REKAPITULASI UTAMA
PROYEK : HOTEL GRAND SQUARELOKASI : BLOK M JAKARTA SELATANPEKERJAAN : PRELIMINARIES, STRUKTUR, ARSITEKTUR & MEP
NO. URAIAN PEKERJAAN
I
II
III
IV PEKERJAAN MEKANIKAL, ELEKTRIKAL & PLUMBING
TOTAL ( I S/D IV ) 0.00
PPN 10 %
GRAND TOTAL
DIBULATKAN
Terbilang :
TOTAL(Rp.)
REKAPITULASI
PROYEK : HOTEL GRAND SQUARELOKASI : BLOK M JAKARTA SELATANPEKERJAAN : PRELIMINARIES
NO. URAIAN PEKERJAAN SUB TOTAL (Rp.)
I
II
III
TOTAL ( I S/D III) 0.00
TOTAL(Rp.)
REKAPITULASI
PROYEK : HOTEL GRAND SQUARELOKASI : BLOK M JAKARTA SELATANPEKERJAAN : LAIN2
PEKERJAAN MEKANIKAL, ELEKTRIKAL & PLUMBINGNO. URAIAN PEKERJAAN SUB TOTAL (Rp.)
1 PEK. AIR BERSIH & AIR KOTOR 0.00A. PEK. AIR BERSIH 0.00B. PEK. AIR KOTOR 0.00
2 PEK. AIR BERSIH PANAS 0.00A. MAI EQUIPMENT 0.00B. INSTTALASI LANTAI 0.00
3 PEK. HYDRANT & SPRINKLER 0.004 PEK. MVAC 0.005 PEK. SANITARI 0.00
6 PEKERJAAN ELEKTRIKAL 0.00A. Pek. Pemasangan Kabel Rock 0.00B. Pek. Pengadaan Panel 0.00C. Pek. Kobel Feeder 0.00D. Pek. Instalasi Pengetanahan/ Grounding 0.00E. Pek. Instalasi Penerangan & Daya 0.00F. Pek. Instalasi Penangkal Petir 0.00G. Pek. Pengadaan & Instalasi Genset 0.00H. Biaya Penyambungan PLN 0.00
7 PEKERJAAN ELEKTRONIK 0.001. Pek. Sistem Telephone 0.002. Pek. Instalasi System Telephone 0.003. Pek. Sistern Data dan Internet 0.004. Pek. Sistem Fire Alarm 0.005. Pek. Instalasi Fire Alarm 0.006. Pek. Sistem CCTV 0.007. Pek. Instalasi dan pengadaan CCTV 0.008. Pek. Sistem MATV 0.009. Pek. Sistem dan Tata Suara. 0.00
8 PEKERJAAN LIFT ( PASENGER+ BARANG ) 0.00
9 PEK. ELEKTRIKAL KOLAM RENANG Lingkup pekerjaan lain
TOTAL PEKERJAAN LAIN-LAIN 0.00
TOTAL(Rp.)
RENCANA ANGGARAN BIAYAPROYEK : HOTEL GRAND SQUARELOKASI : BLOK M JAKARTA SELATANPEKERJAAN : AIR BERSIH DAN AIR KOTOR
NO. URAIAN PEKERJAAN SAT. VOLUME
A INSTALASI AIR BERSIH1 Instalasi Pips Air Bersih LT.Iiasementa Instalasi Fipa Air 8ersih
diameter 50 mm supply roof tank m 20.80 0.00 0.00diameter 40 mm supply m 4.16 0.00 0.00diameter 32 mm m 11.00 0.00 0.00diameter 25 mm m 10.00 0.00 0.00diameter 20 mm m 8.00 0.00 0.00diameter 15 Mm m 35.00 0.00 0.00
Fitting pipe ( Elbow, Tee, Tee reducer, Mil) Ls 1.00 0.00 0.00Support & Hanger Is 1.00 0.00 0.00Bobokan & Plesteran kembali Is 1.00 0.00 0.00Test & Commisioning Ls 1.00 0.00 0.00
b Sumur Deep Well Ttk 1.00 0.00 0.00Pengeboran,pemipaan, fitting, pompa & valvesampai kedalaman 150-200 m sesuai standard dan spesifikasi Pompa Deep WellCap. : 120 liter / menitHead : 90 meterPower : 5,5 Kw/3 ph/380VType : SubmersibleCasing pompa Deep Weel dg pipa Galvanis Medium Class- dia. 150 mm- dia. 100 mmScreen Stainless Steel- dia. 100 mmPengeboran termasuk pengisian kerikil- Dalam 150 - 200 mPipa instalasi dari pompa s/d water meter dg pipa Galvanis Med.
- dia. 65 mm
Gate Valve- dia. 40 mmBak kontrol ukuran (60 x 80) cm dengan tutup chequer plate
WLC u/Sumur dalam + Pengkabelan
Instalasi pengkabelan NYY 4 x 4 min' + 3 x 4 mm2Biaya GeolistrikBiaya perijinan termasuk water meter
Testing Commissioning
c Pompa Transfer Air Bersih ( Ruang Pompa) Set 2.00 0.00 0.00Body and Support Cast Iron, Shaft Stainless Steel
High Quality, Mekanikal Seal, IP 44 Proteksi, Class FFan Cover in Press Steel Sheet, Accessories, MI
Cap. : 100 liter / menitHead : 20 meter
Power : 2,2 Kw/3 ph/380V/S0 HzType : Centrifugal End Suction
Rot. : 2900 rpmLengkap dengan:
Panel Control Lengkap dng Wirring, Contactor/thermal Relay, Change Over Switch, Automatic/manual Operation
Low Tension Transpormer, Electronic SensorLevel min/max-WIC.
Accessories Pump : Base Piate and Mounting,
d Water Treatment Plan( WTP )
Pengadaan dan pemasangan Water treatment Plant
di ruang pompa kapasitas 300 liter per menit Sistem regenerasi otomatis, Termasuk:- Pe an dari rawwater tank ke Clean water tank 1 & 2 Is 1.00 0.00 0.00
- Pernipaan drain back wash ke sum it
- Pampa Transfer WTP dan assesories- Sand Niter- Carbon filter
- Chemical Tank dan dosing pump
Kontrol Panel, sistem pengaruran otomatis dan wiring valve, contol valve, instrument transmitter dan accessories
HARGA SATUAN(Rp.)
JUMLAH MCSP(Rp.)
TOTAL MCSP(Rp.)
NO. URAIAN PEKERJAAN SAT. VOLUME HARGA SATUAN(Rp.)
JUMLAH MCSP(Rp.)
TOTAL MCSP(Rp.)
Testing & comisioning
e Pompa WTP ( WTP.P) Unit 1.00 0.00 0.00Cap. :150liter / menitHead : 25 meter
Power : 1.5 Kw/3 ph/50 Hz
Type : Centrifugal End SuctionRot. :2900 rpmLengkap dengan panel automatic kontrol, etc
Single Alternate Automatically
f Pompa Kuras (P.Kr) Unit 1.00 0.00 0.00Cap. : 100 liter / menit
Head : 15 meterPower : 0.5 Kw/3 ph/50 Hz
Type : Submersible
g - AccessoriesPipa Header diameter 100 mm x 2 m bh 2.00 0.00 0.00
bh 4.00 0.00 0.00Gate valve 0 50 mm bh 9.00 0.00 0.00
bh 3.00 0.00 0.00bh 1.00 0.00 0.00
Strainer 0 65 mm bh 2.00 0.00 0.00Strainer 0 50 mm bh 4.00 0.00 0.00
bh 2.00 0.00 0.00Flexible Joint 0 50 mm bh 4.00 0.00 0.00
Flexible Joint 0 40 mm bh 2.00 0.00 0.00
Check Valve 0 50 mm bh 4.00 0.00 0.00
Check Valve 040mm bh 2.00 0.00 0.00
Water Level Control c/w cable set 2.00 0.00 0.00
Pressure Gauge 0-8 bar bh 5.00 0.00 0.00
Pressure Switch bh 4.00 0.00 0.00
Floating valve 0 50 mm pc 2.00 0.00 0.00
Foot valve 0 65 mm pc 2.00 0.00 0.00
pc 2.00 0.00 0.00
2 Instalasi Pipa Air Bersih IT. Dasar
- Pipa PPR PN.10
diameter 40 mm m 4.00 0.00 0.00
diameter 32 mm m 5.00 0.00 0.00
diameter 25 mm m 12.00 0.00 0.00
diameter 20 mm m 10.00 0.00 0.00
diameter 15 mm m 28.00 0.00 0.00
Fitting pipa ( Elbow, Tee, Tee reducer, dll) Is 1.00 0.00 0.00
Support & Hanger Ls 1.00 0.00 0.00
Bobokan & Plesteran kembali Ls 1.00 0.00 0.00
Test & Commisioning Is 1.00 0.00 0.00
- Accessories
Gate Valve diameter 32 mm bh 1.00 0.00 0.00
3 Instalasi Pipa Air Bersih Lt. MEZANINE
- Pipa PPR PN.10
diameter 50 mm m 4.00 0.00 0.00
diameter 40 mm m 4.00 0.00 0.00
diameter 32 mm m 5.00 0.00 0.00
diameter 25 mm m 5.00 0.00 0.00
diameter 20 mm m 8.00 0.00 0.00
diameter 15 mm m 15.00 0.00 0.00
Ls 1.00 0.00 0.00
Support & Hanger Is 1.00 0.00 0.00
Bobokan & Plesteran kembali Is 1.00 0.00 0.00
Test & Commisioning Is 1.00 0.00 0.00
Accessories
Gate Valve diameter 32 mm bh 1.00 0.00 0.00
4 Instalasi Pipa Air Bersih (Typical IT. 1,2,3,4,5,) Room
Pipa PPR PN.10
diameter 50 mm m 261.00 0.00 0.00diameter 40 mm m 127.00 0.00 0.00
Gate valve 0 65 mm
Gate valve 0 40 mmGate valve 0 25 mm
Flexible Joint 0 65 mm
Foot valve 0 50 mm
Fitting pipa ( Elbow, Tee, Tee reducer, dll)
NO. URAIAN PEKERJAAN SAT. VOLUME HARGA SATUAN(Rp.)
JUMLAH MCSP(Rp.)
TOTAL MCSP(Rp.)
diameter 32 mm m 136.00 0.00 0.00diameter 25 mm m 171.00 0.00 0.00diameter 20 mm m 213.00 0.00 0.00diameter 15 mm m 801.00 0.00 0.00Fitting pipe ( Elbow, Tee, Tee reducer, dll) Is 5.00 0.00 0.00Support & Hanger Is 5.00 0.00 0.00Bobokan & Plesteran kembali Is 5.00 0.00 0.00Test & Commisioning Ls 5.00 0.00 0.00- AccessoriesGate Valve diameter 25 mm bh 70.00 0.00 0.00
5 Instalasi Pipa Air Bersih Typikal Lt.6- Pipa PPR PN.10
m 27.00 0.00 0.00diameter 40 mm m 21.00 0.00 0.00diameter 32 mm m 15.00 0.00 0.00diameter 25 mm m 36.00 0.00 0.00
diameter 20 mm m 24.00 0.00 0.00
diameter 15 mm m 54.00 0.00 0.00
Is 1.00 0.00 0.00
Support & Hanger Is 1.00 0.00 0.00
Bobokan & Plesteran kembali Is 1.00 0.00 0.00
Test & Commisioning Is 1.00 0.00 0.00
- Accessories
Gate Valve diameter 25 mm bh 5.00 0.00 0.00
Gate Valve diameter 20 mm bh 2.00 0.00 0.00
6 Instalasi Pipa Air Bersih LT.ATAP
- Pipa PPR PN.10diameter 65 mm m 12.00 0.00 0.00diameter 50 mm in 40.00 0.00 0.00diameter 40 mm m 14.00 0.00 0.00
Fitting pips ( Elbow, Tee, Tee reducer, dli Is 1.00 0.00 0.00Support & Hanger Ls 1.00 0.00 0.00Test & Commisioning Ls 1.00 0.00 0.00- AccessoriesGate Valve diameter 65 mm bh 6.00 0.00 0.00Gate Valve diameter 50 mm bh 6.00 0.00 0.00Gate Valve diameter 40 mm bh 5.00 0.00 0.00Gate Valve diameter 32 mm bh 2.00 0.00 0.00Ball Valve Valve diameter 32 mm bh 6.00 0.00 0.00PRV diameter 40 mm set 1.00 0.00 0.00Check Valve diameter 50 mm bh 2.00 0.00 0.00Check Valve diameter 40 mm bh 1.00 0.00 0.00Water Hammer set 6.00 0.00 0.00Floating Valve diameter 40 mm bh 2.00 0.00 0.00Water Level Control c/w cable set 1.00 0.00 0.00
Roof tank 8 m'( type panel) Unit 1.00 0.00 0.00Header diameter 100 mm bh 1.00 0.00 0.00
Header diameter 80 mm bh 1.00 0.00 0.00
Booster Pump ( Package) Paket 1.00 0.00 0.00Type : Horizontal Centrifugal PumpCap. : 150 liter / menitHead :10 meterPower : 1,7 Kw/1 ph/50 Hz1 Paket = 2 Pompa (Pararel Alternate Automatically)1 Unit Panel Control Automatic1 Unit Diaphragm Pressure Tank 100 Liter1 Lot Accessories, strainer, fleksible joint, etc
SUB TOTAL INSTALASI AIR BERSIH 0.00
B INSTAIASI AIR KOTOR, BEKAS & VENT1 Instalasi Pipa Air Kotor & Bekas LT.Basement
a. Air KotorPipa PVC AW (10 kg/cm')diameter 200 mm m 14.00 0.00 0.00diameter 150 mm m 23.00 0.00 0.00diameter 100 mm m 26.00 0.00 0.00
b. Air Bekas
diameter 150 mm m 14.00 0.00 0.00diameter 100 mm m 23.00 0.00 0.00diameter 80mm in 25.00 0.00 0.00diameter 65 mm m 6.00 0.00 0.00diameter 50 mm m 6.00 0.00 0.00
diameter 50 mm
Fitting pipe ( Elbow, Tee, Tee reducer, dll)
PipaPVC AW ( 10 kg/cm')
NO. URAIAN PEKERJAAN SAT. VOLUME HARGA SATUAN(Rp.)
JUMLAH MCSP(Rp.)
TOTAL MCSP(Rp.)
