03.perencanaan pondasi tapak
DESCRIPTION
teknik sipilTRANSCRIPT
-
Struktur Beton II; Jur. Teknik Sipil, Unimal, 2012 Page 1
PERENCANAANPONDASITAPAKCONTOH01.Hitungbesarnyapembesian (As)yangdibutuhkandari suatupondasi tapak segiempat,dengankondisiperencanaansebagaiberikut:
Bebanmati =465kN BebanHidup =620kN Bebantakterduga =150kN/m2 TekananTanahIzin =5500kN/m2 tanah =21,1kN/m3 beton =23,4kN/m3 Dimensikolom hk =300mm
bk =300mm fckolom =35MPa fcpondasi =25MPa fy =400MPa
Penyelesaian:1. TekananTanahIzin
Tekanantanahiziyangdapatdigunakan(keperluanpraktis)darihasilsondiradalah:qsi= qs5 =
55005
=1100kn/m2
2. EstimasiUkuranTapak(trialanderror)Misalkantebaltapak(hf)=300mm>hmin=150mm(Ps.17.7SNI0328472002)Bebanbebankerja(tanpafaktorbeban)>(Ps.17.2.2) Bebantanah =(1,0)(21,1) =21,1kN/m2 Bebantapak =(0,3)(23,4) =7,02kN/m2 Bebantakterduga =150kN/m2
Totalbebankerja =178,12kN/m2Didapat:Tekanantanahizin=qiz=qsitotalbebankerja=1100178,12=921,88kN/m2Luastapak(Af)=PDL+PLLqiz =
465+620921,88
=1.18m2Dicobaukurantapak=1,1mx1,1m>Af=1.21m2
3. Reaksitanahyangtimbul Bebankolom =(0,3)(0,3)(23,4)(1,0) =2,11kN Bebantapak =(1,1)(1,1)(0,3)(23,4) =8,49kN Bebantanah =(1,210,32)(21,1)(1,0) =23,63kN Bebantakterduga =(1,210,32)(150) =168kN Bebanmati =465kN Bebanhidup =620kN
Totalbeban =1287,23kN
-
Struktur Beton II; Jur. Teknik Sipil, Unimal, 2012 Page 2
Reaksitanah=TotalBebanAf
=1287,231,21 =1063,83kN/m2s=60mm,d=hs=30060=240mm(i) DesainGeserSatuArah
Penampangkritis(Akr)
Akr=B L2 h2d=1,1 1,1
2- 0,32 0,24=0,176m2
GayaGeserNominal(Vn)
Vn=qu Akr =12810,176
0,55 =409,92kN
=0,55>PS.11.3.4KuatGeserBeton(Vc)Vc=1/6f'c bw d>Ps.13.3.1.1=1/625(1100)(240)103=220kN
-
Struktur Beton II; Jur. Teknik Sipil, Unimal, 2012 Page 3
Reaksitanah=1331,571,44 =924,70kN/m2s=60mm,d=hs=40060=340mm(i) DesainGeserSatuArahPenampangkritis(Akr)
Akr=1,2 1,22 -0,32 0,34=0,132m2
GayaGeserNominal(Vn)
Vn=1076,390,1320,55 =258,33kN
KuatGeserBeton(Vc)Vc=1/625(1200)(340)103=340kN>Vn>Ok!(i) DesainGeserDuaArah
PenampangKritis(Akr)Akr=Af(hk+d)2=1.44(0,3+0,34)2=1,03m2GayaGeserNominal(Vn)
Vn=qu Akr =1076,391,03
0,55 =2015,78kN
KuatGeserBeton(Vc)
Vc=1
>Ps.13.12.2.1
bo=4(h+d)=4(0,3+0,34)=2,56m=B/L=1/1=1
Vc=1
x103
=2176kN>Vn>Ok!
-
Struktur Beton II; Jur. Teknik Sipil, Unimal, 2012 Page 4
9. DesainTerhadapLenturPanjangpenampangkritisdarimukakolom(Lk)Lk=L2
h2=1,2
2+ 0,3
2=0,45m
MomenlenturpadatapakMu=quLk2=(1076,39)(0,45)2=109kNm
Tinggistressblockbeton(bloktegangan)(a)
a d - d2- 2Mu0,85 f'c bw =340 - 3402-2109 x
0,85 0,8251200=16,1mm
Luastulanganlentur(As)
As= Mu fyd - a2=109 x 106
0,8400 340 - 16,12 =1026,13mm2