.07m2Kaca polos 5 mm111,000.00118,770.001.68m2Daun pintu panel Multiplek 9 mm356,459.00598,851.12rangka ky. Kamper Medan/Kruing1.5psEngsel pintu 4"21,000.0031,500.001psspagnolet tanam51,600.0051,600.001bhKunci tanam 2 slaagh (Royal)126,500.00126,500.000lsAcesories ( 5 % )133,340.56133,340.563,009,751.68

101 UNIT Pekerjaan Jalusi Alumunium Sofi-sofiBahan5.1m'Profil aluminium 4" natural + upah 20%181,320.00924,732.008m2Jalusi Alm35,000.00280,000.000lsAcesories ( 5 % )60,236.6060,236.601,264,968.60

111 UNIT Pek. Kusen Bouvenlight Alumunium ( 1 lubang ) uk. 0,70 x 0,60 mBahan4m'Profil aluminium 4" natural + upah 20%181,320.00725,280.000.24m2Kaca polos 5 mm111,000.0026,640.000lsAcesories ( 5 % )37,596.0037,596.00789,516.00

121 UNIT Pek. Kusen Bouvenlight Alumunium ( 2 lubang ) uk. 1,35 x 0,60 mBahan4.5m'Profil aluminium 4" natural + upah 20%181,320.00815,940.000.48m2Kaca polos 5 mm111,000.0053,280.000lsAcesories ( 5 % )43,461.0043,461.00912,681.00

131 UNIT Pek. Kusen Bouvenlight Alumunium ( 3 lubang ) uk. 2,00 x 0,60 mBahan6.4m'Profil aluminium 4" natural + upah 20%181,320.001,160,448.000.72m2Kaca polos 5 mm111,000.0079,920.000lsAcesories ( 5 % )62,018.4062,018.401,302,386.40

141 UNIT Pek. Kusen Bouvenlight Alumunium ( 4 lubang ) uk. 2,65 x 0,60 mBahan8.3m'Profil aluminium 4" natural + upah 20%181,320.001,504,956.000.96m2Kaca polos 5 mm111,000.00106,560.000lsAcesories ( 5 % )80,575.8080,575.801,692,091.80

Kembali ke AHS-SNI

Sheet13Analisa Harga Satuan Pekerjaan Kunci dan KacaDiposkan : 03 Juni 2014Oleh : Endang Kusman

No.URAIANSATVOLUMEHARGA SATHARGA(Rp)(Rp)L-011 Buah Pasang Kunci Tanam 2 slaag-Kunci tanamBh1335,900.00335,900.00-PekerjaOh0.0642,000.002,520.00-Tukang kayuOh0.665,000.0039,000.00-Kepala tukangOh0.0675,000.004,500.00-MandorOh0.00380,000.00240Jumlah382,160.00Dibulatkan382,160.00L-021 Buah Pasang Kunci Tanam Biasa-Kunci tanam biasaBh1165,300.00165,300.00-PekerjaOh0.0142,000.00420-Tukang kayuOh0.565,000.0032,500.00-Kepala tukangOh0.0175,000.00750-MandorOh0.00580,000.00400Jumlah199,370.00Dibulatkan199,370.00L-031 Buah Pasang Kunci Tanam Kamar Mandi-Kunci tanam km mandiBh194,500.0094,500.00-PekerjaOh0.00542,000.00210-Tukang kayuOh0.565,000.0032,500.00-Kepala tukangOh0.00575,000.00375-MandorOh0.002580,000.00200Jumlah127,785.00Dibulatkan127,785.00L-041 Buah Pasang Engsel Pintu-Engsel pintuBh121,000.0021,000.00-PekerjaOh0.01542,000.00630-Tukang kayuOh0.1565,000.009,750.00-Kepala tukangOh0.01575,000.001,125.00-MandorOh0.000880,000.0064Jumlah32,569.00Dibulatkan32,569.00L-051 Buah Pasang Engsel Jendela Kupu-kupu-Engsel jendelaBh115,000.0015,000.00-PekerjaOh0.0142,000.00420-Tukang kayuOh0.165,000.006,500.00-Kepala tukangOh0.0175,000.00750-MandorOh0.000580,000.0040Jumlah22,710.00Dibulatkan22,710.00L-061 Buah Pasang Kait Angin-Kait anginBh13,550.003,550.00-PekerjaOh0.01542,000.00630-Tukang kayuOh0.1565,000.009,750.00-Kepala tukangOh0.01575,000.001,125.00-MandorOh0.000880,000.0064Jumlah15,119.00Dibulatkan15,119.00L-071 Buah Pasang Door Closer-Door closerBh1420,000.00420,000.00-PekerjaOh0.0542,000.002,100.00-Tukang kayuOh0.565,000.0032,500.00-Kepala tukangOh0.0575,000.003,750.00-MandorOh0.002580,000.00200Jumlah458,550.00Dibulatkan458,550.00L-081 Buah Pasang Pegangan Pintu / Door Holder-Door holderBh1205,400.00205,400.00-PekerjaOh0.0542,000.002,100.00-Tukang kayuOh0.565,000.0032,500.00-Kepala tukangOh0.0575,000.003,750.00-MandorOh0.002580,000.00200Jumlah243,950.00Dibulatkan243,950.00L-091 M2 Pasang Kaca , tebal 3 mm-KacaM21.187,400.0096,140.00-PekerjaOh0.01542,000.00630-Tukang kayuOh0.1565,000.009,750.00-Kepala tukangOh0.01575,000.001,125.00-MandorOh0.000880,000.0060Jumlah107,705.00Dibulatkan107,705.00L-101 M2 Pasang Kaca , tebal 5 mm-KacaM21.1111,000.00122,100.00-PekerjaOh0.01542,000.00630-Tukang kayuOh0.1565,000.009,750.00-Kepala tukangOh0.01575,000.001,125.00-MandorOh0.000880,000.0064Jumlah133,669.00Dibulatkan133,669.00

