DAFTAR HARGA SATUAN UPAH DAN BAHAN NO U R A I A N SATUAN HRG SATUAN (RUPIAH) 1 2 3 4 A U P A H 1 Tukang Hari 40,000.00 2 Kepala Tukang Hari 45,000.00 3 Pekerja Hari 25,000.00 4 Mandor Hari 40,000.00 B B A H A N / M A T E R I A L 1 Pasir Pasang 55,000.00 2 Pasir Urug 50,000.00 3 Pasir Beton 60,000.00 4 Semen Batu Raja (50 Kg) Zak 40,000.00 5 Semen Batu Raja kg 800.00 6 Batu Kali 180,000.00 7 Batu Bata Lubang buah 350.00 8 Batu Pecah 3-5 Cm M3 200,000.00 9 Batu Pecah 2-3 Cm M3 215,000.00 10 Batu Pecah 1-2 Cm M3 230,000.00 11 Koral Beton 2/3 215,000.00 12 Besi Siku/Plat Strip Kg 12,000.00 13 Besi Beton Polos kg 11,000.00 14 Kawat Beton kg 12,825.00 15 Kawat Duri M' 1,500.00 16 Paku Biasa 2" - 5" kg 10,000.00 17 kg 12,000.00 18 Kayu Kelas II Persegi 2,200,000.00 19 Kayu Kelas II Papan 2,300,000.00 20 Kayu Kelas III Persegi 1,400,000.00 21 Kayu Kelas III Papan 1,500,000.00 22 Kayu Kelas IV Persegi 750,000.00 23 Kayu Kelas IV Papan 750,000.00 24 Kayu Gelam dia. 8/12 Cm - 14 Cm Btg 5,500.00 25 Seng Gelombang BJLS 20 6 kk lbr 25,000.00 26 Plywood tebal 3 mm Kpg 45,000.00 27 Plywood tebal 5 mm Kpg 66,000.00 28 Cat Tembok kg 8,000.00 29 Plamir Tembok kg 7,000.00 30 Amplas Biasa lembar 2,500.00 31 Besi Plat 1,2 x 2,4 M tebal 10 mm m' 20,500.00 32 Pipa PVC Dia. 4" m' 15,500.00 C BAHAN BAKAR 1 Minyak Solar Ltr 4,300.00 2 Minyak Premium Ltr 4,500.00 3 Minyak SAE 30 Ltr 35,000.00 4 Minyak Hidrolik Ltr 40,000.00 5 Minyak Rem Btl 26,000.00 6 Minyak Gemuk Kg 52,000.00 C PERALATAN BERAT 1 Wheel Loader 80 HP Unit 700,000,000.00 2 Buldozer 110 HP Unit 1,000,000,000.00 3 Alat Penggetar beton 4 HP Unit 10,000,000.00 4 Excavator 80 - 140 HP Unit 1,100,000,000.00 5 Track Loader 75 - 100 HP Unit 850,000,000.00 m 3 m 3 m 3 m 3 m 3 Paku Biasa 1 /2" - 1" m 3 m 3 m 3 m 3 m 3 m 3

Upload: rizki-yansyah

Post on 01-Dec-2015

464 views

Category:

Documents


25 download

DESCRIPTION

Rencana Anggaran Biaya

TRANSCRIPT

Page 1: RAB TYPE 36

DAFTAR HARGA SATUAN UPAH DAN BAHAN

NO U R A I A N SATUANHRG SATUAN

(RUPIAH)1 2 3 4

A U P A H1 Tukang Hari 40,000.002 Kepala Tukang Hari 45,000.003 Pekerja Hari 25,000.004 Mandor Hari 40,000.00

B B A H A N / M A T E R I A L1 Pasir Pasang 55,000.002 Pasir Urug 50,000.003 Pasir Beton 60,000.004 Semen Batu Raja (50 Kg) Zak 40,000.005 Semen Batu Raja kg 800.006 Batu Kali 180,000.007 Batu Bata Lubang buah 350.008 Batu Pecah 3-5 Cm M3 200,000.009 Batu Pecah 2-3 Cm M3 215,000.00

10 Batu Pecah 1-2 Cm M3 230,000.0011 Koral Beton 2/3 215,000.0012 Besi Siku/Plat Strip Kg 12,000.0013 Besi Beton Polos kg 11,000.0014 Kawat Beton kg 12,825.0015 Kawat Duri M' 1,500.0016 Paku Biasa 2" - 5" kg 10,000.00

