9
LAMPIRAN NAMA SHIFT :A2 JADWAL PRAKTIKUM :15.00 WIB NO. PLOT :2 PERLAKUAN MULSA :0 ton/ha No Tanggal (kejadian erosi) Durasi hujan (menit) Tingg i hujan (mm) Aliran permukaan (mL/plot) Erosi (gram/plot) V 1 V 2 BD (gram/cm 3 ) Vt V A 1 A 2 B 1 B 2 C 1 C 2 E 1 E 2 Et 1 7 Mei 2013 180 9.5 0 17621 1.14 24.561 17596. 44 0 7620 0 40 0 28 0 5334.00 5334.00 2 8 Mei 2013 8 11 0 1051 1.17 23.077 1027.9 2 0 300 0 30 0 27 0 270.00 270.00 3 9 Mei 2013 150 9 0 0 0 0 0 0 0 0 0 27 0 0 0 0 4 10 Mei 2013 120 0 0 6600 1.25 2.400 6597.6 0 0 6 0 4 0 3 0 4.50 4.50 5 11 Mei 2013 180 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 12 Mei 2013 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7 13 Mei 2013 210 0 0 3210 1.02 23.529 3186.4 7 0 547 0 30 0 24 0 437.60 437.60 8 14 Mei 2013 TTU 6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9 15 Mei 2013 150 1.5 0 700 1.19 21.008 678.99 0 253 0 38 0 25 0 166.45 166.45 10 16 Mei 2013 120 9 0 650 1,198 0.020 649.98 0 264 0 35 0 24 0 181.03 181.03 11 17 Mei 2013 120 2 0 432 1.26 22.222 409.78 0 132 0 35 0 28 0 105.60 105.60 12 18 Mei 2013 60 8 0 550 1.24 12.097 537.90 0 209 0 20 0 15 0 156.75 156.75 13 19 Mei 2013 60 7.5 0 650 1.2 10.833 639.17 0 272 0 19 0 13 0 158.64 158.64 14 20 Mei 2013 120 0 0 8850 1.176 22.109 8827.8 9 0 281 0 40 0 26 0 182.65 182.65 15 21 Mei 2013 90 6.5 10 600 1.27 13.386 596.61 10 300 5 30 2.5 17 5 170.00 175.00 16 22 Mei 2013 TTU 44 0 0 0 0 0 0 0 0 0 0 0 0 0 0 17 23 Mei 2013 360 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 18 24 Mei 2013 120 18 0 2810 1.23 0.407 2809.5 9 0 13 0 1.5 0 0.5 0 4.33 4.33 19 25 Mei 2013 390 8 0 15600 1.11 23.423 15576. 58 0 2089 0 30 0 26 0 2410.38 2410.38 20 26 Mei 2013 120 12.5 100 10 1.13 9.027 100.97 12 103 4 13 2.3 10.2 6.9 54.67 61.57 21 27 Mei 2013 150 1.5 70 240 1.01 23.762 286.24 23 135 15 30 9.1 24 13.95 62.79 76.74 22 28 Mei 2013 120 13 110 480 1.21 19.835 570.17 71 214 30 30 25 24 59.17 422.06 481.22 23 29 Mei 2013 60 0 0 4020 1.28 1.797 4018.2 0 0 26 0 3 0 2.3 0 19.93 19.93 24 30 Mei 2013 TTU 2.5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 25 31 Mei 2013 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 26 1 Juni 2013 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 27 2 Juni 2013 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Upload: rini-setiawati

Post on 22-Oct-2015

2 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Lampiran Plot Erosi

LAMPIRANNAMA SHIFT :A2 JADWAL PRAKTIKUM :15.00 WIB NO. PLOT :2 PERLAKUAN MULSA :0 ton/ha

NoTanggal (kejadian

erosi)

Durasi hujan

(menit)

Tinggi hujan (mm)

Aliran permukaan (mL/plot) Erosi (gram/plot)

