BERITA ACARA KEMAJUAN PEKEJAANNo. :

Nomor Kontrak Kontrak Awal Tambah/Kurang Total

: 886/964/III/SPP/17.11.2009 : ### : Rp: ### (belum termasuk PPn 10%) (Rp)

Nama Rekanan Tanggal

: PT. KREASIBETON NUSAPERSADA : 17 Februari 2010

NO

URAIAN PEKERJAAN

VOLUME

SAT

HARGA SAT

JUMLAH

BOBOT (%) VOL

S. D. PERIODE LALU JUMLAH (Rp.) PROGG.BOBOT (%) VOL

REALISASI PERIODE INI JUMLAH (Rp.) PROGG.BOBOT (%) VOL

S. D. PERIODE INI JUMLAH (Rp.) PROGG.BOBOT (%)

A 1 2 B 3 4 5

MUTU BETON Harga 03 November s/d 13 Desember 2009 K-250 K-350 Harga 14 Desember 2009 s/d 28 Februari 2010 K-175 K-250 K-350

321.50 465.50 130.00 395.50 3085.00

M3 M3 M3 M3 M3

565,000 615,000 532,000 595,000 651,000

181,647,500 286,282,500 69,160,000 235,322,500 2,008,335,000

6.53 10.30 2.49 8.46 72.22

321.50 450.00 112.00 ###

181,647,500 276,750,000 66,640,000 1,845,259,500

100.00 96.67 28.32 91.88

6.5323 9.9524 2.3965 66.3584

-

-

-

-

321.50 450.00 112.00 ###

181,647,500 276,750,000 66,640,000 1,845,259,500

100.00 96.67 28.32 91.88

6.53 9.95 2.40 66.36

TOTAL

2,780,747,500

100.00

###

###

-

-

###

85.24

Disetujui oleh, PT. JAYA KONSTRUKSI MP, Tbk

Diperiksa oleh,

Diajukan oleh, PT. Kreasibeton Nusapersada

Ir. Shafril Yinurullah Kepala Proyek

Anas Yafid Kepala Teknik

Ir. Lazuardi Laitly Direktur

BERITA ACARA PEMBAYARANNo : 010/BAP/KRATON/IX/2010 Kontrak Awal No. Kontrak : Tanggal : Nilai Kontrak : Amandemen Kontrak No. Amandemen Tanggal Nilai Kontrak Akhir

886/964/III/SPP/17.11.2009 16 November 2010 Rp2,780,747,500 (Belum termasuk PPN 10%)

: 307/964/III/ADD.II/12.04.2010 : 08 April 2010 : Rp. 3.462.344.500 (Belum termasuk PPN 10%)

Pada hari ini Sabtu tanggal Tiga puluh satu bulan Juli tahun Dua Ribu Sepuluh (31-07-2010), yang bertanda tangan dibawah Nama : Perusahaan : Proyek : Jabatan : Alamat : Selanjutnya dalam Nama : Perusahaan : Jabatan : Alamat : Selanjutnya dalam Ir. Shafrill Yinurullah PT. Jaya Konstruksi Manggala Pratama, Tbk. Gd. Kantor DPRD Sumut Kepala Proyek Kantor Taman Bintaro Jaya Gedung B Jalan Bintaro Raya Jakarta 12330 berita acara ini disebut PIHAK PERTAMA Ir. Lazuardi Laitly PT. Kreasibeton Nusapersada Direktur Jl. P. Karimun Kav. 392 Kawasan Industri Medan II Mabar 20371 berita acara ini disebut PIHAK KEDUA

Berdasarkan Berita Acara Kemajuan Pekerjaan/Rekapitulasi Surat Jalan/Rekapitulasi Jam Kerja Alat tanggal Tiga puluh satu bulan Juli tahun Dua ribu sepuluh, prestasi kemajuan terhadap kontrak telah mencapai 97,68 % (perincian terlampir) Dengan demikian, berdasarkan Kontrak/Amandemen pasal 2 ayat 1 maka Pihak Kedua berhak menerima tagihan atas prestasi tersebut dengan perincian sebagai berikut : No a b c d e f g h i Uraian Prestasi Pembayaran uang muka Pembayaran MOS Potongan Retensi Jumlah I (a+b+c+d) Angsuran uang muka Angsuran MOS Pembayaran retensi Jumlah II (e+f+g) Total I - II PPN 10% Dibayarkan (h+i) Realisasi s/d saat ini % Rp. Err:508 Err:508 Realisasi s/d lalu % Rp. Err:508 Err:508 Dibayarkan saat ini % Rp. Err:508 22,253,000 Err:508 Err:508 Err:508 Err:508 Err:508

