Page 1: Presentasi Tugas Besar Bangunan Lepas Pantai

Tugas Besar : KL-4121 Bangunan Lepas Pantai

Kelompok 10 :Essantio Denira 15508001Yanottama Wirawan 15508022Faisal Dwiyana Purnawarman15508045

Dosen : Prof. Ricky Lukman Tawekal, Ph.DAsisten : Ali Rosyidi, S.T.

Page 2: Presentasi Tugas Besar Bangunan Lepas Pantai

Overview Tugas Besar

• Merancang sebuah Offshore Platform tipe

Jacket dengan 2 deck : Main Deck dan Cellar

Deck

• Memberikan Pembebanan Terhadap Platform

• Melakukan Pengujian terhadap Platform

Page 3: Presentasi Tugas Besar Bangunan Lepas Pantai

Metode Pengerjaan

Desain Struktur

Unity Check

Operating Storm

Desain Ulang

Desain jacket, deck, dll

Pembebanan Tiap Load,dan inplace analysis

Aplikasi Tiap Kondisi

Re-desain platform

Re-checkplatform

Page 4: Presentasi Tugas Besar Bangunan Lepas Pantai

Spesifikasi Platform

• Equipment Layout RMP#3o Spacing Leg = 25 x 42 ft2

o Jacket Batter = type 1

o Jacket plan elevation = 4

o Elevasi Mudline = -98 ft

o Environmental data = grid 2-

9*

o Soil data = 6

o No Piping Load

o No Conductor Pile

o Crane Rest Boom

Plan elevation 2

Plan elevation 3

Plan elevation 4

Plan elevation 1

1 2

A

B

jacket key plan no. 1batter y/z=x/z= 1/8

Page 5: Presentasi Tugas Besar Bangunan Lepas Pantai

Equipment Layout RMP#3 : Main Deck

Page 6: Presentasi Tugas Besar Bangunan Lepas Pantai

Equipment Layout RMP#3 : Cellar Deck

Page 7: Presentasi Tugas Besar Bangunan Lepas Pantai

Jenis Pembebanan ( Load )

Load

Equipment Load

Wave &Current Load

Dead Load

Live Load

Wind Load

Crane Load

Crane Mome

nt Load

Page 8: Presentasi Tugas Besar Bangunan Lepas Pantai

Environmental Data

Depth % Depth ( ft )Return Period ( Years )

1 1000 0 3.08 5.74

10 9.8 2.54 4.4820 19.6 2.14 3.5630 29.4 1.84 2.8840 39.2 1.63 2.3950 49 1.48 2.0360 58.8 1.36 1.7770 68.6 1.28 1.5780 78.4 1.22 1.4390 88.2 1.17 1.33

100 98 1.14 1.26

Current ( Arus ) Wave ( Gelombang )

Item UnitReturn Period ( Years )

1 100Max Individual Wave

H max ft 12.11 30.31T max s 7.64 10.18

Significant Wave

H s ft 6.53 16.34T s s 5.07 7.6

Item UnitReturn Period ( years )

1 1001-hour-mean fps 51.02 117.85

Wind ( Angin )

Page 9: Presentasi Tugas Besar Bangunan Lepas Pantai

Perancangan Jacket dan Deck• Minggu 1

Penambahan Detail Platform• Minggu 2

Memasukkan Data Beban• Minggu 3

Pengujian dan Pengecekan Error• Minggu 4

Timeline

Page 10: Presentasi Tugas Besar Bangunan Lepas Pantai

Minggu 1 Minggu 2 Minggu

3Minggu

4

Detail Timeline

Perancangan Platform:1. Perancangan Jacket2. Perancangan Main Deck3. Perancangan Cellar Deck

Penambahan Detail Platform:1. Penambahan Conductor Pile2. Penambahan Boat Landing

Memasukkan Data Beban:1. Dead Load2. Equipment Load3. Live Load4. Crane Load5. Crane Moment6. Wind Load7. Wave Load8. Current Load

Pengujian dan PengecekanError:1. Run Wizard2. Pengecekan Error3. Memperbaiki Error

Page 11: Presentasi Tugas Besar Bangunan Lepas Pantai

PERANCANGAN JACKET DAN DECK

Page 12: Presentasi Tugas Besar Bangunan Lepas Pantai

Perancangan Jacket

Page 13: Presentasi Tugas Besar Bangunan Lepas Pantai
Page 14: Presentasi Tugas Besar Bangunan Lepas Pantai

Perancangan Main Deck

Page 15: Presentasi Tugas Besar Bangunan Lepas Pantai
Page 16: Presentasi Tugas Besar Bangunan Lepas Pantai

Perancangan Cellar Deck

Page 17: Presentasi Tugas Besar Bangunan Lepas Pantai
Page 18: Presentasi Tugas Besar Bangunan Lepas Pantai

PENAMBAHAN DETAIL PLATFORM

Page 19: Presentasi Tugas Besar Bangunan Lepas Pantai

Perancangan Boat Landing

Page 20: Presentasi Tugas Besar Bangunan Lepas Pantai
Page 21: Presentasi Tugas Besar Bangunan Lepas Pantai