17 kg 12,000.0018 Kayu Kelas II Persegi 2,200,000.0019 Kayu Kelas II Papan 2,300,000.0020 Kayu Kelas III Persegi 1,400,000.0021 Kayu Kelas III Papan 1,500,000.0022 Kayu Kelas IV Persegi 750,000.0023 Kayu Kelas IV Papan 750,000.0024 Kayu Gelam dia. 8/12 Cm - 14 Cm Btg 5,500.0025 Seng Gelombang BJLS 20 6 kk lbr 25,000.0026 Plywood tebal 3 mm Kpg 45,000.0027 Plywood tebal 5 mm Kpg 66,000.0028 Cat Tembok kg 8,000.0029 Plamir Tembok kg 7,000.0030 Amplas Biasa lembar 2,500.0031 Besi Plat 1,2 x 2,4 M tebal 10 mm m' 20,500.0032 Pipa PVC Dia. 4" m' 15,500.00

C BAHAN BAKAR1 Minyak Solar Ltr 4,300.002 Minyak Premium Ltr 4,500.003 Minyak SAE 30 Ltr 35,000.004 Minyak Hidrolik Ltr 40,000.005 Minyak Rem Btl 26,000.006 Minyak Gemuk Kg 52,000.00

C PERALATAN BERAT1 Wheel Loader 80 HP Unit 700,000,000.002 Buldozer 110 HP Unit 1,000,000,000.003 Alat Penggetar beton 4 HP Unit 10,000,000.004 Excavator 80 - 140 HP Unit 1,100,000,000.005 Track Loader 75 - 100 HP Unit 850,000,000.00

m3

m3

m3

m3

m3

Paku Biasa 1/2" - 1"m3

m3

m3

m3

m3

m3

Page 2: RAB TYPE 36

DAFTAR ANALISA PEKERJAAN

NO. U R A I A N

SATUAN HARGA Harga Jumlah Harga Jumlah Jumlah

Satuan Bahan Tenaga Bahan+Tenaga(Rp) (Rp) (Rp) (Rp)

1 2 3 4 5 6

I PEKERJAAN PERSIAPAN

1 1 M' Pengukuran dan Pemasangan Bouwplanka.Bahan

0.012 Kayu 5/7 750,000.00 9,000.00 9,000.000.020 Kg Paku Biasa 2" - 5" 10,000.00 200.00 200.000.007 Kayu Papan 3/20 750,000.00 5,250.00 5,250.00

14,450.00 14,450.00

b.Tenaga0.100 Oh Tukang Kayu 40,000.00 4,000.00 4,000.000.100 Oh Pekerja 25,000.00 2,500.00 2,500.000.005 Oh Mandor 40,000.00 200.00 200.00

6,700.00 6,700.00

Jumlah 14,450.00 6,700.00 21,150.00

2a.Bahan

1.250 Btg Kayu gelam 10-12 cm 5,500.00 6,875.00 6,875.000.180 Kayu kls. IV Persegi 750,000.00 135,000.00 135,000.000.850 Kg Paku Biasa 10,000.00 8,500.00 8,500.001.500 Lbr Seng gelombang BJLS 20 6kk 25,000.00 37,500.00 37,500.002.000 Bh Jendela Nako 1,500.00 3,000.00 3,000.000.150 Bh Kunci tanam biasa 1 slaag 55,000.00 8,250.00 8,250.00

199,125.00 199,125.00

b.Tenaga2.000 Oh Tukang Kayu 40,000.00 80,000.00 80,000.002.000 Oh Pekerja 25,000.00 50,000.00 50,000.000.050 Oh Mandor 40,000.00 2,000.00 2,000.00

132,000.00 132,000.00

Jumlah 199,125.00 132,000.00 331,125.00

3a.Bahan

1.250 Btg Kayu gelam 10-12 cm 5,500.00 6,875.00 6,875.000.180 Kayu kls. IV Persegi 750,000.00 135,000.00 135,000.000.700 Kg Paku Biasa 10,000.00 7,000.00 7,000.001.500 Lbr Seng Gelombang BJLS 20 6 kk 25,000.00 37,500.00 37,500.00

186,375.00 186,375.00

b.Tenaga1.500 Oh Tukang Kayu 40,000.00 60,000.00 60,000.001.000 Oh Pekerja 25,000.00 25,000.00 25,000.000.050 Oh Mandor 40,000.00 2,000.00 2,000.00

87,000.00 87,000.00

Jumlah 186,375.00 87,000.00 273,375.004

a.Tenaga0.100 Oh Pekerja 25,000.00 2,500.00 2,500.000.050 Oh Mandor 40,000.00 2,000.00 2,000.00

4,500.00 4,500.00

Jumlah 4,500.00 4,500.00

II PEKERJAAN TANAH1

a.Tenaga0.526 Oh Pekerja 25,000.00 13,150.00 13,150.00

- - Tukang Gali - - -- - Kepala Tukang - - -

0.052 Oh Mandor 40,000.00 2,080.00 2,080.0015,230.00 15,230.00

Jumlah 15,230.00 15,230.00

M3

M3

1 M2 Pembuatan Direksikeet

M3

1 M2 Pembuatan Rumah Jaga/Konstruksi Kayu

M3

1 M2 Membersihkan Lapangan dan Perataan

1 M3 Galian Tanah Biasa Sedalam 2 Meter

Page 3: RAB TYPE 36

NO. U R A I A N

SATUAN HARGA Harga Jumlah Harga Jumlah Jumlah

Satuan Bahan Tenaga Bahan+Tenaga(Rp) (Rp) (Rp) (Rp)

