pengukuran tinggi 2014_final

Post on 21-Jan-2018

142 Views

Category:

Engineering

1 Downloads

Preview:

Click to see full reader

TRANSCRIPT

TGM

UGM

September 5, 2016 pengukuran Beda Tinggi - MGR 1

Oleh : Gondang Riyadi

TGM

UGM

Infrastruktur Drainase

September 5, 2016 pengukuran Beda Tinggi - MGR 2

TGM

UGM

September 5, 2016

3MGR - Kartografi - PSLH

TGM

UGM

September 5, 2016 pengukuran Beda Tinggi - MGR 4

TGM

UGM

September 5, 2016 Penggambaran Detil - MGR 5

TGM

UGM

PETA ISO KWALITAS BATUBARAPETA ISO KWALITAS BATUBARA

September 5, 2016 pengukuran Beda Tinggi - MGR 6

TGM

UGM

September 5, 2016 pengukuran Beda Tinggi - MGR 7

TGM

UGM

September 5, 2016 pengukuran Beda Tinggi - MGR 8

TGM

UGM

September 5, 2016 pengukuran Beda Tinggi - MGR 9

TGM

UGM

ALTIMETER

BAROMETRIC LEVELLING

TRIGONOMETRIC LEVELING

WATERPASSING (PENYIPAT DATAR)

September 5, 2016 pengukuran Beda Tinggi - MGR 10

TGM

UGM

Alat penyipat datar : konvensional maupun yang modern (baru)

Rambu ukur (baak) baik dilengkapi dengan mistar skala maupun tidak

Sepatu rambu sebagai alas dari rambu ukur Statif rambu untuk menjaga rambu supaya tidak

jatuh Nivo kotak untuk membuat rambu supaya tidak

miring (baik kemuka atau kebelakang dan ke kiri atau ke kanan

September 5, 2016 pengukuran Beda Tinggi - MGR 11

TGM

UGM

September 5, 2016 pengukuran Beda Tinggi - MGR 12

TGM

UGM

September 5, 2016 pengukuran Beda Tinggi - MGR 13

TGM

UGM

September 5, 2016 pengukuran Beda Tinggi - MGR 14

TGM

UGM

September 5, 2016 pengukuran Beda Tinggi - MGR 16

TGM

UGM

September 5, 2016 pengukuran Beda Tinggi - MGR 17

1. Base Plate

2. Horizontal Circle

3. Eyepiece

4. Circular Bubble

5. Sighting Pointer

6. Objective Lens

7. Focusing Knob

8. Fine Motion Drive

9. Footscrew

10. Bubble Mirror

TGM

UGM

September 5, 2016 pengukuran Beda Tinggi - MGR 18

TGM

UGM

September 5, 2016pengukuran Beda Tinggi - MGR 19

Automatic Level Staff Readings ona staff

TGM

UGM

Panjangnya bisa 3 s/d 5 meterDibuat bisa dari kayu atau

aluminiumAda yang sederhana dan ada

yang dilengkapi dengan mistar skala (skala baar)

September 5, 2016 pengukuran Beda Tinggi - MGR 20

TGM

UGM

September 5, 2016 pengukuran Beda Tinggi - MGR 21

•Setiap meter diberi warna yang berbeda

•Setiap graduation sebesar 100 mm

•Setiap “E” adalah 50 mm

•Rambu dibaca dalam satuan milimeter

TGM

UGM

September 5, 2016 pengukuran Beda Tinggi - MGR 22

0.3

0.33

0.339

TGM

UGM

2

1

3 Large numbers are even feet

Small numbers are 10th

of a foot

TGM

UGM

1

3

.10

.09

.08

.07

.06

.05

.04

.03

.02

.01

10 e

qual

sp

ace

s

100

th o

f a fo

ot

.00

TGM

UGM

2

1

3

3.14.10.09.08.07.06.05.04.03.02.01.00

FYI

Foot Reading

10ths Reading

100ths Reading

TGM

UGMActual Rod Reading

2

1

5

5.05.10.09.08.07.06.05.04.03.02.01.00

FYI

TGM

UGM

TGM

UGM

1. 1.09 2. 4.17

3. 7.01 4. 3.89

TGM

UGMMemerlukan peralatan optis yang mempunyai Benang silang

September 5, 2016 pengukuran Beda Tinggi - MGR 29

TGM

UGM

Jarak antara TSR (benang atas) dan BSR (benang bawah) disebut interval stadia .

