jadwal k 175

4
8/20/2019 Jadwal k 175 http://slidepdf.com/reader/full/jadwal-k-175 1/4 Nomor Tanggal Tanggal Tanggal Kedalamn Volume Primary Pengujian Pengujian Pengujian Bor Beton Total Pile (7 Hari) (14 Hari) (28 Hari) (m) (m3) 1 Pile 1 25 Agustus 2014 K-175 19 3 9/1/2014 9/8/2014 9/22/2014 27 14.50 2 Pile 5 26 Agustus 2014 K-175 17 4 9/2/2014 9/9/2014 9/23/2014 26 13.50 3 Pile 2 26 Agustus 2014 K-175 16 3 9/2/2014 9/9/2014 9/23/2014 26 13.50 4 Pile 7 26 Agustus 2014 K-175 17 3 9/2/2014 9/9/2014 9/23/2014 26 13.00 5 Pile 10 27 Agustus 2014 K-175 17 3 9/3/2014 9/10/2014 9/24/2014 26 13.00 6 Pile 3 27 Agustus 2014 K-175 16 3 9/3/2014 9/10/2014 9/24/2014 26 13.00 7 Pile 6 27 Agustus 2014 K-175 16 3 9/3/2014 9/10/2014 9/24/2014 26 13.00 8 Pile 12 27 Agustus 2014 K-175 16 3 9/3/2014 9/10/2014 9/24/2014 26 13.00 9 Pile 8 28 Agustus 2014 K-175 20 3 9/4/2014 9/11/2014 9/25/2014 26 13.00 10 Pile 4 28 Agustus 2014 K-175 17 3 9/4/2014 9/11/2014 9/25/2014 26 13.00 11 Pile 11 28 Agustus 2014 K-175 17 3 9/4/2014 9/11/2014 9/25/2014 26 13.00 12 Pile 14 28 Agustus 2014 K-175 17 3 9/4/2014 9/11/2014 9/25/2014 26 13.00 13 Pile 9 28 Agustus 2014 K-175 16.5 3 9/4/2014 9/11/2014 9/25/2014 26 13.50 14 Pile 18 29 Agustus 2014 K-175 17 3 9/5/2014 9/12/2014 9/26/2014 26 13.00 15 Pile 41 29 Agustus 2014 K-175 18 3 9/5/2014 9/12/2014 9/26/2014 26 13.00 16 Pile 13 29 Agustus 2014 K-175 19 3 9/5/2014 9/12/2014 9/26/2014 26 14.00 17 Pile 16 29 Agustus 2014 K-175 16.5 3 9/5/2014 9/12/2014 9/26/2014 26 14.00 18 Pile 20 29 Agustus 2014 K-175 17.5 3 9/5/2014 9/12/2014 9/26/2014 26 13.50 19 Pile 15 30 Agustus 2014 K-175 18 3 9/6/2014 9/13/2014 9/26/2014 26 13.50 20 Pile 19 30 Agustus 2014 K-175 19 3 9/6/2014 9/13/2014 9/26/2014 26 13.50 21 Pile 21 30 Agustus 2014 K-175 19 3 9/6/2014 9/13/2014 9/26/2014 26 13.50 22 Pile 42 31 Agustus 2014 K-175 17.5 3 9/7/2014 9/14/2014 9/27/2014 26 13.50 23 Pile 17 31 Agustus 2014 K-175 19.5 3 9/7/2014 9/14/2014 9/27/2014 26 13.50 24 Pile 23 31 Agustus 2014 K-175 18.5 3 9/7/2014 9/14/2014 9/27/2014 26 13.50 25 Pile 34 31 Agustus 2014 K-175 18.5 3 9/7/2014 9/14/2014 9/27/2014 26 13.50 26 Pile 40 01 September 2014 K-175 18 3 9/8/2014 9/15/2014 9/28/2014 26 13.50 27 Pile 33 01 September 2014 K-175 16 3 9/8/2014 9/15/2014 9/28/2014 26 13.50 28 Pile 22 01 September 2014 K-175 16 3 9/8/2014 9/15/2014 9/28/2014 26 13.50 29 Pile 27 01 September 2014 K-175 17 3 9/8/2014 9/15/2014 9/28/2014 26 13.50 30 Pile 30 01 September 2014 K-175 16 3 9/8/2014 9/15/2014 9/28/2014 26 13.00 31 Pile 32 02 September 2014 K-175 17.5 3 9/9/2014 9/16/2014 9/29/2014 26 13.50 32 Pile 28 02 September 2014 K-175 18 3 9/9/2014 9/16/2014 9/29/2014 26 13.50 33 Pile 25 02 September 2014 K-175 18 3 9/9/2014 9/16/2014 9/29/2014 26 13.50 34 Pile 36 02 September 2014 K-175 19 3 9/9/2014 9/16/2014 9/29/2014 26 13.50 35 Pile 26 02 September 2014 K-175 18 3 9/9/2014 9/16/2014 9/29/2014 26 13.50 36 Pile 35 03 September 2014 K-175 18.5 3 9/10/2014 9/17/2014 9/30/2014 26 14.50 37 Pile 24 03 September 2014 K-175 18.5 3 9/10/2014 9/17/2014 9/30/2014 26 14.00 38 Pile 38 03 September 2014 K-175 17 3 9/10/2014 9/17/2014 9/30/2014 26 16.50 03 September 2014 K-175 9/10/2014 9/17/2014 9/30/2014 39 Pile 37 04 September 2014 K-175 18 3 9/11/2014 9/18/2014 10/1/2014 26 14.00 04 September 2014 K-175 9/11/2014 9/18/2014 10/1/2014 40 Pile 39 06 September 2014 K-175 17.5 3 9/13/2014 9/20/2014 10/3/2014 26 13.50 41 Pile 29 06 September 2014 K-175 19 3 9/13/2014 9/20/2014 10/3/2014 26 13.50 42 Pile 31 06 September 2014 K-175 20 3 9/13/2014 9/20/2014 10/3/2014 26 13.50 568.00 PRIMARY PILE OUTLET TOTAL JADWAL PENGECORAN DI LAPANGAN PEKERJAAN SECANT PILE (PRIMARY PILE) LOKASI OUTLET NO Hari/ Tanggal Mutu Beton Slump Test 18±2 Benda Uji Silinder Ket  

