LABORATORIUM BAHAN KONSTRUKSIPEMERIKSAAN BERAT VOLUME AGREGAT
No. Contoh : 01 Sumber contoh : Tanjung Balai KarimunTgl. Terima : 18 April 2010 Jenis Contoh : Kasar/ SplitPelaksana : PT. CAZ Untuk : Sample
PENELITIAN 1PADAT GEMBUR
A. Volume Wadah 3 3 LiterB. Berat Wadah 2.115 2.115 KgC. Berat Benda Uji + Wadah 8.175 7.402 KgD. Berat Benda Uji (C - B) 6.060 5.287 KgBerat Volume = D/A 2.02 1.76 Kg/Liter
LABORATORIUM BAHAN KONSTRUKSIPEMERIKSAAN BERAT VOLUME AGREGAT
No. Contoh : 02 Sumber contoh : MoroTgl. Terima : 18 April 2010 Jenis Contoh : Halus / PasirPelaksana : PT. CAZ Untuk : Sample
PENELITIAN 1PADAT GEMBUR
A. Volume Wadah 3 3 LiterB. Berat Wadah 2.115 2.115 KgC. Berat Benda Uji + Wadah 8.852 8.197 KgD. Berat Benda Uji (C - B) 6.737 6.082 KgBerat Volume = D/A 2.25 2.03 Kg/Liter
LABORATORIUM BAHAN KONSTRUKSIPEMERIKSAAN BAHAN LOLOS SARINGAN NO. 200
No. Contoh : 03 Sumber contoh : MoroTgl. Terima : 18 April 2010 Jenis Contoh : Ag. HalusPelaksana : PT. CAZ Untuk : SampleBerat agregat mula-mula (W1) = 1000 GramBerat talam (W2) = 107 GramBerat agregat kering + talam (W3) = 1054 GramBerat Agregat kering (W4) = W3 - W2 = 973 GramAg. Lewat saringan No. 200 (W1-W4)/W1 x 100% = 2.7 %
LABORATORIUM BAHAN KONSTRUKSIPEMERIKSAAN BAHAN LOLOS SARINGAN NO. 16
No. Contoh : 04 Sumber contoh : Tanjung Balai KarimunTgl. Terima : 18 April 2010 Jenis Contoh : Kasar/ SplitPelaksana : PT. CAZ Untuk : SampleBerat agregat mula-mula (W1) = 1500 GramBerat talam (W2) = 192 GramBerat agregat kering + talam (W3) = 1687 GramBerat Agregat kering (W4) = W3 - W2 = 1495 GramAg. Lewat saringan No. 200 (W1-W4)/W1 x 100% = 0.33 %
Lubang Persentase Yang Lewat AyakanAyakan DAERAH 1 DAERAH 2 DAERAH 3 DAERAH 4
(mm) Min Max Min Max Min Max Min Max10 100 100 100 100 100 100 100 1004.8 90 100 90 100 90 100 95 1002.4 60 95 75 100 85 100 95 1001.2 30 70 55 90 75 100 90 1000.6 15 34 35 59 60 79 80 1000.3 5 20 8 30 12 40 15 50
0.15 0 10 0 10 0 10 0 15
Keterangan : Daerah 1 : Pasir KasarDaerah 2 : Pasir Agak Kasar *) Gradasi Pasir Yang BAIKDaerah 3 : Pasir HalusDaerah 4 : Pasir Agak Halus
Lubang Persentase Yang Lewat Ayakan
Besar Butir MaksimumAyakan 40 mm 20 mm(mm) Min Max Min Max
40 95 100 100 10020 30 70 95 10010 10 35 25 55
4.8 0 5 0 10
1 10 1000
20
40
60
80
100
120
Gradasi Kerikil
0.1 1 100
20
40
60
80
100
120Gradasi Pasir Daerah 1, 2, 3 & 4
Lubang ayakan (mm)
Pers
enta
se Le
wat
aya
kan
%
ANALISA SARINGAN AGREGAT HALUSNo. Contoh : 05 Sumber contoh : MoroTgl. Terima : 18 April 2010 Jenis Contoh : PasirPelaksana : PT. CAZ Untuk : SamplePENELITIAN 1
Nomor Ukuran Lubang Berat Persentase Persentase berat Persentase berat
Saringanayakan Tertahan tertahan yang tertahan yang lolos
(mm) (inch) (gram) % (komulatif) (komulatif)2.4 2.4 59 6.24 6.2 93.761.1 1.1 166.5 17.61 23.8 76.150.6 0.6 309.5 32.73 56.6 43.420.3 0.3 226 23.90 80.5 19.51
0.15 0.15 156.5 16.55 97.0 2.96PAN 28 2.96 60 40.45
Wadah = 945.5 100 TOTAL = 276.26
MHB = 276.26 : 100 = 2.7626
No. Contoh : 06 Sumber contoh : Tg. Balai KarimunTgl. Terima : 18 April 2010 Jenis Contoh : SplitPelaksana : PT. CAZ Untuk : SamplePENELITIAN 1
Nomor Ukuran Lubang Berat Persentase Persentase berat Persentase berat
Saringanayakan Tertahan tertahan yang tertahan yang lolos
(mm) (inch) (gram) % (komulatif) (komulatif)37.5 0 0 0 100
3/4 19 3/4 719.5 48.14 48.14 51.865/8 9.52 5/8 766.5 51.29 99.43 0.573/8 4.76 3/8 6 0.40 99.83 0.174 2.6 0.625 0 0.00 99.83 0.17
