2010 pollution prevention minimization
DESCRIPTION
pollution prevention minimizationTRANSCRIPT
Tujuan:
Peserta mengetahui tahapan proses di industri yang menghasilkan limbah sehingga peserta memahami prinsip meminimumkan limbah demi mempertahankan kualitas lingkungan
oleh: Retno Gumilang Dewi
Pencegahan Pencemaran dan Minimisasi Limbah B-3 (Bahan Berbahaya dan Beracun)
Minimisasi Limbah Sebagai Salah Satu Strategi Pencegahan Pencemaran Limbah
Pencegahan Pencemaran (Pollution Prevention): pencegahan terbentuknya polutan di sumber pencemaran - minimisasi limbah (prevention-reduction, recycling-re-use-recovery); - pengolahan limbah (padat-cair-gas secara fisika, kimia, biologi);- penanganan pada saat penyimpanan dan penanganan disposal
(insinerasi atau land fill/dumping).
Minimisasi LimbahReduksi limbah dari sistem produksi sebelum limbah mengalami proses
pengolahan, penyimpanan, dan pembuangan akhir pada tingkat yang dimungkinkan dari segi volume maupun tingkat bahaya/toksisitas limbah yang bersangkutan.
2Pollution Prevention and Waste Minimization
3
Pollution Prevention Hierarchy
Prevention & Reduction(Source – reduction)
Recycling & Re-Use(in-process recycle, on-site-recycle, off-site
recycle)
Treatment
Disposalsecure disposal or direct
release to the environment
Pollution Prevention and Waste Minimization
4
Minimisasi Limbah
Waste minimization techniques
Source reduction Recycling(on site and off site)
Product changes- product substitution- product conservation- change in product composition
Source control Use and reuse- return to original process- raw material substitute for another process
Reclamation- processes for resource recovery- processes as a by- product
Input material changes
- material purification- material substitution
Technology changes
- process changes- equipment, piping, or layout changes- additional automation- change in operational settings
Good operating practices- procedural measures- loss prevention- management practices- wastestream segregation- material handling improvements- production scheduling
Pollution Prevention and Waste Minimization
5
Penerapan Minimisasi Limbah Pada Sistem Proses
PROSESUTAMA
Karakteristik:
Efisienterhadap
penggunaanbahan dan
energi
Mitigatifterhadap
pembentukanpolutan/limbah
Proses daurulang
(recycle )
Proses-prosespengurangan
limbah/polutan
Pre-treatmentProcesses
Market andPost
Processingof Products
Waste RepositorySystem
Pelepasan kelingkungan
MinimumHazardous Waste
Bahan baku yang masihmengandung polutan
Bahan bakubebas polutan
PRODUK
Limbah yang ramah lingkungan(Environmental Benign Wastes )
Limbah yang mengandung polutan
PRODUK
Limbah yangmengandung polutan
Bahan bakubebas polutan
Pollution Prevention and Waste Minimization
6
SOURCE REDUCTION
Definisi- Source reduction, melibatkan pengurangan limbah di
sumber pencemar dalam suatu proses, merupakan pilihan paling layak dalam hirarki pencegahan pencemaran.
- Menghindari pembentukan limbah, source reduction mengurangi masalah penanganan & pembuangan limbah.
Sumber potensial kehilangan bahan (material loss)- Loading & Un-loading- Storage- Process
Pollution Prevention and Waste Minimization
7
Loss prevention dan Segregasi
Mengurangi limbah dengan menghindari tumpahan/kebocoran peralatan. Cara efektif mengurangi limbah yang dihasilkan:
- perancangan tangki sesuai dengan rancangan yang disyaratkan;
- memasang bendungan (dike) untuk menampung tumpahan;
- memasang safety valve, dan lain-lain.
Segregasi - Mengurangi volume limbah B3 dengan mencegah
tercampurnya limbah B3 dan non B3 - Memerintahkan semua pekerja melaksanakan aturan
penting pencegahan pencemaran. Pertama-tama para pekerja harus memahami mengapa prosedur pengelolaan limbah diterapkan.
Pollution Prevention and Waste Minimization
Waste Segregation for Hazardous Waste
Hazardous waste : any waste or combination of wastes that pose a danger
immediately or over a period of time to human, animal or plant life.
A waste is classified as hazardous if it exhibits any characteristic of a Hazardous Substance”.