September 5, 2016 pengukuran Beda Tinggi - MGR 30

Hor. Dist. = SI x SF

SI = Stadia interval

SF = Stadia factor

TGM

UGM Garis silang merupakan garis kolimasi

BB dan BA disebut dengan garis stadia

Biasanya stadia mempunyai faktor pengali 100

September 5, 2016 pengukuran Beda Tinggi - MGR 31

TGM

UGM

BA = 3.040 BB = 2.946 BA – BB = 0.094

Jarak optis = 0.094 x 100 = 9.4 metres

September 5, 2016 pengukuran Beda Tinggi - MGR 32

TGM

UGM

September 5, 2016 pengukuran Beda Tinggi - MGR 33

Hor. Dist. = TSR - BSR( ) x SF

Dist = TSR - BSR( ) x SF= 6.01 - 5.47( ) x 100= 0.54 x 100

= 54 ft

TGM

UGM

September 5, 2016 pengukuran Beda Tinggi - MGR 34

Dist = TSR - BSR( ) x SF= 7.844 - 4.619( ) x 100= 3.225 x 100

= 322.5 ft

TGM

UGM

Apabila Benang atas atau benang bawah terhalang, bisa digunakan cara ½ stadia. ½ stadia adalah setengah dari interval stadia

September 5, 2016 pengukuran Beda Tinggi - MGR 35

Contoh :

Jika TRS = 7.34 dan elevasi 6.21, maka jarak mendatarnya :

Horizontal Distance = TSR - Elev( ) x 2[ ] x 100= 7.34 - 6.21( ) x 2[ ] x 100= 226 ft

TGM

UGM

Ada beberapa faktor yang mempengaruhi kesalahan pengukuran beda tinggi yang menggunakan penyipat datar, di antaranya :: 

•        Kesalahan garis kolimasi •        Karena kelengkungan bumi •        Kesalahan refraksi (undulasi) •        Kesalahan paralaks

September 5, 2016 pengukuran Beda Tinggi - MGR 36

TGM

UGM

Garis kolimasi adalah garis imaginer yang lebat benang silang pada teropong sipat datar

September 5, 2016 pengukuran Beda Tinggi - MGR 37

TGM

UGM

September 5, 2016 pengukuran Beda Tinggi - MGR 38

TGM

UGM

TGM

UGM

TGM

UGM

TGM

UGM

Karena panas sinar matahari akan mengakibatkan bacaan di rambu kabur / tidak jelas (undulasi)

TGM

UGM

Step 1 Staff Slowly Leant Towards Instrument

Important Note – The person using the instrument keeps the staff vertical by use of the Vertical line in the instrument.

Step 2 Staff Slowly Tilted away from Instrument. When Vertical lowest reading will be reading recorded

Step 3 Staff Slowly Tilted away from instrument. Once past vertical readings will increase

Kesalahan dalam Pembacaan Rambu Ukur

September 5, 2016 pengukuran Beda Tinggi - MGR 43

TGM

UGM

A

B

ba

dHab

d1 d2

HB = HA + dHab

= HA + (a – b )September 5, 2016 pengukuran Beda Tinggi - MGR 44

TGM

UGM

September 5, 2016 pengukuran Beda Tinggi - MGR 45

B/S 2.510F/S 1.202Diff Between 1.308

B/S 2.301F/S 1.517Diff Between 0.784

TGM

UGM

MSL

Pengukuran beda tinggi dengan metode sipat datar

September 5, 2016 pengukuran Beda Tinggi - MGR 46

TGM

UGM

p0

p1

p0 = known point (benchmark)

BS IS IS FS

September 5, 2016 pengukuran Beda Tinggi - MGR 47

TGM

UGM

A

B

ba

dHab

d1 d2

HB = HA + dHab

= HA + (a – b )September 5, 2016 pengukuran Beda Tinggi - MGR 48

TGM

UGM

September 5, 2016 pengukuran Beda Tinggi - MGR 49

TGM

UGM

Baca TOR pengukuran Buat SKETSA Lapangan Pemasangan titik ikat di lapangan Mengukur sudut Mengukur Jarak Mengukur Beda Tinggi Mengukur Detil di lapangan

September 5, 2016 pengukuran Beda Tinggi - MGR 50

TGM

UGM

September 5, 2016 pengukuran Beda Tinggi - MGR 51

1. Jarak maksimum antara alat sipat datar ke rambu 60 meter.

2. Kedudukan alat pada setiap slag pengukuran harus pada jarak yang sama antara jarak instrumen ke rambu depan dan instrumen ke rambu belakang.