16 1.1 0.375 0 0.00 99.83 0.170.6 0 0.00 99.83 0.170.3 0 0.00 99.83 0.17
0.15 0.5 0.03 99.87 0.13Pan 2 0.13 100.00 0
Wadah = 1494.5 100 Total = 153.40
MHB = 153.40 : 100 = 1.5339578
MODULUS HALUS BUTIR
Saringan Berat tertinggal Berat Tertinggal ( % )( mm ) ( gram )
Agg. Halus Agg. Kasar
Agg. Halus Agg. Kasar Persen Kumulatif Persen Kumulatif38 0 0 0 0 0 0
25.4 0 0 0 0 0 019 0 719.5 0 0 48.35 48.35
15.8 0 766.5 0 0 51.51 99.879.5 0 0 0 0 0.00 99.87
4.75 0 0 0 0 0.00 99.872.36 59 0 6.24 6.24 0 99.871.18 166.5 0 17.61 23.85 0 99.870.6 309.5 0 32.73 56.58 0 99.870.3 226 0 23.90 80.49 0 99.87
0.15 156.5 0 16.55 97.04 0 99.870.07 28 0 2.96 100.00 0 99.87sisa 0 2 0.00 100.00 0 100.00
Jumlah 945.5 1488 100 464.20 100 1047.14
Didapat :
MHB Aggregat Halus = 464.20 / 100 = 4.642
MHB Aggregat Kasar = 1047.14 / 100 = 10.471
Perbandingan campuran antara 5 - 6.5
W = [ ( K - C )/ (C - P ) ] * 100%
W = [ ( 6.081- 5 )/ (5 - 4.696 ) ] * 100% = 1528.285W = [ ( 6.081- 5.5 )/ (5.5 - 4.696 ) ] * 100% = 579.414W = [ ( 6.081- 5.8 )/ (5.8 - 4.696 ) ] * 100% = 80.542W = [ ( 6.081- 6 )/ (6 - 4.696 ) ] * 100% = -100.000W = [ ( 6.081- 6.2 )/ (6.2 - 4.696 ) ] * 100% = -100.000W = [ ( 6.081- 6.5 )/ (6.5 - 4.696 ) ] * 100% = 213.746679
Saringan Berat Tertinggal Berat LolosPersen Lolos ( % )
( mm )( gram ) ( gram )
( mm )
Agg. Halus Agg. Kasar Agg. Halus Agg. Kasar Agg. Halus Agg. Kasar Agg. Halus*1
0 1 2 3 4 5 6 7 =5 x P
38 0 0 945.5 1488 100 100 10025.4 0 0 945.5 1488 100 100 10019 0 719.5 945.5 768.5 100 51.65 100
15.8 0 766.5 945.5 2 100 51.65 1009.5 0 0 945.5 2 100 0.13 100
4.75 0 0 945.5 2 100 0.13 1002.36 59 0 886.5 2 93.76 0.13 93.761.18 166.5 0 720 2 76.15 0.13 76.150.6 309.5 0 410.5 2 43.42 0.13 43.420.3 226 0 184.5 2 19.51 0.13 19.51
0.15 156.5 0 28 2 2.96 0.13 2.960.07 28 0 0 2 0.00 0.13 0.00sisa 0 2 0 476.5 0 0.13 0
Jumlah 945.5 1488
Agg. Kasar* Agg. Halus Gradasi2.58 + Agg. Kasar Agregat
Campuran8 = 9 = 10 =
6 x K 7 + 8 9/3.58258 358 100258 358 100
133.25 233.25 65.15133.25 233.25 65.15
0.35 100.35 28.030.35 100.35 28.030.35 94.11 26.290.35 76.50 21.370.35 43.76 12.220.35 19.86 5.550.35 3.31 0.920.35 0.35 0.100.35 0.35 0.10
LABORATORIUM BAHAN KONSTRUKSIPEMERIKSAAN KADAR AIR AGREGAT KASAR
No. Contoh : 07 Sumber contoh : Tg. Balai KaTgl. Terima : 18 April 2010 Jenis Contoh : Ag, KasarPelaksana : PT. CAZ Untuk : SampleUkuran Agregat = 20 mmBerat talam (W1) = 190 gramBerat Talam + benda uji (W2) = 1690 gramBerat benda uji (W3) = W2 - W1 = 1500 gramBerat benda uji kering + talam (W4) = 1678 gramBerat benda uji kering (W5) = W4 - W1 = 1488 gramKadar air agregat (W3 - W5)/ W3 * 100 = 0.80 %
LABORATORIUM BAHAN KONSTRUKSIPEMERIKSAAN KADAR AIR AGREGAT HALUS
No. Contoh : 3 Sumber contoh : MoroTgl. Terima : 18 April 2010 Jenis Contoh : PasirPelaksana : PT. CAZ Untuk : SampleUkuran Agregat = Ag. Halus mmBerat talam (W1) = 107 gramBerat Talam + benda uji (W2) = 1107 gramBerat benda uji (W3) = W2 - W1 = 1000 gramBerat benda uji kering + talam (W4) = 1079.5 gramBerat benda uji kering (W5) = W4 - W1 = 972.5 gramKadar air agregat (W3 - W5)/ W3 * 100 = 2.75 %
LABORATORIUM BAHAN KONSTRUKSIPEMERIKSAAN SPESIFIC GRAFITY AGREGAT HALUS
No. Contoh : 7 Sumber contoh : MoroTgl. Terima : 18 April 2010 Jenis Contoh : pasirPelaksana : PT. CAZ Untuk : SampleBerat Contoh SSD ( A ) = 360 gramBerat contoh dalam air ( B ) = 227.5 gramBerat contoh kering udara ( C ) = 351.5 gram
