backup of backup of peta sebaran ntt(revisi terbaru)

Post on 06-Jul-2015

146 Views

Category:

Documents

1 Downloads

Preview:

Click to see full reader

TRANSCRIPT

5/7/2018 Backup of Backup of Peta Sebaran NTT(Revisi Terbaru) - slidepdf.com

http://slidepdf.com/reader/full/backup-of-backup-of-peta-sebaran-nttrevisi-terbaru 1/1

 

ke TimTim

S o E

Manufui

KUPANG

 

Bolok

Tenau

TIMTIM

P. TIMOR 

Bts.TimTim

Olisina

NaikiluEban

Kapan

Kukak

SulamuBokong

Oelamasi

Oinlasi

Batuputih

Nikiniki

Besikama

Kolbano

Putain

Nunkolo

Boking

WebuaNesam

Bitauni

Lakafehan

Halilulik

Maubesi

Manamas

Bismark

Sakato

Baun

Wini

Noelmuti

Oesao

Oesapa

Mena

Oekabiti

Bupuh

Burain

Junction

Boronubaen

Onu

Lelogama Puka

Bokis

Oenaek

Nenuk

Barate

Oepoli

PaniteOemoro

Betun

Atapupu

Non

Wanibesak

Atambua

Amol

Oelfaub

Kukun

Manenu

Kefamenanu

KAB. TTS.

KAB. TTU.

 

Motomasin

Mota'ain

SilawanHaliwen

TIM TIM

Keliting

Weluli

 

LB.BAJO

BAJAWA

ENDE

Reo

Poma

Waeklambu

Waepana

Terang

 

Pota

Malwatar 

Mbazang

Nabe

Gako

Magepanda

 

Km.210

Malanuza

Moropokat

Iteng

Km.180P. FLORES

P. LEMBATA

Danga

Bealaing

Sp.Wangkung

Naga

Dampek

Waebela

 

Mangulewa

NilaKondo

Bari

Hita

Bambor 

Li

PokaMano

Nangarawa

Aimere

Sawu

 

Ekomawo

Jerebuu

Dere

Wolokuku

Kisanata

Malapare

Boanari

 

Saga

Nggorang

RUTENG

Maumbawa

 

BORONG

Kotabaru

Napungmali

Mudajebak

Waepare

Lianunu

Atawai

Loang

Balauring

Wairiang

Lamalera

Sagu

Nuabosi

Detuwija

Wologai

Nggela

DetukeliWarundariBola

Lela

Tanarawa

Muroona

    T   o    b    i   w   u    t   u   n   g

Lato

D.Kelimutu

HepangWologai

Woloara

Sp Sagu

Lewoleba

Aemali

Kaburea

Waelengga

Nangaroro

Puukungu

Sokoria

Ranakolo

Detusuko

W

 

olowaru

Tendeleo

Maurole

HangalandeMAUMERE

LARANTUKA

Waiklibang

Waerunu

Hikong Nebe

Nangalili

KenariP.RINCA

P.KOMODO

Riung

Poma

Aegela

AeramoTowak

Pausolek

Sawu

PauDere

MenangaNusadane

Lewohedo

RitaebangRiangsungai

Lamakera

P. ADONARA

WitihamaKolilanang

Waiwerang

Waiwuring

WaiwadanWaihama

Wailebe

KAB. MANGGARAI

KAB. NGADAKAB. ENDE

KAB. SIKKA

KAB. FLORES TIMUR

Kedindi

 

Reo

Nita

Junction

ENDE

WAIKABUBAK

Waikelo

 G a ur  a

    L   o    k   o   r    i

WAITABULA

Km. 35LEWA

P. SUMBA

    K   a   w   a   n   g   u

 

Bukambani Wonoroto

    T   a   m    b   o    l   a    k   a

Praipaha

Tidas

Aukakehok

Umananu

Kananggar 

Lumbung

Malahar 

Wahang

Kanta

Ramuk

Tanarara

Sp. Mahubokul

 

