Page 1 of 334
DAFTAR UPAH PEKERJA
PROYEK PEMBANGUNAN GEDUNG MENEJEMEN 4 LANTAI
RUMAH SAKIT UMUM PROVINSI dr. SOEDONO MADIUN
JALAN Dr. SOETOMO No. 29 MADIUN - JAWA TIMUR
No. URAIAN TENAGA KERJA KOEF. HARGA ( Rp )
VOL SAT. SATUAN JUMLAH
1 Mandor 1.00 O-H 60,000.00 60,000.00
2 Kepala tukang Batu 1.00 O-H 55,000.00 55,000.00
3 Kepala tukang Besi 1.00 O-H 55,000.00 55,000.00
4 Kepala tukang Cat 1.00 O-H 55,000.00 55,000.00
5 Kepala tukang Galian Tanah 1.00 O-H 55,000.00 55,000.00
6 Kepala tukang Kayu 1.00 O-H 55,000.00 55,000.00
7 Kepala tukang Listrik 1.00 O-H 55,000.00 55,000.00
8 Kepala tukang Pipa. 1.00 O-H 55,000.00 55,000.00
9 Tukang Batu 1.00 O-H 52,500.00 52,500.00
10 Tukang Besi 1.00 O-H 52,500.00 52,500.00
11 Tukang Cat / Kapur 1.00 O-H 52,500.00 52,500.00
12 Tukang Gali lumpur 1.00 O-H 52,500.00 52,500.00
13 Tukang Gali tanah 1.00 O-H 52,500.00 52,500.00
14 Tukang Kayu 1.00 O-H 52,500.00 52,500.00
15 Tukang Listrik 1.00 O-H 52,500.00 52,500.00
16 Tukang Pipa 1.00 O-H 52,500.00 52,500.00
17 Tukang Plitur 1.00 O-H 52,500.00 52,500.00
18 Tukang Potong Pohon 1.00 O-H 52,500.00 52,500.00
19 Pekerja Terampil 1.00 O-H 40,000.00 40,000.00
20 Pekerja tak terampil 1.00 O-H 35,000.00 35,000.00
21 Masinis 1.00 O-H 50,000.00 50,000.00
22 Mekanik terampil 1.00 O-H 52,500.00 52,500.00
23 Mekanik Pembantu 1.00 O-H 40,000.00 40,000.00
24 Operator teralatih 1.00 O-H 52,500.00 52,500.00
25 Pemasak aspal 1.00 O-H 40,000.00 40,000.00
26 Pembantu masinis 1.00 O-H 40,000.00 40,000.00
27 Pembantu Operator 1.00 O-H 40,000.00 40,000.00
28 Pengawas 1.00 O-H 55,000.00 55,000.00
29 Pengemudi / sopir 1.00 O-H 52,500.00 52,500.00
30 Penjaga 1.00 O-H 52,500.00 52,500.00
Surabaya, 05 Januari 2011
PT. ANGGREK MERAH
No. JENIS PEKERJAAN SAT.HARGA PLUS HARGA
MATERIAL UPAH
A PEK. BEGISTING
1 Kolom /m2 Rp 75,000.00
2 Balok /m2 Rp 85,000.00
3 Plat Lantai /m2 Rp 80,000.00
4 Poer dan Sloof /m2 Rp 55,000.00
B PEMBESIAN
1 Pabrikasi dan Install /kg Rp 450.00
Page 2 of 334
C COR BETON
1 Cor Ready mix CP /m3 Rp 25,000.00
2 Cor Ready mix Manual /m3 Rp 75,000.00
3 Cor Set mix /m3 Rp 600,000.00 Rp 80,000.00
D PEKERJAAN ARSITEKTUR
a Pekerjaan Tanah dan Pondasi
1 Pasang Bouwplank /m' Rp 5,000.00
2 Galian Tanah Pondasi /m3
3 Urugan Tanah Kembali /m3 Rp 10,000.00
4 Urugan Pasir /m2 Rp 5,000.00
5 Lantai Kerja /m2 Rp 8,000.00
b Pekerjaan Pasangan
1 Pasang Bata Merah /m2 Rp 50,000.00
2 Plesteran /m2 Rp 27,500.00
3 Acian /m2 Rp 15,000.00
4 Benangan /m' Rp 4,000.00
5 Benangan Sudut /m' Rp 4,000.00
6 Kolom Praktis /m' Rp 25,000.00
7 Balok Latei /m' Rp 25,000.00
c Pekerjaan Keramik
1 Keramik Lantai /m2 Rp 40,000.00
2 Keramik Dinding /m2 Rp 40,000.00
3 Pasang Batu Alam /m2 Rp 40,000.00
4 Pasang Granito 60 x 60 /m2 Rp 42,500.00
d Pekerjaan Sanitasi
1 Pas. Kloset Duduk /bh Rp 100,000.00
2 Pas. Kloset Jongkok /bh Rp 100,000.00
3 Pas. Wastafel /bh Rp 100,000.00
4 Pas. Bak Fiber /bh Rp 100,000.00
e Pekerjaan Pengecatan
1 Cat Tembok Luar /m2 Rp 20,000.00
2 Cat Tembok Dalam /m2 Rp 10,000.00
3 Cat Kayu /m2 Rp 75,000.00
Surabaya, 10 Januari 2011
PT. YOSS FORM WORK
SUTIYOSO
Page 3 of 334
No. URAIAN TENAGA KERJA KOOEF HARGA ( Rp )
VOL SAT. SATUAN JUMLAH
TANAH / PASIR
1 Agregat Kelas A 1.00 m3 70,000.00 70,000.00
2 Agregat Kelas B 1.00 m3 60,000.00 60,000.00
3 Pasir Beton 1.00 m3 140,000.00 140,000.00
4 Pasir Cor 1.00 m3 140,000.00 140,000.00
5 Pasir Hitam 1.00 m3 150,000.00 150,000.00
6 Pasir Pasang 1.00 m3 135,000.00 135,000.00
7 Pasir Silikon 1.00 kg 7,800.00 7,800.00
8 Pasir Urug 1.00 m3 85,000.00 85,000.00
9 Sirtu 1.00 m3 85,000.00 85,000.00
10 Tanah Liat 1.00 m3 65,000.00 65,000.00
11 Tanah Urug 1.00 m3 75,000.00 75,000.00
12 Tanah urug taman / ketel 1.00 m3 70,000.00 70,000.00
BATU BATA /BETON BLOCK/PAVING/STENSLAG
1 Bata Berongga 1.00 bh -
2 Bata 1.00 bh 590.00 590.00
3 Batako 1.00 bh -
4 Batu ampyang 1.00 zak -
5 Batu apung 1.00 kg -
6 Batu belah gunung 1.00 m3 -
7 Batu belah kali 1.00 m3 145,000.00 145,000.00
8 Batu granito 1.00 kg -
9 Batu kali 1.00 m3 -
10 Batu kapur 1.00 zak -
11 Batu kerikil pasir 1.00 m3 95,000.00 95,000.00
12 Batu kerikil tersaring 1.00 m3 90,000.00 90,000.00
13 Batu koral 1.00 m3 125,000.00 125,000.00
14 Batu lempeng 1.00 m2 135,000.00 135,000.00
15 Batu Palimanan 1.00 m2 -
16 Batu Pecah mesin 1/2 1.00 m3 150,000.00 150,000.00
17 Batu Pecah mesin 1/2 1.00 m3 150,000.00 150,000.00
18 Batu Pecah mesin 2/3 1.00 m3 150,000.00 150,000.00
19 Batu Pecah mesin 3/5 1.00 m3 150,000.00 150,000.00
20 Batu Pecah mesin 4/6 - 5/7 1.00 m3 150,000.00 150,000.00
21 Batu Terraso 1.00 kg -
22 Batu tempel hitam/Batu candi 1.00 m2 87,000.00 87,000.00
23 Batu Klingker 1.00 bj 11,500.00 11,500.00
24 Batu Ampyang 1.00 m2 -
25 Batu Gilang ex. Jember ( simetris ) 1.00 m2 -
26 Batu Gilang ex. Jember ( ansimetris ) 1.00 m2 -
27 Batu Gilang ex. Cirebon ( simetris ) 1.00 m2 175,000.00 175,000.00
28 Batu Gilang ex. Cirebon ( ansimetris ) 1.00 m2 -
29 Batu Bobos uk. 10 x 20 x 1,5 cm 1.00 m2 16,000.00 16,000.00
30 Rooster kerawangan 11 x 12 x 24 1.00 bh -
31 Rooster kerawangan 11 x 22 x 22 1.00 bh -
32 Rooster beton 11 x 20 x 22 1.00 bh -
33 Batu tempel kasar / marmo 1.00 m2 -
34 Bt temp halus ( candi/hitam dan palimanan ) 1.00 m2 88,000.00 88,000.00
35 Batu sirih / alur (hitam / kuning) 1.00 m2 39,000.00 39,000.00
36 Batu alur andesit hitam 1.00 m2 -
HARGA MATERIAL / BAHAN
Page 4 of 334
37 Batu koral hitam ex NTT 1.00 m2 -
38 Batu koral hitam ex. Tulungagung 1.00 m2 -
39 Batu tempel Terrakota / Karangpilang 1.00 m2 -
40 List batu andesit p=40 cm, lebar = 5cm 1.00 m' -
41 List batu candi p=40 cm lebar = 5 cm 1.00 m' -
42 Batako 1.00 bj 8,500.00 8,500.00
43 Concrete block ( CB 10 ) 1.00 bh -
44 Concrete block ( CB 15 ) 1.00 bh -
45 Concrete block ( CB 20 ) 1.00 bh -
46 Hollow Block ( HB.10 ) 1.00 bh -
47 Hollow Block ( HB.15 ) 1.00 bh -
48 Hollow Block ( HB.20 ) 1.00 bh -
49 Kansteen 1.00 m' -
50 Paving Block 1.00 m2 -
51 Paving stone natural 6 cm 1.00 m2 38,000.00 38,000.00
52 Paving Stone natural 8 cm 1.00 m2 54,000.00 54,000.00
53 Rooster 1.00 bh 4,500.00 4,500.00
54 Stenslag / batu pecah tangan 2/3 1.00 m3 -
55 Stenslag / batu pecah tangan 1/2 1.00 m3 -
56 Stenslag / batu pecah tangan 3/5 1.00 m3 -
57 Stenslag / batu pecah tangan 4/6 - 5/7 1.00 m3 -
58 Glass Block 1.00 m3 30,000.00 30,000.00
SEMEN -
1 Delosit 1.00 zak 65,000.00 65,000.00
2 Gamping 1.00 kg -
3 Gamping Bongkahan 1.00 m3 -
4 Gamping Bubukan 1.00 m3 -
5 Kapur 1.00 m3 145,000.00 145,000.00
6 PC Gresik 1.00 kg 1,200.00 1,200.00
7 PC Grouting 1.00 kg -
8 PC Putih 1.00 kg -
9 PC Warna 1.00 kg 9,000.00 9,000.00
10 Semen 40 kg 1.00 zak 47,000.00 47,000.00
11 Semen 50 kg 1.00 zak 57,000.00 57,000.00
12 Semen Merah 1.00 m3 55,550.00 55,550.00
13 Semen putih 1.00 kg 61,000.00 61,000.00
-
BUIS BETON -
1 Buis beton Ø 20 cm 1.00 bh -
2 Buis beton Ø 30 cm 1.00 bh -
3 Buis beton Ø 40 cm 1.00 bh -
4 Buis beton Ø 60 cm 1.00 bh -
5 Buis beton Ø 70 cm 1.00 bh -
6 Buis beton Ø 80 cm 1.00 bh -
7 Buis beton Ø 90 cm 1.00 bh -
8 Buis beton Ø 100 cm 1.00 bh 280,000.00 280,000.00
9 Buis beton U - Ø 20 cm 1.00 bh -
10 Buis beton U - Ø 30 cm 1.00 bh -
11 Pagar Panel (Precast Pabrik) tinggi 1.20 M 1.00 m' -
12 Pagar Panel (Precast Pabrik) tinggi 1.60 M 1.00 m' -
13 Pagar Panel (Precast Pabrik) tinggi 2.00 M 1.00 m' -
14
15
BESI -
1 Baja WF dan Canal C 1.00 kg 9,800.00 9,800.00
2 Baut segala ukuran 1.00 kg -
3 Besi Bronjong 1.00 kg -
4 Besi baja paku-paku jembatan 1.00 kg -
Page 5 of 334
5 Besi Plat Bordes 4"x8" tebal 3 mm 1.00 kg -
6 Besi plat 4"x8" tebal 2 mm 1.00 kg -
7 Besi plat strip uk. 3x30 mm - 6 m 1.00 kg 9,000.00 9,000.00
8 Walter Mour 1.00 bh -
9 Plat Besi tebal 1 cm 1.00 kg -
10 Angkur Bolt 12 cm 1.00 m' -
11 Pagar BRC uk. 1.2 x 2.4 M 1.00 unit -
12 Pagar BRC PMG 2.4 M 1.00 unit -
13 Pintu Swing Ganda BRC 1.00 unit -
14 Pintu Dorong Ganda BRC 1.00 unit -
15 Besi Beton Ulir 1.00 kg 7,200.00 7,200.00
16 Besi beton Polos 1.00 kg 7,100.00 7,100.00
17 Besi beugel / kavel 1.00 kg -
18 Besi Pipa Galvanis L-6m / Ø 2" 1.00 lnjr -
19 Besi Pipa Galvanis L-6m / Ø 2½" 1.00 lnjr -
20 Besi Pipa Galvanis L-6m / Ø 3" 1.00 lnjr -
21 Besi Pipa Galvanis L-6m / Ø 4" 1.00 lnjr -
22 Besi Pipa Galvanis L-6m / Ø ½" 1.00 lnjr -
23 Besi Pipa Galvanis L-6m / Ø ¾" 1.00 lnjr -
24 Besi Pipa Galvanis L-6m / Ø 1" 1.00 lnjr -
25 Besi Pipa Galvanis L-6m / Ø 1¼" 1.00 lnjr -
26 Besi plat kecil KS 3"- 6 m 1.00 lnjr -
27 Besi strip 1.00 kg 9,000.00 9,000.00
28 Besi Hollow 40/40 1.00 Bh 67,500.00 67,500.00
29 Besi Hollow 20/20 1.00 bH 51,000.00 51,000.00
30 Pagar Besi 1.00 m2 450,000.00 450,000.00
-
ALUMUNIUM -
1 Aluminium Foil / Sesalation 1.00 kg -
2 Atap alumunium 1.00 kg -
3 Aluminium Truss Rangka Galvalume t=0.8 mm 1.00 m2 100,000.00 100,000.00
4 Alumunium Truss Rangka Galvalum t= 0.5 mm 1.00 m2 87,500.00 87,500.00
5 Alumunium bubung atap 1.00 m2 125,000.00 125,000.00
6 Alumunium Metal Clidding Colour 1.00 m2 485,000.00 485,000.00
7 Jendela alumunium coklat ex. INDALEX 1.00 m' 75,000.00 75,000.00
8 Jendela alumunium putih ex. INDALEX 1.00 m' 75,000.00 75,000.00
9 Kosen alumunium coklat ex. INDALEX 1.00 m' -
10 Kosen alumunium putih ex. INDALEX 1.00 m' -
11 Pintu alumunium 1.00 m2 -
12 Profil alumunium T 1.00 m' -
13 Atap Galvalume 1.00 bh -
14 Bubungan atap Galvalume 4 mm 1.00 lmb -
15 Rolling Door 1.00 m2 -
KAWAT -
1 Kawat Elektrode 1.00 kg 21,000.00 21,000.00
2 Kawat Kabel Prestressed 1.00 kg -
3 Kawat bendrat 1.00 kg 10,500.00 10,500.00
4 Kawat beton / Bendrat RRT 1.00 kg -
5 Kawat duri / pagar 1.00 rol -
6 Kawat galvanis 2 mm 1.00 kg -
7 Kawat galvanis 3 mm 1.00 kg -
8 Kawat harmonika 1.00 m2 -
9 Kawat harmonika gas 1.00 m2 -
10 Kawat nyamuk / kasa Besi 1.00 m2 -
11 Kawat nyamuk / kasa plastik 1.00 m2 -
-
PAKU -
1 Paku 1½ " 1.00 kg 11,000.00 11,000.00
2 Paku 1¼ " 1.00 kg 11,000.00 11,000.00
Page 6 of 334
3 Paku 1" 1.00 kg 11,000.00 11,000.00
4 Paku 2" 1.00 kg 11,000.00 11,000.00
5 Paku 2½ " 1.00 kg 11,000.00 11,000.00
6 Paku 3" 1.00 kg 11,000.00 11,000.00
7 Paku 4" 1.00 kg 11,000.00 11,000.00
8 Paku 5" 1.00 kg 11,000.00 11,000.00
9 Paku 6" 1.00 kg 13,000.00 13,000.00
10 Paku Asbes segala ukuran 1.00 kg 13,000.00 13,000.00
11 Paku Beton 1.00 kg 20,000.00 20,000.00
12 Paku Kait segala ukuran 1.00 kg -
13 Paku Kayu segala ukuran 1.00 kg 13,000.00 13,000.00
14 Paku Keling 1.00 bh 12,500.00 12,500.00
15 Paku Payung 1.00 kg 13,000.00 13,000.00
16 Paku Reng 1.00 kg 11,000.00 11,000.00
17 Paku Seng Segala ukuran 1.00 kg 9,000.00 9,000.00
18 Paku Sumbat segala ukuran 1.00 bh 13,000.00 13,000.00
19 Paku Triplex 1.00 kg 12,000.00 12,000.00
20 Paku Usuk 1.00 kg 11,000.00 11,000.00
21 Paku Skrup segala ukuran 1.00 bh 150.00 150.00
-
KAYU UMUM -
1 Kayu begisting lokal 1.00 m3 2,500,000.00 2,500,000.00
2 Kayu Parancah 1.00 m3 2,500,000.00 2,500,000.00
KAYU BORNEO -
1 Balok 1.00 m3 5,200,000.00 5,200,000.00
2 Papan 2 x 20 cm 1.00 m3 5,250,000.00 5,250,000.00
3 Papan 3 x 20 cm 1.00 m3 5,250,000.00 5,250,000.00
4 Papan 2 x 30 cm 1.00 m3 5,250,000.00 5,250,000.00
5 Reng 2/3 - 3/5 1.00 m3 5,200,000.00 5,200,000.00
6 Usuk 5/7 - 4/6 1.00 m3 5,200,000.00 5,200,000.00
KAYU MERANTI -
1 Balok 1.00 m3 3,800,000.00 3,800,000.00
2 Papan 2 x 20 cm 1.00 m3 2,200,000.00 2,200,000.00
3 Papan 3 x 20 cm 1.00 m3 4,100,000.00 4,100,000.00
4 Papan 2 x 30 cm 1.00 m3 -
5 Reng 2/3 - 3/5 1.00 m3 -
6 Usuk 5/7 - 4/6 1.00 m3 2,500,000.00 2,500,000.00
7 Kayu Meranti Papan 2/20 1.00 m3 -
KAYU DAMAR LAUT -
1 Balok p= 4 M 1.00 m3 -
2 Papan l=20 CM 1.00 m3 -
3 Usuk / FP = 4 M 1.00 m3 -
KAYU KRUING -
1 Balok 1.00 m3 2,650,000.00 2,650,000.00
2 Papan 2 x 20 cm 1.00 m3 -
3 Papan 3 x 20 cm 1.00 m3 -
4 Papan 2 x 30 cm 1.00 m3 -
5 Reng 2/3 - 3/5 1.00 m3 -
6 Usuk 5/7 - 4/6 1.00 m3 -
KAYU BENGKIRAI -
1 Balok 1.00 m3 -
2 Papan 2 x 20 cm 1.00 m3 -
3 Papan 3 x 20 cm 1.00 m3 -
4 Papan 2 x 30 cm 1.00 m3 -
5 Reng 2/3 - 3/5 1.00 m3 -
6 Usuk 5/7 - 4/6 1.00 m3 -
KAYU KAMPER -
1 Balok 1.00 m3 8,800,000.00 8,800,000.00
2 Papan 2 x 20 cm 1.00 m3 -
Page 7 of 334
3 Papan 3 x 20 cm 1.00 m3 -
4 Papan 2 x 30 cm 1.00 m3 8,900,000.00 8,900,000.00
5 Reng 2/3 - 3/5 1.00 m3 3,850,000.00 3,850,000.00
6 Usuk 5/7 - 4/6 1.00 m3 5,200,000.00 5,200,000.00
KAYU JATI Ex. MALANG -
1 Balok 1.00 m3 7,600,000.00 7,600,000.00
2 Papan 2 x 20 cm 1.00 m3 -
3 Papan 3 x 20 cm 1.00 m3 -
4 Papan 2 x 30 cm 1.00 m3 17,500,000.00 17,500,000.00
5 Reng 2/3 - 3/5 1.00 m3 15,000,000.00 15,000,000.00
6 Usuk 5/7 - 4/6 1.00 m3 -
KAYU JATI Ex. MADIUN / NGAWI -
1 Balok 1.00 m3 -
2 Papan 2 x 20 cm 1.00 m3 -
3 Papan 3 x 20 cm 1.00 m3 -
4 Papan 2 x 30 cm 1.00 m3 -
5 Reng 2/3 - 3/5 1.00 m3 -
6 Usuk 5/7 - 4/6 1.00 m3 -
KAYU JATI Ex. BOJONEGORO -
1 Balok 1.00 m3 12,500,000.00 12,500,000.00
2 Papan 2 x 20 cm 1.00 m3 13,000,000.00 13,000,000.00
3 Papan 3 x 20 cm 1.00 m3 13,500,000.00 13,500,000.00
4 Papan 2 x 30 cm 1.00 m3 -
5 Reng 2/3 - 3/5 1.00 m3 -
6 Usuk 5/7 - 4/6 1.00 m3 -
KAYU LAIN-LAIN -
1 Kayu bakar 1.00 m3 -
2 Kayu Bambu Ø 10 cm 1.00 btng 20,000.00 20,000.00
3 Kayu Bambu Ø 6-8 cm 1.00 btng 20,000.00 20,000.00
4 Bilik bambu 1.00 m2 -
5 Kayu Dolken Ø8 cm 1.00 btng 14,000.00 14,000.00
6 Gedeg 2 x 3 m 1.00 lbr 25,000.00 25,000.00
7 Kayu Albasiah 1.00 m3 -
8 Kayu Ramin 1.00 m3 -
9 List Kayu 2/4 1.00 m' -
10 List Kayu profil 1.00 m' -
11 Sirap 1.00 m3 -
ATAP - BUBUNGAN - TALANG -
1 Bubung Sirap 1.00 bh -
2 Bubung Genteng aspal 1.00 bh -
3 Bubung genteng beton 1.00 bh -
4 Bubung Genteng biasa ex. Malang 1.00 bh -
5 Bubung Genteng Karangpilang ex. Malang 1.00 bh -
6 Bubung Genteng Karangpilang ex. Surabaya 1.00 bh 22,500.00 22,500.00
7 Bubung Genteng Karangpilang ex. Trenggalek 1.00 bh -
8 Bubung Genteng kodok glazur 1.00 bh 9,500.00 9,500.00
9 Bubung Genteng Metal 1.00 bh -
10 Bubung Pelentong Kecil 1.00 bh -
11 Bubung Genteng Pelentong besar / super 1.00 bh -
12 Bubung Genteng prss ex. Trenggalek 1.00 bh -
13 Bubung Atap seng galvalum 1.00 m2 -
14 Bubung Paten 0,92 m 1.00 lmb -
15 Bubung Paten 1,o5 m 1.00 lmb -
16 Bubung Paten 1,08 m 1.00 lmb -
17 Bubung Seng gelombang 1.00 lmb -
18 Bubung Stel Gelombang 0,92 m 1.00 lmb -
19 Bubung Stel Gelombang 1,05 m 1.00 lmb -
20 Bubung Stel Gelombang 1,08 m 1.00 lmb -
21 Bubung stel rata 0,92 m 1.00 lmb -
Page 8 of 334
22 Bubung stel rata 0,92 m 1.00 lmb -
23 Genteng Aspal 1.00 lmb -
24 Genteng Beton 1.00 bh -
25 Genteng Beton Maestro Royal 1.00 bh -
26 Genteng Biasa ex. Malang 1.00 bh -
27 Genteng kaca 1.00 bh -
28 Genteng Kaca Beton Kupu-kupu 1.00 bh -
29 Genteng Kaca Kodok Kupu-kupu 1.00 bh -
30 Genteng Karangpilang ex. Malang 1.00 bh -
31 Genteng Karangpilang ex. Surabaya 1.00 bh 4,500.00 4,500.00
32 Genteng Karangpilang ex. Trenggalek 1.00 bh -
33 Genteng Keramik Natural KIA 1.00 bh -
34 Genteng Keramik Warna KIA 1.00 bh 6,800.00 6,800.00
35 Genteng Kodok Glazuur 1.00 bh -
36 Genteng Kodok Good Years 1.00 bh 6,800.00 6,800.00
37 Genteng Metal 1.00 bh -
38 Genteng Palentong kecil 1.00 bh -
39 Genteng kaca Palentong supr / besar 1.00 bh -
40 Genteng Press Trenggalek 1.00 bh -
41 Asbes Gelombang 4 mm 300 x 1,05 m 1.00 lmb -
42 Asbes Gelombang 4 mm 240 x 1,05 m 1.00 lmb -
43 Asbes Gelombang 4 mm 210 x 1,05 m 1.00 lmb -
44 Asbes Gelombang 4 mm 150 x 1,05 m 1.00 lmb -
45 Asbes Gelombang 5 mm 250 x 0,92 m 1.00 lmb -
46 Asbes Gelombang 5 mm 225 x 0,92 m 1.00 lmb -
47 Asbes Gelombang 5 mm 180 x 0,92 m 1.00 lmb -
48 Asbes Gelombang 11 Atrisco 150 x 80 x 3,5 mm 1.00 lmb -
49 Asbes Gelombang 14 Atrisco 150 x105 x 4 mm 1.00 lmb -
50 Asbes Gelombang 4 Atrisco 150x105x4mm 1.00 lmb -
51 Asbes Gelombang 6,5 Atrisco 150x110x5mm 1.00 lmb -
52 Asbes Gelombang Besar Jabesmen 300x102x5 mm 1.00 lmb -
53 Asbes Gelombang Kecil Jabesmen 380x105x4mm 1.00 lmb -
54 Asbes Gelombang 200x0.92x 5mm 1.00 lmb -
55 Asbes Gelombang 270x108x6mm 1.00 lmb -
56 Asbes Gelombang 210x108x6mm 1.00 lmb -
57 Asbes Gelombang 180x108x6mm 1.00 lmb -
58 Asbes Nok Gelombang ex. Atrisco 11 - 30x80x3,5mm 1.00 lmb -
59 Asbes Nok Gelombang ex. Atrisco 14- 30x105x4mm 1.00 lmb -
60 Asbes Nok Gelombang ex. Atrisco 6,5 -50x110x5mm 1.00 lmb -
61 Asbes Gelombang 270x105x4 mm 1.00 lmb -
62 Atap Policarbonat 1.00 m2 105,932.20 105,932.20
63 Roof Light Fibreglass 1.00 m2 -
64 Seng Datar ex. Elephant 0,2x30 cm 1.00 lmb -
65 Seng Datar ex. Elephant 0,30 x 50 cm 1.00 lmb -
66 Seng Datar ex. Elephant 0,40 x 90 cm 1.00 lmb -
67 Seng Gelombang ex. Elephant 180x80x0,2 cm 1.00 lmb 44,000.00 44,000.00
68 Seng Gelombang ex. Elephant 210x80x0,20 cm 1.00 lmb -
69 Seng Gelombang ex. Elephant 240x80x0,2 cm 1.00 lmb -
70 Seng Gelombang ex. Elephant 300x80x0,2 cm 1.00 lmb -
71 Seng Plat BJLS L= 0,45 m 1.00 m' -
72 Seng Plat BJLS L= 0,60 m 1.00 m' -
73 Seng Plat BJLS L= 0,90 m 1.00 m' 38,000.00 38,000.00
74 Seng Plat BJLS 24 1.00 lmb -
75 Seng Plat BJLS 28 1.00 lmb -
76 Soft Board 1.00 lmb -
77 Talang Plastik Biasa 50 cm 1.00 bh -
78 Talang Plastik Biasa 60 cm 1.00 bh -
79 Talang Plastik Biasa 75 cm 1.00 bh -
80 Talang Plastik Biasa 90 cm 1.00 bh -
Page 9 of 334
81 Talang PVC kotak 4 x 13 cm 1.00 bh -
82 Glass wol 1.00 Rol 925,000.00 925,000.00
83 Roof Mes 1.00 Rol 450,000.00 450,000.00
84 Alluminium foil /insulation double side 1.00 Rol 1,250,000.00 1,250,000.00
85 Allumunium Tape 1.00 Rol 26,500.00 26,500.00
PLAFOND -
1 Akustik 30x30 cm 1.00 lbr -
2 Akustik 30x60 cm 1.00 lbr -
3 Akustik 60x120 cm 1.00 lbr -
4 Asbes 100x100x6 mm 1.00 lbr 12,500.00 12,500.00
5 Asbes 100x100x5 mm 1.00 lbr -
6 Asbes 100x100x4 mm 1.00 lbr -
7 Asbes 100x100x3,5 mm 1.00 lbr -
8 Asbes rata jabesmen 50 x 100 mm 1.00 lbr -
9 Asbes super rata Atrisco 50 x 100 x 2,8 mm 1.00 lbr -
10 Kalsiboard 1,00x1,00 ex. Gresik 1.00 lbr -
11 Kalsiboard 1,20x2,40 ex. Gresik 1.00 lbr -
12 Gyp board 1,20x2,40 m tabal 9 mm 1.00 lbr 65,000.00 65,000.00
13 Gypsum board 1,20x2,40 m tabal 12 mm 1.00 lbr 110,000.00 110,000.00
14 List Gypsum lebar 7 cm 1.00 m' -
15 List Gypsum lebar 12 cm 1.00 m' -
16 List Gypsum lebar 15 cm 1.00 m' 15,000.00 15,000.00
17 List Profil Kayu Kamper 1/7 1.00 m' -
18 List Profil Kayu Kamper 1/10 1.00 m' 10,000.00 10,000.00
19 List Profil Kayu Kamper 1/15 1.00 m' -
20 List kayu jati profil 1.5/15 1.00 m' -
21 List kayu pelipit meranti 1.00 m' -
22 Papan GRC t= 9mm lebar= 20 cm 1.00 m' -
23 Papan GRC t= 9mm lebar= 30 cm 1.00 m' -
24 GRC lengkung tinggi 7,5 cm 1.00 m2 -
25 Rangka metal furing 1.00 m2 25,000.00 25,000.00
26 Stifenner 1.00 m2 10,000.00 10,000.00
27 Juster penggantung 1.00 m2 2,500.00 2,500.00
28 Joint Tape 1.00 m2 6,500.00 6,500.00
29 Jointing Compound 1.00 m2 8,500.00 8,500.00
30 Steger 1.00 m2 -
KAYU LAPIS -
1 Multiplex tebal = 6 mm 1.00 lbr 65,000.00 65,000.00
2 Multiplex tebal = 9 mm 1.00 lbr 125,000.00 125,000.00
3 Multiplex tebal = 10 mm 1.00 lbr 121,500.00 121,500.00
4 Multiplex tebal = 12 mm 1.00 lbr 100,000.00 100,000.00
5 Multiplex tebal = 18 mm 1.00 lbr 180,000.00 180,000.00
6 Plywood 30 x 60 cm x 4 mm 1.00 m2 59,700.00 59,700.00
7 Plywood 30 x 60 cm x 6 mm 1.00 m2 83,500.00 83,500.00
8 Plywood 60 x 120 cm x 3 mm 1.00 m2 54,250.00 54,250.00
9 Plywood 60 x 120 cm x 6 mm 1.00 m2 83,500.00 83,500.00
10 Plywood 120 x 240 cm x 3 mm 1.00 m2 56,000.00 56,000.00
11 Plywood lapis Aluminium 1.00 m2 108,350.00 108,350.00
12 Teakwood 30 x 60 cm x 4 mm 1.00 lbr 95,000.00 95,000.00
13 Teakwood 60 x 120 cm x 4 mm 1.00 lbr 95,000.00 95,000.00
14 Teakwood 120 x 240 cm x 3 mm 1.00 lbr 75,000.00 75,000.00
15 Triplex 3 mm 1.00 m2 40,000.00 40,000.00
16 Triplex 4 mm 1.00 m2 48,000.00 48,000.00
K A C A -
1 Daun pintu kaca tempered 8 mm 1.00 unit -
2 Glass Block 1.00 bh 25,000.00 25,000.00
3 Jendela Naco + assesories 1.00 m2 -
4 Kaca Buram tebal = 3 mm 1.00 m2 -
5 Kaca Buram tebal = 5 mm 1.00 m2 -
Page 10 of 334
6 Kaca Buram tebal = 8 mm 1.00 m2 -
7 Kaca Buram tebal = 12 mm 1.00 m2 -
8 Kaca Cermin tebal = 5 mm 1.00 m2 175,000.00 175,000.00
9 Kaca Cermin tebal = 6 mm 1.00 m2 -
10 Kaca Cermin tebal = 8 mm 1.00 m2 -
11 Kaca Stopsol Blue Grey 6 mm 1.00 m2 -
12 Kaca Stopsol Blue Grey 8 mm 1.00 m2 -
13 Cladding Wall ex. Indal 1.00 m2 -
14 Curtain Wall 1.00 m' -
15 Sealent 1.00 klg 21,000.00 21,000.00
16 Kaca hitam Asahi 3 mm 1.00 m' -
17 Kaca Patri 4 mm 1.00 m' -
18 Kaca polos tebal = 3 mm 1.00 m' 75,000.00 75,000.00
19 Kaca polos tebal = 5 mm 1.00 m' 70,000.00 70,000.00
20 Kaca polos tebal = 8 mm 1.00 m' 130,000.00 130,000.00
21 Kaca polos Asahi tebal = 3 mm 1.00 m' -
22 Kaca polos Asahi tebal = 5 mm 1.00 m' 75,000.00 75,000.00
23 Kaca polos Asahi tebal = 8 mm 1.00 m' 140,000.00 140,000.00
24 Kaca Polos tebal = 12 mm 1.00 m' 240,000.00 240,000.00
25 Kaca Rayben tebal = 12 mm 1.00 m' -
26 Kaca Rayben tebal = 3 mm 1.00 m' -
27 Kaca Rayben tebal = 5 mm 1.00 m2 115,000.00 115,000.00
28 Kaca Rayben tebal = 8 mm 1.00 m2 125,000.00 125,000.00
29 Kaca " Wireglass" 1.00 daun -
30 Kaca Panting 1.00 m2 -
PENGGANTUNG - PENGUNCI -
1 Door Closer ex. Dorma 1.00 bh -
2 Door Closer ex. Alpha 1.00 bh -
3 Door Holder 1.00 bh -
4 Door Stop Import 1.00 bh -
5 Door Stop Diamond 1.00 bh -
6 Engsel Angin ex. Kuda 1.00 bh -
7 Engsel Jendela 1.00 bh 10,000.00 10,000.00
8 Engsel Jendela ex. Kuda 1.00 bh -
9 Engsel Kuningan Arch 1.00 bh 35,000.00 35,000.00
10 Engsel Pintu 1.00 bh 17,500.00 17,500.00
11 Engsel Pintu ex. Kuda 1.00 bh 32,500.00 32,500.00
12 Engsel Pintu H 1.00 bh 20,000.00 20,000.00
13 Grendel 3" ex. Muller 1.00 bh -
14 Grendel Biasa Besar ex. RRC 1.00 bh -
15 Grendel Biasa kecil ex. RRC 1.00 bh -
16 Grendel jendela kuningan 1.00 bh 19,500.00 19,500.00
17 Grendel pintu 1.00 bh 23,000.00 23,000.00
18 Grendel Espanyolet 1.00 bh -
19 Hak Angin 1.00 bh 45,000.00 45,000.00
20 Kunci Pintu KM/WC 1.00 ps 35,200.00 35,200.00
21 Kait Angin 1.00 bh -
22 Kunci Lemari 1.00 bh -
23 Kunci Pintu Napoli 1.00 bh -
24 Kunci Silinder 1.00 bh 35,200.00 35,200.00
25 Kunci Silinder Kuda 1.00 bh -
26 Kunci Slot 1.00 bh -
27 Kunci SES 1.00 bh -
28 Sealant 1.00 klg 21,000.00 21,000.00
29 Kunci Tanam 1.00 bh 142,000.00 142,000.00
30 Kunci Tanam antik 1.00 bh 250,000.00 250,000.00
31 Pegangan pintu kuningan 1.00 bh -
32 Pleser Lokal 8 mm 1.00 bh -
33 Pleser Lokal 10 mm 1.00 bh -
Page 11 of 334
34 Pleser Lokal 12 mm 1.00 bh -
35 Rel pintu dorong 1.00 bh -
36 Slot / Kunci Pintu 1.00 bh -
37 Spring Knip 1.00 bh -
38 Pleser Lokal 16 mm 1.00 set -
39 Espanyolet 1.00 bh -
40 Fitrase 1.00 m2 -
41 Foam Lapisan Karpet 1.00 m2 -
42 Karpet Standart 1.00 m2 -
43 Vertical Blid 1.00 m2 -
44 Kunci 2 Slaag setara LOGO-CISA 1.00 set 245,000.00 245,000.00
45 Handle set ( lever handle) 1.00 bh -
46 Pull Handle 40 SST dia 11/4" 1.00 set -
47 Kunci Pintu KM/WC 1.00 set -
48 Engsel Cashment 24" 1.00 set -
49 Slot Jendela 1.00 bh -
50 Kunci Slot 1.00 bh -
51 Hak Angin ( tipe Geser ) 1.00 bh -
52 Rel Pintu Geser 1.00 bh -
53 Door Closer 1.00 set 1,240,000.00 1,240,000.00
54 Flust Bolt 1.00 bh -
55 Panic handle 1.00 bh -
56 Floor Hinge 1.00 set -
57 Kick plate SS 1.00 set -
58 Bottom Patch 1.00 bh -
59 Top Patch 1.00 bh -
60 Top Pivot Plate 1.00 bh -
61 Corner lock 1.00 bh -
62 Mohair 1.00 m1 -
63 Dinabolt D 12 mm 1.00 bh -
64 Pisher D 5 mm 1.00 bh -
CAT MARKA JALAN -
1 Cat Thermolpastic Aastho M.249-77 1.00 kg -
2 Cat Thermolpastic Aastho M.249-79 1.00 kg -
3 Glassbed pottes 1.00 kg -
CAT KAYU / BESI / TEMBOK / GENTING. -
1 Amplas kasar 1.00 kg 3,000.00 3,000.00
2 Cat anti karat ex. Avian 1.00 kg 55,000.00 55,000.00
3 Cat Besi ex. Avian 1.00 kg 40,000.00 40,000.00
4 Cat Besi EMCO 1.00 kg 42,500.00 42,500.00
5 Cat Besi Patna 1.00 kg -
6 Cat dasar Besi 1.00 kg 45,000.00 45,000.00
7 Cat dasar Kayu 1.00 kg 29,500.00 29,500.00
8 Cat dasar Tembok 1.00 kg 10,500.00 10,500.00
9 Thinner / Minyak cat type A Biasa 1.00 kg 22,500.00 22,500.00
10 Thinner / Minyak cat type A Spesial 1.00 kg 14,500.00 14,500.00
11 Thinner / Minyak cat type B 1.00 kg 9,000.00 9,000.00
12 Cat Genteng Impra 1.00 kg -
13 Cat Genteng / Seng Belmas 1.00 kg -
14 Cat Genteng Aga 1.00 kg -
15 Cat Genteng 1.00 kg 23,000.00 23,000.00
16 Cat Kayu 1.00 kg 40,000.00 40,000.00
17 Cat Kayu Avian 1.00 kg -
18 Dempul Padang 1.00 kg 27,100.00 27,100.00
19 Dempul Coklat 1.00 bh -
20 Dempul Jadi 1.00 kg -
21 Filler 1.00 kg -
22 Kalkarium 1.00 kg -
23 Kapur Sirih 1.00 kg -
Page 12 of 334
24 Kertas Gosok 1.00 lmb -
25 Cat Tembok Ex. Decolith 1.00 kg -
26 Cat Tembok Ex. Paragon 1.00 kg -
27 Cat Tembok Ex. Catylac INTERIOR 1.00 kg 12,500.00 12,500.00
28 Cat Tembok Ex. Catylac EXTERIOR 1.00 kg 26,500.00 26,500.00
29 Cat Tembok Ex. Mowilex warna Standart 1.00 kg -
30 Cat Tembok Ex. Mowilex warna khusus 1.00 kg -
31 Cat Tembok Ex. Vinilex 1.00 kg -
32 Cat Tembok Ex. Avitex 1.00 kg -
33 Cat Tembok Ex. Altex 1.00 kg -
34 Cat Tembok Ex. Levi's Exterior 1.00 kg -
35 Cat Tembok Ex. Levi's Interior 1.00 kg -
36 Cat Tembok Ex. Flora. 1.00 kg -
37 Kuas ukuran 1 RRT 1.00 bh -
38 Kuas ukuran 1,5 RRT 1.00 bh -
39 Kuas ukuran 2 RRT 1.00 bh -
40 Kuas ukuran 2,5 RRT 1.00 bh -
41 Kuas ukuran 3 RRT 1.00 bh -
42 Kuas ukuran 4 RRT 1.00 bh -
43 Kuas ukuran 5 RRT 1.00 bh -
44 Kuas Rol 1.00 bh 7,500.00 7,500.00
45 Lem Vinyl 1.00 kg 62,500.00 62,500.00
46 Lem Kayu 1.00 ltr 22,000.00 22,000.00
47 Lem Rajawali 1.00 kg -
48 Lem pipa PVC 1.00 kg -
49 Plamur Besi 1.00 kg -
50 Plamur Besi ex. Pedang 1.00 kg -
51 Plamur Kayu 1.00 kg -
52 Plamur Kayu ex. Pedang 1.00 kg -
53 Plamur Tembok ex. Paragon 1.00 kg -
54 Plamur Tembok 1.00 kg 7,500.00 7,500.00
46 Spirtus 1.00 ltr 10,500.00 10,500.00
47 Teak Oil 1.00 ltr -
48 Residu 1.00 ltr -
49 Politur dasar 1.00 ltr -
50 Politur jadi ex. Mowilex 1.00 ltr -
51 Water Proffing 1.00 kg 45,000.00 45,000.00
52 Vernish Jadi 1.00 ltr -
53 Wood Filler 1.00 kg 75,000.00 75,000.00
54 Pewarna 1.00 sach 75,000.00 75,000.00
55 Kertas gosok No. 150 1.00 lbr 3,000.00 3,000.00
56 Kertas gosok no280 1.00 lbr 3,000.00 3,000.00
57 Shanding 1.00 kg 65,000.00 65,000.00
58 Clear Doof 1.00 kg 45,000.00 45,000.00
59 Coumpond 1.00 klng 40,000.00 40,000.00
60 Sewa alat bantu ( 1 set @ 3 alat ) 1.00 set 1,500,000.00 1,500,000.00
61 Sewa compresor 1.00 jam -
62 Soda Api 1.00 kg -
63 Serat fiber 1.00 m2 -
64 Wallpaper Eksklusif 1.00 m' 20,000.00 20,000.00
65 Sirlak 1.00 kg 178,000.00 178,000.00
KERAMIK - UBIN -
1 Gymfloor 1.00 m2 287,000.00 287,000.00
2 Internal Cove 5 x 5 x 20 cm 1.00 bh -
3 Keramik Lantai Artistik 5 x 20 1.00 bh -
4 Keramik lantai Artistik 10 x 10 1.00 bh -
5 Keramik Dinding 20 x 20 1.00 m2 -
6 Keramik lantai 20 x 20 Motif 1.00 m2 38,000.00 38,000.00
7 Keramik lantai 20 x 20 KM/WC 1.00 m2 -
Page 13 of 334
8 Keramik lantai 20 x 20 putih MULIA 1.00 m2 -
9 Keramik lantai 20 x 20 Warna /Motif 1.00 m2 -
10 Keramik Dinding 20 x 25 1.00 m2 46,000.00 46,000.00
11 Keramik Dinding 20 x 25 polos`MULIA 1.00 m2 46,000.00 46,000.00
12 Keramik Dinding 20 x 25 Warna / Motif Mulia 1.00 m2 -
13 Keramik Lantai 30 x 30 Putih 1.00 m2 -
14 Keramik Lantai 30 x 30 Putih Mulia 1.00 m2 -
15 Keramik Lantai 30 x 30 Warna Mulia 1.00 m2 -
16 Keramik Lantai 30 x 30 Warna / Motif 1.00 m2 65,000.00 65,000.00
17 Keramik Lantai 40 x 40 Putih 1.00 m2 -
18 Keramik Lantai 40 x 40 Warna / Motif 1.00 m2 60,000.00 60,000.00
19 Keramik Lantai 40 x 40 Warna Mulia 1.00 m2 -
20 Plint Keramik Lntai 10 x 20 1.00 bh -
21 Plint Keramik Lantai 10 x 30 1.00 bh -
22 Plint Keramik Lantai 10 x 40 1.00 bh 37,400.00 37,400.00
23 Plint Ubin Terraso 10 x 30 1.00 bh -
24 Plint Ubin PC abu-abu 15 x 20 1.00 bh -
25 Ubin Granito warna Essenza 30 x 30 1.00 m2 -
26 Ubin Granito warna Hitam Essenza 60 x 60 1.00 m2 250,000.00 250,000.00
27 Ubin Panel Accura 20 x 25 - 12 lembar 1.00 m2 -
28 Ubin Panel Accura 20 x 25 - 20 lembar 1.00 m2 -
29 Ubin Panel Accura 20 x 25 - 4 lembar 1.00 m2 -
30 Ubin Panel Accura 20 x 25 - 6 lembar 1.00 m2 -
31 Marmer 100 x 100 1.00 m2 265,000.00 265,000.00
32 Marmer kwalitas export warna pink 0,60x 1m 1.00 m2 -
33 Marmer kw export warna krem 0,60 x 1 m 1.00 m2 -
34 Marmer kw export warna trotol dasar 0,60 x 1 m 1.00 m2 -
35 Batu GRANIT import Italy 1.00 m2 325,000.00 325,000.00
36 Texture GRANITONE 1.00 m2 -
37 PAVINGST ( K.125 ) warna abu2 t=8cm 1.00 m2 -
38 PAVINGST ( K.125 ) warna abu2 t=6cm 1.00 m2 -
39 PAVINGST KW.I tebal=8cm ( K.300) 1.00 m2 -
40 PAVINGST KW.I tebal=6cm ( K.300) 1.00 m2 -
41 Gress Block Beton 10 x 40 x 60 cm 1.00 m2 -
42 Karpet World Class 1.00 m2 -
43 Wallpaper Eksklusif 1.00 m2 -
44 Kansteen BDCM 1.00 m2 -
45 Kansteen 1.00 M' -
46 Stoper / uskup tebal 6 cm 1.00 m2 -
47 Stoper / uskup tebal 8 cm 1.00 m2 -
48 Floor Hardener 1.00 kg 25,000.00 25,000.00
49 Granite Tile Ukuran 30 x 30 Polished 1.00 m² 175,000.00 175,000.00
50 Granite Tile Ukuran 30 x 30 Unpolished 1.00 m² -
51 Granite Tile Ukuran 60 x 60 Polished 1.00 m² 250,000.00 250,000.00
52 Granite Tile Ukuran 60 x 60 Unpolished 1.00 m² -
53 Kansteen Uk. 15.18.40 1.00 bh -
54 Bumper Guard terpasang 1.00 m' -
55 Rail Guard terpasang 1.00 m' -
56 Bed Head terpasang 1.00 m' -
57 Cubical Toilet terpasang 1.00 unit -
58 Timbal Sheet terpasang 1.00 m2 -
PERLENGK.KM - WC. -
1 Avoer plastik 1.00 bh -
2 Avoer stainless 1.00 bh -
3 Bathub Porselin 1.00 bh -
4 Bak Cuci Stainless Steel Ex. Maspion 1.00 bh -
5 Kaca Cermin 5 mm + Bevel 2 cm 1.00 M2 37,500.00 37,500.00
6 Closet Duduk ex. INA 1.00 bh 1,750,000.00 1,750,000.00
7 Closet Duduk Putih Porselin Komplit ex. INA 1.00 bh -
Page 14 of 334
8 Closet Duduk Warna Porselin komplit ex. TOTO 1.00 bh -
9 Closet Jongkok putih ex. INA 1.00 bh -
10 Closet Jongkok Warna ex. TOTO 1.00 bh -
11 Closet Duduk Putih Porselin Komplit ex. INA Lux 1.00 bh -
12 Closet Jongkok putih ex. INA KW.A 1.00 bh -
13 Closet Jongkok Warna ex. TOTO Lux 1.00 bh -
14 Kran Air ؽ" 1.00 bh -
15 Kran Air ؽ" ex. Cina 1.00 bh -
16 Kran Air ؾ" 1.00 bh -
17 Kran Air ؾ" ex. Omeo 1.00 bh -
18 Kran Bathub Panas dan Dingin 1.00 bh -
19 Flexible 36 cm 1.00 bh -
20 Flexible 45 cm 1.00 bh -
21 Flexible 60 cm 1.00 bh 60,000.00 60,000.00
22 Flexible MB 30 cm 1.00 bh -
23 Flexible MB 40 cm 1.00 bh -
24 Seal Tape / Rol TBA 1.00 bh 115,000.00 115,000.00
25 Shower Spray ex. TOTO TX 403 SP1V 1.00 bh -
26 Sifon TOTO U-370 M 1.00 bh -
27 Stopkran air TOTO TS251 FT2 1.00 bh -
28 Tempat sabun keramik 1.00 bh -
29 Urinoar keramik 1.00 bh -
30 Washtafel lokal besar 1.00 bh 880,000.00 880,000.00
31 Washtafel lokal Kecil 1.00 bh -
32 Floor Drain (TOTO TX 1 B) 1.00 unit 115,000.00 126,500.00
33 Wastafel Meja Warna Standard Lengkap (L 546) 1.00 unit 1,000,000.00 1,100,000.00
34 Urinoar Type Muslim (U 57 M) 1.00 unit 1,245,000.00 1,394,400.00
35 Kran air Ø 1/2" atau Ø 3/4" (TOTO T23 B13) 1.00 bh 115,000.00 132,250.00
36 Kran Sink 1.00 bh -
37 Jet Washer (TOTO TX 423 SVINCR) 1.00 bh 95,000.00 109,250.00
38 Wastafel Gantung (L 237 V3) 1.00 unit -
39 Closet Duduk Standard lengkap TOTO C 48 1.00 unit 1,250,000.00 1,437,500.00
40 Closet Duduk TOTO CW 660 J 1.00 unit -
41 Closet Duduk Type difable (TOTO CW 705 L) 1.00 unit -
42 Kitchen Zink Stainless Standard Lokal ( 1 Lobang ) 1.00 bh -
43 Bak mandi fibergalss 1.00 bh -
44 Soap Holder (TOTO S 11 N) 1.00 bh 25,000.00 31,250.00
45 Tisue Holder (TS 116 R) 1.00 bh -
46 Hand Dryer 1.00 bh -
47 Towel Shelf (TOTO TX 4 A) 1.00 bh -
48 Towel Ring (TOTO TS 115 S) 1.00 bh -
49 Grab Bar (TOTO TX3 A2) 1.00 bh -
50 Double robe hook (TS 118 WS) 1.00 bh -
51 Partisi Ruang Closet 1.00 bh -
52 Kloset Jongkok 1.00 bh -
53 Flush Valve 1.00 bh -
54 Seal Tape 1.00 bh 7,500.00 8,625.00
55 Patisi Penyekat Urinoir (TOTO A 100) 1.00 bh -
56 Slop Sink 1.00 bh -
57 Single Lever Bath & Shower set (TOTO TX 432 SDZ) 1.00 bh -
PIPA DAN ACCESSORIES -
1 K / 100 PVC Ø 1,5 " 1.00 bh -
2 Knee Maspion Ø 1½" 1.00 bh -
3 Knee Maspion Ø 1" 1.00 bh -
4 Knee Maspion Ø ½" 1.00 bh -
5 Knee Maspion Ø 2½" 1.00 bh -
6 Knee Maspion Ø 2" 1.00 kg -
7 Knee Maspion Ø 3" 1.00 bh -
8 Knee Maspion Ø ¾" 1.00 bh -
Page 15 of 334
9 Knee Maspion Ø 4" 1.00 bh -
10 Knee Galvanis Ø ½ " 1.00 bh -
