PENJADWALAN JOB SHOP STATIK DENGAN MENGGUNAKAN ALGORITMA SIMULATED ANNEALING UNTUK MEMINIMASI WAKTU MAKESPAN (Studi Kasus di Meubel Agung Rizky Blitar) SKRIPSI Diajukan Kepada Universitas Muhammadiyah Malang Untuk Memenuhi Salah Satu Persyaratan Akademik Dalam Menyelesaikan Program Strata Satu (S-1) Sarjana Teknik Disusun Oleh : MOH.HUSEN 09540052 JURUSAN TEKNIK INDUSTRI FAKULTAS TEKNIK UNIVERSITAS MUHAMMADIYAH MALANG 2014

Upload: doanlien

Post on 10-Mar-2019

241 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PENJADWALAN JOB SHOP STATIK DENGAN … · PENJADWALAN JOB SHOP STATIK DENGAN MENGGUNAKAN ALGORITMA SIMULATED ANNEALING UNTUK MEMINIMASI WAKTU MAKESPAN (Studi Kasus di Meubel Agung

PENJADWALAN JOB SHOP STATIK DENGAN

MENGGUNAKAN ALGORITMA SIMULATED ANNEALING

UNTUK MEMINIMASI WAKTU MAKESPAN

(Studi Kasus di Meubel Agung Rizky Blitar)

SKRIPSI

Diajukan Kepada Universitas Muhammadiyah Malang

Untuk Memenuhi Salah Satu Persyaratan Akademik

Dalam Menyelesaikan Program Strata Satu (S-1) Sarjana Teknik

Disusun Oleh :

MOH.HUSEN

09540052

JURUSAN TEKNIK INDUSTRI

FAKULTAS TEKNIK

UNIVERSITAS MUHAMMADIYAH MALANG

2014

Page 2: PENJADWALAN JOB SHOP STATIK DENGAN … · PENJADWALAN JOB SHOP STATIK DENGAN MENGGUNAKAN ALGORITMA SIMULATED ANNEALING UNTUK MEMINIMASI WAKTU MAKESPAN (Studi Kasus di Meubel Agung

LEMBAR PENGESAHAN SKRIPSI

Penjadwalan Job Shop Statik dengan Menggunakan Metode

Simulated Annealing

(Studi Kasus pada Meubel Agung Rizky)

Disusun Oleh:

Moh. Husen

09540052

Menyetujui dan Mengesahkan:

Dosen Pembimbing I

Ilyas Mas’udin, ST. M.log SCM. Ph.D.

Malang, 30 Desember 2014

Dosen Pembimbing II

Dana Marsetiya Utama, ST, MT

Mengetahui,

Ketua Jurusan Teknik Industri

Ilyas Mas'udin, Ph.D

Page 3: PENJADWALAN JOB SHOP STATIK DENGAN … · PENJADWALAN JOB SHOP STATIK DENGAN MENGGUNAKAN ALGORITMA SIMULATED ANNEALING UNTUK MEMINIMASI WAKTU MAKESPAN (Studi Kasus di Meubel Agung

v

DAFTAR ISI

Halaman Judul .................................................................................................

Lembar Pengesahan Skripsi ............................................................................

Lembar Asistensi Skripsi ................................................................................

Berita Acara Ujian ...........................................................................................

Surat Pernyataan Keaslian ...............................................................................

Surat Keterangan Pengambilan Data dari Perusahaan ……………………….

Kata Pengantar ................................................................................................ i

Abstrak ............................................................................................................ iii

Abstract ........................................................................................................... iv

Daftar Isi .......................................................................................................... v

Daftar Tabel .................................................................................................... viii

Daftar Gambar ................................................................................................. ix

Daftar Lampiran .............................................................................................. xi

BAB I PENDAHULUAN ................................................................................ 1

1.1 Latar Belakang ....................................................................................... 1

1.2 Rumusan Masalah .................................................................................. 3

1.3 Tujuan Penelitian ................................................................................... 3

1.4 Manfaat Penelitian ................................................................................. 3

1.5 Batasan Masalah dan Asumsi ................................................................ 3

BAB II LANDASAN TEORI .......................................................................... 5

2.1 Definisi Penjadwalan ............................................................................. 5

2.1.1 Istilah-Istilah Dalam Penjadwalan ............................................. 5

Page 4: PENJADWALAN JOB SHOP STATIK DENGAN … · PENJADWALAN JOB SHOP STATIK DENGAN MENGGUNAKAN ALGORITMA SIMULATED ANNEALING UNTUK MEMINIMASI WAKTU MAKESPAN (Studi Kasus di Meubel Agung

