Page 1 of 117 DAFTAR SURVEY HARGA UPAH DAN MATERIAL NO NAMA UPAH DAN MATERIAL SAT. PEMBULATAN INDEK HARGA HALAMAN 1 2 3 9 10 11 A. UPAH 1 Pekerja Oh 25,000.00 25,500.00 30,000.00 2 Pekerja Bongkar / Siram Oh 23,000.00 23,375.00 27,500.00 3 Tukang Batu Oh 30,000.00 30,100.00 35,000.00 4 Tukang Besi Oh 30,000.00 30,100.00 35,000.00 5 Tukang Cat Oh 30,000.00 30,100.00 35,000.00 6 Tukang Gali Oh 30,000.00 30,100.00 35,000.00 7 Tukang Kayu Oh 30,000.00 30,100.00 35,000.00 8 Tukang Aspal Oh 30,000.00 30,100.00 35,000.00 9 Tukang Mantras Oh 30,000.00 30,100.00 35,000.00 10 Operatot Alat Berat Oh 51,000.00 51,600.00 60,000.00 11 Pembantu Operator Oh 43,000.00 43,000.00 50,000.00 12 Mekanik Oh 38,000.00 38,700.00 45,000.00 13 Pembantu Mekanik Oh 31,000.00 31,820.00 37,000.00 14 Kepala Tukang Oh 34,000.00 34,400.00 40,000.00 15 Mandor Oh 35,000.00 34,400.00 40,000.00 B. MATERIAL 1 Alang-alang Ikat 1,850.00 1,859.55 2,310.00 2 Aluminium Foil / Sisalation m2 11,330.00 11,334.40 14,080.00 3 Amplas Lbr 1,700.00 1,700.00 2,200.00 4 Asbes Gelombang M2 29,500.00 29,500.00 37,000.00 5 Badkip - - 6 Bak Cuci Piring Stainless Steel Bh 145,220.00 145,222.00 180,400.00 7 Batu Bata Bh 270.00 270.00 350.00 8 Abu Batu M3 120,000.00 120,000.00 150,700.00 9 Batu Kali Blonos M3 72,000.00 72,000.00 90,000.00 10 Batu Kali Pecah M3 92,500.00 92,500.00 115,000.00 11 Batu Belah 15/20 cm M3 73,500.00 73,500.00 91,300.00 12 Batu Belah 10/15 cm M3 84,000.00 84,000.00 104,500.00 13 Batu Belah 5/7 cm M3 86,000.00 86,000.00 107,800.00 14 Batu Pecah Tangan 2/3 cm M3 110,000.00 110,000.00 138,600.00 15 Batu Pecah mesin 3-5 cm M3 135,000.00 135,000.00 170,000.00 16 Batu Pecah mesin 2-3 cm M3 140,000.00 140,000.00 180,000.00 17 Batu Pecah mesin 1-2 cm M3 155,000.00 155,000.00 195,000.00 18 Batu Pecah mesin 0,5-1 cm M3 155,000.00 155,000.00 195,000.00 19 Batu Pecah 0,2-0,5 cm M3 155,000.00 155,000.00 195,000.00 20 Batu Kambang / Apung Kg 6,500.00 6,500.00 8,250.00 21 Batu Kerikil M3 40,000.00 40,000.00 48,400.00 22 Tanah Urug M3 45,000.00 45,000.00 60,500.00 23 Begel kg - -

Upload: hamdaniyn116785499

Post on 04-Aug-2015

208 views

Category:

Documents


11 download

TRANSCRIPT

Page 1: Analis Sni Ta 2008

Page 1 of 77

DAFTAR SURVEY HARGA UPAH DAN MATERIAL

NO NAMA UPAH DAN MATERIAL SAT. PEMBULATAN INDEK HARGA HALAMAN

1 2 3 9 10 11

A. UPAH1 Pekerja Oh 25,000.00 25,500.00 30,000.00 2 Pekerja Bongkar / Siram Oh 23,000.00 23,375.00 27,500.00 3 Tukang Batu Oh 30,000.00 30,100.00 35,000.00 4 Tukang Besi Oh 30,000.00 30,100.00 35,000.00 5 Tukang Cat Oh 30,000.00 30,100.00 35,000.00 6 Tukang Gali Oh 30,000.00 30,100.00 35,000.00 7 Tukang Kayu Oh 30,000.00 30,100.00 35,000.00 8 Tukang Aspal Oh 30,000.00 30,100.00 35,000.00 9 Tukang Mantras Oh 30,000.00 30,100.00 35,000.00

10 Operatot Alat Berat Oh 51,000.00 51,600.00 60,000.00 11 Pembantu Operator Oh 43,000.00 43,000.00 50,000.00 12 Mekanik Oh 38,000.00 38,700.00 45,000.00 13 Pembantu Mekanik Oh 31,000.00 31,820.00 37,000.00 14 Kepala Tukang Oh 34,000.00 34,400.00 40,000.00 15 Mandor Oh 35,000.00 34,400.00 40,000.00

B. MATERIAL1 Alang-alang Ikat 1,850.00 1,859.55 2,310.00 2 Aluminium Foil / Sisalation m2 11,330.00 11,334.40 14,080.00 3 Amplas Lbr 1,700.00 1,700.00 2,200.00 4 Asbes Gelombang M2 29,500.00 29,500.00 37,000.00 5 Badkip - - 6 Bak Cuci Piring Stainless Steel Bh 145,220.00 145,222.00 180,400.00 7 Batu Bata Bh 270.00 270.00 350.00 8 Abu Batu M3 120,000.00 120,000.00 150,700.00 9 Batu Kali Blonos M3 72,000.00 72,000.00 90,000.00

10 Batu Kali Pecah M3 92,500.00 92,500.00 115,000.00 11 Batu Belah 15/20 cm M3 73,500.00 73,500.00 91,300.00 12 Batu Belah 10/15 cm M3 84,000.00 84,000.00 104,500.00 13 Batu Belah 5/7 cm M3 86,000.00 86,000.00 107,800.00 14 Batu Pecah Tangan 2/3 cm M3 110,000.00 110,000.00 138,600.00 15 Batu Pecah mesin 3-5 cm M3 135,000.00 135,000.00 170,000.00 16 Batu Pecah mesin 2-3 cm M3 140,000.00 140,000.00 180,000.00 17 Batu Pecah mesin 1-2 cm M3 155,000.00 155,000.00 195,000.00 18 Batu Pecah mesin 0,5-1 cm M3 155,000.00 155,000.00 195,000.00 19 Batu Pecah 0,2-0,5 cm M3 155,000.00 155,000.00 195,000.00 20 Batu Kambang / Apung Kg 6,500.00 6,500.00 8,250.00 21 Batu Kerikil M3 40,000.00 40,000.00 48,400.00 22 Tanah Urug M3 45,000.00 45,000.00 60,500.00 23 Begel kg - -

Page 2: Analis Sni Ta 2008

Page 2 of 77

24 Bindrat kg 9,000.00 9,000.00 11,275.00 25 Besi Beton Polos kg 7,000.00 7,393.93 9,185.00 26 Besi Beton Ulir kg 10,000.00 10,183.25 12,650.00 27 Besi Siku /Profil kg 10,000.00 10,183.25 12,650.00 28 Baja Plat kg 7,000.00 7,305.38 9,075.00 29 Buis Beton 20 cm buah 36,000.00 36,225.00 45,000.00 30 Buis Beton 30 cm buah 48,000.00 48,300.00 60,000.00 31 Buis Beton 50 cm buah 104,000.00 104,650.00 130,000.00 32 Buis Beton 60 cm buah 123,000.00 123,970.00 154,000.00 33 Buis Beton 80 cm buah 182,000.00 182,855.75 227,150.00 34 Buis Beton 100 cm buah 221,000.00 221,375.00 275,000.00 35 Buis Beton U 15 cm buah 13,000.00 13,282.50 16,500.00 36 Buis Beton U 20 cm buah 19,000.00 19,481.00 24,200.00 37 Buis Beton U 30 cm buah 26,000.00 26,565.00 33,000.00 38 Buis Beton U 100 cm buah 161,000.00 161,382.38 200,475.00 39 Glas Box 20/20 cm buah 15,000.00 15,053.50 18,700.00 40 Cat Tembok Sek. Cathylac Kg 11,000.00 11,732.88 14,575.00 41 Cat Tembok Sek. Decolith Kg 10,000.00 10,183.25 12,650.00 42 Cat Tembok Sek. Mollex Kg 6,000.00 6,818.35 8,470.00 43 Cat Tembok Sek. Mowilex Kg 52,000.00 52,598.70 65,340.00 44 Cat Kayu Sek. Avian Kg 28,000.00 28,336.00 35,200.00 45 Cat Genteng Kg 17,000.00 17,710.00 22,000.00 46 Cat Meni Kg 11,000.00 11,732.88 14,575.00 47 Dempul Kayu Kg 9,000.00 9,257.50 11,500.00 48 Door Closer Bh 189,000.00 189,577.50 235,500.00 49 Door Stop Bh 21,000.00 21,252.00 26,400.00 50 Engsel Angin Bh 6,000.00 6,641.25 8,250.00 51 Engsel Jendela Kupu-kupu Bh 4,000.00 4,427.50 5,500.00 52 Engsel Pintu Bh 8,000.00 8,855.00 11,000.00 53 Grendel Jendela Bh 3,000.00 3,099.25 3,850.00 54 Grendel Pintu Bh 4,000.00 4,427.50 5,500.00 55 Sanggan Jendela Antik Bh 14,000.00 14,168.00 17,600.00 56 Sanggan Jendela Lipat Bh 4,000.00 4,870.25 6,050.00 57 Kunci tanam Bh 70,000.00 70,840.00 88,000.00 58 Kunci tanam kamar mandi Bh 31,000.00 31,878.00 39,600.00 59 Kawat Duri m' 3,000.00 3,010.70 3,740.00 60 Kawat Bronjong dia 4 mm Kg 10,000.00 10,626.00 13,200.00 61 Kawat Mantras Pabrikan 3 mm Kg 15,000.00 15,053.50 18,700.00 62 Eternit Kerang Super m2 5,000.00 5,313.00 6,600.00 63 Floor Drain Bh 18,000.00 18,595.50 23,100.00 64 Formite/Penjaga Jarak Bekisting/Spacer - - 65 Genteng Vlams Soka Bh 640.00 644.00 800.00 66 Genteng Pres Glasur Bh 3,000.00 3,984.75 4,950.00 67 Genteng Pres Plentong Bh 750.00 752.68 935.00 68 Genteng Pres Kodok Bh 970.00 974.05 1,210.00 69 Genteng Beton Bh 3,000.00 3,320.63 4,125.00 70 Genteng Morando Bh 2,000.00 2,213.75 2,750.00 71 Genteng Nok Beton Bh 3,000.00 3,320.63 4,125.00

Page 3: Analis Sni Ta 2008

Page 3 of 77

72 Genteng Nok Morando Bh 3,000.00 3,364.90 4,180.00 73 Genteng Nok Plentong Bh 2,000.00 2,435.13 3,025.00 74 Gypsum Board ( 120 x 240 ) cm x 9 mm lbr 38,000.00 38,962.00 48,400.00 75 Harplek m2 10,000.00 10,183.25 12,650.00 76 Kaca Bening 3 mm M2 41,000.00 41,618.50 51,700.00 77 Kaca Bening 5 mm M2 53,000.00 53,794.13 66,825.00 78 Kaca Cermin M2 121,000.00 121,555.00 151,000.00 79 Kaca Polos Tb. 8 mm M2 128,000.00 128,397.50 159,500.00 80 Kait Angin Bh - - 81 Kapur padam M3 104,000.00 104,650.00 130,000.00 82 Kapur Pasang M3 144,000.00 144,900.00 180,000.00 83 Kapur Sirih / Labur Kg 2,000.00 2,169.48 2,695.00 84 Kawat Burung m2 13,000.00 13,282.50 16,500.00 85 Kayu Bakar M3 48,000.00 48,702.50 60,500.00 86 Pelumas Liter 30,000.00 30,590.00 38,000.00 87 Solar Liter 4,000.00 4,427.50 5,500.00 88 Premium Liter 4,000.00 4,870.25 6,050.00 89 Minyak tanah Liter 2,000.00 2,302.30 2,860.00 90 Thiner Liter 39,000.00 39,847.50 49,500.00 91 Aspal Penetrasi 60/70 Kg 5,000.00 5,844.30 7,260.00 92 Aspal Curah Kg 5,000.00 5,578.65 6,930.00 93 Keramik 10/20 cm m2 32,000.00 32,763.50 40,700.00 94 Keramik 20/20 cm m2 38,000.00 38,519.25 47,850.00 95 Keramik 20/25 cm Kw I m2 38,000.00 38,519.25 47,850.00 96 Keramik 20/25 cm Kw II m2 - - 97 Keramik 30/30 cm Kw I m2 38,000.00 38,253.60 47,520.00 98 Keramik 30/30 cm Kw II m2 35,000.00 35,420.00 44,000.00 99 Keramik 40/40 cm Kw I m2 45,000.00 45,160.50 56,100.00

100 Keramik 40/40 cm Kw II m2 42,000.00 42,504.00 52,800.00 101 Tegel Abu-abu 20/20 bh 640.00 644.00 800.00 102 Tegel Abu-abu 30/30 bh 1,680.00 1,682.45 2,090.00 103 Kayu Bangkir ( Balok ) M3 5,932,000.00 5,932,850.00 7,370,000.00 104 Kayu Bangkir ( Papan ) M3 6,240,000.00 6,240,118.50 7,751,700.00 105 Kayu Bangkir ( Usuk 5/7 ) M3 5,186,000.00 5,186,373.50 6,442,700.00 106 Kayu Jati ( Balok ) M3 10,214,000.00 10,214,242.50 12,688,500.00 107 Kayu Jati ( Papan ) M3 9,751,000.00 9,751,126.00 12,113,200.00 108 Kayu Jati ( Usuk 5/7 ) M3 8,071,000.00 8,071,332.50 10,026,500.00 109 Kayu Kamper ( Balok ) M3 5,702,000.00 5,702,177.25 7,083,450.00 110 Kayu Kamper ( Papan ) M3 6,240,000.00 6,240,118.50 7,751,700.00 111 Kayu Kamper ( Usuk 5/7 ) M3 4,432,000.00 4,432,813.00 5,506,600.00 112 Kayu Kruing ( Balok ) M3 4,088,000.00 4,088,353.50 5,078,700.00 113 Kayu Kruing ( Papan ) M3 4,325,000.00 4,325,667.50 5,373,500.00 114 Kayu Kruing ( Usuk 5/7 ) M3 3,648,000.00 3,648,260.00 4,532,000.00 115 Kayu Meranti ( Balok ) M3 3,227,000.00 3,227,647.50 4,009,500.00 116 Kayu Meranti ( Papan ) M3 3,464,000.00 3,464,961.50 4,304,300.00 117 Kayu Meranti ( Usuk 5/7 ) M3 2,980,000.00 2,980,593.00 3,702,600.00 118 Kayu Tahun M3 1,090,000.00 1,090,775.00 1,355,000.00 119 Kayu Perancah M3 898,000.00 898,782.50 1,116,500.00

Page 4: Analis Sni Ta 2008

Page 4 of 77

120 Glugu Tua M3 1,090,000.00 1,090,775.00 1,355,000.00 121 Kayu Dolken M3 947,000.00 947,485.00 1,177,000.00 122 Bambu Petung btg 17,000.00 17,710.00 22,000.00 123 Bambu Wulung btg 6,000.00 6,641.25 8,250.00 124 Bambu Ampel btg 3,000.00 3,340.75 4,150.00 125 Bambu Tali btg 7,000.00 7,084.00 8,800.00 126 Kloset Duduk / Monoblok Bh 860,000.00 860,706.00 1,069,200.00 127 Kloset Jongkok Porselen Bh 96,000.00 96,519.50 119,900.00 128 Washtafel Bh 295,000.00 295,757.00 367,400.00 129 Bak mandi Fiber Bh 128,000.00 128,397.50 159,500.00 130 Urinoir Bh 425,000.00 425,040.00 528,000.00 131 Pintu Aluminium uk 70 cm lengkap Bh 391,000.00 391,230.00 486,000.00 132 Pintu PVC uk 70 cm Polos lengkap Bh 268,000.00 268,870.00 334,000.00 133 Labur Gamping m3 94,000.00 94,748.50 117,700.00 134 Lem Kayu Kg 9,000.00 9,257.50 11,500.00 135 List Kayu Propil m' 3,000.00 3,179.75 3,950.00 136 Meni Besi Kg 11,000.00 11,511.50 14,300.00 137 Minyak Cat Liter 30,000.00 30,992.50 38,500.00 138 Nok Stel as bes Gelombang psg 23,000.00 23,908.50 29,700.00 139 Paku Biasa ( 1/2" - 1" ) Kg 10,000.00 10,183.25 12,650.00 140 Paku Biasa ( 2" - 5" ) Kg 7,000.00 7,836.68 9,735.00 141 Paku eternit, List ( 1/2" - 1" ) Kg 10,000.00 10,183.25 12,650.00 142 Paku Kait bj 640.00 644.00 800.00 143 Paku Payung bj 440.00 442.75 550.00 144 Paku Sumbat bj 440.00 442.75 550.00 145 Paku Sekrup 3,5" Bh 600.00 603.75 750.00 146 Paku Seng ( 1/2" - 1" ) Kg 21,000.00 21,517.65 26,730.00 147 Paku Usuk/Plafond/Reng ( 2" - 5" ) Kg 8,000.00 8,170.75 10,150.00 148 Pasir Beton M3 96,000.00 96,600.00 120,000.00 149 Pasir Pasang M3 92,000.00 92,575.00 115,000.00 150 Pasir urug M3 60,000.00 60,375.00 75,000.00 151 Paving Block Natural 6 cm M2 27,000.00 27,893.25 34,650.00 152 Paving Block t = 6 cm K - 300 M2 48,000.00 48,259.75 59,950.00 153 Paving Block t = 8 cm K - 400 M2 64,000.00 64,641.50 80,300.00 154 Paving Block Warna 6 cm M2 30,000.00 30,549.75 37,950.00 155 PC Tiga Roda 50 Kg zak 39,000.00 39,360.00 48,000.00 156 PC Nusantara 50 Kg zak 38,000.00 38,130.00 46,500.00 157 PC Gresik 50 Kg zak 37,000.00 37,023.00 45,150.00 158 PC Warna / Nat Kg 5,000.00 5,313.00 6,600.00 159 Pegangan Pintu / Door Holder bh - - 160 Plamir Kayu kg 12,000.00 12,175.63 15,125.00 161 Plamir Tembok kg 6,000.00 6,037.50 7,500.00 162 Plywood Tb. 9 mm - - 163 Politur - - 164 Politur Jadi 13,000.00 13,282.50 16,500.00 165 Rel Pintu Dorong Bh 288,000.00 288,673.00 358,600.00 166 Residu dan Ter liter 2,650.00 2,656.50 3,300.00 167 Seal Tape Bh 1,410.00 1,416.80 1,760.00

Page 5: Analis Sni Ta 2008

Page 5 of 77

168 Seng Gelombang 3" x 6" BJLS 20 M2 23,000.00 23,908.50 29,700.00 169 Seng Gelombang 3" x 6" BJLS 30 M2 29,000.00 29,221.50 36,300.00 170 Seng Plat 3" x 6" BJLS 30 M2 21,000.00 21,694.75 26,950.00 171 Sirtu M3 52,000.00 52,325.00 65,000.00 172 Sirlak kg 61,000.00 61,582.50 76,500.00 173 Soda Api liter 14,000.00 14,168.00 17,600.00 174 Spritus litter - - 175 Tali Ijuk kg - - 176 Tir Kayu litter 2,600.00 2,656.50 3,300.00 177 Triplek 3 mm x 1,20 x 2,40 M lbr 38,000.00 38,962.00 48,400.00 178 Triplek 4 mm x 1,20 x 2,40 M lbr 45,000.00 45,160.50 56,100.00 179 Triplek 6 mm x 1,20 x 2,40 M lbr 59,000.00 59,328.50 73,700.00 180 Multiplek 9 mm x 0,90 x 2,10 M lbr 123,000.00 123,970.00 154,000.00 181 Multiplek 12 mm x 0,90 x 2,10 M lbr 123,000.00 123,970.00 154,000.00 182 Teakwood 3 mm x 0,90 x 2,10 M lbr 51,000.00 51,359.00 63,800.00 183 Lampu Pijar 5 Watt bh 3,000.00 3,099.25 3,850.00 184 Lampu Pijar 10 Watt bh 3,000.00 3,099.25 3,850.00 185 Lampu Pijar 15 Watt bh 3,700.00 3,719.10 4,620.00 186 Lampu Pijar 25 Watt bh 3,900.00 3,984.75 4,950.00 187 Lampu Pijar 40 Watt bh 3,900.00 3,984.75 4,950.00 188 Water drain + accessories batang - - 189 Pipa galvanis Bahan Rambu 1,5 Inc Medium A batang 244,000.00 244,840.75 304,150.00 190 Pipa galvanis Bahan Rambu 1,5 Inc Medium B batang 256,000.00 256,795.00 319,000.00 191 Pipa galvanis Bahan Rambu 1,5 Inc batang 212,000.00 212,520.00 264,000.00 192 Pipa galvanis Bahan Rambu 2 Inc Medium A batang 287,000.00 287,787.50 357,500.00 193 Pipa galvanis Bahan Rambu 2 Inc Medium A batang 297,000.00 297,528.00 369,600.00 194 Pipa galvanis Bahan Rambu 2 Inc m' 230,000.00 230,230.00 286,000.00 195 Pipa Gip 4" Medium A (P.6M) m' 160,000.00 160,275.50 199,100.00 196 Pipa Gip 3" Medium A (P.6M) m' 108,000.00 108,916.50 135,300.00 197 Pipa Gip 2" Medium A (P.6M) m' 63,000.00 63,876.75 79,350.00 198 Pipa Gip 1 1/2" Medium A (P.6M) m' 44,000.00 44,275.00 55,000.00 199 Pipa Gip 1 " Medium A (P.6M) m' 26,000.00 26,343.63 32,725.00 200 Pipa Gip 3/4" Medium A (P.6M) m' 23,000.00 23,465.75 29,150.00 201 Pipa Gip 1/2" Medium A (P.6M) m' 19,000.00 19,320.00 24,000.00 202 Pipa Gip 4" Medium B (P.6M) m' 87,000.00 87,221.75 108,350.00 203 Pipa Gip 3" Medium B (P.6M) m' 66,000.00 66,855.25 83,050.00 204 Pipa Gip 2" Medium B (P.6M) m' 42,000.00 42,866.25 53,250.00 205 Pipa Gip 1 1/2" Medium B (P.6M) m' 25,000.00 25,449.27 31,614.00 206 Pipa Gip 1 " Medium B (P.6M) m' 87,000.00 87,221.75 108,350.00 207 Pipa Gip 3/4" Medium B (P.6M) m' 66,000.00 66,855.25 83,050.00 208 Pipa PVC 6" S 12,5 10 Bar m' 117,000.00 117,932.50 146,500.00 209 Pipa PVC 4" S 12,5 10 Bar m' 125,000.00 125,741.00 156,200.00 210 Pipa PVC 3" S 12,5 10 Bar m' 43,000.00 43,389.50 53,900.00 211 Pipa PVC 2" S 12,5 10 Bar m' - - 212 Pipa PVC 1 1/2" S 12,5 10 Bar m' 13,000.00 13,282.50 16,500.00 213 Pipa PVC 1 1/2" S 10 10 Bar m' 15,000.00 15,939.00 19,800.00 214 Pipa PVC 1 1/4" S 10 10 Bar m' 10,000.00 10,626.00 13,200.00 215 Pipa PVC 1" S 10 10 Bar m' 7,000.00 7,526.75 9,350.00

Page 6: Analis Sni Ta 2008

Page 6 of 77

216 Pipa PVC 3/4" S 10 10 Bar m' 3,000.00 3,984.75 4,950.00 217 Pipa PVC 1/2" S 10 10 Bar m' 3,000.00 3,010.70 3,740.00 218 Pipa PVC 4" S 16 8 Bar m' 47,000.00 47,817.00 59,400.00 219 Pipa PVC 3" S 16 8 Bar m' 30,000.00 30,590.00 38,000.00 220 Pipa PVC 2" S 16 8 Bar m' 17,000.00 17,227.00 21,400.00 221 Pipa PVC 4" Aw m' 40,000.00 40,290.25 50,050.00 222 Pipa PVC 3" Aw m' 23,900.00 23,908.50 29,700.00 223 Pipa PVC 2" Aw m' 12,000.00 12,397.00 15,400.00 224 Pipa PVC 1 1/2" Aw m' 9,000.00 9,740.50 12,100.00 225 Pipa PVC 1 1/4" Aw m' 7,500.00 7,526.75 9,350.00 226 Pipa PVC 1" Aw m' 5,000.00 5,313.00 6,600.00 227 Pipa PVC 3/4" Aw m' 4,000.00 4,250.40 5,280.00 228 Pipa PVC 1/2" Aw buah 2,600.00 2,656.50 3,300.00 229 Stop Kran (valve) Kitz 4" buah 2,552,000.00 2,552,027.10 3,170,220.00 230 Stop Kran (valve) Kitz 8" buah 832,000.00 832,370.00 1,034,000.00 231 Stop Kran (valve) Kitz 2" buah 277,000.00 277,161.50 344,300.00 232 Stop Kran (valve) Kitz 1,5" buah 139,000.00 139,909.00 173,800.00 233 Stop Kran (valve) Kitz 1" buah 110,000.00 110,687.50 137,500.00 234 Stop Kran (valve) Kitz 3/4" buah 72,000.00 72,168.25 89,650.00 235 Stop Kran (valve) Kitz 1/2" buah 49,000.00 49,588.00 61,600.00 236 Knee PVC 4 " buah 142,000.00 142,565.50 177,100.00 237 Knee PVC 3 " buah 85,000.00 85,008.00 105,600.00 238 Knee PVC 2 " buah 36,000.00 36,305.50 45,100.00 239 Knee PVC 1 1/2 " buah 8,600.00 8,633.63 10,725.00 240 Knee PVC 1 1/4 " buah 5,300.00 5,313.00 6,600.00 241 Knee PVC 1 " buah 3,500.00 3,542.00 4,400.00 242 Knee PVC 3/4 " buah 2,100.00 2,125.20 2,640.00 243 Knee PVC 1/2 " buah 1,700.00 1,771.00 2,200.00 244 Sock PVC 3" buah 8,800.00 8,855.00 11,000.00 245 Sock PVC 2" buah 5,800.00 5,844.30 7,260.00 246 Sock PVC 1" buah 2,600.00 2,656.50 3,300.00 247 Knee Drat Gip 4" buah 67,000.00 67,740.75 84,150.00 248 Knee Drat Gip 3" buah 36,000.00 36,305.50 45,100.00 249 Knee Drat Gip 2" buah 12,000.00 12,477.50 15,500.00 250 Knee Drat Gip 1 1/4" buah 8,000.00 8,855.00 11,000.00 251 Knee Drat Gip 1 1/2" buah 10,000.00 10,626.00 13,200.00 252 Knee Drat Gip 1" buah 3,600.00 3,630.55 4,510.00 253 Knee Drat Gip 1/2" buah 3,200.00 3,220.00 4,000.00 254 Knee Drat Gip 3/4" buah 3,100.00 3,187.80 3,960.00 255 Sock Drat Gip 4" buah 51,000.00 51,922.50 64,500.00 256 SockDrat Gip 3" buah 36,000.00 36,305.50 45,100.00 257 Sokc Drat Gip 2" buah 8,000.00 8,050.00 10,000.00 258 Sokc Drat Gip 1 1/2" buah 6,400.00 6,440.00 8,000.00 259 Sokc Drat Gip 1 1/4" buah 6,100.00 6,198.50 7,700.00 260 Sokc Drat Gip 1" buah 3,600.00 3,622.50 4,500.00 261 Sokc Drat Gip 3/4" buah 2,400.00 2,415.00 3,000.00 262 Sokc Drat Gip 1/2" buah 1,600.00 1,610.00 2,000.00 263 Water meter buah 169,000.00 169,130.50 210,100.00

Page 7: Analis Sni Ta 2008

Page 7 of 77

264 Kran 3/4" buah 17,900.00 17,931.38 22,275.00 265 Kran 1/2" buah 12,800.00 12,839.75 15,950.00 266 Tangki Fiberglass 2M3 buah 3,882,000.00 3,882,917.50 4,823,500.00 267 Air Valve 20 mm buah 140,000.00 140,794.50 174,900.00 268 Air Valve 3/4 mm buah 154,000.00 154,962.50 192,500.00 269 Bend GIP 90 2" buah 28,000.00 28,336.00 35,200.00 270 Bend GIP 90 3" buah 82,000.00 82,351.50 102,300.00 271 Bend GIP 90 4" buah 170,000.00 170,901.50 212,300.00 272 Bend GIP 75 X 90 buah 79,000.00 79,695.00 99,000.00 273 Bend PVC 45' 2" buah 96,000.00 96,962.25 120,450.00 274 Bend PVC 45' 3" buah 114,000.00 114,229.50 141,900.00 275 Bend PVC 45' 4" buah 170,000.00 170,901.50 212,300.00 276 Bend Soket PVC DN 50x45 buah 75,000.00 75,515.44 93,808.00 277 Bend Soket PVC DN 75x45 buah 89,000.00 89,435.50 111,100.00 278 Claim Sadle 2" x 1/2" buah 14,100.00 14,168.00 17,600.00 279 Claim Sadle DN 60 x 25 mm buah 16,100.00 16,100.00 20,000.00 280 Claim Sadle DN 50 x 20 mm buah 15,200.00 15,295.00 19,000.00 281 Dop PVC DN 20 mm buah 19,400.00 19,481.00 24,200.00 282 Dop GIP 1/2" AW buah 2,000.00 2,012.50 2,500.00 283 Dop GIP 3/4" AW buah 2,400.00 2,435.13 3,025.00 284 Dop GIP 1" AW buah 26,500.00 26,565.00 33,000.00 285 Dop GIP 1 1/4" AW buah 3,600.00 3,622.50 4,500.00 286 Dop GIP 1 1/2" AW buah 5,200.00 5,232.50 6,500.00 287 Dop GIP 2" AW buah 8,000.00 8,050.00 10,000.00 288 Dop GIP 3" AW buah 21,200.00 21,252.00 26,400.00 289 Dop GIP 4" AW buah 36,300.00 36,305.50 45,100.00 290 Double Nipple GIP 4" buah 93,800.00 93,863.00 116,600.00 291 Double Nipple GIP 3" buah 27,400.00 27,450.50 34,100.00 292 Double Nipple GIP 2" buah 9,200.00 9,297.75 11,550.00 293 Double Nipple GIP 1 1/2" buah 6,600.00 6,641.25 8,250.00 294 Double Nipple GIP 1 1/4" buah 4,200.00 4,206.13 5,225.00 295 Double Nipple GIP 1" buah 3,200.00 3,220.00 4,000.00 296 Double Nipple GIP 3/4" buah 2,400.00 2,435.13 3,025.00 297 Double Nipple GIP 1/2" buah 2,200.00 2,213.75 2,750.00 298 Double Nipple GIP DN 20 mm buah 4,400.00 4,427.50 5,500.00 299 Fland Spigot Diameter 2 buah 166,000.00 166,474.00 206,800.00 300 Fouchet Elbouw PVC DN 20 mm buah 6,400.00 6,464.15 8,030.00 301 Flange 4" buah 138,000.00 138,138.00 171,600.00 302 Flange 3" buah 110,000.00 110,687.50 137,500.00 303 Flange 2 1/2" buah 93,000.00 93,863.00 116,600.00 304 Flange 2" buah 83,000.00 83,237.00 103,400.00 305 Flange DN 75 MM buah 41,000.00 41,175.75 51,150.00 306 Flange DN 50 MM buah 36,000.00 36,305.50 45,100.00 307 Lem PVC buah 55,000.00 55,343.75 68,750.00 308 Floating Valve DN 20 mm buah 42,000.00 42,504.00 52,800.00 309 Floating Valve Kitz 1" buah 387,000.00 387,406.25 481,250.00 310 Floating Valve Kitz 3/4" buah 276,000.00 276,276.00 343,200.00 311 Floating Valve Kitz 1/2" buah 193,000.00 193,924.50 240,900.00

Page 8: Analis Sni Ta 2008

Page 8 of 77

312 GilbouLiter Joint 4" buah 72,100.00 72,168.25 89,650.00 313 GilbouLiter Joint 3" buah 58,000.00 58,000.25 72,050.00 314 GilbouLiter Joint 2" buah 43,800.00 43,832.25 54,450.00 315 GilbouLiter Joint 1 1/2" buah 38,500.00 38,519.25 47,850.00 316 GilbouLiter DN 50 mm buah 50,000.00 50,030.75 62,150.00 317 GilbouLiter DN 75 mm buah 75,200.00 75,267.50 93,500.00 318 Keni GIP DN 20 mm buah 4,400.00 4,427.50 5,500.00 319 Keni PVC DN 20 mm buah 2,600.00 2,656.50 3,300.00 320 Mur dan Baut buah 3,000.00 3,099.25 3,850.00 321 Plug DN 20 mm buah 4,400.00 4,427.50 5,500.00 322 Plug GI 4" buah 41,400.00 41,457.50 51,500.00 323 Plug GI 3" buah 25,700.00 25,760.00 32,000.00 324 Plug GI 2" buah 8,800.00 8,855.00 11,000.00 325 Plug GI 1 1/2" buah 6,400.00 6,464.15 8,030.00 326 Plug GI 1 1/4" buah 4,000.00 4,025.00 5,000.00 327 Plug GI 1" buah 26,500.00 26,565.00 33,000.00 328 Plug GI 3/4" buah 2,000.00 2,012.50 2,500.00 329 Plug GI 1/2" buah 1,600.00 1,610.00 2,000.00 330 Reducer DN 3/4" x 1/2" buah 3,500.00 3,542.00 4,400.00 331 Reducer DN 75 x 50 mm buah 62,900.00 62,959.05 78,210.00 332 Reducer GIP 1/2" - 3/4" buah 3,300.00 3,320.63 4,125.00 333 Reducer GIP 1/2" - 1" buah 3,700.00 3,763.38 4,675.00 334 Reducer GIP 1" - 1 1/4" buah 5,300.00 5,393.50 6,700.00 335 Reducer GIP 1" - 2" buah 10,700.00 10,758.83 13,365.00 336 Reducer GIP 2" - 3" buah 38,700.00 38,740.63 48,125.00 337 Reducer GIP 3" - 4" buah 54,900.00 54,901.00 68,200.00 338 Reducer PVC 1/2" - 3/4" buah 2,100.00 2,125.20 2,640.00 339 Reducer PVC 1/2" - 1" buah 2,100.00 2,125.20 2,640.00 340 Reducer PVC 1" - 1 1/4" buah 3,700.00 3,763.38 4,675.00 341 Reducer PVC 1" - 1 1/2" buah 4,000.00 4,025.00 5,000.00 342 Reducer PVC 1" - 2" buah 5,300.00 5,313.00 6,600.00 343 Reducer PVC 1 1/2" - 2" buah 6,800.00 6,862.63 8,525.00 344 Reducer PVC 2" - 3" buah 8,600.00 8,633.63 10,725.00 345 Reducer PVC 3" - 4" buah 13,200.00 13,282.50 16,500.00 346 Saringan 4" CI buah 154,000.00 154,962.50 192,500.00 347 Saringan 3" CI buah 133,000.00 133,710.50 166,100.00 348 Saringan 2" CI buah 122,000.00 122,199.00 151,800.00 349 SLD PVC DN 20 mm buah 2,000.00 2,656.50 3,300.00 350 SDL PVC 4" buah 191,000.00 191,710.75 238,150.00 351 SDL PVC 3" buah 78,000.00 78,809.50 97,900.00 352 SDL PVC 2" buah 42,900.00 42,946.75 53,350.00 353 SDL PVC 1 1/2" buah 15,000.00 15,053.50 18,700.00 354 SDL PVC 1 1/4" buah 8,600.00 8,633.63 10,725.00 355 SDL PVC 1" buah 5,300.00 5,313.00 6,600.00 356 SDL PVC 3/4" buah 5,300.00 5,313.00 6,600.00 357 SDL PVC 1/2" buah 5,100.00 5,135.90 6,380.00 358 Sok Drat GIP 4" buah 51,900.00 51,922.50 64,500.00 359 Sok Drat GIP 3" buah 36,300.00 36,305.50 45,100.00

Page 9: Analis Sni Ta 2008

Page 9 of 77

360 Sok Drat GIP 2" buah 8,000.00 8,058.05 10,010.00 361 Sok Drat GIP 1 1/2" buah 6,400.00 6,440.00 8,000.00 362 Sok Drat GIP 1 1/4" buah 5,300.00 5,313.00 6,600.00 363 Sok Drat GIP 1" buah 36,300.00 36,305.50 45,100.00 364 Sok Drat GIP 3/4" buah 2,400.00 2,435.13 3,025.00 365 Sok Drat GIP 1/2" buah 1,600.00 1,610.00 2,000.00 366 Sock GIP DN 75 mm buah 17,700.00 17,710.00 22,000.00 367 Sock GIP DN 20 mm buah 4,400.00 4,427.50 5,500.00 368 Stop Valve Bras DN 20 mm buah 52,200.00 52,244.50 64,900.00 369 Stop Valve Bras DN 50 mm buah 111,000.00 111,573.00 138,600.00 370 Stop Valve Bras DN 75 mm buah 310,000.00 310,367.75 385,550.00 371 TBA buah 1,700.00 1,771.00 2,200.00 372 Tee GIP 4" buah 83,200.00 83,237.00 103,400.00 373 Tee GIP 3" buah 46,900.00 46,931.50 58,300.00 374 Tee GIP 2" buah 15,400.00 15,496.25 19,250.00 375 Tee GIP 1 1/2" buah 10,600.00 10,626.00 13,200.00 376 Tee GIP 1 1/4" buah 8,000.00 8,050.00 10,000.00 377 Tee GIP 1" buah 5,300.00 5,313.00 6,600.00 378 Tee GIP 3/4" buah 3,600.00 3,622.50 4,500.00 379 Tee GIP 1/2" buah 2,400.00 2,415.00 3,000.00 380 Tee PVC 4" x 4" SC buah 167,000.00 167,802.25 208,450.00 381 Tee PVC 4" x 3" SC buah 230,000.00 230,230.00 286,000.00 382 Tee PVC 4" x 2" SC buah 230,000.00 230,230.00 286,000.00 383 Tee PVC 3" x 3" SC buah 105,000.00 105,374.50 130,900.00 384 Tee PVC 3" x 2" SC buah 182,000.00 182,855.75 227,150.00 385 Tee PVC 3" x 1 1/2" SC buah 188,000.00 188,168.75 233,750.00 386 Tee PVC 2" x 2" SC buah 38,000.00 38,076.50 47,300.00 387 Tee PVC 2" x 2 1/2" SC buah 42,900.00 42,946.75 53,350.00 388 Tee PVC 2" x 1" SC buah 38,000.00 38,076.50 47,300.00 389 Tee GIP DN 20 mm buah 2,400.00 2,435.13 3,025.00 390 Tee GIP DN 50 mm buah 11,000.00 11,068.75 13,750.00 391 Tee Socket DN 50 x 50 mm buah 50,600.00 50,650.60 62,920.00 392 Tee Socket DN 75 x 50 mm buah 160,300.00 160,381.76 199,232.00 393 Valve Socket PVC DN 50 mm buah 59,000.00 59,000.00 394 Valve Socket PVC DN 75 mm buah 79,000.00 79,000.00 395 Pipa PVC 3" S 10 12,5Bar m' - - 396 Pipa PVC 2" S 10 12,5 Bar m' - - 26,400.00 397 Kerep uk. Tinggi 50 cm buah - -

Keterangan :TOKO ITOKO IITOKO IIITOKO IVTOKO VINDEK HARGA

Page 10: Analis Sni Ta 2008

Page 10 of 77

DAFTAR PERHITUNGAN HARGA MATERIAL DAN UPAH PEKERJA TAHUN ANGGARAN 2008(HARGA BORONGAN)

NO URAIAN UPAH DAN MATERIAL SAT. DASAR HARGA JUMLAH TOTAL

1 2 3 4 5 6 7 8 9 10 11

A. UPAH1 Pekerja Oh 25,000.00 - - - - 25,000.00 25,000.00 27,500.00 2 Pekerja Bongkar / Siram Oh 23,000.00 - - - - 23,000.00 23,000.00 25,300.00 3 Tukang Batu Oh 30,000.00 - - - - 30,000.00 30,000.00 33,000.00 4 Tukang Besi Oh 30,000.00 - - - - 30,000.00 30,000.00 33,000.00 5 Tukang Cat Oh 30,000.00 - - - - 30,000.00 30,000.00 33,000.00 6 Tukang Gali Oh 30,000.00 - - - - 30,000.00 30,000.00 33,000.00 7 Tukang Kayu Oh 30,000.00 - - - - 30,000.00 30,000.00 33,000.00 8 Tukang Aspal Oh 30,000.00 - - - - 30,000.00 30,000.00 33,000.00 9 Tukang Mantras Oh 30,000.00 - - - - 30,000.00 30,000.00 33,000.00

10 Operatot Alat Berat Oh 51,000.00 - - - - 51,000.00 51,000.00 56,100.00 11 Pembantu Operator Oh 43,000.00 - - - - 43,000.00 43,000.00 47,300.00 12 Mekanik Oh 38,000.00 - - - - 38,000.00 38,000.00 41,800.00 13 Pembantu Mekanik Oh 31,000.00 - - - - 31,000.00 31,000.00 34,100.00 14 Kepala Tukang Oh 34,000.00 - - - - 34,000.00 34,000.00 37,400.00 15 Mandor Oh 35,000.00 - - - - 35,000.00 35,000.00 38,500.00

B. MATERIAL1 Alang-alang Ikat 1,850.00 185.00 203.50 9.25 - 2,247.75 2,200.00 2,420.00 2 Aluminium Foil / Sisalation m2 11,330.00 1,133.00 1,246.30 56.65 - 13,765.95 13,700.00 15,070.00 3 Amplas Lbr 1,700.00 170.00 187.00 8.50 - 2,065.50 2,000.00 2,200.00 4 Asbes Gelombang M2 29,500.00 2,950.00 3,245.00 147.50 - 35,842.50 35,800.00 39,380.00 5 Badkip - - - - - - - - 6 Bak Cuci Piring Stainless Steel Bh 145,220.00 14,522.00 15,974.20 726.10 - 176,442.30 176,400.00 194,040.00 7 Batu Bata Bh 270.00 27.00 29.70 1.35 - 328.05 320.00 352.00 8 Abu Batu M3 120,000.00 12,000.00 13,200.00 600.00 1,200.00 147,000.00 147,000.00 161,700.00 9 Batu Kali Blonos M3 72,000.00 7,200.00 7,920.00 360.00 720.00 88,200.00 88,000.00 96,800.00

10 Batu Kali Pecah M3 92,500.00 9,250.00 10,175.00 462.50 925.00 113,312.50 113,000.00 124,300.00 11 Batu Belah 15/20 cm M3 73,500.00 7,350.00 8,085.00 367.50 735.00 90,037.50 90,000.00 99,000.00 12 Batu Belah 10/15 cm M3 84,000.00 8,400.00 9,240.00 420.00 840.00 102,900.00 102,000.00 112,200.00 13 Batu Belah 5/7 cm M3 86,000.00 8,600.00 9,460.00 430.00 860.00 105,350.00 105,000.00 115,500.00 14 Batu Pecah Tangan 2/3 cm M3 110,000.00 11,000.00 12,100.00 550.00 1,100.00 134,750.00 134,000.00 147,400.00 15 Batu Pecah mesin 3-5 cm M3 135,000.00 13,500.00 14,850.00 675.00 1,350.00 165,375.00 165,000.00 181,500.00 16 Batu Pecah mesin 2-3 cm M3 140,000.00 14,000.00 15,400.00 700.00 1,400.00 171,500.00 171,000.00 188,100.00 17 Batu Pecah mesin 1-2 cm M3 155,000.00 15,500.00 17,050.00 775.00 1,550.00 189,875.00 189,000.00 207,900.00 18 Batu Pecah mesin 0,5-1 cm M3 155,000.00 15,500.00 17,050.00 775.00 1,550.00 189,875.00 189,000.00 207,900.00

JASA PEMBORONG (4x10%) =

P P N (4+5)x10%

ASTEK (4x0,50%)

PAJAK GOL. C (4x1,00%)

PEMBULATAN (HARGA YANG

DIPAKAI)

