doc1

6
JUMLAH (Rp) (1) (2) (3) A. BIAYA PERSONIL 414,000,000 Rp 1 Tenaga Ahli 325,000,000 Rp 2 Asisten Tenaga Ahli 44,000,000 Rp 3 Tenaga Pendukung 45,000,000 Rp B. BIAYA NON PERSONIL 195,095,000 Rp 1 Biaya Bahan 14,375,000 Rp 2 Biaya Perjalanan Dinas 124,690,000 Rp 3 Biaya Pembahasan 33,000,000 Rp 4 Biaya Produksi Dokumentasi 10,400,000 Rp 5 Biaya Laporan 12,630,000 Rp JUMLAH TOTAL HPS (A+B) 609,095,000 Rp PPN 10% JUMLAH TOTAL 60,909,500 Rp TOTAL 670,004,500 Rp DIBULATKAN 670,000,000 Rp Terbilang : ENAM RATUS TUJUH PULUH JUTA RUPIAH REKAPITULASI URAIAN KEGIATAN NO. HARGA PERKIRAAN SENDIRI (HPS) UPDATTING DATA KETERSEDIAAN DAN KEBUTUHAN INFRASTRUKTUR PENDIDIKAN DALAM RANGKA PENINGKATAN MUTU PELAYANAN PENDIDIKAN DI DAERAH TERTINGGAL

Upload: akbar-aksan

Post on 23-Nov-2015

6 views

Category:

Documents


0 download

TRANSCRIPT

  • JUMLAH (Rp)

    (1) (2) (3)A. BIAYA PERSONIL 414,000,000Rp 1 Tenaga Ahli 325,000,000Rp 2 Asisten Tenaga Ahli 44,000,000Rp 3 Tenaga Pendukung 45,000,000Rp

    B. BIAYA NON PERSONIL 195,095,000Rp 1 Biaya Bahan 14,375,000Rp 2 Biaya Perjalanan Dinas 124,690,000Rp 3 Biaya Pembahasan 33,000,000Rp 4 Biaya Produksi Dokumentasi 10,400,000Rp 5 Biaya Laporan 12,630,000Rp

    JUMLAH TOTAL HPS (A+B) 609,095,000Rp PPN 10% JUMLAH TOTAL 60,909,500Rp

    TOTAL 670,004,500Rp DIBULATKAN 670,000,000Rp

    Terbilang :ENAM RATUS TUJUH PULUH JUTA RUPIAH

    REKAPITULASI

    URAIAN KEGIATANNO.

    HARGA PERKIRAAN SENDIRI (HPS)UPDATTING DATA KETERSEDIAAN DAN KEBUTUHAN INFRASTRUKTUR PENDIDIKAN

    DALAM RANGKA PENINGKATAN MUTU PELAYANAN PENDIDIKAN DI DAERAH TERTINGGAL

  • NO. URAIAN VOLUME SATUAN VOLUME SATUAN BIAYA BANTUAN JUMLAH

    A. BIAYA PERSONILTenaga Ahli 325,000,000Rp

    1 Ketua Tim/ Ahli Manajemen 1 Orang 5 Bulan 12,500,000Rp 62,500,000Rp 2 Tenaga Ahli Perencana Wilayah 1 Orang 5 Bulan 10,500,000Rp 52,500,000Rp 3 Tenaga Ahli Database 1 Orang 5 Bulan 10,500,000Rp 52,500,000Rp 4 Tenaga Ahli Infrastruktur/ Sipil 1 Orang 5 Bulan 10,500,000Rp 52,500,000Rp 5 Tenaga Ahli Multimedia 2 Orang 5 Bulan 10,500,000Rp 105,000,000Rp

    Asisten Tenaga Ahli 44,000,000Rp 1 Asisten Tenaga Ahli Statistik 1 Orang 4 Bulan 5,500,000Rp 22,000,000Rp 2 Asisten Tenaga Ahli Desain Grafis 1 Orang 4 Bulan 5,500,000Rp 22,000,000Rp

    Tenaga Pendukung 45,000,000Rp 1 Adiministrasi 1 Orang 5 Bulan 2,500,000Rp 12,500,000Rp 2 Sekretaris 1 Orang 5 Bulan 2,500,000Rp 12,500,000Rp 3 Operator Komputer 1 Orang 5 Bulan 2,500,000Rp 12,500,000Rp 4 Office Boy 1 Orang 5 Bulan 1,500,000Rp 7,500,000Rp