1 2 3 4 5 62

a.Tenaga0.823 Oh Pekerja 25,000.00 20,575.00 20,575.00

- - Tukang Gali - - -- - Kepala Tukang - - -

0.083 Oh Mandor 40,000.00 3,320.00 3,320.0023,895.00 23,895.00

Jumlah 23,895.00 23,895.00

3a.Tenaga

0.192 Oh Pekerja 25,000.00 4,800.00 4,800.00- - Tukang Gali - - -- - Kepala Tukang - - -

0.019 Oh Mandor 40,000.00 760.00 760.005,560.00 5,560.00

Jumlah 5,560.00 5,560.00

4a.Tenaga

0.500 Oh Pekerja 25,000.00 12,500.00 12,500.00- - Tukang Gali - - -- - Kepala Tukang - - -

0.050 Oh Mandor 40,000.00 2,000.00 2,000.0014,500.00 14,500.00

Jumlah 14,500.00 14,500.00

5a.Bahan

1.200 Pasir Urug 50,000.00 60,000.00 60,000.0060,000.00 60,000.00

b.Tenaga0.200 Oh Pekerja 25,000.00 5,000.00 5,000.000.025 Oh Mandor 40,000.00 1,000.00 1,000.00

6,000.00 6,000.00

Jumlah 60,000.00 6,000.00 66,000.00

III PEKERJAAN PONDASI

1 1 Btg Pasang Cerucuk Gelama.Bahan

0.500 Btg Cerucuk gelam 5,500.00 2,750.00 2,750.002,750.00 2,750.00

b.Tenaga0.100 Oh Pekerja 25,000.00 2,500.00 2,500.000.010 Oh Tukang kayu 40,000.00 400.00 400.000.005 Oh Mandor 40,000.00 200.00 200.00

3,100.00 3,100.00

Jumlah 2,750.00 3,100.00 5,850.00

2a.Bahan

1.100 Batu Belah 15/20 cm 180,000.00 198,000.00 198,000.00163 Kg Semen Portland 800.00 130,400.00 130,400.00

0.520 Pasir Pasang 55,000.00 28,600.00 28,600.00357,000.00 357,000.00

b.Tenaga1.500 Oh Pekerja 25,000.00 37,500.00 37,500.000.600 Oh Tukang Batu 40,000.00 24,000.00 24,000.000.060 Oh Kepala Tukang 45,000.00 2,700.00 2,700.000.075 Oh Mandor 40,000.00 3,000.00 3,000.00

67,200.00 67,200.00

Jumlah 357,000.00 67,200.00 424,200.00

1 M3 Galian Tanah Lumpur Sedalam 1 Meter

1 M3 Urugan Kembali

1 M3 Pemadatan Tanah

1 M3 Urugan Pasir

M3

1 M3 Pasang Pondasi Batu Kali, 1 Pc : 4 Ps

M3

M3

Page 4: RAB TYPE 36

NO. U R A I A N

SATUAN HARGA Harga Jumlah Harga Jumlah Jumlah

Satuan Bahan Tenaga Bahan+Tenaga(Rp) (Rp) (Rp) (Rp)

1 2 3 4 5 6IV PEKERJAAN DINDING

1a.Bahan

45.000 Bh Batu Bata Bolong 350.00 15,750.00 15,750.0022.000 Kg Semen Portland 800.00 17,600.00 17,600.00

0.093 Pasir Pasang 55,000.00 5,115.00 5,115.0038,465.00 38,465.00

b.Tenaga0.650 Oh Pekerja 25,000.00 16,250.00 16,250.000.200 Oh Tukang Batu 40,000.00 8,000.00 8,000.000.020 Oh Kepala Tukang 45,000.00 900.00 900.00

0.0300 Oh Mandor 40,000.00 1,200.00 1,200.0026,350.00 26,350.00

Jumlah 38,465.00 26,350.00 64,815.00

V PEKERJAAN PLESTERAN

1a.Bahan

10.800 Kg Semen Portland 800.00 8,640.00 8,640.000.026 Pasir Pasang 55,000.00 1,430.00 1,430.00

10,070.00 10,070.00

b.Tenaga0.250 Oh Pekerja 25,000.00 6,250.00 6,250.000.100 Oh Tukang Batu 40,000.00 4,000.00 4,000.000.020 Oh Kepala Tukang 45,000.00 900.00 900.00