Fitting : Elbow, Tee-Y, Reducer, dll Ls 1.00 0.00 0.00Galian & Urugan kembali Is 1.00 0.00 0.00Test & Commisioning Is 1.00 0.00 0.00
Bio STP Kap.16 m' (Sistem) set 1.00 0.00 0.00Include Blower, Pompa Submersible, etcexluded pekerjaan sipil
2 Instalasi Pipa Air Kotor, Bekas & Vent LT. Dasara. Air KotorPipa PVC AW (10 kg/cm')diameter 200 mm m 5.00 0.00 0.00diameter 150 mm m 5.00 0.00 0.00diameter 125 mm m 5.00 0.00 0.00diameter 100 mm m 24.00 0.00 0.00
b. Air BekasPipa PVC AW ( 10 kg/cm')diameter 150 mm m 5.00 0.00 0.00diameter 100 mm m 6.00 0.00 0.00diameter 80 mm m 6.00 0.00 0.00diameter 65 mm m 21.00 0.00 0.00diameter 50 mm m 38.00 0.00 0.00
Fitting : Elbow, Tee-V, Reducer, dtl IS 1.00 0.00 0.00Support & Hanger Ls 1.00 0.00 0.008obokan & Plesteran kembali Is 1.00 0.00 0.00Test & Commisioning Is 1.00 0.00 0.00
3 Instalasi Pipa Air Kotor, Bekas & Vent Lt.Mezaninea. Air KotorPipa PVC AW ( 10 kg/cm')diameter 200 mm m 32.00 0.00 0.00diameter 150 mm m 43.00 0.00 0.00diameter 100 mm m 60.00 0.00 0.00
b. Air BekasPipa PVC AW (10 kg/cm')diameter 150 mm m 26.00 0.00 0.00diameter 100 mm m 32.00 0.00 0.00
c. VentPipa PVC D ( 5 kg/cm')diameter 40mm m 42.00 0.00 0.00diameter 32 mm m 78.00 0.00 0.00
Fitting : Elbow, Tee-Y, Reducer, dll Ls 1.00 0.00 0.00Support & Hanger Is 1.00 0.00 0.00Bobokan & Plesteran kembali Is 1.00 0.00 0.00Test & Commisioning Is 1.00 0.00 0.00
4 Instalasi Pipa Air Kotor, Bekas & Vent (Typical LT. 1,2,3,4,5,) Rooma. Air KotorPipa PVC AW ( 10 kg/cm')diameter 150 mm m 184.00 0.00 0.00diameter 100 mm m 354.00 0.00 0.00
b. Air BekasPipa PVC AW ( 10 kg/cm')diameter 65 mm m 304.00 0.00 0.00diameter 50 mm m 948.00 0.00 0.00
c. VentPipa PVC D ( 5 kg/cm')
m 8.00 0.00 0.00m 22.00 0.00 0.00
Fitting : Elbow, Tee-Y, Reducer, dll Is 5.00 0.00 0.00Support & Hanger Is 5.00 0.00 0.00Bobokan & Plesteran kembak Is 5.00 0.00 0.00Test & Commisioning 1.s 5.00 0.00 0.00
5 Instalasi Pipa Air Kotor, Bekas & Vent Lt.6a. Mr RotorPipa PVC AW (10 kg/cm')diameter 150 mm m 32.00 0.00 0.00diameter 100 min m 60.00 0.00 0.00
b. Air BekasPipit PVC AW (10 kg/cm')diameter 80 mm m 24.00 0.00 0.00diameter 65 mm m 54.00 0.00 0.00diameter 50 mm m 120.00 0.00 0.00
c. VentPipa PVC 0 (5 kg/cml
diameter40 mmdiameter32 mm
NO. URAIAN PEKERJAAN SAT. VOLUME HARGA SATUAN(Rp.)
JUMLAH MCSP(Rp.)
TOTAL MCSP(Rp.)
diameter 40 mm m 15.00 0.00 0.00diameter 32 mm m 12.00 0.00 0.00
Fitting : Elbow, Tee-Y, Reducer, dR Is 1.00 0.00 0.00Support & Hanger Is 1.00 0.00 0.00Bobokan & Plesteran kembali Is 1.00 0.00 0.00Test & Commisioning IS 1.00 0.00 0.00
6 Instalasi Pipe Air Hujan LT. AtapPipe PVC AW (10 kg/cm')diameter 150 mm m 34.00 0.00 0.00diameter 100 mm m 118.00 0.00 0.00
Fitting : Elbow, Tee-Y, Reducer, dB Is 1.00 0.00 0.00Support & Hanger Is 1.00 0.00 0.00- AccessoriesRoot Drain (Brass) 0 100 bh 5.00 0.00 0.00
SUB TOTAL INSTALASI AIR KOTOR 0.00TOTAL PEKERJAAN AIR BERSIH & AIR KOTOR 0.00
RENCANA ANGGARAN BIAYA
TOTAL MCSP(Rp.)
TOTAL MCSP(Rp.)
TOTAL MCSP(Rp.)
0.00
TOTAL MCSP(Rp.)
TOTAL MCSP(Rp.)
0.000.00
RENCANA ANGGARAN BIAYAPROYEK : HOTEL GRAND SQUARELOKASI : BLOK M JAKARTA SELATANPEKERJAAN : AIR BERSIH PANAS
NO. URAIAN PEKERJAAN SAT. VOLUME
1 PEKERIAAN AIR PANASPenawaran termasuk pengadaan danpemasangan bahan lengkap di-site sesuaidengan Spesifikasi, RKS & Gambar
A MAI EQUIPMENTS- Water Heter ripe TI 300 STI unit 3.00 0.00 0.00Type : HIGH TEMP 90'Kapasitas : 300 LTRPower : 3 KWOperasional : Stand-byTermasuk Label power NYM 4x2,5 mm (Prov.sum 20 mtr)
Type : Vertical in Line unit 0.00Kapasitas : 150 LPMPower :0,2 KWOperasional : Pararet AlternateTermasuk Label power NYM 4x2,5 mm (Prov.sum 20 mtr)
ACCESORIES PADA PERALATAN UTAMA- Check Valve dia. 65 unit 2.00 0.00 0.00- Strainer dia. 40 unit 2.00 0.00 0.00- Gate Valve dia. 65 unit 4.00 0.00 0.00- Gate Valve dia. 40 unit 6.00 0.00 0.00- Butterfly Valve dia. 40 unit 3.00 0.00 0.00- Butterfly Valve dia. 65 unit 3.00 0.00 0.00
INSTALASI PIPA PADA PERALATAN UTAMA-Header dia. 100mm unit 1.00 0.00 0.00
0.00
B INSTALASI LANTAI1 LANTAI DASAR
Pipa PPR PN 20
- dia. 25 mtr 25.00 0.00 0.00- dia. 20 mtr 12.00 0.00 0.00- dia. 15 mtr 11.00 0.00 0.00
- Fitting Hangers, & Support lot 1.00 0.00 0.00
Accessories- Ball Valve dia. 20 mm unit 1.00 0.00 0.00- Ball Valve dia. 15 mm unit 2.00 0.00 0.00
2 LANTAI MezaninePipa PPR PN 20- dia. 25 mtr 5.00 0.00 0.00- Fitting Hangers, & Support lot 1.00 0.00 0.00
3 LANTAI typikal (1,2,3,4,5,6,) RoomPipa PPR PN 20- dia. 50 mtr 40.00 0.00 0.00
- dia. 40 mtr 50.00 0.00 0.00- dia. 32 mtr 274.00 0.00 0.00- dia. 20 mtr 104.00 0.00 0.00- dia. 15 mtr 136.00 0.00 0.00
- Fitting Hangers, & Support lot 5.00 0.00 0.00Accessories- Gate Valve dia. 20 mm unit 75.00 0.00 0.00- Gate Valve dia. 15 mm unit 70.00 0.00 0.00
4 LANTAI ATAP /ROOF TOP
Pipa PPR PN 20- dia. 50 mtr 32.00 0.00 0.00- dia. 20 mtr 25.00 0.00 0.00- dia. 15 mtr 81.00 0.00 0.00
lot 1.00 0.00 0.00Accessories
HARGA SATUAN
(Rp.)JUMLAH MCSP
(Rp.)TOTAL MCSP
(Rp.)
SUB TOTAL. A
- Fitting Hangers, & Support
NO. URAIAN PEKERJAAN SAT. VOLUMEHARGA SATUAN
(Rp.)JUMLAH MCSP
(Rp.)TOTAL MCSP
(Rp.)
- Gate Valve dia. 20 mm unit 5.00 0.00 0.00
unit 18.00 0.00 0.00
- COMMISIONING Its 1.00 0.00 0.00
0.000.00
- Gate Valve dia. 15 mm
SUB TOTAL. BTOTAL PEKERJAAN AIR PANAS
RENCANA ANGGARAN BIAYA
RENCANA ANGGARAN BIAYAPROYEK : HOTEL GRAND SQUARELOKASI : BLOK M JAKARTA SELATANPEKERJAAN : HYDRANT& SPRINKLER
NO. URAIAN PEKERJAAN SAT. VOLUME
A INSTALASI HYDRANT & SPRINKLERPengadaan dan Pemasangan Pemadam Kebakaran, PeralatanPompa (Electric, Hydrant, Jockey, Outdoor Hose Cabinet (OMB) danpondasi, Indoor House Cabinet (IHC),Hydrant Pilar dan bak kontrol,Siemese Connection, dll Lengkap Acessories Terpasang SesuaiGambar Rencana dan Spesifikasi Teknis.
1 Electric Hydrant Pump (EHP) Unit 1.00 0.00 0.00Type : Sentrifugal end suction / Horizontal split casingCapacity : 500 GpmRotary : 2900 rpmHead : 90 mElec. Power: SSKW,380V/3 Ph/50 HzMax Temp : 80' CelciusLengkap dengan Panel Kontrol Standar NFPA 20 (Electric Fire Pump Controller )Elektro Motor Mounted On The Baseplate & accessories
2 Jockey Hydrant Pump OHO Unit 1.00 0.00 0.00Type : Vertikal Multistage In LineCapacity : 200 LpmHead : 100 mElec. Power: 11 KW / 380 V /3 Ph / 50 HzLengkap dengan Panel Kontrol (Electric Jockey Pump Controller) &Accessories
3 Pressure Tank kapasitas 1000 ltr Unit 1.00 0.00 0.00mild steel c/w safety valve,pressure switch,pressure gauge, fitting & accessories
4Standard ASTM A 53,d11BSP dia. 150 mm m 16.00 0.00 0.00BSP dia. 100 mm m 28.00 0.00 0.00BSP dia. 80 mm m 12.00 0.00 0.00BSP dia. 65 mm m 4.68 0.00 0.008SP dia. 50 mm m 4.00 0.00 0.00Pipe Header dia. 200 mm x 2 m Is 1.00 0.00 0.00
Valve & Accessories Type Flange end, Cast Iron, Class 150 Lbs,115 10 K Standard ANSI/MSS, ATSM A 120, dllBSP dia. 150 mm bh 2.00 0.00 0.00BSP dia. 100 mm bh 2.00 0.00 0.00BSP dia. 80 mm bh 1.00 0.00 0.00BSP dia. 65 mm bh 1.00 0.00 0.00
Strainerdia. 150 mm bh 2.00 0.00 0.00dia. 80 mm bh 1.00 0.00 0.00
Flexible Jointdia. 150 mm bh 2.00 0.00 0.00dia. 100 mm bh 2.00 0.00 0.00dia. 80 mm bh 1.00 0.00 0.00dia. 65 mm bh 1.00 0.00 0.00
Check Valvedia. 100 mm bh 2.00 0.00 0.00dia. 65 mm bh 1.00 0.00 0.00
Pressure Reducing Valve (PRV) dia. 150 mm bh 1.00 0.00 0.00Safety Valve dia. 100 min bh 1.00 0.00 0.00Foot Valve dia. 100 mm + filter bh 3.00 0.00 0.00Pressure Switch bh 3.00 0.00 0.00Pressure Gauge 0-8bar bh 4.00 0.00 0.00Fitting pipe ( Elbow, Tee, Tee reducer, etc.) Is 1.00 0.00 0.00Support & Hanger Is 1.00 0.00 0.00
5 Instalasi Pipa Hydrant & APAR It. BasementPipa Distribusi Hydrant Pipa Black Steel, Class Sch. 40Standard ASTM A 53, dllBSP dia 100mrn m 6.00 0.00 0.00BSP dia. 65 mm m 8.00 0.00 0.00
Fitting : Elbow, Tee-Y, Reducer, dli Is 1.00 0.00 0.00Support & Hanger Is 1.00 0.00 0.008obokan & Plesteran kembali & Coring binding Is 1.00 0.00 0.00Test & Commisioning Is 1.00 0.00 0.00- Accessories
HARGA SATUAN(Rp.)
JUMLAH MCSP(Rp.)
TOTAL MCSP(Rp.)
Peralatan Utama di Ruang Pompa & GWT
Pipa Distribusi Hydrant Pipa Black Steel, Class Sch. 40
NO. URAIAN PEKERJAAN SAT. VOLUME HARGA SATUAN(Rp.)
JUMLAH MCSP(Rp.)
TOTAL MCSP(Rp.)
6 Hydrant Box Type indoor bh 1.00 0.00 0.00ukuran : 125 x 7S x 18 cm, red color-1 pc Hose Nozzle dia. 40 mm
-1 pc Hose rack 600 mm COMB-1 roll fire hose with Machin Coupling dia 40 mm x 30 m
bh 1.00 0.00 0.00Fire Extinguiser kap.3 kg bh 3.00 0.00 0.00
7 Instalasi Sprinkler Lt. BasementPipa Distribusi Hydrant Pipa Black Steel, Class Sch. 40Standard ASTM A S3, silt
m 4.00 0.00 0.00m 6.00 0.00 0.00
BSP dia. 50 mm m 23.00 0.00 0.00BSP dia. 40 mm m 22.00 0.00 0.00BSP dia. 32 mm m 26.00 0.00 0.00BSP dia. 25 mm m 53.00 0.00 0.00
Fitting : Elbow, Tee-Y, Reducer, dll Is 1.00 0.00 0.00Support & Hanger Is 1.00 0.00 0.00Test &Commisioning Is 1.00 0.00 0.00- AccessoriesHead Sprinkler Upright bh 20.00 0.00 0.00Head Sprinkler Pendant bh 16.00 0.00 0.00Branch Control Valve 0100 mm set 1.00 0.00 0.00
bh 1.00 0.00 0.00Gate Valve dia. 80 mm bh 1.00 0.00 0.00
- Gate valve dia. 25 mm bh 1.00 0.00 0.00Pressure Gauge bh 1.00 0.00 0.00Pressure Switch bh 1.00 0.00 0.00Sight Glass bh 1.00 0.00 0.00Orrifice bh 1.00 0.00 0.00
8 Instalasi Pipa Hydrant & APAR It. DasarPipa Distribusi Hydrant Pipa Black Steel, Class Sch. 40Standard ASTM A 53, dtlBSP dia. 150 mm m 6.00 0.00 0.00
m 10.00 0.00 0.00m 4.00 0.00 0.00
Is 1.00 0.00 0.00Support & Hanger Is 1.00 0.00 0.00Bobokan & Plesteran kembali & Coring binding Is 1.00 0.00 0.00Test & Commisioning Is 1.00 0.00 0.00- AccessoriesHydrant Box Type Indoor bh 1.00 0.00 0.00ukuran :.125 x 75 x 18 cm, red color- 1 pc Hose Nozzle dia. 40 mm- 1 pcc Hydrant valve dia. 40 mm
- 1 pc Hose rack 600 mm COMB- 1 roll fire hose with Machino Coupling dia. 40 mm x 30 m
9 Hydrant Box Type Outdoor bh 1.00 0.00 0.00Size : 9S x 66 x 20 cm, red color
- 1 pc Hose Nozzle dia. 40 mm-
Hydrant Pillar Cast Iron bh 1.00 0.00 0.00type : H - 14 A, two waySeammease Connection bh 1.00 0.00 0.00
bh 1.00 0.00 0.00Gate Valve dia. 80 mm bh 1.00 0.00 0.00Gate Valve dia. 100 mm bh 1.00 0.00 0.00Check Valve dia. 150 mm bh 1.00 0.00 0.00Pressure Gauge bh 1.00 0.00 0.00
bh 3.00 0.00 0.00
10
BSP dia. 150 mm m 4.00 0.00 0.00m 8.00 0.00 0.00m 6.00 0.00 0.00
BSP dia. 50 mm m 20.00 0.00 0.00BSP dia. 40 mm m 4.00 0.00 0.00BSP dia. 32 mm m 8.00 0.00 0.00BSP dia. 25 mm m 28.00 0.00 0.00
Is 1.00 0.00 0.00Is 1.00 0.00 0.00
Test & Commiskming Is 1.00 0.00 0.00• Accessories
-1 pcc Hydrant valve dia. 40 mm-1 pc Hydrant valve dia. 65 mm
i
Gate Valve dia. 65 mm
BSP dia. 80 mmBSP dia. 65 mm
Gate Valve dia. 150 mm
BSP dia. 80 mmBSP dia. 65 mm
Fitting : Elbow, Tee-Y, Reducer, dil
- 1 pc Hydrant valve dia. 65 mm
1 roll fire hose with Machino Coupling dia 65 mm x 30 m
Gate Valve dia 65 mm
Fire Extinguiser kap.3 kg
Instalasi Sprinkler U. DasarPipa Distribusi Hydrant Pipa Black Steel, Class Sch. 40Standard ASTM A 53, dR
BSP dia. 80 mmBSP dia. 65 mm
Fitting : Elbow, Tee-Y, Reducer, dilSupport & Hanger
NO. URAIAN PEKERJAAN SAT. VOLUME HARGA SATUAN(Rp.)
JUMLAH MCSP(Rp.)
TOTAL MCSP(Rp.)