    414,000,000Rp

    HARGA PERKIRAAN SENDIRI (HPS)UPDATTING DATA KETERSEDIAAN DAN KEBUTUHAN INFRASTRUKTUR PENDIDIKAN

    DALAM RANGKA PENINGKATAN MUTU PELAYANAN PENDIDIKAN DI DAERAH TERTINGGAL

    JUMLAH BIAYA A

  • NO. URAIAN VOLUME SATUAN VOLUME SATUAN BIAYA BANTUAN JUMLAH

    B. BIAYA NON PERSONIL1 Biaya Bahan

    Sewa Komputer Pc 1 Paket 5 Bulan 250,000Rp 1,250,000Rp Sewa Printer 1 Paket 5 Bulan 125,000Rp 625,000Rp ATK 1 Paket 5 Bulan 1,000,000Rp 5,000,000Rp Komputer Suplies 1 Paket 5 Bulan 1,500,000Rp 7,500,000Rp

    14,375,000Rp 2 Biaya Perjalanan Dinas (Kunjungan Lapangan)

    Provinsi Sumatera Barat- Jakarta - Padang 2 Orang 1 Trip 2,900,000Rp 5,800,000Rp - Transportasi Lokal Bandara 2 Orang 1 Trip 300,000Rp 600,000Rp - Airport tax 2 Orang 1 Trip 80,000Rp 160,000Rp - OSA Personil ( 2 org x 4 Hr) 2 Orang 4 Hari 380,000Rp 3,040,000Rp - Penginapan ( 2 org x 3 Hr) 2 Orang 3 Hari 420,000Rp 2,520,000Rp - Sewa Kendaraan Operasional 1 Orang 3 Hari 640,000Rp 1,920,000Rp

    Provinsi Kalimantan Barat- Jakarta - Pontianak 2 Orang 1 Trip 2,750,000Rp 5,500,000Rp - Transportasi Lokal Bandara 2 Orang 1 Trip 300,000Rp 600,000Rp - Airport tax 2 Orang 1 Trip 80,000Rp 160,000Rp - OSA Personil ( 2 org x 4 Hr) 2 Orang 4 Hari 380,000Rp 3,040,000Rp - Penginapan ( 2 org x 3 Hr) 2 Orang 3 Hari 400,000Rp 2,400,000Rp - Sewa Kendaraan Operasional 1 Orang 3 Hari 700,000Rp 2,100,000Rp

    Provinsi Gorontalo- Jakarta - Gorontalo 2 Orang 1 Trip 4,800,000Rp 9,600,000Rp - Transportasi Lokal Bandara 2 Orang 1 Trip 300,000Rp 600,000Rp - Airport tax 2 Orang 1 Trip 80,000Rp 160,000Rp - OSA Personil ( 2 org x 4 Hr) 2 Orang 4 Hari 370,000Rp 2,960,000Rp - Penginapan ( 2 org x 3 Hr) 2 Orang 3 Hari 400,000Rp 2,400,000Rp

    - Sewa Kendaraan Operasional 1 Orang 3 Hari 650,000Rp 1,950,000Rp

    Sub Total B.1

  • NO. URAIAN VOLUME SATUAN VOLUME SATUAN BIAYA BANTUAN JUMLAH

    Provinsi Jawa Timur- Jakarta - Surabaya 2 Orang 1 Trip 2,600,000Rp 5,200,000Rp - Transportasi Lokal Bandara 2 Orang 1 Trip 300,000Rp 600,000Rp - Airport tax 2 Orang 1 Trip 80,000Rp 160,000Rp - OSA Personil ( 2 org x 4 Hr) 2 Orang 4 Hari 380,000Rp 3,040,000Rp - Penginapan ( 2 org x 3 Hr) 2 Orang 3 Hari 450,000Rp 2,700,000Rp - Sewa Kendaraan Operasional 1 Orang 3 Hari 620,000Rp 1,860,000Rp

    Provinsi NTB- Jakarta - Mataram 2 Orang 1 Trip 3,200,000Rp 6,400,000Rp - Transportasi Lokal Bandara 2 Orang 1 Trip 300,000Rp 600,000Rp - Airport tax 2 Orang 1 Trip 80,000Rp 160,000Rp - OSA Personil ( 2 org x 4 Hr) 2 Orang 4 Hari 410,000Rp 3,280,000Rp - Penginapan ( 2 org x 3 Hr) 2 Orang 3 Hari 500,000Rp 3,000,000Rp - Sewa Kendaraan Operasional 1 Orang 3 Hari 730,000Rp 2,190,000Rp

