ESTIMATE ENGINEERS (EE) HARGA UPAH DAN BAHAN BANGUNAN TAHUN ANGGARAN 2013 DAERAH BAIK DAFTAR UPAH NO. JENIS UPAH SATUAN HARGA UPAH KETERANGAN 1 2 3 4 5 1 Pekerja OH 62,100.00 2 Tukang Gali OH 74,750.00 3 Tukang Kayu OH 75,900.00 4 Tukang Batu OH 74,750.00 5 Tukang Las OH 74,750.00 6 Tukang Besi OH 74,750.00 7 Tukang Pipa OH 75,900.00 8 Tukang Cat OH 74,750.00 9 Kepala Tukang OH 75,900.00 10 Mandor OH 80,500.00 11 Operator OH 86,250.00 12 Pembantu Operator OH 64,400.00 NO. JENIS BAHAN SATUAN MUAT BONGKAR TRANSPORT OVERHEAD (10%) KETERANGAN 1 2 3 4 5 6 7 8 9 I BAHAN PASANGAN 1 Pasir Urug (PU) M3 78,800.00 20,000.00 ### 7,880.00 129,430.00 2 Pasir Pasang (PP) M3 125,000.00 20,000.00 ### 12,500.00 180,250.00 3 Pasir Beton (PB) M3 122,000.00 20,000.00 ### 12,200.00 176,950.00 4 Pasir Kuarsa M3 190,000.00 20,000.00 ### 19,000.00 261,500.00 5 Kerikil (KR) M3 113,750.00 25,000.00 ### 11,375.00 172,875.00 6 Sirtu M3 72,000.00 20,000.00 ### 7,200.00 121,950.00 7 Batu Belah (gunung) 15cm/20 cm M3 325,000.00 25,000.00 ### 32,500.00 405,250.00 8 Batu sungai (mangga) M3 300,000.00 25,000.00 ### 30,000.00 377,750.00 9 Portland Cement (PC) Kg 1,160.00 10.00 6.50 116.00 1,292.50 10 Semen putih Kg 1,500.00 10.00 6.50 150.00 1,666.50 11 Cornite Compound Jayaboard Zak 70,000.00 2,500.00 325.00 7,000.00 79,825.00 12 Bata Merah (kulim) Buah 285.00 10.00 13.00 28.50 336.50 13 Kerawang (Roster semen)20x20 cm Buah 22,000.00 20.00 52.00 2,200.00 24,272.00 14 Kerawang (Roster semen)40x40 cm Buah 45,000.00 20.00 52.00 4,500.00 49,572.00 15 Rumput Gajah Mini M2 11,500.00 500.00 650.00 1,150.00 13,800.00 16 Rumput Biasa M2 11,000.00 500.00 650.00 1,100.00 13,250.00 17 Tanah Hitam M3 43,000.00 20,000.00 ### 4,300.00 90,050.00 18 Tanah Urug M3 20,000.00 2,000.00 ### 2,000.00 46,750.00 19 Conblock K.175 T= 6 cm Bh 1,600.00 20.00 52.00 160.00 1,832.00 HARGA TOKO/QUARRY JUMLAH HARGA BAHAN

Upload: sendi-cheng

Post on 30-Nov-2015

309 views

Category:

Documents


30 download

DESCRIPTION

file excel

TRANSCRIPT

Page 1: Analisa 2013 Pu Cipta Karya kabupaten kampar

ESTIMATE ENGINEERS (EE)HARGA UPAH DAN BAHAN BANGUNAN TAHUN ANGGARAN 2013

DAERAH BAIK

DAFTAR UPAH

NO. JENIS UPAH SATUAN HARGA UPAH KETERANGAN

1 2 3 4 51 Pekerja OH 62,100.00 2 Tukang Gali OH 74,750.00 3 Tukang Kayu OH 75,900.00 4 Tukang Batu OH 74,750.00 5 Tukang Las OH 74,750.00 6 Tukang Besi OH 74,750.00 7 Tukang Pipa OH 75,900.00 8 Tukang Cat OH 74,750.00 9 Kepala Tukang OH 75,900.00

10 Mandor OH 80,500.00 11 Operator OH 86,250.00 12 Pembantu Operator OH 64,400.00

NO. JENIS BAHAN SATUAN MUAT BONGKAR TRANSPORT OVERHEAD (10%) KETERANGAN

1 2 3 4 5 6 7 8 9 I BAHAN PASANGAN1 Pasir Urug (PU) M3 78,800.00 20,000.00 22,750.00 7,880.00 129,430.00 2 Pasir Pasang (PP) M3 125,000.00 20,000.00 22,750.00 12,500.00 180,250.00 3 Pasir Beton (PB) M3 122,000.00 20,000.00 22,750.00 12,200.00 176,950.00 4 Pasir Kuarsa M3 190,000.00 20,000.00 32,500.00 19,000.00 261,500.00 5 Kerikil (KR) M3 113,750.00 25,000.00 22,750.00 11,375.00 172,875.00 6 Sirtu M3 72,000.00 20,000.00 22,750.00 7,200.00 121,950.00 7 Batu Belah (gunung) 15cm/20 cm M3 325,000.00 25,000.00 22,750.00 32,500.00 405,250.00 8 Batu sungai (mangga) M3 300,000.00 25,000.00 22,750.00 30,000.00 377,750.00 9 Portland Cement (PC) Kg 1,160.00 10.00 6.50 116.00 1,292.50

10 Semen putih Kg 1,500.00 10.00 6.50 150.00 1,666.50 11 Cornite Compound Jayaboard Zak 70,000.00 2,500.00 325.00 7,000.00 79,825.00 12 Bata Merah (kulim) Buah 285.00 10.00 13.00 28.50 336.50 13 Kerawang (Roster semen)20x20 cm Buah 22,000.00 20.00 52.00 2,200.00 24,272.00 14 Kerawang (Roster semen)40x40 cm Buah 45,000.00 20.00 52.00 4,500.00 49,572.00 15 Rumput Gajah Mini M2 11,500.00 500.00 650.00 1,150.00 13,800.00 16 Rumput Biasa M2 11,000.00 500.00 650.00 1,100.00 13,250.00 17 Tanah Hitam M3 43,000.00 20,000.00 22,750.00 4,300.00 90,050.00 18 Tanah Urug M3 20,000.00 2,000.00 22,750.00 2,000.00 46,750.00 19 Conblock K.175 T= 6 cm Bh 1,600.00 20.00 52.00 160.00 1,832.00

HARGA TOKO/QUARRY

JUMLAH HARGA BAHAN

Page 2: Analisa 2013 Pu Cipta Karya kabupaten kampar

NO. JENIS BAHAN SATUAN MUAT BONGKAR TRANSPORT OVERHEAD (10%) KETERANGAN

1 2 3 4 5 6 7 8 9

HARGA TOKO/QUARRY

JUMLAH HARGA BAHAN

20 Conblock K.225 T= 6 cm Bh 1,800.00 20.00 52.00 180.00 2,052.00 21 Conblock K.300 T= 8 cm Bh 2,000.00 20.00 52.00 200.00 2,272.00 22 Grass Block T= 6 cm Bh 19,000.00 20.00 52.00 1,900.00 20,972.00 23 Buis Beton Dia 20cm P= 50 Cm Bh 40,000.00 5,000.00 3,250.00 4,000.00 52,250.00 24 Buis Beton Dia 40cm P = 60 Cm Bh 108,000.00 10,000.00 9,750.00 10,800.00 138,550.00 25 Buis Beton Dia 60cm P= 80 Cm Bh 190,000.00 15,000.00 9,750.00 19,000.00 233,750.00 26 Buis Beton Dia 80cm P= 100 Cm Bh 325,000.00 20,000.00 13,000.00 32,500.00 390,500.00 27 Buis Beton Dia 100cm P = 100 Cm Bh 400,000.00 20,000.00 13,000.00 40,000.00 473,000.00

- II BAHAN KAYU - 1 Kayu Kelas I M3 3,500,000.00 20,000.00 22,750.00 350,000.00 3,892,750.00 2 Kayu Kelas II M3 2,200,000.00 20,000.00 22,750.00 220,000.00 2,462,750.00 3 Kayu Kelas III M3 1,800,000.00 20,000.00 22,750.00 180,000.00 2,022,750.00 4 Kayu List Profil siku2" M' 2,500.00 5.00 6.50 250.00 2,761.50 5 Kayu List Profil 0.8x3" M' 3,000.00 5.00 6.50 300.00 3,311.50 6 Papan 2 x 20 M3 1,800,000.00 20,000.00 22,750.00 180,000.00 2,022,750.00 7 Kayu Cerocok dia. 10 - 15 cm Btg 41,500.00 500.00 1,950.00 4,150.00 48,100.00

8 Dolken Kayu Galam, Ø (8-10)Cm,Panjang 4 M Batang 9,500.00 500.00 325.00 950.00 11,275.00

9 Kayu Bakar M3 650,000.00 20,000.00 22,750.00 65,000.00 757,750.00 10 Papan Piri - piri (Siap Ketam 3 sisi) M3 2,200,000.00 20,000.00 22,750.00 220,000.00 2,462,750.00 11 Papan Lebah Bergayut M' 40,000.00 500.00 650.00 4,000.00 45,150.00 12 Singap Ukir kayu M2 670,000.00 3,000.00 6,500.00 67,000.00 746,500.00 13 Singap Ukir GRC M2 400,000.00 3,000.00 6,500.00 40,000.00 449,500.00 14 Selembayung GRC Lembar 30 cm Pasang 400,000.00 1,000.00 3,250.00 40,000.00 444,250.00 15 Selembayung kayu lebar 30 cm Pasang 250,000.00 1,000.00 3,250.00 25,000.00 279,250.00 16 Sayap layang-layang lebar 30 cm Pasang 250,000.00 1,000.00 3,250.00 25,000.00 279,250.00 17 M' 50,000.00 1,000.00 3,250.00 5,000.00 59,250.00

- III BAHAN BESI DAN BAJA - 1 Besi Beton Polos Kg 13,500.00 50.00 65.00 1,350.00 14,965.00 2 Besi Beton Ulir Kg 16,200.00 50.00 65.00 1,620.00 17,935.00 3 Kawat Beton Kg 16,300.00 20.00 32.50 1,630.00 17,982.50 4 Kawat Ø 4 mm Kg 14,500.00 20.00 32.50 1,450.00 16,002.50 5 Kawat Las Listrik Kg 28,500.00 20.00 32.50 2,850.00 31,402.50 6 Kawat Ayam M2 13,833.00 20.00 130.00 1,383.30 15,366.30 7 Besi Strip Tebal 5 mm Kg 10,000.00 20.00 97.50 1,000.00 11,117.50 8 Baja Ringan C75 100 int kg 29,000.00 20.00 97.50 2,900.00 32,017.50 9 Baja Ringan C75 75 int Kg 27,000.00 20.00 97.50 2,700.00 29,817.50

10 Baja IWF Kg 11,850.00 20.00 97.50 1,185.00 13,152.50 11 Terali besi (Non Motif) M2 344,000.00 1,000.00 650.00 34,400.00 380,050.00

Lisplank papan + anak ( + 30 cm)

Page 3: Analisa 2013 Pu Cipta Karya kabupaten kampar

NO. JENIS BAHAN SATUAN MUAT BONGKAR TRANSPORT OVERHEAD (10%) KETERANGAN

1 2 3 4 5 6 7 8 9

HARGA TOKO/QUARRY

JUMLAH HARGA BAHAN

12 Baja Siku Kg 14,800.00 20.00 130.00 1,480.00 16,430.00 13 Pagar Hollow starbuss 1,2 mm x 20 mm x mm (standard minima M2 270,000.00 20.00 130.00 27,000.00 297,150.00 14 Hollow Ment Hijau 0.25mm x 40 mm x 20 mm Btg 16,000.00 300.00 65.00 1,600.00 17,965.00 15 Hollow Ment Hijau 0.25mm x 40 mm x 40 mm Btg 19,000.00 300.00 65.00 1,900.00 21,265.00 16 Hollow Galvanis 0.30 mm x 40 mm x 20 mm Btg 18,500.00 300.00 65.00 1,850.00 20,715.00 17 Hollow Galvanis 0.30 mm x 40 mm x 40 mm Btg 22,500.00 300.00 65.00 2,250.00 25,115.00 18 Rangka Furing Btg 10,000.00 300.00 65.00 1,000.00 11,365.00

- IV BAHAN PAKU - 1 Paku 1 Cm - 2,5 Cm Kg 16,000.00 80.00 65.00 1,600.00 17,745.00 2 Paku 5 Cm - 12 Cm Kg 15,000.00 80.00 65.00 1,500.00 16,645.00 3 Paku Skrup Kg 10,000.00 80.00 65.00 1,000.00 11,145.00 4 Paku Skrup 5 Cm Kg 14,500.00 80.00 65.00 1,450.00 16,095.00 5 Paku Skrup 10 Cm Kg 15,000.00 80.00 65.00 1,500.00 16,645.00 6 Paku Asbes Kg 26,900.00 80.00 65.00 2,690.00 29,735.00 7 Paku Atap Genteng Metal Kg 22,000.00 80.00 65.00 2,200.00 24,345.00 8 Paku Atap Seng Gelombang Kg 22,500.00 80.00 65.00 2,250.00 24,895.00

- V BAHAN ALLUMUNIUM - 1 Profil Allumunium "T" M' 22,850.00 275.00 715.00 2,285.00 26,125.00

-

Page 4: Analisa 2013 Pu Cipta Karya kabupaten kampar

NO. JENIS BAHAN SATUAN MUAT BONGKAR TRANSPORT OVERHEAD (10%) KETERANGAN

1 2 3 4 5 6 7 8 9

HARGA TOKO/QUARRY

JUMLAH HARGA BAHAN

VI BAHAN LANTAI - 1 Homogenius (60x60) Cm Buah 72,000.00 100.00 65.00 7,200.00 79,365.00 2 Keramik (40x40) Cm Buah 8,000.00 100.00 65.00 800.00 8,965.00 3 Keramik (30x30) Cm Buah 4,000.00 100.00 65.00 400.00 4,565.00 4 Keramik (20x20) Cm Buah 1,800.00 100.00 65.00 180.00 2,145.00 5 Keramik (20x25) Cm Buah 1,800.00 100.00 65.00 180.00 2,145.00 6 Homogenius Warna (60x60) Cm Buah 80,000.00 100.00 65.00 8,000.00 88,165.00 7 Keramik Warna (40x40) Cm Buah 8,300.00 100.00 65.00 830.00 9,295.00 8 Keramik Warna (30x30) Cm Buah 4,200.00 100.00 65.00 420.00 4,785.00 9 Keramik Warna (20x20) Cm Buah 2,000.00 100.00 65.00 200.00 2,365.00

10 Plint Keramik (10x20) Cm Buah 1,250.00 50.00 32.50 125.00 1,457.50 11 Plint Keramik (10x30) Cm Buah 2,200.00 30.00 19.50 220.00 2,469.50 12 Plint Keramik (10x40) Cm Buah 2,900.00 25.00 16.25 290.00 3,231.25 13 Plint Homogenius (10x60) Cm Buah 12,000.00 20.00 13.00 1,200.00 13,233.00 14 Plint Keramik Warna (10x20) Cm Buah 1,000.00 50.00 32.50 100.00 1,182.50 15 Plint Keramik Warna (10x30) Cm Buah 1,400.00 30.00 19.50 140.00 1,589.50 16 Plint Keramik Warna (10x40) Cm Buah 2,075.00 25.00 16.25 207.50 2,323.75 17 Plint Homogenius Warna (10x60) Cm Buah 13,333.33 20.00 13.00 1,333.33 14,699.67 18 Bon-bon Keramik M' 7,750.00 20.00 13.00 775.00 8,558.00 19 Floor hardener M2 34,800.00 100.00 65.00 3,480.00 38,445.00 20 Parquette M2 225,500.00 100.00 65.00 22,550.00 248,215.00 21 Karpet M2 12,959.00 323.98 2,198.30 1,295.90 16,777.18

- VII BAHAN ATAP - 1 Asbes Gelombang Lbr 31,000.00 100.00 130.00 3,100.00 34,330.00 2 Atap canopy (poly carbonat + rangka hollow starbus) M2 250,000.00 100.00 130.00 25,000.00 275,230.00 3 Genteng Metal gelombang Lbr 77,000.00 100.00 130.00 7,700.00 84,930.00 4 Genteng Metal alur lurus Lbr 39,000.00 100.00 130.00 3,900.00 43,130.00 5 Perabung genteng metal Lbr 25,000.00 100.00 130.00 2,500.00 27,730.00 6 Seng Gelombang BJLS 020 K Lbr 37,800.00 100.00 130.00 3,780.00 41,810.00 7 Seng Gelombang Alumunium 0,25 Lbr 65,000.00 100.00 130.00 6,500.00 71,730.00 8 Seng Plat BJLS 20 Lbr 59,720.00 100.00 130.00 5,972.00 65,922.00 9 Atap Multi Sirap Lbr 5,100.00 100.00 130.00 510.00 5,840.00

10 EDF M2 250,000.00 100.00 130.00 25,000.00 275,230.00 11 Genteng Beton warna BH 21,520.00 100.00 130.00 2,152.00 23,902.00 12 Bubungan beton warna BH 28,000.00 100.00 130.00 2,800.00 31,030.00 13 Allumunium Foil / Sisalation M2 10,000.00 100.00 130.00 1,000.00 11,230.00 14 Formika M2 40,000.00 500.00 650.00 4,000.00 45,150.00

- VIII BAJA RINGAN -

1 Supertruss C75. 100INT Kg 29,000.00 100.00 130.00 25,000.00 35,700.00 2 Supertruss C75. 75INT Kg 27,000.00 100.00 130.00 25,000.00 33,000.00 3 Topspan 40,055 INT Kg 24,770.00 100.00 130.00 25,000.00 31,500.00 4 Wteks 12-14x20 HWFS Kls II Pc 160.00 100.00 130.00 510.00 900.00 5 CSP 10-16X16 HWFS Kls II Pc 160.00 100.00 130.00 510.00 900.00 6 SG10 Multiplate Pc 7,660.00 100.00 130.00 510.00 8,400.00

- IX BAHAN LANGIT-LANGIT - 1 Teakwood (lapis jati) Tebal 3,6 mm Lembar 150,000.00 500.00 650.00 15,000.00 166,150.00 2 Plywood (Multiplek) 9 mm Lembar 111,000.00 500.00 650.00 11,100.00 123,250.00 3 Plywood (triplek) 3,6 mm Lembar 76,000.00 500.00 650.00 7,600.00 84,750.00 4 Gypsum Board 9 mm Lembar 85,000.00 500.00 650.00 8,500.00 94,650.00 5 List Gypsum lbr 15-20cm M' 17,600.00 500.00 650.00 1,760.00 20,510.00 6 Papan Gypsum 9 mm setara jayaboard Lembar 48,000.00 1,700.00 325.00 4,800.00 54,825.00 7 Papan Gypsum 8 mm setara jayaboard Lembar 34,500.00 1,550.00 325.00 3,450.00 39,825.00 8 Asbes Semen M2 31,200.00 500.00 650.00 3,120.00 35,470.00 9 Triplek melamin Lembar 75,000.00 500.00 650.00 7,500.00 83,650.00

-

Page 5: Analisa 2013 Pu Cipta Karya kabupaten kampar

NO. JENIS BAHAN SATUAN MUAT BONGKAR TRANSPORT OVERHEAD (10%) KETERANGAN

1 2 3 4 5 6 7 8 9

HARGA TOKO/QUARRY

JUMLAH HARGA BAHAN

X BAHAN PIPA DAN SANITAIR - 1 Pipa PVC Type AW Ø 1/2" M' 3,500.00 50.00 130.00 350.00 4,030.00 2 Pipa PVC Type AW Ø 3/4" M' 5,200.00 50.00 130.00 520.00 5,900.00 3 Pipa PVC Type AW Ø 1" M' 5,200.00 50.00 130.00 520.00 5,900.00 4 Pipa PVC Type AW Ø 2" M' 14,700.00 50.00 130.00 1,470.00 16,350.00 5 Pipa PVC Type AW Ø 3" M' 29,000.00 50.00 130.00 2,900.00 32,080.00 6 Pipa PVC Type AW Ø 4" M' 44,500.00 50.00 130.00 4,450.00 49,130.00 7 Pipa PVC Type AW Ø 6" M' 40,000.00 50.00 130.00 4,000.00 44,180.00 8 Pipa Abu-abu 4" M' 15,000.00 50.00 130.00 1,500.00 16,680.00 9 Pipa GIP dia 1" M' 55,000.00 50.00 130.00 5,500.00 60,680.00

10 Pipa GIP dia 1,5" M' 82,000.00 50.00 130.00 8,200.00 90,380.00 11 Pipa GIP dia 2" M' 112,000.00 50.00 130.00 11,200.00 123,380.00 12 Pipa Besi dia 1" M' 35,000.00 50.00 130.00 3,500.00 38,680.00 13 Pipa Besi dia 1,5" M' 21,000.00 50.00 130.00 2,100.00 23,280.00 14 Pipa Besi dia 3/4" M' 28,000.00 50.00 130.00 2,800.00 30,980.00 15 Stop kran 3/4" Bh 47,000.00 50.00 130.00 4,700.00 51,880.00 16 Kran Air Ø 1/2" atau 3/4" plastik Bh 12,500.00 50.00 130.00 1,250.00 13,930.00 17 Kran Air Ø 1/2" atau 3/4" stainless Bh 125,000.00 50.00 130.00 12,500.00 137,680.00 18 Bak Fiberglass Kap. Kecil Bh 160,000.00 5,000.00 13,000.00 16,000.00 194,000.00 19 Bak Fiberglass Kap. Besar Bh 250,000.00 5,000.00 13,000.00 25,000.00 293,000.00 20 Kloset Duduk Monoblok Bh 1,600,000.00 5,000.00 13,000.00 160,000.00 1,778,000.00 21 Kloset Jongkok Porselen Bh 150,000.00 5,000.00 13,000.00 15,000.00 183,000.00 22 Urinoir Bh 1,300,000.00 5,000.00 13,000.00 130,000.00 1,448,000.00 23 Wastafel kecil standard dinding Bh 450,000.00 5,000.00 13,000.00 45,000.00 513,000.00 24 Seal Tape Bh 5,100.00 50.00 48.75 510.00 5,708.75 25 Floor Drain stainless Bh 160,000.00 50.00 130.00 16,000.00 176,180.00 26 Floor Drain plastik Bh 15,000.00 50.00 130.00 1,500.00 16,680.00 27 Tangki Plastik 250 L Unit 400,000.00 5,000.00 13,000.00 40,000.00 458,000.00 28 Tangki Plastik 500 L Unit 600,000.00 5,000.00 13,000.00 60,000.00 678,000.00 29 Tangki Plastik 1000 L setara Tedmond Unit 1,000,000.00 5,000.00 13,000.00 100,000.00 1,118,000.00 30 Tangki Stainless 500 Liter setara Tedmond Unit 1,600,000.00 5,000.00 13,000.00 160,000.00 1,778,000.00 31 Tangki Stainless 1100 Liter + Kaki setara Tedmond Unit 3,250,000.00 5,000.00 13,000.00 325,000.00 3,593,000.00

- XI BAHAN PINTU - 1 Pintu Besi M2 660,500.00 5,000.00 13,000.00 66,050.00 744,550.00 2 Pintu Fiber Warna Lbr 754,500.00 5,000.00 13,000.00 21,000.00 793,500.00 3 Pintu Fiber KM/WC (lengkap) Lbr 210,000.00 5,000.00 13,000.00 21,000.00 249,000.00 4 Pintu Panel Tembusu Lbr 760,500.00 5,000.00 13,000.00 76,050.00 854,550.00 5 Pintu Panel Meranti Lbr 470,000.00 5,000.00 13,000.00 47,000.00 535,000.00 6 Pintu Plywood (triplek depan blkg) Lbr 190,000.00 5,000.00 13,000.00 19,000.00 227,000.00 7 Pintu Teakwood (lapis jati) depan belakang Lbr 620,000.00 5,000.00 13,000.00 62,000.00 700,000.00 8 Vertical Blind M2 90,000.00 5,000.00 1,722.50 9,000.00 105,722.50 9 Rolling Door M2 300,000.00 5,000.00 6,500.00 30,000.00 341,500.00

10 Folding Gate M2 500,000.00 5,000.00 6,500.00 50,000.00 561,500.00 11 Pintu Aluminium Kaca Lbr 2,100,000.00 5,000.00 6,500.00 210,000.00 2,321,500.00

- XII BAHAN PENGGANTUNG / KUNCI - 1 Kunci Tanam Antik kuningan (standard) Bh 200,000.00 100.00 195.00 20,000.00 220,295.00 2 Kunci Tanam Biasa stainless (minimalis) Bh 100,000.00 100.00 195.00 10,000.00 110,295.00 3 Kunci Tanam Kamar Mandi Bh 38,000.00 100.00 195.00 3,800.00 42,095.00 4 Kunci Silinder Bh 23,500.00 100.00 195.00 2,350.00 26,145.00 5 Engsel Pintu 4" Bh 15,000.00 100.00 195.00 1,500.00 16,795.00 6 Engsel Jendela 3" Bh 10,000.00 100.00 195.00 1,000.00 11,295.00 7 Grendel pintu 6" (krom) Bh 20,000.00 100.00 195.00 2,000.00 22,295.00 8 Grendel Pintu 4"(krom) Bh 11,000.00 100.00 195.00 1,100.00 12,395.00 9 Grendel Jendela 2" (krom) Bh 8,500.00 100.00 195.00 850.00 9,645.00