Head Sprinkler bh 22.00 0.00 0.00set 1.00 0.00 0.00
Gate Valve dia. 80 mm bh 1.00 0.00 0.00Gate valve dia. 25 mm bh 1.00 0.00 0.00
bh 1.00 0.00 0.00bh 1.00 0.00 0.00
Sight Glass bh 1.00 0.00 0.00Orrifice bh 1.00 0.00 0.00
11
BSP dia. 100 mm m 6.00 0.00 0.00m 10.00 0.00 0.00
Is 1.00 0.00 0.00Is 1.00 0.00 0.00Is 1.00 0.00 0.00
Test & Commisioning Is 1.00 0.00 0.00
Hydrant Box Type Indoor bh 1.00 0.00 0.00
- 1 pc Hose Nozzle dia. 40 mm- 1 pcc Hydrant valve dia. 40 mm
- 1 pc Hose rack 600 mm COMB- 1 roll fire hose with Machino Coupling dia. 40 mm x 30 m
bh 1.00 0.00 0.00bh 2.00 0.00 0.00
12
BSP dia. 150 mm m 4.00 0.00 0.00m 6.00 0.00 0.00m 5.00 0.00 0.00
BSP dia. 50 mm m 7.00 0.00 0.00BSP dia. 40 mm m 24.00 0.00 0.00BSP dia. 32 mm m 16.00 0.00 0.00BSP dia. 25 mm m 58.00 0.00 0.00
Is 1.00 0.00 0.00Support & Hanger Is 1.00 0.00 0.00Test & Commisioning Is 1.00 0.00 0.00
bh 26.00 0.00 0.00set 1.00 0.00 0.00bh 1.00 0.00 0.00
Gate Valve dia. 25 mm bh 1.00 0.00 0.00bh 1.00 0.00 0.00bh 1.00 0.00 0.00
Glass bh 1.00 0.00 0.00Orrifice bh 1.00 0.00 0.00
13
BSP dia. 100 mm m 20.00 0.00 0.00BSP dia. 65 mm m 50.00 0.00 0.00
Is 5.00 0.00 0.00Is 5.00 0.00 0.00Is 5.00 0.00 0.00Is 5.00 0.00 0.00
bh 6.00 0.00 0.00ukuran :12S x 75 x 18 cm, red color- 1 pc Hose Nozzle dia. 40 mm- 1 pcc Hydrant valve dia. 40 mm
- 1 pc Hose rack 600 mm COMB- 1 roll fire hose with Machino Coupling dia. 40 mm x 30 m
- bh 5.00 0.00 0.00- bh 10.00 0.00 0.00
14
BSP dia. 150 mm m 20.00 0.00 0.00m 36.00 0.00 0.00m 50.00 0.00 0.00
BSP dia. 50 mm m 68.00 0.00 0.00BSP dia. 40 mm m 89.00 0.00 0.00BSP dia. 32 mm m 153.00 0.00 0.00
Branch Control Valve 0 80 mm
Pressure GaugePressure Switch
Instalasi Pipa Hydrant & APAR LT.MezaninePipa Distribusi Hydrant Pipa Black Steel, Class Sch. 40Standard ASTM A 53, dll
BSP dia. 65 mm
Fitting : Elbow, Tee-Y, Reducer, dllSupport & HangerBobokan & Plesteran kembali & Coring Dinding
ukuran : 125 x 75 x 18 cm, red color
- 1 pc Hydrant valve dia. 65 mm
Gate Valve dia. 65 mmFire Extinguiser kap.3 kg
Instalasi Sprinkler Lt. MezaninePipa Distribusi Hydrant Pipa Black Steel, Class Sch. 40Standard ASTM A 53, dll
BSP dia. 80 mmBSP dia. 65 mm
Fitting : Elbow, Tee-Y, Reducer, dll
- AccessoriesHead SprinklerBranch Control Valve 0 80 mmGate Valve dia. 800 mm
Pressure GaugePressure Switch
14 InstalasiPipa Hydrant & APAR (Typical Lt.1,2,3,4,5,6)Pipa Distribusi Hydrant Pipa Black Steel, Class Sch. 40Standard ASTM A 53, dll
Fitting : Elbow, Tee-Y, Reducer, dilSupport & HangerBobokan & Plesteran kembali & Coring DindingTest & Commisioning- Accessories
Hydrant Box Type Indoor
- 1 pc Hydrant valve dia. 65 mm
Gate Valve dia. 65 mmFire Extinguiser kap.3 kg
Instalasl Sprinkler (Typical Lt .1,2,3,4,5,6)Pipa Distribusi Hydrant Pipe Black Steel, Class Sch. 40Standard ASTM A 53, dB
BSP dia. 80 mmBSP dia. 65 mm
NO. URAIAN PEKERJAAN SAT. VOLUME HARGA SATUAN(Rp.)
JUMLAH MCSP(Rp.)
TOTAL MCSP(Rp.)
BSP dia. 25 mm m 811.00 0.00 0.00
Is 5.00 0.00 0.00Support & Hanger Is 5.00 0.00 0.00
Is 5.00 0.00 0.00
bh 45.00 0.00 0.00bh 70.00 0.00 0.00set 5.00 0.00 0.00bh 5.00 0.00 0.00
Gate Valve dia. 25 mm bh 5.00 0.00 0.00bh 5.00 0.00 0.00bh 5.00 0.00 0.00
Glass bh 5.00 0.00 0.00Orrifice bh 5.00 0.00 0.00
15 Instalasl Hydrant Roof Top
BSP dia. 150 mm m 4.00 0.00 0.00m 14.00 0.00 0.00m 4.00 0.00 0.00
Is 1.00 0.00 0.00Is 1.00 0.00 0.00Is 1.00 0.00 0.00Is 1.00 0.00 0.00
17 Is 1.00 0.00 0.00
TOTAL PEKERJAAN HYDRANT & SPRINKLER 0.00
Fitting : Elbow, Tee-Y, Reducer, di!
Test & Commisioning- AccessoriesHead Sprinkler type pendantHead Sprinkler type wallBranch Control Valve 0 100 mmGate Valve dia. 800 mm
Pressure GaugePressure Switch
Pipa Distribusi Hydrant Pipe Black Steel, Class Sch. 40Standard ASTM A 53, dB
BSP dia. 80 mmBSP dia. 65 mm
Fitting : Elbow, Tee-Y, Reducer, dilSupport & HangerBobokan & Plesteran kembali & Coring DindingTest & Commisioning- Accessories
Perijinan, Trainning, Testing dan Commissioning termasukpenyediaan air, mendatangkan Petugas Pemadam Kebakaran, di!
RENCANA ANGGARAN BIAYA
RENCANA ANGGARAN BIAYAPROYEK : HOTEL GRAND SQUARELOKASI : BLOK M JAKARTA SELATANPEKERJAAN : MVAC
NO. URAIAN PEKERJAAN SAT. VOLUME
I Pekerjaan Tata UdaraPengadaan dan pemasangan unit AC lengkap terpasang sesuaigambar & spesifikasi teknis dengan material pendukung lainnya.
IA Peralatan Utama ACA.1 Lantal Basement
1 IU-OU. Ll - BA- Type : Split Wall Mounted Unit 6 0.00 0.00- Kapasitas 5000 BTUHLengkap bracket, freon, remote control & accessories,
A.2 Lantai Dasar
1 IU-OU. D.8 s/d D.10- Type : Split Wall Mounted Unit 3 0.00 0.00• Kapasitas : 9000 BTUHLengkap bracket, freon, remote control & accessories,
2 IU-OU. D.1 s/d IU-OU. D.6- Type : Ceiling Cassette Unit 6 0.00 0.00- Kapasitas : 12000 BTUHLengkap bracket, freon, remote control & accessories,
Pipa Drain dia. 3/4' + Insulasi tebal = 3/8"
3 IU-OU. D.7- Type : Ceiling Cassette Unit 1 0.00 0.00- Kapasitas 18000 BTUHLengkap bracket, freon, remote control & accessories,
A.3 t.antai MEZANINE
1 IU-OU. M.9- Type: Split Wall Mounted Unit 1 0.00 0.00- Kapasitas 9000 BTUHLengkap bracket, freon, remote control & accessories,
2 IU-OU. M.1 s/d IU-OU. M.8- Type Ceiling Cassette Unit 8 0.00 0.00- Kapasitas : 12000 STUNLengkap bracket, freon, remote control & accessories,
A.4 Lantail - 1
1 IU-OU. 1.1 s/d 1U-0U. 1.15-Type Split Wall Mounted Unit 14 0.00 0.00- Kapasitas : 9000 BTUHLengkap bracket, freon, remote control & accessories,
A.5 Lantai21 IU-OU. 2.1 s/d IU-OU. 2.15
- Type Split Wall Mounted Unit 14 0.00 0.00- Kapasitas : 9000 BTUHLengkap bracket, freon, remote control & accessories,Pipe refrigerant 1/4'+ 3/8" (tebal isolasi 3/8"),
A.6 Lantal 3
IU-OU. 31 s/d IU-OU. 3.15-Type : Split Wall Mounted Unit 14 0.00 0.00- Kapasitas : 9000 BTUHLengkap bracket, freon, remote control & accessories,Pipe refrigerant 1/4'+ 3/8" (tebal isolasi 3/8"),
JUMLAH (Rp.)
HARGA SATUAN(Rp.)
Pipe refrigerant 1/4" + 3/9 (tebal isolasi 3/8"),
Pipa Drain dia. 1/2' + Insulasi tebal = 3/8"
Pipa refrigerant 1/4" + 3/8" (tebal isolasl 3/8"),Pipa Drain dia. 1/2' + Insulasi tebal = 3/8"
Pipa refrigerant 1/4" + 3/8" (tebal isolasi 3/8"),
Pipa refrigerant 1/4" + 3/8" (tebal isolasi 3/8"),Pipa Drain dia 1" + Insulasi tebal = 3/8"
Pipe refrigerant 1/4" + 3/8" (tebal isolasi 3/8"),Pipa Drain dia 1/2" + Insulasi tebal = 3/8"
Pipa refrigerant 1/4" + 3/8" (tebal isolasi 3/8"),
Pipa refrigerant 1/4" + 3/8" (tebal isolasi 3/8"),Pipe Drain dia 1/2" + Insulasi tabs!. 3/8"
Pipe Drain dia 1/2" + Insulasi tabal 3/8"
NO. URAIAN PEKERJAAN SAT. VOLUME JUMLAH (Rp.)
HARGA SATUAN(Rp.)
A.7 Lantai 4
IU-OU. 4.1 s/d IU-OU. 4.15- Type : Split Wall Mounted Unit 14 0.00 0.00- Kapasltas : 9000 STUNLengkap bracket, freon, remote control & accessories,Pipe refrigerant 1/4'+ 3/8" (tebal isolasi 3/8"),
A.8 Lantal 5
IU-OU. 5.1 s/d IU-OU. 5.15- Type : Split Wall Mounted Unit 14 0.00 0.00- Kapasitas : 9000 BTUHLengkap bracket, freon, remote control & accessories,Pipe refrigerant 1/4'+ 3/8" (tebal isolasi 3/8"),
A-9 Lantai 6 ROOF TOP
IU-OU.7.1 s/d IU-OU. R.5-Type : Split Wall Mounted Unit 5 0.00 0.00- Kapasitas : 9000 BTUHLengkap bracket, freon, remote control & accessories,Pipe refrigerant 1/4'+ 3/8" (tebal isolasi 3/8"),
11.B Peralatan Mama Fan
B.1 Lantai Basement
1 EFW.B.1 s/d EFW.B.5- Type : Exhaust Fan Wall type Unit 5 0.00 0.00Kapasitas : 300 CFM- Power: 0,3KW / 220 V / 1 PH/ 50 HzLengkap bracket / hanger & accessories
2 JF.B.1 s/d JF.B.2-Type :Jet Fan Unit 2 0.00 0.00- Kapasitas : 350 CFM- Power :0,65 KW / 220 V / 1 PH/50 HzLengkap bracket / hanger & accessories
3 Ducting fresh air & Exhaust lengkap dengan coatingtermasuk bracket, penggantung, support, peralatan bantu till.Bahan ducting :- BJLS 60 (325 - 750 mm) m' 13 0.00 0.00- RAD ukuran 300 x 200 mm bh 6 0.00 0.00
Exhaust Fan bh 1 0.00 0.00-Tipe : Inline Duct Fan-Kapasitas udara :1.500 (cfm)-Total static pressure : 1.2 (in WG)-Putaran motor fan :... RPM-Data Listrik : 220 V/1 ph /50 HZ
4 Pipa PVC AW ( 10 kg/cm') Include Fitting & Support Pipa m 1 0.00 0.000 100 mm
5 EF D.1 s/d EF.D.2- Type : Exhaust Fan Ceiling Mounted Unit 3 0.00 0.00- Kapasitas : 100 CFM- Static Pressure : 0,1 in wg- Power :0,1KW/220V/1PH/50 Hz- Lengkap bracket / hanger & accessories
B.2 Lantai Dasar
- Type : Exhaust Fan Wall type Unit 3 0.00 0.00- Kapasitas : 300 CFM- Power :0,3KW/220V/1PH/50 HzLengkap bracket / hanger & accessories
2 m 20 0.00 0.00dia. 100 mm
3 Flexible tanpa isolasi dia. 100 mm m 10 0.00 0.00
4 Louvre Exhaust bh 1 0.00 0.00- Bahan : Alumunium
Pipe Drain dia 1/2" + Insulasi tabal 3/8"
Pipe Drain dia 1/2" + Insulasi tabal 3/8"
Pipe Drain dia 1/2" + Insulasi tabal 3/8"
1 EFW.B.1s/d EFW.B.S
Pip. PVC AW (10 kg/cros) Include Fitting & Support Pipa
NO. URAIAN PEKERJAAN SAT. VOLUME JUMLAH (Rp.)
HARGA SATUAN(Rp.)
- Ukuran:150xlOO
B.3 Lantai Mannino
1 EF M.1 s/d EF.M.4- Type : Exhaust Fan Ceiling Mounted Unit 5 0.00 0.00- Kapasitas : 100 CFM- Static Pressure : 0,1 in wg- Power : 0,1KW / 220 V / 1 PH / 50 HzLengkap bracket / hanger & accessories
2 Pipa PVC AW ( 10 kg/cm') Include Fitting & Support Pipa m' 32 0.00 0.00dia. 100 mm
3 Flexible tanpa isolasi dia. 100 mm m 10 0.00 0.00
4 Louvre Exhaust bh 1 0.00 0.00-Behan : Alumunium-Ukuran : 150x100
8.4 Lantai:l
1 EF 1.1 s/d EF.1.15- Type: Exhaust Fan Ceiling Mounted Unit 14 0.00 0.00- Kapasitas : 100 CFM- Static Pressure : 0,1 in wg- Power : 0,1KW / 220 V 1 PH / 50 HzLengkap bracket / hanger & accessories
2 Pipa PVC AW ( 10 kg/cm' Include Fitting & Support Pipa m' 70 0.00 0.00dia. 100 mm
3 Flexible tanpa isolasi dia. 100 mm m 42 0.00 0.00
4 Louvre Exhaust bh 1 0.00 0.00-Bahan : Alumunium-Ukuran : 150x100
B3 Lantai. 21 EF 2.1 s/d EF.2.15
- Type : Exhaust Fan Ceiling Mounted Unit 14 0.00 0.00- Kapasitas : 100 CFM- Static Pressure : 0,1 in wg- Power : 0,3KW / 220 V / 1 PH / 50 HzLengkap bracket / hanger & accessories
2 Pipa PVC AW ( 10 kg/cm') Include Fitting & Support Pipa m' 70 0.00 0.00dia. 100 mm
3 Flexible tanpa isolasi dia. 100 mm m 42 0.00 0.00
4 Louvre Exhaust bh 1 0.00 0.00
B.6 Lantai- 31 EF 3.1 s/d EF.3.15- Type : Exhaust Fan Ceiling Mounted Unit 14 0.00 0.00- Kapasitas : 100 CFM- Static Pressure : 0,1 in wg- Power : 0,1KW / 220 V / 1 PH/50 Hz
2 Pipa PVC AW ( 10 kg/cm') Include Fitting & Support Pipa m' 70 0.00 0.00dia. 100 mm
3 Flexible tanpa isolasi dia. 100 mm m 42 0.00 0.00
4 Louvre Exhaust bh 1 0.00 0.00-Bohan : Alumunium-Ukuran:150x100
B.7 Dotal. 4
1 EF 4.1 s/d EF.4.15- Type : Exhaust Fan Ceiling Mounted Unit 14 0.00 0.00- Kapasitas : 100 CFM- Static Pressure : 0,1 In wg-Power :0,1KW/220V/1PH/50 HzLengkap bracket / hanger & accessories
2 Pipa PVC AW ( 10 kg/cm') Include Fitting & Support Pipe m' 70 0.00 0.00dia. 100 mm
3 Flexible tanpa isolasi dia. 100 mm m 42 0.00 0.00
-Behan: Alumunium-Ukuran:150x100
Lengkapbracket / hanger & accessories
NO. URAIAN PEKERJAAN SAT. VOLUME JUMLAH (Rp.)