11 Knee Galvanis Ø ¾ " 1.00 bh -
12 Knee Galvanis Ø1 " 1.00 bh -
13 Knee Galvanis Ø 1½ " 1.00 bh -
14 Knee Galvanis Ø2 " 1.00 bh -
15 Knee Galvanis Ø 2½ " 1.00 bh -
16 Knee Galvanis Ø3 " 1.00 bh -
17 Knee Galvanis Ø4 " 1.00 bh -
18 Knee PVC Ø ½ " 1.00 bh -
19 Knee PVC Ø 11/2 " 1.00 bh 6,900.00 6,900.00
20 Knee PVC Ø 1 " 1.00 bh -
21 Knee PVC Ø 4 " 1.00 bh 56,100.00 56,100.00
22 Knee PVC Ø3 " 1.00 bh 27,370.00 27,370.00
23 Pipa Galvanis Ø ½ " 1.00 ljr -
24 Pipa Galvanis Ø ¾ " 1.00 ljr -
25 Pipa Galvanis Ø 1 " 1.00 ljr 864,000.00 864,000.00
26 Pipa Galvanis Ø 1½ " 1.00 ljr 1,290,000.00 1,290,000.00
27 Pipa Galvanis Ø 2 " 1.00 ljr 1,890,000.00 1,890,000.00
28 Pipa Galvanis Ø 3 " 1.00 ljr 2,952,000.00 2,952,000.00
29 Pipa PVC Type AW Ø ½ " 1.00 ljr -
30 Pipa PVC Type AW Ø ¾ " 1.00 ljr -
31 Pipa PVC Type AW Ø 1 " 1.00 ljr -
32 Pipa PVC Type AW Ø 1½ " 1.00 ljr -
33 Pipa PVC Type AW Ø 2 " 1.00 ljr -
34 Pipa PVC Type AW Ø 2½ " 1.00 ljr -
35 Pipa PVC Type AW Ø 3 " 1.00 ljr 245,000.00 245,000.00
36 Pipa PVC Type AW Ø 4 " 1.00 ljr 360,000.00 360,000.00
37 Pipa PVC Type AW Ø 6 " 1.00 ljr 452,000.00 452,000.00
38 Pipa PVC Type AW Ø 8 " 1.00 ljr -
39 Pipa PVC Type C Ø ½ " 1.00 ljr -
40 Pipa PVC Type C Ø ¾ " 1.00 ljr -
41 Pipa PVC Type C Ø 1" 1.00 ljr -
42 Pipa PVC Type C Ø 1½ " 1.00 ljr -
43 Pipa PVC Type C Ø 2 " 1.00 ljr -
44 Pipa PVC Type C Ø 2½ " 1.00 ljr -
45 Pipa PVC Type C Ø 3 " 1.00 ljr -
46 Pipa PVC Type C Ø 4 " 1.00 ljr -
47 Pipa PVC Type D Ø ½ " 1.00 ljr -
48 Pipa PVC Type D Ø ¾ " 1.00 ljr -
49 Pipa PVC Type D Ø 1" 1.00 ljr -
50 Pipa PVC Type D Ø 1½ " 1.00 ljr -
51 Pipa PVC Type D Ø 2 " 1.00 ljr -
52 Pipa PVC Type D Ø 2½ " 1.00 ljr -
53 Pipa PVC Type D Ø 3 " 1.00 ljr -
54 Pipa PVC Type D Ø 4 " 1.00 ljr -
55 Pipa Screen PVC Type AW Ø6" 1.00 ljr -
56 Shock Galvanis Ø ½ " 1.00 bh -
57 Shock Galvanis Ø ¾ " 1.00 bh -
58 Shock Galvanis Ø 1 " 1.00 bh -
59 Shock Galvanis Ø 1½ " 1.00 bh -
60 Shock Galvanis Ø 2 " 1.00 bh -
61 Shock Galvanis Ø 2½ " 1.00 bh -
62 Shock Galvanis Ø 3 " 1.00 bh -
63 Shock Galvanis Ø 4 " 1.00 bh -
64 Shock Maspion Ø ½" 1.00 bh -
65 Shock Maspion Ø ¾" 1.00 bh -
66 Shock Maspion Ø 1" 1.00 bh -
67 Shock Maspion Ø 1¼" 1.00 bh -
Page 16 of 334
68 Shock Maspion Ø 2" 1.00 bh -
69 Shock Maspion Ø 3" 1.00 bh -
70 Shock Maspion Ø 4" 1.00 bh -
71 Shock PVC Ø ½" 1.00 bh -
72 Shock PVC Ø ¾" 1.00 bh -
73 Shock PVC Ø 1" 1.00 bh -
74 Shock PVC Ø 1½" 1.00 bh 5,400.00 5,400.00
75 Shock PVC Ø 2" 1.00 bh -
76 Shock PVC Ø 2½" 1.00 bh -
77 Shock PVC Ø 3" 1.00 bh 20,700.00 20,700.00
78 Shock PVC Ø 4" 1.00 bh 41,100.00 41,100.00
79 Pipa PVC Moof m' S-12,5 - Ø ½" 1.00 btng -
80 Pipa PVC Moof m' S-12,5 - Ø ¾" 1.00 btng -
81 Pipa PVC Moof m' S-12,5 - Ø 1" 1.00 btng -
82 Pipa PVC Moof m' S-12,5 - Ø 1½" 1.00 btng 32,500.00 32,500.00
83 Pipa PVC Moof m' S-12,5 - Ø 2" 1.00 btng -
84 Pipa PVC Moof m' S-12,5 - Ø 2½" 1.00 btng -
85 Pipa PVC Moof m' S-12,5 - Ø 3" 1.00 btng 92,220.00 92,220.00
86 Pipa PVC Moof m' S-12,5 - Ø 4" 1.00 btng 130,000.00 130,000.00
87 Pipa PVC Moof m' S-12,5 - Ø 6" 1.00 btng -
88 Pipa PVC Moof m' S-12,5 - Ø 8" 1.00 btng -
89 Pipa PVC Moof m' S-12,5 - Ø 10" 1.00 btng -
90 Pipa PVC Moof m' S-12,5 - Ø 12" 1.00 btng -
91 Pipa Air GI Ø ½" - Tebal = 1,5 mm 1.00 btng -
92 Pipa Air GI Ø ½" - Tebal = 1,8 mm 1.00 btng -
93 Pipa Air GI Ø ½" - Tebal = 2,0 mm 1.00 btng -
94 Pipa Air GI Ø ½" - Tebal = 2,2 mm 1.00 btng -
95 Pipa Air GI Ø ¾" - Tebal = 1,5 mm 1.00 btng -
96 Pipa Air GI Ø ¾" - Tebal = 1,8 mm 1.00 btng -
97 Pipa Air GI Ø ¾" - Tebal = 2,0 mm 1.00 btng -
98 Pipa Air GI Ø 1" - Tebal = 1,8 mm 1.00 btng -
99 Pipa Air GI Ø 1" - Tebal = 2,0 mm 1.00 btng -
100 Pipa Air GI Ø 1" - Tebal = 2,30 mm 1.00 btng -
101 Pipa Air GI Ø 1" - Tebal = 2,5 mm 1.00 btng -
102 Pipa Air GI Ø 1" - Tebal = 2,8 mm 1.00 btng -
103 Pipa Air GI Ø 1¼" - Tebal = 1,8 mm 1.00 btng -
104 Pipa Air GI Ø 1¼" - Tebal = 2,30 mm 1.00 btng -
105 Pipa Air GI Ø 1¼" - Tebal = 2,8 mm 1.00 btng -
106 Pipa Air GI Ø 1½" - Tebal = 1,8 mm 1.00 btng -
107 Pipa Air GI Ø 1½" - Tebal = 2,0 mm 1.00 btng -
108 Pipa Air GI Ø 1½" - Tebal = 2,30 mm 1.00 btng -
109 Pipa Air GI Ø 1½" - Tebal = 2,5 mm 1.00 btng -
110 Pipa Air GI Ø 1½" - Tebal = 2,8 mm 1.00 btng -
111 Pipa Air GI Ø 2" - Tebal = 1,8 mm 1.00 btng -
112 Pipa Air GI Ø 2" - Tebal = 2,0 mm 1.00 btng -
113 Pipa Air GI Ø 2" - Tebal = 2,30 mm 1.00 btng -
114 Pipa Air GI Ø 2" - Tebal = 2,5 mm 1.00 btng -
115 Pipa Air GI Ø 2" - Tebal = 2,8 mm 1.00 btng -
116 Pipa Air GI Ø 2½" - Tebal = 2,30 mm 1.00 btng -
117 Pipa Air GI Ø 2½" - Tebal = 2,5 mm 1.00 btng -
118 Pipa Air GI Ø 2½" - Tebal = 2,8 mm 1.00 btng -
119 Pipa Air GI Ø 2½" - Tebal = 3,0 mm 1.00 btng -
120 Pipa Air GI Ø 3" - Tebal = 2,0 mm 1.00 btng -
121 Pipa Air GI Ø 3" - Tebal = 2,30 mm 1.00 btng -
122 Pipa Air GI Ø 3" - Tebal = 2,5 mm 1.00 btng -
123 Pipa Air GI Ø 3" - Tebal = 2,8 mm 1.00 btng -
124 Pipa Air GI Ø 3" - Tebal = 3,0 mm 1.00 btng -
125 Pipa Air GI Ø 4" - Tebal = 2,30 mm 1.00 btng -
126 Pipa Air GI Ø 4" - Tebal = 2,5 mm 1.00 btng -
Page 17 of 334
127 Pipa Air GI Ø 4" - Tebal = 2,8 mm 1.00 btng -
128 Pipa Air GI Ø 4" - Tebal = 3,0 mm 1.00 btng -
129 Pipa Air GI Ø 4" - Tebal = 3,50 mm 1.00 btng -
130 Pipa Air GI Ø 6" - Tebal = 2,5 mm 1.00 btng -
131 Pipa Air GI Ø 6" - Tebal = 2,8 mm 1.00 btng -
132 Pipa Air GI Ø 6" - Tebal = 3,0 mm 1.00 btng -
133 Pipa Air GI Ø 6" - Tebal = 3,50 mm 1.00 btng -
134 Pipa Air GI Ø 6" - Tebal = 3,30 mm 1.00 btng -
135 Pipa Air GI Ø 8" - Medium 1.00 btng -
136 Pipa Air GI Ø 10" - Medium 1.00 btng -
137 Pipa Air GI Ø 12" - Medium 1.00 btng -
138 Pipa Air GI Ø 16" - Medium 1.00 btng -
139 Ball Valve ( Kuningan ) Ø ½" 1.00 bh -
140 Ball Valve ( Kuningan ) Ø ¾" 1.00 bh 65,000.00 65,000.00
141 Ball Valve ( Kuningan ) Ø 1" 1.00 bh -
142 Ball Valve ( Kuningan ) Ø 1¼" 1.00 bh -
143 Ball Valve ( Kuningan ) Ø 1½" 1.00 bh -
144 Ball Valve ( Kuningan ) Ø 2" 1.00 bh -
145 Ball Valve ( Kuningan ) Ø 3" 1.00 bh -
146 Ball Valve ( Kuningan ) Ø 4" 1.00 bh -
147 Ball Valve ( Kuningan ) Ø ½" 1.00 bh -
148 Ball Valve ( Kuningan ) Ø ½" 1.00 bh -
149 Klem PVC 1.00 bh 600.00 600.00
PERALATAN AIR BERSIH -
1 Pompa Air 1.00 unit -
2 Sumur Pompa Tangan Lengkap 1.00 unit -
3 Tandon air PVC 0,5 m3 1.00 bh -
4 Tandon air PVC 1 m3 1.00 bh -
5 Tandon air stainless 1,0 m3 1.00 bh -
6 Tandon air stinless 0,5 m3 1.00 bh -
INSTALASI LISTRIK -
1 Fitting Plafond 1.00 bh -
2 Isolator 1.00 m' -
3 Kabel NYA 2,5 mm 1.00 m' -
4 Kabel NYA 4,0 mm 1.00 m' -
5 Lampu pijar 5-40 watt 1.00 bh -
6 Lampu pijar 50 - 100 watt 1.00 bh -
7 Lampu TL komplit 40 watt 1.00 bh -
8 Lampu TL Komplit 20 watt 1.00 bh -
9 Lampu TL 4X20 Watt setara Artolite, armuture,Ignitor,Caps 1.00 bh -
10 Lampu TL 2X20 Watt setara Artolite, armuture,Ignitor,Caps 1.00 bh -
11 Lampu HPS (Armature,Balas,Ignitor.Caps) 70 W/220 1.00 bh -
12 Lampu HPS (Armature,Balas,Ignitor.Caps) 150 W/220 1.00 bh -
13 Lampu HPS (Armature,Balas,Ignitor.Caps) 250 W / 220 1.00 bh -
14 Lampu HPS (Armature,Balas,Ignitor.Caps) 400 W / 220 1.00 bh -
15 Bola lampu Mercury HPLN-220 V / 80 W 1.00 bh -
16 Bola lampu Mercury HPLN-220 V / 200 W 1.00 bh -
17 Lampu Natrium 250 W/ 220 V + Balast 1.00 bh -
18 Lampu Sorot (Armature,Balas,Ignitor.Caps) 250 watt 1.00 bh -
19 Lampu Sorot (Armature,Balas,Ignitor.Caps) 150 watt 1.00 bh -
20 Lampu XL ( Lilin ) 5 watt 1.00 bh -
21 Lampu XL ( Lilin ) 8 watt 1.00 bh -
22 Lampu XL ( Lilin ) 14 watt 1.00 bh -
23 Lampu XL ( Lilin ) 18 watt 1.00 bh -
24 Lampu XL ( Lilin ) 23 watt 1.00 bh -
25 Las doof 1.00 bh -
26 Pasang baru PLN 1.00 ls -
27 Pipa Arde 1.00 m' -
28 Pipa PVC 5/8 " 1.00 ljr -
Page 18 of 334
29 Saklar Broco 1.00 bh -
30 Stop Kontak Broco 1.00 bh -
31 T Dos PVC 1.00 bh -
32 Tambah Daya 2200 watt 1.00 ls -
33 Zekering Kast Lokal 1 Group 1.00 unit -
34 Zekering Kast Lokal 2 Group 1.00 unit -
35 Zekering Kast Lokal 3 Group 1.00 unit -
36 Tiang Oktogonal Singgle Hot Dipped Galv + Flenders 5m 1.00 unit -
37 Tiang Oktogonal Double Hot Dipped Galv + Flenders 5m 1.00 unit -
38 Tiang Oktogonal Singgle Hot Dipped Galv + Flenders 7 m 1.00 unit -
39 Tiang Oktogonal Double Hot Dipped Galv + Flenders 7 m 1.00 unit -
40 Tiang Oktogonal Singgle Hot Dipped Galv + Flenders 9 m 1.00 unit -
41 Tiang Oktogonal Double Hot Dipped Galv + Flenders 9 m 1.00 unit -
42 Tiang Oktogonal Singgle Hot Dipped Galv + Flenders 12 m 1.00 unit -
43 Tiang Oktogonal Double Hot Dipped Galv + Flenders 12 m 1.00 unit -
LAIN - LAIN -
1 AC Wall Mounted 8900 BTU / H 1 PK 1.00 bh -
2 Alat bantu pasang rangka plafond 1.00 ls -
3 Bahan terraso cor 1.00 m3 -
4 Bak Kontrol 40 x 40 x 50 cm 1.00 lot -
5 Batacota 1.00 kg -
6 Besi Holo 1.00 ljr -
7 Bor Strous 1.00 ttk 17,500.00 17,500.00
8 Elektrode 1.00 kg -
9 Formika 90 x 120 cm 1.00 lbr -
10 Gedeg Guling 1.00 m2 -
11 Grease 1.00 kg -
12 Grill ( tutup Saluran Air Hujan ) 1.00 unit -
13 Grounding 1.00 bh -
14 Grounding penangkala petir 1.00 lot -
15 Halogeen spot DL 50 watt 1.00 bh -
16 Kabel Coaxial 2 x 30 mm 1.00 m' -
17 Kawat BC 1.00 m' -
18 Kolom Beton pracetak un. Pagar 1.00 bh -
19 Lampu Gantung 1.00 buah -
20 Ijuk 1.00 kg 15,000.00 15,000.00
21 Material bantu 1.00 ls -
22 Minyak Bekisting 1.00 ltr 50,000.00 50,000.00
23 Minyak Pelumas 1.00 ltr -
24 Ornamen Kolom 1.00 bh -
25 Pagar pengaman dan besi pipa 1.00 m2 -
26 Panel beton prcetak un. Pagar 1.00 bh -
27 Panel Induk 1.00 unit -
28 Polycarbonite 1.00 lbr -
29 Pompa submersible 1.00 unit -
30 Railling Tngga Virkan 1.00 m2 -
31 Railling Tangga Pipa 1.00 m2 -
32 Seal Tape / TBA 1.00 buah -
33 Sending daun jendela 1.00 buah -
34 Sending daun pintu 1.00 buah -
35 Sending kosen pintu / jendela 1.00 m' -
36 Sewa alat sandblasting 1.00 hr -
37 Sewa Genset 1.00 hr -
38 Sewa Mesin Las 1.00 hr -
39 Sew Mesin Bor 1.00 hr -
40 Sewa pompa Tes 1.00 hr -
41 Spot light 1.00 buah -
42 Sub panel 1.00 buah -
43 Sumur bor dalam 1.00 unit -
Page 19 of 334
44 Sunscreen Alumunium 1.00 m3 -
45 Tali ijuk 1.00 kg -
46 Telephone outlet 1.00 buah -
47 Timah 1.00 kg -
48 Vertical Blind 1.00 m2 -
49 Vonetion Blind 1.00 m2 -
50 Wallpaper 1.00 m2 -
51 Waterstop lebar 200 mm 1.00 m' -
52 Waterstop lebar 150 mm 1.00 m' -
53 Waterstop lebar 230 mm 1.00 m' -
54 Waterstop lebar 250 mm 1.00 m' -
55 Waterstop lebar 300 mm 1.00 m' -
56 Waterstop lebar 320 mm 1.00 m' -
ASPHAL -
1 Aspal Curah 1.00 drum -
2 Aspal Pertamina KW. I 1.00 drum -
3 Aspal Shell Ex. Singpura 1.00 drum -
BAHAN MATERIAL TERPASANG -
1 Auning + Rangka hollow 1.00 m2 -
2 Polycarbonat ex. Twilite rangka hollow 1.00 m2 -
3 Polycarbonat ex. Twilite rangka stainless 1.00 m2 -
4 Baja Truss Prof C .Z-Alm bent lbh= 8m 1 sd 1.00 m2 -
5 Baja Truss Prof C .Z-Alm bent lbh= 8m 2 sd 1.00 m2 -
6 Baja Truss Prof C .Z-Alm bent krng= 8m 1 sd 1.00 m2 -
7 Baja Truss Prof C .Z-Alm bent krng= 8m 2 1.00 m2 -
8 Pasang kisdam 1.00 m' -
9 Membran sheet water profing ex. Foxroc 1.00 m2 60,000.00 60,000.00
10 Kosen ALUMINIUM warna 4" ex. Elexindo 1.00 m' -
11 Kosen ALUMINIUM putih 4" ex. Elexindo 1.00 m' -
12 Kosen ALUM warna 4,5x10x0,1 ex. Indal 1.00 m' -
13 Kosen ALUM 4,5x10x0,1 putih ex. Indal 1.00 m' -
14 Keray aluminium 1.00 m2 -
15 Jalusi aluminium 1.00 m2 -
16 Vertical Blind 1.00 m2 -
17 Plafond rangka Hollow 1.00 m2 -
18 Plafond rangka hollow galvanis 1.00 m2 -
19 Exhaust fan kecil ex. Maspion 1.00 bh -
20 Exhaust fan besar ex. Maspion 1.00 bh -
21 Pintu KM/WC PVC 200x70 1.00 bh -
22 Pintu KM/WC Aluminium 185 x 65 cm 1.00 bh -
23 Daun pintu + assc ALPHA / ATT warna 1.00 m2 -
24 Daun pintu + assc ALPHA / ATT putih 1.00 m2 -
25 Daun jend kaca+assc ALPHA/ATT l warna 1.00 m2 -
26 Daun jend kaca+assc ALPHA/ATT putih 1.00 m2 -
27 Assesories pintu Floorhang "DORMA" 1.00 BH -
28 Assesories pintu Floorhang "ALPHA" 1.00 BH -
29 Kansteen Besar 15x30x50 cm 1.00 m' -
30 Kansteen Kecil 15x20x50 cm 1.00 m' -
31 Lampu SL ex. PHILLIPS watt 14 1.00 unit -
32 Lampu SL ex. PHILLIPS watt 18 1.00 unit -
33 Lampu dop )bolamp) ex. PHILLIPS 1.00 unit -
34 Downlicht PANASONIC 1.00 bh -
35 Downlicht lokal 1.00 bh -
36 Saklar Tunggal ex BROCO 1.00 bh -
37 Saklar Ganda ex BROCO 1.00 bh -
38 Stop kontak 1.00 bh -
39 Pas.Ins listrik non saklar/stop kontak 1.00 ttk -
40 Pintu rolling door Aluminium 1.00 m2 -
41 Box Cluvert U1000 K.350 (Besi 130 Kg 1.00 bh -
Page 20 of 334
42 Cover Cluvert 1000x1000x2400; besi 160 kg 1.00 bh -
PERALATAN SEWA -
1 Buldozer 1.00 jam 283,000.00 283,000.00
2 Motor Grader 100 HP 1.00 jam 264,000.00 264,000.00
3 Hydraulic Excavator 1.00 jam 208,000.00 208,000.00
4 Pneumatic Tire Roller 1.00 jam 140,000.00 140,000.00
5 Vibrator Roller 1.00 jam 202,000.00 202,000.00
6 Pemecah Batu 1.00 jam 667,000.00 667,000.00
7 Mesin Penyaring 1.00 jam -
8 Wheel Loader 1.00 jam 237,000.00 237,000.00
9 Wheel Tractor 1.00 jam 202,000.00 202,000.00
10 Mesin Gilas 3 Roda besi 8-10 ton 1.00 jam 129,000.00 129,000.00
11 Mesin Gilas Tandem 6-10 ton 1.00 jam 129,000.00 129,000.00
12 Mesin gilas Bergetar / Vibro roller 10 ton 1.00 jam 202,000.00 202,000.00
13 Mesin Gilas Roda karet 8-15 ton 1.00 jam 140,000.00 140,000.00
14 Mesin Gilas bergetar 1 ton 1.00 jam 202,000.00 202,000.00
15 Stamper 4 HP 1.00 jam 21,000.00 21,000.00
16 Mesin Penyempro Aspal 1.00 jam 38,000.00 38,000.00
17 Mesin Penyampur aspal 1.00 jam 4,492,000.00 4,492,000.00
18 Mesin Penghambar Aspal 1.00 jam 236,000.00 236,000.00
19 Truck Tangki Air 1.00 jam 136,000.00 136,000.00
20 Sewa Truck klas 3 dalam kota 1.00 jam 126,000.00 126,000.00
21 Dump Truck 3,5 ton 1.00 jam 136,000.00 136,000.00
22 Dump Truck 5 ton 1.00 jam 261,000.00 261,000.00
23 Pompa Air 1.00 jam 20,000.00 20,000.00
24 Tractor Equipment, etc 1.00 jam 261,000.00 261,000.00
25 Truck Aspal ( Asphalt Distrubutor ) 1.00 jam 261,000.00 261,000.00
26 Genset 1.00 jam 74,000.00 74,000.00
27 Batching Plant 1.00 jam 667,000.00 667,000.00
28 Truck Mixer 1.00 jam 261,000.00 261,000.00
29 Concrete Vibrator 1.00 jam 16,000.00 16,000.00
30 Concrete Paver 1.00 jam 293,000.00 293,000.00
31 Sewa bucket dan crane 1.00 jam 225,000.00 225,000.00
32 Concrete Pump 1.00 jam 285,000.00 285,000.00
33 Welding Set 1.00 jam 25,000.00 25,000.00
34 Sewa Crane 1.00 jam 225,000.00 225,000.00
35 Jack Hammer 1.00 jam 18,000.00 18,000.00
36 Theodholit 1.00 set 25,000.00 25,000.00
37 Surveyor 1.00 Oh 40,000.00 40,000.00
Surabaya, 23 November 2010
PT. ANGGREK MERAH
ALBERTINUS WIDYANTO
Direktur Utama
Page 21 of 334
DAFTAR HARGA BAHAN DAN MATERIALPROYEK PEMBANGUNAN GEDUNG MENEJEMEN 4 LANTAI
RUMAH SAKIT UMUM PROVINSI dr. SOEDONO MADIUNJALAN Dr. SOETOMO No. 29 MADIUN - JAWA TIMUR
No. URAIAN TENAGA KERJA KOOEF HARGA ( Rp )
VOL SAT. SATUAN JUMLAH
TANAH / PASIR1 Agregat Kelas A 1.00 m3 70,000.00 70,000.00 2 Agregat Kelas B 1.00 m3 60,000.00 60,000.00 3 Pasir Beton 1.00 m3 140,000.00 140,000.00 4 Pasir Cor 1.00 m3 140,000.00 140,000.00 5 Pasir Hitam 1.00 m3 150,000.00 150,000.00 6 Pasir Pasang 1.00 m3 135,000.00 135,000.00 7 Pasir Silikon 1.00 kg 7,800.00 7,800.00 8 Pasir Urug 1.00 m3 85,000.00 85,000.00 9 Sirtu 1.00 m3 85,000.00 85,000.00
10 Tanah Liat 1.00 m3 65,000.00 65,000.00 11 Tanah Urug 1.00 m3 75,000.00 75,000.00 12 Tanah urug taman / ketel 1.00 m3 70,000.00 70,000.00
BATU BATA /BETON BLOCK/PAVING/STENSLAG1 Bata Berongga 1.00 bh - 2 Bata 1.00 bh 590.00 590.00 3 Batako 1.00 bh - 4 Batu ampyang 1.00 zak - 5 Batu apung 1.00 kg - 6 Batu belah gunung 1.00 m3 - 7 Batu belah kali 1.00 m3 145,000.00 145,000.00 8 Batu granito 1.00 kg - 9 Batu kali 1.00 m3 -
10 Batu kapur 1.00 zak - 11 Batu kerikil pasir 1.00 m3 95,000.00 95,000.00 12 Batu kerikil tersaring 1.00 m3 90,000.00 90,000.00 13 Batu koral 1.00 m3 125,000.00 125,000.00 14 Batu lempeng 1.00 m2 135,000.00 135,000.00 15 Batu Palimanan 1.00 m2 - 16 Batu Pecah mesin 1/2 1.00 m3 150,000.00 150,000.00 17 Batu Pecah mesin 1/2 1.00 m3 150,000.00 150,000.00 18 Batu Pecah mesin 2/3 1.00 m3 150,000.00 150,000.00 19 Batu Pecah mesin 3/5 1.00 m3 150,000.00 150,000.00 20 Batu Pecah mesin 4/6 - 5/7 1.00 m3 150,000.00 150,000.00 21 Batu Terraso 1.00 kg - 22 Batu tempel hitam/Batu candi 1.00 m2 87,000.00 87,000.00 23 Batu Klingker 1.00 bj 11,500.00 11,500.00 24 Batu Ampyang 1.00 m2 - 25 Batu Gilang ex. Jember ( simetris ) 1.00 m2 - 26 Batu Gilang ex. Jember ( ansimetris ) 1.00 m2 - 27 Batu Gilang ex. Cirebon ( simetris ) 1.00 m2 175,000.00 175,000.00 28 Batu Gilang ex. Cirebon ( ansimetris ) 1.00 m2 - 29 Batu Bobos uk. 10 x 20 x 1,5 cm 1.00 m2 16,000.00 16,000.00 30 Rooster kerawangan 11 x 12 x 24 1.00 bh - 31 Rooster kerawangan 11 x 22 x 22 1.00 bh - 32 Rooster beton 11 x 20 x 22 1.00 bh - 33 Batu tempel kasar / marmo 1.00 m2 - 34 Bt temp halus ( candi/hitam dan palimanan ) 1.00 m2 88,000.00 88,000.00 35 Batu sirih / alur (hitam / kuning) 1.00 m2 39,000.00 39,000.00 36 Batu alur andesit hitam 1.00 m2 - 37 Batu koral hitam ex NTT 1.00 m2 - 38 Batu koral hitam ex. Tulungagung 1.00 m2 - 39 Batu tempel Terrakota / Karangpilang 1.00 m2 - 40 List batu andesit p=40 cm, lebar = 5cm 1.00 m' - 41 List batu candi p=40 cm lebar = 5 cm 1.00 m' - 42 Batako 1.00 bj 8,500.00 8,500.00 43 Concrete block ( CB 10 ) 1.00 bh - 44 Concrete block ( CB 15 ) 1.00 bh - 45 Concrete block ( CB 20 ) 1.00 bh - 46 Hollow Block ( HB.10 ) 1.00 bh - 47 Hollow Block ( HB.15 ) 1.00 bh - 48 Hollow Block ( HB.20 ) 1.00 bh - 49 Kansteen 1.00 m' - 50 Paving Block 1.00 m2 - 51 Paving stone natural 6 cm 1.00 m2 38,000.00 38,000.00 52 Paving Stone natural 8 cm 1.00 m2 54,000.00 54,000.00 53 Rooster 1.00 bh 4,500.00 4,500.00 54 Stenslag / batu pecah tangan 2/3 1.00 m3 - 55 Stenslag / batu pecah tangan 1/2 1.00 m3 - 56 Stenslag / batu pecah tangan 3/5 1.00 m3 -
Page 22 of 334
57 Stenslag / batu pecah tangan 4/6 - 5/7 1.00 m3 - 58 Glass Block 1.00 m3 30,000.00 30,000.00
SEMEN - 1 Delosit 1.00 zak 65,000.00 65,000.00 2 Gamping 1.00 kg - 3 Gamping Bongkahan 1.00 m3 - 4 Gamping Bubukan 1.00 m3 - 5 Kapur 1.00 m3 145,000.00 145,000.00 6 PC Gresik 1.00 kg 1,200.00 1,200.00 7 PC Grouting 1.00 kg - 8 PC Putih 1.00 kg - 9 PC Warna 1.00 kg 9,000.00 9,000.00
10 Semen 40 kg 1.00 zak 47,000.00 47,000.00 11 Semen 50 kg 1.00 zak 57,000.00 57,000.00 12 Semen Merah 1.00 m3 55,550.00 55,550.00 13 Semen putih 1.00 kg 61,000.00 61,000.00
- BUIS BETON -
1 Buis beton Ø 20 cm 1.00 bh - 2 Buis beton Ø 30 cm 1.00 bh - 3 Buis beton Ø 40 cm 1.00 bh - 4 Buis beton Ø 60 cm 1.00 bh - 5 Buis beton Ø 70 cm 1.00 bh - 6 Buis beton Ø 80 cm 1.00 bh - 7 Buis beton Ø 90 cm 1.00 bh - 8 Buis beton Ø 100 cm 1.00 bh 280,000.00 280,000.00 9 Buis beton U - Ø 20 cm 1.00 bh -
10 Buis beton U - Ø 30 cm 1.00 bh - 11 Pagar Panel (Precast Pabrik) tinggi 1.20 M 1.00 m' - 12 Pagar Panel (Precast Pabrik) tinggi 1.60 M 1.00 m' - 13 Pagar Panel (Precast Pabrik) tinggi 2.00 M 1.00 m' - 1415
BESI - 1 Baja WF dan Canal C 1.00 kg 9,800.00 9,800.00 2 Baut segala ukuran 1.00 kg - 3 Besi Bronjong 1.00 kg - 4 Besi baja paku-paku jembatan 1.00 kg - 5 Besi Plat Bordes 4"x8" tebal 3 mm 1.00 kg - 6 Besi plat 4"x8" tebal 2 mm 1.00 kg - 7 Besi plat strip uk. 3x30 mm - 6 m 1.00 kg 9,000.00 9,000.00 8 Walter Mour 1.00 bh - 9 Plat Besi tebal 1 cm 1.00 kg -
10 Angkur Bolt 12 cm 1.00 m' - 11 Pagar BRC uk. 1.2 x 2.4 M 1.00 unit - 12 Pagar BRC PMG 2.4 M 1.00 unit - 13 Pintu Swing Ganda BRC 1.00 unit - 14 Pintu Dorong Ganda BRC 1.00 unit - 15 Besi Beton Ulir 1.00 kg 7,200.00 7,200.00 16 Besi beton Polos 1.00 kg 7,100.00 7,100.00 17 Besi beugel / kavel 1.00 kg - 18 Besi Pipa Galvanis L-6m / Ø 2" 1.00 lnjr - 19 Besi Pipa Galvanis L-6m / Ø 2½" 1.00 lnjr - 20 Besi Pipa Galvanis L-6m / Ø 3" 1.00 lnjr - 21 Besi Pipa Galvanis L-6m / Ø 4" 1.00 lnjr - 22 Besi Pipa Galvanis L-6m / Ø ½" 1.00 lnjr - 23 Besi Pipa Galvanis L-6m / Ø ¾" 1.00 lnjr - 24 Besi Pipa Galvanis L-6m / Ø 1" 1.00 lnjr - 25 Besi Pipa Galvanis L-6m / Ø 1¼" 1.00 lnjr - 26 Besi plat kecil KS 3"- 6 m 1.00 lnjr - 27 Besi strip 1.00 kg 9,000.00 9,000.00 28 Besi Hollow 40/40 1.00 Bh 67,500.00 67,500.00 29 Besi Hollow 20/20 1.00 bH 51,000.00 51,000.00 30 Pagar Besi 1.00 m2 450,000.00 450,000.00
- ALUMUNIUM -
1 Aluminium Foil / Sesalation 1.00 kg - 2 Atap alumunium 1.00 kg - 3 Aluminium Truss Rangka Galvalume t=0.8 mm 1.00 m2 100,000.00 100,000.00 4 Alumunium Truss Rangka Galvalum t= 0.5 mm 1.00 m2 87,500.00 87,500.00 5 Alumunium bubung atap 1.00 m2 125,000.00 125,000.00 6 Alumunium Metal Clidding Colour 1.00 m2 485,000.00 485,000.00 7 Jendela alumunium coklat ex. INDALEX 1.00 m' 75,000.00 75,000.00 8 Jendela alumunium putih ex. INDALEX 1.00 m' 75,000.00 75,000.00 9 Kosen alumunium coklat ex. INDALEX 1.00 m' -
10 Kosen alumunium putih ex. INDALEX 1.00 m' - 11 Pintu alumunium 1.00 m2 - 12 Profil alumunium T 1.00 m' - 13 Atap Galvalume 1.00 bh -
Page 23 of 334
14 Bubungan atap Galvalume 4 mm 1.00 lmb - 15 Rolling Door 1.00 m2 -
KAWAT - 1 Kawat Elektrode 1.00 kg 21,000.00 21,000.00 2 Kawat Kabel Prestressed 1.00 kg - 3 Kawat bendrat 1.00 kg 10,500.00 10,500.00 4 Kawat beton / Bendrat RRT 1.00 kg - 5 Kawat duri / pagar 1.00 rol - 6 Kawat galvanis 2 mm 1.00 kg - 7 Kawat galvanis 3 mm 1.00 kg - 8 Kawat harmonika 1.00 m2 - 9 Kawat harmonika gas 1.00 m2 -
10 Kawat nyamuk / kasa Besi 1.00 m2 - 11 Kawat nyamuk / kasa plastik 1.00 m2 -
- PAKU -
1 Paku 1½ " 1.00 kg 11,000.00 11,000.00 2 Paku 1¼ " 1.00 kg 11,000.00 11,000.00 3 Paku 1" 1.00 kg 11,000.00 11,000.00 4 Paku 2" 1.00 kg 11,000.00 11,000.00 5 Paku 2½ " 1.00 kg 11,000.00 11,000.00 6 Paku 3" 1.00 kg 11,000.00 11,000.00 7 Paku 4" 1.00 kg 11,000.00 11,000.00 8 Paku 5" 1.00 kg 11,000.00 11,000.00 9 Paku 6" 1.00 kg 13,000.00 13,000.00
10 Paku Asbes segala ukuran 1.00 kg 13,000.00 13,000.00 11 Paku Beton 1.00 kg 20,000.00 20,000.00 12 Paku Kait segala ukuran 1.00 kg - 13 Paku Kayu segala ukuran 1.00 kg 13,000.00 13,000.00 14 Paku Keling 1.00 bh 12,500.00 12,500.00 15 Paku Payung 1.00 kg 13,000.00 13,000.00 16 Paku Reng 1.00 kg 11,000.00 11,000.00 17 Paku Seng Segala ukuran 1.00 kg 9,000.00 9,000.00 18 Paku Sumbat segala ukuran 1.00 bh 13,000.00 13,000.00 19 Paku Triplex 1.00 kg 12,000.00 12,000.00 20 Paku Usuk 1.00 kg 11,000.00 11,000.00 21 Paku Skrup segala ukuran 1.00 bh 150.00 150.00
- KAYU UMUM -
1 Kayu begisting lokal 1.00 m3 2,500,000.00 2,500,000.00 2 Kayu Parancah 1.00 m3 2,500,000.00 2,500,000.00
KAYU BORNEO - 1 Balok 1.00 m3 5,200,000.00 5,200,000.00 2 Papan 2 x 20 cm 1.00 m3 5,250,000.00 5,250,000.00 3 Papan 3 x 20 cm 1.00 m3 5,250,000.00 5,250,000.00 4 Papan 2 x 30 cm 1.00 m3 5,250,000.00 5,250,000.00 5 Reng 2/3 - 3/5 1.00 m3 5,200,000.00 5,200,000.00 6 Usuk 5/7 - 4/6 1.00 m3 5,200,000.00 5,200,000.00
KAYU MERANTI - 1 Balok 1.00 m3 3,800,000.00 3,800,000.00 2 Papan 2 x 20 cm 1.00 m3 2,200,000.00 2,200,000.00 3 Papan 3 x 20 cm 1.00 m3 4,100,000.00 4,100,000.00 4 Papan 2 x 30 cm 1.00 m3 - 5 Reng 2/3 - 3/5 1.00 m3 - 6 Usuk 5/7 - 4/6 1.00 m3 2,500,000.00 2,500,000.00 7 Kayu Meranti Papan 2/20 1.00 m3 -
KAYU DAMAR LAUT - 1 Balok p= 4 M 1.00 m3 - 2 Papan l=20 CM 1.00 m3 - 3 Usuk / FP = 4 M 1.00 m3 -
KAYU KRUING - 1 Balok 1.00 m3 2,650,000.00 2,650,000.00 2 Papan 2 x 20 cm 1.00 m3 - 3 Papan 3 x 20 cm 1.00 m3 - 4 Papan 2 x 30 cm 1.00 m3 - 5 Reng 2/3 - 3/5 1.00 m3 - 6 Usuk 5/7 - 4/6 1.00 m3 -
KAYU BENGKIRAI - 1 Balok 1.00 m3 - 2 Papan 2 x 20 cm 1.00 m3 - 3 Papan 3 x 20 cm 1.00 m3 - 4 Papan 2 x 30 cm 1.00 m3 - 5 Reng 2/3 - 3/5 1.00 m3 - 6 Usuk 5/7 - 4/6 1.00 m3 -
KAYU KAMPER - 1 Balok 1.00 m3 8,800,000.00 8,800,000.00 2 Papan 2 x 20 cm 1.00 m3 - 3 Papan 3 x 20 cm 1.00 m3 - 4 Papan 2 x 30 cm 1.00 m3 8,900,000.00 8,900,000.00 5 Reng 2/3 - 3/5 1.00 m3 3,850,000.00 3,850,000.00
Page 24 of 334
6 Usuk 5/7 - 4/6 1.00 m3 5,200,000.00 5,200,000.00 KAYU JATI Ex. MALANG -
1 Balok 1.00 m3 7,600,000.00 7,600,000.00 2 Papan 2 x 20 cm 1.00 m3 - 3 Papan 3 x 20 cm 1.00 m3 - 4 Papan 2 x 30 cm 1.00 m3 17,500,000.00 17,500,000.00 5 Reng 2/3 - 3/5 1.00 m3 15,000,000.00 15,000,000.00 6 Usuk 5/7 - 4/6 1.00 m3 -
KAYU JATI Ex. MADIUN / NGAWI - 1 Balok 1.00 m3 - 2 Papan 2 x 20 cm 1.00 m3 - 3 Papan 3 x 20 cm 1.00 m3 - 4 Papan 2 x 30 cm 1.00 m3 - 5 Reng 2/3 - 3/5 1.00 m3 - 6 Usuk 5/7 - 4/6 1.00 m3 -
KAYU JATI Ex. BOJONEGORO - 1 Balok 1.00 m3 12,500,000.00 12,500,000.00 2 Papan 2 x 20 cm 1.00 m3 13,000,000.00 13,000,000.00 3 Papan 3 x 20 cm 1.00 m3 13,500,000.00 13,500,000.00 4 Papan 2 x 30 cm 1.00 m3 - 5 Reng 2/3 - 3/5 1.00 m3 - 6 Usuk 5/7 - 4/6 1.00 m3 -
KAYU LAIN-LAIN - 1 Kayu bakar 1.00 m3 - 2 Kayu Bambu Ø 10 cm 1.00 btng 20,000.00 20,000.00 3 Kayu Bambu Ø 6-8 cm 1.00 btng 20,000.00 20,000.00 4 Bilik bambu 1.00 m2 - 5 Kayu Dolken Ø8 cm 1.00 btng 14,000.00 14,000.00 6 Gedeg 2 x 3 m 1.00 lbr 25,000.00 25,000.00 7 Kayu Albasiah 1.00 m3 - 8 Kayu Ramin 1.00 m3 - 9 List Kayu 2/4 1.00 m' -
10 List Kayu profil 1.00 m' - 11 Sirap 1.00 m3 -
ATAP - BUBUNGAN - TALANG - 1 Bubung Sirap 1.00 bh - 2 Bubung Genteng aspal 1.00 bh - 3 Bubung genteng beton 1.00 bh - 4 Bubung Genteng biasa ex. Malang 1.00 bh - 5 Bubung Genteng Karangpilang ex. Malang 1.00 bh - 6 Bubung Genteng Karangpilang ex. Surabaya 1.00 bh 22,500.00 22,500.00 7 Bubung Genteng Karangpilang ex. Trenggalek 1.00 bh - 8 Bubung Genteng kodok glazur 1.00 bh 9,500.00 9,500.00 9 Bubung Genteng Metal 1.00 bh -
10 Bubung Pelentong Kecil 1.00 bh - 11 Bubung Genteng Pelentong besar / super 1.00 bh - 12 Bubung Genteng prss ex. Trenggalek 1.00 bh - 13 Bubung Atap seng galvalum 1.00 m2 - 14 Bubung Paten 0,92 m 1.00 lmb - 15 Bubung Paten 1,o5 m 1.00 lmb - 16 Bubung Paten 1,08 m 1.00 lmb - 17 Bubung Seng gelombang 1.00 lmb - 18 Bubung Stel Gelombang 0,92 m 1.00 lmb - 19 Bubung Stel Gelombang 1,05 m 1.00 lmb - 20 Bubung Stel Gelombang 1,08 m 1.00 lmb - 21 Bubung stel rata 0,92 m 1.00 lmb - 22 Bubung stel rata 0,92 m 1.00 lmb - 23 Genteng Aspal 1.00 lmb - 24 Genteng Beton 1.00 bh - 25 Genteng Beton Maestro Royal 1.00 bh - 26 Genteng Biasa ex. Malang 1.00 bh - 27 Genteng kaca 1.00 bh - 28 Genteng Kaca Beton Kupu-kupu 1.00 bh - 29 Genteng Kaca Kodok Kupu-kupu 1.00 bh - 30 Genteng Karangpilang ex. Malang 1.00 bh - 31 Genteng Karangpilang ex. Surabaya 1.00 bh 4,500.00 4,500.00 32 Genteng Karangpilang ex. Trenggalek 1.00 bh - 33 Genteng Keramik Natural KIA 1.00 bh - 34 Genteng Keramik Warna KIA 1.00 bh 6,800.00 6,800.00 35 Genteng Kodok Glazuur 1.00 bh - 36 Genteng Kodok Good Years 1.00 bh 6,800.00 6,800.00 37 Genteng Metal 1.00 bh - 38 Genteng Palentong kecil 1.00 bh - 39 Genteng kaca Palentong supr / besar 1.00 bh - 40 Genteng Press Trenggalek 1.00 bh - 41 Asbes Gelombang 4 mm 300 x 1,05 m 1.00 lmb - 42 Asbes Gelombang 4 mm 240 x 1,05 m 1.00 lmb - 43 Asbes Gelombang 4 mm 210 x 1,05 m 1.00 lmb - 44 Asbes Gelombang 4 mm 150 x 1,05 m 1.00 lmb - 45 Asbes Gelombang 5 mm 250 x 0,92 m 1.00 lmb -
Page 25 of 334
46 Asbes Gelombang 5 mm 225 x 0,92 m 1.00 lmb - 47 Asbes Gelombang 5 mm 180 x 0,92 m 1.00 lmb - 48 Asbes Gelombang 11 Atrisco 150 x 80 x 3,5 mm 1.00 lmb - 49 Asbes Gelombang 14 Atrisco 150 x105 x 4 mm 1.00 lmb - 50 Asbes Gelombang 4 Atrisco 150x105x4mm 1.00 lmb - 51 Asbes Gelombang 6,5 Atrisco 150x110x5mm 1.00 lmb - 52 Asbes Gelombang Besar Jabesmen 300x102x5 mm 1.00 lmb - 53 Asbes Gelombang Kecil Jabesmen 380x105x4mm 1.00 lmb - 54 Asbes Gelombang 200x0.92x 5mm 1.00 lmb - 55 Asbes Gelombang 270x108x6mm 1.00 lmb - 56 Asbes Gelombang 210x108x6mm 1.00 lmb - 57 Asbes Gelombang 180x108x6mm 1.00 lmb - 58 Asbes Nok Gelombang ex. Atrisco 11 - 30x80x3,5mm 1.00 lmb - 59 Asbes Nok Gelombang ex. Atrisco 14- 30x105x4mm 1.00 lmb - 60 Asbes Nok Gelombang ex. Atrisco 6,5 -50x110x5mm 1.00 lmb - 61 Asbes Gelombang 270x105x4 mm 1.00 lmb - 62 Atap Policarbonat 1.00 m2 105,932.20 105,932.20 63 Roof Light Fibreglass 1.00 m2 - 64 Seng Datar ex. Elephant 0,2x30 cm 1.00 lmb - 65 Seng Datar ex. Elephant 0,30 x 50 cm 1.00 lmb - 66 Seng Datar ex. Elephant 0,40 x 90 cm 1.00 lmb - 67 Seng Gelombang ex. Elephant 180x80x0,2 cm 1.00 lmb 44,000.00 44,000.00 68 Seng Gelombang ex. Elephant 210x80x0,20 cm 1.00 lmb - 69 Seng Gelombang ex. Elephant 240x80x0,2 cm 1.00 lmb - 70 Seng Gelombang ex. Elephant 300x80x0,2 cm 1.00 lmb - 71 Seng Plat BJLS L= 0,45 m 1.00 m' - 72 Seng Plat BJLS L= 0,60 m 1.00 m' - 73 Seng Plat BJLS L= 0,90 m 1.00 m' 38,000.00 38,000.00 74 Seng Plat BJLS 24 1.00 lmb - 75 Seng Plat BJLS 28 1.00 lmb - 76 Soft Board 1.00 lmb - 77 Talang Plastik Biasa 50 cm 1.00 bh - 78 Talang Plastik Biasa 60 cm 1.00 bh - 79 Talang Plastik Biasa 75 cm 1.00 bh - 80 Talang Plastik Biasa 90 cm 1.00 bh - 81 Talang PVC kotak 4 x 13 cm 1.00 bh - 82 Glass wol 1.00 Rol 925,000.00 925,000.00 83 Roof Mes 1.00 Rol 450,000.00 450,000.00 84 Alluminium foil /insulation double side 1.00 Rol 1,250,000.00 1,250,000.00 85 Allumunium Tape 1.00 Rol 26,500.00 26,500.00
PLAFOND - 1 Akustik 30x30 cm 1.00 lbr - 2 Akustik 30x60 cm 1.00 lbr - 3 Akustik 60x120 cm 1.00 lbr - 4 Asbes 100x100x6 mm 1.00 lbr 12,500.00 12,500.00 5 Asbes 100x100x5 mm 1.00 lbr - 6 Asbes 100x100x4 mm 1.00 lbr - 7 Asbes 100x100x3,5 mm 1.00 lbr - 8 Asbes rata jabesmen 50 x 100 mm 1.00 lbr - 9 Asbes super rata Atrisco 50 x 100 x 2,8 mm 1.00 lbr -
10 Kalsiboard 1,00x1,00 ex. Gresik 1.00 lbr - 11 Kalsiboard 1,20x2,40 ex. Gresik 1.00 lbr - 12 Gyp board 1,20x2,40 m tabal 9 mm 1.00 lbr 65,000.00 65,000.00 13 Gypsum board 1,20x2,40 m tabal 12 mm 1.00 lbr 110,000.00 110,000.00 14 List Gypsum lebar 7 cm 1.00 m' - 15 List Gypsum lebar 12 cm 1.00 m' - 16 List Gypsum lebar 15 cm 1.00 m' 15,000.00 15,000.00 17 List Profil Kayu Kamper 1/7 1.00 m' - 18 List Profil Kayu Kamper 1/10 1.00 m' 10,000.00 10,000.00 19 List Profil Kayu Kamper 1/15 1.00 m' - 20 List kayu jati profil 1.5/15 1.00 m' - 21 List kayu pelipit meranti 1.00 m' - 22 Papan GRC t= 9mm lebar= 20 cm 1.00 m' - 23 Papan GRC t= 9mm lebar= 30 cm 1.00 m' - 24 GRC lengkung tinggi 7,5 cm 1.00 m2 - 25 Rangka metal furing 1.00 m2 25,000.00 25,000.00 26 Stifenner 1.00 m2 10,000.00 10,000.00 27 Juster penggantung 1.00 m2 2,500.00 2,500.00 28 Joint Tape 1.00 m2 6,500.00 6,500.00 29 Jointing Compound 1.00 m2 8,500.00 8,500.00 30 Steger 1.00 m2 -
KAYU LAPIS - 1 Multiplex tebal = 6 mm 1.00 lbr 65,000.00 65,000.00 2 Multiplex tebal = 9 mm 1.00 lbr 125,000.00 125,000.00 3 Multiplex tebal = 10 mm 1.00 lbr 121,500.00 121,500.00 4 Multiplex tebal = 12 mm 1.00 lbr 100,000.00 100,000.00 5 Multiplex tebal = 18 mm 1.00 lbr 180,000.00 180,000.00 6 Plywood 30 x 60 cm x 4 mm 1.00 m2 59,700.00 59,700.00 7 Plywood 30 x 60 cm x 6 mm 1.00 m2 83,500.00 83,500.00 8 Plywood 60 x 120 cm x 3 mm 1.00 m2 54,250.00 54,250.00
Page 26 of 334
9 Plywood 60 x 120 cm x 6 mm 1.00 m2 83,500.00 83,500.00 10 Plywood 120 x 240 cm x 3 mm 1.00 m2 56,000.00 56,000.00 11 Plywood lapis Aluminium 1.00 m2 108,350.00 108,350.00 12 Teakwood 30 x 60 cm x 4 mm 1.00 lbr 95,000.00 95,000.00 13 Teakwood 60 x 120 cm x 4 mm 1.00 lbr 95,000.00 95,000.00 14 Teakwood 120 x 240 cm x 3 mm 1.00 lbr 75,000.00 75,000.00 15 Triplex 3 mm 1.00 m2 40,000.00 40,000.00 16 Triplex 4 mm 1.00 m2 48,000.00 48,000.00
K A C A - 1 Daun pintu kaca tempered 8 mm 1.00 unit - 2 Glass Block 1.00 bh 25,000.00 25,000.00 3 Jendela Naco + assesories 1.00 m2 - 4 Kaca Buram tebal = 3 mm 1.00 m2 - 5 Kaca Buram tebal = 5 mm 1.00 m2 - 6 Kaca Buram tebal = 8 mm 1.00 m2 - 7 Kaca Buram tebal = 12 mm 1.00 m2 - 8 Kaca Cermin tebal = 5 mm 1.00 m2 175,000.00 175,000.00 9 Kaca Cermin tebal = 6 mm 1.00 m2 -
10 Kaca Cermin tebal = 8 mm 1.00 m2 - 11 Kaca Stopsol Blue Grey 6 mm 1.00 m2 - 12 Kaca Stopsol Blue Grey 8 mm 1.00 m2 - 13 Cladding Wall ex. Indal 1.00 m2 - 14 Curtain Wall 1.00 m' - 15 Sealent 1.00 klg 21,000.00 21,000.00 16 Kaca hitam Asahi 3 mm 1.00 m' - 17 Kaca Patri 4 mm 1.00 m' - 18 Kaca polos tebal = 3 mm 1.00 m' 75,000.00 75,000.00 19 Kaca polos tebal = 5 mm 1.00 m' 70,000.00 70,000.00 20 Kaca polos tebal = 8 mm 1.00 m' 130,000.00 130,000.00 21 Kaca polos Asahi tebal = 3 mm 1.00 m' - 22 Kaca polos Asahi tebal = 5 mm 1.00 m' 75,000.00 75,000.00 23 Kaca polos Asahi tebal = 8 mm 1.00 m' 140,000.00 140,000.00 24 Kaca Polos tebal = 12 mm 1.00 m' 240,000.00 240,000.00 25 Kaca Rayben tebal = 12 mm 1.00 m' - 26 Kaca Rayben tebal = 3 mm 1.00 m' - 27 Kaca Rayben tebal = 5 mm 1.00 m2 115,000.00 115,000.00 28 Kaca Rayben tebal = 8 mm 1.00 m2 125,000.00 125,000.00 29 Kaca " Wireglass" 1.00 daun - 30 Kaca Panting 1.00 m2 -