Upload: yudanto-eko-prabowo

Post on 07-Aug-2018

218 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Jadwal k 175

8/20/2019 Jadwal k 175

http://slidepdf.com/reader/full/jadwal-k-175 1/4

Nomor Tanggal Tanggal Tanggal Kedalamn Volume

Primary Pengujian Pengujian Pengujian BorBeton

Total

Pile (7 Hari) (14 Hari) (28 Hari) (m) (m3)

1 Pile 1 25 Agustus 2014 K-175 19 3 9/1/2014 9/8/2014 9/22/2014 27 14.50

2 Pile 5 26 Agustus 2014 K-175 17 4 9/2/2014 9/9/2014 9/23/2014 26 13.50

3 Pile 2 26 Agustus 2014 K-175 16 3 9/2/2014 9/9/2014 9/23/2014 26 13.50

4 Pile 7 26 Agustus 2014 K-175 17 3 9/2/2014 9/9/2014 9/23/2014 26 13.005 Pile 10 27 Agustus 2014 K-175 17 3 9/3/2014 9/10/2014 9/24/2014 26 13.00

6 Pile 3 27 Agustus 2014 K-175 16 3 9/3/2014 9/10/2014 9/24/2014 26 13.00

7 Pile 6 27 Agustus 2014 K-175 16 3 9/3/2014 9/10/2014 9/24/2014 26 13.00

8 Pile 12 27 Agustus 2014 K-175 16 3 9/3/2014 9/10/2014 9/24/2014 26 13.00

9 Pile 8 28 Agustus 2014 K-175 20 3 9/4/2014 9/11/2014 9/25/2014 26 13.00

10 Pile 4 28 Agustus 2014 K-175 17 3 9/4/2014 9/11/2014 9/25/2014 26 13.00

11 Pile 11 28 Agustus 2014 K-175 17 3 9/4/2014 9/11/2014 9/25/2014 26 13.00

12 Pile 14 28 Agustus 2014 K-175 17 3 9/4/2014 9/11/2014 9/25/2014 26 13.00

13 Pile 9 28 Agustus 2014 K-175 16.5 3 9/4/2014 9/11/2014 9/25/2014 26 13.50

14 Pile 18 29 Agustus 2014 K-175 17 3 9/5/2014 9/12/2014 9/26/2014 26 13.00

15 Pile 41 29 Agustus 2014 K-175 18 3 9/5/2014 9/12/2014 9/26/2014 26 13.00

16 Pile 13 29 Agustus 2014 K-175 19 3 9/5/2014 9/12/2014 9/26/2014 26 14.00

17 Pile 16 29 Agustus 2014 K-175 16.5 3 9/5/2014 9/12/2014 9/26/2014 26 14.00

18 Pile 20 29 Agustus 2014 K-175 17.5 3 9/5/2014 9/12/2014 9/26/2014 26 13.50

19 Pile 15 30 Agustus 2014 K-175 18 3 9/6/2014 9/13/2014 9/26/2014 26 13.50

20 Pile 19 30 Agustus 2014 K-175 19 3 9/6/2014 9/13/2014 9/26/2014 26 13.50

21 Pile 21 30 Agustus 2014 K-175 19 3 9/6/2014 9/13/2014 9/26/2014 26 13.50