Kembali ke AHS-SNI

Sheet14Analisa Harga Satuan Pekerjaan Sanitasi

Diposkan : 04 Juni 2014Oleh : Endang Kusman

No.URAIANSATVOLUMEHARGA SATHARGA(Rp)(Rp)M-011 Buah Closet jongkok Porselen StandarCloset jongkokbh1188,200.00188,200.00P.C (50 gk)Kg61,406.008,436.00Pasir pasangm30.01233,400.002,334.00Pekerjaorg142,000.0042,000.00Tukang batuorg1.565,000.0097,500.00Kepala Tukangorg1.575,000.00112,500.00Mandororg0.1680,000.0012,800.00Jumlah463,770.00Dibulatkan463,770.00M-021 Buah UrinoirUrinoirbh11,773,400.001,773,400.00P.C (50 gk)Kg61,406.008,436.00Pasir pasangm30.01233,400.002,334.00Pekerjaorg142,000.0042,000.00Tukang batuorg165,000.0065,000.00Kepala Tukangorg0.175,000.007,500.00Mandororg0.00180,000.0080Perlengkapan 30 % harga urinoirlot0.31,773,400.00532,020.00Jumlah2,430,770.00Dibulatkan2,430,770.00M-031 Buah Wastafelwastafel standarunit11,012,700.001,012,700.00P.C (50 gk)Kg61,406.008,436.00Pasir pasangm30.01233,400.002,334.00Pekerjaorg1.242,000.0050,400.00Tukang batuorg1.4565,000.0094,250.00Kepala Tukangorg0.1575,000.0011,250.00Mandororg0.180,000.008,000.00Perlengkapan 12 % harga wastafellot0.121,773,400.00212,808.00Jumlah1,400,178.00Dibulatkan1,400,178.00M-041 Buah bak Mandi Fibreglass Volume 0,30 m3Bak fibreglass 0.60m x 0.60mbh1255,300.00255,300.00Pekerjaorg1.842,000.0075,600.00Tukang batuorg2.765,000.00175,500.00Kepala Tukangorg0.5475,000.0040,500.00Mandororg0.1180,000.008,800.00Perlengkapan 18 % harga baklot0.18255,300.0045,954.00Jumlah601,654.00Dibulatkan601,654.00M-051 M' Saluran Air Limbah Buis beton d = 30 cm - 60 cmBuis beton 30 cmbh1.161,700.0067,870.00Bata merahbh2577519,375.00P.C (50 gk)Kg10.31,406.0014,481.80Pasir pasangm30.061233,400.0014,237.40Pasir urugm30.069175,300.0012,095.70Pekerjaorg0.3842,000.0015,960.00Tukang batuorg0.1965,000.0012,350.00Kepala Tukangorg0.01975,000.001,425.00Mandororg0.01980,000.001,520.00Jumlah159,314.90Dibulatkan159,315.00M-061 Buah Bak Kontrol Pas Bata Merah Uk (60 x 60) cmBata merahbh186775144,150.00P.C (50 gk)Kg1141,406.00160,284.00Pasir pasangm30.184233,400.0042,945.60Batu pecah 2/3m30.033211,100.006,966.30Besi betonm34.8516,500.0080,025.00Pasir betonm30.12255,400.0030,648.00Pekerjaorg2.1642,000.0090,720.00Tukang batuorg0.7265,000.0046,800.00Kepala Tukangorg0.07275,000.005,400.00Mandororg0.10880,000.008,640.00Tukang galiorg0.142,000.004,200.00Jumlah620,778.90Dibulatkan620,779.00M-071 Buah Bak Kontrol Pas Bata Merah Uk (30 x 30) cmBata merahbh5377541,075.00P.C (50 gk)Kg441,406.0061,864.00Pasir pasangm30.07233,400.0016,338.00Batu pecah 2/3m30.07211,100.0014,777.00Besi betonm31.616,500.0026,400.00Pasir betonm30.06255,400.0015,324.00Pekerjaorg3.242,000.00134,400.00Tukang batuorg1.01565,000.0065,975.00Kepala Tukangorg0.001575,000.00112.5Mandororg0.01680,000.001,280.00Jumlah377,545.50Dibulatkan377,546.00M-081 M' Pipa PVC 1/2" (AW)Pipa pvc 1/2"m'1.210,025.0012,030.00Pekerjaorg0.03642,000.001,512.00Tukang batuorg0.0665,000.003,900.00Kepala Tukangorg0.00675,000.00450Mandororg0.001880,000.00144Perlengkapan 35 % harga pipalot0.3512,030.004,210.50Jumlah22,246.50Dibulatkan22,247.00M-091 M' Pipa PVC 1" (AW)Pipa pvc 1"m'1.215,800.0018,960.00Pekerjaorg0.03642,000.001,512.00Tukang batuorg0.0665,000.003,900.00Kepala Tukangorg0.00675,000.00450Mandororg0.001880,000.00144Perlengkapan 35 % harga pipalot0.3518,960.006,636.00Jumlah31,602.00Dibulatkan31,602.00M-101 M' Pipa PVC 11/2" (AW)Pipa pvc 11/2"m'1.226,475.0031,770.00Pekerjaorg0.03642,000.001,512.00Tukang batuorg0.0665,000.003,900.00Kepala Tukangorg0.00675,000.00450Mandororg0.001880,000.00144Perlengkapan 35 % harga pipalot0.3531,770.0011,119.50Jumlah48,895.50Dibulatkan48,896.00M-111 M' Pipa PVC 2" (AW)Pipa pvc 2"m'1.227,675.0033,210.00Pekerjaorg0.03642,000.001,512.00Tukang batuorg0.0665,000.003,900.00Kepala Tukangorg0.00675,000.00450Mandororg0.001880,000.00144Perlengkapan 35 % harga pipalot0.3531,770.0011,119.50Jumlah50,335.50Dibulatkan50,336.00M-121 M' Pipa PVC 4" (AW)Pipa pvc 4"m'1.286,975.00104,370.00Pekerjaorg0.08142,000.003,402.00Tukang batuorg0.13565,000.008,775.00Kepala Tukangorg0.013575,000.001,012.50Mandororg0.004180,000.00328Perlengkapan 35 % harga pipalot0.35104,370.0036,529.50Jumlah154,417.00Dibulatkan154,417.00M-131 M' Pipa PVC 3/4" (AW)Pipa pvc 