PEMBEBANANPLATFORM

Page 22: Presentasi Tugas Besar Bangunan Lepas Pantai

Pembebanan Dead Load

Page 23: Presentasi Tugas Besar Bangunan Lepas Pantai

Pembebanan Equipment Load

• Menghitung Equipment Loado Rumus : ( Size / Weight ) * 1000

o Main Deck

o Cellar Deck

Code Name Size Weight Pressure

C-845 48 2.2 45.833333

Genset 29.88 1.5 50.200803

Elect Equip 84.96 1.23 14.477401

Elect Equip 350 1.23 3.5142857

L-410 240 2 8.3333333

L-210 0.91 1.6 1758.2417

T-820 3.46 1.1 317.91907

TR 16.025 5.9 368.17472

V-850 25.6 2.4 93.75

V-860 14.43 2.6 180.18018

X-875 50.8 2.2 43.307086

P-490 2 1.49 745

PCR 350 33.07 94.485714

Total 1216.065 58.52 3723.4176

Code Name Size Weight PressureP-895 61.625 1.1 17.849898V-300 160 26 162.5

Fw pump 2.25 1.1 488.88888

Total 223.875 28.2 669.23878

Page 24: Presentasi Tugas Besar Bangunan Lepas Pantai

Equipment Load Pada Main Deck

Page 25: Presentasi Tugas Besar Bangunan Lepas Pantai

Equipment Load Pada Cellar Deck

Page 26: Presentasi Tugas Besar Bangunan Lepas Pantai

Pembebanan Live Load

• Menghitung Besar Live Loado Main Deck

o Cellar Deck

Luas area deck 3201.971Luas equipment 1216.065Luas live load 1985.906Weight ( normal ) 100Pressure ( normal ) 50.354850Weight ( storm ) 75Pressure ( storm ) 37.766137

Luas area deck 3257.393Luas equipment 223.875Luas live load 3033.518Weight ( normal ) 100Pressure ( normal ) 32.965026Weight ( storm ) 75Pressure ( storm ) 2275.1385

Page 27: Presentasi Tugas Besar Bangunan Lepas Pantai

Live Load pada Main Deck

Page 28: Presentasi Tugas Besar Bangunan Lepas Pantai

Live Load pada Cellar Deck

Page 29: Presentasi Tugas Besar Bangunan Lepas Pantai

Pembebanan Crane Load dan Crane Moment

• Masing – masing load dan Moment crane :

Page 30: Presentasi Tugas Besar Bangunan Lepas Pantai

Gambar Load dan Moment Crane

Page 31: Presentasi Tugas Besar Bangunan Lepas Pantai

Pembebanan Wind Load

• Penghitungan Wind Load

V = kecepatan angin pada 32,8 ft di atas permukaan lautz = elevasi desainZr = 32,8 ft diatas permukaan lautm = 1/8 untuk angin tetap, 1/13 untuk badai

Cs = koefisien bentukA = Luas proyeksi (ft^2)Vz = Kecepatan Angin (Mph)

Page 32: Presentasi Tugas Besar Bangunan Lepas Pantai

Besar Wind Load

• Kondisi Normal (dalam Kips)

• Kondisi Storm (dalam Kips)

y xcellar deck 2.399 1.943main deck 0.55 0.475

y xcellar deck 12.73 10.31main deck 2.78 2.4

Page 33: Presentasi Tugas Besar Bangunan Lepas Pantai

Wind Load pada arah-x

Page 34: Presentasi Tugas Besar Bangunan Lepas Pantai

Wind Load pada arah-y

Page 35: Presentasi Tugas Besar Bangunan Lepas Pantai

Pembebanan Wave Load dan Current Load

• Menghitung Wave Loado Rumus :

o Nilai wave load

H/gT^2 d/gT^2max 0.029814077 0.096396555significant 0.025895736 0.38863432

Page 36: Presentasi Tugas Besar Bangunan Lepas Pantai

Gambar Wave Load dan Current Load

Page 37: Presentasi Tugas Besar Bangunan Lepas Pantai

Combination Load

Page 38: Presentasi Tugas Besar Bangunan Lepas Pantai

PENGUJIAN PLATFORM

Page 39: Presentasi Tugas Besar Bangunan Lepas Pantai

Metode Pengujian Platform

• Run Unity-Check Wizard dengan memperhitungkan :o File model

o File soil data

o File tubular joints check

• Run Postvue data file untuk melihat kondisi platform

setelah diuji.

• Apabila struktur masih bermasalah, re-desain dan ulangi

unity-check

Page 40: Presentasi Tugas Besar Bangunan Lepas Pantai

Hasil Pengujian

• Pengujian dilakukan pada platform untuk kondisi operating

dan storm

• Pengujian model keduanya menghasilkan data Postvue

tanpa ada defleksi pada struktur ( ada pada gambar )

• Pengujian diatas tanpa menggunakan faktor soil data

• Pengujian menggunakan faktor soil data menghasilkan

keluaran dengan beberapa error pada pile group ( ada

pada gambar )

Page 41: Presentasi Tugas Besar Bangunan Lepas Pantai

Gambar Postvue data file

Page 42: Presentasi Tugas Besar Bangunan Lepas Pantai

Gambar Error Soil Data

Page 43: Presentasi Tugas Besar Bangunan Lepas Pantai

Date 1

- Error disconnected

joints and members

Date 2

- Error Boat Landing Skipping

Check

Date 3- Error Equipment Load

- Error Live Load Joints

- Error Wind Direction

- Error Combination Load

Week 4- Error running soil data

- Error pile data load

Error Timeline

Page 44: Presentasi Tugas Besar Bangunan Lepas Pantai

KESIMPULAN

Page 45: Presentasi Tugas Besar Bangunan Lepas Pantai

Kesimpulan

• Desain struktur harus dilakukan secara teliti dan runtut

agar efisien dan efektif

• Penghitungan load dan momen harus teliti agar hasilnya

lebih presisi

• Setiap detail desain dan momen harus dicek ulang untuk

menghindari error saat pengujian

• Perlu dilakukan re-check dan re-desain hingga didapatkan

struktur yang memenuhi persyaratan beban, momen,

maupun efisiensi struktur