V1 V2

BD (gram/cm3) Vt V A1 A2 B1 B2 C1 C2 E1 E2 Et

1 7 Mei 2013 180 9.5 0 17621 1.14 24.561 17596.44 0 7620 0 40 0 28 0 5334.00 5334.00

2 8 Mei 2013 8 11 0 1051 1.17 23.077 1027.92 0 300 0 30 0 27 0 270.00 270.00

3 9 Mei 2013 150 9 0 0 0 0 0 0 0 0 0 27 0 0 0 0

4 10 Mei 2013 120 0 0 6600 1.25 2.400 6597.60 0 6 0 4 0 3 0 4.50 4.50

5 11 Mei 2013 180 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

6 12 Mei 2013 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

7 13 Mei 2013 210 0 0 3210 1.02 23.529 3186.47 0 547 0 30 0 24 0 437.60 437.60

8 14 Mei 2013 TTU 6 0 0 0 0 0 0 0 0 0 0 0 0 0 0

9 15 Mei 2013 150 1.5 0 700 1.19 21.008 678.99 0 253 0 38 0 25 0 166.45 166.45

10 16 Mei 2013 120 9 0 650 1,198 0.020 649.98 0 264 0 35 0 24 0 181.03 181.03

11 17 Mei 2013 120 2 0 432 1.26 22.222 409.78 0 132 0 35 0 28 0 105.60 105.60

12 18 Mei 2013 60 8 0 550 1.24 12.097 537.90 0 209 0 20 0 15 0 156.75 156.75

13 19 Mei 2013 60 7.5 0 650 1.2 10.833 639.17 0 272 0 19 0 13 0 158.64 158.64

14 20 Mei 2013 120 0 0 8850 1.176 22.109 8827.89 0 281 0 40 0 26 0 182.65 182.65

15 21 Mei 2013 90 6.5 10 600 1.27 13.386 596.61 10 300 5 30 2.5 17 5 170.00 175.00

16 22 Mei 2013 TTU 44 0 0 0 0 0 0 0 0 0 0 0 0 0 0

17 23 Mei 2013 360 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0

18 24 Mei 2013 120 18 0 2810 1.23 0.407 2809.59 0 13 0 1.5 0 0.5 0 4.33 4.33

19 25 Mei 2013 390 8 0 15600 1.11 23.423 15576.58 0 2089 0 30 0 26 0 2410.38 2410.38

20 26 Mei 2013 120 12.5 100 10 1.13 9.027 100.97 12 103 4 13 2.3 10.2 6.9 54.67 61.57

21 27 Mei 2013 150 1.5 70 240 1.01 23.762 286.24 23 135 15 30 9.1 24 13.95 62.79 76.74

22 28 Mei 2013 120 13 110 480 1.21 19.835 570.17 71 214 30 30 25 24 59.17 422.06 481.22

23 29 Mei 2013 60 0 0 4020 1.28 1.797 4018.20 0 26 0 3 0 2.3 0 19.93 19.93

24 30 Mei 2013 TTU 2.5 0 0 0 0 0 0 0 0 0 0 0 0 0 0

25 31 Mei 2013 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

26 1 Juni 2013 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

27 2 Juni 2013 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

28 3 Juni 2013 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

29 4 Juni 2013 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

30 5 Juni 2013 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

31 6 Juni 2013 90 0 0 750 0 0 750.00 0 0 0 0 0 0 0 0 0

NAMA SHIFT :A1 JADWAL PRAKTIKUM :13.00 WIB NO. PLOT :3 PERLAKUAN MULSA :2 ton/ha

No Tanggal Durasi Tinggi Aliran Permukaan (mL/Plot) EROSI (gr/Plot)

Page 2: Lampiran Plot Erosi

(Kejadian Erosi)

Hujan (Menit)

Hujan (mm)

V2BD

(gram/cm3)Vt (mL)

V (mL)

A1 (gram)