USULAN HARGA TAHUN 2009

Page 11: Analis Sni Ta 2008

Page 11 of 77

19 Batu Pecah 0,2-0,5 cm M3 155,000.00 15,500.00 17,050.00 775.00 1,550.00 189,875.00 189,000.00 207,900.00 20 Batu Kambang / Apung Kg 6,500.00 650.00 715.00 32.50 65.00 7,962.50 7,900.00 8,690.00 21 Batu Kerikil M3 40,000.00 4,000.00 4,400.00 200.00 400.00 49,000.00 49,000.00 53,900.00 22 Tanah Urug M3 45,000.00 4,500.00 4,950.00 225.00 - 54,675.00 54,600.00 60,060.00 23 Begel kg - - - - - - - - 24 Bindrat kg 9,000.00 900.00 990.00 45.00 - 10,935.00 10,900.00 11,990.00 25 Besi Beton Polos kg 7,000.00 700.00 770.00 35.00 - 8,505.00 8,500.00 9,350.00 26 Besi Beton Ulir kg 10,000.00 1,000.00 1,100.00 50.00 - 12,150.00 12,000.00 13,200.00 27 Besi Siku /Profil kg 10,000.00 1,000.00 1,100.00 50.00 - 12,150.00 12,000.00 13,200.00 28 Baja Plat kg 7,000.00 700.00 770.00 35.00 - 8,505.00 8,500.00 9,350.00 29 Buis Beton 20 cm buah 36,000.00 3,600.00 3,960.00 180.00 - 43,740.00 43,000.00 47,300.00 30 Buis Beton 30 cm buah 48,000.00 4,800.00 5,280.00 240.00 - 58,320.00 58,000.00 63,800.00 31 Buis Beton 50 cm buah 104,000.00 10,400.00 11,440.00 520.00 - 126,360.00 126,000.00 138,600.00 32 Buis Beton 60 cm buah 123,000.00 12,300.00 13,530.00 615.00 - 149,445.00 149,000.00 163,900.00 33 Buis Beton 80 cm buah 182,000.00 18,200.00 20,020.00 910.00 - 221,130.00 221,000.00 243,100.00 34 Buis Beton 100 cm buah 221,000.00 22,100.00 24,310.00 1,105.00 - 268,515.00 268,000.00 294,800.00 35 Buis Beton U 15 cm buah 13,000.00 1,300.00 1,430.00 65.00 - 15,795.00 15,000.00 16,500.00 36 Buis Beton U 20 cm buah 19,000.00 1,900.00 2,090.00 95.00 - 23,085.00 23,000.00 25,300.00 37 Buis Beton U 30 cm buah 26,000.00 2,600.00 2,860.00 130.00 - 31,590.00 31,000.00 34,100.00 38 Buis Beton U 100 cm buah 161,000.00 16,100.00 17,710.00 805.00 - 195,615.00 195,000.00 214,500.00 39 Glas Box 20/20 cm buah 15,000.00 1,500.00 1,650.00 75.00 - 18,225.00 18,000.00 19,800.00 40 Cat Tembok Sek. Cathylac Kg 11,000.00 1,100.00 1,210.00 55.00 - 13,365.00 13,300.00 14,630.00 41 Cat Tembok Sek. Decolith Kg 10,000.00 1,000.00 1,100.00 50.00 - 12,150.00 12,100.00 13,310.00 42 Cat Tembok Sek. Mollex Kg 6,000.00 600.00 660.00 30.00 - 7,290.00 7,200.00 7,920.00 43 Cat Tembok Sek. Mowilex Kg 52,000.00 5,200.00 5,720.00 260.00 - 63,180.00 63,100.00 69,410.00 44 Cat Kayu Sek. Avian Kg 28,000.00 2,800.00 3,080.00 140.00 - 34,020.00 34,000.00 37,400.00 45 Cat Genteng Kg 17,000.00 1,700.00 1,870.00 85.00 - 20,655.00 20,600.00 22,660.00 46 Cat Meni Kg 11,000.00 1,100.00 1,210.00 55.00 - 13,365.00 13,300.00 14,630.00 47 Dempul Kayu Kg 9,000.00 900.00 990.00 45.00 - 10,935.00 10,900.00 11,990.00 48 Door Closer Bh 189,000.00 18,900.00 20,790.00 945.00 - 229,635.00 229,600.00 252,560.00 49 Door Stop Bh 21,000.00 2,100.00 2,310.00 105.00 - 25,515.00 25,500.00 28,050.00 50 Engsel Angin Bh 6,000.00 600.00 660.00 30.00 - 7,290.00 7,200.00 7,920.00 51 Engsel Jendela Kupu-kupu Bh 4,000.00 400.00 440.00 20.00 - 4,860.00 4,800.00 5,280.00 52 Engsel Pintu Bh 8,000.00 800.00 880.00 40.00 - 9,720.00 9,700.00 10,670.00 53 Grendel Jendela Bh 3,000.00 300.00 330.00 15.00 - 3,645.00 3,600.00 3,960.00 54 Grendel Pintu Bh 4,000.00 400.00 440.00 20.00 - 4,860.00 4,800.00 5,280.00 55 Sanggan Jendela Antik Bh 14,000.00 1,400.00 1,540.00 70.00 - 17,010.00 17,000.00 18,700.00 56 Sanggan Jendela Lipat Bh 4,000.00 400.00 440.00 20.00 - 4,860.00 4,800.00 5,280.00 57 Kunci tanam Bh 70,000.00 7,000.00 7,700.00 350.00 - 85,050.00 85,000.00 93,500.00 58 Kunci tanam kamar mandi Bh 31,000.00 3,100.00 3,410.00 155.00 - 37,665.00 37,600.00 41,360.00 59 Kawat Duri m' 3,000.00 300.00 330.00 15.00 - 3,645.00 3,600.00 3,960.00 60 Kawat Bronjong dia 4 mm Kg 10,000.00 1,000.00 1,100.00 50.00 - 12,150.00 12,100.00 13,310.00 61 Kawat Mantras Pabrikan 3 mm Kg 15,000.00 1,500.00 1,650.00 75.00 - 18,225.00 18,200.00 20,020.00 62 Eternit Kerang Super m2 5,000.00 500.00 550.00 25.00 - 6,075.00 6,000.00 6,600.00 63 Floor Drain Bh 18,000.00 1,800.00 1,980.00 90.00 - 21,870.00 21,800.00 23,980.00 64 Formite/Penjaga Jarak Bekisting/Spacer - - - - - - - - 65 Genteng Vlams Soka Bh 640.00 64.00 70.40 3.20 - 777.60 700.00 770.00 66 Genteng Pres Glasur Bh 3,000.00 300.00 330.00 15.00 - 3,645.00 3,600.00 3,960.00

Page 12: Analis Sni Ta 2008

Page 12 of 77

67 Genteng Pres Plentong Bh 750.00 75.00 82.50 3.75 - 911.25 900.00 990.00 68 Genteng Pres Kodok Bh 970.00 97.00 106.70 4.85 - 1,178.55 1,100.00 1,210.00 69 Genteng Beton Bh 3,000.00 300.00 330.00 15.00 - 3,645.00 3,600.00 3,960.00 70 Genteng Morando Bh 2,000.00 200.00 220.00 10.00 - 2,430.00 2,400.00 2,640.00 71 Genteng Nok Beton Bh 3,000.00 300.00 330.00 15.00 - 3,645.00 3,600.00 3,960.00 72 Genteng Nok Morando Bh 3,000.00 300.00 330.00 15.00 - 3,645.00 3,600.00 3,960.00 73 Genteng Nok Plentong Bh 2,000.00 200.00 220.00 10.00 - 2,430.00 2,400.00 2,640.00 74 Gypsum Board ( 120 x 240 ) cm x 9 mm lbr 38,000.00 3,800.00 4,180.00 190.00 - 46,170.00 46,000.00 50,600.00 75 Harplek m2 10,000.00 1,000.00 1,100.00 50.00 - 12,150.00 12,000.00 13,200.00 76 Kaca Bening 3 mm M2 41,000.00 4,100.00 4,510.00 205.00 - 49,815.00 49,000.00 53,900.00 77 Kaca Bening 5 mm M2 53,000.00 5,300.00 5,830.00 265.00 - 64,395.00 64,000.00 70,400.00 78 Kaca Cermin M2 121,000.00 12,100.00 13,310.00 605.00 - 147,015.00 147,000.00 161,700.00 79 Kaca Polos Tb. 8 mm M2 128,000.00 12,800.00 14,080.00 640.00 - 155,520.00 155,000.00 170,500.00 80 Kait Angin Bh - - - - - - - - 81 Kapur padam M3 104,000.00 10,400.00 11,440.00 520.00 - 126,360.00 126,000.00 138,600.00 82 Kapur Pasang M3 144,000.00 14,400.00 15,840.00 720.00 - 174,960.00 174,000.00 191,400.00 83 Kapur Sirih / Labur Kg 2,000.00 200.00 220.00 10.00 20.00 2,450.00 2,400.00 2,640.00 84 Kawat Burung m2 13,000.00 1,300.00 1,430.00 65.00 - 15,795.00 15,700.00 17,270.00 85 Kayu Bakar M3 48,000.00 4,800.00 5,280.00 240.00 - 58,320.00 58,000.00 63,800.00 86 Pelumas Liter 30,000.00 3,000.00 3,300.00 150.00 - 36,450.00 36,000.00 39,600.00 87 Solar Liter 4,000.00 400.00 440.00 20.00 - 4,860.00 4,800.00 5,280.00 88 Premium Liter 4,000.00 400.00 440.00 20.00 - 4,860.00 4,800.00 5,280.00 89 Minyak tanah Liter 2,000.00 200.00 220.00 10.00 - 2,430.00 2,400.00 2,640.00 90 Thiner Liter 39,000.00 3,900.00 4,290.00 195.00 - 47,385.00 47,000.00 51,700.00 91 Aspal Penetrasi 60/70 Kg 5,000.00 500.00 550.00 25.00 - 6,075.00 6,000.00 6,600.00 92 Aspal Curah Kg 5,000.00 500.00 550.00 25.00 - 6,075.00 6,000.00 6,600.00 93 Keramik 10/20 cm m2 32,000.00 3,200.00 3,520.00 160.00 - 38,880.00 38,800.00 42,680.00 94 Keramik 20/20 cm m2 38,000.00 3,800.00 4,180.00 190.00 - 46,170.00 46,000.00 50,600.00 95 Keramik 20/25 cm Kw I m2 38,000.00 3,800.00 4,180.00 190.00 - 46,170.00 46,000.00 50,600.00 96 Keramik 20/25 cm Kw II m2 - - - - - - - - 97 Keramik 30/30 cm Kw I m2 38,000.00 3,800.00 4,180.00 190.00 - 46,170.00 46,000.00 50,600.00 98 Keramik 30/30 cm Kw II m2 35,000.00 3,500.00 3,850.00 175.00 - 42,525.00 42,500.00 46,750.00 99 Keramik 40/40 cm Kw I m2 45,000.00 4,500.00 4,950.00 225.00 - 54,675.00 54,600.00 60,060.00

100 Keramik 40/40 cm Kw II m2 42,000.00 4,200.00 4,620.00 210.00 - 51,030.00 51,000.00 56,100.00 101 Tegel Abu-abu 20/20 bh 640.00 64.00 70.40 3.20 - 777.60 770.00 847.00 102 Tegel Abu-abu 30/30 bh 1,680.00 168.00 184.80 8.40 - 2,041.20 2,000.00 2,200.00 103 Kayu Bangkir ( Balok ) M3 5,932,000.00 593,200.00 652,520.00 29,660.00 - 7,207,380.00 7,207,000.00 7,927,700.00 104 Kayu Bangkir ( Papan ) M3 6,240,000.00 624,000.00 686,400.00 31,200.00 - 7,581,600.00 7,581,000.00 8,339,100.00 105 Kayu Bangkir ( Usuk 5/7 ) M3 5,186,000.00 518,600.00 570,460.00 25,930.00 - 6,300,990.00 6,300,000.00 6,930,000.00 106 Kayu Jati ( Balok ) M3 ### 1,021,400.00 1,123,540.00 51,070.00 - 12,410,010.00 12,410,000.00 13,651,000.00 107 Kayu Jati ( Papan ) M3 9,751,000.00 975,100.00 1,072,610.00 48,755.00 - 11,847,465.00 11,847,000.00 13,031,700.00 108 Kayu Jati ( Usuk 5/7 ) M3 8,071,000.00 807,100.00 887,810.00 40,355.00 - 9,806,265.00 9,806,000.00 10,786,600.00 109 Kayu Kamper ( Balok ) M3 5,702,000.00 570,200.00 627,220.00 28,510.00 - 6,927,930.00 6,927,000.00 7,619,700.00 110 Kayu Kamper ( Papan ) M3 6,240,000.00 624,000.00 686,400.00 31,200.00 - 7,581,600.00 7,581,000.00 8,339,100.00 111 Kayu Kamper ( Usuk 5/7 ) M3 4,432,000.00 443,200.00 487,520.00 22,160.00 - 5,384,880.00 5,384,000.00 5,922,400.00 112 Kayu Kruing ( Balok ) M3 4,088,000.00 408,800.00 449,680.00 20,440.00 - 4,966,920.00 4,966,000.00 5,462,600.00 113 Kayu Kruing ( Papan ) M3 4,325,000.00 432,500.00 475,750.00 21,625.00 - 5,254,875.00 5,254,000.00 5,779,400.00 114 Kayu Kruing ( Usuk 5/7 ) M3 3,648,000.00 364,800.00 401,280.00 18,240.00 - 4,432,320.00 4,432,000.00 4,875,200.00

Page 13: Analis Sni Ta 2008

Page 13 of 77

115 Kayu Meranti ( Balok ) M3 3,227,000.00 322,700.00 354,970.00 16,135.00 - 3,920,805.00 3,920,000.00 4,312,000.00 116 Kayu Meranti ( Papan ) M3 3,464,000.00 346,400.00 381,040.00 17,320.00 - 4,208,760.00 4,208,000.00 4,628,800.00 117 Kayu Meranti ( Usuk 5/7 ) M3 2,980,000.00 298,000.00 327,800.00 14,900.00 - 3,620,700.00 3,620,000.00 3,982,000.00 118 Kayu Tahun M3 1,090,000.00 109,000.00 119,900.00 5,450.00 - 1,324,350.00 1,324,000.00 1,456,400.00 119 Kayu Perancah M3 898,000.00 89,800.00 98,780.00 4,490.00 - 1,091,070.00 1,091,000.00 1,200,100.00 120 Glugu Tua M3 1,090,000.00 109,000.00 119,900.00 5,450.00 - 1,324,350.00 1,324,000.00 1,456,400.00 121 Kayu Dolken M3 947,000.00 94,700.00 104,170.00 4,735.00 - 1,150,605.00 1,150,000.00 1,265,000.00 122 Bambu Petung btg 17,000.00 1,700.00 1,870.00 85.00 - 20,655.00 20,600.00 22,660.00 123 Bambu Wulung btg 6,000.00 600.00 660.00 30.00 - 7,290.00 7,200.00 7,920.00 124 Bambu Ampel btg 3,000.00 300.00 330.00 15.00 - 3,645.00 3,600.00 3,960.00 125 Bambu Tali btg 7,000.00 700.00 770.00 35.00 - 8,505.00 8,500.00 9,350.00 126 Kloset Duduk / Monoblok Bh 860,000.00 86,000.00 94,600.00 4,300.00 - 1,044,900.00 1,044,000.00 1,148,400.00 127 Kloset Jongkok Porselen Bh 96,000.00 9,600.00 10,560.00 480.00 - 116,640.00 116,000.00 127,600.00 128 Washtafel Bh 295,000.00 29,500.00 32,450.00 1,475.00 - 358,425.00 358,000.00 393,800.00 129 Bak mandi Fiber Bh 128,000.00 12,800.00 14,080.00 640.00 - 155,520.00 155,000.00 170,500.00 130 Urinoir Bh 425,000.00 42,500.00 46,750.00 2,125.00 - 516,375.00 516,000.00 567,600.00 131 Pintu Aluminium uk 70 cm lengkap Bh 391,000.00 39,100.00 43,010.00 1,955.00 - 475,065.00 475,000.00 522,500.00 132 Pintu PVC uk 70 cm Polos lengkap Bh 268,000.00 26,800.00 29,480.00 1,340.00 - 325,620.00 325,000.00 357,500.00 133 Labur Gamping m3 94,000.00 9,400.00 10,340.00 470.00 - 114,210.00 114,000.00 125,400.00 134 Lem Kayu Kg 9,000.00 900.00 990.00 45.00 - 10,935.00 10,900.00 11,990.00 135 List Kayu Propil m' 3,000.00 300.00 330.00 15.00 - 3,645.00 3,600.00 3,960.00 136 Meni Besi Kg 11,000.00 1,100.00 1,210.00 55.00 - 13,365.00 13,000.00 14,300.00 137 Minyak Cat Liter 30,000.00 3,000.00 3,300.00 150.00 - 36,450.00 36,000.00 39,600.00 138 Nok Stel as bes Gelombang psg 23,000.00 2,300.00 2,530.00 115.00 - 27,945.00 27,000.00 29,700.00 139 Paku Biasa ( 1/2" - 1" ) Kg 10,000.00 1,000.00 1,100.00 50.00 - 12,150.00 12,000.00 13,200.00 140 Paku Biasa ( 2" - 5" ) Kg 7,000.00 700.00 770.00 35.00 - 8,505.00 8,500.00 9,350.00 141 Paku eternit, List ( 1/2" - 1" ) Kg 10,000.00 1,000.00 1,100.00 50.00 - 12,150.00 12,100.00 13,310.00 142 Paku Kait bj 640.00 64.00 70.40 3.20 - 777.60 770.00 847.00 143 Paku Payung bj 440.00 44.00 48.40 2.20 - 534.60 530.00 583.00 144 Paku Sumbat bj 440.00 44.00 48.40 2.20 - 534.60 530.00 583.00 145 Paku Sekrup 3,5" Bh 600.00 60.00 66.00 3.00 - 729.00 720.00 792.00 146 Paku Seng ( 1/2" - 1" ) Kg 21,000.00 2,100.00 2,310.00 105.00 - 25,515.00 25,500.00 28,050.00 147 Paku Usuk/Plafond/Reng ( 2" - 5" ) Kg 8,000.00 800.00 880.00 40.00 - 9,720.00 9,700.00 10,670.00 148 Pasir Beton M3 96,000.00 9,600.00 10,560.00 480.00 960.00 117,600.00 117,000.00 128,700.00 149 Pasir Pasang M3 92,000.00 9,200.00 10,120.00 460.00 920.00 112,700.00 112,000.00 123,200.00 150 Pasir urug M3 60,000.00 6,000.00 6,600.00 300.00 600.00 73,500.00 73,000.00 80,300.00 151 Paving Block Natural 6 cm M2 27,000.00 2,700.00 2,970.00 135.00 - 32,805.00 32,800.00 36,080.00 152 Paving Block t = 6 cm K - 300 M2 48,000.00 4,800.00 5,280.00 240.00 - 58,320.00 58,000.00 63,800.00 153 Paving Block t = 8 cm K - 400 M2 64,000.00 6,400.00 7,040.00 320.00 - 77,760.00 77,000.00 84,700.00 154 Paving Block Warna 6 cm M2 30,000.00 3,000.00 3,300.00 150.00 - 36,450.00 36,000.00 39,600.00 155 PC Tiga Roda 50 Kg zak 39,000.00 3,900.00 4,290.00 195.00 - 47,385.00 47,000.00 51,700.00 156 PC Nusantara 50 Kg zak 38,000.00 3,800.00 4,180.00 190.00 - 46,170.00 46,000.00 50,600.00 157 PC Gresik 50 Kg zak 37,000.00 3,700.00 4,070.00 185.00 - 44,955.00 44,900.00 49,390.00 158 PC Warna / Nat Kg 5,000.00 500.00 550.00 25.00 - 6,075.00 6,000.00 6,600.00 159 Pegangan Pintu / Door Holder bh - - - - - - - - 160 Plamir Kayu kg 12,000.00 1,200.00 1,320.00 60.00 - 14,580.00 14,000.00 15,400.00 161 Plamir Tembok kg 6,000.00 600.00 660.00 30.00 - 7,290.00 7,200.00 7,920.00 162 Plywood Tb. 9 mm - - - - - - - -

Page 14: Analis Sni Ta 2008

Page 14 of 77

163 Politur - - - - - - - - 164 Politur Jadi 13,000.00 1,300.00 1,430.00 65.00 130.00 15,925.00 15,900.00 17,490.00 165 Rel Pintu Dorong Bh 288,000.00 28,800.00 31,680.00 1,440.00 - 349,920.00 349,000.00 383,900.00 166 Residu dan Ter liter 2,650.00 265.00 291.50 13.25 - 3,219.75 3,200.00 3,520.00 167 Seal Tape Bh 1,410.00 141.00 155.10 7.05 - 1,713.15 1,700.00 1,870.00 168 Seng Gelombang 3" x 6" BJLS 20 M2 23,000.00 2,300.00 2,530.00 115.00 - 27,945.00 27,900.00 30,690.00 169 Seng Gelombang 3" x 6" BJLS 30 M2 29,000.00 2,900.00 3,190.00 145.00 - 35,235.00 35,200.00 38,720.00 170 Seng Plat 3" x 6" BJLS 30 M2 21,000.00 2,100.00 2,310.00 105.00 - 25,515.00 25,500.00 28,050.00 171 Sirtu M3 52,000.00 5,200.00 5,720.00 260.00 - 63,180.00 63,100.00 69,410.00 172 Sirlak kg 61,000.00 6,100.00 6,710.00 305.00 - 74,115.00 74,100.00 81,510.00 173 Soda Api liter 14,000.00 1,400.00 1,540.00 70.00 - 17,010.00 17,000.00 18,700.00 174 Spritus litter - - - - - - - - 175 Tali Ijuk kg - - - - - - - - 176 Tir Kayu litter 2,600.00 260.00 286.00 13.00 - 3,159.00 3,100.00 3,410.00 177 Triplek 3 mm x 1,20 x 2,40 M lbr 38,000.00 3,800.00 4,180.00 190.00 - 46,170.00 46,000.00 50,600.00 178 Triplek 4 mm x 1,20 x 2,40 M lbr 45,000.00 4,500.00 4,950.00 225.00 - 54,675.00 54,000.00 59,400.00 179 Triplek 6 mm x 1,20 x 2,40 M lbr 59,000.00 5,900.00 6,490.00 295.00 - 71,685.00 71,000.00 78,100.00 180 Multiplek 9 mm x 0,90 x 2,10 M lbr 123,000.00 12,300.00 13,530.00 615.00 - 149,445.00 149,000.00 163,900.00 181 Multiplek 12 mm x 0,90 x 2,10 M lbr 123,000.00 12,300.00 13,530.00 615.00 - 149,445.00 149,000.00 163,900.00 182 Teakwood 3 mm x 0,90 x 2,10 M lbr 51,000.00 5,100.00 5,610.00 255.00 - 61,965.00 61,000.00 67,100.00 183 Lampu Pijar 5 Watt bh 3,000.00 300.00 330.00 15.00 - 3,645.00 3,600.00 3,960.00 184 Lampu Pijar 10 Watt bh 3,000.00 300.00 330.00 15.00 - 3,645.00 3,600.00 3,960.00 185 Lampu Pijar 15 Watt bh 3,700.00 370.00 407.00 18.50 - 4,495.50 4,400.00 4,840.00 186 Lampu Pijar 25 Watt bh 3,900.00 390.00 429.00 19.50 - 4,738.50 4,700.00 5,170.00 187 Lampu Pijar 40 Watt bh 3,900.00 390.00 429.00 19.50 - 4,738.50 4,700.00 5,170.00 188 Water drain + accessories batang - - - - - - - - 189 Pipa galvanis Bahan Rambu 1,5 Inc Medium A batang 244,000.00 24,400.00 26,840.00 1,220.00 - 296,460.00 296,000.00 325,600.00 190 Pipa galvanis Bahan Rambu 1,5 Inc Medium B batang 256,000.00 25,600.00 28,160.00 1,280.00 - 311,040.00 311,000.00 342,100.00 191 Pipa galvanis Bahan Rambu 1,5 Inc batang 212,000.00 21,200.00 23,320.00 1,060.00 - 257,580.00 257,000.00 282,700.00 192 Pipa galvanis Bahan Rambu 2 Inc Medium A batang 287,000.00 28,700.00 31,570.00 1,435.00 - 348,705.00 348,000.00 382,800.00 193 Pipa galvanis Bahan Rambu 2 Inc Medium A batang 297,000.00 29,700.00 32,670.00 1,485.00 - 360,855.00 360,000.00 396,000.00 194 Pipa galvanis Bahan Rambu 2 Inc m' 230,000.00 23,000.00 25,300.00 1,150.00 - 279,450.00 279,000.00 306,900.00 195 Pipa Gip 4" Medium A (P.6M) m' 160,000.00 16,000.00 17,600.00 800.00 - 194,400.00 194,000.00 213,400.00 196 Pipa Gip 3" Medium A (P.6M) m' 108,000.00 10,800.00 11,880.00 540.00 - 131,220.00 131,000.00 144,100.00 197 Pipa Gip 2" Medium A (P.6M) m' 63,000.00 6,300.00 6,930.00 315.00 - 76,545.00 76,000.00 83,600.00 198 Pipa Gip 1 1/2" Medium A (P.6M) m' 44,000.00 4,400.00 4,840.00 220.00 - 53,460.00 53,000.00 58,300.00 199 Pipa Gip 1 " Medium A (P.6M) m' 26,000.00 2,600.00 2,860.00 130.00 - 31,590.00 31,000.00 34,100.00 200 Pipa Gip 3/4" Medium A (P.6M) m' 23,000.00 2,300.00 2,530.00 115.00 - 27,945.00 27,000.00 29,700.00 201 Pipa Gip 1/2" Medium A (P.6M) m' 19,000.00 1,900.00 2,090.00 95.00 - 23,085.00 23,000.00 25,300.00 202 Pipa Gip 4" Medium B (P.6M) m' 87,000.00 8,700.00 9,570.00 435.00 - 105,705.00 105,000.00 115,500.00 203 Pipa Gip 3" Medium B (P.6M) m' 66,000.00 6,600.00 7,260.00 330.00 - 80,190.00 80,000.00 88,000.00 204 Pipa Gip 2" Medium B (P.6M) m' 42,000.00 4,200.00 4,620.00 210.00 - 51,030.00 51,000.00 56,100.00 205 Pipa Gip 1 1/2" Medium B (P.6M) m' 25,000.00 2,500.00 2,750.00 125.00 - 30,375.00 30,000.00 33,000.00 206 Pipa Gip 1 " Medium B (P.6M) m' 87,000.00 8,700.00 9,570.00 435.00 - 105,705.00 105,000.00 115,500.00 207 Pipa Gip 3/4" Medium B (P.6M) m' 66,000.00 6,600.00 7,260.00 330.00 - 80,190.00 80,000.00 88,000.00 208 Pipa PVC 6" S 12,5 10 Bar m' 110,000.00 11,000.00 12,100.00 550.00 - 133,650.00 133,000.00 146,300.00 209 Pipa PVC 4" S 12,5 10 Bar m' 55,000.00 5,500.00 6,050.00 275.00 - 66,825.00 66,000.00 72,600.00 210 Pipa PVC 3" S 12,5 10 Bar m' 37,500.00 3,750.00 4,125.00 187.50 - 45,562.50 45,000.00 49,500.00

Page 15: Analis Sni Ta 2008

Page 15 of 77

211 Pipa PVC 2" S 12,5 10 Bar m' 17,500.00 1,750.00 1,925.00 87.50 - 21,262.50 21,000.00 23,100.00 212 Pipa PVC 1 1/2" S 12,5 10 Bar m' 13,000.00 1,300.00 1,430.00 65.00 - 15,795.00 15,000.00 16,500.00 213 Pipa PVC 1 1/2" S 10 10 Bar m' 15,000.00 1,500.00 1,650.00 75.00 - 18,225.00 18,000.00 19,800.00 214 Pipa PVC 1 1/4" S 10 10 Bar m' 10,000.00 1,000.00 1,100.00 50.00 - 12,150.00 12,000.00 13,200.00 215 Pipa PVC 1" S 10 10 Bar m' 7,000.00 700.00 770.00 35.00 - 8,505.00 8,000.00 8,800.00 216 Pipa PVC 3/4" S 10 10 Bar m' 4,000.00 400.00 440.00 20.00 - 4,860.00 4,000.00 4,400.00 217 Pipa PVC 1/2" S 10 10 Bar m' 3,000.00 300.00 330.00 15.00 - 3,645.00 3,000.00 3,300.00 218 Pipa PVC 4" S 16 8 Bar m' 45,000.00 4,500.00 4,950.00 225.00 - 54,675.00 54,000.00 59,400.00 219 Pipa PVC 3" S 16 8 Bar m' 30,000.00 3,000.00 3,300.00 150.00 - 36,450.00 36,000.00 39,600.00 220 Pipa PVC 2" S 16 8 Bar m' 17,000.00 1,700.00 1,870.00 85.00 - 20,655.00 20,000.00 22,000.00 221 Pipa PVC 4" Aw m' 40,000.00 4,000.00 4,400.00 200.00 - 48,600.00 48,000.00 52,800.00 222 Pipa PVC 3" Aw m' 23,900.00 2,390.00 2,629.00 119.50 - 29,038.50 29,000.00 31,900.00 223 Pipa PVC 2" Aw m' 12,000.00 1,200.00 1,320.00 60.00 - 14,580.00 14,000.00 15,400.00 224 Pipa PVC 1 1/2" Aw m' 9,000.00 900.00 990.00 45.00 - 10,935.00 10,000.00 11,000.00 225 Pipa PVC 1 1/4" Aw m' 7,500.00 750.00 825.00 37.50 - 9,112.50 9,000.00 9,900.00 226 Pipa PVC 1" Aw m' 5,000.00 500.00 550.00 25.00 - 6,075.00 6,000.00 6,600.00 227 Pipa PVC 3/4" Aw m' 4,000.00 400.00 440.00 20.00 - 4,860.00 4,000.00 4,400.00 228 Pipa PVC 1/2" Aw buah 2,600.00 260.00 286.00 13.00 - 3,159.00 3,000.00 3,300.00 229 Stop Kran (valve) Kitz 4" buah 2,552,000.00 255,200.00 280,720.00 12,760.00 - 3,100,680.00 3,100,000.00 3,410,000.00 230 Stop Kran (valve) Kitz 8" buah 832,000.00 83,200.00 91,520.00 4,160.00 - 1,010,880.00 1,010,000.00 1,111,000.00 231 Stop Kran (valve) Kitz 2" buah 277,000.00 27,700.00 30,470.00 1,385.00 - 336,555.00 336,000.00 369,600.00 232 Stop Kran (valve) Kitz 1,5" buah 139,000.00 13,900.00 15,290.00 695.00 - 168,885.00 168,000.00 184,800.00 233 Stop Kran (valve) Kitz 1" buah 110,000.00 11,000.00 12,100.00 550.00 - 133,650.00 133,000.00 146,300.00 234 Stop Kran (valve) Kitz 3/4" buah 72,000.00 7,200.00 7,920.00 360.00 - 87,480.00 87,000.00 95,700.00 235 Stop Kran (valve) Kitz 1/2" buah 49,000.00 4,900.00 5,390.00 245.00 - 59,535.00 59,000.00 64,900.00 236 Knee PVC 4 " buah 142,000.00 14,200.00 15,620.00 710.00 - 172,530.00 172,000.00 189,200.00 237 Knee PVC 3 " buah 85,000.00 8,500.00 9,350.00 425.00 - 103,275.00 103,000.00 113,300.00 238 Knee PVC 2 " buah 36,000.00 3,600.00 3,960.00 180.00 - 43,740.00 43,000.00 47,300.00 239 Knee PVC 1 1/2 " buah 8,600.00 860.00 946.00 43.00 - 10,449.00 10,400.00 11,440.00 240 Knee PVC 1 1/4 " buah 5,300.00 530.00 583.00 26.50 - 6,439.50 6,400.00 7,040.00 241 Knee PVC 1 " buah 3,500.00 350.00 385.00 17.50 - 4,252.50 4,200.00 4,620.00 242 Knee PVC 3/4 " buah 2,100.00 210.00 231.00 10.50 - 2,551.50 2,500.00 2,750.00 243 Knee PVC 1/2 " buah 1,700.00 170.00 187.00 8.50 - 2,065.50 2,000.00 2,200.00 244 Sock PVC 3" buah 8,800.00 880.00 968.00 44.00 - 10,692.00 10,600.00 11,660.00 245 Sock PVC 2" buah 5,800.00 580.00 638.00 29.00 - 7,047.00 7,000.00 7,700.00 246 Sock PVC 1" buah 2,600.00 260.00 286.00 13.00 - 3,159.00 3,100.00 3,410.00 247 Knee Drat Gip 4" buah 67,000.00 6,700.00 7,370.00 335.00 - 81,405.00 81,000.00 89,100.00 248 Knee Drat Gip 3" buah 36,000.00 3,600.00 3,960.00 180.00 - 43,740.00 43,000.00 47,300.00 249 Knee Drat Gip 2" buah 12,000.00 1,200.00 1,320.00 60.00 - 14,580.00 14,000.00 15,400.00 250 Knee Drat Gip 1 1/4" buah 8,000.00 800.00 880.00 40.00 - 9,720.00 9,700.00 10,670.00 251 Knee Drat Gip 1 1/2" buah 10,000.00 1,000.00 1,100.00 50.00 - 12,150.00 12,000.00 13,200.00 252 Knee Drat Gip 1" buah 3,600.00 360.00 396.00 18.00 - 4,374.00 4,300.00 4,730.00 253 Knee Drat Gip 1/2" buah 3,200.00 320.00 352.00 16.00 - 3,888.00 3,800.00 4,180.00 254 Knee Drat Gip 3/4" buah 3,100.00 310.00 341.00 15.50 - 3,766.50 3,700.00 4,070.00 255 Sock Drat Gip 4" buah 51,000.00 5,100.00 5,610.00 255.00 - 61,965.00 61,000.00 67,100.00 256 SockDrat Gip 3" buah 36,000.00 3,600.00 3,960.00 180.00 - 43,740.00 43,000.00 47,300.00 257 Sokc Drat Gip 2" buah 8,000.00 800.00 880.00 40.00 - 9,720.00 9,700.00 10,670.00 258 Sokc Drat Gip 1 1/2" buah 6,400.00 640.00 704.00 32.00 - 7,776.00 7,700.00 8,470.00

Page 16: Analis Sni Ta 2008

Page 16 of 77

259 Sokc Drat Gip 1 1/4" buah 6,100.00 610.00 671.00 30.50 - 7,411.50 7,400.00 8,140.00 260 Sokc Drat Gip 1" buah 3,600.00 360.00 396.00 18.00 - 4,374.00 4,300.00 4,730.00 261 Sokc Drat Gip 3/4" buah 2,400.00 240.00 264.00 12.00 - 2,916.00 2,900.00 3,190.00 262 Sokc Drat Gip 1/2" buah 1,600.00 160.00 176.00 8.00 - 1,944.00 1,900.00 2,090.00 263 Water meter buah 169,000.00 16,900.00 18,590.00 845.00 - 205,335.00 205,000.00 225,500.00 264 Kran 3/4" buah 17,900.00 1,790.00 1,969.00 89.50 - 21,748.50 21,700.00 23,870.00 265 Kran 1/2" buah 12,800.00 1,280.00 1,408.00 64.00 - 15,552.00 15,500.00 17,050.00 266 Tangki Fiberglass 2M3 buah 3,882,000.00 388,200.00 427,020.00 19,410.00 - 4,716,630.00 4,716,000.00 5,187,600.00 267 Air Valve 20 mm buah 140,000.00 14,000.00 15,400.00 700.00 - 170,100.00 170,000.00 187,000.00 268 Air Valve 3/4 mm buah 154,000.00 15,400.00 16,940.00 770.00 - 187,110.00 187,000.00 205,700.00 269 Bend GIP 90 2" buah 28,000.00 2,800.00 3,080.00 140.00 - 34,020.00 34,000.00 37,400.00 270 Bend GIP 90 3" buah 82,000.00 8,200.00 9,020.00 410.00 - 99,630.00 99,600.00 109,560.00 271 Bend GIP 90 4" buah 170,000.00 17,000.00 18,700.00 850.00 - 206,550.00 206,000.00 226,600.00 272 Bend GIP 75 X 90 buah 79,000.00 7,900.00 8,690.00 395.00 - 95,985.00 95,000.00 104,500.00 273 Bend PVC 45' 2" buah 96,000.00 9,600.00 10,560.00 480.00 - 116,640.00 116,000.00 127,600.00 274 Bend PVC 45' 3" buah 114,000.00 11,400.00 12,540.00 570.00 - 138,510.00 138,000.00 151,800.00 275 Bend PVC 45' 4" buah 170,000.00 17,000.00 18,700.00 850.00 - 206,550.00 206,000.00 226,600.00 276 Bend Soket PVC DN 50x45 buah 75,000.00 7,500.00 8,250.00 375.00 - 91,125.00 91,000.00 100,100.00 277 Bend Soket PVC DN 75x45 buah 89,000.00 8,900.00 9,790.00 445.00 - 108,135.00 108,000.00 118,800.00 278 Claim Sadle 2" x 1/2" buah 14,100.00 1,410.00 1,551.00 70.50 - 17,131.50 17,100.00 18,810.00 279 Claim Sadle DN 60 x 25 mm buah 16,100.00 1,610.00 1,771.00 80.50 - 19,561.50 19,500.00 21,450.00 280 Claim Sadle DN 50 x 20 mm buah 15,200.00 1,520.00 1,672.00 76.00 - 18,468.00 18,400.00 20,240.00 281 Dop PVC DN 20 mm buah 19,400.00 1,940.00 2,134.00 97.00 - 23,571.00 23,500.00 25,850.00 282 Dop GIP 1/2" AW buah 2,000.00 200.00 220.00 10.00 - 2,430.00 2,400.00 2,640.00 283 Dop GIP 3/4" AW buah 2,400.00 240.00 264.00 12.00 - 2,916.00 2,900.00 3,190.00 284 Dop GIP 1" AW buah 26,500.00 2,650.00 2,915.00 132.50 - 32,197.50 32,100.00 35,310.00 285 Dop GIP 1 1/4" AW buah 3,600.00 360.00 396.00 18.00 - 4,374.00 4,300.00 4,730.00 286 Dop GIP 1 1/2" AW buah 5,200.00 520.00 572.00 26.00 - 6,318.00 6,300.00 6,930.00 287 Dop GIP 2" AW buah 8,000.00 800.00 880.00 40.00 - 9,720.00 9,700.00 10,670.00 288 Dop GIP 3" AW buah 21,200.00 2,120.00 2,332.00 106.00 - 25,758.00 25,700.00 28,270.00 289 Dop GIP 4" AW buah 36,300.00 3,630.00 3,993.00 181.50 - 44,104.50 44,000.00 48,400.00 290 Double Nipple GIP 4" buah 93,800.00 9,380.00 10,318.00 469.00 - 113,967.00 113,000.00 124,300.00 291 Double Nipple GIP 3" buah 27,400.00 2,740.00 3,014.00 137.00 - 33,291.00 33,000.00 36,300.00 292 Double Nipple GIP 2" buah 9,200.00 920.00 1,012.00 46.00 - 11,178.00 11,100.00 12,210.00 293 Double Nipple GIP 1 1/2" buah 6,600.00 660.00 726.00 33.00 - 8,019.00 8,000.00 8,800.00 294 Double Nipple GIP 1 1/4" buah 4,200.00 420.00 462.00 21.00 - 5,103.00 5,100.00 5,610.00 295 Double Nipple GIP 1" buah 3,200.00 320.00 352.00 16.00 - 3,888.00 3,800.00 4,180.00 296 Double Nipple GIP 3/4" buah 2,400.00 240.00 264.00 12.00 - 2,916.00 2,900.00 3,190.00 297 Double Nipple GIP 1/2" buah 2,200.00 220.00 242.00 11.00 - 2,673.00 2,600.00 2,860.00 298 Double Nipple GIP DN 20 mm buah 4,400.00 440.00 484.00 22.00 - 5,346.00 5,300.00 5,830.00 299 Fland Spigot Diameter 2 buah 166,000.00 16,600.00 18,260.00 830.00 - 201,690.00 201,000.00 221,100.00 300 Fouchet Elbouw PVC DN 20 mm buah 6,400.00 640.00 704.00 32.00 - 7,776.00 7,700.00 8,470.00 301 Flange 4" buah 138,000.00 13,800.00 15,180.00 690.00 - 167,670.00 167,000.00 183,700.00 302 Flange 3" buah 110,000.00 11,000.00 12,100.00 550.00 - 133,650.00 133,000.00 146,300.00 303 Flange 2 1/2" buah 93,000.00 9,300.00 10,230.00 465.00 - 112,995.00 112,000.00 123,200.00 304 Flange 2" buah 83,000.00 8,300.00 9,130.00 415.00 - 100,845.00 100,000.00 110,000.00 305 Flange DN 75 MM buah 41,000.00 4,100.00 4,510.00 205.00 - 49,815.00 49,000.00 53,900.00 306 Flange DN 50 MM buah 36,000.00 3,600.00 3,960.00 180.00 - 43,740.00 43,000.00 47,300.00

Page 17: Analis Sni Ta 2008

Page 17 of 77

307 Lem PVC buah 55,000.00 5,500.00 6,050.00 275.00 - 66,825.00 66,000.00 72,600.00 308 Floating Valve DN 20 mm buah 42,000.00 4,200.00 4,620.00 210.00 - 51,030.00 51,000.00 56,100.00 309 Floating Valve Kitz 1" buah 387,000.00 38,700.00 42,570.00 1,935.00 - 470,205.00 470,000.00 517,000.00 310 Floating Valve Kitz 3/4" buah 276,000.00 27,600.00 30,360.00 1,380.00 - 335,340.00 335,000.00 368,500.00 311 Floating Valve Kitz 1/2" buah 193,000.00 19,300.00 21,230.00 965.00 - 234,495.00 234,000.00 257,400.00 312 GilbouLiter Joint 4" buah 72,100.00 7,210.00 7,931.00 360.50 - 87,601.50 87,000.00 95,700.00 313 GilbouLiter Joint 3" buah 58,000.00 5,800.00 6,380.00 290.00 - 70,470.00 70,000.00 77,000.00 314 GilbouLiter Joint 2" buah 43,800.00 4,380.00 4,818.00 219.00 - 53,217.00 53,000.00 58,300.00 315 GilbouLiter Joint 1 1/2" buah 38,500.00 3,850.00 4,235.00 192.50 - 46,777.50 46,000.00 50,600.00 316 GilbouLiter DN 50 mm buah 50,000.00 5,000.00 5,500.00 250.00 - 60,750.00 60,000.00 66,000.00 317 GilbouLiter DN 75 mm buah 75,200.00 7,520.00 8,272.00 376.00 - 91,368.00 91,000.00 100,100.00 318 Keni GIP DN 20 mm buah 4,400.00 440.00 484.00 22.00 - 5,346.00 5,300.00 5,830.00 319 Keni PVC DN 20 mm buah 2,600.00 260.00 286.00 13.00 - 3,159.00 3,100.00 3,410.00 320 Mur dan Baut buah 3,000.00 300.00 330.00 15.00 - 3,645.00 3,600.00 3,960.00 321 Plug DN 20 mm buah 4,400.00 440.00 484.00 22.00 - 5,346.00 5,300.00 5,830.00 322 Plug GI 4" buah 41,400.00 4,140.00 4,554.00 207.00 - 50,301.00 50,000.00 55,000.00 323 Plug GI 3" buah 25,700.00 2,570.00 2,827.00 128.50 - 31,225.50 31,000.00 34,100.00 324 Plug GI 2" buah 8,800.00 880.00 968.00 44.00 - 10,692.00 10,600.00 11,660.00 325 Plug GI 1 1/2" buah 6,400.00 640.00 704.00 32.00 - 7,776.00 7,700.00 8,470.00 326 Plug GI 1 1/4" buah 4,000.00 400.00 440.00 20.00 - 4,860.00 4,800.00 5,280.00 327 Plug GI 1" buah 26,500.00 2,650.00 2,915.00 132.50 - 32,197.50 32,100.00 35,310.00 328 Plug GI 3/4" buah 2,000.00 200.00 220.00 10.00 - 2,430.00 2,400.00 2,640.00 329 Plug GI 1/2" buah 1,600.00 160.00 176.00 8.00 - 1,944.00 1,900.00 2,090.00 330 Reducer DN 3/4" x 1/2" buah 3,500.00 350.00 385.00 17.50 - 4,252.50 4,200.00 4,620.00 331 Reducer DN 75 x 50 mm buah 62,900.00 6,290.00 6,919.00 314.50 - 76,423.50 76,000.00 83,600.00 332 Reducer GIP 1/2" - 3/4" buah 3,300.00 330.00 363.00 16.50 - 4,009.50 4,000.00 4,400.00 333 Reducer GIP 1/2" - 1" buah 3,700.00 370.00 407.00 18.50 - 4,495.50 4,400.00 4,840.00 334 Reducer GIP 1" - 1 1/4" buah 5,300.00 530.00 583.00 26.50 - 6,439.50 6,400.00 7,040.00 335 Reducer GIP 1" - 2" buah 10,700.00 1,070.00 1,177.00 53.50 - 13,000.50 13,000.00 14,300.00 336 Reducer GIP 2" - 3" buah 38,700.00 3,870.00 4,257.00 193.50 - 47,020.50 47,000.00 51,700.00 337 Reducer GIP 3" - 4" buah 54,900.00 5,490.00 6,039.00 274.50 - 66,703.50 66,000.00 72,600.00 338 Reducer PVC 1/2" - 3/4" buah 2,100.00 210.00 231.00 10.50 - 2,551.50 2,500.00 2,750.00 339 Reducer PVC 1/2" - 1" buah 2,100.00 210.00 231.00 10.50 - 2,551.50 2,500.00 2,750.00 340 Reducer PVC 1" - 1 1/4" buah 3,700.00 370.00 407.00 18.50 - 4,495.50 4,400.00 4,840.00 341 Reducer PVC 1" - 1 1/2" buah 4,000.00 400.00 440.00 20.00 - 4,860.00 4,800.00 5,280.00 342 Reducer PVC 1" - 2" buah 5,300.00 530.00 583.00 26.50 - 6,439.50 6,400.00 7,040.00 343 Reducer PVC 1 1/2" - 2" buah 6,800.00 680.00 748.00 34.00 - 8,262.00 8,200.00 9,020.00 344 Reducer PVC 2" - 3" buah 8,600.00 860.00 946.00 43.00 - 10,449.00 10,400.00 11,440.00 345 Reducer PVC 3" - 4" buah 13,200.00 1,320.00 1,452.00 66.00 - 16,038.00 16,000.00 17,600.00 346 Saringan 4" CI buah 154,000.00 15,400.00 16,940.00 770.00 - 187,110.00 187,000.00 205,700.00 347 Saringan 3" CI buah 133,000.00 13,300.00 14,630.00 665.00 - 161,595.00 161,000.00 177,100.00 348 Saringan 2" CI buah 122,000.00 12,200.00 13,420.00 610.00 - 148,230.00 148,000.00 162,800.00 349 SLD PVC DN 20 mm buah 2,000.00 200.00 220.00 10.00 - 2,430.00 2,400.00 2,640.00 350 SDL PVC 4" buah 191,000.00 19,100.00 21,010.00 955.00 - 232,065.00 232,000.00 255,200.00 351 SDL PVC 3" buah 78,000.00 7,800.00 8,580.00 390.00 - 94,770.00 94,000.00 103,400.00 352 SDL PVC 2" buah 42,900.00 4,290.00 4,719.00 214.50 - 52,123.50 52,000.00 57,200.00 353 SDL PVC 1 1/2" buah 15,000.00 1,500.00 1,650.00 75.00 - 18,225.00 18,200.00 20,020.00 354 SDL PVC 1 1/4" buah 8,600.00 860.00 946.00 43.00 - 10,449.00 10,400.00 11,440.00