PENGGANTUNG - PENGUNCI - 1 Door Closer ex. Dorma 1.00 bh - 2 Door Closer ex. Alpha 1.00 bh - 3 Door Holder 1.00 bh - 4 Door Stop Import 1.00 bh - 5 Door Stop Diamond 1.00 bh - 6 Engsel Angin ex. Kuda 1.00 bh - 7 Engsel Jendela 1.00 bh 10,000.00 10,000.00 8 Engsel Jendela ex. Kuda 1.00 bh - 9 Engsel Kuningan Arch 1.00 bh 35,000.00 35,000.00
10 Engsel Pintu 1.00 bh 17,500.00 17,500.00 11 Engsel Pintu ex. Kuda 1.00 bh 32,500.00 32,500.00 12 Engsel Pintu H 1.00 bh 20,000.00 20,000.00 13 Grendel 3" ex. Muller 1.00 bh - 14 Grendel Biasa Besar ex. RRC 1.00 bh - 15 Grendel Biasa kecil ex. RRC 1.00 bh - 16 Grendel jendela kuningan 1.00 bh 19,500.00 19,500.00 17 Grendel pintu 1.00 bh 23,000.00 23,000.00 18 Grendel Espanyolet 1.00 bh - 19 Hak Angin 1.00 bh 45,000.00 45,000.00 20 Kunci Pintu KM/WC 1.00 ps 35,200.00 35,200.00 21 Kait Angin 1.00 bh - 22 Kunci Lemari 1.00 bh - 23 Kunci Pintu Napoli 1.00 bh - 24 Kunci Silinder 1.00 bh 35,200.00 35,200.00 25 Kunci Silinder Kuda 1.00 bh - 26 Kunci Slot 1.00 bh - 27 Kunci SES 1.00 bh - 28 Sealant 1.00 klg 21,000.00 21,000.00 29 Kunci Tanam 1.00 bh 142,000.00 142,000.00 30 Kunci Tanam antik 1.00 bh 250,000.00 250,000.00 31 Pegangan pintu kuningan 1.00 bh - 32 Pleser Lokal 8 mm 1.00 bh - 33 Pleser Lokal 10 mm 1.00 bh - 34 Pleser Lokal 12 mm 1.00 bh - 35 Rel pintu dorong 1.00 bh - 36 Slot / Kunci Pintu 1.00 bh - 37 Spring Knip 1.00 bh - 38 Pleser Lokal 16 mm 1.00 set - 39 Espanyolet 1.00 bh - 40 Fitrase 1.00 m2 -
Page 27 of 334
41 Foam Lapisan Karpet 1.00 m2 - 42 Karpet Standart 1.00 m2 - 43 Vertical Blid 1.00 m2 - 44 Kunci 2 Slaag setara LOGO-CISA 1.00 set 245,000.00 245,000.00 45 Handle set ( lever handle) 1.00 bh - 46 Pull Handle 40 SST dia 11/4" 1.00 set - 47 Kunci Pintu KM/WC 1.00 set - 48 Engsel Cashment 24" 1.00 set - 49 Slot Jendela 1.00 bh - 50 Kunci Slot 1.00 bh - 51 Hak Angin ( tipe Geser ) 1.00 bh - 52 Rel Pintu Geser 1.00 bh - 53 Door Closer 1.00 set 1,240,000.00 1,240,000.00 54 Flust Bolt 1.00 bh - 55 Panic handle 1.00 bh - 56 Floor Hinge 1.00 set - 57 Kick plate SS 1.00 set - 58 Bottom Patch 1.00 bh - 59 Top Patch 1.00 bh - 60 Top Pivot Plate 1.00 bh - 61 Corner lock 1.00 bh - 62 Mohair 1.00 m1 - 63 Dinabolt D 12 mm 1.00 bh - 64 Pisher D 5 mm 1.00 bh -
CAT MARKA JALAN - 1 Cat Thermolpastic Aastho M.249-77 1.00 kg - 2 Cat Thermolpastic Aastho M.249-79 1.00 kg - 3 Glassbed pottes 1.00 kg -
CAT KAYU / BESI / TEMBOK / GENTING. - 1 Amplas kasar 1.00 kg 3,000.00 3,000.00 2 Cat anti karat ex. Avian 1.00 kg 55,000.00 55,000.00 3 Cat Besi ex. Avian 1.00 kg 40,000.00 40,000.00 4 Cat Besi EMCO 1.00 kg 42,500.00 42,500.00 5 Cat Besi Patna 1.00 kg - 6 Cat dasar Besi 1.00 kg 45,000.00 45,000.00 7 Cat dasar Kayu 1.00 kg 29,500.00 29,500.00 8 Cat dasar Tembok 1.00 kg 10,500.00 10,500.00 9 Thinner / Minyak cat type A Biasa 1.00 kg 22,500.00 22,500.00
10 Thinner / Minyak cat type A Spesial 1.00 kg 14,500.00 14,500.00 11 Thinner / Minyak cat type B 1.00 kg 9,000.00 9,000.00 12 Cat Genteng Impra 1.00 kg - 13 Cat Genteng / Seng Belmas 1.00 kg - 14 Cat Genteng Aga 1.00 kg - 15 Cat Genteng 1.00 kg 23,000.00 23,000.00 16 Cat Kayu 1.00 kg 40,000.00 40,000.00 17 Cat Kayu Avian 1.00 kg - 18 Dempul Padang 1.00 kg 27,100.00 27,100.00 19 Dempul Coklat 1.00 bh - 20 Dempul Jadi 1.00 kg - 21 Filler 1.00 kg - 22 Kalkarium 1.00 kg - 23 Kapur Sirih 1.00 kg - 24 Kertas Gosok 1.00 lmb - 25 Cat Tembok Ex. Decolith 1.00 kg - 26 Cat Tembok Ex. Paragon 1.00 kg - 27 Cat Tembok Ex. Catylac INTERIOR 1.00 kg 12,500.00 12,500.00 28 Cat Tembok Ex. Catylac EXTERIOR 1.00 kg 26,500.00 26,500.00 29 Cat Tembok Ex. Mowilex warna Standart 1.00 kg - 30 Cat Tembok Ex. Mowilex warna khusus 1.00 kg - 31 Cat Tembok Ex. Vinilex 1.00 kg - 32 Cat Tembok Ex. Avitex 1.00 kg - 33 Cat Tembok Ex. Altex 1.00 kg - 34 Cat Tembok Ex. Levi's Exterior 1.00 kg - 35 Cat Tembok Ex. Levi's Interior 1.00 kg - 36 Cat Tembok Ex. Flora. 1.00 kg - 37 Kuas ukuran 1 RRT 1.00 bh - 38 Kuas ukuran 1,5 RRT 1.00 bh - 39 Kuas ukuran 2 RRT 1.00 bh - 40 Kuas ukuran 2,5 RRT 1.00 bh - 41 Kuas ukuran 3 RRT 1.00 bh - 42 Kuas ukuran 4 RRT 1.00 bh - 43 Kuas ukuran 5 RRT 1.00 bh - 44 Kuas Rol 1.00 bh 7,500.00 7,500.00 45 Lem Vinyl 1.00 kg 62,500.00 62,500.00 46 Lem Kayu 1.00 ltr 22,000.00 22,000.00 47 Lem Rajawali 1.00 kg - 48 Lem pipa PVC 1.00 kg - 49 Plamur Besi 1.00 kg - 50 Plamur Besi ex. Pedang 1.00 kg - 51 Plamur Kayu 1.00 kg -
Page 28 of 334
52 Plamur Kayu ex. Pedang 1.00 kg - 53 Plamur Tembok ex. Paragon 1.00 kg - 54 Plamur Tembok 1.00 kg 7,500.00 7,500.00 46 Spirtus 1.00 ltr 10,500.00 10,500.00 47 Teak Oil 1.00 ltr - 48 Residu 1.00 ltr - 49 Politur dasar 1.00 ltr - 50 Politur jadi ex. Mowilex 1.00 ltr - 51 Water Proffing 1.00 kg 45,000.00 45,000.00 52 Vernish Jadi 1.00 ltr - 53 Wood Filler 1.00 kg 75,000.00 75,000.00 54 Pewarna 1.00 sach 75,000.00 75,000.00 55 Kertas gosok No. 150 1.00 lbr 3,000.00 3,000.00 56 Kertas gosok no280 1.00 lbr 3,000.00 3,000.00 57 Shanding 1.00 kg 65,000.00 65,000.00 58 Clear Doof 1.00 kg 45,000.00 45,000.00 59 Coumpond 1.00 klng 40,000.00 40,000.00 60 Sewa alat bantu ( 1 set @ 3 alat ) 1.00 set 1,500,000.00 1,500,000.00 61 Sewa compresor 1.00 jam - 62 Soda Api 1.00 kg - 63 Serat fiber 1.00 m2 - 64 Wallpaper Eksklusif 1.00 m' 20,000.00 20,000.00 65 Sirlak 1.00 kg 178,000.00 178,000.00
KERAMIK - UBIN - 1 Gymfloor 1.00 m2 287,000.00 287,000.00 2 Internal Cove 5 x 5 x 20 cm 1.00 bh - 3 Keramik Lantai Artistik 5 x 20 1.00 bh - 4 Keramik lantai Artistik 10 x 10 1.00 bh - 5 Keramik Dinding 20 x 20 1.00 m2 - 6 Keramik lantai 20 x 20 Motif 1.00 m2 38,000.00 38,000.00 7 Keramik lantai 20 x 20 KM/WC 1.00 m2 - 8 Keramik lantai 20 x 20 putih MULIA 1.00 m2 - 9 Keramik lantai 20 x 20 Warna /Motif 1.00 m2 -
10 Keramik Dinding 20 x 25 1.00 m2 46,000.00 46,000.00 11 Keramik Dinding 20 x 25 polos`MULIA 1.00 m2 46,000.00 46,000.00 12 Keramik Dinding 20 x 25 Warna / Motif Mulia 1.00 m2 - 13 Keramik Lantai 30 x 30 Putih 1.00 m2 - 14 Keramik Lantai 30 x 30 Putih Mulia 1.00 m2 - 15 Keramik Lantai 30 x 30 Warna Mulia 1.00 m2 - 16 Keramik Lantai 30 x 30 Warna / Motif 1.00 m2 65,000.00 65,000.00 17 Keramik Lantai 40 x 40 Putih 1.00 m2 - 18 Keramik Lantai 40 x 40 Warna / Motif 1.00 m2 60,000.00 60,000.00 19 Keramik Lantai 40 x 40 Warna Mulia 1.00 m2 - 20 Plint Keramik Lntai 10 x 20 1.00 bh - 21 Plint Keramik Lantai 10 x 30 1.00 bh - 22 Plint Keramik Lantai 10 x 40 1.00 bh 37,400.00 37,400.00 23 Plint Ubin Terraso 10 x 30 1.00 bh - 24 Plint Ubin PC abu-abu 15 x 20 1.00 bh - 25 Ubin Granito warna Essenza 30 x 30 1.00 m2 - 26 Ubin Granito warna Hitam Essenza 60 x 60 1.00 m2 250,000.00 250,000.00 27 Ubin Panel Accura 20 x 25 - 12 lembar 1.00 m2 - 28 Ubin Panel Accura 20 x 25 - 20 lembar 1.00 m2 - 29 Ubin Panel Accura 20 x 25 - 4 lembar 1.00 m2 - 30 Ubin Panel Accura 20 x 25 - 6 lembar 1.00 m2 - 31 Marmer 100 x 100 1.00 m2 265,000.00 265,000.00 32 Marmer kwalitas export warna pink 0,60x 1m 1.00 m2 - 33 Marmer kw export warna krem 0,60 x 1 m 1.00 m2 - 34 Marmer kw export warna trotol dasar 0,60 x 1 m 1.00 m2 - 35 Batu GRANIT import Italy 1.00 m2 325,000.00 325,000.00 36 Texture GRANITONE 1.00 m2 - 37 PAVINGST ( K.125 ) warna abu2 t=8cm 1.00 m2 - 38 PAVINGST ( K.125 ) warna abu2 t=6cm 1.00 m2 - 39 PAVINGST KW.I tebal=8cm ( K.300) 1.00 m2 - 40 PAVINGST KW.I tebal=6cm ( K.300) 1.00 m2 - 41 Gress Block Beton 10 x 40 x 60 cm 1.00 m2 - 42 Karpet World Class 1.00 m2 - 43 Wallpaper Eksklusif 1.00 m2 - 44 Kansteen BDCM 1.00 m2 - 45 Kansteen 1.00 M' - 46 Stoper / uskup tebal 6 cm 1.00 m2 - 47 Stoper / uskup tebal 8 cm 1.00 m2 - 48 Floor Hardener 1.00 kg 25,000.00 25,000.00 49 Granite Tile Ukuran 30 x 30 Polished 1.00 m² 175,000.00 175,000.00 50 Granite Tile Ukuran 30 x 30 Unpolished 1.00 m² - 51 Granite Tile Ukuran 60 x 60 Polished 1.00 m² 250,000.00 250,000.00 52 Granite Tile Ukuran 60 x 60 Unpolished 1.00 m² - 53 Kansteen Uk. 15.18.40 1.00 bh - 54 Bumper Guard terpasang 1.00 m' - 55 Rail Guard terpasang 1.00 m' - 56 Bed Head terpasang 1.00 m' -
Page 29 of 334
57 Cubical Toilet terpasang 1.00 unit - 58 Timbal Sheet terpasang 1.00 m2 -
PERLENGK.KM - WC. - 1 Avoer plastik 1.00 bh - 2 Avoer stainless 1.00 bh - 3 Bathub Porselin 1.00 bh - 4 Bak Cuci Stainless Steel Ex. Maspion 1.00 bh - 5 Kaca Cermin 5 mm + Bevel 2 cm 1.00 M2 37,500.00 37,500.00 6 Closet Duduk ex. INA 1.00 bh 1,750,000.00 1,750,000.00 7 Closet Duduk Putih Porselin Komplit ex. INA 1.00 bh - 8 Closet Duduk Warna Porselin komplit ex. TOTO 1.00 bh - 9 Closet Jongkok putih ex. INA 1.00 bh -
10 Closet Jongkok Warna ex. TOTO 1.00 bh - 11 Closet Duduk Putih Porselin Komplit ex. INA Lux 1.00 bh - 12 Closet Jongkok putih ex. INA KW.A 1.00 bh - 13 Closet Jongkok Warna ex. TOTO Lux 1.00 bh - 14 Kran Air ؽ" 1.00 bh - 15 Kran Air ؽ" ex. Cina 1.00 bh - 16 Kran Air ؾ" 1.00 bh - 17 Kran Air ؾ" ex. Omeo 1.00 bh - 18 Kran Bathub Panas dan Dingin 1.00 bh - 19 Flexible 36 cm 1.00 bh - 20 Flexible 45 cm 1.00 bh - 21 Flexible 60 cm 1.00 bh 60,000.00 60,000.00 22 Flexible MB 30 cm 1.00 bh - 23 Flexible MB 40 cm 1.00 bh - 24 Seal Tape / Rol TBA 1.00 bh 115,000.00 115,000.00 25 Shower Spray ex. TOTO TX 403 SP1V 1.00 bh - 26 Sifon TOTO U-370 M 1.00 bh - 27 Stopkran air TOTO TS251 FT2 1.00 bh - 28 Tempat sabun keramik 1.00 bh - 29 Urinoar keramik 1.00 bh - 30 Washtafel lokal besar 1.00 bh 880,000.00 880,000.00 31 Washtafel lokal Kecil 1.00 bh - 32 Floor Drain (TOTO TX 1 B) 1.00 unit 115,000.00 126,500.00 33 Wastafel Meja Warna Standard Lengkap (L 546) 1.00 unit 1,000,000.00 1,100,000.00 34 Urinoar Type Muslim (U 57 M) 1.00 unit 1,245,000.00 1,394,400.00 35 Kran air Ø 1/2" atau Ø 3/4" (TOTO T23 B13) 1.00 bh 115,000.00 132,250.00 36 Kran Sink 1.00 bh - 37 Jet Washer (TOTO TX 423 SVINCR) 1.00 bh 95,000.00 109,250.00 38 Wastafel Gantung (L 237 V3) 1.00 unit - 39 Closet Duduk Standard lengkap TOTO C 48 1.00 unit 1,250,000.00 1,437,500.00 40 Closet Duduk TOTO CW 660 J 1.00 unit - 41 Closet Duduk Type difable (TOTO CW 705 L) 1.00 unit - 42 Kitchen Zink Stainless Standard Lokal ( 1 Lobang ) 1.00 bh - 43 Bak mandi fibergalss 1.00 bh - 44 Soap Holder (TOTO S 11 N) 1.00 bh 25,000.00 31,250.00 45 Tisue Holder (TS 116 R) 1.00 bh - 46 Hand Dryer 1.00 bh - 47 Towel Shelf (TOTO TX 4 A) 1.00 bh - 48 Towel Ring (TOTO TS 115 S) 1.00 bh - 49 Grab Bar (TOTO TX3 A2) 1.00 bh - 50 Double robe hook (TS 118 WS) 1.00 bh - 51 Partisi Ruang Closet 1.00 bh - 52 Kloset Jongkok 1.00 bh - 53 Flush Valve 1.00 bh - 54 Seal Tape 1.00 bh 7,500.00 8,625.00 55 Patisi Penyekat Urinoir (TOTO A 100) 1.00 bh - 56 Slop Sink 1.00 bh - 57 Single Lever Bath & Shower set (TOTO TX 432 SDZ) 1.00 bh -
PIPA DAN ACCESSORIES - 1 K / 100 PVC Ø 1,5 " 1.00 bh - 2 Knee Maspion Ø 1½" 1.00 bh - 3 Knee Maspion Ø 1" 1.00 bh - 4 Knee Maspion Ø ½" 1.00 bh - 5 Knee Maspion Ø 2½" 1.00 bh - 6 Knee Maspion Ø 2" 1.00 kg - 7 Knee Maspion Ø 3" 1.00 bh - 8 Knee Maspion Ø ¾" 1.00 bh - 9 Knee Maspion Ø 4" 1.00 bh -
10 Knee Galvanis Ø ½ " 1.00 bh - 11 Knee Galvanis Ø ¾ " 1.00 bh - 12 Knee Galvanis Ø1 " 1.00 bh - 13 Knee Galvanis Ø 1½ " 1.00 bh - 14 Knee Galvanis Ø2 " 1.00 bh - 15 Knee Galvanis Ø 2½ " 1.00 bh - 16 Knee Galvanis Ø3 " 1.00 bh - 17 Knee Galvanis Ø4 " 1.00 bh - 18 Knee PVC Ø ½ " 1.00 bh - 19 Knee PVC Ø 11/2 " 1.00 bh 6,900.00 6,900.00
Page 30 of 334
20 Knee PVC Ø 1 " 1.00 bh - 21 Knee PVC Ø 4 " 1.00 bh 56,100.00 56,100.00 22 Knee PVC Ø3 " 1.00 bh 27,370.00 27,370.00 23 Pipa Galvanis Ø ½ " 1.00 ljr - 24 Pipa Galvanis Ø ¾ " 1.00 ljr - 25 Pipa Galvanis Ø 1 " 1.00 ljr 864,000.00 864,000.00 26 Pipa Galvanis Ø 1½ " 1.00 ljr 1,290,000.00 1,290,000.00 27 Pipa Galvanis Ø 2 " 1.00 ljr 1,890,000.00 1,890,000.00 28 Pipa Galvanis Ø 3 " 1.00 ljr 2,952,000.00 2,952,000.00 29 Pipa PVC Type AW Ø ½ " 1.00 ljr - 30 Pipa PVC Type AW Ø ¾ " 1.00 ljr - 31 Pipa PVC Type AW Ø 1 " 1.00 ljr - 32 Pipa PVC Type AW Ø 1½ " 1.00 ljr - 33 Pipa PVC Type AW Ø 2 " 1.00 ljr - 34 Pipa PVC Type AW Ø 2½ " 1.00 ljr - 35 Pipa PVC Type AW Ø 3 " 1.00 ljr 245,000.00 245,000.00 36 Pipa PVC Type AW Ø 4 " 1.00 ljr 360,000.00 360,000.00 37 Pipa PVC Type AW Ø 6 " 1.00 ljr 452,000.00 452,000.00 38 Pipa PVC Type AW Ø 8 " 1.00 ljr - 39 Pipa PVC Type C Ø ½ " 1.00 ljr - 40 Pipa PVC Type C Ø ¾ " 1.00 ljr - 41 Pipa PVC Type C Ø 1" 1.00 ljr - 42 Pipa PVC Type C Ø 1½ " 1.00 ljr - 43 Pipa PVC Type C Ø 2 " 1.00 ljr - 44 Pipa PVC Type C Ø 2½ " 1.00 ljr - 45 Pipa PVC Type C Ø 3 " 1.00 ljr - 46 Pipa PVC Type C Ø 4 " 1.00 ljr - 47 Pipa PVC Type D Ø ½ " 1.00 ljr - 48 Pipa PVC Type D Ø ¾ " 1.00 ljr - 49 Pipa PVC Type D Ø 1" 1.00 ljr - 50 Pipa PVC Type D Ø 1½ " 1.00 ljr - 51 Pipa PVC Type D Ø 2 " 1.00 ljr - 52 Pipa PVC Type D Ø 2½ " 1.00 ljr - 53 Pipa PVC Type D Ø 3 " 1.00 ljr - 54 Pipa PVC Type D Ø 4 " 1.00 ljr - 55 Pipa Screen PVC Type AW Ø6" 1.00 ljr - 56 Shock Galvanis Ø ½ " 1.00 bh - 57 Shock Galvanis Ø ¾ " 1.00 bh - 58 Shock Galvanis Ø 1 " 1.00 bh - 59 Shock Galvanis Ø 1½ " 1.00 bh - 60 Shock Galvanis Ø 2 " 1.00 bh - 61 Shock Galvanis Ø 2½ " 1.00 bh - 62 Shock Galvanis Ø 3 " 1.00 bh - 63 Shock Galvanis Ø 4 " 1.00 bh - 64 Shock Maspion Ø ½" 1.00 bh - 65 Shock Maspion Ø ¾" 1.00 bh - 66 Shock Maspion Ø 1" 1.00 bh - 67 Shock Maspion Ø 1¼" 1.00 bh - 68 Shock Maspion Ø 2" 1.00 bh - 69 Shock Maspion Ø 3" 1.00 bh - 70 Shock Maspion Ø 4" 1.00 bh - 71 Shock PVC Ø ½" 1.00 bh - 72 Shock PVC Ø ¾" 1.00 bh - 73 Shock PVC Ø 1" 1.00 bh - 74 Shock PVC Ø 1½" 1.00 bh 5,400.00 5,400.00 75 Shock PVC Ø 2" 1.00 bh - 76 Shock PVC Ø 2½" 1.00 bh - 77 Shock PVC Ø 3" 1.00 bh 20,700.00 20,700.00 78 Shock PVC Ø 4" 1.00 bh 41,100.00 41,100.00 79 Pipa PVC Moof m' S-12,5 - Ø ½" 1.00 btng - 80 Pipa PVC Moof m' S-12,5 - Ø ¾" 1.00 btng - 81 Pipa PVC Moof m' S-12,5 - Ø 1" 1.00 btng - 82 Pipa PVC Moof m' S-12,5 - Ø 1½" 1.00 btng 32,500.00 32,500.00 83 Pipa PVC Moof m' S-12,5 - Ø 2" 1.00 btng - 84 Pipa PVC Moof m' S-12,5 - Ø 2½" 1.00 btng - 85 Pipa PVC Moof m' S-12,5 - Ø 3" 1.00 btng 92,220.00 92,220.00 86 Pipa PVC Moof m' S-12,5 - Ø 4" 1.00 btng 130,000.00 130,000.00 87 Pipa PVC Moof m' S-12,5 - Ø 6" 1.00 btng - 88 Pipa PVC Moof m' S-12,5 - Ø 8" 1.00 btng - 89 Pipa PVC Moof m' S-12,5 - Ø 10" 1.00 btng - 90 Pipa PVC Moof m' S-12,5 - Ø 12" 1.00 btng - 91 Pipa Air GI Ø ½" - Tebal = 1,5 mm 1.00 btng - 92 Pipa Air GI Ø ½" - Tebal = 1,8 mm 1.00 btng - 93 Pipa Air GI Ø ½" - Tebal = 2,0 mm 1.00 btng - 94 Pipa Air GI Ø ½" - Tebal = 2,2 mm 1.00 btng - 95 Pipa Air GI Ø ¾" - Tebal = 1,5 mm 1.00 btng - 96 Pipa Air GI Ø ¾" - Tebal = 1,8 mm 1.00 btng - 97 Pipa Air GI Ø ¾" - Tebal = 2,0 mm 1.00 btng - 98 Pipa Air GI Ø 1" - Tebal = 1,8 mm 1.00 btng - 99 Pipa Air GI Ø 1" - Tebal = 2,0 mm 1.00 btng -
Page 31 of 334
100 Pipa Air GI Ø 1" - Tebal = 2,30 mm 1.00 btng - 101 Pipa Air GI Ø 1" - Tebal = 2,5 mm 1.00 btng - 102 Pipa Air GI Ø 1" - Tebal = 2,8 mm 1.00 btng - 103 Pipa Air GI Ø 1¼" - Tebal = 1,8 mm 1.00 btng - 104 Pipa Air GI Ø 1¼" - Tebal = 2,30 mm 1.00 btng - 105 Pipa Air GI Ø 1¼" - Tebal = 2,8 mm 1.00 btng - 106 Pipa Air GI Ø 1½" - Tebal = 1,8 mm 1.00 btng - 107 Pipa Air GI Ø 1½" - Tebal = 2,0 mm 1.00 btng - 108 Pipa Air GI Ø 1½" - Tebal = 2,30 mm 1.00 btng - 109 Pipa Air GI Ø 1½" - Tebal = 2,5 mm 1.00 btng - 110 Pipa Air GI Ø 1½" - Tebal = 2,8 mm 1.00 btng - 111 Pipa Air GI Ø 2" - Tebal = 1,8 mm 1.00 btng - 112 Pipa Air GI Ø 2" - Tebal = 2,0 mm 1.00 btng - 113 Pipa Air GI Ø 2" - Tebal = 2,30 mm 1.00 btng - 114 Pipa Air GI Ø 2" - Tebal = 2,5 mm 1.00 btng - 115 Pipa Air GI Ø 2" - Tebal = 2,8 mm 1.00 btng - 116 Pipa Air GI Ø 2½" - Tebal = 2,30 mm 1.00 btng - 117 Pipa Air GI Ø 2½" - Tebal = 2,5 mm 1.00 btng - 118 Pipa Air GI Ø 2½" - Tebal = 2,8 mm 1.00 btng - 119 Pipa Air GI Ø 2½" - Tebal = 3,0 mm 1.00 btng - 120 Pipa Air GI Ø 3" - Tebal = 2,0 mm 1.00 btng - 121 Pipa Air GI Ø 3" - Tebal = 2,30 mm 1.00 btng - 122 Pipa Air GI Ø 3" - Tebal = 2,5 mm 1.00 btng - 123 Pipa Air GI Ø 3" - Tebal = 2,8 mm 1.00 btng - 124 Pipa Air GI Ø 3" - Tebal = 3,0 mm 1.00 btng - 125 Pipa Air GI Ø 4" - Tebal = 2,30 mm 1.00 btng - 126 Pipa Air GI Ø 4" - Tebal = 2,5 mm 1.00 btng - 127 Pipa Air GI Ø 4" - Tebal = 2,8 mm 1.00 btng - 128 Pipa Air GI Ø 4" - Tebal = 3,0 mm 1.00 btng - 129 Pipa Air GI Ø 4" - Tebal = 3,50 mm 1.00 btng - 130 Pipa Air GI Ø 6" - Tebal = 2,5 mm 1.00 btng - 131 Pipa Air GI Ø 6" - Tebal = 2,8 mm 1.00 btng - 132 Pipa Air GI Ø 6" - Tebal = 3,0 mm 1.00 btng - 133 Pipa Air GI Ø 6" - Tebal = 3,50 mm 1.00 btng - 134 Pipa Air GI Ø 6" - Tebal = 3,30 mm 1.00 btng - 135 Pipa Air GI Ø 8" - Medium 1.00 btng - 136 Pipa Air GI Ø 10" - Medium 1.00 btng - 137 Pipa Air GI Ø 12" - Medium 1.00 btng - 138 Pipa Air GI Ø 16" - Medium 1.00 btng - 139 Ball Valve ( Kuningan ) Ø ½" 1.00 bh - 140 Ball Valve ( Kuningan ) Ø ¾" 1.00 bh 65,000.00 65,000.00 141 Ball Valve ( Kuningan ) Ø 1" 1.00 bh - 142 Ball Valve ( Kuningan ) Ø 1¼" 1.00 bh - 143 Ball Valve ( Kuningan ) Ø 1½" 1.00 bh - 144 Ball Valve ( Kuningan ) Ø 2" 1.00 bh - 145 Ball Valve ( Kuningan ) Ø 3" 1.00 bh - 146 Ball Valve ( Kuningan ) Ø 4" 1.00 bh - 147 Ball Valve ( Kuningan ) Ø ½" 1.00 bh - 148 Ball Valve ( Kuningan ) Ø ½" 1.00 bh - 149 Klem PVC 1.00 bh 600.00 600.00
PERALATAN AIR BERSIH - 1 Pompa Air 1.00 unit - 2 Sumur Pompa Tangan Lengkap 1.00 unit - 3 Tandon air PVC 0,5 m3 1.00 bh - 4 Tandon air PVC 1 m3 1.00 bh - 5 Tandon air stainless 1,0 m3 1.00 bh - 6 Tandon air stinless 0,5 m3 1.00 bh -
INSTALASI LISTRIK - 1 Fitting Plafond 1.00 bh - 2 Isolator 1.00 m' - 3 Kabel NYA 2,5 mm 1.00 m' - 4 Kabel NYA 4,0 mm 1.00 m' - 5 Lampu pijar 5-40 watt 1.00 bh - 6 Lampu pijar 50 - 100 watt 1.00 bh - 7 Lampu TL komplit 40 watt 1.00 bh - 8 Lampu TL Komplit 20 watt 1.00 bh - 9 Lampu TL 4X20 Watt setara Artolite, armuture,Ignitor,Caps 1.00 bh -
10 Lampu TL 2X20 Watt setara Artolite, armuture,Ignitor,Caps 1.00 bh - 11 Lampu HPS (Armature,Balas,Ignitor.Caps) 70 W/220 1.00 bh - 12 Lampu HPS (Armature,Balas,Ignitor.Caps) 150 W/220 1.00 bh - 13 Lampu HPS (Armature,Balas,Ignitor.Caps) 250 W / 220 1.00 bh - 14 Lampu HPS (Armature,Balas,Ignitor.Caps) 400 W / 220 1.00 bh - 15 Bola lampu Mercury HPLN-220 V / 80 W 1.00 bh - 16 Bola lampu Mercury HPLN-220 V / 200 W 1.00 bh - 17 Lampu Natrium 250 W/ 220 V + Balast 1.00 bh - 18 Lampu Sorot (Armature,Balas,Ignitor.Caps) 250 watt 1.00 bh - 19 Lampu Sorot (Armature,Balas,Ignitor.Caps) 150 watt 1.00 bh - 20 Lampu XL ( Lilin ) 5 watt 1.00 bh - 21 Lampu XL ( Lilin ) 8 watt 1.00 bh - 22 Lampu XL ( Lilin ) 14 watt 1.00 bh -
Page 32 of 334
23 Lampu XL ( Lilin ) 18 watt 1.00 bh - 24 Lampu XL ( Lilin ) 23 watt 1.00 bh - 25 Las doof 1.00 bh - 26 Pasang baru PLN 1.00 ls - 27 Pipa Arde 1.00 m' - 28 Pipa PVC 5/8 " 1.00 ljr - 29 Saklar Broco 1.00 bh - 30 Stop Kontak Broco 1.00 bh - 31 T Dos PVC 1.00 bh - 32 Tambah Daya 2200 watt 1.00 ls - 33 Zekering Kast Lokal 1 Group 1.00 unit - 34 Zekering Kast Lokal 2 Group 1.00 unit - 35 Zekering Kast Lokal 3 Group 1.00 unit - 36 Tiang Oktogonal Singgle Hot Dipped Galv + Flenders 5m 1.00 unit - 37 Tiang Oktogonal Double Hot Dipped Galv + Flenders 5m 1.00 unit - 38 Tiang Oktogonal Singgle Hot Dipped Galv + Flenders 7 m 1.00 unit - 39 Tiang Oktogonal Double Hot Dipped Galv + Flenders 7 m 1.00 unit - 40 Tiang Oktogonal Singgle Hot Dipped Galv + Flenders 9 m 1.00 unit - 41 Tiang Oktogonal Double Hot Dipped Galv + Flenders 9 m 1.00 unit - 42 Tiang Oktogonal Singgle Hot Dipped Galv + Flenders 12 m 1.00 unit - 43 Tiang Oktogonal Double Hot Dipped Galv + Flenders 12 m 1.00 unit -
LAIN - LAIN - 1 AC Wall Mounted 8900 BTU / H 1 PK 1.00 bh - 2 Alat bantu pasang rangka plafond 1.00 ls - 3 Bahan terraso cor 1.00 m3 - 4 Bak Kontrol 40 x 40 x 50 cm 1.00 lot - 5 Batacota 1.00 kg - 6 Besi Holo 1.00 ljr - 7 Bor Strous 1.00 ttk 17,500.00 17,500.00 8 Elektrode 1.00 kg - 9 Formika 90 x 120 cm 1.00 lbr -
10 Gedeg Guling 1.00 m2 - 11 Grease 1.00 kg - 12 Grill ( tutup Saluran Air Hujan ) 1.00 unit - 13 Grounding 1.00 bh - 14 Grounding penangkala petir 1.00 lot - 15 Halogeen spot DL 50 watt 1.00 bh - 16 Kabel Coaxial 2 x 30 mm 1.00 m' - 17 Kawat BC 1.00 m' - 18 Kolom Beton pracetak un. Pagar 1.00 bh - 19 Lampu Gantung 1.00 buah - 20 Ijuk 1.00 kg 15,000.00 15,000.00 21 Material bantu 1.00 ls - 22 Minyak Bekisting 1.00 ltr 50,000.00 50,000.00 23 Minyak Pelumas 1.00 ltr - 24 Ornamen Kolom 1.00 bh - 25 Pagar pengaman dan besi pipa 1.00 m2 - 26 Panel beton prcetak un. Pagar 1.00 bh - 27 Panel Induk 1.00 unit - 28 Polycarbonite 1.00 lbr - 29 Pompa submersible 1.00 unit - 30 Railling Tngga Virkan 1.00 m2 - 31 Railling Tangga Pipa 1.00 m2 - 32 Seal Tape / TBA 1.00 buah - 33 Sending daun jendela 1.00 buah - 34 Sending daun pintu 1.00 buah - 35 Sending kosen pintu / jendela 1.00 m' - 36 Sewa alat sandblasting 1.00 hr - 37 Sewa Genset 1.00 hr - 38 Sewa Mesin Las 1.00 hr - 39 Sew Mesin Bor 1.00 hr - 40 Sewa pompa Tes 1.00 hr - 41 Spot light 1.00 buah - 42 Sub panel 1.00 buah - 43 Sumur bor dalam 1.00 unit - 44 Sunscreen Alumunium 1.00 m3 - 45 Tali ijuk 1.00 kg - 46 Telephone outlet 1.00 buah - 47 Timah 1.00 kg - 48 Vertical Blind 1.00 m2 - 49 Vonetion Blind 1.00 m2 - 50 Wallpaper 1.00 m2 - 51 Waterstop lebar 200 mm 1.00 m' - 52 Waterstop lebar 150 mm 1.00 m' - 53 Waterstop lebar 230 mm 1.00 m' - 54 Waterstop lebar 250 mm 1.00 m' - 55 Waterstop lebar 300 mm 1.00 m' - 56 Waterstop lebar 320 mm 1.00 m' -
ASPHAL - 1 Aspal Curah 1.00 drum -
Page 33 of 334
2 Aspal Pertamina KW. I 1.00 drum - 3 Aspal Shell Ex. Singpura 1.00 drum -
BAHAN MATERIAL TERPASANG - 1 Auning + Rangka hollow 1.00 m2 - 2 Polycarbonat ex. Twilite rangka hollow 1.00 m2 - 3 Polycarbonat ex. Twilite rangka stainless 1.00 m2 - 4 Baja Truss Prof C .Z-Alm bent lbh= 8m 1 sd 1.00 m2 - 5 Baja Truss Prof C .Z-Alm bent lbh= 8m 2 sd 1.00 m2 - 6 Baja Truss Prof C .Z-Alm bent krng= 8m 1 sd 1.00 m2 - 7 Baja Truss Prof C .Z-Alm bent krng= 8m 2 1.00 m2 - 8 Pasang kisdam 1.00 m' - 9 Membran sheet water profing ex. Foxroc 1.00 m2 60,000.00 60,000.00
10 Kosen ALUMINIUM warna 4" ex. Elexindo 1.00 m' - 11 Kosen ALUMINIUM putih 4" ex. Elexindo 1.00 m' - 12 Kosen ALUM warna 4,5x10x0,1 ex. Indal 1.00 m' - 13 Kosen ALUM 4,5x10x0,1 putih ex. Indal 1.00 m' - 14 Keray aluminium 1.00 m2 - 15 Jalusi aluminium 1.00 m2 - 16 Vertical Blind 1.00 m2 - 17 Plafond rangka Hollow 1.00 m2 - 18 Plafond rangka hollow galvanis 1.00 m2 - 19 Exhaust fan kecil ex. Maspion 1.00 bh - 20 Exhaust fan besar ex. Maspion 1.00 bh - 21 Pintu KM/WC PVC 200x70 1.00 bh - 22 Pintu KM/WC Aluminium 185 x 65 cm 1.00 bh - 23 Daun pintu + assc ALPHA / ATT warna 1.00 m2 - 24 Daun pintu + assc ALPHA / ATT putih 1.00 m2 - 25 Daun jend kaca+assc ALPHA/ATT l warna 1.00 m2 - 26 Daun jend kaca+assc ALPHA/ATT putih 1.00 m2 - 27 Assesories pintu Floorhang "DORMA" 1.00 BH - 28 Assesories pintu Floorhang "ALPHA" 1.00 BH - 29 Kansteen Besar 15x30x50 cm 1.00 m' - 30 Kansteen Kecil 15x20x50 cm 1.00 m' - 31 Lampu SL ex. PHILLIPS watt 14 1.00 unit - 32 Lampu SL ex. PHILLIPS watt 18 1.00 unit - 33 Lampu dop )bolamp) ex. PHILLIPS 1.00 unit - 34 Downlicht PANASONIC 1.00 bh - 35 Downlicht lokal 1.00 bh - 36 Saklar Tunggal ex BROCO 1.00 bh - 37 Saklar Ganda ex BROCO 1.00 bh - 38 Stop kontak 1.00 bh - 39 Pas.Ins listrik non saklar/stop kontak 1.00 ttk - 40 Pintu rolling door Aluminium 1.00 m2 - 41 Box Cluvert U1000 K.350 (Besi 130 Kg 1.00 bh - 42 Cover Cluvert 1000x1000x2400; besi 160 kg 1.00 bh -
PERALATAN SEWA - 1 Buldozer 1.00 jam 283,000.00 283,000.00 2 Motor Grader 100 HP 1.00 jam 264,000.00 264,000.00 3 Hydraulic Excavator 1.00 jam 208,000.00 208,000.00 4 Pneumatic Tire Roller 1.00 jam 140,000.00 140,000.00 5 Vibrator Roller 1.00 jam 202,000.00 202,000.00 6 Pemecah Batu 1.00 jam 667,000.00 667,000.00 7 Mesin Penyaring 1.00 jam - 8 Wheel Loader 1.00 jam 237,000.00 237,000.00 9 Wheel Tractor 1.00 jam 202,000.00 202,000.00
10 Mesin Gilas 3 Roda besi 8-10 ton 1.00 jam 129,000.00 129,000.00 11 Mesin Gilas Tandem 6-10 ton 1.00 jam 129,000.00 129,000.00 12 Mesin gilas Bergetar / Vibro roller 10 ton 1.00 jam 202,000.00 202,000.00 13 Mesin Gilas Roda karet 8-15 ton 1.00 jam 140,000.00 140,000.00 14 Mesin Gilas bergetar 1 ton 1.00 jam 202,000.00 202,000.00 15 Stamper 4 HP 1.00 jam 21,000.00 21,000.00 16 Mesin Penyempro Aspal 1.00 jam 38,000.00 38,000.00 17 Mesin Penyampur aspal 1.00 jam 4,492,000.00 4,492,000.00 18 Mesin Penghambar Aspal 1.00 jam 236,000.00 236,000.00 19 Truck Tangki Air 1.00 jam 136,000.00 136,000.00 20 Sewa Truck klas 3 dalam kota 1.00 jam 126,000.00 126,000.00 21 Dump Truck 3,5 ton 1.00 jam 136,000.00 136,000.00 22 Dump Truck 5 ton 1.00 jam 261,000.00 261,000.00 23 Pompa Air 1.00 jam 20,000.00 20,000.00 24 Tractor Equipment, etc 1.00 jam 261,000.00 261,000.00 25 Truck Aspal ( Asphalt Distrubutor ) 1.00 jam 261,000.00 261,000.00 26 Genset 1.00 jam 74,000.00 74,000.00 27 Batching Plant 1.00 jam 667,000.00 667,000.00 28 Truck Mixer 1.00 jam 261,000.00 261,000.00 29 Concrete Vibrator 1.00 jam 16,000.00 16,000.00 30 Concrete Paver 1.00 jam 293,000.00 293,000.00 31 Sewa bucket dan crane 1.00 jam 225,000.00 225,000.00 32 Concrete Pump 1.00 jam 285,000.00 285,000.00 33 Welding Set 1.00 jam 25,000.00 25,000.00 34 Sewa Crane 1.00 jam 225,000.00 225,000.00
Page 34 of 334
35 Jack Hammer 1.00 jam 18,000.00 18,000.00 36 Theodholit 1.00 set 25,000.00 25,000.00 37 Surveyor 1.00 Oh 40,000.00 40,000.00
Surabaya, 23 November 2010PT. ANGGREK MERAH
ALBERTINUS WIDYANTODirektur Utama
Page 35 of 334
ANALISA HARGA SATUAN PEKERJAANPROYEK PEMBANGUNAN GEDUNG MENEJEMEN 4 LANTAI
RUMAH SAKIT UMUM PROVINSI dr. SOEDONO MADIUNJALAN Dr. SOETOMO No. 29 MADIUN - JAWA TIMUR
No. Vol. URAIAN KOOEF St.HARGA ( Rp)
SATUAN JUMLAH TOTALPEKERJAAN PERSIAPAN DAN TANAH
1 M' PEMBUATAN BOUPLANK 28,810.00 BAHAN
Kayu meranti papan 2/20 0.0042 m3 2,200,000.00 9,240.00 Kayu meranti usuk 5/7 0.0039 m3 2,500,000.00 9,750.00 Paku biasa 0.0200 kg 11,000.00 220.00 19,210.00
TENAGA Mandor 0.0050 oh 60,000.00 300.00 Kepala Tukang 0.0100 oh 55,000.00 550.00 Tukang 0.1000 oh 52,500.00 5,250.00 Pekerja Terampil 0.0000 oh 40,000.00 - Pekerja tak terampil 0.1000 oh 35,000.00 3,500.00 9,600.00
1 M2 PEMBERSIHAN LAPANGAN RINGAN 1,900.00 TENAGA
Mandor 0.0025 oh 60,000.00 150.00 Pekerja tak terampil 0.0500 oh 35,000.00 1,750.00
1 M2 PEMBERSIHAN LAPANGAN BERAT 3,800.00 TENAGA
Mandor 0.0050 oh 60,000.00 300.00 Pekerja tak terampil 0.1000 oh 35,000.00 3,500.00
1 Hr. UITZET DENGAN WATERPASS / THEODOLITH 145,000.00 BAHAN
Sewa Theodolit 1.0000 set 25,000.00 25,000.00 25,000.00 TENAGA -
Surveyor 1.0000 oh 40,000.00 40,000.00 Pekerja Terampil 2.0000 oh 40,000.00 80,000.00 120,000.00
1 M2 PEMBUATAN PAGAR SEMENTARA DARI SENG GELOMBANG, T= 2 M 292,455.00 BAHAN
Dolken Kayu Gelam 8-10 / 400 cm 1.2500 btg 20,000.00 25,000.00 PC 2.5000 kg 1,200.00 3,000.00 Seng Gelombang 1.2000 lbr 44,000.00 52,800.00 Pasir beton 0.0050 m3 140,000.00 700.00 Batu pecah 2-3 0.009 m3 150,000.00 1,350.00 Kayu meranti 5/7 0.0720 m3 2,500,000.00 180,000.00 Paku asbes 0.0600 kg 13,000.00 780.00 Cat Meni Besi 0.0450 ltr 45,000.00 2,025.00 265,655.00
TENAGA - Mandor 0.0200 oh 60,000.00 1,200.00 Kepala Tukang 0.0200 oh 55,000.00 1,100.00 Tukang 0.2000 oh 52,500.00 10,500.00 Pekerja Terampil 0.0000 oh 40,000.00 - Pekerja tak terampil 0.4000 oh 35,000.00 14,000.00 26,800.00
1 M2 PEMBUATAN DIREKSI KEET 803,880.00 BAHAN
Dolken Kayu gelam 8-10 / 400 cm 1.2500 btg 14,000.00 17,500.00 Kayu meranti 5/7 0.1800 m3 2,500,000.00 450,000.00 Paku biasa 0.8500 kg 11,000.00 9,350.00 Besi plat strip 1.1000 kg 9,000.00 9,900.00 PC 35.000 kg 1,200.00 42,000.00 Pasir pasang 0.1500 m3 135,000.00 20,250.00 Pasir beton 0.1000 m3 140,000.00 14,000.00 Batu pecah mesin 2/3 0.1500 m3 150,000.00 22,500.00 Bata merah 30.0000 bh 590.00 17,700.00 Seng gelombang BJLS 30 0.2500 lembr 44,000.00 11,000.00 Kaca polos 3 mm 0.0800 m2 75,000.00 6,000.00 Kunci tanam 0.1500 buah 142,000.00 21,300.00 Lapis triplex 4 mm 0.0600 lembr 48,000.00 2,880.00 644,380.00
- TENAGA -
Mandor 0.0500 oh 60,000.00 3,000.00 Kepala Tukang 0.3000 oh 55,000.00 16,500.00 Tukang 2.0000 oh 52,500.00 105,000.00 Pekerja Terampil 0.0000 40,000.00 - Pekerja tak terampil 1.0000 oh 35,000.00 35,000.00 159,500.00
1 M3 BONGKARAN BETON BERTULANG 253,325.00 TENAGA
Mandor 0.3330 oh 60,000.00 19,980.00 Pekerja tak terampil 6.6670 oh 35,000.00 233,345.00
1 M2 PEMBUATAN STEGGER BAMBU UNT ANDANG 43,980.00 BAHAN
Bambu dia.6-8 cm / 600 cm 1.2500 btg 20,000.00 25,000.00 Tali ijuk 0.2500 kg 15,000.00 3,750.00 28,750.00
TENAGA Mandor 0.0130 oh 60,000.00 780.00 Kepala Tukang 0.2500 oh 55,000.00 13,750.00 Tukang 0.0020 oh 52,500.00 105.00 Pekerja Terampil 0.0000 oh 40,000.00 - Pekerja tak terampil 0.0170 oh 35,000.00 595.00 15,230.00
1 M3 GALIAN TANAH KONSTRUKSI 27,750.00 TENAGA
Mandor 0.0250 oh 60,000.00 1,500.00 Pekerja tak terampil 0.7500 oh 35,000.00 26,250.00
1 M2 PERATAAN TANAH 7,012.50 TENAGA
Mandor 0.0075 oh 60,000.00 450.00 Pekerja tak terampil 0.1875 oh 35,000.00 6,562.50
Page 36 of 334
1 M3 PENGANGKUTAN TANAH KELUAR PROYEK 74,000.00 ALAT
Sewa Dumptruck 5 T ( Min. 5 jam ) 0.2500 jam 261,000.00 65,250.00 TENAGA -
Mandor 0.0000 oh 60,000.00 - Pekerja tak terampil 0.2500 oh 35,000.00 8,750.00
1 TTK PEMBUATAN LUBANG STROUS DIA.20-30 CM 75,720.00 ALAT
Sewa alat bantu strouss pile 1.2000 jam 17,500.00 21,000.00 TENAGA -
Mandor 0.0720 oh 60,000.00 4,320.00 Pekerja tak terampil 1.4400 oh 35,000.00 50,400.00
1 M3 GALIAN TANAH KERAS 54,420.00 TENAGA
Mandor 0.0320 oh 60,000.00 1,920.00 Pekerja tak terampil 1.5000 oh 35,000.00 52,500.00
1 M3 GALIAN TANAH LUMPUR 44,700.00 TENAGA
Mandor 0.0450 oh 60,000.00 2,700.00 Pekerja tak terampil 1.2000 oh 35,000.00 42,000.00
1 M3 GALIAN TANAH LUMPUR DENGAN ALAT 39,524.00 TENAGA
Mandor 0.0070 oh 60,000.00 420.00 Pekerja tak terampil 0.2260 oh 35,000.00 7,910.00
ALAT Sewa Dump Truck 5 T ( Min. 5 Jam ) 0.0740 jam 261,000.00 19,314.00 Sewa Bucket dan Crane 0.0528 jam 225,000.00 11,880.00
1 M3 GALIAN TANAH DENGAN ALAT BERAT 40,536.00 TENAGA
Mandor 0.0070 oh 60,000.00 420.00 Pekerja tak terampil 0.2260 oh 35,000.00 7,910.00
ALAT Sewa Dump Truck 5 T ( Min. 5 Jam ) 0.0700 jam 261,000.00 18,270.00 Sewa Escavator 0.0670 jam 208,000.00 13,936.00
1 M3 PENGURUGAN TANAH KEMBALI UNTUK BANGUNAN 9,230.00 TENAGA
Mandor 0.0080 oh 60,000.00 480.00 Pekerja tak terampil 0.2500 oh 35,000.00 8,750.00
1 M3 PENGURUGAN TANAH DENGAN PEMADATAN 118,830.60 TENAGA
Mandor 0.0100 oh 60,000.00 600.00 Pekerja terampil 0.3000 oh 40,000.00 12,000.00
ALAT Sewa alat bantu ( 1 set @ 3 alat ) 0.0213 jam 762,000.00 16,230.60
BAHAN Tanah Urug 1.2000 m3 75,000.00 90,000.00
1 M3 PENGURUGAN PASIR PADAT 130,830.60 LANTAI I 1.0000 130,830.60 130,830.60 LANTAI II 1.0900 130,830.60 142,605.35 LANTAI III 1.1200 130,830.60 146,530.27 LANTAI IV 1.1350 130,830.60 148,492.73 LANTAI V 1.1620 130,830.60 152,025.16 LANTAI ATAP 1.1970 130,830.60 156,604.23
TENAGA Mandor 0.0100 oh 60,000.00 600.00 Pekerja terampil 0.3000 oh 40,000.00 12,000.00
ALAT Sewa alat bantu ( 1 set @ 3 alat ) 0.0213 jam 762,000.00 16,230.60
BAHAN Pasir Urug 1.2000 m3 85,000.00 102,000.00
1 M3 PENGURUGAN SIRTU PADAT 113,500.00 TENAGA
Mandor 0.0250 oh 60,000.00 1,500.00 Pekerja terampil 0.2500 oh 40,000.00 10,000.00
ALAT Sewa alat bantu ( 1 set @ 3 alat ) 0.0000 jam 762,000.00 -
BAHAN Sirtu 1.2000 m3 85,000.00 102,000.00
1 M3 PENGURUGAN PUDEL 1 Kp : 6 Ps 162,470.60 TENAGA
Mandor 0.0100 oh 60,000.00 600.00 Pekerja terampil 0.8330 oh 40,000.00 33,320.00
ALAT Sewa alat bantu ( 1 set @ 3 alat ) 0.0213 jam 762,000.00 16,230.60