vi

2.1.2 Aturan Prioritas ........................................................................... 8

2.2 Teori Penjadwalan ................................................................................. 8

2.3 Klasifikasi penjadwalan ......................................................................... 10

2.4 Kreteria dalam penjadwalan .................................................................. 16

2.5 Penjadwalan Job Shop ............................................................................ 18

2.5.1 Masalah dalam penjadwalan job shop ........................................ 21

2.5.2 Klasifikasi penjadwalan job shop .............................................. 23

2.5.3 Krakteristik & asumsi dalam penjadwalan job shop .................. 23

2.6 Simulated Annealing (SA) ..................................................................... 24

2.6.1 ALgoritma Simulated Annealing (SA) ...................................... 27

2.6.2 Langkah-Langkah Simulated Annealing (SA) .......................... 29

BAB III METODOLOGI PENELITIAN......................................................... 31

3.1 Flow Chart Penelitian ............................................................................ 31

3.2 Studi Lapangan ...................................................................................... 33

3.3 Identifikasi Masalah ............................................................................... 33

3.4 Studi Literatur ........................................................................................ 33

3.5 Perumusan Masalah & Tujuan penelitian ............................................... 33

3.6 Tujuan Penelitian ................................................................................... 34

3.7 Pengumpulan Data ................................................................................. 34

3.8 Pengolahan Data .................................................................................... 36

3.9 Analisa Pembahasan .............................................................................. 39

3.10 Kesimpulan & Saran ............................................................................. 39

BAB IV PENGUMPULAN DAN PENGOLAHAN DATA ........................... 41

4.1 Tinjauan Perusahaan .............................................................................. 41

4.1.1 Deskripsi umum Perusahaan ..................................................... 41

4.1.2 Proses Produksi .......................................................................... 42

4.2 Pengumpulan Data ................................................................................. 44

4.2.1 Data Order .................................................................................. 44

4.2.2 Data Jumlah Mesin ..................................................................... 45

4.2.3 Data Gaji .................................................................................... 46

Page 5: PENJADWALAN JOB SHOP STATIK DENGAN … · PENJADWALAN JOB SHOP STATIK DENGAN MENGGUNAKAN ALGORITMA SIMULATED ANNEALING UNTUK MEMINIMASI WAKTU MAKESPAN (Studi Kasus di Meubel Agung

vii

4.2.4 Waktu Proses Produksi .............................................................. 46

4.3 Pengolahan Data .................................................................................... 48

4.3.1 Bahasa Pemrograman Komputasi Matlab .................................... 48

4.3.2. Validasi ......................................................................................... 48

4.3.3 Penjadwalan Awal Perusahaan ..................................................... 48

4.3.2 Penjadwalan Dengan Metode Simulated Annealing .................... 52

BAB V ANALISA PEMBAHASAN............................................................... 60

5.1 Analisa Penjadwalan Awal Perusahaan ................................................. 60

5.2 Analisa Penjadwalan Dengan Metode Simulated Annealing (SA) ......... 61

5.3 Analisa Sensitivitas ................................................................................ 63

5.4 Analisa Perbandingan Penjadwalan Perusahaan Dengan Penjadwalan

Simulated Annealing (SA) ..................................................................... 70

5.5 Perhitungan biaya produksi ................................................................... 72

BAB VI PENUTUP ......................................................................................... 74

6.1 Kesimpulan ............................................................................................ 74

6.2 Saran ...................................................................................................... 75

DAFTAR PUSTAKA ..................................................................................... 76

LAMPIRAN .................................................................................................... 77

Page 6: PENJADWALAN JOB SHOP STATIK DENGAN … · PENJADWALAN JOB SHOP STATIK DENGAN MENGGUNAKAN ALGORITMA SIMULATED ANNEALING UNTUK MEMINIMASI WAKTU MAKESPAN (Studi Kasus di Meubel Agung

viii

DAFTAR TABEL

Tabel 2.1 Contoh model job shop statik ....................................................... 12

Tabel 2.2 Contoh model job shop dinamis .................................................... 13

Tabel 2.3 Contoh model non - deterministik ................................................ 15

Tabel 3.1 Contoh table proses produksi ...................................................... 35

Tabel 3.2 Identifikasi job dan mesin ........................................................... 35

Tabel 4.1 Data order produk bulan agustus 2014 ....................................... 44

Tabel 4.2 Data jumlah mesin ....................................................................... 45

Tabel 4.3 Data karyawan ............................................................................. 45

