BIDANG : Sumber Daya Air ZONA : Penajam 1 TAHUN ANGGARAN : 2015 NO SAT HARGA DASAR TANPA PAJAK BIAYA ANGKUT HARGA DASAR SATUAN KETERANGAN 1 3 4 = 6+5 5 6 7 A UPAH KERJA 1 Pekerja Hari - 2 Tukang Kayu Hari - 3 Tukang Batu Hari - 4 Tukang Cat Hari - 5 Kepala Tukang Hari - 6 Mandor Hari - B HARGA BAHAN/MATERIAL I GALIAN 1 Pasir urug M3 - 2 Pasir pasang (putih) M3 - 3 Pasir beton (pasir sungai) ex.Kandilo M3 - 4 Batu pecah M3 - 5 Batu belah/gunung M3 - II SEMEN 1 Semen 50 Kg Gresik setara Kg - III KAYU 1 Ijuk KG - 2 Pipa PVC AW Ø 2" M' - IV SEWA ALAT 1 Concrete Mixer Hari - HARGA SATUAN UPAH DAN BAHAN URAIAN 2

Upload: annas-frendytre

Post on 11-Jan-2016

220 views

Category:

Documents


2 download

DESCRIPTION

bill of quantity

TRANSCRIPT

Page 1: BQ4-HS

BIDANG : Sumber Daya Air

ZONA : Penajam 1

TAHUN ANGGARAN : 2015

NO SATHARGA DASAR

TANPA PAJAK

BIAYA

ANGKUT

HARGA DASAR

SATUAN KETERANGAN

1 3 4 = 6+5 5 6 7

A UPAH KERJA

1 Pekerja Hari -

2 Tukang Kayu Hari -

3 Tukang Batu Hari -

4 Tukang Cat Hari -

5 Kepala Tukang Hari -

6 Mandor Hari -

B HARGA BAHAN/MATERIAL

I GALIAN

1 Pasir urug M3 -

2 Pasir pasang (putih) M3 -

3 Pasir beton (pasir sungai) ex.Kandilo M3 -

4 Batu pecah M3 -

5 Batu belah/gunung M3 -

II SEMEN

1 Semen 50 Kg Gresik setara Kg -

III KAYU

1 Ijuk KG -

2 Pipa PVC AW Ø 2" M' -

IV SEWA ALAT

1 Concrete Mixer Hari -

HARGA SATUAN UPAH DAN BAHAN

URAIAN

2

Penajam, Januari 2005