BAHAN Kapur Pasang 0.1720 m3 145,000.00 24,940.00 Pasir Urug 1.028 m3 85,000.00 87,380.00
1 M3 PENGURUGAN SIRTU PADAT DENGAN PEMADATAN MENGGUNAKAN ALAT 136,532.00 TENAGA
Mandor 0.0210 oh 60,000.00 1,260.00 Pekerja terampil 0.2500 oh 40,000.00 10,000.00
ALAT Sewa Dump Truck 3,5 T 0.0880 jam 136,000.00 11,968.00 Sewa Motor Grader 125-140 PK (min.5 Jam) 0.0080 jam 264,000.00 2,112.00 Sewa Pneumatic Tire Roller (min.5 jam) 0.0040 jam 140,000.00 560.00 Sewa Truck Tangki Air (min.5 jam) 0.0120 jam 136,000.00 1,632.00 Sewa Vibrator Roller (min.5 Jam) 0.0120 jam 202,000.00 2,424.00 Sewa Escavator 6 m3 0.0220 jam 208,000.00 4,576.00
BAHAN Sirtu 1.2000 m3 85,000.00 102,000.00
1 M3 PENGERUGAN SALURAN MANUAL 23,660.00
Page 37 of 334
TENAGA Mandor 0.0400 oh 60,000.00 2,400.00 Pekerja tak terampil 0.4000 oh 35,000.00 14,000.00
ALAT Sewa Truck klas 3 dalam kota 0.0100 jam 126,000.00 1,260.00
BAHAN Glansing 25 kg ( isi 150 kg sedimen) 12.0000 bh 500.00 6,000.00
1 M3 PENGERUGAN SALURAN DENGAN ALAT BERAT 52,160.00 TENAGA
Mandor 0.0070 oh 60,000.00 420.00 Pekerja tak terampil 0.2260 oh 35,000.00 7,910.00
ALAT Sewa Truck klas 3 dalam kota 0.0800 jam 126,000.00 10,080.00 Sewa Bucket dan Crane / Graglin scrapper 0.1500 jam 225,000.00 33,750.00
1 M3 PENGURUGAN PASIR UNTUK PAVING 114,600.00 TENAGA
Mandor 0.0100 oh 60,000.00 600.00 Pekerja terampil 0.3000 oh 40,000.00 12,000.00
BAHAN Pasir Urug 1.2000 m3 85,000.00 102,000.00
1 M3 PENGURUGAN SIRTU UNTUK PAVING 117,500.00 TENAGA
Mandor 0.0250 oh 60,000.00 1,500.00 Pekerja tak terampil 0.4000 oh 35,000.00 14,000.00
BAHAN Sirtu 1.2000 m3 85,000.00 102,000.00
PEKERJAAN PONDASI
1 M2 PEMASANGAN TURAP PAPAN TEBAL 3 CM 232,240.00 TENAGA
Mandor 0.0250 oh 60,000.00 1,500.00 Kepala Tukang 0.0080 oh 55,000.00 440.00 Tukang 0.0800 oh 52,500.00 4,200.00 Pekerja Terampil 0.0000 oh 40,000.00 - Pekerja tak terampil 1.0000 oh 35,000.00 35,000.00 41,140.00
BAHAN Kayu Meranti papan 3/30 0.0330 m3 4,100,000.00 135,300.00 Kayu Meranti Usuk 0.0210 m3 2,500,000.00 52,500.00 Paku Klem 0.3000 kg 11,000.00 3,300.00 191,100.00
1 M2 PEMASANGAN TURAP BAMBU TINGGI 1,5-2 M 114,690.00 TENAGA
Mandor 0.0068 oh 60,000.00 408.00 Kepala Tukang 0.0022 oh 52,500.00 115.50 Tukang 0.0218 oh 40,000.00 872.00 Pekerja Terampil 0.2725 oh 40,000.00 10,900.00 Pekerja tak terampil 0.0000 oh 35,000.00 - 12,295.50
BAHAN Bambu 10-12 cm 3.0000 btg 20,000.00 60,000.00 Gedeg Guling 1.6500 m2 25,000.00 41,250.00 Kawat Ikat Beton 0.1090 kg 10,500.00 1,144.50 102,394.50
1M' PANCANG PILE + PENGADAAN PILE 35X35 - 16 m SISTIM INJECTION 290,122.75 BAHAN
Tiang Panc. K-600, 30/30,L=16m' 1.0000 m' 155,000.00 155,000.00 205,000.00 Join las 1.0000 m' 50,000.00 50,000.00
TENAGA Pekerja Terampil 0.9000 oh 40,000.00 36,000.00 55,593.75 Mandor 0.0750 oh 60,000.00 4,500.00 Operator terampil 0.1750 oh 52,500.00 9,187.50 Sopir 0.1125 oh 52,500.00 5,906.25
PERALATAN Alat bantu 0.2000 set 22,500.00 4,500.00 29,529.00 Sewa Crane 0.1030 jm/hr 225,000.00 23,175.00 Alat Injection 0.1030 jm/hr 18,000.00 1,854.00
1M' PANCANG PILE + PENGADAAN PILE 35X35 - 16 m SISTIM HAMMER 347,987.54 BAHAN
Tiang Panc. K-600, 35X35,L=16m' 1.0000 m' 180,000.00 180,000.00 230,000.00 Join Las 1.0000 titik 50,000.00 50,000.00
TENAGA Pekerja Terampil 1.2000 oh 40,000.00 48,000.00 83,175.00 Mandor 0.1488 oh 60,000.00 8,925.00 Operator terampil 0.3000 oh 52,500.00 15,750.00 Sopir 0.2000 oh 52,500.00 10,500.00
PERALATAN Alat bantu 0.2400 set 21,375.00 5,130.00 34,812.54 Sewa Crane 0.1236 jm/hr 213,750.00 26,419.50 Sewa Hammer Pancang 0.2266 jm/hr 14,400.00 3,263.04
1M3 PASANG PONDASI BATU KALI 1PC : 4PS 530,737.50 BAHAN
Batu belah 15/20 1.2000 m3 145,000.00 174,000.00 PC 163.0000 kg 1,200.00 195,600.00 Pasir Pasang 0.5200 m3 135,000.00 70,200.00
TENAGA Pekerja 1.5000 oh 35,000.00 52,500.00 Tukang 0.7500 oh 40,000.00 30,000.00 Kepala Tukang 0.0750 oh 52,500.00 3,937.50 Mandor 0.0750 oh 60,000.00 4,500.00
1M3 PASANG PONDASI BATU KALI 1PC : 5 PS 501,577.50 BAHAN
Batu belah 15/20 1.2000 m3 145,000.00 174,000.00 PC 136.0000 kg 1,200.00 163,200.00 Pasir Pasang 0.5440 m3 135,000.00 73,440.00
TENAGA Pekerja 1.5000 oh 35,000.00 52,500.00 Tukang 0.7500 oh 40,000.00 30,000.00 Kepala Tukang 0.0750 oh 52,500.00 3,937.50 Mandor 0.0750 oh 60,000.00 4,500.00
1M3 PASANG PONDASI BATU KOSONG / AANSTAMPENG T= 20 CM 194,057.50
Page 38 of 334
BAHAN Batu belah 15/20 1.2000 m3 145,000.00 174,000.00 Pasir Urug 0.0000 m3 -
TENAGA Pekerja 0.3500 oh 35,000.00 12,250.00 Tukang 0.1500 oh 40,000.00 6,000.00 Kepala Tukang 0.0150 oh 52,500.00 787.50 Mandor 0.0170 oh 60,000.00 1,020.00
1 KG PASANGAN IJUK 21,340.00 TENAGA
Mandor 0.0000 oh 60,000.00 - Pekerja terampil 0.0835 oh 40,000.00 3,340.00
BAHAN Ijuk 1.2000 kg 15,000.00 18,000.00
1 M3 PEMBUATAN LUBANG STROUSS Ǿ20 CM DALAM 3 M 51,600.00 TENAGA
Mandor 0.0600 oh 60,000.00 3,600.00 Pekerja tak terampil 1.2000 oh 35,000.00 42,000.00
BAHAN Alat Bantu Stroys Pile 1.2000 m3 5,000.00 6,000.00
1 M3 PEMBUATAN LUBANG STROUSS Ǿ30 CM DALAM 3 M 60,720.00 TENAGA
Mandor 0.0720 oh 60,000.00 4,320.00 Pekerja tak terampil 1.4400 oh 35,000.00 50,400.00
BAHAN Alat Bantu Stroys Pile 1.2000 m3 5,000.00 6,000.00
1M3 PEMAKAIAN SPESI CAMP.STROUS (1Pc:1,5Ps:2,5Kr) 657,380.00 BAHAN
Semen PC 358.0150 kg 1,200.00 429,618.00 Pasir Cor 0.4882 m3 140,000.00 68,348.00 Batu Kerikil 0.8137 m3 95,000.00 77,301.50
TENAGA Pekerja terampil 1.6500 oh 40,000.00 66,000.00 Tukang 0.2500 oh 40,000.00 10,000.00 Kepala Tukang 0.0250 oh 52,500.00 1,312.50 Mandor 0.0800 oh 60,000.00 4,800.00
PEKERJAAN STRUKTUR BETON
1 M2 PASANG BEKISTING UN. PONDASI 119,965.00 BAHAN
Kayu Meranti 0.0400 m3 2,200,000.00 88,000.00 Paku Biasa 0.4000 kg 11,000.00 4,400.00 Minyak Bekisting 0.1000 ltr 50,000.00 5,000.00 97,400.00
TENAGA Pekerja 0.3000 oh 35,000.00 10,500.00 Tukang 0.2600 oh 40,000.00 10,400.00 Kepala Tukang 0.0260 oh 52,500.00 1,365.00 Mandor 0.0050 oh 60,000.00 300.00 22,565.00
1 M2 PASANG BEKISTING UN. SLOOF + STRUKTUR PRAKTIS ( 3 kali pakai ) 92,365.00 LANTAI I 1.0000 92,365.00 92,365.00 LANTAI II 1.0900 92,365.00 100,677.85 LANTAI III 1.1200 92,365.00 103,448.80 LANTAI IV 1.1350 92,365.00 104,834.28 LANTAI V 1.1620 92,365.00 107,328.13 LANTAI ATAP
BAHAN Kayu Meranti 0.0200 m3 2,200,000.00 44,000.00 Paku Biasa 0.3000 kg 11,000.00 3,300.00 Minyak Bekisting 0.1000 ltr 50,000.00 5,000.00 Multiplex 12 mm 0.1750 m2 100,000.00 17,500.00 69,800.00
TENAGA Pekerja 0.3000 oh 35,000.00 10,500.00 Tukang 0.2600 oh 40,000.00 10,400.00 Kepala Tukang 0.0260 oh 52,500.00 1,365.00 Mandor 0.0050 oh 60,000.00 300.00 22,565.00
1 M2 PASANG BEKISTING UNTUK KOLOM ( 3 kali pakai ) 155,230.50
LANTAI I 1.0000 155,230.50 155,230.50
LANTAI II 1.0900 155,230.50 169,201.25
LANTAI III 1.1200 155,230.50 173,858.16
LANTAI IV 1.1350 155,230.50 176,186.62
LANTAI V 1.1620 155,230.50 180,377.84
BAHAN Kayu Meranti 0.0200 m3 2,200,000.00 44,000.00
Paku Biasa 0.4000 kg 11,000.00 4,400.00
Minyak Bekisting 0.2000 ltr 50,000.00 10,000.00
Balok Kayu Kruing 0.0180 m3 2,650,000.00 47,700.00
Multiplex 12 mm 0.1400 lbr 100,000.00 14,000.00
Kayu Dolken 8-10 cm 0.6670 btg 14,000.00 9,338.00 129,438.00
TENAGA Pekerja 0.3000 oh 35,000.00 10,500.00
Tukang 0.3300 oh 40,000.00 13,200.00
Kepala Tukang 0.0330 oh 52,500.00 1,732.50
Mandor 0.0060 oh 60,000.00 360.00 25,792.50
1 M2 PASANG BEKISTING UNTUK BALOK ( 3 kali pakai ) 136,592.50
LANTAI I 1.0000 136,592.50 136,592.50
LANTAI II 1.0900 136,592.50 148,885.83
LANTAI III 1.1200 136,592.50 152,983.60
LANTAI IV 1.1350 136,592.50 155,032.49
LANTAI V 1.1620 136,592.50 158,720.49
BAHAN Kayu Meranti 0.0200 m3 1,200,000.00 24,000.00
Paku Biasa 0.4000 kg 11,000.00 4,400.00
Minyak Bekisting 0.2000 ltr 50,000.00 10,000.00
Balok Kayu Kruing 0.0180 m3 1,650,000.00 29,700.00
Multiplex 12 mm 0.1400 lbr 100,000.00 14,000.00
Kayu stoot 2.0000 btg 14,000.00 28,000.00 110,100.00
TENAGA Pekerja 0.3200 oh 35,000.00 11,200.00
Tukang 0.3300 oh 40,000.00 13,200.00
Kepala Tukang 0.0330 oh 52,500.00 1,732.50
Mandor 0.0060 oh 60,000.00 360.00 26,492.50
1 M2 PASANG BEKISTING UNTUK LANTAI ( 3 kali pakai ) 150,592.50
Page 39 of 334
LANTAI I 1.0000 150,592.50 150,592.50
LANTAI II 1.0900 150,592.50 164,145.83
LANTAI III 1.1200 150,592.50 168,663.60
LANTAI IV 1.1350 150,592.50 170,922.49
LANTAI V 1.1620 150,592.50 174,988.49
BAHAN Kayu Meranti 0.0200 m3 1,200,000.00 24,000.00
Paku Biasa 0.4000 kg 11,000.00 4,400.00
Minyak Bekisting 0.2000 ltr 50,000.00 10,000.00
Balok Kayu Kruing 0.0180 m3 1,650,000.00 29,700.00
Multiplex 12 mm 0.1400 lbr 100,000.00 14,000.00
Kayu stoot 3.0000 btg 14,000.00 42,000.00 124,100.00
TENAGA Pekerja 0.3200 oh 35,000.00 11,200.00
Tukang 0.3300 oh 40,000.00 13,200.00
Kepala Tukang 0.0330 oh 52,500.00 1,732.50
Mandor 0.0060 oh 60,000.00 360.00 26,492.50
1 M2 PASANG BEKISTING UNTUK TANGGA 117,030.51
LANTAI I 1.0000 117,030.51 117,030.51
LANTAI II 1.0900 117,030.51 127,563.26
LANTAI III 1.1200 117,030.51 131,074.17
LANTAI IV 1.1350 117,030.51 132,829.63
LANTAI V 1.1620 117,030.51 135,989.46
BAHAN Kayu Meranti 0.0200 m3 1,200,000.00 24,000.00
Paku Biasa 0.4000 kg 11,000.00 4,400.00
Minyak Bekisting 0.1500 ltr 50,000.00 7,500.00
Balok Kayu Kruing 0.0180 m3 1,650,000.00 29,700.00
Multiplex 12 mm 0.1400 lbr 100,000.00 14,000.00
Kayu stoot 0.6670 btg 14,000.00 9,338.00 88,938.00
TENAGA Pekerja 0.3392 oh 35,000.00 11,872.00
Tukang 0.3498 oh 40,000.00 13,992.00
Kepala Tukang 0.0351 oh 52,500.00 1,845.11
Mandor 0.0064 oh 60,000.00 383.40 28,092.51
1 KG PEMBESIAN BESI POLOS U-24 8,183.50
LANTAI I 1.0000 8,183.50 8,183.50
LANTAI II 1.0900 8,183.50 8,920.02
LANTAI III 1.1200 8,183.50 9,165.52
LANTAI IV 1.1350 8,183.50 9,288.27
LANTAI V 1.1620 8,183.50 9,509.23
BAHAN Besi beton ( Polos ) 1.0500 kg 7,100.00 7,455.00
Kawat beton 0.0150 kg 10,500.00 157.50 7,612.50
TENAGA Mandor 0.0003 oh 60,000.00 18.00
Tukang Besi 0.0070 oh 40,000.00 280.00
Pekerja Tak Terampil 0.0070 oh 35,000.00 245.00
Kepala Tukang 0.0007 oh 40,000.00 28.00 571.00
1 KG PEMBESIAN BESI ULIR U-39 8,299.00
LANTAI I 1.0000 8,299.00 8,299.00
LANTAI II 1.0900 8,299.00 9,045.91
LANTAI III 1.1200 8,299.00 9,294.88
LANTAI IV 1.1350 8,299.00 9,419.37
LANTAI V 1.1620 8,299.00 9,643.44
BAHAN Besi beton Ulir 1.0500 kg 7,200.00 7,560.00
Kawat beton 0.0150 kg 10,500.00 157.50 7,717.50
TENAGA Mandor 0.0003 oh 60,000.00 18.00
Tukang Besi 0.0070 oh 40,000.00 280.00
Pekerja Tak Terampil 0.0070 oh 35,000.00 245.00
Kepala Tukang 0.0007 oh 55,000.00 38.50 581.50
1 KG PEMASANGAN WIREMESH 8,724.42
BAHAN Besi beton Polos 1.0200 kg 8,183.50 8,347.17
Kawat beton 0.0050 kg 10,500.00 52.50 8,399.67
TENAGA Mandor 0.0001 oh 60,000.00 6.00
Kepala Tukang 0.0025 oh 52,500.00 131.25
Tukang 0.0025 oh 40,000.00 100.00
Pekerja tak terampil 0.0025 oh 35,000.00 87.50 324.75
1 M2 MEMBUAT LANTAI KERJA BETON TUMBUK, 1 PC : 3 PS : 5 KR, TEBAL 5 CM 25,612.50
LANTAI I 1.0000 25,612.50 25,612.50
LANTAI II 1.0900 25,612.50 27,917.63
LANTAI III 1.1200 25,612.50 28,686.00
LANTAI IV 1.1350 25,612.50 29,070.19
LANTAI V 1.1620 25,612.50 29,761.73
BAHAN PC 10.0000 kg 1,200.00 12,000.00
Pasir Beton 0.0200 m3 140,000.00 2,800.00
Batu Pecah 2-3 0.0444 m3 150,000.00 6,660.00 21,460.00
TENAGA Pekerja tak terampil 0.0825 oh 35,000.00 2,887.50
Tukang 0.0200 oh 40,000.00 800.00
Kepala Tukang 0.0020 oh 52,500.00 105.00
Mandor 0.0060 oh 60,000.00 360.00 4,152.50
1 M3 MEMBUAT BETON MUTU f'c=7,4 Mpa ( K-100), SLUMP (12+2) CM, W/C = 0.87 456,489.80
BAHAN PC 218.0000 kg 1,200.00 261,600.00
Pasir Beton 0.0621 m3 140,000.00 8,689.80
Batu Pecah 2-3 0.7400 m3 150,000.00 111,000.00 381,289.80
TENAGA Pekerja tak terampil 1.6500 oh 35,000.00 57,750.00
Tukang 0.2750 oh 40,000.00 11,000.00
Kepala Tukang 0.0280 oh 52,500.00 1,470.00
Mandor 0.0830 oh 60,000.00 4,980.00 75,200.00
1 M3 MEMBUAT BETON MUTU f'c= 14.5 Mpa ( K-175), SLUMP (12+2) CM, W/C = 0.66 656,750.00
LANTAI I 1.0000 656,750.00 656,750.00
LANTAI II 1.0900 656,750.00 715,857.50
LANTAI III 1.1200 656,750.00 735,560.00
LANTAI IV 1.1350 656,750.00 745,411.25
LANTAI V 1.1620 656,750.00 763,143.50
BAHAN PC 326.0000 kg 1,200.00 391,200.00
Pasir Beton 0.5430 m3 140,000.00 76,020.00
Batu Pecah 2-3 0.7622 m3 150,000.00 114,330.00 581,550.00
TENAGA Pekerja tak terampil 1.6500 oh 35,000.00 57,750.00
Tukang 0.2750 oh 40,000.00 11,000.00
Kepala Tukang 0.0280 oh 52,500.00 1,470.00
Page 40 of 334
Mandor 0.0830 oh 60,000.00 4,980.00 75,200.00
1 M3 MEMBUAT BETON MUTU SITEMIX f'c= 21,7 Mpa ( K-250), SLUMP (12+2) CM, W/C = 0.56 711,342.00
BAHAN PC 384.0000 kg 1,200.00 460,800.00
Pasir Beton 0.4343 m3 140,000.00 60,802.00
Batu Pecah 2-3 0.7636 m3 150,000.00 114,540.00 636,142.00
TENAGA Pekerja tak terampil 1.6500 oh 35,000.00 57,750.00
Tukang 0.2750 oh 40,000.00 11,000.00
Kepala Tukang 0.0280 oh 52,500.00 1,470.00
Mandor 0.0830 oh 60,000.00 4,980.00 75,200.00
1 M3 BETON READYMIX K-175, BERIKUT POMPA : 542,150.00
LANTAI I 1.0000 542,150.00 542,150.00
LANTAI II 1.0900 542,150.00 590,943.50
LANTAI III 1.1200 542,150.00 607,208.00
LANTAI IV 1.1350 542,150.00 615,340.25
LANTAI V 1.1620 542,150.00 629,978.30
BAHAN Beton Readymix K-175 1.0200 m3 450,000.00 459,000.00 459,000.00
PERALATAN Peralatan bantu ( pompa+vibrator+tes lab ) 0.0450 ls 165,000.00 7,425.00 7,425.00
TENAGA Pekerja tak terampil 1.5000 oh 35,000.00 52,500.00
Tukang 0.5000 oh 40,000.00 20,000.00
Kepala Tukang 0.0500 oh 52,500.00 2,625.00
Mandor 0.0100 oh 60,000.00 600.00 75,725.00
1 M3 BETON READYMIX K-225, BERIKUT POMPA : 674,750.00
LANTAI I 1.0000 674,750.00 674,750.00
LANTAI II 1.0900 674,750.00 735,477.50
LANTAI III 1.1200 674,750.00 755,720.00
LANTAI IV 1.1350 674,750.00 765,841.25
LANTAI V 1.1620 674,750.00 784,059.50
BAHAN Beton Readymix K-225 1.0200 m3 580,000.00 591,600.00 591,600.00 528000
PERALATAN Peralatan bantu ( pompa+vibrator+tes lab ) 0.0450 ls 165,000.00 7,425.00 7,425.00
TENAGA Pekerja tak terampil 1.5000 oh 35,000.00 52,500.00
Tukang 0.5000 oh 40,000.00 20,000.00
Kepala Tukang 0.0500 oh 52,500.00 2,625.00
Mandor 0.0100 oh 60,000.00 600.00 75,725.00
1 M3 BETON READYMIX K-250, BERIKUT POMPA : 603,350.00
LANTAI I 1.0000 603,350.00 603,350.00
LANTAI II 1.0900 603,350.00 657,651.50
LANTAI III 1.1200 603,350.00 675,752.00
LANTAI IV 1.1350 603,350.00 684,802.25
LANTAI V 1.1620 603,350.00 701,092.70
BAHAN BETON READYMIX K-250, BERIKUT POMPA : 1.0200 m3 510,000.00 520,200.00 520,200.00 526500
PERALATAN Peralatan bantu ( pompa+vibrator+tes lab ) 0.0450 ls 165,000.00 7,425.00 7,425.00
TENAGA Pekerja tak terampil 1.5000 oh 35,000.00 52,500.00
Tukang 0.5000 oh 40,000.00 20,000.00
Kepala Tukang 0.0500 oh 52,500.00 2,625.00
Mandor 0.0100 oh 60,000.00 600.00 75,725.00
1 M3 MEMBUAT BETON STROUS DIA 20 CM 1,312,060.00
Spesi Beton Strous 1.0000 m3 657,380.00 657,380.00
Besi polos 5 dia 10, Dia 6-150mm 80.0000 kg 8,183.50 654,680.00
1 M3 MEMBUAT BETON STROUS DIA 25 CM 1,462,063.56
Spesi Beton Strous 1.0000 m3 657,380.00 657,380.00
Besi polos 6 dia 10, Dia 6-150mm 98.3300 kg 8,183.50 804,683.55
1 M3 MEMBUAT BETON STROUS DIA 30 CM 1,516,647.50
Spesi Beton Strous 1.0000 m3 657,380.00 657,380.00
Besi polos 7 dia 10, Dia 6-150mm 105.0000 kg 8,183.50 859,267.50
1 M3 PEMBONGKARAN CETAKAN DAN PENYIRAMAN 105,000.00
TENAGA Pekerja / Buruh tak terampil 3.0000 oh 35,000.00 105,000.00
PEK.BETON DIBAWAH LANTAI ± 0.001 M3 Poer type P1/. (165x90x70) 126.18 KG = 1,845,786.86
Pekerjaan Beton Struktur K-300 1.0000 m3 603,350.00 603,350.00
Pekerjaan Pembesian beton ulir 126.1847 kg 8,299.00 1,047,206.86
Bekisting 2.0000 m2 92,365.00 184,730.00
Pembongkaran cetakan 0.1000 m3 105,000.00 10,500.00
1 M3 Poer type P2. (1750x1750x70) 165.81 KG = 2,174,617.11
Pekerjaan Beton Struktur K-300 1.0000 m3 603,350.00 603,350.00
Pekerjaan Pembesian beton ulir 165.8076 kg 8,299.00 1,376,037.11
Bekisting 2.0000 m2 92,365.00 184,730.00
Pembongkaran cetakan 0.1000 m3 105,000.00 10,500.00
1 M3 Poer type P3. (2000x2000x70) 144.74 KG = 1,969,043.43
Pekerjaan Beton Struktur K-300 1.0000 m3 603,350.00 603,350.00
Pekerjaan Pembesian beton ulir 144.7429 kg 8,299.00 1,201,220.97
Bekisting 1.6670 m2 92,365.00 153,972.46
Pembongkaran cetakan 0.1000 m3 105,000.00 10,500.00
1 M3 Poer type P4/. (2400x2400x70) 169.19 KG = 2,159,473.18
Pekerjaan Beton Struktur K-300 1.0000 m3 603,350.00 603,350.00
Pekerjaan Pembesian beton ulir 169.1915 kg 8,299.00 1,404,120.00
Bekisting 1.5320 m2 92,365.00 141,503.18
Pembongkaran cetakan 0.1000 m3 105,000.00 10,500.00
1 M3 Poer type P5. (900X900X50) RAMP 126.18 KG = 1,815,029.32
Pekerjaan Beton Struktur K-300 1.0000 m3 603,350.00 603,350.00
Pekerjaan Pembesian beton ulir 126.1847 kg 8,299.00 1,047,206.86
Bekisting 1.6670 m2 92,365.00 153,972.46
Pembongkaran cetakan 0.1000 m3 105,000.00 10,500.00
1 M3 Poer type P2. (1750x1750x70) unt. TANGGA UTAMA 165.81 KG = 2,143,859.56
Pekerjaan Beton Struktur K-250 1.0000 m3 603,350.00 603,350.00
Pekerjaan Pembesian beton ulir 165.8076 kg 8,299.00 1,376,037.11
Bekisting 1.6670 m2 92,365.00 153,972.46
Pembongkaran cetakan 0.1000 m3 105,000.00 10,500.00
1 M3 Poer type P1/P7 (tangga). (165x90x70) UN.T.UTMA 126.18 KG = 1,815,029.32
Pekerjaan Beton Struktur K-300 1.0000 m3 603,350.00 603,350.00
Pekerjaan Pembesian beton ulir 126.1847 kg 8,299.00 1,047,206.86
Bekisting 1.6670 m2 92,365.00 153,972.46
Pembongkaran cetakan 0.1000 m3 105,000.00 10,500.00
1 M3 Poer type P4/. (2400x2400x70)g un.LIFT 169.19 KG = 2,136,723.68
Pekerjaan Beton Struktur K-300 1.0000 m3 603,350.00 603,350.00
Pekerjaan Pembesian beton ulir 169.1915 kg 8,299.00 1,404,120.00
Bekisting 1.2857 m2 92,365.00 118,753.68
Pembongkaran cetakan 0.1000 m3 105,000.00 10,500.00
1 M3 Poer type P1. (165x90x70) UN.LIFT 126.18 KG = 1,768,819.11
Page 41 of 334
Pekerjaan Beton Struktur K-300 1.0000 m3 603,350.00 603,350.00
Pekerjaan Pembesian beton ulir 126.1847 kg 8,299.00 1,047,206.86
Bekisting 1.1667 m2 92,365.00 107,762.25
Pembongkaran cetakan 0.1000 m3 105,000.00 10,500.00
1 M3 BETON SLOOF 30/40 BESI ULIR TYPE S2 265.00 KG = 3,429,159.55
Pekerjaan Beton Struktur K-300 1.0000 m3 603,350.00 603,350.00
Pekerjaan Pembesian beton ulir 265.0000 kg 8,299.00 2,199,235.00
Bekisting 6.6700 m2 92,365.00 616,074.55
Pembongkaran cetakan 0.1000 m3 105,000.00 10,500.00
1 M3 BETON SLOOF 40/60 BESI ULIR TYPE S1 181.59 KG = 2,726,439.96
Pekerjaan Beton Struktur K-300 1.0000 m3 603,350.00 603,350.00
Pekerjaan Pembesian beton ulir 181.5900 kg 8,299.00 1,507,015.41
Bekisting 6.6700 m2 92,365.00 616,074.55
Pembongkaran cetakan 0.0000 m3 105,000.00 -
1 M3 BETON KOLOM UTAMA 50/50 BESI ULIR 274.57 KG = 4,020,402.32
Pekerjaan Beton Struktur K-300 1.0000 m3 603,350.00 603,350.00
Pekerjaan Pembesian beton ulir 274.5740 kg 8,299.00 2,278,689.63
Bekisting 7.3334 m2 155,230.50 1,138,362.69
Pembongkaran cetakan 0.0000 m3 105,000.00 -
1 M3 BETON KOLOM UTAMA 40/40 BESI ULIR UN.LIFT 286.35 KG = 4,014,643.82
Pekerjaan Beton Struktur K-300 1.0000 m3 603,350.00 603,350.00
Pekerjaan Pembesian beton ulir 286.3500 kg 8,299.00 2,376,418.65
Bekisting 6.6667 m2 155,230.50 1,034,875.17
Pembongkaran cetakan 0.0000 m3 105,000.00 -
1 M3 BETON KOLOM UTAMA 30/30 BESI ULIR 286.69 KG = 5,052,278.57
Pekerjaan Beton Struktur K-300 1.0000 m3 603,350.00 603,350.00
Pekerjaan Pembesian beton ulir 286.6900 kg 8,299.00 2,379,240.31
Bekisting 13.3330 m2 155,230.50 2,069,688.26
Pembongkaran cetakan 0.0000 m3 105,000.00 -
1 M3 BETON KOLOM PRAKTIS 15/15 K-175 BESI POLOS 111.42 KG = 3,643,987.36
Pekerjaan Beton Struktur K-175 1.0000 m3 656,750.00 656,750.00
Pekerjaan Pembesian beton polos 111.4200 kg 8,183.50 911,805.57
Bekisting 13.3700 m2 155,230.50 2,075,431.79
Pembongkaran cetakan 0.0000 m3 105,000.00 -
1 M3 BETON PLAT T=15 CM LIFT LANTAI/DINDING DASAR 197.36 KG = 2,834,243.02
Pekerjaan Beton Struktur K-300 1.0000 m3 603,350.00 603,350.00
Pekerjaan Pembesian beton POLOS 197.3600 kg 8,183.50 1,615,095.56
Bekisting 6.6670 m2 92,365.00 615,797.46
Pembongkaran cetakan 0.0000 m3 105,000.00 -
1 M3 BETON PONDASI PLAT LAJUR KHUSUS TANGGA 15.86 KG = 1,116,623.79
Pekerjaan Beton Struktur K-300 1.0000 m3 603,350.00 603,350.00
Pekerjaan Pembesian beton ulir U-39 15.8600 kg 8,299.00 131,622.14
Bekisting 2.9952 m2 92,365.00 276,651.65
Pembongkaran cetakan 1.0000 m3 105,000.00 105,000.00
PEK. BETON DIATAS LANTAI.1 ( ± 0.00 )1 M3 BETON KOLOM UTAMA 50/50 BESI ULIR 274.574 KG = 4,020,402.32
Pekerjaan Beton Struktur K-250 1.0000 m3 603,350.00 603,350.00
Pekerjaan Pembesian beton ulir 274.5740 kg 8,299.00 2,278,689.63
Bekisting 7.3334 m2 155,230.50 1,138,362.69
Pembongkaran cetakan 0.0000 m3 105,000.00 -
1 M3 BETON KOLOM UTAMA 40/40 BESI ULIR 286.35 KG = 4,014,643.82
Pekerjaan Beton Struktur K-250 1.0000 m3 603,350.00 603,350.00
Pekerjaan Pembesian beton ulir 286.3500 kg 8,299.00 2,376,418.65
Bekisting 6.6667 m2 155,230.50 1,034,875.17
Pembongkaran cetakan 0.0000 m3 105,000.00 -
1 M3 BETON KOLOM UTAMA 30/30 BESI ULIR 286.69 KG = 4,756,657.60
Pekerjaan Beton Struktur K-250 1.0000 m3 603,350.00 603,350.00
Pekerjaan Pembesian beton ulir 286.6900 kg 8,299.00 2,379,240.31
Bekisting 11.4286 m2 155,230.50 1,774,067.29
Pembongkaran cetakan 0.0000 m3 105,000.00 -
1 M3 BETON KOLOM PRAKTIS 15/15 K-175 BESI POLOS 111.42 KG = 1,639,454.77
Pekerjaan Beton Struktur K-175 1.0000 m3 542,150.00 542,150.00
Pekerjaan Pembesian beton polos 111.4200 kg 8,299.00 924,674.58
Bekisting 1.8690 m2 92,365.00 172,630.18
Pembongkaran cetakan 0.0000 m3 105,000.00 -
1 M3 BETON BALOK 35/70 K-250 BESI ULIR type B-1 199.41 KG = 3,075,196.73
Pekerjaan Beton Struktur K-250 1.0000 m3 603,350.00 603,350.00
Pekerjaan Pembesian beton ulir 199.4080 kg 8,299.00 1,654,886.99
Bekisting 5.9810 m2 136,592.50 816,959.74
Pembongkaran cetakan 0.0000 m3 105,000.00 -
1 M3 BETON BALOK 30/60 K-250 BESI ULIR type B-2 253.91 KG = 3,635,195.94
Pekerjaan Beton Struktur K-250 1.0000 m3 603,350.00 603,350.00
Pekerjaan Pembesian beton ulir 253.9130 kg 8,299.00 2,107,223.99
Bekisting 6.7692 m2 136,592.50 924,621.95
Pembongkaran cetakan 0.0000 m3 105,000.00 -
1 M3 BETON BALOK 20/40 K-250 BESI ULIR type B-3 264.21 KG = 3,720,642.44
Pekerjaan Beton Struktur K-250 1.0000 m3 603,350.00 603,350.00
;..; 264.2090 kg 8,299.00 2,192,670.49
Bekisting 6.7692 m2 136,592.50 924,621.95
Pembongkaran cetakan 0.0000 m3 105,000.00 -
1 M3 BETON BALOK 15/25 BESI POLOS 110.00 KG = 2,008,532.71
Pekerjaan Beton Struktur K-225 1.0000 m3 674,750.00 674,750.00
Pekerjaan Pembesian beton Polos 110.0000 kg 8,299.00 912,890.00
Bekisting 3.0814 m2 136,592.50 420,892.71
Pembongkaran cetakan 0.0000 m3 105,000.00 -
1 M3 BETON LANTAI BESI POLOS 131.13 KG = 2,946,538.65
Pekerjaan Beton Struktur K-250 1.0000 m3 603,350.00 603,350.00
Pekerjaan Pembesian beton polos 131.1310 kg 8,299.00 1,088,256.17
Bekisting 8.3333 m2 150,592.50 1,254,932.48
Pembongkaran cetakan 0.0000 m3 105,000.00 -
1 M3 BETON TANGGA BESI POLOS 203.81 KG = 3,958,650.50
Pekerjaan Beton Struktur K-250 1.0000 m3 603,350.00 603,350.00
Pekerjaan Pembesian beton polos 203.8100 kg 8,299.00 1,691,419.19
Bekisting 14.2175 m2 117,030.51 1,663,881.31
Pembongkaran cetakan 0.0000 m3 105,000.00 -
1 M3 BETON CANOPY JENDELA BESI POLOS 127.60 KG = 1,870,183.38
Pekerjaan Beton Struktur K-225 1.0000 m3 674,750.00 674,750.00
Pekerjaan Pembesian beton polos 127.6000 kg 8,299.00 1,058,952.40
Bekisting 1.1662 m2 117,030.51 136,480.98
Pembongkaran cetakan 0.0000 m3 105,000.00 -
PEK. BETON DIATAS LANTAI.2 ( + 4.50 )1 M3 BETON KOLOM UTAMA 50/50 BESI ULIR 274.57 KG = 4,382,238.53
Pekerjaan Beton Struktur K-250 1.0000 m3 657,651.50 657,651.50
Pekerjaan Pembesian beton ulir 274.5740 kg 9,045.91 2,483,771.69
Bekisting 7.3334 m2 169,201.25 1,240,815.33
Pembongkaran cetakan 0.0000 m3 105,000.00 -
1 M3 BETON KOLOM UTAMA 40/40 BESI ULIR 286.35 KG = 4,375,961.77
Pekerjaan Beton Struktur K-250 1.0000 m3 657,651.50 657,651.50
Pekerjaan Pembesian beton ulir 286.3500 kg 9,045.91 2,590,296.33
Bekisting 6.6667 m2 169,201.25 1,128,013.94
Pembongkaran cetakan 0.0000 m3 105,000.00 -
1 M3 BETON KOLOM UTAMA 30/30 BESI ULIR 286.69 KG = 5,184,756.79
Page 42 of 334
Pekerjaan Beton Struktur K-250 1.0000 m3 657,651.50 657,651.50
Pekerjaan Pembesian beton ulir 286.6900 kg 9,045.91 2,593,371.94
Bekisting 11.4286 m2 169,201.25 1,933,733.35
Pembongkaran cetakan 0.0000 m3 105,000.00 -
1 M3 BETON KOLOM PRAKTIS 15/15 K-175 BESI POLOS 111.42 KG = 1,772,978.47
Pekerjaan Beton Struktur K-175 1.0000 m3 590,943.50 590,943.50
Pekerjaan Pembesian beton polos 111.4200 kg 8,920.02 993,868.07
Bekisting 1.8690 m2 100,677.85 188,166.90
Pembongkaran cetakan 0.0000 m3 105,000.00 -
1 M3 BETON BALOK 35/70 K-300 BESI ULIR type B-1 199.41 KG = 3,351,964.44
Pekerjaan Beton Struktur K-250 1.0000 m3 657,651.50 657,651.50
Pekerjaan Pembesian beton ulir 199.4080 kg 9,045.91 1,803,826.82
Bekisting 5.9810 m2 148,885.83 890,486.12
Pembongkaran cetakan 0.0000 m3 105,000.00 -
1 M3 BETON BALOK 30/60 K-300 BESI ULIR type B-2 253.91 KG = 4,002,677.09
Pekerjaan Beton Struktur K-250 1.0000 m3 657,651.50 657,651.50
Pekerjaan Pembesian beton ulir 253.9130 kg 9,045.91 2,296,874.15
Bekisting 7.0400 m2 148,885.83 1,048,151.44
Pembongkaran cetakan 0.0000 m3 105,000.00 -
1 M3 BETON BALOK 20/40 K-300 BESI ULIR type B-3 264.21 KG = 4,055,500.26
Pekerjaan Beton Struktur K-250 1.0000 m3 657,651.50 657,651.50
Pekerjaan Pembesian beton ulir 264.2090 kg 9,045.91 2,390,010.84
Bekisting 6.7692 m2 148,885.83 1,007,837.93
Pembongkaran cetakan 0.0000 m3 105,000.00 -
1 M3 BETON BALOK 15/25 BESI POLOS 110.00 KG = 2,137,663.36
Pekerjaan Beton Struktur K-225 1.0000 m3 674,750.00 674,750.00
Pekerjaan Pembesian beton Polos 110.0000 kg 8,920.02 981,201.65
Bekisting 3.2354 m2 148,885.83 481,711.71
Pembongkaran cetakan 0.0000 m3 105,000.00 -
1 M3 BETON LANTAI BESI POLOS 131.13 KG = 3,195,218.39
Pekerjaan Beton Struktur K-250 1.0000 m3 657,651.50 657,651.50
Pekerjaan Pembesian beton polos 131.1310 kg 8,920.02 1,169,690.49
Bekisting 8.3333 m2 164,145.83 1,367,876.40
Pembongkaran cetakan 0.0000 m3 105,000.00 -
1 M3 BETON TANGGA BESI POLOS 203.81 KG = 4,289,270.39
Pekerjaan Beton Struktur K-250 1.0000 m3 657,651.50 657,651.50
Pekerjaan Pembesian beton polos 203.8100 kg 8,920.02 1,817,988.26
Bekisting 14.2175 m2 127,563.26 1,813,630.63
Pembongkaran cetakan 0.0000 m3 105,000.00 -
1 M3 BETON CANOPY JENDELA BESI POLOS 127.60 KG = 1,882,466.67
Pekerjaan Beton Struktur K-225 1.0000 m3 674,750.00 674,750.00
Pekerjaan Pembesian beton polos 127.6000 kg 8,299.00 1,058,952.40
Bekisting 1.1662 m2 127,563.26 148,764.27
Pembongkaran cetakan 0.0000 m3 105,000.00 -
PEK. BETON DIATAS LANTAI.3 ( + 8.50 )1 M3 BETON KOLOM UTAMA 50/50 BESI ULIR 274.57 KG = 4,502,850.60
Pekerjaan Beton Struktur K-300 1.0000 m3 675,752.00 675,752.00
Pekerjaan Pembesian beton ulir 274.5740 kg 9,294.88 2,552,132.38
Bekisting 7.3334 m2 173,858.16 1,274,966.21
Pembongkaran cetakan 0.0000 m3 105,000.00 -
1 M3 BETON KOLOM UTAMA 40/40 BESI ULIR 286.35 KG = 4,496,401.08
Pekerjaan Beton Struktur K-300 1.0000 m3 675,752.00 675,752.00
Pekerjaan Pembesian beton ulir 286.3500 kg 9,294.88 2,661,588.89
Bekisting 6.6667 m2 173,858.16 1,159,060.20
Pembongkaran cetakan 0.0000 m3 105,000.00 -
1 M3 BETON KOLOM UTAMA 30/30 BESI ULIR 286.69 KG = 5,327,456.51
Pekerjaan Beton Struktur K-300 1.0000 m3 675,752.00 675,752.00
Pekerjaan Pembesian beton ulir 286.6900 kg 9,294.88 2,664,749.15
Bekisting 11.4286 m2 173,858.16 1,986,955.37
Pembongkaran cetakan 0.0000 m3 105,000.00 -
1 M3 BETON KOLOM PRAKTIS 15/15 K-175 BESI POLOS 149.17 KG = 2,299,369.52
Pekerjaan Beton Struktur K-175 1.0000 m3 607,208.00 607,208.00
Pekerjaan Pembesian beton polos 149.1700 kg 9,165.52 1,367,220.62
Bekisting 1.8690 m2 173,858.16 324,940.90
Pembongkaran cetakan 0.0000 m3 105,000.00 -
1 M3 BETON BALOK 35/70 K-300 BESI ULIR type B-1 199.41 KG = 3,444,220.34
Pekerjaan Beton Struktur K-250 1.0000 m3 675,752.00 675,752.00
Pekerjaan Pembesian beton ulir 199.4080 kg 9,294.88 1,853,473.43
Bekisting 5.9810 m2 152,983.60 914,994.91
Pembongkaran cetakan 0.0000 m3 105,000.00 -
1 M3 BETON BALOK 30/60 K-300 BESI ULIR type B-2 253.91 KG = 4,112,842.51
Pekerjaan Beton Struktur K-250 1.0000 m3 675,752.00 675,752.00
Pekerjaan Pembesian beton ulir 253.9130 kg 9,294.88 2,360,090.87
Bekisting 7.0400 m2 152,983.60 1,076,999.65
Pembongkaran cetakan 0.0000 m3 105,000.00 -
1 M3 BETON BALOK 20/40 K-300 BESI ULIR type B-3 264.21 KG = 4,167,119.54
Pekerjaan Beton Struktur K-250 1.0000 m3 675,752.00 675,752.00
Pekerjaan Pembesian beton ulir 264.2090 kg 9,294.88 2,455,790.95
Bekisting 6.7692 m2 152,983.60 1,035,576.59
Pembongkaran cetakan 0.0000 m3 105,000.00 -
1 M3 BETON BALOK 15/25 BESI POLOS 110.00 KG = 2,110,385.03
Pekerjaan Beton Struktur K-225 1.0000 m3 607,208.00 607,208.00
Pekerjaan Pembesian beton Polos 110.0000 kg 9,165.52 1,008,207.20
Bekisting 3.2354 m2 152,983.60 494,969.83
Pembongkaran cetakan 0.0000 m3 105,000.00 -
1 M3 BETON LANTAI BESI POLOS 131.13 KG = 3,283,160.18
Pekerjaan Beton Struktur K-250 1.0000 m3 675,752.00 675,752.00
Pekerjaan Pembesian beton polos 131.1310 kg 9,165.52 1,201,883.80
Bekisting 8.3333 m2 168,663.60 1,405,524.38
Pembongkaran cetakan 0.0000 m3 105,000.00 -
1 M3 BETON TANGGA BESI POLOS 203.81 KG = 4,407,323.70
Pekerjaan Beton Struktur K-250 1.0000 m3 675,752.00 675,752.00
Pekerjaan Pembesian beton polos 203.8100 kg 9,165.52 1,868,024.63
Bekisting 14.2175 m2 131,074.17 1,863,547.07
Pembongkaran cetakan 0.0000 m3 105,000.00 -
1 M3 BETON CANOPY JENDELA BESI POLOS 127.60 KG = 1,929,587.05
Pekerjaan Beton Struktur K-225 1.0000 m3 607,208.00 607,208.00
Pekerjaan Pembesian beton polos 127.6000 kg 9,165.52 1,169,520.35
Bekisting 1.1662 m2 131,074.17 152,858.70
Pembongkaran cetakan 0.0000 m3 105,000.00 -
PEK. BETON DIATAS LANTAI.4 ( + 12.50)1 M3 BETON KOLOM UTAMA 50/50 BESI ULIR 274.57 KG = 4,563,156.63
Pekerjaan Beton Struktur K-250 1.0000 m3 684,802.25 684,802.25
Pekerjaan Pembesian beton ulir 274.5740 kg 9,419.37 2,586,312.73
Bekisting 7.3334 m2 176,186.62 1,292,041.66
Pembongkaran cetakan 0.0000 m3 105,000.00 -
1 M3 BETON KOLOM UTAMA 40/40 BESI ULIR 286.35 KG = 4,556,620.74
Pekerjaan Beton Struktur K-250 1.0000 m3 684,802.25 684,802.25
Pekerjaan Pembesian beton ulir 286.3500 kg 9,419.37 2,697,235.17
Bekisting 6.6667 m2 176,186.62 1,174,583.32
Pembongkaran cetakan 0.0000 m3 105,000.00 -
1 M3 BETON KOLOM UTAMA 30/30 BESI ULIR 286.69 KG = 5,398,806.38
Page 43 of 334
Pekerjaan Beton Struktur K-250 1.0000 m3 684,802.25 684,802.25
Pekerjaan Pembesian beton ulir 286.6900 kg 9,419.37 2,700,437.75
Bekisting 11.4286 m2 176,186.62 2,013,566.38
Pembongkaran cetakan 0.0000 m3 105,000.00 -
1 M3 BETON KOLOM PRAKTIS 15/15 K-175 BESI POLOS 149.17 KG = 2,322,032.40
Pekerjaan Beton Struktur K-175 1.0000 m3 607,208.00 607,208.00
Pekerjaan Pembesian beton polos 149.1700 kg 9,288.27 1,385,531.61
Bekisting 1.8690 m2 176,186.62 329,292.79
Pembongkaran cetakan 0.0000 m3 105,000.00 -
1 M3 BETON BALOK 35/70 K-300 BESI ULIR type B-1 199.41 KG = 3,490,348.29
Pekerjaan Beton Struktur K-250 1.0000 m3 684,802.25 684,802.25
Pekerjaan Pembesian beton ulir 199.4080 kg 9,419.37 1,878,296.74
Bekisting 5.9810 m2 155,032.49 927,249.31
Pembongkaran cetakan 0.0000 m3 105,000.00 -
1 M3 BETON BALOK 30/60 K-300 BESI ULIR type B-2 284.16 KG = 4,452,832.76
Pekerjaan Beton Struktur K-250 1.0000 m3 684,802.25 684,802.25
Pekerjaan Pembesian beton ulir 284.1600 kg 9,419.37 2,676,606.76
Bekisting 7.0400 m2 155,032.49 1,091,423.75
Pembongkaran cetakan 0.0000 m3 105,000.00 -
1 M3 BETON BALOK 20/40 K-300 BESI ULIR type B-3 264.21 KG = 4,222,929.17
Pekerjaan Beton Struktur K-250 1.0000 m3 684,802.25 684,802.25
Pekerjaan Pembesian beton ulir 264.2090 kg 9,419.37 2,488,681.01
Bekisting 6.7692 m2 155,032.49 1,049,445.91
Pembongkaran cetakan 0.0000 m3 105,000.00 -