Hazardous wastes :
• Used battery,
• fluorescent lamp,
• paint & thinner,
• waste lube oil,
• contaminated drum/packaging, etc 8
Pollution Prevention and Waste Minimization
Waste Segregation for Non Haz. Waste
Non Hazardous Waste:- biodegradable waste :
food waste, - burnable waste : e.g. paper,
cardboard, wood (Some are reusable/office paper)
- non-burnable waste : tin cans, tires, plastics, glass, etc
- scrap metal, - inert waste : rubble,
earthworks, gravel, non-contaminated fill, etc.
9Pollution Prevention and Waste Minimization
10
Perubahan prosedur di dalam managemen, organisasi, dan fungsi-fungsi personal produksi
Membutuhkan sedikit biaya kapital dan menghasilkan tingkat pengembalian investasi yang tinggi
Segala ukuran perusahaan dapat menerapkannya
Perubahan prosedur meliputi:- Loss Prevention- Penanganan material- Perbaikan jadwal - Segregasi- Praktek yang melibatkan pegawai (personnel)
PERUBAHAN PROSEDUR
Pollution Prevention and Waste Minimization
11
Penanganan bahan dan pelaksanaan inventori
Pengurangan kehilangan material akibat kesalahan penanganan, habisnya waktu hidup (shelf life) dari bahan-bahan yang senstif terhadap waktu (time-sensitive material)
Perubahan jadwal
Produksi batch menurunkan frekuensi pembersihan peralatan
Contoh
Penjadwalan batch di pabrik cat harus berturut-turut dari terang ke gelap untuk mengurangi kebutuhan pembersihan dan untuk memperbaiki keseragaman warna.
Penanganan bahan dan pelaksanaan inventori
Pollution Prevention and Waste Minimization
12
PERUBAHAN TEKNOLOGI
Perubahan teknologi dengan modifikasi proses dan peralatan untuk mengurangi limbah, terutama sejak tahap perancangan.
Modifikasi teknologi memerlukan personil dan biaya kapital yang lebih besar dibandingkan dengan perubahan prosedur.
Perubahan teknologi diterapkan setelah menelusuri semua perubahan prosedur yang mungkin.
Modifikasi teknologi- Perubahan proses;- Peralatan, perpipaan, atau perubahan layout;- Perubahan kondisi operasi;- Penambahan otomatisasi atau pengendalian.Pollution Prevention and Waste Minimization
13
Perubahan proses melalui inovasi teknologi untuk mengembangkan proses baru guna mendapatkan produk akhir berkualitas sama tetapi mengurangi limbah. Modifikasi/penggantian peralatan akan mengurangi limbah dengan meningkatkan efisiensi peralatan.
Perubahan kondisi operasi melibatkan perubahan operasi peralatan, termasuk pengaturan temperatur, tekanan, laju alir, dan waktu tinggal.
Contoh:
Perusahaan electroplating dapat mengubah laju alir kromium dalam bak plating hingga kondisi optimum untuk mengurangi konsentrasi kromium yang digunakan sehingga limbah kromium yang terbentuk berkurang.
Pengendali operasi tambahan (otomatisasi) untuk perbaikan monitoring dan pengaturan parameter operasi untuk menjamin efisiensi tinggi.
PERUBAHAN PROSES
Pollution Prevention and Waste Minimization
14
PERUBAHAN BAHAN YANG DIGUNAKAN
Perubahan material input dalam beberapa kasus membantu program pencegahan pencemaran dengan mengurangi material-material limbah yang memasuki proses.
Perubahan material input dimasukkan ke dalam kategori substitusi dan pemurnian material.
PERUBAHAN PRODUK
Perubahan produk dilakukan oleh pembuat produk dengan maksud mengurangi limbah yang dihasilkan dari penggunaan produk termaksud.