Err:508 Err:508

Err:508

Err:508 Err:508 Err:508

Err:508 Err:508 Err:508

Dibayarkan saat ini, terbilang : ( Dua puluh empat juta empat ratus tujuh puluh delapan ribu tiga ratus rupiah ) Demikian Berita Acara Pembayaran ini dibuat dengan sebenar-benarnya untuk digunakan sebagaimana mestinya.

Medan, 31 Juli 2010 PIHAK PERTAMA PT. Jaya Konstruksi Manggala Pratama, Tbk. PIHAK KEDUA PT. Kreasibeton Nusapersada

Ir. Shafrill Yinurullah Kepala Proyek

Ir. Lazuardi Laitly Direktur

BERITA ACARA KEMAJUAN PEKERJAANPekerjaan No. Surat Perjanjian Pekerjaan Tgl. Surat Perjanjian Pekerjaan : Beton Readymix : 886/964/III/SPP/17.11.2009 : 16 November 2010

Pada hari ini Sabtu tanggal Tiga puluh satu bulan Juli tahun Dua Ribu Sepuluh (31-07-2010), yang bertanda tangan dibawah i 1. Nama Jabatan : Ir. Shafrill Yinurullah : Kepala Proyek Bertindak untuk dan atas nama Jaya Konstruksi Manggala Pratama, Tbk. PT. selanjutnya disebut PIHAK PERTAMA : Ir. Lazuardi Laitly : Direktur Bertindak untuk dan atas nama Kreasibeton Nusapersada PT. Selanjutnya disebut PIHAK KEDUA

2. Nama Jabatan

Berdasarkan SPK No.886/964/III/SPP/17.11.2009 tanggal 16 November 2010 kedua belah pihak sepakat untuk mengadakan pemeriksaan bersama terhadap pekerjaan Beton readymix Proyek Gedung Kantor DPRD Medan dengan nilai kontrak Rp. 3.058.822.250,00 (terbilang : Tiga milyar lima puluh delapan juta delapan ratus dua puluh dua ribu dua ratus lima puluh rupiah ) Dari hasil pemeriksaan/penelitian terbukti bahwa pekerjaan PIHAK KEDUA telah mencapai 85.24%

Demikian Berita Acara Pemeriksaan Pekerjaan ini dibuat untuk dapat dipergunakan sebagaimana mestinya.

PIHAK PERTAMA PT. Jaya Konstruksi Manggala Pratama, Tbk.

PIHAK KEDUA PT. Kreasibeton Nusapersada

Ir. Shafrill Yinurullah Kepala Proyek

Ir. Lazuardi Laitly Direktur

BERITA ACARA SERAH TERIMA BARANGKontrak Awal No. Kontrak Tanggal Nilai Kontrak : 886/964/III/SPP/17.11.2009 : 16 November 2010 : Rp2,780,747,500.00 (Belum termasuk PPN 10%) Amandemen Kontrak No. Amandemen : Tanggal : Nilai Kontrak Akhir: (Belum termasuk PPN 10%)

Pada hari ini Sabtu tanggal Tiga puluh satu bulan Juli tahun Dua Ribu Sepuluh (31-07-2010), yang bertanda tangan dibawah 1. Nama Jabatan : Ir. Shafrill Yinurullah : Kepala Proyek Bertindak untuk dan atas nama Jaya Konstruksi Manggala Pratama, Tbk. PT. selanjutnya disebut PIHAK PERTAMA : Ir. Lazuardi Laitly : Direktur Bertindak untuk dan atas nama Kreasibeton Nusapersada PT. Selanjutnya disebut PIHAK KEDUA

2. Nama Jabatan

PIHAK KEDUA selaku pelaksana pekerjaan Pengadaan Beton K-250, K-350, K-450 Proyek GD Kantor DPRD Medan dengan ini melaksanakan SERAH TERIMA barang dengan perincian sebagai berikut : 1 Beton K-175 2 Beton K-250 3 Beton K-350 Jumlah 754.00 754.00 M2 M2 M2 M2

Demikian Berita Acara Serah Terima ini dibuat dengan sebenarnya untuk dapat digunakan sebagaimana mestinya

PIHAK PERTAMA PT. Jaya Konstruksi Manggala Pratama, Tbk.