Tanah dr bak

A2 (gram)

B1 (gram)Diambil sampel

B2 (gram)

C1 (gram) setelah oven

C2 (gram)

E1 (gram)

E2 (gram)

Et (gram)

1 7 Mei 180 9,50 7337,5 12800 0 10 0 6,3 0 02 8 Mei 120 11,0 7337,5 416,5 0 10 0 6 0 03 9 Mei 150 9,0 7337,5 416,5 0 10 0 6 0 04 10 Mei 0 0 0 0 0 0 0 0 0 0 0 0 0 0 05 11 Mei 0 0 0 0 0 0 0 0 0 0 0 0 0 0 06 12 Mei 0 0 0 0 0 0 0 0 0 0 0 0 0 0 07 13 Mei 0 0 0 0 0 0 0 0 0 0 0 0 0 0 08 14 Mei 0 6,0 1026,34 1,1 74,5 98 0 10 0 9 0 88,2 0 88,29 15 Mei 150 1.50 249,02 0,92 22,56 27 0 9 0 8 0 24 0 2410 16 Mei 120 9,00 1897,00 1,21 136,98 164 0 10 0 9 0 147,6 0 147,611 17 Mei 120 2,00 286,85 1,13 43,87 67 0 8 0 7.5 0 62,8125 0 62,812512 18 Mei 60 8,00 1258,35 1,15 298,45 402 0 9 0 7.5 0 335 0 33513 19 Mei 60 7,50 100 1,32 2,64,22 346 0 10 0 8 0 276,8 0 276,814 20 Mei 0 0 0 0 0 0 0 0 0 0 0 0 0 0 015 21 Mei 90 6,50 100 0 0 0 190 0 30 0 23 0 145,67 0 145,6716 22 Mei 0 0 4020 0 0 0 113 0 6 0 3,6 0 68,93 0 68,9317 23 Mei 360 3,0 6780 0,954 6220 16980 68 21 30 0 19 6 1,3122 12,6 13,912218 24 Mei 120 18,0 400 0,095 157 3843 38 0 5 0 3 0 22,8 0 22,819 25 Mei 390 8,0 5976 1,23 543,23 48 32 30 30 24 25 38,4 26,6 6520 26 Mei 120 12,50 2076,8 0,98 254,76 276,5 0 10 0 8,5 0 235,025 0 235,02521 27 Mei 150 1,50 187,6 1,21 65,86 43,87 0 9 0 7 0 34,121 0 34,12122 28 Mei 120 13,00 2468,56 1,26 254,38 298,97 0 9 0 7,3 0 242,5 0 242,523 29 Mei 0 0 0 0 0 0 0 0 0 0 0 0 0 0 024 30 Mei 0 2,5 276,46 1,46 38,78 61,25 0 9 0 7,8 0 53,083 0 53,08325 31 Mei 0 0 0 0 0 0 0 0 0 0 0 0 0 0 026 1 Juni 0 0 0 0 0 0 0 0 0 0 0 0 0 0 027 2 Juni 0 0 0 0 0 0 0 0 0 0 0 0 0 0 028 3 Juni 0 0 0 0 0 0 0 0 0 0 0 0 0 0 029 4 Juni 0 0 0 0 0 0 0 0 0 0 0 0 0 0 030 5 Juni 0 0 0 0 0 0 0 0 0 0 0 0 0 0 031 6 Juni 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

NAMA SHIFT :B2 JADWAL PRAKTIKUM :10.00 WIB NO. PLOT :4 PERLAKUAN MULSA :4 ton/ha

Page 3: Lampiran Plot Erosi

NO

TANGGAL (kejadian erosi dan

aliran permukaan)

TINGGI HUJAN

(mm)

DURASI HUJAN (menit)

ALIRAN PERMUKAAN (Ltr/Plot)

EROSI (gr/Plot)

