lampiran - repository.maranatha.edu file6 bondek 97,000 m² 7 kawat las 12,500 kg 8 shear connector...
TRANSCRIPT
LAMPIRAN
63
64
JALAN LAYANG CIMINDI
Gambar Lokasi Proyek Fly Over Cimindi, Bandung
65 65
586
66
POTO
NG
AN
I -
I
Tam
pak
Sam
ping
Pot
onga
n I -
I
67
UPAH PEKERJA BANGUNANKOTA BANDUNGTAHUN ANGGARAN AGUSTUS 2006 [7]
No. URAIAN PEKERJAAN
Pekerja 31,600 1 Orang / Hari / 8 Jam
Tukang Batu 36,900 1 Orang / Hari / 8 Jam
Kepala Tukang Batu 39,600 1 Orang / Hari / 8 Jam
Tukang Besi Beton 38,200 1 Orang / Hari / 8 Jam
Tukang Besi Profil 38,200 1 Orang / Hari / 8 Jam
Kepala Tukang Besi Beton 42,200 1 Orang / Hari / 8 Jam
Mandor 46,200 1 Orang / Hari / 8 Jam7
4
1
5
6
Harga Upah (Rp)
Satuan Waktu
2
3
68
68
HARGA BAHAN BANGUNANKOTA BANDUNGTAHUN ANGGARAN AGUSTUS 2006 [7]
No. URAIAN PEKERJAAN
1 Adukan K-300 Readymix 557,000 m3
2 Adukan K-175 Readymix 515,000 m3
3 besi beton 5,500 Kg
4 Kawat Beton 8,500 Kg
5 Pipa PVC Rucika 280,000 m'
6 Bondek 97,000 m²
7 Kawat Las 12,500 kg
8 Shear Connector 8,700 ls
9 Curb Beton 50,000 buah
10 Hotmix jadi + alat besar, tenaga dan bahan bakar 790,000 Ton
11 Perlengkapan 8,500 ls
12 Alat Bantu (slang + tes lab) 639,247 ls
13 Peralatan, Spancer 8,500 ls
14 Tiang Pagar 1,000,000 m
Harga Upah (Rp) Satuan
HARGA BAHAN BANGUNANKOTA BANDUNGTAHUN ANGGARAN AGUSTUS 2006 [7]
No. URAIAN PEKERJAAN
1 Adukan K-300 Readymix 557,000 m3
2 Adukan K-175 Readymix 515,000 m3
3 besi beton 5,500 Kg
4 Kawat Beton 8,500 Kg
5 Pipa PVC Rucika 280,000 m'
6 Bondek 97,000 m²
7 Kawat Las 12,500 kg
8 Shear Connector 8,700 ls
9 Curb Beton 50,000 buah
10 Hotmix jadi + alat besar, tenaga dan bahan bakar 790,000 Ton
11 Perlengkapan 8,500 ls
12 Alat Bantu (slang + tes lab) 639,247 ls
13 Peralatan, Spancer 8,500 ls
14 Tiang Pagar 1,000,000 m
Harga Upah (Rp) Satuan