1 M3 BETON BALOK 15/25 BESI POLOS 110.00 KG = 2,130,516.87
Pekerjaan Beton Struktur K-225 1.0000 m3 607,208.00 607,208.00
Pekerjaan Pembesian beton Polos 110.0000 kg 9,288.27 1,021,709.98
Bekisting 3.2354 m2 155,032.49 501,598.89
Pembongkaran cetakan 0.0000 m3 105,000.00 -
1 M3 BETON LANTAI BESI POLOS 131.13 KG = 3,327,131.08
Pekerjaan Beton Struktur K-250 1.0000 m3 684,802.25 684,802.25
Pekerjaan Pembesian beton polos 131.1310 kg 9,288.27 1,217,980.46
Bekisting 8.3333 m2 170,922.49 1,424,348.37
Pembongkaran cetakan 0.0000 m3 105,000.00 -
1 M3 BETON TANGGA BESI POLOS 203.81 KG = 4,466,350.36
Pekerjaan Beton Struktur K-250 1.0000 m3 684,802.25 684,802.25
Pekerjaan Pembesian beton polos 203.8100 kg 9,288.27 1,893,042.82
Bekisting 14.2175 m2 132,829.63 1,888,505.29
Pembongkaran cetakan 0.0000 m3 105,000.00 -
1 M3 BETON CANOPY JENDELA BESI POLOS 127.60 KG = 1,947,297.49
Pekerjaan Beton Struktur K-225 1.0000 m3 607,208.00 607,208.00
Pekerjaan Pembesian beton polos 127.6000 kg 9,288.27 1,185,183.57
Bekisting 1.1662 m2 132,829.63 154,905.92
Pembongkaran cetakan 0.0000 m3 105,000.00 -
PEK. BETON DIATAS LANTAI.ATAP ( + 16.50 )1 M3 BETON KOLOM UTAMA 50/50 BESI ULIR 274.57 KG = 4,671,707.49
Pekerjaan Beton Struktur K-300 1.0000 m3 701,092.70 701,092.70
Pekerjaan Pembesian beton ulir 274.5740 kg 9,643.44 2,647,837.35
Bekisting 7.3334 m2 180,377.84 1,322,777.45
Pembongkaran cetakan 0.0000 m3 105,000.00 -
1 M3 BETON KOLOM UTAMA 40/40 BESI ULIR 286.35 KG = 4,665,016.12
Pekerjaan Beton Struktur K-300 1.0000 m3 701,092.70 701,092.70
Pekerjaan Pembesian beton ulir 286.3500 kg 9,643.44 2,761,398.47
Bekisting 6.6667 m2 180,377.84 1,202,524.95
Pembongkaran cetakan 0.0000 m3 105,000.00 -
1 M3 BETON KOLOM UTAMA 30/30 BESI ULIR 286.69 KG = 5,527,236.13
Pekerjaan Beton Struktur K-300 1.0000 m3 701,092.70 701,092.70
Pekerjaan Pembesian beton ulir 286.6900 kg 9,643.44 2,764,677.24
Bekisting 11.4286 m2 180,377.84 2,061,466.19
Pembongkaran cetakan 0.0000 m3 105,000.00 -
1 M3 BETON KOLOM PRAKTIS 15/15 K-175 BESI POLOS 149.17 KG = 2,362,825.58
Pekerjaan Beton Struktur K-175 1.0000 m3 607,208.00 607,208.00
Pekerjaan Pembesian beton polos 149.1700 kg 9,509.23 1,418,491.39
Bekisting 1.8690 m2 180,377.84 337,126.18
Pembongkaran cetakan 0.0000 m3 105,000.00 -
1 M3 BETON BALOK 35/70 K-300 BESI ULIR type B-1 199.41 KG = 3,573,378.61
Pekerjaan Beton Struktur K-300 1.0000 m3 701,092.70 701,092.70
Pekerjaan Pembesian beton ulir 199.4080 kg 9,643.44 1,922,978.68
Bekisting 5.9810 m2 158,720.49 949,307.22
Pembongkaran cetakan 0.0000 m3 105,000.00 -
1 M3 BETON BALOK 30/60 K-300 BESI ULIR type B-2 284.16 KG = 4,558,759.18
Pekerjaan Beton Struktur K-300 1.0000 m3 701,092.70 701,092.70
Pekerjaan Pembesian beton ulir 284.1600 kg 9,643.44 2,740,279.34
Bekisting 7.0400 m2 158,720.49 1,117,387.14
Pembongkaran cetakan 0.0000 m3 105,000.00 -
1 M3 BETON BALOK 20/40 K-300 BESI ULIR type B-3 264.21 KG = 4,323,386.52
Pekerjaan Beton Struktur K-300 1.0000 m3 701,092.70 701,092.70
Pekerjaan Pembesian beton ulir 264.2090 kg 9,643.44 2,547,883.11
Bekisting 6.7692 m2 158,720.49 1,074,410.71
Pembongkaran cetakan 0.0000 m3 105,000.00 -
1 M3 BETON BALOK 15/25 BESI POLOS 110.00 KG = 2,166,754.17
Pekerjaan Beton Struktur K-225 1.0000 m3 607,208.00 607,208.00
Pekerjaan Pembesian beton Polos 110.0000 kg 9,509.23 1,046,014.97
Bekisting 3.2354 m2 158,720.49 513,531.20
Pembongkaran cetakan 0.0000 m3 105,000.00 -
1 M3 BETON LANTAI BESI POLOS 131.13 KG = 3,406,278.69
Pekerjaan Beton Struktur K-250 1.0000 m3 701,092.70 701,092.70
Pekerjaan Pembesian beton polos 131.1310 kg 9,509.23 1,246,954.45
Bekisting 8.3333 m2 174,988.49 1,458,231.54
Pembongkaran cetakan 0.0000 m3 105,000.00 -
1 M3 BETON TANGGA BESI POLOS 203.81 KG = 4,572,598.34
Pekerjaan Beton Struktur K-250 1.0000 m3 701,092.70 701,092.70
Pekerjaan Pembesian beton polos 203.8100 kg 9,509.23 1,938,075.55
Bekisting 14.2175 m2 135,989.46 1,933,430.08
Pembongkaran cetakan 0.0000 m3 105,000.00 -
1 M3 BETON CANOPY JENDELA BESI POLOS 127.60 KG = 1,950,982.47
Pekerjaan Beton Struktur K-225 1.0000 m3 607,208.00 607,208.00
Pekerjaan Pembesian beton polos 127.6000 kg 9,288.27 1,185,183.57
Bekisting 1.1662 m2 135,989.46 158,590.90
Pembongkaran cetakan 0.0000 m3 105,000.00 -
PEKERJAAN BETON RABAT DAN BETON LAIN
1 m2 BETON SCREED 1 : 3 63,755.00
Lantai Satu 1.0000 63,755.00 63,755.00
Lantai Dua 1.0900 63,755.00 69,492.95
Lantai Tiga 1.1200 63,755.00 71,405.60
Lantai Empat 1.1350 63,755.00 72,361.93
Lantai Lima 1.1620 63,755.00 74,083.31
Lantai Enam 1.1970 63,755.00 76,314.74
Lantai Tujuh 1.2360 63,755.00 78,801.18
BAHAN Semen PC/50 kg 10.0000 kg 1,200.00 12,000.00
Pasir Beton I 0.0260 m3 140,000.00 3,640.00
Page 44 of 334
Batu Koral Beton 0.0440 m3 150,000.00 6,600.00 22,240.00
TENAGA Pekerja 1.1500 oh 35,000.00 40,250.00
Tukang batu 0.0200 oh 40,000.00 800.00
Kepala tukang batu 0.0020 oh 52,500.00 105.00
Mandor 0.0060 oh 60,000.00 360.00 41,515.00
1 M2 MEMBUAT LANTAI KERJA 25,612.50
BAHAN PC 10.0000 kg 1,200.00 12,000.00
Pasir Beton 0.0200 m3 140,000.00 2,800.00
Batu kerikil 0.0444 m3 150,000.00 6,660.00 21,460.00
TENAGA Pekerja Terampil 0.0825 oh 35,000.00 2,887.50
Tukang 0.0200 oh 40,000.00 800.00
Kepala Tukang 0.0020 oh 52,500.00 105.00
Mandor 0.0060 oh 60,000.00 360.00 4,152.50
1 M3 CHIPPING & CONCRETING / JACKETING 417,972.00
BAHAN PC 43.2000 kg 1,200.00 51,840.00
Pasir Pasang 0.4200 m3 135,000.00 56,700.00
Batu kerikil 0.7700 m3 150,000.00 115,500.00 224,040.00
TENAGA Pekerja Tak Terampil 2.1000 oh 35,000.00 73,500.00
Tukang 0.2100 oh 40,000.00 8,400.00
Kepala Tukang 0.0000 oh 52,500.00 -
Mandor 0.0840 oh 60,000.00 5,040.00 86,940.00
ALAT Sewa Concrete Mixer 0.2520 jam 261,000.00 65,772.00
Sewa Concrete Pump 0.0840 jam 285,000.00 23,940.00
Sewa Concrete vibrator 1.0800 jam 16,000.00 17,280.00 106,992.00
1M' SALURAN BETON PRECAST (PABRIK) PENURUNAN DAN PEMASANGAN 49,735.50
BAHAN U.Guffer U.1000 K-350; besi 130 kg 0.4166 bh - -
Cover 1000x1000x2400; besi 160 kg 0.4166 bh - - -
TENAGA Pekerja Tak Terampil 0.0381 oh 35,000.00 1,333.50
Mandor 0.0038 oh 60,000.00 228.00 10,675.50
Operator 0.1736 oh 52,500.00 9,114.00
ALAT Sewa Crane 0.1736 jam 225,000.00 39,060.00
Sewa alat bantu 0.1000 jam - - 39,060.00
1M' PEMASANGAN SALURAN BUIS BETON Ǿ 1.00 M 284,361.50
BAHAN Buis Beton bulat ukuran 100x100 1.0000 bh 280,000.00 280,000.00 280,000.00
TENAGA Pekerja Tak Terampil 0.0381 oh 35,000.00 1,333.50
Mandor 0.0038 oh 60,000.00 228.00 1,561.50
ALAT Sewa alat bantu 0.1000 jam 28,000.00 2,800.00 2,800.00
PEKERJAAN BESI ( BAJA-PAGAR-PIPA )
1 KG PEK.PABRIKASI DAN PEMASANGAN BAJA ( ELEKTRODE ) 22,955.00 BAHAN
Elektrode Baja 1.0000 kg 21,000.00 21,000.00 21,095.00 Bahan bakar solar 0.0100 kg 6,500.00 65.00 Pelumas 0.0010 kg 30,000.00 30.00
TENAGA Pekerja 0.0010 oh 35,000.00 35.00 Tukang besi profil 0.0010 oh 40,000.00 40.00 Kepala Tukang besi profil 0.0002 oh 52,500.00 10.50 Operator Alat berat 0.0002 oh 52,500.00 10.50 Pembantu operator 0.0002 oh 40,000.00 8.00 Mandor 0.0001 oh 60,000.00 6.00 110.00
ALAT Sewa Welding Set 0.0700 jam 25,000.00 1,750.00 1,750.00
1 KG PEKERJAAN BESI PLAT BORDES 4,591.00 BAHAN
Besi Plat Bordes 4"x8" Tebal 3 mm 1.1000 kg - - Pabrikasi ( 20 % ) 0.2000 kg 22,955.00 4,591.00 4,591.00
1 KG PEKERJAAN BESI PLAT TEBAL 2 MM 4,591.00 BAHAN
Besi Plats 4"x8" Tebal 2 mm 1.1000 kg - - Pabrikasi ( 20 % ) 0.2000 kg 22,955.00 4,591.00 4,591.00
1 KG PEKERJAAN BESI PLAT STRIP 14,491.00 BAHAN
Besi Plat Strip Uk. 30x30 mm 1.1000 kg 9,000.00 9,900.00 Pabrikasi ( 20 % ) 0.2000 kg 22,955.00 4,591.00 14,491.00
1 KG PEKERJAAN BESI BAJA PROFIL WF ≤ 200 MM 15,371.00 BAHAN
Besi Profil WF ≤200 mm 1.1000 kg 9,800.00 10,780.00 Pabrikasi ( 20 % ) 0.2000 kg 22,955.00 4,591.00 15,371.00
1 KG PEKERJAAN BESI BAJA PROFIL WF ≥ 200 MM 15,910.00 BAHAN
Besi Profil WF ≥ 200 mm 1.1000 kg 10,290.00 11,319.00 Pabrikasi ( 20 % ) 0.2000 kg 22,955.00 4,591.00 15,910.00
1 KG PEKERJAAN BESI BAJA PROFIL C 100 - 150 MM 15,371.00 BAHAN
Besi Profil C 100 mm - 150 mm 1.1000 kg 9,800.00 10,780.00 Pabrikasi ( 20 % ) 0.2000 kg 22,955.00 4,591.00 15,371.00
1 M2 RANGKA ATAP GALVALUM / TRUSS TEBAL 0.8 MM 128,787.50 BAHAN
Rangka Galvalum Truss 0.8 mm 1.1000 m2 100,000.00 110,000.00 110,000.00 TENAGA
Pekerja Tak Terampil 0.4000 oh 35,000.00 14,000.00 Tukang 0.1000 oh 40,000.00 4,000.00 Kepala Tukang 0.0100 oh 52,500.00 525.00 Mandor 0.0050 oh 52,500.00 262.50 18,787.50
1 M2 RANGKA ATAP GALVALUM / TRUSS TEBAL 0.5 MM 115,037.50 BAHAN
Page 45 of 334
Rangka Galvalum Truss 0.5 mm 1.1000 m2 87,500.00 96,250.00 96,250.00 TENAGA
Pekerja Tak Terampil 0.4000 oh 35,000.00 14,000.00 Tukang 0.1000 oh 40,000.00 4,000.00 Kepala Tukang 0.0100 oh 52,500.00 525.00 Mandor 0.0050 oh 52,500.00 262.50 18,787.50
1 M2 PEMASANGAN PAGAR BESI 528,750.00 Lantai Satu 1.0000 528,750.00 528,750.00 Lantai Dua 1.0900 528,750.00 576,337.50 Lantai Tiga 1.1200 528,750.00 592,200.00 Lantai Empat 1.1350 528,750.00 600,131.25 Lantai Lima 1.1620 528,750.00 614,407.50
BAHAN Pagar Besi Komplit Assesories 1.0000 m2 450,000.00 450,000.00 450,000.00
TENAGA Pekerja Tak Terampil 1.0500 oh 35,000.00 36,750.00 Tukang 1.0500 oh 40,000.00 42,000.00 78,750.00
1 M2 PEMASANGAN PAGAR PANEL / FABRIKASI TINGGI 2.00 M 25,312.50 BAHAN
Precast Pagar Panel 1.0000 m' - - - TENAGA
Mandor 0.1250 oh 52,500.00 6,562.50 Tukang Batu 0.2500 oh 40,000.00 10,000.00 Pekerja Tak Terampil 0.2500 oh 35,000.00 8,750.00 25,312.50
1 M2 PEMASANGAN TERALIS JENDELA 143,104.60 BAHAN
Besi strip 0.0154 kg 9,000.00 138.60 4,729.60 Elektride Baja 0.2000 kg 22,955.00 4,591.00
TENAGA Mandor 0.0830 oh 52,500.00 4,357.50 Kepala Tukang 0.1670 oh 52,500.00 8,767.50 Tukang 1.6700 oh 40,000.00 66,800.00 Pekerja Tak Terampil 1.6700 m' 35,000.00 58,450.00 138,375.00
1 M' ONGKOS PEMASANGAN PIPA GALVANIS 4,136.00 BAHAN
Sewa Welding Set 0.0210 hari 25,000.00 525.00 651.00 Kawat Elektrode Baja 0.0060 Kg 21,000.00 126.00
TENAGA Mandor 0.0020 oh 52,500.00 105.00 Tukang Batu 0.0600 oh 40,000.00 2,400.00 Pekerja Tak Terampil 0.0280 oh 35,000.00 980.00 3,485.00
1 M' PEKERJAAN BESI PIPA GALVANIS Ǿ 1,5" ( MEDIUM ) 341,125.56 BAHAN
Besi Pipa Galvanis Ǿ1,5" ( Medium ) 1.0200 m' 322,500.00 328,950.00 TENAGA
Ongkos Pemasangan 2.9438 m' 4,136.00 12,175.56
1 M' PEKERJAAN BESI PIPA GALVANIS Ǿ 3" ( MEDIUM ) 765,581.60 BAHAN
Besi Pipa Galvanis Ǿ 3" ( Medium ) 1.0200 m' 738,000.00 752,760.00 TENAGA
Ongkos Pemasangan 3.1000 m' 4,136.00 12,821.60
1 M' PEKERJAAN RAILLING TANGGA PIPA STAINLESS 664,937.50 Lantai Satu 1.0000 664,937.50 664,937.50 Lantai Dua 1.0900 664,937.50 724,781.88 Lantai Tiga 1.1200 664,937.50 744,730.00 Lantai Empat 1.1350 664,937.50 754,704.06 Lantai Lima 1.1620 664,937.50 772,657.38 Lantai Enam 1.1970 664,937.50 795,930.19 Lantai Tujuh 1.2360 664,937.50 821,862.75
BAHAN Plat Tiang Railling Hot Deep Galvanis 1.5000 btg 105,000.00 157,500.00 Pipa Stainless Steel Ø 13 mm 4.0000 m' 110,000.00 440,000.00 Hand Railling Aluminium Ø 75mm 1.0000 m' 47,500.00 47,500.00 Dinabol dia. 8mm 3.0000 buah 1,500.00 4,500.00 Tutup Hand Railling 0.0500 buah 25,000.00 1,250.00 Tutup Hand Railling ke dinding 0.0250 buah 25,000.00 625.00 651,375.00
TENAGA Pekerja tak terampil 0.2500 oh 35,000.00 8,750.00 Tukang 0.0500 oh 40,000.00 2,000.00 Kepala Tukang 0.0250 oh 52,500.00 1,312.50 Mandor 0.0250 oh 60,000.00 1,500.00 13,562.50
1 M' HAND RAILLING ALUMUNIUM Ø 75 MM 260,322.92 Lantai Satu 1.0000 260,322.92 260,322.92 Lantai Dua 1.0900 260,322.92 283,751.98 Lantai Tiga 1.1200 260,322.92 291,561.67 Lantai Empat 1.1350 260,322.92 295,466.51 Lantai Lima 1.1620 260,322.92 302,495.23 Lantai Enam 1.1970 260,322.92 311,606.53 Lantai Tujuh 1.2360 260,322.92 321,759.13
BAHAN Pipa Stainless Steel Ø 13 mm 4.0000 m' 39,166.67 156,666.67 Hand Railling Aluminium Ø 75mm 1.0000 m' 86,250.00 86,250.00 Dinabol dia. 8mm 3.0000 buah 1,500.00 4,500.00 247,416.67
TENAGA Pekerja tak terampil 0.2500 oh 35,000.00 8,750.00 Tukang 0.0500 oh 40,000.00 2,000.00 Kepala Tukang 0.0125 oh 52,500.00 656.25 Mandor 0.0250 oh 60,000.00 1,500.00 12,906.25
1 M2 RAILLING BALKON DAN TERAAS BESI HOLLOW. 852,554.98 Lantai Satu 1.0000 852,554.98 852,554.98 Lantai Dua 1.0900 852,554.98 929,284.93 Lantai Tiga 1.1200 852,554.98 954,861.58 Lantai Empat 1.1350 852,554.98 967,649.90 Lantai Lima 1.1620 852,554.98 990,668.89
Page 46 of 334
Lantai Enam 1.1970 852,554.98 1,020,508.31 Lantai Tujuh 1.2360 852,554.98 1,053,757.96
BAHAN Besi Hollow 4/4 0.7500 btg 67,500.00 50,625.00 Besi Hollow 2/4 2.5000 btg 51,000.00 127,500.00 Pipa Galvanise Ø 2,5" 0.2500 btng 1,890,000.00 472,500.00 Dinabol dia. 8mm 3.0000 buah 1,500.00 4,500.00 Finishing cat Besi 1.9600 m2 98,153.00 192,379.88 Upah Pabrikasi & Stel 0.2000 % 22,955.00 4,591.00 852,095.88
TENAGA Fabrikasi 20 % 0.0200 ls 22,955.00 459.10 459.10
PEKERJAAN DINDING DAN PLESTERAN
1 M2 PEMASANGAN 1/2 BATU BATA CAMP 1Pc : 2Ps. (TINGGI S/D 2.00M ) 79,808.00 Lantai Satu 1.0000 79,808.00 79,808.00 Lantai Dua 1.0900 79,808.00 86,990.72 Lantai Tiga 1.1200 79,808.00 89,384.96 Lantai Empat 1.1350 79,808.00 90,582.08 Lantai Lima 1.1620 79,808.00 92,736.90 Lantai Enam 1.1970 79,808.00 95,530.18 Lantai Tujuh 1.2360 79,808.00 98,642.69
BAHAN Semen PC 19.1100 kg 1,200.00 22,932.00 Pasir Pasang 0.0348 m3 135,000.00 4,698.00 Batu Bata lokal uk. 22 x 11 x 5 cm 52.0000 bh 590.00 30,680.00 58,310.00
TENAGA - Mandor 0.0160 oh 60,000.00 960.00 Kepala Tukang 0.0126 oh 55,000.00 693.00 Tukang 0.1260 oh 52,500.00 6,615.00 Pekerja Terampil 0.0000 oh 40,000.00 - Pekerja tak terampil 0.3780 oh 35,000.00 13,230.00 21,498.00
1 M2 PEMASANGAN 1/2 BATU BATA CAMP 1Pc : 2Ps. (TINGGI 2.00 - 5.00 M ) 83,061.25 Lantai Satu 1.0000 83,061.25 83,061.25 Lantai Dua 1.0900 83,061.25 90,536.76 Lantai Tiga 1.1200 83,061.25 93,028.60 Lantai Empat 1.1350 83,061.25 94,274.52 Lantai Lima 1.1620 83,061.25 96,517.17 Lantai Enam 1.1970 83,061.25 99,424.32 Lantai Tujuh 1.2360 83,061.25 102,663.71
BAHAN Semen PC 17.1600 kg 1,200.00 20,592.00 Pasir Pasang 0.0348 m3 135,000.00 4,698.00 Batu Bata lokal uk. 22 x 11 x 5 cm 52.0000 bh 590.00 30,680.00 55,970.00
TENAGA - Mandor 0.0236 oh 60,000.00 1,416.00 Kepala Tukang 0.0158 oh 55,000.00 869.00 Tukang 0.1575 oh 52,500.00 8,268.75 Pekerja Terampil 0.0000 oh 40,000.00 - Pekerja tak terampil 0.4725 oh 35,000.00 16,537.50 27,091.25
1 M2 PEMASANGAN 1/2 BATU BATA CAMP 1Pc : 3Ps. (TINGGI S/D 2.00M ) 74,942.00 Lantai Satu 1.0000 74,942.00 74,942.00 Lantai Dua 1.0900 74,942.00 81,686.78 Lantai Tiga 1.1200 74,942.00 83,935.04 Lantai Empat 1.1350 74,942.00 85,059.17 Lantai Lima 1.1620 74,942.00 87,082.60 Lantai Enam 1.1970 74,942.00 89,705.57 Lantai Tujuh 1.2360 74,942.00 92,628.31
BAHAN Semen PC 14.5150 kg 1,200.00 17,418.00 Pasir Pasang 0.0396 m3 135,000.00 5,346.00 Batu Bata lokal uk. 22 x 11 x 5 cm 52.0000 bh 590.00 30,680.00 53,444.00
TENAGA - Mandor 0.0160 oh 60,000.00 960.00 Kepala Tukang 0.0126 oh 55,000.00 693.00 Tukang 0.1260 oh 52,500.00 6,615.00 Pekerja Terampil 0.0000 oh 40,000.00 - Pekerja tak terampil 0.3780 oh 35,000.00 13,230.00 21,498.00
1 M2 PEMASANGAN 1/2 BATU BATA CAMP 1Pc : 3Ps. (TINGGI 2.00 - 5.00 M ) 80,535.25 Lantai Satu 1.0000 80,535.25 80,535.25 Lantai Dua 1.0900 80,535.25 87,783.42 Lantai Tiga 1.1200 80,535.25 90,199.48 Lantai Empat 1.1350 80,535.25 91,407.51 Lantai Lima 1.1620 80,535.25 93,581.96 Lantai Enam 1.1970 80,535.25 96,400.69 Lantai Tujuh 1.2360 80,535.25 99,541.57
BAHAN Semen PC 14.5150 kg 1,200.00 17,418.00 Pasir Pasang 0.0396 m3 135,000.00 5,346.00 Batu Bata lokal uk. 22 x 11 x 5 cm 52.0000 bh 590.00 30,680.00 53,444.00
TENAGA - Mandor 0.0236 oh 60,000.00 1,416.00 Kepala Tukang 0.0158 oh 55,000.00 869.00 Tukang 0.1575 oh 52,500.00 8,268.75 Pekerja Terampil 0.0000 oh 40,000.00 - Pekerja tak terampil 0.4725 oh 35,000.00 16,537.50 27,091.25
1 M2 PEMASANGAN 1/2 BATU BATA CAMP 1Pc : 4Ps. (TINGGI S/D 2.00M ) 71,937.50 Lantai Satu 1.0000 71,937.50 71,937.50 Lantai Dua 1.0900 71,937.50 78,411.88 Lantai Tiga 1.1200 71,937.50 80,570.00 Lantai Empat 1.1350 71,937.50 81,649.06 Lantai Lima 1.1620 71,937.50 83,591.38 Lantai Enam 1.1970 71,937.50 86,109.19 Lantai Tujuh 1.2360 71,937.50 88,914.75
- BAHAN
Semen PC 11.6850 kg 1,200.00 14,022.00 Pasir Pasang 0.0425 m3 135,000.00 5,737.50 Batu Bata lokal uk. 22 x 11 x 5 cm 52.0000 bh 590.00 30,680.00 50,439.50
TENAGA -
Page 47 of 334
Mandor 0.0160 oh 60,000.00 960.00 Kepala Tukang 0.0126 oh 55,000.00 693.00 Tukang 0.1260 oh 52,500.00 6,615.00 Pekerja Terampil 0.0000 oh 40,000.00 - Pekerja tak terampil 0.3780 oh 35,000.00 13,230.00 21,498.00
1 M2 PEMASANGAN 1/2 BATU BATA CAMP 1Pc :4Ps. (TINGGI 2.00 - 5.00 M ) 77,530.75 Lantai Satu 1.0000 77,530.75 77,530.75 Lantai Dua 1.0900 77,530.75 84,508.52 Lantai Tiga 1.1200 77,530.75 86,834.44 Lantai Empat 1.1350 77,530.75 87,997.40 Lantai Lima 1.1620 77,530.75 90,090.73 Lantai Enam 1.1970 77,530.75 92,804.31 Lantai Tujuh 1.2360 77,530.75 95,828.01
77,530.75 - BAHAN
Semen PC 11.6850 kg 1,200.00 14,022.00 Pasir Pasang 0.0425 m3 135,000.00 5,737.50 Batu Bata lokal uk. 22 x 11 x 5 cm 52.0000 bh 590.00 30,680.00 50,439.50
TENAGA - Mandor 0.0236 oh 60,000.00 1,416.00 Kepala Tukang 0.0158 oh 55,000.00 869.00 Tukang 0.1575 oh 52,500.00 8,268.75 Pekerja Terampil 0.0000 oh 40,000.00 - Pekerja tak terampil 0.4725 oh 35,000.00 16,537.50 27,091.25
1 M2 PEMASANGAN 1/2 BATU BATA CAMP 1Pc : 5Ps. (TINGGI S/D 2.00M ) 70,547.00 Lantai Satu 1.0000 70,547.00 70,547.00 Lantai Dua 1.0900 70,547.00 76,896.23 Lantai Tiga 1.1200 70,547.00 79,012.64 Lantai Empat 1.1350 70,547.00 80,070.85 Lantai Lima 1.1620 70,547.00 81,975.61 Lantai Enam 1.1970 70,547.00 84,444.76 Lantai Tujuh 1.2360 70,547.00 87,196.09
- BAHAN
Semen PC 9.9750 kg 1,200.00 11,970.00 Pasir Pasang 0.0474 m3 135,000.00 6,399.00 Batu Bata lokal uk. 22 x 11 x 5 cm 52.0000 bh 590.00 30,680.00 49,049.00
TENAGA - Mandor 0.0160 oh 60,000.00 960.00 Kepala Tukang 0.0126 oh 55,000.00 693.00 Tukang 0.1260 oh 52,500.00 6,615.00 Pekerja Terampil 0.0000 oh 40,000.00 - Pekerja tak terampil 0.3780 oh 35,000.00 13,230.00 21,498.00
1 M2 PEMASANGAN 1/2 BATU BATA CAMP 1Pc :5Ps. (TINGGI 2.00 - 5.00 M ) 76,140.25 Lantai Satu 1.0000 76,140.25 76,140.25 Lantai Dua 1.0900 76,140.25 82,992.87 Lantai Tiga 1.1200 76,140.25 85,277.08 Lantai Empat 1.1350 76,140.25 86,419.18 Lantai Lima 1.1620 76,140.25 88,474.97 Lantai Enam 1.1970 76,140.25 91,139.88 Lantai Tujuh 1.2360 76,140.25 94,109.35
- BAHAN
Semen PC 9.9750 kg 1,200.00 11,970.00 Pasir Pasang 0.0474 m3 135,000.00 6,399.00 Batu Bata lokal uk. 22 x 11 x 5 cm 52.0000 bh 590.00 30,680.00 49,049.00
TENAGA - Mandor 0.0236 oh 60,000.00 1,416.00 Kepala Tukang 0.0158 oh 55,000.00 869.00 Tukang 0.1575 oh 52,500.00 8,268.75 Pekerja Terampil 0.0000 oh 40,000.00 - Pekerja tak terampil 0.4725 oh 35,000.00 16,537.50 27,091.25
1 M3 PASANGAN BATU MERAH KOSONGAN 502,210.00 BAHAN
Batu Bata lokal uk. 22 x 11 x 5 cm 755.0000 bh 590.00 445,450.00 445,450.00 TENAGA -
Mandor 0.0495 oh 60,000.00 2,970.00 Kepala Tukang 0.0330 oh 55,000.00 1,815.00 Tukang 0.3300 oh 52,500.00 17,325.00 Pekerja Terampil 0.0000 oh 40,000.00 - Pekerja tak terampil 0.9900 oh 35,000.00 34,650.00 56,760.00
1 M2 PLESTERAN CAMP 1Pc :2Ps. (TTEBAL 1 CM ) 25,412.50 Lantai Satu 1.0000 25,412.50 25,412.50 Lantai Dua 1.0900 25,412.50 27,699.63 Lantai Tiga 1.1200 25,412.50 28,462.00 Lantai Empat 1.1350 25,412.50 28,843.19 Lantai Lima 1.1620 25,412.50 29,529.32 Lantai Enam 1.1970 25,412.50 30,418.76 Lantai Tujuh 1.2360 25,412.50 31,409.85
- BAHAN
Semen PC 6.2550 kg 1,200.00 7,506.00 Pasir Pasang 0.0119 m3 135,000.00 1,606.50 9,112.50
TENAGA - Mandor 0.0100 oh 60,000.00 600.00 Kepala Tukang 0.0150 oh 55,000.00 825.00 Tukang 0.1500 oh 52,500.00 7,875.00 Pekerja Terampil 0.0000 oh 40,000.00 - Pekerja tak terampil 0.2000 oh 35,000.00 7,000.00 16,300.00
1 M2 PLESTERAN CAMP 1Pc :2Ps. (TTEBAL 1,5 CM ) 32,608.50 Lantai Satu 1.0000 32,608.50 32,608.50 Lantai Dua 1.0900 32,608.50 35,543.27 Lantai Tiga 1.1200 32,608.50 36,521.52 Lantai Empat 1.1350 32,608.50 37,010.65 Lantai Lima 1.1620 32,608.50 37,891.08 Lantai Enam 1.1970 32,608.50 39,032.37 Lantai Tujuh 1.2360 32,608.50 40,304.11
BAHAN Semen PC 8.5000 kg 1,200.00 10,200.00
Page 48 of 334
Pasir Pasang 0.0171 m3 135,000.00 2,308.50 12,508.50 TENAGA -
Mandor 0.0150 oh 60,000.00 900.00 Kepala Tukang 0.0150 oh 55,000.00 825.00 Tukang 0.1500 oh 52,500.00 7,875.00 Pekerja Terampil 0.0000 oh 40,000.00 - Pekerja tak terampil 0.3000 oh 35,000.00 10,500.00 20,100.00
1 M2 PLESTERAN CAMP 1Pc :3Ps. (TTEBAL 1 CM ) 24,295.00 Lantai Satu 1.0000 24,295.00 24,295.00 Lantai Dua 1.0900 24,295.00 26,481.55 Lantai Tiga 1.1200 24,295.00 27,210.40 Lantai Empat 1.1350 24,295.00 27,574.83 Lantai Lima 1.1620 24,295.00 28,230.79 Lantai Enam 1.1970 24,295.00 29,081.12 Lantai Tujuh 1.2360 24,295.00 30,028.62
- BAHAN
Semen PC 5.2000 kg 1,200.00 6,240.00 Pasir Pasang 0.0130 m3 135,000.00 1,755.00 7,995.00
TENAGA - Mandor 0.0100 oh 60,000.00 600.00 Kepala Tukang 0.0150 oh 55,000.00 825.00 Tukang 0.1500 oh 52,500.00 7,875.00 Pekerja Terampil 0.0000 oh 40,000.00 - Pekerja tak terampil 0.2000 oh 35,000.00 7,000.00 16,300.00
1 M2 PLESTERAN CAMP 1Pc :3Ps. (TTEBAL 1,5 CM ) 30,984.00 Lantai Satu 1.0000 30,984.00 30,984.00 Lantai Dua 1.0900 30,984.00 33,772.56 Lantai Tiga 1.1200 30,984.00 34,702.08 Lantai Empat 1.1350 30,984.00 35,166.84 Lantai Lima 1.1620 30,984.00 36,003.41 Lantai Enam 1.1970 30,984.00 37,087.85 Lantai Tujuh 1.2360 30,984.00 38,296.22
- BAHAN
Semen PC 6.8200 kg 1,200.00 8,184.00 Pasir Pasang 0.0200 m3 135,000.00 2,700.00 10,884.00
TENAGA - Mandor 0.0150 oh 60,000.00 900.00 Kepala Tukang 0.0150 oh 55,000.00 825.00 Tukang 0.1500 oh 52,500.00 7,875.00 Pekerja Terampil 0.0000 oh 40,000.00 - Pekerja tak terampil 0.3000 oh 35,000.00 10,500.00 20,100.00
1 M2 PLESTERAN CAMP 1Pc :4Ps. (TTEBAL 1 CM ) 22,754.50 Lantai Satu 1.0000 22,754.50 22,754.50 Lantai Dua 1.0900 22,754.50 24,802.41 Lantai Tiga 1.1200 22,754.50 25,485.04 Lantai Empat 1.1350 22,754.50 25,826.36 Lantai Lima 1.1620 22,754.50 26,440.73 Lantai Enam 1.1970 22,754.50 27,237.14 Lantai Tujuh 1.2360 22,754.50 28,124.56
BAHAN - Semen PC 3.8150 kg 1,200.00 4,578.00 Pasir Pasang 0.0139 m3 135,000.00 1,876.50 6,454.50
TENAGA - Mandor 0.0100 oh 60,000.00 600.00 Kepala Tukang 0.0150 oh 55,000.00 825.00 Tukang 0.1500 oh 52,500.00 7,875.00 Pekerja Terampil 0.0000 oh 40,000.00 - Pekerja tak terampil 0.2000 oh 35,000.00 7,000.00 16,300.00
1 M2 PLESTERAN CAMP 1Pc :4Ps. (TTEBAL 1,5 CM ) 29,182.50 Lantai Satu 1.0000 29,182.50 29,182.50 Lantai Dua 1.0900 29,182.50 31,808.93 Lantai Tiga 1.1200 29,182.50 32,684.40 Lantai Empat 1.1350 29,182.50 33,122.14 Lantai Lima 1.1620 29,182.50 33,910.06 Lantai Enam 1.1970 29,182.50 34,931.45 Lantai Tujuh 1.2360 29,182.50 36,069.57
- BAHAN
Semen PC 5.1500 kg 1,200.00 6,180.00 Pasir Pasang 0.0215 m3 135,000.00 2,902.50 9,082.50
TENAGA - Mandor 0.0150 oh 60,000.00 900.00 Kepala Tukang 0.0150 oh 55,000.00 825.00 Tukang 0.1500 oh 52,500.00 7,875.00 Pekerja Terampil 0.0000 oh 40,000.00 - Pekerja tak terampil 0.3000 oh 35,000.00 10,500.00 20,100.00
1 M2 MERAPIKAN PERMUKAAN PAS.DENGN SPESI 1Pc : 2 Ps 20,866.00 BAHAN
Semen PC 3.1300 kg 1,200.00 3,756.00 Pasir Pasang 0.0060 m3 135,000.00 810.00 4,566.00
TENAGA - Mandor 0.0100 oh 60,000.00 600.00 Kepala Tukang 0.0150 oh 55,000.00 825.00 Tukang 0.1500 oh 52,500.00 7,875.00 Pekerja Terampil 0.0000 oh 40,000.00 - Pekerja tak terampil 0.2000 oh 35,000.00 7,000.00 16,300.00
1 M' BENANGAN 14,840.00 Lantai Satu 1.0000 14,840.00 14,840.00 Lantai Dua 1.0900 14,840.00 16,175.60 Lantai Tiga 1.1200 14,840.00 16,620.80 Lantai Empat 1.1350 14,840.00 16,843.40 Lantai Lima 1.1620 14,840.00 17,244.08 Lantai Enam 1.1970 14,840.00 17,763.48 Lantai Tujuh 1.2360 14,840.00 18,342.24
BAHAN Semen PC 1.2000 kg 1,200.00 1,440.00
Page 49 of 334
Pasir Pasang 0.0000 m3 135,000.00 - 1,440.00 TENAGA -
Mandor 0.0100 oh 60,000.00 600.00 Kepala Tukang 0.0100 oh 55,000.00 550.00 Tukang 0.1000 oh 52,500.00 5,250.00 Pekerja Terampil 0.0000 oh 40,000.00 - Pekerja tak terampil 0.2000 oh 35,000.00 7,000.00 13,400.00
1M2 PEKERJAAN ACIAN 17,300.00 Lantai Satu 1.0000 17,300.00 17,300.00 Lantai Dua 1.0900 17,300.00 18,857.00 Lantai Tiga 1.1200 17,300.00 19,376.00 Lantai Empat 1.1350 17,300.00 19,635.50 Lantai Lima 1.1620 17,300.00 20,102.60 Lantai Enam 1.1970 17,300.00 20,708.10 Lantai Tujuh 1.2360 17,300.00 21,382.80
BAHAN PC 3.2500 kg 1,200.00 3,900.00 3,900.00
TENAGA Pekerja 0.2000 oh 35,000.00 7,000.00 Tukang 0.1000 oh 52,500.00 5,250.00 Kepala Tukang 0.0100 oh 55,000.00 550.00 Mandor 0.0100 oh 60,000.00 600.00 13,400.00
1M' KOL-KOLAN 17,840.00 BAHAN
Pasir Pasang 0.0040 m3 135,000.00 540.00 PC 3.2500 kg 1,200.00 3,900.00 4,440.00
TENAGA Pekerja 0.2000 oh 35,000.00 7,000.00 Tukang 0.1000 oh 52,500.00 5,250.00 Kepala Tukang 0.0100 oh 55,000.00 550.00 Mandor 0.0100 oh 60,000.00 600.00 13,400.00
1M2 BERAPEN 1 PC : 5 PS, Tebal 15 mm 19,699.00 BAHAN
PC 5.6700 kg 1,200.00 6,804.00 Pasir Pasang 0.0230 m3 135,000.00 3,105.00 9,909.00
TENAGA Pekerja 0.1500 oh 35,000.00 5,250.00 Tukang 0.0700 oh 52,500.00 3,675.00 Kepala Tukang 0.0070 oh 55,000.00 385.00 Mandor 0.0080 oh 60,000.00 480.00 9,790.00
1M2 PLESTERAN BETON 1 PC : 3 PS tebal 15 mm 32,799.00 Lantai Satu 1.0000 32,799.00 32,799.00 Lantai Dua 1.0900 32,799.00 35,750.91 Lantai Tiga 1.1200 32,799.00 36,734.88 Lantai Empat 1.1350 32,799.00 37,226.87 Lantai Lima 1.1620 32,799.00 38,112.44 Lantai Enam 1.1970 32,799.00 39,260.40 Lantai Tujuh 1.2360 32,799.00 40,539.56
BAHAN PC 7.0700 kg 1,200.00 8,484.00 Pasir Pasang 0.0210 m3 135,000.00 2,835.00 11,319.00
TENAGA Pekerja 0.2600 oh 35,000.00 9,100.00 Tukang 0.2000 oh 52,500.00 10,500.00 Kepala Tukang 0.0200 oh 55,000.00 1,100.00 Mandor 0.0130 oh 60,000.00 780.00 21,480.00
1M2 PASANGAN GLASS BLOCK 651,498.50 Lantai Satu 1.0000 651,498.50 651,498.50 Lantai Dua 1.0900 651,498.50 710,133.37 Lantai Tiga 1.1200 651,498.50 729,678.32 Lantai Empat 1.1350 651,498.50 739,450.80 Lantai Lima 1.1620 651,498.50 757,041.26 Lantai Enam 1.1970 651,498.50 779,843.70 Lantai Tujuh 1.2360 651,498.50 805,252.15
BAHAN Glass Block 25.0000 bh 25,000.00 625,000.00 PC 5.0000 kg 1,200.00 6,000.00 631,000.00
TENAGA Pekerja 0.3400 oh 35,000.00 11,900.00 Tukang 0.1300 oh 52,500.00 6,825.00 Kepala Tukang 0.0137 oh 55,000.00 753.50 Mandor 0.0170 oh 60,000.00 1,020.00 20,498.50
1M2 PASANGAN BATACO 149,218.50 BAHAN
Bataco tebal 10 cm 12.5000 bh 8,500.00 106,250.00 PC 14.0000 kg 1,200.00 16,800.00 Pasir Pasang 0.0420 kg 135,000.00 5,670.00 128,720.00
TENAGA Pekerja 0.3400 oh 35,000.00 11,900.00 Tukang 0.1300 oh 52,500.00 6,825.00 Kepala Tukang 0.0137 oh 55,000.00 753.50 Mandor 0.0170 oh 60,000.00 1,020.00 20,498.50
1M2 PASANGAN BATU KLINGKER 634,832.50 BAHAN
Batu Klingker 52.5000 bh 11,500.00 603,750.00 PC 6.2550 kg 1,200.00 7,506.00 Pasir Pasang 0.0119 kg 135,000.00 1,606.50 612,862.50
TENAGA Pekerja 0.3500 oh 35,000.00 12,250.00 Tukang 0.1500 oh 52,500.00 7,875.00 Kepala Tukang 0.0150 oh 55,000.00 825.00 Mandor 0.0170 oh 60,000.00 1,020.00 21,970.00
1M2 PASANGAN BATU AMPYANG 136,995.00 BAHAN
Batu Ampyang 1.1000 m2 88,000.00 96,800.00 PC 12.5100 kg 1,200.00 15,012.00
Page 50 of 334
Pasir Pasang 0.0238 kg 135,000.00 3,213.00 115,025.00 TENAGA
Pekerja 0.3500 oh 35,000.00 12,250.00 Tukang 0.1500 oh 52,500.00 7,875.00 Kepala Tukang 0.0150 oh 55,000.00 825.00 Mandor 0.0170 oh 60,000.00 1,020.00 21,970.00
1M2 PASANGAN BATU CANDI HITAM 83,095.00 BAHAN
Batu Candi Hitam 1.1000 m2 39,000.00 42,900.00 PC 12.5100 kg 1,200.00 15,012.00 Pasir Pasang 0.0238 kg 135,000.00 3,213.00 61,125.00
TENAGA Pekerja 0.3500 oh 35,000.00 12,250.00 Tukang 0.1500 oh 52,500.00 7,875.00 Kepala Tukang 0.0150 oh 55,000.00 825.00 Mandor 0.0170 oh 60,000.00 1,020.00 21,970.00
1M2 PASANGAN BATU GILANG Ex. JEMBER - ASIMETRIS 86,995.00 BAHAN
Batu Gilang Ex. Jember 1.2000 m2 39,000.00 46,800.00 PC 12.5100 kg 1,200.00 15,012.00 Pasir Pasang 0.0238 kg 135,000.00 3,213.00 65,025.00
TENAGA Pekerja 0.3500 oh 35,000.00 12,250.00 Tukang 0.1500 oh 52,500.00 7,875.00 Kepala Tukang 0.0150 oh 55,000.00 825.00 Mandor 0.0170 oh 60,000.00 1,020.00 21,970.00
1M2 PASANGAN BATU GILANG Ex. CIREBON - SIMETRIS 232,695.00 BAHAN
Batu Gilang Ex. Cirebon 1.1000 m2 175,000.00 192,500.00 PC 12.5100 kg 1,200.00 15,012.00 Pasir Pasang 0.0238 kg 135,000.00 3,213.00 210,725.00
TENAGA Pekerja 0.3500 oh 35,000.00 12,250.00 Tukang 0.1500 oh 52,500.00 7,875.00 Kepala Tukang 0.0150 oh 55,000.00 825.00 Mandor 0.0170 oh 60,000.00 1,020.00 21,970.00
1M2 PASANGAN BATU GILANG Ex. CIREBON - ASIMETRIS 250,195.00 BAHAN
Batu Gilang Ex. Cirebon 1.2000 m2 175,000.00 210,000.00 PC 12.5100 kg 1,200.00 15,012.00 Pasir Pasang 0.0238 kg 135,000.00 3,213.00 228,225.00
TENAGA Pekerja 0.3500 oh 35,000.00 12,250.00 Tukang 0.1500 oh 52,500.00 7,875.00 Kepala Tukang 0.0150 oh 55,000.00 825.00 Mandor 0.0170 oh 60,000.00 1,020.00 21,970.00
1M2 PASANGAN BATU BOBOS 48,581.00 BAHAN
Batu Bobos uk. 10x20x1,5 1.0000 m2 16,000.00 16,000.00 PC 6.4800 kg 1,200.00 7,776.00 Pasir Pasang 0.0210 kg 135,000.00 2,835.00 26,611.00
TENAGA Pekerja 0.3500 oh 35,000.00 12,250.00 Tukang 0.1500 oh 52,500.00 7,875.00 Kepala Tukang 0.0150 oh 55,000.00 825.00 Mandor 0.0170 oh 60,000.00 1,020.00 21,970.00
PEKERJAAN CAT-CATAN-W.PROOFING-W.PAPER
1M2 CAT TEMBOK INTERIOR DAN PLAFOND 13,536.50 Lantai Satu 1.0000 13,536.50 13,536.50 Lantai Dua 1.0900 13,536.50 14,754.79 Lantai Tiga 1.1200 13,536.50 15,160.88 Lantai Empat 1.1350 13,536.50 15,363.93 Lantai Lima 1.1620 13,536.50 15,729.41 Lantai Enam 1.1970 13,536.50 16,203.19 Lantai Tujuh 1.2360 13,536.50 16,731.11
BAHAN Plamuur Tembok 0.1500 Kg 7,500.00 1,125.00 Cat dasar 0.2000 lt 10,500.00 2,100.00 Cat Dinding Interior Catylac 0.2600 Kg 12,500.00 3,250.00 Roll Cat 0.0100 bh 7,500.00 75.00 Kertas Gosok 0.5000 lbr 3,000.00 1,500.00 Steigger 0.1500 lot 6,550.00 982.50 9,032.50
TENAGA Pekerja 0.0200 oh 35,000.00 700.00 Tukang 0.0630 oh 52,500.00 3,307.50 Kepala Tukang 0.0063 oh 55,000.00 346.50 Mandor 0.0025 oh 60,000.00 150.00 4,504.00
1M2 CAT TEMBOK EXTERIOR (WEATHERSHIELD) 15,188.50 Lantai Satu 1.0000 15,188.50 15,188.50 Lantai Dua 1.0900 15,188.50 16,555.47 Lantai Tiga 1.1200 15,188.50 17,011.12 Lantai Empat 1.1350 15,188.50 17,238.95 Lantai Lima 1.1620 15,188.50 17,649.04 Lantai Enam 1.1970 15,188.50 18,180.63 Lantai Tujuh 1.2360 15,188.50 18,772.99
BAHAN Plamuur Tembok 0.1500 Kg 7,500.00 1,125.00 Cat dasar 0.1000 lt 10,500.00 1,050.00 Cat Dinding Exxterior Catylac 0.2600 Kg 26,500.00 6,890.00 Roll Cat 0.0100 bh 7,500.00 75.00 Kertas Gosok 0.5000 lbr 3,000.00 1,500.00 Steigger 0.1500 lot 6,550.00 982.50 11,622.50
Page 51 of 334
TENAGA Pekerja 0.0280 oh 35,000.00 980.00 Tukang 0.0420 oh 52,500.00 2,205.00 Kepala Tukang 0.0042 oh 55,000.00 231.00 Mandor 0.0025 oh 60,000.00 150.00 3,566.00
1M2 CAT MENI BESI / KAYU 44,640.00 BAHAN
Cat Meni kayu / besi 0.8400 kg 45,000.00 37,800.00 Minyak Cat 0.0440 kg 22,500.00 990.00
TENAGA Pekerja 0.0300 oh 40,000.00 1,200.00 Tukang 0.0750 oh 52,500.00 3,937.50 Kepala Tukang 0.0075 oh 55,000.00 412.50 Mandor 0.0050 oh 60,000.00 300.00 44,640.00
1M2 PENGCATAN 3X SERTA MENGGOSOK TANPA MENI ( BESI / KAYU ) 53,513.00 BAHAN
Cat Besi 0.4250 kg 42,500.00 18,062.50 Dempul 0.0800 kg 27,100.00 2,168.00 Minyak Cat 0.0570 lmb 22,500.00 1,282.50 Kertas Gosok 1.0000 lmb 12,500.00 12,500.00 34,013.00
TENAGA Pekerja 0.1500 oh 40,000.00 6,000.00 Tukang 0.2250 oh 52,500.00 11,812.50 Kepala Tukang 0.0225 oh 55,000.00 1,237.50 Mandor 0.0075 oh 60,000.00 450.00 19,500.00
1M2 POLITUR 2 X SAMPAI RATA 65,432.00 BAHAN
Cerlax 0.0340 kg 178,000.00 6,052.00 Spirtus 0.6600 ltr 10,500.00 6,930.00 Kerta Gosok No. 150 0.5000 lmb 12,500.00 6,250.00 19,232.00