Ngadulanggi

Kabanda

Langgi

Kataka

Tamma

    W   a    t   u   m    b   a    k   a

Kamanggih

Maubokul

Kota Liu

Bondokodi

P  a t  i    al    a

W an ok  ak  a

Memboro    K   e    t   e   w   e   r

Radamata

Lolangbokul

Mangnipa

P  a d  e d  ew a t   u

Wikit

Pero

P  an an  g  g o d  e

 S   p.K ah  el    e

Waikapoda

Rita

Tanambanas

MaubanggaUbupede

Wawarongo

Tombo

Waibakul

Katura

Kondamara

Lenang

Padedeweri

Dolo

Tossi

Belagar 

    M   a    h   u    b   o    k   u    l

Kawangohari

WAINGAPU

 

Km. 35LEWA

Nggongi

P. SUMBA

    K   a

 

Praipaha

Mbaing

Tidas

Aukakehok

Umananu

Melolo

Kananggar 

Ngalu

Hambautang

Lumbung

Malahar 

Wahang

Kanta

Ramuk

Tanarara

Sp. Mahubokul

Petawang

Ngadulanggi

Kabanda

Langgi

RendeKataka

Tamma

    W

   u

Kamanggih

Maujawa

Maubokul

Kota Liu

Lolangbokul

Tanambanas Rambangaru

Praikarambua Kondamara

    M   a    h   u

WAINGAPU

Lidewatu

Target

Biaya

KAB. SUMBABARAT

KAB. SUMBATIMUR

 

P. PANTAR 

P. ALOR 

Taramana

Bukapiting

Lelahomi

Apui

Mainang

Kokar 

Lantoka

Kabir 

KALABAHI

 

P. ALOR 

Taramana

Maritaing

Bukapiting

Lelahomi

Apui

Mainang

Mataraben

Lapter.Mali

Lantoka

KALABAHI

P. PANTAR 

Baranusa

KAB. KUPANG

KAB. B E LU

Paket Peningkatan JalanOesapa - Oesao

U

Bolow

Ledeana

Tr iwu

Beh

Namu

Mananga Seba

Mesara

Ege

068 069

P SABURAIJUA

 

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 3,35 Km.Eff : Rp. 5.321.995.000 APBN: PT Waskita Karya::

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 1,34 Km.Eff : Rp. 2.147.768.000 APBN: PT Waskita Karya: 3 Mei 2010: 29 September 2010

Paket Peningkatan JalanBokong - Batu Putih

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 3,96 Km.Eff : Rp. 6.414.414.000 APBN: PT Hutama Karya: 3 Mei 2010: 29 Oktober 2010

Paket Peningkatan Jalan

Niki Niki - Noelmuti

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 1,77 Km.Eff : Rp. 2.583.432.000 APBN: PT Waskita Karya: 3 Mei 2010: 29 Sept 2010

Paket Berkala JalanOesao - Bokong

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 2,65 Km.Eff : Rp. 3.936.582.000 APBN: PTAlam IndahC Lestari

::

Paket Berkala JalanSp.Oesapa - Lap.Terbang Eltari

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 3,53 Km.Eff : Rp. 5.266.012.000 APBN: PTAlam IndahC Lestari

::

Paket Berkala JalanJln. Raya Eltari

TargetNilai KontrakKontraktor 

SPMKRenc. PHO

: 3,05 Km.Eff : Rp. 4.915.838.000 APBN: PTRamayana Cipta Perkasa

: 3 Mei 2010:

Paket Peningkatan JalanNoelmuti - Kefamenanu

KAB. KUPANG

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 2,46 Km.Eff : Rp. 3.886.688.000 APBN: PT Hutama Karya: 3 Mei 2010:

Paket Peningkatan JalanJln. Pattimura, Cs

KAB. KUPANG

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 2,13 Km.Eff : Rp. 3.491.700.000 APBN: PT Dian Nusa Lestari::