Page 18: Analis Sni Ta 2008

Page 18 of 77

355 SDL PVC 1" buah 5,300.00 530.00 583.00 26.50 - 6,439.50 6,400.00 7,040.00 356 SDL PVC 3/4" buah 5,300.00 530.00 583.00 26.50 - 6,439.50 6,400.00 7,040.00 357 SDL PVC 1/2" buah 5,100.00 510.00 561.00 25.50 - 6,196.50 6,100.00 6,710.00 358 Sok Drat GIP 4" buah 51,900.00 5,190.00 5,709.00 259.50 - 63,058.50 63,000.00 69,300.00 359 Sok Drat GIP 3" buah 36,300.00 3,630.00 3,993.00 181.50 - 44,104.50 44,000.00 48,400.00 360 Sok Drat GIP 2" buah 8,000.00 800.00 880.00 40.00 - 9,720.00 9,700.00 10,670.00 361 Sok Drat GIP 1 1/2" buah 6,400.00 640.00 704.00 32.00 - 7,776.00 7,700.00 8,470.00 362 Sok Drat GIP 1 1/4" buah 5,300.00 530.00 583.00 26.50 - 6,439.50 6,400.00 7,040.00 363 Sok Drat GIP 1" buah 36,300.00 3,630.00 3,993.00 181.50 - 44,104.50 44,000.00 48,400.00 364 Sok Drat GIP 3/4" buah 2,400.00 240.00 264.00 12.00 - 2,916.00 2,900.00 3,190.00 365 Sok Drat GIP 1/2" buah 1,600.00 160.00 176.00 8.00 - 1,944.00 1,900.00 2,090.00 366 Sock GIP DN 75 mm buah 17,700.00 1,770.00 1,947.00 88.50 - 21,505.50 21,500.00 23,650.00 367 Sock GIP DN 20 mm buah 4,400.00 440.00 484.00 22.00 - 5,346.00 5,300.00 5,830.00 368 Stop Valve Bras DN 20 mm buah 52,200.00 5,220.00 5,742.00 261.00 - 63,423.00 63,000.00 69,300.00 369 Stop Valve Bras DN 50 mm buah 111,000.00 11,100.00 12,210.00 555.00 - 134,865.00 134,000.00 147,400.00 370 Stop Valve Bras DN 75 mm buah 310,000.00 31,000.00 34,100.00 1,550.00 - 376,650.00 376,000.00 413,600.00 371 TBA buah 1,700.00 170.00 187.00 8.50 - 2,065.50 2,000.00 2,200.00 372 Tee GIP 4" buah 83,200.00 8,320.00 9,152.00 416.00 - 101,088.00 101,000.00 111,100.00 373 Tee GIP 3" buah 46,900.00 4,690.00 5,159.00 234.50 - 56,983.50 56,000.00 61,600.00 374 Tee GIP 2" buah 15,400.00 1,540.00 1,694.00 77.00 - 18,711.00 18,700.00 20,570.00 375 Tee GIP 1 1/2" buah 10,600.00 1,060.00 1,166.00 53.00 - 12,879.00 12,800.00 14,080.00 376 Tee GIP 1 1/4" buah 8,000.00 800.00 880.00 40.00 - 9,720.00 9,700.00 10,670.00 377 Tee GIP 1" buah 5,300.00 530.00 583.00 26.50 - 6,439.50 6,400.00 7,040.00 378 Tee GIP 3/4" buah 3,600.00 360.00 396.00 18.00 - 4,374.00 4,300.00 4,730.00 379 Tee GIP 1/2" buah 2,400.00 240.00 264.00 12.00 - 2,916.00 2,900.00 3,190.00 380 Tee PVC 4" x 4" SC buah 167,000.00 16,700.00 18,370.00 835.00 - 202,905.00 202,000.00 222,200.00 381 Tee PVC 4" x 3" SC buah 230,000.00 23,000.00 25,300.00 1,150.00 - 279,450.00 279,000.00 306,900.00 382 Tee PVC 4" x 2" SC buah 230,000.00 23,000.00 25,300.00 1,150.00 - 279,450.00 279,000.00 306,900.00 383 Tee PVC 3" x 3" SC buah 105,000.00 10,500.00 11,550.00 525.00 - 127,575.00 127,000.00 139,700.00 384 Tee PVC 3" x 2" SC buah 182,000.00 18,200.00 20,020.00 910.00 - 221,130.00 221,000.00 243,100.00 385 Tee PVC 3" x 1 1/2" SC buah 188,000.00 18,800.00 20,680.00 940.00 - 228,420.00 228,000.00 250,800.00 386 Tee PVC 2" x 2" SC buah 38,000.00 3,800.00 4,180.00 190.00 - 46,170.00 46,000.00 50,600.00 387 Tee PVC 2" x 2 1/2" SC buah 42,900.00 4,290.00 4,719.00 214.50 - 52,123.50 52,000.00 57,200.00 388 Tee PVC 2" x 1" SC buah 38,000.00 3,800.00 4,180.00 190.00 - 46,170.00 46,000.00 50,600.00 389 Tee GIP DN 20 mm buah 2,400.00 240.00 264.00 12.00 - 2,916.00 2,900.00 3,190.00 390 Tee GIP DN 50 mm buah 11,000.00 1,100.00 1,210.00 55.00 - 13,365.00 13,300.00 14,630.00 391 Tee Socket DN 50 x 50 mm buah 50,600.00 5,060.00 5,566.00 253.00 - 61,479.00 61,000.00 67,100.00 392 Tee Socket DN 75 x 50 mm buah 160,300.00 16,030.00 17,633.00 801.50 - 194,764.50 194,000.00 213,400.00

Page 19: Analis Sni Ta 2008

Page 19 of 77

DAFTAR PERHITUNGAN HARGA MATERIAL DAN UPAH PEKERJA TAHUN ANGGARAN 2008(HARGA BORONGAN)

INDEX HARGA

12

30,000.00 27,500.00 35,000.00 35,000.00 35,000.00 35,000.00 35,000.00 35,000.00 35,000.00 60,000.00 50,000.00 45,000.00 37,000.00 40,000.00 40,000.00

2,310.00 14,080.00 2,200.00 37,000.00

180,400.00 350.00 150,700.00 90,000.00 115,000.00 91,300.00 104,500.00 107,800.00 138,600.00 170,000.00 180,000.00 195,000.00 195,000.00

Page 20: Analis Sni Ta 2008

Page 20 of 77

195,000.00 8,250.00 48,400.00 60,500.00

11,275.00 9,185.00 12,650.00 12,650.00 9,075.00 45,000.00 60,000.00 130,000.00 154,000.00 227,150.00 275,000.00 16,500.00 24,200.00 33,000.00 200,475.00 18,700.00 14,575.00 12,650.00 8,470.00

35,200.00 22,000.00 14,575.00 11,500.00 235,500.00 26,400.00 8,250.00 5,500.00 11,000.00 3,850.00 5,500.00 17,600.00 6,050.00 88,000.00 39,600.00 3,740.00 13,200.00 18,700.00 6,600.00 23,100.00

800.00 4,950.00

Page 21: Analis Sni Ta 2008

Page 21 of 77

935.00 1,210.00 4,125.00 2,750.00 4,125.00 4,180.00 3,025.00 48,400.00 12,650.00 51,700.00 66,825.00 151,000.00 159,500.00

130,000.00 180,000.00 2,695.00 16,500.00 60,500.00 38,000.00 5,500.00 6,050.00 2,860.00 49,500.00 7,260.00 6,930.00 40,700.00 47,850.00 47,850.00

47,520.00 44,000.00 56,100.00 52,800.00 800.00 2,090.00 7,370,000.00 7,751,700.00 6,442,700.00 12,688,500.00 12,113,200.00 10,026,500.00 7,083,450.00 7,751,700.00 5,506,600.00 5,078,700.00 5,373,500.00 4,532,000.00

Page 22: Analis Sni Ta 2008

Page 22 of 77

4,009,500.00 4,304,300.00 3,702,600.00 1,355,000.00 1,116,500.00 1,355,000.00 1,177,000.00 22,000.00 8,250.00 4,150.00 8,800.00 1,069,200.00 119,900.00 367,400.00 159,500.00 528,000.00 486,000.00 334,000.00 117,700.00 11,500.00 3,950.00 14,300.00 38,500.00 29,700.00 12,650.00 9,735.00 12,650.00 800.00 550.00 550.00 750.00 26,730.00 10,150.00 120,000.00 115,000.00 75,000.00 34,650.00 59,950.00 80,300.00 37,950.00 48,000.00 46,500.00 45,150.00 6,600.00

15,125.00 7,500.00

Page 23: Analis Sni Ta 2008

Page 23 of 77

16,500.00 358,600.00 3,300.00 1,760.00 29,700.00 36,300.00 26,950.00 65,000.00 76,500.00 17,600.00

3,300.00 48,400.00 56,100.00 73,700.00 154,000.00 154,000.00 63,800.00 3,850.00 3,850.00 4,620.00 4,950.00 4,950.00

304,150.00 319,000.00 264,000.00 357,500.00 369,600.00 286,000.00 199,100.00 135,300.00 79,350.00 55,000.00 32,725.00 29,150.00 24,000.00 108,350.00 83,050.00 53,250.00 31,614.00 108,350.00 83,050.00 146,500.00 156,200.00 53,900.00

Page 24: Analis Sni Ta 2008

Page 24 of 77

16,500.00 19,800.00 13,200.00 9,350.00 4,950.00 3,740.00 59,400.00 38,000.00 21,400.00 50,050.00 29,700.00 15,400.00 12,100.00 9,350.00 6,600.00 5,280.00 3,300.00 3,170,220.00 1,034,000.00 344,300.00 173,800.00 137,500.00 89,650.00 61,600.00 177,100.00 105,600.00 45,100.00 10,725.00 6,600.00 4,400.00 2,640.00 2,200.00 11,000.00 7,260.00 3,300.00 84,150.00 45,100.00 15,500.00 11,000.00 13,200.00 4,510.00 4,000.00 3,960.00 64,500.00 45,100.00 10,000.00 8,000.00

Page 25: Analis Sni Ta 2008

Page 25 of 77

7,700.00 4,500.00 3,000.00 2,000.00 210,100.00 22,275.00 15,950.00 4,823,500.00 174,900.00 192,500.00 35,200.00 102,300.00 212,300.00 99,000.00 120,450.00 141,900.00 212,300.00 93,808.00 111,100.00 17,600.00 20,000.00 19,000.00 24,200.00 2,500.00 3,025.00 33,000.00 4,500.00 6,500.00 10,000.00 26,400.00 45,100.00 116,600.00 34,100.00 11,550.00 8,250.00 5,225.00 4,000.00 3,025.00 2,750.00 5,500.00 206,800.00 8,030.00 171,600.00 137,500.00 116,600.00 103,400.00 51,150.00 45,100.00

Page 26: Analis Sni Ta 2008

Page 26 of 77

68,750.00 52,800.00 481,250.00 343,200.00 240,900.00 89,650.00 72,050.00 54,450.00 47,850.00 62,150.00 93,500.00 5,500.00 3,300.00 3,850.00 5,500.00 51,500.00 32,000.00 11,000.00 8,030.00 5,000.00 33,000.00 2,500.00 2,000.00 4,400.00 78,210.00 4,125.00 4,675.00 6,700.00 13,365.00 48,125.00 68,200.00 2,640.00 2,640.00 4,675.00 5,000.00 6,600.00 8,525.00 10,725.00 16,500.00 192,500.00 166,100.00 151,800.00 3,300.00 238,150.00 97,900.00 53,350.00 18,700.00 10,725.00

Page 27: Analis Sni Ta 2008

Page 27 of 77

6,600.00 6,600.00 6,380.00 64,500.00 45,100.00 10,010.00 8,000.00 6,600.00 45,100.00 3,025.00 2,000.00 22,000.00 5,500.00 64,900.00 138,600.00 385,550.00 2,200.00 103,400.00 58,300.00 19,250.00 13,200.00 10,000.00 6,600.00 4,500.00 3,000.00 208,450.00 286,000.00 286,000.00 130,900.00 227,150.00 233,750.00 47,300.00 53,350.00 47,300.00 3,025.00 13,750.00 62,920.00 199,232.00

Page 28: Analis Sni Ta 2008

Page 28 of 77

DAFTAR HARGA SATUAN UPAH DAN MATERIAL

NO. URAIAN SATUAN HARGA SATUAN KETERANGAN

A. UPAH

1 Pekerja Oh 25,000.00 2 Pekerja Bongkar / Siram Oh 23,000.00 3 Tukang Batu Oh 30,000.00 4 Tukang Besi Oh 30,000.00 5 Tukang Cat Oh 30,000.00 6 Tukang Gali Oh 30,000.00 7 Tukang Kayu Oh 30,000.00 8 Tukang Aspal Oh 30,000.00 9 Tukang Mantras Oh 30,000.00

10 Operatot Alat Berat Oh 51,000.00 11 Pembantu Operator Oh 43,000.00 12 Mekanik Oh 38,000.00 13 Pembantu Mekanik Oh 31,000.00 14 Kepala Tukang Oh 34,000.00 15 Mandor Oh 35,000.00

B. BAHAN

1 Alang-alang Ikat 2,200.00 2 Aluminium Foil / Sisalation m2 13,700.00 3 Amplas Lbr 2,000.00 4 Asbes Gelombang M2 35,800.00 5 Badkip - 6 Bak Cuci Piring Stainless Steel Bh 176,400.00 7 Batu Bata Bh 320.00 8 Abu Batu M3 147,000.00 9 Batu Kali Blonos M3 88,000.00

10 Batu Kali Pecah M3 113,000.00 11 Batu Belah 15/20 cm M3 90,000.00 12 Batu Belah 10/15 cm M3 102,000.00 13 Batu Belah 5/7 cm M3 105,000.00 14 Batu Pecah Tangan 2/3 cm M3 134,000.00 15 Batu Pecah mesin 3-5 cm M3 165,000.00 16 Batu Pecah mesin 2-3 cm M3 171,000.00 17 Batu Pecah mesin 1-2 cm M3 189,000.00 18 Batu Pecah mesin 0,5-1 cm M3 189,000.00 19 Batu Pecah 0,2-0,5 cm M3 189,000.00 20 Batu Kambang / Apung Kg 7,900.00 21 Batu Kerikil M3 49,000.00 22 Tanah Urug M3 54,600.00 23 Begel kg - 24 Bindrat kg 10,900.00 25 Besi Beton Polos kg 8,500.00 26 Besi Beton Ulir kg 12,000.00 27 Besi Siku /Profil kg 12,000.00 28 Baja Plat kg 8,500.00 29 Buis Beton 20 cm buah 43,000.00 30 Buis Beton 30 cm buah 58,000.00 31 Buis Beton 50 cm buah 126,000.00 32 Buis Beton 60 cm buah 149,000.00 33 Buis Beton 80 cm buah 221,000.00 34 Buis Beton 100 cm buah 268,000.00 35 Buis Beton U 15 cm buah 15,000.00 36 Buis Beton U 20 cm buah 23,000.00 37 Buis Beton U 30 cm buah 31,000.00 37 Buis Beton U 100 cm buah 195,000.00 37 Glas Box 20/20 cm buah 18,000.00 40 Cat Tembok Sek. Cathylac Kg 13,300.00

Page 29: Analis Sni Ta 2008

Page 29 of 77

41 Cat Tembok Sek. Decolith Kg 12,100.00 42 Cat Tembok Sek. Mollex Kg 7,200.00 43 Cat Tembok Sek. Mowilex Kg 63,100.00 44 Cat Kayu Sek. Avian Kg 34,000.00 45 Cat Genteng Kg 20,600.00 46 Cat Meni Kg 13,300.00 47 Dempul Kayu Kg 10,900.00 48 Door Closer Bh 229,600.00 49 Door Stop Bh 25,500.00 50 Engsel Angin Bh 7,200.00 51 Engsel Jendela Kupu-kupu Bh 4,800.00 52 Engsel Pintu Bh 9,700.00 53 Grendel Jendela Bh 3,600.00 54 Grendel Pintu Bh 4,800.00 55 Sanggan Jendela Antik Bh 17,000.00 56 Sanggan Jendela Lipat Bh 4,800.00 57 Kunci tanam Bh 85,000.00 58 Kunci tanam kamar mandi Bh 37,600.00 59 Kawat Duri m' 3,600.00 60 Kawat Bronjong dia 4 mm Kg 12,100.00 61 Kawat Mantras Pabrikan 3 mm Kg 18,200.00 62 Eternit Kerang Super m2 6,000.00 63 Floor Drain Bh 21,800.00 64 Formite/Penjaga Jarak Bekisting/Spacer - 65 Genteng Vlams Soka Bh 700.00 66 Genteng Pres Glasur Bh 3,600.00 67 Genteng Pres Plentong Bh 900.00 68 Genteng Pres Kodok Bh 1,100.00 69 Genteng Beton Bh 3,600.00 70 Genteng Morando Bh 2,400.00 71 Genteng Nok Beton Bh 3,600.00 72 Genteng Nok Morando Bh 3,600.00 73 Genteng Nok Plentong Bh 2,400.00 74 Gypsum Board ( 120 x 240 ) cm x 9 mm lbr 46,000.00 75 Harplek m2 12,000.00 76 Kaca Bening 3 mm M2 49,000.00 77 Kaca Bening 5 mm M2 64,000.00 78 Kaca Cermin M2 147,000.00 79 Kaca Polos Tb. 8 mm M2 155,000.00 80 Kait Angin Bh - 81 Kapur padam M3 126,000.00 82 Kapur Pasang M3 174,000.00 83 Kapur Sirih / Labur Kg 2,400.00 84 Kawat Burung m2 15,700.00 85 Kayu Bakar M3 58,000.00 86 Pelumas Liter 36,000.00 87 Solar Liter 4,800.00 88 Premium Liter 4,800.00 89 Minyak tanah Liter 2,400.00 90 Thiner Liter 47,000.00 91 Aspal Penetrasi 60/70 Kg 6,000.00 92 Aspal Curah Kg 6,000.00 93 Keramik 10/20 cm m2 38,800.00 94 Keramik 20/20 cm m2 46,000.00 95 Keramik 20/25 cm Kw I m2 46,000.00 96 Keramik 20/25 cm Kw II m2 - 97 Keramik 30/30 cm Kw I m2 46,000.00 98 Keramik 30/30 cm Kw II m2 42,500.00 99 Keramik 40/40 cm Kw I m2 54,600.00

100 Keramik 40/40 cm Kw II m2 51,000.00 101 Tegel Abu-abu 20/20 bh 770.00 102 Tegel Abu-abu 30/30 bh 2,000.00 103 Kayu Bangkir ( Balok ) M3 7,207,000.00 104 Kayu Bangkir ( Papan ) M3 7,581,000.00 105 Kayu Bangkir ( Usuk 5/7 ) M3 6,300,000.00 106 Kayu Jati ( Balok ) M3 12,410,000.00 107 Kayu Jati ( Papan ) M3 11,847,000.00 108 Kayu Jati ( Usuk 5/7 ) M3 9,806,000.00 109 Kayu Kamper ( Balok ) M3 6,927,000.00 110 Kayu Kamper ( Papan ) M3 7,581,000.00 111 Kayu Kamper ( Usuk 5/7 ) M3 5,384,000.00 112 Kayu Kruing ( Balok ) M3 4,966,000.00 113 Kayu Kruing ( Papan ) M3 5,254,000.00 114 Kayu Kruing ( Usuk 5/7 ) M3 4,432,000.00 115 Kayu Meranti ( Balok ) M3 3,920,000.00

Page 30: Analis Sni Ta 2008

Page 30 of 77

116 Kayu Meranti ( Papan ) M3 4,208,000.00 117 Kayu Meranti ( Usuk 5/7 ) M3 3,620,000.00 118 Kayu Tahun M3 1,324,000.00 118 Kayu Perancah M3 1,091,000.00 118 Glugu Tua M3 1,324,000.00 118 Kayu Dolken M3 1,150,000.00 118 Bambu Petung btg 20,600.00 123 Bambu Wulung btg 7,200.00 124 Bambu Ampel btg 3,600.00 125 Bambu Tali btg 8,500.00 126 Kloset Duduk / Monoblok Bh 1,044,000.00 127 Kloset Jongkok Porselen Bh 116,000.00 128 Washtafel Bh 358,000.00 129 Bak mandi Fiber Bh 155,000.00 130 Urinoir Bh 516,000.00 131 Pintu Aluminium uk 70 cm lengkap Bh 475,000.00 132 Pintu PVC uk 70 cm Polos lengkap Bh 325,000.00 133 Labur Gamping m3 114,000.00 134 Lem Kayu Kg 10,900.00 135 List Kayu Propil m' 3,600.00 136 Meni Besi Kg 13,000.00 137 Minyak Cat Liter 36,000.00 138 Nok Stel as bes Gelombang psg 27,000.00 139 Paku Biasa ( 1/2" - 1" ) Kg 12,000.00 140 Paku Biasa ( 2" - 5" ) Kg 8,500.00 141 Paku eternit, List ( 1/2" - 1" ) Kg 12,100.00 142 Paku Kait bj 770.00 143 Paku Payung bj 530.00 144 Paku Sumbat bj 530.00 145 Paku Sekrup 3,5" Bh 720.00 146 Paku Seng ( 1/2" - 1" ) Kg 25,500.00 147 Paku Usuk/Plafond/Reng ( 2" - 5" ) Kg 9,700.00 148 Pasir Beton M3 117,000.00 149 Pasir Pasang M3 112,000.00 150 Pasir urug M3 73,000.00 151 Paving Block Natural 6 cm M2 32,800.00 152 Paving Block t = 6 cm K - 300 M2 58,000.00 153 Paving Block t = 8 cm K - 400 M2 77,000.00 154 Paving Block Warna 6 cm M2 36,000.00 155 PC Tiga Roda 50 Kg zak 47,000.00 156 PC Nusantara 50 Kg zak 46,000.00 157 PC Gresik 50 Kg zak 44,900.00 158 PC Warna / Nat Kg 6,000.00 159 Pegangan Pintu / Door Holder bh - 160 Plamir Kayu kg 14,000.00 161 Plamir Tembok kg 7,200.00 162 Plywood Tb. 9 mm - 163 Politur - 164 Politur Jadi 15,900.00 165 Rel Pintu Dorong Bh 349,000.00 166 Residu dan Ter liter 3,200.00 167 Seal Tape Bh 1,700.00 168 Seng Gelombang 3" x 6" BJLS 20 M2 27,900.00 169 Seng Gelombang 3" x 6" BJLS 30 M2 35,200.00 170 Seng Plat 3" x 6" BJLS 30 M2 25,500.00 171 Sirtu M3 63,100.00 172 Sirlak kg 74,100.00 173 Soda Api liter 17,000.00 174 Spritus litter - 175 Tali Ijuk kg - 176 Tir Kayu litter 3,100.00 177 Triplek 3 mm x 1,20 x 2,40 M lbr 46,000.00 178 Triplek 4 mm x 1,20 x 2,40 M lbr 54,000.00 179 Triplek 6 mm x 1,20 x 2,40 M lbr 71,000.00 180 Multiplek 9 mm x 0,90 x 2,10 M lbr 149,000.00 181 Multiplek 12 mm x 0,90 x 2,10 M lbr 149,000.00 182 Teakwood 3 mm x 0,90 x 2,10 M lbr 61,000.00 183 Lampu Pijar 5 Watt bh 3,600.00 184 Lampu Pijar 10 Watt bh 3,600.00 185 Lampu Pijar 15 Watt bh 4,400.00 186 Lampu Pijar 25 Watt bh 4,700.00 187 Lampu Pijar 40 Watt bh 4,700.00 188 Water drain + accessories batang - 189 Pipa galvanis Bahan Rambu 1,5 Inc Medium A batang 296,000.00 190 Pipa galvanis Bahan Rambu 1,5 Inc Medium B batang 311,000.00

Page 31: Analis Sni Ta 2008

Page 31 of 77

191 Pipa galvanis Bahan Rambu 1,5 Inc batang 257,000.00 192 Pipa galvanis Bahan Rambu 2 Inc Medium A batang 348,000.00 193 Pipa galvanis Bahan Rambu 2 Inc Medium A batang 360,000.00 194 Pipa galvanis Bahan Rambu 2 Inc m' 279,000.00 195 Pipa Gip 4" Medium A (P.6M) m' 194,000.00 196 Pipa Gip 3" Medium A (P.6M) m' 131,000.00 197 Pipa Gip 2" Medium A (P.6M) m' 76,000.00 198 Pipa Gip 1 1/2" Medium A (P.6M) m' 53,000.00 199 Pipa Gip 1 " Medium A (P.6M) m' 31,000.00 200 Pipa Gip 3/4" Medium A (P.6M) m' 27,000.00 201 Pipa Gip 1/2" Medium A (P.6M) m' 23,000.00 201 Pipa Gip 4" Medium B (P.6M) m' 105,000.00 201 Pipa Gip 3" Medium B (P.6M) m' 80,000.00 204 Pipa Gip 2" Medium B (P.6M) m' 51,000.00 205 Pipa Gip 1 1/2" Medium B (P.6M) m' 30,000.00 206 Pipa Gip 1 " Medium B (P.6M) m' 105,000.00 207 Pipa Gip 3/4" Medium B (P.6M) m' 80,000.00 208 Pipa PVC 6" S 12,5 10 Bar m' 133,000.00 209 Pipa PVC 4" S 12,5 10 Bar m' 66,000.00 210 Pipa PVC 3" S 12,5 10 Bar m' 45,000.00 211 Pipa PVC 2" S 12,5 10 Bar m' 21,000.00 212 Pipa PVC 1 1/2" S 12,5 10 Bar m' 15,000.00 213 Pipa PVC 1 1/2" S 10 10 Bar m' 18,000.00 214 Pipa PVC 1 1/4" S 10 10 Bar m' 12,000.00 215 Pipa PVC 1" S 10 10 Bar m' 8,000.00 216 Pipa PVC 3/4" S 10 10 Bar m' 4,000.00 217 Pipa PVC 1/2" S 10 10 Bar m' 3,000.00 218 Pipa PVC 4" S 16 8 Bar m' 54,000.00 219 Pipa PVC 3" S 16 8 Bar m' 36,000.00 220 Pipa PVC 2" S 16 8 Bar m' 20,000.00 221 Pipa PVC 4" Aw m' 48,000.00 222 Pipa PVC 3" Aw m' 29,000.00 223 Pipa PVC 2" Aw m' 14,000.00 224 Pipa PVC 1 1/2" Aw m' 10,000.00 225 Pipa PVC 1 1/4" Aw m' 9,000.00 226 Pipa PVC 1" Aw m' 6,000.00 227 Pipa PVC 3/4" Aw m' 4,000.00 228 Pipa PVC 1/2" Aw buah 3,000.00 229 Stop Kran (valve) Kitz 4" buah 3,100,000.00 230 Stop Kran (valve) Kitz 8" buah 1,010,000.00 231 Stop Kran (valve) Kitz 2" buah 336,000.00 232 Stop Kran (valve) Kitz 1,5" buah 168,000.00 233 Stop Kran (valve) Kitz 1" buah 133,000.00 234 Stop Kran (valve) Kitz 3/4" buah 87,000.00 235 Stop Kran (valve) Kitz 1/2" buah 59,000.00 236 Knee PVC 4 " buah 172,000.00 237 Knee PVC 3 " buah 103,000.00 238 Knee PVC 2 " buah 43,000.00 239 Knee PVC 1 1/2 " buah 10,400.00 240 Knee PVC 1 1/4 " buah 6,400.00 241 Knee PVC 1 " buah 4,200.00 242 Knee PVC 3/4 " buah 2,500.00 243 Knee PVC 1/2 " buah 2,000.00 244 Sock PVC 3" buah 10,600.00 245 Sock PVC 2" buah 7,000.00 246 Sock PVC 1" buah 3,100.00 247 Knee Drat Gip 4" buah 81,000.00 248 Knee Drat Gip 3" buah 43,000.00 249 Knee Drat Gip 2" buah 14,000.00 250 Knee Drat Gip 1 1/4" buah 9,700.00 251 Knee Drat Gip 1 1/2" buah 12,000.00 252 Knee Drat Gip 1" buah 4,300.00 253 Knee Drat Gip 1/2" buah 3,800.00 254 Knee Drat Gip 3/4" buah 3,700.00 255 Sock Drat Gip 4" buah 61,000.00 256 SockDrat Gip 3" buah 43,000.00 257 Sokc Drat Gip 2" buah 9,700.00 258 Sokc Drat Gip 1 1/2" buah 7,700.00 259 Sokc Drat Gip 1 1/4" buah 7,400.00 260 Sokc Drat Gip 1" buah 4,300.00 261 Sokc Drat Gip 3/4" buah 2,900.00 262 Sokc Drat Gip 1/2" buah 1,900.00 263 Water meter buah 205,000.00 264 Kran 3/4" buah 21,700.00 265 Kran 1/2" buah 15,500.00

Page 32: Analis Sni Ta 2008

Page 32 of 77

266 Tangki Fiberglass 2M3 buah 4,716,000.00 267 Air Valve 20 mm buah 170,000.00 268 Air Valve 3/4 mm buah 187,000.00 269 Bend GIP 90 2" buah 34,000.00 270 Bend GIP 90 3" buah 99,600.00 271 Bend GIP 90 4" buah 206,000.00 272 Bend GIP 75 X 90 buah 95,000.00 273 Bend PVC 45' 2" buah 116,000.00 274 Bend PVC 45' 3" buah 138,000.00 275 Bend PVC 45' 4" buah 206,000.00 276 Bend Soket PVC DN 50x45 buah 91,000.00 277 Bend Soket PVC DN 75x45 buah 108,000.00 278 Claim Sadle 2" x 1/2" buah 17,100.00 279 Claim Sadle DN 60 x 25 mm buah 19,500.00 280 Claim Sadle DN 50 x 20 mm buah 18,400.00 281 Dop PVC DN 20 mm buah 23,500.00 282 Dop GIP 1/2" AW buah 2,400.00 283 Dop GIP 3/4" AW buah 2,900.00 283 Dop GIP 1" AW buah 32,100.00 283 Dop GIP 1 1/4" AW buah 4,300.00 283 Dop GIP 1 1/2" AW buah 6,300.00 287 Dop GIP 2" AW buah 9,700.00 288 Dop GIP 3" AW buah 25,700.00 289 Dop GIP 4" AW buah 44,000.00 290 Double Nipple GIP 4" buah 113,000.00 291 Double Nipple GIP 3" buah 33,000.00 292 Double Nipple GIP 2" buah 11,100.00 293 Double Nipple GIP 1 1/2" buah 8,000.00 294 Double Nipple GIP 1 1/4" buah 5,100.00 295 Double Nipple GIP 1" buah 3,800.00 296 Double Nipple GIP 3/4" buah 2,900.00 297 Double Nipple GIP 1/2" buah 2,600.00 298 Double Nipple GIP DN 20 mm buah 5,300.00 299 Fland Spigot Diameter 2 buah 201,000.00 300 Fouchet Elbouw PVC DN 20 mm buah 7,700.00 301 Flange 4" buah 167,000.00 302 Flange 3" buah 133,000.00 303 Flange 2 1/2" buah 112,000.00 304 Flange 2" buah 100,000.00 305 Flange DN 75 MM buah 49,000.00 306 Flange DN 50 MM buah 43,000.00 307 Lem PVC buah 66,000.00 308 Floating Valve DN 20 mm buah 51,000.00 309 Floating Valve Kitz 1" buah 470,000.00 310 Floating Valve Kitz 3/4" buah 335,000.00 311 Floating Valve Kitz 1/2" buah 234,000.00 312 GilbouLiter Joint 4" buah 87,000.00 313 GilbouLiter Joint 3" buah 70,000.00 314 GilbouLiter Joint 2" buah 53,000.00 315 GilbouLiter Joint 1 1/2" buah 46,000.00 316 GilbouLiter DN 50 mm buah 60,000.00 317 GilbouLiter DN 75 mm buah 91,000.00 318 Keni GIP DN 20 mm buah 5,300.00 319 Keni PVC DN 20 mm buah 3,100.00 320 Mur dan Baut buah 3,600.00 321 Plug DN 20 mm buah 5,300.00 322 Plug GI 4" buah 50,000.00 323 Plug GI 3" buah 31,000.00 324 Plug GI 2" buah 10,600.00 325 Plug GI 1 1/2" buah 7,700.00 326 Plug GI 1 1/4" buah 4,800.00 327 Plug GI 1" buah 32,100.00 328 Plug GI 3/4" buah 2,400.00 329 Plug GI 1/2" buah 1,900.00 330 Reducer DN 3/4" x 1/2" buah 4,200.00 331 Reducer DN 75 x 50 mm buah 76,000.00 332 Reducer GIP 1/2" - 3/4" buah 4,000.00 333 Reducer GIP 1/2" - 1" buah 4,400.00 334 Reducer GIP 1" - 1 1/4" buah 6,400.00 335 Reducer GIP 1" - 2" buah 13,000.00 336 Reducer GIP 2" - 3" buah 47,000.00 337 Reducer GIP 3" - 4" buah 66,000.00 338 Reducer PVC 1/2" - 3/4" buah 2,500.00 339 Reducer PVC 1/2" - 1" buah 2,500.00 340 Reducer PVC 1" - 1 1/4" buah 4,400.00

Page 33: Analis Sni Ta 2008

Page 33 of 77

341 Reducer PVC 1" - 1 1/2" buah 4,800.00 342 Reducer PVC 1" - 2" buah 6,400.00 343 Reducer PVC 1 1/2" - 2" buah 8,200.00 344 Reducer PVC 2" - 3" buah 10,400.00 345 Reducer PVC 3" - 4" buah 16,000.00 346 Saringan 4" CI buah 187,000.00 347 Saringan 3" CI buah 161,000.00 348 Saringan 2" CI buah 148,000.00 349 SLD PVC DN 20 mm buah 2,400.00 350 SDL PVC 4" buah 232,000.00 351 SDL PVC 3" buah 94,000.00 352 SDL PVC 2" buah 52,000.00 353 SDL PVC 1 1/2" buah 18,200.00 354 SDL PVC 1 1/4" buah 10,400.00 355 SDL PVC 1" buah 6,400.00 356 SDL PVC 3/4" buah 6,400.00 357 SDL PVC 1/2" buah 6,100.00 358 Sok Drat GIP 4" buah 63,000.00 359 Sok Drat GIP 3" buah 44,000.00 360 Sok Drat GIP 2" buah 9,700.00 361 Sok Drat GIP 1 1/2" buah 7,700.00 362 Sok Drat GIP 1 1/4" buah 6,400.00 363 Sok Drat GIP 1" buah 44,000.00 364 Sok Drat GIP 3/4" buah 2,900.00 365 Sok Drat GIP 1/2" buah 1,900.00 365 Sock GIP DN 75 mm buah 21,500.00 365 Sock GIP DN 20 mm buah 5,300.00 368 Stop Valve Bras DN 20 mm buah 63,000.00 369 Stop Valve Bras DN 50 mm buah 134,000.00 370 Stop Valve Bras DN 75 mm buah 376,000.00 371 TBA buah 2,000.00 372 Tee GIP 4" buah 101,000.00 373 Tee GIP 3" buah 56,000.00 374 Tee GIP 2" buah 18,700.00 375 Tee GIP 1 1/2" buah 12,800.00 376 Tee GIP 1 1/4" buah 9,700.00 377 Tee GIP 1" buah 6,400.00 378 Tee GIP 3/4" buah 4,300.00 379 Tee GIP 1/2" buah 2,900.00 380 Tee PVC 4" x 4" SC buah 202,000.00 381 Tee PVC 4" x 3" SC buah 279,000.00 382 Tee PVC 4" x 2" SC buah 279,000.00 383 Tee PVC 3" x 3" SC buah 127,000.00 384 Tee PVC 3" x 2" SC buah 221,000.00 385 Tee PVC 3" x 1 1/2" SC buah 228,000.00 386 Tee PVC 2" x 2" SC buah 46,000.00 387 Tee PVC 2" x 2 1/2" SC buah 52,000.00 388 Tee PVC 2" x 1" SC buah 46,000.00 389 Tee GIP DN 20 mm buah 2,900.00 390 Tee GIP DN 50 mm buah 13,300.00 391 Tee Socket DN 50 x 50 mm buah 61,000.00 392 Tee Socket DN 75 x 50 mm buah 194,000.00 393 Valve Socket PVC DN 50 mm buah 71,600.00 394 Valve Socket PVC DN 75 mm buah 95,900.00 395 Pipa PVC 3" S 10 12,5Bar m' 42,500.00 396 Pipa PVC 2" S 10 12,5 Bar m' 25,500.00 397 Kereb uk. Tinggi 50 cm buah 37,000.00

Page 34: Analis Sni Ta 2008

Page 34 of 77

ANALISA SNI

A. PEKERJAAN PERSIAPAN

SNI - A.6.4 1 M' Pengukuran dan Pemasangan Bouplank (kayu meranti) =Rp. #N/A 0.0120 M3 Kayu Usuk 5/7 @Rp. #N/A = Rp. #N/A 0.0200 Kg Paku Biasa (2" - 5") @Rp. #N/A = Rp. #N/A 0.0070 M3 Kayu Papan 3/20 @Rp. #N/A = Rp. #N/A 0.1000 Oh Pekerja @Rp. 25,000.00 = Rp. 2,500.00 0.1000 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 3,000.00 0.0100 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 340.00 0.0050 Oh Mandor @Rp. 35,000.00 = Rp. 175.00

SNI - A.6.4a 1 M' Pengukuran dan Pemasangan Bouplank (kayu Tahun) =Rp. #N/A 0.0120 M3 Kayu Usuk 5/7 @Rp. #N/A = Rp. #N/A 0.0200 Kg Paku Biasa (2" - 5") @Rp. #N/A = Rp. #N/A 0.0070 M3 Kayu Papan 3/20 @Rp. #N/A = Rp. #N/A 0.1000 Oh Pekerja @Rp. 25,000.00 = Rp. 2,500.00 0.1000 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 3,000.00 0.0100 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 340.00 0.0050 Oh Mandor @Rp. 35,000.00 = Rp. 175.00

SNI - A.6.6 1 M2 Pembuatan Gudang Semen dan Alat-alat ( Kayu Meranti ) =Rp. #N/A 1.7000 Btg Dolken Kayu diam. 8-10 / 4 m @Rp. 35,000.00 = Rp. 59,500.00 0.2100 M3 Kayu Papan 3/20 @Rp. #N/A = Rp. #N/A 0.3000 Kg Paku Biasa (2" - 5") @Rp. #N/A = Rp. #N/A 10.5000 Kg Portland Cement @Rp. #N/A = Rp. #N/A 0.0300 M3 Pasir Beton @Rp. #N/A = Rp. #N/A 0.0500 M3 Koral Beton (Batu Pecah 2/3) @Rp. #N/A = Rp. #N/A 1.5000 lbr Seng Gelombang BJLS 20 @Rp. #N/A = Rp. #N/A 1.0000 Oh Pekerja @Rp. 25,000.00 = Rp. 25,000.00 2.0000 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 60,000.00 0.2000 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 6,800.00 0.0500 Oh Mandor @Rp. 35,000.00 = Rp. 1,750.00

SNI - A.6.6a 1 M2 Pembuatan Gudang Semen dan Alat-alat ( Kayu Tahun ) =Rp. #N/A 1.7000 Btg Dolken Kayu diam. 8-10 / 4 m @Rp. 35,000.00 = Rp. 59,500.00 0.2100 M3 Kayu Papan 3/20 @Rp. #N/A = Rp. #N/A 0.3000 Kg Paku Biasa (2" - 5") @Rp. #N/A = Rp. #N/A 10.5000 Kg Portland Cement @Rp. #N/A = Rp. #N/A 0.0300 M3 Pasir Beton @Rp. #N/A = Rp. #N/A 0.0500 M3 Koral Beton (Batu Pecah 2/3) @Rp. #N/A = Rp. #N/A 1.5000 lbr Seng Gelombang BJLS 20 @Rp. #N/A = Rp. #N/A 1.0000 Oh Pekerja @Rp. 25,000.00 = Rp. 25,000.00 2.0000 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 60,000.00 0.2000 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 6,800.00 0.0500 Oh Mandor @Rp. 35,000.00 = Rp. 1,750.00

SNI - A.6.7 1 M2 Pembuatan Rumah Jaga / Konstruksi Kayu ( Kayu Meranti ) =Rp. #N/A 3.0000 Btg Dolken Kayu diam. 8-10 / 4 m @Rp. 35,000.00 = Rp. 105,000.00 0.2760 M3 Kayu Papan 3/20 @Rp. #N/A = Rp. #N/A 0.7000 Kg Paku Biasa (2" - 5") @Rp. #N/A = Rp. #N/A 1.5000 lbr Seng Gelombang BJLS 20 @Rp. #N/A = Rp. #N/A 1.0000 Oh Pekerja @Rp. 25,000.00 = Rp. 25,000.00 1.5000 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 45,000.00 0.1500 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 5,100.00 0.0500 Oh Mandor @Rp. 35,000.00 = Rp. 1,750.00

SNI - A.6.7a 1 M2 Pembuatan Rumah Jaga / Konstruksi Kayu ( Kayu Tahun ) =Rp. #N/A 3.0000 Btg Dolken Kayu diam. 8-10 / 4 m @Rp. 35,000.00 = Rp. 105,000.00 0.2760 M3 Kayu Papan 3/20 @Rp. #N/A = Rp. #N/A 0.7000 Kg Paku Biasa (2" - 5") @Rp. #N/A = Rp. #N/A 1.5000 lbr Seng Gelombang BJLS 20 @Rp. #N/A = Rp. #N/A 1.0000 Oh Pekerja @Rp. 25,000.00 = Rp. 25,000.00 1.5000 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 45,000.00 0.1500 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 5,100.00 0.0500 Oh Mandor @Rp. 35,000.00 = Rp. 1,750.00

SNI - A.6.8 1 M2 Membersihkan Lapangan dan Perataan =Rp. 4,250.00 0.1000 Oh Pekerja @Rp. 25,000.00 = Rp. 2,500.00 0.0500 Oh Mandor @Rp. 35,000.00 = Rp. 1,750.00

Page 35: Analis Sni Ta 2008

Page 35 of 77

SNI - A.6.10 1 Bh Pembuatan Bak Adukan Uk. ( 40 x 50 x 20 ) Cm Kayu Tahun =Rp. #N/A 0.0360 M3 Kayu Tahun @Rp. #N/A = Rp. #N/A 0.0800 Kg Paku Biasa ( 2" - 5" ) @Rp. #N/A = Rp. #N/A 1.0000 Btg Usuk 5/7 @Rp. 13,000.00 = Rp. 13,000.00 0.3000 Oh Tukang Batu @Rp. 30,000.00 = Rp. 9,000.00 0.0015 Oh Mandor @Rp. 35,000.00 = Rp. 52.50

