LIST DATA YANG DIPERLUKAN

A. DATA TAMBAHAN 1. PETA TOPOGRAFI DAERAH BANKO BARAT2. PENAMPANG LITOLOGI TAMBANG BANKO BARAT PIT 13. PETA GEOLOGI REGIONAL PT BA UPTE4. PENAMPANG STRATIGRAFI TAMBANG BANKO BARAT PIT 15. JENIS BATUAN OVERBURDEN YANG AKAN DIRIPPING DAN KARAKTERISTIKNYA (SIFAT

FISIK DAN MEKANIK BATUAN)6. DATA CADANGAN BATUBARA YANG ADA DI BANKO BARAT (PIT 1 KHUSUSNYA)7. DATA KUALITAS BATUBARA DI PIT 1 BANKO BARAT8. KONSUMEN BATUBARA PT BA9. HARGA BATUBARA PER TON UNTUK TIAP KONSUMEN10. DATA CURAH HUJAN – JULI 2014

B. DATA PENELITIANKAJIAN TEKNIS 1. DATA LOKASI YANG AKAN DILAKUKAN RIPPING2. DATA LUAS DAERAH YANG AKAN DI-RIPPING DAN VOLUMENYA3. ALAT YANG DIGUNAKAN UNTUK RIPPING DAN SPESIFIKASINYA4. ALAT MUAT YANG DIGUNAKAN UNTUK MENGGALI MATERIAL HASIL DARI RIPPING DAN

SPESIFIKASINYA5. DIGGING RATE DARI ALAT GALI MUAT YANG MENGGALI MATERIAL HASIL DARI RIPPING

(DIHITUNG SENDIRI)

KAJIAN EKONOMIS (SISTEM RENTAL)

1. JAM KERJA DOZER RATA-RATA PER TAHUN2. JADWAL KERJA DOZER PER SHIFT (UNTUK MENGHITUNG EFISIENSI KERJA) 3. CYCLE TIME ALAT DOZER SAAT MELAKUKAN RIPPING4. PRODUKTIVITAS ALAT DOZER PER JAM5. BIAYA SEWA ALAT DOZER PER JAM

KAJIAN EKONOMIS

1. HARGA RIPPER2. UMUR PAKAI ALAT DOZER3. JAM KERJA/TAHUN4. BIAYA ASURANSI5. BIAYA SOLAR6. BIAYA PELUMAS7. BIAYA GREASE8. BIAYA FILTER

9. BIAYA PEMELIHARAAN10. UPAH OPERATOR11. JAM KERJA OPERATOR