HARGA SATUAN(Rp.)
4 Louvre Exhaust bh 1 0.00 0.00-Bahan : Alumunium-Ukuran : 150xlOO
B.8 Lantai.5
1 EF 5.1 s/d EF.5.15- Type : Exhaust Fan Ceiling Mounted Unit 14 0.00 0.00Kapasitas : 100 CFM- Static Pressure : 0,1 in wg- Power : 0,1KW / 220 V / 1 PH / 50 HzLengkap bracket / hanger & accessories
2 Pipa PVC AW ( 10 kg/cm') Include Fitting & Support Pipa m' 70 0.00 0.00dia. 100 mm
3 Flexible tanpa isolasi dia. 100 mm m 42 0.00 0.00
4 Louvre Exhaust bh 1 0.00 0.00-Bahan : Alumunium-Ukuran: 15OxlOO
B . 9 Lantai Atap
1 EFA-1(u/toilet )- Type : Axial Unit 5 0.00 0.00- Kapasitas 100 CFM• Static Pressure : 1,4 in wg- Power: 0,8KW / 380 V/3PH / 50 HzLengkap bracket / hanger & accessories
2 Pipa PVC AW 10 kg / cm3 include Fitting & Support pipa diameter 100 Unit 25 0.00 123,500.00
C.1 Testing & Commissioning Is 1 0.00 0.00
TOTAL PEKERJAAN MVAP 0.00
RENCANA ANGGARAN BIAYA
KETERANGAN
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
JUMLAH (Rp.)
KETERANGANJUMLAH (Rp.)
0.00
0.00
0.00
0.00
0.00
0.000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
KETERANGANJUMLAH (Rp.)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
KETERANGANJUMLAH (Rp.)
0.00
0.00
0.00
0.00
0.00
0.00
3,087,500.00
0.00
3,087,500.00
RENCANA ANGGARAN BIAYAPROYEK : HOTEL GRAND SQUARELOKASI : BLOK M JAKARTA SELATANPEKERJAAN : SANITARI
NO. URAIAN PEKERJAAN SAT. VOLUME
1 Closet Duduk Umum+Accessories ( Basement,Dasar,Mexani bh 11 0.00 0.00 0.00Type CW 421 J / SW 420 JP Standart Ex TOTO
2 Closet Duduk Suite + Accessories (Room) bh 75 0.00 0.00 0.00Type CW 421 J / SW 420 JP Standart Ex TOTO
3 Washtafel ♦ Accessories bh 75 0.00 0.00 0.00LW 641 CJ TYX 115 LE SBR THX 1A-3N TOTO
4 let Shower complt accssories bh 61 0.00 0.00 0.00Shower Spray THX 20 NB # N5 - Black ex TOTO
5 Rain Shower & Spray (Room) set 75 0.00 0.00 0.00Fixed shower TX 465 SEN + Shower Mixer TX 469 SESBR ex TOTO
6 Basin Mixer Wastafel (Room) set 75 0.00 0.00 0.00Beton finish granit nero absolute india + Box HPLserat kayu body plywood + ACC hafale
7 Clean Out 2" bh 61 0.00 0.00 0.00
8 Floor Drain 2" bh 150 0.00 0.00 0.00
9 Kran Taman bh 3 0.00 0.00 0.00
TOTAL KERJA SANITARI PICTURE 0.00
HARGA SATUAN(Rp.)
JUMLAH (Rp.)
HARGA SATUAN(Rp.)
RENCANA ANGGARAN BIAYA
KETERANGAN
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
JUMLAH (Rp.)
RENCANA ANGGARAN BIAYAPROYEK : HOTEL GRAND SQUARELOKASI : BLOK M JAKARTA SELATANPEKERJAAN : ELEKTRIKAL
NO. URAIAN PEKERJAAN SAT. VOLUME
II PEKERJAAN ELEKTRIKAL
Pengadaan dan Pemasangan Instalasi Penerangan, InstalasiStop Kontak, Kabel Feeder, Instalasi Panel, Instalasi GroundingSistem, Lengkap dengan Accessories Terpasang SesuaiGambar Data Spesifikasi Teknis.
A Pekerjaan Kabel Tray dan Kabel Ladder
Pekerjaan pengadaan dan pemasangan kabel traydan kabel ladder lengkap dengan Tee, Elbow, support& asesoris
Kabel Ladder
Lantai Basement :Riser :Kabel Ladder 300 x 100 mtr 35 0.00 0.00Hanger dan Bracket, Acc lot 1 0.00 0.00
Kabel Tray Elektrikal dan Elektronik
Lantai Basement :Kabel Tray Elektrikal 100 x 100 mtr 7 0.00 0.00Kabel Tray Elektrikal 200 x 100 mtr 28 0.00 0.00Kabel Tray Elektronik 200 x 100 mtr 28 0.00 0.00Kabel Tray Elektrikal 300 x 100 mtr 7 0.00 0.00Hanger dan Bracket, Acc lot 1 0.00 0.00
Lantai Dasar:Kabel Tray Elektrikal 100 x 100 mtr 2 0.00 0.00Kabel Tray Elektronik 200 x 100 mtr 23 0.00 0.00Hanger dan Bracket, Acc lot 1 0.00 0.00
Lantai Mezanine :mtr 22 0.00 0.00
Kabel Tray Elektronik 200 x I00 mtr 22 0.00 0.00Hangerdan Bracket, Acc lot 1 0.00 0.00
Kabel Tray Elektronik 100 x 100 mtr 16 0.00 0.00Kabel Tray Elektrikal 200 x 100 mtr 16 0.00 0.00Hanger dan Bracket, Acc lot 1 0.00 0.00
Lantai 2 :Kabel Tray Elektronik 100 x 100 mtr 16 0.00 0.00Kabel Tray Elektrikal 200 x 100 mtr 16 0.00 0.00Hanger dan Bracket, Acc lot 1 0.00 0.00
Kabel Tray Elektronik 100 x 100 mtr 16 0.00 0.00mtr 16 0.00 0.00
Hanger dan Bracket, Acc lot 1 0.00 0.00
Lantai 4 :KabelTray Elektronik 100 x 100 mtr 16 0.00 0.00Kabel Tray Elektrikal 200 x 100 mtr 16 0.00 0.00Hanger dan Bracket, Acc lot 1 0.00 0.00
Kabel Tray Elektronik 100 x 100 mtr 16 0.00 0.00Kabel Tray Elektrikal 200 x 100 mtr 16 0.00 0.00Hanger dan Bracket, Ace lot 1 0.00 0.00
Lantai ROOF TOPmtr 16 0.00 0.00
)(abet Tray Elektrikal 200 x 100 mtr 16 0.00 0.00Hanger dan Bracket, Arc lot 1 0.00 0.00
Total Pekerjaan dan Pemasangan Kabel Rock 0.00
HARGA SATUAN(Rp.)
JUMLAH MCSP(Rp.)
TOTAL MCSP(Rp.)
Kabel Tray Elektrikal 100 x 100
Lantai 1:
Lantai 3:
Kabel Tray Elektrikal 200 x 100
Lantai 5:
Kabel Tray Elektronik 100 x 100
NO. URAIAN PEKERJAAN SAT. VOLUME HARGA SATUAN(Rp.)
JUMLAH MCSP(Rp.)
TOTAL MCSP(Rp.)
B Pekerjaan Panel Tegangan Rendah
1 Lantai BasementPanel 1.V MOP set 1 0.00 0.00Panel Kapasitor bank set 1 0.00 0.00PP/LP - LB set 1 0.00 0.00PP - AB set 1 0.00 0.00PP - WTP set 1 0.00 0.00PP - STP set 1 0.00 0.00PP - SUMPIT.1 set 1 0.00 0.00PP - SUMPIT.2 set 1 0.00 0.00PP - DW set 1 0.00 0.00PP - HYD set 1 0.00 0.00
2 Lantal DasarPP/LP •LD set 1 0.00 0.00
2 Lantai MezaninePP/LP- Mezanine set 1 0.00 0.00
3 Lantai 1set 1 0.00 0.00
LP-K1.1 sd LP-K1.14 set 14 0.00 0.004 Lantai 2
PP/LP - L2 set 1 0.00 0.00LP-K2.1 sd LP-K2.14 set 14 0.00 0.00
5 Lantai 3PP/lP-13 set 1 0.00 0.00LP-K3.1 sd LP-K3.14 set 14 0.00 0.00
6 Lantai 4PP/LP -L4 set 1 0.00 0.00LP-K4.1 sd LP-K4.14 set 14 0.00 0.00
6PP/LP-L5 set 1 0.00 0.00LP-K5.1 sd LP-K5.14 set 14 0.00 0.00
7 ROOF TOPPP/LP-RT set 1 0.00 0.00LP-K6.1 sd LP-K6.14 set 5 0.00 0.00PP Kitchen set 1 0.00 0.00
9 Lantai AtapPP/LP- ATAP set 1 0.00 0.00PP-LIFT set 1 0.00 0.00PP-BP (Booster Pump) set 1 0.00 0.00PP-HP (Heat Pump) set 1 0.00 0.00PP-GONDOLA set 1 0.00 0.00
0.00
C Pekerjaan Kobel Feeder
Pekerjaan Pengadaan dan InstalasiKabel Feeder
Kabel feeder dari PKG ke LVMDP :Kabel NYY 4x185 mm2 mtr 10 0.00 0.00
Kabel feeder dari LVMDP ke :PP/LP-LBKabel NYY 4x6 mm2 mtr 10 0.00 0.00PP - ABKabel NYY 4x4 mm2 mtr 20 0.00 0.00PP - WTPKabel NYY 4x4 mm2 mtr 20 0.00 0.00PP-STPKabel NYY 4x4 mm2 mtr 20 0.00 0.00PP- SUMPIT.1Kabel NYY 4x4 mm2 mtr 15 0.00 0.00PP - SUMPIT.2Kabel NYY 4x4 mm2 mtr 20 0.00 0.00PP-DWKabel NYY4x4mm2 mtr 20 0.00 0.00PP - HYDKabel FRC 4x1x70 mm2 mtr 25 0.00 0.00PP/LP-LDKabel NYY 4x16 mm2 mtr 50 0.00 0.00PP/LP-1 MEZANINEKabel NYY 4x16 mm2 mtr 50 0.00 0.00
PP/LP-L1
lantai 5
Total Pekerjaan Pengadaan Panel
NO. URAIAN PEKERJAAN SAT. VOLUME HARGA SATUAN(Rp.)
JUMLAH MCSP(Rp.)
TOTAL MCSP(Rp.)
PP/LP-L1Kabel NYY 4x16 mm2 mtr 40 0.00 0.00PP/LP-12Kabel NYY 4x16 mm2 mtr 44 0.00 0.00PP/LP-L3Kabel NYY 4x16 mm2 mtr 48 0.00 0.00PP/LP-l4Kabel NYY 4x16 mm2 mtr 52 0.00 0.00PP/LP-L5Kabel NYY 4x16 mm2 mtr 56 0.00 0.00PP/LP-L6Kabel NYY 4x50 mm2 mtr 64 0.00 0.00PP/LP - ATMKabel NYY 4x35 mm2 mtr 70 0.00 0.00
Kabel feeder dari PP/LP - ATAP kePP-LIFTKabel FRC 4x1x6 mm2 mtr 15 0.00 0.00PP-BP (Booster Pump)Kabel NYY 4x4 mm2 mtr 15 0.00 0.00
KabelNYY4x4mm2 mtr 15 0.00 0.00PP-GONDOLAKabel NYY 4x6 mm2 mtr 15 0.00 0.00
Total Pekerjaan Pengadaan Kabel Feeder 0.00
D Pekerjaan Instalasi Pengetanahan/ Grounding
1 Pembuatan titik Grounding Elektrikal titik 4 0.00 0.00
2 Pembuatan titik Grounding Elektronika titik 1 0.00 0.00
Total Pekerjaan dan Pengadaan Kabel Toefuur 0.00
E Pekerjaan Instalasi Penerangan & Daya
a Lantai Basement :
1 Area Parkir BasementLampu TL Balk 2x36 watt c/w Armature bh 24 0.00 0.00Saklar Ganda bh 2 0.00 0.00Instalasi Penerangan ttk 24 0.00 0.00Instalasi Saklar Ganda ttk 2 0.00 0.00
2 Ruang Laundry PortLampu DL 2x18W bh 2 0.00 0.00Saklar Tunggal bh 1 0.00 0.00Instalasi Penerangan ttk 2 0.00 0.00Instalasi Saklar Tunggal ttk 1 0.00 0.00
3 Ruang GensetLampu DL 2x18W bh 2 0.00 0.00Saklar Tunggal bh 1 0.00 0.00Instalasi Penerangan ttk 2 0.00 0.00Instalasi Saklar Tunggal ttk 1 0.00 0.00
4 Ruang Engineering Workshop / GudangLampu DL 2x18W bh 2 0.00 0.00Saklar Tunggal bh 1 0.00 0.00Instalasi Penerangan ttk 2 0.00 0.00Instalasi Saklar Tunggal ttk 1 0.00 0.00
5 Ruang MusholaLampu DL 2x18W bh 2 0.00 0.00Saklar Tunggal bh 1 0.00 0.00Instalasi Penerangan bh 2 0.00 0.00Instalasi Saklar Tunggal ttk 1 0.00 0.00
6 Ruang KantinLampu DL 2818W bh 2 0.00 0.00Saklar Tunggal bh 1 0.00 0.00Instalasi Penerangan ttk 2 0.00 0.00Instalasi Saklar Tunggal ttk 1 0.00 0.00
7 Ruang Security 0.00 0.00
PP-HP (Heat Pump)
NO. URAIAN PEKERJAAN SAT. VOLUME HARGA SATUAN(Rp.)
JUMLAH MCSP(Rp.)
TOTAL MCSP(Rp.)