SNI - A.6.11 1 M2 Pembuatan Steger dari Bambu ukuran (40 x 50 x 20) cm =Rp. #N/A 1.0000 Btg Bambu diam. 6 - 8 / 6 m @Rp. #N/A = Rp. #N/A 0.2500 Kg Tali Ijuk @Rp. #N/A = Rp. #N/A 0.2500 Oh Pekerja @Rp. 25,000.00 = Rp. 6,250.00 0.0170 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 510.00 0.0020 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 68.00 0.0130 Oh Mandor @Rp. 35,000.00 = Rp. 455.00

SNI - A.6.14 1 M3 Bongkaran Dinding Tembok Bata Merah =Rp. 167,830.00 6.6670 Oh Pekerja @Rp. 25,000.00 = Rp. 166,675.00 0.0330 Oh Mandor @Rp. 35,000.00 = Rp. 1,155.00

B. PEKERJAAN TANAH

SNI - B.6.1 1 M3 Galian Tanah Biasa Sedalam 1 meter =Rp. 11,400.00 0.4000 Oh Pekerja @Rp. 25,000.00 = Rp. 10,000.00 0.0400 Oh Mandor @Rp. 35,000.00 = Rp. 1,400.00

SNI - B.6.2 1 M3 Galian Tanah Biasa Sedalam 2 meter =Rp. 14,970.00 0.5260 Oh Pekerja @Rp. 25,000.00 = Rp. 13,150.00 0.0520 Oh Mandor @Rp. 35,000.00 = Rp. 1,820.00

SNI - B.6.4 1 M3 Galian Tanah Keras Sedalam 1 meter =Rp. 17,795.00 0.6250 Oh Pekerja @Rp. 25,000.00 = Rp. 15,625.00 0.0620 Oh Mandor @Rp. 35,000.00 = Rp. 2,170.00

SNI - B.6.7 1 M2 Pekerjaan Striping Setinggi 1 meter =Rp. 1,425.00 0.0500 Oh Pekerja @Rp. 25,000.00 = Rp. 1,250.00 0.0050 Oh Mandor @Rp. 35,000.00 = Rp. 175.00

SNI - B.6.8 1 M3 Pembuangan Tanah Sejauh 150 meter =Rp. 14,650.00 0.5160 Oh Pekerja @Rp. 25,000.00 = Rp. 12,900.00 0.0500 Oh Mandor @Rp. 35,000.00 = Rp. 1,750.00

SNI - B.6.9 1 M3 Urugan Kembali =Rp. 5,465.00 0.1920 Oh Pekerja @Rp. 25,000.00 = Rp. 4,800.00 0.0190 Oh Mandor @Rp. 35,000.00 = Rp. 665.00

SNI - B.6.10 1 M3 Pemadatan Tanah =Rp. 14,250.00 0.5000 Oh Pekerja @Rp. 25,000.00 = Rp. 12,500.00 0.0500 Oh Mandor @Rp. 35,000.00 = Rp. 1,750.00

SNI - B.6.11 1 M3 Urugan Pasir =Rp. #N/A 1.2000 m3 Pasir urug @Rp. #N/A = Rp. #N/A 0.3000 Oh Pekerja @Rp. 25,000.00 = Rp. 7,500.00 0.0100 Oh Mandor @Rp. 35,000.00 = Rp. 350.00

SNI - B.6.14 1 M3 Pemasangan Ijuk =Rp. #N/A 1.2000 M3 Ijuk @Rp. #N/A = Rp. #N/A 0.1500 Oh Pekerja @Rp. 25,000.00 = Rp. 3,750.00 0.0150 Oh Mandor @Rp. 35,000.00 = Rp. 525.00

SNI - B - 6.15 1 M3 Urugan Sirtu =Rp. #N/A 1.2000 M3 Sirtu @Rp. #N/A = Rp. #N/A 0.2500 Oh Pekerja @Rp. 25,000.00 = Rp. 6,250.00 0.0250 Oh Mandor @Rp. 35,000.00 = Rp. 875.00

C. PEKERJAAN PONDASI BATU KALI

SNI - C.6.5 1 M3 Pas. Batu Kali 1 PC : 4 Ps =Rp. #N/A 1.1000 M3 Batu Belah 15/20 cm @Rp. 90,000.00 = Rp. 99,000.00 163.0000 Kg Portland Cement @Rp. #N/A = Rp. #N/A 0.5200 M3 Pasir Pasang @Rp. #N/A = Rp. #N/A 1.5000 Oh Pekerja @Rp. 25,000.00 = Rp. 37,500.00 0.6000 Oh Tukang Batu @Rp. 30,000.00 = Rp. 18,000.00 0.0600 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 2,040.00 0.0750 Oh Mandor @Rp. 35,000.00 = Rp. 2,625.00

SNI - C.6.6 1 M3 Pas. Batu Kali 1 PC : 5 Ps =Rp. #N/A 1.1000 M3 Batu Belah 15/20 cm @Rp. 90,000.00 = Rp. 99,000.00

Page 36: Analis Sni Ta 2008

Page 36 of 77

136.0000 Kg Portland Cement @Rp. #N/A = Rp. #N/A 0.5440 M3 Pasir Pasang @Rp. #N/A = Rp. #N/A 1.5000 Oh Pekerja @Rp. 25,000.00 = Rp. 37,500.00 0.6000 Oh Tukang Batu @Rp. 30,000.00 = Rp. 18,000.00 0.0600 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 2,040.00 0.0750 Oh Mandor @Rp. 35,000.00 = Rp. 2,625.00

SNI - C.6.12 1 M3 Pas. Batu Kali 1 PC : 3 Kp : 10 Ps =Rp. #N/A 1.1000 M3 Batu Belah 15/20 cm @Rp. 90,000.00 = Rp. 99,000.00 61.0000 Kg Portland Cement @Rp. #N/A = Rp. #N/A 0.1470 M3 Kapur Pasang @Rp. #N/A = Rp. #N/A 0.4920 M3 Pasir Pasang @Rp. #N/A = Rp. #N/A 1.5000 Oh Pekerja @Rp. 25,000.00 = Rp. 37,500.00 0.6000 Oh Tukang Batu @Rp. 30,000.00 = Rp. 18,000.00 0.0600 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 2,040.00 0.0750 Oh Mandor @Rp. 35,000.00 = Rp. 2,625.00

SNI - C.6.114 1 M3 Pas.Batu Kosong =Rp. #N/A 1.2000 M3 Batu Belah 15/20 cm @Rp. 90,000.00 = Rp. 108,000.00 0.3000 M3 Pasir urug @Rp. #N/A = Rp. #N/A 0.7800 Oh Pekerja @Rp. 25,000.00 = Rp. 19,500.00 0.3900 Oh Tukang Batu @Rp. 30,000.00 = Rp. 11,700.00 0.0390 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 1,326.00 0.0390 Oh Mandor @Rp. 35,000.00 = Rp. 1,365.00

D.PEKERJAAN DINDINGSNI - D.6.3 1 M2 Pas. Batu Merah tb. 1 bata 1 PC : 3 Ps =Rp. #N/A

140.0000 Bh Bata Merah (5x11x22 cm) @Rp. #N/A = Rp. #N/A 32.9500 Kg Portland Cement @Rp. #N/A = Rp. #N/A 0.0910 M3 Pasir Pasang @Rp. #N/A = Rp. #N/A 0.6500 Oh Pekerja @Rp. 25,000.00 = Rp. 16,250.00 0.2000 Oh Tukang Batu @Rp. 30,000.00 = Rp. 6,000.00 0.0200 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 680.00 0.0300 Oh Mandor @Rp. 35,000.00 = Rp. 1,050.00

SNI - D.6.5 1 M2 Pas. Batu Bata tb. 1 bata 1 PC : 5 Ps =Rp. #N/A 140.0000 Bh Bata Merah (5x11x22 cm) @Rp. #N/A = Rp. #N/A 22.2000 Kg Portland Cement @Rp. #N/A = Rp. #N/A 0.1020 M3 Pasir Pasang @Rp. #N/A = Rp. #N/A 0.6500 Oh Pekerja @Rp. 25,000.00 = Rp. 16,250.00 0.2000 Oh Tukang Batu @Rp. 30,000.00 = Rp. 6,000.00 0.0200 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 680.00 0.0300 Oh Mandor @Rp. 35,000.00 = Rp. 1,050.00

SNI - D.6.7 1 M2 Pas. Batu bata tb. 1 bata 1 PC : 3 Kp : 10 Ps =Rp. #N/A 140.0000 Bh Bata Merah (5x11x22 cm) @Rp. #N/A = Rp. #N/A 10.0800 Kg Portland Cement @Rp. #N/A = Rp. #N/A 0.0925 M3 Pasir Pasang @Rp. #N/A = Rp. #N/A 0.0275 M3 Kapur Pasang @Rp. #N/A = Rp. #N/A 0.6500 M4 Pekerja @Rp. 25,000.00 = Rp. 16,250.00 0.2000 Oh Tukang Batu @Rp. 30,000.00 = Rp. 6,000.00 0.0200 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 680.00 0.0300 Oh Mandor @Rp. 35,000.00 = Rp. 1,050.00

SNI - D.6.10 1 M2 Pas. Batu Bata tb. 1/2 bata 1 PC : 3 Ps =Rp. #N/A 70.0000 Bh Bata Merah (5x11x22 cm) @Rp. #N/A = Rp. #N/A 14.3700 Kg Portland Cement @Rp. #N/A = Rp. #N/A 0.0400 M3 Pasir Pasang @Rp. #N/A = Rp. #N/A 0.3200 Oh Pekerja @Rp. 25,000.00 = Rp. 8,000.00 0.1000 Oh Tukang Batu @Rp. 30,000.00 = Rp. 3,000.00 0.0100 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 340.00 0.0150 Oh Mandor @Rp. 35,000.00 = Rp. 525.00

SNI - D.6.12 1 M2 Pas. Batu Bata tb. 1/2 bata 1 PC : 5 Ps =Rp. #N/A 70.0000 Bh Bata Merah (5x11x22 cm) @Rp. #N/A = Rp. #N/A 9.6800 Kg Portland Cement @Rp. #N/A = Rp. #N/A 0.0450 M3 Pasir Pasang @Rp. #N/A = Rp. #N/A 0.3200 Oh Pekerja @Rp. 25,000.00 = Rp. 8,000.00 0.1000 Oh Tukang Batu @Rp. 30,000.00 = Rp. 3,000.00 0.0100 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 340.00 0.0150 Oh Mandor @Rp. 35,000.00 = Rp. 525.00

SNI - D.6 .15 1 M2 Pas. Batu Bata tb. 1/2 bata 1 PC : 3 Kp : 10 Ps =Rp. #N/A 70.0000 Bh Bata Merah (5x11x22 cm) @Rp. #N/A = Rp. #N/A 4.5000 Kg Portland Cement @Rp. #N/A = Rp. #N/A 0.0500 M3 Pasir Pasang @Rp. #N/A = Rp. #N/A 0.0150 M3 Kapur padam @Rp. #N/A = Rp. #N/A 0.3200 Oh Pekerja @Rp. 25,000.00 = Rp. 8,000.00 0.1000 Oh Tukang Batu @Rp. 30,000.00 = Rp. 3,000.00 0.0100 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 340.00 0.0150 Oh Mandor @Rp. 35,000.00 = Rp. 525.00

Page 37: Analis Sni Ta 2008

Page 37 of 77

E. PEKERJAAN PLESTERAN

SNI - E.6.3 1 M2 Plesteran 1 PC : 3 Ps tb. 1,5 cm =Rp. #N/A 6.4800 Kg Porland Cement @Rp. #N/A = Rp. #N/A 0.0190 M3 Pasir Pasang @Rp. #N/A = Rp. #N/A 0.2000 Oh Pekerja @Rp. 25,000.00 = Rp. 5,000.00 0.1500 Oh Tukang Batu @Rp. 30,000.00 = Rp. 4,500.00 0.0150 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 510.00 0.0100 Oh Mandor @Rp. 35,000.00 = Rp. 350.00

SNI - E.6.5 1 M2 Plesteran 1 PC : 5 Ps tb. 1,5 cm =Rp. #N/A 4.3200 Kg Porland Cement @Rp. #N/A = Rp. #N/A 0.0220 M3 Pasir Pasang @Rp. #N/A = Rp. #N/A 0.2000 Oh Pekerja @Rp. 25,000.00 = Rp. 5,000.00 0.1500 Oh Tukang Batu @Rp. 30,000.00 = Rp. 4,500.00 0.0150 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 510.00 0.0100 Oh Mandor @Rp. 35,000.00 = Rp. 350.00

SNI - E.6.9 1 M2 Plesteran 1 PC : 3 Kp : 10 Ps tb. 1,5 cm =Rp. #N/A 1.8400 Kg Porland Cement @Rp. #N/A = Rp. #N/A 0.0060 M3 Kapur padam @Rp. #N/A = Rp. #N/A 0.0140 M3 Pasir Pasang @Rp. #N/A = Rp. #N/A 0.2000 Oh Pekerja @Rp. 25,000.00 = Rp. 5,000.00 0.1500 Oh Tukang Batu @Rp. 30,000.00 = Rp. 4,500.00 0.0150 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 510.00 0.0100 Oh Mandor @Rp. 35,000.00 = Rp. 350.00

SNI - E.6.14 1 M2 Plesteran 1 PC : 3 Ps tb. 2 cm =Rp. #N/A 10.8 Kg Porland Cement @Rp. #N/A = Rp. #N/A 0.026 M3 Pasir Pasang @Rp. #N/A = Rp. #N/A 0.25 Oh Pekerja @Rp. 25,000.00 = Rp. 6,250.00 0.2 Oh Tukang Batu @Rp. 30,000.00 = Rp. 6,000.00 0.02 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 680.00 0.0125 Oh Mandor @Rp. 35,000.00 = Rp. 437.50

SNI - E.6.16 1 M2 Plesteran 1 PC : 5 Ps tb. 2 cm =Rp. #N/A 7.29 Kg Porland Cement @Rp. #N/A = Rp. #N/A 0.028 M3 Pasir Pasang @Rp. #N/A = Rp. #N/A 0.25 Oh Pekerja @Rp. 25,000.00 = Rp. 6,250.00 0.2 Oh Tukang Batu @Rp. 30,000.00 = Rp. 6,000.00 0.02 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 680.00 0.0125 Oh Mandor @Rp. 35,000.00 = Rp. 437.50

SNI - E.6.28 1 M2 Beraben 1 PC : 5 Ps tb. 1,5 cm =Rp. #N/A 5.67 Kg Porland Cement @Rp. #N/A = Rp. #N/A 0.023 M3 Pasir Pasang @Rp. #N/A = Rp. #N/A 0.15 Oh Pekerja @Rp. 25,000.00 = Rp. 3,750.00 0.07 Oh Tukang Batu @Rp. 30,000.00 = Rp. 2,100.00 0.007 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 238.00 0.008 Oh Mandor @Rp. 35,000.00 = Rp. 280.00

SNI - E.6.30 1 M2 Plesteran Beton 1 PC : 3 Ps tb. 1,5 cm =Rp. #N/A 7.07 Kg Porland Cement @Rp. #N/A = Rp. #N/A 0.021 M3 Pasir Pasang @Rp. #N/A = Rp. #N/A 0.26 Oh Pekerja @Rp. 25,000.00 = Rp. 6,500.00 0.2 Oh Tukang Batu @Rp. 30,000.00 = Rp. 6,000.00 0.02 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 680.00 0.013 Oh Mandor @Rp. 35,000.00 = Rp. 455.00

SNI - E.6.31 1 M2 Plesteran Skoning 1 PC : 2 Ps =Rp. #N/A 0.5 Kg Porland Cement @Rp. #N/A = Rp. #N/A 0.002 M3 Pasir Pasang @Rp. #N/A = Rp. #N/A 0.057 Oh Pekerja @Rp. 25,000.00 = Rp. 1,425.00 0.038 Oh Tukang Batu @Rp. 30,000.00 = Rp. 1,140.00 0.038 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 1,292.00 0.002 Oh Mandor @Rp. 35,000.00 = Rp. 70.00

SNI - E.6.35 1 M2 Plesteran Siar Adukan 1 PC : 2 Ps =Rp. #N/A 4.32 Kg Porland Cement @Rp. #N/A = Rp. #N/A 0.016 M3 Pasir Pasang @Rp. #N/A = Rp. #N/A 0.15 Oh Pekerja @Rp. 25,000.00 = Rp. 3,750.00 0.07 Oh Tukang Batu @Rp. 30,000.00 = Rp. 2,100.00 0.007 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 238.00 0.008 Oh Mandor @Rp. 35,000.00 = Rp. 280.00

Page 38: Analis Sni Ta 2008

Page 38 of 77

F.PEKERJAAN KAYUSNI - F.6.1 1 M3 Pas.Kusen Pintu dan Jendela Kayu Jati =Rp. #N/A

1.1 M3 Kayu Jati (balok) @Rp. #N/A = Rp. #N/A 6 Oh Pekerja @Rp. 25,000.00 = Rp. 150,000.00 20 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 600,000.00 2 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 68,000.00 0.3 Oh Mandor @Rp. 35,000.00 = Rp. 10,500.00

SNI - F.6.2 1 M3 Pas.Kusen Pintu dan Jendela Kayu Kamper =Rp. #N/A 1.2 M3 Kayu Kamper ( Balok ) @Rp. #N/A = Rp. #N/A 6 Oh Pekerja @Rp. 25,000.00 = Rp. 150,000.00 18 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 540,000.00 2 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 68,000.00 0.3 Oh Mandor @Rp. 35,000.00 = Rp. 10,500.00

SNI - F.6.2a 1 M3 Pas.Kusen Pintu dan Jendela Kayu Bangkir =Rp. #N/A 1.2 M3 Kayu Bangkir ( Balok ) @Rp. #N/A = Rp. #N/A 6 Oh Pekerja @Rp. 25,000.00 = Rp. 150,000.00 18 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 540,000.00 2 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 68,000.00 0.3 Oh Mandor @Rp. 35,000.00 = Rp. 10,500.00

SNI - F.6.2b 1 M3 Pas.Kusen Pintu dan Jendela Kayu Kruing =Rp. #N/A 1.2 M3 Kayu Kruing ( Balok ) @Rp. #N/A = Rp. #N/A 6 Oh Pekerja @Rp. 25,000.00 = Rp. 150,000.00 18 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 540,000.00 2 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 68,000.00 0.3 Oh Mandor @Rp. 35,000.00 = Rp. 10,500.00

SNI - F.6.7 1 M2 Pasang Pintu Panil Kayu Jati =Rp. #N/A 0.04 M3 Kayu Jati ( Papan ) @Rp. #N/A = Rp. #N/A 1 Oh Pekerja @Rp. 25,000.00 = Rp. 25,000.00 2.5 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 75,000.00 0.25 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 8,500.00 0.05 Oh Mandor @Rp. 35,000.00 = Rp. 1,750.00

SNI - F.6.8 1 M2 Pasang Pintu Panil Kayu Kamper =Rp. #N/A 0.04 M3 Kayu Kamper ( Papan ) @Rp. #N/A = Rp. #N/A 1 Oh Pekerja @Rp. 25,000.00 = Rp. 25,000.00 2.5 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 75,000.00 0.25 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 8,500.00 0.05 Oh Mandor @Rp. 35,000.00 = Rp. 1,750.00

SNI - F.6.8a 1 M2 Pasang Pintu Panil Kayu Bangkir =Rp. #N/A 0.04 M3 Kayu Bangkir ( Papan ) @Rp. #N/A = Rp. #N/A 1 Oh Pekerja @Rp. 25,000.00 = Rp. 25,000.00 2.5 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 75,000.00 0.25 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 8,500.00 0.05 Oh Mandor @Rp. 35,000.00 = Rp. 1,750.00

SNI - F.6.8b 1 M2 Pasang Pintu Panil Kayu Kruing =Rp. #N/A 0.04 M3 Kayu Kruing ( Papan ) @Rp. #N/A = Rp. #N/A 1 Oh Pekerja @Rp. 25,000.00 = Rp. 25,000.00 2.5 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 75,000.00 0.25 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 8,500.00 0.05 Oh Mandor @Rp. 35,000.00 = Rp. 1,750.00

SNI - F.6.9 1 M2 Pas. Pintu dan Jendela Kaca Kayu Jati =Rp. #N/A 0.035 M3 Kayu Jati ( Papan ) @Rp. #N/A = Rp. #N/A 0.8 Oh Pekerja @Rp. 25,000.00 = Rp. 20,000.00 2 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 60,000.00 0.2 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 6,800.00 0.04 Oh Mandor @Rp. 35,000.00 = Rp. 1,400.00

SNI - F.6.10 1 M2 Pas. Pintu dan Jendela Kaca Kayu Kamper =Rp. #N/A 0.035 M3 Kayu Kamper ( Papan ) @Rp. #N/A = Rp. #N/A 0.8 Oh Pekerja @Rp. 25,000.00 = Rp. 20,000.00 2 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 60,000.00 0.2 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 6,800.00 0.04 Oh Mandor @Rp. 35,000.00 = Rp. 1,400.00

SNI - F.6.10a 1 M2 Pas. Pintu dan Jendela Kaca Kayu Bangkir =Rp. #N/A 0.035 M3 Kayu Bangkir ( Papan ) @Rp. #N/A = Rp. #N/A 0.8 Oh Pekerja @Rp. 25,000.00 = Rp. 20,000.00 2 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 60,000.00 0.2 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 6,800.00 0.04 Oh Mandor @Rp. 35,000.00 = Rp. 1,400.00

SNI - F.6.10b 1 M2 Pas. Pintu dan Jendela Kaca Kayu Kruing =Rp. #N/A 0.035 M3 Kayu Kruing ( Papan ) @Rp. #N/A = Rp. #N/A 0.8 Oh Pekerja @Rp. 25,000.00 = Rp. 20,000.00 2 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 60,000.00 0.2 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 6,800.00 0.04 Oh Mandor @Rp. 35,000.00 = Rp. 1,400.00

Page 39: Analis Sni Ta 2008

Page 39 of 77

SNI - F.6.12 1 M2 Pas. Pintu dan Jendela Jalusi Kayu Jati =Rp. #N/A 0.064 M3 Kayu Jati ( Papan ) @Rp. #N/A = Rp. #N/A 1 Oh Pekerja @Rp. 25,000.00 = Rp. 25,000.00 3 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 90,000.00 0.3 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 10,200.00 0.3 Oh Mandor @Rp. 35,000.00 = Rp. 10,500.00

SNI - F.6.13 1 M2 Pas. Pintu dan Jendela Jalusi Kayu Kamper =Rp. #N/A 0.064 M3 Kayu Kamper ( Papan ) @Rp. #N/A = Rp. #N/A 1 Oh Pekerja @Rp. 25,000.00 = Rp. 25,000.00 3 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 90,000.00 0.3 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 10,200.00 0.3 Oh Mandor @Rp. 35,000.00 = Rp. 10,500.00

SNI - F.6.13a 1 M2 Pas. Pintu dan Jendela Jalusi Kayu Bangkir =Rp. #N/A 0.064 M3 Kayu Bangkir ( Papan ) @Rp. #N/A = Rp. #N/A 1 Oh Pekerja @Rp. 25,000.00 = Rp. 25,000.00 3 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 90,000.00 0.3 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 10,200.00 0.3 Oh Mandor @Rp. 35,000.00 = Rp. 10,500.00

SNI - F.6.13b 1 M2 Pas. Pintu dan Jendela Jalusi Kayu Kruing =Rp. #N/A 0.064 M3 Kayu Kruing ( Papan ) @Rp. #N/A = Rp. #N/A 1 Oh Pekerja @Rp. 25,000.00 = Rp. 25,000.00 3 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 90,000.00 0.3 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 10,200.00 0.3 Oh Mandor @Rp. 35,000.00 = Rp. 10,500.00

SNI - F.6.16 1 M2 Pas. Jalusi Mati Kusen Kayu Jati =Rp. #N/A 0.0600 M3 Kayu Jati ( Papan ) @Rp. #N/A = Rp. #N/A 0.1500 Kg Paku Biasa ( 1/2" - 1" ) @Rp. #N/A = Rp. #N/A 0.5000 Oh Pekerja @Rp. 25,000.00 = Rp. 12,500.00 2.0000 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 60,000.00 0.2000 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 6,800.00 0.0250 Oh Mandor @Rp. 35,000.00 = Rp. 875.00

SNI - F.6.17 1 M2 Pas. Jalusi Mati Kusen Kayu Kamper =Rp. #N/A 0.0600 M3 Kayu Kamper ( Papan ) @Rp. #N/A = Rp. #N/A 0.1500 Kg Paku Biasa ( 1/2" - 1" ) @Rp. #N/A = Rp. #N/A 0.5000 Oh Pekerja @Rp. 25,000.00 = Rp. 12,500.00 2.0000 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 60,000.00 0.2000 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 6,800.00 0.0250 Oh Mandor @Rp. 35,000.00 = Rp. 875.00

SNI - F.6.17a 1 M2 Pas. Jalusi Mati Kusen Kayu Bangkir =Rp. #N/A 0.0600 M3 Kayu Bangkir ( Papan ) @Rp. #N/A = Rp. #N/A 0.1500 Kg Paku Biasa ( 1/2" - 1" ) @Rp. #N/A = Rp. #N/A 0.5000 Oh Pekerja @Rp. 25,000.00 = Rp. 12,500.00 2.0000 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 60,000.00 0.2000 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 6,800.00 0.0250 Oh Mandor @Rp. 35,000.00 = Rp. 875.00

SNI - F.6.17b 1 M2 Pas. Jalusi Mati Kusen Kayu Kruing =Rp. #N/A 0.0600 M3 Kayu Kruing ( Papan ) @Rp. #N/A = Rp. #N/A 0.1500 Kg Paku Biasa ( 1/2" - 1" ) @Rp. #N/A = Rp. #N/A 0.5000 Oh Pekerja @Rp. 25,000.00 = Rp. 12,500.00 2.0000 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 60,000.00 0.2000 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 6,800.00 0.0250 Oh Mandor @Rp. 35,000.00 = Rp. 875.00

SNI - F.6.19 1 M2 Pas. Pintu Teakwood rangkap, rangka Kayu Jati =Rp. #N/A 0.0196 M3 Kayu Jati ( Papan ) @Rp. #N/A = Rp. #N/A 0.3000 Kg Paku Biasa ( 1/2" - 1" ) @Rp. #N/A = Rp. #N/A 0.3000 Kg Lem Kayu @Rp. #N/A = Rp. #N/A 1.0000 lbr Teakwood 3' x 7' x 3 mm @Rp. #N/A = Rp. #N/A 0.6000 Oh Pekerja @Rp. 25,000.00 = Rp. 15,000.00 2.0000 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 60,000.00 0.2000 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 6,800.00 0.0300 Oh Mandor @Rp. 35,000.00 = Rp. 1,050.00

SNI - F.6.20 1 M2 Pas. Pintu Teakwood rangkap, rangka Kayu Kamper =Rp. #N/A 0.0196 M3 Kayu Kamper ( Papan ) @Rp. #N/A = Rp. #N/A 0.3000 Kg Paku Biasa ( 1/2" - 1" ) @Rp. #N/A = Rp. #N/A 0.3000 Kg Lem Kayu @Rp. #N/A = Rp. #N/A 1.0000 lbr Teakwood 3' x 7' x 3 mm @Rp. #N/A = Rp. #N/A 0.6000 Oh Pekerja @Rp. 25,000.00 = Rp. 15,000.00 2.0000 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 60,000.00 0.2000 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 6,800.00 0.0300 Oh Mandor @Rp. 35,000.00 = Rp. 1,050.00

SNI - F.6.20a 1 M2 Pas. Pintu Teakwood rangkap, rangka Kayu Bangkir =Rp. #N/A 0.0196 M3 Kayu Bangkir ( Papan ) @Rp. #N/A = Rp. #N/A 0.3000 Kg Paku Biasa ( 1/2" - 1" ) @Rp. #N/A = Rp. #N/A 0.3000 Kg Lem Kayu @Rp. #N/A = Rp. #N/A 1.0000 lbr Teakwood 3' x 7' x 3 mm @Rp. #N/A = Rp. #N/A

Page 40: Analis Sni Ta 2008

Page 40 of 77

0.6000 Oh Pekerja @Rp. 25,000.00 = Rp. 15,000.00 2.0000 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 60,000.00 0.2000 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 6,800.00 0.0300 Oh Mandor @Rp. 35,000.00 = Rp. 1,050.00

SNI - F.6.20b 1 M2 Pas. Pintu Teakwood rangkap, rangka Kayu Kruing =Rp. #N/A 0.0196 M3 Kayu Kruing ( Papan ) @Rp. #N/A = Rp. #N/A 0.3000 Kg Paku Biasa ( 1/2" - 1" ) @Rp. #N/A = Rp. #N/A 0.3000 Kg Lem Kayu @Rp. #N/A = Rp. #N/A 1.0000 lbr Teakwood 3' x 7' x 3 mm @Rp. #N/A = Rp. #N/A 0.6000 Oh Pekerja @Rp. 25,000.00 = Rp. 15,000.00 2.0000 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 60,000.00 0.2000 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 6,800.00 0.0300 Oh Mandor @Rp. 35,000.00 = Rp. 1,050.00

SNI - F.6.20c 1 M2 Pintu Triplek 3 mm rangkap, rangka Kayu Kamper =Rp. #N/A 0.0196 M3 Kayu Kamper ( Papan ) @Rp. #N/A = Rp. #N/A 0.3000 Kg Paku Biasa ( 1/2" - 1" ) @Rp. #N/A = Rp. #N/A 0.3000 Kg Lem Kayu @Rp. #N/A = Rp. #N/A 1.0000 lbr Triplek 3 mm ( 3' x 7' ) @Rp. #N/A = Rp. #N/A 0.6000 Oh Pekerja @Rp. 25,000.00 = Rp. 15,000.00 2.0000 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 60,000.00 0.2000 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 6,800.00 0.0300 Oh Mandor @Rp. 35,000.00 = Rp. 1,050.00

SNI - F.6.20d 1 M2 Pas. Pintu Triplek 3 mm rangkap, rangka Kayu Bangkir = Rp. #N/A 0.0196 M3 Kayu Bangkir ( Papan ) @Rp. #N/A = Rp. #N/A 0.3000 Kg Paku Biasa ( 1/2" - 1" ) @Rp. #N/A = Rp. #N/A 0.3000 Kg Lem Kayu @Rp. #N/A = Rp. #N/A 1.0000 lbr Triplek 3 mm ( 3' x 7' ) @Rp. #N/A = Rp. #N/A 0.6000 Oh Pekerja @Rp. 25,000.00 = Rp. 15,000.00 2.0000 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 60,000.00 0.2000 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 6,800.00 0.0300 Oh Mandor @Rp. 35,000.00 = Rp. 1,050.00

SNI - F.6.20e 1 M2 Pas. Pintu Triplek 3 mm rangkap, rangka Kayu Kruing = Rp. #N/A 0.0196 M3 Kayu Kruing ( Papan ) @Rp. #N/A = Rp. #N/A 0.3000 Kg Paku Biasa ( 1/2" - 1" ) @Rp. #N/A = Rp. #N/A 0.3000 Kg Lem Kayu @Rp. #N/A = Rp. #N/A 1.0000 lbr Triplek 3 mm ( 3' x 7' ) @Rp. #N/A = Rp. #N/A 0.6000 Oh Pekerja @Rp. 25,000.00 = Rp. 15,000.00 2.0000 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 60,000.00 0.2000 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 6,800.00 0.0300 Oh Mandor @Rp. 35,000.00 = Rp. 1,050.00

SNI - F.6.27 1 M3 Pas. Konstruksi Kuda-kuda Kayu Jati = Rp. #N/A 1.1000 M3 Kayu Jati ( Balok ) @Rp. #N/A = Rp. #N/A 15.0000 Kg Begel @Rp. #N/A = Rp. #N/A 0.8000 Kg Paku Biasa ( 2" - 5" ) @Rp. #N/A = Rp. #N/A 4.0000 Oh Pekerja @Rp. 25,000.00 = Rp. 100,000.00 12.0000 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 360,000.00 1.2000 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 40,800.00 0.2000 Oh Mandor @Rp. 35,000.00 = Rp. 7,000.00

SNI - F.6.28 1 M3 Pas. Konstruksi Kuda-kuda Kayu Kamper = Rp. #N/A 1.1000 M3 Kayu Kamper ( Balok ) @Rp. #N/A = Rp. #N/A 15.0000 Kg Begel @Rp. #N/A = Rp. #N/A 0.8000 Kg Paku Biasa ( 2" - 5" ) @Rp. #N/A = Rp. #N/A 4.0000 Oh Pekerja @Rp. 25,000.00 = Rp. 100,000.00 12.0000 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 360,000.00 1.2000 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 40,800.00 0.2000 Oh Mandor @Rp. 35,000.00 = Rp. 7,000.00

SNI - F.6.28a 1 M3 Konstruksi Kuda-kuda Kayu Bangkir = Rp. #N/A 1.1000 M3 Kayu Bangkir ( Balok ) @Rp. #N/A = Rp. #N/A 15.0000 Kg Begel @Rp. #N/A = Rp. #N/A 0.8000 Kg Paku Biasa ( 2" - 5" ) @Rp. #N/A = Rp. #N/A 4.0000 Oh Pekerja @Rp. 25,000.00 = Rp. 100,000.00 12.0000 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 360,000.00 1.2000 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 40,800.00 0.2000 Oh Mandor @Rp. 35,000.00 = Rp. 7,000.00

SNI - F.6.30 1 M3 Pas. Konstruksi Kuda-kuda Kayu Kruing = Rp. #N/A 1.1000 M3 Kayu Kruing ( Balok ) @Rp. #N/A = Rp. #N/A 15.0000 Kg Begel @Rp. #N/A = Rp. #N/A 0.8000 Kg Paku Biasa ( 2" - 5" ) @Rp. #N/A = Rp. #N/A 4.0000 Oh Pekerja @Rp. 25,000.00 = Rp. 100,000.00 12.0000 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 360,000.00 1.2000 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 40,800.00 0.2000 Oh Mandor @Rp. 35,000.00 = Rp. 7,000.00

SNI - F.6.31 1 M2 Pas.Kaso dan Reng genteng ( Kodok, Plentong, Vlams dan sejenisnya ) Kayu Kamper = Rp. #N/A 0.0120 M3 Kayu Kamper @Rp. #N/A = Rp. #N/A 0.1500 Kg Paku Biasa ( 2" - 5" ) @Rp. #N/A = Rp. #N/A

Page 41: Analis Sni Ta 2008

Page 41 of 77

0.1000 Oh Pekerja @Rp. 25,000.00 = Rp. 2,500.00 0.1000 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 3,000.00 0.0100 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 340.00 0.0050 Oh Mandor @Rp. 35,000.00 = Rp. 175.00

SNI - F.6.31a 1 M2 Pas.Kaso dan Reng genteng ( Kodok, Plentong, Vlams dan sejenisnya ) Kayu Bangkir = Rp. #N/A 0.0120 M3 Kayu Bangkir @Rp. #N/A = Rp. #N/A 0.1500 Kg Paku Biasa ( 2" - 5" ) @Rp. #N/A = Rp. #N/A 0.1000 Oh Pekerja @Rp. 25,000.00 = Rp. 2,500.00 0.1000 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 3,000.00 0.0100 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 340.00 0.0050 Oh Mandor @Rp. 35,000.00 = Rp. 175.00

SNI - F.6.31b 1 M2 Pas.Kaso dan Reng genteng ( Kodok, Plentong, Vlams dan sejenisnya ) Kayu Kruing = Rp. #N/A 0.0120 M3 Kayu Kruing @Rp. #N/A = Rp. #N/A 0.1500 Kg Paku Biasa ( 2" - 5" ) @Rp. #N/A = Rp. #N/A 0.1000 Oh Pekerja @Rp. 25,000.00 = Rp. 2,500.00 0.1000 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 3,000.00 0.0100 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 340.00 0.0050 Oh Mandor @Rp. 35,000.00 = Rp. 175.00

SNI - F.6.31c 1 M2 Pas.Kaso dan Reng genteng ( Kodok, Plentong, Vlams dan sejenisnya ) Kayu Meranti = Rp. #N/A 0.0120 M3 Kayu Meranti @Rp. #N/A = Rp. #N/A 0.1500 Kg Paku Biasa ( 2" - 5" ) @Rp. #N/A = Rp. #N/A 0.1000 Oh Pekerja @Rp. 25,000.00 = Rp. 2,500.00 0.1000 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 3,000.00 0.0100 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 340.00 0.0050 Oh Mandor @Rp. 35,000.00 = Rp. 175.00

SNI - F.6.35 1 M2 Pas.Kaso dan Reng genteng ( beton, monier, morando dan sejenisnya ) Kayu Kamper = Rp. #N/A 0.0140 M3 Kayu Kamper @Rp. #N/A = Rp. #N/A 0.1500 Kg Paku Biasa ( 2" - 5" ) @Rp. #N/A = Rp. #N/A 0.1000 Oh Pekerja @Rp. 25,000.00 = Rp. 2,500.00 0.1000 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 3,000.00 0.0100 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 340.00 0.0050 Oh Mandor @Rp. 35,000.00 = Rp. 175.00

SNI - F.6.35a 1 M2 Pas.Kaso dan Reng genteng ( beton, monier, morando dan sejenisnya ) Kayu Bangkir = Rp. #N/A 0.0140 M3 Kayu Bangkir @Rp. #N/A = Rp. #N/A 0.1500 Kg Paku Biasa ( 2" - 5" ) @Rp. #N/A = Rp. #N/A 0.1000 Oh Pekerja @Rp. 25,000.00 = Rp. 2,500.00 0.1000 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 3,000.00 0.0100 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 340.00 0.0050 Oh Mandor @Rp. 35,000.00 = Rp. 175.00

SNI - F.6.35b 1 M2 Pas.Kaso dan Reng genteng ( beton, monier, morando dan sejenisnya ) Kayu Kruing = Rp. #N/A 0.0140 M3 Kayu Kruing @Rp. #N/A = Rp. #N/A 0.1500 Kg Paku Biasa ( 2" - 5" ) @Rp. #N/A = Rp. #N/A 0.1000 Oh Pekerja @Rp. 25,000.00 = Rp. 2,500.00 0.1000 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 3,000.00 0.0100 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 340.00 0.0050 Oh Mandor @Rp. 35,000.00 = Rp. 175.00

SNI - F.6.38 1 M2 Pas. Rangka Langit-langit Kayu Jati Uk. 1 x 1 m = Rp. #N/A 0.0120 M3 Kayu Jati @Rp. #N/A = Rp. #N/A 0.1000 Kg Paku Biasa ( 2" - 5" ) @Rp. #N/A = Rp. #N/A 0.1500 Oh Pekerja @Rp. 25,000.00 = Rp. 3,750.00 0.2500 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 7,500.00 0.0250 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 850.00 0.0750 Oh Mandor @Rp. 35,000.00 = Rp. 2,625.00

SNI - F.6.39 1 M2 Pas. Rangka Langit-langit Kayu Kamper Uk. 1 x 1 m = Rp. #N/A 0.0120 M3 Kayu Kamper @Rp. #N/A = Rp. #N/A 0.1000 Kg Paku Biasa ( 2" - 5" ) @Rp. #N/A = Rp. #N/A 0.1500 Oh Pekerja @Rp. 25,000.00 = Rp. 3,750.00 0.2500 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 7,500.00 0.0250 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 850.00 0.0750 Oh Mandor @Rp. 35,000.00 = Rp. 2,625.00

SNI - F.6.39a 1 M2 Pas. Rangka Langit-langit Kayu Bangkir Uk. 1 x 1 m = Rp. #N/A 0.0120 M3 Kayu Bangkir @Rp. #N/A = Rp. #N/A 0.1000 Kg Paku Biasa ( 2" - 5" ) @Rp. #N/A = Rp. #N/A 0.1500 Oh Pekerja @Rp. 25,000.00 = Rp. 3,750.00 0.2500 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 7,500.00 0.0250 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 850.00 0.0750 Oh Mandor @Rp. 35,000.00 = Rp. 2,625.00

SNI - F.6.39b 1 M2 Pas. Rangka Langit-langit Kayu Kruing Uk. 1 x 1 m = Rp. #N/A

Page 42: Analis Sni Ta 2008

Page 42 of 77

0.0120 M3 Kayu Kruing @Rp. #N/A = Rp. #N/A 0.1000 Kg Paku Biasa ( 2" - 5" ) @Rp. #N/A = Rp. #N/A 0.1500 Oh Pekerja @Rp. 25,000.00 = Rp. 3,750.00 0.2500 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 7,500.00 0.0250 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 850.00 0.0750 Oh Mandor @Rp. 35,000.00 = Rp. 2,625.00

SNI - F.6.39c 1 M2 Pas. Rangka Langit-langit Kayu Meranti Uk. 1 x 1 m = Rp. #N/A 0.0120 M3 Kayu Meranti @Rp. #N/A = Rp. #N/A 0.1000 Kg Paku Biasa ( 2" - 5" ) @Rp. #N/A = Rp. #N/A 0.1500 Oh Pekerja @Rp. 25,000.00 = Rp. 3,750.00 0.2500 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 7,500.00 0.0250 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 850.00 0.0750 Oh Mandor @Rp. 35,000.00 = Rp. 2,625.00

SNI - F.6.44 1 M2 Pas. Rangka Langit-langit Kayu Kamper Uk. 0,30 x 0,30 m = Rp. #N/A 0.0270 M3 Kayu Kamper @Rp. #N/A = Rp. #N/A 0.2000 Kg Paku Biasa ( 2" - 5" ) @Rp. #N/A = Rp. #N/A 0.2500 Oh Pekerja @Rp. 25,000.00 = Rp. 6,250.00 0.3500 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 10,500.00 0.0350 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 1,190.00 0.0125 Oh Mandor @Rp. 35,000.00 = Rp. 437.50

SNI - F.6.44a 1 M2 Pas. Rangka Langit-langit Kayu Bangkir Uk. 0,30 x 0,30 m = Rp. #N/A 0.0270 M3 Kayu Bangkir @Rp. #N/A = Rp. #N/A 0.2000 Kg Paku Biasa ( 2" - 5" ) @Rp. #N/A = Rp. #N/A 0.2500 Oh Pekerja @Rp. 25,000.00 = Rp. 6,250.00 0.3500 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 10,500.00 0.0350 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 1,190.00 0.0125 Oh Mandor @Rp. 35,000.00 = Rp. 437.50

SNI - F.6.44b 1 M2 Pas. Rangka Langit-langit Kayu Kruing Uk. 0,30 x 0,30 m = Rp. #N/A 0.0270 M3 Kayu Kruing @Rp. #N/A = Rp. #N/A 0.2000 Kg Paku Biasa ( 2" - 5" ) @Rp. #N/A = Rp. #N/A 0.2500 Oh Pekerja @Rp. 25,000.00 = Rp. 6,250.00 0.3500 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 10,500.00 0.0350 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 1,190.00 0.0125 Oh Mandor @Rp. 35,000.00 = Rp. 437.50

SNI - F.6.44c 1 M2 Pas. Rangka Langit-langit Kayu Meranti Uk. 0,30 x 0,30 m = Rp. #N/A 0.0270 M3 Kayu Meranti @Rp. #N/A = Rp. #N/A 0.2000 Kg Paku Biasa ( 2" - 5" ) @Rp. #N/A = Rp. #N/A 0.2500 Oh Pekerja @Rp. 25,000.00 = Rp. 6,250.00 0.3500 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 10,500.00 0.0350 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 1,190.00 0.0125 Oh Mandor @Rp. 35,000.00 = Rp. 437.50

SNI - F.6.47 1 M' Pas. Lisplank Kayu Jati Uk. 3 x 20 cm = Rp. #N/A 0.0072 M3 Kayu Jati ( Papan ) @Rp. #N/A = Rp. #N/A 0.0500 Kg Paku Biasa ( 2" - 5" ) @Rp. #N/A = Rp. #N/A 0.1000 Oh Pekerja @Rp. 25,000.00 = Rp. 2,500.00 0.2000 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 6,000.00 0.0250 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 850.00 0.0050 Oh Mandor @Rp. 35,000.00 = Rp. 175.00

SNI - F.6.48 1 M' Pas. Lisplank Kayu Kamper Uk. 3 x 20 cm = Rp. #N/A 0.0072 M3 Kayu Kamper ( Papan ) @Rp. #N/A = Rp. #N/A 0.0500 Kg Paku Biasa ( 2" - 5" ) @Rp. #N/A = Rp. #N/A 0.1000 Oh Pekerja @Rp. 25,000.00 = Rp. 2,500.00 0.2000 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 6,000.00 0.0250 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 850.00 0.0050 Oh Mandor @Rp. 35,000.00 = Rp. 175.00

SNI - F.6.48a 1 M' Pas. Lisplank Kayu Bangkir Uk. 3 x 20 cm = Rp. #N/A 0.0072 M3 Kayu Bangkir ( Papan ) @Rp. #N/A = Rp. #N/A 0.0500 Kg Paku Biasa ( 2" - 5" ) @Rp. #N/A = Rp. #N/A 0.1000 Oh Pekerja @Rp. 25,000.00 = Rp. 2,500.00 0.2000 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 6,000.00 0.0250 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 850.00 0.0050 Oh Mandor @Rp. 35,000.00 = Rp. 175.00

