  • DATA PEKERJAAN GALIAN KM. 49+012 - 49+069,7PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I

    STA/KM

    49+012

    CL

    49+029

    49+038,7

    49+043,2

    49+069,7

    2,00 4,00

    1,50

    3,00

    2,70

    2,00 3,30

    4,00

    1,50

    3,00

    2,00 4,00 2,00

    1,202,30

    0 (0/0) 1 (4,00/0)

    3 (7,30/2,00)

    5 (2,50/2,40)

    2 (5,00/2,00)

    4 (7,90/3,20)

    2,40 Galian

    Existing

    0(0/0)

    CELAH

    2(5,30/4,00)

    3(6,80/4,00)

    4(8,30/7,00)

    5(3,50/5,90)

    0 (0/0) 1(4,00/0)

    2(5.50/3,00)3(8,20/3,00)

    4(8,95/4,50)5(2,50/3,50)

    5,90

    3,50

    2,00 4,30 1,502,00

    1,00

    0 (0/0) 1(4,30/0)

    2(5,05/1,50) 3(7,05/1,50)

    4(8,05/2,50)5(2,00/2,00)2,00

    2,00 3,503,00

    2,002,00

    0 (0/0) 1(3,50/0)

    2(5,00/3,00)3(7,00/3,00)

    4(8,00/5,00)5(3,00/4,00)

    2,00

    Galian

    Existing

    1 (3,30/0)

  • STA/KM

  • KM. 49+012 - 49+069,7PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I

    ELEVASI

  • ELEVASI

  • DATA PEKERJAAN GALIAN KM. 49+084,7 - 49+137,1PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I

    STA/KM

    49+084,7

    CL

    49+096,1

    49+114,1

    49+137,1

    2,00 4,403,00

    3,00

    1,50

    0 (0/0) 1 (4,40/0)

    3 (7,40/3,00)

    5 (4,00/5,00)

    2 (5,90/3,00)

    4 (8,90/6,00)

    5,00 Galian

    Existing

    0(0/0)

    5,40

    Galian

    Existing

    2,50

    2,00

    3,00

    1,50

    1 (5,40/0)

    3 (8,65/2,50)

    5 (2,70/3,00)

    2 (6,65/2,50)

    4 (9,40/4,00)

    2,00

    0(0/0)4,00

    Galian

    Existing 1,503,30

    1,50

    1 (5,40/0)

    3 (8,65/2,50)

    5 (2,80/3,30)

    2 (6,65/2,50)

    4 (9,40/4,00)

    2,00 2,20

    4,00

    Galian

    Existing

    1 (4,00/0)

    2,00

    0(0/0)

    2,00

    2,00

    1,50

    2,00

    1,50 2,00

    2 (5,00/2,00)3 (6,50/2,00)

    4 (7,50/4,00)5 (9,50/4,00)

    6 (10,50/6,00)

    8 (12,75/7,50)

    10 (14,35/8,50)

    11 (4,50/7,20)

  • STA/KM

  • KM. 49+084,7 - 49+137,1PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I

    ELEVASI

    1,10 1,00

    1,50

    5 (9,50/4,00)

    6 (10,50/6,00) 7 (12,00/6,00)

    8 (12,75/7,50) 9 (13,85/7,50)

    10 (14,35/8,50)

  • ELEVASI

  • DATA PEKERJAAN GALIAN KM. 49+160,1 - 49+237,1PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I

    STA/KM

    49+160,1

    CL

    49+183,1

    49+216,1

    49+237,1

    4,40

    CELAH / BLANG

    3,50

    Galian

    Existing

    1 (4,00/0)

    2,00

    0(0/0)

    2,50

    1,00

    1,80

    1,20

    1,50

    1,50 2,00

    1,50

    2 (5,00/2,00)3 (6,50/2,00)

    4 (7,50/4,00)5 (9,50/4,00)

    6 (10,50/6,00)

    8 (12,75/7,50)

    10 (14,35/8,50)11 (5,50/8,70)

    4,00 2,00

    2,002,50

    2,00 2,00

    1,50

    Existing

    1 (4,00/0)0(0/0)

    2 (5,00/2,00)3 (7,00/2,00)

    4 (8,25/4,50)5 (10,25/4,50)

    6 (11,25/6,50)7 (12,75/6,50)

    8 (13,25/7,50)

    10 (14,75/8,50)

    11 (4,50/7,40)

    Galian

    4,00

    Existing

    1 (4,00/0)

    Galian

    2,00

    2,004,00

    1,502,00

    1,003,00

    7 (4,70/8,00)

    2 (6,00/4,00)3 (7,50/4,00)

    4 (8,50/6,00)5 (9,50/6,00)

    6 (11,00/9,00)