3/4"m'1.213,050.0015,660.00Pekerjaorg0.08142,000.003,402.00Tukang batuorg0.13565,000.008,775.00Kepala Tukangorg0.013575,000.001,012.50Mandororg0.004180,000.00328Perlengkapan 35 % harga pipalot0.3515,660.005,481.00Jumlah34,658.50Dibulatkan34,659.00M-141 Buah Bak Cuci piring Stainless steelBak cuci stainless steel + asesoris lengkapbh1397,800.00397,800.00Pekerjaorg0.0342,000.001,260.00Tukang batuorg0.365,000.0019,500.00Kepala Tukangorg0.0375,000.002,250.00Mandororg0.001580,000.00120Jumlah420,930.00Dibulatkan420,930.00M-151 Buah Kran 1/2" - 3/4"Kran airbh140,900.0040,900.00Seal tapebh0.0254,200.00105Pekerjaorg0.0142,000.00420Tukang batuorg0.165,000.006,500.00Kepala Tukangorg0.0175,000.00750Mandororg0.00580,000.00400Jumlah49,075.00Dibulatkan49,075.00M-161 Buah Floor DrainFloor drainbh166,600.0066,600.00Pekerjaorg0.0142,000.00420Tukang batuorg0.165,000.006,500.00Kepala Tukangorg0.0175,000.00750Mandororg0.00580,000.00400Jumlah74,670.00Dibulatkan74,670.00M-171 M' Grafel beton U 20 cm -60 cmPipa beton Ubh1.144,300.0048,730.00Bata merahbh127759,300.00P.C (50 gk)zak0.1031,406.00144.82Pasir pasangm30.0305233,400.007,118.70Pasir urugm30.0345175,300.006,047.85Pekerjaorg0.0142,000.00420Tukang batuorg0.165,000.006,500.00Kepala Tukangorg0.0175,000.00750Mandororg0.00580,000.00400Jumlah79,411.37Dibulatkan79,411.00M-181 M' Pasang Talang Plastik PVC U 15 cm (AW)Talang plastik PVCm'1.0560,000.0063,000.00Perlengkapan 35 % harga talanglot0.3563,000.0022,050.00Pekerjaorg0.1542,000.006,300.00Tukang batuorg0.465,000.0026,000.00Kepala Tukangorg0.02575,000.001,875.00Mandororg0.001380,000.00100Jumlah119,325.00Dibulatkan119,325.00M-191 M' Saluran Air Limbah Buis Beton 60 cmBuis beton 60 cmbh1.1130,900.00143,990.00Bata merahbh2577519,375.00P.C (50 gk)zak0.2061,406.00289.64Pasir pasangm30.061233,400.0014,237.40Pasir urugm30.069175,300.0012,095.70Pekerjaorg0.3842,000.0015,960.00Tukang batuorg0.1965,000.0012,350.00Kepala Tukangorg0.01975,000.001,425.00Mandororg0.01980,000.001,520.00Jumlah221,242.74Dibulatkan221,243.00M-201 M' Pasang Talang Seng DatarSeng pelat 3" x 6"lbr0.520,801.0010,400.50Pakukg0.01523,400.00351Kayu kelas IIm30.00962,850,000.0027,360.00Meni besikg0.2530,400.007,600.00Pekerjaorg0.1542,000.006,300.00Tukang batuorg0.465,000.0026,000.00Kepala Tukangorg0.02575,000.001,875.00Mandororg0.001380,000.00100Jumlah79,986.50Dibulatkan79,987.00M-211 Buah Closet DudukCloset dudukbh11,724,700.001,724,700.00Pekerjaorg3.342,000.00138,600.00Tukang batuorg1.165,000.0071,500.00Kepala Tukangorg0.00175,000.0075Mandororg0.1680,000.0012,800.00Perlengkapan 6 % harga closetlot0.061,724,700.00103,482.00Jumlah2,051,157.00Dibulatkan2,051,157.00M-221 Buah Tangki Air fibreglass Volume 1 m3Bak fibreglass kapasitas 1 m3bh11,316,400.001,316,400.00Pekerjaorg3.342,000.00138,600.00Tukang batuorg1.165,000.0071,500.00Kepala Tukangorg0.00175,000.0075Mandororg0.1680,000.0012,800.00Perlengkapan 6 % harga baklot0.061,316,400.0078,984.00Jumlah1,618,359.00Dibulatkan1,618,359.00M-231 Unit Septictank 2x1,50x1,50 m + RembesanGalian tanahm34.526,252.00118,134.00Pasir urugm30.214175,300.0037,514.20lantai kerjam32.25716,798.001,612,795.50Pas bata adk 1pc : 3psm215220,267.103,304,006.50Pelat beton K-225m30.36,438,864.001,931,659.20Plesteran adk 1pc : 3psm21541,301.82619,527.30Pipa PVC 4" jenis AWm'5.4256,800.001,386,720.00Pipa GIP 1 1/2"m'546,750.00233,750.00Galian tanah untuk rembesanm33.37520,000.0067,500.00Pas ijukkg5.423,400.00126,360.00Urugan kerikil 3/5m31.05205,000.00215,250.00Pipa PVC 4" berlubang jenis AWm'936,700.00330,300.00Urugan dan perataan tanahm31.12534,584.0038,907.00Jumlah10,022,423.70Dibulatkan10,022,424.00M-241 Unit Septictank 1x1,50x1,50 m + RembesanGalian tanahm32.2520,000.0045,000.00Pasir urugm30.107175,300.0018,757.10lantai kerjam31.125716,798.00806,397.75Pas bata adk 1pc : 3psm27.5220,267.101,652,003.25Pelat beton K-225m30.156,438,864.00965,829.60Plesteran adk 1pc : 3psm27.541,301.82309,763.65Pipa PVC 4" jenis AWm'9256,800.002,311,200.00Pipa GIP 1 1/2"m'2.546,750.00116,875.00Galian tanah untuk rembesanm31.68820,000.0033,760.00Pas ijukkg2.723,400.0063,180.00Urugan kerikil 3/5m30.525205,000.00107,625.00Pipa PVC 4" berlubang jenis AWm'936,700.00330,300.00Urugan dan perataan tanahm30.56334,584.0019,470.79Jumlah6,780,162.14Dibulatkan6,780,162.00