Paket Peningkatan JalanKefamenanu - Maubesi

TargetNilai Kontrak

Kontraktor SPMKRenc. PHO

: 2,13 Km.Eff : Rp. 3.111.413.000 APBN

: PT Waskita Karya: 3 mei 2010: 30 Sept 2010

Paket Berkala JalanJln. Gajah Mada (Soe)

KAB. KUPANG

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 1,83 Km.Eff : Rp. 2.960.500.000 APBN: PT Nindya Karya: 3 Mei 2010:

Paket Peningkatan JalanMaubesi - Nesam

KAB. KUPANG

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 2,13 Km.Eff : Rp. 3.339.481.000 APBN: PT Waskita Karya: 3 Mei 2010: 30 September 2010

Paket Peningkatan JalanAtambua - Motaain

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 2,66 Km.Eff : Rp. 4.294.005.000 APBN: PT Teratai: 3 Mei 2010: 29 Oktober 2010

Paket Peningkatan JalanJln. Matawi Amahul (Waingapu)

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 3,05 Km.Eff : Rp. 4.978.870.000 APBN: PT Teratai: 3 Mei 2010: 29 Oktober 2010

Paket Peningkatan JalanWaingapu - Km. 35

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 1,77 Km.Eff : Rp. 2.640.346.000 APBN: PT Nusa Jaya Abadi: 3 Mei 2010: 29 September 2010

Paket Berkala JalanJln. Suprapto, Cs (Waingapu)

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 2,21 Km.Eff : Rp. 3.304.200.000 APBN: PT Teratai::

Paket Berkala JalanKm. 35 - Bts. Sumba Timur 

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 3,55 Km.Eff : Rp. 5.980.599.000 APBN: PT Sahabat Baru Sejahtera

: 3 Mei 2010: 29 Oktober 2010

Paket Peningkatan JalanBts. Sumba Timur - Waikabubak

TargetNilai Kontrak

Kontraktor SPMKRenc. PHO

: 4,88 Km.Eff : Rp. 7.982.104.000 APBN

: PT Bumi Indah: 3 Mei 2010: 29 Oktober 2010

Paket Peningkatan JalanWaitabula - Waikelo

Target

Biaya

TargetNilai Kontrak

Kontraktor SPMKRenc. PHO

: 3,20 Km.Eff : Rp. 4.578.981.000 APBN

: PT Mitra: 3 Mei 2010: 29 Oktober 2010

Paket Berkala JalanBts. Sumba Timur - Waikabubak

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 3,53 Km.Eff : Rp. 4.466.665.000 APBN: PTTiga Dara Karya Sejahtera

: 3 Mei 2010: 29 September 2010

Paket Berkala JalanKalabahi - Taramana

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 24,00 m.Eff : Rp. 3.456.788.000 APBN: PT Sumber Oeluan: 3 Mei 2010: 5 Sept 2010

Paket Peningkatan JembatanLoho

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 10,00 m.Eff : Rp. 1.478.163.000 APBN: PTAlam Flores KsoPTEzra

: 3 Mei 2010: 28 November 2010

Paket Peningkatan JembatanLendewacu 2 (Sumba Barat)

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 10,00 m.Eff : Rp. 1.308.488.000 APBN: PT Anggrek Merah: 3 Mei 2010: 29 September 2010

Paket Peningkatan JembatanTakaliliang (Alor)

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 10,00 m.Eff : Rp. 294.050.000 APBN: CV Alva Angkasa::

Paket Berkala JembatanKalembukuni

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 160,90 m.Eff : Rp. 4.813.700.000 APBN: PT Dian Nusa Lestari::

Paket Berkala JembatanP. Timor 

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 2,44 Km.Eff : Rp. 3.948.685.000 APBN: PT Yetty Darmawan: 26 April 2010: 21 November 2010