D E

V (liter)BD

(gram/cm³)

vṯ (liter / plot) A₁ A₂ B₁ B₂ C₁ C₂ E₁ E₂ Eṯ

1 5/7/20139.5 120 6.125 5.71 0.52 4723

0.0010

0.006.3

0.002975.49

0.00 2975.492.97549 751.386

2 5/8/201311 150 6.125 1.2 0.19 373

0.0010

0.006

0.00223.8

0.00 223.800.2238 56.5152

3 5/9/20139 120 6.125 1.2 0.20 400

0.0010

0.006

0.00240

0.00 240.000.24 60.6061

4 5/10/20130 180 6.125 0.35 3.05 2015

0.0010

0.005.3

0.001067.95

0.00 1067.951.06795 269.684

5 5/11/20130 0 4.77 5.4 0.09 520

0.0030

0.0027

0.00468

0.00 468.000.468 118.182

6 5/12/20130 210

0.00 0.000.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.000 0

7 5/13/20130 TTU 0.275 1.61 0.02 44

0.0030

0.0023

0.00 33.73333333

0.00 33.730.03373 8.51852

8 5/14/20136 150

0.00 0.000.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.000 0

9 5/15/20131.5 120 0.61 1.61 0.06 117.2

0.0030

0.0023

0.00 89.85333333

0.00 89.850.08985 22.6902

10 5/16/20139 120 0.435 1.1 0.11 173

0.0010

0.007

0.00121.1

0.00 121.100.1211 30.5808

11 5/17/20132 60 9.3 0.8 0.13 130

0.0010

0.008

0.00104

0.00 104.000.104 26.2626

12 5/18/20138 60 0.39 1.2 0.07 136

0.0010

0.006

0.0081.6

0.00 81.600.0816 20.6061

13 5/19/20137.5 120 0.447 0.8 0.21 205

0.0010

0.008

0.00164

0.00 164.000.164 41.4141

14 5/20/20130 90 4.48 2.1 0.05 149.25

0.0027.84

0.0021

0.00 112.580819

0.00 112.580.11258 28.4295

15 5/21/20136.5 TTU 0.496 0.33 3.87 2554

0.0010

0.005

0.001277

0.00 1277.001.277 322.475

16 5/22/201344 360

0.00 0.000.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.000 0

17 5/23/20133 120 55.35 0.8 0.12 164

0.0020

0.0012

0.0098.4

0.00 98.400.0984 24.8485

18 5/24/201318 390 0.98 0.33 0.21 141

0.0010

0.005

0.0070.5

0.00 70.500.0705 17.803

19 5/25/20138 120 60 1.58 0.11 229

0.0030

0.0023

0.00 175.5666667

0.00 175.570.17557 44.335

20 5/26/201312.5 150 4.3 2 0.01 20

0.0010

0.006

0.0012

0.00 12.000.012 3.0303

21 5/27/20131.5 120 12.5 0.33 0.05 39

0.0010

0.004

0.0015.6

0.00 15.600.0156 3.93939

22 5/28/201313 60 8.75 0.75 0.02 25

0.005

0.003

0.0015

0.00 15.000.015 3.78788

23 5/29/20130 TTU 0.64 0.35 0.13 89

0.0010

0.005

0.0044.5

0.00 44.500.0445 11.2374

24 5/30/20132.5 0

0.00 0.000.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.000 0

Page 4: Lampiran Plot Erosi

25 5/31/20130 0

0.00 0.000.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.000 0

26 6/1/20130 0

0.00 0.000.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.000 0

27 6/2/20130 0

0.00 0.000.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.000 0

28 6/3/20130 0

0.00 0.000.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.000 0

29 6/4/20130 0

0.00 0.000.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.000 0

30 6/5/20130 90

0.00 0.000.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.000 0

31 6/6/20130 0 0.615

0.000.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.000 0

Page 5: Lampiran Plot Erosi

NAMA SHIFT :B1 JADWAL PRAKTIKUM :08.00 WIB NO. PLOT :1 PERLAKUAN MULSA :6 ton/ha

NO

TANGGAL (kejadian erosi dan

aliran permukaan)