PIHAK KEDUA PT. Kreasibeton Nusapersada

Ir. Shafrill Yinurullah Kepala Proyek

Ir. Lazuardi Laitly Direktur

PT. JAYA KONSTRUKSI MP. Tbk. PROYEK : GD. KANTOR DPRD SUMATRA UTARA PKP : 964

MONITORING BETONNO TANGGAL SAT1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 01-02-10 02-02-10 03-02-10 04-02-10 05-02-10 06-02-10 08-02-10 09-02-10 10-02-10 13-02-10 15-02-10 16-02-10 17-02-10 18-02-10 19-02-10 21-02-10 23-02-10 24-02-10 25-02-10 27-02-10 SUB TOTAL TOTAL M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3

SURAT JALAN K 175 K 250 K 35021.00 45.50 19.00 12.50 27.50 108.00 90.50 9.50 59.50 212.50 6.50 5.00 18.50 5.50 36.00 5.00 41.50 6.00 6.50 18.00 754.00 754.00

K 175

REALISASI K 250 K 35021.00 45.50 19.00 12.50 27.50 108.00 90.50 9.50 59.50 212.50 6.50 5.00 18.50 5.50 36.00 5.00 41.50 6.00 6.50 18.00 754.00 754.00

K 175-

DEVIASI K 250-

K 350

KET.- Harga baru - Harga baru - Harga baru - Harga baru - Harga baru - Harga baru - Harga baru - Harga baru - Harga baru - Harga baru - Harga baru - Harga baru - Harga baru - Harga baru - Harga baru - Harga baru - Harga baru - Harga baru - Harga baru - Harga baru - Harga baru -

BB.000218 BB.000218 BB.000219 BB.000219 BB.000219 BB.000219 BB.000220 BB.000220 BB.000220 BB.000220 BB.000225 BB.000225 BB.000225 BB.000225 BB.000227 BB.000227 BB.000227 BB.000227 BB.000228 BB.000228 BB.000229 BB.000229 BB.000229 BB.000229 BB.000233 BB.000233 BB.000233 BB.000233 BB.000234 BB.000234 BB.000237 BB.000237 BB.000237 BB.000237 BB.000241 BB.000241 BB.000241 BB.000242 BB.000242 BB.000258 BB.000258 BB.000258 BB.000258 BB.000258 BB.000260 BB.000261 BB.000261 BB.000261 BB.000262 BB.000262

BBETON.000001 BBETON.000001 BBETON.000001 BBETON.000001 BBETON.000001 BBETON.000001 BBETON.000001 BBETON.000001 BBETON.000001 BBETON.000001 BBETON.000001 BBETON.000001 BBETON.000001 BBETON.000001 BBETON.000001 BBETON.000001 BBETON.000001 BBETON.000001 BBETON.000001 BBETON.000001 BBETON.000001 BBETON.000001 BBETON.000001 BBETON.000001 BBETON.000001 BBETON.000001 BBETON.000001 BBETON.000001 BBETON.000001 BBETON.000001 BBETON.000001 BBETON.000001 BBETON.000001 BBETON.000001 BBETON.000001 BBETON.000001 BBETON.000001 BBETON.000001 BBETON.000001 BBETON.000001 BBETON.000001 BBETON.000001 BBETON.000001 BBETON.000001 BBENAG.000000 BBETON.000001 BBETON.000001 BBETON.000001 BBETON.000001 BBETON.000001