10 Kait Angin / Hak Angin Bh 7,500.00 100.00 195.00 750.00 8,545.00 11 Tarikan Tangan Bh 7,500.00 100.00 195.00 750.00 8,545.00 12 Door Closer Bh 395,000.00 100.00 195.00 39,500.00 434,795.00 13 Door Stoper Plastik Bh 20,500.00 100.00 195.00 2,050.00 22,845.00

Page 6: Analisa 2013 Pu Cipta Karya kabupaten kampar

NO. JENIS BAHAN SATUAN MUAT BONGKAR TRANSPORT OVERHEAD (10%) KETERANGAN

1 2 3 4 5 6 7 8 9

HARGA TOKO/QUARRY

JUMLAH HARGA BAHAN

-

Page 7: Analisa 2013 Pu Cipta Karya kabupaten kampar

NO. JENIS BAHAN SATUAN MUAT BONGKAR TRANSPORT OVERHEAD (10%) KETERANGAN

1 2 3 4 5 6 7 8 9

HARGA TOKO/QUARRY

JUMLAH HARGA BAHAN

XIII BAHAN KACA - 1 Kaca 3 mm M2 76,500.00 800.00 3,250.00 7,650.00 88,200.00 2 Kaca 5 mm M2 87,000.00 800.00 3,250.00 8,700.00 99,750.00 3 Kaca es/buram 3 mm M2 60,000.00 800.00 3,250.00 6,000.00 70,050.00 4 Kaca es/buram 5 mm M2 67,500.00 800.00 3,250.00 6,750.00 78,300.00 5 Kaca patry M2 180,000.00 800.00 3,250.00 18,000.00 202,050.00 6 Kaca Rayben 3 mm M2 92,000.00 800.00 3,250.00 9,200.00 105,250.00 7 Kaca Rayben 5 mm M2 95,000.00 800.00 3,250.00 9,500.00 108,550.00 8 Jendela Nako (rangka + Kaca 5 mm) M2 85,000.00 800.00 3,250.00 8,500.00 97,550.00 9 Glass Block Ukuran standard BH 15,000.00 800.00 3,250.00 1,500.00 20,550.00

- XIV BAHAN LISTRIK -

1 Pemasangan Titik Lampu (termasuk kabel,teedus, fitting) Ttk 180,000.00 - 180,000.00

2 Lampu Pijar 25 Watt Bh 6,500.00 5.00 5.00 650.00 7,160.00 3 Lampu Pijar 40 Watt Bh 8,200.00 5.00 5.00 820.00 9,030.00 4 Lampu Neon Jantung Bh 75,000.00 5.00 5.00 7,500.00 82,510.00 5 Lampu Save Energy (Lilin) Setara Philips Bh 50,000.00 5.00 5.00 5,000.00 55,010.00 6 Lampu TL Komplit 1 x 20 watt Bh 74,500.00 50.00 50.00 7,450.00 82,050.00 7 Lampu TL Komplit 2 x 20 Watt Bh 310,500.00 50.00 50.00 31,050.00 341,650.00 8 Lampu TL Komplit 1 x 40 Watt Bh 100,000.00 50.00 50.00 10,000.00 110,100.00 9 Lampu Down Light 4" komplit Bh 94,000.00 50.00 50.00 9,400.00 103,500.00

10 Lampu Baret Bh 188,000.00 50.00 65.00 18,800.00 206,915.00 11 Stop Kontak (setara broco) Bh 14,500.00 50.00 65.00 1,450.00 16,065.00 12 Saklar Tunggal (setara broco) Bh 14,500.00 50.00 65.00 1,450.00 16,065.00 13 Saklar Ganda (setara broco) Bh 21,600.00 50.00 65.00 2,160.00 23,875.00 14 Saklar Triple (setara broco) Bh 27,000.00 50.00 65.00 2,700.00 29,815.00 15 Zakering Khas (setara merlin gerlin) Bh 50,000.00 50.00 65.00 5,000.00 55,115.00

- XV BAHAN CAT - 1 Cat Tembok setara maxilite Kg 19,300.00 100.00 130.00 1,930.00 21,460.00 2 Cat Tembok setara Catylac kg 38,270.00 100.00 130.00 900.00 39,400.00 3 Cat Kayu Kg 43,500.00 100.00 130.00 4,350.00 48,080.00 4 Cat Dasar / Kapur Kg 6,000.00 100.00 130.00 600.00 6,830.00 5 Cat Dasar / Menie Kayu Kg 27,000.00 100.00 130.00 2,700.00 29,930.00 6 Cat Vernish Kg 56,150.00 100.00 130.00 5,615.00 61,995.00 7 Cat Impra Kg 41,500.00 100.00 130.00 4,150.00 45,880.00 8 Cat Residu Kg 9,800.00 100.00 130.00 980.00 11,010.00 9 Soda Api Kg 11,600.00 100.00 130.00 1,160.00 12,990.00

10 Plamir setara RJ Kg 27,250.00 100.00 130.00 2,725.00 30,205.00 11 Dempul Kayu Kg 38,400.00 100.00 130.00 3,840.00 42,470.00 12 Kertas Amplas Lbr 6,150.00 25.00 32.50 615.00 6,822.50 13 Kuas 3" Bh 17,300.00 25.00 32.50 1,730.00 19,087.50 14 Kuas Golong/rol Bh 26,350.00 25.00 32.50 2,635.00 29,042.50 15 Thinner Ltr 19,000.00 100.00 130.00 1,900.00 21,130.00 16 Flincote / Menie Besi Kg 16,500.00 100.00 130.00 1,650.00 18,380.00

-

Page 8: Analisa 2013 Pu Cipta Karya kabupaten kampar

NO. JENIS BAHAN SATUAN MUAT BONGKAR TRANSPORT OVERHEAD (10%) KETERANGAN

1 2 3 4 5 6 7 8 9

HARGA TOKO/QUARRY

JUMLAH HARGA BAHAN

XVI BAHAN LAIN-LAIN - 1 Air Liter 20.00 1.00 3.25 2.00 26.25 2 Lem Kg 2,500.00 125.00 146.25 250.00 3,021.25 3 Lem Kayu Kg 25,300.00 125.00 146.25 2,530.00 28,101.25 4 Sealant Tube 12,000.00 125.00 146.25 1,200.00 13,471.25 5 Profil Kaca M' 1,700.00 42.50 110.50 170.00 2,023.00 6 Solar Liter 4,500.00 100.00 130.00 450.00 5,180.00 7 Minyak Pelumas Liter 23,000.00 308.13 801.13 2,300.00 26,409.26 8 Minyak Bekisting Liter 6,950.00 182.50 451.75 695.00 8,279.25 9 Aspal Kg 7,800.00 195.00 507.00 780.00 9,282.00

10 Tempat Masak Aspal BH 43,950.00 1,098.75 2,856.75 4,395.00 52,300.50 11 Ijuk Kg 10,400.00 100.00 130.00 1,040.00 11,670.00 12 Water proofing Coating Kg 22,500.00 100.00 130.00 2,250.00 24,980.00 13 Water proofing Membran M2 80,000.00 500.00 650.00 8,000.00 89,150.00 14 Batu Coral sikat ZAK 50,000.00 500.00 650.00 5,000.00 56,150.00

- XVII Alat -

1 Mesin las Jam 98,100.00 - 98,100.00 2 Meja kayu 1 biro Unit 675,000.00 2,000.00 3,250.00 67,500.00 747,750.00 3 Meja kayu ramin + triplek motif teakwood 1 biro Unit 400,000.00 2,000.00 3,250.00 40,000.00 445,250.00 4 Meja kayu 1/2 biro Unit 425,000.00 2,000.00 3,250.00 42,500.00 472,750.00 5 Meja kayu ramin + triplek motif teakwood 1/2 biro Unit 225,000.00 2,000.00 3,250.00 22,500.00 252,750.00 6 Kursi direktur sedang (kaki 5 beroda) Unit 675,000.00 2,000.00 3,250.00 67,500.00 747,750.00 7 Kursi hadap (polaris) kaki besi, alas busa lapis kain Unit 200,000.00 2,000.00 1,300.00 20,000.00 223,300.00 8 Kursi Plastik Unit 40,000.00 1,000.00 3,250.00 4,000.00 48,250.00 9 Lemari Arsip 2 pintu (papan serbuk+kaca) Unit 725,000.00 2,000.00 3,250.00 72,500.00 802,750.00

10 Lemari Arsip 2 pintu sliding (besi+kaca) Unit 1,750,000.00 2,000.00 3,250.00 175,000.00 1,930,250.00 11 Filling Cabinet 4 laci Unit 1,257,354.00 2,000.00 3,250.00 125,735.40 1,388,339.40 12 Kursi Tamu standard (kayu, alas busa lapis kain Unit 1,800,000.00 2,000.00 3,250.00 180,000.00 1,985,250.00 13 Kursi tunggu (besi) 4 susun Unit 1,400,000.00 2,000.00 3,250.00 140,000.00 1,545,250.00

Bangkinang, Januari 2013

Page 9: Analisa 2013 Pu Cipta Karya kabupaten kampar

-

25.38 28.87 12,250.00 35,000.00 OK 12,250.00 35,000.00 OK 12,250.00 35,000.00

17,500.00 50,000.00 OK 12,250.00 35,000.00

12,250.00 35,000.00 17,500.00 50,000.00 12,250.00 35,000.00

64,625.00 OK 3.50 10.00 3.50 10.00 175.00 500.00 7.00 20.00 28.00 80.00 28.00 80.00 350.00 1,000.00 350.00 1,000.00 12,250.00 35,000.00 12,250.00 35,000.00 28.00 80.00

Page 10: Analisa 2013 Pu Cipta Karya kabupaten kampar

28.00 80.00 28.00 80.00 28.00 80.00 1,750.00 5,000.00 5,250.00 15,000.00 5,250.00 15,000.00 7,000.00 20,000.00 7,000.00 20,000.00 - - 12,250.00 35,000.00 12,250.00 35,000.00 12,250.00 35,000.00 3.50 10.00 3.50 10.00 12,250.00 35,000.00 1,050.00 3,000.00

175.00 500.00

12,250.00 35,000.00 12,250.00 35,000.00 350.00 1,000.00 3,500.00 10,000.00 3,500.00 10,000.00 1,750.00 5,000.00 1,750.00 5,000.00 1,750.00 5,000.00 1,750.00 5,000.00 - -

OK 35.00 100.00 OK 35.00 100.00 OK 17.50 50.00

17.50 50.00 17.50 50.00 70.00 200.00 52.50 150.00 52.50 150.00 52.50 150.00 52.50 150.00 350.00 1,000.00

Page 11: Analisa 2013 Pu Cipta Karya kabupaten kampar

70.00 200.00 70.00 200.00 35.00 100.00 35.00 100.00 35.00 100.00 35.00 100.00 35.00 100.00 - - 35.00 100.00 35.00 100.00 35.00 100.00 35.00 100.00 35.00 100.00 35.00 100.00 35.00 100.00 35.00 100.00 - - 385.00 1,100.00 -

Page 12: Analisa 2013 Pu Cipta Karya kabupaten kampar

- 35.00 100.00

8.50 35.00 100.00 35.00 100.00 35.00 100.00 35.00 100.00 35.00 100.00 35.00 100.00 35.00 100.00 35.00 100.00 17.50 50.00 10.50 30.00 8.75 25.00 7.00 20.00 17.50 50.00 10.50 30.00 8.75 25.00 7.00 20.00 7.00 20.00 35.00 100.00 35.00 100.00 1,183.70 3,382.00 - - 70.00 200.00 70.00 200.00 70.00 200.00 70.00 200.00 70.00 200.00

OK 70.00 200.00 70.00 200.00 70.00 200.00 70.00 200.00 70.00 200.00 70.00 200.00 70.00 200.00 70.00 200.00 350.00 1,000.00 - - 70.00 200.00 70.00 200.00 70.00 200.00 70.00 200.00 70.00 200.00 70.00 200.00 - - 350.00 1,000.00 350.00 1,000.00

OK 350.00 1,000.00 350.00 1,000.00 350.00 1,000.00 175.00 500.00 175.00 500.00 350.00 1,000.00 350.00 1,000.00 -

Page 13: Analisa 2013 Pu Cipta Karya kabupaten kampar

- 70.00 200.00 70.00 200.00 70.00 200.00 70.00 200.00 70.00 200.00 70.00 200.00 70.00 200.00 70.00 200.00 70.00 200.00 70.00 200.00 70.00 200.00 70.00 200.00 70.00 200.00 70.00 200.00 70.00 200.00 70.00 200.00 70.00 200.00 7,000.00 20,000.00 7,000.00 20,000.00 7,000.00 20,000.00 7,000.00 20,000.00 7,000.00 20,000.00 7,000.00 20,000.00 26.25 75.00 70.00 200.00 70.00 200.00 7,000.00 20,000.00 7,000.00 20,000.00 7,000.00 20,000.00 7,000.00 20,000.00 7,000.00 20,000.00 - - 7,000.00 20,000.00 7,000.00 20,000.00 7,000.00 20,000.00 7,000.00 20,000.00 7,000.00 20,000.00 7,000.00 20,000.00 7,000.00 20,000.00 927.50 2,650.00 3,500.00 10,000.00 3,500.00 10,000.00 3,500.00 10,000.00 - - 105.00 300.00 105.00 300.00 105.00 300.00 105.00 300.00 105.00 300.00 105.00 300.00 105.00 300.00 105.00 300.00 105.00 300.00 105.00 300.00 105.00 300.00 105.00 300.00 105.00 300.00

Page 14: Analisa 2013 Pu Cipta Karya kabupaten kampar

-

Page 15: Analisa 2013 Pu Cipta Karya kabupaten kampar

- 1,750.00 5,000.00 1,750.00 5,000.00 1,750.00 5,000.00 1,750.00 5,000.00 1,750.00 5,000.00 1,750.00 5,000.00 1,750.00 5,000.00 1,750.00 5,000.00 1,750.00 5,000.00 - -

- 35.00 100.00 35.00 100.00 35.00 100.00 35.00 100.00 70.00 200.00 70.00 200.00 70.00 200.00 35.00 100.00 35.00 100.00 35.00 100.00 35.00 100.00 35.00 100.00 35.00 100.00 35.00 100.00 - - 70.00 200.00 70.00 200.00 70.00 200.00 70.00 200.00 70.00 200.00 70.00 200.00 70.00 200.00 70.00 200.00 70.00 200.00 70.00 200.00 70.00 200.00 17.50 50.00 17.50 50.00 17.50 50.00 70.00 200.00 70.00 200.00 -

Page 16: Analisa 2013 Pu Cipta Karya kabupaten kampar

- 1.75 5.00 78.75 225.00 78.75 225.00 78.75 225.00 59.50 170.00 70.00 200.00 431.38 1,232.50 243.25 695.00 273.00 780.00 1,538.25 4,395.00 70.00 200.00 70.00 200.00 350.00 1,000.00 350.00 1,000.00 - - - 1,750.00 5,000.00 1,750.00 5,000.00 1,750.00 5,000.00 1,750.00 5,000.00 1,750.00 5,000.00 700.00 2,000.00 1,750.00 5,000.00 1,750.00 5,000.00 1,750.00 5,000.00 1,750.00 5,000.00 1,750.00 5,000.00 1,750.00 5,000.00

Page 17: Analisa 2013 Pu Cipta Karya kabupaten kampar

49,500.00 60,500.00 60,500.00 60,500.00 60,500.00 60,500.00 60,500.00 60,500.00 82,500.00 60,500.00 82,500.00 66,000.00

Page 18: Analisa 2013 Pu Cipta Karya kabupaten kampar

DAFTAR HARGA SATUAN UPAHDAN BAHAN BANGUNAN

DAFTAR UPAH

NO. JENIS UPAH SATUAN HARGA SATUAN KETERANGAN

1 2 3 4 51 Pekerja OH 62,100.00 2 Tukang Gali OH 74,750.00 3 Tukang Kayu OH 75,900.00 4 Tukang Batu OH 74,750.00 5 Tukang Las OH 74,750.00 6 Tukang Besi OH 74,750.00 7 Tukang Pipa OH 75,900.00 8 Tukang Cat OH 74,750.00 9 Kepala Tukang OH 75,900.00

10 Mandor OH 80,500.00 11 Operator OH 86,250.00 12 Pembantu Operator OH 64,400.00

DAFTAR BAHAN BANGUNAN

NO. JENIS BAHAN SATUAN HARGA SATUAN KETERANGAN

1 2 3 4 5I BAHAN PASANGAN1 Pasir Urug (PU) M3 129,430.00 2 Pasir Pasang (PP) M3 180,250.00 3 Pasir Beton (PB) M3 176,950.00 4 Pasir Kuarsa M3 261,500.00 5 Kerikil (KR) M3 172,875.00 6 Sirtu M3 121,950.00 7 Batu Belah (gunung) 15cm/20 cm M3 405,250.00 8 Batu sungai (mangga) M3 377,750.00 9 Portland Cement (PC) Kg 1,292.50

10 Semen putih Kg 1,666.50 11 Cornite Compound Jayaboard Zak 79,825.00 12 Bata Merah (kulim) Buah 336.50 13 Kerawang (Roster semen)20x20 cm Buah 24,272.00 14 Kerawang (Roster semen)40x40 cm Buah 49,572.00 15 Rumput Gajah Mini M2 13,800.00 16 Rumput Biasa M2 13,250.00 17 Tanah Hitam M3 90,050.00 18 Tanah Urug M3 46,750.00 19 Conblock K.175 T= 6 cm Bh 1,832.00 20 Conblock K.225 T= 6 cm Bh 2,052.00 21 Conblock K.300 T= 8 cm Bh 2,272.00 22 Grass Block T= 6 cm Bh 20,972.00 23 Buis Beton Dia 20cm P= 50 Cm Bh 52,250.00 24 Buis Beton Dia 40cm P = 60 Cm Bh 138,550.00 25 Buis Beton Dia 60cm P= 80 Cm Bh 233,750.00 26 Buis Beton Dia 80cm P= 100 Cm Bh 390,500.00 27 Buis Beton Dia 100cm P = 100 Cm Bh 473,000.00

Page 19: Analisa 2013 Pu Cipta Karya kabupaten kampar

II BAHAN KAYU1 Kayu Kelas I M3 3,892,750.00 2 Kayu Kelas II M3 2,462,750.00 3 Kayu Kelas III M3 2,022,750.00 4 Kayu List Profil siku2" M' 2,761.50 5 Kayu List Profil 0.8x3" M' 3,311.50 6 Papan 2 x 20 M3 2,022,750.00 7 Kayu Cerocok dia. 10 - 15 cm Btg 48,100.00 8 Dolken Kayu Galam, Ø (8-10)Cm,Panjang 4 M Batang 11,275.00 9 Kayu Bakar M3 757,750.00

10 Papan Piri - piri (Siap Ketam 3 sisi) M3 2,462,750.00 11 Papan Lebah Bergayut M' 45,150.00 12 Singap Ukir kayu M2 746,500.00 13 Singap Ukir GRC M2 449,500.00 14 Selembayung GRC Lembar 30 cm Pasang 444,250.00 15 Selembayung kayu lebar 30 cm Pasang 279,250.00 16 Sayap layang-layang lebar 30 cm Pasang 279,250.00 17 Lisplank papan + anak ( + 30 cm) M' 59,250.00

III BAHAN BESI DAN BAJA1 Besi Beton Polos Kg 14,965.00 2 Besi Beton Ulir Kg 17,935.00 3 Kawat Beton Kg 17,982.50 4 Kawat Ø 4 mm Kg 16,002.50 5 Kawat Las Listrik Kg 31,402.50 6 Kawat Ayam M2 15,366.30 7 Besi Strip Tebal 5 mm Kg 11,117.50 8 Baja Ringan C75 100 int kg 32,017.50 9 Baja Ringan C75 75 int Kg 29,817.50

10 Baja IWF Kg 13,152.50 11 Terali besi (Non Motif) M2 380,050.00 12 Baja Siku Kg 16,430.00 13 Pagar Hollow starbuss 1,2 mm x 20 mm x mm (standard minimalis) M2 297,150.00 14 Hollow Ment Hijau 0.25mm x 40 mm x 20 mm Btg 17,965.00 15 Hollow Ment Hijau 0.25mm x 40 mm x 40 mm Btg 21,265.00 16 Hollow Galvanis 0.30 mm x 40 mm x 20 mm Btg 20,715.00 17 Hollow Galvanis 0.30 mm x 40 mm x 40 mm Btg 25,115.00 18 Rangka Furing Btg 11,365.00

IV BAHAN PAKU1 Paku 1 Cm - 2,5 Cm Kg 17,745.00 2 Paku 5 Cm - 12 Cm Kg 16,645.00 3 Paku Skrup Kg 11,145.00 4 Paku Skrup 5 Cm Kg 16,095.00 5 Paku Skrup 10 Cm Kg 16,645.00 6 Paku Asbes Kg 29,735.00 7 Paku Atap Genteng Metal Kg 24,345.00 8 Paku Atap Seng Gelombang Kg 24,895.00

V BAHAN ALLUMUNIUM1 Profil Allumunium "T" M' 26,125.00

VI BAHAN LANTAI1 Homogenius (60x60) Cm Buah 79,365.00 2 Keramik (40x40) Cm Buah 8,965.00 3 Keramik (30x30) Cm Buah 4,565.00 4 Keramik (20x20) Cm Buah 2,145.00 5 Keramik (20x25) Cm Buah 2,145.00 6 Homogenius Warna (60x60) Cm Buah 88,165.00 7 Keramik Warna (40x40) Cm Buah 9,295.00 8 Keramik Warna (30x30) Cm Buah 4,785.00 9 Keramik Warna (20x20) Cm Buah 2,365.00

10 Plint Keramik (10x20) Cm Buah 1,457.50 11 Plint Keramik (10x30) Cm Buah 2,469.50 12 Plint Keramik (10x40) Cm Buah 3,231.25 13 Plint Homogenius (10x60) Cm Buah 13,233.00 14 Plint Keramik Warna (10x20) Cm Buah 1,182.50 15 Plint Keramik Warna (10x30) Cm Buah 1,589.50 16 Plint Keramik Warna (10x40) Cm Buah 2,323.75 17 Plint Homogenius Warna (10x60) Cm Buah 14,699.67 18 Bon-bon Keramik M' 8,558.00 19 Floor hardener M2 38,445.00 20 Parquette M2 248,215.00 21 Karpet M2 16,777.18

Page 20: Analisa 2013 Pu Cipta Karya kabupaten kampar

VII BAHAN ATAP1 Asbes Gelombang Lbr 34,330.00 2 Atap canopy (poly carbonat + rangka hollow starbus) M2 275,230.00 3 Genteng Metal gelombang Lbr 84,930.00 4 Genteng Metal alur lurus Lbr 43,130.00 5 Perabung genteng metal Lbr 27,730.00 6 Seng Gelombang BJLS 020 K Lbr 41,810.00 7 Seng Gelombang Alumunium 0,25 Lbr 71,730.00 8 Seng Plat BJLS 20 Lbr 65,922.00 9 Atap Multi Sirap Lbr 5,840.00

10 EDF M2 275,230.00 11 Genteng Beton warna BH 23,902.00 12 Bubungan beton warna BH 31,030.00 13 Allumunium Foil / Sisalation M2 11,230.00 14 Formika M2 45,150.00

VIII BAJA RINGAN 1 Supertruss C75. 100INT Kg 35,700.00 2 Supertruss C75. 75INT Kg 33,000.00 3 Topspan 40,055 INT Kg 31,500.00 4 Wteks 12-14x20 HWFS Kls II Pc 900.00 5 CSP 10-16X16 HWFS Kls II Pc 900.00 6 SG10 Multiplate Pc 8,400.00

IX BAHAN LANGIT-LANGIT1 Teakwood (lapis jati) Tebal 3,6 mm Lembar 166,150.00 2 Plywood (Multiplek) 9 mm Lembar 123,250.00 3 Plywood (triplek) 3,6 mm Lembar 84,750.00 4 Gypsum Board 9 mm Lembar 94,650.00 5 List Gypsum lbr 15-20cm M' 20,510.00 6 Papan Gypsum 9 mm setara jayaboard Lembar 54,825.00 7 Papan Gypsum 8 mm setara jayaboard Lembar 39,825.00 8 Asbes Semen M2 35,470.00 9 Triplek melamin Lembar 83,650.00

X BAHAN PIPA DAN SANITAIR1 Pipa PVC Type AW Ø 1/2" M' 4,030.00 2 Pipa PVC Type AW Ø 3/4" M' 5,900.00 3 Pipa PVC Type AW Ø 1" M' 5,900.00 4 Pipa PVC Type AW Ø 2" M' 16,350.00 5 Pipa PVC Type AW Ø 3" M' 32,080.00 6 Pipa PVC Type AW Ø 4" M' 49,130.00 7 Pipa PVC Type AW Ø 6" M' 44,180.00 8 Pipa Abu-abu 4" M' 16,680.00 9 Pipa GIP dia 1" M' 60,680.00