Kembali ke Analisa SNI

Copyright @ 2014 softwarerab.com. All rights reserved

Contact | About | Sitemap | Privacy | XHTML- Feed | G+ | G++ | Valid RSS

Sheet15Analisa Harga Satuan Pekerjaan PengecatanDiposkan : 05 Juni 2014Oleh : Endang Kusman

No.URAIANSATVOLUMEHARGA SATHARGA

N-011 M2 Mengikis / Mengerok Permukaan Cat Tembok Lama-Soda apiKg0.0535,600.001,780.00-PekerjaOh0.1542,000.006,300.00-MandorOh0.002580,000.00200Jumlah8,280.00Dibulatkan8,280.00N-021 M2 Mendempul Dan Menggosok Kayu-DempulKg0.0835,800.002,864.00-Minyak catKg0.0238,400.00768-Batu apungKg0.0129,600.00296-PekerjaOh0.0442,000.001,680.00-Tukang catOh0.0465,000.002,600.00-Kepala tukangOh0.00475,000.00300-MandorOh0.002580,000.00200Jumlah8,708.00Dibulatkan8,708.00N-031 M2 Pengecatan Bidang Kayu Lama Setara Sieve-PlamirKg0.1525,000.003,750.00-Cat dasarKg0.1730,000.005,100.00-Cat penutup setara sieve 2xKg0.1741,700.007,089.00-PekerjaOh0.0742,000.002,940.00-Tukang catOh0.07565,000.004,875.00-Kepala tukangOh0.007575,000.00562.5-MandorOh0.002580,000.00200Jumlah24,516.50Dibulatkan24,517.00N-041 M2 Pengecatan Bidang Kayu Baru Setara Sieve-Cat meniKg0.230,400.006,080.00-PlamirKg0.1525,000.003,750.00-Cat dasarKg0.1730,000.005,100.00-Cat penutup 3x setara sieveKg0.3541,700.0014,595.00-PekerjaOh0.0742,000.002,940.00-Tukang catOh0.10565,000.006,825.00-Kepala tukangOh0.00475,000.00300-MandorOh0.002580,000.00200Jumlah39,790.00Dibulatkan39,790.00N-051 M2 Pelaburan Bidang Kayu dengan Politur-PoliturLtr0.1548,000.007,200.00-Politur jadiLtr0.372112,700.0041,924.40-AmpelasLbr25,000.0010,000.00-Tukang catOh0.0665,000.003,900.00-Kepala tukangOh0.01675,000.001,200.00-MandorOh0.002580,000.00200Jumlah64,424.40Dibulatkan64,424.00N-061 M2 Pelaburan Bidang Kayu dengan Cat Residu dan Ter-Residu atau terLtr0.358,100.002,835.00-PekerjaOh0.142,000.004,200.00-MandorOh0.00680,000.00480Jumlah7,515.00Dibulatkan7,515.00N-071 M2 Pengecatan Tembok Baru Setara ICI-Plamir tembokKg0.125,000.002,500.00-Cat dasarKg0.130,000.003,000.00-Cat penutup 2x setara ICIKg0.2675,000.0019,500.00-PekerjaOh0.0242,000.00840-Tukang catOh0.06365,000.004,095.00-Kepala tukangOh0.006375,000.00472.5-MandorOh0.002580,000.00200Jumlah30,607.50Dibulatkan30,608.00N-081 M2 Pengecatan Tembok Lama Setara ICI-Cat dasarKg0.1230,000.003,600.00-Cat penutup 2 xKg0.1875,000.0013,500.00-PekerjaOh0.02842,000.001,176.00-Tukang catOh0.04265,000.002,730.00-Kepala tukangOh0.004275,000.00315-MandorOh0.002580,000.00200Jumlah21,521.00Dibulatkan21,521.00N-091 M2 Pengecatan Plafond ( 3x ) Setara ICI-Cat tembok setara ICIKg0.275,000.0015,000.00-Plamir tembokKg0.1625,000.004,000.00-Rol catBh0.0132,500.00325-Steger werkLs11,000.001,000.00-AmpelasLbr0.55,000.002,500.00-PekerjaOh0.242,000.008,400.00-Tukang catOh0.365,000.0019,500.00-Kepala tukangOh0.0375,000.002,250.00-MandorOh0.0180,000.00800Jumlah53,775.00Dibulatkan53,775.00N-101 M2 Pengecatan Plafond ( 3x ) Setara Vinilex-Cat tembok setara VinilexKg0.225,000.005,000.00-Plamir tembokKg0.1625,000.004,000.00-Rol catBh0.0132,500.00325-Steger werkLs11,000.001,000.00-AmpelasLbr0.55,000.002,500.00-PekerjaOh0.242,000.008,400.00-Tukang catOh0.365,000.0019,500.00-Kepala tukangOh0.0375,000.002,250.00-MandorOh0.0180,000.00800Jumlah43,775.00Dibulatkan43,775.00N-10-r'1 M2 Pengecatan Plafond ( 2x ) Setara Vinilex-Cat tembok setara VinilexKg0.1325,000.003,250.00-Plamir tembokKg0.1125,000.002,750.00-Rol catBh0.132,500.003,250.00-Steger werkLs0.671,000.00670-AmpelasLbr0.335,000.001,650.00-PekerjaOh0.1342,000.005,460.00-Tukang catOh0.265,000.0013,000.00-Kepala tukangOh0.0275,000.001,500.00-MandorOh0.0180,000.00800Jumlah32,330.00Dibulatkan32,330.00N-111 M2 Memasang Wallpaper-Wallpaperm21.255,700.0066,840.00-Lem PerekatKg0.2535,700.008,925.00-PekerjaOh0.3542,000.0014,700.00-Tukang catOh0.17565,000.0011,375.00-Kepala tukangOh0.01775,000.001,275.00-MandorOh0.001780,000.00136Jumlah103,251.00Dibulatkan103,251.00N-121 M2 Pengecatan Permukaan Baja dengan Meni Besi-Meni besiKg0.130,400.003,040.00-Kuas 3"Bh0.0116,000.00160-PekerjaOh0.0242,000.00840-Tukang catOh0.265,000.0013,000.00-Kepala tukangOh0.0275,000.001,500.00-MandorOh0.0180,000.00800Jumlah19,340.00Dibulatkan19,340.00N-131 M2 Pengecatan Permukaan Baja dengan Meni Besi dan Perancah-Meni besiKg0.130,400.003,040.00-Kuas 3"Bh0.0116,000.00160-Kayu perancahm30.0022,069,800.004,139.60-PekerjaOh0.2542,000.0010,500.00-Tukang catOh0.22565,000.0014,625.00-Kepala tukangOh0.022575,000.001,687.50-MandorOh0.007580,000.00600Jumlah34,752.10Dibulatkan34,752.00N-141 M2 Pengecatan Permukaan Baja Lapis seng (galbani) secara manual 1 lps cat 2 um-Cat besi setara ICIKg0.367,700.0020,310.00-PekerjaOh0.00642,000.00252-Tukang catOh0.0665,000.003,900.00-Kepala tukangOh0.01275,000.00900-MandorOh0.00680,000.00480Jumlah25,842.00Dibulatkan25,842.00N-151 M2 Pengecatan Tembok Baru Setara Vinilex (2 x laburan)-Plamir tembokKg0.125,000.002,500.00-Cat dasarKg0.130,000.003,000.00-Cat penutup 2x setara vinilexKg0.2625,000.006,500.00-PekerjaOh0.0242,000.00840-Tukang catOh0.06365,000.004,095.00-Kepala tukangOh0.006375,000.00472.5-MandorOh0.002580,000.00200Jumlah17,607.50Dibulatkan17,608.00N-15r'1 M2 Pengecatan Tembok Baru Setara Vinilex (3 x laburan)-Plamir tembokKg0.125,000.002,500.00-Cat dasarKg0.130,000.003,000.00-Cat penutup 3x setara vinilexKg0.3925,000.009,750.00-PekerjaOh0.0342,000.001,260.00-Tukang catOh0.094565,000.006,142.50-Kepala tukangOh0.009575,000.00712.5-MandorOh0.003880,000.00304Jumlah23,669.00Dibulatkan23,669.00N-161 M2 Pengecatan Tembok Lama Setara Vinilex-Cat dasarKg0.1230,000.003,600.00-Cat penutup 2 xKg0.1825,000.004,500.00-PekerjaOh0.02842,000.001,176.00-Tukang catOh0.04265,000.002,730.00-Kepala tukangOh0.004275,000.00315-MandorOh0.002580,000.00200Jumlah12,521.00Dibulatkan12,521.00