TENAGA Pekerja 0.0000 oh 40,000.00 - Tukang 0.8800 oh 52,500.00 46,200.00 Kepala Tukang 0.0000 oh 55,000.00 - Mandor 0.0000 oh 60,000.00 - 46,200.00
1M2 PEMASANGAN WALLPAPER 77,425.00 BAHAN
Wall Paper lbar 55 cm 2.0000 m 20,000.00 40,000.00 Lem 0.2000 kg 62,500.00 12,500.00 52,500.00
TENAGA Pekerja 0.2500 oh 40,000.00 10,000.00 Tukang 0.2500 oh 52,500.00 13,125.00 Kepala Tukang 0.0000 oh 55,000.00 - Mandor 0.0300 oh 60,000.00 1,800.00 24,925.00
1M2 PELAPISAN WATERPROOFING 32,750.00 BAHAN
Water Proofing 0.3500 kg 45,000.00 15,750.00 Serat Fiber 1.0000 m2 10,500.00 10,500.00 26,250.00
TENAGA Pekerja 0.0500 oh 40,000.00 2,000.00 Tukang 0.0750 oh 52,500.00 3,937.50 Kepala Tukang 0.0075 oh 55,000.00 412.50 Mandor 0.0025 oh 60,000.00 150.00 6,500.00
1M2 PENGECATAN TEXTURE GRANITONE 3,706.00 BAHAN
Texture GRANITONE 1.1000 m2 - - Peralatan ( 10 % dr Bahan ) 0.1000 ls - - -
TENAGA Pekerja 0.0280 oh 40,000.00 1,120.00 Tukang 0.0420 oh 52,500.00 2,205.00 Kepala Tukang 0.0042 oh 55,000.00 231.00 Mandor 0.0025 oh 60,000.00 150.00 3,706.00
1M2 PELAPISAN WATERPROOFING MEMBRAN 72,500.00 BAHAN
Water proofing bithuthene sheet 3000 1.0500 m2 60,000.00 63,000.00 66,000.00 Peralatan 1.0000 ls 3,000.00 3,000.00
TENAGA Pekerja 0.0500 oh 40,000.00 2,000.00 Tukang 0.0750 oh 52,500.00 3,937.50 Kepala Tukang 0.0075 oh 55,000.00 412.50 Mandor 0.0025 oh 60,000.00 150.00 6,500.00
1 M2 PENGECATAN MELAMINE NATURAL 121,735.00 BAHAN
WoodFiller 0.2000 kg 75,000.00 15,000.00 Pewarna 0.5000 sct 75,000.00 37,500.00 Kertas gosok No. 150 1.0000 lbr 3,000.00 3,000.00 Kertas gosok No. 280 1.0000 lbr 3,000.00 3,000.00 Shanding 0.5000 kg 65,000.00 32,500.00 Clear doof 0.2000 kg 45,000.00 9,000.00 Thinner A special 0.3700 kg 14,500.00 5,365.00 Coumpound 0.2000 klng 40,000.00 8,000.00 Sewa alat bantu ( 1 set @ 3 alat ) 1.0000 set - - 113,365.00
TENAGA Pekerja 0.0750 oh 40,000.00 3,000.00 Tukang 0.0900 oh 52,500.00 4,725.00 Kepala tukang 0.0090 oh 55,000.00 495.00 Mandor 0.0025 oh 60,000.00 150.00 8,370.00
1 M2 PENGECATAN GENTING BARU 11,100.00 BAHAN
Cat Genting 0.2000 kg 23,000.00 4,600.00 4,600.00 TENAGA -
Pekerja 0.0500 oh 40,000.00 2,000.00 Tukang 0.0750 oh 52,500.00 3,937.50 Kepala tukang 0.0075 oh 55,000.00 412.50 Mandor 0.0025 oh 60,000.00 150.00 6,500.00
Page 52 of 334
1M2 PENGECATAN KAYU 50,282.50 BAHAN
Cat Kayu 0.4250 kg 40,000.00 17,000.00 Minyak Cat 0.0570 ltr 22,500.00 1,282.50 Kertas Gosok 1.0000 lmb 12,500.00 12,500.00 30,782.50
TENAGA Pekerja 0.1500 oh 40,000.00 6,000.00 Tukang 0.2250 oh 52,500.00 11,812.50 Kepala Tukang 0.0225 oh 55,000.00 1,237.50 Mandor 0.0075 oh 60,000.00 450.00 19,500.00
PEKERJAAN LANTAI
1 M2 PEMASANGAN GRANITE TILE 30X30 POLISH 253,475.00 Pemasangan Lantai I 1.0000 253,475.00 253,475.00 Pemasangan Lantai II 1.0900 253,475.00 276,287.75 Pemasangan Lantai III 1.1200 253,475.00 283,892.00 Pemasangan Lantai IV 1.1350 253,475.00 287,694.13 Pemasangan Lantai V 1.1620 253,475.00 294,537.95 Pemasangan Lantai VI 1.1970 253,475.00 303,409.58 Pemasangan Lantai VII 1.2360 253,475.00 313,295.10
BAHAN - PC 10.0000 kg 1,200.00 12,000.00 Semen warna nut 1.5000 kg 9,000.00 13,500.00 Pasir pasang 0.0450 m3 135,000.00 6,075.00 Granite Tile Ukuran 30 x 30 Polished 1.0000 m2 175,000.00 175,000.00 206,575.00
TENAGA - Pekerja 0.6200 oh 40,000.00 24,800.00 Tukang 0.3500 oh 52,500.00 18,375.00 Kepala Tukang 0.0350 oh 55,000.00 1,925.00 Mandor 0.0300 oh 60,000.00 1,800.00 46,900.00
1 M2 PEMASANGAN GRANITE TILE 60X60 POLISH 328,475.00 Pemasangan Lantai I 1.0000 328,475.00 328,475.00 Pemasangan Lantai II 1.0900 328,475.00 358,037.75 Pemasangan Lantai III 1.1200 328,475.00 367,892.00 Pemasangan Lantai IV 1.1350 328,475.00 372,819.13 Pemasangan Lantai V 1.1620 328,475.00 381,687.95 Pemasangan Lantai VI 1.1970 328,475.00 393,184.58 Pemasangan Lantai VII 1.2360 328,475.00 405,995.10
BAHAN - PC 10.0000 kg 1,200.00 12,000.00 Semen warna nut 1.5000 kg 9,000.00 13,500.00 Pasir pasang 0.0450 m3 135,000.00 6,075.00 Granite Tile Ukuran 60 x 60 Polished 1.0000 m2 250,000.00 250,000.00 281,575.00
TENAGA - Pekerja 0.6200 oh 40,000.00 24,800.00 Tukang 0.3500 oh 52,500.00 18,375.00 Kepala Tukang 0.0350 oh 55,000.00 1,925.00 Mandor 0.0300 oh 60,000.00 1,800.00 46,900.00
1 M2 PEMASANGAN UBIN KERAMIK 30x30 WARNA MOTIF 143,475.00 Pemasangan Lantai I 1.0000 143,475.00 143,475.00 Pemasangan Lantai II 1.0900 143,475.00 156,387.75 Pemasangan Lantai III 1.1200 143,475.00 160,692.00 Pemasangan Lantai IV 1.1350 143,475.00 162,844.13 Pemasangan Lantai V 1.1620 143,475.00 166,717.95 Pemasangan Lantai VI 1.1970 143,475.00 171,739.58 Pemasangan Lantai VII 1.2360 143,475.00 177,335.10
BAHAN - PC 10.0000 kg 1,200.00 12,000.00 Semen warna nut 1.5000 kg 9,000.00 13,500.00 Pasir pasang 0.0450 m3 135,000.00 6,075.00 Keramik Lantai 30 x 30 Warna / Motif 1.0000 m2 65,000.00 65,000.00 96,575.00
TENAGA - Pekerja 0.6200 oh 40,000.00 24,800.00 Tukang 0.3500 oh 52,500.00 18,375.00 Kepala Tukang 0.0350 oh 55,000.00 1,925.00 Mandor 0.0300 oh 60,000.00 1,800.00 46,900.00
1 M2 PEMASANGAN PELAPIS BATU CANDI 165,475.00 Pemasangan Lantai I 1.0000 165,475.00 165,475.00 Pemasangan Lantai II 1.0900 165,475.00 180,367.75 Pemasangan Lantai III 1.1200 165,475.00 185,332.00 Pemasangan Lantai IV 1.1350 165,475.00 187,814.13 Pemasangan Lantai V 1.1620 165,475.00 192,281.95 Pemasangan Lantai VI 1.1970 165,475.00 198,073.58 Pemasangan Lantai VII 1.2360 165,475.00 204,527.10
BAHAN - PC 10.0000 kg 1,200.00 12,000.00 Semen warna nut 1.5000 kg 9,000.00 13,500.00 Pasir pasang 0.0450 m3 135,000.00 6,075.00 Batu Candi 1.0000 m2 87,000.00 87,000.00 118,575.00
TENAGA - Pekerja 0.6200 oh 40,000.00 24,800.00 Tukang 0.3500 oh 52,500.00 18,375.00 Kepala Tukang 0.0350 oh 55,000.00 1,925.00 Mandor 0.0300 oh 60,000.00 1,800.00 46,900.00
1 M2 PEMASANGAN UBIN KERAMIK 40X40 WARNA MOTIF 138,475.00 Pemasangan Lantai I 1.0000 138,475.00 138,475.00 Pemasangan Lantai II 1.0900 138,475.00 150,937.75 Pemasangan Lantai III 1.1200 138,475.00 155,092.00 Pemasangan Lantai IV 1.1350 138,475.00 157,169.13 Pemasangan Lantai V 1.1620 138,475.00 160,907.95 Pemasangan Lantai VI 1.1970 138,475.00 165,754.58 Pemasangan Lantai VII 1.2360 138,475.00 171,155.10
BAHAN - PC 10.0000 kg 1,200.00 12,000.00 Semen warna nut 1.5000 kg 9,000.00 13,500.00 Pasir pasang 0.0450 m3 135,000.00 6,075.00 Keramik Lantai 40 x 40 Warna / Motif 1.0000 m2 60,000.00 60,000.00 91,575.00
Page 53 of 334
TENAGA - Pekerja 0.6200 oh 40,000.00 24,800.00 Tukang 0.3500 oh 52,500.00 18,375.00 Kepala Tukang 0.0350 oh 55,000.00 1,925.00 Mandor 0.0300 oh 60,000.00 1,800.00 46,900.00
1 M2 PEMASANGAN PELAPIS DINDING CLADDING Ex. INDAL 235,725.00 BAHAN -
Bahan Cladding Ex. Indal 1.0500 m2 - - Paku baut 50.0000 bh 150.00 7,500.00 Sewa alat pmbntu 1.0000 ls - - Rangka Hollow 1.0000 m2 192,225.00 192,225.00 199,725.00
TENAGA - Pekerja 0.5000 oh 40,000.00 20,000.00 Tukang 0.2500 oh 52,500.00 13,125.00 Kepala Tukang 0.0250 oh 55,000.00 1,375.00 Mandor 0.0250 oh 60,000.00 1,500.00 36,000.00
1 M2 PEMASANGAN GARNITE TILE WARNA EX. ESSENZA 60X60 328,475.00 Pemasangan Lantai I 1.0000 328,475.00 328,475.00 Pemasangan Lantai II 1.0900 328,475.00 358,037.75 Pemasangan Lantai III 1.1200 328,475.00 367,892.00 Pemasangan Lantai IV 1.1350 328,475.00 372,819.13 Pemasangan Lantai V 1.1620 328,475.00 381,687.95 Pemasangan Lantai VI 1.1970 328,475.00 393,184.58 Pemasangan Lantai VII 1.2360 328,475.00 405,995.10
BAHAN - PC 10.0000 kg 1,200.00 12,000.00 Semen warna nut 1.5000 kg 9,000.00 13,500.00 Pasir pasang 0.0450 m3 135,000.00 6,075.00 Ubin Granito warna Hitam Essenza 60 x 60 1.0000 m2 250,000.00 250,000.00 281,575.00
TENAGA - Pekerja 0.6200 oh 40,000.00 24,800.00 Tukang 0.3500 oh 52,500.00 18,375.00 Kepala Tukang 0.0350 oh 55,000.00 1,925.00 Mandor 0.0300 oh 60,000.00 1,800.00 46,900.00
1 M2 PEMASANGAN MARMER 100 X 100 343,475.00 Pemasangan Lantai I 1.0000 343,475.00 343,475.00 Pemasangan Lantai II 1.0900 343,475.00 374,387.75 Pemasangan Lantai III 1.1200 343,475.00 384,692.00 Pemasangan Lantai IV 1.1350 343,475.00 389,844.13 Pemasangan Lantai V 1.1620 343,475.00 399,117.95 Pemasangan Lantai VI 1.1970 343,475.00 411,139.58 Pemasangan Lantai VII 1.2360 343,475.00 424,535.10
BAHAN - PC 10.0000 kg 1,200.00 12,000.00 Semen warna nut 1.5000 kg 9,000.00 13,500.00 Pasir pasang 0.0450 m3 135,000.00 6,075.00 Marmer 100 x 100 1.0000 m2 265,000.00 265,000.00 296,575.00
TENAGA - Pekerja 0.6200 oh 40,000.00 24,800.00 Tukang 0.3500 oh 52,500.00 18,375.00 Kepala Tukang 0.0350 oh 55,000.00 1,925.00 Mandor 0.0300 oh 60,000.00 1,800.00 46,900.00
1 M2 PEMASANGAN GRANIT IMPORT 403,475.00 Pemasangan Lantai I 1.0000 403,475.00 403,475.00 Pemasangan Lantai II 1.0900 403,475.00 439,787.75 Pemasangan Lantai III 1.1200 403,475.00 451,892.00 Pemasangan Lantai IV 1.1350 403,475.00 457,944.13 Pemasangan Lantai V 1.1620 403,475.00 468,837.95 Pemasangan Lantai VI 1.1970 403,475.00 482,959.58 Pemasangan Lantai VII 1.2360 403,475.00 498,695.10
BAHAN - PC 10.0000 kg 1,200.00 12,000.00 Semen warna nut 1.5000 kg 9,000.00 13,500.00 Pasir pasang 0.0450 m3 135,000.00 6,075.00 Batu GRANIT import Italy 1.0000 m2 325,000.00 325,000.00 356,575.00
TENAGA - Pekerja 0.6200 oh 40,000.00 24,800.00 Tukang 0.3500 oh 52,500.00 18,375.00 Kepala Tukang 0.0350 oh 55,000.00 1,925.00 Mandor 0.0300 oh 60,000.00 1,800.00 46,900.00
1 M2 PASANG LANTAI KERAMIK 20 X 20 MOTIF 109,425.00 Pemasangan Lantai I 1.0000 109,425.00 109,425.00 Pemasangan Lantai II 1.0900 109,425.00 119,273.25 Pemasangan Lantai III 1.1200 109,425.00 122,556.00 Pemasangan Lantai IV 1.1350 109,425.00 124,197.38 Pemasangan Lantai V 1.1620 109,425.00 127,151.85 Pemasangan Lantai VI 1.1970 109,425.00 130,981.73 Pemasangan Lantai VII 1.2360 109,425.00 135,249.30
BAHAN PC 3.3000 kg 1,200.00 3,960.00 Semen warna nut 1.3400 kg 9,000.00 12,060.00 Pasir pasang 0.0180 m3 135,000.00 2,430.00 Keramik Lantai 20/20 motif 1.0000 m2 38,000.00 38,000.00 56,450.00
TENAGA - Pekerja 0.6250 oh 40,000.00 25,000.00 Tukang 0.4500 oh 52,500.00 23,625.00 Kepala Tukang 0.0450 oh 55,000.00 2,475.00 Mandor 0.0313 oh 60,000.00 1,875.00 52,975.00
1 M2 PASANG DINDING KERAMIK 20 X 25 MOTIF 117,425.00 Pemasangan Lantai I 1.0000 117,425.00 117,425.00 Pemasangan Lantai II 1.0900 117,425.00 127,993.25 Pemasangan Lantai III 1.1200 117,425.00 131,516.00 Pemasangan Lantai IV 1.1350 117,425.00 133,277.38 Pemasangan Lantai V 1.1620 117,425.00 136,447.85 Pemasangan Lantai VI 1.1970 117,425.00 140,557.73 Pemasangan Lantai VII 1.2360 117,425.00 145,137.30
BAHAN PC 3.3000 kg 1,200.00 3,960.00
Page 54 of 334
Semen warna nut 1.3400 kg 9,000.00 12,060.00 Pasir pasang 0.0180 m3 135,000.00 2,430.00 Keramik Dinding 20 x 25 1.0000 m2 46,000.00 46,000.00 64,450.00
TENAGA - Pekerja 0.6250 oh 40,000.00 25,000.00 Tukang 0.4500 oh 52,500.00 23,625.00 Kepala Tukang 0.0450 oh 55,000.00 2,475.00 Mandor 0.0313 oh 60,000.00 1,875.00 52,975.00
1 M' PASANG PLINT KERAMIK UKURAN 10X40 - 109,945.60 Pemasangan Lantai I 1.0000 109,945.60 109,945.60 Pemasangan Lantai II 1.0900 109,945.60 119,840.70 Pemasangan Lantai III 1.1200 109,945.60 123,139.07 Pemasangan Lantai IV 1.1350 109,945.60 124,788.26 Pemasangan Lantai V 1.1620 109,945.60 127,756.79 Pemasangan Lantai VI 1.1970 109,945.60 131,604.88 Pemasangan Lantai VII 1.2360 109,945.60 135,892.76
BAHAN - PC 0.0330 kg 1,200.00 39.60 Semen warna nut 0.1000 kg 9,000.00 900.00 Pasir pasang 0.0032 m3 135,000.00 432.00 Plint Keramik Lantai 10 x 40 2.6600 bh 37,400.00 99,484.00 100,855.60
TENAGA - Pekerja 0.0900 oh 40,000.00 3,600.00 Tukang 0.0900 oh 52,500.00 4,725.00 Kepala Tukang 0.0090 oh 55,000.00 495.00 Mandor 0.0045 oh 60,000.00 270.00 9,090.00
1 M2 PEMASANGAN METAL CLADDING WARNA - 606,526.25 BAHAN -
Alat bantu 1.0000 ls 48,500.00 48,500.00 48,500.00 Sealent 0.4000 klng 21,000.00 8,400.00 8,400.00 Clidding Wall Colour + Rangka 1.1000 m2 485,000.00 533,500.00 533,500.00
TENAGA - Pekerja 0.3400 oh 40,000.00 13,600.00 Tukang 0.0300 oh 52,500.00 1,575.00 Kepala Tukang 0.0078 oh 55,000.00 426.25 Mandor 0.0088 oh 60,000.00 525.00 16,126.25
1 M2 PEMASANGAN HARDENER FLOOR - 87,120.00 BAHAN -
Floor Hardener 3.0000 kg 25,000.00 75,000.00 75,000.00
TENAGA - Pekerja 0.1200 oh 40,000.00 4,800.00 Tukang 0.1200 oh 52,500.00 6,300.00 Kepala Tukang 0.0120 oh 55,000.00 660.00 Mandor 0.0060 oh 60,000.00 360.00 12,120.00
1 M2 PEMASANGAN LANTAI KARPET - 340,450.00 BAHAN -
Karpet World Class 1.0500 m2 287,000.00 301,350.00 Lem 0.5000 kg 62,500.00 31,250.00 332,600.00
TENAGA - Pekerja 0.0500 oh 40,000.00 2,000.00 Tukang 0.1000 oh 52,500.00 5,250.00 Kepala Tukang 0.0000 oh 55,000.00 - Mandor 0.0100 oh 60,000.00 600.00 7,850.00
1 M2 PEMASANGAN LAPISAN FOAM UNTUK KARPET - 76,162.50 BAHAN -
Foam Lapisan Karpet 1.0500 m2 46,000.00 48,300.00 Lem 0.3750 kg 62,500.00 23,437.50 71,737.50
TENAGA - Pekerja 0.0300 oh 40,000.00 1,200.00 Tukang 0.0500 oh 52,500.00 2,625.00 Kepala Tukang 0.0000 oh 55,000.00 - Mandor 0.0100 oh 60,000.00 600.00 4,425.00
1 M2 PEMASANGAN LANTAI KAYU ( GYMFLOOR) - 69,985.00 BAHAN -
Gymfloor 1.0500 kg 37,500.00 39,375.00 Lem 0.6000 m2 22,000.00 13,200.00 52,575.00
TENAGA - Pekerja 0.1700 oh 40,000.00 6,800.00 Tukang 0.1700 oh 52,500.00 8,925.00 Kepala Tukang 0.0170 oh 55,000.00 935.00 Mandor 0.0125 oh 60,000.00 750.00 17,410.00
PEKERJAAN KUDA-KUDA, RENG USUK
1 M3 KUDA-KUDA KAYU JATI ( BENTANG MAX.7.00 M) - 9,424,600.00 BAHAN -
Kayu Jati ( Balok 6/12 ) Ex. Malang 1.1000 m3 7,600,000.00 8,360,000.00 Besi Plat strip 15.0000 kg 9,000.00 135,000.00 Paku Klem No.4 5.6000 kg 11,000.00 61,600.00 8,556,600.00
TENAGA - Pekerja 4.0000 oh 40,000.00 160,000.00 Tukang 12.0000 oh 52,500.00 630,000.00 Kepala Tukang 1.2000 oh 55,000.00 66,000.00 Mandor 0.2000 oh 60,000.00 12,000.00 868,000.00
1 M3 KUDA-KUDA KAYU MERANTI ( BENTANG MAX.7.00 M) - 5,244,600.00 BAHAN -
Kayu Balok Meranti 1.1000 m3 3,800,000.00 4,180,000.00 Besi Plat strip 15.0000 kg 9,000.00 135,000.00 Paku Klem No.4 5.6000 kg 11,000.00 61,600.00 4,376,600.00
TENAGA - Pekerja 4.0000 oh 40,000.00 160,000.00 Tukang 12.0000 oh 52,500.00 630,000.00 Kepala Tukang 1.2000 oh 55,000.00 66,000.00 Mandor 0.2000 oh 60,000.00 12,000.00 868,000.00
Page 55 of 334
1 M3 GORDING KAYU KAMPER - 10,336,900.00 BAHAN -
Kayu Kamper Balok 1.1000 m3 8,800,000.00 9,680,000.00 Besi Plat strip 15.0000 kg 9,000.00 135,000.00 Paku Klem No.4 0.2000 kg 11,000.00 2,200.00 9,817,200.00
TENAGA - Pekerja 2.4000 oh 40,000.00 96,000.00 Tukang 7.2000 oh 52,500.00 378,000.00 Kepala Tukang 0.7000 oh 55,000.00 38,500.00 Mandor 0.1200 oh 60,000.00 7,200.00 519,700.00
1 M2 PEMASANGAN RENG KAMPER / USUK KAMPER - 89,175.00 BAHAN -
Kayu Kamper Reng 0.0039 m3 3,850,000.00 15,015.00 Kayu Kamper Usuk 0.0108 m3 5,200,000.00 56,160.00 Paku Reng 0.2000 kg 11,000.00 2,200.00 73,375.00
TENAGA - Pekerja 0.1000 oh 40,000.00 4,000.00 Tukang 0.1000 oh 52,500.00 5,250.00 Kepala Tukang 0.0100 oh 55,000.00 550.00 Mandor 0.1000 oh 60,000.00 6,000.00 15,800.00
1 M2 PEMASANGAN RENG KAMPER / USUK MERANTI - 60,015.00 BAHAN -
Kayu Kamper Reng 0.0039 m3 3,850,000.00 15,015.00 Kayu Meranti Usuk 0.0108 m3 2,500,000.00 27,000.00 Paku Reng 0.2000 kg 11,000.00 2,200.00 44,215.00
TENAGA - Pekerja 0.1000 oh 40,000.00 4,000.00 Tukang 0.1000 oh 52,500.00 5,250.00 Kepala Tukang 0.0100 oh 55,000.00 550.00 Mandor 0.1000 oh 60,000.00 6,000.00 15,800.00
1 M2 PEMASANGAN RENG JATI / USUK KAMPER 132,660.00 BAHAN
Kayu jatir Reng 0.0039 m3 15,000,000.00 58,500.00 Kayu Kamper Usuk 0.0108 m3 5,200,000.00 56,160.00 Paku Reng 0.2000 kg 11,000.00 2,200.00 116,860.00
TENAGA - Pekerja 0.1000 oh 40,000.00 4,000.00 Tukang 0.1000 oh 52,500.00 5,250.00 Kepala Tukang 0.0100 oh 55,000.00 550.00 Mandor 0.1000 oh 60,000.00 6,000.00 15,800.00
PEKERJAAN PENUTUP ATAP
1 M2 PEMASANGAN GENTENG KARANGPILANG Ex. SURABAYA 123,357.50 Lantai Satu 1.0000 123,357.50 123,357.50 Lantai Dua 1.0900 123,357.50 134,459.68 Lantai Tiga 1.1200 123,357.50 138,160.40 Lantai Empat 1.1350 123,357.50 140,010.76 Lantai Lima 1.1620 123,357.50 143,341.41
BAHAN Genteng Karangpilang ex. Surabaya 25.0000 bh 4,500.00 112,500.00 112,500.00
TENAGA - Pekerja 0.1500 oh 40,000.00 6,000.00 Tukang 0.0750 oh 52,500.00 3,937.50 Kepala Tukang 0.0080 oh 55,000.00 440.00 Mandor 0.0080 oh 60,000.00 480.00 10,857.50
1 M2 PEMASANGAN GENTENG KERAMIK WARNA Ex.KIA 89,200.00 BAHAN
Genteng Keramik Warna KIA 11.0000 bh 6,800.00 74,800.00 74,800.00 TENAGA -
Pekerja 0.2000 oh 40,000.00 8,000.00 Tukang 0.1000 oh 52,500.00 5,250.00 Kepala Tukang 0.0100 oh 55,000.00 550.00 Mandor 0.0100 oh 60,000.00 600.00 14,400.00
1 M2 PEMASANGAN GENTENG KODOK GOOD YEARS 180,857.50 BAHAN
Genteng Kodok Good Years 25.0000 bh 6,800.00 170,000.00 170,000.00 TENAGA -
Pekerja 0.1500 oh 40,000.00 6,000.00 Tukang 0.0750 oh 52,500.00 3,937.50 Kepala Tukang 0.0080 oh 55,000.00 440.00 Mandor 0.0080 oh 60,000.00 480.00 10,857.50
1 M2 PEMASANGAN ATAP POLY CARBONIT 116,789.70 BAHAN
Polycarbonite 1.0000 m2 105,932.20 105,932.20 105,932.20 TENAGA -
Pekerja 0.1500 oh 40,000.00 6,000.00 Tukang 0.0750 oh 52,500.00 3,937.50 Kepala Tukang 0.0080 oh 55,000.00 440.00 Mandor 0.0080 oh 60,000.00 480.00 10,857.50
1 M' PEMASANGAN WUWUNG GENTENG KARANGPILANG 114,880.50 Lantai Satu 1.0000 114,880.50 114,880.50 Lantai Dua 1.0900 114,880.50 125,219.75 Lantai Tiga 1.1200 114,880.50 128,666.16 Lantai Empat 1.1350 114,880.50 130,389.37 Lantai Lima 1.1620 114,880.50 133,491.14
BAHAN PC 11.8500 kg 1,200.00 14,220.00 Pasir Pasang 0.0323 m3 135,000.00 4,360.50 Bubung Genteng Karangpilang ex. Surabaya 3.0000 bh 22,500.00 67,500.00 86,080.50
TENAGA - Pekerja 0.4000 oh 40,000.00 16,000.00 Tukang 0.2000 oh 52,500.00 10,500.00 Kepala Tukang 0.0200 oh 55,000.00 1,100.00 Mandor 0.0200 oh 60,000.00 1,200.00 28,800.00
Page 56 of 334
1 M' PEMASANGAN WUWUNG GENTENG KODOK GLAZUR 75,880.50 BAHAN
PC 11.8500 kg 1,200.00 14,220.00 Pasir Pasang 0.0323 m3 135,000.00 4,360.50 Bubung Genteng kodok glazur 3.0000 bh 9,500.00 28,500.00 47,080.50
TENAGA - Pekerja 0.4000 oh 40,000.00 16,000.00 Tukang 0.2000 oh 52,500.00 10,500.00 Kepala Tukang 0.0200 oh 55,000.00 1,100.00 Mandor 0.0200 oh 60,000.00 1,200.00 28,800.00
1 M' PEMASANGAN WUWUNG GENTENG PELENTONG BESAR 47,380.50 BAHAN
PC 11.8500 kg 1,200.00 14,220.00 Pasir Pasang 0.0323 m3 135,000.00 4,360.50 Bubung Genteng Pelentong besar / super 3.0000 bh - - 18,580.50
TENAGA - Pekerja 0.4000 oh 40,000.00 16,000.00 Tukang 0.2000 oh 52,500.00 10,500.00 Kepala Tukang 0.0200 oh 55,000.00 1,100.00 Mandor 0.0200 oh 60,000.00 1,200.00 28,800.00
1 M' PEMASANGAN WUWUNG GENTENG KARANGPILANG GEDUNG BERTINGKAT 149,704.50 BAHAN
PC 11.8500 kg 1,200.00 14,220.00 Pasir Pasang 0.0323 m3 135,000.00 4,360.50 Genteng kaca Palentong supr / besar 3.0000 bh 22,500.00 67,500.00 86,080.50
TENAGA - Pekerja 0.8800 oh 40,000.00 35,200.00 Tukang 0.4400 oh 52,500.00 23,100.00 Kepala Tukang 0.0440 oh 55,000.00 2,420.00 Mandor 0.0484 oh 60,000.00 2,904.00 63,624.00
1 M2 ALUMINIUM FOIL / INSULATION 110,897.78 BAHAN
Glass wol 0.0183 Rol 925,000.00 16,958.33 Roof Mes 0.0153 Rol 450,000.00 6,875.00 Alluminium foil /insulation double side 0.0611 Rol 1,250,000.00 76,388.89 Allumunium Tape 0.0489 Rol 26,500.00 1,295.56 101,517.78
TENAGA Pekerja 0.1500 oh 40,000.00 6,000.00 Tukang kayu 0.0500 oh 52,500.00 2,625.00 Kepala tukang Kayu 0.0050 oh 55,000.00 275.00 Mandor 0.0080 oh 60,000.00 480.00 9,380.00
PEKERJAAN TALANG
1 M' PEMASANGAN TALANG SENG BJLS 40 ( LEBAR 90 CM ) 364,840.00 BAHAN
Kayu Kamper ( Papan ) 2/30 0.0160 m3 8,900,000.00 142,400.00 Kayu KamperUsuk 0.0073 m3 5,200,000.00 37,960.00 Seng Talang BJLS 40 Lebar 90 cm 1.0000 m' 38,000.00 38,000.00 Paku Sumbat 5.0000 bh 13,000.00 65,000.00 283,360.00
TENAGA - Pekerja 0.6000 oh 40,000.00 24,000.00 Tukang 0.9600 oh 52,500.00 50,400.00 Kepala Tukang 0.0960 oh 55,000.00 5,280.00 Mandor 0.0300 oh 60,000.00 1,800.00 81,480.00
1 M' PEMASANGAN TALANG PEMBULUH PVC Ø 3" 46,333.25 BAHAN
Pipa PVC Ø 3" 0.1667 lnjr 245,000.00 40,841.50 Klem PVC 1.0000 buah 600.00 600.00 41,441.50
TENAGA - Pekerja 0.0337 oh 40,000.00 1,348.00 Tukang 0.0675 oh 52,500.00 3,543.75 4,891.75
1 M' PEMASANGAN TALANG PEMBULUH PVC Ø 4 " 65,503.75 BAHAN
Pipa PVC Ø 4 " 0.1667 lnjr 360,000.00 60,012.00 Klem PVC 1.0000 buah 600.00 600.00 60,612.00
TENAGA - Pekerja 0.0337 oh 40,000.00 1,348.00 Tukang 0.0675 oh 52,500.00 3,543.75 4,891.75
1 M' PEMASANGAN TALANG PEMBULUH PVC Ø 5 " 118,514.35 BAHAN
Pipa PVC Ø 5 " 0.1667 lnjr 678,000.00 113,022.60 Klem PVC 1.0000 buah 600.00 600.00 113,622.60
TENAGA - Pekerja 0.0337 oh 40,000.00 1,348.00 Tukang 0.0675 oh 52,500.00 3,543.75 4,891.75
1 M' PEMASANGAN TALANG PEMBULUH PIPA GALVANIS Ø 3" 497,590.15 BAHAN
Pipa Galvanis Ø 3" 0.1667 lnjr 2,952,000.00 492,098.40 Klem Galvanis 1.0000 buah 600.00 600.00 492,698.40
TENAGA - Pekerja 0.0337 oh 40,000.00 1,348.00 Tukang 0.0675 oh 52,500.00 3,543.75 4,891.75
1 M' PEMASANGAN TALANG PEMBULUH PIPA GALVANIS Ø 4 " 320,554.75 BAHAN
Pipa Galvanis Ø 4 " 0.1667 lnjr 1,890,000.00 315,063.00 Klem Galvanis 1.0000 buah 600.00 600.00 315,663.00
TENAGA - Pekerja 0.0337 oh 40,000.00 1,348.00 Tukang 0.0675 oh 52,500.00 3,543.75 4,891.75
1 M' PEMASANGAN TALANG PEMBULUH PIPA GALVANIS Ø 5 " 399,320.50 BAHAN
Pipa Galvanis Ø 5 " 0.1667 lnjr 2,362,500.00 393,828.75 Klem Galvanis 1.0000 buah 600.00 600.00 394,428.75
TENAGA -
Page 57 of 334
Pekerja 0.0337 oh 40,000.00 1,348.00 Tukang 0.0675 oh 52,500.00 3,543.75 4,891.75
1 M' PEMASANGAN LISPLANK KAYU JATI 2/30 212,515.75 BAHAN
Kayu Jati Papan ex. Malang 0.0099 m3 17,500,000.00 173,250.00 Paku Biasa 0.0500 kg 11,000.00 550.00 173,800.00
TENAGA - Pekerja 0.1867 oh 40,000.00 7,468.00 Tukang 0.5333 oh 52,500.00 27,998.25 Kepala Tukang 0.0533 oh 55,000.00 2,931.50 Mandor 0.0053 oh 60,000.00 318.00 38,715.75
1 M' PEMASANGAN LISPLANK KAYU KAMPER 2/30 127,375.75 BAHAN
Kayu Papan kamper 0.0099 m3 8,900,000.00 88,110.00 Paku Biasa 0.0500 kg 11,000.00 550.00 88,660.00
TENAGA - Pekerja 0.1867 oh 40,000.00 7,468.00 Tukang 0.5333 oh 52,500.00 27,998.25 Kepala Tukang 0.0533 oh 55,000.00 2,931.50 Mandor 0.0053 oh 60,000.00 318.00 38,715.75
1 BH BAK KONTROL 30X30 TINGGI 35 CM 324,348.08 BAHAN
bata Merak 83.9120 bh 590.00 49,508.08 Semen PC/50 kg 44.0000 Kg 1,200.00 52,800.00 Pasir Pasang 0.0700 m3 135,000.00 9,450.00 Koral Beon 0.0700 m3 150,000.00 10,500.00 Besi beton 1.6000 Kg 7,100.00 11,360.00 Pasir Beton 0.0600 m3 140,000.00 8,400.00 142,018.08
TENAGA - Pekerja 3.2000 oh 40,000.00 128,000.00 Tukang 1.0150 oh 52,500.00 53,287.50 Kepala Tukang 0.0015 oh 55,000.00 82.50 Mandor 0.0160 oh 60,000.00 960.00 182,330.00
PEKERJAAN PLAFOND
1 M2 PEMASANGAN PLAFOND ASBES DATAR RANGKA KAYU KAMPER 86,193.45 BAHAN
Kayu Balok Kamper 5/7 0.0116 m3 5,200,000.00 60,320.00 Asbes datar t= 4 mm 1.0500 m2 - - Paku Asbes 0.0324 kg 13,000.00 421.20 Paku biasa 0.0300 kg 11,000.00 330.00 61,071.20
TENAGA - Pekerja 0.1170 oh 40,000.00 4,680.00 Tukang 0.3465 oh 52,500.00 18,191.25 Kepala Tukang 0.0346 oh 55,000.00 1,903.00 Mandor 0.0058 oh 60,000.00 348.00 25,122.25
1 M2 PEMASANGAN PLAFOND ASBES DATAR RANGKA KAYU Kruing 69,738.45 Lantai Satu 1.0000 69,738.45 69,738.45 Lantai Dua 1.0900 69,738.45 76,014.91 Lantai Tiga 1.1200 69,738.45 78,107.06 Lantai Empat 1.1350 69,738.45 79,153.14 Lantai Lima 1.1620 69,738.45 81,036.08
BAHAN Kayu Balok Kamper 5/7 0.0116 m3 2,650,000.00 30,740.00 Asbes 100x100x6 mm 1.0500 m2 12,500.00 13,125.00 Paku Asbes 0.0324 kg 13,000.00 421.20 Paku biasa 0.0300 kg 11,000.00 330.00 44,616.20
TENAGA - Pekerja 0.1170 oh 40,000.00 4,680.00 Tukang 0.3465 oh 52,500.00 18,191.25 Kepala Tukang 0.0346 oh 55,000.00 1,903.00 Mandor 0.0058 oh 60,000.00 348.00 25,122.25
1 M2 PEMASANGAN PLAFOND TRIPLEX RANGKA KAYU KAMPER 74,944.65 BAHAN
Kayu Balok Kamper 5/7 0.0116 m3 2,650,000.00 30,740.00 Triplex 4 mm 0.3819 lbr 48,000.00 18,331.20 Paku Triplex 0.0324 kg 13,000.00 421.20 Paku biasa 0.0300 kg 11,000.00 330.00 49,822.40
TENAGA - Pekerja 0.1170 oh 40,000.00 4,680.00 Tukang 0.3465 oh 52,500.00 18,191.25 Kepala Tukang 0.0346 oh 55,000.00 1,903.00 Mandor 0.0058 oh 60,000.00 348.00 25,122.25
1 M2 PEMASANGAN PLAFOND GYPSUM + RANGKA METAL FURING 126,841.39 Lantai Satu 1.0000 126,841.39 126,841.39 Lantai Dua 1.0900 126,841.39 138,257.11 Lantai Tiga 1.1200 126,841.39 142,062.36 Lantai Empat 1.1350 126,841.39 143,964.98 Lantai Lima 1.1620 126,841.39 147,389.69 Lantai Enam 1.1970 126,841.39 151,829.14 Lantai Tujuh 1.2360 126,841.39 156,775.96
BAHAN Gypsumboard 122 x 244 t = 9 mm 0.3472 Lembar 65,000.00 22,569.44 Sekrup 11.0000 bh 150.00 1,650.00 Rangka metal furing 0.9900 btg 25,000.00 24,750.00 Stifenner 3.0000 btg 10,000.00 30,000.00 Juster penggantung 4.0000 bh 2,500.00 10,000.00 Joint Tape 0.8000 m' 6,500.00 5,200.00 Jointing Compound 0.3000 Kg 8,500.00 2,550.00 Steger 0.1000 ls 96,719.44 9,671.94 106,391.39
TENAGA - Pekerja 0.3000 oh 40,000.00 12,000.00 Tukang 0.1500 oh 52,500.00 7,875.00 Kepala Tukang 0.0050 oh 55,000.00 275.00 Mandor 0.0050 oh 60,000.00 300.00 20,450.00
Page 58 of 334
1 M2 PEMASANGAN PLAFOND KLASIBOARD TANPA RANGKA 25,600.00 BAHAN
Kalsiboard 1,00x1,00 ex. Gresik 0.3819 lbr - - Sekrup 4.0000 bh 150.00 600.00 600.00
TENAGA - Pekerja 0.1500 oh 40,000.00 6,000.00 Tukang 0.2500 oh 52,500.00 13,125.00 Kepala Tukang 0.0250 oh 55,000.00 1,375.00 Mandor 0.0750 oh 60,000.00 4,500.00 25,000.00
1 M2 PEMASANGAN PLAFOND LUAR KISI-KISI TANPA RANGKA 91,780.00 BAHAN
Kayu Kamper Balok 0.0120 m3 2,650,000.00 31,800.00 Paku biasa 0.1400 kg 11,000.00 1,540.00 33,340.00
TENAGA - Pekerja 0.2800 oh 40,000.00 11,200.00 Tukang 0.8000 oh 52,500.00 42,000.00 Kepala Tukang 0.0800 oh 55,000.00 4,400.00 Mandor 0.0140 oh 60,000.00 840.00 58,440.00
1 M2 PEMASANGAN RANGKA PLAFOND KAYU KAMPER 47,892.40 BAHAN
Kayu Kamper Balok 0.0116 m3 2,650,000.00 30,740.00 Paku Klem 0.0308 kg 13,000.00 400.40 31,140.40
TENAGA - Pekerja 0.0780 oh 40,000.00 3,120.00 Tukang 0.2310 oh 52,500.00 12,127.50 Kepala Tukang 0.0231 oh 55,000.00 1,270.50 Mandor 0.0039 oh 60,000.00 234.00 16,752.00
1 M2 PEMASANGAN RANGKA PLAFOND KAYU MERANTI 61,232.40 BAHAN
Kayu Meranti r Balok 0.0116 m3 3,800,000.00 44,080.00 Paku Klem 0.0308 kg 13,000.00 400.40 44,480.40
TENAGA - Pekerja 0.0780 oh 40,000.00 3,120.00 Tukang 0.2310 oh 52,500.00 12,127.50 Kepala Tukang 0.0231 oh 55,000.00 1,270.50 Mandor 0.0039 oh 60,000.00 234.00 16,752.00
1 M2 PEMASANGAN RANGKA PLAFOND BESI HOLLOW 192,225.00 BAHAN
Besi Hollow 40/40 0.7500 m' 67,500.00 50,625.00 Besi Hollow 20/20 2.0000 m' 51,000.00 102,000.00 Paku sekrup 4.0000 bh 150.00 600.00 153,225.00
TENAGA - Pekerja 0.5000 oh 40,000.00 20,000.00 Tukang 0.2500 oh 52,500.00 13,125.00 Kepala Tukang 0.0250 oh 55,000.00 1,375.00 Mandor 0.0750 oh 60,000.00 4,500.00 39,000.00
1 M2 PEMASANGAN LIST PLAFOND GYPSUM PROFIL 10 CM 19,547.50 BAHAN
List Profil Gypsum, t = 5 - 10 cm 1.0000 m' 15,000.00 15,000.00 Jointing Compound 0.1000 Kg 8,500.00 850.00 Steger 0.1000 ls 15,850.00 1,585.00 17,435.00
TENAGA - Pekerja 0.0210 oh 40,000.00 840.00 Tukang 0.0210 oh 52,500.00 1,102.50 Kepala Tukang 0.0020 oh 55,000.00 110.00 Mandor 0.0010 oh 60,000.00 60.00 2,112.50
PEKERJAAN KOSEN DAN PINTU
1 M3 KOSEN PINTU DAN JENDELA KAYU JATI Ex. MALANG 9,916,600.00 BAHAN
Kayu Jati Balok 1.1000 m3 7,600,000.00 8,360,000.00 Paku Klem 1.2000 kg 13,000.00 15,600.00 Lem Kayu 1.0000 kg 22,000.00 22,000.00 8,397,600.00
TENAGA - Pekerja 7.0000 oh 40,000.00 280,000.00 Tukang 21.0000 oh 52,500.00 1,102,500.00 Kepala Tukang 2.1000 oh 55,000.00 115,500.00 Mandor 0.3500 oh 60,000.00 21,000.00 1,519,000.00
1 M3 KOSEN PINTU DAN JENDELA KAYU KAMPER 11,585,250.00 Lantai Satu 1.0000 11,585,250.00 11,585,250.00 Lantai Dua 1.0900 11,585,250.00 12,627,922.50 Lantai Tiga 1.1200 11,585,250.00 12,975,480.00 Lantai Empat 1.1350 11,585,250.00 13,149,258.75 Lantai Lima 1.1620 11,585,250.00 13,462,060.50
BAHAN Kayu Kamper Balok 1.2000 m3 8,800,000.00 10,560,000.00 Paku Klem 1.2500 kg 13,000.00 16,250.00 Lem Kayu 1.0000 kg 22,000.00 22,000.00 10,598,250.00
TENAGA - Pekerja 6.0000 oh 40,000.00 240,000.00 Tukang 12.0000 oh 52,500.00 630,000.00 Kepala Tukang 1.8000 oh 55,000.00 99,000.00 Mandor 0.3000 oh 60,000.00 18,000.00 987,000.00
1 M' PASANG KOSEN PINTU DAN KOSEN JENDELA DARI ALUMINIUM 114,945.00 Lantai Satu 1.0000 114,945.00 114,945.00 Lantai Dua 1.0900 114,945.00 125,290.05 Lantai Tiga 1.1200 114,945.00 128,738.40 Lantai Empat 1.1350 114,945.00 130,462.58 Lantai Lima 1.1620 114,945.00 133,566.09
BAHAN Jendela alumunium putih ex. INDALEX 1.2000 m' 75,000.00 90,000.00 90,000.00 Sealent 8.0000 m' 21,000.00 168,000.00
TENAGA Pekerja 0.1500 oh 40,000.00 6,000.00 Tukang 0.2500 oh 52,500.00 13,125.00 Kepala Tukang 0.0240 oh 55,000.00 1,320.00
Page 59 of 334
Mandor 0.0750 oh 60,000.00 4,500.00 24,945.00
1 M2 DAUN PINTU PANIL JATI Ex. MALANG 524,750.00 BAHAN
kayu Jati Papan 3 cm 0.0400 m3 7,600,000.00 304,000.00 Skrup 25.0000 bh 150.00 3,750.00 307,750.00
TENAGA Pekerja 1.0000 oh 40,000.00 40,000.00 Tukang 3.0000 oh 52,500.00 157,500.00 Kepala Tukang 0.3000 oh 55,000.00 16,500.00 Mandor 0.0500 oh 60,000.00 3,000.00 217,000.00
1 M2 DAUN PINTU PANIL KAMPER 576,750.00 BAHAN
Kayu Kamper Papan 3 cm 0.0400 m3 8,900,000.00 356,000.00 Skrup 25.0000 bh 150.00 3,750.00 359,750.00
TENAGA Pekerja 1.0000 oh 40,000.00 40,000.00 Tukang 3.0000 oh 52,500.00 157,500.00 Kepala Tukang 0.3000 oh 55,000.00 16,500.00 Mandor 0.0500 oh 60,000.00 3,000.00 217,000.00
1 M2 PASANG PINTU PANIL (80X230) KAMPER + MULTIPLEX 9 MM + TEAKWOOD 576,490.00 BAHAN
Kayu Papan Kamper 0.0291 m3 8,900,000.00 258,990.00 Multiplex 9 mm 0.6500 lmbr 125,000.00 81,250.00 Teakwood Jati 4 mm 1.0000 lmbr 95,000.00 95,000.00 Paku Triplex 0.2000 kg 11,000.00 2,200.00 Lem Putih Fox 0.0500 kg 22,000.00 1,100.00 Profil kayu 3.5000 m' 10,000.00 35,000.00 473,540.00
TENAGA Pekerja 0.3000 oh 40,000.00 12,000.00 Tukang 1.5000 oh 52,500.00 78,750.00 Kepala Tukang 0.2000 oh 55,000.00 11,000.00 Mandor 0.0200 oh 60,000.00 1,200.00 102,950.00
1 M2 PINTU / JENDELA KACA ALUMUNIUM 524,450.00 BAHAN
Aluminium Jendela 4.0000 m' 75,000.00 300,000.00 Sealent 0.1000 kg 21,000.00 2,100.00 Kaca Polos tebal 5mm 0.6500 m' 75,000.00 48,750.00 350,850.00
TENAGA Pekerja 0.8000 oh 40,000.00 32,000.00 Tukang 2.4000 oh 52,500.00 126,000.00 Kepala Tukang 0.2400 oh 55,000.00 13,200.00 Mandor 0.0400 oh 60,000.00 2,400.00 173,600.00
1 M2 PINTU / JENDELA KACA PAPAN KAYU KAMPER 537,000.00 BAHAN
Kayu Papan Kamper 0.0350 m3 8,900,000.00 311,500.00 Paku biasa 1.4000 m2 21,000.00 29,400.00 Kaca Polos tebal 5mm 0.3000 m2 75,000.00 22,500.00 363,400.00
TENAGA Pekerja 0.8000 oh 40,000.00 32,000.00 Tukang 2.4000 oh 52,500.00 126,000.00 Kepala Tukang 0.2400 oh 55,000.00 13,200.00 Mandor 0.0400 oh 60,000.00 2,400.00 173,600.00
1 M2 PASANG PINTU PLYWOOD RANGKAP RANGKA JATI 206,500.00 BAHAN
Kayu Jati 0.0196 m3 75,000.00 1,470.00 Paku Biasa 0.0300 kg 21,000.00 630.00 Lem Kayu 0.3000 ltr 22,000.00 6,600.00 Plywood t=4mm 1.0000 lbr 56,000.00 56,000.00 64,700.00
TENAGA Pekerja 0.6000 oh 40,000.00 24,000.00 Tukang 2.0000 oh 52,500.00 105,000.00 Kepala Tukang 0.2000 oh 55,000.00 11,000.00 Mandor 0.0300 oh 60,000.00 1,800.00 141,800.00
1 M2 PASANG PINTU TEAKWOOD+ FORMIKA RANGKA KAMPER KISI UN. KM 570,715.00 BAHAN
Kayu Kamper 0.0196 m3 8,900,000.00 174,440.00 Multiplex 9 mm 0.7000 m2 125,000.00 87,500.00 Teakwood Jati 4 mm + Formika 0.7000 m2 166,250.00 116,375.00 Pembuatan Kisis2 kayu kamper 0.3000 m2 140,000.00 42,000.00 420,315.00
TENAGA Pekerja 0.8000 oh 40,000.00 32,000.00 Tukang 2.0000 oh 52,500.00 105,000.00 Kepala Tukang 0.2000 oh 55,000.00 11,000.00 Mandor 0.0400 oh 60,000.00 2,400.00 150,400.00
1 M2 PASANG KACA MATI 5 MM 133,650.00 BAHAN
Alat bantu 1.0000 m3 - - Sealent 0.4000 kg 21,000.00 8,400.00 Kaca Gelap 5 mm 1.0000 m2 115,000.00 115,000.00 123,400.00