    4,50

    Existing2,00 1,50

    1 (4,50/0)

    2 (5,25/1,50)

    3 (0,90/1,20)

  • STA/KM

  • KM. 49+160,1 - 49+237,1PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I

    ELEVASI

    1,002,00

    1,506 (10,50/6,00) 7 (12,00/6,00)

    9 (13,85/7,50)

    10 (14,35/8,50)

    2,00

    1,50 1,00

    1,001,00

    5 (10,25/4,50)

    7 (12,75/6,50)

    8 (13,25/7,50) 9 (14,25/7,50)

    10 (14,75/8,50)

    5 (9,50/6,00)

    6 (11,00/9,00)

  • ELEVASI

  • DATA PEKERJAAN GALIAN KM. 49+244,1 - 49+290,1PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I

    STA/KM

    CL

    49+244,1

    49+253,1

    49+290,1

    3,00

    3,00

    GalianExisting

    1 (3,00/0)

    2,00

    0(0/0)

    7 (3,00/6,30)

    4,00 2,50

    2,50

    2,00

    1,50

    Existing

    1 (4,00/0)0(0/0)

    2 (5,25/2,50)3 (6,75/2,50)

    4 (8,00/5,00)5 (10,00/5,00)

    6 (11,25/7,50)

    8 (15,25/11,50)

    11 (5,90/11,90)

    Galian

    4,50

    ExistingGalian

    2,00

    2,002,20

    2,50

    2,501,50

    1,502,00

    3 (5,75/2,50)

    5 (8,50/5,00)

    6 (9,50/7,00)

    4 (7,00/5,00)

    2 (4,25/2,50)

    2,50

    2,00

    2,00 1,50

    1,00 1,50

    2,00

    1 (4,50/0)0(0/0)

    2 (5,60/2,20)

    4 (8,35/3,70)

    6 (10,10/5,20)

    8 (12,85/6,70)

    11 (4,50/7,90)

    3 (7,60/2,20)

    5 (9,35/3,70)

    7 (12,10/5,20)7,90

  • STA/KM

  • KM. 49+244,1 - 49+290,1PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I

    ELEVASI

    4,00

    2,00

    5 (10,00/5,00)

    6 (11,25/7,50)7 (13,25/7,50)

    8 (15,25/11,50)9 (17,25/11,50)

    10 (18,25/13,50)

    2,005 (8,50/5,00)

    6 (9,50/7,00)

    2,00

    1,50

    2,00 2,008 (12,85/6,70)

    5 (9,35/3,70)

    7 (12,10/5,20)

    9 (14,85/6,70)

    10 (15,85/8,70)

  • ELEVASI

  • DATA PEKERJAAN GALIAN KM. 49+314,1 - 49+398,1PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I

    STA/KM

    49+314,1CL

    49+335,1

    49+376,1

    49+383,1

    49+398,1

    7,00

    CELAH

    3,00GalianExisting

    1 (7,00/0)

    2,00

    0(0/0)

    3 (1,50/2,50)

    8,00 2,50

    Existing

    1 (8,00/0)0(0/0)

    2 (9,25/2,50)3 (10,25/2,50)

    9 (5,50/6,80)

    Galian

    ExistingGalian

    2,00

    2,00

    2 (8,50/7,00)

    1 (4,00/0)0(0/0)

    11 (4,50/6,40)

    1,00 1,50

    1,504 (11,00/4,00)

    6 (13,50/6,00)

    6,80

    4,00 1,00

    1,50 1,50

    1,502,50

    2,00

    Existing2,00

    3 (0,50/0,90)

    6,40

    3 (6,00/1,00)2 (4,50/1,00)

    4 (6,75/2,50)5 (9,25/2,50)

    6 (10,00/4,00)7 (12,00/4,00)

    8 (13,00/6,00)

    10 (15,00/7,00)

    Existing

    2,00

    0(0/0)1,20

    5,501 (5,50/0)

    2 (6,10/1,20)

    0,90

    3 (0,50/2,00)

    0(0/0)

    3,006,00

    1 (6,00/0)

    2 (6,15/3,00)

    0,90

  • STA/KM

  • KM. 49+314,1 - 49+398,1PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I

    ELEVASI

    2 (9,25/2,50)3 (10,25/2,50)

    1,50 2,00

    2,00 1,50

    5 (12,50/4,00)

    6 (13,50/6,00) 7 (15,50/6,00)

    8 (16,25/7,50)

    1,50

    2,00

    1,00

    7 (12,00/4,00)

    8 (13,00/6,00)9 (14,50/6,00)

    10 (15,00/7,00)

  • ELEVASI

  • DATA PEKERJAAN GALIAN KM. 49+432,1 - 49+523,1PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I

