Overview Tugas Besar
• Merancang sebuah Offshore Platform tipe
Jacket dengan 2 deck : Main Deck dan Cellar
Deck
• Memberikan Pembebanan Terhadap Platform
• Melakukan Pengujian terhadap Platform
Metode Pengerjaan
Desain Struktur
Unity Check
Operating Storm
Desain Ulang
Desain jacket, deck, dll
Pembebanan Tiap Load,dan inplace analysis
Aplikasi Tiap Kondisi
Re-desain platform
Re-checkplatform
Spesifikasi Platform
• Equipment Layout RMP#3o Spacing Leg = 25 x 42 ft2
o Jacket Batter = type 1
o Jacket plan elevation = 4
o Elevasi Mudline = -98 ft
o Environmental data = grid 2-
9*
o Soil data = 6
o No Piping Load
o No Conductor Pile
o Crane Rest Boom
Plan elevation 2
Plan elevation 3
Plan elevation 4
Plan elevation 1
1 2
A
B
jacket key plan no. 1batter y/z=x/z= 1/8
Equipment Layout RMP#3 : Main Deck
Equipment Layout RMP#3 : Cellar Deck
Jenis Pembebanan ( Load )
Load
Equipment Load
Wave &Current Load
Dead Load
Live Load
Wind Load
Crane Load
Crane Mome
nt Load
Environmental Data
Depth % Depth ( ft )Return Period ( Years )
1 1000 0 3.08 5.74
10 9.8 2.54 4.4820 19.6 2.14 3.5630 29.4 1.84 2.8840 39.2 1.63 2.3950 49 1.48 2.0360 58.8 1.36 1.7770 68.6 1.28 1.5780 78.4 1.22 1.4390 88.2 1.17 1.33
100 98 1.14 1.26
Current ( Arus ) Wave ( Gelombang )
Item UnitReturn Period ( Years )
1 100Max Individual Wave
H max ft 12.11 30.31T max s 7.64 10.18
Significant Wave
H s ft 6.53 16.34T s s 5.07 7.6
Item UnitReturn Period ( years )
1 1001-hour-mean fps 51.02 117.85
Wind ( Angin )
Perancangan Jacket dan Deck• Minggu 1
Penambahan Detail Platform• Minggu 2
Memasukkan Data Beban• Minggu 3
Pengujian dan Pengecekan Error• Minggu 4
Timeline
Minggu 1 Minggu 2 Minggu
3Minggu
4
Detail Timeline
Perancangan Platform:1. Perancangan Jacket2. Perancangan Main Deck3. Perancangan Cellar Deck
Penambahan Detail Platform:1. Penambahan Conductor Pile2. Penambahan Boat Landing
Memasukkan Data Beban:1. Dead Load2. Equipment Load3. Live Load4. Crane Load5. Crane Moment6. Wind Load7. Wave Load8. Current Load
Pengujian dan PengecekanError:1. Run Wizard2. Pengecekan Error3. Memperbaiki Error
PERANCANGAN JACKET DAN DECK
Perancangan Jacket
Perancangan Main Deck
Perancangan Cellar Deck
PENAMBAHAN DETAIL PLATFORM
Perancangan Boat Landing
PEMBEBANANPLATFORM
Pembebanan Dead Load
Pembebanan Equipment Load
• Menghitung Equipment Loado Rumus : ( Size / Weight ) * 1000
o Main Deck
o Cellar Deck
Code Name Size Weight Pressure
C-845 48 2.2 45.833333
Genset 29.88 1.5 50.200803
Elect Equip 84.96 1.23 14.477401
Elect Equip 350 1.23 3.5142857
L-410 240 2 8.3333333
L-210 0.91 1.6 1758.2417
T-820 3.46 1.1 317.91907
TR 16.025 5.9 368.17472
V-850 25.6 2.4 93.75
V-860 14.43 2.6 180.18018
X-875 50.8 2.2 43.307086
P-490 2 1.49 745
PCR 350 33.07 94.485714
Total 1216.065 58.52 3723.4176
Code Name Size Weight PressureP-895 61.625 1.1 17.849898V-300 160 26 162.5
Fw pump 2.25 1.1 488.88888
Total 223.875 28.2 669.23878
Equipment Load Pada Main Deck
Equipment Load Pada Cellar Deck
Pembebanan Live Load
• Menghitung Besar Live Loado Main Deck
o Cellar Deck
Luas area deck 3201.971Luas equipment 1216.065Luas live load 1985.906Weight ( normal ) 100Pressure ( normal ) 50.354850Weight ( storm ) 75Pressure ( storm ) 37.766137
Luas area deck 3257.393Luas equipment 223.875Luas live load 3033.518Weight ( normal ) 100Pressure ( normal ) 32.965026Weight ( storm ) 75Pressure ( storm ) 2275.1385
Live Load pada Main Deck
Live Load pada Cellar Deck
Pembebanan Crane Load dan Crane Moment
• Masing – masing load dan Moment crane :
Gambar Load dan Moment Crane
Pembebanan Wind Load
• Penghitungan Wind Load
V = kecepatan angin pada 32,8 ft di atas permukaan lautz = elevasi desainZr = 32,8 ft diatas permukaan lautm = 1/8 untuk angin tetap, 1/13 untuk badai
Cs = koefisien bentukA = Luas proyeksi (ft^2)Vz = Kecepatan Angin (Mph)
Besar Wind Load
• Kondisi Normal (dalam Kips)
• Kondisi Storm (dalam Kips)
y xcellar deck 2.399 1.943main deck 0.55 0.475
y xcellar deck 12.73 10.31main deck 2.78 2.4
Wind Load pada arah-x
Wind Load pada arah-y
Pembebanan Wave Load dan Current Load
• Menghitung Wave Loado Rumus :
o Nilai wave load
H/gT^2 d/gT^2max 0.029814077 0.096396555significant 0.025895736 0.38863432
Gambar Wave Load dan Current Load
Combination Load
PENGUJIAN PLATFORM
Metode Pengujian Platform
• Run Unity-Check Wizard dengan memperhitungkan :o File model
o File soil data
o File tubular joints check
• Run Postvue data file untuk melihat kondisi platform
setelah diuji.
• Apabila struktur masih bermasalah, re-desain dan ulangi
unity-check
Hasil Pengujian
• Pengujian dilakukan pada platform untuk kondisi operating
dan storm
• Pengujian model keduanya menghasilkan data Postvue
tanpa ada defleksi pada struktur ( ada pada gambar )
• Pengujian diatas tanpa menggunakan faktor soil data
• Pengujian menggunakan faktor soil data menghasilkan
keluaran dengan beberapa error pada pile group ( ada
pada gambar )
Gambar Postvue data file
Gambar Error Soil Data
Date 1
- Error disconnected
joints and members
Date 2
- Error Boat Landing Skipping
Check
Date 3- Error Equipment Load
- Error Live Load Joints
- Error Wind Direction
- Error Combination Load
Week 4- Error running soil data
- Error pile data load
Error Timeline
KESIMPULAN
Kesimpulan
• Desain struktur harus dilakukan secara teliti dan runtut
agar efisien dan efektif
• Penghitungan load dan momen harus teliti agar hasilnya
lebih presisi
• Setiap detail desain dan momen harus dicek ulang untuk
menghindari error saat pengujian
• Perlu dilakukan re-check dan re-desain hingga didapatkan
struktur yang memenuhi persyaratan beban, momen,
maupun efisiensi struktur