Kembali ke AHS-SNI

Sheet16Analisa Harga Satuan Pekerjaan Penanaman PohonDiposkan : o6 Juni2014Oleh : Endang Kusman

NO.URAIANKOEFSAT.HARGA SAT. (Rp)HARGA (Rp)O-011 Lubang (70x70x70) cm, tanam pohon pelindung tinggi 2mPupuk kandang0.08krg25,000.002,000.00Furadan0.001kg24,000.0024Pohon pelindung1btng25,000.0025,000.00Pekerja0.025org42,000.001,050.00Mandor0.0025org80,000.00200Jumlah28,274.00Dibulatkan28,274.00O-021 Lubang (70x70x70) cm, tanam bambu krisik/jepangPupuk kandang0.08krg25,000.002,000.00Furadan0.001kg24,000.0024Bambu krisik/jepang1btng50,000.0050,000.00Pekerja0.025org42,000.001,050.00Mandor0.0025org80,000.00200Jumlah53,274.00Dibulatkan53,274.00O-031 Lubang (40x40x40) cm, tanam pohon perdu (polibag)Pupuk kandang0.04krg25,000.001,000.00Furadan0.001kg24,000.0024Pohon perdu1btng10,000.0010,000.00Pekerja0.02org42,000.00840Mandor0.002org80,000.00160Jumlah12,024.00Dibulatkan12,024.00O-041 M2 Tanam rumput gajah (silang papan catur)Pupuk kandang0.04krg25,000.001,000.00Rumput gajah mini0.5m215,000.007,500.00Pekerja0.04org42,000.001,680.00Mandor0.004org80,000.00320Jumlah10,500.00Dibulatkan10,500.00

Kembali ke AHA-SNI

Sheet17Harga Satuan Pekerjaan KonstruksiDiposkan : 06 Junii 2014Oleh : Endang KusmanNOURAIAN PEKERJAANHARGA (RP)A.PEKERJAAN PERSIAPAN11 M' Pagar Sementara Dari Kayu Tinggi 2 m269,316.0021 M' Pagar Sementara Seng Gelombang Tinggi 2 m355,236.0031 M' Pagar SementaraKawat Duri Tinggi 1,80 m222,843.0041 M2 Pengukuran Dan Pasang Bouwplank49,266.0051 M2 Pembuatan Kantor Sementara dgn Lantai Diplester1,135,066.0061 M2 Pembuatan Gudang Semen dan Alat-alat927,350.0071 M2 Pembuatan Bedeng Buruh861,935.0081 M2 Membersihkan Lapangan dan Perataan8,200.0091M2 Pembuatan Jalan Sementara96,799.00101 M3 Bongkaran Beton Bertulang306,654.00111 M3 Bongkaran Dinding Tembok Bata Merah282,654.00121 M Pagar beton Pracetak ( 5 x 50 x 213 ) cm474,296.00131 M Pagar kawat ayam tiang besi L50.50.5, tinggi 1 m'166,813.00141 M2 Pagar BRC lengkap dengan tiang265,378.00151 M2 Steiger Werk / perancah dari Bambu43,645.00161 M' Cerucuk Bambu54,250.00

B.PEKERJAAN TANAH11 M3 Galian Tanah Biasa sedalam 1 m20,000.0021 M3 Galian Tanah Biasa Sedalam 2 m26,252.0031 M3 Galian Tanah Biasa Sedalam 3 m36,710.0041 M3 Galian Tanah Keras Sedalam 1 m31,210.0051 M3 Galian Tanah Lumpur Sedalam 1 m41,206.0061 M2 Pekerjaan Stripping Setinggi 10 cm2,500.0071 M3 Pembuangan Tanah sejauh 150 m25,672.0081 M3 Urugan Kembali9,584.0091 M3 Pemadatan Tanah25,000.00101 M3 Urugaan Pasir223,760.00111 M2 Pemasangan Lapisan Ijuk Tebal 10 cm33,900.00121 M3 Urugan Sirtu256,700.00131 M3 Urugan Tanah Pilihan119,540.00141 M2 Pembuatan jalan sementara, tebal 25 cm120,456.00

C.PEKERJAAN PONDASI11 M3 Pasanag Pondasi batu Kali adk 1pc : 3 ps735,761.0021 M3 Pasang Pondasi Batu kali adk 1pc : 4ps689,096.0031 M3 Pasang Pondasi Batu kali adk 1pc : 5ps656,736.0041 M3 Pasang Pondasi Batu Kosong (aanstamping)363,345.0051 M3 Beton siklop adk 1pc : 2ps : 3kr + 40 % Batu Belah dgn besi tulangan2,020,939.0061 M3 Pasang Pondasi Sumuran adk 1pc:2ps:3kr + 40 % Batu Belah (D= 1m)870,632.0071 M3 Pondasi siklop adk 1pc:2ps:3kr + 40 % Batu Belah761,279.0081 M' Pembuatan Tiang Pancang (40x40) cm, Beton Tulang1,104,309.0091 M' Pembuatan Tiang Pancang (35x35) cm, Beton Tulang864,246.00101 M' Pembuatan Tiang Pancang f 40 cm, Beton Tulang1,073,335.00111 M' Memancang Tiang Pancang Beton Tulang128,057.00121 Buah Memotong Tiang Pancang (40x40) cm Beton Tulang216,932.00131 M' Menyambung Tiang Pancang Beton Bertulang628,577.00