Apparent spesific grafityC
= 2.83 gram(C - B)
Bulk spesific grafity kondisi keringC
= 2.65 gram(A - B)
Bulk spesific grafity kondisi SSDA
= 2.72 gram(A - B)
Persentase Absorbsi air(A - C)
x 100 % = 2.42 %C
LABORATORIUM BAHAN KONSTRUKSIPEMERIKSAAN SPESIFIC GRAFITY AGREGAT KASAR
No. Contoh : 8 Sumber contoh : Tg. Balai KaTgl. Terima : 18 April 2010 Jenis Contoh : Ag, KasarPelaksana : PT. CAZ Untuk : SampleBerat Contoh SSD ( A ) = 1500 gramBerat contoh dalam air ( B ) = 936 gramBerat contoh kering udara ( C ) = 1494.5 gram
Apparent spesific grafityC
= 2.68 gram(C - B)
Bulk spesific grafity kondisi keringC
= 2.65 gram(A - B)
Bulk spesific grafity kondisi SSDA
= 2.66 gram(A - B)
Persentase Absorbsi air(A - C)
x 100 % = 0.00 %C
BJ SSD GABUNGAN AGREGAT = 2.681963
AG. HALUS = 0.39 X BJ SSD AG. HALUSAG. HALUS = 0.39 X 2.72AG. HALUS = 1.059623
AG. KASAR = 0.61 X BJ SSD AG. KASARAG. KASAR = 0.61 X 2.66AG. KASAR = 1.622
Perencanaan menggunakan Metode SNI K-350
No. Data -data yang diperlukan Nilai Satuan Ket
1 Kuat tekan, f'c = 254 kg/cm2 26 MPa2 Ukuran Aggregat Maksimum 20 mm3 Standar Deviasi ( s ) -4 Kuat tekan rata-rata, f'cr = f'c + 8.5 34.5 MPa5 Jenis Agregat Kasar - - Split6 Jenis Agregat halus - Alami7 FAS utk 33,5 Mpa 0.58 Persyaratan FAS Maks 0.59 Nilai Slump 7.5 - 12 cm
10 Kebutuhan Air 186.54 liter11 Kebutuhan Semen Portland 373.07 kg12 Kebutuhan Semen Portland minimum 325 kg13 Jumlah Kebutuhan Semen Portland yang dipakai 373.07 kg14 Penyesuaian jumlah air atau FAS 0.515 Daerah gradasi agregat halus 116 Persen Agregat halus terhadap campuran 44 %17 Berat jenis Agregat Campuran 1.865 t/m318 Berat jenis Beton 2424.98 kg/m319 Kebutuhan Agregat 1865.37 kg/m320 Kebutuhan Agregat halus 820.76 kg/m321 Kebutuhan Agregat kasar 1044.61 kg/m322 γs = Berat jenis semen 3.1423 γag. H = berat jenis Pasir 2.7224 γag. K = berat jenis Kerikil 2.6625 γair = Berat jenis air 126 v = prosentase udara dalam beton 2%27 Modulus halus campuran direncanakan antara 5 - 6,5 5
Perbandingan Campuran :
Semen : Pasir : Kerikil : Air = 1 : prop. Agg.H : prop. Agg.K : Air
S + 0.01 x vγs x γair γ ag. H x γ air γ ag. K x γ air γ air
S + 5 x 44% x ℠ 0.01 x v3.14 x 1 2.72 x 1 2.66 x 1 1
0.3185 S + 0.8088 S + 1.0526 S + 0.5 S + 0.0002
2.6799 S = 1 - 0.0002S = 0.9998
2.6799S = 0.3731 tS = 373.074 kg
Semen = 373.07 kgAir : 373.07 x 0.5 = 186.54 literAggregat Halus : 5 x 373.07x 0.44 = 820.76 kgAggregat kasar : 5 x 373.07 x 0.56 = 1044.61 kg
Total = 2424.98 kg
Volume yang diperlukan untuk pembuatan sampel = 0.02631 m33 pcs kubus = 0.15 x 0.15 x 0.15 x 3 = 0.0101 m33 pcs silinder = π x r² x t x 3
= = 0.0159 m3Loose Factor = 15 % x 0.026 m3 = 0.0003 m3
Untuk itu diperlukan,Semen : 327.34 x 0.02626 = 9.816 kgAir : 163.67 x 0.02626 = 4.908 literAggregat Halus : 765.98 x 0.02626 = 21.596 kgAggregat kasar : 1198.07 x 0.02626 = 27.486 kg
prop. Agg.H℠ + prop. Agg.K℠ + A.S + = 1 m³
+ 5 x 56% x ℠ + 0.5 x S + = 1 m³
= 1 m³
Sehingga untuk 1m³ Beton Segar dibutuhkan,
3.14 x 0.075² x 0.3 x 3
Perencanaan menggunakan Metode SNI K-250
No. Data -data yang diperlukan Nilai Satuan Ket
1 Kuat tekan, f'c = 254 kg/cm2 25 MPa2 Ukuran Aggregat Maksimum 20 mm3 Standar Deviasi ( s ) -4 Kuat tekan rata-rata, f'cr = f'c + 8.5 33.5 MPa5 Jenis Agregat Kasar - - Split6 Jenis Agregat halus - Alami7 FAS utk 33,5 Mpa 0.58 Persyaratan FAS Maks 0.59 Nilai Slump 7.5 - 12 cm