Lampu (DL 2x 18W bh 1 0.00 0.00Saklar Tunggal bh 1 0.00 0.00Instalasi Penerangan ttk 1 0.00 0.00Instalasi Saklar Tunggal ttk 1 0.00 0.00
8 Ruang LockerLampu DL 2x18W bA 2 0.00 0.00Saklar Tunggal bh 2 0.00 0.00Instalasi Penerangan ttk 2 0.00 0.00Instalasi Saklar Tunggal ttk 2 0.00 0.00
11 Area TanggaRM 2x36 WATT bh 2 0.00 0.00Exit Lamp btt , 1 0.00 0.00Saklar Ganda bh 0 0.00 0.00Saklar Tunggal bh 1 0.00 0.00Saklar Tukar bh 0 0.00 0.00Instalasi Penerangan ttk 3 0.00 0.00Instalasi Saklar Ganda ttk 0 0.00 0.00Instalasi Saklar Tunggal ttk 1 0.00 0.00InstalasiSaklarTukar ttk 0 0.00 0.00
OfficeLampu Downlight 2x18 watt c/w Armature bb 6 0.00 0.00SaklarGanda bh 1 0.00 0.00Instalasi Penerangan ttk 6 0.00 0.00Instalasi Saklar Ganda ttk 1 0.00 0.00
Tempat WudhuLampe Downlight 2u18 watt c/w Armature bh 2 0.00 0.00Sakar Ganda bh 1 0.00 0.00Instalasi Penerangan ttk 2 0.00 0.00Instalasi Saklar Ganda ttk 1 0.00 0.00
ToiletLampu Downlight 2x18 watt c/w Armature bh 3 0.00 0.00Saklar Ganda bh 3 0.00 0.00Instalasi Penerangan ttk 3 0.00 0.00Instalasi Saklar Ganda ttk 3 0.00 0.00
LobbyLampu Downlight 2x18 watt c/w Armature bh 3 0.00 0.00Saklar Ganda bh 1 0.00 0.00Instalasi Penerangan ttk 3 0.00 0.00Instalasi Saklar Ganda ttk 1 0.00 0.00
12 Instlasi Daya Stop Kontak Lt. BasementStop Kontak bh 12 0.00 0.00Instalasi Stop Kontak ttk 12 0.00 0.00
Sub Total Lantai Basement 0.00 0.00
b Lantai Dasar :
1 TerasLampu Downlight 2x18 watt c/w Armature bh 11 0.00 0.00Iampu TamanInstalasi Penerangan ttk 11 0.00 0.00
2 LobbyLampu Downlight 2x18 watt c/w Armature bh 26 0.00 0.00Saklar Ganda bh 2 0.00 0.00Instalasi Penerangan ttk 20 0.00 0.00Instalasi Saklar Ganda ttk 2 0.00 0.00
3 Office 1Lampu Downlight 1x18 watt c/w Armature bh 3 0.00 0.00Saklar Ganda bh 1 0.00 0.00Saklar Tunggal bh 1 0.00 0.00Instalasi Penerangan ttk 3 0.00 0.00Instalasi Saklar Ganda ttk 1 0.00 0.00Instalasi Saklar Tunggal ttk 1 0.00 0.00
4 Ruang ReceptionistLampu Downlight 2x18 watt c/w Armature bh 8 0.00 0.00Saklar Tunggal bh 2 0.00 0.00Saklar Ganda bh 2 0.00 0.00
NO. URAIAN PEKERJAAN SAT. VOLUME HARGA SATUAN(Rp.)
JUMLAH MCSP(Rp.)
TOTAL MCSP(Rp.)
Instalasi Penerangan ttk 8 0.00 0.00Instalasi Saklar Tunggal ttk 2 0.00 0.00Instalasi Saklar Ganda ttk 2 0.00 0.00
5 Office 2Lampu Downlight 2x18 watt c/w Armature bh 3 0.00 0.00Saklar Tunggal bh 2 0.00 0.00Saklar Ganda bh 3 0.00 0.00Instalasi Penerangan ttk 1 0.00 0.00
6 Lobby LiftLampu Downlight 2x18 watt c/w Armature bh 2 0.00 0.00Instalasi Penerangan ttk 2 0.00 0.00
7 Area TanggaRM 1x36 WATT bh 1 0.00 0.00Exit Lamp bh 1 0.00 0.00Instalasi Penerangan ttk 2 0.00 0.00
8 KitchenBalk 2 x 36 watt bh 4 0.00 0.00Stop Kontak 1PPh / 16A bh 2 0.00 0.00Stop Kontak AC SPh / 16A bh 3 0.00 0.00Saklar Ganda bh 2 0.00 0.00Instalasi Penerangan ttk 19 0.00 0.00Instalasi Stop Kontak ttk 2 0.00 0.00Instalasi Stop Kontak AC ttk 3 0.00 0.00Instalasi Saklar ttk 3 0.00 0.00
9 CafeLampu PL 19W C/W BATT. bh 3 0.00 0.00Saklar Ganda bh 1 0.00 0.00Instalasi Penerangan ttk 3 0.00 0.00Instalasi Saklar Ganda ttk 1 0.00 0.00
12 OutdoorLampu Sorot 125 W c/w Armature bh 12 0.00 0.00Saklar Ganda bh 3 0.00 0.00
ttk 12 0.00 0.00ttk 3 0.00 0.00
12 Instlasi Daya Stop Kontak Lt.dasarStop Kontak ' bh 12 0.00 0.00
ttk 12 0.00 0.00
Sub Total lantai Dasar 0.00 0.00
Lantai Mezanine:
1 Area TanggaBALK 1x36 WATT bh 4 0.00 0.00Exit Lamp bh 1 0.00 0.00Saklar Tunggal bh 3 0.00 0.00Instalasi Penerangan ttk 5 0.00 0.00Instalasi Sakiar ttk 3 0.00 0.00
2 Lobby LiftLampu Downlight 2x18 watt c/w Armature bh 18 0.00 0.00Sakiar Tunggal bh 3 0.00 0.00Instalasi Penerangan ttk 18 0.00 0.00Instalasi Sakiar ttk 2 0.00 0.00
3 Ruang MeetingLampu DL 1x18 W C/W BATT. bh 18 0.00 0.00Saklar Tunggal bh 1 0.00 0.00Saklar Ganda bh 3 0.00 0.00Instalasi Penerangan ttk 18 0.00 0.00tnstalasiSaklar Turggal ttk 1 0.00 0.00Instalasi Saklar Ganda ttk 3 0.00 0.00
6 MusholaLampu Downlight 1x18 watt c/w Armature bh 4 0.00 0.00Saklar Ganda bh 1 0.00 0.00Instalasi Penerangan ttk 4 0.00 0.00Instalasi Sakiar Ganda ttk 1 0.00 0.00
7 Toilet
InstalasiPeneranganInstalasiSaklar Ganda
InstalasiStop Kontak
NO. URAIAN PEKERJAAN SAT. VOLUME HARGA SATUAN(Rp.)
JUMLAH MCSP(Rp.)
TOTAL MCSP(Rp.)
Lampu Downlight 1x18 watt c/w Armature bh 12 0.00 0.00Saklar Ganda bh 2 0.00 0.00Instalasi Penerangan ttk 12 0.00 0.00Instalasi Saklar Ganda ttk 2 0.00 0.00
12 Instlasi Daya Stop Kontak Lt.MezanineStop Kontak bh 16 0.00 0.00Instalasi Stop Kontak ttk 16 0.00 0.00
0.00 0.00
Lantai Typikal 1-51 Area Tangga
BALK 1x36 WATT bh 2 0.00 0.00Exit Lamp bh 1 0.00 0.00Saklar Ga nda bh 1 0.00 0.00Instalasi Penerangan ttk 3 0.00 0.00Instalasi Sakiar ttk 1 0.00 0.00
2 Lobby LiftLampu Downlight 1x18 watt c/w Armature bh 3 0.00 0.00Saklar Ganda bh 2 0.00 0.00Instalasi Penerangan ttk 3 0.00 0.00Instalasi Saklar ttk 2 0.00 0.00
3 SelasarLampu Downlight 7x18 watt c/w Armature bh 13 0.00 0.00Saklar Ganda bh 2 0.00 0.00Instalasi Penerangan ttk 13 0.00 0.00Instalasi Saklar ttk 1 0.00 0.00
4 KamarLampu Down Light LED 5 W c/w Armature bh 10 0.00 0.00Lampu Down Light PL 20 W c/w Armature bh 12 0.00 0.00Lampu TS Warm White 14 W c/w Armature bh 2 0.00 0.00Stop Kontak lPPh/ 16A bh 6 0.00 0.00Stop Kontak AC'lPh / 16A bh 1 0.00 0.00Saklar Tunggal bh 4 0.00 0.00Instalasi Penerangan ttk 24 0.00 0.00Instalasi Stop Kontak ttk 6 0.00 0.00Instalasi Stop Kontak AC ttk 1 0.00 0.00Instalasi Sakiar ttk 4 0.00 0.00
5 Ruang LinenLampu Downlight 1x18 watt c/w Armature bh 1 0.00 0.00Saklar Tunggal bh 1 0.00 0.00Instalasi Penerangan ttk 1 0.00 0.00Instalasi Saklar ttk 1 0.00 0.00
12 Instlasi Daya Stop Kontak Lt.typikal 1-6Stop Kontak bh 6 0.00 0.00Instalasi Stop Kontak ttk 6 0.00 0.00
Sub Total Lantal typikal 1-5 5x 5 0.00 0.00
Lanai ROOF TOP
1 Area TanggaBALK 1x36 WATT bh 2 0.00 0.00Exit lamp bh 1 0.00 0.00Saklar Ganda bh 1 0.00 0.00Instalasi Penerangan ttk 3 0.00 0.00Instalasi Saklar ttk 1 0.00 0.00
2 Lobby LittLampu Downlight 1x18 watt c/w Armature bh 3 0.00 0.00Saklar ganda bh 1 0.00 0.00Instalasi Penerangan ttk 3 0.00 0.00Instalasi Saklar ttk 1 0.00 0.00
3 SelasarLampu Downlight lx18 watt c/w Armature bh 9 0.00 0.00Saklar Tunggal bh 1 0.00 0.00Instalasi Penerangan ttk 9 0.00 0.00Instalasi Saklar ttk 1 0.00 0.00
Sub Total Lantai 1 (Satu)
NO. URAIAN PEKERJAAN SAT. VOLUME HARGA SATUAN(Rp.)
JUMLAH MCSP(Rp.)
TOTAL MCSP(Rp.)
4 KamarLampu Down Light LED 5 W c/w Armature bh 10 0.00 0.00Lampu Down Light PL 20 W c/w Armature bh 12 0.00 0.00Lampu TS Warm White 14 W c/w Armature bh 2 0.00 0.00Stop Kontak lPPh/ 16A bh 6 0.00 0.00Stop Kontak AC'lPh / 16A bh 1 0.00 0.00Saklar Tunggal bh 4 0.00 0.00Instalasi Penerangan bh 24 0.00 0.00Instalasi Stop Kontak bh 6 0.00 0.00Instalasi Stop Kontak AC bh 1 0.00 0.00Instalasi Sakiar bh 4 0.00 0.00
4 Ruang KantorLampu Downlight 1x18 watt c/w Armature bh 4 0.00 0.00Saklar Ganda bh 1 0.00 0.00Instalasi Penerangan ttk 4 0.00 0.00Instalasi Saklar Ganda ttk 1 0.00 0.00
5 Instlasi Daya Stop Kontak Lt.BasementStop Kontak bh 7 0.00 0.00Instalasi Stop Kontak ttk 7 0.00 0.00
0.00 0.00
0.00
F Pekerjaan Instalasi Penangkal Petir
Pekerjaan pengadaan dan pemasangan penyalur Is 1 0.00 0.00petir type EF sistem dengan radius 25 meter
Elektroda EF dipasang di area atap, di alas ruangmesin lift, lengkap dengan Hang penyangga dankelengkapannya. Terpasang sesuai gambar danspesifikasi teknis.
Penawaran termasuk instalasi titik grounding,instalasi wiring grounding menggunakan kabelNYA 50 mm2, bak kontrol uk. 400x400mm, testing &commissioning, dan perizinan/legalisasi dariinstansi terkait
Sistem proteksi petir yang lengkap, terdiri darikomponen-komponen berikut :- Advanced lightning rod (Terminal)- Mounting support (Penyangga terminal)- High voltage shielded cable (Kabel Penghantar)- Dedicated earthing system (Pentanahan)
Total Pekerjaan Instalasi Penangkal Petir 0.00
G
Instalasi Gensetlengkap dengan Engine Instrument Panel, Automatic Shutdown deviceDaily fuel tank 500 liter, wekly tank 8000 liter, Isolation Mounting,Standar Radiator 40 der Celcius, Battery, Grounding System, Instalasipemipaan bahan bakar lengkap pompa.Test certificate, Certificate Origon, Manual Box Operation, Test Comm, etc.
1 Peralatan UtamaSupply Power Generator- Type: Silent Type Unit 1 0.00 0.00Capacity : 200 XVA, 380/220 V, 50 Hz, pf 0,8- Rotary : 1500 rpm- Assembly : Complete Built Up Unit- Starting system : Electric Starting- Cooling system : Radiator with fan- Incl. Exhaust Silencer, Exhaust Flexible Pipe & Generator Control- Panel Kontrol Genset
2wiring sehingga sistem beroperasi dengan baik sesuai spesifikasi teknis,meliputi :- Pompa solar tangan unit 1 0.00 0.00
Sub Total Lantai ROOF TOP
Total Pekerjaan lnstalasi Listrik
Pekerjaan Pengadaan dan Instalasi Genset
Pengadaan dan pemasangan peralatan dan instalasi pemipaan, valve control
NO. URAIAN PEKERJAAN SAT. VOLUME HARGA SATUAN(Rp.)
JUMLAH MCSP(Rp.)
TOTAL MCSP(Rp.)
- Pompa solar listrik unit 1 0.00 0.00- Tangki harian 500 liter, plat t = 3 mm unit 1 0.00 0.00
unit 1 0.00 0.00- Piping, valve, wiring control pompa, fuel level control dan ac Is 1 0.00 0.00Panel PompaGrounding Body Genset, BCC 70 mm', termasuk rod + bak kon lot 1 0.00 0.00Biaya Transportasi / Pengiriman unit 1 0.00 0.00Perijinan Is 1 0.00 0.00
3 Testing & Commissioning Genset termasuk pengadaan solar lot 1 0.00 0.00testing (menggunakan load bank)
Total Pekerjaan Pengodoan don lnstokzsi Genset 0.00
H Biaya Penyambungan Listrik PLN
1 Biaya Penyambungan dan Uang Jaminan Langganan
- Biaya Penyambungan (BP) kVA 197 0.00 0.00- Uang Jaminan Langganan (UJL) kVA 197 0.00 0.00
2 Konsuil kVA 197 0.00 0.003 Jasa Instalatir & Supervisi kVA 197 0.00 0.00
0.00
TOTAL PEKERJAAN ELEKTRIKAL 0.00DIBULATKAN 0.00
- Tangki mingguan, kap. 8.000 liter, t = 8 mm, tidak termasuk pondasi struktur
Total Pekerjaan Penyambungan Listrik PLN
RENCANA ANGGARAN BIAYA
0.00
TOTAL MCSP(Rp.)
TOTAL MCSP(Rp.)
0.00
TOTAL MCSP(Rp.)
0.00
0.00
TOTAL MCSP(Rp.)
TOTAL MCSP(Rp.)
TOTAL MCSP(Rp.)
TOTAL MCSP(Rp.)
0.00
0.00
TOTAL MCSP(Rp.)
0.00
0.00
0.000.00
RENCANA ANGGARAN BIAYAPROYEK : HOTEL GRAND SQUARELOKASI : BLOK M JAKARTA SELATANPEKERJAAN : ELEKTRONIK
NO. URAIAN PEKERJAAN SAT. VOLUME
1 Pekerjaan Sistem Telephone
Peralatan Utama Sistem Telephone.
ABX System / Hotel System10 line 70 ext.Analog CentralAnalog Truck CardSLT ext CardDigital Hybrid Card.
Exspansion SelfBillingh SystemDigital Key Telp
Harga / Set set 1.00 0.00 0.00
Key Phone dan handset bh 1.00 0.00 0.00MDF set 1.00 0.00 0.00Terminal Box, bracket & acc. set 1.00 0.00 0.00Testing dan Commisioning It 1.00 0.00 0.00
Sub Total Pekerjaan Sistem Telephone 0.00
2 Pekerjaan Instalasi System Telephone
Lantai Basement.Instalasi Titik Telephone ttk 5.00 0.00 0.00Handset Telephone. bh 5.00 0.00 0.00Outlet Telephone bh 5.00 0.00 0.00TB / Junction Box bh 1.00 0.00 0.00
Lantai Dasar.Instalasi Titik Telephone ttk 3.00 0.00 0.00Handset Telephone. bh 3.00 0.00 0.00Outlet Telephone bh 3.00 0.00 0.00TB / Junction Box bh 1.00 0.00 0.00
Lantai Mezzanine.Instalasi Titik Telephone ttk 3.00 0.00 0.00Handset Telephone. bh 3.00 0.00 0.00Outlet Telephone bh 3.00 0.00 0.00TB / Junction Box bh 1.00 0.00 0.00
Lantai 1 :Instalasi Titik Telephone ttk 14.00 0.00 0.00Handset Telephone. bh 14.00 0.00 0.00Outlet Telephone bh 14.00 0.00 0.00TB / Junction Box bh 1.00 0.00 0.00
Lantai 2 :Instalasi Titik Telephone ttk 14.00 0.00 0.00Handset Telephone. bh 14.00 0.00 0.00Outlet Telephone bh 14.00 0.00 0.00TB / Junction Box bh 1.00 0.00 0.00
Instalasi Titik Telephone ttk 14.00 0.00 0.00Handset Telephone. bh 14.00 0.00 0.00Outlet Telephone bh 14.00 0.00 0.00TB / Junction Box bh 1.00 0.00 0.00
Lantai 4 :ttk 14.00 0.00 0.00
Handset Telephone. bh 14.00 0.00 0.00Outlet Telephone bh 14.00 0.00 0.00TB / Junction Box bh 1.00 0.00 0.00
Lanai 5 :Instalasi Titik Telephone ttk 14.00 0.00 0.00Handset Telephone. bh 14.00 0.00 0.00Outlet Telephone bh 14.00 0.00 0.00TB / Junction Boat bh 1.00 0.00 0.00
HARGA SATUAN(Rp.)