0.0125 Oh Mandor 40,000.00 500.00 500.0011,650.00 11,650.00

Jumlah 10,070.00 11,650.00 21,720.00

2a.Bahan

8.680 Kg Semen Portland 800.00 6,944.00 6,944.000.028 Pasir Pasang 55,000.00 1,540.00 1,540.00

8,484.00 8,484.00

b.Tenaga0.250 Oh Pekerja 25,000.00 6,250.00 6,250.000.100 Oh Tukang Batu 40,000.00 4,000.00 4,000.000.020 Oh Kepala Tukang 45,000.00 900.00 900.00

0.0125 Oh Mandor 40,000.00 500.00 500.0011,650.00 11,650.00

Jumlah 8,484.00 11,650.00 20,134.00

VII PEKERJAAN BETON

1a.Bahan

0.200 Kayu Kelas IV. 750,000.00 150,000.00 150,000.00 1.500 Kg Paku Biasa 2"- 5" 10,000.00 15,000.00 15,000.000.400 Ltr Minyak Bekisting 4,300.00 1,720.00 1,720.00

125.000 Kg Besi Beton Polos 11,000.00 1,375,000.00 1,375,000.002.250 Kg Kawat Beton 12,825.00 28,856.25 28,856.25

323.000 Kg Semen Portland 800.00 258,400.00 258,400.000.520 Pasir Beton 60,000.00 31,200.00 31,200.000.780 Koral Beton 215,000.00 167,700.00 167,700.00

2,027,876.25 2,027,876.25

1 M2 Pasang Batu - Bata Bolong , 1Pc : 4Ps

M3

1 M2 Plesteran 1 Pc : 3 Ps, Tebal 20 mm

M3

1 M2 Plesteran 1 Pc : 4 Ps, Tebal 20 mm

M3

1 M3 Membuat Pondasi Beton Bertulang

M3

M3

M3

Page 5: RAB TYPE 36

NO. U R A I A N

SATUAN HARGA Harga Jumlah Harga Jumlah Jumlah

Satuan Bahan Tenaga Bahan+Tenaga(Rp) (Rp) (Rp) (Rp)

1 2 3 4 5 6

b.Tenaga3.900 Oh Pekerja 25,000.00 97,500.00 97,500.000.350 Oh Tukang Batu 40,000.00 14,000.00 14,000.001.040 Oh Tukang Kayu 40,000.00 41,600.00 41,600.001.050 Oh Tukang Besi 40,000.00 42,000.00 42,000.000.245 Oh Kepala Tukang 45,000.00 11,025.00 11,025.000.165 Oh Mandor 40,000.00 6,600.00 6,600.00

212,725.00 212,725.00

Jumlah 2,027,876.25 212,725.00 2,240,601.25

2a.Bahan

0.270 Kayu Kelas IV. 750,000.00 202,500.00 202,500.00 2.000 Kg Paku Biasa 2"- 5" 10,000.00 20,000.00 20,000.000.600 Ltr Minyak Bekisting 4,300.00 2,580.00 2,580.00

125.000 Kg Besi Beton Polos 11,000.00 1,375,000.00 1,375,000.003.000 Kg Kawat Beton 12,825.00 38,475.00 38,475.00

323.000 Kg Semen Portland 800.00 258,400.00 258,400.000.520 Pasir Beton 60,000.00 31,200.00 31,200.000.780 Koral Beton 215,000.00 167,700.00 167,700.00

2,095,855.00 2,095,855.00

b.Tenaga4.850 Oh Pekerja 25,000.00 121,250.00 121,250.000.350 Oh Tukang Batu 40,000.00 14,000.00 14,000.001.560 Oh Tukang Kayu 40,000.00 62,400.00 62,400.001.400 Oh Tukang Besi 40,000.00 56,000.00 56,000.000.331 Oh Kepala Tukang 45,000.00 14,895.00 14,895.000.170 Oh Mandor 40,000.00 6,800.00 6,800.00

275,345.00 275,345.00

Jumlah 2,095,855.00 275,345.00 2,371,200.00

3a.Bahan

0.400 Kayu Kelas IV. 750,000.00 300,000.00 300,000.00 4.000 Kg Paku Biasa 2"- 5" 10,000.00 40,000.00 40,000.002.000 Ltr Minyak Bekisting 4,300.00 8,600.00 8,600.00

125.000 Kg Besi Beton Polos 11,000.00 1,375,000.00 1,375,000.004.500 Kg Kawat Beton 12,825.00 57,712.50 57,712.50

323.000 Kg Semen Portland 800.00 258,400.00 258,400.000.520 Pasir Beton 60,000.00 31,200.00 31,200.000.780 Koral Beton 215,000.00 167,700.00 167,700.00

2,238,612.50 2,238,612.50

b.Tenaga4.850 Oh Pekerja 25,000.00 121,250.00 121,250.000.350 Oh Tukang Batu 40,000.00 14,000.00 14,000.001.560 Oh Tukang Kayu 40,000.00 62,400.00 62,400.001.400 Oh Tukang Besi 40,000.00 56,000.00 56,000.000.331 Oh Kepala Tukang 45,000.00 14,895.00 14,895.000.170 Oh Mandor 40,000.00 6,800.00 6,800.00