10 Kebutuhan Air 163.67 liter11 Kebutuhan Semen Portland 330 kg12 Kebutuhan Semen Portland minimum 325 kg13 Jumlah Kebutuhan Semen Portland yang dipakai 327.34 kg14 Penyesuaian jumlah air atau FAS 0.515 Daerah gradasi agregat halus 116 Persen Agregat halus terhadap campuran 39 %17 Berat jenis Agregat Campuran 1.964 t/m318 Berat jenis Beton 2455.06 kg/m319 Kebutuhan Agregat 1964.05 kg/m320 Kebutuhan Agregat halus 765.98 kg/m321 Kebutuhan Agregat kasar 1198.07 kg/m322 γs = Berat jenis semen 3.1423 γag. H = berat jenis Pasir 2.7224 γag. K = berat jenis Kerikil 2.6625 γair = Berat jenis air 126 v = prosentase udara dalam beton 2%27 Modulus halus campuran direncanakan antara 5 - 6,5 6
Perbandingan Campuran :
Semen : Pasir : Kerikil : Air = 1 : prop. Agg.H : prop. Agg.K : Air
S + 0.01 x vγs x γair γ ag. H x γ air γ ag. K x γ air γ air
S + 6 x 40% x ℠ 0.01 x v3.14 x 1 2.72 x 1 2.66 x 1 1
0.3185 S + 0.8824 S + 1.3534 S + 0.5 S + 0.0002
3.0543 S = 1 - 0.0002S = 0.9998
3.0543S = 0.3273 tS = 327.342 kg
Semen = 327.34 kgAir : 327.34 x 0.5 = 163.67 literAggregat Halus : 6 x 327.34 x 0.39 = 765.98 kgAggregat kasar : 6 x 327.34 x 0.61 = 1198.07 kg
Total = 2455.06 kg
Volume yang diperlukan untuk pembuatan sampel = 0.02631 m33 pcs kubus = 0.15 x 0.15 x 0.15 x 3 = 0.0101 m33 pcs silinder = π x r² x t x 3
= = 0.0159 m3Loose Factor = 15 % x 0.026 m3 = 0.0003 m3
Untuk itu diperlukan,Semen : 327.34 x 0.02626 = 8.613 kgAir : 163.67 x 0.02626 = 4.307 literAggregat Halus : 765.98 x 0.02626 = 20.154 kgAggregat kasar : 1198.07 x 0.02626 = 31.524 kg
prop. Agg.H℠ + prop. Agg.K℠ + A.S + = 1 m³
+ 6 x 60% x ℠ + 0.5 x S + = 1 m³
= 1 m³
Sehingga untuk 1m³ Beton Segar dibutuhkan,
3.14 x 0.075² x 0.3 x 3
Perencanaan menggunakan Metode Road Note No.4
No. Data -data yang diperlukan Nilai Satuan Ket1 f'cr = 254 kg/cm2 25 MPa2 Ukuran Aggregat Maksimum 20 mm3 Standar Deviasi 4.2 Baik4 m dari SD 4.2 =1.64 x S 6.888 MPa5 f'cr real 31.888 MPa 32 Mpa6 FAS utk 32 Mpa ( tabel 8.3 hal 170 ) 0.357 Persyaratan FAS Maks ( tabel 8.11 ) 0.55 Sedang8 Proporsi FAS dengan Aggregat ( A/C )( tabel 8.12 ) 2.89 γs = Berat jenis semen 3.14
10 γag. H = berat jenis Pasir 2.7211 γag. K = berat jenis Kerikil 2.6612 γair = Berat jenis air 113 v = prosentase udara dalam beton 2%14 Modulus halus campuran direncanakan antara 5 - 6,5 6
Perbandingan Campuran :
Semen : Pasir : Kerikil : Air = 1 : prop. Agg.H : prop. Agg.K : Air
S + 0.01 x vγs x γair γ ag. H x γ air γ ag. K x γ air γ air
S + 5 x 40% x ℠ 0.01 x v3.14 x 1 2.72 x 1 2.66 x 1 1
0.3185 S + 0.7353 S + 1.1278 S + 0.35 S + 0.0002
2.6316 S = 1 - 0.0002S = 0.9998
2.6316S = 0.3799 tS = 379.921 kg
Semen = 379.9210 kgAir : 379.921 x 0.45 = 170.9644 literAggregat Halus : 5 x 379.921 x 0.4 = 759.8419 kgAggregat kasar : 5 x 379.921 x 0.6 = 1139.763 kg
Volume yang diperlukan untuk pembuatan sampel = 0.02626 m33 pcs kubus = 0.15 x 0.15 x 0.15 x 3 = 0.0101 m3
prop. Agg.H℠ + prop. Agg.K℠ + A.S + = 1 m³
+ 5 x 60% x ℠ + 0.35 x S + = 1 m³
= 1 m³
Sehingga untuk 1m³ Beton Segar dibutuhkan,
3 pcs silinder = π x r² x t x 3= = 0.0159 m3
Loose Factor = 10 % x 0.026 m3 = 0.00026 m3
Untuk itu diperlukan,Semen : 379.921 x 0.02626 = 9.977 kgAir : 170.9644 x 0.02626 = 4.490 literAggregat Halus : 759.8419 x 0.02626 = 19.953 kgAggregat kasar : 1139.763 x 0.02626 = 29.930 kg
3.14 x 0.075² x 0.3 x 3
LABORATORIUM BAHAN KONSTRUKSIPEMERIKSAAN BERAT VOLUME AGREGAT