Contoh: pabrik cat memproduksi cat water-based sebagai pengganti cat solvent-based
Pollution Prevention and Waste Minimization
15
PERMASALAHAN PENGURANGAN LIMBAH DI SUMBERNYA
Hambatan
• Kualitas produk yang harus dipenuhi
• Biaya besar
• Kualitas produk tidak dapat dikorbankan sebagai hasil usaha pencegahan pencemaran
Pollution Prevention and Waste Minimization
ISO 14001:2004 Structure (Total = 17 element / clausal)
Continual Improvement
Management Review
Checking & Corrective Action Monitoring & measurement Evaluation of compliance Nonconformity, corrective action &
preventive action Control of records Internal audit
Environmental Policy
Planning Environmental aspects Legal & other requirements Objectives, targets and programe
Implementation & Operation Resources, roles, responsibility & authority Competence, training and awareness Communication Documentation Control of documents Operational control Emergency preparedness and response
ISO 14001:2004 Structure (Total = 17 element / clausal)
Continual Improvement
Management Review
Checking & Corrective Action Monitoring & measurement Evaluation of compliance Nonconformity, corrective action &
preventive action Control of records Internal audit
Environmental Policy
Planning Environmental aspects Legal & other requirements Objectives, targets and programe
Implementation & Operation Resources, roles, responsibility & authority Competence, training and awareness Communication Documentation Control of documents Operational control Emergency preparedness and response
ISO 14001:2004 Structure (Total = 17 element / clausal)
Continual Improvement
Management Review
Checking & Corrective Action Monitoring & measurement Evaluation of compliance Nonconformity, corrective action &
preventive action Control of records Internal audit
Environmental Policy
Planning Environmental aspects Legal & other requirements Objectives, targets and programe
Implementation & Operation Resources, roles, responsibility & authority Competence, training and awareness Communication Documentation Control of documents Operational control Emergency preparedness and response
ENVIRONMENTAL MANAGEMENT
16Pollution Prevention and Waste Minimization
Waste Management
Responsibilities - for each TI actor on site - highlight interfaces with other sites, - inventory the third parties involved
with name and contact of main re-presentatives
RSES
SES
Spv/Sup
All personnel: - knowing the actual and potential waste stream
routes- attending any training and/or environmental talks
related to waste management, - adhering to the communication campaigns.
17Pollution Prevention and Waste Minimization
Waste Management – Responsibility
Site Env.Supervisor Implement & monitor on Site- Monthly register waste - Segregate, label,
storageManage the risks on
Site: - Ensuring compliance - Appointing a Waste
Handler, - Maintaining & Improve
waste management practices
- Validate waste data
Superintendent/Supervisor:
Ensure all chemical storage, handling &disposal .
Monitor that procedures are followed on site.
Head of Env. Dept. Develop & maintain TI WMP Communicate WMP Auditing Getting Permits Collect data for report to
DGEP, etc
18Pollution Prevention and Waste Minimization
WASTE MANAGEMENT
References: • PP no. 18/1999 jo PP 85/1999), • Kep-Bapedal no.1,2,3,4,5 / 1995• SOP Waste Management • SOP Waste Documentation procedure
Scope of Waste management
Handling Storing Transferrin
gTreating & Disposing
Recording
19Pollution Prevention and Waste Minimization
How to Manage Waste ?
Identification of licensed Waste Handlers to treat and dispose of waste streams
Waste Handler
Internal : Use WTN Refer to SOP No...
External : Hazardous Waste
Manifest (HWM) Refer to SOP No...
Symbol & label
20Pollution Prevention and Waste Minimization
How to Manage Waste ?
Site inspection program: - planned general
inspection lists and schedule,
- audit schedules and action plans,
Training: - annual training
program relating to Waste
- individual schedule of site personnel
CHECKLIST
21Pollution Prevention and Waste Minimization
Waste Management records
Records Waste Register: qualitative and
quantitative record of waste generation, Waste Transfer Notes/WTN Hazardous Waste Manifests (if any), Anomaly reports for non-conformance,
action plans and follow up,
22Pollution Prevention and Waste Minimization
Waste Management records
23Pollution Prevention and Waste Minimization
Waste Management Strategy
Prior to treatment and disposal, the following options should be reviewed:
•Reduce: Substitution with longer life alternatives, respect expiry dates, use bulk supply
•Reuse/ Recycle: Return to Supplier, or recycle by Licensed Hazardous Waste Contractor
•Treatment/ Disposal: Treatment and disposal must be performed with license from Ministry of Environment or internal treatment.
