I BELANJA BARANG DAN JASA
I.8 1. BELANJA SEWA ALAT BERAT
1 Asphalt Cutter Hari 525.000
2 Buldozer Komatsu - D20-3 Jam 94.000
3 Buldozer Komatsu - D31E Jam 105.000
4 Buldozer Komatsu Swim- D31P Jam 131.000
5 Buldozer Komatsu Swim D65P Jam 157.000
6 Buldozer Caterpilar - D6D Jam 131.000
7 Buldozer Caterpilar - D7G Jam 262.000
8 Compressor 2 Jack (250 CFM) Hari 813.000
9 Dump Truck 3,5 M3 Hari 446.000
10 Excavator Standard Th. 1995 - 1998, 0,8 m3 Jam 121.000
11 Excavator Standard Th. 1999 - 2000, 0,8 m3 Jam 131.000
12 Excavator Standard Th. 2004, Keatas 0,8 m3 Jam 142.000
13 Excavator Standard Th. 2007 - 2008, 0,8 m3 Jam 157.000
14 Excavator Long Arm Th. 1995 - 1996, 0,5 m3 Jam 199.000
15 Excavator Long Arm Th. 1998, 0,5 m3 Jam 199.000
16 Excavator Long Arm Th. 2008, 0,5 m3 Jam 262.000
17 Excavator Long Arm Kelas 200 daya jangkau 14 - 16 ( Komatsu ) Jam 199.000
18 Excavator Long Arm Kelas 200 daya jangkau 14 - 16 ( Kobelco) Jam 231.000
19 Excavator Long Arm Kelas 200 daya jangkau 14 - 16 ( Hitachi ) Jam 231.000
20 Excavator Vio 40 Yanmar (link karet) 0,2 m3 Jam 105.000
21 Excavator Stone Breaker Kelas 200 Jam 304.000
22 ExcavatorMini Exavator, Kelas 100 / Bucket Capasitas 0.4 - 0.5 m3
( Komatsu )Jam 115.000
23 ExcavatorMini Exavator, Kelas 100 / Bucket Capasitas 0.4 - 0.5 m3
( Hitachi )Jam 126.000
24 Excavator Komatsu PC200 - 6 /Setara, Tahun 2000 ke atas Jam 121.000
25 Excavator PC 200-7 Th 2005, 200 Jam ( 25 Hari ) Unit 31.470.000
26 Excavator CAT 320 C Th 2005, 200 Jam ( 25 Hari ) Unit 31.470.000
27 Excavator Kobelco / Hitachi Jam 142.000
28 Mesin Giling Wacker 1 - 3 ton Hari 157.000
29 Mesin Giling 4/6 ton Hari 184.000
30 Mesin Giling 6/8 ton Hari 210.000
31 Mesin Giling 8/10 ton Hari 210.000
32 Mesin Giling 10/12 ton Hari 210.000
33 Mesin Giling 10/12 ton Rd 2 Hari 252.000
34 Mesin Giling 10/12 ton - 10/12 ton Rd 3 Hari 236.000
35 Mesin Giling 14/16 ton Hari 288.000
36 Mobil Crane Uk. 20 - 25 Ton + Mobilisasi 1 X P/P Bulan 78.675.000
37 Mobil Crane Uk. 45 Ton + Mobilisasi 1 X P/P Bulan 115.390.000
38 Mobil Crane Uk. 20 - 25 Ton + Mobilisasi 1 X P/P ( 1 Hari/Shift/8 Jam Kerja ) Hari 20.770.000
39 Mobil Crane Uk. 45 Ton + Mobilisasi 1 X P/P ( 1 Hari/Shift/8 Jam Kerja ) Hari 24.652.000
40 Molen Hari 136.000
41 Roller / Vibro Vibro Sakai SV 91 Jam 100.000
42 Roller / Vibro Vibro Sakai SV 500 Jam 126.000
43 Roller / Vibro Vibro Caterpilar CS 531 Jam 110.000
43 Roller / Vibro Vibro Sakai SV 512 TF Th. 2011 Jam 142.000
44 Tower Crane Ukuran 12 Ton, Tinggi 30 Meter, Panjang Jangkauan 30 Meter Bulan 89.165.000
44 Tower Crane Mobilisasi pp 52.450.000
45 Tower Crane Pemasangan Set 78.675.000
45 Tower Crane Angkur Unit 57.695.000
STANDAR SATUAN HARGA BARANG/JASA DI LINGKUNGAN PEMERINTAH KOTA DEPOK
TAHUN ANGGARAN 2013
NO NAMA BARANG SPESIFIKASI SATUAN
I - 190
-
2. SEWA ALAT SURVEY
46 Theodolite Digital ( Per Set ) Bulan 2.623.000
47 Total Station Segala Merk, Tripod + Rambu Ukur Bulan 6.294.000
48 Waterpass / Autolevel Per Set Bulan 1.364.000