No. Contoh : 01 Sumber contoh : BangkinangTgl. Terima : 4 April 2010 Jenis Contoh : KasarPelaksana : Kelompok 2 ( Asda ) Untuk : Sample
PENELITIAN 1PADAT GEMBUR
A. Volume Wadah 3 3 LiterB. Berat Wadah 2.118 2.118 KgC. Berat Benda Uji + Wadah 7.149 6.997 KgD. Berat Benda Uji (C - B) 5.031 4.879 KgBerat Volume = D/A 1.68 1.63 Kg/Liter
PENELITIAN 2PADAT GEMBUR
A. Volume Wadah 3 3 LiterB. Berat Wadah 2.118 2.118 KgC. Berat Benda Uji + Wadah 7.183 7.026 KgD. Berat Benda Uji (C - B) 5.065 4.908 KgBerat Volume = D/A 1.69 1.64 Kg/Liter
BERAT VOLUME RATA-RATA :
KONDISI PADAT = = 1.6826672
KONDISI GEMBUR = = 1.6311672
(D/A)1 + (D/A)2
(D/A)1 + (D/A)2
LABORATORIUM BAHAN KONSTRUKSIPEMERIKSAAN BAHAN LOLOS SARINGAN NO. 200
No. Contoh : 05 Sumber contoh : BangkinangTgl. Terima : 5 April 2011 Jenis Contoh : Ag. HalusPelaksana : Kelompok 2 ( Asda ) Untuk : SampleBerat agregat mula-mula (W1) = 1000 GramBerat talam (W2) = 107 GramBerat agregat kering + talam (W3) = 1079.5 GramBerat Agregat kering (W4) = W3 - W2 = 972.5 GramAg. Lewat saringan No. 200 (W1-W4)/W1 x 100% = 2.75 %
LABORATORIUM BAHAN KONSTRUKSIPEMERIKSAAN BAHAN LOLOS SARINGAN NO. 16
No. Contoh : 06 Sumber contoh : BangkinangTgl. Terima : 5 April 2011 Jenis Contoh : Ag. KasarPelaksana : Kelompok 2 ( Asda ) Untuk : SampleBerat agregat mula-mula (W1) = 1500 GramBerat talam (W2) = 190 GramBerat agregat kering + talam (W3) = 1678 GramBerat Agregat kering (W4) = W3 - W2 = 1488 GramAg. Lewat saringan No. 200 (W1-W4)/W1 x 100% = 0.80 %
LABORATORIUM BAHAN KONSTRUKSIPEMERIKSAAN BAHAN LOLOS SARINGAN NO. 200
No. Contoh : 05 Sumber contoh : BangkinangTgl. Terima : 5 April 2011 Jenis Contoh : PasirPelaksana : Kelompok 2 ( Asda ) Untuk : SampleTinggi Pasir (V1) = 4.8 cmTinggi Lumpur (V2) = 0.2 cmKadar Lumpur V2 / (V1+V2) x 100% = 4.0 %
LABORATORIUM BAHAN KONSTRUKSIPEMERIKSAAN KADAR AIR AGREGAT KASAR
No. Contoh : 2 Sumber contoh : BangkinangTgl. Terima : 4 April 2011 Jenis Contoh : Ag, KasarPelaksana : Kelompok 2 ( Asda ) Untuk : SampleUkuran Agregat = 20 mmBerat talam (W1) = 190 gramBerat Talam + benda uji (W2) = 1690 gramBerat benda uji (W3) = W2 - W1 = 1500 gramBerat benda uji kering + talam (W4) = 1678 gramBerat benda uji kering (W5) = W4 - W1 = 1488 gramKadar air agregat (W3 - W5)/ W3 * 100 = 0.80 %
LABORATORIUM BAHAN KONSTRUKSIPEMERIKSAAN KADAR AIR AGREGAT HALUS
No. Contoh : 3 Sumber contoh : BangkinangTgl. Terima : 4 April 2011 Jenis Contoh : PasirPelaksana : Kelompok 2 ( Asda ) Untuk : SampleUkuran Agregat = Ag. Halus mmBerat talam (W1) = 107 gramBerat Talam + benda uji (W2) = 1107 gramBerat benda uji (W3) = W2 - W1 = 1000 gramBerat benda uji kering + talam (W4) = 1079.5 gramBerat benda uji kering (W5) = W4 - W1 = 972.5 gramKadar air agregat (W3 - W5)/ W3 * 100 = 2.75 %
Lubang Persentase Yang Lewat AyakanAyakan DAERAH 1 DAERAH 2 DAERAH 3 DAERAH 4
(mm) Min Max Min Max Min Max Min Max10 100 100 100 100 100 100 100 1004.8 90 100 90 100 90 100 95 1002.4 60 95 75 100 85 100 95 1001.2 30 70 55 90 75 100 90 1000.6 15 34 35 59 60 79 80 1000.3 5 20 8 30 12 40 15 50
0.15 0 10 0 10 0 10 0 15
Keterangan : Daerah 1 : Pasir KasarDaerah 2 : Pasir Agak Kasar *) Gradasi Pasir Yang BAIKDaerah 3 : Pasir HalusDaerah 4 : Pasir Agak Halus
Lubang Persentase Yang Lewat Ayakan
Besar Butir MaksimumAyakan 40 mm 20 mm(mm) Min Max Min Max
40 95 100 100 10020 30 70 95 10010 10 35 25 55
4.8 0 5 0 10
1 10 1000
20
40
60
80
100
120