JUMLAH MCSP(Rp.)
TOTAL MCSP(Rp.)
Power Supply
Lantai 3:
InstalasiTtikTelephone
NO. URAIAN PEKERJAAN SAT. VOLUME HARGA SATUAN(Rp.)
JUMLAH MCSP(Rp.)
TOTAL MCSP(Rp.)
Lanai 6 :Instalasi Titik Telephone ttk 5.00 0.00 0.00Handset Telephone. bh 5.00 0.00 0.00Outlet Telephone bh 5.00 0.00 0.00TB /'unction Box bh 1.00 0.00 0.00
Testing dan Commisioning It 1.00 0.00 0.00
Sub Total Pekerjaan Instalasi Sistem Telephone 0.00
3 Pekerjaan Sistern Data dan Internet
Peralatan Utama Sistem Data & Internet
Patch Panel Hub / Switch 32 Port set 1.00Wiring ManagementServerUPS
Lantai Dasar:Instalasi Outlet Data 81.45 ttk 3.00 0.00 0.00Instalasi Wireless Access Point ttk 3.00 0.00 0.00Instalasi Stop Kontak u/ Wireless Access Point ttk 3.00 0.00 0.00
Lantai Mezanine :Instalasi Wireless Access Point ttk 2.00 0.00 0.00Instalasi Stop Kontak u/ Wireless Access Point ttk 2.00 0.00 0.00
Lantai 1Instalasi Wireless Access Point ttk 3.00 0.00 0.00Instalasi Stop Kontak u/ Wireless Access Point ttk 3.00 0.00 0.00
Lantai 2Instalasi Wireless Access Point ttk 3.00 0.00 0.00Instalasi Stop Kontak u/ Wireless Access Point ttk 3.00 0.00 0.00
Lantai 3Instalasi Wireless Access Point ttk 3.00 0.00 0.00Instalasi Stop Kontak u/ Wireless Access Point ttk 3.00 0.00 0.00
Lantai 4 :Instalasi Wireless Access Point ttk 3.00 0.00 0.00Instalasi Stop Kontak u/ Wireless Access Point ttk 3.00 0.00 0.00
Lantai 5 :Instalasi Wireless Access Point ttk 3.00 0.00 0.00Instalasi Stop Kontak u/ Wireless Access Point ttk 3.00 0.00 0.00
Instalasi Outlet Data RJ.45 ttk 1.00 0.00 0.00Instalasi Wireless Access Point ttk 3.00 0.00 0.00Instalasi Stop Kontak u/ Wireless Access Point ttk 3.00 0.00 0.00
Testing dan Commisioning It 1.00 0.00 0.00
Sub Total Pekerjaan Sistern Data dan Internet 0.00
4 Pekerjaan Sistem Fire Alarm
Peralatan Utama Sisatem Fire Alarm
MCFA Kapasitas 20 Zone,semiAdressable.MDF - Fire Alarm.
Rectifire Back Up ( Battery Charge )Dan semua kelengkapannya. set 1.00 0.00 0.00
Sub Total Pekerjaan Sistem Fire Alarm 0.00
5 Instalasi Fire Alarm
Lantai Basement :Instalasi Ttk Smoke/ Head Detektor. ttk 19.00 0.00 0.00Pengadaan dan pemasangan Smoke Det bh 1.00 0.00 0.00Pengadaan dan pemasangan Heat Det bh 18.00 0.00 0.00Manual Call Point bh 0.00 0.00 0.00Alarm Bell bh 2.00 0.00 0.00Breaking Glass bh 2.00 0.00 0.00
Lantai 6:
ZoneAnnuciator.
NO. URAIAN PEKERJAAN SAT. VOLUME HARGA SATUAN(Rp.)
JUMLAH MCSP(Rp.)
TOTAL MCSP(Rp.)
Indikator Lamp bh 2.00 0.00 0.00End Of Line bh 1.00 0.00 0.00
Lantai Dasar :Instalasi Ttk Smoke/ Head Detektor. ttk 17.00 0.00 0.00Pengadaan dan pemasangan Smoke Det bh 15.00 0.00 0.00Pengadaan dan pemasangan Heat Det bh 2.00 0.00 0.00Manual Call Point bh 0.00 0.00 0.00Alarm Bell bh 2.00 0.00 0.00Breaking Glass bh 2.00 0.00 0.00Indikator Lamp bh 2.00 0.00 0.00End Of Line bh 1.00 0.00 0.00
Lantal Mezzanine :Instalasi Ttk Smoke/Head Detektor. ttk 13.00 0.00 0.00Pengadaan dan pemasangan Smoke Det bh 13.00 0.00 0.00Manual Call Point bh 2.00 0.00 0.00Alarm Bell bh 1.00 0.00 0.00Breaking Glass bh 1.00 0.00 0.00Indikator Lamp bh 1.00 0.00 0.00End Of Line bh 1.00 0.00 0.00
Instalasi Ttk Smoke/Head Detektor. ttk 22.00 0.00 0.00Pengadaan dan pemasangan Smoke Det bh 7.00 0.00 0.00Pengadaan dan pemasangan Heat Det bh 15.00 0.00 0.00Manual Call Point bh 2.00 0.00 0.00Alarm Bell bh 2.00 0.00 0.00Breaking Glass bh 2.00 0.00 0.00Indikator Lamp bh 2.00 0.00 0.00End Of Line bh 1.00 0.00 0.00
Lantai 2 :Instalasi Ttk Smoke/Head Detektor. ttk 22.00 0.00 0.00Pengadaan dan pemasangan Smoke Det bh 7.00 0.00 0.00Pengadaan dan pemasangan Heat Det bh 15.00 0.00 0.00Manual Call Point bh 2.00 0.00 0.00Alarm Bell bh 2.00 0.00 0.00Breaking Glass bh 2.00 0.00 0.00Indikator lamp bh 2.00 0.00 0.00End Of Line bh 1.00 0.00 0.00
Lantai 3 :Instalasi Ttk Smoke/Head Detektor. ttk 22.00 0.00 0.00Pengadaan dan pemasangan Smoke Det bh 7.00 0.00 0.00Pengadaan dan pemasangan Heat Det bh 15.00 0.00 0.00Manual Call Point bh 2.00 0.00 0.00Alarm Bell bh 2.00 0.00 0.00Breaking Glass bh 2.00 0.00 0.00Indikator Lamp bh 2.00 0.00 0.00End Of Line bh 1.00 0.00 0.00
Lantai 4 :Instalasi Ttk Smoke/Head Detektor. ttk 22.00 0.00 0.00Pengadaan dan pemasangan Smoke Det bh 7.00 0.00 0.00Pengadaan dan pemasangan Heat Det bh 15.00 0.00 0.00Manual Call Point bh 2.00 0.00 0.00Alarm Bell bh 2.00 0.00 0.00Breaking Glass bh 2.00 0.00 0.00Indikator Lamp bh 2.00 0.00 0.00End Of Line bh 1.00 0.00 0.00
Lantai 5 :Instalasi Ttk Smoke/Head Detektor. ttk 22.00 0.00 0.00Pengadaan dan pemasangan Smoke Det bh 7.00 0.00 0.00Pengadaan dan pemasangan Heat Det bh 15.00 0.00 0.00Manual Call Point bh 2.00 0.00 0.00Alarm Bell bh 2.00 0.00 0.00Breaking Glass bh 2.00 0.00 0.00Indikator Lamp bh 2.00 0.00 0.00End Of Line bh 1.00 0.00 0.00
Lantai 6 :Instalasi Ttk Smoke/Head Detektor. ttk 11.00 0.00 0.00Pengadaan dan pemasangan Smoke Det bh 4.00 0.00 0.00Pengadaan dan pemasangan Heat Det bh 7.00 0.00 0.00Manual Call Point bh 2.00 0.00 0.00Alarm Bell bh 2.00 0.00 0.00Breaking Glass bh 2.00 0.00 0.00Indikator Lamp bh 2.00 0.00 0.00End Of Line bh 1.00 0.00 0.00
Lantai 1:
NO. URAIAN PEKERJAAN SAT. VOLUME HARGA SATUAN(Rp.)
JUMLAH MCSP(Rp.)
TOTAL MCSP(Rp.)
Testing dan Commisioning It 1.00 0.00 0.00
Sub Total Instalasi Fire Alarm 0.00
6 Pekerjaan Sistem CCTV
Peralatan Utama sistem CCTV set 1.00 0.00 0.00
Auto switcherTV Monitor 22"Digital Video RecorderBack Up UPSDan kelengkapannya
Sub Total Pekerjaan Sistem CCTV 0.00
7 Instalasi dan pengadaan CCTV
Lantai Basement :Instalasi CCTV , coaxial RG 6 ttk 3.00 0.00 0.00Pengadaan dan pemasangan Dome Cmr bh 0.00 0.00 0.00Pengadaan dan pemasangan Fix Cmr bh 3.00 0.00 0.00
Lantai Dasar :Instalasi CCTV , coaxial RG 6 ttk 3.00 0.00 0.00Pengadaan dan pemasangan Dome Cmr bh 1.00 0.00 0.00Pengadaan dan pemasangan Fix Cmr bh 2.00 0.00 0.00
Lantai Mezzanine :Instalasi CCTV, coaxial RG 6 ttk 2.00 0.00 0.00Pengadaan dan pemasangan Dome Cmr bh 2.00 0.00 0.00Pengadaan dan pemasangan Fix Cmr bh 0.00 0.00 0.00
Lantai 1 :Instalasi CCTV , coaxial RG 6 ttk 2.00 0.00 0.00Pengadaan dan pemasangan Dome Cmr bh 2.00 0.00 0.00
Instatasi CCTV , coaxial RG 6 ttk 2.00 0.00 0.00Pengadaan dan pemasangan Dome Cmr bh 2.00 0.00 0.00
Lantai 3 ;Instalasi CCTV, coaxial RG 6 ttk 2.00 0.00 0.00Pengadaan dan pemasangan Dome Cmr bh 2.00 0.00 0.00
Lantai 4 :Instalasi CCTV , coaxial RG 6 ttk 2.00 0.00 0.00Pengadaan dan pemasangan Dome Cmr bh 2.00 0.00 0.00
Lantai 5 :ttk 2.00 0.00 0.00
Pengadaan dan pemasangan Dome Cmr bh 2.00 0.00 0.00
Instalasi CCTV , coaxial RG 6 ttk 3.00 0.00 0.00Pengadaan dan pemasangan Dome Cmr bh 2.00 0.00 0.00Pengadaan dan pemasangan Fix Cmr bh 1.00 0.00 0.00
Testing dan Commisioning It 1.00 0.00 0.00
Sub Total Instalasi dan pengadaan CCTV 0.00
8 Pekerjaan Sistem MATV
* Provider TV Comersial scope Managementkontraktor hanya sampai input cable ygtertera di RAB bawah
Lantai Basement :Instalasi MAW Main Line RG 6 ttk 1.00 0.00 0.00Instalasi Outlet MAN RG 59 ttk 1.00 0.00 0.00Splitter 4 way bh 1.00 0.00 0.00Coupler 4 way bh 1.00 0.00 0.00Main Booster •bh 0.00 0.00 0.00
Lanai Oasar :Instalasi MAW Main Line RG 6 ttk 2.00 0.00 0.00Instalasi Outlet MAN RG 59 ttk 1.00 0.00 0.00Splitter 4 way bh 1.00 0.00 0.00
bh 1.00 0.00 0.00
Lantai 2:
InstalasiCCTV , coaxial RG 6
Lantai 6:
Coupler 4 way
NO. URAIAN PEKERJAAN SAT. VOLUME HARGA SATUAN(Rp.)
JUMLAH MCSP(Rp.)
TOTAL MCSP(Rp.)
Main Booster bh 0.00 0.00 0.00
Lantai Mezzanine :Instalasi MAW Main Line RG 6 ttk 3.00 0.00 0.00Instalasi Outlet MAN RG 59 ttk 2.00 0.00 0.00Splitter 4 way bh 1.00 0.00 0.00Coupler 4 way bh 1.00 0.00 0.00Main Booster bh 0.00 0.00 0.00
Instalasi MAN Main Line RG 6 ttk 15.00 0.00 0.00Instalasi Outlet MAW RG 59 ttk 15.00 0.00 0.00Splitter 4 way bh 1.00 0.00 0.00Coupler 4 way bh 4.00 0.00 0.00
Lantai 2 :Instalasi MAW Main Line RG 6 ttk 15.00 0.00 0.00Instalasi Outlet MAW RG 59 ttk 15.00 0.00 0.00Splitter 4 way bh 1.00 0.00 0.00Coupler 4 way bh 4.00 0.00 0.00
Lantai 3 :Instalasi MAW Main Line RG 6 ttk 15.00 0.00 0.00Instalasi Outlet MAN RG 59 ttk 15.00 0.00 0.00
bh 1.00 0.00 0.00Coupler 4 way bh 4.00 0.00 0.00
Lantai 4 :Instalasi MAW Main Line RG 6 ttk 15.00 0.00 0.00Instalasi Outlet MAW RG 59 ttk 15.00 0.00 0.00Splitter 4 way bh 1.00 0.00 0.00Coupler 4 way bh 4.00 0.00 0.00
Lantai 5 :Instalasi MAW Main Line RG 6 ttk 15.00 0.00 0.00Instalasi Outlet MAW RG 59 ttk 15.00 0.00 0.00Splitter 4 way bh 1.00 0.00 0.00Coupler 4 way bh 4.00 0.00 0.00
Lantai 7 :Instalasi MAW Main Line RG 6 ttk 5.00 0.00 0.00
ttk 5.00 0.00 0.00Splitter 4 way bh 1.00 0.00 0.00Coupler4way bh 1.00 0.00 0.00
Testing dan Commisioning It 1.00 0.00 0.00
Sub Total Pekerjaan Sistem MATV 0.00
9 Pekerjaan Sistem dan Tata Suara.
Peralatan Utama Sistem Tata Suara.Central Terminal Box - CTB set 1.00 0.00 0.00EqualizerPower Amplifier 240 WPre-AmplifierMixerTunerCD/DVD/MP3 PlayerRemote Microphone (RM-200)Remote MicrophoneRak cabinetPengkabelan peralatan utama diruang kontrolPekerjaan grounding sistem
Sub Total Pekerjaan Sistem dan Tata Suara 0.00
Lantai Basement :Instalasi Tata Suara ttk 12.00 0.00 0.00Horn Speaker 5 watt bh 3.00 0.00 0.00Ceiling Speaker 3 watt bh 9.00 0.00 0.00Junction Box S5 bh 1.00 0.00 0.00
Lantai Dasar :Instalasi Tata Suara ttk 15.00 0.00 0.00Ceiling Speaker 3 watt bh 1.00 0.00 0.00Wall Speaker bh 1.00 0.00 0.00Volume Control bh 3.00 0.00 0.00Pengadaan dan Pemasangan Consieur Mic. bh 3.00 0.00 0.00Junction Box SS bh 1.00 0.00 0.00
Lantai Mezanine :Instalasi Tata Suara ttk 14.00 0.00 0.00Ceiling Speaker 3 watt bh 14.00 0.00 0.00Wall Speaker bh 1.00 0.00 0.00Pengadaan dan Pemasangan Consieur Mic. bh 1.00 0.00 0.00
Lantai 1:
Splitter 4 way
InstalasiOutlet MAW RG 59
NO. URAIAN PEKERJAAN SAT. VOLUME HARGA SATUAN(Rp.)
