InvestasiJenis Peralatan2010Jenis Peralatan2011Harga SatuanJumlah AlatBiaya InvestasiHarga SatuanJumlah AlatBiaya InvestasiRpUnitRpRpUnitRpTabung Pencacah24,624,2430Tabung Pencacah27,323,060.250Alat Pengayak6,156,060.800Alat Pengayak6,830,765.060Conveyor24,624,243.200Conveyor27,323,060.250Bambu Aerasi123,121.2219624,131,758.34Bambu Aerasi136,615.3019626,776,559.05Termometer61,560.61161,560.61Termometer68,307.65168,307.65PH Meter123,121.221123,121.22PH Meter136,615.301136,615.30Sekop30,780.3018554,045.47Sekop34,153.8318614,768.86Gerobak492,484.8641,969,939.46Gerobak546,461.2142,185,844.82Sepatu Boot49,248.4918886,472.76Sepatu Boot54,646.1218983,630.17Kaos Tangan12,312.1218221,618.19Kaos Tangan13,661.5318245,907.54Perlindung Pernapasan6,156.0618110,809.09Perlindung Pernapasan6,830.7718122,953.77Perlengkapan P3K18,468.18118,648.18Perlengkapan P3K20,492.30120,492.30Total28,077,973.32Total31,155,079.46Jenis Peralatan2015Harga SatuanJumlah AlatBiaya InvestasiRpUnitRpTabung Pencacah41,418,573.010Alat Pengayak10,354,643.250Conveyor41,418,573.010Bambu Aerasi207,092.8719640,590,201.55Termometer103,546.431103,546.43PH Meter207,092.871207,092.87Sekop51,773.2218931,912.89Gerobak828,371.4643,313,485.84Sepatu Boot82,837.15181,491,068.63Kaos Tangan20,709.2918327,767.16Perlindung Pernapasan10,354.6418186,383.58Perlengkapan P3K31,063.93131,063.93Total47,182,522.88

RABNoKodeSatuanVolumeHarga Satuan BiayaJumlah TotalBANGUNAN PENERIMA SAMPAH(Rp)(Rp)(Rp)1Pekerjaan PersiapanSNI-A.6.4Pengukuran dan Pemasangan Bouwplankm78.444,073.003,455,323.20SUB TOTAL3,455,323.202Pekerjaan TanahSNI - B.6.1Galian Tanahm3125.0011,800.001,475,000.00SNI - B.6.9Urugan Tanahm328.6624,610.00705,322.60SNI - B.6.11Urugan Pasirm320.0094,450.001,889,000.00SNI - B.6.10Pemadatan tanahm328.6614,750.00422,735.00SUB TOTAL4,492,057.60Pekerjaan Pondasi BakSNI -C.6.12Pondasi pas.Batu Kalim70.88348,844.8024,726,119.42SNI - C.6.114Pondasi batu kosongm30.33184,906.505,608,214.15SNI - G.6.5Pekerjaan beton bertulang 1:2:3m16.64508,258.508,457,421.44SUB TOTAL38,791,755.013Pekerjaan PondasiSNI - C.6.12Pondasi pas.Batu Kalim2.25348,844.80784,900.80SNI - C.6.114Pondasi batu kosongm7.00184,906.501,294,345.50SNI - G.6.5Pekerjaan beton bertulang 1:2:3m16.64508,258.508,457,421.44SUB TOTAL10,536,667.74

4Pekerjaan lantaiSNI - E.6.91 m2 Plesteran 1 PC : 3 Kp : 10 Psm2114.6616,873.781,934,747.61SNI - G.6.41 m3 Membuat Lantai Kerja Betonm2114.6665,653.007,527,772.98SUB TOTAL9,462,520.59

5Pekerjaan AtapBOW - F.19Pekerjaan rangka atapm2764.4065,503.0650,070,539.06SNI - H.6.38Pas.Atap Seng Gelombang BJLS 20m3382.2037,425.0014,303,835.00SNI - H.6.39Pas.Atap Nok Sengm4382.2022,741.008,691,610.20SUB TOTAL73,065,984.26TOTAL139,804,308.41

NoKodeSatuanVolumeHarga Satuan BiayaJumlah TotalBANGUNAN KOMPOS AKTIF(Rp)(Rp)(Rp)1Pekerjaan PersiapanSNI-A.6.4Pengukuran dan Pemasangan Bouwplankm229.0044,073.0010,092,717.00SUB TOTAL10,092,717.002Pekerjaan TanahSNI - B.6.1Galian Tanahm3596.0011,800.007,032,800.00SNI - B.6.9Urugan Tanahm336.4824,610.00897,772.80SNI - B.6.11Urugan Pasirm35.7694,450.00544,032.00SNI - B.6.10Pemadatan tanahm336.4814,750.00538,080.00SUB TOTAL9,012,684.803Pekerjaan PondasiPondasi beton bertulang (150 kg)m5.762,945,015.5016,963,289.28SUB TOTAL16,963,289.284Pekerjaan Bajaa. SNI X 03Pasang rangka atap bajakg21,631.5065,503.061,416,929,442.39SNI - H.6.38Pas. Atap Seng Gelombang BJLSm210,815.7537,425.00404,779,443.75SNI - H.6.39Pas.Atap Nok Sengm310,815.7522,741.00245,960,970.75b. Kolom ajaBaja WF 200 x 100kg14,542.0011,300.00164,324,600.00SUB TOTAL2,231,994,456.895Pekerjaan lantaiSNI - E.6.91 m2 Plesteran 1 PC : 3 Kp : 10 Pm23,244.0016,873.7854,738,542.32SNI - G.6.41 m3 Membuat Lantai Kerja Betonm23,244.0065,653.00212,978,332.00SUB TOTAL267,716,874.32TOTAL2,535,780,022.29