potensi pembangkit listrik berbasis … cair (pome) padat (tankos) biogas biomasa boiler turbin...

25
POTENSI PEMBANGKIT LISTRIK BERBASIS LIMBAH BIOMASA DAN LIMBAH CAIR LPP YOGYAKARTA

Upload: doankhue

Post on 13-Apr-2018

239 views

Category:

Documents


7 download

TRANSCRIPT

POTENSI PEMBANGKIT LISTRIK BERBASIS LIMBAH BIOMASA DAN LIMBAH CAIR

LPP YOGYAKARTA

KENAPA MENGELOLA ENERGI

- Perkembangan harga energi dunia

- Ketersediaan energi, terutama natural resources (BBM) yang makin menipis

- Supply in Demand

- Pola konsumsi energi/trend energy consumption

- Global warming akibat eksploitasi energi

EKSPLOITASI & DINAMIKA INDUSTRI

Naiknya CO2 di atmosfer Bumi

SCENARIO TECHNOLOGIES FOR CONTROL CO2

Energy Saving/Efficiency

RE

Peraturan Presiden Republik Indonesia Nomor 5 Tahun 2006.

2006

SUMBER ENERGI PEMBANGKIT LISTRIK

2025

BBN 7%

Panas Bumi 7%

Biomassa, dll 7%

BtBara Cair 2%

EBT 17% -23%

JENIS BAHAN BAKAR BIOMASA

*) Cogen3:Cogeneration potential in ASEAN and opportunities for European suppliers

1 Ton TBS

220 Kg CP0

40 Kg Kernel

WATER (0,73 Ton)

WASTE

• EFB/Tankos (22%-23%)• Fiber (13% – 15%)• Shell (5%-7%)

Neraca Massa dan Energi pada Pabrik Pengolahan Kelapa Sawit

EFB

Moisture : 64% Kalori : 1.580 kCal/kg Berat : 14,65 mg

Moisture : 31% Kalori : 3.244 kCal/kg Berat : 10,00 mg

Moisture : turun 50% Kalori : naik 205% Berat : turun 68%

WASTE WATER

• Waste Water (55%)

Kalori : 1.580 kCal/kg

Kalori : 3.244 kCal/kg

COD = 60.000 – 150.000 mg/lBOD = 30.000 – 100.000 mg/l

Teknologi Pembangkit (Lagoon)

Flow Process CSTR POME

TEKNOLOGI PEMBANGKIT BIOMASA SAWIT

proses

JUAL LISTRIK

KE PLN

LIMBAH

Cair (POME)

Padat (Tankos)

Biogas

BiomasaBOILER TURBIN

Listrik

(Excess Power)

Listrik :

- Pengolahan

- Domestik

BA

HA

N B

AK

U

Pembangkit Co - Firing

FIBER +

CANGKANG

PKS YG MERINTIS PLTBS/PLTBG

• PLTBS PABATU 3 MW

• PLTBS SEI MANGKE 2 X 3,5 MW

• PLTBS SEI RAMBUTAN 2,2 MW

• PLTBG TANDUN 1 MW

• PLTBG PTPN 2

• SAWINDO KENCANA 6 MW sdh tersambung ke grid PLN (Pulau Bangka) &

7,5 MW (Pulau Belitung)

WASTE

• FIBER (13%)• SHELL (5%)• EFB (22%)

• POME

Power Plant 14 MW

Integrated Bio Energy TSH Sabah

Sabah Electric, Malaysia = 10 MW

Biogass Plant 2,7 MW

ListrikUap

45 Ton ( - 2007)

75 Ton (2007 - Sekarang)

KINERJA PLTBS TSH KUNAKNo Parameter Nilai Unit

1 Daya terbangkit rerata 12,5 MWe

2 Kapasitas uap 80000 kg/jam

3 Tekanan 50 bar g

4 Temperatur 402 C

5 Entalpi uap 3193,3 Kj/kg

6 Feed water Temperature 275 C

7 Feed water Enthalphy 1210 Kj/kg

8 Ekstraksi Turbin

Pressure 4 bar g

Temperatur 170 C

Entalpi aktual 2796 Kj/kg

Entalpi Adiabatis 2765,8 kj/kg

9 Condensing Turbin

Pressure 0,1 bar abs

Temperatur 46 C

Entalpi aktual 2583,4 kj/kg

Entalpi Adiabatis 2102 kj/kg

10 Efisiensi Ekstraksi Turbin 93 %

11

Efisiensi Condensing

Turbin 56 %

12 Plant Heat Rate 11.900 BTU/kwh

13 Biomass Fuel Rate 33 TPH

14 Overall Plant Fuel rate 2,64 kg/kwh

15 Efisiensi Thermal 28,6 %

Peraturan MenteriEnergi dan Sumber Daya Mineral

Nomor : 12 Tahun 2017

“............”

Rata – rata Nasional :Rp 983/kWh

Pembangkit biomasa (Riau)ASPEK NILAI

Kapasitas Pabrik 75 ton/jam

EFB 10,9 ton/jam

Biogas 880 m3/jam

Cangkang (beli) 1,09 ton/jam

Kapasitas terpasang 8 MW

Daya ke grid 6 MW

Investasi 166 Milyar

Harga jual listrik Rp 1.146,7 /kWH

IRR 17,03%

NPV 31,12 milyar

Payback periode 5 tahun 8 bulan

Perbandingan Lagoon dan CSTR

ASPEK Lagoon CSTR

Kapasitas Pabrik 45 ton/jam 45 ton/jam

Potensi daya 1,1 MW 2 MW

Efisiensi Lebih rendah Lebih tinggi

Maintenance Lebih sulit Lebih mudah

Risiko Lebih tinggi Lebih rendah

Umur methane trap 8 tahun 25 tahun

Investasi 34,02 Milyar 47,1 Milyar

IRR 15,11% 19,29%

NPV 2 Milyar 17,7 Milyar

Payback periode 6 tahun 4 bulan 5 tahun 6 bulan