lampiran - repository.maranatha.edu file6 bondek 97,000 m² 7 kawat las 12,500 kg 8 shear connector...

6
LAMPIRAN 63

Upload: buidien

Post on 07-Aug-2019

222 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: LAMPIRAN - repository.maranatha.edu file6 Bondek 97,000 m² 7 Kawat Las 12,500 kg 8 Shear Connector 8,700 ls 9 Curb Beton 50,000 buah 10 Hotmix jadi + alat besar, tenaga dan bahan

LAMPIRAN

63

Page 2: LAMPIRAN - repository.maranatha.edu file6 Bondek 97,000 m² 7 Kawat Las 12,500 kg 8 Shear Connector 8,700 ls 9 Curb Beton 50,000 buah 10 Hotmix jadi + alat besar, tenaga dan bahan

64

JALAN LAYANG CIMINDI

Gambar Lokasi Proyek Fly Over Cimindi, Bandung

Page 3: LAMPIRAN - repository.maranatha.edu file6 Bondek 97,000 m² 7 Kawat Las 12,500 kg 8 Shear Connector 8,700 ls 9 Curb Beton 50,000 buah 10 Hotmix jadi + alat besar, tenaga dan bahan

65 65

586

Page 4: LAMPIRAN - repository.maranatha.edu file6 Bondek 97,000 m² 7 Kawat Las 12,500 kg 8 Shear Connector 8,700 ls 9 Curb Beton 50,000 buah 10 Hotmix jadi + alat besar, tenaga dan bahan

66

POTO

NG

AN

I -

I

Tam

pak

Sam

ping

Pot

onga

n I -

I

Page 5: LAMPIRAN - repository.maranatha.edu file6 Bondek 97,000 m² 7 Kawat Las 12,500 kg 8 Shear Connector 8,700 ls 9 Curb Beton 50,000 buah 10 Hotmix jadi + alat besar, tenaga dan bahan

67

UPAH PEKERJA BANGUNANKOTA BANDUNGTAHUN ANGGARAN AGUSTUS 2006 [7]

No. URAIAN PEKERJAAN

Pekerja 31,600 1 Orang / Hari / 8 Jam

Tukang Batu 36,900 1 Orang / Hari / 8 Jam

Kepala Tukang Batu 39,600 1 Orang / Hari / 8 Jam

Tukang Besi Beton 38,200 1 Orang / Hari / 8 Jam

Tukang Besi Profil 38,200 1 Orang / Hari / 8 Jam

Kepala Tukang Besi Beton 42,200 1 Orang / Hari / 8 Jam

Mandor 46,200 1 Orang / Hari / 8 Jam7

4

1

5

6

Harga Upah (Rp)

Satuan Waktu

2

3

Page 6: LAMPIRAN - repository.maranatha.edu file6 Bondek 97,000 m² 7 Kawat Las 12,500 kg 8 Shear Connector 8,700 ls 9 Curb Beton 50,000 buah 10 Hotmix jadi + alat besar, tenaga dan bahan

68

68

HARGA BAHAN BANGUNANKOTA BANDUNGTAHUN ANGGARAN AGUSTUS 2006 [7]

No. URAIAN PEKERJAAN

1 Adukan K-300 Readymix 557,000 m3

2 Adukan K-175 Readymix 515,000 m3

3 besi beton 5,500 Kg

4 Kawat Beton 8,500 Kg

5 Pipa PVC Rucika 280,000 m'

6 Bondek 97,000 m²

7 Kawat Las 12,500 kg

8 Shear Connector 8,700 ls

9 Curb Beton 50,000 buah

10 Hotmix jadi + alat besar, tenaga dan bahan bakar 790,000 Ton

11 Perlengkapan 8,500 ls

12 Alat Bantu (slang + tes lab) 639,247 ls

13 Peralatan, Spancer 8,500 ls

14 Tiang Pagar 1,000,000 m

Harga Upah (Rp) Satuan

HARGA BAHAN BANGUNANKOTA BANDUNGTAHUN ANGGARAN AGUSTUS 2006 [7]

No. URAIAN PEKERJAAN

1 Adukan K-300 Readymix 557,000 m3

2 Adukan K-175 Readymix 515,000 m3

3 besi beton 5,500 Kg

4 Kawat Beton 8,500 Kg

5 Pipa PVC Rucika 280,000 m'

6 Bondek 97,000 m²

7 Kawat Las 12,500 kg

8 Shear Connector 8,700 ls

9 Curb Beton 50,000 buah

10 Hotmix jadi + alat besar, tenaga dan bahan bakar 790,000 Ton

11 Perlengkapan 8,500 ls

12 Alat Bantu (slang + tes lab) 639,247 ls

13 Peralatan, Spancer 8,500 ls

14 Tiang Pagar 1,000,000 m

Harga Upah (Rp) Satuan