TOR / KAKKerangka acuan Kerja

BacaTOR

TGM

UGM

September 5, 2016 pengukuran Beda Tinggi - MGR 52

PENGUKURAN TITIK KONTROL VERTIKAL

1.Pengukuran tinggi titik-titik kontrol vertikal dilakukan dengan metode sipat datar. Spesifikasi pengukuran adalah sebagai berikut:2.Sebelum alat digunakan harus dicek garis kolimasinya terlebih dahulu.3.Pengukuran beda tinggi dalam satu seksi dilakukan pergi pulang dalam satu hari.4.Jarak maksimum antara alat sipatdatar ke rambu 60 meter.5.Kedudukan alat pada setiap slag pengukuran harus pada jarak yang sama antara jarak instrumen ke rambu depan dan instrumen ke rambu belakang. 6.Kesalahan penutup maksimum ukuran pergi-pulang sebesar 10 mm √L (L: dalam kilometer).

TGM

UGM

p0

PENGUKURAN SATU SLAG

BSFS

September 5, 2016 pengukuran Beda Tinggi - MGR 53

TGM

UGM

p0

p1

PENGUKURAN SATU SEKSI

BS FS

September 5, 2016 pengukuran Beda Tinggi - MGR 54

TGM

UGM

September 5, 2016 pengukuran Beda Tinggi - MGR 55

p0

p1

P0 dan P1 = (benchmark))

TGM

UGM

MSL

Pengukuran beda tinggi dengan metode sipat datar

September 5, 2016 pengukuran Beda Tinggi - MGR 56

TGM

UGM

September 5, 2016 pengukuran Beda Tinggi - MGR 57

TGM

UGM

September 5, 2016 pengukuran Beda Tinggi - MGR 58

Pengukuran PERGI ><PULANG

TGM

UGM

September 5, 2016 pengukuran Beda Tinggi - MGR 59

TGM

UGM

September 5, 2016 pengukuran Beda Tinggi - MGR 60

TGM

UGM

September 5, 2016 pengukuran Beda Tinggi - MGR 61

TGM

UGM

September 5, 2016 pengukuran Beda Tinggi - MGR 62

TGM

UGM

September 5, 2016 pengukuran Beda Tinggi - MGR 63

TGM

UGM

September 5, 2016 pengukuran Beda Tinggi - MGR 64

TGM

UGM

September 5, 2016 pengukuran Beda Tinggi - MGR 65

TGM

UGM

A benchmark in every-day language is a point of reference for a measurement. In surveying a benchmark is specifically any permanent marker placed by a surveyor with a precisely known vertical elevation (but not necessarily a precisely known horizontal location). Designed to be used for many projects.

TGM

UGM

TGM

UGM

TGM

UGM

TGM

UGM

September 5, 2016 pengukuran Beda Tinggi - MGR 70

TGM

UGM

September 5, 2016 pengukuran Beda Tinggi - MGR 71

Set up the instrument where the benchmark can be viewed within correct parameters and a reasonable number of sights can be viewed. This location is identified as L1 circled in red