275,345.00 275,345.00

Jumlah 2,238,612.50 275,345.00 2,513,957.50

40a.Bahan

0.400 Kayu Kelas IV. 750,000.00 300,000.00 300,000.00 4.000 Kg Paku Biasa 2"- 5" 10,000.00 40,000.00 40,000.002.000 Ltr Minyak Bekisting 4,300.00 8,600.00 8,600.00

110.000 Kg Besi Beton Polos 11,000.00 1,210,000.00 1,210,000.004.500 Kg Kawat Beton 12,825.00 57,712.50 57,712.50

323.000 Kg Semen Portland 800.00 258,400.00 258,400.000.520 Pasir Beton 60,000.00 31,200.00 31,200.000.780 Koral Beton 215,000.00 167,700.00 167,700.00

2,073,612.50 2,073,612.50

1 M3 Membuat Sloof Beton Bertulang

M3

M3

M3

1 M3 Membuat Kolom Beton Bertulang

M3

M3

M3

1 M3 Membuat Ringbalok Beton Bertulang

M3

M3

M3

Page 6: RAB TYPE 36

NO. U R A I A N

SATUAN HARGA Harga Jumlah Harga Jumlah Jumlah

Satuan Bahan Tenaga Bahan+Tenaga(Rp) (Rp) (Rp) (Rp)

1 2 3 4 5 6b.Tenaga

4.850 Oh Pekerja 25,000.00 121,250.00 121,250.000.350 Oh Tukang Batu 40,000.00 14,000.00 14,000.001.560 Oh Tukang Kayu 40,000.00 62,400.00 62,400.001.400 Oh Tukang Besi 40,000.00 56,000.00 56,000.000.331 Oh Kepala Tukang 45,000.00 14,895.00 14,895.000.170 Oh Mandor 40,000.00 6,800.00 6,800.00

275,345.00 275,345.00

Jumlah 2,073,612.50 275,345.00 2,348,957.50

X PEKERJAAN PIPA AIR

1 Memasang 1 m' Pipa PVC Tipe AW Dia. 4"a.Bahan

1.200 M' Pipa PVC 15,500.00 18,600.00 18,600.00

18,600.00 18,600.00

b.Tenaga0.081 Oh Pekerja 25,000.00 2,025.00 2,025.000.135 Oh Tukang Batu 40,000.00 5,400.00 5,400.00

0.0135 Oh Kepala Tukang 45,000.00 607.50 607.500.0041 Oh Mandor 40,000.00 164.00 164.00

8,196.50 8,196.50

Jumlah 18,600.00 8,196.50 26,796.50

XI PEKERJAAN BESI PINTU & PAGAR1

a.Bahan1.000 Pintu lipat besi 450,000.00 450,000.00 450,000.00

450,000.00 450,000.00

b.Tenaga1.500 Oh Tukang Besi Konstruksi 40,000.00 60,000.00 60,000.001.050 Oh Pekerja 25,000.00 26,250.00 26,250.000.105 Oh Kepala Tukang 45,000.00 4,725.00 4,725.000.005 Oh Mandor 40,000.00 208.00 208.00

91,183.00 91,183.00

Jumlah 450,000.00 91,183.00 541,183.00

2a.Bahan

3.500 Kg Besi Strip 2 x 3 12,000.00 42,000.00 42,000.0015.000 Kg Besi Beton dia. 8 mm 12,000.00 180,000.00 180,000.00

222,000.00 222,000.00

b.Tenaga0.350 Oh Tukang Las 40,000.00 14,000.00 14,000.000.350 Oh Pekerja 25,000.00 8,750.00 8,750.000.035 Oh Kepala Tukang 45,000.00 1,575.00 1,575.00

0.00175 Oh Mandor 40,000.00 70.00 70.0024,395.00 24,395.00

Jumlah 222,000.00 24,395.00 246,395.00

XIV PEKERJAAN PENGECATAN

26a.Bahan

3.500 Kg Cat Tembok 8,000.00 28,000.00 28,000.002.000 Kg Plamir Tembok 7,000.00 14,000.00 14,000.002.000 Lbr Amplas Biasa 2,500.00 5,000.00 5,000.00

47,000.00 47,000.00

1 m2 Pasang Pintu Sorong Besi

M2

1 m2 Pasang Terali Besi

10 m2 Pengecatan Tembok 3 x

Page 7: RAB TYPE 36

NO. U R A I A N

SATUAN HARGA Harga Jumlah Harga Jumlah Jumlah

Satuan Bahan Tenaga Bahan+Tenaga(Rp) (Rp) (Rp) (Rp)

1 2 3 4 5 6b.Tenaga

2.000 Oh Tukang Cat 40,000.00 80,000.00 80,000.000.200 Oh Kepala Tukang 45,000.00 9,000.00 9,000.001.500 Oh Pekerja 25,000.00 37,500.00 37,500.000.075 Oh Mandor 40,000.00 3,000.00 3,000.00