SNI - F.6.48b 1 M' Pas. Lisplank Kayu Kruing Uk. 3 x 20 cm = Rp. #N/A 0.0072 M3 Kayu Kruing ( Papan ) @Rp. #N/A = Rp. #N/A 0.0500 Kg Paku Biasa ( 2" - 5" ) @Rp. #N/A = Rp. #N/A 0.1000 Oh Pekerja @Rp. 25,000.00 = Rp. 2,500.00 0.2000 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 6,000.00 0.0200 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 680.00 0.0050 Oh Mandor @Rp. 35,000.00 = Rp. 175.00

Page 43: Analis Sni Ta 2008

Page 43 of 77

SNI - F.6.52 1 M' Pas. Lisplank Kayu Jati ( 2 x 20 ) cm = Rp. #N/A 0.0086 M3 Kayu Jati ( Papan ) @Rp. #N/A = Rp. #N/A 0.0600 Kg Paku Biasa ( 2" - 5" ) @Rp. #N/A = Rp. #N/A 0.1000 Oh Pekerja @Rp. 25,000.00 = Rp. 2,500.00 0.1000 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 3,000.00 0.0100 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 340.00 0.0500 Oh Mandor @Rp. 35,000.00 = Rp. 1,750.00

SNI - F.6.52a 1 M' Pas. Lisplank Kayu Kamper ( 2 x 20 ) cm = Rp. #N/A 0.0086 M3 Kayu Kamper ( Papan ) @Rp. #N/A = Rp. #N/A 0.0600 Kg Paku Biasa ( 2" - 5" ) @Rp. #N/A = Rp. #N/A 0.1000 Oh Pekerja @Rp. 25,000.00 = Rp. 2,500.00 0.1000 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 3,000.00 0.0100 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 340.00 0.0500 Oh Mandor @Rp. 35,000.00 = Rp. 1,750.00

SNI - F.6.52b 1 M' Pas. Lisplank Kayu Bangkir ( 2 x 20 ) cm = Rp. #N/A 0.0086 M3 Kayu Bangkir ( Papan ) @Rp. #N/A = Rp. #N/A 0.0600 Kg Paku Biasa ( 2" - 5" ) @Rp. #N/A = Rp. #N/A 0.1000 Oh Pekerja @Rp. 25,000.00 = Rp. 2,500.00 0.1000 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 3,000.00 0.0100 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 340.00 0.0500 Oh Mandor @Rp. 35,000.00 = Rp. 1,750.00

SNI - F.6.52c 1 M' Pas. Lisplank Kayu Kruing ( 2 x 20 ) cm = Rp. #N/A 0.0086 M3 Kayu Kruing ( Papan ) @Rp. #N/A = Rp. #N/A 0.0600 Kg Paku Biasa ( 2" - 5" ) @Rp. #N/A = Rp. #N/A 0.1000 Oh Pekerja @Rp. 25,000.00 = Rp. 2,500.00 0.1000 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 3,000.00 0.0100 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 340.00 0.0500 Oh Mandor @Rp. 35,000.00 = Rp. 1,750.00

G. PEKERJAAN BETON

SNI - G.6.1 1 M3 Pas. Beton Tumbuk 1 PC : 3 Ps : 5 Kr = Rp. #N/A 218.0000 Kg Portland Cement @Rp. #N/A = Rp. #N/A 0.5200 M3 Pasir Beton @Rp. #N/A = Rp. #N/A 0.8700 M3 Koral Beton ( Batu Pecah 2/3 cm ) @Rp. #N/A = Rp. #N/A 1.6500 Oh Pekerja @Rp. 25,000.00 = Rp. 41,250.00 0.2500 Oh Tukang Batu @Rp. 30,000.00 = Rp. 7,500.00 0.0250 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 850.00 0.0800 Oh Mandor @Rp. 35,000.00 = Rp. 2,800.00

SNI - G.6.4 1 M3 Pas. Lantai Kerja Beton Tumbuk 1 PC : 3 Ps : 5 Kr tb. 5 cm = Rp. #N/A 10.0000 Kg Portland Cement @Rp. #N/A = Rp. #N/A 0.0260 M3 Pasir Beton @Rp. #N/A### = Rp. #N/A 0.0440 M3 Koral Beton ( Batu Pecah 2/3 cm ) @Rp. #N/A### = Rp. #N/A 1.1500 Oh Pekerja @Rp. 25,000.00 = Rp. 28,750.00 0.0200 Oh Tukang Batu @Rp. 30,000.00 = Rp. 600.00 0.0020 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 68.00 0.0060 Oh Mandor @Rp. 35,000.00 = Rp. 210.00

SNI - G.6.7 1 M3 Pas. Beton Cor 1 PC : 2 Ps : 2,5 Kr = Rp. #N/A 352.0000 Kg Portland Cement @Rp. #N/A = Rp. #N/A 0.5600 M3 Pasir Beton @Rp. #N/A = Rp. #N/A 0.7000 M3 Koral Beton ( Batu Pecah 2/3 cm ) @Rp. #N/A = Rp. #N/A 1.6500 Oh Pekerja @Rp. 25,000.00 = Rp. 41,250.00 0.2500 Oh Tukang Batu @Rp. 30,000.00 = Rp. 7,500.00 0.0250 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 850.00 0.0800 Oh Mandor @Rp. 35,000.00 = Rp. 2,800.00

SNI - G.6.13 1 M3 Pas. Beton Cor 1 PC : 2 Ps : 3 Kr = Rp. #N/A 336.0000 Kg Portland Cement @Rp. #N/A = Rp. #N/A 0.5400 M3 Pasir Beton @Rp. #N/A = Rp. #N/A 0.8100 M3 Koral Beton ( Batu Pecah 2/3 cm ) @Rp. #N/A = Rp. #N/A 2.0000 Oh Pekerja @Rp. 25,000.00 = Rp. 50,000.00 0.3500 Oh Tukang Batu @Rp. 30,000.00 = Rp. 10,500.00 0.0350 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 1,190.00 1.0000 Oh Mandor @Rp. 35,000.00 = Rp. 35,000.00

SNI - G.6.25 1 Kg Pembesian dengan Besi Beton Polos = Rp. #N/A 1.0500 Kg Besi Beton Polos @Rp. #N/A = Rp. #N/A 0.0150 Kg Kawat Beton ( Bendrat ) @Rp. #N/A = Rp. #N/A 0.0070 Oh Pekerja @Rp. 25,000.00 = Rp. 175.00 0.0070 Oh Tukang Besi @Rp. 30,000.00 = Rp. 210.00 0.0007 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 23.80 0.0003 Oh Mandor @Rp. 35,000.00 = Rp. 10.50

SNI - G.6.25a 1 Kg Pembesian dengan Besi Beton Ulir = Rp. #N/A 1.0500 Kg Besi Beton Ulir @Rp. #N/A = Rp. #N/A 0.0150 Kg Kawat Beton ( Bendrat ) @Rp. #N/A = Rp. #N/A 0.0070 Oh Pekerja @Rp. 25,000.00 = Rp. 175.00 0.0070 Oh Tukang Besi @Rp. 30,000.00 = Rp. 210.00

Page 44: Analis Sni Ta 2008

Page 44 of 77

0.0007 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 23.80 0.0003 Oh Mandor @Rp. 35,000.00 = Rp. 10.50

SNI - G.6.28 1 M2 Pas. Bekisting untuk Pondasi = Rp. #N/A 0.0400 M3 Kayu Tahun @Rp. #N/A = Rp. #N/A 0.3000 Kg Paku Usuk/Plafon/Reng (2" - 5") @Rp. #N/A = Rp. #N/A 0.3000 Oh Pekerja @Rp. 25,000.00 = Rp. 7,500.00 0.2600 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 7,800.00 0.0260 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 884.00 0.0050 Oh Mandor @Rp. 35,000.00 = Rp. 175.00

SNI - G.6.29 1 M2 Pas. Bekisting untuk Sloof = Rp. #N/A 0.0450 M3 Kayu Tahun @Rp. #N/A = Rp. #N/A 0.3000 Kg Paku Biasa (2" - 5") @Rp. #N/A = Rp. #N/A 0.3000 Oh Pekerja @Rp. 25,000.00 = Rp. 7,500.00 0.2600 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 7,800.00 0.0260 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 884.00 0.0050 Oh Mandor @Rp. 35,000.00 = Rp. 175.00

SNI - G.6.30 1 M2 Pas. Bekisting untuk Kolom = Rp. #N/A 0.0400 M3 Kayu Tahun @Rp. #N/A = Rp. #N/A 0.4000 Kg Paku Biasa (2" - 5") @Rp. #N/A = Rp. #N/A 0.0150 M3 Kayu Meranti ( Usuk 5/7 ) @Rp. #N/A = Rp. #N/A 0.3500 Lbr. Multiplek Tb. 9 mm @Rp. #N/A = Rp. #N/A 2.0000 Btg. Dolken Kayu Galam diam. 8-10/4 m @Rp. 35,000.00 = Rp. 70,000.00 0.3000 Oh Pekerja @Rp. 25,000.00 = Rp. 7,500.00 0.3300 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 9,900.00 0.0330 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 1,122.00 0.0060 Oh Mandor @Rp. 35,000.00 = Rp. 210.00

SNI - G.6.31 1 M2 Pas. Bekisting untuk Balok = Rp. #N/A 0.0400 M3 Kayu Tahun @Rp. #N/A = Rp. #N/A 0.4000 Kg Paku Biasa (2" - 5") @Rp. #N/A = Rp. #N/A 0.0180 M3 Kayu Meranti ( Usuk 5/7 ) @Rp. #N/A = Rp. #N/A 0.3500 Lbr. Multiplek Tb. 9 mm @Rp. #N/A = Rp. #N/A 2.0000 Btg. Dolken Kayu Galam diam. 8-10/4 m @Rp. 35,000.00 = Rp. 70,000.00 0.3200 Oh Pekerja @Rp. 25,000.00 = Rp. 8,000.00 0.3300 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 9,900.00 0.0330 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 1,122.00 0.0060 Oh Mandor @Rp. 35,000.00 = Rp. 210.00

SNI - G.6.32 1 M2 Pas. Bekisting untuk Lantai = Rp. #N/A 0.0400 M3 Kayu Tahun @Rp. #N/A = Rp. #N/A 0.4000 Kg Paku Biasa (2" - 5") @Rp. #N/A = Rp. #N/A 0.0150 M3 Kayu Meranti ( Usuk 5/7 ) @Rp. #N/A = Rp. #N/A 0.3500 Lbr. Multiplek Tb. 9 mm @Rp. #N/A = Rp. #N/A 6.0000 Btg. Dolken Kayu Galam diam. 8-10/4 m @Rp. 35,000.00 = Rp. 210,000.00 0.3200 Oh Pekerja @Rp. 25,000.00 = Rp. 8,000.00 0.3300 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 9,900.00 0.0330 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 1,122.00 0.0060 Oh Mandor @Rp. 35,000.00 = Rp. 210.00

SNI - G.6.33 1 M2 Pas. Bekisting untuk Dinding = Rp. #N/A 0.0300 M3 Kayu Tahun @Rp. #N/A = Rp. #N/A 0.4000 Kg Paku Biasa (2" - 5") @Rp. #N/A = Rp. #N/A 0.0200 M3 Kayu Meranti ( Usuk 5/7 ) @Rp. #N/A = Rp. #N/A 0.3500 Lbr. Multiplek Tb. 9 mm @Rp. #N/A = Rp. #N/A 3.0000 Btg. Dolken Kayu Galam diam. 8-10/4 m @Rp. 35,000.00 = Rp. 105,000.00 4.0000 Btg. Formite/Penjaga Jarak Bekisting/Spacer @Rp. - = Rp. - 0.3200 Oh Pekerja @Rp. 25,000.00 = Rp. 8,000.00 0.3300 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 9,900.00 0.0330 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 1,122.00 0.0060 Oh Mandor @Rp. 35,000.00 = Rp. 210.00

,SNI - G.6.34 1 M2 Pas. Bekisting untuk Tangga = Rp. #N/A

0.0300 M3 Kayu Tahun @Rp. #N/A = Rp. #N/A 0.4000 Kg Paku Biasa (2" - 5") @Rp. #N/A = Rp. #N/A 0.0150 M3 Kayu Meranti ( Balok ) @Rp. #N/A = Rp. #N/A 0.3500 Lbr. Plywood Tb. 9 mm @Rp. #N/A = Rp. #N/A 2.0000 Btg. Dolken Kayu Galam diam. 8-10/4 m @Rp. 35,000.00 = Rp. 70,000.00 0.3200 Oh Pekerja @Rp. 25,000.00 = Rp. 8,000.00 0.3300 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 9,900.00 0.0330 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 1,122.00 0.0060 Oh Mandor @Rp. 35,000.00 = Rp. 210.00

SNI - G.6.45 1 M' Pas. Kolom Penguat Beton Bertulang ( 11 x 11 ) cm = Rp. #N/A 0.0020 M3 Kayu Tahun @Rp. #N/A = Rp. #N/A 0.0100 Kg Paku Biasa (2" - 5") @Rp. #N/A = Rp. #N/A 3.0000 Kg Besi Beton Polos @Rp. #N/A = Rp. #N/A 0.4500 Kg Kawat Beton ( Bendrat ) @Rp. #N/A = Rp. #N/A 4.0000 Kg Portland Cement @Rp. #N/A = Rp. #N/A 0.0060 M3 Pasir Beton @Rp. #N/A = Rp. #N/A 0.0090 Lbr. Koral Beton ( Batu Pecah 2/3 ) @Rp. #N/A = Rp. #N/A 0.0600 Oh Pekerja @Rp. 25,000.00 = Rp. 1,500.00 0.0200 Oh Tukang Batu @Rp. 30,000.00 = Rp. 600.00

Page 45: Analis Sni Ta 2008

Page 45 of 77

0.0200 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 600.00 0.0200 Oh Tukang Besi @Rp. 30,000.00 = Rp. 600.00 0.0060 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 204.00 0.0030 Oh Mandor @Rp. 35,000.00 = Rp. 105.00

SNI - G.6.46 1 M' Pas. Ring Balok Beton ( Bertulang 10 x 15 cm ) = Rp. #N/A 0.0030 M3 Kayu Tahun @Rp. #N/A = Rp. #N/A 0.0200 Kg Paku Biasa (2" - 5") @Rp. #N/A = Rp. #N/A 3.6000 Kg Besi Beton Polos @Rp. #N/A = Rp. #N/A 0.0500 Kg Kawat Beton ( Bendrat ) @Rp. #N/A = Rp. #N/A 5.5000 Kg Portland Cement @Rp. #N/A = Rp. #N/A 0.0090 M3 Pasir Beton @Rp. #N/A = Rp. #N/A 0.0150 Lbr. Koral Beton ( Batu Pecah 2/3 ) @Rp. #N/A = Rp. #N/A 0.1000 Oh Pekerja @Rp. 25,000.00 = Rp. 2,500.00 0.0330 Oh Tukang Batu @Rp. 30,000.00 = Rp. 990.00 0.0330 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 990.00 0.0330 Oh Tukang Besi @Rp. 30,000.00 = Rp. 990.00 0.0100 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 340.00 0.0050 Oh Mandor @Rp. 35,000.00 = Rp. 175.00

SNI - H.6.1 1 M2 Pas. Atap Genteng Plentong Kecil = Rp. #N/A 25.0000 Bh Genteng Plentong @Rp. #N/A = Rp. #N/A 0.1500 Oh Pekerja @Rp. 25,000.00 = Rp. 3,750.00 0.0750 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 1,875.00 0.0080 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 272.00 0.0080 Oh Mandor @Rp. 35,000.00 = Rp. 280.00

SNI - H.6.2 1 M2 Pas. Atap Genteng Kodok/Glasuur = Rp. #N/A 25.0000 Bh Genteng Kodok @Rp. #N/A = Rp. #N/A 0.1500 Oh Pekerja @Rp. 25,000.00 = Rp. 3,750.00 0.0750 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 2,250.00 0.0080 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 272.00 0.0080 Oh Mandor @Rp. 35,000.00 = Rp. 280.00

SNI - H.6.4 1 M2 Pas. Atap Genteng Bubung Plentong/Kodok = Rp. #N/A 5.0000 Bh Genteng Bubung Plentong/Kodok @Rp. #N/A = Rp. #N/A 8.0000 Kg Portland Cement @Rp. #N/A = Rp. #N/A 0.0320 M3 Pasir Pasang @Rp. #N/A = Rp. #N/A 0.4000 Oh Pekerja @Rp. 25,000.00 = Rp. 10,000.00 0.2000 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 6,000.00 0.0200 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 680.00 0.0020 Oh Mandor @Rp. 35,000.00 = Rp. 70.00

SNI - H.6.12 1 M2 Pas. Atap Asbes Gelombang Uk. ( 3,00 x 1,05 m ) x 4 mm = Rp. #N/A 0.3500 Lbr. Asbes Gelombang @Rp. 57,000.00 = Rp. 19,950.00 0.1200 Kg Paku Kait @Rp. #N/A = Rp. #N/A 0.1400 Oh Pekerja @Rp. 25,000.00 = Rp. 3,500.00 0.0700 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 2,100.00 0.0070 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 238.00 0.0070 Oh Mandor @Rp. 35,000.00 = Rp. 245.00

SNI - H.6.13 1 M2 Pas. Atap Asbes Gelombang Uk. ( 2,70 x 1,05 m ) x 4 mm = Rp. #N/A 0.4200 Lbr. Asbes Gelombang @Rp. 51,000.00 = Rp. 21,420.00 0.1200 Kg Paku Kait @Rp. #N/A = Rp. #N/A 0.1400 Oh Pekerja @Rp. 25,000.00 = Rp. 3,500.00 0.0700 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 2,100.00 0.0070 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 238.00 0.0070 Oh Mandor @Rp. 35,000.00 = Rp. 245.00

SNI - H.6.14 1 M2 Pas. Atap Asbes Gelombang Uk. ( 2,40 x 1,05 m ) x 4 mm = Rp. #N/A 0.4400 Lbr. Asbes Gelombang @Rp. 45,000.00 = Rp. 19,800.00 0.1200 Kg Paku Kait @Rp. #N/A = Rp. #N/A 0.1400 Oh Pekerja @Rp. 25,000.00 = Rp. 3,500.00 0.0670 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 2,010.00 0.0070 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 238.00 0.0070 Oh Mandor @Rp. 35,000.00 = Rp. 245.00

SNI - H.6.15 1 M2 Pas. Atap Asbes Gelombang Uk. ( 2,10 x 1,05 m ) x 4 mm = Rp. #N/A 0.5100 Lbr. Asbes Gelombang @Rp. 40,000.00 = Rp. 20,400.00 0.1200 Kg Paku Kait @Rp. #N/A = Rp. #N/A 0.1400 Oh Pekerja @Rp. 25,000.00 = Rp. 3,500.00 0.0670 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 2,010.00 0.0070 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 238.00 0.0070 Oh Mandor @Rp. 35,000.00 = Rp. 245.00

SNI - H.6.16 1 M2 Pas. Atap Asbes Gelombang Uk. ( 1,50 x 1,05 m ) x 4 mm = Rp. #N/A 0.8000 Lbr. Asbes Gelombang @Rp. 28,000.00 = Rp. 22,400.00 0.1200 Kg Paku Kait @Rp. #N/A = Rp. #N/A 0.1400 Oh Pekerja @Rp. 25,000.00 = Rp. 3,500.00 0.0670 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 2,010.00 0.0070 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 238.00 0.0070 Oh Mandor @Rp. 35,000.00 = Rp. 245.00

Page 46: Analis Sni Ta 2008

Page 46 of 77

SNI - H.6.23 1 M' Pas. Nok Stel Asbes Gelombang Uk. 1,05 m = Rp. #N/A 2.1000 Lbr. Nok Stel as bes Gelombang @Rp. #N/A = Rp. #N/A 6.0000 Bh Paku Sekrup 3,5" @Rp. #N/A = Rp. #N/A 0.0840 Oh Pekerja @Rp. 25,000.00 = Rp. 2,100.00 0.1250 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 3,750.00 0.0130 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 442.00 0.0040 Oh Mandor @Rp. 35,000.00 = Rp. 140.00

SNI - H.6.30 1 M2 Pas. Atap Genteng Beton = Rp. #N/A 11.0000 Bh Genteng Beton @Rp. #N/A = Rp. #N/A 0.0300 Kg Paku Usuk/Plafond/Reng ( 2" - 5" ) @Rp. #N/A = Rp. #N/A 0.2000 Oh Pekerja @Rp. 25,000.00 = Rp. 5,000.00 0.1000 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 3,000.00 0.0100 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 340.00 0.0100 Oh Mandor @Rp. 35,000.00 = Rp. 350.00

SNI - H.6.30a 1 M2 Pas. Atap Genteng Morando = Rp. #N/A 18.0000 Bh Genteng Morando @Rp. #N/A = Rp. #N/A 0.0300 Kg Paku Usuk/Plafond/Reng ( 2" - 5" ) @Rp. #N/A = Rp. #N/A 0.2000 Oh Pekerja @Rp. 25,000.00 = Rp. 5,000.00 0.1000 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 3,000.00 0.0100 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 340.00 0.0100 Oh Mandor @Rp. 35,000.00 = Rp. 350.00

SNI - H.6.34 1 M' Nok Genteng Beton = Rp. #N/A 3.5000 Bh Genteng Nok Beton @Rp. #N/A = Rp. #N/A 0.0500 Kg Paku Usuk/Plafond/Reng ( 2" - 5" ) @Rp. #N/A = Rp. #N/A 10.8000 Kg Portland Cement @Rp. #N/A = Rp. #N/A 0.0320 M3 Pasir Pasang @Rp. #N/A = Rp. #N/A 1.0000 Kg PC Warna @Rp. #N/A = Rp. #N/A 0.4000 Oh Pekerja @Rp. 25,000.00 = Rp. 10,000.00 0.2000 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 6,000.00 0.0200 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 680.00 0.0200 Oh Mandor @Rp. 35,000.00 = Rp. 700.00

SNI - H.6.34a 1 M' Nok Genteng Beton = Rp. #N/A 3.5000 Bh Genteng Nok Morando @Rp. #N/A = Rp. #N/A 0.0500 Kg Paku Usuk/Plafond/Reng ( 2" - 5" ) @Rp. #N/A = Rp. #N/A 10.8000 Kg Portland Cement @Rp. #N/A = Rp. #N/A 0.0320 M3 Pasir Pasang @Rp. #N/A = Rp. #N/A 1.0000 Kg PC Warna @Rp. #N/A = Rp. #N/A 0.4000 Oh Pekerja @Rp. 25,000.00 = Rp. 10,000.00 0.2000 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 6,000.00 0.0200 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 680.00 0.0200 Oh Mandor @Rp. 35,000.00 = Rp. 700.00

SNI - H.6.38 1 M2 Pas. Atap Seng Gelombang BJLS 20 = Rp. #N/A 0.7000 Bh Seng Gelombang 3" x 6" BJLS 20 @Rp. #N/A = Rp. #N/A 0.0200 Kg Paku Seng ( 1/2" - 1" ) @Rp. #N/A = Rp. #N/A 0.1200 Oh Pekerja @Rp. 25,000.00 = Rp. 3,000.00 0.0600 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 1,800.00 0.0060 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 204.00 0.0060 Oh Mandor @Rp. 35,000.00 = Rp. 210.00

SNI - H.6.39 1 M2 Pas.Atap Nok Seng = Rp. #N/A 0.3000 Bh Seng Plat 3" x 6" BJLS 20 @Rp. #N/A = Rp. #N/A 0.0400 Kg Paku Seng ( 1/2" - 1" ) @Rp. #N/A = Rp. #N/A 0.1500 Oh Pekerja @Rp. 25,000.00 = Rp. 3,750.00 0.0700 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 2,100.00 0.0080 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 272.00 0.0060 Oh Mandor @Rp. 35,000.00 = Rp. 210.00

SNI - H.6.40 1 M' Pas. Talang Datar Seng BJLS 30 ( Kayu Meranti ) = Rp. #N/A 0.5000 Lbr Seng Plat 3" x 6" BJLS 30 @Rp. #N/A = Rp. #N/A 0.0150 Kg Paku Seng ( 1/2" - 1" ) @Rp. #N/A = Rp. #N/A 0.0096 M3 Kayu Meranti ( Papan ) @Rp. #N/A = Rp. #N/A 0.2500 Kg Meni Besi @Rp. #N/A = Rp. #N/A 0.1500 Oh Pekerja @Rp. 25,000.00 = Rp. 3,750.00 0.4000 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 12,000.00 0.0250 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 850.00 0.00125 Oh Mandor @Rp. 35,000.00 = Rp. 43.75

SNI - H.6.40a 1 M' Pas. Talang Datar Seng BJLS 30 ( Kayu Kruing ) = Rp. #N/A

Page 47: Analis Sni Ta 2008

Page 47 of 77

0.5000 Lbr Seng Plat 3" x 6" BJLS 30 @Rp. #N/A = Rp. #N/A 0.0150 Kg Paku Seng ( 1/2" - 1" ) @Rp. #N/A = Rp. #N/A 0.0096 M3 Kayu Kruing ( Papan ) @Rp. #N/A = Rp. #N/A 0.2500 Kg Meni Besi @Rp. #N/A = Rp. #N/A 0.1500 Oh Pekerja @Rp. 25,000.00 = Rp. 3,750.00 0.4000 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 12,000.00 0.0250 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 850.00 0.00125 Oh Mandor @Rp. 35,000.00 = Rp. 43.75

SNI - H.6.41 1 M' Pas. Talang Miring Seng BJLS 30 ( Kayu Meranti ) = Rp. #N/A 0.5000 Lbr Seng Plat 3" x 6" BJLS 30 @Rp. #N/A = Rp. #N/A 0.0150 Kg Paku Seng ( 1/2" - 1" ) @Rp. #N/A = Rp. #N/A 0.0190 M3 Kayu Meranti ( Papan ) @Rp. #N/A = Rp. #N/A 0.3000 Kg Meni Besi @Rp. #N/A = Rp. #N/A 0.0040 Oh Pekerja @Rp. 25,000.00 = Rp. 100.00 0.4000 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 12,000.00 0.0250 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 850.00 0.00125 Oh Mandor @Rp. 35,000.00 = Rp. 43.75

SNI - H.6.41a 1 M' Pas. Talang Miring Seng BJLS 30 ( Kayu Kruing ) = Rp. #N/A 0.5000 Lbr Seng Plat 3" x 6" BJLS 30 @Rp. #N/A = Rp. #N/A 0.0150 Kg Paku Seng ( 1/2" - 1" ) @Rp. #N/A = Rp. #N/A 0.0190 M3 Kayu Kruing ( Papan ) @Rp. #N/A = Rp. #N/A 0.3000 Kg Meni Besi @Rp. #N/A = Rp. #N/A 0.0040 Oh Pekerja @Rp. 25,000.00 = Rp. 100.00 0.4000 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 12,000.00 0.0250 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 850.00 0.00125 Oh Mandor @Rp. 35,000.00 = Rp. 43.75

SNI - H.6.42 1 M2 Pas. Aluminium Foil / Sisalation = Rp. 20,085.00 1.0500 M2 Aluminium Foil / Sisalation @Rp. 13,700.00 = Rp. 14,385.00 0.1500 Oh Pekerja @Rp. 25,000.00 = Rp. 3,750.00 0.0500 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 1,500.00 0.0050 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 170.00 0.0080 Oh Mandor @Rp. 35,000.00 = Rp. 280.00

SNI - H.6.43 1 M2 Pas. Kawat Burung ( Kayu Meranti ) = Rp. #N/A 1.1000 M2 Kawat Burung @Rp. #N/A = Rp. #N/A 0.0200 Kg Paku eternit, List ( 1/2" - 1" ) @Rp. #N/A = Rp. #N/A 0.0018 M3 Kayu Meranti ( Papan ) @Rp. #N/A = Rp. #N/A 0.1000 Oh Pekerja @Rp. 25,000.00 = Rp. 2,500.00 0.1000 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 3,000.00 0.0100 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 340.00 0.0005 Oh Mandor @Rp. 35,000.00 = Rp. 17.50

SNI - H.6.43a 1 M2 Pas. Kawat Burung ( Kayu Kruing ) = Rp. #N/A 1.1000 M2 Kawat Burung @Rp. #N/A = Rp. #N/A 0.0200 Kg Paku eternit, List ( 1/2" - 1" ) @Rp. #N/A = Rp. #N/A 0.0018 M3 Kayu Kruing ( Papan ) @Rp. #N/A = Rp. #N/A 0.1000 Oh Pekerja @Rp. 25,000.00 = Rp. 2,500.00 0.1000 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 3,000.00 0.0100 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 340.00 0.0005 Oh Mandor @Rp. 35,000.00 = Rp. 17.50

I. PEKERJAAN LANGIT-LANGITSNI - I.6.19 1 M' List Langit-langit Kayu Propil ( Kayu Kruing ) = Rp. #N/A

1.1000 M' List Kayu Propil @Rp. #N/A = Rp. #N/A 0.0100 Kg Paku eternit, List @Rp. #N/A = Rp. #N/A 0.0500 Oh Pekerja @Rp. 25,000.00 = Rp. 1,250.00 0.0500 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 1,500.00 0.0050 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 170.00 0.0030 Oh Mandor @Rp. 35,000.00 = Rp. 105.00

SNI - I.6.19a 1 M' List Langit-langit Kayu ( Kayu Kruing ) = Rp. #N/A 1.1000 M' List Kayu @Rp. #N/A = Rp. #N/A 0.0100 Kg Paku eternit, List @Rp. #N/A = Rp. #N/A 0.0500 Oh Pekerja @Rp. 25,000.00 = Rp. 1,250.00 0.0500 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 1,500.00 0.0050 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 170.00 0.0030 Oh Mandor @Rp. 35,000.00 = Rp. 105.00

SNI - I.6.20 1 M2 Langit-langit Eternit ( 1,00 x 1,00 ) Rangka Kayu Kamper = Rp. #N/A 0.0120 M3 Kayu Kamper ( Usuk 5/7 ) @Rp. #N/A = Rp. #N/A 0.0600 Kg Paku eternit, List @Rp. #N/A = Rp. #N/A 1.1000 Lbr Eternit ( 1,00 x 1,00 ) m @Rp. #N/A = Rp. #N/A 0.1800 Oh Pekerja @Rp. 25,000.00 = Rp. 4,500.00 0.3200 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 9,600.00 0.0320 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 1,088.00 0.0090 Oh Mandor @Rp. 35,000.00 = Rp. 315.00

Page 48: Analis Sni Ta 2008

Page 48 of 77

SNI - I.6.20a 1 M2 Langit-langit Eternit ( 1,00 x 1,00 ) Rangka Kayu Bangkir = Rp. #N/A 0.0120 M3 Kayu Bangkir ( Usuk 5/7 ) @Rp. #N/A = Rp. #N/A 0.0600 Kg Paku eternit, List @Rp. #N/A = Rp. #N/A 1.1000 Lbr Eternit ( 1,00 x 1,00 ) m @Rp. #N/A = Rp. #N/A 0.1800 Oh Pekerja @Rp. 25,000.00 = Rp. 4,500.00 0.3200 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 9,600.00 0.0320 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 1,088.00 0.0090 Oh Mandor @Rp. 35,000.00 = Rp. 315.00

SNI - I.6.20b 1 M2 Langit-langit Eternit ( 1,00 x 1,00 ) Rangka Kayu Kruing = Rp. #N/A 0.0120 M3 Kayu Kruing ( Usuk 5/7 ) @Rp. #N/A = Rp. #N/A 0.0600 Kg Paku eternit, List @Rp. #N/A = Rp. #N/A 1.1000 Lbr Eternit ( 1,00 x 1,00 ) m @Rp. #N/A = Rp. #N/A 0.1800 Oh Pekerja @Rp. 25,000.00 = Rp. 4,500.00 0.3200 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 9,600.00 0.0320 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 1,088.00 0.0090 Oh Mandor @Rp. 35,000.00 = Rp. 315.00

SNI - I.6.20c 1 M2 Langit-langit Eternit ( 1,00 x 1,00 ) Rangka Kayu Meranti = Rp. #N/A 0.0120 M3 Kayu Meranti ( Usuk 5/7 ) @Rp. #N/A = Rp. #N/A 0.0600 Kg Paku eternit, List @Rp. #N/A = Rp. #N/A 1.1000 Lbr Eternit ( 1,00 x 1,00 ) m @Rp. #N/A = Rp. #N/A 0.1800 Oh Pekerja @Rp. 25,000.00 = Rp. 4,500.00 0.3200 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 9,600.00 0.0320 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 1,088.00 0.0090 Oh Mandor @Rp. 35,000.00 = Rp. 315.00

SNI - I.6.20d 1 M2 Langit-langit Hardplek ( 1,00 x 1,00 ) Rangka Kayu Kruing = Rp. #N/A 0.0120 M3 Kayu Kruing ( Balok ) @Rp. #N/A = Rp. #N/A 0.0600 Kg Paku eternit, List @Rp. #N/A = Rp. #N/A 1.1000 Lbr Hardplek 4 mm ( 1,00 x 1,00 ) m @Rp. #N/A = Rp. #N/A 0.1800 Oh Pekerja @Rp. 25,000.00 = Rp. 4,500.00 0.3200 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 9,600.00 0.0320 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 1,088.00 0.0090 Oh Mandor @Rp. 35,000.00 = Rp. 315.00

SNI - I.6.20e 1 M2 Langit-langit Hardplek ( 1,00 x 1,00 ) Rangka Kayu Meranti = Rp. #N/A 0.0120 M3 Kayu Meranti ( Balok ) @Rp. #N/A = Rp. #N/A 0.0600 Kg Paku eternit, List @Rp. #N/A = Rp. #N/A 1.1000 Lbr Hardplek 4 mm ( 1,00 x 1,00 ) m @Rp. #N/A = Rp. #N/A 0.1800 Oh Pekerja @Rp. 25,000.00 = Rp. 4,500.00 0.3200 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 9,600.00 0.0320 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 1,088.00 0.0090 Oh Mandor @Rp. 35,000.00 = Rp. 315.00

SNI - I.6.24 1 M2 Langit-langit Gypsum Board Tb. 19 mm = Rp. #N/A 0.3640 Lbr Gypsum Board ( 120 x 240 ) cm x 9 mm @Rp. #N/A = Rp. #N/A 0.1100 Kg Paku Skrup @Rp. #N/A = Rp. #N/A 0.1000 Oh Pekerja @Rp. 25,000.00 = Rp. 2,500.00 0.0500 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 1,500.00 0.0050 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 170.00 0.0050 Oh Mandor @Rp. 35,000.00 = Rp. 175.00

J. PEKERJAAN SANITASISNI - J.6.1 1 Bh Pasang Kloset Duduk / Monoblok = Rp. #N/A

1.0000 Bh Kloset Duduk / Monoblok @Rp. #N/A = Rp. #N/A 6%xhrg kloset - Perlengkapan @Rp. #N/A = Rp. #N/A 3.3000 Oh Pekerja @Rp. 25,000.00 = Rp. 82,500.00 1.1000 Oh Tukang Batu @Rp. 30,000.00 = Rp. 33,000.00 0.0010 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 34.00 0.1600 Oh Mandor @Rp. 35,000.00 = Rp. 5,600.00

SNI - J.6.2 1 Bh Pasang Kloset Jongkok = Rp. #N/A 1.0000 Bh Kloset Jongkok Porselen @Rp. #N/A = Rp. #N/A 6.0000 Kg Portland Cement @Rp. #N/A = Rp. #N/A 0.0100 M3 Pasir Pasang @Rp. #N/A = Rp. #N/A 1.0000 Oh Pekerja @Rp. 25,000.00 = Rp. 25,000.00 1.5000 Oh Tukang Batu @Rp. 30,000.00 = Rp. 45,000.00 1.5000 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 51,000.00 0.1600 Oh Mandor @Rp. 35,000.00 = Rp. 5,600.00

SNI - J.6.4 1 Bh Pasang Urinoir = Rp. #N/A 1.0000 Bh Urinoir @Rp. #N/A = Rp. #N/A

30%xhrg Urinoir - Perlengkapan @Rp. #N/A = Rp. #N/A 6.0000 Kg Portland Cement @Rp. #N/A = Rp. #N/A 0.0100 M3 Pasir Pasang @Rp. #N/A = Rp. #N/A 1.0000 Oh Pekerja @Rp. 25,000.00 = Rp. 25,000.00 1.0000 Oh Tukang Batu @Rp. 30,000.00 = Rp. 30,000.00 0.1000 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 3,400.00 0.1000 Oh Mandor @Rp. 35,000.00 = Rp. 3,500.00

SNI - J.6.5 1 Bh Pasang Wastafel = Rp. #N/A

Page 49: Analis Sni Ta 2008

Page 49 of 77

1.0000 Bh Wastafel @Rp. #N/A = Rp. #N/A 12%xhrg Wastafel - Perlengkapan @Rp. #N/A = Rp. #N/A

6.0000 Kg Portland Cement @Rp. #N/A = Rp. #N/A 0.0100 M3 Pasir Pasang @Rp. #N/A = Rp. #N/A 1.2000 Oh Pekerja @Rp. 25,000.00 = Rp. 30,000.00 1.4500 Oh Tukang Batu @Rp. 30,000.00 = Rp. 43,500.00 0.1500 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 5,100.00 0.1000 Oh Mandor @Rp. 35,000.00 = Rp. 3,500.00

SNI - J.6.7 1 Bh Pasang Bak Mandi Fiber Glass Volume 0,30 m3 = Rp. #N/A 1.0000 Bh Bak Fiber Glass @Rp. #N/A = Rp. #N/A 18% x hrg Bak - Perlengkapan @Rp. #N/A = Rp. #N/A 1.8000 Oh Pekerja @Rp. 25,000.00 = Rp. 45,000.00 2.7000 Oh Tukang Batu @Rp. 30,000.00 = Rp. 81,000.00 0.5400 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 18,360.00 0.1100 Oh Mandor @Rp. 35,000.00 = Rp. 3,850.00

SNI - J.6.8 1 Bh Pasang Bak Mandi Batu Bata Volume 0,30 m3 = Rp. #N/A 0.4000 M3 Batu Bata @Rp. #N/A = Rp. #N/A 120.0000 Kg Portland Cement @Rp. #N/A = Rp. #N/A 0.3000 M3 Pasir Pasang @Rp. #N/A = Rp. #N/A 109.0000 Bh Keramik 20/20 cm @Rp. #N/A = Rp. #N/A 6.0000 Kg PC Warna / Nat @Rp. #N/A = Rp. #N/A 6.0000 Oh Pekerja @Rp. 25,000.00 = Rp. 150,000.00 3.0000 Oh Tukang Batu @Rp. 30,000.00 = Rp. 90,000.00 0.3000 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 10,200.00 0.3000 Oh Mandor @Rp. 35,000.00 = Rp. 10,500.00

SNI - J.6.9 1 Bh Pasang Badkip Porselen = Rp. #N/A 1.0000 Bh Badkip @Rp. #N/A = Rp. #N/A

20%xhrg Badkip - Perlengkapan @Rp. #N/A = Rp. #N/A 0.0750 Oh Tukang Batu @Rp. 30,000.00 = Rp. 2,250.00 0.7500 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 25,500.00 0.2500 Oh Mandor @Rp. 35,000.00 = Rp. 8,750.00

SNI - J.6.11 1 Bh Pasang Bak Fiber Glass Vol. 1 m3 Air = Rp. #N/A 1.0000 Bh Bak Fiberglass @Rp. #N/A = Rp. #N/A

20%xhrg Badkip - Perlengkapan @Rp. #N/A = Rp. #N/A 3.0000 Oh Pekerja @Rp. 25,000.00 = Rp. 75,000.00 4.5000 Oh Tukang Batu @Rp. 30,000.00 = Rp. 135,000.00 0.9000 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 30,600.00 0.9000 Oh Mandor @Rp. 35,000.00 = Rp. 31,500.00

SNI - J.6.16 1 Bh Pasang Bak Kontrol Pasangan Batu Bata uk. ( 30 x 30 ) cm Tinggi 35 cm = Rp. #N/A 0.1450 M3 Batu Bata @Rp. #N/A = Rp. #N/A 44.0000 Kg Portland Cement @Rp. #N/A = Rp. #N/A 0.0700 M3 Pasir Pasang @Rp. #N/A = Rp. #N/A 0.0700 M3 Batu Kerikil @Rp. #N/A = Rp. #N/A 1.6000 Kg Besi Beton @Rp. #N/A = Rp. #N/A 0.0600 M3 Pasir Beton @Rp. #N/A = Rp. #N/A 3.2000 Oh Pekerja @Rp. 25,000.00 = Rp. 80,000.00 1.0150 Oh Tukang Batu @Rp. 30,000.00 = Rp. 30,450.00 0.0015 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 51.00 0.0160 Oh Mandor @Rp. 35,000.00 = Rp. 560.00

SNI - J.6.17 1 Bh Pasang Bak Kontrol Pasangan Batu Bata uk. ( 45 x 45 ) cm Tinggi 50 cm = Rp. #N/A 0.2500 M3 Batu Bata @Rp. #N/A = Rp. #N/A 77.0000 Kg Portland Cement @Rp. #N/A = Rp. #N/A 0.1300 M3 Pasir Pasang @Rp. #N/A = Rp. #N/A 0.0200 M3 Batu Kerikil @Rp. #N/A = Rp. #N/A 2.6000 Kg Besi Beton @Rp. #N/A = Rp. #N/A 0.0900 M3 Pasir Beton @Rp. #N/A = Rp. #N/A 1.4200 Oh Pekerja @Rp. 25,000.00 = Rp. 35,500.00 0.4730 Oh Tukang Batu @Rp. 30,000.00 = Rp. 14,190.00 0.0470 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 1,598.00 0.0710 Oh Mandor @Rp. 35,000.00 = Rp. 2,485.00

SNI - J.6.18 1 Bh Pasang Bak Kontrol Pasangan Batu Bata uk. ( 60 x 60 ) cm Tinggi 65 cm = Rp. #N/A 0.3710 M3 Batu Bata @Rp. #N/A = Rp. #N/A 114.0000 Kg Portland Cement @Rp. #N/A = Rp. #N/A 0.1840 M3 Pasir Pasang @Rp. #N/A = Rp. #N/A 0.0330 M3 Batu Kerikil @Rp. #N/A = Rp. #N/A 4.8500 Kg Besi Beton @Rp. #N/A = Rp. #N/A 0.1200 M3 Pasir Beton @Rp. #N/A = Rp. #N/A 0.1000 Oh Tukang Gali @Rp. 30,000.00 = Rp. 3,000.00 2.1600 Oh Pekerja @Rp. 25,000.00 = Rp. 54,000.00 0.7200 Oh Tukang Batu @Rp. 30,000.00 = Rp. 21,600.00

Page 50: Analis Sni Ta 2008

Page 50 of 77

0.0720 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 2,448.00 0.1080 Oh Mandor @Rp. 35,000.00 = Rp. 3,780.00

SNI - J.6.19 1 M' Pasang Pipa Galvanis diameter 1/2" med. B = Rp. 378,501.00 1.2000 M' Pipa Galvanis diam. 1/2" @Rp. 311,000.00 = Rp. 373,200.00 35%xhrg pipa - Perlengkapan @Rp. - = Rp. - 0.0540 Oh Pekerja @Rp. 25,000.00 = Rp. 1,350.00 0.0900 Oh Tukang Batu @Rp. 30,000.00 = Rp. 2,700.00 0.0090 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 306.00 0.0270 Oh Mandor @Rp. 35,000.00 = Rp. 945.00

SNI - J.6.20 1 M' Pasang Pipa Galvanis diameter 3/4" med. B = Rp. #N/A 1.2000 M' Pipa Galvanis diam. 3/4" @Rp. #N/A = Rp. #N/A 35%xhrg pipa - Perlengkapan @Rp. - = Rp. - 0.0540 Oh Pekerja @Rp. 25,000.00 = Rp. 1,350.00 0.0900 Oh Tukang Batu @Rp. 30,000.00 = Rp. 2,700.00 0.0090 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 306.00 0.0270 Oh Mandor @Rp. 35,000.00 = Rp. 945.00

SNI - J.6.21 1 M' Pasang Pipa Galvanis diameter 1" med. B = Rp. #N/A 1.2000 M' Pipa Galvanis diam. 1" @Rp. #N/A = Rp. #N/A 35%xhrg pipa - Perlengkapan @Rp. - = Rp. - 0.0540 Oh Pekerja @Rp. 25,000.00 = Rp. 1,350.00 0.0900 Oh Tukang Batu @Rp. 30,000.00 = Rp. 2,700.00 0.0090 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 306.00 0.0270 Oh Mandor @Rp. 35,000.00 = Rp. 945.00

SNI - J.6.22 1 M' Pasang Pipa Galvanis diameter 1 1/2" med. B = Rp. #N/A 1.2000 M' Pipa Galvanis diam. 1 1/2" @Rp. #N/A = Rp. #N/A 35%xhrg pipa - Perlengkapan @Rp. - = Rp. - 0.1080 Oh Pekerja @Rp. 25,000.00 = Rp. 2,700.00 0.1800 Oh Tukang Batu @Rp. 30,000.00 = Rp. 5,400.00 0.0180 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 612.00 0.0054 Oh Mandor @Rp. 35,000.00 = Rp. 189.00