    STA/KM

    CL

    49+432,1

    49+448,1

    49+507,1

    49+523,1

    3,50

    Galian

    Existing

    1 (3,50/0)

    2,00

    0(0/0)

    11 (6,50/9,90)

    Existing

    Galian

    2,00

    0(0/0)

    6,00

    2,90

    Existing

    2,00

    0(0/0) 1 (6,50/0)

    2,00

    1,50 2,00

    1,50 2,00

    1,50

    2 (4,50/2,00)3 (6,00/2,00)

    4 (7,00/4,00)5 (8,50/4,00)

    6 (9,50/6,00)7 (11,00/6,00)

    9,90

    7,502,00

    1,50

    1,50

    1,50Galian

    Existing

    1 (7,50/0)

    2,00

    0(0/0)

    7 (5,50/5,80)

    2 (8,50/2,00) 3 (9,50/2,00)5,80

    4 (10,25/3,50)

    6 (13,00/6,00)

    2,00

    2,002,00

    1 (7,50/0)

    5 (2,50/2,90)

    2 (8,50/2,00)3 (10,50/2,00)

    4 (11,50/4,00)

    6,50 2,10

    1,80 1,50

    1,50

    3 (9,35/2,10)2 (7,55/2,10)

    4 (10,10/3,60) 5 (11,60/3,60)

    6 (12,10/4,60)

    8 (14,60/6,60)

    9 (3,50/4,90)

    4,90

  • STA/KM

  • KM. 49+432,1 - 49+523,1PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I

    ELEVASI

    2,00

    2,00

    3,00

    6 (9,50/6,00)7 (11,00/6,00)

    8 (12,00/8,00)9 (14,00/8,00)

    10 (15,50/11,00)

    1,50

    1,50

    2,50

    3 (9,50/2,00)

    5 (11,75/3,50)

    6 (13,00/6,00)

    3 (10,50/2,00)

    1,001,50 2,00

    5 (11,60/3,60)

    7 (13,60/4,60)

    8 (14,60/6,60)

  • ELEVASI

  • DATA PEKERJAAN GALIAN KM. 49+571,1 - 49+620,1PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I

    STA/KM

    CL

    49+571,1

    49+577,1

    49+620,1

    CELAH / BLANG

    8,50

    Galian

    Existing

    1 (8,50/0)

    2,00

    0(0/0)

    7 (5,50/7,00)

    Existing

    Galian

    2,00

    0(0/0)

    4,00

    5,00

    2,002 (9,50/2,00)

    7,504,00

    Galian

    Existing

    1 (7,50/0)

    2,00

    0(0/0)

    5 (5,00/5,80)

    2,50

    2,003,50

    1 (4,00/0)

    5 (3,50/5,00)

    2 (5,25/2,50)3 (7,25/2,50)

    4 (9,00/6,00)

    1,50 1,503 (11,00/2,00)

    4 (11,75/3,50)7,00

    1,50

    2 (9,50/4,00)3 (11,00/4,00)

    4 (12,50/7,00)

    5,80

  • STA/KM

  • KM. 49+571,1 - 49+620,1PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I

    ELEVASI

    2 (9,50/2,00)

    1,50

    1,50

    4,70

    3 (11,00/2,00)

    5 (13,25/3,50)

    6 (15,60/8,20)

    3,00

    2 (9,50/4,00)3 (11,00/4,00)

    4 (12,50/7,00)

  • ELEVASI

  • DATA PEKERJAAN GALIAN KM. 50+620 - 50+701PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I

    STA/KM

    CL50+620

    50+641

    50+701

    5,50Galian

    Existing

    1 (5,50/0)

    2,00

    0(0/0)

    2,602 (6,80/2,60)

    3 (3,00/1,90)1,90

    4,50Galian

    Existing

    1 (4,50/0)

    2,00

    0(0/0)

    4,50

    2 (6,75/4,50)3 (2,50/3,60)

    3,60

    3,00

    Galian

    Existing

    1 (3,00/0)

    2,00

    0(0/0)

    4,20

    2 (5,10/4,20)3 (2,00/3,80)

    3,80

  • STA/KM

  • KM. 50+620 - 50+701PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I

    ELEVASI

  • ELEVASI

  • DATA PEKERJAAN GALIAN KM. 51+885 - 51+941PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I

    STA/KM

    51+885 CL

    51+900

    51+934

    51+941

    3,00Galian

    1 (1,50/1,50)

    2,00

    0(0/0)

    2,00

    2 (4,00/2,00)

    3 (3,00/0)

    4,50

    Galian

    Existing

    1 (4,50/6,90)

    0(0/0)

    2 (9,50/8,00)

    5 (4,50/0)