D.PEKERJAAN BETON11 M3 Membuat Beton Tumbuk adk 1pc:3ps:5kr716,798.0021 M3 Membuat Beton Tumbuk adk 1pc:3ps:6kr689,279.0031 M3 Membuat Beton Tumbuk 1pc:2ps:3kr970,698.0041 M3 Membuat Tiang Pancang Beton Prestressed1,047,667.0051 M3 Membuat Beton Tumbuk adk 1pc:2ps:4kr914,882.0061 M Memasang PVC Waterstop Lebar 200 mm65,593.0071 Kg Pembesian Dengan Besi Polos/ulir18,566.0081 M2 Pasang Bekesting Untuk Pondasi152,870.0091 M2 Pasang Bekisting Untuk Sloof167,120.00101 M2 Pasang Bekesting Untuk Kolom308,850.00111 M2 Pasang Bekesting Untuk Balok316,770.00121 M2 Pasang Bekesting Untuk Lantai431,850.00131 M2 Pasang Bekesting Untuk Tangga289,440.00141 M3 Membuat Beton Cor Mutu K-2251,197,898.00151 M3 Membuat Beton Cor Mutu K-2751,186,807.00161 M3 Pondasi Beton Tulang (150 kg besi + bekisting)4,248,004.00171 M3 Sloof Beton Tulang (200 kg besi + bekisting)5,441,279.001 M3 Sloof Beton Tulang 15/20 (150 kg besi + bekisting)4,616,279.001 M3 Sloof Beton Tulang 15/20 (180 kg besi + bekisting) 4dia. 12 ring 8-155,078,279.001 M3 Sloof Beton Tulang 20/30 (150 kg besi + bekisting) Struktur bertingkat 4dia.16 8-154,583,279.001 M3 Sloof Beton Tulang 20/30 (200 kg besi + bekisting) Struktur bertingkat 6dia.16 8-155,408,279.001 M3 Sloof Beton Tulang 20/40 (240 kg besi + bekisting) Struktur bertingkat6,101,279.00

181 M3 Kolom Beton Tulang (120 kg besi + bekisting)6,646,664.001 M3 Kolom Beton Tulang 20/20 (140 kg besi + bekisting) 4dia. 12 8-156,573,014.001 M3 Kolom Beton Tulang 15/20 (180 kg besi + bekisting) 4dia.12 8-157,233,014.001 M3 Kolom Beton Tulang Praktis 12/12 (175 kg besi + bekisting)6,225,664.001 M3 Kolom Beton Tulang Praktis 12/12 (210 kg besi + bekisting)6,803,164.001 M3 Kolom Beton Tulang 20/20 (210 kg besi + bekisting) Struktur bertingkat 4dia.16 8-157,728,014.001 M3 Kolom Beton Tulang 20/30 (230 kg besi + bekisting) Struktur bertingkat 6dia.16 +2dia.12, 8-158,058,014.001 M3 Kolom Beton Tulang 20/40 (250 kg besi + bekisting) Struktur bertingkat8,498,014.001 M3 Kolom Beton Tulang 30/30 (175 kg besi + bekisting) Struktur bertingkat 8dia.16, 8-157,150,514.001 M3 Kolom Beton Tulang 30/40 (200 kg besi + bekisting) Struktur bertingkat7,673,014.00191 M3 Kolom Beton Tulang (140 kg besi + bekisting)6,691,324.00201 M3 Kolom Beton Tulang (150 kg besi + bekisting)6,864,634.00211 M3 Kolom Beton Tulang (180 kg besi + bekisting)7,367,944.00221 M3 Kolom Beton Tulang (200 kg besi + bekisting)7,706,254.00231 M3 Kolom Beton Tulang (250 kg besi + bekisting)8,552,029.00241 M3 Kolom Beton Tulang (300 kg besi + bekisting)9,397,804.00251 M3 Balok Beton Tulang (120 kg besi + bekisting)5,693,859.00261 M3 Balok Beton Tulang 15/20 (150 kg besi + bekisting)6,201,324.001 M3 Balok Beton Lintel 11/11 (300 kg besi + bekisting) 4dia.10 8-158,288,164.001 M3 Balok Beton Lintel 11/15 (234 kg besi + bekisting) 4dia.10 8-157,199,164.001 M3 Balok Beton Tulang 15/20 (180 kg besi + bekisting) 4dia. 12, 8-156,608,324.001 M3 Balok Beton Tulang 15/30 (190 kg besi + bekisting) Struktur bertingkat 4dia. 16, 8-156,773,324.00271 M3 Balok Beton Tulang 20/40 (200 kg besi + bekisting) Struktur bertingkat 7dia.16+2dia.12, 8-156,959,099.001 M3 Balok Beton Tulang 20/30 (200 kg besi + bekisting) Struktur bertingkat 6dia. 16, 8-156,959,099.001 M3 Balok Beton Tulang 20/30 (175 kg besi + bekisting) Struktur bertingkat 5dia. 16, 8-156,628,499.001 M3 Balok Beton Tulang 25/55 (140 kg besi + bekisting) Struktur bertingkat 8dia.16 +2dia.12, 8-155,969,099.00

281 M3 Balok Beton Tulang (230 kg besi + bekisting)7,554,564.00291 M3 Tangga Beton Tulang (200 kg besi + bekisting)6,575,339.00301 M3 Pelat Lantai Beton Tulang T= 10 cm (90 kg besi + bekisting)6,904,322.001 M3 Lisplang Beton Tulang T= 8 cm (77,5 kg besi + bekisting)6,672,247.00311 M3 Pelat Lantai Beton Tulang T= 12 cm (110 kg besi + bekisting) dia.8-12,56,554,453.00321 M3 Pelat Lantai Beton Tulang T= 12 cm (130 kg besi + bekisting)6,925,773.00331 M3 Pelat Lantai Beton Tulang T= 15 cm (90 kg besi + bekisting)5,466,262.00341 M3 Pelat Lantai Beton Tulang T= 15 cm (115 kg besi + bekisting)5,930,412.00351 M' Kolom Praktis Beton Tulang (11x11) cm72,847.00361 M' Ring Balok Beton Tulang (10x15) cm94,786.00371 M2 Pasang Bekesting Untuk Dinding315,287.00381 M3 Pelat Beton Tulang (150 kg besi + bekisting)6,438,864.00391 M3 Dinding Beton Tulang (150 kg besi + bekisting)6,196,529.00401 M3 Dinding Beton Tulang (200 kg besi + bekisting)6,574,999.00411 M3 Membuat Beton Cor Mutu K-300928,986.00421 M3 Membuat Beton Cor Mutu K-200852,609.00431 M3 Membuat Beton Cor Mutu K-250892,501.00