TGM

UGM

September 5, 2016 pengukuran Beda Tinggi - MGR 72

Surveyor______________________ Chainmen_________________________________

Instrument No___________________ Date__________________

BacksightIntermediate

Sight Foresight Rise FallReduced

Level Top Bottom Dist Remarks1.575 47.195 1.817 1.377 44.000 BM

Booking Sheet

TGM

UGM

September 5, 2016 pengukuran Beda Tinggi - MGR 73

Surveyor______________________ Chainmen_________________________________

Instrument No___________________ Date__________________

BacksightIntermediate

Sight Foresight Rise FallReduced

Level Top Bottom Dist Remarks1.575 47.195 1.817 1.377 44.000 BM

1.250 Station 10.850 Station 21.330 Station 31.580 Station 4

Booking Sheet

TGM

UGM

September 5, 2016 pengukuran Beda Tinggi - MGR 74

Surveyor______________________ Chainmen_________________________________

Instrument No___________________ Date__________________

BacksightIntermediate

Sight Foresight Rise FallReduced

Level Top Bottom Dist Remarks1.575 47.195 1.817 1.377 44.000 BM

1.250 Station 10.850 Station 21.330 Station 31.580 Station 4

1.450 1.462 1.438 24.000 S5 (CP)

Booking Sheet

TGM

UGM

September 5, 2016 pengukuran Beda Tinggi - MGR 75

Surveyor______________________ Chainmen_________________________________

Instrument No___________________ Date__________________

BacksightIntermediate

Sight Foresight Rise FallReduced

Level Top Bottom Dist Remarks1.575 47.195 1.817 1.377 44.000 BM

1.250 Station 10.850 Station 21.330 Station 31.580 Station 4

1.450 1.570 1.330 24.000 S5 (CP)2.550 2.680 2.420 26.000 S5 (CP)

Booking Sheet

TGM

UGM

September 5, 2016 pengukuran Beda Tinggi - MGR 76

Surveyor______________________ Chainmen_________________________________

Instrument No___________________ Date__________________

BacksightIntermediate

Sight Foresight Rise FallReduced

Level Top Bottom Dist Remarks1.575 47.195 1.597 1.553 44.000 BM

1.250 S10.850 S21.330 S31.580 S4

1.450 1.570 1.330 24.000 S5 (CP)2.550 2.680 2.420 26.000 S5 (CP)

1.980 S61.760 S71.710 S81.840 S91.920 S10

Booking Sheet

TGM

UGM

September 5, 2016 pengukuran Beda Tinggi - MGR 77

Surveyor______________________ Chainmen_________________________________

Instrument No___________________ Date__________________

BacksightIntermediate

Sight Foresight Rise FallReduced

Level Top Bottom Dist Remarks1.575 47.195 1.597 1.553 44.000 BM

1.250 S10.850 S21.330 S31.580 S4

1.450 1.570 1.330 24.000 S5 (CP)2.550 2.680 2.420 26.000 S5 (CP)

1.980 S61.760 S71.710 S81.840 S91.920 S10

3.250 S11 (CP)

Booking Sheet

TGM

UGM

September 5, 2016 pengukuran Beda Tinggi - MGR 78

Surveyor______________________ Chainmen_________________________________

Instrument No___________________ Date__________________

BacksightIntermediate

Sight Foresight Rise FallReduced

Level Top Bottom Dist Remarks1.575 47.195 1.597 1.553 44.000 BM

1.250 S10.850 S21.330 S31.580 S4

1.450 1.570 1.330 24.000 S5 (CP)2.550 2.680 2.420 26.000 S5 (CP)

1.980 S61.760 S71.710 S81.840 S91.920 S10

3.250 3.400 3.100 30.000 S11 (CP)1.831 2.021 1.641 38.000 S11 (CP)

1.258 1.418 1.098 32.000 BM

TGM

UGM

September 5, 2016 pengukuran Beda Tinggi - MGR 79

Surveyor______________________ Chainmen_________________________________

Instrument No___________________ Date__________________

BacksightIntermediate

Sight Foresight Rise FallReduced

Level Top Bottom Dist Remarks1.575 47.195 1.597 1.553 44.000 BM

1.250 S10.850 S21.330 S31.580 S4

1.450 1.570 1.330 24.000 S5 (CP)2.550 2.680 2.420 26.000 S5 (CP)

1.980 S61.760 S71.710 S81.840 S91.920 S10

3.250 3.400 3.100 30.000 S11 (CP)1.831 2.021 1.641 38.000 S11 (CP)