10 Pipa GIP dia 1,5" M' 90,380.00 11 Pipa GIP dia 2" M' 123,380.00 12 Pipa Besi dia 1" M' 38,680.00 13 Pipa Besi dia 1,5" M' 23,280.00 14 Pipa Besi dia 3/4" M' 30,980.00 15 Stop kran 3/4" Bh 51,880.00 16 Kran Air Ø 1/2" atau 3/4" plastik Bh 13,930.00 17 Kran Air Ø 1/2" atau 3/4" stainless Bh 137,680.00 18 Bak Fiberglass Kap. Kecil Bh 194,000.00 19 Bak Fiberglass Kap. Besar Bh 293,000.00 20 Kloset Duduk Monoblok Bh 1,778,000.00 21 Kloset Jongkok Porselen Bh 183,000.00 22 Urinoir Bh 1,448,000.00 23 Wastafel kecil standard dinding Bh 513,000.00 24 Seal Tape Bh 5,708.75 25 Floor Drain stainless Bh 176,180.00 26 Floor Drain plastik Bh 16,680.00 27 Tangki Plastik 250 L Unit 458,000.00 28 Tangki Plastik 500 L Unit 678,000.00 29 Tangki Plastik 1000 L setara Tedmond Unit 1,118,000.00 30 Tangki Stainless 500 Liter setara Tedmond Unit 1,778,000.00 31 Tangki Stainless 1100 Liter + Kaki setara Tedmond Unit 3,593,000.00

XI BAHAN PINTU1 Pintu Besi M2 744,550.00 3 Pintu Fiber KM/WC (lengkap) Lbr 249,000.00 4 Pintu Panel Tembusu Lbr 854,550.00 5 Pintu Panel Meranti Lbr 535,000.00 6 Pintu Plywood (triplek depan blkg) Lbr 227,000.00 7 Pintu Teakwood (lapis jati) depan belakang Lbr 700,000.00 8 Vertical Blind M2 105,722.50 9 Rolling Door M2 341,500.00

Page 21: Analisa 2013 Pu Cipta Karya kabupaten kampar

10 Folding Gate M2 561,500.00 11 Pintu Aluminium Kaca Lbr 2,321,500.00

Page 22: Analisa 2013 Pu Cipta Karya kabupaten kampar

XII BAHAN PENGGANTUNG / KUNCI1 Kunci Tanam Antik kuningan (standard) Bh 220,295.00 2 Kunci Tanam Biasa stainless (minimalis) Bh 110,295.00 3 Kunci Tanam Kamar Mandi Bh 42,095.00 4 Kunci Silinder Bh 26,145.00 5 Engsel Pintu 4" Bh 16,795.00 6 Engsel Jendela 3" Bh 11,295.00 7 Grendel pintu 6" (krom) Bh 22,295.00 8 Grendel Pintu 4"(krom) Bh 12,395.00 9 Grendel Jendela 2" (krom) Bh 9,645.00

10 Kait Angin / Hak Angin Bh 8,545.00 11 Tarikan Tangan Bh 8,545.00 12 Door Closer Bh 434,795.00 13 Door Stoper Plastik Bh 22,845.00

XIII BAHAN KACA1 Kaca 3 mm M2 88,200.00 2 Kaca 5 mm M2 99,750.00 3 Kaca es/buram 3 mm M2 70,050.00 4 Kaca es/buram 5 mm M2 78,300.00 5 Kaca patry M2 202,050.00 6 Kaca Rayben 3 mm M2 105,250.00 7 Kaca Rayben 5 mm M2 108,550.00 8 Jendela Nako (rangka + Kaca 5 mm) M2 97,550.00 9 Glass Block Ukuran standard BH 20,550.00

XIV BAHAN LISTRIK1 Pemasangan Titik Lampu (termasuk kabel,teedus, fitting) Ttk 180,000.00 2 Lampu Pijar 25 Watt Bh 7,160.00 3 Lampu Pijar 40 Watt Bh 9,030.00 4 Lampu Neon Jantung Bh 82,510.00 5 Lampu Save Energy (Lilin) Setara Philips Bh 55,010.00 6 Lampu TL Komplit 1 x 20 watt Bh 82,050.00 7 Lampu TL Komplit 2 x 20 Watt Bh 341,650.00 8 Lampu TL Komplit 1 x 40 Watt Bh 110,100.00 9 Lampu Down Light 4" komplit Bh 103,500.00

10 Lampu Baret Bh 206,915.00 11 Stop Kontak (setara broco) Bh 16,065.00 12 Saklar Tunggal (setara broco) Bh 16,065.00 13 Saklar Ganda (setara broco) Bh 23,875.00 14 Saklar Triple (setara broco) Bh 29,815.00 15 Zakering Khas (setara merlin gerlin) Bh 55,115.00

XV BAHAN CAT1 Cat Tembok setara maxilite Kg 21,460.00 3 Cat Kayu Kg 48,080.00 4 Cat Dasar / Kapur Kg 6,830.00 5 Cat Dasar / Menie Kayu Kg 29,930.00 6 Cat Vernish Kg 61,995.00 7 Cat Impra Kg 45,880.00 8 Cat Residu Kg 11,010.00 9 Soda Api Kg 12,990.00

10 Plamir setara RJ Kg 30,205.00 11 Dempul Kayu Kg 42,470.00 12 Kertas Amplas Lbr 6,822.50 13 Kuas 3" Bh 19,087.50 14 Kuas Golong/rol Bh 29,042.50 15 Thinner Ltr 21,130.00 16 Flincote / Menie Besi Kg 18,380.00

Page 23: Analisa 2013 Pu Cipta Karya kabupaten kampar

XVI BAHAN LAIN-LAIN1 Air Liter 26.25 2 Lem Kg 3,021.25 3 Lem Kayu Kg 28,101.25 4 Sealant Tube 13,471.25 5 Profil Kaca M' 2,023.00 6 Solar Liter 5,180.00 7 Minyak Pelumas Liter 26,409.26 8 Minyak Bekisting Liter 8,279.25 9 Aspal Kg 9,282.00

10 Tempat Masak Aspal BH 52,300.50 11 Ijuk Kg 11,670.00 12 Water proofing Coating Kg 24,980.00 13 Water proofing Membran M2 89,150.00 14 Batu Coral sikat ZAK 56,150.00

XVII Alat1 Mesin las Jam 98,100.00 2 Meja kayu 1 biro Unit 747,750.00 3 Meja kayu ramin + triplek motif teakwood 1 biro Unit 445,250.00 4 Meja kayu 1/2 biro Unit 472,750.00 5 Meja kayu ramin + triplek motif teakwood 1/2 biro Unit 252,750.00 6 Kursi direktur sedang (kaki 5 beroda) Unit 747,750.00 7 Kursi hadap (polaris) kaki besi, alas busa lapis kain Unit 223,300.00 8 Kursi Plastik Unit 48,250.00 9 Lemari Arsip 2 pintu (papan serbuk+kaca) Unit 802,750.00

10 Lemari Arsip 2 pintu sliding (besi+kaca) Unit 1,930,250.00 11 Filling Cabinet 4 laci Unit 1,388,339.40 12 Kursi Tamu standard (kayu, alas busa lapis kain Unit 1,985,250.00 13 Kursi tunggu (besi) 4 susun Unit 1,545,250.00

Bangkinang, Januari 20130

Page 24: Analisa 2013 Pu Cipta Karya kabupaten kampar

DAFTAR ANALISA PEKERJAAN

I. PEKERJAAN PERSIAPAN1. MEMASANG 1M' PAGAR SEMENTARA DARI KAYU TINGGI 2 METER

Kebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

Bahan

Btg 1.250 Rp 11,275.00 Rp 14,093.75

PC Kg 2.500 Rp 1,292.50 Rp 3,231.25 PB M3 0.005 Rp 176,950.00 Rp 884.75 KR M3 0.009 Rp 172,875.00 Rp 1,555.87 Kayu Kelas II (Balok) M3 0.072 Rp 2,462,750.00 Rp 177,318.00 Paku 5 cm - 12 cm Kg 0.060 Rp 16,645.00 Rp 998.70 Residu Kg 0.400 Rp 11,010.00 Rp 4,404.00

Tenaga Kerja

Pekerja OH 0.400 Rp 62,100.00 Rp 24,840.00 Tukang Kayu OH 0.200 Rp 75,900.00 Rp 15,180.00 Kepala Tukang OH 0.020 Rp 75,900.00 Rp 1,518.00 Mandor OH 0.020 Rp 80,500.00 Rp 1,610.00

Sub Jumlah Rp 245,634.33

2. MEMASANG 1M' PAGAR SEMENTARA DARI SENG GELOMBANG TINGGI 2 METERKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

Bahan

Btg 1.250 Rp 11,275.00 Rp 14,093.75

PC Kg 2.500 Rp 1,292.50 Rp 3,231.25 Seng Gelombang Lbr 1.200 Rp 27,730.00 Rp 33,276.00 PB M3 0.005 Rp 176,950.00 Rp 884.75 KR M3 0.009 Rp 172,875.00 Rp 1,555.87 Kayu Kelas II (Balok) M3 0.072 Rp 2,462,750.00 Rp 177,318.00 Paku 5 cm - 12 cm Kg 0.060 Rp 16,645.00 Rp 998.70 Meni Besi Kg 0.400 Rp 90,050.00 Rp 36,020.00

Tenaga Kerja

Pekerja OH 0.400 Rp 62,100.00 Rp 24,840.00 Tukang Kayu OH 0.200 Rp 75,900.00 Rp 15,180.00 Kepala Tukang OH 0.020 Rp 75,900.00 Rp 1,518.00 Mandor OH 0.020 Rp 80,500.00 Rp 1,610.00

Sub Jumlah Rp 310,526.33

3. MEMASANG 1M' PAGAR SEMENTARA DARI KAWAT BERDURI TINGGI 1,8 METERKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

Bahan

Btg 1.000 Rp 11,275.00 Rp 11,275.00

PC Kg 2.000 Rp 1,292.50 Rp 2,585.00 Kawat Duri Kg 25.000 Rp 15,366.30 Rp 384,157.50 PB M3 0.005 Rp 176,950.00 Rp 884.75 KR M3 0.009 Rp 172,875.00 Rp 1,555.87

Tenaga Kerja

Pekerja OH 0.400 Rp 62,100.00 Rp 24,840.00 Tukang Kayu OH 0.200 Rp 75,900.00 Rp 15,180.00 Kepala Tukang OH 0.020 Rp 75,900.00 Rp 1,518.00 Mandor OH 0.020 Rp 80,500.00 Rp 1,610.00

Sub Jumlah Rp 443,606.13

4. PEMBUATAN 1M2 RUMAH JAGA KONSTRUKSI KAYUKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

Bahan

Btg 1.500 Rp 1,292.50 Rp 1,938.75

Kayu Kelas II M3 1.000 Rp 2,462,750.00 Rp 2,462,750.00 Paku Biasa Kg 0.150 Rp 16,645.00 Rp 2,496.75 Seng Gelombang Lbr 0.050 Rp 27,730.00 Rp 1,386.50

Tenaga Kerja

Pekerja OH 3.000 Rp 62,100.00 Rp 186,300.00 Tukang Kayu OH 0.276 Rp 75,900.00 Rp 20,948.40 Kepala Tukang OH 0.700 Rp 75,900.00 Rp 53,130.00 Mandor OH 1.500 Rp 80,500.00 Rp 120,750.00

Sub Jumlah Rp 2,849,700.40

Dolken Kayu Galam, Ø(8-10)Cm,Panjang 4 M

Dolken Kayu Galam, Ø(8-10)Cm,Panjang 4 M

Dolken Kayu Galam, Ø(8-10)Cm,Panjang 4 M

Dolken Kayu Galam, Ø(8-10)Cm,Panjang 4 M

Page 25: Analisa 2013 Pu Cipta Karya kabupaten kampar

5. 1 M2 MEMBERSIHKAN LAPANGAN DAN PERATAANKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

Tenaga KerjaPekerja OH 0.100 Rp 62,100.00 Rp 6,210.00 Mandor OH 0.050 Rp 80,500.00 Rp 4,025.00

Sub Jumlah Rp 10,235.00

6. 1 M2 PENGUKURAN DAN PEMASANGAN BAWPLANKKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

Tenaga KerjaKayu Kelas III M3 0.008 Rp 2,022,750.00 Rp 16,182.00 Paku Biasa KG 0.020 Rp 16,645.00 Rp 332.90

Tenaga Kerja

Pekerja OH 0.100 Rp 62,100.00 Rp 6,210.00 Tukang Kayu OH 0.100 Rp 75,900.00 Rp 7,590.00 Kepala Tukang OH 0.010 Rp 75,900.00 Rp 759.00 Mandor OH 0.005 Rp 80,500.00 Rp 402.50

Sub Jumlah Rp 31,476.40

7. MEMBONGKAR 1 M3 BETON BERTULANGKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

Tenaga KerjaPekerja OH 6.667 Rp 62,100.00 Rp 414,020.70 Mandor OH 0.333 Rp 80,500.00 Rp 26,806.50

Sub Jumlah Rp 440,827.20

8. MEMBONGKAR 1 M3 TEMBOK BATA MERAHKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

Tenaga KerjaPekerja OH 6.667 Rp 62,100.00 Rp 414,020.70 Mandor OH 0.033 Rp 80,500.00 Rp 2,656.50

Sub Jumlah Rp 416,677.20

II. PEKERJAAN TANAH9.

Kebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

Tenaga KerjaPekerja OH 0.700 Rp 62,100.00 Rp 43,470.00 Mandor OH 0.025 Rp 80,500.00 Rp 2,012.50

Sub Jumlah Rp 45,482.50

10.Kebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

Tenaga KerjaPekerja OH 0.900 Rp 62,100.00 Rp 55,890.00 Mandor OH 0.045 Rp 80,500.00 Rp 3,622.50

Sub Jumlah Rp 59,512.50

11.Kebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

Tenaga KerjaPekerja OH 1.050 Rp 62,100.00 Rp 65,205.00 Mandor OH 0.067 Rp 80,500.00 Rp 5,393.50

Sub Jumlah Rp 70,598.50

12.Kebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

Tenaga KerjaPekerja OH 1.000 Rp 62,100.00 Rp 62,100.00 Mandor OH 0.032 Rp 80,500.00 Rp 2,576.00

Sub Jumlah Rp 64,676.00

13.Kebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

Tenaga KerjaPekerja OH 1.500 Rp 62,100.00 Rp 93,150.00 Mandor OH 0.060 Rp 80,500.00 Rp 4,830.00

Sub Jumlah Rp 97,980.00

14.Kebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

Tenaga KerjaPekerja OH 1.200 Rp 62,100.00 Rp 74,520.00 Mandor OH 0.045 Rp 80,500.00 Rp 3,622.50

Sub Jumlah Rp 78,142.50

MENGGALI 1 M3 TANAH BIASA SEDALAM 1 METER

MENGGALI 1 M3 TANAH BIASA SEDALAM 2 METER

MENGGALI 1 M3 TANAH BIASA SEDALAM 3 METER

MENGGALI 1 M3 TANAH KERAS SEDALAM 1 METER

MENGGALI 1 M3 TANAH CADAS SEDALAM 1 METER

MENGGALI 1 M3 TANAH LUMPUR SEDALAM 1 METER

Page 26: Analisa 2013 Pu Cipta Karya kabupaten kampar

15.Kebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

Tenaga KerjaPekerja OH 0.050 Rp 62,100.00 Rp 3,105.00 Mandor OH 0.005 Rp 80,500.00 Rp 402.50

Sub Jumlah Rp 3,507.50

16.Kebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

Tenaga KerjaPekerja OH 0.330 Rp 62,100.00 Rp 20,493.00 Mandor OH 0.010 Rp 80,500.00 Rp 805.00

Sub Jumlah Rp 21,298.00

17.Mengurug kembali 1 M3 galian dihitung 1/3 kali dari indeks pekerjaan galian

18.Kebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

Tenaga KerjaPekerja OH 0.500 Rp 62,100.00 Rp 31,050.00 Mandor OH 0.050 Rp 80,500.00 Rp 4,025.00

Sub Jumlah Rp 35,075.00

19.Kebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

Bahan Pasir Urug M3 1.200 Rp 129,430.00 Rp 155,316.00

Tenaga KerjaPekerja OH 0.300 Rp 62,100.00 Rp 18,630.00 Mandor OH 0.010 Rp 80,500.00 Rp 805.00

Sub Jumlah Rp 174,751.00

20.Kebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

Bahan Ijuk Kg 6.000 Rp 11,670.00 Rp 70,020.00

Tenaga KerjaPekerja OH 0.150 Rp 62,100.00 Rp 9,315.00 Mandor OH 0.015 Rp 80,500.00 Rp 1,207.50

Sub Jumlah Rp 80,542.50

21.Kebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

Bahan Sirtu M3 1.200 Rp 121,950.00 Rp 146,340.00

Tenaga KerjaPekerja OH 0.250 Rp 62,100.00 Rp 15,525.00 Mandor OH 0.025 Rp 80,500.00 Rp 2,012.50

Sub Jumlah Rp 163,877.50

22. MENGURUG 1 M3 TANAH URUGKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

Bahan Tanah Urug M3 1.200 Rp 46,750.00 Rp 56,100.00

Tenaga KerjaPekerja OH 0.300 Rp 62,100.00 Rp 18,630.00 Mandor OH 0.010 Rp 80,500.00 Rp 805.00

Sub Jumlah Rp 75,535.00

III. PEKERJAAN PONDASI23.

Kebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanBatu belah 15 cm/20 cm M3 1.200 Rp 405,250.00 Rp 486,300.00 PC Kg 202.000 Rp 1,292.50 Rp 261,085.00 PP M3 0.485 Rp 180,250.00 Rp 87,421.25

Tenaga Kerja

Pekerja OH 1.500 Rp 62,100.00 Rp 93,150.00 Tukang Batu OH 0.600 Rp 75,900.00 Rp 45,540.00 Kepala Tukang OH 0.060 Rp 75,900.00 Rp 4,554.00 Mandor OH 0.075 Rp 80,500.00 Rp 6,037.50

Sub Jumlah Rp 984,087.75

MENGERJAKAN 1 M2 STRIPPING TEBING SETINGGI 1 METER

MEMBUANG 1 M3 TANAH SEJAUH 30 METER

MENGURUG KEMBALI 1 M3 GALIAN

MEMADATKAN 1 M3 TANAH (PER 20 CM)

MENGURUG 1 M3 PASIR URUG

MEMASANG 1 M2 LAPISAN LAPISAN IJUK TEBAL 10 CM

MENGURUG 1 M3 SIRTU PADAT UNTUK PENINGGIAN LANTAI BANGUNAN

MEMASANG 1 M3 PONDASI BATU BELAH, CAMPURAN 1 PC : 3 PP

Page 27: Analisa 2013 Pu Cipta Karya kabupaten kampar

24. MEMASANG 1 M3 PONDASI BATU BELAH, CAMPURAN 1 PC : 4 PPKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanBatu belah 15 cm/20 cm M3 1.200 Rp 405,250.00 Rp 486,300.00 PC Kg 163.000 Rp 1,292.50 Rp 210,677.50 PP M3 0.520 Rp 180,250.00 Rp 93,730.00

Tenaga Kerja

Pekerja OH 1.500 Rp 62,100.00 Rp 93,150.00 Tukang Batu OH 0.600 Rp 75,900.00 Rp 45,540.00 Kepala Tukang OH 0.060 Rp 75,900.00 Rp 4,554.00 Mandor OH 0.075 Rp 80,500.00 Rp 6,037.50

Sub Jumlah Rp 939,989.00

25. MEMASANG 1 M3 PONDASI BATU BELAH, CAMPURAN 1 PC : 5 PPKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanBatu belah 15 cm/20 cm M3 1.200 Rp 405,250.00 Rp 486,300.00 PC Kg 136.000 Rp 1,292.50 Rp 175,780.00 PP M3 0.544 Rp 180,250.00 Rp 98,056.00

Tenaga Kerja

Pekerja OH 1.500 Rp 62,100.00 Rp 93,150.00 Tukang Batu OH 0.600 Rp 75,900.00 Rp 45,540.00 Kepala Tukang OH 0.060 Rp 75,900.00 Rp 4,554.00 Mandor OH 0.075 Rp 80,500.00 Rp 6,037.50

Sub Jumlah Rp 909,417.50

26. MEMASANG 1 M3 PONDASI BATU BELAH, CAMPURAN 1 PC : 6 PPKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanBatu belah 15 cm/20 cm M3 1.200 Rp 405,250.00 Rp 486,300.00 PC Kg 117.000 Rp 1,292.50 Rp 151,222.50 PP M3 0.561 Rp 180,250.00 Rp 101,120.25

Tenaga Kerja

Pekerja OH 1.500 Rp 62,100.00 Rp 93,150.00 Tukang Batu OH 0.600 Rp 75,900.00 Rp 45,540.00 Kepala Tukang OH 0.060 Rp 75,900.00 Rp 4,554.00 Mandor OH 0.075 Rp 80,500.00 Rp 6,037.50

Sub Jumlah Rp 887,924.25

27. MEMASANG 1 M3 PONDASI BATU BELAH, CAMPURAN 1 PC : 8 PPKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanBatu belah 15 cm/20 cm M3 1.200 Rp 405,250.00 Rp 486,300.00 PC Kg 91.000 Rp 1,292.50 Rp 117,617.50 PP M3 0.584 Rp 180,250.00 Rp 105,266.00

Tenaga Kerja

Pekerja OH 1.500 Rp 62,100.00 Rp 93,150.00 Tukang Batu OH 0.600 Rp 75,900.00 Rp 45,540.00 Kepala Tukang OH 0.060 Rp 75,900.00 Rp 4,554.00 Mandor OH 0.075 Rp 80,500.00 Rp 6,037.50

Sub Jumlah Rp 858,465.00

28. MEMASANG 1 M3 BATU KOSONG (AANSTAMPING)Kebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanBatu belah 15 cm/20 cm M3 1.200 Rp 405,250.00 Rp 486,300.00 PU M3 0.432 Rp 129,430.00 Rp 55,913.76

Tenaga Kerja

Pekerja OH 0.780 Rp 62,100.00 Rp 48,438.00 Tukang Batu OH 0.390 Rp 75,900.00 Rp 29,601.00 Kepala Tukang OH 0.039 Rp 75,900.00 Rp 2,960.10 Mandor OH 0.039 Rp 80,500.00 Rp 3,139.50

Sub Jumlah Rp 626,352.36

29. MEMASANG 1 M3 PONDASI SIKLOP, 60% BETON CAMPURAN 1 PC : 2 PB : 3 KR DAN 40% BATU BELAHKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

Bahan

Batu belah 15 cm/20 cm M3 0.480 Rp 405,250.00 Rp 194,520.00 PC Kg 194.000 Rp 1,292.50 Rp 250,745.00 PB M3 0.312 Rp 176,950.00 Rp 55,208.40 KR M3 0.468 Rp 172,875.00 Rp 80,905.50 Besi Beton polos Kg 126.000 Rp 14,965.00 Rp 1,885,590.00 Kawat Beton Kg 1.800 Rp 17,982.50 Rp 32,368.50

Tenaga Kerja

Pekerja OH 3.000 Rp 62,100.00 Rp 186,300.00 Tukang Batu OH 0.850 Rp 75,900.00 Rp 64,515.00 Kepala Tukang OH 0.085 Rp 75,900.00 Rp 6,451.50 Mandor OH 0.150 Rp 80,500.00 Rp 12,075.00

Sub Jumlah Rp 2,768,678.90

Page 28: Analisa 2013 Pu Cipta Karya kabupaten kampar

30. MEMASANG 1 M3 PONDASI SUMURAN, DIAMETER 100 CMKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

Bahan

Batu belah 15 cm/20 cm M3 0.450 Rp 405,250.00 Rp 182,362.50 PC Kg 194.000 Rp 1,292.50 Rp 250,745.00 PB M3 0.312 Rp 176,950.00 Rp 55,208.40 KR M3 0.468 Rp 172,875.00 Rp 80,905.50

Tenaga Kerja

Pekerja OH 2.380 Rp 62,100.00 Rp 147,798.00 Tukang Batu OH 0.300 Rp 75,900.00 Rp 22,770.00 Kepala Tukang OH 0.030 Rp 75,900.00 Rp 2,277.00 Mandor OH 0.080 Rp 80,500.00 Rp 6,440.00

Sub Jumlah Rp 748,506.40

IV. PEKERJAAN DINDING31. MEMASANG 1 M2 DINDING BATA MERAH TEBAL 1 BATA

CAMPURAN SPESI 1 PC : 2 PPKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanBata Merah Buah 140.000 Rp 336.50 Rp 47,110.00 PC Kg 43.500 Rp 1,292.50 Rp 56,223.75 PP M3 0.080 Rp 180,250.00 Rp 14,420.00

Tenaga Kerja

Pekerja OH 0.600 Rp 62,100.00 Rp 37,260.00 Tukang Batu OH 0.200 Rp 75,900.00 Rp 15,180.00 Kepala Tukang OH 0.020 Rp 75,900.00 Rp 1,518.00 Mandor OH 0.030 Rp 80,500.00 Rp 2,415.00