129,500.00 129,500.00

Jumlah 47,000.00 129,500.00 176,500.004,700.00 12,950.00 17,650.00

27a.Bahan

2.330 Kg Cat Tembok 8,000.00 18,640.00 18,640.001.000 Lbr Amplas Biasa 2,500.00 2,500.00 2,500.00

21,140.00 21,140.00

b.Tenaga1.330 Oh Tukang Cat 40,000.00 53,200.00 53,200.000.133 Oh Kepala Tukang 45,000.00 5,985.00 5,985.001.000 Oh Pekerja 25,000.00 25,000.00 25,000.000.050 Oh Mandor 40,000.00 2,000.00 2,000.00

86,185.00 86,185.00

Jumlah 21,140.00 86,185.00 107,325.002,114.00 8,618.50 10,732.50

Untuk 1 M2 Jumlah

10 m2 Pengecatan Tembok 2 x ( Pemeliharaan )

Untuk 1 M2 Jumlah

Page 8: RAB TYPE 36

B PAGAR

I PEKERJAAN GALIAN DAN URUGAN TANAH.1 Pek Galian Tanah Pondasi 4.59 12,500.00 57,421.88 2 Pek Urugan Tanah Bekas Galian 1.53 5,560.00 8,513.75 3 Pek Urugan Pasir Pondasi 1.31 45,000.00 59,062.50

124,998.13 0.25 31,249.53 156,247.66

II PEKERJAAN PONDASI, BETON & DINDING1 Pek Pondasi Menerus Batu Bata Ad 1:4 6.84

1 Bata Lbg 2,872.80 Bh 350.00 1,005,480.00 2 Pasir 4.10 42,500.00 174,420.00 3 Semen 18.13 Zak 38,500.00 697,851.00

1,877,751.00 0.25 469,437.75 2,347,188.75 1 Pek Sloof uk 15x20 cm 1.71

1 Besi ø 10 20.73 Btg 22,500.00 466,363.64 2 Besi ø 6 17.10 Btg 11,000.00 188,100.00 3 Koral 1.37 M³ 175,000.00 239,400.00 4 Pasir 1.03 M³ 45,000.00 46,170.00 5 Semen 9.41 Zak 38,500.00 362,092.50

1,302,126.14 0.25 325,531.53 1,627,657.67

2 Pek Kolom Praktis 12x12 cm 0.47 1 Besi ø 10 12.00 Btg 22,500.00 270,000.00 2 Besi ø 6 8.10 Btg 14,000.00 113,400.00 3 Koral 0.38 M³ 175,000.00 66,124.80 4 Pasir 0.28 M³ 45,000.00 12,752.64 5 Semen 2.60 Zak 38,500.00 100,013.76

562,291.20 0.25 140,572.80 702,864.00

3 Pek Ring Balok Praktis 12x15 cm 1.03 1 Besi ø 10 20.73 Btg 22,500.00 466,363.64 2 Besi ø 6 13.99 Btg 11,000.00 153,900.00 3 Koral 0.82 M³ 175,000.00 143,640.00 4 Pasir 0.62 M³ 45,000.00 27,702.00 5 Semen 5.64 Zak 38,500.00 217,255.50

1,008,861.14 0.25 252,215.28 1,261,076.42

4 Pek Dinding Bataco 57.80 1 Bataco 722.50 Bh 1,250.00 903,125.00 2 Pasir 1.73 M³ 45,000.00 78,030.00 3 Semen 5.78 Zak 38,500.00 222,530.00

1,203,685.00 0.25 300,921.25 1,504,606.25

5 Pek Beton Plat Pintu Pagar 0.30 1 Besi ø 10 4.00 Btg 22,500.00 90,000.00 3 Koral 0.24 M³ 1,250.00 300.00

M³M³M³

Page 9: RAB TYPE 36

4 Pasir 0.18 M³ 45,000.00 8,100.00 5 Semen 1.65 Zak 38,500.00 63,525.00

161,925.00 0.25 40,481.25 202,406.25

6 Pek Plesteran Saluran ad !:4 22.80 1 Pasir 0.64 M³ 45,000.00 287282 Semen 2.28 Zak 38,500.00 87780

116,508.00 0.50 58,254.00 174,762.00 III PEKERJAAN PAGAR & PINTU BESI BRC

1 Pek Besi Pagar BRC 9.85 225,000.00 2,216,250.00 2 Pek Pintu Besi Pagar BRC 2.00 Unit 250,000.00 500,000.00

2,716,250.00 0.10 271,625.00 2,987,875.00

Jumlah Bahan Rp 8,957,887.60 Jumlah Upah Rp 1,832,034.40 Jumlah Bahan + Upah Rp 10,964,684.00

