TRANSCRIPT

RENCANA/ RELISASI PENGADAAN TA 2009 *

Unit Kerja

No Kode Nama PaketEstimasi

Biaya (Rp)

Estimasi Biaya

eqv(US$)

Metode Pengadaan

1 2 3 4 5 6

I KEGIATAN YANG DIBIAYAI LOAN & GOI/ PENDAMPING

RIM B (Category 6)

Sub Prject A1 (Category 7)

Sub Prject A2 (Category 8)

Consulting Services (Category 3)

Training, Workshop (Category 4)

RIM A (Category 5)

Water Resources and Irrigation Sector Management Project (WISMP) APL IKomponen B & C

Civil Works (Category 1)

Goods (Category 2)

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

II KEGIATAN YANG DIBIAYAI GOI (PARALEL FINANCING/APBD)

Sub Total Keg Cat 3 (Loan + Pend) - -Sub Total Keg Selain Cat 3 (Loan) - -TOTAL KEGIATAN I (Loan + Pend) - -

TOTAL KEGIATAN II (GOI-PF/APBD) - 0

KETERANGAN : 1 US$ = Rp. 8.500 PETUNJUK PENGISIANI. Kegiatan yang dibiayai (Loan + GOI pendamping/APBN)

1. Force Account (FA) untuk pekerjaan Rim - B < Rp. 127,500,0002. Comm. Driven Development (CDD) untuk pek Irigasi < Rp. 425,000,0003. Small Works (SW) < Rp. 212,500,0004. National Competitive Bidding (NCB) < Rp. 4,250,000,000

Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > dalam Rp2. Pengadaan Barang (Goods) :

1. National Shopping (NS) < Rp. 212,500,000 Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > eqv. US$ 2. National Competitive Bidding (NCB) < Rp. 1,700,000,000

3. Pengadaan Konsultan (Consulting Services) :1. Consultant Qualification Selection (CQS) < Rp. 850,000,0002. Quality and Cost Based Selection (QCBS) < Rp. 3,400,000,0003. Quality Based Selection (QBS) < Rp. 3,400,000,0004. Individual Consultant (IC) < Rp. 425,000,000 Bila sudah terkontrak, agar diisi

* dilaporkan setiap triwulan oleh para PIU / KPIU ke NPMU melalui PPMU/KPMU

** Untuk Prior Review Kontrak I: dipilih salah satu paket untuk minta persetujuan NOL Bank Dunia, Bila sudah terkontrak, agar diisi paket lainnya cukup Post Review, & dilaksanakan setelah paket yang pertama mendapat NOLII. Kegiatan yang dibiayai GOI (Paralel Financing/APBD)(termasuk paket kontrak I pekerjaan sejenis sudah mendapat NOL pada TA sebelumnya).

Categary yang tidak ada tidak perlu ditulis

1. Pekerjaan Konstruksi (Civil Works) :

Sub Prject B1/B2 (Category 9)

Status : Januari 2009

Post/ Prior Review

Pengumuman

Pengadaan

Pemasukan

PenawaranEval/ Nego

Penandata-nganan Kontrak

Jangka Waktu

Kontrak

Keterangan: Permasalahan/

7 8 9 10 11 12 13

PETUNJUK PENGISIANI. Kegiatan yang dibiayai (Loan + GOI pendamping/APBN)

Kolom 1 : Nomor UrutKolom 2: Kode pengadaan, mis. barang : Gd 1, Gd 2, konstruksi : CW 1, CW 2, konsultan : CS 1, dstKolom 3: Nama paket pekerjaan, agar ditulis setiap paketKolom 4: Selain Category 3: Estimasi biaya (Loan 100%) > dalam Rp

Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > dalam RpKolom 5: Selain Category 3: Estimasi biaya (Loan 100%) > eqv. US$

Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > eqv. US$ Kolom 6: Metoda Pengadaan, mis NS, DC, NCB, ICB, SW, CDD, CQS, QCBS, SSS, QBS, ICKolom 7: Post Review, Prior Review Kontrak I **, Prior ReviewKolom 8: Rencana pengumuman (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn)Kolom 9: Rencana pemasukan penawaran (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn)Kolom 10: Rencana evaluasi/negosiasi (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn)Kolom 11: Rencana penandatanganan kontrak (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn)