22 Pile 42 31 Agustus 2014 K-175 17.5 3 9/7/2014 9/14/2014 9/27/2014 26 13.50

23 Pile 17 31 Agustus 2014 K-175 19.5 3 9/7/2014 9/14/2014 9/27/2014 26 13.50

24 Pile 23 31 Agustus 2014 K-175 18.5 3 9/7/2014 9/14/2014 9/27/2014 26 13.50

25 Pile 34 31 Agustus 2014 K-175 18.5 3 9/7/2014 9/14/2014 9/27/2014 26 13.50

26 Pile 40 01 September 2014 K-175 18 3 9/8/2014 9/15/2014 9/28/2014 26 13.50

27 Pile 33 01 September 2014 K-175 16 3 9/8/2014 9/15/2014 9/28/2014 26 13.50

28 Pile 22 01 September 2014 K-175 16 3 9/8/2014 9/15/2014 9/28/2014 26 13.50

29 Pile 27 01 September 2014 K-175 17 3 9/8/2014 9/15/2014 9/28/2014 26 13.50

30 Pile 30 01 September 2014 K-175 16 3 9/8/2014 9/15/2014 9/28/2014 26 13.00

31 Pile 32 02 September 2014 K-175 17.5 3 9/9/2014 9/16/2014 9/29/2014 26 13.50

32 Pile 28 02 September 2014 K-175 18 3 9/9/2014 9/16/2014 9/29/2014 26 13.50

33 Pile 25 02 September 2014 K-175 18 3 9/9/2014 9/16/2014 9/29/2014 26 13.50

34 Pile 36 02 September 2014 K-175 19 3 9/9/2014 9/16/2014 9/29/2014 26 13.50

35 Pile 26 02 September 2014 K-175 18 3 9/9/2014 9/16/2014 9/29/2014 26 13.50

36 Pile 35 03 September 2014 K-175 18.5 3 9/10/2014 9/17/2014 9/30/2014 26 14.5037 Pile 24 03 September 2014 K-175 18.5 3 9/10/2014 9/17/2014 9/30/2014 26 14.00

38 Pile 38 03 September 2014 K-175 17 3 9/10/2014 9/17/2014 9/30/2014 26 16.50

03 September 2014 K-175 9/10/2014 9/17/2014 9/30/2014

39 Pile 37 04 September 2014 K-175 18 3 9/11/2014 9/18/2014 10/1/2014 26 14.00

04 September 2014 K-175 9/11/2014 9/18/2014 10/1/2014

40 Pile 39 06 September 2014 K-175 17.5 3 9/13/2014 9/20/2014 10/3/2014 26 13.50

41 Pile 29 06 September 2014 K-175 19 3 9/13/2014 9/20/2014 10/3/2014 26 13.50

42 Pile 31 06 September 2014 K-175 20 3 9/13/2014 9/20/2014 10/3/2014 26 13.50

568.00

PRIMARY PILE OUTLET

TOTAL

JADWAL PENGECORAN DI LAPANGAN

PEKERJAAN SECANT PILE (PRIMARY PILE) LOKASI OUTLET

NO Hari/ TanggalMutu

Beton

Slump

Test 18±2

Benda Uji

SilinderKet

 