Paket Peningkatan JalanEnde - Detusoko

KAB. KUPANG

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 2,44 Km.Eff : Rp. 3.934.966.000 APBN: PT Yetty Darmawan: 26 April 2010: 21 November 2010

Paket Peningkatan JalanJunction - Woloaru

KAB. KUPANG

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 2,44 Km.Eff : Rp. 3.939.998.000 APBN: PT Nindya Karya: 26 April 2010: 21 November 2010

Paket Peningkatan JalanLianunu - Hepang

KAB. KUPANG

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 2,44 Km.Eff : Rp. 3.900.523.000 APBN: PT Nindya Karya: 26 April 2010: 21 November 2010

Paket Berkala JalanWoloaru - Lianunu

KAB. KUPANG

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 14,00 m.Eff : Rp. 1.673.175.000 APBN: PT Novita Karya Taga: 26 April 2010: 21 November 2010

Paket Peningkatan JembatanMengulewa 1

KAB. KUPANG

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 341,10 m.Eff : Rp. 10.215.000.000 APBN: PT Usaha Karya Buana::

Paket Berkala JembatanP. Flores

KAB. KUPANG

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 1,83 Km.Eff : Rp. 2.890.594.000 APBN: PT Waekuli Saranamega: 26 April 2010: 17 Oktober 2010 

Paket Peningkatan JalanKm. 210 - Ruteng

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 2,04 Km.Eff : Rp. 3.145.620.000 APBN: PT Floresco Aneka Indah

: 26 April 2010: 17 Oktober 2010

Paket Peningkatan JalanA. Yani Cs. - Ruteng

KAB. KUPANG

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 4,42 Km.Eff : Rp. 6.466.792.000 APBN: PT Waekuli Saranamega: 14 April 2010: 10 Oktober 2010:

Paket Berkala JalanBts. Manggarai - Km. 210

KAB. KUPANG

TargetNilai KontrakKontraktor 

SPMKRenc. PHO

: 3,05 Km.Eff : Rp. 4.961.504.000 APBN: PT Waekuli Saranamega

: 14 April 2010: 10 Oktober 2010:

 

Paket Peningkatan JalanBts. Manggarai - Km. 210

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 4,42 Km.Eff : Rp. 6.643.592.000 APBN: PT Waekuli Saranamega: 26 April 2010: 16 November 2010

Paket Berkala JalanKm. 210 - Ruteng

KAB. KUPANG

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 3,08 Km.Eff : Rp. 4.596.789.000 APBN: PTKencana S Nusantara

: 26 April 2010: 21 November 2010

Paket Berkala JalanSp. Bajawa - Bts. Manggarai

KAB. KUPANG

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 3,23 Km.Eff : Rp. 5.284.002.000 APBN: PT Alam Flores: 26 April 2010: 21 November 2010

Paket Peningkatan JalanWaepare - Km. 180

KAB. KUPANG

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 2,44 Km.Eff : Rp. 3.873.307.000 APBN: PT Talenta Jaya Rentalindo

: 26 April 2010: 21 November 2010

Paket Peningkatan JalanKm. 180 - Waenunu

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 2,98 Km.Eff : Rp. 4.436.345.000 APBN: PT Alam Flores: 26 April 2010: 21 Novemebr 2010

Paket Berkala JalanMaumere - Waepare

KAB. KUPANG

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 2,86 Km.Eff : Rp. 4.270.000.000 APBN: PT Talenta Jaya Rentalindo

::

Paket Berkala JalanWaerunu - Larantuka

KAB. KUPANG

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 1,90 Km.Eff : Rp. 6.600.000.000 APBN: PT Talenta Jaya Rentalindo

::

Paket Berkala JalanBasuki Rahmat Cs. ( Larantuka)

KAB. KUPANG

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 2,99 Km.Eff : Rp. 4.791.343.000 APBN: PT Floresco Aneka Indah: 26 April 2010: 21 November 2010