TENAGA Pekerja 0.0500 oh 40,000.00 2,000.00 Kepala Tukang 0.1500 oh 55,000.00 8,250.00 10,250.00
1 M2 PASANG KACA BURAM 5 MM 18,650.00 BAHAN
Alat bantu 1.0000 m3 - - Sealent 0.4000 kg 21,000.00 8,400.00 Kaca Buram tebal = 5 mm 1.0000 m2 - - 8,400.00
TENAGA Pekerja 0.0500 oh 40,000.00 2,000.00 Kepala Tukang 0.1500 oh 55,000.00 8,250.00 10,250.00
1 M' PASANG PROFIL KAYU KAMPER 7 CM 16,892.00 BAHAN
List Profil Kayu Kamper 1/7 1.0500 m' - - Paku biasa 0.0020 kg 21,000.00 42.00
Page 60 of 334
Lem Kayu 0.3000 ltr 22,000.00 6,600.00 6,642.00 TENAGA
Pekerja 0.0500 oh 40,000.00 2,000.00 Kepala Tukang 0.1500 oh 55,000.00 8,250.00 10,250.00
1 M' PASANG PROFIL KAYU KAMPER 10 CM 27,392.00 BAHAN
List Profil Kayu Kamper 1/10 1.0500 m' 10,000.00 10,500.00 Paku biasa 0.0020 kg 21,000.00 42.00 Lem Kayu 0.3000 ltr 22,000.00 6,600.00 17,142.00
TENAGA Pekerja 0.0500 oh 40,000.00 2,000.00 Kepala Tukang 0.1500 oh 55,000.00 8,250.00 10,250.00
1 M' PASANG PROFIL KAYU KAMPER 15 CM 16,892.00 BAHAN
List Profil Kayu Kamper 1/15 1.0500 m' - - Paku biasa 0.0020 kg 21,000.00 42.00 Lem Kayu 0.3000 ltr 22,000.00 6,600.00 6,642.00
TENAGA Pekerja 0.0500 oh 40,000.00 2,000.00 Kepala Tukang 0.1500 oh 55,000.00 8,250.00 10,250.00
1 M' PASANG PROFIL KAYU JATI 15 CM 16,892.00 BAHAN
List kayu jati profil 1.5/15 1.0500 m' - - Paku biasa 0.0020 kg 21,000.00 42.00 Lem Kayu 0.3000 ltr 22,000.00 6,600.00 6,642.00
TENAGA Pekerja 0.0500 oh 40,000.00 2,000.00 Kepala Tukang 0.1500 oh 55,000.00 8,250.00 10,250.00
1 M2 PASANG KACA STOPSOL BLUEGREY 6 MM 27,475.00 BAHAN
Alat bantu 1.0000 ls - - Sealent 0.4000 klng 21,000.00 8,400.00 Kaca Stopsol Blue Grey 6 mm 1.0500 m2 - - 8,400.00
TENAGA Pekerja 0.2000 oh 40,000.00 8,000.00 Tukang 0.2000 oh 52,500.00 10,500.00 Kepala Tukang 0.0050 oh 55,000.00 275.00 Mandor 0.0050 oh 60,000.00 300.00 19,075.00
1 M2 PASANG KACA STOPSOL BLUEGREY 8 MM 27,475.00 BAHAN
Alat bantu 1.0000 ls - - Sealent 0.4000 klng 21,000.00 8,400.00 Kaca Stopsol Blue Grey 8 mm 1.0500 m2 - - 8,400.00
TENAGA Pekerja 0.2000 oh 40,000.00 8,000.00 Tukang 0.2000 oh 52,500.00 10,500.00 Kepala Tukang 0.0050 oh 55,000.00 275.00 Mandor 0.0050 oh 60,000.00 300.00 19,075.00
1 M2 PASANG KACA TEMPERED 12 MM 27,475.00 BAHAN
Alat bantu 1.0000 ls - - Sealent 0.4000 klng 21,000.00 8,400.00 Kaca Temprd 12 mm 1.1000 m2 - - 8,400.00
TENAGA Pekerja 0.2000 oh 40,000.00 8,000.00 Tukang 0.2000 oh 52,500.00 10,500.00 Kepala Tukang 0.0050 oh 55,000.00 275.00 Mandor 0.0050 oh 60,000.00 300.00 19,075.00
1 M2 PASANG KACA NACO TEBAL 5 MM RAYBEN 176,975.00 BAHAN
Krepyak Naco 10.0000 daun - - Kaca Rayben 5 mm 1.3600 m2 115,000.00 156,400.00 Sekrup 10.0000 kg 150.00 1,500.00 157,900.00
TENAGA Pekerja 0.2000 oh 40,000.00 8,000.00 Tukang 0.2000 oh 52,500.00 10,500.00 Kepala Tukang 0.0050 oh 55,000.00 275.00 Mandor 0.0050 oh 60,000.00 300.00 19,075.00
1 M2 METAL CLIDDING COLOUR 18,025.00 BAHAN
Alat bantu 1.0000 ls - - Sealent 0.4000 klng 21,000.00 8,400.00 Clidding Wall Colour + Rangka 1.2000 m2 - - 8,400.00
TENAGA Pekerja 0.2000 oh 40,000.00 8,000.00 Tukang 0.0200 oh 52,500.00 1,050.00 Kepala Tukang 0.0050 oh 55,000.00 275.00 Mandor 0.0050 oh 60,000.00 300.00 9,625.00
1 M' PASANG KOSEN CURTAIN WALL ALUMINIUM 26,945.00 BAHAN
Aluminium Curtain 1.1000 m' - - - Sealent 2.0000 klng 21,000.00 42,000.00
TENAGA Pekerja 0.2000 oh 40,000.00 8,000.00 Tukang 0.2500 oh 52,500.00 13,125.00 Kepala Tukang 0.0240 oh 55,000.00 1,320.00 Mandor 0.0750 oh 60,000.00 4,500.00 26,945.00
1 UNIT PINTU FRAME LESS TEMPERED 103,855.50 Kaca tempered 12 mm 3.7800 m2 27,475.00 103,855.50 Aluminium profil warna 4" 0.0000 m' 114,945.00 - Patch Fitting Handle SS Complete Dekkson+Floorhinge Dorma 2.0000 set - - Kunci Ex Dorma 2.0000 set - - Handel Stainless Steel 2.0000 set - - 103,855.50
Page 61 of 334
PEKERJAAN PARTISI
1 M2 PARTISI DOUBLE TEAKWOOD 192,980.00 BAHAN
Teakwood 3 mm 1.0000 lbr 75,000.00 75,000.00 Kayu Kamper Usuk 0.0154 m3 5,200,000.00 80,080.00 Paku Klem 0.1000 kg 13,000.00 1,300.00 156,380.00
TENAGA Pekerja 0.1500 oh 40,000.00 6,000.00 Tukang 0.4500 oh 52,500.00 23,625.00 Kepala Tukang 0.0450 oh 55,000.00 2,475.00 Mandor 0.0750 oh 60,000.00 4,500.00 36,600.00
1 M2 PARTISI DOUBLE GYPSUM TEBAL 12 MM 214,313.89 Lantai Satu 1.0000 214,313.89 214,313.89 Lantai Dua 1.0900 214,313.89 233,602.14 Lantai Tiga 1.1200 214,313.89 240,031.56 Lantai Empat 1.1350 214,313.89 243,246.26 Lantai Lima 1.1620 214,313.89 249,032.74 Lantai Enam 1.1970 214,313.89 256,533.73 Lantai Tujuh 1.2360 214,313.89 264,891.97
BAHAN Gypsum Board 12 mm 0.6944 Lembar 110,000.00 76,388.89 Skrup 22.0000 bh 150.00 3,300.00 Hollow 2/4 0.5000 btg 51,000.00 25,500.00 Hollow 4/4 1.0000 btg 67,500.00 67,500.00 Skrup Fisher 2.0000 bh 500.00 1,000.00 Joint Tape 2.0000 m' 6,500.00 13,000.00 Jointing Compound 0.3000 Kg 8,500.00 2,550.00 189,238.89
TENAGA Pekerja 0.3500 oh 40,000.00 14,000.00 Tukang 0.2000 oh 52,500.00 10,500.00 Kepala Tukang 0.0050 oh 55,000.00 275.00 Mandor 0.0050 oh 60,000.00 300.00 25,075.00
PEKERJAAN ASSESORIES PINTU / JENDELA
1 BH PASANG KUNCI PINTU DOUBLE SLAAG SETARA LOGO - CISA 269,900.00 BAHAN
Kunci Pintu (Lockcase) + double cylinder 1.0000 bh 245,000.00 245,000.00 TENAGA
Pekerja 0.1500 oh 40,000.00 6,000.00 Tukang 0.3600 oh 52,500.00 18,900.00
1 BH PEMASANGAN KUNCI TANAM ANTIK 274,900.00 BAHAN
Kunci Tanam antik 1.0000 bh 250,000.00 250,000.00 TENAGA
Pekerja 0.1500 oh 40,000.00 6,000.00 Tukang 0.3600 oh 52,500.00 18,900.00
1 BH PEMASANGAN KUNCI TANAM SES 24,900.00 BAHAN
Kunci SES 1.0000 bh - - TENAGA
Pekerja 0.1500 oh 40,000.00 6,000.00 Tukang 0.3600 oh 52,500.00 18,900.00
1 BH PEMASANGAN KUNCI TANAM SILENDER KM/WC 60,100.00 BAHAN
Kunci Silinder 1.0000 bh 35,200.00 35,200.00 TENAGA
Pekerja 0.1500 oh 40,000.00 6,000.00 Tukang 0.3600 oh 52,500.00 18,900.00
1 BH PEMASANGAN ENGSEL PINTU 28,050.00 BAHAN
Engsel Pintu 1.0000 bh 17,500.00 17,500.00 TENAGA
Pekerja 0.0800 oh 40,000.00 3,200.00 Tukang 0.1400 oh 52,500.00 7,350.00
1 BH PEMASANGAN ENGSEL JENDELA 20,550.00 BAHAN
Engsel Jendela 1.0000 bh 10,000.00 10,000.00 TENAGA
Pekerja 0.0800 oh 40,000.00 3,200.00 Tukang 0.1400 oh 52,500.00 7,350.00
1 BH PEMASANGAN GRENDEL PINTU 31,700.00 BAHAN
Grendel pintu 1.0000 bh 23,000.00 23,000.00 TENAGA
Pekerja 0.0600 oh 40,000.00 2,400.00 Tukang 0.1200 oh 52,500.00 6,300.00
1 BH PEMASANGAN GRENDEL PINTU 3" 8,700.00 BAHAN
Grendel 3" ex. Muller 1.0000 bh - - TENAGA
Pekerja 0.0600 oh 40,000.00 2,400.00 Tukang 0.1200 oh 52,500.00 6,300.00
1 BH PEMASANGAN GRENDEL JENDELA KUNINGAN 28,200.00 BAHAN
Grendel jendela kuningan 1.0000 bh 19,500.00 19,500.00 TENAGA
Pekerja 0.0600 oh 40,000.00 2,400.00 Tukang 0.1200 oh 52,500.00 6,300.00
1 BH PEMASANGAN GRENDEL ESPANYOLET 8,700.00 BAHAN
Page 62 of 334
Grendel Espanyolet 1.0000 bh - - TENAGA
Pekerja 0.0600 oh 40,000.00 2,400.00 Tukang 0.1200 oh 52,500.00 6,300.00
1 BH PEMASANGAN HAK ANGIN 55,550.00 BAHAN
Hak Angin 1.0000 bh 45,000.00 45,000.00 TENAGA
Pekerja 0.0800 oh 40,000.00 3,200.00 Tukang 0.1400 oh 52,500.00 7,350.00
1 BH PASANG DOOR CLOSER 1,250,550.00 BAHAN
Door Closer 1.0000 bh 1,240,000.00 1,240,000.00 1,240,000.00 TENAGA -
Pekerja 0.0800 oh 40,000.00 3,200.00 Tukang 0.1400 oh 52,500.00 7,350.00 10,550.00
PEKERJAAN INSTALASI LISTRIK
1 TTK PEMASANGAN TITIK STOP KONTAK GEDUNG - 13,290.00 BAHAN -
Stop Kontak Broco 1.0000 bh - - Kabel NYA 500 V 2 x 2,5 mm2 15.0000 m' - - Pipa Pralon 5/8 1.0000 ljr - - T Dos PVC 1.0000 bh - - -
TENAGA - Pekerja Terampil 0.0010 oh 40,000.00 40.00 Tukang 0.2000 oh 52,500.00 10,500.00 Kepala Tukang 0.0500 oh 55,000.00 2,750.00 Mandor 0.0000 oh 60,000.00 - 13,290.00
1 TTK PEMASANGAN TITIK LAMPU GEDUNG - 41,000.00 BAHAN -
Isolator 4.0000 bh - - Kabel NYA 500 V 2 x 2,5 mm2 10.0000 m' - - Pipa Pralon 5/8 1.0000 ljr - - T Dos PVC 1.0000 bh - - Fitting Plafond 1.0000 bh - - -
TENAGA - Pekerja Terampil 0.3000 oh 40,000.00 12,000.00 Tukang 0.5000 oh 52,500.00 26,250.00 Kepala Tukang 0.0500 oh 55,000.00 2,750.00 Mandor 0.0000 oh 60,000.00 - 41,000.00
1 TTK PEMASANGAN TITIK LAMPU GEDUNG STOP KONTAK AC - 62,400.00 BAHAN -
Isolator 5.0000 bh - - Kabel NYY Eterna Ø 2½" x 3 18.0000 m' - - Pipa Pralon Ø 5/8 2.0000 ljr - - Inbow Dos PVC Kontak 1.0000 bh - -
- - - TENAGA -
Pekerja Terampil 0.6000 oh 40,000.00 24,000.00 Tukang 0.6000 oh 52,500.00 31,500.00 Kepala Tukang 0.0600 oh 55,000.00 3,300.00 Mandor 0.0600 oh 60,000.00 3,600.00 62,400.00
- 1 TTK PEMASANGAN SAKLAR TUNGGAL - 13,290.00
BAHAN - Saklar Tunggal Broco 1.0000 bh - - -
TENAGA - Pekerja Terampil 0.0010 oh 40,000.00 40.00 Tukang 0.2000 oh 52,500.00 10,500.00 Kepala Tukang 0.0500 oh 55,000.00 2,750.00 13,290.00
- 1 TTK PEMASANGAN SAKLAR GANDA - 10,665.00
BAHAN - Saklar Ganda Broco 1.0000 bh - - -
TENAGA - Pekerja Terampil 0.0010 oh 40,000.00 40.00 Tukang 0.2000 oh 40,000.00 8,000.00 Kepala Tukang 0.0500 oh 52,500.00 2,625.00 10,665.00
1 M' PEMASANGAN PVC UNTUK KABEL TANAM - 10,000.00 BAHAN -
Pipa PVC Type AW Ø 2 " 0.2500 ljr - - - TENAGA -
Pekerja Terampil 0.2500 oh 40,000.00 10,000.00 Tukang 0.0000 oh 40,000.00 - Kepala Tukang 0.0000 oh 40,000.00 - 10,000.00
1 UNIT PEMASANGAN PANEL PENERANGAN JALAN UMUM ( PJU ) - 60,000.00 BAHAN -
TENAGA - Pekerja Terampil 0.5000 oh 40,000.00 20,000.00 Tukang 0.5000 oh 40,000.00 20,000.00 Kepala Tukang 0.5000 oh 40,000.00 20,000.00 60,000.00
1 UNIT PEMASANGAN LAMPU HPS 70 W / 220 V LENGKAP - 55,000.00 BAHAN -
Lampu HPS (Armature,Balas,Ignitor.Caps) 70 W/220 1.0000 bh - - - ALAT -
Sewa Alat Bantu PJU 0.2500 jam - - - TENAGA -
Pekerja Tak Terampil 0.7500 oh 40,000.00 30,000.00 Tukang 0.2500 oh 40,000.00 10,000.00 Mandor 0.2500 oh 60,000.00 15,000.00 55,000.00
1 UNIT PEMASANGAN LAMPU HPS 150 W / 220 V LENGKAP - 55,000.00 BAHAN -
Lampu HPS (Armature,Balas,Ignitor.Caps) 150 W/220 1.0000 bh - - - ALAT -
Page 63 of 334
Sewa Alat Bantu PJU 0.2500 jam - - - TENAGA -
Pekerja Tak Terampil 0.7500 oh 40,000.00 30,000.00 Tukang 0.2500 oh 40,000.00 10,000.00 Mandor 0.2500 oh 60,000.00 15,000.00 55,000.00
1 UNIT PEMASANGAN LAMPU HPS 250 W / 220 V LENGKAP - 55,000.00 BAHAN -
Lampu HPS (Armature,Balas,Ignitor.Caps) 250 W / 220 1.0000 bh - - - ALAT -
Sewa Alat Bantu PJU 0.2500 jam - - - TENAGA -
Pekerja Tak Terampil 0.7500 oh 40,000.00 30,000.00 Tukang 0.2500 oh 40,000.00 10,000.00 Mandor 0.2500 oh 60,000.00 15,000.00 55,000.00
1 UNIT PEMASANGAN LAMPU HPS 400 W / 220 V LENGKAP - 55,000.00 BAHAN -
Lampu HPS (Armature,Balas,Ignitor.Caps) 400 W / 220 1.0000 bh - - - ALAT -
Sewa Alat Bantu PJU 0.2500 jam - - - TENAGA -
Pekerja Tak Terampil 0.7500 oh 40,000.00 30,000.00 Tukang 0.2500 oh 40,000.00 10,000.00 Mandor 0.2500 oh 60,000.00 15,000.00 55,000.00
1 UNIT PEMASANGAN LAMPU MERCURY HPLN 80 WATT - 55,000.00 BAHAN -
Bola lampu Mercury HPLN-220 V / 80 W 1.0000 bh - - - ALAT -
Sewa Alat Bantu PJU 0.2500 jam - - - TENAGA -
Pekerja Tak Terampil 0.7500 oh 40,000.00 30,000.00 Tukang 0.2500 oh 40,000.00 10,000.00 Mandor 0.2500 oh 60,000.00 15,000.00 55,000.00
1 UNIT PEMASANGAN LAMPU MERCURY HPLN 200 WATT - 55,000.00 BAHAN -
Bola lampu Mercury HPLN-220 V / 200 W 1.0000 bh - - - ALAT -
Sewa Alat Bantu PJU 0.2500 jam - - - TENAGA -
Pekerja Tak Terampil 0.7500 oh 40,000.00 30,000.00 Tukang 0.2500 oh 40,000.00 10,000.00 Mandor 0.2500 oh 60,000.00 15,000.00 55,000.00
1 UNIT PEMASANGAN LAMPU NATRIUM 250 W / 220 V - 55,000.00 BAHAN -
Lampu Natrium 250 W/ 220 V + Balast 1.0000 bh - - - ALAT -
Sewa Alat Bantu PJU 0.2500 jam - - - TENAGA -
Pekerja Tak Terampil 0.7500 oh 40,000.00 30,000.00 Tukang 0.2500 oh 40,000.00 10,000.00 Mandor 0.2500 oh 60,000.00 15,000.00 55,000.00
1 UNIT PEMASANGAN LAMPU SOROT 250 W / 220 V - 55,000.00 BAHAN -
Lampu Sorot (Armature,Balas,Ignitor.Caps) 250 watt 1.0000 bh - - - ALAT -
Sewa Alat Bantu PJU 0.2500 jam - - - TENAGA -
Pekerja Tak Terampil 0.7500 oh 40,000.00 30,000.00 Tukang 0.2500 oh 40,000.00 10,000.00 Mandor 0.2500 oh 60,000.00 15,000.00 55,000.00
1 UNIT PEMASANGAN LAMPU SOROT 150 W / 220 V - 55,000.00 BAHAN -
Lampu Sorot (Armature,Balas,Ignitor.Caps) 150 watt 1.0000 bh - - - ALAT -
Sewa Alat Bantu PJU 0.2500 jam - - - TENAGA -
Pekerja Tak Terampil 0.7500 oh 40,000.00 30,000.00 Tukang 0.2500 oh 40,000.00 10,000.00 Mandor 0.2500 oh 60,000.00 15,000.00 55,000.00
1 UNIT PEMASANGAN TIAN OKTOGONAL 5 M SINGLE+FLANDERS - 170,300.00 BAHAN -
Tiang Oktogonal Singgle Hot Dipped Galv + Flenders 5m 1.0000 unit - - - ALAT -
Sewa Crane 0.5000 jam 225,000.00 112,500.00 112,500.00 TENAGA -
Pekerja Tak Terampil 0.7500 oh 40,000.00 30,000.00 Pekerja Terampil 0.2500 oh 40,000.00 10,000.00 Tukang Listrik 0.2500 oh 40,000.00 10,000.00 Mandor 0.1300 oh 60,000.00 7,800.00 57,800.00
1 UNIT PEMASANGAN TIAN OKTOGONAL 5 M DOUBLE + FLANDERS - 170,300.00 BAHAN -
Tiang Oktogonal Double Hot Dipped Galv + Flenders 5m 1.0000 unit - - - ALAT -
Sewa Crane 0.5000 jam 225,000.00 112,500.00 112,500.00 TENAGA -
Pekerja Tak Terampil 0.7500 oh 40,000.00 30,000.00 Pekerja Terampil 0.2500 oh 40,000.00 10,000.00 Tukang Listrik 0.2500 oh 40,000.00 10,000.00 Mandor 0.1300 oh 60,000.00 7,800.00 57,800.00
1 UNIT PEMASANGAN TIAN OKTOGONAL 7 M SINGLE + FLANDERS - 170,300.00 BAHAN -
Tiang Oktogonal Singgle Hot Dipped Galv + Flenders 7 m 1.0000 unit - - - ALAT -
Sewa Crane 0.5000 jam 225,000.00 112,500.00 112,500.00 TENAGA -
Pekerja Tak Terampil 0.7500 oh 40,000.00 30,000.00
Page 64 of 334
Pekerja Terampil 0.2500 oh 40,000.00 10,000.00 Tukang Listrik 0.2500 oh 40,000.00 10,000.00 Mandor 0.1300 oh 60,000.00 7,800.00 57,800.00
1 UNIT PEMASANGAN TIAN OKTOGONAL 7 M DOUBLE + FLANDERS - 170,300.00 BAHAN -
Tiang Oktogonal Double Hot Dipped Galv + Flenders 7 m 1.0000 unit - - - ALAT -
Sewa Crane 0.5000 jam 225,000.00 112,500.00 112,500.00 TENAGA -
Pekerja Tak Terampil 0.7500 oh 40,000.00 30,000.00 Pekerja Terampil 0.2500 oh 40,000.00 10,000.00 Tukang Listrik 0.2500 oh 40,000.00 10,000.00 Mandor 0.1300 oh 60,000.00 7,800.00 57,800.00
1 UNIT PEMASANGAN TIAN OKTOGONAL 9 M SINGLE + FLANDERS - 170,300.00 BAHAN -
Tiang Oktogonal Singgle Hot Dipped Galv + Flenders 9 m 1.0000 unit - - - ALAT -
Sewa Crane 0.5000 jam 225,000.00 112,500.00 112,500.00 TENAGA -
Pekerja Tak Terampil 0.7500 oh 40,000.00 30,000.00 Pekerja Terampil 0.2500 oh 40,000.00 10,000.00 Tukang Listrik 0.2500 oh 40,000.00 10,000.00 Mandor 0.1300 oh 60,000.00 7,800.00 57,800.00
1 UNIT PEMASANGAN TIAN OKTOGONAL 9 M DOUBLE + FLANDERS - 170,300.00 BAHAN -
Tiang Oktogonal Double Hot Dipped Galv + Flenders 9 m 1.0000 unit - - - ALAT -
Sewa Crane 0.5000 jam 225,000.00 112,500.00 112,500.00 TENAGA -
Pekerja Tak Terampil 0.7500 oh 40,000.00 30,000.00 Pekerja Terampil 0.2500 oh 40,000.00 10,000.00 Tukang Listrik 0.2500 oh 40,000.00 10,000.00 Mandor 0.1300 oh 60,000.00 7,800.00 57,800.00
1 UNIT PEMASANGAN TIAN OKTOGONAL 12 M SINGLE + FLANDERS - 170,300.00 BAHAN -
Tiang Oktogonal Singgle Hot Dipped Galv + Flenders 12 m 1.0000 unit - - - ALAT -
Sewa Crane 0.5000 jam 225,000.00 112,500.00 112,500.00 TENAGA -
Pekerja Tak Terampil 0.7500 oh 40,000.00 30,000.00 Pekerja Terampil 0.2500 oh 40,000.00 10,000.00 Tukang Listrik 0.2500 oh 40,000.00 10,000.00 Mandor 0.1300 oh 60,000.00 7,800.00 57,800.00
1 UNIT PEMASANGAN TIAN OKTOGONAL 12 M DOUBLE + FLANDERS - 170,300.00 BAHAN -
Tiang Oktogonal Double Hot Dipped Galv + Flenders 12 m 1.0000 unit - - - ALAT -
Sewa Crane 0.5000 jam 225,000.00 112,500.00 112,500.00 TENAGA -
Pekerja Tak Terampil 0.7500 oh 40,000.00 30,000.00 Pekerja Terampil 0.2500 oh 40,000.00 10,000.00 Tukang Listrik 0.2500 oh 40,000.00 10,000.00 Mandor 0.1300 oh 60,000.00 7,800.00 57,800.00
1 UNIT PONDASI BIASA PJU 5 M - 7 M - 1,657,948.30 BAHAN -
Angkur Besi D.16 10.9720 kg 108,000.00 1,184,976.00 Pipa PVC Class D Ǿ 2 " 2.0000 m' - - Pasir Urug 0.0640 m3 85,000.00 5,440.00 Kayui Meranti Bekisting 0.0500 m3 2,500,000.00 125,000.00 Paku Reng 0.5000 kg 11,000.00 5,500.00 PC 94.3750 kg 1,200.00 113,250.00 Pasir Beton 1.1784 m3 140,000.00 164,976.00 Batu Pecah Mesin 2/3 0.0406 m3 150,000.00 6,090.00 Batu Pecah Mesin 1/2 0.1889 m3 150,000.00 28,335.00 1,633,567.00
ALAT Sewa Alat Bantu 0.1767 jam - - Sewa Vibrator Roller 0.0076 jam 202,000.00 1,535.20 Sewa Concrete Mixer 0.0076 jam 261,000.00 1,983.60 3,518.80
TENAGA - Mandor 0.0650 oh 60,000.00 3,900.00 Kepala Tukang 0.0300 oh 55,000.00 1,650.00 Tukang 0.1250 oh 52,500.00 6,562.50 Pekerja Terampil 0.0000 oh 40,000.00 - Pekerja tak terampil 0.2500 oh 35,000.00 8,750.00 20,862.50
1 UNIT PONDASI BIASA PJU 7 M - 9 M - 2,029,943.90 BAHAN -
Angkur Besi D.19 10.9720 kg 140,400.00 1,540,468.80 Pipa PVC Class D Ǿ 2 " 2.0000 m' - - Pasir Urug 0.0960 m3 85,000.00 8,160.00 Kayui Meranti Bekisting 0.0500 m3 2,500,000.00 125,000.00 Paku Reng 0.5000 kg 11,000.00 5,500.00 PC 181.2950 kg 1,200.00 217,554.00 Pasir Beton 0.3364 m3 140,000.00 47,096.00 Batu Pecah Mesin 2/3 0.0406 m3 150,000.00 6,090.00 Batu Pecah Mesin 1/2 0.3770 m3 150,000.00 56,550.00 2,006,418.80
ALAT Sewa Alat Bantu 0.2709 jam - - Sewa Vibrator Roller 0.0152 jam 202,000.00 3,070.40 Sewa Concrete Mixer 0.0152 jam 261,000.00 3,967.20 7,037.60
TENAGA - Mandor 0.0650 oh 60,000.00 3,900.00 Kepala Tukang 0.0300 oh 55,000.00 1,650.00 Tukang 0.1250 oh 52,500.00 6,562.50 Pekerja Terampil 0.0000 oh 40,000.00 - Pekerja tak terampil 0.1250 oh 35,000.00 4,375.00 16,487.50
1 UNIT PONDASI STROUSS PJU - 2,560,392.29 BAHAN -
Page 65 of 334
Angkur Besi D.19 10.9720 kg 182,520.00 2,002,609.44 Besi beton 6 mm polos 9.5400 btg - - Kawat Beton 0.1735 kg 10,500.00 1,821.75 Pipa PVC Class D Ǿ 2 " 2.0000 m' - - Pasir Urug 0.0960 m3 85,000.00 8,160.00 Kayui Meranti Bekisting 0.0500 m3 2,500,000.00 125,000.00 Paku Reng 0.5000 kg 11,000.00 5,500.00 PC 219.2000 kg 1,200.00 263,040.00 Pasir Beton 0.3364 m3 140,000.00 47,096.00 Batu Pecah Mesin 2/3 0.0406 m3 150,000.00 6,090.00 Batu Pecah Mesin 1/2 0.3770 m3 150,000.00 56,550.00 2,515,867.19
ALAT Sewa Alat Bantu 0.2709 jam - - Sewa alat strouss 1.2000 jam 17,500.00 21,000.00 Sewa Vibrator Roller 0.0152 jam 202,000.00 3,070.40 Sewa Concrete Mixer 0.0152 jam 261,000.00 3,967.20 28,037.60
TENAGA - Mandor 0.0650 oh 60,000.00 3,900.00 Kepala Tukang 0.0300 oh 55,000.00 1,650.00 Tukang 0.1250 oh 52,500.00 6,562.50 Pekerja Terampil 0.0000 oh 40,000.00 - Pekerja tak terampil 0.1250 oh 35,000.00 4,375.00 16,487.50
PEKERJAAN SANITAIR / FICTURE UNIT
1 M' PEMASANGAN SALURAN Ǿ 40 SEGMEN - 20,404.00 BAHAN -
Buis beton Ø 40 cm 1.0000 bh - - - TENAGA -
Pekerja Tak Terampil 0.4750 oh 40,000.00 19,000.00 Mandor 0.0234 oh 60,000.00 1,404.00 20,404.00
1 M' PEMASANGAN SALURAN Ǿ 60 SEGMEN - 20,404.00 BAHAN -
Buis beton Ø 60 cm 1.0000 bh - - - TENAGA -
Pekerja Tak Terampil 0.4750 oh 40,000.00 19,000.00 Mandor 0.0234 oh 60,000.00 1,404.00 20,404.00
1 M' PEMASANGAN SALURAN Ǿ 80 SEGMEN - 20,404.00 BAHAN -
Buis beton Ø 80 cm 1.0000 bh - - - TENAGA -
Pekerja Tak Terampil 0.4750 oh 40,000.00 19,000.00 Mandor 0.0234 oh 60,000.00 1,404.00 20,404.00
1 M' PEMASANGAN SALURAN Ǿ 100 SEGMEN - 300,404.00 BAHAN -
Buis beton Ø 100 cm 1.0000 bh 280,000.00 280,000.00 280,000.00 TENAGA -
Pekerja Tak Terampil 0.4750 oh 40,000.00 19,000.00 Mandor 0.0234 oh 60,000.00 1,404.00 20,404.00
1 M' PEMASANGAN SALURAN U- Ǿ 20 SEGMEN - 16,616.00 BAHAN -
Buis beton U - Ø 20 cm 1.0000 bh - - - TENAGA -
Pekerja Tak Terampil 0.3800 oh 40,000.00 15,200.00 Mandor 0.0236 oh 60,000.00 1,416.00 16,616.00
1 M' PEMASANGAN SALURAN U- Ǿ 30 SEGMEN - 16,616.00 BAHAN -
Buis beton U - Ø 30 cm 1.0000 bh - - - TENAGA -
Pekerja Tak Terampil 0.3800 oh 40,000.00 15,200.00 Mandor 0.0236 oh 60,000.00 1,416.00 16,616.00
1 M' PEMASANGAN PIPA AIR BERSIH Ǿ ½ " - 36,806.50 BAHAN -
Pipa PVC Type AW Ø ½ " 1.1000 m' - - - Lem PVC 0.1000 bh - - -
TENAGA - Pekerja Terampil 0.8128 oh 40,000.00 32,512.00 Tukang Pipa 0.0818 oh 52,500.00 4,294.50 36,806.50
1 M' PEMASANGAN PIPA AIR BERSIH Ǿ ¾ " - 36,806.50 BAHAN -
Pipa PVC Type AW Ø ¾ " 1.1000 m' - - - Lem PVC 0.1000 bh - - -
TENAGA - Pekerja Terampil 0.8128 oh 40,000.00 32,512.00 Tukang Pipa 0.0818 oh 52,500.00 4,294.50 36,806.50
1 M' PEMASANGAN PIPA AIR BERSIH Ǿ 1 " - 36,806.50 BAHAN -
Pipa PVC Type AW Ø 1 " 1.1000 m' - - - Lem PVC 0.1000 bh - - -
TENAGA - Pekerja Terampil 0.8128 oh 40,000.00 32,512.00 Tukang Pipa 0.0818 oh 52,500.00 4,294.50 36,806.50
1 M' PEMASANGAN PIPA AIR BERSIH Ǿ 1½ " - 36,806.50 BAHAN -
Pipa PVC Type AW Ø 1½ " 1.1000 m' - - - Lem PVC 0.1000 bh - - -
TENAGA - Pekerja Terampil 0.8128 oh 40,000.00 32,512.00 Tukang Pipa 0.0818 oh 52,500.00 4,294.50 36,806.50
1 M' PEMASANGAN PIPA AIR KOTOR Ǿ 1½ " - 36,806.50 BAHAN -
Pipa PVC Type C Ø 1½ " 1.1000 m' - - - Lem PVC 0.2000 bh - - -
TENAGA -
Page 66 of 334
Pekerja Terampil 0.8128 oh 40,000.00 32,512.00 Tukang Pipa 0.0818 oh 52,500.00 4,294.50 36,806.50
1 M' PEMASANGAN PIPA AIR KOTOR Ǿ 2 " - 36,806.50 BAHAN -
Pipa PVC Type C Ø 2 " 1.1000 m' - - - Lem PVC 0.2000 bh - - -
TENAGA - Pekerja Terampil 0.8128 oh 40,000.00 32,512.00 Tukang Pipa 0.0818 oh 52,500.00 4,294.50 36,806.50
1 M' PEMASANGAN PIPA AIR KOTOR Ǿ 3 " - 36,806.50 BAHAN -
Pipa PVC Type C Ø 3 " 1.1000 m' - - - Lem PVC 0.2000 bh - - -
TENAGA - Pekerja Terampil 0.8128 oh 40,000.00 32,512.00 Tukang Pipa 0.0818 oh 52,500.00 4,294.50 36,806.50
1 M' PEMASANGAN PIPA AIR KOTOR Ǿ 4 " - 36,806.50 BAHAN -
Pipa PVC Type C Ø 4 " 1.1000 m' - - - Lem PVC 0.2000 bh - - -
TENAGA - Pekerja Terampil 0.8128 oh 40,000.00 32,512.00 Tukang Pipa 0.0818 oh 52,500.00 4,294.50 36,806.50
1 BH PEMASANGAN KRAN AIR IMPORT - 124,525.00 BAHAN -
Kran Air ؾ" 1.0000 bh - - - Rol TBA 1.0000 roll 115,000.00 115,000.00 115,000.00
TENAGA - Kepala Tukang 0.0300 oh 55,000.00 1,650.00 Tukang Pipa 0.1500 oh 52,500.00 7,875.00 9,525.00
1 BH PEMASANGAN KRAN AIR LOKAL - 124,525.00 BAHAN -
Kran Air ؽ" 1.0000 bh - - - Rol TBA 1.0000 roll 115,000.00 115,000.00 115,000.00
TENAGA - Kepala Tukang 0.0300 oh 55,000.00 1,650.00 Tukang Pipa 0.1500 oh 52,500.00 7,875.00 9,525.00
1 BH PEMASANGAN CLOSET DUDUK Ex. INA - 1,837,000.00 BAHAN -
Closet Duduk ex. INA 1.0000 bh 1,750,000.00 1,750,000.00 1,750,000.00 TENAGA -
Kepala Tukang 0.1500 oh 55,000.00 8,250.00 Tukang Pipa 1.5000 oh 52,500.00 78,750.00 87,000.00
1 BH PEMASANGAN CLOSET DUDUK Ex. INA - 100,202.50 BAHAN -
Closet Duduk Putih Porselin Komplit ex. INA 1.0000 bh - - - TENAGA -
Pekerja tak terampil 1.3300 oh 35,000.00 46,550.00 Tukang 1.1000 oh 40,000.00 44,000.00 Kepala Tukang 0.0010 oh 52,500.00 52.50 Mandor 0.1600 oh 60,000.00 9,600.00 100,202.50
1 BH PEMASANGAN CLOSET DUDUK MONOBLOCK Ex. TOTO - 1,623,952.50 BAHAN -
Closet Duduk Standard lengkap TOTO C 48 1.0000 bh 1,437,500.00 1,437,500.00 1,523,750.00
Perlengkapan ( 6% X Harga closet) 0.0600 ls 1,437,500.00 86,250.00 TENAGA -
Pekerja tak terampil 1.3300 oh 35,000.00 46,550.00 Tukang 1.1000 oh 40,000.00 44,000.00 Kepala Tukang 0.0010 oh 52,500.00 52.50 Mandor 0.1600 oh 60,000.00 9,600.00 100,202.50
1 BH PEMASANGAN CLOSET JONGKOK Ex. INA - 65,250.00 BAHAN -
Closet Jongkok putih ex. INA 1.0000 bh - - - TENAGA -
Kepala Tukang 0.1500 oh 35,000.00 5,250.00 Tukang Pipa 1.5000 oh 40,000.00 60,000.00 65,250.00
1 BH PEMASANGAN CLOSET JONGKOK Ex. TOTO - 65,250.00 BAHAN -
Closet Jongkok Warna ex. TOTO 1.0000 bh - - - TENAGA -
Kepala Tukang 0.1500 oh 35,000.00 5,250.00 Tukang Pipa 1.5000 oh 40,000.00 60,000.00 65,250.00
1 BH PEMASANGAN WASHTAFEL - 1,324,425.00 BAHAN -
Washtafel lokal besar 1.0000 bh 880,000.00 880,000.00 Kran Air ( Import ) 1.0000 bh 124,525.00 124,525.00 Flexible 60 cm 1.0000 m 60,000.00 60,000.00 Knee PVC Ø 11/2 " 1.0000 bh 6,900.00 6,900.00 Rol TBA 1.0000 rol 115,000.00 115,000.00 Sifon Wasser 1.0000 set - - Waltermoor 1.0000 bh - -
- - 1,186,425.00 TENAGA -
Pekerja Tak Terampil 1.2000 oh 40,000.00 48,000.00 Tukang 1.4500 oh 52,500.00 76,125.00 Kepala Tukang 0.1500 oh 52,500.00 7,875.00 Mandor 0.1000 oh 60,000.00 6,000.00 138,000.00
1 BH PEMASANGAN WASHTAFEL Ex. TOTO - 1,559,900.00 BAHAN -
Wastafel Meja Warna Standard Lengkap (L 546) 1.0000 bh 1,100,000.00 1,100,000.00 Kran Air ( Import ) 1.0000 bh 140,000.00 140,000.00 Flexible 60 cm 1.0000 m 60,000.00 60,000.00 Knee PVC Ø 11/2 " 1.0000 bh 6,900.00 6,900.00
Page 67 of 334
Rol TBA 1.0000 rol 115,000.00 115,000.00 1,421,900.00
TENAGA Pekerja Tak Terampil 1.2000 oh 40,000.00 48,000.00 Tukang 1.4500 oh 52,500.00 76,125.00 Kepala Tukang 0.1500 oh 52,500.00 7,875.00 Mandor 0.1000 oh 60,000.00 6,000.00 138,000.00
1 BH PEMASANGAN LUBANG AVOER - 15,975.00 BAHAN -
Pipa PVC Type C Ø 2 " 0.5000 m - - - Ijuk 0.0500 kg 15,000.00 750.00 750.00
TENAGA - Pekerja Tak Terampil 0.0600 oh 40,000.00 2,400.00 Tukang 0.0300 oh 52,500.00 1,575.00 Kepala Tukang 0.1000 oh 52,500.00 5,250.00 Mandor 0.1000 oh 60,000.00 6,000.00 15,225.00
1 BH URINOAR TYPE MUSLIM 1,590,364.00 BAHAN
Urinoar Type Muslim 1.0000 Bh 1,394,400.00 1,394,400.00 Perlengkapan ( 6% X Harga closet) 0.0600 ls 1,394,400.00 83,664.00 Semen PC/50 kg 6.0000 Kg 1,200.00 7,200.00 Pasir Pasang 0.0100 m3 135,000.00 1,350.00 1,486,614.00
TENAGA Pekerja 1.0000 oh 40,000.00 40,000.00 Tukang Batu 1.0000 oh 52,500.00 52,500.00 Kepala tukang Batu 0.1000 oh 52,500.00 5,250.00 Mandor 0.1000 oh 60,000.00 6,000.00 103,750.00
1 BH PARTISI PENYEKAT URINOAR 34,375.00 BAHAN
Patisi Penyekat Urinoir (TOTO A 100) 1.0000 Bh - - Perlengkapan ( 6% X Harga penyekat) 0.0600 ls - - -
TENAGA Pekerja 0.2500 oh 40,000.00 10,000.00 Tukang Batu 0.2500 oh 52,500.00 13,125.00 Kepala tukang Batu 0.1000 oh 52,500.00 5,250.00 Mandor 0.1000 oh 60,000.00 6,000.00 34,375.00
1 BH WASHTAFEL PADESTAL 146,550.00 Lantai Satu 1.0000 146,550.00 146,550.00 Lantai Dua 1.0900 146,550.00 159,739.50 Lantai Tiga 1.1200 146,550.00 164,136.00 Lantai Empat 1.1350 146,550.00 166,334.25 Lantai Lima 1.1620 146,550.00 170,291.10 Lantai Enam 1.1970 146,550.00 175,420.35 Lantai Tujuh 1.2360 146,550.00 181,135.80
BAHAN Wastafel Gantung (L 237 V3) 1.0000 Bh - - Perlengkapan ( 12% X Harga washtafel) 0.1200 ls - - Semen PC/50 kg 6.0000 Kg 1,200.00 7,200.00 Pasir Pasang 0.0100 m3 135,000.00 1,350.00 8,550.00
TENAGA Pekerja 1.2000 oh 40,000.00 48,000.00 Tukang Batu 1.4500 oh 52,500.00 76,125.00 Kepala tukang Batu 0.1500 oh 52,500.00 7,875.00 Mandor 0.1000 oh 60,000.00 6,000.00 138,000.00
1 BH WASHTAFEL MEJA 1,378,550.00 Lantai Satu 1.0000 1,378,550.00 1,378,550.00 Lantai Dua 1.0900 1,378,550.00 1,502,619.50 Lantai Tiga 1.1200 1,378,550.00 1,543,976.00 Lantai Empat 1.1350 1,378,550.00 1,564,654.25 Lantai Lima 1.1620 1,378,550.00 1,601,875.10 Lantai Enam 1.1970 1,378,550.00 1,650,124.35 Lantai Tujuh 1.2360 1,378,550.00 1,703,887.80
BAHAN Wastafel Meja Warna Standard Lengkap (L 546) 1.0000 Bh 1,100,000.00 1,100,000.00 Perlengkapan ( 12% X Harga washtafel) 0.1200 ls 1,100,000.00 132,000.00 Semen PC/50 kg 6.0000 Kg 1,200.00 7,200.00 Pasir Pasang 0.0100 m3 135,000.00 1,350.00 1,240,550.00
TENAGA Pekerja 1.2000 oh 40,000.00 48,000.00 Tukang Batu 1.4500 oh 52,500.00 76,125.00 Kepala tukang Batu 0.1500 oh 52,500.00 7,875.00 Mandor 0.1000 oh 60,000.00 6,000.00 138,000.00
1 BH SLOP SINK / SERVICE SINK 146,550.00 Lantai Satu 1.0000 146,550.00 146,550.00 Lantai Dua 1.0900 146,550.00 159,739.50 Lantai Tiga 1.1200 146,550.00 164,136.00 Lantai Empat 1.1350 146,550.00 166,334.25 Lantai Lima 1.1620 146,550.00 170,291.10 Lantai Enam 1.1970 146,550.00 175,420.35 Lantai Tujuh 1.2360 146,550.00 181,135.80
BAHAN Slop Sink 1.0000 Bh - - Perlengkapan ( 12% X Harga washtafel) 0.1200 ls - - Semen PC/50 kg 6.0000 Kg 1,200.00 7,200.00 Pasir Pasang 0.0100 m3 135,000.00 1,350.00 8,550.00
TENAGA Pekerja 1.2000 oh 40,000.00 48,000.00 Tukang Batu 1.4500 oh 52,500.00 76,125.00 Kepala tukang Batu 0.1500 oh 52,500.00 7,875.00 Mandor 0.1000 oh 60,000.00 6,000.00 138,000.00
1 BH BAK MANDI FABER 0,3 M3 248,700.00 Lantai Satu 1.0000 248,700.00 248,700.00 Lantai Dua 1.0900 248,700.00 271,083.00 Lantai Tiga 1.1200 248,700.00 278,544.00 Lantai Empat 1.1350 248,700.00 282,274.50 Lantai Lima 1.1620 248,700.00 288,989.40 Lantai Enam 1.1970 248,700.00 297,693.90 Lantai Tujuh 1.2360 248,700.00 307,393.20
Page 68 of 334
BAHAN Bak mandi fibergalss 1.0000 Bh - - Perlengkapan ( 18% X Harga washtafel) 0.1800 ls - - -
TENAGA Pekerja 1.8000 oh 40,000.00 72,000.00 Tukang Batu 2.7000 oh 52,500.00 141,750.00 Kepala tukang Batu 0.5400 oh 52,500.00 28,350.00 Mandor 0.1100 oh 60,000.00 6,600.00 248,700.00
1 BH KRAN AIR Ø 1/2 " ATAU Ø 3/4 " 138,940.63 Lantai Satu 1.0000 138,940.63 138,940.63 Lantai Dua 1.0900 138,940.63 151,445.28 Lantai Tiga 1.1200 138,940.63 155,613.50 Lantai Empat 1.1350 138,940.63 157,697.61 Lantai Lima 1.1620 138,940.63 161,449.01 Lantai Enam 1.1970 138,940.63 166,311.93 Lantai Tujuh 1.2360 138,940.63 171,730.61
BAHAN Kran air Ø 1/2" atau Ø 3/4" (TOTO T23 B13) 1.0000 Bh 132,250.00 132,250.00 SEAL TAPE 0.0250 Bh 8,625.00 215.63 132,465.63
TENAGA Pekerja 0.0100 oh 40,000.00 400.00 Tukang Batu 0.1000 oh 52,500.00 5,250.00 Kepala tukang Batu 0.0100 oh 52,500.00 525.00 Mandor 0.0050 oh 60,000.00 300.00 6,475.00
1 BH KRAN SINK 6,690.63 Lantai Satu 1.0000 6,690.63 6,690.63 Lantai Dua 1.0900 6,690.63 7,292.78 Lantai Tiga 1.1200 6,690.63 7,493.50 Lantai Empat 1.1350 6,690.63 7,593.86 Lantai Lima 1.1620 6,690.63 7,774.51 Lantai Enam 1.1970 6,690.63 8,008.68 Lantai Tujuh 1.2360 6,690.63 8,269.61
BAHAN Kran Sink 1.0000 Bh - - SEAL TAPE 0.0250 Bh 8,625.00 215.63 215.63
TENAGA Pekerja 0.0100 oh 40,000.00 400.00 Tukang Batu 0.1000 oh 52,500.00 5,250.00 Kepala tukang Batu 0.0100 oh 52,500.00 525.00 Mandor 0.0050 oh 60,000.00 300.00 6,475.00
1 BH FLOOR DRAIN 132,975.00 Lantai Satu 1.0000 132,975.00 132,975.00 Lantai Dua 1.0900 132,975.00 144,942.75 Lantai Tiga 1.1200 132,975.00 148,932.00 Lantai Empat 1.1350 132,975.00 150,926.63 Lantai Lima 1.1620 132,975.00 154,516.95 Lantai Enam 1.1970 132,975.00 159,171.08 Lantai Tujuh 1.2360 132,975.00 164,357.10
BAHAN Floor Drain (TOTO TX 1 B) 1.0000 Bh 126,500.00 126,500.00 126,500.00
TENAGA Pekerja 0.0100 oh 40,000.00 400.00 Tukang Batu 0.1000 oh 52,500.00 5,250.00 Kepala tukang Batu 0.0100 oh 52,500.00 525.00 Mandor 0.0050 oh 60,000.00 300.00 6,475.00
1 BH SOAP HOLDER 37,725.00 Lantai Satu 1.0000 37,725.00 37,725.00 Lantai Dua 1.0900 37,725.00 41,120.25 Lantai Tiga 1.1200 37,725.00 42,252.00 Lantai Empat 1.1350 37,725.00 42,817.88 Lantai Lima 1.1620 37,725.00 43,836.45 Lantai Enam 1.1970 37,725.00 45,156.83 Lantai Tujuh 1.2360 37,725.00 46,628.10
BAHAN Soap Holder (TOTO S 11 N) 1.0000 Bh 31,250.00 31,250.00 31,250.00
TENAGA Pekerja 0.0100 oh 40,000.00 400.00 Tukang Batu 0.1000 oh 52,500.00 5,250.00 Kepala tukang Batu 0.0100 oh 52,500.00 525.00 Mandor 0.0050 oh 60,000.00 300.00 6,475.00
1 BH TISSEU HOLDER 6,475.00 Lantai Satu 1.0000 6,475.00 6,475.00 Lantai Dua 1.0900 6,475.00 7,057.75 Lantai Tiga 1.1200 6,475.00 7,252.00 Lantai Empat 1.1350 6,475.00 7,349.13 Lantai Lima 1.1620 6,475.00 7,523.95 Lantai Enam 1.1970 6,475.00 7,750.58 Lantai Tujuh 1.2360 6,475.00 8,003.10
BAHAN Tisue Holder (TS 116 R) 1.0000 Bh - - -
TENAGA Pekerja 0.0100 oh 40,000.00 400.00 Tukang Batu 0.1000 oh 52,500.00 5,250.00 Kepala tukang Batu 0.0100 oh 52,500.00 525.00 Mandor 0.0050 oh 60,000.00 300.00 6,475.00
1 BH JET WASHER 115,725.00 Lantai Satu 1.0000 115,725.00 115,725.00 Lantai Dua 1.0900 115,725.00 126,140.25 Lantai Tiga 1.1200 115,725.00 129,612.00 Lantai Empat 1.1350 115,725.00 131,347.87 Lantai Lima 1.1620 115,725.00 134,472.45 Lantai Enam 1.1970 115,725.00 138,522.82 Lantai Tujuh 1.2360 115,725.00 143,036.10
BAHAN Jet Washer (TOTO TX 423 SVINCR) 1.0000 Bh 109,250.00 109,250.00 109,250.00
TENAGA Pekerja 0.0100 oh 40,000.00 400.00 Tukang Batu 0.1000 oh 52,500.00 5,250.00 Kepala tukang Batu 0.0100 oh 52,500.00 525.00
Page 69 of 334
Mandor 0.0050 oh 60,000.00 300.00 6,475.00
1 BH TEMPAT HANDUK (TOWELSHELF) SETARA TOTO TYPE TX.4A 6,475.00 Lantai Satu 1.0000 6,475.00 6,475.00 Lantai Dua 1.0900 6,475.00 7,057.75 Lantai Tiga 1.1200 6,475.00 7,252.00 Lantai Empat 1.1350 6,475.00 7,349.13 Lantai Lima 1.1620 6,475.00 7,523.95 Lantai Enam 1.1970 6,475.00 7,750.58 Lantai Tujuh 1.2360 6,475.00 8,003.10