Gradasi Kerikil
0.1 1 100
20
40
60
80
100
120Gradasi Pasir Daerah 1, 2, 3 & 4
Lubang ayakan (mm)
Pers
enta
se Le
wat
aya
kan
%
ANALISA SARINGAN AGREGAT HALUSNo. Contoh : 03 Sumber contoh : BangkinangTgl. Terima : 5 April 2011 Jenis Contoh : PasirPelaksana : Kelompok 2 ( Asda ) Untuk : SamplePENELITIAN 1
Nomor Ukuran Lubang Berat Persentase Persentase berat Persentase berat
Saringanayakan Tertahan tertahan yang tertahan yang lolos
(mm) (inch) (gram) % (komulatif) (komulatif)8 2.36 179 18.41 18.4 81.59
10 2 72.5 7.46 25.9 74.1412 1.7 37 3.80 29.7 70.3330 0.6 248.5 25.55 55.2 44.7850 0.3 178.5 18.35 73.6 26.43
100 0.15 219.5 22.57 96.1 3.86200 0.076 30 3.08 99.2 0.77PAN 7.5 0.77 100 0.00
Wadah = 972.5 100 Total = 301.90
No. Contoh : 04 Sumber contoh : BangkinangTgl. Terima : 5 April 2011 Jenis Contoh : KrikilPelaksana : Kelompok 2 ( Asda ) Untuk : SamplePENELITIAN 1
Nomor Ukuran Lubang Berat Persentase Persentase berat Persentase berat
Saringanayakan Tertahan tertahan yang tertahan yang lolos
(mm) (inch) (gram) % (komulatif) (komulatif)3/4 19 3/4 75.5 5.07 5.07 94.935/8 15.8 5/8 112.5 7.56 12.63 87.373/8 9.5 3/8 381 25.59 38.21 61.794 4.75 0.625 541 36.33 74.55 25.45
16 1.18 0.375 354 23.77 98.32 1.68Pan 25 1.68 100.00 0
Wadah = 1489 100 Total = 271.22
0.01 0.1 1 100.00
10.00
20.00
30.00
40.00
50.00
60.00
70.00
80.00
90.00
100.00
Diameter lubang ayakan (mm)
Pers
enta
e ya
ng lo
los %
31-Dec 9-Jan 9-Apr0.00
20.00
40.00
60.00
80.00
100.00
120.00
Diameter lubanga ayakan (mm)
Pers
enta
se y
agn
lolo
s %
LABORATORIUM BAHAN KONSTRUKSIPEMERIKSAAN SPESIFIC GRAFITY AGREGAT HALUS
No. Contoh : 6 Sumber contohTgl. Terima : 5 April 2010 Jenis ContohPelaksana : Kelompok 2 ( Asda ) Untuk Berat Contoh SSD ( A ) = 300
Berat contoh dalam air ( B ) = 185.5
Berat contoh kering udara ( C ) = 297
Apparent spesific grafityC
= 2.66(C - B)
Bulk spesific grafity kondisi keringC
= 2.59(A - B)
Bulk spesific grafity kondisi SSDA
= 2.62(A - B)
Persentase Absorbsi air(A - C)
x 100 % = 1.01C
LABORATORIUM BAHAN KONSTRUKSIPEMERIKSAAN SPESIFIC GRAFITY AGREGAT KASAR
No. Contoh : Sumber contohTgl. Terima : 5 April 2010 Jenis ContohPelaksana : Kelompok 2 ( Asda ) Untuk Berat Contoh SSD ( A ) = 1488Berat contoh dalam air ( B ) = 1435Berat contoh kering udara ( C ) = 1485
Apparent spesific grafityC
= 29.70(C - B)
Bulk spesific grafity kondisi keringC
= 28.02(A - B)
Bulk spesific grafity kondisi SSDA
= 28.08(A - B)
Persentase Absorbsi air(A - C)
x 100 % = 0.00C
LABORATORIUM BAHAN KONSTRUKSIPEMERIKSAAN SPESIFIC GRAFITY AGREGAT HALUS
: Bangkinang: pasir: Sample w awal 1344.5 gram
gram wadah 201 gramgram 1143.5gram
gram 444.5
gram
gram
%
LABORATORIUM BAHAN KONSTRUKSIPEMERIKSAAN SPESIFIC GRAFITY AGREGAT KASAR
: Bangkinang: Kerikil: Sample
gram WADAH 111 GRAMgram KERTAS 5gram 2004.5 1888.5
gram
gram
gram
%
MODULUS HALUS BUTIR
Saringan Berat tertinggal Berat Tertinggal ( % )( mm ) ( gram )
Agg. Halus Agg. Kasar
Agg. Halus Agg. Kasar Persen Kumulatif Persen Kumulatif38 0 0 0 0 0 0
25.4 0 0 0 0 0 019 0 9.5 0 0 0.64 0.64
15.8 0 51 0 0 3.45 4.099.5 0 365 0 0 24.66 28.75
4.75 0 578 0 0 39.05 67.802.36 167 0 17.22 17.22 0 67.801.18 169.5 0 17.47 34.69 0 67.800.6 180 0 18.56 53.25 0 67.800.3 170.5 0 17.58 70.82 0 67.80
0.15 234 0 24.12 94.95 0 67.800.07 36.5 0 3.76 98.71 0 67.80sisa 12.5 476.5 1.29 100.00 32 100.00
Jumlah 970 1480 100 469.64 100 608.11
Didapat :