Bila sudah terkontrak, agar diisi Tgl & No. KontrakKolom 12: Hari/Bulan Kalender

Kolom 13: Penjelasan yang perlu, atau bila ada permasalahan, mis. TOR atau NOL belum disetujui BD

Bila sudah terkontrak, agar diisi Nilai Kontrak & Nama Rekanan

II. Kegiatan yang dibiayai GOI (Paralel Financing/APBD)Kolom : 1, 2, 8, 9, 10, 11, 12, 13 > cara pengisian sama dg kegiatan I

Kolom 3: Nama paket pekerjaan, agar ditulis setiap paketKolom 4: Estimasi biaya, dalam RpKolom 5 : diisi (0) Kolom 6: Metoda Pengadaan sesuai Keppres 80/2003Kolom 7 : diisi (–)

RENCANA/ RELISASI PENGADAAN TA 2010 *

Unit Kerja : Bappeda Prov. Jawa Barat Status

No Kode Nama PaketEstimasi

Biaya (Rp)

Estimasi Biaya

eqv(US$)

Metode Pengadaa

n

Post/ Prior Review

Pengumuman Pengadaan

Pemasukan Penawaran

Eval/ NegoPenandata-

nganan Kontrak

Jangka Waktu

Kontrak

Keterangan: Permasalahan/

1 2 3 4 5 6 7 8 9 10 11 12 13

I KEGIATAN YANG DIBIAYAI LOAN & GOI/ PENDAMPING

II KEGIATAN YANG DIBIAYAI GOI (PARALEL FINANCING/APBD)

Sub Total Keg Cat 3 (Loan + Pend) - -Sub Total Keg Selain Cat 3 (Loan) - -TOTAL KEGIATAN I (Loan + Pend) - -

TOTAL KEGIATAN II (GOI-PF/APBD) - 0

Sub Prject A2 (Category 8)

Water Resources and Irrigation Sector Management Project (WISMP) APL IKomponen B & C

RENCANA/ RELISASI PENGADAAN TA 2010 *

Unit Kerja BAPPEDA Kabupaten Bekasi Status

No Kode Nama PaketEstimasi Biaya

(Rp) Estimasi Biaya

eqv(US$) Metode

PengadaanPost/ Prior

Review

Pengumuman

Pengadaan

Pemasukan Penawaran

Eval/ NegoPenandata-

nganan Kontrak

Jangka Waktu

Kontrak

Keterangan: Permasalahan/

1 2 3 4 5 6 7 8 9 10 11 12 13

1 CS 1

II KEGIATAN YANG DIBIAYAI GOI (PARALEL FINANCING/APBD)1

Sub Total Keg Cat 3 (Loan + Pend) - -Sub Total Keg Selain Cat 3 (Loan) - -TOTAL KEGIATAN I (Loan + Pend) - -

TOTAL KEGIATAN II (GOI-PF/APBD) - -

Water Resources and Irrigation Sector Management Project (WISMP) APL IKomponen B & C

Sub Prject A2 (Category 8)

RENCANA/ RELISASI PENGADAAN TA 2010*

Unit Kerja BAPPEDA Kab. Karawang Status :

No Kode Nama PaketEstimasi Biaya

(Rp) Estimasi Biaya

eqv(US$) Metode

PengadaanPost/ Prior

Review

Pengumuman

Pengadaan

Pemasukan Penawaran

Eval/ NegoPenandata-nganan

Kontrak Jangka Waktu

KontrakKeterangan: Permasalahan/

1 2 3 4 5 6 7 8 9 10 11 12 13

I KEGIATAN YANG DIBIAYAI LOAN & GOI/ PENDAMPING

1 Gd 1

2 CS 1

II KEGIATAN YANG DIBIAYAI GOI (PARALEL FINANCING/APBD)1

Sub Total Keg Cat 3 (Loan + Pend) - -Sub Total Keg Selain Cat 3 (Loan) - -TOTAL KEGIATAN I (Loan + Pend) - -