    1,50

    2,00

    5,00

    3,001,003 (8,00/5,00)

    4 (7,00/5,00)6,90

    6,50 2,001,50

    3,00

    3,50

    2,50

    1,00

    Galian

    Existing

    1 (6,00/6,50)

    0(0/0)

    2 (14,25/7,50)

    3 (13,00/5,00)4 (10,00/5,00)

    5 (8,25/1,50) 6 (7,25/1,50)

    7 (6,50/0)

    6,50

    6,002,00

    1,502,00

    1,501,20

    2,50

    2,00

    1,50

    Galian

    Existing

    1 (5,00/5,90)

    0(0/0)

    8 (7,00/2,00)

    2 (14,35/7,70)

    3 (13,10/5,20) 4 (11,60/5,20)

    5 (11,00/4,00) 6 (9,50/4,00)

    7 (8,50/2,00)

    9 (6,00/0)

    5,90

  • STA/KM

  • KM. 51+885 - 51+941PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I

    ELEVASI

  • ELEVASI

  • DATA PEKERJAAN GALIAN KM. 51+953 - 52+029PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I

    STA/KM

    CL

    51+953

    51+980

    51+997

    52+029

    CELAH / BLANG

    6,00

    Galian

    1 (5,50/5,90)

    2,00

    0(0/0)

    2,00

    2 (14,75/7,50)

    1,50

    1 (0,80/1,00)

    2,00

    2,00

    1,501,50

    2,00

    Existing3 (13,75/5,50) 4 (12,25/5,50)

    5 (11,50/4,00)6 (9,50/4,00)

    7 (8,50/2,00) 8 (7,00/2,00)

    9 (6,00/2,00)

    6,00 2,001,00

    1,502,00

    1,502,50

    1,401,50

    Galian

    1 (5,50/5,90)

    0(0/0)

    Existing3 (13,15/5,50) 4 (11,75/5,50)

    5 (10,50/3,00)6 (9,00/3,00)

    7 (8,00/1,00) 8 (6,50/1,00)

    9 (6,00/0)

    2 (13,90/7,00)

    5,90

    5,00 2,002,50

    2,002,50

    Galian

    1 (3,50/3,90)

    0(0/0)

    Existing

    2 (10,50/5,00)

    3 (9,25/2,50)4 (7,25/2,50)

    5 (6,00/0)

    3,000(0/0)

    5,90

    3,90

    1,002 (3,75/1,50)

    3 (3,00/0)1,50

  • STA/KM

  • KM. 51+953 - 52+029PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I

    ELEVASI

  • ELEVASI

  • DATA PEKERJAAN GALIAN KM. 52+400 - 52+592PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I

    STA/KM

    CL

    52+400

    52+427G. Batu

    52+454

    52+491

    52+521G. Batu

    52+525,5

    52+592

    Galian

    1 (2,50/2,90)

    0(0/0)

    2,00

    1 (0,80/1,00)

    Existing

    0,800(0/0)

    2,00

    0(0/0)

    3,500(0/0)

    1,00

    2 (4,25/1,50)

    3 (3,50/0)

    2 (5,50/4,00)

    3 (3,50/0)3,50

    4,00 2,90

    Galian

    1 (9,50/6,90)

    0(0/0)

    2,00

    Existing

    2 (7,50/8,00)

    3 (3,50/0)

    9,00

    8,006,90

    1 (1,00/0,80)2 (3,50/1,00)

    3 (3,00/0)1,00 3,00

    1 (0,90/1,90)

    1,902 (4,75/2,50)

    3 (3,50/0)

    3,502,50

    1,50

    1 (0,80/1,00)

    3,500(0/0)

    1,00

    2 (4,25/1,50)

    3 (3,50/0)

    1,50

    1 (1,50/1,60)

    0(0/0)

    2 (5,25/2,50)

    3 (4,00/0)4,00

    2,50 1,60

  • STA/KM

  • KM. 52+400 - 52+592PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I

    ELEVASI

  • ELEVASI

  • DATA PEKERJAAN GALIAN KM. 52+607 - 52+732PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I

    STA/KM

    CL52+607

    52+644

    52+663

    52+691

    52+703

    52+732

    BLANG

    Galian

    1 (2,50/1,90)

    0(0/0)2,00

    Existing2 (5,25/2,50)

    3 (4,00/0)4,002,50

    1,90

    4,002,50

    3,002,00

    2,00G. Batu Lepas

    1 (3,50/4,50)

    0(0/0)

    ExistingG. Biasa2 (8,75/5,50)

    3 (7,25/2,50)4 (5,25/2,50)

    5 (4,00/0)

    4,50

    4,00 2,00

    1 (2,50/2,90)

    0(0/0)

    ExistingGalian3,30

    2 (5,65/3,30)