1.258 1.418 1.098 32.000 BM

5.956 5.958 (Misclose) 194.000

Booking Sheet

TGM

UGM

September 5, 2016 pengukuran Beda Tinggi - MGR 80

Surveyor______________________ Chainmen_________________________________

Instrument No___________________ Date__________________

BacksightIntermediate

Sight Foresight Rise FallReduced

Level Top Bottom Dist Remarks1.575 47.195 1.597 1.553 44.000 BM

1.250 0.325 S10.850 0.400 S21.330 -0.480 S31.580 -0.250 S4

1.450 0.130 1.570 1.330 24.000 S5 (CP)2.550 2.680 2.420 26.000 S5 (CP)

1.980 0.570 S61.760 0.220 S71.710 0.050 S81.840 -0.130 S91.920 -0.080 S10

3.250 -1.330 3.400 3.100 30.000 S11 (CP)1.831 2.021 1.641 38.000 S11 (CP)

1.258 0.573 1.418 1.098 32.000 BM

5.956 5.958 194.000

Booking Sheet

TGM

UGM

September 5, 2016 pengukuran Beda Tinggi - MGR 81

Surveyor______________________ Chainmen_________________________________

Instrument No___________________ Date__________________

BacksightIntermediate

Sight Foresight Rise FallReduced

Level Top Bottom Dist Remarks1.575 47.195 1.597 1.553 44.000 BM

1.250 0.325 S10.850 0.400 S21.330 -0.480 S31.580 -0.250 S4

1.450 0.130 1.570 1.330 24.000 S5 (CP)2.550 2.680 2.420 26.000 S5 (CP)

1.980 0.570 S61.760 0.220 S71.710 0.050 S81.840 -0.130 S91.920 -0.080 S10

3.250 -1.330 3.400 3.100 30.000 S11 (CP)1.831 2.021 1.641 38.000 S11 (CP)

1.258 0.573 1.418 1.098 32.000 BM

5.956 5.958 2.268 -2.270 194.000

Booking Sheet

TGM

UGM

September 5, 2016 pengukuran Beda Tinggi - MGR 82

Surveyor______________________ Chainmen_________________________________

Instrument No___________________ Date__________________

BacksightIntermediate

Sight Foresight Rise FallReduced

Level Top Bottom Dist Remarks1.575 47.195 1.597 1.553 44.000 BM

1.250 0.325 47.520 S10.850 0.400 47.920 S21.330 -0.480 47.440 S31.580 -0.250 47.190 S4

1.450 0.130 47.320 1.570 1.330 24.000 S5 (CP)2.550 2.680 2.420 26.000 S5 (CP)

1.980 0.570 47.890 S61.760 0.220 48.110 S71.710 0.050 48.160 S81.840 -0.130 48.030 S91.920 -0.080 47.950 S10

3.250 -1.330 46.620 3.400 3.100 30.000 S11 (CP)1.831 2.021 1.641 38.000 S11 (CP)

1.258 0.573 47.193 1.418 1.098 32.000 BM

5.956 5.958 2.268 -2.270 -0.002 194.000

Booking Sheet

TGM

UGM

Traverse Length = 190 metres Allowable Misclose = 12 x SQRT(0.190)

= 12 x 0.4359= 5.23mm

September 5, 2016 pengukuran Beda Tinggi - MGR 83

TGM

UGM

September 5, 2016 pengukuran Beda Tinggi - MGR 84

BacksightIntermediate

Sight Foresight Rise Fall

1.3501.8502.2502.5353.030

2.7802.500

2.1903.1403.3802.230

1.9601.680

2.3601.480

1.2560.570

TGM

UGM

September 5, 2016 pengukuran Beda Tinggi - MGR 85

Surveyor______________________ Chainmen_________________________________

Instrument No___________________ Date__________________

BacksightIntermediate

Sight Foresight Rise FallReduced

Level Top Bottom Dist Remarks1.350 BM

1.850 B2.250 C2.535 D3.030 E (CP)

2.780 F (CP)2.500 F (CP)

2.190 G3.140 H3.380 I2.230 J

1.960 K (CP)1.680 K (CP)

2.360 L1.480 M (CP)

1.256 BM0.570

6.786 -6.790 0.000 0.000

B/S 6.786 RISE 0.000 END 0.000F/S -6.790 FALL 0.000 START 0.000Misclose -0.004 0.000 0.000