TOTAL KEGIATAN II (GOI-PF/APBD) - -

Water Resources and Irrigation Sector Management Project (WISMP) APL IKomponen B & C

Goods (Category 2)

Sub Prject A2 (Category 8)

RENCANA/ RELISASI PENGADAAN TA 2010 *

Unit Kerja : Bappeda Kab. Sukabumi

No Kode Nama PaketEstimasi

Biaya (Rp)

Estimasi Biaya

eqv(US$)

Metode Pengadaan

1 2 3 4 5 6

I KEGIATAN YANG DIBIAYAI LOAN & GOI/ PENDAMPING

Tidak Ada Kegiatan Pengadaan

II KEGIATAN YANG DIBIAYAI GOI (PARALEL FINANCING/APBD)

Sub Total Keg Cat 3 (Loan + Pend) - -Sub Total Keg Selain Cat 3 (Loan) - -TOTAL KEGIATAN I (Loan + Pend) - -

TOTAL KEGIATAN II (GOI-PF/APBD) - 0

KETERANGAN : 1 US$ = Rp. 8.500 PETUNJUK PENGISIANI. Kegiatan yang dibiayai (Loan + GOI pendamping/APBN)

1. Force Account (FA) untuk pekerjaan Rim - B < Rp. 127,500,0002. Comm. Driven Development (CDD) untuk pek Irigasi < Rp. 425,000,0003. Small Works (SW) < Rp. 212,500,0004. National Competitive Bidding (NCB) < Rp. 4,250,000,000

Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > dalam Rp2. Pengadaan Barang (Goods) :

1. National Shopping (NS) < Rp. 212,500,000 Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > eqv. US$ 2. National Competitive Bidding (NCB) < Rp. 1,700,000,000

3. Pengadaan Konsultan (Consulting Services) :1. Consultant Qualification Selection (CQS) < Rp. 850,000,0002. Quality and Cost Based Selection (QCBS) < Rp. 3,400,000,0003. Quality Based Selection (QBS) < Rp. 3,400,000,0004. Individual Consultant (IC) < Rp. 425,000,000 Bila sudah terkontrak, agar diisi

Sub Prject B1/B2 (Category 9)

1. Pekerjaan Konstruksi (Civil Works) :

Water Resources and Irrigation Sector Management Project (WISMP) APL IKomponen B & C

* dilaporkan setiap triwulan oleh para PIU / KPIU ke NPMU melalui PPMU/KPMU

** Untuk Prior Review Kontrak I: dipilih salah satu paket untuk minta persetujuan NOL Bank Dunia, Bila sudah terkontrak, agar diisi paket lainnya cukup Post Review, & dilaksanakan setelah paket yang pertama mendapat NOLII. Kegiatan yang dibiayai GOI (Paralel Financing/APBD)(termasuk paket kontrak I pekerjaan sejenis sudah mendapat NOL pada TA sebelumnya).

Categary yang tidak ada tidak perlu ditulis

Status : Februari 2010

Post/ Prior Review

Pengumuman

Pengadaan

Pemasukan

PenawaranEval/ Nego

Penandata-nganan Kontrak

Jangka Waktu

Kontrak

Keterangan: Permasalahan/

7 8 9 10 11 12 13

PETUNJUK PENGISIANI. Kegiatan yang dibiayai (Loan + GOI pendamping/APBN)

Kolom 1 : Nomor UrutKolom 2: Kode pengadaan, mis. barang : Gd 1, Gd 2, konstruksi : CW 1, CW 2, konsultan : CS 1, dstKolom 3: Nama paket pekerjaan, agar ditulis setiap paketKolom 4: Selain Category 3: Estimasi biaya (Loan 100%) > dalam Rp

Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > dalam RpKolom 5: Selain Category 3: Estimasi biaya (Loan 100%) > eqv. US$

Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > eqv. US$ Kolom 6: Metoda Pengadaan, mis NS, DC, NCB, ICB, SW, CDD, CQS, QCBS, SSS, QBS, ICKolom 7: Post Review, Prior Review Kontrak I **, Prior ReviewKolom 8: Rencana pengumuman (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn)Kolom 9: Rencana pemasukan penawaran (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn)Kolom 10: Rencana evaluasi/negosiasi (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn)Kolom 11: Rencana penandatanganan kontrak (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn)

Bila sudah terkontrak, agar diisi Tgl & No. Kontrak

Kolom 12: Hari/Bulan Kalender

Kolom 13: Penjelasan yang perlu, atau bila ada permasalahan, mis. TOR atau NOL belum disetujui BD

Bila sudah terkontrak, agar diisi Nilai Kontrak & Nama Rekanan

II. Kegiatan yang dibiayai GOI (Paralel Financing/APBD)Kolom : 1, 2, 8, 9, 10, 11, 12, 13 > cara pengisian sama dg kegiatan I

Kolom 3: Nama paket pekerjaan, agar ditulis setiap paketKolom 4: Estimasi biaya, dalam RpKolom 5 : diisi (0) Kolom 6: Metoda Pengadaan sesuai Keppres 80/2003Kolom 7 : diisi (–)

RENCANA/ RELISASI PENGADAAN TA 2010 *

Unit Kerja BAPPEDA Kabupaten Purwakarta Status

No Kode Nama PaketEstimasi Biaya

(Rp) Estimasi Biaya

eqv(US$) Metode

PengadaanPost/ Prior

ReviewPengumuman

PengadaanPemasukan Penawaran

Eval/ NegoPenandata-nganan

Kontrak Jangka Waktu

KontrakKeterangan:

Permasalahan/

1 2 3 4 5 6 7 8 9 10 11 12 13

I KEGIATAN YANG DIBIAYAI LOAN & GOI/ PENDAMPING

1 S1/S2

2 CS 1

II KEGIATAN YANG DIBIAYAI GOI (PARALEL FINANCING/APBD)

Sub Total Keg Cat 3 (Loan + Pend) - -Sub Total Keg Selain Cat 3 (Loan) - -TOTAL KEGIATAN I (Loan + Pend) - -

TOTAL KEGIATAN II (GOI-PF/APBD) - -

Water Resources and Irrigation Sector Management Project (WISMP) APL IKomponen B & C

Goods (Category 2)

Sub Prject A2 (Category 8)

RENCANA/ RELISASI PENGADAAN TA 2010 *

Unit Kerja : Bappeda Kab. Cianjur Status

No Kode Nama PaketEstimasi

Biaya (Rp)

Estimasi Biaya

eqv(US$)

Metode Pengadaa

n

Post/ Prior Review

Pengumuman

Pengadaan

Pemasukan

PenawaranEval/ Nego

Penandata-nganan Kontrak

Jangka Waktu

Kontrak

Keterangan: Permasalahan/

1 2 3 4 5 6 7 8 9 10 11 12 13

I KEGIATAN YANG DIBIAYAI LOAN & GOI/ PENDAMPING

II KEGIATAN YANG DIBIAYAI GOI (PARALEL FINANCING/APBD)1

Sub Total Keg Cat 3 (Loan + Pend) - -Sub Total Keg Selain Cat 3 (Loan) - -TOTAL KEGIATAN I (Loan + Pend) - -

TOTAL KEGIATAN II (GOI-PF/APBD) - 0

Water Resources and Irrigation Sector Management Project (WISMP) APL IKomponen B & C

RENCANA/ RELISASI PENGADAAN TA 2010 *

Unit Kerja : Bappeda Kab. Bogor Status

No Kode Nama PaketEstimasi Biaya

(Rp)

Estimasi Biaya

eqv(US$)

Metode Pengadaan

Post/ Prior Review

Pengumuman

Pengadaan

Pemasukan

PenawaranEval/ Nego

Penandata-nganan Kontrak

Jangka Waktu

KontrakKeterangan: Permasalahan/

1 2 3 4 5 6 7 8 9 10 11 12 13

I KEGIATAN YANG DIBIAYAI LOAN & GOI/ PENDAMPING

1 CW 1

II KEGIATAN YANG DIBIAYAI GOI (PARALEL FINANCING/APBD)