    Provinsi Maluku- Jakarta - Ambon 2 Orang 1 Trip 7,000,000Rp 14,000,000Rp - Transportasi Lokal Bandara 2 Orang 1 Trip 300,000Rp 600,000Rp - Airport tax 2 Orang 1 Trip 80,000Rp 160,000Rp - OSA Personil ( 2 org x 4 Hr) 2 Orang 4 Hari 380,000Rp 3,040,000Rp - Penginapan ( 2 org x 3 Hr) 2 Orang 3 Hari 460,000Rp 2,760,000Rp - Sewa Kendaraan Operasional 1 Orang 3 Hari 820,000Rp 2,460,000Rp

    Provinsi Papua- Jakarta - Mataram 2 Orang 1 Trip 8,000,000Rp 16,000,000Rp - Transportasi Lokal Bandara 2 Orang 1 Trip 300,000Rp 600,000Rp - Airport tax 2 Orang 1 Trip 80,000Rp 160,000Rp - OSA Personil ( 2 org x 4 Hr) 2 Orang 4 Hari 575,000Rp 4,600,000Rp - Penginapan ( 2 org x 3 Hr) 2 Orang 3 Hari 460,000Rp 2,760,000Rp - Sewa Kendaraan Operasional 1 Orang 3 Hari 950,000Rp 2,850,000Rp

    124,690,000Rp Sub Total B.2

  • NO. URAIAN VOLUME SATUAN VOLUME SATUAN BIAYA BANTUAN JUMLAH

    3 Biaya PembahasanPembahasan Laporan AwalPaket Full day di Jakarta 25 org 1 Kali 400,000Rp 10,000,000Rp Materi Pembahasan 25 org 1 Kali 40,000Rp 1,000,000Rp Pembahasan Laporan IntermPaket Full day di Jakarta 25 org 1 Kali 400,000Rp 10,000,000Rp Materi Pembahasan 25 org 1 Kali 40,000Rp 1,000,000Rp Pembahasan Laporan AkhirPaket Full day di Jakarta 25 org 1 Kali 400,000Rp 10,000,000Rp Materi Pembahasan 25 org 1 Kali 40,000Rp 1,000,000Rp

    33,000,000Rp 4 Biaya Produksi Dokumentasi

    Sewa Peralatan (Kamera, dll) 1 Paket 1 Kali 400,000Rp 400,000Rp Video & Foto Editing 1 Paket 1 Kali 5,000,000Rp 5,000,000Rp Mastering (Cetak dan Copy) 1 Paket 1 Kali 5,000,000Rp 5,000,000Rp

    10,400,000Rp 5 BIAYA LAPORAN

    Laporan Pendahuluan 20 Eks 1 Kali 120,000Rp 2,400,000Rp Laporan Kemajuan 20 Eks 1 Kali 150,000Rp 3,000,000Rp Draft Laporan Akhir 20 Eks 1 Kali 175,000Rp 3,500,000Rp Laporan Akhir 20 Eks 1 Kali 175,000Rp 3,500,000Rp Dokumentasi/CD 20 Eks 1 Kali 11,500Rp 230,000Rp

    12,630,000Rp 195,095,000Rp 609,095,000Rp 60,909,500Rp

    670,004,500Rp 670,000,000Rp DIBULATKAN

    Terbilang :

    JUMLAH TOTAL (A+B)PPN 10% x JUMLAH TOTAL

    ENAM RATUS TUJUH PULUH JUTA RUPIAH

    TOTAL BIAYA B

    Sub Total B.3

    TOTAL

    Sub Total B.4

    Sub Total B.4

  • Gaji Dasar Beban Biaya Sosial (40% dari 4)Beban Biaya Umum

    (130% dari 4) Sub Total (4+5+6)Imbalan Jasa (10%dari 7)

    Tunjangan Proyek (30% dari 4)