Booking Sheet

TGM

UGM

September 5, 2016 pengukuran Beda Tinggi - MGR 86

BacksightIntermediate

Sight Foresight Rise Fall

0.6550.4651.2150.3650.690

1.1000.455

0.7601.2000.985

2.1002.560

0.7551.645

3.2732.100

TGM

UGM

September 5, 2016 pengukuran Beda Tinggi - MGR 87

Surveyor______________________ Chainmen_________________________________

Instrument No___________________ Date__________________

BacksightIntermediate

Sight Foresight Rise FallReduced

Level Top Bottom Dist Remarks0.655 3.650 BM

0.465 0.190 3.840 B1.215 -0.750 3.090 C0.365 0.850 3.940 D0.690 -0.325 3.615 E

1.100 -0.410 3.205 F (CP)0.455 F (CP)

0.760 -0.305 2.900 G1.200 -0.440 2.460 H0.985 0.215 2.675 I

2.100 -1.115 1.560 J (CP)2.560 J (CP)

0.755 1.805 3.365 K1.645 -0.890 2.475 L (CP)

3.273 L (CP)2.100 1.173 3.648 BM

6.943 -6.945 4.233 -4.235

B/S 6.943 RISE 4.233 END 3.648F/S -6.945 FALL -4.235 START 3.650Misclose -0.002 -0.002 -0.002

Booking Sheet

TGM

UGM

September 5, 2016 pengukuran Beda Tinggi - MGR 88

TGM

UGM

September 5, 2016 pengukuran Beda Tinggi - MGR 89

Surveyor______________________ Chainmen_________________________________

Instrument No___________________ Date__________________

BacksightIntermediate

SightFore sight

Height of Collimation

Reduced Level Top Bottom Dist Remarks

1.575 48.770 47.1951.250 47.5200.850 47.9201.330 47.4401.580 47.190

Booking Sheet

• It is more convenient for “Area Levelling” and can become cumbersome on long traverses.

It is also an easier method for “On the Fly Levelling”

• Also Known as Instrument Height Method

TGM

UGM

September 5, 2016 pengukuran Beda Tinggi - MGR 90

TGM

UGM

September 5, 2016 pengukuran Beda Tinggi - MGR 91

Set up the instrument where the benchmark can be viewed within correct parameters and a reasonable number of sights can be viewed. This location is identified as L1 circled in red