SNI - J.6.22a 1 M' Pasang Pipa Galvanis diameter 2" med. B = Rp. #N/A 1.2000 M' Pipa Galvanis diam. 2" @Rp. #N/A = Rp. #N/A 35%xhrg pipa - Perlengkapan @Rp. - = Rp. - 0.1080 Oh Pekerja @Rp. 25,000.00 = Rp. 2,700.00 0.1800 Oh Tukang Batu @Rp. 30,000.00 = Rp. 5,400.00 0.0180 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 612.00 0.0054 Oh Mandor @Rp. 35,000.00 = Rp. 189.00

SNI - J.6.23 1 M' Pasang Pipa Galvanis diameter 3" med. B = Rp. #N/A 1.2000 M' Pipa Galvanis diam. 3" @Rp. #N/A = Rp. #N/A 35%xhrg pipa - Perlengkapan @Rp. - = Rp. - 0.1080 Oh Pekerja @Rp. 25,000.00 = Rp. 2,700.00 0.1800 Oh Tukang Batu @Rp. 30,000.00 = Rp. 5,400.00 0.0180 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 612.00 0.0054 Oh Mandor @Rp. 35,000.00 = Rp. 189.00

SNI - J.6.24 1 M' Pasang Pipa Galvanis diameter 4" med. B = Rp. #N/A 1.2000 M' Pipa Galvanis diam. 4" @Rp. #N/A = Rp. #N/A 35%xhrg pipa - Perlengkapan @Rp. - = Rp. - 0.1350 Oh Pekerja @Rp. 25,000.00 = Rp. 3,375.00 0.2500 Oh Tukang Batu @Rp. 30,000.00 = Rp. 7,500.00 0.0225 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 765.00 0.0068 Oh Mandor @Rp. 35,000.00 = Rp. 238.00

SNI - J.6.25 1 M' Pasang Pipa PVC diameter 1/2" type AW = Rp. #N/A 1.2000 M' Pipa PVC diam. 1/2" @Rp. #N/A = Rp. #N/A 35%xhrg pipa - Perlengkapan @Rp. - = Rp. - 0.0360 Oh Pekerja @Rp. 25,000.00 = Rp. 900.00 0.0600 Oh Tukang Batu @Rp. 30,000.00 = Rp. 1,800.00 0.0060 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 204.00 0.0018 Oh Mandor @Rp. 35,000.00 = Rp. 63.00

SNI - J.6.26 1 M' Pasang Pipa PVC diameter 3/4" type AW = Rp. #N/A 1.2000 M' Pipa PVC diam. 3/4" @Rp. #N/A = Rp. #N/A 35%xhrg pipa - Perlengkapan @Rp. - = Rp. - 0.0360 Oh Pekerja @Rp. 25,000.00 = Rp. 900.00 0.0600 Oh Tukang Batu @Rp. 30,000.00 = Rp. 1,800.00 0.0060 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 204.00 0.0018 Oh Mandor @Rp. 35,000.00 = Rp. 63.00

SNI - J.6.27 1 M' Memasang 1 m' Pipa PVC diameter 1" type AW = Rp. #N/A 1.2000 M' Pipa PVC diam. 1" @Rp. #N/A = Rp. #N/A 35%xhrg pipa - Perlengkapan @Rp. - = Rp. - 0.0360 Oh Pekerja @Rp. 25,000.00 = Rp. 900.00 0.0600 Oh Tukang Batu @Rp. 30,000.00 = Rp. 1,800.00 0.0060 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 204.00 0.0018 Oh Mandor @Rp. 35,000.00 = Rp. 63.00

Page 51: Analis Sni Ta 2008

Page 51 of 77

SNI - J.6.28 1 M' Pasang Pipa PVC diameter 1 1/2" type AW = Rp. #N/A 1.2000 M' Pipa PVC diam. 1 1/2" @Rp. #N/A = Rp. #N/A 35%xhrg pipa - Perlengkapan @Rp. - = Rp. - 0.0360 Oh Pekerja @Rp. 25,000.00 = Rp. 900.00 0.0600 Oh Tukang Batu @Rp. 30,000.00 = Rp. 1,800.00 0.0060 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 204.00 0.0018 Oh Mandor @Rp. 35,000.00 = Rp. 63.00

SNI - J.6.29 1 M' Pasang Pipa PVC diameter 2" type AW = Rp. #N/A 1.2000 M' Pipa PVC diam. 2" @Rp. #N/A = Rp. #N/A 35%xhrg pipa - Perlengkapan @Rp. - = Rp. - 0.0540 Oh Pekerja @Rp. 25,000.00 = Rp. 1,350.00 0.0900 Oh Tukang Batu @Rp. 30,000.00 = Rp. 2,700.00 0.0090 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 306.00 0.0027 Oh Mandor @Rp. 35,000.00 = Rp. 94.50

SNI - J.6.31 1 M' Pasang Pipa PVC diameter 3" type AW = Rp. #N/A 1.2000 M' Pipa PVC diam. 3" @Rp. #N/A = Rp. #N/A 35%xhrg pipa - Perlengkapan @Rp. - = Rp. - 0.0810 Oh Pekerja @Rp. 25,000.00 = Rp. 2,025.00 0.1350 Oh Tukang Batu @Rp. 30,000.00 = Rp. 4,050.00 0.0135 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 459.00 0.0041 Oh Mandor @Rp. 35,000.00 = Rp. 143.50

SNI - J.6.32 1 M' Pasang Pipa PVC diameter 4" type AW = Rp. #N/A 1.2000 M' Pipa PVC diam. 4" @Rp. #N/A = Rp. #N/A 35%xhrg pipa - Perlengkapan @Rp. - = Rp. - 0.0810 Oh Pekerja @Rp. 25,000.00 = Rp. 2,025.00 0.1350 Oh Tukang Batu @Rp. 30,000.00 = Rp. 4,050.00 0.0135 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 459.00 0.0041 Oh Mandor @Rp. 35,000.00 = Rp. 143.50

SNI - J.6.33 1 Bh Pasang Bak Cuci Piring Stainless Steel = Rp. #N/A 1.0000 Bh Bak Cuci Piring Stainless Steel @Rp. #N/A = Rp. #N/A 1.0000 Set Water drain + accessories @Rp. #N/A = Rp. #N/A 0.0300 Oh Pekerja @Rp. 25,000.00 = Rp. 750.00 0.3000 Oh Tukang Batu @Rp. 30,000.00 = Rp. 9,000.00 0.0300 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 1,020.00 0.0015 Oh Mandor @Rp. 35,000.00 = Rp. 52.50

SNI - J.6.35 1 Bh Pasang Kran diameter 3/4" atau 1/2" = Rp. #N/A 1.0000 Bh Kran Air @Rp. #N/A = Rp. #N/A 0.0250 Bh Seal Tape @Rp. #N/A = Rp. #N/A 0.0100 Oh Pekerja @Rp. 25,000.00 = Rp. 250.00 0.1000 Oh Tukang Batu @Rp. 30,000.00 = Rp. 3,000.00 0.0100 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 340.00 0.0050 Oh Mandor @Rp. 35,000.00 = Rp. 175.00

SNI - J.6.36 1 Bh Pasang Floor Drain = Rp. #N/A 1.0000 Bh Floor Drain @Rp. #N/A = Rp. #N/A 0.0100 Oh Pekerja @Rp. 25,000.00 = Rp. 250.00 0.1000 Oh Tukang Batu @Rp. 30,000.00 = Rp. 3,000.00 0.0100 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 340.00 0.0050 Oh Mandor @Rp. 35,000.00 = Rp. 175.00

K. PEKERJAAN KUNCI DAN KACASNI - K.6.1 1 Bh Pasang Kunci Tanam Antik = Rp. #N/A

1.0000 Bh Kunci Tanam Antik @Rp. #N/A = Rp. #N/A 0.0600 Oh Pekerja @Rp. 25,000.00 = Rp. 1,500.00 0.6000 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 18,000.00 0.0600 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 2,040.00 0.0030 Oh Mandor @Rp. 35,000.00 = Rp. 105.00

SNI - K.6.2 1 Bh Pasang Kunci Tanam Biasa = Rp. #N/A 1.0000 Bh Kunci Tanam Biasa @Rp. #N/A = Rp. #N/A 0.0100 Oh Pekerja @Rp. 25,000.00 = Rp. 250.00 0.5000 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 15,000.00 0.0100 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 340.00 0.0050 Oh Mandor @Rp. 35,000.00 = Rp. 175.00

SNI - K.6.3 1 Bh Pasang Kunci Tanam Kamar Mandi = Rp. #N/A 1.0000 Bh Kunci Tanam Kamar Mandi @Rp. #N/A = Rp. #N/A 0.0050 Oh Pekerja @Rp. 25,000.00 = Rp. 125.00 0.5000 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 15,000.00 0.0050 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 170.00 0.0025 Oh Mandor @Rp. 35,000.00 = Rp. 87.50

SNI - K.6.5 1 Bh Pasang Engsel Pintu = Rp. #N/A 1.0000 Bh Engsel Pintu @Rp. #N/A = Rp. #N/A 0.0150 Oh Pekerja @Rp. 25,000.00 = Rp. 375.00

Page 52: Analis Sni Ta 2008

Page 52 of 77

0.1500 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 4,500.00 0.0150 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 510.00 0.00075 Oh Mandor @Rp. 35,000.00 = Rp. 26.25

SNI - K.6.6 1 Bh Pasang Engsel Jendela Kupu-kupu = Rp. #N/A 1.0000 Bh Engsel Jendela Kupu-kupu @Rp. #N/A = Rp. #N/A 0.0100 Oh Pekerja @Rp. 25,000.00 = Rp. 250.00 0.1000 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 3,000.00 0.0100 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 340.00 0.00050 Oh Mandor @Rp. 35,000.00 = Rp. 17.50

SNI - K.6.7 1 Bh Pasang Engsel Angin = Rp. #N/A 1.0000 Bh Engsel Angin @Rp. #N/A = Rp. #N/A 0.0200 Oh Pekerja @Rp. 25,000.00 = Rp. 500.00 0.2000 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 6,000.00 0.0200 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 680.00 0.0100 Oh Mandor @Rp. 35,000.00 = Rp. 350.00

SNI - K.6.9 1 Bh Pasang Kait Angin = Rp. #N/A 1.0000 Bh Kait Angin @Rp. #N/A = Rp. #N/A 0.0150 Oh Pekerja @Rp. 25,000.00 = Rp. 375.00 0.1500 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 4,500.00 0.0150 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 510.00 0.00075 Oh Mandor @Rp. 35,000.00 = Rp. 26.25

SNI - K.6.10 1 Bh Pasang Door Closer = Rp. #N/A 1.0000 Bh Door Closer @Rp. #N/A = Rp. #N/A 0.0500 Oh Pekerja @Rp. 25,000.00 = Rp. 1,250.00 0.5000 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 15,000.00 0.0500 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 1,700.00 0.0025 Oh Mandor @Rp. 35,000.00 = Rp. 87.50

SNI - K.6.11 1 Bh Pasang Kunci Selot = Rp. 92,215.00 1.0000 Bh Kunci Selot @Rp. 85,000.00 = Rp. 85,000.00 0.0200 Oh Pekerja @Rp. 25,000.00 = Rp. 500.00 0.2000 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 6,000.00 0.0200 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 680.00 0.0010 Oh Mandor @Rp. 35,000.00 = Rp. 35.00

SNI - K.6.12 1 Bh Pasang Pegangan Pintu / Door Holder = Rp. #N/A 1.0000 Bh Pegangan Pintu / Door Holder @Rp. #N/A = Rp. #N/A 0.0500 Oh Pekerja @Rp. 25,000.00 = Rp. 1,250.00 0.5000 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 15,000.00 0.0500 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 1,700.00 0.0025 Oh Mandor @Rp. 35,000.00 = Rp. 87.50

SNI - K.6.13 1 Bh Pasang Door Stop = Rp. #N/A 1.0000 Bh Door Stop @Rp. #N/A = Rp. #N/A 0.0100 Oh Pekerja @Rp. 25,000.00 = Rp. 250.00 0.1000 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 3,000.00 0.0100 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 340.00 0.0005 Oh Mandor @Rp. 35,000.00 = Rp. 17.50

SNI - K.6.14 1 Bh Pasang Rel Pintu Dorong = Rp. #N/A 1.0000 Bh Rel Pintu Dorong @Rp. #N/A = Rp. #N/A 0.0600 Oh Pekerja @Rp. 25,000.00 = Rp. 1,500.00 0.6000 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 18,000.00 0.0600 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 2,040.00 0.0030 Oh Mandor @Rp. 35,000.00 = Rp. 105.00

SNI - K.6.16 1 M2 Pasang Kaca Tb. 3 mm = Rp. #N/A 1.0000 M2 Kaca bening Tb. 3 mm @Rp. #N/A = Rp. #N/A 0.0150 Oh Pekerja @Rp. 25,000.00 = Rp. 375.00 0.1500 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 4,500.00 0.0150 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 510.00 0.00075 Oh Mandor @Rp. 35,000.00 = Rp. 26.25

SNI - K.6.17 1 M2 Pasang Kaca Tb. 5 mm = Rp. #N/A 1.1000 M2 Kaca bening Tb. 5 mm @Rp. #N/A = Rp. #N/A 0.0150 Oh Pekerja @Rp. 25,000.00 = Rp. 375.00 0.1500 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 4,500.00 0.0150 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 510.00 0.00075 Oh Mandor @Rp. 35,000.00 = Rp. 26.25

SNI - K.6.18 1 M2 Pasang Kaca Tb. 8 mm = Rp. #N/A 1.0000 M2 Kaca Polos Tb. 8 mm @Rp. #N/A = Rp. #N/A 0.0165 Oh Pekerja @Rp. 25,000.00 = Rp. 412.50 0.1650 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 4,950.00 0.0165 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 561.00 0.00080 Oh Mandor @Rp. 35,000.00 = Rp. 28.00

SNI - K.6.20 1 M2 Pasang Kaca Cermin Tb. 5 mm = Rp. #N/A 1.1000 M2 Kaca Cermin @Rp. #N/A = Rp. #N/A 0.0150 Oh Pekerja @Rp. 25,000.00 = Rp. 375.00

Page 53: Analis Sni Ta 2008

Page 53 of 77

0.1500 Oh Tukang Kayu @Rp. 30,000.00 = Rp. 4,500.00 0.0150 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 510.00 0.00075 Oh Mandor @Rp. 35,000.00 = Rp. 26.25

L. PEKERJAAN LANTAISNI - L.6.2 1 M2 Pas. Lantai Ubin PC Abu-abu Uk. ( 30 x 30 ) cm = Rp. #N/A

11.8700 Bh Ubin Abu-abu 30 x 30 cm @Rp. #N/A = Rp. #N/A 10.0000 Kg Portland Cement @Rp. #N/A = Rp. #N/A 0.0215 M3 Pasir Pasang @Rp. #N/A = Rp. #N/A 0.2600 Oh Pekerja @Rp. 25,000.00 = Rp. 6,500.00 0.1250 Oh Tukang Batu @Rp. 30,000.00 = Rp. 3,750.00 0.0125 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 425.00 0.0130 Oh Mandor @Rp. 35,000.00 = Rp. 455.00

SNI - L.6.3 1 M2 Pas. Lantai Ubin PC Abu-abu Uk. ( 20 x 20 ) cm = Rp. #N/A 26.5000 Bh Ubin Abu-abu 20 x 20 cm @Rp. #N/A = Rp. #N/A 10.4000 Kg Portland Cement @Rp. #N/A = Rp. #N/A 0.0135 M3 Pasir Pasang @Rp. #N/A = Rp. #N/A 0.2700 Oh Pekerja @Rp. 25,000.00 = Rp. 6,750.00 0.1300 Oh Tukang Batu @Rp. 30,000.00 = Rp. 3,900.00 0.0130 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 442.00 0.0135 Oh Mandor @Rp. 35,000.00 = Rp. 472.50

SNI - L.6.44 1 M2 Pasang Lantai Keramik Uk. ( 20 x 20 ) cm KW.I = Rp. #N/A 25.0000 Bh Ubin Keramik 20 x 20 cm KW.I @Rp. #N/A = Rp. #N/A 11.3800 Kg Portland Cement @Rp. #N/A = Rp. #N/A 0.0420 M3 Pasir Pasang @Rp. #N/A = Rp. #N/A 1.5000 Kg Semen Warna @Rp. #N/A = Rp. #N/A 0.6200 Oh Pekerja @Rp. 25,000.00 = Rp. 15,500.00 0.3500 Oh Tukang Batu @Rp. 30,000.00 = Rp. 10,500.00 0.0350 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 1,190.00 0.0300 Oh Mandor @Rp. 35,000.00 = Rp. 1,050.00

SNI - L.6.44a 1 M2 Pasang Lantai Keramik Uk. ( 20 x 20 ) cm KW.II = Rp. #N/A 25.0000 Bh Ubin Keramik 20 x 20 cm KW.II @Rp. #N/A = Rp. #N/A 11.3800 Kg Portland Cement @Rp. #N/A = Rp. #N/A 0.0420 M3 Pasir Pasang @Rp. #N/A = Rp. #N/A 1.5000 Kg Semen Warna @Rp. #N/A = Rp. #N/A 0.6200 Oh Pekerja @Rp. 25,000.00 = Rp. 15,500.00 0.3500 Oh Tukang Batu @Rp. 30,000.00 = Rp. 10,500.00 0.0350 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 1,190.00 0.0300 Oh Mandor @Rp. 35,000.00 = Rp. 1,050.00

SNI - L.6.47 1 M2 Pasang Lantai Keramik Uk. ( 33 x 33 ) cm KW.I = Rp. #N/A 10.0000 Bh Ubin Keramik 33 x 33 cm KW.I @Rp. #N/A = Rp. #N/A 11.3800 Kg Portland Cement @Rp. #N/A = Rp. #N/A 0.0420 M3 Pasir Pasang @Rp. #N/A = Rp. #N/A 1.5000 Kg Semen Warna @Rp. #N/A = Rp. #N/A 0.6200 Oh Pekerja @Rp. 25,000.00 = Rp. 15,500.00 0.3500 Oh Tukang Batu @Rp. 30,000.00 = Rp. 10,500.00 0.0350 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 1,190.00 0.0300 Oh Mandor @Rp. 35,000.00 = Rp. 1,050.00

SNI - L.6.47a 1 M2 Pasang Lantai Keramik Uk. ( 33 x 33 ) cm KW.II = Rp. #N/A 10.0000 Bh Ubin Keramik 33 x 33 cm KW.II @Rp. #N/A = Rp. #N/A 11.3800 Kg Portland Cement @Rp. #N/A = Rp. #N/A 0.0420 M3 Pasir Pasang @Rp. #N/A = Rp. #N/A 1.5000 Kg Semen Warna @Rp. #N/A = Rp. #N/A 0.6200 Oh Pekerja @Rp. 25,000.00 = Rp. 15,500.00 0.3500 Oh Tukang Batu @Rp. 30,000.00 = Rp. 10,500.00 0.0350 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 1,190.00 0.0300 Oh Mandor @Rp. 35,000.00 = Rp. 1,050.00

SNI - L.6.47b 1 M2 Pasang Lantai Keramik Uk. ( 40 x 40 ) cm KW.I = Rp. #N/A 7.0000 Bh Ubin Keramik 40 x 40 cm KW.I @Rp. #N/A = Rp. #N/A 11.3800 Kg Portland Cement @Rp. #N/A = Rp. #N/A 0.0420 M3 Pasir Pasang @Rp. #N/A = Rp. #N/A 1.5000 Kg Semen Warna @Rp. #N/A = Rp. #N/A 0.6200 Oh Pekerja @Rp. 25,000.00 = Rp. 15,500.00 0.3500 Oh Tukang Batu @Rp. 30,000.00 = Rp. 10,500.00 0.0350 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 1,190.00 0.0300 Oh Mandor @Rp. 35,000.00 = Rp. 1,050.00

SNI - L.6.47c 1 M2 Pasang Lantai Keramik Uk. ( 40 x 40 ) cm KW.II = Rp. #N/A 7.0000 Bh Ubin Keramik 40 x 40 cm KW.II @Rp. #N/A = Rp. #N/A 11.3800 Kg Portland Cement @Rp. #N/A = Rp. #N/A 0.0420 M3 Pasir Pasang @Rp. #N/A = Rp. #N/A 1.5000 Kg Semen Warna @Rp. #N/A = Rp. #N/A 0.6200 Oh Pekerja @Rp. 25,000.00 = Rp. 15,500.00 0.3500 Oh Tukang Batu @Rp. 30,000.00 = Rp. 10,500.00 0.0350 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 1,190.00 0.0300 Oh Mandor @Rp. 35,000.00 = Rp. 1,050.00

SNI - L.6.47d 1 M2 Pasang Lantai Keramik Uk. ( 30 x 30 ) cm KW.I = Rp. #N/A 12.0000 Bh Ubin Keramik 30 x 30 cm KW.I @Rp. #N/A = Rp. #N/A 11.3800 Kg Portland Cement @Rp. #N/A = Rp. #N/A 0.0420 M3 Pasir Pasang @Rp. #N/A = Rp. #N/A

Page 54: Analis Sni Ta 2008

Page 54 of 77

1.5000 Kg Semen Warna @Rp. #N/A = Rp. #N/A 0.6200 Oh Pekerja @Rp. 25,000.00 = Rp. 15,500.00 0.3500 Oh Tukang Batu @Rp. 30,000.00 = Rp. 10,500.00 0.0350 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 1,190.00 0.0300 Oh Mandor @Rp. 35,000.00 = Rp. 1,050.00

SNI - L.6.47e 1 M2 Pasang Lantai Keramik Uk. ( 30 x 30 ) cm KW.II = Rp. #N/A 12.0000 Bh Ubin Keramik 30 x 30 cm KW.II @Rp. #N/A = Rp. #N/A 11.3800 Kg Portland Cement @Rp. #N/A = Rp. #N/A 0.0420 M3 Pasir Pasang @Rp. #N/A = Rp. #N/A 1.5000 Kg Semen Warna @Rp. #N/A = Rp. #N/A 0.6200 Oh Pekerja @Rp. 25,000.00 = Rp. 15,500.00 0.3500 Oh Tukang Batu @Rp. 30,000.00 = Rp. 10,500.00 0.0350 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 1,190.00 0.0300 Oh Mandor @Rp. 35,000.00 = Rp. 1,050.00

SNI - L.6.48 1 M2 Pasang Lantai Keramik Anti Slip Uk. ( 33 x 33 ) cm KW.I = Rp. #N/A 10.0000 Bh Ubin Keramik 33 x 33 cm Anti Slip @Rp. - = Rp. - 11.3800 Kg Portland Cement @Rp. #N/A = Rp. #N/A 0.0420 M3 Pasir Pasang @Rp. #N/A = Rp. #N/A 1.5000 Kg Semen Warna @Rp. #N/A = Rp. #N/A 0.6200 Oh Pekerja @Rp. 25,000.00 = Rp. 15,500.00 0.3500 Oh Tukang Batu @Rp. 30,000.00 = Rp. 10,500.00 0.0350 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 1,190.00 0.0300 Oh Mandor @Rp. 35,000.00 = Rp. 1,050.00

SNI - L.6.48a 1 M2 Pasang Lantai Keramik Anti Slip Uk. ( 33 x 33 ) cm KW.II = Rp. #N/A 10.0000 Bh Ubin Keramik 33 x 33 cm Anti Slip @Rp. - = Rp. - 11.3800 Kg Portland Cement @Rp. #N/A = Rp. #N/A 0.0420 M3 Pasir Pasang @Rp. #N/A = Rp. #N/A 1.5000 Kg Semen Warna @Rp. #N/A = Rp. #N/A 0.6200 Oh Pekerja @Rp. 25,000.00 = Rp. 15,500.00 0.3500 Oh Tukang Batu @Rp. 30,000.00 = Rp. 10,500.00 0.0350 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 1,190.00 0.0300 Oh Mandor @Rp. 35,000.00 = Rp. 1,050.00

SNI - L.6.48b 1 M2 Pasang Lantai Keramik Anti Slip Uk. ( 40 x 40 ) cm KW.I = Rp. #N/A 7.0000 Bh Ubin Keramik 40 x 40 cm Anti Slip @Rp. - = Rp. - 11.3800 Kg Portland Cement @Rp. #N/A = Rp. #N/A 0.0420 M3 Pasir Pasang @Rp. #N/A = Rp. #N/A 1.5000 Kg Semen Warna @Rp. #N/A = Rp. #N/A 0.6200 Oh Pekerja @Rp. 25,000.00 = Rp. 15,500.00 0.3500 Oh Tukang Batu @Rp. 30,000.00 = Rp. 10,500.00 0.0350 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 1,190.00 0.0300 Oh Mandor @Rp. 35,000.00 = Rp. 1,050.00

SNI - L.6.48c 1 M2 Pasang Lantai Keramik Anti Slip Uk. ( 40 x 40 ) cm KW.II = Rp. #N/A 7.0000 Bh Ubin Keramik 40 x 40 cm Anti Slip @Rp. - = Rp. - 11.3800 Kg Portland Cement @Rp. #N/A = Rp. #N/A 0.0420 M3 Pasir Pasang @Rp. #N/A = Rp. #N/A 1.5000 Kg Semen Warna @Rp. #N/A = Rp. #N/A 0.6200 Oh Pekerja @Rp. 25,000.00 = Rp. 15,500.00 0.3500 Oh Tukang Batu @Rp. 30,000.00 = Rp. 10,500.00 0.0350 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 1,190.00 0.0300 Oh Mandor @Rp. 35,000.00 = Rp. 1,050.00

SNI - L.6.48d 1 M2 Pasang Lantai Keramik Anti Slip Uk. ( 30 x 30 ) cm KW.I = Rp. #N/A 12.0000 Bh Ubin Keramik 30 x 30 cm Anti Slip @Rp. - = Rp. - 11.3800 Kg Portland Cement @Rp. #N/A = Rp. #N/A 0.0420 M3 Pasir Pasang @Rp. #N/A = Rp. #N/A 1.5000 Kg Semen Warna @Rp. #N/A = Rp. #N/A 0.6200 Oh Pekerja @Rp. 25,000.00 = Rp. 15,500.00 0.3500 Oh Tukang Batu @Rp. 30,000.00 = Rp. 10,500.00 0.0350 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 1,190.00 0.0300 Oh Mandor @Rp. 35,000.00 = Rp. 1,050.00

SNI - L.6.48e 1 M2 Pasang Lantai Keramik Anti Slip Uk. ( 30 x 30 ) cm KW.II = Rp. #N/A 12.0000 Bh Ubin Keramik 30 x 30 cm Anti Slip @Rp. - = Rp. - 11.3800 Kg Portland Cement @Rp. #N/A = Rp. #N/A 0.0420 M3 Pasir Pasang @Rp. #N/A = Rp. #N/A 1.5000 Kg Semen Warna @Rp. #N/A = Rp. #N/A 0.6200 Oh Pekerja @Rp. 25,000.00 = Rp. 15,500.00 0.3500 Oh Tukang Batu @Rp. 30,000.00 = Rp. 10,500.00 0.0350 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 1,190.00 0.0300 Oh Mandor @Rp. 35,000.00 = Rp. 1,050.00

SNI - L.6.68 1 M2 Pasang Lantai Keramik Anti Slip Uk. ( 20 x 20 ) cm KW.I = Rp. #N/A 25.0000 Bh Ubin Keramik 20 x 20 cm KW.I @Rp. - = Rp. - 9.3000 Kg Portland Cement @Rp. #N/A = Rp. #N/A 0.0180 M3 Pasir Pasang @Rp. #N/A = Rp. #N/A 1.5000 Kg Semen Warna @Rp. #N/A = Rp. #N/A 0.6000 Oh Pekerja @Rp. 25,000.00 = Rp. 15,000.00 0.1000 Oh Tukang Batu @Rp. 30,000.00 = Rp. 3,000.00 0.0450 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 1,530.00 0.0300 Oh Mandor @Rp. 35,000.00 = Rp. 1,050.00

SNI - L.6.68a 1 M2 Pasang Lantai Keramik Anti Slip Uk. ( 20 x 20 ) cm KW.II = Rp. #N/A

Page 55: Analis Sni Ta 2008

Page 55 of 77

25.0000 Bh Ubin Keramik 20 x 20 cm KW.II @Rp. - = Rp. - 9.3000 Kg Portland Cement @Rp. #N/A = Rp. #N/A 0.0180 M3 Pasir Pasang @Rp. #N/A = Rp. #N/A 1.5000 Kg Semen Warna @Rp. #N/A = Rp. #N/A 0.6000 Oh Pekerja @Rp. 25,000.00 = Rp. 15,000.00 0.1000 Oh Tukang Batu @Rp. 30,000.00 = Rp. 3,000.00 0.0450 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 1,530.00 0.0300 Oh Mandor @Rp. 35,000.00 = Rp. 1,050.00

M. PEKERJAAN PENGECATANSNI - M.6.1 1 M2 Mengikis / mengerok Permukaan Cat Tembok Lama = Rp. #N/A

0.0500 Kg Soda Api @Rp. #N/A = Rp. #N/A 0.1500 Oh Pekerja @Rp. 25,000.00 = Rp. 3,750.00 0.0025 Oh Mandor @Rp. 35,000.00 = Rp. 87.50

SNI - M.6.6 1 M2 Mendempul dan Menggosok Kayu = Rp. #N/A 25.0000 Kg Dempul Jadi @Rp. #N/A = Rp. #N/A 9.3000 Kg Minyak Cat @Rp. #N/A = Rp. #N/A 0.0180 Kg Batu Kambang / Apung @Rp. #N/A = Rp. #N/A 0.6000 Oh Pekerja @Rp. 25,000.00 = Rp. 15,000.00 0.1000 Oh Tukang Cat @Rp. 30,000.00 = Rp. 3,000.00 0.0450 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 1,530.00 0.0300 Oh Mandor @Rp. 35,000.00 = Rp. 1,050.00

SNI - M.6.7 1 M2 Pengecatan Bidang Kayu Lama ( Sek. Avian ) = Rp. #N/A 0.1500 Kg Plamir Kayu @Rp. #N/A = Rp. #N/A 0.1700 Kg Cat Dasar (Sek. Avian ) @Rp. #N/A = Rp. #N/A 0.1700 Kg Cat Penutup ( Sek. Avian ) @Rp. #N/A = Rp. #N/A 0.0700 Oh Pekerja @Rp. 25,000.00 = Rp. 1,750.00 0.0750 Oh Tukang Cat @Rp. 30,000.00 = Rp. 2,250.00 0.0075 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 255.00 0.0025 Oh Mandor @Rp. 35,000.00 = Rp. 87.50

SNI - M.6.8 1 M2 Pengecatan Bidang Ky. Baru ( 1 lps plamir, 2 lps cat dasar, 2 lps cat penutup ) Sek. Avian = Rp. #N/A 0.2000 Kg Cat Meni @Rp. #N/A = Rp. #N/A 0.1500 Kg Plamir Kayu @Rp. #N/A = Rp. #N/A 0.1700 Kg Cat Dasar (Sek. Avian ) @Rp. #N/A = Rp. #N/A 0.2600 Kg Cat Penutup ( Sek. Avian ) @Rp. #N/A = Rp. #N/A 0.0700 Oh Pekerja @Rp. 25,000.00 = Rp. 1,750.00 0.0090 Oh Tukang Cat @Rp. 30,000.00 = Rp. 270.00 0.0060 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 204.00 0.0025 Oh Mandor @Rp. 35,000.00 = Rp. 87.50

SNI - M.6.9 1 M2 Pengecatan Bidang Ky. Baru ( 1 lps plamir, 1 lps cat dasar, 3 lps cat penutup ) Sek. Avian = Rp. #N/A 0.2000 Kg Cat Meni @Rp. #N/A = Rp. #N/A 0.1500 Kg Plamir Kayu @Rp. #N/A = Rp. #N/A 0.1700 Kg Cat Dasar (Sek. Avian ) @Rp. #N/A = Rp. #N/A 0.3500 Kg Cat Penutup ( Sek. Avian ) @Rp. #N/A = Rp. #N/A 0.0700 Oh Pekerja @Rp. 25,000.00 = Rp. 1,750.00 0.1050 Oh Tukang Cat @Rp. 30,000.00 = Rp. 3,150.00 0.0040 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 136.00 0.0025 Oh Mandor @Rp. 35,000.00 = Rp. 87.50

SNI - M.6.11 1 M2 Pelaburan Bidang Kayu dengan Politur = Rp. #N/A 0.1500 Ltr Politur @Rp. #N/A = Rp. #N/A 0.3720 Ltr Politur Jadi @Rp. #N/A = Rp. #N/A 2.0000 Lbr Amplas @Rp. 2,000.00 = Rp. 4,000.00 0.0600 Oh Pekerja @Rp. 25,000.00 = Rp. 1,500.00 0.0160 Oh Tukang Cat @Rp. 30,000.00 = Rp. 480.00 0.0160 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 544.00 0.0025 Oh Mandor @Rp. 35,000.00 = Rp. 87.50

SNI - M.6.12 1 M2 Pelaburan Bidang Kayu dengan Cat Residu dan Ter = Rp. #N/A 0.3500 Ltr Residu dan Ter @Rp. #N/A = Rp. #N/A 0.1000 Oh Pekerja @Rp. 25,000.00 = Rp. 2,500.00 0.0060 Oh Mandor @Rp. 35,000.00 = Rp. 210.00

SNI - M.6.14 1 M2 Pengecatan Tembok Baru ( 1 lps plamir, 1 lps cat dasar, 2 lps cat penutup ) Sek. Mowilex untuk Interior = Rp. #N/A 0.1000 Kg Plamir Tembok @Rp. #N/A = Rp. #N/A 0.1000 Kg Cat Dasar ( Sek. Mowilex ) @Rp. 57,600.00 = Rp. 5,760.00 0.2600 Kg Cat Penutup 2 kali ( Sek. Mowilex ) @Rp. 57,600.00 = Rp. 14,976.00 0.0200 Oh Pekerja @Rp. 25,000.00 = Rp. 500.00 0.0630 Oh Tukang Cat @Rp. 30,000.00 = Rp. 1,890.00 0.0063 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 214.20 0.0025 Oh Mandor @Rp. 35,000.00 = Rp. 87.50

SNI - M.6.14a 1 M2 Pengecatan Tembok Baru ( 1 lps plamir, 1 lps cat dasar, 2 lps cat penutup ) Sek. Mowilex untuk Exterior = Rp. #N/A 0.1000 Kg Plamir Tembok @Rp. #N/A = Rp. #N/A 0.1000 Kg Cat Dasar ( Sek. Mowilex ) @Rp. #N/A = Rp. #N/A

Page 56: Analis Sni Ta 2008

Page 56 of 77

0.2600 Kg Cat Penutup 2 kali ( Sek. Mowilex ) @Rp. #N/A = Rp. #N/A 0.0200 Oh Pekerja @Rp. 25,000.00 = Rp. 500.00 0.0630 Oh Tukang Cat @Rp. 30,000.00 = Rp. 1,890.00 0.0063 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 214.20 0.0025 Oh Mandor @Rp. 35,000.00 = Rp. 87.50

SNI - M.6.14b 1 M2 = Rp. #N/A 0.1000 Kg Plamir Tembok @Rp. #N/A = Rp. #N/A 0.1000 Kg Cat Dasar ( Sek. Cathylac ) @Rp. #N/A = Rp. #N/A 0.2600 Kg Cat Penutup 2 kali ( Sek. Cathylac ) @Rp. #N/A = Rp. #N/A 0.0200 Oh Pekerja @Rp. 25,000.00 = Rp. 500.00 0.0630 Oh Tukang Cat @Rp. 30,000.00 = Rp. 1,890.00 0.0063 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 214.20 0.0025 Oh Mandor @Rp. 35,000.00 = Rp. 87.50

SNI - M.6.14c 1 M2 = Rp. #N/A 0.1000 Kg Plamir Tembok @Rp. #N/A = Rp. #N/A 0.1000 Kg Cat Dasar ( Sek. Decolith ) @Rp. #N/A = Rp. #N/A 0.2600 Kg Cat Penutup 2 kali ( Sek. Decolith ) @Rp. #N/A = Rp. #N/A 0.0200 Oh Pekerja @Rp. 25,000.00 = Rp. 500.00 0.0630 Oh Tukang Cat @Rp. 30,000.00 = Rp. 1,890.00 0.0063 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 214.20 0.0025 Oh Mandor @Rp. 35,000.00 = Rp. 87.50

SNI - M.6.14d 1 M2 = Rp. #N/A 0.1000 Kg Plamir Tembok @Rp. #N/A = Rp. #N/A 0.1000 Kg Cat Dasar ( Sek. Mollex ) @Rp. #N/A = Rp. #N/A 0.2600 Kg Cat Penutup 2 kali ( Sek. Mollex ) @Rp. #N/A = Rp. #N/A 0.0200 Oh Pekerja @Rp. 25,000.00 = Rp. 500.00 0.0630 Oh Tukang Cat @Rp. 30,000.00 = Rp. 1,890.00 0.0063 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 214.20 0.0025 Oh Mandor @Rp. 35,000.00 = Rp. 87.50

SNI - M.6.15 1 M2 Pengecatan Tembok Lama ( 1 lps cat dasar, 2 lps cat penutup ) Sek. Mowilex untuk Interior = Rp. 19,470.30 0.1200 Kg Cat Dasar ( Sek. Mowilex ) @Rp. 57,600.00 = Rp. 6,912.00 0.1800 Kg Cat Penutup 2 kali ( Sek. Mowilex ) @Rp. 57,600.00 = Rp. 10,368.00 0.0280 Oh Pekerja @Rp. 25,000.00 = Rp. 700.00 0.0420 Oh Tukang Cat @Rp. 30,000.00 = Rp. 1,260.00 0.0042 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 142.80 0.0025 Oh Mandor @Rp. 35,000.00 = Rp. 87.50

SNI - M.6.15a 1 M2 Pengecatan Tembok Lama ( 1 lps cat dasar, 2 lps cat penutup ) Sek. Mowilex untuk Exterior = Rp. #N/A 0.1200 Kg Cat Dasar ( Sek. Mowilex ) @Rp. #N/A = Rp. #N/A 0.1800 Kg Cat Penutup 2 kali ( Sek. Mowilex ) @Rp. #N/A = Rp. #N/A 0.0280 Oh Pekerja @Rp. 25,000.00 = Rp. 700.00 0.0420 Oh Tukang Cat @Rp. 30,000.00 = Rp. 1,260.00 0.0042 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 142.80 0.0025 Oh Mandor @Rp. 35,000.00 = Rp. 87.50

SNI - M.6.15b 1 M2 Pengecatan Tembok Lama ( 1 lps cat dasar, 2 lps cat penutup ) Sek. Cathylac = Rp. #N/A 0.1200 Kg Cat Dasar ( Sek. Cathylac ) @Rp. #N/A = Rp. #N/A 0.1800 Kg Cat Penutup 2 kali ( Sek. Cathylac ) @Rp. #N/A = Rp. #N/A 0.0280 Oh Pekerja @Rp. 25,000.00 = Rp. 700.00 0.0420 Oh Tukang Cat @Rp. 30,000.00 = Rp. 1,260.00 0.0042 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 142.80 0.0025 Oh Mandor @Rp. 35,000.00 = Rp. 87.50

SNI - M.6.15c 1 M2 Pengecatan Tembok Lama ( 1 lps cat dasar, 2 lps cat penutup ) Sek. Decolith = Rp. #N/A 0.1200 Kg Cat Dasar ( Sek. Decolith ) @Rp. #N/A = Rp. #N/A 0.1800 Kg Cat Penutup 2 kali ( Sek. Decolith ) @Rp. #N/A = Rp. #N/A 0.0280 Oh Pekerja @Rp. 25,000.00 = Rp. 700.00 0.0420 Oh Tukang Cat @Rp. 30,000.00 = Rp. 1,260.00 0.0042 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 142.80 0.0025 Oh Mandor @Rp. 35,000.00 = Rp. 87.50

SNI - M.6.15d 1 M2 Pengecatan Tembok Lama ( 1 lps cat dasar, 2 lps cat penutup ) Sek. Mollex = Rp. #N/A 0.1200 Kg Cat Dasar ( Sek. Mollex ) @Rp. #N/A = Rp. #N/A 0.1800 Kg Cat Penutup 2 kali ( Sek. Mollex ) @Rp. #N/A = Rp. #N/A 0.0280 Oh Pekerja @Rp. 25,000.00 = Rp. 700.00 0.0420 Oh Tukang Cat @Rp. 30,000.00 = Rp. 1,260.00 0.0042 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 142.80 0.0025 Oh Mandor @Rp. 35,000.00 = Rp. 87.50

SNI - M.6.17 1 M2 Melabur Tembok dengan Kapur Sirih = Rp. #N/A 0.1000 Lbr Amplas @Rp. 2,000.00 = Rp. 200.00 0.2500 Ikat Alang-alang @Rp. 2,200.00 = Rp. 550.00 0.0020 M3 Perancah Kayu @Rp. 1,091,000.00 = Rp. 2,182.00 0.1500 Kg Kapur Sirih / Labur @Rp. #N/A = Rp. #N/A

Pengecatan Tembok Baru ( 1 lps plamir, 1 lps cat dasar, 2 lps cat penutup ) Sek. Cathylac

Pengecatan Tembok Baru ( 1 lps plamir, 1 lps cat dasar, 2 lps cat penutup ) Sek. Decolith

Pengecatan Tembok Baru ( 1 lps plamir, 1 lps cat dasar, 2 lps cat penutup ) Sek. Mollex

Page 57: Analis Sni Ta 2008

Page 57 of 77

0.1500 Oh Pekerja @Rp. 25,000.00 = Rp. 3,750.00 0.0010 Oh Tukang Cat @Rp. 30,000.00 = Rp. 30.00 0.0001 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 3.40 0.0025 Oh Mandor @Rp. 35,000.00 = Rp. 87.50

SNI - M.6.18 1 M2 Melabur Tembok Lama dengan Kapur Sirih ( Untuk Pemeliharaan ) = Rp. #N/A 0.0020 M3 Perancah Kayu @Rp. #N/A = Rp. #N/A 0.3000 Kg Kapur Sirih / Labur @Rp. #N/A = Rp. #N/A 0.0400 Oh Pekerja @Rp. 25,000.00 = Rp. 1,000.00 0.0050 Oh Tukang Cat @Rp. 30,000.00 = Rp. 150.00 0.0005 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 17.00 0.0025 Oh Mandor @Rp. 35,000.00 = Rp. 87.50

SNI - M.6.20 1 M2 Pengecatan Permukaan Baja dengan Meni Besi = Rp. #N/A 0.1000 Kg Meni Besi @Rp. #N/A = Rp. #N/A 0.0100 Kg Kuas @Rp. 5,000.00 = Rp. 50.00 0.0200 Oh Pekerja @Rp. 25,000.00 = Rp. 500.00 0.2000 Oh Tukang Cat @Rp. 30,000.00 = Rp. 6,000.00 0.0200 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 680.00 0.0100 Oh Mandor @Rp. 35,000.00 = Rp. 350.00

SNI - M.6.21 1 M2 Pengecatan Permukaan Baja dengan Meni Besi dan Perancah = Rp. #N/A 0.1000 Kg Meni Besi @Rp. #N/A = Rp. #N/A 0.0100 Bh Kuas @Rp. 5,000.00 = Rp. 50.00 0.0020 M3 Perancah Kayu @Rp. #N/A = Rp. #N/A 0.2500 Oh Pekerja @Rp. 25,000.00 = Rp. 6,250.00 0.2250 Oh Tukang Cat @Rp. 30,000.00 = Rp. 6,750.00 0.0225 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 765.00 0.0075 Oh Mandor @Rp. 35,000.00 = Rp. 262.50

SNI - M.6.24 1 M2 = Rp. 53,700.00 0.1100 Kg Cat Dasar @Rp. - = Rp. - 0.1700 Kg Cat Antara @Rp. - = Rp. - 0.0800 Kg Cat Penutup @Rp. - = Rp. - 0.5000 Oh Pekerja @Rp. 25,000.00 = Rp. 12,500.00 0.8000 Oh Tukang Cat @Rp. 30,000.00 = Rp. 24,000.00 0.3000 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 10,200.00 0.2000 Oh Mandor @Rp. 35,000.00 = Rp. 7,000.00

ANALISA BOW

A. PEKERJAAN LANTAIBOW - KPU.IVa 1 M2 Pasang Paving Block Natural = Rp. #N/A

1.0000 M2 Paving Block Natural 6 cm @Rp. #N/A = Rp. #N/A 0.1000 M3 Pasir Pasang @Rp. #N/A = Rp. #N/A 0.2000 Hr Tukang Batu @Rp. 30,000.00 = Rp. 6,000.00 0.0200 Hr Kepala Tukang @Rp. 34,000.00 = Rp. 680.00 0.4000 Hr Pekerja @Rp. 25,000.00 = Rp. 10,000.00 0.0200 Hr Mandor @Rp. 35,000.00 = Rp. 700.00