PT. KREASIBETON NUSAPERSADA PT. KREASIBETON NUSAPERSADA PT. KREASIBETON NUSAPERSADA PT. KREASIBETON NUSAPERSADA PT. KREASIBETON NUSAPERSADA PT. KREASIBETON NUSAPERSADA PT. KREASIBETON NUSAPERSADA PT. KREASIBETON NUSAPERSADA PT. KREASIBETON NUSAPERSADA PT. KREASIBETON NUSAPERSADA PT. KREASIBETON NUSAPERSADA PT. KREASIBETON NUSAPERSADA PT. KREASIBETON NUSAPERSADA PT. KREASIBETON NUSAPERSADA PT. KREASIBETON NUSAPERSADA PT. KREASIBETON NUSAPERSADA PT. KREASIBETON NUSAPERSADA PT. KREASIBETON NUSAPERSADA PT. KREASIBETON NUSAPERSADA PT. KREASIBETON NUSAPERSADA PT. KREASIBETON NUSAPERSADA PT. KREASIBETON NUSAPERSADA PT. KREASIBETON NUSAPERSADA PT. KREASIBETON NUSAPERSADA PT. KREASIBETON NUSAPERSADA PT. KREASIBETON NUSAPERSADA PT. KREASIBETON NUSAPERSADA PT. KREASIBETON NUSAPERSADA PT. KREASIBETON NUSAPERSADA PT. KREASIBETON NUSAPERSADA PT. KREASIBETON NUSAPERSADA PT. KREASIBETON NUSAPERSADA PT. KREASIBETON NUSAPERSADA PT. KREASIBETON NUSAPERSADA PT. KREASIBETON NUSAPERSADA PT. KREASIBETON NUSAPERSADA PT. KREASIBETON NUSAPERSADA PT. KREASIBETON NUSAPERSADA PT. KREASIBETON NUSAPERSADA PT. KREASIBETON NUSAPERSADA PT. KREASIBETON NUSAPERSADA PT. KREASIBETON NUSAPERSADA PT. KREASIBETON NUSAPERSADA PT. KREASIBETON NUSAPERSADA PT. KREASIBETON NUSAPERSADA PT. KREASIBETON NUSAPERSADA PT. KREASIBETON NUSAPERSADA PT. KREASIBETON NUSAPERSADA PT. KREASIBETON NUSAPERSADA PT. KREASIBETON NUSAPERSADA

BETON JADI K 350 SLUMP 12 BETON JADI K 350 SLUMP 12 BETON JADI K 350 SLUMP 12 BETON JADI K 350 SLUMP 12 BETON JADI K 350 SLUMP 12 BETON JADI K 350 SLUMP 12 BETON JADI K 350 SLUMP 12 BETON JADI K 350 SLUMP 12 BETON JADI K 350 SLUMP 12 BETON JADI K 350 SLUMP 12 BETON JADI K 350 SLUMP 12 BETON JADI K 350 SLUMP 12 BETON JADI K 350 SLUMP 12 BETON JADI K 350 SLUMP 12 BETON JADI K 350 SLUMP 12 BETON JADI K 350 SLUMP 12 BETON JADI K 350 SLUMP 12 BETON JADI K 350 SLUMP 12 BETON JADI K 350 SLUMP 12 BETON JADI K 350 SLUMP 12 BETON JADI K 350 SLUMP 12 BETON JADI K 350 SLUMP 12 BETON JADI K 350 SLUMP 12 BETON JADI K 350 SLUMP 12 BETON JADI K 350 SLUMP 12 BETON JADI K 350 SLUMP 12 BETON JADI K 350 SLUMP 12 BETON JADI K 350 SLUMP 12 BETON JADI K 350 SLUMP 12 BETON JADI K 350 SLUMP 12 BETON JADI K 350 SLUMP 12 BETON JADI K 350 SLUMP 12 BETON JADI K 350 SLUMP 12 BETON JADI K 350 SLUMP 12 BETON JADI K 350 SLUMP 12 BETON JADI K 350 SLUMP 12 BETON JADI K 350 SLUMP 12 BETON JADI K 350 SLUMP 12 BETON JADI K 350 SLUMP 12 BETON JADI K 350 SLUMP 12 BETON JADI K 350 SLUMP 12 BETON JADI K 350 SLUMP 12 BETON JADI K 350 SLUMP 12 BETON JADI K 350 SLUMP 12 BETON JADI K 350 SLUMP 12 BETON JADI K 350 SLUMP 12 BETON JADI K 350 SLUMP 12 BETON JADI K 350 SLUMP 12 BETON JADI K 350 SLUMP 12 BETON JADI K 350 SLUMP 12