Sub Jumlah Rp 174,126.75

32. MEMASANG 1 M2 DINDING BATA MERAH TEBAL 1 BATACAMPURAN SPESI 1 PC : 3 PP

Kebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanBata Merah Buah 140.000 Rp 336.50 Rp 47,110.00 PC Kg 32.950 Rp 1,292.50 Rp 42,587.88 PP M3 0.091 Rp 180,250.00 Rp 16,402.75

Tenaga Kerja

Pekerja OH 0.600 Rp 62,100.00 Rp 37,260.00 Tukang Batu OH 0.200 Rp 75,900.00 Rp 15,180.00 Kepala Tukang OH 0.020 Rp 75,900.00 Rp 1,518.00 Mandor OH 0.030 Rp 80,500.00 Rp 2,415.00

Sub Jumlah Rp 162,473.63

33. MEMASANG 1 M2 DINDING BATA MERAH TEBAL 1 BATACAMPURAN SPESI 1 PC : 4 PP

Kebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanBata Merah Buah 140.000 Rp 336.50 Rp 47,110.00 PC Kg 26.550 Rp 1,292.50 Rp 34,315.88 PP M3 0.093 Rp 180,250.00 Rp 16,763.25

Tenaga Kerja

Pekerja OH 0.600 Rp 62,100.00 Rp 37,260.00 Tukang Batu OH 0.200 Rp 75,900.00 Rp 15,180.00 Kepala Tukang OH 0.020 Rp 75,900.00 Rp 1,518.00 Mandor OH 0.030 Rp 80,500.00 Rp 2,415.00

Sub Jumlah Rp 154,562.13

34. MEMASANG 1 M2 DINDING BATA MERAH TEBAL 1 BATACAMPURAN SPESI 1 PC : 5 PP

Kebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanBata Merah Buah 140.000 Rp 336.50 Rp 47,110.00 PC Kg 22.200 Rp 1,292.50 Rp 28,693.50 PP M3 0.102 Rp 180,250.00 Rp 18,385.50

Tenaga Kerja

Pekerja OH 0.600 Rp 62,100.00 Rp 37,260.00 Tukang Batu OH 0.200 Rp 75,900.00 Rp 15,180.00 Kepala Tukang OH 0.020 Rp 75,900.00 Rp 1,518.00 Mandor OH 0.030 Rp 80,500.00 Rp 2,415.00

Sub Jumlah Rp 150,562.00

Page 29: Analisa 2013 Pu Cipta Karya kabupaten kampar

35. MEMASANG 1 M2 DINDING BATA MERAH TEBAL 1 BATACAMPURAN SPESI 1 PC : 6 PP

Kebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanBata Merah Buah 140.000 Rp 336.50 Rp 47,110.00 PC Kg 18.500 Rp 1,292.50 Rp 23,911.25 PP M3 0.122 Rp 180,250.00 Rp 21,990.50

Tenaga Kerja

Pekerja OH 0.600 Rp 62,100.00 Rp 37,260.00 Tukang Batu OH 0.200 Rp 75,900.00 Rp 15,180.00 Kepala Tukang OH 0.020 Rp 75,900.00 Rp 1,518.00 Mandor OH 0.030 Rp 80,500.00 Rp 2,415.00

Sub Jumlah Rp 149,384.75

36. MEMASANG 1 M2 DINDING BATA MERAH TEBAL 1/2 BATACAMPURAN SPESI 1 PC : 2 PP

Kebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanBata Merah Buah 100.000 Rp 336.50 Rp 33,650.00 PC Kg 18.950 Rp 1,292.50 Rp 24,492.88 PP M3 0.038 Rp 180,250.00 Rp 6,849.50

Tenaga Kerja

Pekerja OH 0.300 Rp 62,100.00 Rp 18,630.00 Tukang Batu OH 0.100 Rp 75,900.00 Rp 7,590.00 Kepala Tukang OH 0.010 Rp 75,900.00 Rp 759.00 Mandor OH 0.015 Rp 80,500.00 Rp 1,207.50

Sub Jumlah Rp 93,178.88

37. MEMASANG 1 M2 DINDING BATA MERAH TEBAL 1/2 BATACAMPURAN SPESI 1 PC : 3 PP

Kebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanBata Merah Buah 100.000 Rp 336.50 Rp 33,650.00 PC Kg 14.370 Rp 1,292.50 Rp 18,573.23 PP M3 0.040 Rp 180,250.00 Rp 7,210.00

Tenaga Kerja

Pekerja OH 0.300 Rp 62,100.00 Rp 18,630.00 Tukang Batu OH 0.100 Rp 75,900.00 Rp 7,590.00 Kepala Tukang OH 0.010 Rp 75,900.00 Rp 759.00 Mandor OH 0.015 Rp 80,500.00 Rp 1,207.50

Sub Jumlah Rp 87,619.73

38. MEMASANG 1 M2 DINDING BATA MERAH TEBAL 1/2 BATACAMPURAN SPESI 1 PC : 4 PP

Kebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanBata Merah Buah 100.000 Rp 336.50 Rp 33,650.00 PC Kg 11.500 Rp 1,292.50 Rp 14,863.75 PP M3 0.043 Rp 180,250.00 Rp 7,750.75

Tenaga Kerja

Pekerja OH 0.300 Rp 62,100.00 Rp 18,630.00 Tukang Batu OH 0.100 Rp 75,900.00 Rp 7,590.00 Kepala Tukang OH 0.010 Rp 75,900.00 Rp 759.00 Mandor OH 0.015 Rp 80,500.00 Rp 1,207.50

Sub Jumlah Rp 84,451.00

39. MEMASANG 1 M2 DINDING BATA MERAH TEBAL 1/2 BATACAMPURAN SPESI 1 PC : 5 PP

Kebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanBata Merah Buah 100.000 Rp 336.50 Rp 33,650.00 PC Kg 9.680 Rp 1,292.50 Rp 12,511.40 PP M3 0.045 Rp 180,250.00 Rp 8,111.25

Tenaga Kerja

Pekerja OH 0.300 Rp 62,100.00 Rp 18,630.00 Tukang Batu OH 0.100 Rp 75,900.00 Rp 7,590.00 Kepala Tukang OH 0.010 Rp 75,900.00 Rp 759.00 Mandor OH 0.015 Rp 80,500.00 Rp 1,207.50

Sub Jumlah Rp 82,459.15

Page 30: Analisa 2013 Pu Cipta Karya kabupaten kampar

40. MEMASANG 1 M2 DINDING BATA MERAH TEBAL 1/2 BATACAMPURAN SPESI 1 PC : 6 PP

Kebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanBata Merah Buah 100.000 Rp 336.50 Rp 33,650.00 PC Kg 8.320 Rp 1,292.50 Rp 10,753.60 PP M3 0.049 Rp 180,250.00 Rp 8,832.25

Tenaga Kerja

Pekerja OH 0.300 Rp 62,100.00 Rp 18,630.00 Tukang Batu OH 0.100 Rp 75,900.00 Rp 7,590.00 Kepala Tukang OH 0.010 Rp 75,900.00 Rp 759.00 Mandor OH 0.015 Rp 80,500.00 Rp 1,207.50

Sub Jumlah Rp 81,422.35

41. MEMASANG 1 M2 DINDING BATA MERAH TEBAL 1/2 BATACAMPURAN SPESI 1 PC : 8 PP

Kebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanBata Merah Buah 100.000 Rp 336.50 Rp 33,650.00 PC Kg 6.500 Rp 1,292.50 Rp 8,401.25 PP M3 0.050 Rp 180,250.00 Rp 9,012.50

Tenaga Kerja

Pekerja OH 0.300 Rp 62,100.00 Rp 18,630.00 Tukang Batu OH 0.100 Rp 75,900.00 Rp 7,590.00 Kepala Tukang OH 0.010 Rp 75,900.00 Rp 759.00 Mandor OH 0.015 Rp 80,500.00 Rp 1,207.50

Sub Jumlah Rp 79,250.25

V. PEKERJAAN BETON42. PEMBESIAN 10 KG DENGAN BESI POLOS ATAU BESI ULIR

Kebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanBesi Beton (Polos/Ulir) Kg 10.500 Rp 14,965.00 Rp 157,132.50 Kawat Beton Kg 0.150 Rp 17,982.50 Rp 2,697.38

Tenaga Kerja

Pekerja OH 0.070 Rp 62,100.00 Rp 4,347.00 Tukang Besi OH 0.070 Rp 74,750.00 Rp 5,232.50 Kepala Tukang OH 0.007 Rp 75,900.00 Rp 531.30 Mandor OH 0.004 Rp 80,500.00 Rp 322.00

Sub Jumlah Rp 170,262.68

43. MEMASANG 10 KG KABEL PRESSTRESSED POLOS/STRANDSKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanBesi Beton (Polos/Ulir) Kg 10.500 Rp 14,965.00 Rp 157,132.50 Kawat Beton Kg 0.100 Rp 17,982.50 Rp 1,798.25

Tenaga Kerja

Pekerja OH 0.050 Rp 62,100.00 Rp 3,105.00 Tukang Besi OH 0.050 Rp 74,750.00 Rp 3,737.50 Kepala Tukang OH 0.005 Rp 75,900.00 Rp 379.50 Mandor OH 0.003 Rp 80,500.00 Rp 241.50

Sub Jumlah Rp 166,394.25

44. MEMASANG 1 M2 BEKISTING UNTUK PONDASIKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanKayu Kelas III M3 0.040 Rp 2,022,750.00 Rp 80,910.00 Paku 5 Cm - 10 Cm Kg 0.300 Rp 16,645.00 Rp 4,993.50 Minyak Bekisting Liter 0.100 Rp 8,279.25 Rp 827.93

Tenaga Kerja

Pekerja OH 0.520 Rp 62,100.00 Rp 32,292.00 Tukang Kayu OH 0.260 Rp 74,750.00 Rp 19,435.00 Kepala Tukang OH 0.026 Rp 75,900.00 Rp 1,973.40 Mandor OH 0.026 Rp 80,500.00 Rp 2,093.00

Sub Jumlah Rp 142,524.83

45. MEMASANG 1 M2 BEKISTING UNTUK SLOOFKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanKayu Kelas III M3 0.045 Rp 2,022,750.00 Rp 91,023.75 Paku 5 Cm - 10 Cm Kg 0.300 Rp 16,645.00 Rp 4,993.50 Minyak Bekisting Liter 0.100 Rp 8,279.25 Rp 827.93

Tenaga Kerja

Pekerja OH 0.520 Rp 62,100.00 Rp 32,292.00 Tukang Kayu OH 0.260 Rp 74,750.00 Rp 19,435.00 Kepala Tukang OH 0.026 Rp 75,900.00 Rp 1,973.40 Mandor OH 0.026 Rp 80,500.00 Rp 2,093.00

Sub Jumlah Rp 152,638.58

Page 31: Analisa 2013 Pu Cipta Karya kabupaten kampar

46. MEMASANG 1 M2 BEKISTING UNTUK KOLOMKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

Bahan

Kayu Kelas III M3 0.040 Rp 2,022,750.00 Rp 80,910.00 Paku 5 Cm - 12 Cm Kg 0.400 Rp 16,645.00 Rp 6,658.00 Minyak Bekisting Liter 0.200 Rp 8,279.25 Rp 1,655.85 Balok Kayu Kelas II M3 0.015 Rp 2,462,750.00 Rp 36,941.25 Plywood Tebal 6 mm Lbr 0.350 Rp 123,250.00 Rp 43,137.50

Batang 2.000 Rp 11,275.00 Rp 22,550.00

Tenaga Kerja

Pekerja OH 0.660 Rp 62,100.00 Rp 40,986.00 Tukang Kayu OH 0.330 Rp 74,750.00 Rp 24,667.50 Kepala Tukang OH 0.033 Rp 75,900.00 Rp 2,504.70 Mandor OH 0.033 Rp 80,500.00 Rp 2,656.50

Sub Jumlah Rp 262,667.30

47. MEMASANG 1 M2 BEKISTING UNTUK BALOKKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

Bahan

Kayu Kelas III M3 0.040 Rp 2,022,750.00 Rp 80,910.00 Paku 5 Cm - 12 Cm Kg 0.400 Rp 16,645.00 Rp 6,658.00 Minyak Bekisting Liter 0.200 Rp 8,279.25 Rp 1,655.85 Balok Kayu Kelas II M3 0.018 Rp 2,462,750.00 Rp 44,329.50 Plywood Tebal 9 mm Lbr 0.350 Rp 123,250.00 Rp 43,137.50

Batang 2.000 Rp 11,275.00 Rp 22,550.00

Tenaga Kerja

Pekerja OH 0.660 Rp 62,100.00 Rp 40,986.00 Tukang Kayu OH 0.330 Rp 74,750.00 Rp 24,667.50 Kepala Tukang OH 0.033 Rp 75,900.00 Rp 2,504.70 Mandor OH 0.033 Rp 80,500.00 Rp 2,656.50

Sub Jumlah Rp 270,055.55

48. MEMASANG 1 M2 BEKISTING UNTUK LANTAIKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

Bahan

Kayu Kelas III M3 0.040 Rp 2,022,750.00 Rp 80,910.00 Paku 5 Cm - 12 Cm Kg 0.400 Rp 16,645.00 Rp 6,658.00 Minyak Bekisting Liter 0.200 Rp 8,279.25 Rp 1,655.85 Balok Kayu Kelas II M3 0.015 Rp 2,462,750.00 Rp 36,941.25 Plywood Tebal 9 mm Lbr 0.350 Rp 123,250.00 Rp 43,137.50

Batang 6.000 Rp 11,275.00 Rp 67,650.00

Tenaga Kerja

Pekerja OH 0.660 Rp 62,100.00 Rp 40,986.00 Tukang Kayu OH 0.330 Rp 74,750.00 Rp 24,667.50 Kepala Tukang OH 0.033 Rp 75,900.00 Rp 2,504.70 Mandor OH 0.033 Rp 80,500.00 Rp 2,656.50

Sub Jumlah Rp 307,767.30

48. MEMASANG 1 M2 BEKISTING UNTUK TANGGAKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

Bahan

Kayu Kelas III M3 0.030 Rp 2,022,750.00 Rp 60,682.50 Paku 5 Cm - 12 Cm Kg 0.400 Rp 16,645.00 Rp 6,658.00 Minyak Bekisting Liter 0.150 Rp 8,279.25 Rp 1,241.89 Balok Kayu Kelas II M3 0.015 Rp 2,462,750.00 Rp 36,941.25 Plywood Tebal 9 mm Lbr 0.350 Rp 123,250.00 Rp 43,137.50

Batang 2.000 Rp 11,275.00 Rp 22,550.00

Tenaga Kerja

Pekerja OH 0.660 Rp 62,100.00 Rp 40,986.00 Tukang Kayu OH 0.330 Rp 74,750.00 Rp 24,667.50 Kepala Tukang OH 0.033 Rp 75,900.00 Rp 2,504.70 Mandor OH 0.033 Rp 80,500.00 Rp 2,656.50

Sub Jumlah Rp 242,025.84

Dolken Kayu Galam, Ø (8-10) Cm, Panjang 4 M

Dolken Kayu Galam, Ø (8-10) Cm, Panjang 4 M

Dolken Kayu Galam, Ø (8-10) Cm, Panjang 4 M

Dolken Kayu Galam, Ø (8-10) Cm, Panjang 4 M

Page 32: Analisa 2013 Pu Cipta Karya kabupaten kampar

49. MEMASANG 1 M2 JEMBATAN UNTUK MENGECORAN BETONKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

Bahan

Kayu Kelas III (Papan) M3 0.0264 Rp 2,022,750.00 Rp 53,400.60 Paku 5 Cm - 12 Cm Kg 0.600 Rp 16,645.00 Rp 9,987.00

Batang 0.500 Rp 11,275.00 Rp 5,637.50

Tenaga Kerja

Pekerja OH 0.150 Rp 62,100.00 Rp 9,315.00 Tukang Kayu OH 0.050 Rp 74,750.00 Rp 3,737.50 Kepala Tukang OH 0.005 Rp 75,900.00 Rp 379.50 Mandor OH 0.008 Rp 80,500.00 Rp 644.00

Sub Jumlah Rp 83,101.10

50. MEMBUAT 1 M3 PONDASI BETON BERTULANG (BESI + BEKISTING)Kebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

Bahan

Kayu Kelas III M3 0.200 Rp 2,022,750.00 Rp 404,550.00 Paku 5 Cm - 12 Cm Kg 1.500 Rp 16,645.00 Rp 24,967.50 Minyak Bekisting Liter 0.400 Rp 8,279.25 Rp 3,311.70 Besi Beton Polos Kg 157.500 Rp 14,965.00 Rp 2,356,987.50 Kawat Beton Kg 2.250 Rp 17,982.50 Rp 40,460.63 PC Kg 336.000 Rp 1,292.50 Rp 434,280.00 PB M3 0.540 Rp 176,950.00 Rp 95,553.00 KR M3 0.810 Rp 172,875.00 Rp 140,028.75

Tenaga Kerja

Pekerja OH 5.300 Rp 62,100.00 Rp 329,130.00 Tukang Batu OH 0.275 Rp 74,750.00 Rp 20,556.25 Tukang Kayu OH 1.300 Rp 75,900.00 Rp 98,670.00 Tukang Besi OH 1.050 Rp 74,750.00 Rp 78,487.50 Kepala Tukang OH 0.262 Rp 75,900.00 Rp 19,885.80 Mandor OH 0.265 Rp 80,500.00 Rp 21,332.50

Sub Jumlah Rp 4,068,201.13

51. MEMBUAT 1 M3 SLOOF BETON BERTULANG ( BESI + BEKISTING)Kebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

Bahan

Kayu Kelas III M3 0.270 Rp 2,022,750.00 Rp 546,142.50 Paku 5 Cm - 12 Cm Kg 2.000 Rp 16,645.00 Rp 33,290.00 Minyak Bekisting Liter 0.600 Rp 8,279.25 Rp 4,967.55 Besi Beton Polos Kg 157.500 Rp 14,965.00 Rp 2,356,987.50 Kawat Beton Kg 2.250 Rp 17,982.50 Rp 40,460.63 PC Kg 336.000 Rp 1,292.50 Rp 434,280.00 PB M3 0.540 Rp 176,950.00 Rp 95,553.00 KR M3 0.810 Rp 172,875.00 Rp 140,028.75

Tenaga Kerja

Pekerja OH 5.650 Rp 62,100.00 Rp 350,865.00 Tukang Batu OH 0.275 Rp 74,750.00 Rp 20,556.25 Tukang Kayu OH 1.560 Rp 75,900.00 Rp 118,404.00 Tukang Besi OH 1.400 Rp 74,750.00 Rp 104,650.00 Kepala Tukang OH 0.323 Rp 75,900.00 Rp 24,515.70 Mandor OH 0.283 Rp 80,500.00 Rp 22,781.50

Sub Jumlah Rp 4,293,482.38

52. MEMBUAT 1 M3 KOLOM BETON BERTULANG ( BESI + BEKISTING)Kebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

Bahan

Kayu Kelas III M3 0.400 Rp 2,022,750.00 Rp 809,100.00 Paku 5 Cm - 12 Cm Kg 4.000 Rp 16,645.00 Rp 66,580.00 Minyak Bekisting Liter 2.000 Rp 8,279.25 Rp 16,558.50 Besi Beton Polos Kg 315.000 Rp 14,965.00 Rp 4,713,975.00 Kawat Beton Kg 4.500 Rp 17,982.50 Rp 80,921.25 PC Kg 336.000 Rp 1,292.50 Rp 434,280.00 PB M3 0.540 Rp 176,950.00 Rp 95,553.00 KR M3 0.810 Rp 172,875.00 Rp 140,028.75 Kayu Kelas II (Balok) M3 0.150 Rp 2,462,750.00 Rp 369,412.50 Plywood 6 mm Lbr 3.500 Rp 123,250.00 Rp 431,375.00

Batang 20.000 Rp 11,275.00 Rp 225,500.00

Tenaga Kerja

Pekerja OH 7.050 Rp 62,100.00 Rp 437,805.00 Tukang Batu OH 0.275 Rp 74,750.00 Rp 20,556.25 Tukang Kayu OH 1.650 Rp 75,900.00 Rp 125,235.00 Tukang Besi OH 2.100 Rp 74,750.00 Rp 156,975.00 Kepala Tukang OH 0.403 Rp 75,900.00 Rp 30,587.70 Mandor OH 0.353 Rp 80,500.00 Rp 28,416.50

Sub Jumlah Rp 8,182,859.45

Dolken Kayu Galam (Kaso), Ø (8-10) Cm, Panjang 4 M

Dolken Kayu Galam, Ø (8-10) Cm, Panjang 4 M

Page 33: Analisa 2013 Pu Cipta Karya kabupaten kampar

53. MEMBUAT 1 M3 BALOK BETON BERTULANG (BESI + BEKISTING)Kebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

Bahan

Kayu Kelas III M3 0.320 Rp 2,022,750.00 Rp 647,280.00 Paku 5 Cm - 12 Cm Kg 3.200 Rp 16,645.00 Rp 53,264.00 Minyak Bekisting Liter 1.600 Rp 8,279.25 Rp 13,246.80 Besi Beton Polos Kg 157.500 Rp 14,965.00 Rp 2,356,987.50 Kawat Beton Kg 2.250 Rp 17,982.50 Rp 40,460.63 PC Kg 336.000 Rp 1,292.50 Rp 434,280.00 PB M3 0.540 Rp 176,950.00 Rp 95,553.00 KR M3 0.810 Rp 172,875.00 Rp 140,028.75 Kayu Kelas II (Balok) M3 0.140 Rp 2,462,750.00 Rp 344,785.00 Plywood 9 mm Lbr 2.800 Rp 123,250.00 Rp 345,100.00

Batang 16.000 Rp 11,275.00 Rp 180,400.00

Tenaga Kerja

Pekerja OH 6.350 Rp 62,100.00 Rp 394,335.00 Tukang Batu OH 0.275 Rp 74,750.00 Rp 20,556.25 Tukang Kayu OH 1.650 Rp 75,900.00 Rp 125,235.00 Tukang Besi OH 1.400 Rp 74,750.00 Rp 104,650.00 Kepala Tukang OH 0.333 Rp 75,900.00 Rp 25,274.70 Mandor OH 0.318 Rp 80,500.00 Rp 25,599.00

Sub Jumlah Rp 5,347,035.63

54. MEMBUAT 1 M3 KOLOM BETON BERTULANG (BESI + BEKISTING)Kebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

Bahan

Kayu Kelas III M3 0.320 Rp 2,022,750.00 Rp 647,280.00 Paku 5 Cm - 12 Cm Kg 3.200 Rp 16,645.00 Rp 53,264.00 Minyak Bekisting Liter 1.600 Rp 8,279.25 Rp 13,246.80 Besi Beton Polos Kg 157.500 Rp 14,965.00 Rp 2,356,987.50 Kawat Beton Kg 2.250 Rp 17,982.50 Rp 40,460.63 PC Kg 336.000 Rp 1,292.50 Rp 434,280.00 PB M3 0.540 Rp 176,950.00 Rp 95,553.00 KR M3 0.810 Rp 172,875.00 Rp 140,028.75 Kayu Kelas II (Balok) M3 0.120 Rp 2,462,750.00 Rp 295,530.00 Plywood 9 mm Lbr 2.800 Rp 123,250.00 Rp 345,100.00

Batang 32.000 Rp 11,275.00 Rp 360,800.00

Tenaga Kerja

Pekerja OH 5.300 Rp 62,100.00 Rp 329,130.00 Tukang Batu OH 0.275 Rp 74,750.00 Rp 20,556.25 Tukang Kayu OH 1.300 Rp 75,900.00 Rp 98,670.00 Tukang Besi OH 1.050 Rp 74,750.00 Rp 78,487.50 Kepala Tukang OH 0.265 Rp 75,900.00 Rp 20,113.50 Mandor OH 0.265 Rp 80,500.00 Rp 21,332.50

Sub Jumlah Rp 5,350,820.43

55. MEMBUAT 1 M3 DINDING BETON BERTULANG (BESI + BEKISTING)Kebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

Bahan

Kayu Kelas III M3 0.240 Rp 2,022,750.00 Rp 485,460.00 Paku 5 Cm - 12 Cm Kg 3.200 Rp 16,645.00 Rp 53,264.00 Minyak Bekisting Liter 1.600 Rp 8,279.25 Rp 13,246.80 Besi Beton Polos Kg 157.500 Rp 14,965.00 Rp 2,356,987.50 Kawat Beton Kg 2.250 Rp 17,982.50 Rp 40,460.63 PC Kg 336.000 Rp 1,292.50 Rp 434,280.00 PB M3 0.540 Rp 176,950.00 Rp 95,553.00 KR M3 0.810 Rp 172,875.00 Rp 140,028.75 Kayu Kelas II (Balok) M3 0.160 Rp 2,462,750.00 Rp 394,040.00 Plywood 9 mm Lbr 2.800 Rp 123,250.00 Rp 345,100.00

Batang 24.000 Rp 11,275.00 Rp 270,600.00

Tenaga Kerja

Pekerja OH 5.300 Rp 62,100.00 Rp 329,130.00 Tukang Batu OH 0.275 Rp 74,750.00 Rp 20,556.25 Tukang Kayu OH 1.300 Rp 75,900.00 Rp 98,670.00 Tukang Besi OH 1.050 Rp 74,750.00 Rp 78,487.50 Kepala Tukang OH 0.265 Rp 75,900.00 Rp 20,113.50 Mandor OH 0.265 Rp 80,500.00 Rp 21,332.50