JUMLAH MCSP(Rp.)
TOTAL MCSP(Rp.)
Junction Box SS bh 1.00 0.00 0.00
Lantai 1:Instalasi Tata Suara ttk 8.00 0.00 0.00Ceiling Speaker 3 watt bh 7.00 0.00 0.00Wall Speaker bh 1.00 0.00 0.00Volume Control. bh 1.00 0.00 0.00Junction Box SS bh 1.00 0.00 0.00
Lantai 2:Instalasi Tata Suara ttk 8.00 0.00 0.00Ceiling Speaker 3 watt bh 7.00 0.00 0.00Wall Speaker bhVolume Control. bh 0.00 0.00 0.00Junction Box SS bh 1.00 0.00 0.00
Lantai 3:Instalasi Tata Suara ttk 8.00 0.00 0.00Ceiling Speaker 3 watt bh 7.00 0.00 0.00Wall Speaker bhVolume Control. bh 0.00 0.00 0.00Junction Box SS bh 1.00 0.00 0.00
Lantai 4:Instalasi Tata Suara ttk 8.00 0.00 0.00Ceiling Speaker 3 watt bh 7.00 0.00 0.00Wall Speaker bhVolume Control. bh 0.00 0.00 0.00
bh 1.00 0.00 0.00
Lantai 5:Instalasi Tata Suara ttk 8.00 0.00 0.00Ceiling Speaker 3 watt bh 7.00 0.00 0.00Wall Speaker bhVolume Control. bh 0.00 0.00 0.00Junction Box SS bh 1.00 0.00 0.00
Lantai 6:Instalasi Tata Suara ttk 8.00 0.00 0.00Ceiling Speaker 3 watt bh 7.00 0.00 0.00Wall Speaker bhVolume Control. bh 1.00 0.00 0.00Junction Box SS bh 1.00 0.00 0.00
Testing dan Commisioning k 1.00 0.00 0.00
Sub Total Pekerjaan Sistem dan Tata Suara 0.00
TOTAL PEKER/AAN ELEKTRONIKA 0.00
JunctionBox SS
RENCANA ANGGARAN BIAYA
RENCANA ANGGARAN BIAYAPROYEK : HOTEL GRAND SQUARELOKASI : BLOK M JAKARTA SELATANPEKERJAAN : LIFT SYSTEMS
NO. URAIAN PEKERJAAN SAT. VOLUME TOTAL
A PEKERIAAN LIFT PASENGERPERALATAN UTAMA UTILITY ROOM UNIT 2 0.00 0.00SISTIM LIFTLF.PANEL P-01FUNCTIONTYPECAPACITY : PASENGERSPEED : TRACTION, MACHINE ROOMPOWER CONTROL : 15 PERSON / 1000 KGOPERATION CONTROL : AC - WWFNOMBER4 FLOOR SERVED : DUPLEWX: 9 LANTAI
SUB - PEKERJAAN LIFT PASSENGER 0.00
B PEKERIAAN LIFT BARANG UNIT 1 0.00 0.00
SUB - PEKERJAAN LIFT BARANG 0.00
0.00
HARGA SATUAN(Rp.)
JUMLAH (Rp.)
RENCANA ANGGARAN BIAYA
RENCANA ANGGARAN BIAYA
PROYEK : HOTEL GRAND SQUARE
LOKASI : BLOK M JAKARTA SELATAN
PEKERJAAN : KOLAM RENANG
NO. URAIAN PEKERJAAN SAT. VOLUME KETERANGAN
A. Peralatan Utama Kolam Renang
Pengadaan dan pemasangan Peralatan Utama Kolam
Renang, lengkap terpasang dengan alat bantu dan
accessories yang diperlukan sesuai dengan gambar
perencanaan dan spesifikasi teknis.
1 Pompa Sirkulasi Kolam (PS-KL) unit 2.00
- Kapasitas : 12 M'/Jam, 12 M, 2 x 1,5 KW
- Tipe : End Suction
- Operasi : Paralel
- Lokasi : Ruang Pompa Kolam Renang
2 Sand Filter (SF-01 & 02) unit 2.00
- Tipe : Vertical Cylinder
- Lokasi : Ruang Pompa Kolam Renang
3 Main Drain (MD-01A & B) unit 2.00
- Tipe : Frame & Grille
Dimensi : 300 x 300
Lokasi : Kolam Renang
4 Inlet Fitting Kolam Dewasa (IF-01) unit 6.00
- Kapasitas : 60 LPM
- Tipe : Botton Inlet
- Operasi : Paralel
- Lokasi : Kolam Renang
- Material : A B S
5 Vaccum Suction (VS - 01) unit 2.00
- Kapasitas : LPM
- Tipe : Wall Inlet
- Operasi : Paralel
- Lokasi : Kolam Renang
- Material : A B S
8 Dosing Pump (DSP-01) unit 1.00
- Kapasitas : 10,0 Ltr/Jam, 200 W
- Tipe : End Suction
- Operasi : Single
- Lokasi : Ruang Pompa
Sub Total - A.1 0.00
HARGA SATUAN(Rp.)
JUMLAH (Rp.)
Kapasitas : 2 x 12 M3/Jam
- Diameter : m 700 MM
NO. URAIAN PEKERJAAN SAT. VOLUME KETERANGANHARGA SATUAN(Rp.)
JUMLAH (Rp.)
B. Pekerjaan Instalasi Pompa
1 Ruang Pompa
a Pemipaan Air Kolam Renang
Pengadaan dan pemasangan Pipa Air Kolam Renang
bahan pipa PVC Class AW, lengkap terpasang dengan
alat bantu dan accessories yang diperlukan sesuai
dengan gambar perencanaan dan spesifikasi teknis.
- Pipa Air Kolam Renang dia. 100 (Header) 1 to 6.00
m 12.00
- Pipa Air Kolam Renang dia. 80 m 2.00
m 25.00
to 5.00
- Material Bantu + Fitting lot 1.00
b Valve-Valve
Pengadaan dan pemasangan Valve-Valve, lengkap
terpasang dengan alat bantu dan accessories yang
diperlukan sesuai dengan gambar perencanaan dan
spesifikasi teknis.
- Ball Valve dia. 65 bh 4.00
- Gate Valve dia. 80 bh 1.00
- Gate Valve dia.65 bh 7.00
bh 1.00
bh 2.00
- Check Valve dia. 50 bh 1.00
- Flexible Joint dia. 65 bh 4.00
- Material Bantu lot 1.00
Sub Total - B.1 0.00
2 Pekerjaan Instalasi Kolam Renang
a Pemipaan Kolam Renang
Pengadaan dan pemasangan Pipa Kolam Renang
bahan pips PVC Class AW, lengkap terpasang dengan
alat bantu dan accessories yang diperlukan sesuai
dengan gambar perencanaan dan spesifikasi teknis.
- Pipa Kolam Renang (I) 80 (Pips Drain R,Pompa) m 58.00
m 12.00
m 141.00
m 127.00
m 52.00
- Material Bantu + Fitting lot 1.00
Sub Total - B.2 0.00
Sub Total - B (B.1 + B.2) 0.00
C. Testing & Commissioning 1.00
Sub Total - C 0.00
- Pipa Air Kolam Renang dia. 65 (Instalasi Pompa)
- Pipa Air Kolam Renang dia. 65
- Pipa Air Kolam Renang dia. 50
- Gate Valve dia. 50
- Check Valve dia. 65
- Pipa Kolam Renang m 80
- Pipa Kolam Renang m 65
- Pipa Kolam Renang m 50
- Pipa Kolam Renang m 25
lot
NO. URAIAN PEKERJAAN SAT. VOLUME KETERANGANHARGA SATUAN(Rp.)
JUMLAH (Rp.)
D. Peralatan Utama Elektrikal
1 Pengadaan dan pemasangan Peralatan Utama
Elektrikal lengkap terpasang dengan alat bantu dan accessories
a PP-KR (Panel Lighting Kolam Renang) unit 1.00
b P.KR (Panel Kolam Renang) unit 1.00
2 Pengkabelan
Pengadaan dan pemasangan Kabel Feede lengkap
terpasang dengan alat bantu dan accessories
a Penarikan Kabel Feeder dari LVMDB ke :
- P KR (Panel Kolam Renang) NYY 4 x 10 mm'+ BC 10 mm' m 30.00
b Penarikan Kabel Feeder dad P KR ke :
- PS - KL01A NYY 4 x 2,5 mm2 + E m 8.00
- PS - KL.O1B NYY 4 x 2,5 mm2 + E m 7.00
- DSP - 01 NYY 3 x 2,5 mm2 m 10.00
- P1 - L2 NYY 4 x 6 mm2 + BC 6 mm2 m 10.00
3 Pekerjaan Instalasi Penerangan
Pengadaan dan pemasangan Instalasi Penerangan &
Stop Kontak, Iengkap terpasang dengan alat bantu dan accessories
UWW - 2 x - Hal QR - CBC 51/50 W/12 V/GU 5,3/24 Deg bh 4.00
UWW - 1 x - Hal. Qt- ax 12V/2 x 100W/4400 LM bh 4.00
Instalasi Penerangan NYY 3 x 2,5 mm' (PVC Cond 0 20) m 48.00
4 Testing & Commissioning lot 1.00
Sub Total - D 0.00
TOTAL PEKERJAAN ELEKTRIKAL KOLAM RENANG 0.00
MATERIAL LIST
PROYEK : HOTEL GRAND SQUARELOKASI : BLOK M JAKARTA SELATANPEKERJAAN : STRUKTUR, ARSITEKTUR & MEKANIKAL ELEKTRIKAL
NO. U R A I A N MATERIAL1 2 3A BAHAN AGREGAT KASAR & BAHAN PEREKAT1 Tanah Urug Ex. Lokal
2 Tanah Urug/Dari Luar lokasi Ex. Lokal
3 Abu batu Ex. Lokal
4 Pasir urug Ex. Lokal
5 Pasir pasang Ex. Lokal
6 Pasir beton Ex. Lokal
7 Pasir batu ( sirtu ) Ex. Lokal
8 Batu belah pondasi Ex. Lokal
9 Batu pecah mesin 1/2 Ex. Lokal
10 Batu pecah mesin 2/3 Ex. Lokal
11 Batu pecah mesin 3/5 Ex. Lokal
12 Batu pecah mesin 5/7 Ex. Lokal
13 Batu pecah mesin 7/10 Ex. Lokal
14 Batu belah pondasi Ex. Lokal
15 Batu apung Ex. Lokal
16 Batu templek hitam Ex. Lokal
17 Batu templek hijau Ex. Lokal
18 Batu templek Palimanan Ex. Lokal
19 Batu pares Ex. Lokal
20 Batu candi Ex. Cina
21 Batu granit Ex. Tiga Roda
22 Semen Tiga Roda Ex. Tiga Roda
23 Semen putih Ex. Lokal
24 Semen warna muda Ex. Lokal
25 Semen etiarna tua Ex. Lokal
26 Semen warna khusu s ( biru ) Ex Mortar Utama
27 Semen MU 380 Ex Mortar Utama
28 Semen MU 100 Ex Mortar Utama
29 Semen MU 200 Ex. Lokal
30 Lem kuning Ex. Lokal
31 Lem putih fox Ex. Lokal
32 Lem Vaal Ez Adhimix / Holcim
33 Baton Ready Mix K-175 Ez Adhimix / Holcim
34 Beton Ready I ',Aix K-225 Ez Adhimix / Holcim
35 Baton Ready Mix K-250 Ex. Cikarang
B BAHAN PENUTUP DINDING1 Bata rnerah Ex. Cikarang
2 Hebel Ex. Indo Blok / Grand Hebel
3 Bata merah dekoratif Ex. Cisangkan
4 Bata pelapis dinding Ex. Cisangkan
5 Batako kecil uk. 10 x 20 x 8 Ex. Lokal
6 Batako besar uk. 20 x 40 x 8 Ex. Lokal
NO. U R A I A N MATERIAL1 2 37 Bata terawang / rooster Ex. Lokal
8 Baton rooster, uk. 20 x 20 cm Ex. Lokal
4 Beton dekoratif uk. 10 x 20 x 40 Ex. Lokal
10 Baton conblock (CB. 10 ) Ex. Lokal
11 Baton conblock ( CB. 15 ) Ex. Lokal
12 Beton conblock ( CB. 20) Ex. Lokal
13 Batacote Ex. Lokal
14 Ijuk (20 kg / m2)
15 BiIik, tanpa hinis
16 BiIik Dekoratif
C BAHAN LOGAM1 Besi baton U 24 rata rata uk dia. 8 s/d 16 mm Ex. Toyo Giri / Ms
2 Besi baton U-24, rata - rata uk. dia 19 s/d 22 mm Ex. Toyo Giri / Ms
3 Besi baton ulir, rata - rata uk. dia 12 s/d 22 mm Ex. Toyo Giri / Ms
4 Besi profit siku, rata rata ex DN-SII Ex. garuda
5 Besi profil 1\.A/F-, rata - rata ex DN-SII Ex. garuda
6 Besi kanal "C" s/d. 150.65.20.3,2 Ex. garuda
7 Besi kanal "C" 200.75.20.3,2 Ex. garuda
8 Besi Strip, uk. 3 x 30 mm x 6 m ( 4,21 Kg) Ex. garuda
9 Seng BJLS 0.20, I = 55 cm (1 rol = 50 m') Ex. Lok Fom
10 Seng BJLS 0.30, I = 55 cm (1 rol = 50 m') Ex. Lok Fom
11 Seng plat BJLS 25 uk. 90 x 180 cm Ex. Lok Fom
12 Seng plat BJLS 30 uk. 90 x 180 cm Ex. Lok Fom
13 Seng gelombang BJLS 25 uk. 0.90 x 1.80 m Ex. Lok Fom
14 Seng gelombang BJLS 30 uk. 0.90 x 1.80 m Ex. Lok Fom
15 Kawat baton
16 Kawat duri (1 rol = 25 m' )
17 Kawat raam
18 Kawat nyamuk hijau Ex. lokal
19 Kawat elektrode Ex. lokal
20 Ex. lokal
21 Ex. lokal
22 Ex. lokal
23 Almunium plat 0,50 mm ( 1.00 x 2.00) Ex. lokal
24 Almunium kusen (3") Ex. Indal
25 Ex. Indal
26 Wiremesh M6
27 Wiremesh M7
28 Wire-mesh M8
29 Floor Deck
30 Kawat las listrik Ex. lokal
31 Kawat las karbit Ex. lokal
32 Baud dan Mur HTM M16 (HTB) Ex. Sinar laut
33 Baud dan Mur HTM M19 (HTB) Ex. Sinar laut
34 Baud dan Mur HTM M22 (HTB) Ex. Sinar laut
35 Baud dan Mur HTM M25 (HTB) Ex. Sinar laut
36 Rolling door biasa, Type Grill aluminium
37 Rolling door biasa, Type Selat aluminium
38 Rolling door biasa, Type one sheet
Ex. Toyo Giri / Ms
Ex. Toyo Giri / Ms
Ex. Toyo Giri / Ms
Almunium plat 0,25 mm ( 1.00 x 2.00)
Almunium plat 0,30 mm (1.00 x 2.00)
Almunium plat 0,40 mm ( 1.00 x 2.00)
Almunium kusen ( 4")
Ex. Toyo Giri / Ms
Ex. Toyo Giri / Ms
Ex. Toyo Giri / Ms
Ex Union Metal
NO. U R A I A N MATERIAL1 2 339 Raillingtangga besi stainless
40 Paku 1/2 - 1" Ex. lokal
41 Paku uk. 2" - 5" Ex. lokal
42 Paku uk. 3" - 6" Ex. lokal
43 Paku anti karat u/ genteng metal ( 35.00 m2 /kg ) Ex. lokal
44 Paku seng Ex. lokal
45 Hak kait asbes 7 cm lengkap Ex. lokal
46 Paku gipsump ( 20.00 m2 / kg) Ex. lokal
47 Paku sekrup Ex. lokal
D BAHAN PENGUNCI / PENGGANTUNG DAN KACA
1 Engsel pinto nylon besar
2 Engsel pinto nylon kecil
3 Engsel jendela biasa
4 Engsel angin
5 Grendel jendela ( spring knip
6 Grande) jendela biasa
7 Crendel pinto biasa (selot )
8 Grendel tanam pintu Banda (espagnolet )
9 Hak angin stainless
10 Hak angin kart biasa
11 Ku ci pinto antik Type besar
12 Kunci pinto Union Type besar