    1 2 3 4 5 6 7 8 9 10

    1 Ir. Adhiarto, MM Ketua Tim/ Ahli Manajemen 4,200,000.00 1,470,000.00 4,452,000.00 10,222,000.00 1,022,200.00 1,255,800.00 12,500,000.00 2 Ir. Firmansyah, MT Tenaga Ahli Perencana Wilayah 3,500,000.00 1,225,000.00 3,885,000.00 8,610,000.00 861,000.00 1,029,000.00 10,500,000.00 3 Ir. Novandi Imam Santoso, M.Kom Tenaga Ahli Database 3,500,000.00 1,225,000.00 3,885,000.00 8,610,000.00 861,000.00 1,029,000.00 10,500,000.00 4 Ir. Yus Lembakeng Tenaga Ahli Infrastruktur/ Sipil 3,500,000.00 1,225,000.00 3,885,000.00 8,610,000.00 861,000.00 1,029,000.00 10,500,000.00 5 Marwan, S.Kom Tenaga Ahli Multimedia 3,500,000.00 1,225,000.00 3,885,000.00 8,610,000.00 861,000.00 1,029,000.00 10,500,000.00 6 Awaluddin, ST Tenaga Ahli Multimedia 3,500,000.00 1,225,000.00 3,885,000.00 8,610,000.00 861,000.00 1,029,000.00 10,500,000.00

    6 Andi Nurkholis Poke, S.Kom Asisten Tenaga Ahli Statistik 1,850,000.00 462,500.00 2,220,000.00 4,532,500.00 453,250.00 514,250.00 5,500,000.00 7 Ismail, ST Asisten Tenaga Ahli Desain Grafis 1,850,000.00 462,500.00 2,220,000.00 4,532,500.00 453,250.00 514,250.00 5,500,000.00

    8 Akbar H.Aksan Adiministrasi 850,000.00 212,500.00 1,020,000.00 2,082,500.00 208,250.00 209,250.00 2,500,000.00 9 Almujahin Sekretaris 850,000.00 212,500.00 1,020,000.00 2,082,500.00 208,250.00 209,250.00 2,500,000.00 10 Hasbudi, ST Operator Komputer 850,000.00 212,500.00 1,020,000.00 2,082,500.00 208,250.00 209,250.00 2,500,000.00 11 Andika Office Boy 500,000.00 175,000.00 600,000.00 1,275,000.00 127,500.00 97,500.00 1,500,000.00

    Catatan :

    Lajur 4 : Gaji Dasar (GD) meliputi gaji bruto yang senyatanya sebelum dipotng pajak pendapatan dan daftar gaji masing-masing personil yang diusulkan harus disertakanLajur 5 : Beban Biaya Sosial harus mencakup konstribusi perusahaan terhadap Asuransi Tenaga Kerja, tunjangan liburan yang dibayar, cuti sakit dan tunjangan standar lainnya yang dibayarkan oleh perusahaan konsultan kepada personil sebagai karyawan Rincian Biaya yang diusulkan harus diajukan dan didukung oleh penjelasan yang besarnya 0,3 s.d 0,4 kali (GD)Lajur 6 : Beban Biaya Umum (BBU) harus meliputi biaya administrasi umum biaya sewa kantor, biaya tata usaha, dan staf junior dan biaya Usaha untuk memperoleh pekerjaan dll. Rincian Biaya yang diusulkan harus diajukan dan didukung oleh penjelasan yang besarnya 0,5 s.d 1,3 kali (GD)Lajur 8 : Imbalan jasa mencakup keuntungan perusahaan termasuk pajak perusahaan, deviden bonus, dana cadangan dan investasi sebesar 0,1 kali (GD+BBS+BBU)Lajur 9 : Tunjangan Penugasan merupakan insentif yang senyatanya dibayarkan kepada personil yang tinggal ditempat tugas yang besarnya antara 0,1 s.d 0,3 (GD)Lajur 10 : Beban Biaya Personil perbulan antara 2,2 s.d 3,1 kali (GD) Pekerjaan lapangan meliputi semua lokasi di Indonesia

    RINCIAN BIAYA PERSONILUPDATTING DATA KETERSEDIAAN DAN KEBUTUHAN INFRASTRUKTUR PENDIDIKAN

    DALAM RANGKA PENINGKATAN MUTU PELAYANAN PENDIDIKAN DI DAERAH TERTINGGALPT. INSAN MANDIRI KONSULTAN

    Ir. Darwis Darlis

    Tenaga Ahli

    No Nama Jabatan

    Rincian Biaya RemunerasiRemunerasi Per-Bulan

    (7+8+9)

    Direktur Utama

    Jakarta, 10 Juli 2014

    Tenaga Sub Profesional

    Tenaga Pendukung

    PT. INSAN MANDIRI KONSULTAN