Sub Jumlah Rp 5,197,310.43

Dolken Kayu Galam, Ø (8-10) Cm, Panjang 4 M

Dolken Kayu Galam, Ø (8-10) Cm, Panjang 4 M

Dolken Kayu Galam, Ø (8-10) Cm, Panjang 4 M

Page 34: Analisa 2013 Pu Cipta Karya kabupaten kampar

56. MEMBUAT 1 M3 DINDING BETON BERTULANG (BESI + BEKISTING)Kebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

Bahan

Kayu Kelas III M3 0.250 Rp 2,022,750.00 Rp 505,687.50 Paku 5 Cm - 12 Cm Kg 3.000 Rp 16,645.00 Rp 49,935.00 Minyak Bekisting Liter 1.200 Rp 8,279.25 Rp 9,935.10 Besi Beton Polos Kg 210.000 Rp 14,965.00 Rp 3,142,650.00 Kawat Beton Kg 3.000 Rp 17,982.50 Rp 53,947.50 PC Kg 336.000 Rp 1,292.50 Rp 434,280.00 PB M3 0.540 Rp 176,950.00 Rp 95,553.00 KR M3 0.810 Rp 172,875.00 Rp 140,028.75 Kayu Kelas II (Balok) M3 0.105 Rp 2,462,750.00 Rp 258,588.75 Plywood 9 mm Lbr 2.500 Rp 123,250.00 Rp 308,125.00

Batang 14.000 Rp 11,275.00 Rp 157,850.00

Tenaga Kerja

Pekerja OH 5.650 Rp 62,100.00 Rp 350,865.00 Tukang Batu OH 0.275 Rp 74,750.00 Rp 20,556.25 Tukang Kayu OH 1.560 Rp 75,900.00 Rp 118,404.00 Tukang Besi OH 1.400 Rp 74,750.00 Rp 104,650.00 Kepala Tukang OH 0.323 Rp 75,900.00 Rp 24,515.70 Mandor OH 0.283 Rp 80,500.00 Rp 22,781.50

Sub Jumlah Rp 5,798,353.05

57. MEMBUAT 1 M' KOLOM PRAKTIS BETON BERTULANG (11 x 11) CMKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

Bahan

Kayu Kelas III M3 0.002 Rp 2,022,750.00 Rp 4,045.50 Paku 5 Cm - 12 Cm Kg 0.010 Rp 16,645.00 Rp 166.45 Minyak Bekisting Liter 1.200 Rp 8,279.25 Rp 9,935.10 Besi Beton Polos Kg 3.000 Rp 14,965.00 Rp 44,895.00 Kawat Beton Kg 0.450 Rp 17,982.50 Rp 8,092.13 PC Kg 4.000 Rp 1,292.50 Rp 5,170.00 PB M3 0.006 Rp 176,950.00 Rp 1,061.70 KR M3 0.009 Rp 172,875.00 Rp 1,555.87

Tenaga Kerja

Pekerja OH 0.180 Rp 62,100.00 Rp 11,178.00 Tukang Batu OH 0.020 Rp 74,750.00 Rp 1,495.00 Tukang Kayu OH 0.020 Rp 75,900.00 Rp 1,518.00 Tukang Besi OH 0.020 Rp 74,750.00 Rp 1,495.00 Kepala Tukang OH 0.006 Rp 75,900.00 Rp 455.40 Mandor OH 0.009 Rp 80,500.00 Rp 724.50

Sub Jumlah Rp 91,787.65

58. MEMBUAT 1 M' RING BALOK BETON BERTULANG ( 10 x 15) CMKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

Bahan

Kayu Kelas III M3 0.003 Rp 2,022,750.00 Rp 6,068.25 Paku 5 Cm - 12 Cm Kg 0.020 Rp 16,645.00 Rp 332.90 Minyak Bekisting Liter 1.200 Rp 8,279.25 Rp 9,935.10 Besi Beton Polos Kg 3.600 Rp 14,965.00 Rp 53,874.00 Kawat Beton Kg 0.050 Rp 17,982.50 Rp 899.13 PC Kg 5.500 Rp 1,292.50 Rp 7,108.75 PB M3 0.009 Rp 176,950.00 Rp 1,592.55 KR M3 0.015 Rp 172,875.00 Rp 2,593.13

Tenaga Kerja

Pekerja OH 0.297 Rp 62,100.00 Rp 18,443.70 Tukang Batu OH 0.033 Rp 74,750.00 Rp 2,466.75 Tukang Kayu OH 0.033 Rp 75,900.00 Rp 2,504.70 Tukang Besi OH 0.033 Rp 74,750.00 Rp 2,466.75 Kepala Tukang OH 0.010 Rp 75,900.00 Rp 759.00 Mandor OH 0.015 Rp 80,500.00 Rp 1,207.50

Sub Jumlah Rp 110,252.20

Dolken Kayu Galam, Ø (8-10) Cm, Panjang 4 M

Page 35: Analisa 2013 Pu Cipta Karya kabupaten kampar

59. MEMBUAT 1 M3 BETON 1 : 3 : 5Kebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanPC Kg 218.000 Rp 1,292.50 Rp 281,765.00 PB M3 0.520 Rp 176,950.00 Rp 92,014.00 KR M3 0.870 Rp 172,875.00 Rp 150,401.25

Tenaga Kerja

Pekerja OH 1.650 Rp 62,100.00 Rp 102,465.00 Tukang Batu OH 0.250 Rp 74,750.00 Rp 18,687.50 Kepala Tukang OH 0.025 Rp 75,900.00 Rp 1,897.50 Mandor OH 0.080 Rp 80,500.00 Rp 6,440.00

Sub Jumlah Rp 653,670.25

60. MEMBUAT 1 M3 BETON 1 : 2 : 3Kebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanPC Kg 336.000 Rp 1,292.50 Rp 434,280.00 PB M3 0.540 Rp 176,950.00 Rp 95,553.00 KR M3 0.810 Rp 172,875.00 Rp 140,028.75

Tenaga Kerja

Pekerja OH 2.000 Rp 62,100.00 Rp 124,200.00 Tukang Batu OH 0.350 Rp 74,750.00 Rp 26,162.50 Kepala Tukang OH 0.035 Rp 75,900.00 Rp 2,656.50 Mandor OH 1.000 Rp 80,500.00 Rp 80,500.00

Sub Jumlah Rp 903,380.75

61. MEMBUAT 1 M3 BETON 1 : 2 : 3 + BEKISTINGKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanPC Kg 336.000 Rp 1,292.50 Rp 434,280.00 PB M3 0.540 Rp 176,950.00 Rp 95,553.00 KR M3 0.810 Rp 172,875.00 Rp 140,028.75 Kayu Kelas II M3 0.130 Rp 2,462,750.00 Rp 320,157.50 Paku kayu Kg 1.000 Rp 17,745.00 Rp 17,745.00

Tenaga Kerja

Pekerja OH 2.000 Rp 62,100.00 Rp 124,200.00 Tukang Batu OH 0.100 Rp 74,750.00 Rp 7,475.00 Tukang Kayu OH 0.350 Rp 74,750.00 Rp 26,162.50 Kepala Tukang OH 0.035 Rp 75,900.00 Rp 2,656.50 Mandor OH 1.000 Rp 80,500.00 Rp 80,500.00

Sub Jumlah Rp 1,248,758.25

62. MEMBUAT 1 M3 BETON 1 : 3 : 5 + BEKISTING (PONDASI LAJUR)Kebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanPC Kg 218.000 Rp 1,292.50 Rp 281,765.00 PB M3 0.520 Rp 176,950.00 Rp 92,014.00 KR M3 0.870 Rp 172,875.00 Rp 150,401.25 Kayu Kelas II M3 0.130 Rp 2,462,750.00 Rp 320,157.50 Paku kayu Kg 1.000 Rp 17,745.00 Rp 17,745.00

Tenaga Kerja

Pekerja OH 1.650 Rp 62,100.00 Rp 102,465.00 Tukang Batu OH 0.250 Rp 74,750.00 Rp 18,687.50 Tukang Kayu OH 0.350 Rp 74,750.00 Rp 26,162.50 Kepala Tukang OH 0.025 Rp 75,900.00 Rp 1,897.50 Mandor OH 0.080 Rp 80,500.00 Rp 6,440.00

Sub Jumlah Rp 1,017,735.25

63. MEMBUAT 1 M3 BETON K 225Kebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanPC Kg 388.000 Rp 1,292.50 Rp 501,490.00 PB M3 0.650 Rp 176,950.00 Rp 115,017.50 KR M3 0.650 Rp 172,875.00 Rp 112,368.75

Tenaga Kerja

Pekerja OH 6.000 Rp 62,100.00 Rp 372,600.00 Tukang Batu OH 1.000 Rp 74,750.00 Rp 74,750.00 Kepala Tukang OH 0.100 Rp 75,900.00 Rp 7,590.00 Mandor OH 0.300 Rp 80,500.00 Rp 24,150.00

Sub Jumlah Rp 1,207,966.25

Page 36: Analisa 2013 Pu Cipta Karya kabupaten kampar

64. MEMBUAT 1 M3 BETON K 275Kebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanPC Kg 400.000 Rp 1,292.50 Rp 517,000.00 PB M3 0.400 Rp 176,950.00 Rp 70,780.00 KR M3 0.820 Rp 172,875.00 Rp 141,757.50

Tenaga Kerja

Pekerja OH 6.000 Rp 62,100.00 Rp 372,600.00 Tukang Batu OH 1.000 Rp 74,750.00 Rp 74,750.00 Kepala Tukang OH 0.100 Rp 75,900.00 Rp 7,590.00 Mandor OH 0.300 Rp 80,500.00 Rp 24,150.00

Sub Jumlah Rp 1,208,627.50

65. MEMBUAT 1 M3 DINDING BETON BERTULANG ( BESI + BEKISTING) DRAINASEKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

Bahan

Kayu Kelas III M3 0.133 Rp 2,022,750.00 Rp 269,025.75 Paku 5 Cm - 12 Cm Kg 1.333 Rp 17,745.00 Rp 23,654.09 Minyak Bekisting Liter 1.200 Rp 8,279.25 Rp 9,935.10 Besi Beton Polos Kg 60.000 Rp 14,965.00 Rp 897,900.00 Kawat Beton Kg 1.000 Rp 17,982.50 Rp 17,982.50 PC Kg 336.000 Rp 1,292.50 Rp 434,280.00 PB M3 0.540 Rp 176,950.00 Rp 95,553.00 KR M3 0.810 Rp 172,875.00 Rp 140,028.75 Plywood 9 mm Lbr 0.800 Rp 123,250.00 Rp 98,600.00

Tenaga Kerja

Pekerja OH 5.300 Rp 62,100.00 Rp 329,130.00 Tukang Batu OH 0.275 Rp 74,750.00 Rp 20,556.25 Tukang Kayu OH 1.560 Rp 74,750.00 Rp 116,610.00 Tukang Besi OH 1.400 Rp 74,750.00 Rp 104,650.00 Tukang Bongkar OH 1.200 Rp 74,750.00 Rp 89,700.00 Kepala Tukang OH 0.323 Rp 75,900.00 Rp 24,515.70 Mandor OH 0.283 Rp 80,500.00 Rp 22,781.50

Sub Jumlah Rp 2,694,902.64

66. MEMBUAT 1 M3 PELAT LANTAI BETON BERTULANG (BESI + BEKESTING)Kebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

Bahan

Kayu Kelas III M3 0.240 Rp 2,022,750.00 Rp 485,460.00 Paku 5 Cm - 12 Cm Kg 3.200 Rp 17,745.00 Rp 56,784.00 Minyak Bekisting Liter 1.600 Rp 8,279.25 Rp 13,246.80 Besi Beton Polos Kg 120.000 Rp 14,965.00 Rp 1,795,800.00 Kawat Beton Kg 2.000 Rp 17,982.50 Rp 35,965.00 PC Kg 336.000 Rp 1,292.50 Rp 434,280.00 PB M3 0.540 Rp 176,950.00 Rp 95,553.00 KR M3 0.810 Rp 172,875.00 Rp 140,028.75 Kayu Kelas II (Balok) M3 0.160 Rp 2,022,750.00 Rp 323,640.00 Plywood 9 mm LBR 2.800 Rp 123,250.00 Rp 345,100.00 Dolken Kayu galam BTG 24.000 Rp 11,275.00 Rp 270,600.00

Tenaga Kerja

Pekerja OH 5.300 Rp 62,100.00 Rp 329,130.00 Tukang Batu OH 0.275 Rp 74,750.00 Rp 20,556.25 Tukang Kayu OH 1.300 Rp 74,750.00 Rp 97,175.00 Tukang Besi OH 1.050 Rp 74,750.00 Rp 78,487.50 Kepala Tukang OH 0.265 Rp 75,900.00 Rp 20,113.50 Mandor OH 0.265 Rp 80,500.00 Rp 21,332.50

Sub Jumlah Rp 4,563,252.30

VI. PEKERJAAN KAYU67. MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN KUSEN JENDELA, KAYU KELAS I

Kebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanKayu Kelas I (Balok) M3 1.100 Rp 3,892,750.00 Rp 4,282,025.00 Paku 10 Cm Kg 1.250 Rp 16,645.00 Rp 20,806.25 Lem Kayu Kg 1.000 Rp 28,101.25 Rp 28,101.25

Tenaga Kerja

Pekerja OH 6.000 Rp 62,100.00 Rp 372,600.00 Tukang Kayu OH 20.000 Rp 74,750.00 Rp 1,495,000.00 Kepala Tukang OH 2.000 Rp 75,900.00 Rp 151,800.00 Mandor OH 0.300 Rp 80,500.00 Rp 24,150.00

Sub Jumlah Rp 6,374,482.50

Page 37: Analisa 2013 Pu Cipta Karya kabupaten kampar

68. MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN KUSEN JENDELA, KAYU KELAS II Kebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanKayu Kelas II M3 1.200 Rp 2,462,750.00 Rp 2,955,300.00 Paku 10 Cm Kg 1.250 Rp 16,645.00 Rp 20,806.25 Lem Kayu Kg 1.000 Rp 28,101.25 Rp 28,101.25

Tenaga Kerja

Pekerja OH 6.000 Rp 62,100.00 Rp 372,600.00 Tukang Kayu OH 18.000 Rp 74,750.00 Rp 1,345,500.00 Kepala Tukang OH 2.000 Rp 75,900.00 Rp 151,800.00 Mandor OH 0.300 Rp 80,500.00 Rp 24,150.00

Sub Jumlah Rp 4,898,257.50

69. MEMBUAT DAN MEMASANG 1 M2 PINTU KLAMP STANDAR, KAYU KELAS IIKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanKayu Kelas II (Papan) M3 0.040 Rp 2,462,750.00 Rp 98,510.00 Paku 5 Cm - 7 Cm Kg 0.050 Rp 16,645.00 Rp 832.25

Tenaga Kerja

Pekerja OH 0.350 Rp 62,100.00 Rp 21,735.00 Tukang Kayu OH 1.050 Rp 74,750.00 Rp 78,487.50 Kepala Tukang OH 0.105 Rp 75,900.00 Rp 7,969.50 Mandor OH 0.018 Rp 80,500.00 Rp 1,449.00

Sub Jumlah Rp 208,983.25

70. MEMBUAT DAN MEMASANG 1 M2 PINTU KLAMP SEDERHANA, KAYU KELAS IIIKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanKayu Kelas III (Papan) M3 0.040 Rp 2,022,750.00 Rp 80,910.00 Paku 5 Cm - 7 Cm Kg 0.050 Rp 16,645.00 Rp 832.25

Tenaga Kerja

Pekerja OH 0.350 Rp 62,100.00 Rp 21,735.00 Tukang Kayu OH 1.050 Rp 74,750.00 Rp 78,487.50 Kepala Tukang OH 0.105 Rp 75,900.00 Rp 7,969.50 Mandor OH 0.018 Rp 80,500.00 Rp 1,449.00

Sub Jumlah Rp 191,383.25

71. MEMBUAT DAN MEMASANG 1 M2 DAUN PINTU PANEL, KAYU KELAS I ATAU KELAS IIKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanKayu Kelas I atau kelas II (Papan) M3 0.040 Rp 2,462,750.00 Rp 98,510.00 Lem Kayu Kg 0.500 Rp 28,101.25 Rp 14,050.63

Tenaga Kerja

Pekerja OH 1.000 Rp 62,100.00 Rp 62,100.00 Tukang Kayu OH 2.500 Rp 74,750.00 Rp 186,875.00 Kepala Tukang OH 0.250 Rp 75,900.00 Rp 18,975.00 Mandor OH 0.050 Rp 80,500.00 Rp 4,025.00

Sub Jumlah Rp 384,535.63

72. MEMBUAT DAN MEMASANG 1 M2 PINTU DAN JENDELA KACA, KAYU KELAS I ATAU KELAS IIKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanKayu Kelas I atau kelas II (Papan) M3 0.024 Rp 2,462,750.00 Rp 59,106.00 Lem Kayu Kg 0.300 Rp 28,101.25 Rp 8,430.38

Tenaga Kerja

Pekerja OH 0.800 Rp 62,100.00 Rp 49,680.00 Tukang Kayu OH 2.000 Rp 74,750.00 Rp 149,500.00 Kepala Tukang OH 0.200 Rp 75,900.00 Rp 15,180.00 Mandor OH 0.040 Rp 80,500.00 Rp 3,220.00

Sub Jumlah Rp 285,116.38

73. MEMBUAT DAN MEMASANG 1 M2 PINTU DAN JENDELA JALUSI, KAYU KELAS I ATAU KELAS IIKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanKayu Kelas I atau kelas II (Papan) M3 0.064 Rp 2,462,750.00 Rp 157,616.00 Lem Kayu Kg 0.500 Rp 28,101.25 Rp 14,050.63

Tenaga Kerja

Pekerja OH 1.000 Rp 62,100.00 Rp 62,100.00 Tukang Kayu OH 3.000 Rp 74,750.00 Rp 224,250.00 Kepala Tukang OH 0.300 Rp 75,900.00 Rp 22,770.00 Mandor OH 0.050 Rp 80,500.00 Rp 4,025.00

Sub Jumlah Rp 484,811.63

Page 38: Analisa 2013 Pu Cipta Karya kabupaten kampar

74. MEMBUAT 1 M2 DAUN PINTU KAYU LAPIS (PLYWOOD) RANGKAP, RANGKA TERTUTUPKAYU KELAS II (LEBAR SAMPAI 90 CM)

Kebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

Bahan

Kayu Kelas II (Papan) M3 0.025 Rp 2,462,750.00 Rp 61,568.75 Paku 1 Cm - 2,5 Cm Kg 0.030 Rp 16,645.00 Rp 499.35 Lem Kayu Kg 0.500 Rp 28,101.25 Rp 14,050.63

Lembar 1.000 Rp 84,750.00 Rp 84,750.00

Tenaga Kerja

Pekerja OH 0.600 Rp 62,100.00 Rp 37,260.00 Tukang Kayu OH 2.000 Rp 74,750.00 Rp 149,500.00 Kepala Tukang OH 0.200 Rp 75,900.00 Rp 15,180.00 Mandor OH 0.030 Rp 80,500.00 Rp 2,415.00

Sub Jumlah Rp 365,223.73

75. MEMBUAT 1 M2 PINTU PLYWOOD RANGKAP, RANGKA EXPOSE KAYU KELAS I ATAU KELAS IIKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

Bahan

Kayu Kelas I atau Kelas II (Papan) M3 0.0256 Rp 2,462,750.00 Rp 63,046.40 Paku 1 Cm - 2,5 Cm Kg 0.030 Rp 16,645.00 Rp 499.35 Lem Kayu Kg 0.500 Rp 28,101.25 Rp 14,050.63

Lembar 1.000 Rp 84,750.00 Rp 84,750.00

Tenaga Kerja

Pekerja OH 0.800 Rp 62,100.00 Rp 49,680.00 Tukang Kayu OH 2.000 Rp 74,750.00 Rp 149,500.00 Kepala Tukang OH 0.200 Rp 75,900.00 Rp 15,180.00 Mandor OH 0.040 Rp 80,500.00 Rp 3,220.00

Sub Jumlah Rp 379,926.38

76. MEMASANG 1 M2 JALUSI KUSEN, KAYU KELAS I ATAU KELAS IIKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanKayu Kelas I atau Kelas II (Papan) M3 0.060 Rp 2,462,750.00 Rp 147,765.00 Paku 1 Cm - 2,5 Cm Kg 0.150 Rp 17,745.00 Rp 2,661.75

Tenaga Kerja

Pekerja OH 0.500 Rp 62,100.00 Rp 31,050.00 Tukang Kayu OH 2.000 Rp 74,750.00 Rp 149,500.00 Kepala Tukang OH 0.200 Rp 75,900.00 Rp 15,180.00 Mandor OH 0.025 Rp 80,500.00 Rp 2,012.50

Sub Jumlah Rp 348,169.25

77. MEMASANG 1 M2 TEAKWOOD RANGKAP, RANGKA EXPOSE KAYU KELAS IKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

Bahan

Kayu Kelas I atau Kelas II (Papan) M3 0.025 Rp 2,462,750.00 Rp 61,568.75 Paku 1 Cm - 2,5 Cm Kg 0.030 Rp 17,745.00 Rp 532.35 Lem Kayu Kg 0.300 Rp 28,101.25 Rp 8,430.38

Lembar 1.000 Rp 166,150.00 Rp 166,150.00

Tenaga Kerja

Pekerja OH 0.800 Rp 62,100.00 Rp 49,680.00 Tukang Kayu OH 2.000 Rp 74,750.00 Rp 149,500.00 Kepala Tukang OH 0.200 Rp 75,900.00 Rp 15,180.00 Mandor OH 0.040 Rp 80,500.00 Rp 3,220.00

Sub Jumlah Rp 454,261.48

78. MEMASANG 1 M2 TEAKWOOD RANGKAP LAPIS FORMIKA, RANGKA EXPOSE KAYU KELAS IIKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

Bahan

Kayu Kelas II (Papan) M3 0.025 Rp 2,462,750.00 Rp 61,568.75 Paku 1 Cm - 2,5 Cm Kg 0.030 Rp 17,745.00 Rp 532.35 Lem Kayu Kg 0.800 Rp 28,101.25 Rp 22,481.00

Lembar 1.000 Rp 166,150.00 Rp 166,150.00

Formika Lembar 0.500 Rp 45,150.00 Rp 22,575.00

Tenaga Kerja

Pekerja OH 0.800 Rp 62,100.00 Rp 49,680.00 Tukang Kayu OH 2.500 Rp 74,750.00 Rp 186,875.00 Kepala Tukang OH 0.250 Rp 75,900.00 Rp 18,975.00 Mandor OH 0.040 Rp 80,500.00 Rp 3,220.00

Sub Jumlah Rp 532,057.10

Plywood Tebal 3,6 mm Ukuran (90 x 220) Cm

Plywood Tebal 3,6 mm Ukuran (90 x 220) Cm

Teakwood Tebal 3,6 mm Ukuran (90 x 220) Cm

Teakwood Tebal 3,6 mm Ukuran (90 x 220) Cm

Page 39: Analisa 2013 Pu Cipta Karya kabupaten kampar

79. MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA KONVENSIONAL, KAYU KELAS I, KELAS II DAN KELAS IIIBENTANG 6 METER

Kebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanKayu Kelas I, Kelas II, Kelas III (Balok) M3 1.100 Rp 2,022,750.00 Rp 2,225,025.00

Besi Strip Tebal 5 mm Kg 15.000 Rp 11,117.50 Rp 166,762.50 Paku 5 cm - 12 Cm Kg 5.600 Rp 16,645.00 Rp 93,212.00

Tenaga Kerja

Pekerja OH 4.000 Rp 62,100.00 Rp 248,400.00 Tukang Kayu OH 12.000 Rp 74,750.00 Rp 897,000.00 Kepala Tukang OH 1.200 Rp 75,900.00 Rp 91,080.00 Mandor OH 0.200 Rp 80,500.00 Rp 16,100.00

Sub Jumlah Rp 3,737,579.50

80. MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA EXPOSE, KAYU KELAS IKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanKayu Kelas I (Balok) M3 1.200 Rp 3,892,750.00 Rp 4,671,300.00 Besi Strip Tebal 5 mm Kg 15.000 Rp 11,117.50 Rp 166,762.50 Paku 12 Cm Kg 5.600 Rp 16,645.00 Rp 93,212.00

Tenaga Kerja

Pekerja OH 6.000 Rp 62,100.00 Rp 372,600.00 Tukang Kayu OH 20.000 Rp 74,750.00 Rp 1,495,000.00 Kepala Tukang OH 2.000 Rp 75,900.00 Rp 151,800.00 Mandor OH 0.300 Rp 80,500.00 Rp 24,150.00

Sub Jumlah Rp 6,974,824.50

81. MEMASANG 1 M3 KONSTRUKSI GORDENG, KAYU KELAS IIKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanKayu Kelas II (Balok) M3 1.100 Rp 2,462,750.00 Rp 2,709,025.00 Besi Strip Tebal 5 mm Kg 15.000 Rp 11,117.50 Rp 166,762.50 Paku 5 cm - 12 Cm Kg 3.000 Rp 16,645.00 Rp 49,935.00