24Pollution Prevention and Waste Minimization
Chemical Management
Definition: Hazardous SubstancesMaterial due to its nature and or concentration and or quantity, directly or indirectly, may pollute and or damage the environment, and or may harm the environment, health, human and other living organism existence
(PP 74 Th. 2001)
Clasification of Hazardous Substances:-Very toxic-Toxic-Harmful-Corrosive-Irritant-Danger of sensitisation-Carcinogenic-Teratogenic-Mutagenic-Dangerous for the environment. 25Pollution Prevention and Waste Minimization
Hazardous Substances Management
Ensure proper Handling & Storing
Keep clean & tidy, far from ignition not store in direct sun, inspect on a regular basis, fire protection & spillage recovery equipment.
MSDS
26 Respect for the Environment – System in Place 26Pollution Prevention and Waste Minimization
Hazardous Substances Management
Employees /third party must be made fully aware of:
- the hazards - protective clothing,- First aid - MSDS,- Disposal & protective
measures to Environment.
27Pollution Prevention and Waste Minimization
Responsibility
RSES : • ensuring the safe custody of haz..substances,• designating areas for the storage of haz.subst.,• adhering to safe procedures on transport, storage,
use & disposal of hazardous substances.
HSE:- assisting in developing SSI,- evaluation of safety & environment
acceptability - maintaining MSDS database - update of contingency plans
END USER• Understand the hazard of chemicals,• Ensure PO/contract, incl. MSDS, correct labeling, etc• Ensure safety & Env Precautions & Use PPE.
Site S & E SPT/SUPV• maintaining SSI • verifying MSDS • Inspection practices • participating in risk assessments
The Company Doctors (HSE/MED) -Provide advice/assistance on hazardous substances -Audits.
The Procurement/ Logistic services :• ensuring that the supplier for MSDS, packaging,
label, transport requirements.• forwarding MSDS to relevant personnel• training & communication of handling & storage
practices within the warehouses. 28Pollution Prevention and Waste Minimization
MSDS
Ref: KEP. MENAKER 187/MEN/ 1999
Provided by Vendor/Supplier (English & Indonesia), in paper & Electronic, and available on site
29Pollution Prevention and Waste Minimization
30
Symbol & Lable
30Pollution Prevention and Waste Minimization
The HSE Management System
Policy & Objectives - MAESTRO Rules & Regulation, Environmental Studies
EIA/AMDAL & RKL/RPL EBS & ESIA
Implementation & Operation Waste Mgmt & Chemical Mgmt ERP - Emergency Response &
Preparedness Monitoring & Reporting Review & Audit
3131Pollution Prevention and Waste Minimization
Emergency Team Preparedness
Oil Spill Contingency Plan Training Level 1 and 2.
Periodic ERT (Emergency Response Team) drill.
Periodic Emergency Exercise, including Major Scale Emergency Exercise.
32Pollution Prevention and Waste Minimization
OSCP
To set in motion the necessary actions to stop or minimize any discharge of oil and to mitigate its effects.
Provides an emergency notification system & standard forms for oil spill reporting.
Explains the escalation process from Tier 1 to Tier 2 and Tier 3 incidents.
Outlines a system for command and control.
Provides checklists of actions to be taken by key personnel during an oil spill response
Slide ShowOSCP
33Pollution Prevention and Waste Minimization
34 Respect for the Environment – Concrete Production
Hazardous Waste Transfer Area
34Pollution Prevention and Waste Minimization
IPOC
35Pollution Prevention and Waste Minimization
Initial Action Procedures
36Pollution Prevention and Waste Minimization
First response to spill – PEAR Principle
The priorities in an oil spill response :
PEOPLE : Ensure safety of personnel, responders and public
ENVIRONMENT: Protection of sensitive assets in the environment (birds, fish, shellfish and sheltered coastal habitats)ASSETS: Protection of property, socio-economic resources (e.g. shrimp farms, fisheries), and TI installations
REPUTATION• Rapid response, at the correct level• Good organization and efficient communication• Keep people informed (TI personnel, next of kin, public and
the Media)• Be helpful, be honest• Restore the environment to pre-spill state• Deal fairly with claims and compensation• Learn from mistakes
37Pollution Prevention and Waste Minimization
AnPoll Equipment
38Pollution Prevention and Waste Minimization
AnPOll Equipment
39Pollution Prevention and Waste Minimization
Anti Pollution Equipment on Site
40Pollution Prevention and Waste Minimization
The HSE Management System
Policy & Objectives - MAESTRO Rules & Regulation, Environmental Studies
EIA/AMDAL & RKL/RPL EBS & ESIA
Implementation & Operation Waste Mgmt & Chemical Mgmt ERP - Emergency Response &
Preparedness Monitoring & Reporting Review & Audit
41 - Respect for the Environment – System in Place41Pollution Prevention and Waste Minimization
Monitoring
Monitoring: periodical sampling,
measuring and recording, of the characteristics of the environmental elements
Reference: Applicable rules and
regulations RKL/RPL and/ UKL/UPL Site- EMP
Expectation:
Management ensures that significant environmental impact factors are regularly monitored, and the results recorded and reported. These measurements are done in accordance with specific procedures
42Pollution Prevention and Waste Minimization
Regular Environmental Monitoring
Water monitoring
Ambient Air monitoring
Air Emission Monitoring
43Pollution Prevention and Waste Minimization
Responsibilities in Monitoring
Head ENV. Dept : Review the Environmental
Monitoring Plan at Affiliate and Site levels on an annual basis (ref. regulation, AMDAL (RKL/RPL and ESIAs) and TI activity plans.