    3 (4,00/0)

    2,90

    3,001,00 2,00

    0(0/0)3 (3,00/0)

    2 (3,50/1,00) 1 (0,90/0,80)

    4,00 2,003,50

    0(0/0)3 (4,00/0)

    2 (5,75/3,50)1 (2,00/2,50)

    2,50

    Existing

    Galian

    4,00

    6,00

    2,30

    3,50

    2,00

    0(0/0)

    2 (11,05/9,50)1 (5,30/7,90)

    Existing

    G. Batu Lepas

    G. Biasa

    3 (9,30/6,00)4 (7,00/6,00)

    5 (4,00/0)

    BLANG

    7,90

  • STA/KM

  • KM. 52+607 - 52+732PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I

    ELEVASI

  • ELEVASI

  • DATA PEKERJAAN GALIAN KM. 52+833 - 52+951PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I

    STA/KM

    CL52+833

    52+851

    52+895G. Batu

    52+905G. Batu

    52+951G. Batu

    Galian

    1 (1,50/2,20)

    0(0/0)

    2,00

    Existing

    2 (4,00/3,00)

    3 (2,50/0)

    2,503,00

    2,20

    2,003,00

    1 (4,80/9,80)

    0(0/0)

    2 (8,50/11,00)

    3 (3,00/0)

    11,00 Galian9,80

    2,002,503,50

    1 (2,40/2,80)

    0(0/0)3 (2,50/0)

    2 (4,90/3,50)2,80

    2,005,002,50

    Existing

    0(0/0)3 (5,00/0)

    2 (6,25/2,50)1 (2,50/1,90)

    1,90

    BLANG

    2,004,00

    6,00

    Existing

    0(0/0)3 (4,00/0)

    2 (6,00/6,00) 1 (4,10/4,60)

    4,60

  • STA/KM

  • KM. 52+833 - 52+951PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I

    ELEVASI

  • ELEVASI

  • DATA PEKERJAAN GALIAN KM. 53+001 - 53+270PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I

    STA/KM

    CL

    53+001

    53+051

    53+111

    53+200

    53+250

    53+270

    Galian

    1 (4,00/6,90)

    0(0/0)

    2,00

    Existing

    2 (8,00/8,00)

    3 (3,50/0)

    6,90

    4,00

    8,00

    3,503,00

    0(0/0)

    3 (4,00/0)

    2 (5,00/3,00) 1 (1,50/1,90)

    1,90Galian

    Existing

    2,502,00

    3 (2,50/0) 0(0/0)

    2 (3,50/2,00) 1 (1,50/1,50)1,50

    BLANG

    3,002,00

    3 (3,00/0) 0(0/0)

    2 (4,00/2,00) 1 (1,80/1,50)1,50

    G. Batu Lepas

    2,00 4,003 (4,00/0) 0(0/0)

    2 (5,00/2,00)1 (1,50/1,40)

    1,40

    2,00 3,50

    3 (3,50/0) 0(0/0)

    2 (4,50/2,00)1 (1,20/1,40)

    1,40

  • STA/KM

  • KM. 53+001 - 53+270PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I

    ELEVASI

  • ELEVASI

  • DATA PEKERJAAN GALIAN KM. 53+315 - 53+515PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I

    STA/KM

    CL

    53+315

    53+365

    53+415

    53+465

    53+515

    Galian

    1 (2,00/1,90)

    0(0/0)

    Existing

    2 (3,75/2,50)

    3 (2,50/0)

    2,502,50 1,90

    3,003,00

    0(0/0)3 (3,00/0)

    2 (4,50/3,00)1 (1,90/2,20)

    2,20

    2,502,000(0/0)3 (2,50/0)

    2 (3,50/2,00)1 (1,50/1,50)

    1,50

    3,00

    0(0/0)3 (3,00/0)

    2 (7,50/9,00)

    1 (1,90/4,90)

    9,00

    4,90

    2,00

    2,50

    6,00Galian

    Existing

    0(0/0)3 (2,50/0)

    2 (5,50/6,00)1 (3,40/5,20)

    5,20

  • STA/KM

  • KM. 53+315 - 53+515PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I

    ELEVASI

  • ELEVASI

  • DATA PEKERJAAN GALIAN KM. 53+565 - 53+750PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I

    STA/KM

    CL

    53+565

    53+615

    53+679

    53+696

    53+719

    53+750

    Galian

    1 (1,00/1,50)

    0(0/0)2,00

    Existing

    2 (2,50/2,00)

    3 (1,50/0)1,502,00

    1,50

    0(0/0)3 (1,50/0)2,50

    3,00

    2 (3,00/3,00) 1 (2,50/2,20)