13 Kunci pintu Union Type kecil
14
15 Kunci pinto Cap KUDA TEREANG Type kecil
16 Kunci pinto SEIS Type besar
17 Kunci pinto SEIS Type kecil
18 Kunci pinto silinder
19 Kunci pintu KNI/VJC, ALPHA
20 Kunci pinto Leman
21 Ret pinto dorong Marathon ( i pintu )
22 Kaca polos 3 mm Ex. Asahi mas
23 Kaca polos 5 mm Ex. Asahi mas
24 Kaca raybend 3 mm Ex. Asahi mas
25 Kaca raybend 5 mm Ex. Asahi mas
26 Kaca es 3 mm Ex. Asahi mas
27 Kaca es 5 mm Ex. Asahi mas
E BAHAN KAYO J KAYU LAPIS DAN PLAFOND
1 Kayu balok Albasia
2 Kayu papan Albasia
3 Kayu balok Borneo
4 Kayu papan Borneo, uk. 3/20 cm
5 Kayu balok Borneo super ( Meranti)
6 Kayu papan Borneo super ( Meranti) uk. 3/20 cm
7 Kayu papan Borneo super ( Meranti ) uk.3/30 cm
8 Kayu balok kamper Medan ( kruing )
9 Kayu balok kamper Banjar
Kano pintu Cap KUDA TERBANG Type besar
NO. U R A I A N MATERIAL1 2 310 Kayu papan kamper Banjar, uk. 3/20 cm
11
12 Kayu balok kamper Samarinda
13 Kayu papan kamper Samarinda, uk. 3/20 cm
14 Kayu balok jati Jawa Barat15 Kayu papan jati Jawa Barat16 Kayu kaso Borneo uk. 5/7 - 4. 00 m'17 Dolken dia 5 s/d 7 cm18 Dolken dia 8 s/d 10 cm19 Bambu dia 5 - 7 Cm20 Bambu dia 7 - 10 Cm21 Bambu Gombong22 Triplek 3 mm, uk. 1,20 x 2,40 Ex. Lokal
23 Triplek 4 mm, uk. 1,20 x 2,40 Ex. Lokal
24 Triplex 6 mm, uk. 1,20 x 2,40 Ex. Lokal
25 Multiplek 9 mm, uk. 1,20 x2,40 Ex. Lokal
26 Multiplek 12 mm, uk. 1,20 x 2,40 Ex. Lokal
27 Multiplek 15 mm, uk. 1,20 x 2,40 Ex. Lokal
28 Multiplek 18 mm, uk. 1,20 x 2,40 Ex. Lokal
29 Teakwood 4 mm, uk. 1,20 x 2,4.0 Ex. Lokal
30 Melamin 4 mm, uk. 1,20 x 2,40 Ex. Lokal
31 Formika putih polos, uk. 1,20 x 2,4032 Formika motif, uk. 1,20 x 2,4033 Reng uk. 2/3 kayu Borneo Super ( Meranti)34 Reng uk. 3/4 kayu Borneo Super ( Meranti )35 Partikel board, 1,20 x 2,4036 Gipsum Jayaboard, uk. 1,20 x 2,40 Ex. Jayaboard
37 Dome Gipsump type Merak dia 85 cm38 Dome Gipsump type Bunga dia 90 cm39 Eternit cap Bola Dunia40 Eternit cap dua gajah41 Eternit hardflex 3 mm, uk. 1,20 x 2,4042 Eternit hardflex 5 mm, uk. 1,20 x 2,4043 List profil 2 x 2 cm44 List Profil 1 x 3 cm45 List Profil 1x5 cm46 List Kayu 1 x 4 cm47 List Kayu 1 x 5 cm48 List Kayu 2 x 4 cm49 List Gipsump 7 cm Ex. Lokal
50 List Gipsump 10 cm Ex. Lokal
51 List Gipsump 14 cm Ex. Lokal
F BAHAN PENUTUP ATAP.1 Genteng kodok natural, ex jatiwangi2 Genteng kodok glazuur, ex jatiwangi3 Genteng palentong natural, ex Jatiwangi4 Genteng palentong glazuur, ex Jatiwangi5 Genteng palentong super / besar natural, ex Jatiwangi6 Genteng palentong super / besar glazuur, ex Jatiwangi
Kayu papan kamper Banjar, uk.-3/3LI-cm
NO. U R A I A N MATERIAL1 2 37 Genteng beton natural, Rengganis8 Genteng beton warna, Rengganis9 Genteng Morando natural ex Jatiwangi10 Genteng Morando glazuur ex Jatiwangi11 Genteng bubung segi tiga / bulat, natural12 Genteng bubung segi tiga / bulat, glazuur13 Genteng bubung beton natural Rengganis_14 Genteng bubung beton warna Rengganis15 Genteng bubung natural Morando16 Genteng bubung glazuur Morando
G BAHAN PENUTUP LANTAI.1 Keramik dinding 20/25, putih poles, Roman2 Keramik dinding 20/25 putih polos, Mulya Ex. Mulia
3 Keramik dinding 20/25, warna muda / corak, Roman4 Keramik dinding 20/20 warna muda / corak, Mulya Ex. Mulia
5 Keramik lantai 30 x30, putih polos Roman6 Keramik lantai 30 x30, putih polos Mulya Ex. Mulia
7 Keramik lantai 30 x30, warna polos Roman
8
9 Keramik lantai 30 x30 warna muda /corak Roman
10 Keramik lantai 20 x 20, warna poles Roman
11 Keramik lantai 20 x 20, warna poles Mulya Ex. Mulia
12 Keramik lantai 20 x 20, warna/corak Roman
13 Keramik lantai 20 x 20, warna/corak Mulya
14 Keramik lantai 60 x60 warna/corak Ex. Roman
15 Paving block natural, t = 6 cm. Ex. Lokal
16 Paving block warna, t = 6 cm. Ex. Lokal
17 Kaansteen uk. x 1 x 40 cm
18 Kaansteen uk. 10 x 20 x 40 cm
19 Kaansteen -61715 x 40 x 60 cm
20 Kaansteen uk. 17 x 28 x 60 cm
H BAHAN FINISHING.
1 Cat dasar tembok, Indo 9000 Sealer Water Base Ex. Vinilex/ Propain
2 Cat tembok Sanlex
3 Cat tembok Sanlex Wonder Ex. Vinilex/ Propain
4 Cat tembok Vinilex
5 Cat tembok Wiratex
6 Cat kayu / besi Seiv
7 Cat kayu/ besi Avian Ex. Vinilex/ Propain
8 WATERPROOFING (NO DROP)
9 WATER PROOFING (AQUA PROF)
10 MENI BESI
11 Meni kayu / besi Bola mas
12 Soda Coustic
13 Cat sinchromate Bola mas
14 PlInt coat
15 Dempul tembok ( plamuur ) Sanlex
16 Dempul kayu cap kucing
Keramik lantai 30 x30, warna polos Mulya
NO. U R A I A N MATERIAL1 2 317 Dempul halos Impra
18 Dempul Mir
19 Terpentin ( minyak cat )
20 Solignem ( 1 biek = 10 liter )
21 Thiner A
22 Thiner B
23 Oker
24 Oten ( pewarna plituran )
25 Sirlak ex India
26 Spirtus
27 Poiitur
28 Politer jadi Ultran
29 Teak Oil
30 Vern i s
31 Kertas emples kayu / tembok
32 Kape kayu 2"
33 Kape tembok
34 kolas 3" - 4"
35 Roll cat
36 Minyak bekisting
37 Seal tape
I BAHAN PERPIPAAN.
1 Pipa hitam kias Medium dia 1
2 Pipa hitam klas Medium dia 1 1/4
3 Pipa hitam kias Medium dia 1 1/2 "
4 F ipa hitam kias Medium 2 " dia
5 Pipa hitam kias Medium dia 2 1/2
6 Pipa hitam kias Medium dia 3 "
7 Pipa hitam kias Medium dia 4 "
8 Pipa hitam kias Medium dia 5 "
9 Pipa hitam kias Medium dia 6 "
10 Pipa pralon PVC. ( AW ) dia 1/2 ", sekualitas Maspion ( Abu - abu
11 Pipa pralon PVC. (AW ) dia 3/4 ", sekualitas Maspion ( Abu - abu )
12 Pipa pralon PVC. (AW ) dia 1 ", sekualitas Maspion ( Abu - abu )
13 Pipa pralon PVC. (AW) dia 1 1/4 ", sekualitas Maspion ( Abu - abu
14 Pipa pralon PVC. (AW ) dia 1 1/2 ", sekualitas Maspion ( Abu - abu )
15 Pipa pralon PVC. ( AW ) dia 2 ", sekualitas Maspion ( Abu - abu )
16 Pipa pralon PVC. (AW) dia 2 1/2 ", sekualitas Maspion ( Abu - abu )
17 Pipa pralon PVC. ( AW ) dia 3 ", sekualitas Maspion ( Abu - abu )
18 Pipa pralon PVC. ( AW ) dia 4 ", sekualitas Maspion ( Abu - abu )
19 Pipa pralon PVC. (AW ) dia 5 ", sekualitas Maspion ( Abu - abu )
20 Pipa pralon PVC. ( D ) dia 1 1/2 ", sekualitas Maspion
21 Pipa pralon PVC. ( D) dia 2 ", sekualitas Maspion
22 Pipe pralon PVC. ( D ) dia 2 1/2 ', sekualitas Maspion
23
24 Pipa pralon PVC. ( D ) dia 4 ", sekualitas Maspion
25 Pipa pralon PVC. ( D) dia 5 ", sekualitas Maspion
26
27 Pipa slang PE, dia 3/4 "
Pipa pralon PVC. ( D) dia 3 "-sekualitas Maspion
Pipa slang PE, dia 1/2
NO. U R A I A N MATERIAL1 2 328 Pipa slang PE, dia 1
29 Buis beton dia 20 cm - 1.00 m
30
31
32 Grevel beton 1/2 dia 30 cm
J BAHAN / ALAT-ALAT SANITAIR1 Kloset jongkok porselen TOTO, standard lengkap, putih Ex. Toto
2 Kloset jongkok porselen INA, standard lengkap, putih
3 Kloset duduk porselen TOTO, standard lengkap, putih Ex. Toto
4 Kloset duduk porselen TOTO, standard lengkap, warna tua
5 Kloset duduk porselen INA, standard lengkap, warna tua
6 Kloset jongkok putih ex lokal
7 Urinoir lengkap standard ex TOTO Ex. Toto
8 Penyekat urinoir ex TOTO Ex. Toto
9 Bak mandi fibre glass, uk. Kecil
10 Bak mandi fibre glass, uk. Besar
11 Kran air lokal leher angsa dia 1/2 "
12
13
14 Floor drain Lokal
15 Pompa lift pump ex SANYO 100 watt
16 Pompa lift pump ex SANYO 150 watt
17 Pompa Jet pump SIMIZU Ex. Simizu
18 Pompa jetpump ex NATIONAL 450 watt
19 Tanki air fibre glass kap. 500 liter ex PINGUIN
20 Tanki air fibre glass kap. 1000 liter ex PINGUIN
21 Tanki air fibre glass kap. 2000 liter ex PINGUIN
K1 Tanah pupuk Ex. Lokal
2 Rumput
Buis betondia30cm-1.00m
31 -Grevel_beton1/2 dia 20 cm
Kran tembok Sun Ei dia 1/2 "
Kran tembok lokal dia 1/2
BAHAN PERTAMANAN
MATERIAL LIST
PROYEK : HOTEL GRAND SQUARELOKASI : BLOK M JAKARTA SELATANPEKERJAAN : STRUKTUR, ARSITEKTUR & MEKANIKAL ELEKTRIKAL
NO. NAMA MATERIAL SPESIFIKASI KONTRAK MATERIAL
I PEKERJAAN PLUMBING
1 Pompa Transfer, Pompa Booster Ebara. Wilo
2 Pompa Deepwell Grundfoss
3 Pompa Penguras Ebara
4 Pipa Air Kotor, Bekas, Hujan PVC Class AW Wavin, Pralon
5 Pipa Vent PVC Class D Wavin, Pralon
6 Fitting PVC Class D Rucika , CM
7 Pipa Air Bersih PPR PN10 SD, Wespex, Fushiotherm, Aquatherm
8 Pipa Air Panas PPR PN20 SD, Wespex, Fushiotherm, Aquatherm
9 Fitting PPR PN20 SD, Wespex, Fushiotherm, Aquatherm
10 Gate, Strainer, Check Valve Class 125/10K Kitz
11 Floating Valve Yuta
12 Flexible Joint Tozen, Afaflex
13 Pressure Gauge Nagano
14 Roof Drain, Floor Clean Out & Floor Way Riser (PVC) Kharisma, Antasan
15 Foot Valve Mizu
16 Heat Pump Midea, Wika
17 Roof Tank Whale, Sigma, Fibrite
18 Saniter Toto, American Standart
II PEKERJAAN HYDRANT SPRINKLER
1 Electric Fire Pump Ebara,Firebank Morse
2 Electric Jockey Fire Pump Grundfoss
3 Pipa Sprinkler & Hydrant Black Steel SCH 40 Spindo
4 Fitting Black steel JZ, HE,Riser, Ricon, Benkan
5 Gate, Strainer, Check Valve PN 16 Kitz
6 Flexible Joint Tozen, Afaflex
7 Pressure Gauge Nagano
8 Foot Valve Mizu
9 Pressure Switch Saeinomlya
10 Flow Switch Johnson,
11 Branch Control Valve Kitz
12 Main Control Valve Viking, Tyco
13 Flow Meter Model Tancap Blue-White
14 Automatic Air Vent untuk Plumbing & AC Samyang 10 K
15 Singer, Cla val, Watts
16 Indoor / Outdoor Hydrant Box Ojjeki, Hooseki
17 Fire Extinguisher Fireking Servo
PRV Pressure Relieve Valve
NO. NAMA MATERIAL SPESIFIKASI KONTRAK MATERIAL
III PEKERJAAN MVAC
1 Unit Air Conditioning LG Samsung
2 Exhaust Fan, Pressurised Fan Vanco, Katsu, CKE
3 Fipa Refrigerant Denji, Elgin
4 Isolasi Pipa tembaga / Drain Termaflex, Arm ex, Insuflex
5 Seng BJLS Lokforn, Fumira
6 Glass Wool AB Wool, ACI
7 Grille / Louvre Primawangi, Cattura, Cornfor aire
8 Flexible Duct
9 Kabel NYM Kabel Metal, Kabelindo, Voksel, Extrana
IV PEKERJAAN ELEKTRIKAL
1 Panel Tegangan Rendah Ega Tekelindo, Simetri, Indusmitra JapaPanel
2 Komponen Panel : fv1CB, MCCB Schneider, ABB, LS
3 Armature Lampu nterlite,lndahlite, Locolite
4 Balast, Lampu Philips, Osram
5 Saklar, Stop kontak MK, Clipsal
6 Balast, Lampu Philips, Osram
7 Kabel NYY, NYFGBY, NYM, NYA Kabel Metal, Kabelindo, Voksel, Extrana
8 Pipa Conduit PVC + Fitting Clipsal, Ega
9 Kable Tray & Fitting Spectra, Tri Abadi, Threestar, Sims Tray
10 Penangkal Petir EF, Erico, Viking
V PEKERIAAN SOUND SYSTEM
1 Power Amplifier, Mixer, Equalizer Bosch-Phillips, TOA
2 DVD Player Phillips, Pioner
3 Tuner FM Bosch-Phillips, TOA
BILL OF QUANTITYGRAND SQUARE HOTEL
BLOK M, JAKARTA SELATAN
PEKERJAAN : ARSITEKTUR
PT PROPELAT
BILL OF QUANTITYGRAND SQUARE HOTEL
BLOK M, JAKARTA SELATAN