Tenaga Kerja

Pekerja OH 2.400 Rp 62,100.00 Rp 149,040.00 Tukang Kayu OH 7.200 Rp 74,750.00 Rp 538,200.00 Kepala Tukang OH 0.720 Rp 75,900.00 Rp 54,648.00 Mandor OH 0.120 Rp 80,500.00 Rp 9,660.00

Sub Jumlah Rp 3,677,270.50

82. MEMASANG 1 M2 RANGKA ATAP GENTENG KERAMIK, KAYU KELAS IIKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanKaso-Kaso (5 x 7 ) Cm M3 0.014 Rp 2,462,750.00 Rp 34,478.50 Reng (2 x 3 ) Cm M3 0.036 Rp 2,462,750.00 Rp 88,659.00 Paku 5 Cm dan 10 Cm Kg 0.250 Rp 16,645.00 Rp 4,161.25

Tenaga Kerja

Pekerja OH 0.100 Rp 62,100.00 Rp 6,210.00 Tukang Kayu OH 0.100 Rp 74,750.00 Rp 7,475.00 Kepala Tukang OH 0.010 Rp 75,900.00 Rp 759.00 Mandor OH 0.005 Rp 80,500.00 Rp 402.50

Sub Jumlah Rp 142,145.25

83. MEMASANG 1 M2 RANGKA ATAP GENTENG BETON, KAYU KELAS IIKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanKaso-Kaso (5 x 7 ) Cm M3 0.014 Rp 2,462,750.00 Rp 34,478.50 Reng (3 x 4 ) Cm M3 0.057 Rp 2,462,750.00 Rp 140,376.75 Paku 5 Cm dan 10 Cm Kg 0.250 Rp 16,645.00 Rp 4,161.25

Tenaga Kerja

Pekerja OH 0.100 Rp 62,100.00 Rp 6,210.00 Tukang Kayu OH 0.100 Rp 74,750.00 Rp 7,475.00 Kepala Tukang OH 0.010 Rp 75,900.00 Rp 759.00 Mandor OH 0.005 Rp 80,500.00 Rp 402.50

Sub Jumlah Rp 193,863.00

84. MEMASANG 1 M2 RANGKA ATAP SIRAP, KAYU KELAS IIKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanKayu Kelas II M3 0.165 Rp 2,462,750.00 Rp 406,353.75 Paku 5 Cm dan 10 Cm Kg 0.200 Rp 16,645.00 Rp 3,329.00

Tenaga Kerja

Pekerja OH 0.120 Rp 62,100.00 Rp 7,452.00 Tukang Kayu OH 0.120 Rp 74,750.00 Rp 8,970.00 Kepala Tukang OH 0.012 Rp 75,900.00 Rp 910.80 Mandor OH 0.006 Rp 80,500.00 Rp 483.00

Sub Jumlah Rp 427,498.55

Page 40: Analisa 2013 Pu Cipta Karya kabupaten kampar

85. MEMASANG 1 M2 RANGKA LANGIT-LANGIT (50 x 100) CM, KAYU KELAS II ATAU KELAS IIIKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanKaso-Kaso (5 x 7) Cm M3 0.0154 Rp 2,462,750.00 Rp 37,926.35 Paku 7 Cm - 10 Cm Kg 0.200 Rp 16,645.00 Rp 3,329.00

Tenaga Kerja

Pekerja OH 0.150 Rp 62,100.00 Rp 9,315.00 Tukang Kayu OH 0.250 Rp 74,750.00 Rp 18,687.50 Kepala Tukang OH 0.025 Rp 75,900.00 Rp 1,897.50 Mandor OH 0.075 Rp 80,500.00 Rp 6,037.50

Sub Jumlah Rp 77,192.85

86. MEMASANG 1 M2 RANGKA LANGIT-LANGIT (60 x 60) CM, KAYU KELAS II ATAU KELAS IIIKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanKaso-Kaso (5 x 7) Cm M3 0.0163 Rp 2,462,750.00 Rp 40,142.83 Paku 7 Cm - 10 Cm Kg 0.250 Rp 16,645.00 Rp 4,161.25

Tenaga Kerja

Pekerja OH 0.200 Rp 62,100.00 Rp 12,420.00 Tukang Kayu OH 0.300 Rp 74,750.00 Rp 22,425.00 Kepala Tukang OH 0.030 Rp 75,900.00 Rp 2,277.00 Mandor OH 0.010 Rp 80,500.00 Rp 805.00

Sub Jumlah Rp 82,231.08

87. MEMASANG 1 M' LISTPLANK UKURAN (2 x 20) CM, KAYU KELAS I ATAU KELAS IIKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanKayu Kelas I atau Kelas II (Papan) M3 0.0108 Rp 2,462,750.00 Rp 26,597.70 Paku 5 Cm dan 7 Cm Kg 0.100 Rp 16,645.00 Rp 1,664.50

Tenaga Kerja

Pekerja OH 0.100 Rp 62,100.00 Rp 6,210.00 Tukang Kayu OH 0.200 Rp 74,750.00 Rp 14,950.00 Kepala Tukang OH 0.025 Rp 75,900.00 Rp 1,897.50 Mandor OH 0.005 Rp 80,500.00 Rp 402.50

Sub Jumlah Rp 51,722.20

89. MEMASANG 1 M2 RANGKA DINDING PEMISAH (60 x 120) CM KAYU KELAS II ATAU KELAS IIIKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanKayu Kelas II atau Kelas III (Balok) M3 0.028 Rp 2,462,750.00 Rp 68,957.00 Paku 5 Cm dan 7 Cm Kg 0.150 Rp 16,645.00 Rp 2,496.75

Tenaga Kerja

Pekerja OH 0.150 Rp 62,100.00 Rp 9,315.00 Tukang Kayu OH 0.450 Rp 74,750.00 Rp 33,637.50 Kepala Tukang OH 0.045 Rp 75,900.00 Rp 3,415.50 Mandor OH 0.008 Rp 80,500.00 Rp 644.00

Sub Jumlah Rp 118,465.75

90. MEMASANG 1 M2 DINDING PEMISAH TEAKWOOD RANGKAP, RANGKA KAYU KELAS IIKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

Bahan

M3 0.028 Rp 2,462,750.00 Rp 68,957.00

Paku 5 Cm dan 10 Cm Kg 0.150 Rp 16,645.00 Rp 2,496.75

Lembar 0.860 Rp 166,150.00 Rp 142,889.00

Lem Kayu Kg 0.560 Rp 28,101.25 Rp 15,736.70

Tenaga Kerja

Pekerja OH 0.150 Rp 62,100.00 Rp 9,315.00 Tukang Kayu OH 0.450 Rp 74,750.00 Rp 33,637.50 Kepala Tukang OH 0.045 Rp 75,900.00 Rp 3,415.50 Mandor OH 0.008 Rp 80,500.00 Rp 644.00

Sub Jumlah Rp 277,091.45

Kayu Kelas II (Balok) Ukuran (6 x 12) Cm

Teakwood Tebal 3,6 mm, Ukuran 120 x 240 Cm

Page 41: Analisa 2013 Pu Cipta Karya kabupaten kampar

91. MEMASANG 1 M2 DINDING PEMISAH PLYWOOD RANGKAP, RANGKA KAYU KELAS IIKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

Bahan

M3 0.028 Rp 2,462,750.00 Rp 68,957.00

Paku 5 Cm dan 10 Cm Kg 0.150 Rp 16,645.00 Rp 2,496.75

Lembar 0.860 Rp 84,750.00 Rp 72,885.00

Lem Kayu Kg 0.560 Rp 28,101.25 Rp 15,736.70

Tenaga Kerja

Pekerja OH 0.200 Rp 62,100.00 Rp 12,420.00 Tukang Kayu OH 0.600 Rp 74,750.00 Rp 44,850.00 Kepala Tukang OH 0.060 Rp 75,900.00 Rp 4,554.00 Mandor OH 0.010 Rp 80,500.00 Rp 805.00

Sub Jumlah Rp 222,704.45

92. MEMASANG 1 M2 DINDING LAMBRIZIRING DARI PAPAN KAYU KELAS IKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanKayu Kelas I (Papan) M3 0.007 Rp 3,892,750.00 Rp 27,249.25 Paku 5 Cm dan 10 Cm Kg 0.100 Rp 16,645.00 Rp 1,664.50 Paku Skrup 10 Cm Kg 0.150 Rp 11,145.00 Rp 1,671.75

Tenaga Kerja

Pekerja OH 0.600 Rp 62,100.00 Rp 37,260.00 Tukang Kayu OH 1.800 Rp 74,750.00 Rp 134,550.00 Kepala Tukang OH 0.180 Rp 75,900.00 Rp 13,662.00 Mandor OH 0.030 Rp 80,500.00 Rp 2,415.00

Sub Jumlah Rp 218,472.50

93. MEMASANG 1 M2 DINDING LAMBRIZIRING DARI PLYWOOD UKURAN (120 x 240) CMKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanPlywood Tebal 3,6 mm Lembar 0.400 Rp 84,750.00 Rp 33,900.00 Paku 1 Cm dan 2,5 Cm Kg 0.050 Rp 16,645.00 Rp 832.25

Tenaga Kerja

Pekerja OH 0.025 Rp 62,100.00 Rp 1,552.50 Tukang Kayu OH 0.075 Rp 74,750.00 Rp 5,606.25 Kepala Tukang OH 0.0075 Rp 75,900.00 Rp 569.25 Mandor OH 0.0013 Rp 80,500.00 Rp 104.65

Sub Jumlah Rp 42,564.90

94. MEMASANG 1 M2 PINTU / JENDELA KACA BINGKAIKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanKayu Kelas II M3 0.020 Rp 2,462,750.00 Rp 49,255.00 Kaca Polos 5 MM M2 1.000 Rp 99,750.00 Rp 99,750.00

Tenaga Kerja

Pekerja OH 0.800 Rp 62,100.00 Rp 49,680.00 Tukang Kayu OH 1.000 Rp 74,750.00 Rp 74,750.00 Kepala Tukang OH 0.2000 Rp 75,900.00 Rp 15,180.00 Mandor OH 0.0800 Rp 80,500.00 Rp 6,440.00

Sub Jumlah Rp 295,055.00

95. MEMASANG 1 M2 KASO + RENG ATAPKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanKayu Kelas II M3 0.014 Rp 2,462,750.00 Rp 34,478.50 Paku Biasa Kg 0.150 Rp 16,645.00 Rp 2,496.75

Tenaga Kerja

Pekerja OH 0.120 Rp 62,100.00 Rp 7,452.00 Tukang Kayu OH 0.120 Rp 74,750.00 Rp 8,970.00 Kepala Tukang OH 0.0120 Rp 75,900.00 Rp 910.80 Mandor OH 0.0060 Rp 80,500.00 Rp 483.00

Sub Jumlah Rp 54,791.05

VII. PEKERJAAN PLESTERAN96. MEMASANG 1 M2 PLESTERAN 1 PC : 1 PP, TEBAL 15 MM

Kebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanPC Kg 15.504 Rp 1,292.50 Rp 20,038.92 PP M3 0.016 Rp 180,250.00 Rp 2,884.00

Tenaga Kerja

Pekerja OH 0.200 Rp 62,100.00 Rp 12,420.00 Tukang Batu OH 0.150 Rp 74,750.00 Rp 11,212.50 Kepala Tukang OH 0.015 Rp 75,900.00 Rp 1,138.50 Mandor OH 0.010 Rp 80,500.00 Rp 805.00

Sub Jumlah Rp 48,498.92

Kayu Kelas II (Balok) Ukuran (6 x 12) Cm

Plywood Tebal 3,6 mm, Ukuran 120 x 240 Cm

Page 42: Analisa 2013 Pu Cipta Karya kabupaten kampar

97. MEMASANG 1 M2 PLESTERAN 1 PC : 2 PP, TEBAL 15 MMKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanPC Kg 10.224 Rp 1,292.50 Rp 13,214.52 PP M3 0.023 Rp 180,250.00 Rp 4,145.75

Tenaga Kerja

Pekerja OH 0.200 Rp 62,100.00 Rp 12,420.00 Tukang Batu OH 0.150 Rp 74,750.00 Rp 11,212.50 Kepala Tukang OH 0.015 Rp 75,900.00 Rp 1,138.50 Mandor OH 0.010 Rp 80,500.00 Rp 805.00

Sub Jumlah Rp 42,936.27

98. MEMASANG 1 M2 PLESTERAN 1 PC : 3 PP, TEBAL 15 MMKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanPC Kg 7.776 Rp 1,292.50 Rp 10,050.48 PP M3 0.023 Rp 180,250.00 Rp 4,145.75

Tenaga Kerja

Pekerja OH 0.200 Rp 62,100.00 Rp 12,420.00 Tukang Batu OH 0.150 Rp 74,750.00 Rp 11,212.50 Kepala Tukang OH 0.015 Rp 75,900.00 Rp 1,138.50 Mandor OH 0.010 Rp 80,500.00 Rp 805.00

Sub Jumlah Rp 39,772.23

99. MEMASANG 1 M2 PLESTERAN 1 PC : 4 PP, TEBAL 15 MMKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanPC Kg 6.240 Rp 1,292.50 Rp 8,065.20 PP M3 0.024 Rp 180,250.00 Rp 4,326.00

Tenaga Kerja

Pekerja OH 0.200 Rp 62,100.00 Rp 12,420.00 Tukang Batu OH 0.150 Rp 74,750.00 Rp 11,212.50 Kepala Tukang OH 0.015 Rp 75,900.00 Rp 1,138.50 Mandor OH 0.010 Rp 80,500.00 Rp 805.00

Sub Jumlah Rp 37,967.20

98. MEMASANG 1 M2 PLESTERAN 1 PC : 5 PP, TEBAL 15 MMKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanPC Kg 5.184 Rp 1,292.50 Rp 6,700.32 PP M3 0.026 Rp 180,250.00 Rp 4,686.50

Tenaga Kerja

Pekerja OH 0.200 Rp 62,100.00 Rp 12,420.00 Tukang Batu OH 0.150 Rp 74,750.00 Rp 11,212.50 Kepala Tukang OH 0.015 Rp 75,900.00 Rp 1,138.50 Mandor OH 0.010 Rp 80,500.00 Rp 805.00

Sub Jumlah Rp 36,962.82

99. MEMASANG 1 M2 PLESTERAN 1 PC : 6 PP, TEBAL 15 MMKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanPC Kg 4.416 Rp 1,292.50 Rp 5,707.68 PP M3 0.027 Rp 180,250.00 Rp 4,866.75

Tenaga Kerja

Pekerja OH 0.200 Rp 62,100.00 Rp 12,420.00 Tukang Batu OH 0.150 Rp 74,750.00 Rp 11,212.50 Kepala Tukang OH 0.015 Rp 75,900.00 Rp 1,138.50 Mandor OH 0.010 Rp 80,500.00 Rp 805.00

Sub Jumlah Rp 36,150.43

100. MEMASANG 1 M2 PLESTERAN 1 PC : 7 PP, TEBAL 15 MMKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanPC Kg 3.936 Rp 1,292.50 Rp 5,087.28 PP M3 0.028 Rp 180,250.00 Rp 5,047.00

Tenaga Kerja

Pekerja OH 0.200 Rp 62,100.00 Rp 12,420.00 Tukang Batu OH 0.150 Rp 74,750.00 Rp 11,212.50 Kepala Tukang OH 0.015 Rp 75,900.00 Rp 1,138.50 Mandor OH 0.010 Rp 80,500.00 Rp 805.00

Sub Jumlah Rp 35,710.28

Page 43: Analisa 2013 Pu Cipta Karya kabupaten kampar

101. MEMASANG 1 M2 PLESTERAN 1 PC : 8 PP, TEBAL 15 MMKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanPC Kg 3.456 Rp 1,292.50 Rp 4,466.88 PP M3 0.029 Rp 180,250.00 Rp 5,227.25

Tenaga Kerja

Pekerja OH 0.200 Rp 62,100.00 Rp 12,420.00 Tukang Batu OH 0.150 Rp 74,750.00 Rp 11,212.50 Kepala Tukang OH 0.015 Rp 75,900.00 Rp 1,138.50 Mandor OH 0.010 Rp 80,500.00 Rp 805.00

Sub Jumlah Rp 35,270.13

102. MEMASANG 1 M2 PLESTERAN 1 PC : 2 PP, TEBAL 20 MMKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanPC Kg 13.632 Rp 1,292.50 Rp 17,619.36 PP M3 0.027 Rp 180,250.00 Rp 4,866.75

Tenaga Kerja

Pekerja OH 0.260 Rp 62,100.00 Rp 16,146.00 Tukang Batu OH 0.200 Rp 74,750.00 Rp 14,950.00 Kepala Tukang OH 0.020 Rp 75,900.00 Rp 1,518.00 Mandor OH 0.013 Rp 80,500.00 Rp 1,046.50

Sub Jumlah Rp 56,146.61

103. MEMASANG 1 M2 PLESTERAN 1 PC : 3 PP, TEBAL 20 MMKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanPC Kg 10.368 Rp 1,292.50 Rp 13,400.64 PP M3 0.031 Rp 180,250.00 Rp 5,587.75

Tenaga Kerja

Pekerja OH 0.260 Rp 62,100.00 Rp 16,146.00 Tukang Batu OH 0.200 Rp 74,750.00 Rp 14,950.00 Kepala Tukang OH 0.020 Rp 75,900.00 Rp 1,518.00 Mandor OH 0.013 Rp 80,500.00 Rp 1,046.50

Sub Jumlah Rp 52,648.89

104. MEMASANG 1 M2 PLESTERAN 1 PC : 4 PP, TEBAL 20 MMKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanPC Kg 8.320 Rp 1,292.50 Rp 10,753.60 PP M3 0.032 Rp 180,250.00 Rp 5,768.00

Tenaga Kerja

Pekerja OH 0.260 Rp 62,100.00 Rp 16,146.00 Tukang Batu OH 0.200 Rp 74,750.00 Rp 14,950.00 Kepala Tukang OH 0.020 Rp 75,900.00 Rp 1,518.00 Mandor OH 0.013 Rp 80,500.00 Rp 1,046.50

Sub Jumlah Rp 50,182.10

105. MEMASANG 1 M2 PLESTERAN 1 PC : 5 PP, TEBAL 20 MMKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanPC Kg 6.912 Rp 1,292.50 Rp 8,933.76 PP M3 0.035 Rp 180,250.00 Rp 6,308.75

Tenaga Kerja

Pekerja OH 0.260 Rp 62,100.00 Rp 16,146.00 Tukang Batu OH 0.200 Rp 74,750.00 Rp 14,950.00 Kepala Tukang OH 0.020 Rp 75,900.00 Rp 1,518.00 Mandor OH 0.013 Rp 80,500.00 Rp 1,046.50

Sub Jumlah Rp 48,903.01

106. MEMASANG 1 M2 PLESTERAN 1 PC : 6 PP, TEBAL 20 MMKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanPC Kg 5.888 Rp 1,292.50 Rp 7,610.24 PP M3 0.036 Rp 180,250.00 Rp 6,489.00

Tenaga Kerja

Pekerja OH 0.260 Rp 62,100.00 Rp 16,146.00 Tukang Batu OH 0.200 Rp 74,750.00 Rp 14,950.00 Kepala Tukang OH 0.020 Rp 75,900.00 Rp 1,518.00 Mandor OH 0.013 Rp 80,500.00 Rp 1,046.50

Sub Jumlah Rp 47,759.74

Page 44: Analisa 2013 Pu Cipta Karya kabupaten kampar

107. MEMASANG 1 M2 BARAPEN 1 PC : 5 PP, TEBAL 15 MMKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanPC Kg 5.184 Rp 1,292.50 Rp 6,700.32 PP M3 0.026 Rp 180,250.00 Rp 4,686.50

Tenaga Kerja

Pekerja OH 0.150 Rp 62,100.00 Rp 9,315.00 Tukang Batu OH 0.070 Rp 74,750.00 Rp 5,232.50 Kepala Tukang OH 0.007 Rp 75,900.00 Rp 531.30 Mandor OH 0.008 Rp 80,500.00 Rp 644.00

Sub Jumlah Rp 27,109.62

108. MEMASANG 1 M2 PLESTERAN SKONING 1 PC : 2 PP, LEBAR 10 MMKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanPC Kg 0.500 Rp 1,292.50 Rp 646.25 PP M3 0.013 Rp 180,250.00 Rp 2,343.25

Tenaga Kerja

Pekerja OH 0.057 Rp 62,100.00 Rp 3,539.70 Tukang Batu OH 0.380 Rp 74,750.00 Rp 28,405.00 Kepala Tukang OH 0.038 Rp 75,900.00 Rp 2,884.20 Mandor OH 0.003 Rp 80,500.00 Rp 241.50

Sub Jumlah Rp 38,059.90

109. MEMASANG 1 M2 PLESTERAN CIPRAT 1 PC : 2 PPKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanPC Kg 4.320 Rp 1,292.50 Rp 5,583.60 PP M3 0.006 Rp 180,250.00 Rp 1,081.50

Tenaga Kerja

Pekerja OH 0.250 Rp 62,100.00 Rp 15,525.00 Tukang Batu OH 0.100 Rp 74,750.00 Rp 7,475.00 Kepala Tukang OH 0.010 Rp 75,900.00 Rp 759.00 Mandor OH 0.013 Rp 80,500.00 Rp 1,046.50

Sub Jumlah Rp 31,470.60

110. MEMASANG 1 M2 FINISHING SIAR PASANGAN DINDING BATA MERAH (=20 M')Kebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

Bahan PC Kg 3.108 Rp 1,292.50 Rp 4,017.09

Tenaga Kerja

Pekerja OH 0.150 Rp 62,100.00 Rp 9,315.00 Tukang Batu OH 0.070 Rp 74,750.00 Rp 5,232.50 Kepala Tukang OH 0.007 Rp 75,900.00 Rp 531.30 Mandor OH 0.008 Rp 80,500.00 Rp 644.00

Sub Jumlah Rp 19,739.89

111. MEMASANG 1 M2 FINISHING SIAR PASANGAN DINDING CONBLOCK EXPOSE (=8 M')Kebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

Bahan PC Kg 1.600 Rp 1,292.50 Rp 2,068.00

Tenaga Kerja

Pekerja OH 0.075 Rp 62,100.00 Rp 4,657.50 Tukang Batu OH 0.035 Rp 74,750.00 Rp 2,616.25 Kepala Tukang OH 0.004 Rp 75,900.00 Rp 303.60 Mandor OH 0.004 Rp 80,500.00 Rp 322.00

Sub Jumlah Rp 9,967.35

112. MEMASANG 1 M2 FINISHING SIAR PASANGAN BATU KALI ADUKAN 1 PC : 2 PPKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanPC Kg 6.340 Rp 1,292.50 Rp 8,194.45 PP M3 0.012 Rp 180,250.00 Rp 2,163.00

Tenaga Kerja

Pekerja OH 0.300 Rp 62,100.00 Rp 18,630.00 Tukang Batu OH 0.140 Rp 74,750.00 Rp 10,465.00 Kepala Tukang OH 0.014 Rp 75,900.00 Rp 1,062.60 Mandor OH 0.015 Rp 80,500.00 Rp 1,207.50

Sub Jumlah Rp 41,722.55

Page 45: Analisa 2013 Pu Cipta Karya kabupaten kampar

113. MEMASANG 1 M2 ACIANKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

Bahan PC Kg 3.250 Rp 1,292.50 Rp 4,200.63

Tenaga Kerja

Pekerja OH 0.150 Rp 62,100.00 Rp 9,315.00 Tukang Batu OH 0.100 Rp 74,750.00 Rp 7,475.00 Kepala Tukang OH 0.010 Rp 75,900.00 Rp 759.00 Mandor OH 0.008 Rp 80,500.00 Rp 644.00

Sub Jumlah Rp 22,393.63

VIII. PEKERJAAN LANGIT-LANGIT

114. MEMASANG 1 M2 LANGIT-LANGIT ASBES SEMEN, TEBAL 4 MM, 5 MM DAN 6 MMKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanAsbes Semen M2 1.100 Rp 83,650.00 Rp 92,015.00 Paku 1 Cm - 2,5 Cm Kg 0.010 Rp 29,735.00 Rp 297.35

Tenaga Kerja

Pekerja OH 0.030 Rp 62,100.00 Rp 1,863.00 Tukang Kayu OH 0.070 Rp 74,750.00 Rp 5,232.50 Kepala Tukang OH 0.007 Rp 75,900.00 Rp 531.30 Mandor OH 0.002 Rp 80,500.00 Rp 161.00

Sub Jumlah Rp 100,100.15

115. MEMASANG 1 M2 LANGIT-LANGIT TRIPLEK UKURAN (120 x 240) CM, TEBAL 3 MM s/d 6 MMKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanPlywood 3,6 mm Lembar 0.375 Rp 84,750.00 Rp 31,781.25 Paku 1 Cm - 2,5 Cm Kg 0.030 Rp 16,645.00 Rp 499.35

Tenaga Kerja

Pekerja OH 0.070 Rp 62,100.00 Rp 4,347.00 Tukang Kayu OH 0.100 Rp 74,750.00 Rp 7,475.00 Kepala Tukang OH 0.010 Rp 75,900.00 Rp 759.00 Mandor OH 0.004 Rp 80,500.00 Rp 322.00