E.PEKERJAAN PASANGAN DINDING11 M2 Pasang Bata Merah Tebal 1 Bata, 1pc : 3ps220,267.0021 M2 Pasang Bata Merah Tebal 1 Bata, 1pc : 4ps211,736.0031 M2 Pasang Bata Merah Tebal 1 Bata, 1pc : 5ps207,720.0041 M2 Pasang Bata Merah Tebal 1/2 Bata, 1pc : 3ps105,680.0051 M2 Pasang Bata Merah Tebal 1/2 Bata, 1pc : 4ps102,345.0061 M2 Pasang Bata Merah Tebal 1/2 Bata, 1pc : 5ps100,253.0071 M2 Pasang Dinding Roster Beton 20 x 20 adk 1pc : 3ps580,016.0081 M2 Pasang Dinding Roster Beton 20 x 20 adk 1pc : 4ps577,485.0091 M2 Pasang Dinding Roster/terawng (12 x 11 x 24) cm580,016.00101 M2 Pasang Dinding Batako Besar Pres uk. 8x20x30 adk. 1pc:4ps46,791.00111 M2 Pasang Dinding hollowblock (HB-20)151,794.00121 M2 Pasang Dinding hollowblock (HB-15)129,077.00131 M2 Pasang Dinding hollowblock (HB-10)109,862.00141 M2 Pasang Dinding Conblock (CB-20)190,791.00151 M2 Pasang Dinding Conblock (CB-15)117,281.00161 M2 Pasang Dinding Conblock (CB-10)104,781.00171 M2 Dinding Keramik Corak 10 x 20 cm Setara Mulia108,782.00181 M2 Dinding Keramik polos 10 x 20 cm Setara Mulia107,282.00191 M2 Dinding Keramik corak 20 x 20 cm setara Mulia115,282.00201 M2 Dinding Keramik polos 20 x 20 cm Setara Mulia107,282.00211 M2 Dinding Keramik polos 20 x 25 cm Setara Mulia107,282.00221 M2 Dinding Keramik Corak 20 x 25 cm Setara Mulia115,282.00231 M2 Dinding Keramik Polos 30 x 30 cm Setara Mulia105,782.00241 M2 Dinding Keramik Corak 30 x 30 cm Setara Mulia110,782.00251 M2 Dinding Keramik Polos 40 x 40 cm Setara Mulia109,582.00261 M2 Dinding Keramik Corak 40 x 40 cm Setara Mulia118,282.00271 M2 Dinding Keramik Corak 10 x 20 cm Setara Roman124,982.00281 M2 Dinding Keramik polos 10 x 20 cm Setara Roman117,182.00291 M2 Dinding Keramik corak 20 x 20 cm setara Roman127,982.00301 M2 Dinding Keramik polos 20 x 20 cm Setara Roman117,182.00311 M2 Dinding Keramik polos 20 x 25 cm Setara Roman125,682.00321 M2 Dinding Keramik Corak 20 x 25 cm Setara Roman127,982.00331 M2 Dinding Keramik Polos 30 x 30 cm Setara Roman121,682.00341 M2 Dinding Keramik Corak 30 x 30 cm Setara Roman129,382.00351 M2 Dinding Keramik Polos 40 x 40 cm Setara Roman125,282.00361 M2 Dinding Keramik Corak 40 x 40 cm Setara Roman129,782.00371 M2 Dinding Marmer689,841.00381 M2 Dinding Batu Tempel Hitam179,935.00391 M2 Dinding Porselen (11 x 11) cm116,082.00401 M2 Wall paper94,920.00411 M2 Dinding Pemisah Teakwood Rangkap, Rangka Kayu Kamper Medan329,174.00421 M2 Dinding Pemisah Plywood Rangkap, Rangka Kayu Kamper Medan431,147.00431 M2 Dinding Pemisah Triplek 4 mm Rangkap, Rangka Kayu Kamper Medan284,431.00441 M2 Dinding Pemisah GRC t = 4 mm + rangka besi hollow92,049.00451 M2 Dinding Pemisah Plywood t = 4 mm + rangka besi hollow140,691.00461 M2 Dinding Pemisah teakwood t = 4 mm + rangka besi hollow103,090.00471 M2 Pasang Dinding Glass Block 20 x 20 adk 1pc : 4ps836,685.00481 M2 Pasang Dinding anyaman bambu, rangka kayu105,137.00

F.PEKERJAAN PLESTERAN DAN SIARAN171 M2 Plesteran adk. 1pc : 2ps Tebal 15 mm36,022.00181 M2 Plesteran adk. 1pc : 3ps Tebal 15 mm33,620.00191 M2 Plesteran adk. 1pc : 4ps Tebal 15 mm32,054.00201 M2 Plesteran adk. 1pc : 3ps Tebal 20 mm47,253.00211 M2 Plesteran adk. 1pc : 4ps Tebal 20 mm44,739.00221 M2 Plesteran adk. 1pc:5ps tebal 20 mm42,318.001 M2 Plesteran adk. 1pc:5ps tebal 15 mm + Acian31,284.00231 M2 Berapen adk. 1pc : 5ps Tebal 15 mm25,355.00241 M2 Plesteran Beton adk. 1pc : 2ps Tebal 15 mm43,737.00251 M2 Plesteran Beton adk. 1pc : 3ps Tebal 15 mm41,302.00261 M2 Plesteran Skoning adk. 1pc : 2ps, tebal 10mm36,417.00271 M2 Acian Plesteran20,213.00281 M2 Plesteran Siar adk. 1pc : 2ps batu belah36,390.00291 M2 Plesteran Siar adk. 1pc : 2ps dinding bata merah21,823.00

G.PEKERJAAN ATAP11 M2 Pasang Atap Genteng Palentong59,915.0021 M2 Pasang Genteng Bubung Palentong80,177.0031 M2 Pasang Roof Light Fibreglass ( 180 x 90 ) cm72,510.0041 M2 Pasang Atap Asbes Gelombang ( 3,00 x 1,05 m ) x 4 mm42,371.0051 M2 Pasang Atap Asbes Gelombang ( 2,70 x 1,05 m ) x 4 mm45,157.0061 M2 Pasang Atap Asbes Gelombang ( 2,40 x 1,05 m ) x 4 mm43,172.0071 M2 Pasang Atap Asbes Gelombang ( 2,10 x 1,05 m ) x 4 mm44,011.0081 M2 Pasang Atap Asbes Gelombang ( 1,50 x 1,05 m ) x 4 mm48,016.0091 M Pasang Nok Stel Gelombang 1,05 m97,758.00101 M2 Pasang Atap Genteng Beton110,652.00111 M2 Pasang Atap Genteng Murando Natural61,015.00121 M2 Pasang Atap Genteng Murando Glazur84,415.00131 M2 Pasang Atap Genteng Metal227,572.00141 M Pasang Nok Genteng Beton109,174.00151 M Pasang Nok Genteng Metal175,955.00161 M2 Pasang Atap Seng Gelombang68,516.00171 M2 Pasang Atap Nok Seng24,132.00181 M2 Pasang Alluminium Foil / Sisalation31,145.00191 M2 Pasang Atap Alluminium Natural204,160.00201 M2 Pasang Atap Alluminium warna229,465.00211 M2 Pasang Nok Alluminium161,550.00221 M' Pasang Lisplank GRC ukuran 30 cm43,125.001 M' Pasang Nok Pinggir30,000.00