MHB Aggregat Halus = 469.64 / 100 = 4.696
MHB Aggregat Kasar = 608.11 / 100 = 6.081
Perbandingan campuran antara 5 - 6.5
W = [ ( K - C )/ (C - P ) ] * 100%
W = [ ( 6.081- 5 )/ (5 - 4.696 ) ] * 100% = 356.078W = [ ( 6.081- 5.5 )/ (5.5 - 4.696 ) ] * 100% = 72.309W = [ ( 6.081- 5.8 )/ (5.8 - 4.696 ) ] * 100% = 4.846W = [ ( 6.081- 6 )/ (6 - 4.696 ) ] * 100% = -100.000W = [ ( 6.081- 6.2 )/ (6.2 - 4.696 ) ] * 100% = -100.000W = [ ( 6.081- 6.5 )/ (6.5 - 4.696 ) ] * 100% = -23.226713
Saringan Berat Tertinggal Berat LolosPersen Lolos ( % )
( mm )( gram ) ( gram )
Agg. Halus Agg. Kasar Agg. Halus Agg. Kasar Agg. Halus Agg. Kasar Agg. Halus*1
0 1 2 3 4 5 6 7 =5 x P
38 0 0 966 1480 100 100 10025.4 0 0 966 1480 100 100 10019 0 9.5 966 1470.5 100 99.36 100
15.8 0 51 966 1419.5 100 99.36 1009.5 0 365 966 1054.5 100 71.25 100
4.75 0 578 966 476.5 100 32.20 1002.36 163 0 803 476.5 83.13 32.20 83.131.18 169.5 0 633.5 476.5 65.58 32.20 65.580.6 180 0 453.5 476.5 46.95 32.20 46.950.3 170.5 0 283 476.5 29.30 32.20 29.30
0.15 234 0 49 476.5 5.07 32.20 5.070.07 36.5 0 12.5 476.5 1.29 32.20 1.29sisa 12.5 476.5 0 476.5 0 32.20 0
Jumlah 966 1480
8 = 9 = 10 =6 x K 7 + 8 9/3.58258 358 100258 358 100
256.34 356.34 99.54256.34 356.34 99.54183.83 283.83 79.2883.07 183.07 51.1483.07 166.19 46.4283.07 148.65 41.5283.07 130.01 36.3283.07 112.36 31.3983.07 88.14 24.6283.07 84.36 23.5683.07 83.07 23.20
Perencanaan menggunakan Metode Road Note No.4
No. Data -data yang diperlukan Nilai Satuan Ket1 f'cr = 300 kg/cm2 25 MPa2 Ukuran Aggregat Maksimum 20 mm3 Standar Deviasi 4.2 Baik4 m dari SD 4.2 =1.64 x S 6.888 MPa5 f'cr real 31.888 MPa 32 Mpa6 FAS utk 32 Mpa ( tabel 8.3 hal 170 ) 0.357 Persyaratan FAS Maks ( tabel 8.11 ) 0.55 Sedang8 Proporsi FAS dengan Aggregat ( A/C )( tabel 8.12 ) 2.89 γs = Berat jenis semen 3.14
10 γag. H = berat jenis Pasir 2.7211 γag. K = berat jenis Kerikil 2.6612 γair = Berat jenis air 113 v = prosentase udara dalam beton 2%14 Modulus halus campuran direncanakan antara 5 - 6,5 6
Perbandingan Campuran :
Semen : Pasir : Kerikil : Air = 1 : prop. Agg.H : prop. Agg.K : Air
S + 0.01 x vγs x γair γ ag. H x γ air γ ag. K x γ air γ air
S + 6 x 39% x ℠ 0.01 x v3.14 x 1 2.75 x 1 2.66 x 1 1
0.3185 S + 0.8509 S + 1.3759 S + 0.35 S + 0.0002
2.8953 S = 1 - 0.0002S = 0.9998
2.8953S = 0.3453 tS = 345.318 kg
prop. Agg.H℠ + prop. Agg.K℠ + A.S + = 1 m³
+ 6 x 61% x ℠ + 0.35 x S + = 1 m³
= 1 m³
Semen = 345.318 kgAir : 345.3183 x 0.35 = 120.861 literAggregat Halus : 6 x 345.3183 x 0.39 = 808.045 kgAggregat kasar : 6 x 345.3183 x 0.61 = 1263.865 kg
Total = 2538.089 kg
Volume yang diperlukan untuk pembuatan sampel = 0.02626 m33 pcs kubus = 0.15 x 0.15 x 0.15 x 3 = 0.0101 m33 pcs silinder = π x r² x t x 3
= = 0.0159 m3Loose Factor = 10 % x 0.026 m3 = 0.00026 m3
Untuk itu diperlukan,Semen : 344.2126 x 0.02626 = 9.068 kgAir : 120.4744 x 0.02626 = 3.174 literAggregat Halus : 805.4576 x 0.02626 = 21.219 kgAggregat kasar : 1259.818 x 0.02626 = 33.189 kg
Total = 66.650 kg
Sehingga untuk 1m³ Beton Segar dibutuhkan,
3.14 x 0.075² x 0.3 x 3
Perencanaan menggunakan Metode SNI K-350
No. Data -data yang diperlukan Nilai Satuan Ket
1 Kuat tekan, f'c = 254 kg/cm2 26 MPa2 Ukuran Aggregat Maksimum 20 mm3 Standar Deviasi ( s ) -4 Kuat tekan rata-rata, f'cr = f'c + 8.5 34.5 MPa5 Jenis Agregat Kasar - - Alami6 Jenis Agregat halus - Alami7 FAS utk 33,5 Mpa 0.58 Persyaratan FAS Maks 0.59 Nilai Slump 7.5 - 12 cm