Jumlah Bahan ( A+B) Rp 47,281,997.77 Jumlah Upah (A+B) Rp 9,908,430.51 Jumlah Bahan + Upah (A+B) Rp 57,190,428.28

Biaya 1 Rumah + Pagar Rp 28,595,214.14

Page 10: RAB TYPE 36

A RUMAH TYPE 36 / 70 M

I PEKERJAAN PERSIAPAN1 Pek Pembersihan Lokasi 1 Ls2 Pek Pengukuran dan Pasangan Bouflank

Panjang Lebar Tinggi Banyak jumlah Total Sat14 20 2 68 M'

BahanHek 2/7 6.00 Btg

Kasau 5/5 6.00 BtgPaku 2" 1 KgBenang 1 Rol

II PEKERJAAN GALIAN DAN URUGAN TANAH.1 Pek Galian Tanah Pondasi

Panjang Lebar Tinggi Banyak jumlah Total Sat65 0.45 0.35 10.2375 M³

2 Pek Urugan Tanah Bekas Galian 3.413 M³3 Pek Urugan Tanah Peninggian Feil Lantai

Panjang Lebar Tinggi Banyak jumlah Total Sat6 6 0.12 2 8.64 M³

4 Pek Urugan Pasir Pondasi & LantaiPanjang Lebar Tinggi Banyak jumlah Total Sat

6 6 0.05 2 3.6 M³

III PEKERJAAN PONDASI, BETON & DINDING1 Pek Pondasi Menerus Batu Bata Ad 1:4

Panjang Lebar Tinggi Banyak jumlah Total Sat65 0.3 0.2 1 3.9 6.5 M³65 0.2 0.2 1 2.6

BahanBata Lbg 2730 Bh

Pasir 3.9 M³Semen 17.225 Zak

1 Pek Sloof uk 15x20 cmPanjang Lebar Tinggi Banyak jumlah Total Sat

65 0.15 0.2 1 1.95 1.95 M³Bahan

Besi ø 10 23.64 BtgBesi ø 6 19.50 Btg

Koral 1.56 M³

Page 11: RAB TYPE 36

Pasir 1.17 M³Semen 10.73 Zak

2 Pek Kolom Praktis 12x12 cmPanjang Lebar Tinggi Banyak jumlah Total Sat

70 0.12 0.12 1 1.008 1.008 M³Bahan

Besi ø 10 25.45 BtgBesi ø 6 17.18 Btg

Koral 0.81 M³Pasir 0.60 M³

Semen 5.54 Zak

3 Pek Ring Balok Praktis 12x15 cmPanjang Lebar Tinggi Banyak jumlah Total Sat

90 0.12 0.15 1 1.62 1.62 M³Bahan

Besi ø 10 32.73 BtgBesi ø 6 22.09 Btg

Koral 1.30 M³Pasir 0.97 M³

Semen 8.91 Zak

4 Pek Dinding Bataco Panjang Lebar Tinggi Banyak jumlah Total Sat

170 1 1 170BahanBataco 2,125.00 BhPasir 5.10 M³

Semen 17.00 Zak

5 Pek Beton Tumbuk lantai & Selasar T 5 cmPanjang Lebar Tinggi Banyak jumlah Total Sat

7.86 6.8 0.05 2 0.786 M³BahanKoral 0.64 M³Pasir 0.50 M³

Semen 3.14 Zak

6 Pek Seftictang & Rembesan1 Pek Beton ad 1:2:3 Tutup Seftictang T 10 cm

Panjang Lebar Tinggi Banyak jumlah Total Sat1.01 1.36 0.1 1 0.101 M³

Bahan

Page 12: RAB TYPE 36

Besi ø 10 2.00 BtgKoral 0.08 M³Pasir 0.06 M³

Semen 0.56 Zak

2 Pek Pas Batu bata dinding SeftictankPanjang Lebar Tinggi Banyak jumlah Total Sat

4.75 0.12 1.12 1 0.638 M³BahanBata 271.32 BhPasir 0.38 M³

Semen 2.30 Zak

3 RembesanBahanKoral 1.00 BhPasir 0.50 M³Ijuk 10.00 Kg

IV PEKERJAAN KUSEN, PINTU, JENDELA DAN BOUVENLIGHT 1 Pek. Kusen Pintu & Jendela Kayu Type A,B,C,D 20 lbg2 Pek. Pintu Double Triplek Type A,B,C 10 daun3 Pek Pasangan Engsel 4", Pintu Type A,B,C 30 Bh4 Pek. Pas Roster Beton KM 16 Bh

V PEK. ATAP / PLAFOND1 Pek Rangka Atap

Panjang Lebar Tinggi Banyak jumlah Total SatKuda kuda 6.8 4 4 108.8 105.28

Gording 2.2 0.8 2 3.52

Kayu Kuda-kuda, Gording 6x10x400 50 Btg

Kayu Papan lisplang2x20x400 12 KpSambungan Gording Besi U 16 BhPaku 5" 3 KgPaku 4" 3 KgPaku 2,5" 3 KgBenang 1 Rol