    2,002,20

    3,003,50

    0(0/0)3 (3,50/0)

    2 (5,00/3,00)1 (2,20/2,10)

    2,00

    2,10

    BLANG

    1,501,50

    2,50

    0(0/0)5 (1,50/0)

    2 (5,50/3,00)1 (2,20/2,20)

    2,202,00

    3 (4,75/1,50)4 (2,25/1,50)

    1,50

    8,00 2,00

    2,50

    4,00

    4,00

    0(0/0)5 (8,00/0)

    2 (14,50/8,00)

    1 (9,50/6,90)

    3 (12,50/4,00)4 (10,00/4,00)

    6,90

    G. Batu

    G. Biasa

    10,00 2,00

    5,00

    2,00

    4,00

    G. Batu

    G. Biasa

    2 (16,50/9,00)

    1 (10,00/7,10)

    3 (14,50/5,00) 4 (12,50/5,00)

    7,10

    1' (5,40/3,90)

    2' (10,00/4,00)

    3' (8,00/0)

    1' (6,90/4,90)

    2' (12,50/5,00)

    3' (10,00/0)

  • STA/KM0(0/0)5 (10,00/0)

  • KM. 53+565 - 53+750PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I

    ELEVASI

    CELAH / BLANG

  • ELEVASI

  • DATA PEKERJAAN GALIAN KM. 53+765 - 54+015PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I

    STA/KM

    CL

    53+765

    53+791G. Batu

    53+860

    53+932G. Batu

    53+975G. Batu

    54+015

    1 (10,00/5,10)

    0(0/0)

    2,00

    2 (15,00/6,00)

    5 (10,00/0)

    5,10

    10,00 2,00

    2,50

    3,50

    3 (13,75/3,50)4 (11,75/3,50)

    G. Batu

    G. Biasa

    0(0/0)3 (10,00/0)

    10,00 2,00G. Batu

    Existing1 (9,00/3,80)2 (12,25/4,50)

    4,503,80

    5,00

    2,500(0/0)3 (2,50/0)

    1 (3,00/4,20)2 (5,00/5,00)

    4,20Galian

    Existing

    2,00

    BLANG

    4,50 2,00

    4,00

    0(0/0)3 (4,50/0)

    1 (4,00/3,20)2 (6,50/4,00)

    3,20

    2,50 2,002,50

    0(0/0)3 (2,50/0)

    1 (1,80/1,90)2 (3,75/2,50)1,90

    2,50 2,002,001,50

    0(0/0)3 (2,50/0)

    1 (1,80/1,50)2 (3,50/2,00)

    1' (6,50/3,20)2' (11,75/3,50)

    3' (10,00/0)

  • STA/KM

  • KM. 53+765 - 54+015PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I

    ELEVASI

    CELAH / BLANG

  • ELEVASI

  • DATA PEKERJAAN GALIAN KM. 54+065 - 54+263PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I

    STA/KM

    CL

    54+065

    54+115

    54+125

    54+146

    54+171

    54+263G. Batu

    Galian

    1 (2,50/2,90)

    0(0/0)

    2,00

    Existing2 (4,25/3,50)

    3 (2,50/0)2,50

    3,50 2,90

    2,002,50

    5,00

    0(0/0)

    2 (5,00/5,00)

    3 (2,50/0)

    Galian

    1 (3,00/4,10)

    Existing4,10

    2,502,00

    1,50

    4,00

    0(0/0)5 (2,50/0)

    GalianExisting

    2,00

    2 (7,00/6,00) 1 (4,00/4,90)

    3 (5,00/2,00)4 (3,50/2,00)

    4,90

    3,50 2,004,00

    1,50

    0(0/0)5 (3,50/0)

    2 (8,00/6,00)

    3 (7,00/4,00)4 (5,50/4,00)

    2,00

    Galian

    Existing

    1 (4,50/5,10)

    5,10

    3,50 1,002,00

    0(0/0)3 (3,50/0)

    2 (4,50/2,00) 1 (0,80/1,00)Existing

    BLANG

    2,00 2,003,00

    2 (3,50/3,00) 1 (0,90/2,10)

  • STA/KM0(0/0)3 (2,00/0)

  • KM. 54+065 - 54+263PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I

    ELEVASI

    CELAH / BLANG

  • ELEVASI

  • DATA PEKERJAAN GALIAN KM. 54+318 - 54+495PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I

    STA/KM

    CL

    54+318

    54+336

    54+357G. Batu

    54+403

    54+489

    54+495

    1 (3,30/5,20)

    0(0/0)2,00

    Existing

    2 (5,00/6,00)

    3 (2,00/0)2,00

    6,00 5,20

    2,002,000(0/0)

    2 (3,00/2,00)

    3 (2,00/0)