Produce & maintain RKL/RPL
Approve request for monitoring
Coordinator for a cross-functional team
Oversee environmental monitoring
Initiate the SOP review / 2years
Report to internal & external Ask for correction, in case of
anomalies detected
Any Division/ Department/ Service :
• Inform Head of ENV. Dept. prior to the start-up,
Risk management on Site,
Monitor environmental performances,
Ensuring the Site Env.Monitoring Plan has been prepared, implemented, and reviewed
Validate all environmental data under area responsibility
RSES
Ensure that EMP included in Contract agreement with their contractor(s)
Review the results of monitoring & include them in HSE performance indicators.
Prod. Area Method (FO/Area/MTH)
44Pollution Prevention and Waste Minimization
Element to be Monitored
• Air: industrial air emissions, ambient air, noise, odour.
• Water: liquid discharge e.g. produced water, domestic waste water, leachate, and/or effluent from potable water treatment, ground water, river water and sea water,
• Soil: possibly contaminated soils
• Waste: drill cuttings
monthly report: oil content in produced water,
quarterly report: all parameters in produced water including well and stream water,
6 monthly report: air ambient and noise from each site,
regular intervals: heavy metals of OBM / WBM in exploration wells,
yearly report: implementation of RKL/RPL and UKL/UPL..
Environmental Reporting2007
45Pollution Prevention and Waste Minimization
GHG Reporting
Annual Questionaire Affiliate’s characteristic/production
data, Atmospheric Emission with more
complete detail of GHG sources - Drilling fuel consumption, - Well Operations, burn pits for liquid
and sludge, combustion machines, - direct venting & unburnt gas emission, - storage tank vents, loading, fugitive
emissions, etc..
Monthly Monitoring- Flaring,- Fuel gas, - Liquid fuel, - Venting, - gas parameter,- Net utilized
production.
Refer to SOP GHG Reporting System.Activity Sheet GHG Estimations/ Calculations
46Pollution Prevention and Waste Minimization
Responsibility - GHG Reporting
RSES
Validate all data
PROD SUPT
Provide production and wells daily data
SITE ENV SUPV
Focal point for GHG Reporting at SITE
MAINTENANCE ENTITY
Ensure the compliance of GHG emission production data metering with CR EXP 002
ENVIRONMENTLABORATORY
Perform the laboratory analysis of gas composition of samples
SITE WLS ENTITY
Provide daily data of gas burnt during clean up, offloading, well testing, and
vented gas during LWO and Slick Line operation,
S I T E
47Pollution Prevention and Waste Minimization
The HSE Management System
Policy & Objectives Rules & Regulation, Environmental Studies
- EIA/AMDAL & RKL/RPL- EBS & ESIA
Implementation & Operation Waste Mgmt & Chemical Mgmt ERP - Emergency Response & Preparedness
Monitoring & Reporting Review & Audit
48Pollution Prevention and Waste Minimization
Tools to evaluate conformance of the system (HSE MS, ISO 14001) and/or compliance (Audit for Proper Program)
Responsibility : Management and/or HQ (Env. Review )
SHE Committee Meeting : every 2 months on Site
- Site : Level 1- GM; Level 2 :Division;
- Level 3 -Site, 4- Service
Audit Principles:
- refer to specific criteria, objective evidence
- Personnel : professional, independent, not to find personnel faults, etc
Environmental Reviews and Auditing
49Pollution Prevention and Waste Minimization