2 Pek Atap 105.28Atap Genteng Asbes 106 KpBubungan Genteng Asbes 14 KpPaku Genteng 5 Kg

Page 13: RAB TYPE 36

3 Pek Plapond 107Kayu Rangka 5x5x400 142 BtgPlafond Triplek 3 mm 37.00 KpLis Profil Kayu 61 BtgPaku Plafond 2 Kg

VI PEK. INST LISTRIK & PLUMBING1 Instalasi Listrik

1 3 Rol2 Pipa Kabel 30 Btg3 T Dus 14 Bh4 Elbow 20 Bh5 Stop Kontak 12 Bh6 Saklar Ganda 8 Bh7 Lampu 14 Bh8 Penyambunag Titik Api 1 Ls

2 Instalasi Plumbing1 Pipa 1/2" 4 Btg2 Elbow 1/2" 4 Bh3 Pipa 2" 2 Btg4 Elbow 2" 2 Bh5 Pipa 4" 2 Btg6 Elbow 4" 4 Bh7 Lem Pipa 4 Bh8 Amplas 2 Lbr9 Kran 1/2" 4 Bh

10 Sok Drat dalam 1/2" 4 Bh11 Pipa Penguras bak 2 Bh12 Ploor Drain 2 Bh13 Closed Jongkok 2 Bh14 Pipa T Seftictank 2 Bh15 Penyambunag inst Air 2 Ttk

VII PEK. LANTAI 1 Pek Plesteran lantai

Panjang Lebar Tinggi Banyak jumlah Total Sat9.8 13.6 1 133.281 Semen 8.00 Zak2 Pasir 3.73

VIII PEK. BESI, KACA & GANTUNGAN1 Pek Konci & Kaca

1 Konci Pintu 2 Slaag 10 Bh

Kabel ø 2 mm

Page 14: RAB TYPE 36

2 Pek Pas Sloot Pintu 20 Bh3 Pek Pas Kaca Naco 8 Daun 6 Unit4 Pek Pas Kaca Naco 10 Daun 4 Unit

B PAGAR

I PEKERJAAN GALIAN DAN URUGAN TANAH.1 Pek Galian Tanah Pondasi

Panjang Lebar Tinggi Banyak jumlah Total Sat52.5 0.25 0.35 4.59375 M³

2 Pek Urugan Tanah Bekas Galian 1.531 M³3 Pek Urugan Pasir Pondasi & Lantai

Panjang Lebar Tinggi Banyak jumlah Total Sat52.5 0.5 0.05 1 1.3125 M³

II PEKERJAAN PONDASI, BETON & DINDING1 Pek Pondasi Menerus Batu Bata Ad 1:4

Panjang Lebar Tinggi Banyak jumlah Total Sat57 0.2 0.3 1 3.42 6.84 M³57 0.12 0.5 1 3.42

BahanBata Lbg 2872.8 Bh

Pasir 4.104 M³Semen 18.126 Zak

1 Pek Sloof uk 15x20 cmPanjang Lebar Tinggi Banyak jumlah Total Sat

57 0.15 0.2 1 1.71 1.71 M³Bahan

Besi ø 10 20.73 BtgBesi ø 6 17.10 Btg

Koral 1.37 M³Pasir 1.03 M³

Semen 9.41 Zak

2 Pek Kolom Praktis 12x12 cmPanjang Lebar Tinggi Banyak jumlah Total Sat

2 0.12 0.12 5 0.144 0.47232 M³1.2 0.12 0.12 19 0.32832

BahanBesi ø 10 12.00 Btg

Page 15: RAB TYPE 36

Besi ø 6 8.10 BtgKoral 0.38 M³Pasir 0.28 M³

Semen 2.60 Zak

3 Pek Ring Balok Praktis 12x15 cmPanjang Lebar Tinggi Banyak jumlah Total Sat

57 0.12 0.15 1 1.026 1.026 M³Bahan

Besi ø 10 20.73 BtgBesi ø 6 13.99 Btg

Koral 0.82 M³Pasir 0.62 M³

Semen 5.64 Zak

4 Pek Dinding Bataco Panjang Lebar Tinggi Banyak jumlah Total Sat

14.8 2 1 29.6 57.823.5 1.2 1 28.2

BahanBataco 722.50 BhPasir 1.73 M³

Semen 5.78 Zak

6 Pek Plesteran Saluran ad !:4Panjang Lebar Tinggi Banyak jumlah Total Sat

57 0.4 1 22.84 Pasir 0.6384 M³5 Semen 2.28 Zak

5 Pek Beton Plat Pintu PagarPanjang Lebar Tinggi Banyak jumlah Total Sat

1.5 1 0.1 2 0.3 0.3

1 Besi ø 10 4 Btg3 Koral 0.244 Pasir 0.185 Semen 1.65 Zak

M³M³