BOW - KPU.IVb 1 M2 Pasang Paving Block Warna = Rp. #N/A 1.0000 M2 Paving Block Warna 6 cm @Rp. #N/A = Rp. #N/A 0.1000 M3 Pasir Pasang @Rp. #N/A = Rp. #N/A 0.2000 Hr Tukang Batu @Rp. 30,000.00 = Rp. 6,000.00 0.0200 Hr Kepala Tukang @Rp. 34,000.00 = Rp. 680.00 0.4000 Hr Pekerja @Rp. 25,000.00 = Rp. 10,000.00 0.0200 Hr Mandor @Rp. 35,000.00 = Rp. 700.00

BOW - KPU.IVc 1 M2 Pasang Paving Block T = 8 cm, K - 400 = Rp. #N/A 1.0000 M2 Paving Block t = 8 cm K - 400 @Rp. #N/A = Rp. #N/A 0.1000 M3 Pasir Pasang @Rp. #N/A = Rp. #N/A 0.2000 Hr Tukang Batu @Rp. 30,000.00 = Rp. 6,000.00 0.0200 Hr Kepala Tukang @Rp. 34,000.00 = Rp. 680.00 0.4000 Hr Pekerja @Rp. 25,000.00 = Rp. 10,000.00 0.0200 Hr Mandor @Rp. 35,000.00 = Rp. 700.00

BOW - KPU.IVd 1 M2 Pasang Paving Block T = 6 cm, K - 300 = Rp. #N/A 1.0000 M2 Paving Block t = 6 cm K - 300 @Rp. #N/A = Rp. #N/A 0.1000 M3 Pasir Pasang @Rp. #N/A = Rp. #N/A 0.2000 Hr Tukang Batu @Rp. 30,000.00 = Rp. 6,000.00 0.0200 Hr Kepala Tukang @Rp. 34,000.00 = Rp. 680.00 0.4000 Hr Pekerja @Rp. 25,000.00 = Rp. 10,000.00 0.0200 Hr Mandor @Rp. 35,000.00 = Rp. 700.00

Pengecatan Permukaan Baja Lapis Seng ( Galbani ) Secara Manual Sistem 3 Lapis Cat Konvensional dengan tb. 200 um

Page 58: Analis Sni Ta 2008

Page 58 of 77

B. PEKERJAAN KAP BESIBOW - I.a 1 Kg Pekerjaan Kap Besi = Rp. #N/A

1.1000 Kg Besi Siku /Profil @Rp. #N/A = Rp. #N/A 0.0900 Hr Tukang Besi @Rp. 30,000.00 = Rp. 2,700.00 0.0300 Hr Kepala Tukang @Rp. 34,000.00 = Rp. 1,020.00 0.0900 Hr Pekerja @Rp. 25,000.00 = Rp. 2,250.00

C. PEKERJAAN KAYUBOW - F.16 1 M2 Pasang Kembali Usuk Reng Bekas = Rp. #N/A

0.2500 Kg Paku Usuk, Reng @Rp. #N/A = Rp. #N/A 0.1000 Hr Tukang Kayu @Rp. 30,000.00 = Rp. 3,000.00 0.0010 Hr Kepala Tukang @Rp. 34,000.00 = Rp. 34.00 0.1000 Hr Pekerja @Rp. 25,000.00 = Rp. 2,500.00 0.0050 Hr Mandor @Rp. 35,000.00 = Rp. 175.00

BOW - F.16a 1 M2 Reng Kayu Kruing = Rp. #N/A 0.0030 M3 Kayu Kruing @Rp. #N/A = Rp. #N/A 0.1800 Kg Paku Reng @Rp. #N/A = Rp. #N/A 0.0750 Hr Tukang Kayu @Rp. 30,000.00 = Rp. 2,250.00 0.0075 Hr Kepala Tukang @Rp. 34,000.00 = Rp. 255.00 0.0750 Hr Pekerja @Rp. 25,000.00 = Rp. 1,875.00 0.0038 Hr Mandor @Rp. 35,000.00 = Rp. 133.00

BOW - F.16b 1 M2 Usuk Diketam Halus dan Reng Kayu Kruing = Rp. #N/A 0.0120 M3 Kayu Kruing @Rp. #N/A = Rp. #N/A 0.2500 Kg Paku Usuk, Plafond @Rp. #N/A = Rp. #N/A 0.2000 Hr Tukang Kayu @Rp. 30,000.00 = Rp. 6,000.00 0.0200 Hr Kepala Tukang @Rp. 34,000.00 = Rp. 680.00 0.2000 Hr Pekerja @Rp. 25,000.00 = Rp. 5,000.00 0.0100 Hr Mandor @Rp. 35,000.00 = Rp. 350.00

BOW - F.16c 1 M2 Usuk Diketam Halus dan Reng Kayu Bangkir = Rp. #N/A 0.0120 M3 Kayu Bangkir @Rp. #N/A = Rp. #N/A 0.2500 Kg Paku Usuk, Plafond @Rp. #N/A = Rp. #N/A 0.2000 Hr Tukang Kayu @Rp. 30,000.00 = Rp. 6,000.00 0.0200 Hr Kepala Tukang @Rp. 34,000.00 = Rp. 680.00 0.2000 Hr Pekerja @Rp. 25,000.00 = Rp. 5,000.00 0.0100 Hr Mandor @Rp. 35,000.00 = Rp. 350.00

BOW - F.16d 1 M2 Usuk Diketam Halus dan Reng Kayu Kamper = Rp. #N/A 0.0120 M3 Kayu Kamper @Rp. #N/A = Rp. #N/A 0.2500 Kg Paku Usuk, Plafond @Rp. #N/A = Rp. #N/A 0.2000 Hr Tukang Kayu @Rp. 30,000.00 = Rp. 6,000.00 0.0200 Hr Kepala Tukang @Rp. 34,000.00 = Rp. 680.00 0.2000 Hr Pekerja @Rp. 25,000.00 = Rp. 5,000.00 0.0100 Hr Mandor @Rp. 35,000.00 = Rp. 350.00

BOW - F.16e 1 M2 Usuk Diketam Halus dan Reng Kayu Jati = Rp. #N/A 0.0120 M3 Kayu Jati @Rp. #N/A = Rp. #N/A 0.2500 Kg Paku Usuk, Plafond @Rp. #N/A = Rp. #N/A 0.2000 Hr Tukang Kayu @Rp. 30,000.00 = Rp. 6,000.00 0.0200 Hr Kepala Tukang @Rp. 34,000.00 = Rp. 680.00 0.2000 Hr Pekerja @Rp. 25,000.00 = Rp. 5,000.00 0.0100 Hr Mandor @Rp. 35,000.00 = Rp. 350.00

BOW - F.16f 1 M2 Pasang Usuk Kayu Kruing = Rp. #N/A 0.0120 M3 Kayu Kruing @Rp. #N/A = Rp. #N/A 0.1875 Kg Paku Usuk, Plafond @Rp. #N/A = Rp. #N/A 0.0750 Hr Tukang Kayu @Rp. 30,000.00 = Rp. 2,250.00 0.0075 Hr Kepala Tukang @Rp. 34,000.00 = Rp. 255.00 0.0750 Hr Pekerja @Rp. 25,000.00 = Rp. 1,875.00 0.0038 Hr Mandor @Rp. 35,000.00 = Rp. 133.00

BOW - F.16g 1 M2 Pasang Usuk Kayu Bangkir = Rp. #N/A 0.0120 M3 Kayu Bangkir @Rp. #N/A = Rp. #N/A 0.1875 Kg Paku Usuk, Plafond @Rp. #N/A = Rp. #N/A 0.0750 Hr Tukang Kayu @Rp. 30,000.00 = Rp. 2,250.00 0.0075 Hr Kepala Tukang @Rp. 34,000.00 = Rp. 255.00 0.0750 Hr Pekerja @Rp. 25,000.00 = Rp. 1,875.00 0.0038 Hr Mandor @Rp. 35,000.00 = Rp. 133.00

BOW - Supl. VIIIa 1 M2 Plafond Harplek Diatas Usuk = Rp. #N/A 1.1000 M2 Harplek @Rp. #N/A = Rp. #N/A

Page 59: Analis Sni Ta 2008

Page 59 of 77

0.0200 Kg Paku Eternit,Lis @Rp. #N/A = Rp. #N/A 0.2000 Hr Pekerja @Rp. 25,000.00 = Rp. 5,000.00 0.0200 Hr Mandor @Rp. 35,000.00 = Rp. 700.00

BOW - Supl. VIIIb 1 M2 Plafond Eternit Diatas Usuk = Rp. #N/A 1.1000 M3 Eternit Kerang Super @Rp. #N/A = Rp. #N/A 0.0200 Kg Paku Eternit,Lis @Rp. #N/A = Rp. #N/A 0.2000 Hr Pekerja @Rp. 25,000.00 = Rp. 5,000.00 0.0200 Hr Mandor @Rp. 35,000.00 = Rp. 700.00

BOW - F.36a 1 M2 Pintu Kaca Kayu Kruing tb = 3,5 cm = Rp. #N/A 0.0180 M3 Kayu Kruing @Rp. #N/A = Rp. #N/A 0.7000 M2 Kaca Bening 5 mm @Rp. #N/A = Rp. #N/A 0.0200 Kg Paku Eternit,Lis @Rp. #N/A = Rp. #N/A 6.0000 Hr Tukang Kayu @Rp. 30,000.00 = Rp. 180,000.00 0.6000 Hr Kepala Tukang @Rp. 34,000.00 = Rp. 20,400.00 2.0000 Hr Pekerja @Rp. 25,000.00 = Rp. 50,000.00 0.1000 Hr Mandor @Rp. 35,000.00 = Rp. 3,500.00

BOW - F.36b 1 M2 Pintu Kaca Kayu Kruing Sederhana ( Tbl = 3,5 cm ) = Rp. #N/A 0.0160 M3 Kayu Kruing @Rp. #N/A = Rp. #N/A 0.7000 M2 Kaca Bening 5 mm @Rp. #N/A = Rp. #N/A 0.0200 Kg Paku Eternit,Lis @Rp. #N/A = Rp. #N/A 4.0000 Hr Tukang Kayu @Rp. 30,000.00 = Rp. 120,000.00 0.4000 Hr Kepala Tukang @Rp. 34,000.00 = Rp. 13,600.00 1.3300 Hr Pekerja @Rp. 25,000.00 = Rp. 33,250.00 0.0600 Hr Mandor @Rp. 35,000.00 = Rp. 2,100.00

BOW - F.36c 1 M2 Pintu Kaca Kayu Bangkir tb = 3,5 cm = Rp. #N/A 0.0180 M3 Kayu Bangkir @Rp. #N/A = Rp. #N/A 0.7000 M2 Kaca Bening 5 mm @Rp. #N/A = Rp. #N/A 0.0200 Kg Paku Eternit,Lis @Rp. #N/A = Rp. #N/A 6.0000 Hr Tukang Kayu @Rp. 30,000.00 = Rp. 180,000.00 0.6000 Hr Kepala Tukang @Rp. 34,000.00 = Rp. 20,400.00 2.0000 Hr Pekerja @Rp. 25,000.00 = Rp. 50,000.00 0.1000 Hr Mandor @Rp. 35,000.00 = Rp. 3,500.00

BOW - F.36d 1 M2 Pintu Kaca Kayu Kamper tb = 3,5 cm = Rp. #N/A 0.0180 M3 Kayu Kamper @Rp. #N/A = Rp. #N/A 0.7000 M2 Kaca Bening 5 mm @Rp. #N/A = Rp. #N/A 0.0200 Kg Paku Eternit,Lis @Rp. #N/A = Rp. #N/A 6.0000 Hr Tukang Kayu @Rp. 30,000.00 = Rp. 180,000.00 0.6000 Hr Kepala Tukang @Rp. 34,000.00 = Rp. 20,400.00 2.0000 Hr Pekerja @Rp. 25,000.00 = Rp. 50,000.00 0.1000 Hr Mandor @Rp. 35,000.00 = Rp. 3,500.00

BOW - F.36e 1 M2 Pintu Kaca Kayu Jati tb = 3,5 cm = Rp. #N/A 0.0180 M3 Kayu Jati @Rp. #N/A = Rp. #N/A 0.7000 M2 Kaca Bening 5 mm @Rp. #N/A = Rp. #N/A 0.0200 Kg Paku Eternit,Lis @Rp. #N/A = Rp. #N/A 6.0000 Hr Tukang Kayu @Rp. 30,000.00 = Rp. 180,000.00 0.6000 Hr Kepala Tukang @Rp. 34,000.00 = Rp. 20,400.00 2.0000 Hr Pekerja @Rp. 25,000.00 = Rp. 50,000.00 0.1000 Hr Mandor @Rp. 35,000.00 = Rp. 3,500.00

BOW - F.36f 1 M2 Jendela Kaca Kayu Kruing tb = 3 cm = Rp. #N/A 0.0120 M3 Kayu Kruing @Rp. #N/A = Rp. #N/A 0.7000 M2 Kaca Bening 3 mm @Rp. #N/A = Rp. #N/A 0.0200 Kg Paku Eternit,Lis @Rp. #N/A = Rp. #N/A 4.5000 Hr Tukang Kayu @Rp. 30,000.00 = Rp. 135,000.00 0.4500 Hr Kepala Tukang @Rp. 34,000.00 = Rp. 15,300.00 1.5000 Hr Pekerja @Rp. 25,000.00 = Rp. 37,500.00 0.0750 Hr Mandor @Rp. 35,000.00 = Rp. 2,625.00

BOW - F.36g 1 M2 Jendela Kaca Kayu Kruing Sederhana tb = 3 cm = Rp. #N/A 0.0120 M3 Kayu Kruing @Rp. #N/A = Rp. #N/A 0.7000 M2 Kaca Bening 3 mm @Rp. #N/A = Rp. #N/A 0.0200 Kg Paku Eternit,Lis @Rp. #N/A = Rp. #N/A 3.0000 Hr Tukang Kayu @Rp. 30,000.00 = Rp. 90,000.00 0.3000 Hr Kepala Tukang @Rp. 34,000.00 = Rp. 10,200.00 1.0000 Hr Pekerja @Rp. 25,000.00 = Rp. 25,000.00 0.0500 Hr Mandor @Rp. 35,000.00 = Rp. 1,750.00

BOW - F.36h 1 M2 Jendela Kaca Kayu Bangkir tb = 3 cm = Rp. #N/A 0.0120 M3 Kayu Bangkir @Rp. #N/A = Rp. #N/A 0.7000 M2 Kaca Bening 3 mm @Rp. #N/A = Rp. #N/A 0.0200 Kg Paku Eternit,Lis @Rp. #N/A = Rp. #N/A 4.5000 Hr Tukang Kayu @Rp. 30,000.00 = Rp. 135,000.00 0.4500 Hr Kepala Tukang @Rp. 34,000.00 = Rp. 15,300.00 1.5000 Hr Pekerja @Rp. 25,000.00 = Rp. 37,500.00

Page 60: Analis Sni Ta 2008

Page 60 of 77

0.0750 Hr Mandor @Rp. 35,000.00 = Rp. 2,625.00

BOW - F.36i 1 M2 Jendela Kaca Kayu Kamper tb = 3 cm = Rp. #N/A 0.0120 M3 Kayu Kamper @Rp. #N/A = Rp. #N/A 0.7000 M2 Kaca Bening 3 mm @Rp. #N/A = Rp. #N/A 0.0200 Kg Paku Eternit,Lis @Rp. #N/A = Rp. #N/A 4.5000 Hr Tukang Kayu @Rp. 30,000.00 = Rp. 135,000.00 0.4500 Hr Kepala Tukang @Rp. 34,000.00 = Rp. 15,300.00 1.5000 Hr Pekerja @Rp. 25,000.00 = Rp. 37,500.00 0.0750 Hr Mandor @Rp. 35,000.00 = Rp. 2,625.00

BOW - F.36j 1 M2 Jendela Kaca Kayu Jati tb = 3 cm = Rp. #N/A 0.0120 M3 Kayu Jati @Rp. #N/A = Rp. #N/A 0.7000 M2 Kaca Bening 3 mm @Rp. #N/A = Rp. #N/A 0.0200 Kg Paku Eternit,Lis @Rp. #N/A = Rp. #N/A 4.5000 Hr Tukang Kayu @Rp. 30,000.00 = Rp. 135,000.00 0.4500 Hr Kepala Tukang @Rp. 34,000.00 = Rp. 15,300.00 1.5000 Hr Pekerja @Rp. 25,000.00 = Rp. 37,500.00 0.0750 Hr Mandor @Rp. 35,000.00 = Rp. 2,625.00

BOW - F.36k 1 M2 Pintu Panil Multiplek 9 mm Rangka Kayu Jati tb = 3,5 cm = Rp. #N/A 0.0180 M3 Kayu Jati @Rp. #N/A = Rp. #N/A 0.7000 M2 Multiplek 9 mm @Rp. #N/A = Rp. #N/A 4.0000 Hr Tukang Kayu @Rp. 30,000.00 = Rp. 120,000.00 0.4000 Hr Kepala Tukang @Rp. 34,000.00 = Rp. 13,600.00 1.3300 Hr Pekerja @Rp. 25,000.00 = Rp. 33,250.00 0.0660 Hr Mandor @Rp. 35,000.00 = Rp. 2,310.00

BOW - F.36l 1 M2 Pintu Panil Multiplek 9 mm Rangka Kayu Kruing tb = 3,5 cm = Rp. #N/A 0.0180 M3 Kayu Kruing @Rp. #N/A = Rp. #N/A 0.7000 M2 Multiplek 9 mm @Rp. #N/A = Rp. #N/A 4.0000 Hr Tukang Kayu @Rp. 30,000.00 = Rp. 120,000.00 0.4000 Hr Kepala Tukang @Rp. 34,000.00 = Rp. 13,600.00 1.3300 Hr Pekerja @Rp. 25,000.00 = Rp. 33,250.00 0.0660 Hr Mandor @Rp. 35,000.00 = Rp. 2,310.00

BOW - F.36m 1 M2 Pintu Panil Multiplek 9 mm Rangka Kayu Bangkir tb = 3,5 cm = Rp. #N/A 0.0180 M3 Kayu Bangkir @Rp. #N/A = Rp. #N/A 0.7000 M2 Multiplek 9 mm @Rp. #N/A = Rp. #N/A 4.0000 Hr Tukang Kayu @Rp. 30,000.00 = Rp. 120,000.00 0.4000 Hr Kepala Tukang @Rp. 34,000.00 = Rp. 13,600.00 1.3300 Hr Pekerja @Rp. 25,000.00 = Rp. 33,250.00 0.0660 Hr Mandor @Rp. 35,000.00 = Rp. 2,310.00

BOW - F.36n 1 M2 Pintu Panil Multiplek 9 mm Rangka Kayu Kamper tb = 3,5 cm = Rp. #N/A 0.0180 M3 Kayu Kamper @Rp. #N/A = Rp. #N/A 0.7000 M2 Multiplek 9 mm @Rp. #N/A = Rp. #N/A 6.0000 Hr Tukang Kayu @Rp. 30,000.00 = Rp. 180,000.00 0.6000 Hr Kepala Tukang @Rp. 34,000.00 = Rp. 20,400.00 2.0000 Hr Pekerja @Rp. 25,000.00 = Rp. 50,000.00 0.1000 Hr Mandor @Rp. 35,000.00 = Rp. 3,500.00

D. PEKERJAAN PENGECATAN

BOW - K.6 + 23 1 M2 Pengecatan Plafond 3 x ( sek. Catylac ) = Rp. #N/A 0.4000 Kg Cat Tembok ( sekualitas Catylac ) @Rp. #N/A = Rp. #N/A 0.1875 Hr Tukang Cat @Rp. 30,000.00 = Rp. 5,625.00 0.0188 Hr Kepala Tukang @Rp. 34,000.00 = Rp. 639.20 0.1250 Hr Pekerja @Rp. 25,000.00 = Rp. 3,125.00 0.0062 Hr Mandor @Rp. 35,000.00 = Rp. 217.00

BOW - K.6 + 23a 1 M2 Pengecatan Plafond 3 x ( sek. Decolith ) = Rp. #N/A 0.4000 Kg Cat Tembok ( sekualitas Decolith ) @Rp. #N/A = Rp. #N/A 0.1875 Hr Tukang Cat @Rp. 30,000.00 = Rp. 5,625.00 0.0188 Hr Kepala Tukang @Rp. 34,000.00 = Rp. 639.20 0.1250 Hr Pekerja @Rp. 25,000.00 = Rp. 3,125.00 0.0062 Hr Mandor @Rp. 35,000.00 = Rp. 217.00

BOW - K.6 + 23b 1 M2 Pengecatan Plafond 3 x ( sek. Mollex ) = Rp. #N/A 0.4000 Kg Cat Tembok ( sekualitas Mollex ) @Rp. #N/A = Rp. #N/A 0.1875 Hr Tukang Cat @Rp. 30,000.00 = Rp. 5,625.00 0.0188 Hr Kepala Tukang @Rp. 34,000.00 = Rp. 639.20 0.1250 Hr Pekerja @Rp. 25,000.00 = Rp. 3,125.00 0.0062 Hr Mandor @Rp. 35,000.00 = Rp. 217.00

BOW - K.6 + 23c 1 M2 Pengecatan Genteng 3 x = Rp. #N/A 0.3000 Kg Cat Genteng @Rp. #N/A = Rp. #N/A 0.1875 Hr Tukang Cat @Rp. 30,000.00 = Rp. 5,625.00 0.0188 Hr Kepala Tukang @Rp. 34,000.00 = Rp. 639.20 0.1250 Hr Pekerja @Rp. 25,000.00 = Rp. 3,125.00 0.0062 Hr Mandor @Rp. 35,000.00 = Rp. 217.00

E. PEKERJAAN BETON

Page 61: Analis Sni Ta 2008

Page 61 of 77

BOW - F.8 1 M2 Cetakan Beton Kayu Tahun = Rp. 88,090.00 0.0400 M3 Kayu Tahun @Rp. 1,324,000.00 = Rp. 52,960.00 0.4000 Kg Paku Usuk, Plapond @Rp. 9,700.00 = Rp. 3,880.00 0.5000 Hr Tukang Kayu @Rp. 30,000.00 = Rp. 15,000.00 0.0500 Hr Kepala Tukang @Rp. 34,000.00 = Rp. 1,700.00 0.2000 Hr Pekerja @Rp. 25,000.00 = Rp. 5,000.00 0.0100 Hr Mandor @Rp. 35,000.00 = Rp. 350.00 0.4000 Hr Pekerja Bongkar / Siram @Rp. 23,000.00 = Rp. 9,200.00

BOW - G.14 1 M3 Perekat Camp 1PC : 2Ps = Rp. #N/A 587.2000 Kg Potland Cement @Rp. #N/A = Rp. #N/A 0.9500 m3 Pasir pasang @Rp. #N/A = Rp. #N/A

BOW - G.13 1 M3 Perekat Camp 1PC : 1Ps = Rp. #N/A 874.4500 Kg Potland Cement @Rp. #N/A = Rp. #N/A 0.7000 m3 Pasir pasang @Rp. #N/A = Rp. #N/A

BOW - G.77 1 M2 Upah Pasang Lembaran Batu Granit = Rp. 294,100.00 4.0000 Hr Tukang Batu Ahli @Rp. 30,000.00 = Rp. 120,000.00 0.4000 Hr Kepala Tukang @Rp. 34,000.00 = Rp. 13,600.00 6.0000 Hr Pekerja @Rp. 25,000.00 = Rp. 150,000.00 0.3000 Hr Mandor @Rp. 35,000.00 = Rp. 10,500.00

BOW - Supl.IV.a 1 M2 Pasang lantai Batu Granit Lokal = Rp. #N/A 1.0000 M2 Lembaran Granit Lokal @Rp. - = Rp. - 0.0300 M3 Perekat G.14 @Rp. #N/A = Rp. #N/A 0.2100 Ltr Resin Warna @Rp. - = Rp. - 1.0000 Upah Tenaga Kerja @Rp. 25,300.00 = Rp. 25,300.00

BOW - Supl.IV.b 1 M2 Pasang Pelapis Dinding Batu Granit Lokal = Rp. #N/A 1.0000 M2 Lembaran Granit Lokal @Rp. - = Rp. - 0.0200 M3 Perekat G.13 @Rp. #N/A = Rp. #N/A 0.2100 Ltr Resin Warna @Rp. - = Rp. - 0.0700 Kg Kawat Bindrat @Rp. 2,200.00 = Rp. 154.00 20.0000 Bh Paku Beton 5 cm @Rp. - = Rp. - 1.0000 Upah Tenaga Kerja @Rp. 25,300.00 = Rp. 25,300.00

BOW - Supl.IV.c 1 M2 Pelapisan Coating 3x (sebelum dipasang) = Rp. 2,675.00 0.4500 Ltr Cairan Coating @Rp. - = Rp. - 0.1000 Hr Pekerja @Rp. 25,000.00 = Rp. 2,500.00 0.0050 Hr Mandor @Rp. 35,000.00 = Rp. 175.00

BOW - Supl.IV.d 1 M2 Pelapisan Coating 2x (setelah dipasang) = Rp. 1,320.00 0.3000 Ltr Cairan Coating @Rp. - = Rp. - 0.0500 Hr Pekerja @Rp. 25,000.00 = Rp. 1,250.00 0.0020 Hr Mandor @Rp. 35,000.00 = Rp. 70.00

BOW - Supl.IV.e 1 M2 Pemolesan batu Granit (sampai mengkilap) = Rp. 11,850.00 0.0700 Set batu Grenda poles @Rp. - = Rp. - 0.5600 Kg Obat Poles 5x @Rp. - = Rp. - 8.0000 Glg Kain Poles 5x @Rp. - = Rp. - 0.2000 Hr Pekerja @Rp. 25,000.00 = Rp. 5,000.00 0.0500 Hr mandor @Rp. 35,000.00 = Rp. 1,750.00 0.1000 Hr Operator mesin poles @Rp. 51,000.00 = Rp. 5,100.00 0.1000 Hr Sewa mesin poles @Rp. - = Rp. -

BOW - Supl.IV.f 1 M2 Pemolesan Lembaran batu Granit (rata, halus, tidak mengkilap) = Rp. 8,270.00 0.0400 Set batu Grenda poles @Rp. - = Rp. - 0.1600 Hr Pekerja @Rp. 25,000.00 = Rp. 4,000.00 0.0200 Hr mandor @Rp. 35,000.00 = Rp. 700.00 0.0700 Hr Operator mesin poles @Rp. 51,000.00 = Rp. 3,570.00 0.0700 Hr Sewa mesin poles @Rp. - = Rp. -

BOW - Supl.IV.g 1 M2 Penyemiran Lantai = Rp. 3,350.00 0.0900 Set Kain Pel @Rp. - = Rp. - 0.2600 Kg Semir Lantai sel MAA @Rp. - = Rp. - 0.1200 Hr Pekerja @Rp. 25,000.00 = Rp. 3,000.00 0.0100 Hr mandor @Rp. 35,000.00 = Rp. 350.00

BOW - G.69 1 M2 Pasang Tegel = Rp. 21,725.00 0.2500 Hr Tukang Batu @Rp. 30,000.00 = Rp. 7,500.00 0.0250 Hr Kepala tukang @Rp. 34,000.00 = Rp. 850.00 0.5000 Hr Pekerja @Rp. 25,000.00 = Rp. 12,500.00 0.0250 Hr mandor @Rp. 35,000.00 = Rp. 875.00

Page 62: Analis Sni Ta 2008

Page 62 of 77

BOW - Supl.IV.h 1 M2 Pasang Tegel batu Candi = Rp. #N/A 1.0000 M2 Batu candi @Rp. - = Rp. - 0.0300 M3 Perekat G.13 @Rp. #N/A = Rp. #N/A 0.4500 Ltr Cairan Coating @Rp. - = Rp. - 1.2500 M3 Upah Pasang G.69 @Rp. 21,725.00 = Rp. 27,156.25

BOW - Supl.IVi 1 M2 Pasang Koral Sikat = Rp. #N/A 1.0000 M2 Batu Koral Hitam @Rp. - = Rp. - 0.0300 M3 Perekat G.13 @Rp. #N/A = Rp. #N/A 0.0500 Bh Sikat kawat/Plastik @Rp. - = Rp. - 2.0000 M3 Upah Pasang G.69 @Rp. 21,725.00 = Rp. 43,450.00

BOW - Supl.IV.j 1 M2 Pasang Pelapis Dinding Batu Granit Import = Rp. #N/A 1.0000 M2 Lembaran Granit Import @Rp. - = Rp. - 0.0200 M3 Perekat G.13 @Rp. #N/A = Rp. #N/A 0.2100 Ltr Resin Warna @Rp. - = Rp. - 0.0700 Kg Kawat Bindrat @Rp. - = Rp. - 20.0000 Bh Paku Beton 5 cm @Rp. - = Rp. - 2.0000 Upah Pasang G.77 @Rp. 294,100.00 = Rp. 588,200.00

DAFTAR ANALIS PERPIPAAN DAN ACCESORIES

SNI - J.6.19a 1 M' Pasang Pipa Galvanis diameter 1/2" med. A = Rp. #N/A 1.2000 M' Pipa Galvanis diam. 1/2" @Rp. #N/A = Rp. #N/A 35%xhrg pipa - Perlengkapan @Rp. - = Rp. - 0.0540 Oh Pekerja @Rp. 25,000.00 = Rp. 1,350.00 0.0900 Oh Tukang Batu @Rp. 30,000.00 = Rp. 2,700.00 0.0090 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 306.00 0.0270 Oh Mandor @Rp. 35,000.00 = Rp. 945.00

SNI - J.6.20a 1 M' Pasang Pipa Galvanis diameter 3/4" med. A = Rp. #N/A 1.2000 M' Pipa Galvanis diam. 3/4" @Rp. #N/A = Rp. #N/A 35%xhrg pipa - Perlengkapan @Rp. - = Rp. - 0.0540 Oh Pekerja @Rp. 25,000.00 = Rp. 1,350.00 0.0900 Oh Tukang Batu @Rp. 30,000.00 = Rp. 2,700.00 0.0090 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 306.00 0.0270 Oh Mandor @Rp. 35,000.00 = Rp. 945.00

SNI - J.6.21a 1 M' Pasang Pipa Galvanis diameter 1" med. A = Rp. #N/A 1.2000 M' Pipa Galvanis diam. 1" @Rp. #N/A = Rp. #N/A 35%xhrg pipa - Perlengkapan @Rp. - = Rp. - 0.0540 Oh Pekerja @Rp. 25,000.00 = Rp. 1,350.00 0.0900 Oh Tukang Batu @Rp. 30,000.00 = Rp. 2,700.00 0.0090 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 306.00 0.0270 Oh Mandor @Rp. 35,000.00 = Rp. 945.00

SNI - J.6.22a 1 M' Pasang Pipa Galvanis diameter 1 1/2" med. A = Rp. #N/A 1.2000 M' Pipa Galvanis diam. 1 1/2" @Rp. #N/A = Rp. #N/A 35%xhrg pipa - Perlengkapan @Rp. - = Rp. - 0.1080 Oh Pekerja @Rp. 25,000.00 = Rp. 2,700.00 0.1800 Oh Tukang Batu @Rp. 30,000.00 = Rp. 5,400.00 0.0180 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 612.00 0.0054 Oh Mandor @Rp. 35,000.00 = Rp. 189.00

SNI - J.6.22a 1 M' Pasang Pipa Galvanis diameter 2" med. A = Rp. #N/A 1.2000 M' Pipa Galvanis diam. 2" @Rp. #N/A = Rp. #N/A 35%xhrg pipa - Perlengkapan @Rp. - = Rp. - 0.1080 Oh Pekerja @Rp. 25,000.00 = Rp. 2,700.00 0.1800 Oh Tukang Batu @Rp. 30,000.00 = Rp. 5,400.00 0.0180 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 612.00 0.0054 Oh Mandor @Rp. 35,000.00 = Rp. 189.00

SNI - J.6.23a 1 M' Pasang Pipa Galvanis diameter 3" med. A = Rp. #N/A 1.2000 M' Pipa Galvanis diam. 3" @Rp. #N/A = Rp. #N/A 35%xhrg pipa - Perlengkapan @Rp. - = Rp. - 0.1080 Oh Pekerja @Rp. 25,000.00 = Rp. 2,700.00 0.1800 Oh Tukang Batu @Rp. 30,000.00 = Rp. 5,400.00 0.0180 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 612.00 0.0054 Oh Mandor @Rp. 35,000.00 = Rp. 189.00

SNI - J.6.24a 1 M' Pasang Pipa Galvanis diameter 4" med. A = Rp. #N/A 1.2000 M' Pipa Galvanis diam. 4" @Rp. #N/A = Rp. #N/A 35%xhrg pipa - Perlengkapan @Rp. - = Rp. -

Page 63: Analis Sni Ta 2008

Page 63 of 77

0.1350 Oh Pekerja @Rp. 25,000.00 = Rp. 3,375.00 0.2500 Oh Tukang Batu @Rp. 30,000.00 = Rp. 7,500.00 0.0225 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 765.00 0.0068 Oh Mandor @Rp. 35,000.00 = Rp. 238.00

SNI - J.6.25a 1 M' Pasang Pipa PVC diameter 1/2" S10 10 Bar = Rp. #N/A 1.2000 M' Pipa PVC diam. 1/2" @Rp. #N/A = Rp. #N/A 35%xhrg pipa - Perlengkapan @Rp. - = Rp. - 0.0360 Oh Pekerja @Rp. 25,000.00 = Rp. 900.00 0.0600 Oh Tukang Batu @Rp. 30,000.00 = Rp. 1,800.00 0.0060 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 204.00 0.0018 Oh Mandor @Rp. 35,000.00 = Rp. 63.00

SNI - J.6.26a 1 M' Pasang Pipa PVC diameter 3/4" S10 10 Bar = Rp. #N/A 1.2000 M' Pipa PVC diam. 3/4" @Rp. #N/A = Rp. #N/A 35%xhrg pipa - Perlengkapan @Rp. - = Rp. - 0.0360 Oh Pekerja @Rp. 25,000.00 = Rp. 900.00 0.0600 Oh Tukang Batu @Rp. 30,000.00 = Rp. 1,800.00 0.0060 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 204.00 0.0018 Oh Mandor @Rp. 35,000.00 = Rp. 63.00

SNI - J.6.27a 1 M' Pasang Pipa PVC diameter 1" S10 10 Bar = Rp. #N/A 1.2000 M' Pipa PVC diam. 1" @Rp. #N/A = Rp. #N/A 35%xhrg pipa - Perlengkapan @Rp. - = Rp. - 0.0360 Oh Pekerja @Rp. 25,000.00 = Rp. 900.00 0.0600 Oh Tukang Batu @Rp. 30,000.00 = Rp. 1,800.00 0.0060 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 204.00 0.0018 Oh Mandor @Rp. 35,000.00 = Rp. 63.00

SNI - J.6.28a 1 M' Pasang Pipa PVC diameter 1 1/2" S10 10 Bar = Rp. #N/A 1.2000 M' Pipa PVC diam. 1 1/2" @Rp. #N/A = Rp. #N/A 35%xhrg pipa - Perlengkapan @Rp. - = Rp. - 0.0360 Oh Pekerja @Rp. 25,000.00 = Rp. 900.00 0.0600 Oh Tukang Batu @Rp. 30,000.00 = Rp. 1,800.00 0.0060 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 204.00 0.0018 Oh Mandor @Rp. 35,000.00 = Rp. 63.00

SNI - J.6.28b 1 M' Pasang Pipa PVC diameter 1 1/4" S10 10 Bar = Rp. #N/A 1.2000 M' Pipa PVC diam. 1 1/4" @Rp. #N/A = Rp. #N/A 35%xhrg pipa - Perlengkapan @Rp. - = Rp. - 0.0360 Oh Pekerja @Rp. 25,000.00 = Rp. 900.00 0.0600 Oh Tukang Batu @Rp. 30,000.00 = Rp. 1,800.00 0.0060 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 204.00 0.0018 Oh Mandor @Rp. 35,000.00 = Rp. 63.00

SNI - J.6.28c 1 M' Pasang Pipa PVC diameter 1 1/2" S12,5 10 Bar = Rp. 24,677.50 1.2000 M' Pipa PVC diam. 1 1/2" @Rp. 15,000.00 = Rp. 18,000.00 35%xhrg pipa - Perlengkapan @Rp. - = Rp. - 0.0810 Oh Pekerja @Rp. 25,000.00 = Rp. 2,025.00 0.1350 Oh Tukang Batu @Rp. 30,000.00 = Rp. 4,050.00 0.0135 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 459.00 0.0041 Oh Mandor @Rp. 35,000.00 = Rp. 143.50

SNI - J.6.29a 1 M' Pasang Pipa PVC diameter 2" S12,5 10 Bar = Rp. 31,877.50 1.2000 M' Pipa PVC diam. 2" @Rp. 21,000.00 = Rp. 25,200.00 35%xhrg pipa - Perlengkapan @Rp. - = Rp. - 0.0810 Oh Pekerja @Rp. 25,000.00 = Rp. 2,025.00 0.1350 Oh Tukang Batu @Rp. 30,000.00 = Rp. 4,050.00 0.0135 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 459.00 0.0041 Oh Mandor @Rp. 35,000.00 = Rp. 143.50

SNI - J.6.31a 1 M' Pasang Pipa PVC diameter 3" S12,5 10 Bar = Rp. #N/A 1.2000 M' Pipa PVC diam. 3" @Rp. #N/A = Rp. #N/A 35%xhrg pipa - Perlengkapan @Rp. - = Rp. - 0.0810 Oh Pekerja @Rp. 25,000.00 = Rp. 2,025.00 0.1350 Oh Tukang Batu @Rp. 30,000.00 = Rp. 4,050.00 0.0135 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 459.00 0.0041 Oh Mandor @Rp. 35,000.00 = Rp. 143.50

SNI - J.6.32a 1 M' Pasang Pipa PVC diameter 4" S10 12,5 Bar = Rp. 83,650.50 1.2000 M' Pipa PVC diam. 4" @Rp. 66,000.00 = Rp. 79,200.00 35%xhrg pipa - Perlengkapan @Rp. - = Rp. - 0.0540 Oh Pekerja @Rp. 25,000.00 = Rp. 1,350.00 0.0900 Oh Tukang Batu @Rp. 30,000.00 = Rp. 2,700.00 0.0090 Oh Kepala Tukang @Rp. 34,000.00 = Rp. 306.00 0.0027 Oh Mandor @Rp. 35,000.00 = Rp. 94.50

Page 64: Analis Sni Ta 2008

Page 64 of 77

G.5b 1 M3 Membuat Bronjong = Rp. #N/AUntuk 1 m3 Bronjong 1/3 x = Rp. #N/A

Untuk 3 m3 diperlukan #N/A 45.0 Kg Kawat Galvano @Rp. #N/A = Rp. #N/A Pekerjaan mengisi 2.2 Hr Penganyam @Rp. 30,000.00 = Rp. 66,000.00 1.8 Hr Pekerja @Rp. 25,000.00 = Rp. 45,000.00 0.080 Hr Mandor @Rp. 35,000.00 = Rp. 2,800.00 Pekerjaan mengisi 3 m3 Batu Kali Belah @Rp. #N/A = Rp. #N/A 4.5 Hr Pekerja @Rp. 25,000.00 = Rp. 112,500.00 0.075 Hr Mandor @Rp. 35,000.00 = Rp. 2,625.00

BOW - Supl.IV.e 1 Kg Pasang Rangka Atap Baja = Rp. 21,134.00 1.1000 Set Baja @Rp. 12,000.00 = Rp. 13,200.00 0.0800 Kg Meni Besi @Rp. 14,300.00 = Rp. 1,144.00 0.0600 Hr Pekerja @Rp. 25,000.00 = Rp. 1,500.00 0.0500 Hr Tukang Besi @Rp. 30,000.00 = Rp. 1,500.00 0.0600 Hr Kepala Tukang @Rp. 34,000.00 = Rp. 2,040.00 0.0500 Hr mandor @Rp. 35,000.00 = Rp. 1,750.00

6,790.00

Page 65: Analis Sni Ta 2008

= Rp. 6,100,000.00 1 Hr Masins =25 @ 51,000.00 = Rp 1,275,000.00 1 Hr Kenek =25 @ 43,000.00 = Rp 1,075,000.00 6 Hr Pekerja =25 @ 25,000.00 = Rp 3,750,000.00

Bahan Bakar = Rp. #N/A500 Ltr Solar @ #N/A = #N/A25 Ltr Oli @ #N/A = #N/A8 Kg Vet @ 15,000.00 = Rp 120,000.00

= Rp. #N/A1

x Rp 6,100,000.00 + #N/A = #N/A 15,000

= Rp. #N/A1

x Rp 6,100,000.00 + #N/A = #N/A 7,500

= Rp. #N/A1

x Rp 6,100,000.00 + #N/A = #N/A 3,750

W.1 1 Pasir Urug Alas Jalan = Rp. #N/A

1.2 Pasir Urug @ #N/A = #N/A 0.375 Hr Pekerja @ 25,000.00 = Rp 9,375.00 0.019 Hr Mandor @ 35,000.00 = Rp 665.00

Tebal 5 cm = 0,05 x @ #N/A = Rp. #N/ATebal 10 cm = 0,10 x @ #N/A = Rp. #N/A

W.2 1 Hamparan Onderlaag (tebal 15 cm) = Rp. #N/A

0.17 Batu Pecah tangan 10/15 cm @ #N/A = #N/A

0.03 Batu Pecah tangan 5/7 cm @ #N/A = #N/A 0.375 Hr Pekerja @ 25,000.00 = Rp 9,375.00 0.019 Hr Mandor @ 35,000.00 = Rp 665.00 1 Biaya Gilas @ #N/A = #N/A

W.3 1 Hamparan Stanslaag (tebal 6 cm) = Rp. #N/A

0.064 Batu Pecah tangan 5/7 cm @ #N/A = #N/A

0.016 Batu Pecah mesin 3/5 cm @ #N/A = #N/A

0.02 Pasir Urug @ #N/A = #N/A 0.075 Hr Pekerja @ Rp 25,000.00 = Rp 1,875.00 0.00375 Hr Mandor @ Rp 35,000.00 = Rp 131.25 1 Biaya Gilas @ #N/A = #N/A

W.3a 1 Pondasi Batu Pecah Kelas A = Rp. #N/A

0.06 Batu Pecah tangan 5/7 cm @ #N/A = #N/A

0.48 Batu Pecah mesin 3/5 cm @ #N/A = #N/A

0.54 Batu Pecah mesin 2/3 cm @ #N/A = #N/A

0.12 Batu Pecah mesin 1/2 cm @ #N/A = #N/A

0.06 Pasir Urug @ #N/A = #N/A 0.9375 Hr Pekerja @ Rp 25,000.00 = Rp 23,437.50 0.047 Hr Mandor @ Rp 35,000.00 = Rp 1,645.00

Untuk tebal 30 cm = Rp. #N/A0.3 x @ #N/A #N/A

1x @ #N/A = #N/A 1,875

Untuk tebal 25 cm = Rp. #N/A0.25 x @ #N/A #N/A

1x @ #N/A = #N/A 1,875

Untuk tebal 20 cm = Rp. #N/A0.2 x @ #N/A #N/A

1x @ #N/A = #N/A 1,875

Upah Tenaga per m3

Upah Gilas per m2

Upah Gilas Steenslaag per m2

Upah Gilas Onderlaag per m2

M3

M3

M2

M2

M3

M2

M2

M3

M3

M3

M2

M3

M3

M3

M3

Page 66: Analis Sni Ta 2008

Untuk tebal 15 cm = Rp. #N/A0.15 x @ #N/A #N/A

1x @ #N/A = #N/A 3,750

Untuk tebal 10cm = Rp. #N/A0.1 x @ #N/A #N/A

1x @ #N/A = #N/A 3,750

W.5 1 Stanslaag dengan aspal aspal panas = Rp. #N/AUntuk meninggikan muka jalan/cop-copan

2.5 Kg Aspal @ #N/A = #N/A

0.08 Batu Pecah tangan 5/7 cm @ #N/A = #N/A

0.0035 Kayu Bakar @ #N/A = #N/A

0.005 Pemasah aspal @ Rp 30,000.00 = Rp 150.00 0.1 Hr Pekerja @ Rp 25,000.00 = Rp 2,500.00 0.005 Hr Mandor @ Rp 35,000.00 = Rp 175.00 1 Alat - alat @ Rp 1,500.00 = Rp 1,500.00 1 Biaya Gilas @ #N/A = #N/A

W.5a 1 Aspal Overpainting dengan spleet 2/3 cm = Rp. #N/A 2.4 Kg Aspal @ #N/A = #N/A

0.03 Batu Pecah tangan 2/3 cm @ #N/A = #N/A

0.01 Batu Pecah mesin 1/2 cm @ #N/A = #N/A

0.0035 Kayu Bakar @ #N/A = #N/A

0.005 Pemasah aspal @ Rp 30,000.00 = Rp 150.00 0.1 Hr Pekerja @ Rp 25,000.00 = Rp 2,500.00 0.005 Hr Mandor @ Rp 35,000.00 = Rp 175.00 1 Alat - alat @ Rp 1,500.00 = Rp 1,500.00 1 Biaya Gilas @ #N/A = #N/A

