NOPERALATAN UTAMASPESIFIKASISPESIFIKASI YANG DITAWARKAN (FABRIKATOR & THN PEMBUATAN)ALOKASI ALAT

1Header manifoldSize : 3 x 3, 2 line, #300 Cap : 2000 BPD1 unit (2013)

2Separattor 3 phase c/w accesories & instrumentation systemCap 2000 BLPD/4 MMSCFD DP : 300 Psi1 unit (2013)

3Scrubber c/w accesorries & instrumentation systemCap. 4 MMSCFD1 unit (2013)

4Flare stack (tinggi 30 meter)Kap. 100 BBLS, ATM1 unit (2013)

5Tangki test c/w accesories, piping, instumentation system, water sealKap. 200 BBLS, ATM1 unit

6Tangki produksi c/w accesories, piping, instumentation system, water sealKap 2000 BPD, Driven electric motor5 unit

7Skim tank c/w accesories, pipingKap. 2000 BPD Driven electric motor. Kap. Generator set : sesuai perhitungna load ( dilengkapi back up)1 unit

8Transfer pump70m3/hours2 unit

9Unloading pump c/w generator set, penerangan 2 unit

10Generator set c/w panel80 kVa dan 60 kVa. Bahan bakar diesel 50 L/day 2 unit

11Instrument air system1 lot

12Piping sistem1 set

13Kelistrikan sistem1 lot

14Peralatan safety 1 lot

15Atmospheric venting1 lot

16Pilot gas sistem1 lot

17Gas detector1 ea

18Portacamp/minilab1 unit

19Lavatory1 unit

20Multipurpose van (double cabin)1 unit

21Personnel protective equipment4x4 (four while drive)1 lot

22Office / operator room + komputer1 unit

23Safety equipment (fire pump, fire hydrant, APAR, water tank)1 set

Daftar Inventaris Petunang

25. Centrifuge + gelas ukur 26. Hydrometer27. Silver nitrat, potasium chromat28. Ball valve, gate valve, needle valve, check valve dan globe valve29. Water, oil and gas pipeline30. Windshock 31. Lampu sorot32. Heater