Tabel 4.4 Data waktu proses produksi ........................................................ 47

Tabel 4.5 Perbandingan hasil Penjadwalan komputasi MATLAB ................. 53

Tabel 4.5.1 Hasil Penjadwalan MATLAB dengan (T100 fp 0,2,0,5,0,9) ........ 53

Tabel 4.5.2 Hasil Penjadwalan MATLAB dengan (T200 fp 0,2, 0,5, 0,9) ...... 54

Tabel 4.5.3 Hasil Penjadwalan MATLAB dengan (T500 fp 0,2, 0,5, 0,9) ...... 55

Tabel 4.5.4 Hasil Penjadwalan MATLAB dengan (T1000 fp 0,2, 0,5, 0,9)……56

Tabel 5.1 Perbandingan idle time metode usulan SA dengan perusahaan ...... 71

Tabel 5.2 Perbandingan metode usulan SA dengan perusahaan ..................... 72

Page 7: PENJADWALAN JOB SHOP STATIK DENGAN … · PENJADWALAN JOB SHOP STATIK DENGAN MENGGUNAKAN ALGORITMA SIMULATED ANNEALING UNTUK MEMINIMASI WAKTU MAKESPAN (Studi Kasus di Meubel Agung

ix

DAFTAR GAMBAR

Gambar 2.1 Peta Gantt (Gantt Chart) .......................................................... 10

Gambar 2.2 Lintasan proses Flow shop ....................................................... 16

Gambar 2.3 Lintasan proses job shop .......................................................... 16

Gambar 2.4 Tipe aliran job shop .................................................................. 18

Gambar 2.5 Contoh gant chart penjadwalan job shop ................................. 22

Gambar 3.1 Flow Chart penelitian ............................................................... 32

Gambar 3.2 Flow chart job shop simulated annealing ................................ 38

Gambar 4.1 Alamat meubel agung Rizky .................................................... 41

Gambar 4.2 Alur proses produksi secara keseluruhan ................................. 42

Gambar 4.3 Gant chart penjadwalan awal perusahaan dengan FCFS ......... 50

Gambar 4.4 Hasil running hasil MATLAB dengan FCFS .......................... 51

Gambar 4.5 Gant chart penjadwalan dengan SA ......................................... 58

Gambar 4.6 Hasil running hasil MATLAB dengan SA .............................. 59

Gambar 5.1 Grafik Perbandingan T 100, T 200, T 500, dan T 1000 dengan

makespan …………………………………………………………………..64

Gambar 5.2 Grafik Perbandingan T 100, T 200, T 500, dan T 1000 dengan

iterasi .................................................................................................. ..66

Gambar 5.3 Grafik Perbandingan T 100, T 200, T 500, dan T 1000 dengan

waktu komputasi .............................................................................................. ..67

Page 8: PENJADWALAN JOB SHOP STATIK DENGAN … · PENJADWALAN JOB SHOP STATIK DENGAN MENGGUNAKAN ALGORITMA SIMULATED ANNEALING UNTUK MEMINIMASI WAKTU MAKESPAN (Studi Kasus di Meubel Agung

x

Gambar 5.4 Grafik Perbandingan T 100, T 200, T 500, dan T 1000 dengan

mean flow time ................................................................................................. ..68

Page 9: PENJADWALAN JOB SHOP STATIK DENGAN … · PENJADWALAN JOB SHOP STATIK DENGAN MENGGUNAKAN ALGORITMA SIMULATED ANNEALING UNTUK MEMINIMASI WAKTU MAKESPAN (Studi Kasus di Meubel Agung

xi

DAFTAR LAMPIRAN

Lampiran 1. Hasil Running Penjadwalan dengan Komputasi Matlab ........... 78

Lampiran 2. Coding MATLAB ....................................................................... 92

Page 10: PENJADWALAN JOB SHOP STATIK DENGAN … · PENJADWALAN JOB SHOP STATIK DENGAN MENGGUNAKAN ALGORITMA SIMULATED ANNEALING UNTUK MEMINIMASI WAKTU MAKESPAN (Studi Kasus di Meubel Agung

i

KATA PENGANTAR

Assalamu'alaikum Wr. Wb.

Alhamdulillah, puji syukur penulis panjatkan kehadirat Allah SWT atas

segala limpahan Rahmat, Berkah, dan Hidayah-Nya serta sholawat dan salam

penulis haturkan kepada junjungan Nabi Muhammad SAW yang telah menjadi

panutan sehingga penulis dapat menyelesaikan Skripsi yang berjudul

"Penjadwalan Job Shop Statik dengan Menggunakan Metode Simulated

Annealing". Skripsi ini diajukan kepada Universitas Muhammadiyah Malang

untuk memenuhi salah satu persyaratan akademik dalam menyelesaikan program

Sarjana Teknik.