W.5b 1 Aspal Overpainting dengan spleet 3/5 cm = Rp. #N/A 2.5 Kg Aspal @ #N/A = #N/A

0.04 Batu Pecah mesin 3/5 cm @ #N/A = #N/A

0.02 Batu Pecah mesin 2/3 cm @ #N/A = #N/A

0.0035 Kayu Bakar @ #N/A = #N/A

0.005 Pemasah aspal @ Rp 21,000.00 = Rp 105.00 0.1 Hr Pekerja @ Rp 18,000.00 = Rp 1,800.00 0.005 Hr Mandor @ Rp 25,000.00 = Rp 125.00 1 Alat - alat @ Rp 1,500.00 = Rp 1,500.00 1 Biaya Gilas @ #N/A = #N/A

KPU. I 1 Aspal Beton dengan Batu pecah 2/3 cm = Rp. #N/A 4.05 Kg Aspal @ #N/A = #N/A

0.04 Batu Pecah mesin 2/3 cm @ #N/A = #N/A

0.044 Kayu Bakar @ #N/A = #N/A

0.535 Pemasah aspal @ Rp 30,000.00 = Rp 16,050.00 0.077 Hr Pekerja @ Rp 25,000.00 = Rp 1,925.00 0.0268 Hr Mandor @ Rp 35,000.00 = Rp 938.00 1 Alat - alat @ Rp 1,500.00 = Rp 1,500.00 1 Biaya Gilas @ #N/A = #N/A

KPU. II 1 Aspal Sheet dengan Krisik tebal 2 cm = Rp. #N/A 4.4 Kg Aspal @ #N/A = #N/A

0.02 Krisik Aspalan @ #N/A = #N/A

0.024 Kayu Bakar @ #N/A = #N/A

0.03 Pemasak aspal @ Rp 30,000.00 = Rp 900.00 0.22 Hr Pekerja @ Rp 25,000.00 = Rp 5,500.00 0.011 Hr Mandor @ Rp 35,000.00 = Rp 385.00 1 Alat - alat @ Rp 1,500.00 = Rp 1,500.00 1 Biaya Gilas @ #N/A = #N/A

KPU. II a 1 Aspal Sheet denganBatu pecah tebal 2 cm = Rp. #N/A 4.4 Kg Aspal @ #N/A = #N/A

0.024 Batu Pecah mesinn 1/2 cm @ #N/A = #N/A

0.024 Kayu Bakar @ #N/A = #N/A

M2

M3

M3

M3

M2

M3

M3

M3

M3

M2

M3

M3

M3

M3

M2

M3

M3

M3

M2

M3

M3

M3

M2

M3

M3

Page 67: Analis Sni Ta 2008

0.03 Pemasah aspal @ Rp 30,000.00 = Rp 900.00 0.22 Hr Pekerja @ Rp 25,000.00 = Rp 5,500.00 0.011 Hr Mandor @ Rp 35,000.00 = Rp 385.00 1 Alat - alat @ Rp 1,500.00 = Rp 1,500.00 1 Biaya Gilas @ #N/A = #N/A

KPU. II c 1 Aspal Sheet denganBatu pecah tebal 1 cm = Rp. #N/A 2.95 Kg Aspal @ #N/A = #N/A

0.012 Batu Pecah 0,5 - 1 cm @ #N/A = #N/A

0.012 Kayu Bakar @ #N/A = #N/A

0.015 Pemasah aspal @ Rp 30,000.00 = Rp 450.00 0.11 Hr Pekerja @ Rp 25,000.00 = Rp 2,750.00 0.0055 Hr Mandor @ Rp 35,000.00 = Rp 192.50 1 Alat - alat @ Rp 1,500.00 = Rp 1,500.00 1 Biaya Gilas @ #N/A = #N/A

M3

M2

M3

M3

M3

Page 68: Analis Sni Ta 2008

E1-511 1 M3 Lapis Pondasi Agregat Kelas A =Rp. 109,595.05 0.6600 M3 Agregat Kasar @Rp. - = Rp. - 0.5400 M3 Agregat Halus @Rp. - = Rp. - 3.5000 Jam Pekerja @Rp. 25,000.00 = Rp. 87,500.00 0.5000 Jam Mandor @Rp. 35,000.00 = Rp. 17,500.00 0.0178 Jam Tandem Roller 6-8 ton @Rp. 88,444.90 = Rp. 1,574.32 0.0211 Jam Water Truck 2000-4500L @Rp. 72,072.43 = Rp. 1,520.73 1.0000 Ls Alat Bantu @Rp. 1,500.00 = Rp. 1,500.00

E1-511.a 1 M2 Onderlaag tebal 15 cm =Rp. #N/A 0.1500 M3 Batu Belah 10/15 @Rp. #N/A = Rp. #N/A 0.0500 M3 Batu Pecah 5/7 @Rp. #N/A = Rp. #N/A 0.0500 M3 Pasir Urug @Rp. #N/A = Rp. #N/A 2.6250 Jam Pekerja @Rp. 25,000.00 = Rp. 65,625.00 0.1330 Jam Mandor @Rp. 35,000.00 = Rp. 4,655.00 0.0027 Jam Tandem Roller 6-8 ton @Rp. 88,444.90 = Rp. 238.80 0.0032 Jam Water Truck 2000-4500L @Rp. 72,072.43 = Rp. 230.63 1.0000 Ls Alat Bantu @Rp. 1,500.00 = Rp. 1,500.00

E1-511.b 1 M2 Steenslaag tebal 6 cm =Rp. #N/A 0.0600 M3 Batu Pecah 5/7 @Rp. #N/A = Rp. #N/A 0.0200 M3 Batu Pecah 3/5 @Rp. #N/A = Rp. #N/A 0.0200 M3 Pasir Urug @Rp. #N/A = Rp. #N/A 0.5250 Jam Pekerja @Rp. 25,000.00 = Rp. 13,125.00 0.2660 Jam Mandor @Rp. 35,000.00 = Rp. 9,310.00 0.0011 Jam Tandem Roller 6-8 ton @Rp. 88,444.90 = Rp. 97.29 0.0013 Jam Water Truck 2000-4500L @Rp. 72,072.43 = Rp. 93.69 1.0000 Ls Alat Bantu @Rp. 1,500.00 = Rp. 1,500.00

E1-611 1 LITER Lapis Resap Pengikat =Rp. #N/A 0.6468 Kg Aspal penetrasi 60/70 @Rp. #N/A = Rp. #N/A 0.4840 Ltr Kerosene /Minyak Tanah @Rp. #N/A = Rp. #N/A 0.0301 Jam Pekerja @Rp. 25,000.00 = Rp. 752.50 0.0060 Jam Mandor @Rp. 35,000.00 = Rp. 210.00 0.0030 Jam Asphalt Sprayer @Rp. 35,333.11 = Rp. 106.00 0.0031 Jam Compresor 4000-6500 L/M @Rp. 14,579.78 = Rp. 45.20 0.0030 Jam Dump Truck 3 - 4 M3 @Rp. 114,647.09 = Rp. 343.94

E1-612 1 LITER Lapis Perekat =Rp. #N/A 0.8890 Kg Aspal penetrasi 60/70 @Rp. #N/A = Rp. #N/A 0.2530 Ltr Kerosene /Minyak Tanah @Rp. #N/A = Rp. #N/A 0.0301 Jam Pekerja @Rp. 25,000.00 = Rp. 752.50 0.0060 Jam Mandor @Rp. 35,000.00 = Rp. 210.00 0.0030 Jam Asphalt Sprayer @Rp. 35,333.11 = Rp. 106.00 0.0071 Jam Compresor 4000-6500 L/M @Rp. 14,579.78 = Rp. 103.52 0.0030 Jam Dump Truck 3 - 4 M3 @Rp. 114,647.09 = Rp. 343.94

E1-817.a 1 M3 Lapis Penetrasi Macadam (Leveling) =Rp. #N/A 0.97778 M3 Agregat Pokok Lapen @Rp. 125,000.00 = Rp. 122,222.50 0.30556 M3 Agregat Pengunci Lapen @Rp. 125,000.00 = Rp. 38,195.00 0.17111 M3 Agregat Penutup Lapen @Rp. - = Rp. - 80.00000 Kg Aspal penetrasi 60/70 @Rp. #N/A = Rp. #N/A 0.80000 M3 Kayu Bakar @Rp. #N/A = Rp. #N/A 19.7054 Jam Pekerja @Rp. 25,000.00 = Rp. 492,635.00 0.5890 Jam Mandor @Rp. 35,000.00 = Rp. 20,615.00 0.0535 Jam Tree Wheel Roller 6-8 T @Rp. 86,820.63 = Rp. 4,644.90 0.2386 Jam Asphalt Sprayer @Rp. 35,333.11 = Rp. 8,430.48 1.0000 Ls Alat bantu @Rp. 1,500.00 = Rp. 1,500.00

E1-817.b 1 M2 Lapis Penetrasi Macadam Sheet =Rp. #N/A 0.04889 M3 Agregat Pokok Lapen @Rp. 125,000.00 = Rp. 6,111.25 0.01528 M3 Agregat Pengunci Lapen @Rp. 125,000.00 = Rp. 1,910.00 0.01000 M3 Batu Pecah 0,2 - 0,5 cm @Rp. #N/A = Rp. #N/A 4.50000 Kg Aspal penetrasi 60/70 @Rp. #N/A = Rp. #N/A 0.05000 M3 Kayu Bakar @Rp. #N/A = Rp. #N/A 1.0452 Jam Pekerja @Rp. 25,000.00 = Rp. 26,130.00 0.0393 Jam Mandor @Rp. 35,000.00 = Rp. 1,375.50 0.0027 Jam Tree Wheel Roller 6-8 T @Rp. 86,820.63 = Rp. 234.42 0.0119 Jam Asphalt Sprayer @Rp. 35,333.11 = Rp. 420.46 1.0000 Ls Alat bantu @Rp. 1,500.00 = Rp. 1,500.00

E1-631 1 M2 Latasir (Sand Sheet) =Rp. #N/A 0.02000 M3 Batu Pecah 0,2 - 0,5 cm @Rp. #N/A = Rp. #N/A 2.50000 Kg Aspal @Rp. #N/A = Rp. #N/A 0.01800 M3 Kayu Bakar @Rp. #N/A = Rp. #N/A 0.7778 Jam Pekerja @Rp. 25,000.00 = Rp. 19,445.00 0.0389 Jam Mandor @Rp. 35,000.00 = Rp. 1,361.50 0.0020 Jam Tree Wheel Roller 6-8 T @Rp. 86,820.63 = Rp. 173.64

Page 69: Analis Sni Ta 2008

1.0000 Ls Alat bantu @Rp. 1,500.00 = Rp. 1,500.00

Page 70: Analis Sni Ta 2008

Page 70 of 77

NOKODE

SATUAN MACAM PEKERJAAN HARGA SATUANANALIS

1 2 3 4 5

1 SNI - A.6.4 M' Pengukuran dan Pemasangan Bouplank (kayu meran #N/A

2 SNI - A.6.4a M' Pengukuran dan Pemasangan Bouplank (kayu Tahun) #N/A

3 SNI - A.6.6 M2 Pembuatan Gudang Semen dan Alat-alat ( Kayu Meranti ) #N/A

4 SNI - A.6.6a M2 Pembuatan Gudang Semen dan Alat-alat ( Kayu Tahun ) #N/A

5 SNI - A.6.7 M2 Pembuatan Rumah Jaga / Konstruksi Kayu ( Kayu Meranti #N/A

6 SNI - A.6.7a M2 Pembuatan Rumah Jaga / Konstruksi Kayu ( Kayu Tahun ) #N/A

7 SNI - A.6.8 M2 Membersihkan Lapangan dan Perataan 4,250.00

8 SNI - A.6.10 Bh Pembuatan Bak Adukan Uk. ( 40 x 50 x 20 ) Cm Kayu Tah #N/A

9 SNI - A.6.11 M2 Pembuatan Steger dari Bambu ukuran (40 x 50 x 20) cm #N/A

10 SNI - A.6.14 M3 Bongkaran Dinding Tembok Bata Merah 167,830.00

11 SNI - B.6.1 M3 Galian Tanah Biasa Sedalam 1 meter 11,400.00

12 SNI - B.6.2 M3 Galian Tanah Biasa Sedalam 2 meter 14,970.00

13 SNI - B.6.2 M3 Galian Tanah Biasa Sedalam 2 meter 14,970.00

14 SNI - B.6.4 M3 Galian Tanah Keras Sedalam 1 meter 17,795.00

15 SNI - B.6.7 M2 Pekerjaan Striping Setinggi 1 meter 1,425.00

16 SNI - B.6.8 M3 Pembuangan Tanah Sejauh 150 meter 14,650.00

17 SNI - B.6.9 M3 Urugan Kembali 5,465.00

18 SNI - B.6.10 M3 Pemadatan Tanah 14,250.00

19 SNI - B.6.11 M3 Urugan Pasir #N/A

20 SNI - B.6.14 M3 Pemasangan Ijuk #N/A

21 SNI - B - 6.15 M3 Urugan Sirtu #N/A

22 SNI - C.6.5 M3 Pas. Batu Kali 1 PC : 4 Ps #N/A

23 SNI - C.6.6 M3 Pas. Batu Kali 1 PC : 5 Ps #N/A

24 SNI - C.6.12 M3 Pas. Batu Kali 1 PC : 3 Kp : 10 Ps #N/A

25 SNI - C.6.114 M3 Pas.Batu Kosong #N/A

26 SNI - D.6.3 M2 Pas. Batu Merah tb. 1 bata 1 PC : 3 Ps #N/A

27 SNI - D.6.5 M2 Pas. Batu Bata tb. 1 bata 1 PC : 5 Ps #N/A

28 SNI - D.6.7 M2 Pas. Batu bata tb. 1 bata 1 PC : 3 Kp : 10 Ps #N/A

29 SNI - D.6.10 M2 Pas. Batu Bata tb. 1/2 bata 1 PC : 3 Ps #N/A

30 SNI - D.6.12 M2 Pas. Batu Bata tb. 1/2 bata 1 PC : 5 Ps #N/A

31 SNI - D.6 .15 M2 Pas. Batu Bata tb. 1/2 bata 1 PC : 3 Kp : 10 Ps #N/A

32 SNI - E.6.3 M2 Plesteran 1 PC : 3 Ps tb. 1,5 cm #N/A

33 SNI - E.6.5 M2 Plesteran 1 PC : 5 Ps tb. 1,5 cm #N/A

34 SNI - E.6.9 M2 Plesteran 1 PC : 3 Kp : 10 Ps tb. 1,5 cm #N/A

35 SNI - E.6.14 M2 Plesteran 1 PC : 3 Ps tb. 2 cm #N/A

36 SNI - E.6.16 M2 Plesteran 1 PC : 5 Ps tb. 2 cm #N/A

37 SNI - E.6.28 M2 Beraben 1 PC : 5 Ps tb. 1,5 cm #N/A

38 SNI - E.6.30 M2 Plesteran Beton 1 PC : 3 Ps tb. 1,5 cm #N/A

39 SNI - E.6.31 M2 Plesteran Skoning 1 PC : 2 Ps #N/A

40 SNI - E.6.35 M2 Plesteran Siar Adukan 1 PC : 2 Ps #N/A

41 SNI - F.6.1 M3 Pas.Kusen Pintu dan Jendela Kayu Jati #N/A

Page 71: Analis Sni Ta 2008

Page 71 of 77

42 SNI - F.6.2 M3 Pas.Kusen Pintu dan Jendela Kayu Kamper #N/A

43 SNI - F.6.2a M3 Pas.Kusen Pintu dan Jendela Kayu Bangkir #N/A

44 SNI - F.6.2b M3 Pas.Kusen Pintu dan Jendela Kayu Kruing #N/A

45 SNI - F.6.7 M2 Pasang Pintu Panil Kayu Jati #N/A

46 SNI - F.6.8 M2 Pasang Pintu Panil Kayu Kamper #N/A

47 SNI - F.6.8a M2 Pasang Pintu Panil Kayu Bangkir #N/A

48 SNI - F.6.8b M2 Pasang Pintu Panil Kayu Kruing #N/A

49 SNI - F.6.9 M2 Pas. Pintu dan Jendela Kaca Kayu Jati #N/A

50 SNI - F.6.10 M2 Pas. Pintu dan Jendela Kaca Kayu Kamper #N/A

51 SNI - F.6.10a M2 Pas. Pintu dan Jendela Kaca Kayu Bangkir #N/A

52 SNI - F.6.10b M2 Pas. Pintu dan Jendela Kaca Kayu Kruing #N/A

53 SNI - F.6.12 M2 Pas. Pintu dan Jendela Jalusi Kayu Jati #N/A

54 SNI - F.6.13 M2 Pas. Pintu dan Jendela Jalusi Kayu Kamper #N/A

55 SNI - F.6.13a M2 Pas. Pintu dan Jendela Jalusi Kayu Bangkir #N/A

56 SNI - F.6.13b M2 Pas. Pintu dan Jendela Jalusi Kayu Kruing #N/A

57 SNI - F.6.16 M2 Pas. Jalusi Mati Kusen Kayu Jati #N/A

58 SNI - F.6.17 M2 Pas. Jalusi Mati Kusen Kayu Kamper #N/A

59 SNI - F.6.17a M2 Pas. Jalusi Mati Kusen Kayu Bangkir #N/A

60 SNI - F.6.17b M2 Pas. Jalusi Mati Kusen Kayu Kruing #N/A

61 SNI - F.6.19 M2 Pas. Pintu Teakwood rangkap, rangka Kayu Jati #N/A

62 SNI - F.6.20 M2 Pas. Pintu Teakwood rangkap, rangka Kayu Kamper #N/A

63 SNI - F.6.20a M2 Pas. Pintu Teakwood rangkap, rangka Kayu Bangkir #N/A

64 SNI - F.6.20b M2 Pas. Pintu Teakwood rangkap, rangka Kayu Kruing #N/A

65 SNI - F.6.20c M2 Pintu Triplek 3 mm rangkap, rangka Kayu Kamper #N/A

66 SNI - F.6.20d M2 Pas. Pintu Triplek 3 mm rangkap, rangka Kayu Bangkir #N/A

67 SNI - F.6.20e M2 Pas. Pintu Triplek 3 mm rangkap, rangka Kayu Kruing #N/A

68 SNI - F.6.27 M3 Pas. Konstruksi Kuda-kuda Kayu Jati #N/A

69 SNI - F.6.28 M3 Pas. Konstruksi Kuda-kuda Kayu Kamper #N/A

70 SNI - F.6.28a M3 Konstruksi Kuda-kuda Kayu Bangkir #N/A

71 SNI - F.6.30 M3 Pas. Konstruksi Kuda-kuda Kayu Kruing #N/A

72 SNI - F.6.31 M2 #N/A

73 SNI - F.6.31a M2 #N/A

74 SNI - F.6.31b M2 #N/A

75 SNI - F.6.31c M2 #N/A

76 SNI - F.6.35 M2 #N/A

77 SNI - F.6.35a M2 #N/A

78 SNI - F.6.35b M2 #N/A

79 SNI - F.6.38 M2 Pas. Rangka Langit-langit Kayu Jati Uk. 1 x 1 m #N/A

80 SNI - F.6.39 M2 Pas. Rangka Langit-langit Kayu Kamper Uk. 1 x 1 m #N/A

81 SNI - F.6.39a M2 Pas. Rangka Langit-langit Kayu Bangkir Uk. 1 x 1 m #N/A

Pas.Kaso dan Reng genteng ( Kodok, Plentong, Vlams dan sejenisnya ) Kayu Kamper

Pas.Kaso dan Reng genteng ( Kodok, Plentong, Vlams dan sejenisnya ) Kayu Bangkir

Pas.Kaso dan Reng genteng ( Kodok, Plentong, Vlams dan sejenisnya ) Kayu Kruing

Pas.Kaso dan Reng genteng ( Kodok, Plentong, Vlams dan sejenisnya ) Kayu Meranti

Pas.Kaso dan Reng genteng ( beton, monier, morando dan sejenisnya ) Kayu Kamper

Pas.Kaso dan Reng genteng ( beton, monier, morando dan sejenisnya ) Kayu Bangkir

Pas.Kaso dan Reng genteng ( beton, monier, morando dan sejenisnya ) Kayu Kruing

Page 72: Analis Sni Ta 2008

Page 72 of 77

82 SNI - F.6.39b M2 Pas. Rangka Langit-langit Kayu Kruing Uk. 1 x 1 m #N/A

83 SNI - F.6.39c M2 Pas. Rangka Langit-langit Kayu Meranti Uk. 1 x 1 m #N/A

84 SNI - F.6.44 M2 Pas. Rangka Langit-langit Kayu Kamper Uk. 0,30 x 0,30 m #N/A

85 SNI - F.6.44a M2 Pas. Rangka Langit-langit Kayu Bangkir Uk. 0,30 x 0,30 m #N/A

86 SNI - F.6.44b M2 Pas. Rangka Langit-langit Kayu Kruing Uk. 0,30 x 0,30 m #N/A

87 SNI - F.6.44c M2 Pas. Rangka Langit-langit Kayu Meranti Uk. 0,30 x 0,30 m #N/A

88 SNI - F.6.47 M' Pas. Lisplank Kayu Jati Uk. 3 x 20 cm #N/A

89 SNI - F.6.48 M' Pas. Lisplank Kayu Kamper Uk. 3 x 20 cm #N/A

90 SNI - F.6.48a M' Pas. Lisplank Kayu Bangkir Uk. 3 x 20 cm #N/A

91 SNI - F.6.48b M' Pas. Lisplank Kayu Kruing Uk. 3 x 20 cm #N/A

92 SNI - F.6.52 M' Pas. Lisplank Kayu Jati ( 2 x 20 ) cm #N/A

93 SNI - F.6.52a M' Pas. Lisplank Kayu Kamper ( 2 x 20 ) cm #N/A

94 SNI - F.6.52b M' Pas. Lisplank Kayu Bangkir ( 2 x 20 ) cm #N/A

95 SNI - F.6.52c M' Pas. Lisplank Kayu Kruing ( 2 x 20 ) cm #N/A

96 SNI - G.6.1 M3 Pas. Beton Tumbuk 1 PC : 3 Ps : 5 Kr #N/A

97 SNI - G.6.4 M3 Pas. Lantai Kerja Beton Tumbuk 1 PC : 3 Ps : 5 Kr tb. 5 cm #N/A

98 SNI - G.6.7 M3 Pas. Beton Cor 1 PC : 2 Ps : 2,5 Kr #N/A

99 SNI - G.6.13 M3 Pas. Beton Cor 1 PC : 2 Ps : 3 Kr #N/A

100 SNI - G.6.25 Kg Pembesian dengan Besi Beton Polos #N/A

101 SNI - G.6.25a Kg Pembesian dengan Besi Beton Ulir #N/A

102 SNI - G.6.28 M2 Pas. Bekisting untuk Pondasi #N/A

103 SNI - G.6.29 M2 Pas. Bekisting untuk Sloof #N/A

104 SNI - G.6.30 M2 Pas. Bekisting untuk Kolom #N/A

105 SNI - G.6.31 M2 Pas. Bekisting untuk Balok #N/A

106 SNI - G.6.32 M2 Pas. Bekisting untuk Lantai #N/A

107 SNI - G.6.33 M2 Pas. Bekisting untuk Dinding #N/A

108 SNI - G.6.34 M2 Pas. Bekisting untuk Tangga #N/A

109 SNI - G.6.45 M' Pas. Kolom Penguat Beton Bertulang ( 11 x 11 ) cm #N/A

110 SNI - G.6.46 M' Pas. Ring Balok Beton ( Bertulang 10 x 15 cm ) #N/A

111 SNI - H.6.1 M2 Pas. Atap Genteng Plentong Kecil #N/A

112 SNI - H.6.2 M2 Pas. Atap Genteng Kodok/Glasuur #N/A

113 SNI - H.6.4 M2 Pas. Atap Genteng Bubung Plentong/Kodok #N/A

114 SNI - H.6.12 M2 Pas. Atap Asbes Gelombang Uk. ( 3,00 x 1,05 m ) x 4 mm #N/A

115 SNI - H.6.13 M2 Pas. Atap Asbes Gelombang Uk. ( 2,70 x 1,05 m ) x 4 mm #N/A

116 SNI - H.6.14 M2 Pas. Atap Asbes Gelombang Uk. ( 2,40 x 1,05 m ) x 4 mm #N/A

117 SNI - H.6.15 M2 Pas. Atap Asbes Gelombang Uk. ( 2,10 x 1,05 m ) x 4 mm #N/A

118 SNI - H.6.16 M2 Pas. Atap Asbes Gelombang Uk. ( 1,50 x 1,05 m ) x 4 mm #N/A

119 SNI - H.6.23 M' Pas. Nok Stel Asbes Gelombang Uk. 1,05 m #N/A

120 SNI - H.6.30 M2 Pas. Atap Genteng Beton #N/A

121 SNI - H.6.30a M2 Pas. Atap Genteng Morando #N/A

122 SNI - H.6.34 M' Nok Genteng Beton #N/A

123 SNI - H.6.34a M' Nok Genteng Beton #N/A

124 SNI - H.6.38 M2 Pas. Atap Seng Gelombang BJLS 20 #N/A

125 SNI - H.6.39 M2 Pas.Atap Nok Seng #N/A

126 SNI - H.6.40 M' Pas. Talang Datar Seng BJLS 30 ( Kayu Meranti ) #N/A

Page 73: Analis Sni Ta 2008

Page 73 of 77

127 SNI - H.6.40a M' Pas. Talang Datar Seng BJLS 30 ( Kayu Kruing ) #N/A

128 SNI - H.6.41 M' Pas. Talang Miring Seng BJLS 30 ( Kayu Meranti ) #N/A

129 SNI - H.6.41a M' Pas. Talang Miring Seng BJLS 30 ( Kayu Kruing ) #N/A

130 SNI - H.6.42 M2 Pas. Aluminium Foil / Sisalation 20,085.00

131 SNI - H.6.43 M2 Pas. Kawat Burung ( Kayu Meranti ) #N/A

132 SNI - H.6.43a M2 Pas. Kawat Burung ( Kayu Kruing ) #N/A

133 SNI - I.6.19 M' List Langit-langit Kayu Propil ( Kayu Kruing ) #N/A

134 SNI - I.6.19a M' List Langit-langit Kayu ( Kayu Kruing ) #N/A

135 SNI - I.6.20 M2 Langit-langit Eternit ( 1,00 x 1,00 ) Rangka Kayu Kamper #N/A

136 SNI - I.6.20a M2 Langit-langit Eternit ( 1,00 x 1,00 ) Rangka Kayu Bangkir #N/A

137 SNI - I.6.20b M2 Langit-langit Eternit ( 1,00 x 1,00 ) Rangka Kayu Kruing #N/A

138 SNI - I.6.20c M2 Langit-langit Eternit ( 1,00 x 1,00 ) Rangka Kayu Meranti #N/A

139 SNI - I.6.20d M2 Langit-langit Hardplek ( 1,00 x 1,00 ) Rangka Kayu Kruing #N/A

140 SNI - I.6.20e M2 Langit-langit Hardplek ( 1,00 x 1,00 ) Rangka Kayu Merant #N/A

141 SNI - I.6.24 M2 Langit-langit Gypsum Board Tb. 19 mm #N/A

142 SNI - J.6.1 Bh Pasang Kloset Duduk / Monoblok #N/A

143 SNI - J.6.2 Bh Pasang Kloset Jongkok #N/A

144 SNI - J.6.4 Bh Pasang Urinoir #N/A

145 SNI - J.6.5 Bh Pasang Wastafel #N/A

146 SNI - J.6.7 Bh Pasang Bak Mandi Fiber Glass Volume 0,30 m3 #N/A

147 SNI - J.6.8 Bh Pasang Bak Mandi Batu Bata Volume 0,30 m3 #N/A

148 SNI - J.6.9 Bh Pasang Badkip Porselen #N/A

149 SNI - J.6.11 Bh Pasang Bak Fiber Glass Vol. 1 m3 Air #N/A

150 SNI - J.6.16 Bh #N/A

151 SNI - J.6.17 Bh #N/A

152 SNI - J.6.18 Bh #N/A

153 SNI - J.6.19 M' Pasang Pipa Galvanis diameter 1/2" med. B 378,501.00

154 SNI - J.6.20 M' Pasang Pipa Galvanis diameter 3/4" med. B #N/A

155 SNI - J.6.21 M' Pasang Pipa Galvanis diameter 1" med. B #N/A

156 SNI - J.6.22 M' Pasang Pipa Galvanis diameter 1 1/2" med. B #N/A

157 SNI - J.6.22a M' Pasang Pipa Galvanis diameter 2" med. B #N/A

158 SNI - J.6.23 M' Pasang Pipa Galvanis diameter 3" med. B #N/A

159 SNI - J.6.24 M' Pasang Pipa Galvanis diameter 4" med. B #N/A

160 SNI - J.6.25 M' Pasang Pipa PVC diameter 1/2" type AW #N/A

161 SNI - J.6.26 M' Pasang Pipa PVC diameter 3/4" type AW #N/A

162 SNI - J.6.27 M' Memasang 1 m' Pipa PVC diameter 1" type AW #N/A

163 SNI - J.6.28 M' Pasang Pipa PVC diameter 1 1/2" type AW #N/A

164 SNI - J.6.29 M' Pasang Pipa PVC diameter 2" type AW #N/A

165 SNI - J.6.31 M' Pasang Pipa PVC diameter 3" type AW #N/A

166 SNI - J.6.32 M' Pasang Pipa PVC diameter 4" type AW #N/A

167 SNI - J.6.33 Bh Pasang Bak Cuci Piring Stainless Steel #N/A

168 SNI - J.6.35 Bh Pasang Kran diameter 3/4" atau 1/2" #N/A

169 SNI - J.6.36 Bh Pasang Floor Drain #N/A

Pasang Bak Kontrol Pasangan Batu Bata uk. ( 30 x 30 ) cm Tinggi 35 cm

Pasang Bak Kontrol Pasangan Batu Bata uk. ( 45 x 45 ) cm Tinggi 50 cm

Pasang Bak Kontrol Pasangan Batu Bata uk. ( 60 x 60 ) cm Tinggi 65 cm

Page 74: Analis Sni Ta 2008

Page 74 of 77

170 SNI - K.6.1 Bh Pasang Kunci Tanam Antik #N/A

171 SNI - K.6.2 Bh Pasang Kunci Tanam Biasa #N/A

172 SNI - K.6.3 Bh Pasang Kunci Tanam Kamar Mandi #N/A

173 SNI - K.6.5 Bh Pasang Engsel Pintu #N/A

174 SNI - K.6.6 Bh Pasang Engsel Jendela Kupu-kupu #N/A

175 SNI - K.6.7 Bh Pasang Engsel Angin #N/A

176 SNI - K.6.9 Bh Pasang Kait Angin #N/A

177 SNI - K.6.10 Bh Pasang Door Closer #N/A

178 SNI - K.6.11 Bh Pasang Kunci Selot 92,215.00

179 SNI - K.6.12 Bh Pasang Pegangan Pintu / Door Holder #N/A

180 SNI - K.6.13 Bh Pasang Door Stop #N/A

181 SNI - K.6.14 Bh Pasang Rel Pintu Dorong #N/A

182 SNI - K.6.16 M2 Pasang Kaca Tb. 3 mm #N/A

183 SNI - K.6.17 M2 Pasang Kaca Tb. 5 mm #N/A

184 SNI - K.6.18 M2 Pasang Kaca Tb. 8 mm #N/A

185 SNI - K.6.20 M2 Pasang Kaca Cermin Tb. 5 mm #N/A

186 SNI - L.6.2 M2 Pas. Lantai Ubin PC Abu-abu Uk. ( 30 x 30 ) cm #N/A

187 SNI - L.6.3 M2 Pas. Lantai Ubin PC Abu-abu Uk. ( 20 x 20 ) cm #N/A

188 SNI - L.6.44 M2 Pasang Lantai Keramik Uk. ( 20 x 20 ) cm KW.I #N/A

189 SNI - L.6.44a M2 Pasang Lantai Keramik Uk. ( 20 x 20 ) cm KW.II #N/A

190 SNI - L.6.47 M2 Pasang Lantai Keramik Uk. ( 33 x 33 ) cm KW.I #N/A

191 SNI - L.6.47a M2 Pasang Lantai Keramik Uk. ( 33 x 33 ) cm KW.II #N/A

192 SNI - L.6.47b M2 Pasang Lantai Keramik Uk. ( 40 x 40 ) cm KW.I #N/A

193 SNI - L.6.47c M2 Pasang Lantai Keramik Uk. ( 40 x 40 ) cm KW.II #N/A

194 SNI - L.6.47d M2 Pasang Lantai Keramik Uk. ( 30 x 30 ) cm KW.I #N/A

195 SNI - L.6.47e M2 Pasang Lantai Keramik Uk. ( 30 x 30 ) cm KW.II #N/A

196 SNI - L.6.48 M2 Pasang Lantai Keramik Anti Slip Uk. ( 33 x 33 ) cm KW.I #N/A

197 SNI - L.6.48a M2 Pasang Lantai Keramik Anti Slip Uk. ( 33 x 33 ) cm KW.II #N/A

198 SNI - L.6.48b M2 Pasang Lantai Keramik Anti Slip Uk. ( 40 x 40 ) cm KW.I #N/A

199 SNI - L.6.48c M2 Pasang Lantai Keramik Anti Slip Uk. ( 40 x 40 ) cm KW.II #N/A

200 SNI - L.6.48d M2 Pasang Lantai Keramik Anti Slip Uk. ( 30 x 30 ) cm KW.I #N/A

201 SNI - L.6.48e M2 Pasang Lantai Keramik Anti Slip Uk. ( 30 x 30 ) cm KW.II #N/A

202 SNI - L.6.68 M2 Pasang Lantai Keramik Anti Slip Uk. ( 20 x 20 ) cm KW.I #N/A

203 SNI - L.6.68a M2 Pasang Lantai Keramik Anti Slip Uk. ( 20 x 20 ) cm KW.II #N/A

204 SNI - M.6.1 M2 Mengikis / mengerok Permukaan Cat Tembok Lama #N/A

205 SNI - M.6.6 M2 Mendempul dan Menggosok Kayu #N/A

206 SNI - M.6.7 M2 Pengecatan Bidang Kayu Lama ( Sek. Avian ) #N/A

207 SNI - M.6.8 M2 #N/A

208 SNI - M.6.9 M2 #N/A

209 SNI - M.6.11 M2 Pelaburan Bidang Kayu dengan Politur #N/A

210 SNI - M.6.12 M2 Pelaburan Bidang Kayu dengan Cat Residu dan Ter #N/A

211 SNI - M.6.14 M2 #N/A

Pengecatan Bidang Ky. Baru ( 1 lps plamir, 2 lps cat dasar, 2 lps cat penutup ) Sek. Avian

Pengecatan Bidang Ky. Baru ( 1 lps plamir, 1 lps cat dasar, 3 lps cat penutup ) Sek. Avian

Pengecatan Tembok Baru ( 1 lps plamir, 1 lps cat dasar, 2 lps cat penutup ) Sek. Mowilex untuk Interior

Page 75: Analis Sni Ta 2008

Page 75 of 77

212 SNI - M.6.14a M2 #N/A

213 SNI - M.6.14b M2 #N/A

214 SNI - M.6.14c M2 #N/A

215 SNI - M.6.14d M2 #N/A

216 SNI - M.6.15 M2 19,470.30

217 SNI - M.6.15a M2 #N/A

218 SNI - M.6.15b M2 #N/A

219 SNI - M.6.15c M2 #N/A

220 SNI - M.6.15d M2 #N/A

221 SNI - M.6.17 M2 Melabur Tembok dengan Kapur Sirih #N/A

222 SNI - M.6.18 M2 #N/A

223 SNI - M.6.20 M2 Pengecatan Permukaan Baja dengan Meni Besi #N/A224 SNI - M.6.21 M2 #N/A

225 SNI - M.6.24 M2 53,700.00

226 BOW - KPU.IVa M2 Pasang Paving Block Natural #N/A

227 BOW - KPU.IVb M2 Pasang Paving Block Warna #N/A

228 BOW - KPU.IVc M2 Pasang Paving Block T = 8 cm, K - 400 #N/A

229 BOW - KPU.IVd M2 Pasang Paving Block T = 6 cm, K - 300 #N/A

230 BOW - I.a Kg Pekerjaan Kap Besi #N/A

231 BOW - F.16 M2 Pasang Kembali Usuk Reng Bekas #N/A

232 BOW - F.16a M2 Reng Kayu Kruing #N/A

233 BOW - F.16b M2 Usuk Diketam Halus dan Reng Kayu Kruing #N/A

234 BOW - F.16c M2 Usuk Diketam Halus dan Reng Kayu Bangkir #N/A

235 BOW - F.16d M2 Usuk Diketam Halus dan Reng Kayu Kamper #N/A

236 BOW - F.16e M2 Usuk Diketam Halus dan Reng Kayu Jati #N/A

237 BOW - F.16f M2 Pasang Usuk Kayu Kruing #N/A

238 BOW - F.16g M2 Pasang Usuk Kayu Bangkir #N/A

239 BOW - Supl. VIIIa M2 Plafond Harplek Diatas Usuk #N/A

240 BOW - Supl. VIIIb M2 Plafond Eternit Diatas Usuk #N/A

241 BOW - F.36a M2 Pintu Kaca Kayu Kruing tb = 3,5 cm #N/A

242 BOW - F.36b M2 Pintu Kaca Kayu Kruing Sederhana ( Tbl = 3,5 cm ) #N/A

243 BOW - F.36c M2 Pintu Kaca Kayu Bangkir tb = 3,5 cm #N/A

244 BOW - F.36d M2 Pintu Kaca Kayu Kamper tb = 3,5 cm #N/A

245 BOW - F.36e M2 Pintu Kaca Kayu Jati tb = 3,5 cm #N/A

246 BOW - F.36f M2 Jendela Kaca Kayu Kruing tb = 3 cm #N/A

247 BOW - F.36g M2 Jendela Kaca Kayu Kruing Sederhana tb = 3 cm #N/A

248 BOW - F.36h M2 Jendela Kaca Kayu Bangkir tb = 3 cm #N/A

Pengecatan Tembok Baru ( 1 lps plamir, 1 lps cat dasar, 2 lps cat penutup ) Sek. Mowilex untuk Exterior

Pengecatan Tembok Baru ( 1 lps plamir, 1 lps cat dasar, 2 lps cat penutup ) Sek. Cathylac

Pengecatan Tembok Baru ( 1 lps plamir, 1 lps cat dasar, 2 lps cat penutup ) Sek. Decolith

Pengecatan Tembok Baru ( 1 lps plamir, 1 lps cat dasar, 2 lps cat penutup ) Sek. Mollex

Pengecatan Tembok Lama ( 1 lps cat dasar, 2 lps cat penutup ) Sek. Mowilex untuk Interior

Pengecatan Tembok Lama ( 1 lps cat dasar, 2 lps cat penutup ) Sek. Mowilex untuk Exterior

Pengecatan Tembok Lama ( 1 lps cat dasar, 2 lps cat penutup ) Sek. Cathylac

Pengecatan Tembok Lama ( 1 lps cat dasar, 2 lps cat penutup ) Sek. Decolith

Pengecatan Tembok Lama ( 1 lps cat dasar, 2 lps cat penutup ) Sek. Mollex

Melabur Tembok Lama dengan Kapur Sirih ( Untuk Pemeliharaan )

Pengecatan Permukaan Baja dengan Meni Besi dan Perancah

Pengecatan Permukaan Baja Lapis Seng ( Galbani ) Secara Manual Sistem 3 Lapis Cat Konvensional dengan tb. 200 um

Page 76: Analis Sni Ta 2008

Page 76 of 77

249 BOW - F.36i M2 Jendela Kaca Kayu Kamper tb = 3 cm #N/A

250 BOW - F.36j M2 Jendela Kaca Kayu Jati tb = 3 cm #N/A

251 BOW - F.36k M2 Pintu Panil Multiplek 9 mm Rangka Kayu Jati tb = 3,5 cm #N/A

252 BOW - F.36l M2 Pintu Panil Multiplek 9 mm Rangka Kayu Kruing tb = 3,5 c #N/A

253 BOW - F.36m M2 Pintu Panil Multiplek 9 mm Rangka Kayu Bangkir tb = 3,5 #N/A

254 BOW - F.36n M2 Pintu Panil Multiplek 9 mm Rangka Kayu Kamper tb = 3,5 #N/A

255 BOW - K.6 + 23 M2 Pengecatan Plafond 3 x ( sek. Catylac ) #N/A

256 BOW - K.6 + 23a M2 Pengecatan Plafond 3 x ( sek. Decolith ) #N/A

257 BOW - K.6 + 23b M2 Pengecatan Plafond 3 x ( sek. Mollex ) #N/A

258 BOW - K.6 + 23c M2 Pengecatan Genteng 3 x #N/A

259 BOW - F.8 M2 Cetakan Beton Kayu Tahun 88,090.00

260 BOW - G.14 M3 Perekat Camp 1PC : 2Ps #N/A

261 BOW - G.13 M3 Perekat Camp 1PC : 1Ps #N/A

262 BOW - G.77 M2 Upah Pasang Lembaran Batu Granit 294,100.00

263 BOW - Supl.IV.a M2 Pasang lantai Batu Granit Lokal #N/A

264 BOW - Supl.IV.b M2 Pasang Pelapis Dinding Batu Granit Lokal #N/A

265 BOW - Supl.IV.c M2 Pelapisan Coating 3x (sebelum dipasang) 2,675.00

266 BOW - Supl.IV.d M2 Pelapisan Coating 2x (setelah dipasang) 1,320.00

267 BOW - Supl.IV.e M2 Pemolesan batu Granit (sampai mengkilap) 11,850.00

268 BOW - Supl.IV.f M2 8,270.00

269 BOW - Supl.IV.g M2 Penyemiran Lantai 3,350.00

270 BOW - G.69 M2 Pasang Tegel 21,725.00

271 BOW - Supl.IV.h M2 Pasang Tegel batu Candi #N/A

272 BOW - Supl.IVi M2 Pasang Koral Sikat #N/A

273 BOW - Supl.IV.j M2 Pasang Pelapis Dinding Batu Granit Import #N/A

274 SNI - J.6.19a M' Pasang Pipa Galvanis diameter 1/2" med. A #N/A

275 SNI - J.6.20a M' Pasang Pipa Galvanis diameter 3/4" med. A #N/A

276 SNI - J.6.21a M' Pasang Pipa Galvanis diameter 1" med. A #N/A

277 SNI - J.6.22a M' Pasang Pipa Galvanis diameter 1 1/2" med. A #N/A

278 SNI - J.6.22a M' Pasang Pipa Galvanis diameter 2" med. A #N/A

279 SNI - J.6.23a M' Pasang Pipa Galvanis diameter 3" med. A #N/A

280 SNI - J.6.24a M' Pasang Pipa Galvanis diameter 4" med. A #N/A

281 SNI - J.6.25a M' Pasang Pipa PVC diameter 1/2" S10 10 Bar #N/A

282 SNI - J.6.26a M' Pasang Pipa PVC diameter 3/4" S10 10 Bar #N/A

283 SNI - J.6.27a M' Pasang Pipa PVC diameter 1" S10 10 Bar #N/A

284 SNI - J.6.28a M' Pasang Pipa PVC diameter 1 1/2" S10 10 Bar #N/A

285 SNI - J.6.28b M' Pasang Pipa PVC diameter 1 1/4" S10 10 Bar #N/A

286 SNI - J.6.28c M' Pasang Pipa PVC diameter 1 1/2" S12,5 10 Bar 24,677.50

287 SNI - J.6.29a M' Pasang Pipa PVC diameter 2" S12,5 10 Bar 31,877.50

288 SNI - J.6.31a M' Pasang Pipa PVC diameter 3" S12,5 10 Bar #N/A

289 SNI - J.6.32a M' Pasang Pipa PVC diameter 4" S10 12,5 Bar 83,650.50

290 1.00 M3 = Rp.

291 1.00 M2 = Rp.

292 1.00 M2 = Rp.

Pemolesan Lembaran batu Granit (rata, halus, tidak mengkilap)

Page 77: Analis Sni Ta 2008

Page 77 of 77

293 1.00 M3 = Rp.

294 = Rp.

295 = Rp.

296 = Rp.

297 = Rp.

298 = Rp.

299 1.00 M2 = Rp.

300 1.00 M2 = Rp.

301 1.00 M2 = Rp.

302 1.00 M2 = Rp.

303 1.00 M2 = Rp.

304 1.00 M2 = Rp.

305 1.00 M2 = Rp.

306 E1-511 M3 Lapis Pondasi Agregat Kelas A 109,595.05

307 E1-511.a M2 Onderlaag tebal 15 cm #N/A

308 E1-511.b M2 Steenslaag tebal 6 cm #N/A

309 E1-611 LITER Lapis Resap Pengikat #N/A

310 E1-612 LITER Lapis Perekat #N/A

311 E1-817.a M3 Lapis Penetrasi Macadam (Leveling) #N/A

312 E1-817.b M2 Lapis Penetrasi Macadam Sheet #N/A

313 E1-631 M2 Latasir (Sand Sheet) #N/A