REKAPITULASI BEBAN1. Jumlah daya pada masing-masing grupLantai 1Grup 1:No.RuanganBebanTotal Daya (W)

Lampu TL Stop Kontak

NP(W)Total (W)P(W)

1.Carport13535-36

2.Kamar Tidur11818100118

3.Teras11111-11

4.Taman Depan21428-28

Ruang Tamu11818100118

Jumlah110200310

Grup 2:No.RuanganBebanTotal Daya (W)

Lampu TL Stop Kontak

NP(W)Total (W)P(W)

1.Ruang Makan 13636100136

2.Kamar Mandi188-8

3.Ruang Keluarga24080100180

Jumlah124200324

Grup 3:No.RuanganBebanTotal Daya (W)

Lampu TL Stop Kontak

NP(W)Total (W)P(W)

1.Dapur14040100140

2.Kamar Mandi 2188-8

3.Laundry 11818100118

4.Pantry188-8

5.Taman Belakang21428-28

Jumlah102200302

Lantai 2Grup 4:No.RuanganBebanTotal Daya (W)

Lampu TL Stop Kontak

NP(W)Total (W)P(W)

1.Kamar Tidur11818100118

2.Kamar Mandi188-8

3.KT. Pembantu11111100111

4.KM. Pembantu188-8

5.KT. Utama11818100118

Jumlah63300363

Grup 5:No.RuanganBebanTotal Daya (W)

Lampu TL Stop Kontak

NP(W)Total (W)P(W)

1.Ruang Baca23672100172

2.Balkon21836-36

3.Ruang Santai3824100124

4.Lorong Tangga11111-11

Tempat Menjemur11111-11

Jumlah154200354

2. Besar pengaman masing-masing grup dan pengaman utama pada PHBGrup 1:

MCB yang digunakan sebesar 2 AGrup 2:

MCB yang digunakan sebesar 2 AGrup 3:

MCB yang digunakan sebesar 2 AGrup 4:

MCB yang digunakan sebesar 2 AGrup 5:

MCB yang digunakan sebesar 2 AMaka besar MCB pada PHB adalah 10 A

PERENCANAAN INSTALASI PENERANGAN RUMAH TINGGAL DUA LANTAI TYPE 150/200

Oleh:UMI KARUNIAWATIS1 TTL 2012125514220

JURUSAN TEKNIK ELEKTROFAKULTAS TEKNIKUNIVERSITAS NEGERI SURABAYA2014