Sub Jumlah Rp 45,183.60

116. MEMASANG 1 M2 LANGIT-LANGIT LAMBRIZING KAYU TEBAL 9 MMKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanKayu Papan M3 0.015 Rp 2,022,750.00 Rp 30,341.25 Paku 1 Cm - 2,5 Cm Kg 0.010 Rp 16,645.00 Rp 166.45

Tenaga Kerja

Pekerja OH 0.600 Rp 62,100.00 Rp 37,260.00 Tukang Kayu OH 0.800 Rp 74,750.00 Rp 59,800.00 Kepala Tukang OH 0.080 Rp 75,900.00 Rp 6,072.00 Mandor OH 0.030 Rp 80,500.00 Rp 2,415.00

Sub Jumlah Rp 136,054.70

117. MEMASANG LANGIT-LANGIT GYPSUM BOARD UKURAN (120 x 240 x 9) MM, TEBAL 9 MMKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

Bahan

Rangka Furing M' 3.600 Rp 11,365.00 Rp 40,914.00 Kawat dia 4 mm KG 0.150 Rp 16,002.50 Rp 2,400.38 Gybsum Board Lembar 0.364 Rp 94,650.00 Rp 34,452.60 Paku Skrup Kg 0.110 Rp 16,095.00 Rp 1,770.45

Tenaga Kerja

Pekerja OH 0.100 Rp 62,100.00 Rp 6,210.00 Tukang Kayu OH 0.050 Rp 74,750.00 Rp 3,737.50 Kepala Tukang OH 0.005 Rp 75,900.00 Rp 379.50 Mandor OH 0.005 Rp 80,500.00 Rp 402.50

Sub Jumlah Rp 90,266.93

118. MEMASANG 1 M' LIST LANGIT-LANGIT KAYU PROFILKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanList Kayu Profil M' 1.050 Rp 3,311.50 Rp 3,477.08 Paku 1 Cm - 2,5 Cm Kg 0.010 Rp 16,645.00 Rp 166.45

Tenaga Kerja

Pekerja OH 0.050 Rp 62,100.00 Rp 3,105.00 Tukang Kayu OH 0.050 Rp 74,750.00 Rp 3,737.50 Kepala Tukang OH 0.005 Rp 75,900.00 Rp 379.50 Mandor OH 0.003 Rp 80,500.00 Rp 241.50

Sub Jumlah Rp 11,107.03

119. MEMASANG 1 M2 PIRI - PIRI Kebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanPapan piri - piri M3 0.020 Rp 2,462,750.00 Rp 49,255.00 Paku 1 Cm - 2,5 Cm Kg 0.200 Rp 16,645.00 Rp 3,329.00

Tenaga Kerja

Pekerja OH 0.230 Rp 62,100.00 Rp 14,283.00 Tukang Kayu OH 0.670 Rp 74,750.00 Rp 50,082.50 Kepala Tukang OH 0.067 Rp 75,900.00 Rp 5,085.30 Mandor OH 0.012 Rp 80,500.00 Rp 966.00

Sub Jumlah Rp 123,000.80

IX. PEKERJAAN PENUTUP LANTAI DAN DINDING120. MEMASANG 1 M2 LANTAI UBIN PC ABU-ABU UKURAN (40 x 40) CM

Kebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanUbin Abu-Abu (40 x 40) Cm Buah 6.630 Rp 8,965.00 Rp 59,437.95 PC Kg 9.800 Rp 1,292.50 Rp 12,666.50 PP M3 0.045 Rp 180,250.00 Rp 8,111.25

Tenaga Kerja

Pekerja OH 0.250 Rp 62,100.00 Rp 15,525.00 Tukang Batu OH 0.120 Rp 74,750.00 Rp 8,970.00 Kepala Tukang OH 0.012 Rp 75,900.00 Rp 910.80

Page 46: Analisa 2013 Pu Cipta Karya kabupaten kampar

Tenaga Kerja

Mandor OH 0.013 Rp 80,500.00 Rp 1,046.50 Sub Jumlah Rp 106,668.00

Page 47: Analisa 2013 Pu Cipta Karya kabupaten kampar

121. MEMASANG 1 M2 LANTAI UBIN PC ABU-ABU UKURAN (30 x 30) CMKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanUbin Abu-Abu (30 x 30) Cm Buah 11.870 Rp 4,565.00 Rp 54,186.55 PC Kg 10.000 Rp 1,292.50 Rp 12,925.00 PP M3 0.045 Rp 180,250.00 Rp 8,111.25

Tenaga Kerja

Pekerja OH 0.260 Rp 62,100.00 Rp 16,146.00 Tukang Batu OH 0.125 Rp 74,750.00 Rp 9,343.75 Kepala Tukang OH 0.013 Rp 75,900.00 Rp 986.70 Mandor OH 0.013 Rp 80,500.00 Rp 1,046.50

Sub Jumlah Rp 102,745.75

122. MEMASANG 1 M2 LANTAI UBIN PC ABU-ABU UKURAN (20 x 20) CMKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanUbin Abu-Abu (20 x 20) Cm Buah 26.500 Rp 2,145.00 Rp 56,842.50 PC Kg 10.400 Rp 1,292.50 Rp 13,442.00 PP M3 0.045 Rp 180,250.00 Rp 8,111.25

Tenaga Kerja

Pekerja OH 0.270 Rp 62,100.00 Rp 16,767.00 Tukang Batu OH 0.130 Rp 74,750.00 Rp 9,717.50 Kepala Tukang OH 0.013 Rp 75,900.00 Rp 986.70 Mandor OH 0.014 Rp 80,500.00 Rp 1,127.00

Sub Jumlah Rp 106,993.95

123. MEMASANG 1 M2 LANTAI UBIN WARNA UKURAN (40 x 40) CMKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

Bahan

Ubin Warna (40 x 40) Cm Buah 6.630 Rp 9,295.00 Rp 61,625.85 PC Kg 9.800 Rp 1,292.50 Rp 12,666.50 PP M3 0.045 Rp 180,250.00 Rp 8,111.25 Semen Warna Kg 1.300 Rp 1,666.50 Rp 2,166.45

Tenaga Kerja

Pekerja OH 0.250 Rp 62,100.00 Rp 15,525.00 Tukang Batu OH 0.120 Rp 74,750.00 Rp 8,970.00 Kepala Tukang OH 0.012 Rp 75,900.00 Rp 910.80 Mandor OH 0.013 Rp 80,500.00 Rp 1,046.50

Sub Jumlah Rp 111,022.35

124. MEMASANG 1 M2 LANTAI UBIN WARNA UKURAN (30 x 30) CMKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

Bahan

Ubin Warna (30 x 30) Cm Buah 11.870 Rp 4,785.00 Rp 56,797.95 PC Kg 10.000 Rp 1,292.50 Rp 12,925.00 PP M3 0.045 Rp 180,250.00 Rp 8,111.25 Semen Warna Kg 1.500 Rp 1,666.50 Rp 2,499.75

Tenaga Kerja

Pekerja OH 0.260 Rp 62,100.00 Rp 16,146.00 Tukang Batu OH 0.125 Rp 74,750.00 Rp 9,343.75 Kepala Tukang OH 0.013 Rp 75,900.00 Rp 986.70 Mandor OH 0.013 Rp 80,500.00 Rp 1,046.50

Sub Jumlah Rp 107,856.90

125. MEMASANG 1 M2 LANTAI KERAMIK UKURAN (20 x 25) CMKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanUbin Warna (20 x 25) Cm Buah 21.500 Rp 2,145.00 Rp 46,117.50 PC Kg 10.400 Rp 1,292.50 Rp 13,442.00 PP M3 0.045 Rp 180,250.00 Rp 8,111.25

Tenaga Kerja

Pekerja OH 0.270 Rp 62,100.00 Rp 16,767.00 Tukang Batu OH 0.130 Rp 74,750.00 Rp 9,717.50 Kepala Tukang OH 0.013 Rp 75,900.00 Rp 986.70 Mandor OH 0.014 Rp 80,500.00 Rp 1,127.00

Sub Jumlah Rp 96,268.95

Page 48: Analisa 2013 Pu Cipta Karya kabupaten kampar

126. MEMASANG 1 M' PLINT UBIN PC ABU-ABU UKURAN (15 x 20) CMKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanPlint Ubin PC Abu-Abu (15 x 20) Cm Buah 5.300 Rp 1,457.50 Rp 7,724.75

PC Kg 1.650 Rp 1,292.50 Rp 2,132.63 PP M3 0.004 Rp 180,250.00 Rp 721.00

Tenaga Kerja

Pekerja OH 0.090 Rp 62,100.00 Rp 5,589.00 Tukang Batu OH 0.090 Rp 74,750.00 Rp 6,727.50 Kepala Tukang OH 0.009 Rp 75,900.00 Rp 683.10 Mandor OH 0.005 Rp 80,500.00 Rp 402.50

Sub Jumlah Rp 23,980.48

127. MEMASANG 1 M' PLINT UBIN PC ABU-ABU UKURAN (10 x 30) CMKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanPlint Ubin PC Abu-Abu (10 x 30) Cm Buah 3.530 Rp 1,589.50 Rp 5,610.93

PC Kg 1.240 Rp 1,292.50 Rp 1,602.70 PP M3 0.003 Rp 180,250.00 Rp 540.75

Tenaga Kerja

Pekerja OH 0.090 Rp 62,100.00 Rp 5,589.00 Tukang Batu OH 0.090 Rp 74,750.00 Rp 6,727.50 Kepala Tukang OH 0.009 Rp 75,900.00 Rp 683.10 Mandor OH 0.005 Rp 80,500.00 Rp 402.50

Sub Jumlah Rp 21,156.49

128. MEMASANG 1 M' PLINT UBIN PC ABU-ABU UKURAN (10 x 40) CMKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanPlint Ubin PC Abu-Abu (10 x 40) Cm Buah 2.650 Rp 2,323.75 Rp 6,157.94

PC Kg 1.240 Rp 1,292.50 Rp 1,602.70 PP M3 0.003 Rp 180,250.00 Rp 540.75

Tenaga Kerja

Pekerja OH 0.090 Rp 62,100.00 Rp 5,589.00 Tukang Batu OH 0.090 Rp 74,750.00 Rp 6,727.50 Kepala Tukang OH 0.009 Rp 75,900.00 Rp 683.10 Mandor OH 0.005 Rp 80,500.00 Rp 402.50

Sub Jumlah Rp 21,703.49

129. MEMASANG 1 M' PLINT UBIN WARNA UKURAN (10 x 20) CMKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

Bahan

Plint Ubin PC Warna (10 x 20) Cm Buah 5.300 Rp 1,457.50 Rp 7,724.75 PC Kg 1.140 Rp 1,292.50 Rp 1,473.45 PP M3 0.003 Rp 180,250.00 Rp 540.75 Semen Warna Kg 0.100 Rp 1,666.50 Rp 166.65

Tenaga Kerja

Pekerja OH 0.090 Rp 62,100.00 Rp 5,589.00 Tukang Batu OH 0.090 Rp 74,750.00 Rp 6,727.50 Kepala Tukang OH 0.009 Rp 75,900.00 Rp 683.10 Mandor OH 0.005 Rp 80,500.00 Rp 402.50

Sub Jumlah Rp 23,307.70

130. MEMASANG 1 M' PLINT UBIN WARNA UKURAN (10 x 30) CMKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

Bahan

Plint Ubin PC Warna (10 x 30) Cm Buah 3.530 Rp 1,589.50 Rp 5,610.93 PC Kg 1.140 Rp 1,292.50 Rp 1,473.45 PP M3 0.003 Rp 180,250.00 Rp 540.75 Semen Warna Kg 0.100 Rp 1,666.50 Rp 166.65

Tenaga Kerja

Pekerja OH 0.090 Rp 62,100.00 Rp 5,589.00 Tukang Batu OH 0.090 Rp 74,750.00 Rp 6,727.50 Kepala Tukang OH 0.009 Rp 75,900.00 Rp 683.10 Mandor OH 0.005 Rp 80,500.00 Rp 402.50

Sub Jumlah Rp 21,193.89

Page 49: Analisa 2013 Pu Cipta Karya kabupaten kampar

131. MEMASANG 1 M' PLINT UBIN WARNA UKURAN (10 x 40) CMKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

Bahan

Plint Ubin PC Warna (10 x 40) Cm Buah 2.650 Rp 3,231.25 Rp 8,562.81 PC Kg 1.140 Rp 1,292.50 Rp 1,473.45 PP M3 0.003 Rp 180,250.00 Rp 540.75 Semen Warna Kg 0.100 Rp 1,666.50 Rp 166.65

Tenaga Kerja

Pekerja OH 0.090 Rp 62,100.00 Rp 5,589.00 Tukang Batu OH 0.090 Rp 74,750.00 Rp 6,727.50 Kepala Tukang OH 0.009 Rp 75,900.00 Rp 683.10 Mandor OH 0.005 Rp 80,500.00 Rp 402.50

Sub Jumlah Rp 24,145.76

132. MEMASANG 1 M2 LANTAI KARPETKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanKarpet M2 1.050 Rp 16,777.18 Rp 17,616.03 Lem Kg 0.350 Rp 3,021.25 Rp 1,057.44

Tenaga Kerja

Pekerja OH 0.170 Rp 62,100.00 Rp 10,557.00 Tukang Batu OH 0.170 Rp 74,750.00 Rp 12,707.50 Kepala Tukang OH 0.017 Rp 75,900.00 Rp 1,290.30 Mandor OH 0.009 Rp 80,500.00 Rp 724.50

Sub Jumlah Rp 43,952.77

133. MEMASANG 1 M2 FLOOR HARDENERKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

Bahan Floor Hardener Kg 5.000 Rp 38,445.00 Rp 192,225.00

Tenaga Kerja

Pekerja OH 0.120 Rp 62,100.00 Rp 7,452.00 Tukang OH 0.120 Rp 74,750.00 Rp 8,970.00 Kepala Tukang OH 0.012 Rp 75,900.00 Rp 910.80 Mandor OH 0.006 Rp 80,500.00 Rp 483.00

Sub Jumlah Rp 210,040.80

134. MEMASANG 1 M' PLINT KAYU KELAS II UKURAN (2 x 10) CMKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanKayu Kelas II (Papan 2 x 10 Cm) M3 0.003 Rp 2,462,750.00 Rp 7,388.25 Paku Skrup 5 Cm Kg 0.050 Rp 16,095.00 Rp 804.75

Tenaga Kerja

Pekerja OH 0.120 Rp 62,100.00 Rp 7,452.00 Tukang Kayu OH 0.120 Rp 74,750.00 Rp 8,970.00 Kepala Tukang OH 0.012 Rp 75,900.00 Rp 910.80 Mandor OH 0.006 Rp 80,500.00 Rp 483.00

Sub Jumlah Rp 26,008.80

X. PEKERJAAN BESI DAN ALLUMUNIUM135. MENGERJAKAN 100 KG PEKERJAAN PERAKITAN

Kebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanSolar Liter 1.000 Rp 5,180.00 Rp 5,180.00 Minyak Pelumas Liter 0.100 Rp 26,409.26 Rp 2,640.93

Tenaga Kerja

Pekerja OH 0.100 Rp 62,100.00 Rp 6,210.00 Tukang Besi OH 0.100 Rp 74,750.00 Rp 7,475.00 Kepala Tukang OH 0.001 Rp 75,900.00 Rp 75.90 Mandor OH 0.005 Rp 80,500.00 Rp 402.50

Alat Sewa Alat Jam 0.008 Rp 98,100.00 Rp 784.80 Sub Jumlah Rp 22,769.13

136. MENGERJAKAN 1 CM PENGELASAN DENGAN LAS LISTRIKKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanKawat Las Listrik Kg 0.040 Rp 31,402.50 Rp 1,256.10 Solar Liter 0.030 Rp 5,180.00 Rp 155.40 Minyak Pelumas Liter 0.004 Rp 26,409.26 Rp 105.64

Tenaga Kerja

Pekerja OH 0.004 Rp 62,100.00 Rp 248.40 Tukang besi OH 0.002 Rp 74,750.00 Rp 149.50 Kepala Tukang OH 0.0002 Rp 75,900.00 Rp 15.18 Mandor OH 0.0002 Rp 80,500.00 Rp 16.10

Alat Sewa Alat Jam 0.017 Rp 98,100.00 Rp 1,667.70 Sub Jumlah Rp 3,614.02

Page 50: Analisa 2013 Pu Cipta Karya kabupaten kampar

137. MEMASANG 1 M2 PINTU ROLLING DOOR BESIKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

Bahan Pintu Gulung Besi M2 1.000 Rp 744,550.00 Rp 744,550.00

Tenaga Kerja

Pekerja OH 1.200 Rp 62,100.00 Rp 74,520.00 Tukang besi OH 1.200 Rp 74,750.00 Rp 89,700.00 Kepala Tukang OH 0.120 Rp 75,900.00 Rp 9,108.00 Mandor OH 0.006 Rp 80,500.00 Rp 483.00

Sub Jumlah Rp 918,361.00

138. MEMASANG 1 M2 ROLLING DOOR ALLUMUNIUMKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

Bahan Rolling Door Allumunium M2 1.000 Rp 341,500.00 Rp 341,500.00

Tenaga Kerja

Pekerja OH 1.000 Rp 62,100.00 Rp 62,100.00 Tukang besi OH 1.000 Rp 74,750.00 Rp 74,750.00 Kepala Tukang OH 0.100 Rp 75,900.00 Rp 7,590.00 Mandor OH 0.050 Rp 80,500.00 Rp 4,025.00

Sub Jumlah Rp 489,965.00

139. MEMASANG 1 M2 JENDELA NAKO DAN TERALISKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanJendela Nako (Rangka + Kaca 5 mm) M2 1.100 Rp 97,550.00 Rp 107,305.00

Paku Skrup 1 Cm - 2,5 Cm Kg 0.200 Rp 16,645.00 Rp 3,329.00 Besi Strip tebal 5 mm M' 7.000 Rp 11,117.50 Rp 77,822.50

Tenaga Kerja

Pekerja OH 0.200 Rp 62,100.00 Rp 12,420.00 Tukang besi OH 0.200 Rp 74,750.00 Rp 14,950.00 Kepala Tukang OH 0.020 Rp 75,900.00 Rp 1,518.00 Mandor OH 0.001 Rp 80,500.00 Rp 80.50

Sub Jumlah Rp 217,425.00

XI. PEKERJAAN PENUTUP ATAP140. MEMASANG 1 M2 ATAP ASBES GELOMBANG (1,80 x 0,92) x 5 MM

Kebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanAsbes Gelombang Lbr 0.750 Rp 34,330.00 Rp 25,747.50 Paku Asbes Kg 0.120 Rp 29,735.00 Rp 3,568.20

Tenaga Kerja

Pekerja OH 0.140 Rp 62,100.00 Rp 8,694.00 Tukang Kayu OH 0.070 Rp 74,750.00 Rp 5,232.50 Kepala Tukang OH 0.007 Rp 75,900.00 Rp 531.30 Mandor OH 0.007 Rp 80,500.00 Rp 563.50

Sub Jumlah Rp 44,337.00

141. MEMASANG 1 M2 ATAP SUPER STEELKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanGenteng Metal gelombang Lbr 1.020 Rp 84,930.00 Rp 86,628.60 Paku Atap Genteng Metal Kg 0.200 Rp 24,345.00 Rp 4,869.00

Tenaga Kerja

Pekerja OH 0.200 Rp 62,100.00 Rp 12,420.00 Tukang Kayu OH 0.100 Rp 74,750.00 Rp 7,475.00 Kepala Tukang OH 0.010 Rp 75,900.00 Rp 759.00 Mandor OH 0.010 Rp 80,500.00 Rp 805.00

Sub Jumlah Rp 112,956.60

142. MEMASANG 1 M' PERABUNG / NOK SUPER STEELKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanPerabung Genteng Metal Lbr 1.100 Rp 27,730.00 Rp 30,503.00 Paku 5 Cm - 10 Cm Kg 0.050 Rp 24,345.00 Rp 1,217.25

Tenaga Kerja

Pekerja OH 0.250 Rp 62,100.00 Rp 15,525.00 Tukang Kayu OH 0.150 Rp 74,750.00 Rp 11,212.50 Kepala Tukang OH 0.015 Rp 75,900.00 Rp 1,138.50 Mandor OH 0.013 Rp 80,500.00 Rp 1,046.50

Sub Jumlah Rp 60,642.75

Page 51: Analisa 2013 Pu Cipta Karya kabupaten kampar

143. MEMASANG 1 M2 ATAP SENG GELOMBANG BJLSKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanAtap Seng Gelombang BJLS 020 K Lbr 0.840 Rp 41,810.00 Rp 35,120.40 Paku Atap Seng Gelombang Kg 0.020 Rp 24,895.00 Rp 497.90

Tenaga Kerja

Pekerja OH 0.120 Rp 62,100.00 Rp 7,452.00 Tukang Kayu OH 0.060 Rp 74,750.00 Rp 4,485.00 Kepala Tukang OH 0.006 Rp 75,900.00 Rp 455.40 Mandor OH 0.006 Rp 80,500.00 Rp 483.00

Sub Jumlah Rp 48,493.70

144. MEMASANG 1 M' PERABUNG / NOK SENG GELOMBANGKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanSeng Plat BJLS Lbr 0.300 Rp 65,922.00 Rp 19,776.60 Paku 1 Cm - 2,5 Cm Kg 0.040 Rp 17,745.00 Rp 709.80

Tenaga Kerja

Pekerja OH 0.120 Rp 62,100.00 Rp 7,452.00 Tukang Kayu OH 0.060 Rp 74,750.00 Rp 4,485.00 Kepala Tukang OH 0.006 Rp 75,900.00 Rp 455.40 Mandor OH 0.006 Rp 80,500.00 Rp 483.00

Sub Jumlah Rp 33,361.80

145. MEMASANG 1 M2 ALLUMUNIUM FOIL / SISALATIONKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

Bahan Allumunium Foil/Sisalation M2 1.050 Rp 11,230.00 Rp 11,791.50

Tenaga Kerja

Pekerja OH 0.150 Rp 62,100.00 Rp 9,315.00 Tukang Kayu OH 0.050 Rp 74,750.00 Rp 3,737.50 Kepala Tukang OH 0.005 Rp 75,900.00 Rp 379.50 Mandor OH 0.008 Rp 80,500.00 Rp 644.00

Sub Jumlah Rp 25,867.50

XII. PEKERJAAN SANITASI146. MEMASANG 1 BUAH KLOSED DUDUK MONOBLOK

Kebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanKloset Duduk Monoblok Bh 1.000 Rp 1,778,000.00 Rp 1,778,000.00 Perlengkapan (6% dari harga) Ls 1.000 Rp 106,680.00 Rp 106,680.00

Tenaga Kerja

Pekerja OH 3.300 Rp 62,100.00 Rp 204,930.00 Tukang Batu OH 1.100 Rp 74,750.00 Rp 82,225.00 Kepala Tukang OH 0.001 Rp 75,900.00 Rp 75.90 Mandor OH 0.160 Rp 80,500.00 Rp 12,880.00

Sub Jumlah Rp 2,184,790.90

147. MEMASANG 1 BUAH KLOSED JONGKOK PORSELENKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanKloset Jongkok Porselen Bh 1.000 Rp 183,000.00 Rp 183,000.00 PC Kg 6.000 Rp 1,292.50 Rp 7,755.00 PP M3 0.010 Rp 180,250.00 Rp 1,802.50

Tenaga Kerja

Pekerja OH 1.000 Rp 62,100.00 Rp 62,100.00 Tukang Batu OH 1.500 Rp 74,750.00 Rp 112,125.00 Kepala Tukang OH 0.150 Rp 75,900.00 Rp 11,385.00 Mandor OH 0.016 Rp 80,500.00 Rp 1,288.00

Sub Jumlah Rp 379,455.50

148. MEMASANG 1 BUAH URINOIRKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

Bahan

Urinoir Bh 1.000 Rp 1,448,000.00 Rp 1,448,000.00 Perlengkapan (30% dari harga) Ls 1.000 Rp 434,400.00 Rp 434,400.00 PC Kg 6.000 Rp 1,292.50 Rp 7,755.00 PP M3 0.010 Rp 180,250.00 Rp 1,802.50

Tenaga Kerja

Pekerja OH 1.000 Rp 62,100.00 Rp 62,100.00 Tukang Batu OH 1.000 Rp 74,750.00 Rp 74,750.00 Kepala Tukang OH 0.100 Rp 75,900.00 Rp 7,590.00 Mandor OH 0.100 Rp 80,500.00 Rp 8,050.00

Sub Jumlah Rp 2,044,447.50

Page 52: Analisa 2013 Pu Cipta Karya kabupaten kampar

149. MEMASANG 1 BUAH WESTAFELKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

Bahan

Westafel Bh 1.000 Rp 513,000.00 Rp 513,000.00 Perlengkapan (12% dari harga) Ls 1.000 Rp 61,560.00 Rp 61,560.00 PC Kg 6.000 Rp 1,292.50 Rp 7,755.00 PP M3 0.010 Rp 180,250.00 Rp 1,802.50

Tenaga Kerja

Pekerja OH 1.200 Rp 62,100.00 Rp 74,520.00 Tukang Batu OH 1.450 Rp 74,750.00 Rp 108,387.50 Kepala Tukang OH 0.150 Rp 75,900.00 Rp 11,385.00 Mandor OH 0.100 Rp 80,500.00 Rp 8,050.00