TGM

UGM

September 5, 2016 pengukuran Beda Tinggi - MGR 92

Surveyor______________________ Chainmen_________________________________

Instrument No___________________ Date__________________

BacksightIntermediate

SightFore sight

Height of Collimation

Reduced Level Top Bottom Dist Remarks

1.575 48.770 47.195

Booking Sheet

TGM

UGM

September 5, 2016 pengukuran Beda Tinggi - MGR 93

Surveyor______________________ Chainmen_________________________________

Instrument No___________________ Date__________________

BacksightIntermediate

SightFore sight

Height of Collimation

Reduced Level Top Bottom Dist Remarks

1.575 48.770 47.1951.250 47.520 S10.850 47.920 S21.330 47.440 S31.580 47.190 S4

Booking Sheet

TGM

UGM

September 5, 2016 pengukuran Beda Tinggi - MGR 94

Surveyor______________________ Chainmen_________________________________

Instrument No___________________ Date__________________

BacksightIntermediate

SightFore sight

Height of Collimation

Reduced Level Top Bottom Dist Remarks

1.575 48.770 47.195 BM1.250 47.520 S10.850 47.920 S21.330 47.440 S31.580 47.190 S4

1.450 48.770 S5

Booking Sheet

TGM

UGM

September 5, 2016 pengukuran Beda Tinggi - MGR 95

Surveyor______________________ Chainmen_________________________________

Instrument No___________________ Date__________________

BacksightIntermediate

SightFore sight

Height of Collimation

Reduced Level Top Bottom Dist Remarks

1.575 48.770 47.195 BM1.250 47.520 S10.850 47.920 S21.330 47.440 S31.580 47.190 S4

2.550 1.450 49.870 47.320 S5

Booking Sheet

TGM

UGM

September 5, 2016 pengukuran Beda Tinggi - MGR 96

Surveyor______________________ Chainmen_________________________________

Instrument No___________________ Date__________________

BacksightIntermediate

SightFore sight

Height of Collimation

Reduced Level Top Bottom Dist Remarks

1.575 48.770 47.195 BM1.250 47.520 S10.850 47.920 S21.330 47.440 S31.580 47.190 S4

2.550 1.450 49.870 47.320 S51.980 47.890 S61.760 48.110 S71.710 48.160 S81.840 48.030 S91.920 47.950 S10

Booking Sheet

TGM

UGM

September 5, 2016 pengukuran Beda Tinggi - MGR 97

Surveyor______________________ Chainmen_________________________________

Instrument No___________________ Date__________________

BacksightIntermediate

SightFore sight

Height of Collimation

Reduced Level Top Bottom Dist Remarks

1.575 48.770 47.195 BM1.250 47.520 S10.850 47.920 S21.330 47.440 S31.580 47.190 S4

2.550 1.450 49.870 47.320 S51.980 47.890 S61.760 48.110 S71.710 48.160 S81.840 48.030 S91.920 47.950 S10

3.250 46.620 S11 (CP)

Booking Sheet

TGM

UGM

September 5, 2016 pengukuran Beda Tinggi - MGR 98

Surveyor______________________ Chainmen_________________________________

Instrument No___________________ Date__________________

BacksightIntermediate

Sight Fore sightHeight of

CollimationReduced

Level Top Bottom Dist Remarks1.575 48.770 47.195 BM

1.250 47.520 S10.850 47.920 S21.330 47.440 S31.580 47.190 S4

2.550 1.450 49.870 47.320 S51.980 47.890 S61.760 48.110 S71.710 48.160 S81.840 48.030 S91.920 47.950 S10

1.831 3.250 48.451 46.620 S11 (CP)1.258 47.193 BM

Booking Sheet

TGM

UGM

September 5, 2016 pengukuran Beda Tinggi - MGR 99

Surveyor______________________ Chainmen_________________________________

Instrument No___________________ Date__________________

BacksightIntermediate

Sight Fore sightHeight of

CollimationReduced

Level Top Bottom Dist Remarks1.575 48.770 47.195 BM

1.250 47.520 S10.850 47.920 S21.330 47.440 S31.580 47.190 S4

2.550 1.450 49.870 47.320 S51.980 47.890 S61.760 48.110 S71.710 48.160 S81.840 48.030 S91.920 47.950 S10

1.831 3.250 48.451 46.620 S11 (CP)1.258 47.193 BM

5.956 5.9585.958

-0.002 Misclose

Booking Sheet

TGM

UGM

September 5, 2016 pengukuran Beda Tinggi - MGR 100

Surveyor______________________ Chainmen_________________________________

Instrument No___________________ Date__________________

BacksightIntermediate

Sight Fore sightHeight of

CollimationReduced

Level Top Bottom Dist Remarks1.575 48.770 47.195 BM

1.250 47.520 S10.850 47.920 S21.330 47.440 S31.580 47.190 S4

2.550 1.450 49.870 47.320 S51.980 47.890 S61.760 48.110 S71.710 48.160 S81.840 48.030 S91.920 47.950 S10

1.831 3.250 48.451 46.620 S11 (CP)1.258 47.193 BM

5.956 5.9585.958

-0.002 Misclose

End RL 47.193Start BM 47.195Misclose -0.002

Booking Sheet

TGM

UGM

Definition – Misclose- is when closing of a traverse due to errors in readings and instrument limitations there is a discrepancy.

The allowable discrepancy is (12 x square root of traverse in kilometres)

September 5, 2016 pengukuran Beda Tinggi - MGR 101

TGM

UGM

Traverse Length = 190 metres Allowable Misclose = 12 x SQRT(0.190)

= 12 x 0.4359= 5.23mm

September 5, 2016 pengukuran Beda Tinggi - MGR 102

TGM

UGMTERIMA KASIH

TerimakasihPT. Waindo SpecTerra

Geomatic Training and Research Center (GTRC)

September 5, 2016 pengukuran Beda Tinggi - MGR 103

TGM

UGM

PRAKTEK LAPANGANPRAKTEK LAPANGAN

September 5, 2016 pengukuran Beda Tinggi - MGR 104

top related