    1 (1,80/1,80)

    BLANG

    Galian

    2,001,80

    0(0/0)2,009,50

    6,00

    2 (12,50/6,00)

    3 (9,50/0)

    1 (8,00/5,10)

    5,10

    2,000(0/0)3 (2,00/0)

    2 (3,50/3,00) 1 (1,60/2,10)

    2,003,00 2,10

    4,503,00

    3 (4,50/0) 0(0/0)

    2 (6,00/3,00) 1 (3,10/2,60)

    2,602,00

    4,502,00

    3 (4,50/0) 0(0/0)

    2 (5,50/2,00)1 (2,50/1,70)

    1,702,00

  • STA/KM

  • KM. 54+318 - 54+495PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I

    ELEVASI

    CELAH / BLANG

  • ELEVASI

  • DATA PEKERJAAN GALIAN KM. 54+515 - 54+553PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I

    STA/KM

    54+515 CL

    54+553

    1 (4,00/4,50)

    0(0/0)

    2,00

    Existing

    2 (8,00/5,00)

    5 (4,00/0)4,00

    3,00

    4,50

    2,003,000(0/0)

    2 (4,25/2,50)

    3 (3,00/0)

    1 (2,00/1,90)

    BLANG

    Galian2,501,90

    G. Batu

    G. Biasa2,001,503 (7,00/3,00)

    4 (5,50/3,00)

    BLANG

    1' (2,70/2,90)2' (5,50/3,00)

    3' (4,00/0)

  • STA/KM

  • KM. 54+515 - 54+553PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I

    ELEVASI

    CELAH / BLANG

  • ELEVASI

  • DATA PEKERJAAN GALIAN KM. 54+650 - 54+985PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I

    STA/KM

    CL54+650G. Batu

    54+675

    54+950

    54+963

    54+985

    2,00

    Galian

    Existing

    1 (2,00/0)0(0/0)

    2,50

    3 (1,50/2,10)2 (3,25/2,50)

    5,00

    1 (5,00/0)

    2,00

    0(0/0)

    1,50

    2 (6,75/3,50)BLANG

    2,102,00

    3,001 (3,00/0)0(0/0)

    3 (1,80/2,10) 2 (4,50/3,00)2,10

    2,003,00

    3,503,50

    1 (3,50/0)0(0/0)

    3 (2,00/2,80) 2 (5,25/3,50)

    2,00

    2,80

    2,00

    3,50

    2,00

    5,003,00

    2,002,50

    1,50

    Galian

    Existing

    3 (8,75/3,50)

    4 (9,50/5,00)

    6 (13,50/9,00)

    7 (4,80/7,90)

    1 (5,00/0)0(0/0)

    2 (6,50/3,00)

    2,00

    3 (8,50/3,00)

    4 (9,75/5,50)5 (11,25/5,50)

    6 (12,25/7,50)

    8 (15,50/10,00)

    Galian

    Existing

    7,90

    9 (5,10/8,80)

  • STA/KM

  • KM. 54+650 - 54+985PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I

    ELEVASI

    4,00

    2,00

    2,002,50

    3 (8,75/3,50)

    5 (11,50/5,00)

    6 (13,50/9,00)

    4 (9,75/5,50)5 (11,25/5,50)

    7 (14,25/7,50)

    8 (15,50/10,00)

  • ELEVASI

  • DATA PEKERJAAN GALIAN KM. 55+008 - 55+062PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I

    STA/KM

    CL

    55+008

    55+062

    6,00

    1 (6,00/0)

    2,00

    0(0/0)

    1,50

    2 (7,75/3,50)

    2,00

    3,50

    2,00

    Galian

    Existing

    3 (9,75/3,50)

    4 (10,50/5,00)

    6 (13,75/7,5)

    7 (3,90/6,00)

    6,00

    5,00

    1 (5,00/0)

    2,00

    0(0/0)

    1,50

    2 (6,75/3,50)

    2,00

    3,50

    2,00

    GalianExisting

    3 (8,75/3,50)

    4 (9,50/5,00)

    6 (12,75/7,50)

    7 (3,50/5,90)

    7,90

  • STA/KM

  • KM. 55+008 - 55+062PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I

    ELEVASI

    2,002,50

    3 (9,75/3,50)

    5 (12,50/5,00)

    6 (13,75/7,5)

    2,50

    3 (8,75/3,50)

    5 (11,50/5,00)

    6 (12,75/7,50)

  • ELEVASI

  • DATA PEKERJAAN GALIAN KM. 55+062 - 55+081PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I

    STA/KM

    55+062

    55+081

    8,00

    1 (8,00/0)

    2,000(0/0)

    1,502 (9,40/2,80)