H.PEKERJAAN LANGIT-LANGIT11 M2 Langit-langit Asbes ( 1,00 x 1,00 ) m, tebal 5 mm31,443.0021 M2 Langit-langit Asbes ( 1,00 x 1,00 ) m, tebal 3,5 mm28,143.0031 M2 Langit-langit Akustik ( 60 x 120 ) cm210,400.0041 M2 Langit-langit Akustik ( 60 x 120 ) cm + Rangka Alluminium298,060.0051 M2 Langit-langit teakwood (60 x 120) cm, t = 4 mm + rangka kayu borneo super154,907.0061 M2 Langit-langit Teakwood 3 mm + Rangka Kayu Borneo Super153,893.0071 M2 Langit-langit Triplek 4 mm + Rangka Kayu Borneo Super128,684.0081 M2 Langit-langit Gypsum Board, tebal 9 mm + rangka besi hollow93,960.0091 M2 Langit-langit GRC t = 4 mm + rangka besi hollow91,408.00101 M2 Langit-langit gypsum t = 9 mm + Rangka Kayu Borneo Super136,615.00111 M2 Langit-langit GRC t = 4 mm + Rangka Kayu Borneo Super133,743.00121 M List Langit-langit Kayu Profil 10 cm37,073.00131 M List Langit-langit Gypsum 10 cm16,765.001 M List Langit-langit Kayu 1/4 cm7,500.00

I.PEKERJAAN LANTAI11 M2 Lantai Ubin Granito ukuran 40 x 40 cm Setara Essenza421,657.0021 M2 Lantai Ubin Granito ukuran 30 x 30 cm Setara Essenza402,591.0031 M Plint Ubin Granito ukuran 10 x 40 cm Setara Essenza82,032.0041 M Plint Ubin Granito ukuran 10 x 30 cm Setara Essenza101,549.0051 M2 Lantai Keramik Corak 10 x 20 cm setara Mulia92,670.0061 M2 Lantai Keramik corak 20 x 20 cm setara Mulia99,170.0071 M2 Lantai Keramik polos 30 x 30 cm setara Mulia89,670.0081 M2 Lantai Keramik corak 30 x 30 cm Setara Mulia94,670.0091 M2 Lantai Keramik polos 40 x 40 cm Setara Mulia93,470.00101 M2 Lantai Keramik corak 40 x 40 cm Setara Mulia102,170.00111 M2 Lantai Keramik Corak 10 x 20 cm setara Roman108,870.00121 M2 Lantai Keramik corak 20 x 20 cm setara Roman111,870.00131 M2 Lantai Keramik polos 30 x 30 cm setara Roman105,570.00141 M2 Lantai Keramik corak 30 x 30 cm Setara Roman113,270.00151 M2 Lantai Keramik polos 40 x 40 cm setara Roman109,170.00161 M2 Lantai Keramik corak 40 x 40 cm Setara Roman113,670.00171 M2 Lantai Marmer672,798.00181 M2 Lantai Parquet Jati475,845.00191 M Plint Keramik ukuran (10 x 40) cm19,492.00201 M Plint Keramik ukuran (10 x 30) cm27,552.00211 M' Plint kayu kamper Samarinda (2 x 10) cm36,348.00221 M' Plint keramik ukuran (10 x 20) cm29,301.00231 M2 Lantai karpet403,815.00241 M2 Paving block natural 8 cm153,570.00251 M2 Paving block warna 8 cm182,445.00261 M2 Paving block natural 6 cm148,215.00271 M2 Paving block warna 6 cm158,715.00281 M2 Grass Block 20 x 20323,040.00291 M2 Grass Block 30 x 30330,990.00

J.PEKERJAAN KAYU11 M3 Kusen Pintu & jendela kayu Kamper Samarinda11,956,440.0021 M3 Kusen Pintu & jendela kayu Kamper Medan/Kruing8,427,120.0031 M3 Kusen Pintu & jendela kayu Borneo Super7,932,000.0041 M2 Pintu Panel Kayu Kamper Samarinda573,768.0051 M2 Pintu Panel Kayu Kamper Medan/Kruing456,124.0061 M2 Pintu & Jendela Kaca Kayu Kamper Medan381,041.0071 M2 Pintu & Jendela Kaca Kayu Borneo377,653.0081 M2 Pintu & Jendela Jalusi Kayu Kamper Medan663,826.0091 M2 Pintu Triplek Rangkap, Rangka Tertutup Kayu Kamper Medan356,459.00101 M2 Jalusi Mati Kusen Kayu kamper Medan513,126.00111 M2 Pintu Triplek Rangkap, Rangka Kayu Borneo Super354,562.00121 M2 Pintu Teakwood Rangkap, rangka Kayu Kamper Medan430,185.00131 M2 Pintu Triplek & Formika, Rangka Kayu Kamper Medan486,735.00141 M2 Pintu Teakwood & Formika, Rangka Kayu Kamper Medan (dipolitur)606,635.00151 M3 Kuda-kuda Kayu Kamper Medan7,736,900.00161 M3 Kuda-kuda Kayu Borneo Super7,283,040.00171 M2 Kaso + Reng Genteng Plentong Kayu Borneo Super78,780.00181 M2 Kaso + Reng Genteng Beton Kayu Borneo Super89,340.00191 M' Lisplang uk (3x20)cm, Kayu Kamper Medan62,218.00201 M' Lisplang uk (3x30)cm, Kayu Kamper Medan84,779.00211 M List Plafond + kayu Profil 10 cm33,347.00221 M2 Pekerjaan partisi172,437.00231 M2 Rangka Langit-langit (1,00 x 1,00) m, Kayu borneo super64,485.00241 M2 Rangka langit-langit ( 0,50 x 1,00 ) m, Kayu Borneo Super79,466.00251 M' Reuter Kayu kamper Medan29,660.00261 M3 Gording kayu kelas II7,367,660.00271 M