Page 2: Jadwal k 175

8/20/2019 Jadwal k 175

http://slidepdf.com/reader/full/jadwal-k-175 2/4

-0.510

P1

P2

P3

P4

P5

P6

P7

P8

P9

P10

P11

P12

P15P16P17P18P19P20P21

P34

P33

P32

P31

P30

P29

P28

P27

P26

P25

P24

P23

P22

P14 P13

P 35 P 36 P 37 P 38 P 39 P 40 P 41 P 42

S39S38S37   S40

S30

S29

S28

S27

S5

S6

S7

S8

S16S17S18S19

PRIMARY & SECONDARY SECANT PILE DRIVING

SHAFT OUTLET

Page 3: Jadwal k 175

8/20/2019 Jadwal k 175

http://slidepdf.com/reader/full/jadwal-k-175 3/4

LAPORAN KEUANGAN

Jumlah

TM (bh)

A B 1,000,000.00 

2 10,000.00  20,000.00  980,000.00 

2 10,000.00  20,000.00  960,000.00 

2 10,000.00  20,000.00  940,000.00 

2 10,000.00  20,000.00  920,000.00  10,000.00 2 10,000.00  20,000.00  890,000.00 

2 10,000.00  20,000.00  870,000.00 

2 10,000.00  20,000.00  850,000.00 

2 10,000.00  20,000.00  830,000.00  10,000.00 

2 10,000.00  20,000.00  800,000.00 

2 10,000.00  20,000.00  780,000.00 

2 10,000.00  20,000.00  760,000.00 

2 10,000.00  20,000.00  740,000.00 

2 10,000.00  20,000.00  720,000.00  10,000.00 

2 10,000.00  20,000.00  690,000.00 

2 10,000.00  20,000.00  670,000.00 

2 10,000.00  20,000.00  650,000.00 

2 10,000.00  20,000.00  630,000.00 

2 10,000.00  20,000.00  610,000.00  10,000.00 

2 10,000.00  20,000.00  580,000.00 

2 10,000.00  20,000.00  560,000.00 

2 10,000.00  20,000.00  540,000.00  10,000.00 

2 10,000.00  20,000.00  510,000.00 

2 10,000.00  20,000.00  490,000.00 

2 10,000.00  20,000.00  470,000.00 

2 10,000.00  20,000.00  450,000.00  10,000.00 

2 10,000.00  20,000.00  420,000.00 

2 10,000.00  20,000.00  400,000.00 

2 10,000.00  20,000.00  380,000.00 

2 10,000.00  20,000.00  360,000.00 

2 10,000.00  20,000.00  340,000.00  10,000.00 

2 10,000.00  20,000.00  310,000.00 

2 10,000.00  20,000.00  290,000.00 

2 10,000.00  20,000.00  270,000.00 

2 10,000.00  20,000.00  250,000.00 

2 10,000.00  20,000.00  230,000.00  10,000.00 

2 10,000.00  20,000.00  200,000.00 2 10,000.00  20,000.00  180,000.00 

3 10,000.00  30,000.00  150,000.00 

2 10,000.00  20,000.00  130,000.00  10000

2 10,000.00  20,000.00  100,000.00 

2 10,000.00  20,000.00  80,000.00 

2 10,000.00  20,000.00  60,000.00 

850,000.00  1000000 60,000.00  70000

CorDudukan 4 m3

920,000.00 

Harga

Satuan TMTotal Harga Satuan ™ Debit Kredit Sisa Teknisi

Page 4: Jadwal k 175

8/20/2019 Jadwal k 175

http://slidepdf.com/reader/full/jadwal-k-175 4/4