Sub Total Keg Cat 3 (Loan + Pend) - -Sub Total Keg Selain Cat 3 (Loan) - -TOTAL KEGIATAN I (Loan + Pend) - -

TOTAL KEGIATAN II (GOI-PF/APBD) - 0

Sub Prject A2 (Category 8)

Water Resources and Irrigation Sector Management Project (WISMP) APL IKomponen B & C

RENCANA/ RELISASI PENGADAAN TA 2010 *

Unit Kerja : Bappeda Kab. Subang Status

No Kode Nama PaketEstimasi Biaya

(Rp)

Estimasi Biaya

eqv(US$)

Metode Pengadaa

n

Post/ Prior Review

Pengumuman

Pengadaan

Pemasukan

PenawaranEval/ Nego

Penandata-nganan Kontrak

Jangka Waktu

Kontrak

Keterangan: Permasalahan/

1 2 3 4 5 6 7 8 9 10 11 12 13

I KEGIATAN YANG DIBIAYAI LOAN & GOI/ PENDAMPING

1 CS 1

II KEGIATAN YANG DIBIAYAI GOI (PARALEL FINANCING/APBD)

Sub Total Keg Cat 3 (Loan + Pend) - -Sub Total Keg Selain Cat 3 (Loan) - -TOTAL KEGIATAN I (Loan + Pend) - -

TOTAL KEGIATAN II (GOI-PF/APBD) - 0

Sub Prject A2 (Category 8)

Sub Prject B1/B2 (Category 9)

Water Resources and Irrigation Sector Management Project (WISMP) APL IKomponen B & C

RENCANA/ RELISASI PENGADAAN TA 2010*

Unit Kerja : Bappeda Kab. Bandung Status

No Kode Nama PaketEstimasi Biaya

(Rp)

Estimasi Biaya

eqv(US$)

Metode Pengadaa

n

Post/ Prior Review

Pengumuman

Pengadaan

Pemasukan

PenawaranEval/ Nego

Penandata-nganan Kontrak

Jangka Waktu

Kontrak

Keterangan: Permasalahan/

1 2 3 4 5 6 7 8 9 10 11 12 13

I KEGIATAN YANG DIBIAYAI LOAN & GOI/ PENDAMPING

1 CS 1

II KEGIATAN YANG DIBIAYAI GOI (PARALEL FINANCING/APBD)

Sub Total Keg Cat 3 (Loan + Pend) - -Sub Total Keg Selain Cat 3 (Loan) - -TOTAL KEGIATAN I (Loan + Pend) - -

TOTAL KEGIATAN II (GOI-PF/APBD) - 0

Sub Prject A2 (Category 8)

Water Resources and Irrigation Sector Management Project (WISMP) APL IKomponen B & C

RENCANA/ RELISASI PENGADAAN TA 2010 *

Unit Kerja : Bappeda Kab. Bandung Barat Status

No Kode Nama PaketEstimasi

Biaya (Rp)

Estimasi Biaya

eqv(US$)

Metode Pengadaan

Post/ Prior Review

Pengumuman

Pengadaan

Pemasukan Penawaran

Eval/ NegoPenandata-nganan

Kontrak

Jangka Waktu

Kontrak

Keterangan: Permasalahan/

1 2 3 4 5 6 7 8 9 10 11 12 13

I KEGIATAN YANG DIBIAYAI LOAN & GOI/ PENDAMPING

1 Gd 1

II KEGIATAN YANG DIBIAYAI GOI (PARALEL FINANCING/APBD)

Sub Total Keg Cat 3 (Loan + Pend) - -Sub Total Keg Selain Cat 3 (Loan) - -TOTAL KEGIATAN I (Loan + Pend) - -

TOTAL KEGIATAN II (GOI-PF/APBD) - 0

Water Resources and Irrigation Sector Management Project (WISMP) APL IKomponen B & C

Goods (Category 2)

top related