Sesuai dengan judul bahwa Skripsi ini berisikan tahapan-tahapan dalam

melakukan penjadwalan dengan metode Simulated Annealing dimana penelitian

dilakukan di Meubel Agung Rizky. Penentuan metode Simulated Annealing

sebagai tema pada Skripsi ini dikarenakan metode Simulated Annealing dianggap

mampu meminimasi total waktu penyelesaian produksi (makespan) pada

perusahaan yang tipe produksinya Job Shop. Oleh karena itu penulis berusaha

semaksimal mungkin dalam melakukan penjadwalan dengan metode Simulated

Annealing di Meubel Agung Rizky agar dapat menghasilkan analisa yang

diharapkan dapat dijadikan sebagai bahan pertimbangan dalam mengatasi

permasalahan makespan yang ada.

Selama penyusunan Skripsi ini penulis telah banyak mendapatkan

bimbingan, bantuan, dan motivasi dari berbagai pihak. Untuk itu penulis

mengucapkan terima kasih yang sebesar-besarnya kepada:

1. Kedua Orang Tuaku tercinta yang sungguh luar biasa telah memberikan

do’a, motivasi dan kasih sayang yang sangat tulus.

Page 11: PENJADWALAN JOB SHOP STATIK DENGAN … · PENJADWALAN JOB SHOP STATIK DENGAN MENGGUNAKAN ALGORITMA SIMULATED ANNEALING UNTUK MEMINIMASI WAKTU MAKESPAN (Studi Kasus di Meubel Agung

ii

2. Bapak Ilyas Mas'udin, M.Log, Scm, PhD. selaku Ketua Jurusan Teknik

Industri Fakultas Teknik Universitas Muhammadiyah Malang dan selaku

Dosen Dosen Pembimbing I.

3. Bapak Dana Marsetiya Utama, ST, MT. selaku Dosen Pembimbing II.

4. Bapak Teguh Baroto, ST, MT. selaku Dosen Penguji I

5. Ibu Annisa Kesy G, ST, MT Dosen Penguji II

6. Seluruh Bapak/Ibu Dosen Jurusan Teknik Industri Fakultas Teknik

Universitas Muhammadiyah Malang.

7. Seluruh pihak di Meubel Agung Rizky dan teman – teman senasib dan

seperjuangan.

Penulis menyadari bahwa dalam penyusunan Skripsi ini masih terdapat

kekurangan yang memerlukan penyempurnaan. Untuk itu penulis mengharapkan

kritik dan saran yang bersifat membangun sehingga dapat menambah pengetahuan

penulis dan Skripsi ini dapat bermanfaat bagi pembaca pada umumnya serta

perusahaan pada khususnya.

Wassalamu'alaikum Wr. Wb.

Malang, 30 Desember 2014

Penulis

Page 12: PENJADWALAN JOB SHOP STATIK DENGAN … · PENJADWALAN JOB SHOP STATIK DENGAN MENGGUNAKAN ALGORITMA SIMULATED ANNEALING UNTUK MEMINIMASI WAKTU MAKESPAN (Studi Kasus di Meubel Agung

DAFTAR PUSTAKA

Baker, Kenneth R. 1974. Introduction to Sequencing and Scheduling. John

Wiley & Sons, Inc.New York.

Baker, Kenneth R. 1974. Principles Of Sequencing and Scheduling. America :

John Wiley and Son Inc.

Damanik, Dian Amru. Skripsi, 2011. “Penjadwalan Produksi dengan metode

Simulated Annealing Pada Unit Produksi Daun Pintu di PT. Mahogany

Lestari”. Fakultas Teknik, Universitas Sumatera Utara, Medan.

Ginting, Rosnani. 2009.PenjadwalanMesin. Yogyakarta :Grahailmu.

Haming, Murdifin dan Nurnajamuddin, Mahfud. 2012. Manajemen Produksi

Modern. Jakarta : PT. Bumi aksara.

Santosa Budi, Willy Paul. 2011. Metode Metaheuristik konsep dan Implementasi.

Surabaya : Guna Widya.

Penggabean Henry. Penjadwalan job shop statik dengan algoritma simulated

annealing, Vol.6, No.2, 173 – 179, 2002.

Suyanto. 2010. Algoritma Optimasi Deterministik atau Probabilistik. Yogyakarta

:Graha Ilmu.