Sub Jumlah Rp 786,460.00

150. MEMASANG 1 BUAH BAK MANDI FIBERGLASS KAPASITAS 0,3 M3Kebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanBak Fiberglass Kap. 0,3 M3 Kecil Bh 1.000 Rp 194,000.00 Rp 194,000.00 Perlengkapan (18% dari harga) Ls 1.000 Rp 34,920.00 Rp 34,920.00

Tenaga Kerja

Pekerja OH 1.800 Rp 62,100.00 Rp 111,780.00 Tukang Batu OH 2.700 Rp 74,750.00 Rp 201,825.00 Kepala Tukang OH 0.540 Rp 75,900.00 Rp 40,986.00 Mandor OH 0.110 Rp 80,500.00 Rp 8,855.00

Sub Jumlah Rp 592,366.00

151. MEMASANG 1 BUAH BAK FIBERGLASS KAPASITAS 1 M3Kebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanBak Fiberglass Kap. 1 M3 Besar Bh 1.000 Rp 293,000.00 Rp 293,000.00 Perlengkapan (12% dari harga) Ls 1.000 Rp 35,160.00 Rp 35,160.00

Tenaga Kerja

Pekerja OH 0.300 Rp 62,100.00 Rp 18,630.00 Tukang Batu OH 0.450 Rp 74,750.00 Rp 33,637.50 Kepala Tukang OH 0.045 Rp 75,900.00 Rp 3,415.50 Mandor OH 0.090 Rp 80,500.00 Rp 7,245.00

Sub Jumlah Rp 391,088.00

152. MEMASANG 1 BUAH BAK KONTROL (30 X 30) CM, TINGGI 35 CMKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

Bahan

Bata Merah Bh 145.000 Rp 336.50 Rp 48,792.50 PC Kg 44.000 Rp 1,292.50 Rp 56,870.00 PP M3 0.070 Rp 180,250.00 Rp 12,617.50 KR M3 0.007 Rp 172,875.00 Rp 1,210.13 PB M3 0.060 Rp 176,950.00 Rp 10,617.00 Besi Beton Polos Kg 1.600 Rp 14,965.00 Rp 23,944.00

Tenaga Kerja

Pekerja OH 3.200 Rp 62,100.00 Rp 198,720.00 Tukang Batu OH 1.015 Rp 74,750.00 Rp 75,871.25 Kepala Tukang OH 0.0015 Rp 75,900.00 Rp 113.85 Mandor OH 0.002 Rp 80,500.00 Rp 128.80

Sub Jumlah Rp 428,885.02

153. MEMASANG 1 BUAH BAK KONTROL (45 X 45) CM, TINGGI 50 CMKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

Bahan

Bata Merah Bh 250.000 Rp 336.50 Rp 84,125.00 PC Kg 77.000 Rp 1,292.50 Rp 99,522.50 PP M3 0.130 Rp 180,250.00 Rp 23,432.50 KR M3 0.020 Rp 172,875.00 Rp 3,457.50 PB M3 0.090 Rp 176,950.00 Rp 15,925.50 Besi Beton Polos Kg 2.600 Rp 14,965.00 Rp 38,909.00

Tenaga Kerja

Pekerja OH 0.900 Rp 62,100.00 Rp 55,890.00 Tukang Batu OH 0.473 Rp 74,750.00 Rp 35,356.75 Kepala Tukang OH 0.047 Rp 75,900.00 Rp 3,567.30 Mandor OH 0.071 Rp 80,500.00 Rp 5,715.50

Sub Jumlah Rp 365,901.55

154. MEMASANG 1 M' PIPA PVC TYPE AW Ø 1/2"Kebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanPipa PVC Ø 1/2" M' 1.200 Rp 4,030.00 Rp 4,836.00 Perlengkapan (35% dari harga) Ls 1.000 Rp 1,410.50 Rp 1,410.50

Tenaga Kerja

Pekerja OH 0.036 Rp 62,100.00 Rp 2,235.60 Tukang Pipa OH 0.060 Rp 75,900.00 Rp 4,554.00 Kepala Tukang OH 0.006 Rp 75,900.00 Rp 455.40 Mandor OH 0.0018 Rp 80,500.00 Rp 144.90

Sub Jumlah Rp 13,636.40

Page 53: Analisa 2013 Pu Cipta Karya kabupaten kampar

155. MEMASANG 1 M' PIPA PVC TYPE AW Ø 3/4"Kebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanPipa PVC Ø 3/4" M' 1.200 Rp 5,900.00 Rp 7,080.00 Perlengkapan (35% dari harga) Ls 1.000 Rp 2,065.00 Rp 2,065.00

Tenaga Kerja

Pekerja OH 0.036 Rp 62,100.00 Rp 2,235.60 Tukang Pipa OH 0.060 Rp 75,900.00 Rp 4,554.00 Kepala Tukang OH 0.006 Rp 75,900.00 Rp 455.40 Mandor OH 0.0018 Rp 80,500.00 Rp 144.90

Sub Jumlah Rp 16,534.90

156. MEMASANG 1 M' PIPA PVC TYPE AW Ø 1"Kebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanPipa PVC Ø 1" M' 1.200 Rp 5,900.00 Rp 7,080.00 Perlengkapan (35% dari harga) Ls 1.000 Rp 2,065.00 Rp 2,065.00

Tenaga Kerja

Pekerja OH 0.036 Rp 62,100.00 Rp 2,235.60 Tukang Pipa OH 0.060 Rp 75,900.00 Rp 4,554.00 Kepala Tukang OH 0.006 Rp 75,900.00 Rp 455.40 Mandor OH 0.0018 Rp 80,500.00 Rp 144.90

Sub Jumlah Rp 16,534.90

157. MEMASANG 1 M' PIPA PVC TYPE AW Ø 3"Kebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanPipa PVC Ø 3" M' 1.200 Rp 32,080.00 Rp 38,496.00 Perlengkapan (35% dari harga) Ls 1.000 Rp 11,228.00 Rp 11,228.00

Tenaga Kerja

Pekerja OH 0.081 Rp 62,100.00 Rp 5,030.10 Tukang Pipa OH 0.135 Rp 75,900.00 Rp 10,246.50 Kepala Tukang OH 0.0135 Rp 75,900.00 Rp 1,024.65 Mandor OH 0.0041 Rp 80,500.00 Rp 330.05

Sub Jumlah Rp 66,355.30

158. MEMASANG 1 M' PIPA PVC TYPE AW Ø 4"Kebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanPipa PVC Ø 4" M' 1.200 Rp 49,130.00 Rp 58,956.00 Perlengkapan (35% dari harga) Ls 1.000 Rp 17,195.50 Rp 17,195.50

Tenaga Kerja

Pekerja OH 0.081 Rp 62,100.00 Rp 5,030.10 Tukang Pipa OH 0.135 Rp 75,900.00 Rp 10,246.50 Kepala Tukang OH 0.0135 Rp 75,900.00 Rp 1,024.65 Mandor OH 0.0041 Rp 80,500.00 Rp 330.05

Sub Jumlah Rp 92,782.80

159. MEMASANG 1 BUAH KRAN Ø 1/2" ATAU 3/4"Kebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanKran Air Ø 1/2" atau 3/4" stainless Bh 1.000 Rp 137,680.00 Rp 137,680.00 Seal Tape Bh 0.025 Rp 5,708.75 Rp 142.72

Tenaga Kerja

Pekerja OH 0.010 Rp 62,100.00 Rp 621.00 Tukang Pipa OH 0.100 Rp 75,900.00 Rp 7,590.00 Kepala Tukang OH 0.010 Rp 75,900.00 Rp 759.00 Mandor OH 0.005 Rp 80,500.00 Rp 402.50

Sub Jumlah Rp 147,195.22

160. MEMASANG 1 BUAH FLOOR DRAINKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

Bahan Floor Drain stainless Bh 1.000 Rp 176,180.00 Rp 176,180.00

Tenaga Kerja

Pekerja OH 0.010 Rp 62,100.00 Rp 621.00 Tukang Pipa OH 0.100 Rp 75,900.00 Rp 7,590.00 Kepala Tukang OH 0.010 Rp 75,900.00 Rp 759.00 Mandor OH 0.005 Rp 80,500.00 Rp 402.50

Sub Jumlah Rp 185,552.50

XIII. PEKERJAAN KUNCI DAN KACA161. MEMASANG 1 BUAH KUNCI TANAM ANTIK

Kebutuhan Satuan Indeks Harga Satuan Jumlah Harga SatuanBahan Kunci Tanam Antik Bh 1.000 Rp 220,295.00 Rp 220,295.00

Tenaga Kerja

Pekerja OH 0.060 Rp 62,100.00 Rp 3,726.00 Tukang Kayu OH 0.600 Rp 75,900.00 Rp 45,540.00 Kepala Tukang OH 0.060 Rp 75,900.00 Rp 4,554.00 Mandor OH 0.003 Rp 80,500.00 Rp 241.50

Sub Jumlah Rp 274,356.50

162. MEMASANG 1 BUAH KUNCI TANAM BIASAKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

Bahan Kunci Tanam Biasa stainless Bh 1.000 Rp 110,295.00 Rp 110,295.00

Tenaga Kerja

Pekerja OH 0.010 Rp 62,100.00 Rp 621.00 Tukang Kayu OH 0.500 Rp 75,900.00 Rp 37,950.00 Kepala Tukang OH 0.010 Rp 75,900.00 Rp 759.00 Mandor OH 0.005 Rp 80,500.00 Rp 402.50

Sub Jumlah Rp 150,027.50

Page 54: Analisa 2013 Pu Cipta Karya kabupaten kampar

163. MEMASANG 1 BUAH KUNCI TANAM KAMAR MANDIKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

Bahan Kunci Tanam Kamar Mandi Bh 1.000 Rp 42,095.00 Rp 42,095.00

Tenaga Kerja

Pekerja OH 0.005 Rp 62,100.00 Rp 310.50 Tukang Kayu OH 0.500 Rp 75,900.00 Rp 37,950.00 Kepala Tukang OH 0.005 Rp 75,900.00 Rp 379.50 Mandor OH 0.0003 Rp 80,500.00 Rp 24.15

Sub Jumlah Rp 80,759.15

164. MEMASANG 1 BUAH KUNCI SILINDERKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

Bahan Kunci Silinder Bh 1.000 Rp 26,145.00 Rp 26,145.00

Tenaga Kerja

Pekerja OH 0.005 Rp 62,100.00 Rp 310.50 Tukang Kayu OH 0.500 Rp 75,900.00 Rp 37,950.00 Kepala Tukang OH 0.005 Rp 75,900.00 Rp 379.50 Mandor OH 0.0003 Rp 80,500.00 Rp 24.15

Sub Jumlah Rp 64,809.15

165. MEMASANG 1 BUAH ENGSEL PINTUKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

Bahan Engsel Pintu 4" Bh 1.000 Rp 16,795.00 Rp 16,795.00

Tenaga Kerja

Pekerja OH 0.015 Rp 62,100.00 Rp 931.50 Tukang Kayu OH 0.150 Rp 75,900.00 Rp 11,385.00 Kepala Tukang OH 0.015 Rp 75,900.00 Rp 1,138.50 Mandor OH 0.0008 Rp 80,500.00 Rp 64.40

Sub Jumlah Rp 30,314.40

166. MEMASANG 1 BUAH ENGSEL JENDELAKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

Bahan Engsel Jendela 3" Bh 1.000 Rp 11,295.00 Rp 11,295.00

Tenaga Kerja

Pekerja OH 0.010 Rp 62,100.00 Rp 621.00 Tukang Kayu OH 0.100 Rp 75,900.00 Rp 7,590.00 Kepala Tukang OH 0.010 Rp 75,900.00 Rp 759.00 Mandor OH 0.0005 Rp 80,500.00 Rp 40.25

Sub Jumlah Rp 20,305.25

167. MEMASANG 1 BUAH KAIT ANGIN / HAK ANGINKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

Bahan Kait Angin / Hak Angin Bh 1.000 Rp 8,545.00 Rp 8,545.00

Tenaga Kerja

Pekerja OH 0.015 Rp 62,100.00 Rp 931.50 Tukang Kayu OH 0.150 Rp 75,900.00 Rp 11,385.00 Kepala Tukang OH 0.015 Rp 75,900.00 Rp 1,138.50 Mandor OH 0.0008 Rp 80,500.00 Rp 64.40

Sub Jumlah Rp 22,064.40

168. MEMASANG 1 BUAH TARIKAN TANGANKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

Bahan Tarikan Tangan Bh 1.000 Rp 8,545.00 Rp 8,545.00

Tenaga Kerja

Pekerja OH 0.015 Rp 62,100.00 Rp 931.50 Tukang Kayu OH 0.150 Rp 75,900.00 Rp 11,385.00 Kepala Tukang OH 0.015 Rp 75,900.00 Rp 1,138.50 Mandor OH 0.0008 Rp 80,500.00 Rp 64.40

Sub Jumlah Rp 22,064.40

169. MEMASANG 1 BUAH DOOR CLOSERKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

Bahan Door Closer Bh 1.000 Rp 434,795.00 Rp 434,795.00

Tenaga Kerja

Pekerja OH 0.050 Rp 62,100.00 Rp 3,105.00 Tukang Kayu OH 0.500 Rp 75,900.00 Rp 37,950.00 Kepala Tukang OH 0.050 Rp 75,900.00 Rp 3,795.00 Mandor OH 0.0025 Rp 80,500.00 Rp 201.25

Sub Jumlah Rp 479,846.25

170. MEMASANG 1 M2 KACA 3 MMKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanKaca 3 mm M2 1.100 Rp 88,200.00 Rp 97,020.00 Kayu List Profil M' 1.200 Rp 3,311.50 Rp 3,973.80

Tenaga Kerja

Pekerja OH 0.015 Rp 62,100.00 Rp 931.50 Tukang Kayu OH 0.150 Rp 75,900.00 Rp 11,385.00 Kepala Tukang OH 0.015 Rp 75,900.00 Rp 1,138.50 Mandor OH 0.0008 Rp 80,500.00 Rp 64.40

Sub Jumlah Rp 114,513.20

Page 55: Analisa 2013 Pu Cipta Karya kabupaten kampar

171. MEMASANG 1 M2 KACA 5 MMKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanKaca 5 mm M2 1.100 Rp 99,750.00 Rp 109,725.00 Kayu List Profil M' 1.200 Rp 3,311.50 Rp 3,973.80

Tenaga Kerja

Pekerja OH 0.015 Rp 62,100.00 Rp 931.50 Tukang Kayu OH 0.150 Rp 75,900.00 Rp 11,385.00 Kepala Tukang OH 0.015 Rp 75,900.00 Rp 1,138.50 Mandor OH 0.0008 Rp 80,500.00 Rp 64.40

Sub Jumlah Rp 127,218.20

172. MEMASANG 1 M2 KACA PATRYKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanKaca Patry M2 1.100 Rp 202,050.00 Rp 222,255.00 Kayu List Profil M' 1.200 Rp 3,311.50 Rp 3,973.80

Tenaga Kerja

Pekerja OH 0.015 Rp 62,100.00 Rp 931.50 Tukang Kayu OH 0.150 Rp 75,900.00 Rp 11,385.00 Kepala Tukang OH 0.015 Rp 75,900.00 Rp 1,138.50 Mandor OH 0.0008 Rp 80,500.00 Rp 64.40

Sub Jumlah Rp 239,748.20

173. MEMASANG 1 BUAH ENGSEL PINTU KUNINGAN 6"Kebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

Bahan Engsel Pintu Kuningan 6" Bh 1.000 Rp 22,295.00 Rp 22,295.00

Tenaga Kerja

Pekerja OH 0.015 Rp 62,100.00 Rp 931.50 Tukang Kayu OH 0.150 Rp 75,900.00 Rp 11,385.00 Kepala Tukang OH 0.015 Rp 75,900.00 Rp 1,138.50 Mandor OH 0.0008 Rp 80,500.00 Rp 64.40

Sub Jumlah Rp 35,814.40

IV. PEKERJAAN CAT174. MENGIKIS 1 M2 PERMUKAAN CAT TEMBOK LAMA

Kebutuhan Satuan Indeks Harga Satuan Jumlah Harga SatuanBahan Soda Api Kg 0.500 Rp 12,990.00 Rp 6,495.00

Tenaga KerjaPekerja OH 0.150 Rp 62,100.00 Rp 9,315.00 Mandor OH 0.0025 Rp 80,500.00 Rp 201.25

Sub Jumlah Rp 16,011.25

175. PENGECATAN 1 M2 BIDANG TEMBOK BARU (1 PLAMIR, 1 CAT DASAR, 2 CAT PENUTUP)Kebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanPlamir Kg 0.100 Rp 30,205.00 Rp 3,020.50 Cat Dasar / Kapur Kg 0.100 Rp 6,830.00 Rp 683.00 Cat Tembok Kg 0.260 Rp 21,460.00 Rp 5,579.60

Tenaga Kerja

Pekerja OH 0.020 Rp 62,100.00 Rp 1,242.00 Tukang Cat OH 0.063 Rp 74,750.00 Rp 4,709.25 Kepala Tukang OH 0.0063 Rp 75,900.00 Rp 478.17 Mandor OH 0.0025 Rp 80,500.00 Rp 201.25

Sub Jumlah Rp 15,913.77

176. PENGECATAN 1 M2 BIDANG TEMBOK LAMA (1 CAT DASAR, 2 CAT PENUTUP)Kebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

Cat Dasar / Kapur Kg 0.100 Rp 6,830.00 Rp 683.00 Cat Tembok Kg 0.260 Rp 21,460.00 Rp 5,579.60

Tenaga Kerja

Pekerja OH 0.020 Rp 62,100.00 Rp 1,242.00 Tukang Cat OH 0.063 Rp 74,750.00 Rp 4,709.25 Kepala Tukang OH 0.0063 Rp 75,900.00 Rp 478.17 Mandor OH 0.0025 Rp 80,500.00 Rp 201.25

Sub Jumlah Rp 12,893.27

177. PENGECATAN 1 M2 BIDANG KAYU BARU (1 PLAMIR, 1 MENIE, 1 CAT DASAR, 2 CAT PENUTUP)Kebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

Bahan

Plamir Kg 0.150 Rp 30,205.00 Rp 4,530.75 Cat Menie Kayu Kg 0.200 Rp 29,930.00 Rp 5,986.00 Cat Dasar / Menie Kayu Kg 0.170 Rp 29,930.00 Rp 5,088.10 Cat Kayu Kg 0.260 Rp 48,080.00 Rp 12,500.80

Tenaga Kerja

Pekerja OH 0.070 Rp 62,100.00 Rp 4,347.00 Tukang Cat OH 0.009 Rp 74,750.00 Rp 672.75 Kepala Tukang OH 0.006 Rp 75,900.00 Rp 455.40 Mandor OH 0.0025 Rp 80,500.00 Rp 201.25

Sub Jumlah Rp 33,782.05

178. PENGECATAN 1 M2 BIDANG KAYU LAMA (1 PLAMIR, 1 CAT DASAR, 1 CAT PENUTUP)Kebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanPlamir Kg 0.150 Rp 30,205.00 Rp 4,530.75 Cat Dasar / Menie Kayu Kg 0.170 Rp 29,930.00 Rp 5,088.10 Cat Kayu Kg 0.170 Rp 48,080.00 Rp 8,173.60

Tenaga Kerja

Pekerja OH 0.070 Rp 62,100.00 Rp 4,347.00 Tukang Cat OH 0.075 Rp 74,750.00 Rp 5,606.25 Kepala Tukang OH 0.0075 Rp 75,900.00 Rp 569.25 Mandor OH 0.0025 Rp 80,500.00 Rp 201.25

Sub Jumlah Rp 28,516.20

Page 56: Analisa 2013 Pu Cipta Karya kabupaten kampar

179. PENGECATAN 1 M2 VERNISHKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

Bahan

Cat Vernish Kg 0.150 Rp 61,995.00 Rp 9,299.25 Dempul Kayu Kg 0.050 Rp 42,470.00 Rp 2,123.50 Kertas Amplas Lbr 0.100 Rp 6,822.50 Rp 682.25 Kuas Biasa Bh 0.010 Rp 19,087.50 Rp 190.88

Tenaga Kerja

Pekerja OH 0.160 Rp 62,100.00 Rp 9,936.00 Tukang Cat OH 0.160 Rp 74,750.00 Rp 11,960.00 Kepala Tukang OH 0.016 Rp 75,900.00 Rp 1,214.40 Mandor OH 0.0250 Rp 80,500.00 Rp 2,012.50

Sub Jumlah Rp 37,418.78

180. PENGECATAN 1 M2 IMPRA (4 X SAPU)Kebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

Bahan

Cat Impra Kg 0.100 Rp 45,880.00 Rp 4,588.00 Kuas Golong Bh 0.100 Rp 29,042.50 Rp 2,904.25 Kertas Amplas Lbr 0.010 Rp 6,822.50 Rp 68.23 Thinner Ltr 0.100 Rp 21,130.00 Rp 2,113.00 Kayu Perancah M3 0.026 Rp 2,022,750.00 Rp 52,591.50 Kayu Kelas II (Papan) M3 0.002 Rp 2,462,750.00 Rp 4,925.50

Tenaga Kerja

Pekerja OH 0.150 Rp 62,100.00 Rp 9,315.00 Tukang Cat OH 0.300 Rp 74,750.00 Rp 22,425.00 Kepala Tukang OH 0.025 Rp 75,900.00 Rp 1,897.50 Mandor OH 0.007 Rp 80,500.00 Rp 563.50

Sub Jumlah Rp 101,391.48

181. PENGECATAN 1 M2 RESIDUKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

Bahan Cat Residu Kg 0.350 Rp 11,010.00 Rp 3,853.50

Tenaga KerjaPekerja OH 0.100 Rp 62,100.00 Rp 6,210.00 Mandor OH 0.050 Rp 80,500.00 Rp 4,025.00

Sub Jumlah Rp 14,088.50

182. PENGECATAN 1 M2 MENIE KAYUKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

Bahan Cat Menie Kayu Kg 0.120 Rp 29,930.00 Rp 3,591.60

Tenaga KerjaPekerja OH 0.150 Rp 62,100.00 Rp 9,315.00 Kepala Tukang OH 0.015 Rp 75,900.00 Rp 1,138.50

Sub Jumlah Rp 14,045.10

XV. PEKERJAAN LAIN-LAIN183. MEMASANG 1 M2 LAPANGAN RUMPUT

Kebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanRumput M2 1.050 Rp 13,250.00 Rp 13,912.50 Tanah Hitam M3 0.050 Rp 90,050.00 Rp 4,502.50

Tenaga KerjaPekerja OH 0.030 Rp 62,100.00 Rp 1,863.00 Tukang Batu OH 0.100 Rp 74,750.00 Rp 7,475.00 Mandor OH 0.010 Rp 80,500.00 Rp 805.00

Sub Jumlah Rp 28,558.00

184. MEMASANG 1 BTG KAYU CEROCOKKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

Bahan Kayu Cerocok Btg 1.000 Rp 48,100.00 Rp 48,100.00

Tenaga Kerja

Pekerja OH 0.250 Rp 62,100.00 Rp 15,525.00 Tukang Kayu OH 0.030 Rp 74,750.00 Rp 2,242.50 Kepala Tukang OH 0.004 Rp 75,900.00 Rp 303.60 Mandor OH 0.030 Rp 80,500.00 Rp 2,415.00

Sub Jumlah Rp 68,586.10

185. MEMASANG 1 M2 PAVING BLOKKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanPaving Blok Bh 38.000 Rp 1,832.00 Rp 69,616.00 PP M3 0.007 Rp 180,250.00 Rp 1,261.75

Tenaga Kerja

Pekerja OH 0.500 Rp 62,100.00 Rp 31,050.00 Tukang Batu OH 0.020 Rp 74,750.00 Rp 1,495.00 Kepala Tukang OH 0.020 Rp 75,900.00 Rp 1,518.00 Mandor OH 0.002 Rp 80,500.00 Rp 161.00

Sub Jumlah Rp 105,101.75

186. MEMASANG 1 M2 SOSOTAN ASPALKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

BahanAspal Kg 1.500 Rp 9,282.00 Rp 13,923.00 Tempat Masak Aspal Bh 0.003 Rp 52,300.50 Rp 156.90 Kayu Bakar M3 0.020 Rp 757,750.00 Rp 15,155.00

Tenaga KerjaPekerja OH 0.020 Rp 62,100.00 Rp 1,242.00 Tukang Batu OH 0.002 Rp 74,750.00 Rp 149.50 Mandor OH 0.001 Rp 80,500.00 Rp 80.50

Sub Jumlah Rp 30,706.90

187. MEMASANG 1 M2 TABURAN PASIR CORKebutuhan Satuan Indeks Harga Satuan Jumlah Harga Satuan

Bahan PB M3 0.010 Rp 176,950.00 Rp 1,769.50

Tenaga KerjaPekerja OH 0.020 Rp 62,100.00 Rp 1,242.00

Page 57: Analisa 2013 Pu Cipta Karya kabupaten kampar

Tenaga KerjaMandor OH 0.001 Rp 80,500.00 Rp 80.50

Sub Jumlah Rp 3,092.00

Page 58: Analisa 2013 Pu Cipta Karya kabupaten kampar

Bangkinang, Januari 201300