TINGGI HUJAN

(mm)

DURASI HUJAN (menit)

ALIRAN PERMUKAAN (mL/Plot)

EROSI (gr/Plot)

VBD

(gram/cm³)

vṯ A1 A2 B1 B2 C1 C2 E1 E2 Eṯ

  5/7/2013 9.50 180.00 2193.05 1.00 109.56 0.00 121.73 0.00 10.00 0.00 9.00 0.00 109.56 109.56

2 5/8/2013 11.00 120.00 2539.32 1.40 86.30 0.00 140.95 0.00 14.00 0.00 12.00 0.00 120.81 120.81

3 5/9/2013 9.00 150.00 2077.63 1.60 58.56 0.00 115.32 0.00 16.00 0.00 13.00 0.00 93.70 93.70

4 5/10/2013 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

5 5/11/2013 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

6 5/12/2013 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

7 5/13/2013 - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

8 5/14/2013 6.00   1385.08 0.89 69.19 0.00 76.88 0.00 10.00 0.00 8.00 0.00 61.50 61.50

9 5/15/2013 1.50 150.00 346.27 0.78 17.33 0.00 19.25 0.00 10.00 0.00 7.00 0.00 13.48 13.48

10 5/16/2013 9.00 120.00 2170.00 1.00 108.00 0.00 120.00 0.00 10.00 0.00 9.00 0.00 108.00 108.00

11 5/17/2013 2.00 120.00 461.69 0.89 24.00 0.00 26.67 0.00 10.00 0.00 8.00 0.00 21.33 21.33

12 5/18/2013 8.00 60.00 1846.78 0.86 216.30 309.00 0.00 10.00 0.00 6.00 0.00 185.40 0.00 185.40

13 5/19/2013 7.50 60.00 1731.36 1.11 195.54 0.00 289.69 0.00 10.00 0.00 7.50 0.00 217.27 217.27

14 5/20/2013 - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

15 5/21/2013 6.50 90.00 1500.51 1.22 188.30 0.00 251.06 0.00 12.00 0.00 11.00 0.00 230.14 230.14

16 5/22/2013 44.00   10157.29 1.00 635.20 0.00 705.78 0.00 10.00 0.00 9.00 0.00 635.20 635.20

17 5/23/2013 3.00 360.00 692.54 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

18 5/24/2013 18.00 120.00 2720.00 1.00 1.50 0.00 3.00 0.00 2.00 0.00 1.00 0.00 1.50 1.50

19 5/25/2013 8.00 390.00 693.33 0.85 478.83 466.00 39.00 10.00 10.00 8.00 8.20 372.80 31.98 404.78

20 5/26/2013 12.50 120.00 2886.36 0.75 194.49 0.00 200.51 0.00 10.00 0.00 7.30 0.00 146.37 146.37

21 5/27/2013 1.50 150.00 346.33 0.82 23.40 0.00 24.12 0.00 10.00 0.00 8.00 0.00 19.30 19.30

22 5/28/2013 13.00 120.00 3005.60 1.03 182.14 0.00 225.33 0.00 12.00 0.00 10.00 0.00 187.78 187.78

23 5/29/2013 - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

24 5/30/2013 2.50   216.56 1.23 30.42 0.00 43.46 0.00 10.00 0.00 8.60 0.00 37.38 37.38

Page 6: Lampiran Plot Erosi

25 5/31/2013 - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

26 6/1/2013 - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

27 6/2/2013 - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

28 6/3/2013 - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

29 6/4/2013 - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

30 6/5/2013 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

31 6/6/2013 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Page 7: Lampiran Plot Erosi

Gambar 1. Penimbangan Massa Total Tanah (A1)

Gambar 2. Penimbangan Massa Sampel yang Akan Dioven (B1)