10 Kebutuhan Air 186.54 liter11 Kebutuhan Semen Portland 373.07 kg12 Kebutuhan Semen Portland minimum 325 kg13 Jumlah Kebutuhan Semen Portland yang dipakai 373.07 kg14 Penyesuaian jumlah air atau FAS 0.515 Daerah gradasi agregat halus 116 Persen Agregat halus terhadap campuran 44 %17 Berat jenis Agregat Campuran 1.865 t/m318 Berat jenis Beton 2424.98 kg/m319 Kebutuhan Agregat 1865.37 kg/m320 Kebutuhan Agregat halus 820.76 kg/m321 Kebutuhan Agregat kasar 1044.61 kg/m322 γs = Berat jenis semen 3.1423 γag. H = berat jenis Pasir 2.7224 γag. K = berat jenis Kerikil 2.6625 γair = Berat jenis air 126 v = prosentase udara dalam beton 2%27 Modulus halus campuran direncanakan antara 5 - 6,5 5
Perbandingan Campuran :
Semen : Pasir : Kerikil : Air = 1 : prop. Agg.H : prop. Agg.K : Air
S + 0.01 x vγs x γair γ ag. H x γ air γ ag. K x γ air γ air
S + 5 x 44% x ℠ 0.01 x v3.14 x 1 2.72 x 1 2.66 x 1 1
0.3185 S + 0.8088 S + 1.0526 S + 0.5 S + 0.0002
2.6799 S = 1 - 0.0002S = 0.9998
2.6799S = 0.3731 tS = 373.074 kg
Semen = 373.07 kgAir : 373.07 x 0.5 = 186.54 literAggregat Halus : 5 x 373.07x 0.44 = 820.76 kgAggregat kasar : 5 x 373.07 x 0.56 = 1044.61 kg
Total = 2424.98 kg
Volume yang diperlukan untuk pembuatan sampel = 0.02631 m33 pcs kubus = 0.15 x 0.15 x 0.15 x 3 = 0.0101 m33 pcs silinder = π x r² x t x 3
= = 0.0159 m3Loose Factor = 15 % x 0.026 m3 = 0.0003 m3
Untuk itu diperlukan,Semen : 327.34 x 0.02626 = 9.816 kgAir : 163.67 x 0.02626 = 4.908 literAggregat Halus : 765.98 x 0.02626 = 21.596 kgAggregat kasar : 1198.07 x 0.02626 = 27.486 kg
prop. Agg.H℠ + prop. Agg.K℠ + A.S + = 1 m³
+ 5 x 56% x ℠ + 0.5 x S + = 1 m³
= 1 m³
Sehingga untuk 1m³ Beton Segar dibutuhkan,
3.14 x 0.075² x 0.3 x 3
Kuat tekan Rencana = kg/cm2
f'c rKuat tekan Rencana
0 hari1 Timbang berat sampel sebelum diuji 0
sampel1 = kg umur 3 hari 250 0sampel2 = kg umur 3 hari 275 0sampel3 = kg umur 7 hari 300 0sampel4 = kg umur 7 hari 325 0sampel5 = kg umur 14 hari 350 0sampel6 = kg umur 14 hari 400 0
450 02 Lakukan pengetesan Kuat Tekan Beton 500 0
sampel1 = KN silindersampel2 = KN kubussampel3 = KN silindersampel4 = KN kubussampel5 = KN silindersampel6 = KN kubus
3 Kalikan nilai Kuat Tekan yang didapat dengan 102 ( P )sampel1 = kg silindersampel2 = kg kubussampel3 = kg silindersampel4 = kg kubussampel5 = kg silindersampel6 = kg kubus
4 Cari luasan alas ( A ) penampang sampelkubus = 15 x 15 = 225 cm2silinder = = 176.625 cm2
5τ = P/Asampel1 = kg/cm2 silindersampel2 = kg/cm2 kubussampel3 = kg/cm2 silindersampel4 = kg/cm2 kubussampel5 = kg/cm2 silindersampel6 = kg/cm2 kubus
6 Bandingkan nilai Tegangan yang didapat dengan tegangan kuat tekan rencana pada umur yang sama
kalo kecil dari nilai kuat rencana berati gak oke.. Hehe
3.14 x 7,5²
Hitung Tegangan( τ ) dari sampel
apakah ≥ kuat rencana? Kalo iya berarti oke.
3 hari 7 hari 14 hari 28 hari0
100
200
300
400
500
600
Kuat Tekan Beton ( kg/cm2 )
Umur/waktu ( hari )
Kuat
Tek
an B
eton
( kg
/cm
2 )
Kuat tekan Rencana3 hari 7 hari 14 hari 28 hari0.46 0.7 0.85 1115 175 212.5 250
126.5 192.5 233.75 275138 210 255 300
149.5 227.5 276.25 325161 245 297.5 350184 280 340 400207 315 382.5 450230 350 425 500
Bandingkan nilai Tegangan yang didapat dengan tegangan kuat tekan rencana pada umur yang sama
3 hari 7 hari 14 hari 28 hari0
100
200
300
400
500
600
Kuat Tekan Beton ( kg/cm2 )
Umur/waktu ( hari )
Kuat
Tek
an B
eton
( kg
/cm
2 )