Paket Peningkatan JalanMalwatar - Labuhan Bajo

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 2,65 Km.Eff : Rp. 3.923.351.000 APBN: PT Floresco Aneka Indah

: 26 April 2010: 21 November 2010

Paket Berkala JalanRuteng - Malwatar 

Paket Pembangunan JalanOesapa - Oesao

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 2,50 Km.Eff : Rp. 5.621.209.000 APBN: PT Waskita Karya::

Paket Pembangunan JalanOesapa - Bokong

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 3,00 Km.Eff : Rp. 6.889.375.000 APBN: PT Waskita Karya: 19 April 2010: 18 Oktober 2010

Paket Pembangunan JalanSoe - Niki Niki

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 2,00 Km.Eff : Rp. 4.414.413.000 APBN: PT Hutama Karya: 21 April 2010: 17 Oktober 2010

Paket Pembangunan JalanJunction - Mali

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 1,05 Km.Eff : Rp. 2.051.875.000 APBN: PT Adhi Karya: 21 April 2010: 29 Oktober 2010

Paket Pembangunan JalanTaramana - Lantoka - Maritaing

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 2,00 Km.Eff : Rp. 4.913.483.000 APBN: PT Adhi Karya: 21 April 2010: 17 Oktober 2010

Paket Pembangunan JalanHalilulik - Atambua

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 3,00 Km.Eff : Rp. 6.917.700.000 APBN: PT Nindya Karya: 21 April 2010: 18 Oktober 2010

Paket Pembangunan JalanLingkar Luar Kota Kupang

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 3,00 Km.Eff : Rp. 7.166.291.000 APBN: PTAlam IndahC Lestari

::

Paket Pembangunan JalanEnde - Detusoko

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 2,00 Km.Eff : Rp. 7.168.919.000 APBN: PT Yetty Darmawan: 16 April 2010: 11 November 2010

KAB. KUPANGaket Pembangunan Jalan

Detusoko - Wologai

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 2,00 Km.Eff : Rp. 6.535.041.000 APBN: PT Yetty Darmawan: 16 April 2010: 11 November 2010

Paket Pembangunan JalanReo - Dampek - Pota - Riung

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 2,00 Km.Eff : Rp. 4.984.599.000 APBN: PT Sinar99: 16 April 2010: 11 November 2010

KAB. KUPANG

Paket Pembangunan JalanNggorang - Terang

TargetNilai KontrakKontraktor SPMK : 16 April 2010Renc. PHO : 11 November 2010

: 1,80 Km.Eff : Rp. 4.469.003.000 APBN: PT Putra Mas Pratama

Paket Pembangunan JalanRuteng - Reo - Kedindi

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 4,80 Km.Eff : Rp. 11.960.999.000 APBN: PT Menara Armada Pratama

: 16 April 2010: 11 Desember 2010

Paket Pembangunan JalanWaerunu - Larantuka

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 3,40 Km.Eff : Rp. 8.500.000.000 APBN: PT Talenta Jaya Rentalindo

::

KAB. KUPANGPaket Pembangunan JalanNita - Woloara

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 2,84 Km.Eff : Rp. 7.090.882.000 APBN: PT Nindya Karya: 26 April 2010: 12 November 2010

Paket Pembangunan JalanWaitabula - Waikabubak

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 1,60 Km.Eff : Rp. 3.984.846.000 APBN: PT Bumi Indah: 20 April 2010: 16 September 2010

Paket Pembangunan JalanWaingapu - Km. 35.00

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 1,83 Km.Eff : Rp. 4.536.578.000 APBN: PT Teratai::

SNVT PRESERVASI JALAN DAN JEMBATAN NTT

KETERANGAN :

SNVT PRESERVASI JALAN DAN JEMBATAN FLORES

SNVT PEMBANGUNAN JALAN DAN JEMBATAN NTT

SNVT PEMBANGUNAN JALAN DAN JEMBATAN FLORES

SNVT PEMBANGUNAN JALAN DAN JEMBATAN SUMBA

top related