M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 Rol M3 M3 M3 M3 M3

19.50 1.50 21.00 4.00 3.00 37.00 1.50 45.50 3.50 12.50 1.00 2.00 19.00 2.50 4.50 3.50 2.00 12.50 5.00 14.00 3.00 2.00 24.00 105.50 2.50 108.00 3.50 15.50 1.00 70.50 90.50 5.00 2.00 0.50 2.00 9.50 2.50 57.50 60.00 42.50 1.50 1.00 167.50 212.50 2.50 2.00 2.00 6.50 3.00 2.00 5.00 1.50 19.00 15.00 5.00 1.00 41.50 6.00 6.00 1.50 3.50 1.50 6.50 5.00 13.00 18.00 686.00

651,000 651,000 651,000 651,000 651,000 651,000 651,000 651,000 651,000 651,000 651,000 651,000 651,000 651,000 651,000 651,000 651,000 651,000 651,000 651,000 651,000 651,000 651,000 651,000 651,000 651,000 651,000 651,000 651,000 651,000 651,000 651,000 651,000 651,000 651,000 651,000 651,000 651,000 651,000 651,000 651,000 651,000 651,000 651,000 651,000 651,000 651,000 651,000 651,000 651,000

12,694,500 976,500 2,604,000 1,953,000 24,087,000 976,500 2,278,500 8,137,500 651,000 1,302,000 1,627,500 2,929,500 2,278,500 1,302,000 3,255,000 9,114,000 1,953,000 1,302,000 68,680,500 1,627,500 2,278,500 10,090,500 651,000 45,895,500 3,255,000 1,302,000 325,500 1,302,000 1,627,500 37,432,500 27,667,500 976,500 651,000 109,042,500 1,627,500 1,302,000 1,302,000 1,953,000 1,302,000 976,500 12,369,000 9,765,000 3,255,000 651,000 3,906,000 976,500 2,278,500 976,500 3,255,000 8,463,000

01/02/10 01/02/10 02/02/10 02/02/10 02/02/10 02/02/10 03/02/10 03/02/10 03/02/10 03/02/10 04/02/10 04/02/10 04/02/10 04/02/10 05/02/10 05/02/10 05/02/10 05/02/10 06/02/10 06/02/10 08/02/10 08/02/10 08/02/10 08/02/10 09/02/10 09/02/10 09/02/10 09/02/10 10/02/10 10/02/10 13/02/10 13/02/10 13/02/10 13/02/10 15/02/10 15/02/10 15/02/10 16/02/10 16/02/10 23/02/10 23/02/10 23/02/10 23/02/10 23/02/10 24/02/10 25/02/10 25/02/10 25/02/10 27/02/10 27/02/10

- U/ Selasar Lt1 - U/ Kolom - U/ Kolom - U/ Kolom PH - U/ Jembatan Lt4 - U/ Kol. Pedestal U/ Ram Lt 1 U/ Pond. Genset U/ Blk Lif U/ Kolom U/ Kolom PH U/ Kolom Lt3 U/ Ram Lt 1 U/ DDG Tangga U/ Selasar U/ Jembatan Lt4 U/ Ddg Lif U/ Ddg Tangga

- U/ Plat Lt 4 - U/ Kolom Lt 2 U/ Cor Kolom Lt4 U/ Jembatan lt2 U/ Klm Pedestal U/ Plat Lt 4 U/ Kolom Lt 4 u/ Kolom Lt 5 U/ Blk Lif U/ Parapet Lt 5

- U/ Kolom - U/ Selasar, Jban U/ Atap PH U/ kolom U/ DDk GRC U/ Plat Lt 5

- U/ Kolom - U/ Blk Lif - U/ DDk GRC - U/ Kolom - U/ GRC U/ Kolom Kotak U/ Jembatan U/ Tanggga U/ kolom U/ Kolom Lift

- U/ Parapet,lisbl - U/ Kolom kotak - U/ Blk. Lipft - U/ Kolom Lift - U/ Kolom - U/ Jembatan