    2,80

    2,90

    1,60Galian

    Existing

    3 (10,90/2,80)

    4 (12,35/5,70)5 (13,95/5,70)

    6 (15,50/8,80)

    9,20

    2,00

    Galian

    Existing

    3,10

    9 (7,50/9,20)8 (17,95/10,70)

    7,003,60

    2,003,10

    1,70

    3,60

    1 (7,00/0)0(0/0)

    2 (8,80/3,60)3 (10,80/3,60)

    4 (12,35/6,70)5 (14,05/6,70)

    6 (15,85/10,30)

    8 (18,50/12,00)

    11 (10,10/13,70)

    13,70

  • STA/KM

  • KM. 55+062 - 55+081PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I

    ELEVASI

    5 (13,95/5,70)

    6 (15,50/8,80)7 (17,00/8,80)

    3,10

    1,50 1,90

    8 (17,95/10,70)

    3,60

    1,80 1,70

    1,003,50

    5 (14,05/6,70)

    7 (17,65/10,30)

    8 (18,50/12,00) 9 (19,50/12,00)

    10 (21,25/15,50)

  • ELEVASI

  • DATA PEKERJAAN GALIAN KM. 55+094 - 55+115PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I

    STA/KM

    55+094

    55+115

    6,50

    1 (6,50/0)

    2,00

    0(0/0)

    1,50

    2 (9,25/5,50)

    5,50

    2,60

    Galian

    Existing

    3 (10,75/5,50)

    4 (12,05/8,10)5 (13,55/8,10)

    6 (15,10/11,20)7 (16,60/11,20)

    17,90

    2,00

    Galian

    Existing

    3,10

    1,50

    11 (10,70/17,90)

    7,00

    1 (7,00/0)0(0/0)

    15,70

    1,50

    5,00

    8 (19,10/16,20)

    3,60

    2,402,20

    1,602,60

    2,50

    3,40

    1,40

    2 (8,80/3,60)3 (11,20/3,60)

    4 (12,30/5,80) 5 (13,90/5,80)

    6 (15,20/8,40) 7 (17,70/8,40)

    8 (19,40/11,80) 9 (20,80/11,80)

    10 (22,30/14,80)

    13 (10,20/15,70)

  • STA/KM

  • KM. 55+094 - 55+115PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I

    ELEVASI

    7 (16,60/11,20)

    5,00

    2,00

    4,00

    9 (21,10/16,20)

    10 (23,10/20,20)

    1,403,00

    1,403,50

    7 (17,70/8,40)

    9 (20,80/11,80)

    10 (22,30/14,80)11 (23,70/14,80)

    12 (25,45/18,30)

  • ELEVASI

  • DATA PEKERJAAN GALIAN KM. 55+167 - 55+206,5PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I

    STA/KM

    55+167

    55+206,5

    5,00

    1 (5,00/0)

    2,00

    0(0/0)

    Galian

    Existing

    4,80

    1,103,00

    2,00

    2 (7,40/4,80)3 (8,50/4,80)

    4 (10,00/7,80)

    6 (13,90/11,60)7 (6,40/10,50)

    10,50

    5,00

    1 (5,00/0)

    2,00

    0(0/0)

    Galian

    Existing

    4,80

    1,103,00

    2,00

    2 (7,40/4,80)3 (8,50/4,80)

    4 (10,00/7,80)

    6 (13,90/11,60)7 (6,40/10,50)

    10,50

  • STA/KM

  • KM. 55+167 - 55+206,5PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I

    ELEVASI

    3,80

    3 (8,50/4,80)

    4 (10,00/7,80)5 (12,00/7,80)

    6 (13,90/11,60)

    3,80

    3 (8,50/4,80)

    4 (10,00/7,80)5 (12,00/7,80)

    6 (13,90/11,60)

  • ELEVASI

  • DATA PEKERJAAN GALIANPAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I

    STA/KM

    CL

    5 Galian

    1 (2,50/2,90)

    0(0/0)

    2,00

    Existing2 (5,50/4,00)

    3 (3,50/0)3,50

    4,00 2,90

  • STA/KM

    52+521G. Batu

  • KM. 54+318 - 54+PAKET REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN NABIRE - BEDUDIPA I

    ELEVASI

    CELAH / BLANG

  • ELEVASI

  • 49012-49069,749084-49137,149160,1-49237,149244,1-49290,149314,1 - 49398,149432,1 - 49523,149571,1 - 49620,150620 - 5070151885 - 5194151953 - 5202952400 - 5259252607 - 5273252833 - 5295153001 - 5327053315 - 5351553565 - 5375053765 - 5401554065 - 5426354318 - 5449554515 - 5455354650 - 5498555008 - 5506255062 - 5508155094 - 5511555167 - 55206,55