BAHAN Towel Shelf (TOTO TX 4 A) 1.0000 Bh - - -
TENAGA Pekerja 0.0100 oh 40,000.00 400.00 Tukang Batu 0.1000 oh 52,500.00 5,250.00 Kepala tukang Batu 0.0100 oh 52,500.00 525.00 Mandor 0.0050 oh 60,000.00 300.00 6,475.00
1 BH PEGANGAN (GRAB BAR) SETARA TOTO TYPE TX.3 A2 (550MM) 6,475.00 Lantai Satu 1.0000 6,475.00 6,475.00 Lantai Dua 1.0900 6,475.00 7,057.75 Lantai Tiga 1.1200 6,475.00 7,252.00 Lantai Empat 1.1350 6,475.00 7,349.13 Lantai Lima 1.1620 6,475.00 7,523.95 Lantai Enam 1.1970 6,475.00 7,750.58 Lantai Tujuh 1.2360 6,475.00 8,003.10
BAHAN Grab Bar (TOTO TX3 A2) 1.0000 Bh - - -
TENAGA Pekerja 0.0100 oh 40,000.00 400.00 Tukang Batu 0.1000 oh 52,500.00 5,250.00 Kepala tukang Batu 0.0100 oh 52,500.00 525.00 Mandor 0.0050 oh 60,000.00 300.00 6,475.00
1 BH GANTUNGAN HANDUK (TOWEL RING) SETARA TOTO TYPE TS 115 S 6,475.00 Lantai Satu 1.0000 6,475.00 6,475.00 Lantai Dua 1.0900 6,475.00 7,057.75 Lantai Tiga 1.1200 6,475.00 7,252.00 Lantai Empat 1.1350 6,475.00 7,349.13 Lantai Lima 1.1620 6,475.00 7,523.95 Lantai Enam 1.1970 6,475.00 7,750.58 Lantai Tujuh 1.2360 6,475.00 8,003.10
BAHAN Towel Ring (TOTO TS 115 S) 1.0000 Bh - - -
TENAGA Pekerja 0.0100 oh 40,000.00 400.00 Tukang Batu 0.1000 oh 52,500.00 5,250.00 Kepala tukang Batu 0.0100 oh 52,500.00 525.00 Mandor 0.0050 oh 60,000.00 300.00 6,475.00
1 BH KAIT PAKAIAN (DOUBLE ROBE HOOK) SETARA TOTO TYPE TS.118 WS 6,475.00 Lantai Satu 1.0000 6,475.00 6,475.00 Lantai Dua 1.0900 6,475.00 7,057.75 Lantai Tiga 1.1200 6,475.00 7,252.00 Lantai Empat 1.1350 6,475.00 7,349.13 Lantai Lima 1.1620 6,475.00 7,523.95 Lantai Enam 1.1970 6,475.00 7,750.58 Lantai Tujuh 1.2360 6,475.00 8,003.10
BAHAN Double robe hook (TS 118 WS) 1.0000 Bh - - -
TENAGA Pekerja 0.0100 oh 40,000.00 400.00 Tukang Batu 0.1000 oh 52,500.00 5,250.00 Kepala tukang Batu 0.0100 oh 52,500.00 525.00 Mandor 0.0050 oh 60,000.00 300.00 6,475.00
1 BH PASANG KACA CERMIN 120 X 240 CM, T=5mm DI BEVEL 2 CM 129,350.00 Lantai Satu 1.0000 129,350.00 129,350.00 Lantai Dua 1.0900 129,350.00 140,991.50 Lantai Tiga 1.1200 129,350.00 144,872.00 Lantai Empat 1.1350 129,350.00 146,812.25 Lantai Lima 1.1620 129,350.00 150,304.70 Lantai Enam 1.1970 129,350.00 154,831.95 Lantai Tujuh 1.2360 129,350.00 159,876.60
BAHAN Kaca Cermin 5 mm + Bevel 2 cm 2.8880 M2 37,500.00 108,300.00 108,300.00
TENAGA Pekerja 0.0200 oh 40,000.00 800.00 Tukang Batu 0.2500 oh 52,500.00 13,125.00 Kepala tukang Batu 0.0500 oh 52,500.00 2,625.00 Mandor 0.0750 oh 60,000.00 4,500.00 21,050.00
1 BH BAK CUCI STAINLESS STEEL 18,615.00 Lantai Satu 1.0000 18,615.00 18,615.00 Lantai Dua 1.0900 18,615.00 20,290.35 Lantai Tiga 1.1200 18,615.00 20,848.80 Lantai Empat 1.1350 18,615.00 21,128.03 Lantai Lima 1.1620 18,615.00 21,630.63 Lantai Enam 1.1970 18,615.00 22,282.16 Lantai Tujuh 1.2360 18,615.00 23,008.14
BAHAN Kitchen Zink Stainless Standard Lokal ( 1 Lobang ) 1.0000 Bh - - Perlengkapan ( 18% X Harga Bahan) 0.1000 ls - - -
TENAGA Pekerja 0.0300 oh 40,000.00 1,200.00 Tukang Batu 0.3000 oh 52,500.00 15,750.00 Kepala tukang Batu 0.0300 oh 52,500.00 1,575.00 Mandor 0.0015 oh 60,000.00 90.00 18,615.00
1 BH TOP TABLE BATU GRANITE 428,957.50 Lantai Satu 1.0000 428,957.50 428,957.50 Lantai Dua 1.0900 428,957.50 467,563.68 Lantai Tiga 1.1200 428,957.50 480,432.40 Lantai Empat 1.1350 428,957.50 486,866.76 Lantai Lima 1.1620 428,957.50 498,448.62
Page 70 of 334
Lantai Enam 1.1970 428,957.50 513,462.13 Lantai Tujuh 1.2360 428,957.50 530,191.47
BAHAN Batu GRANIT import Italy 1.0520 m2 325,000.00 341,900.00 Semen PC/50 kg 14.1500 Kg 1,200.00 16,980.00 Pasir Pasang 0.0390 m3 135,000.00 5,265.00 Semen Warna 2.0000 Kg 9,000.00 18,000.00 382,145.00
TENAGA Pekerja 0.6200 oh 40,000.00 24,800.00 Tukang Batu 0.3500 oh 52,500.00 18,375.00 Kepala tukang Batu 0.0350 oh 52,500.00 1,837.50 Mandor 0.0300 oh 60,000.00 1,800.00 46,812.50
PEKERJAAN INFRASTRUKTUR
1 M2 PEMASANGAN PAVING T= 8 CM - 15,225.00 BAHAN -
PAVINGST ( K.125 ) warna abu2 t=8cm 1.0500 m2 - - - TENAGA -
Pekerja Tak Terampil 0.0600 oh 40,000.00 2,400.00 Tukang 0.0300 oh 52,500.00 1,575.00 Kepala Tukang 0.1000 oh 52,500.00 5,250.00 Mandor 0.1000 oh 60,000.00 6,000.00 15,225.00
1 M2 PEMASANGAN PAVING T= 6 CM - 15,225.00 BAHAN -
PAVINGST ( K.125 ) warna abu2 t=6cm 1.0500 m2 - - - TENAGA -
Pekerja Tak Terampil 0.0600 oh 40,000.00 2,400.00 Tukang 0.0300 oh 52,500.00 1,575.00 Kepala Tukang 0.1000 oh 52,500.00 5,250.00 Mandor 0.1000 oh 60,000.00 6,000.00 15,225.00
1 M2 PEMASANGAN PAVING T= 8 CM - 15,225.00 BAHAN -
PAVINGST ( K.125 ) warna abu2 t=8cm 1.0500 m2 - - - TENAGA -
Pekerja Tak Terampil 0.0600 oh 40,000.00 2,400.00 Tukang 0.0300 oh 52,500.00 1,575.00 Kepala Tukang 0.1000 oh 52,500.00 5,250.00 Mandor 0.1000 oh 60,000.00 6,000.00 15,225.00
1 M2 PEMASANGAN GRESS BLOCK - 15,225.00 BAHAN -
Gress Block Beton 10 x 40 x 60 cm 1.0500 m2 - - - TENAGA -
Pekerja Tak Terampil 0.0600 oh 40,000.00 2,400.00 Tukang 0.0300 oh 52,500.00 1,575.00 Kepala Tukang 0.1000 oh 52,500.00 5,250.00 Mandor 0.1000 oh 60,000.00 6,000.00 15,225.00
1 M' PEMASANGAN KANSTEEN BDCM - 26,320.00 BAHAN -
PC 18.0000 kg 1,200.00 21,600.00 21,735.00 Pasir Pasang 0.0010 m3 135,000.00 135.00 Kansteen BDCM 1.0000 m' - -
TENAGA - Pekerja Terampil 0.0500 oh 40,000.00 2,000.00 Tukang 0.0500 oh 40,000.00 2,000.00 Kepala Tukang 0.0100 oh 52,500.00 525.00 Mandor 0.0010 oh 60,000.00 60.00 4,585.00
1 M' PEMASANGAN KANSTEEN TRAP - 26,320.00 BAHAN -
PC 18.0000 kg 1,200.00 21,600.00 21,735.00 Pasir Pasang 0.0010 m3 135,000.00 135.00 Kansteen 1.0000 m' - -
TENAGA - Pekerja Terampil 0.0500 oh 40,000.00 2,000.00 Tukang 0.0500 oh 40,000.00 2,000.00 Kepala Tukang 0.0100 oh 52,500.00 525.00 Mandor 0.0010 oh 60,000.00 60.00 4,585.00
1 M2 PEMASANGAN STOPER / USKUP - 12,720.00 BAHAN -
Pasir Pasang 0.0010 m3 135,000.00 135.00 Stoper / uskup tebal 6 cm 3.3400 bh - - 135.00
TENAGA - Pekerja Terampil 0.2000 oh 40,000.00 8,000.00 Tukang 0.1000 oh 40,000.00 4,000.00 Kepala Tukang 0.0100 oh 52,500.00 525.00 Mandor 0.0010 oh 60,000.00 60.00 12,585.00
1 M2 PEMASANGAN STOPER / USKUP - 12,586.20 BAHAN -
Pasir Pasang 0.0010 m3 1,200.00 1.20 Stoper / uskup tebal 8 cm 3.3400 bh - - 1.20
TENAGA - Pekerja Terampil 0.2000 oh 40,000.00 8,000.00 Tukang 0.1000 oh 40,000.00 4,000.00 Kepala Tukang 0.0100 oh 52,500.00 525.00 Mandor 0.0010 oh 60,000.00 60.00 12,585.00
Surabaya, 05 Januari 2011PT.ANGGREK MERAH
ALBERTINUS WIDYANTODirektur Utama
Page 71 of 334
50000
Page 72 of 334
Wheel LoaderDump TruckMotor GraderVibrator RollerWater TankerAlat bantu
Page 73 of 334
0.1 52800580800
0.1 52650579150
Page 74 of 334
1100
Page 75 of 334
0.04
22000
MANPOWER SCHEDULE RENCANA
No. Tenaga Yang Dibutuhkan Jumlah Bulan Ke-3 Bulan Ke-4
07-13/03/11 14-20/03/11 21-27/03/11 28-03/04/11
8 9 10 11
A PROJECT MANAGEMENT
1 Project manager 1 1 1 1 1
2 Construction Manager 1 1 1 1 1
3 Technical Manager 1 1 1 1 1
5 Finance Manager 1 1 1 1 1
B PROJECT STAFF 1 Technical Staff
- Structure Supervisor 3 2 2 3 3
- Asistent Structure Supervisor 1 1 1 2 2
- Drafter 1 1 1 1 1
- Quantity Surveyor 2 2 2 2 2
- Planning & Schedulling 1 1 1 1 1
- Surveyor 2 1 1 1 2
- Asisten Surveyor 2 1 1 2 2
- Technical Administration 1 1 1 1 12 Non Technical Staff
- Cashier 1 1 1 1 1
- Secretary 1 1 1 1 1
- Security 2 1 2 1 2
C Tenaga Kerja Harian - Mandor 7 1 7 7 7 - Kepala Tukang 9 1 9 9 9 - Tukang 25 12 14 18 21 - Tukang besi 26 3 23 23 23 - Pekerja tak terampil 20 6 18 18 18 - Pekerja 12 12 84 93 98
Jumlah 120 52 173 188 198
MANPOWER SCHEDULE RENCANA
Bulan Ke-4 Bulan Ke-5 Bulan Ke-604-10/04/11 11-17/04/11 18-24/04/11 25-01/05/11 02-08/05/11 09-15/05/11 16-22/05/11 23-29/05/11 30-05/06/11
12 13 14 15 16 17 18 19 20
1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1
3 3 3 3 3 3 3 3 2
2 2 2 2 2 2 2 2 1
1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 1
2 2 2 2 2 2 2 2 1
1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1
1 2 1 2 1 2 1 2 1
7 7 7 7 7 1 29 9 9 9 3 4 125 25 25 25 16 11 11 31 726 26 26 26 26 2 2 20 1020 20 20 20 20 2 2 69 26104 104 104 104 38 20 20 15 10212 213 212 213 131 57 56 162 73
MANPOWER SCHEDULE RENCANA
Bulan Ke-606-12/06/11
21
1
1
1
1
2
1
1
2
1
1
1
1
1
1
2
11137132
No Nama Alat Jumlah Harga /hari Hari Pakai
1 Theodol 1 Rp - 282 Alat las 1 Rp 250,000.00 303 Bar Cut 2 Rp 150,000.00 304 Vibrato 3 Rp 125,000.00 305 Bucket 2 Rp 200,000.00 306 Water P 1 Rp 100,000.00 307 Lampu 10 Rp 25,000.00 308 Scafold 520 Rp 10,000.00 30
Genset 1 Rp 150,000.00 30
Total
No. Daftar Sewa Alat Kapasitas Jumlah
1 Theodolit 22 Vibrator 33 Bar Bender 14 Bar Cutter 15 Genset 10 KVA 16 Mesin Las 17 Beton Molen 28 Baby Roller 1 Ton 19 Wales 10 Ton 1
10 Mobil Crane 5 Ton 5 Ton 111 Dozer 5 Ton 112 Concrete Pump 113 Scafolding 414 Lampu Sorot 10
JUMLAH
Jumlah
Rp - Rp 7,500,000.00 Rp 9,000,000.00 Rp 11,250,000.00 Rp 12,000,000.00 Rp 3,000,000.00 Rp 7,500,000.00 Rp 156,000,000.00 Rp 4,500,000.00
Rp 210,750,000.00
Harga Sewa Unit TOTAL
Rp 100,000.00 6 hari Rp 1,200,000.00 Rp 150,000.00 30 hari Rp 13,500,000.00 Rp 150,000.00 30 hari Rp 4,500,000.00 Rp 150,000.00 30 hari Rp 4,500,000.00 Rp 250,000.00 60 hari Rp 15,000,000.00 Rp 100,000.00 30 hari Rp 3,000,000.00 Rp 150,000.00 6 hari Rp 1,800,000.00 Rp 300,000.00 2 hari Rp 600,000.00 Rp 500,000.00 2 hari Rp 1,000,000.00 Rp 1,500,000.00 48 hari Rp 72,000,000.00 Rp 150,000.00 24 jam Rp 3,600,000.00 Rp 2,000,000.00 10 hari Rp 20,000,000.00 Rp 300,000.00 45 hari Rp 54,000,000.00 Rp 25,000.00 90 hari Rp 22,500,000.00
JUMLAH Rp 217,200,000.00
KURVA "S" RENCANA STRUKTUR
PEMBANGUNAN GEDUNG MENEJEMEN 4 LANTAI
RUMAH SAKIT UMUM DAERAH dr. SOEDONO MADIUN
JALAN Dr. SOETOMO No. 29 MADIUN - JAWA TIMUR
No. URAIAN PEKERJAAN Durasi BobotWaktu Bulan Ke-3
Hari 7 8 9
A. LANTAI - I (di atas ± 0.00)
A.1. PEKERJAAN STRUKTUR
1 Beton Kolom
Bekisting 7 1.22% 0.012
Pembesian 6 1.78% 0.018
Ready Mix K-250 7 0.52%
2 Beton Balok
Bekisting 7 2.55%
Pembesian 6 5.98%
Ready Mix K-250 7 2.39%
3 Pek. Tangga Utama
Bekisting 4 0.83%
Pembesian 3 0.30%
Ready Mix K-250 3 0.11%
4 Pek. Lift Utama
Bekisting 4 0.49% 0.002 0.002 0.002
Pembesian 3 0.29% 0.001011 0.001011
Ready Mix K-250 3 0.10%
5 Pek. Ramp Beton
Bekisting 14 0.48%
Pembesian 14 0.46%
Ready Mix K-175 14 0.46%
6 Pek. Plat
Bekisting 7 2.68%
Pembesian 6 3.23%
Ready mix K-250 7 1.79%
B. LANTAI - II (di atas + 4.50)
B.1. PEKERJAAN STRUKTUR
1 Beton Kolom
Bekisting 4 1.23%
Pembesian 3 2.09%
Ready Mix K-250 3 0.48%
2 Beton Balok
Bekisting 4 2.72%
Pembesian 3 5.45%
Ready Mix K-250 3 1.81%
3 Pek. Tangga Utama
Bekisting 4 0.98%
Pembesian 3 0.76%
Ready Mix K-250 3 0.28%
4 Pek. Lift Utama
Bekisting 4 0.49%
Pembesian 3 0.47%
Ready Mix K-250 3 0.09%
5 Pek. Tangga Darurat
Bekisting 7 0.59%
Pembesian 5 0.27%
Ready Mix K-175 7 0.09%
6 Pek. Plat
Bekisting 4 2.92%
Pembesian 3 2.69%
Ready mix K-250 3 1.63%
C. LANTAI - III (di atas +8.50)
C.1. PEKERJAAN STRUKTUR
1 Beton Kolom
Bekisting 4 1.01%
Pembesian 3 1.74%
Ready Mix K-250 3 0.46%
2 Beton Balok
Bekisting 7 2.18%
Pembesian 5 5.55%
Ready Mix K-250 7 1.85%
3 Pek. Tangga Utama
Bekisting 7 1.22%
Pembesian 5 0.68%
Ready Mix K-250 7 0.25%
4 Pek. Lift Utama
Bekisting 7 0.54%
Pembesian 5 0.29%
Ready Mix K-250 7 0.11%
5 Pek. Tangga Darurat
Bekisting 7 1.09%
Pembesian 5 0.20%
Ready Mix K-175 7 0.11%
6 Pek. Plat
Bekisting 4 2.51%
Pembesian 3 2.85%
Ready mix K-250 3 1.60%
D. LANTAI - IV (di atas+12.50)
D.1. PEKERJAAN STRUKTUR
1 Beton Kolom
Bekisting 12 0.83%
Pembesian 5 1.45%
Ready Mix K-250 9 0.38%
2 Beton Balok
Bekisting 12 1.41%
Pembesian 9 4.74%
Ready Mix K-250 9 1.74%
3 Pek. Lisplank
Bekisting 4 0.48%
Pembesian 3 1.21%
Ready Mix K-250 3 0.66%
4 Pek. Tangga Utama
Bekisting 4 1.05%
Pembesian 3 0.54%
Ready Mix K-250 3 0.20%
5 Pek. Lift Utama
Bekisting 4 0.60%
Pembesian 3 0.27%
Ready Mix K-250 3 0.11%
6 Pek. Tangga Darurat
Bekisting 4 1.09%
Pembesian 3 0.20%
Ready Mix K-175 3 0.09%
7 Pek. Plat
Bekisting 4 0.94%
Pembesian 3 2.40%
Ready mix K-250 3 2.01%
E. LANTAI -R. LIFT V (di atas+16.50)
E.1. PEKERJAAN STRUKTUR
1 Beton Kolom
Bekisting 12 0.16%
Pembesian 9 0.55%
Ready Mix K-250 9 0.15%
2 Beton Balok
Bekisting 4 0.22%
Pembesian 3 0.73%
Ready Mix K-250 3 0.25%
3 Pek. Plat
Bekisting 4 0.09%
Pembesian 3 0.33%
Ready Mix K-250 3 0.18%
Total Pekerjaan 100%
Progres (%) 0.002063 0.033116 0.003074
Progres kumulatif (%) 0.002063 0.035179 0.038254
KURVA "S" RENCANA STRUKTUR
PEMBANGUNAN GEDUNG MENEJEMEN 4 LANTAI
KURVA "S" RENCANA & REALISASI
No. URAIAN PEKERJAAN Durasi Bobot
Waktu Bln K-3
Hari 07-13/03/11 14-20/03/11 21-27/03/11
Minggu ke- 8 9 10
A. LANTAI - I (di atas ± 0.00)A.1. PEKERJAAN STRUKTUR
1 Beton Kolom Bekisting 7 1.22% 1.22%Pembesian 6 1.78% 1.78%Ready Mix K-250 7 0.52% 0.52%
2 Beton BalokBekisting 7 2.55% 2.55%Pembesian 6 5.98% 5.98%Ready Mix K-250 7 2.39%
3 Pek. Tangga UtamaBekisting 4 0.83% 0.21%Pembesian 3 0.30% 0.10%Ready Mix K-250 3 0.11% 0.04%
4 Pek. Lift UtamaBekisting 4 0.49% 0.49%Pembesian 3 0.29% 0.29%Ready Mix K-250 3 0.10% 0.10%
5 Pek. Ramp BetonBekisting 14 0.48% 0.24% 0.24%Pembesian 14 0.46% 0.23%Ready Mix K-175 14 0.46%
6 Pek. PlatBekisting 7 2.68% 2.68%Pembesian 6 3.23% 3.23%Ready mix K-250 7 1.79%
B. LANTAI - II (di atas + 4.50)B.1. PEKERJAAN STRUKTUR
1 Beton Kolom Bekisting 4 1.23%Pembesian 3 2.09%Ready Mix K-250 3 0.48%
2 Beton BalokBekisting 4 2.72%Pembesian 3 5.45%Ready Mix K-250 3 1.81%
3 Pek. Tangga UtamaBekisting 4 0.98% 0.98%Pembesian 3 0.76% 0.76%Ready Mix K-250 3 0.28% 0.28%
4 Pek. Lift UtamaBekisting 4 0.49% 0.49%Pembesian 3 0.47% 0.47%Ready Mix K-250 3 0.09% 0.09%
5 Pek. Tangga DaruratBekisting 7 0.59% 0.59%Pembesian 5 0.27% 0.27%Ready Mix K-175 7 0.09%
6 Pek. PlatBekisting 4 2.92%Pembesian 3 2.69%Ready mix K-250 3 1.63%
C. LANTAI - III (di atas +8.50)C.1. PEKERJAAN STRUKTUR
1 Beton Kolom Bekisting 4 1.01%Pembesian 3 1.74%Ready Mix K-250 3 0.46%
2 Beton BalokBekisting 7 2.18%Pembesian 5 5.55%Ready Mix K-250 7 1.85%
3 Pek. Tangga UtamaBekisting 7 1.22%Pembesian 5 0.68%Ready Mix K-250 7 0.25%
4 Pek. Lift UtamaBekisting 7 0.54%Pembesian 5 0.29%Ready Mix K-250 7 0.11%
5 Pek. Tangga DaruratBekisting 7 1.09%Pembesian 5 0.20%Ready Mix K-175 7 0.11%
6 Pek. PlatBekisting 4 2.51%Pembesian 3 2.85%Ready mix K-250 3 1.60%
D. LANTAI - IV (di atas+12.50)D.1. PEKERJAAN STRUKTUR
1 Beton Kolom Bekisting 12 0.83%Pembesian 5 1.45%Ready Mix K-250 9 0.38%
2 Beton BalokBekisting 12 1.41%Pembesian 9 4.74%Ready Mix K-250 9 1.74%
3 Pek. LisplankBekisting 4 0.48%Pembesian 3 1.21%Ready Mix K-250 3 0.66%
4 Pek. Tangga UtamaBekisting 4 1.05%Pembesian 3 0.54%Ready Mix K-250 3 0.20%
5 Pek. Lift UtamaBekisting 4 0.60%Pembesian 3 0.27%Ready Mix K-250 3 0.11%
6 Pek. Tangga DaruratBekisting 4 1.09%Pembesian 3 0.20%Ready Mix K-175 3 0.09%
7 Pek. PlatBekisting 4 0.94%Pembesian 3 2.40%Ready mix K-250 3 2.01%
E. LANTAI -R. LIFT V (di atas+16.50)E.1. PEKERJAAN STRUKTUR
1 Beton Kolom Bekisting 12 0.16%Pembesian 9 0.55%Ready Mix K-250 9 0.15%
2 Beton BalokBekisting 4 0.22%Pembesian 3 0.73%Ready Mix K-250 3 0.25%
3 Pek. PlatBekisting 4 0.09%Pembesian 3 0.33%Ready Mix K-250 3 0.18%
Total Pekerjaan 100%Rencana Progres (%) 0.87% 4.64% 18.31%
Progres kumulatif (%) 0.87% 5.51% 23.82%Realisasi Progres 0.85% 5.43% 23.84%
= RENCANA= REALISASI
KURVA "S" PERCEPATAN
No. URAIAN PEKERJAAN Durasi BobotWaktu
Bln K-3
07-13/03/11 14-20/03/11 21-27/03/11
Hari 1 2 3
A. LANTAI - I (di atas ± 0.00)A.1. PEKERJAAN STRUKTUR
1 Beton Kolom Bekisting 7 1.22% 1.22%Pembesian 6 1.78% 1.78%Ready Mix K-250 7 0.52% 0.52%
2 Beton BalokBekisting 7 2.55% 2.55%Pembesian 6 5.98% 5.98%Ready Mix K-250 7 2.39%
3 Pek. Tangga UtamaBekisting 4 0.83% 0.21%Pembesian 3 0.30% 0.10%Ready Mix K-250 3 0.11% 0.04%
4 Pek. Lift UtamaBekisting 4 0.49% 0.49%Pembesian 3 0.29% 0.29%Ready Mix K-250 3 0.10% 0.10%
5 Pek. Ramp BetonBekisting 14 0.48% 0.24% 0.24%Pembesian 14 0.46% 0.23%Ready Mix K-175 14 0.46%
6 Pek. PlatBekisting 7 2.68% 2.68%Pembesian 6 3.23% 3.23%Ready mix K-250 7 1.79%
B. LANTAI - II (di atas + 4.50)B.1. PEKERJAAN STRUKTUR
1 Beton Kolom Bekisting 4 1.23%Pembesian 3 2.09%Ready Mix K-250 3 0.48%
2 Beton BalokBekisting 4 2.72%
Pembesian 3 5.45%Ready Mix K-250 3 1.81%
3 Pek. Tangga UtamaBekisting 4 0.98% 0.98%Pembesian 3 0.68% 0.68%Ready Mix K-250 3 0.25% 0.25%
4 Pek. Lift UtamaBekisting 4 0.49% 0.49%Pembesian 3 0.47% 0.47%Ready Mix K-250 3 0.09% 0.09%
5 Pek. Tangga DaruratBekisting 7 0.59% 0.59%Pembesian 5 0.27% 0.27%Ready Mix K-175 7 0.09%
6 Pek. PlatBekisting 4 2.92%Pembesian 3 2.69%Ready mix K-250 3 1.63%
C. LANTAI - III (di atas +8.50)C.1. PEKERJAAN STRUKTUR
1 Beton Kolom Bekisting 3 1.01%Pembesian 2 1.74%Ready Mix K-250 3 0.46%
2 Beton BalokBekisting 6 2.18%Pembesian 4 5.55%Ready Mix K-250 5 1.85%
3 Pek. Tangga UtamaBekisting 5 1.22%Pembesian 4 0.68%Ready Mix K-250 5 0.25%
4 Pek. Lift UtamaBekisting 5 0.54%Pembesian 3 0.29%Ready Mix K-250 5 0.11%
5 Pek. Tangga DaruratBekisting 6 1.09%Pembesian 3 0.20%Ready Mix K-175 5 0.09%
6 Pek. PlatBekisting 3 2.51%Pembesian 2 2.85%Ready mix K-250 3 1.60%
D. LANTAI - IV (di atas+12.50)D.1. PEKERJAAN STRUKTUR
1 Beton Kolom Bekisting 10 0.83%Pembesian 4 1.45%Ready Mix K-250 8 0.38%
2 Beton BalokBekisting 10 1.41%Pembesian 8 4.74%Ready Mix K-250 8 1.74%
3 Pek. LisplankBekisting 3 0.48%Pembesian 2 1.21%Ready Mix K-250 2 0.66%
4 Pek. Tangga UtamaBekisting 3 1.05%Pembesian 2 0.54%Ready Mix K-250 3 0.20%
5 Pek. Lift UtamaBekisting 3 0.60%Pembesian 2 0.27%Ready Mix K-250 2 0.11%
6 Pek. Tangga DaruratBekisting 3 1.09%Pembesian 2 0.20%Ready Mix K-175 2 0.09%
7 Pek. PlatBekisting 3 0.94%Pembesian 2 2.40%Ready mix K-250 3 2.01%
E. LANTAI -R. LIFT V (di atas+16.50)E.1. PEKERJAAN STRUKTUR
1 Beton Kolom Bekisting 10 0.16%Pembesian 8 0.55%Ready Mix K-250 5 0.15%
2 Beton BalokBekisting 3 0.22%Pembesian 2 0.73%Ready Mix K-250 2 0.25%
3 Pek. PlatBekisting 3 0.09%Pembesian 2 0.33%Ready Mix K-250 3 0.18%
Total Pekerjaan 100%Rencana Progres (%) 0.87% 4.64% 18.20%
Progres kumulatif (%) 0.87% 5.51% 23.71%Realisasi Progres 0.85% 5.43% 23.84%
= RENCANA= REALISASI= PERCEPATAN
KURVA "S" RENCANA STRUKTUR
PEMBANGUNAN GEDUNG MENEJEMEN 4 LANTAI
RUMAH SAKIT UMUM DAERAH dr. SOEDONO MADIUN
JALAN Dr. SOETOMO No. 29 MADIUN - JAWA TIMUR
Bulan Ke-3
10 11 12 13 14 15 16 17 18 19 ############24 25 26
0.002 0.002 0.002 0.002 0.002 0.002 #########
0.003 0.003 0.003 0.003 0.003 #########
#########0.001 0.001 0.001
#########0.004 0.004 0.004
######0.010 0.010 0.010
0.002 0.002 0.002 0.002 ######
0.001011 0.001011 0.001011
0.0004 0.0004 ###
0.002
0.001011
0.0004 0.0004 0.0004
0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 ############### 0.0003 0.0003
############ 0.0003 0.0003
#########0.004 0.004 0.004
######0.005 0.005 0.005
#########0.002
######0.003
0.001 0.001
0.001 0.001 0.001 0.001
0.002 0.002 0.002
0.0003 0.0003 ###
#########0.001 0.001 0.001
###0.001 0.001 0.001
0.003074 0.0004 0.0004 0.0004 0.005369 0.010923 0.010923 0.010923 0.005731 0.005731#########0 0.031 0.026534 0.026534
0.041328 0.041689 0.04205 0.04241 0.047779 0.058701 0.069624 0.080547 0.086278 0.092009#########0 0.278 0.304328 0.330863
KURVA "S" RENCANA STRUKTUR
PEMBANGUNAN GEDUNG MENEJEMEN 4 LANTAI
KURVA "S" RENCANA & REALISASI
Bln K-4 Bln K-5 Bln K-6
Sk
ala
Ket.28-03/04/11 04-10/04/11 11-17/04/11 18-24/04/11 25-01/05/11 02-08/05/11 09-15/05/11 16-22/05/11 23-29/05/11 30-05/06/11
11 12 13 14 15 16 17 18 19 20
100%
2.39%
0.23%0.23% 0.23%
1.79%
1.23%2.09%0.48% 75%
2.72%5.45%1.81%
0.09%
2.92%2.69%1.63%
1.01%1.74%0.46%
2.18%5.55%
1.85% 50%
1.22%0.68%
0.25%
0.54%0.29%
0.11%
1.09%0.20%
0.11%
2.51%2.85%1.60%
0.49% 0.35%1.45%0.08% 0.30%
0.82% 0.59%1.05% 3.68%
0.39% 1.36%
0.48%1.21%0.66% 25%
1.05%0.54%0.20%
0.60%0.27%0.11%
1.09%0.20%0.09%
0.94%2.40%2.01%
0.09% 0.07%0.24% 0.30%
0.03% 0.12%
0.22%0.73%0.25%
0.09%0.33%0.18% 0%
18.51% 7.47% 4.04% 7.84% 4.23% 12.59% 6.36% 5.84% 6.94% 2.36%42.33% 49.81% 53.85% 61.69% 65.92% 78.51% 84.87% 90.70% 97.64% 100%40.49% 50.33%
KURVA "S" PERCEPATAN
Bln K-4 Bln K-5 Bln K-6
Sk
ala
Ket.28-03/04/11 04-10/04/11 11-17/04/11 18-24/04/11 25-01/05/11 02-08/05/11 09-15/05/11 16-22/05/11 23-29/05/11 30-05/06/11
4 5 6 7 8 9 10 11 12 13
100%
2.39%
0.23%0.23% 0.23%
1.79%
1.23%2.09%0.48% 75%
2.72%
54.51% 63.76% 70.13% 80.29% 84.05% 91.25% 98.33% 100%
5.45%1.81%
0.09%
2.92%2.69%1.63%
54.51% 63.76% 70.13% 80.29% 84.05% 91.25% 98.33% 100%
1.01%1.74%0.46%
0.73% 1.45%5.55%1.11% 0.74% 50%
0.73% 0.49%0.34% 0.34% 0.34%
0.25%
0.54%0.29%0.04% 0.06%
0.90% 0.18%0.14% 0.07%
0.09%
1.67% 0.84%1.42% 1.42%
1.60%
0.42% 0.42%1.45%0.14% 0.24% 0.24%
0.99% 0.42%2.96% 1.78%
0.87% 0.87%
0.48%1.21%
0.66% 25%
1.05%0.54%0.20%
0.20% 0.40%0.27%0.11%
1.09%0.20%0.09%
0.31% 0.63%2.40%2.01%
54.51% 63.76% 70.13% 80.29% 84.05% 91.25% 98.33% 100%
0.11% 0.05%0.34% 0.21%
0.12% 0.03%
0.22%0.73%0.25%
0.03% 0.06%0.33%0.18% 0%
18.51% 7.47% 4.81% 9.25% 6.37% 10.16% 3.76% 7.20% 7.08% 1.23%42.23% 49.70% 54.51% 63.76% 70.13% 80.29% 84.05% 91.25% 98.33% 100%40.49% 50.33%
54.51% 63.76% 70.13% 80.29% 84.05% 91.25% 98.33% 100%
KURVA "S" RENCANA STRUKTUR
PEMBANGUNAN GEDUNG MENEJEMEN 4 LANTAI
RUMAH SAKIT UMUM DAERAH dr. SOEDONO MADIUN
JALAN Dr. SOETOMO No. 29 MADIUN - JAWA TIMUR
Bulan Ke-3 Bulan Ke-4
27 28 29 30 31 1
0.001
0.004
0.010
0.003 0.003 0.003 0.003 0.003
0.0003
0.0003 0.0003 0.0003 0.0003 0.0003 0.0003
0.0003 0.0003 0.0003 0.0003 0.0003
0.004
0.005
0.002561 0.002561 0.002561 0.002561 0.002561
0.001
0.001
0.001
0.0001 0.0001 0.0001 0.0001 0.0001
0.026534 0.006762 0.006762 0.006762 0.006762 0.006762
0.357397 0.364159 0.37092 0.377682 0.384443 0.391205
KURVA "S" RENCANA STRUKTUR
PEMBANGUNAN GEDUNG MENEJEMEN 4 LANTAI
0.00%100.00%
30.5
KURVA "S" RENCANA STRUKTUR
PEMBANGUNAN GEDUNG MENEJEMEN 4 LANTAI
RUMAH SAKIT UMUM DAERAH dr. SOEDONO MADIUN
JALAN Dr. SOETOMO No. 29 MADIUN - JAWA TIMUR
Bulan Ke-4
2 3 4 5 6 7 8 9 10 11 12 13 14
0.003 0.003
0.0003 0.0003
0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003
0.002561 0.002561
0.003 0.003 0.003 0.003
0.007 0.007 0.007
0.002 0.002 0.002
0.007 0.007 0.007 0.007
0.018 0.018 0.018
0.006037 0.006037 0.006037
0.0001 0.0001
0.007 0.007 0.007 0.007
0.00898 0.00898 0.00898
0.005 0.005 0.005
0.003 0.003 0.003 0.003
0.006 0.006 0.006
0.001 0.001 0.001 0.001
0.001 0.001
0.006762 0.006762 0.017511 0.051606 0.051606 0.051606 0.0134 0.0134 0.0134 0.003304 0.009104 0.009691 0.009691
0.397966 0.404728 0.422239 0.473845 0.525451 0.577057 0.590456 0.603856 0.617256 0.620559 0.629663 0.639355 0.649046
KURVA "S" RENCANA STRUKTUR
PEMBANGUNAN GEDUNG MENEJEMEN 4 LANTAI
KURVA "S" RENCANA STRUKTUR
PEMBANGUNAN GEDUNG MENEJEMEN 4 LANTAI
RUMAH SAKIT UMUM DAERAH dr. SOEDONO MADIUN
JALAN Dr. SOETOMO No. 29 MADIUN - JAWA TIMUR
Bulan Ke-4
15 16 17 18 19 20 21 22 23 24 25 26 27
0.002 0.002 0.002
0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.011 0.011 0.011 0.011 0.011
0.003 0.003 0.003
0.002 0.002 0.002
0.001
0.001 0.001 0.001
0.001 0.001 0.001
0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002
0.001 0.001 0.001
0.002884 0.002884 0.002884 0.003267 0.003267 0.014371 0.014371 0.014371 0.014371 0.014371 0.005073 0.005073 0.006436
0.65193 0.654814 0.657698 0.660965 0.664232 0.678603 0.692973 0.707344 0.721715 0.736085 0.741158 0.746231 0.752667
KURVA "S" RENCANA STRUKTUR
PEMBANGUNAN GEDUNG MENEJEMEN 4 LANTAI
KURVA "S" RENCANA STRUKTUR
PEMBANGUNAN GEDUNG MENEJEMEN 4 LANTAI
RUMAH SAKIT UMUM DAERAH dr. SOEDONO MADIUN
JALAN Dr. SOETOMO No. 29 MADIUN - JAWA TIMUR
Bulan Ke-4 Bulan Ke-5
28 29 30 1 2 3 4 5 6 7 8 9 10
0.003 0.003 0.003 0.003
0.002 0.002 0.002 0.002
0.001 0.001 0.001 0.001
0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004
0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.0004 0.0004 0.0004 0.0004 0.0004
0.0002 0.0002
0.006 0.006 0.006 0.006
0.009 0.009 0.009
0.005 0.005 0.005
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.003 0.003 0.003 0.003 0.003
0.0004 0.0004 0.0004 0.0004
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.005 0.005 0.005 0.005 0.005 0.005
0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001
0.001 0.001 0.001 0.001 0.001 0.001
0.006436 0.006436 0.006436 0.006436 0.013084 0.022573 0.022978 0.02885 0.018418 0.015246 0.015246 0.007757 0.007757
0.759103 0.765538 0.771974 0.77841 0.791494 0.814067 0.837045 0.865895 0.884313 0.899559 0.914804 0.922562 0.930319
KURVA "S" RENCANA STRUKTUR
PEMBANGUNAN GEDUNG MENEJEMEN 4 LANTAI
KURVA "S" RENCANA STRUKTUR
PEMBANGUNAN GEDUNG MENEJEMEN 4 LANTAI
RUMAH SAKIT UMUM DAERAH dr. SOEDONO MADIUN
JALAN Dr. SOETOMO No. 29 MADIUN - JAWA TIMUR
Bulan Ke-5
11 12 13 14 15 16 17 18 19 20 21 22 23
0.0002 0.0002 0.0002 0.0002 0.0002
0.0004 0.0004 0.0004 0.0004 0.0004
0.001 0.001 0.001
0.005 0.005 0.005
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.003 0.003 0.003 0.003
0.002 0.002 0.002
0.001 0.001 0.001
0.002
0.003 0.003 0.003 0.003
0.001 0.001 0.001
0.0003 0.0003 0.0003
0.002
0.0001 0.0001 0.0001
0.001 0.001 0.001
0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002
0.001 0.001 0.001 0.001
0.002 0.002 0.002
0.001 0.001 0.001
0.007757 0.007757 0.007757 0.00269 0.00269 0.008009 0.012886 0.012886 0.012886 0.003902 0.003902 0.003902 0.00386
0.938076 0.945833 0.95359 0.95628 0.95897 0.966979 0.979864 0.99275 1.005636 1.009537 1.013439 1.01734 1.0212
KURVA "S" RENCANA STRUKTUR
PEMBANGUNAN GEDUNG MENEJEMEN 4 LANTAI
KURVA "S" RENCANA STRUKTUR
PEMBANGUNAN GEDUNG MENEJEMEN 4 LANTAI
RUMAH SAKIT UMUM DAERAH dr. SOEDONO MADIUN
JALAN Dr. SOETOMO No. 29 MADIUN - JAWA TIMUR
Bulan Ke-5 Bulan Ke-6
24 25 26 27 28 29 30 31 1 2 3 4 5
0.001 0.001 0.001 0.001
0.004 0.004 0.004
0.002 0.002 0.002
0.002 0.002 0.002
0.001 0.001 0.001
0.0004 0.0004 0.0004
0.002 0.002 0.002
0.008 0.008 0.008
0.007 0.007 0.007
0.01276 0.01276 0.01276 0.007066 0.007066 0.007066 0.001207 0.005248 0.005248 0.005248 0.002201 0.002201 0.002201
1.03396 1.04672 1.05948 1.066546 1.073612 1.080678 1.081884 1.087132 1.09238 1.097628 1.099829 1.10203 1.104231
KURVA "S" RENCANA STRUKTUR
PEMBANGUNAN GEDUNG MENEJEMEN 4 LANTAI
Bulan Ke-6
6 7 8 9 10 11 12
0.0002 0.0002 0.0002 0.0002
0.001 0.001 0.001
0.001 0.001 0.001
0.0002 0.0012 0.0012 0.0012 0.0010 0.0010 0.0010
1.104431 1.1056 0.9992 0.9994 0.9996 0.9998 1.00
PEKERJA DAN DURASI PEKERJAAN STRUKTUR
PEMBANGUNAN GEDUNG MENEJEMEN 4 LANTAI
RUMAH SAKIT UMUM DAERAH dr. SOEDONO MADIUN
JALAN Dr. SOETOMO No. 29 MADIUN - JAWA TIMUR
No. URAIAN PEKERJAAN Koef. VOL.Pekerja
Harga. Sat
NORMAL
Hari/Hari
C. LANTAI - I (di atas ± 0.00)
C.1. PEKERJAAN STRUKTUR
1 Beton Kolom
Bekisting
Pekerja 0.3000 oh 260.800 78 Rp 40,000.00 7
Tukang 0.3300 oh 260.800 86 Rp 52,500.00 7
Kepala Tukang 0.0330 oh 260.800 9 Rp 55,000.00 7
Mandor 0.0060 oh 260.800 2 Rp 60,000.00 7
Pembesian
Mandor 0.0003 oh 7136.560 2 Rp 60,000.00 6
Tukang Besi 0.0070 oh 7136.560 50 Rp 52,500.00 6
Pekerja Tak Terampil 0.0070 oh 7136.560 50 Rp 35,000.00 6
Kepala Tukang 0.0007 oh 7136.560 5 Rp 55,000.00 6
Ready Mix K-250
Pekerja tak terampil 1.5000 oh 28.734 43.10 Rp 35,000.00 7
Tukang 0.5000 oh 28.734 14.37 Rp 52,500.00 7
Kepala Tukang 0.0500 oh 28.734 1.44 Rp 55,000.00 7
Mandor 0.0100 oh 28.734 0.29 Rp 60,000.00 7
2 Beton Balok
Bekisting
Pekerja 0.3200 oh 618.622 197.96 Rp 40,000.00 7
Tukang 0.3300 oh 618.622 204.15 Rp 52,500.00 7
Kepala Tukang 0.0330 oh 618.622 20.41 Rp 55,000.00 7
Mandor 0.0060 oh 618.622 3.71 Rp 60,000.00 7
Pembesian
Mandor 0.0003 oh 23911.897 7.17 Rp 60,000.00 6
Tukang Besi 0.0070 oh 23911.897 167.38 Rp 52,500.00 6
Pekerja Tak Terampil 0.0070 oh 23911.897 167.38 Rp 35,000.00 6
Kepala Tukang 0.0007 oh 23911.897 16.74 Rp 55,000.00 6
Ready Mix K-250
Pekerja tak terampil 1.5000 oh 131.457 197.19 Rp 35,000.00 7
Tukang 0.5000 oh 131.457 65.73 Rp 52,500.00 7
Kepala Tukang 0.0500 oh 131.457 6.57 Rp 55,000.00 7
Mandor 0.0100 oh 131.457 1.31 Rp 60,000.00 7
3 Pek. Tangga Utama
Bekisting
Pekerja 0.3392 oh 234.061 79.39 Rp 40,000.00 4
Tukang 0.3498 oh 234.061 81.87 Rp 52,500.00 4
Kepala Tukang 0.0351 oh 234.061 8.23 Rp 55,000.00 4
Mandor 0.0064 oh 234.061 1.50 Rp 60,000.00 4
Pembesian
Mandor 0.0003 oh 1213.179 0.36 Rp 60,000.00 3
Tukang Besi 0.0070 oh 1213.179 8.49 Rp 52,500.00 3
Pekerja Tak Terampil 0.0070 oh 1213.179 8.49 Rp 35,000.00 3
Kepala Tukang 0.0007 oh 1213.179 0.85 Rp 55,000.00 3
Ready Mix K-250
Pekerja tak terampil 1.5000 oh 5.953 8.93 Rp 35,000.00 3
Tukang 0.5000 oh 5.953 2.98 Rp 52,500.00 3
Kepala Tukang 0.0500 oh 5.953 0.30 Rp 55,000.00 3
Mandor 0.0100 oh 5.953 0.06 Rp 60,000.00 3
4 Pek. Lift Utama
Bekisting
Pekerja 0.3200 oh 150.320 48.10 Rp 40,000.00 4
Tukang 0.3300 oh 150.320 49.61 Rp 52,500.00 4
Kepala Tukang 0.0330 oh 150.320 4.96 Rp 55,000.00 4
Mandor 0.0060 oh 150.320 0.90 Rp 60,000.00 4
Pembesian
Mandor 0.0003 oh 1140.884 0.34 Rp 60,000.00 3
Tukang Besi 0.0070 oh 1140.884 7.99 Rp 52,500.00 3
Pekerja Tak Terampil 0.0070 oh 1140.884 7.99 Rp 35,000.00 3
Kepala Tukang 0.0007 oh 1140.884 0.80 Rp 55,000.00 3
Ready Mix K-250
Pekerja tak terampil 1.5000 oh 5.486 8.23 Rp 35,000.00 3
Tukang 0.5000 oh 5.486 2.74 Rp 52,500.00 3
Kepala Tukang 0.0500 oh 5.486 0.27 Rp 55,000.00 3
Mandor 0.0100 oh 5.486 0.05 Rp 60,000.00 3
5 Pek Ramp Beton
Bekisting
Pekerja 0.3200 oh 103.434 33.10 Rp 40,000.00 14
Tukang 0.3300 oh 103.434 34.13 Rp 52,500.00 14
Kepala Tukang 0.0330 oh 103.434 3.41 Rp 55,000.00 14
Mandor 0.0060 oh 103.434 0.62 Rp 60,000.00 14
Pembesian
Mandor 0.0003 oh 1846.631 0.55 Rp 60,000.00 14
Tukang Besi 0.0070 oh 1846.631 12.93 Rp 52,500.00 14
Pekerja Tak Terampil 0.0070 oh 1846.631 12.93 Rp 35,000.00 14
Kepala Tukang 0.0007 oh 1846.631 1.29 Rp 55,000.00 14
Ready mix K-175
Pekerja tak terampil 1.5000 oh 28.203 42.31 Rp 35,000.00 14
Tukang 0.5000 oh 28.203 14.10 Rp 52,500.00 14
Kepala Tukang 0.0500 oh 28.203 1.41 Rp 55,000.00 14
Mandor 0.0100 oh 28.203 0.28 Rp 60,000.00 14
6 Pek. Plat
Bekisting
Pekerja 0.3200 oh 590.200 188.86 Rp 40,000.00 7
Tukang 0.3300 oh 590.200 194.77 Rp 52,500.00 7
Kepala Tukang 0.0330 oh 590.200 19.48 Rp 55,000.00 7
Mandor 0.0060 oh 590.200 3.54 Rp 60,000.00 7
Pembesian
Mandor 0.0003 oh 12933.503 3.88 Rp 60,000.00 6
Tukang Besi 0.0070 oh 12933.503 90.53 Rp 52,500.00 6
Pekerja Tak Terampil 0.0070 oh 12933.503 90.53 Rp 35,000.00 6
Kepala Tukang 0.0007 oh 12933.503 9.05 Rp 55,000.00 6
Ready mix K-250
Pekerja tak terampil 1.5000 oh 98.630 147.95 Rp 35,000.00 7
Tukang 0.5000 oh 98.630 49.32 Rp 52,500.00 7
Kepala Tukang 0.0500 oh 98.630 4.93 Rp 55,000.00 7
Mandor 0.0100 oh 98.630 0.99 Rp 60,000.00 7
D. LANTAI - II (di atas + 4.50)
D.1. PEKERJAAN STRUKTUR
1 Beton Kolom
Bekisting
Pekerja 0.3000 oh 241.600 72.48 Rp 40,000.00 4
Tukang 0.3300 oh 241.600 79.73 Rp 52,500.00 4
Kepala Tukang 0.0330 oh 241.600 7.97 Rp 55,000.00 4
Mandor 0.0060 oh 241.600 1.45 Rp 60,000.00 4
Pembesian
Mandor 0.0003 oh 7651.197 2.30 Rp 60,000.00 3
Tukang Besi 0.0070 oh 7651.197 53.56 Rp 52,500.00 3
Pekerja Tak Terampil 0.0070 oh 7651.197 53.56 Rp 35,000.00 3
Kepala Tukang 0.0007 oh 7651.197 5.36 Rp 55,000.00 3
Ready Mix K-250
Pekerja tak terampil 1.5000 oh 24.320 36.48 Rp 35,000.00 3
Tukang 0.5000 oh 24.320 12.16 Rp 52,500.00 3
Kepala Tukang 0.0500 oh 24.320 1.22 Rp 55,000.00 3
Mandor 0.0100 oh 24.320 0.24 Rp 60,000.00 3
2 Beton Balok
Bekisting
Pekerja 0.3200 oh 606.877 194.20 Rp 40,000.00 4
Tukang 0.3300 oh 606.877 200.27 Rp 52,500.00 4
Kepala Tukang 0.0330 oh 606.877 20.03 Rp 55,000.00 4
Mandor 0.0060 oh 606.877 3.64 Rp 60,000.00 4
Pembesian
Mandor 0.0003 oh 19993.060 6.00 Rp 60,000.00 3
Tukang Besi 0.0070 oh 19993.060 139.95 Rp 52,500.00 3
Pekerja Tak Terampil 0.0070 oh 19993.060 139.95 Rp 35,000.00 3
Kepala Tukang 0.0007 oh 19993.060 14.00 Rp 55,000.00 3
Ready Mix K-250
Pekerja tak terampil 1.5000 oh 91.406 137.11 Rp 35,000.00 3
Tukang 0.5000 oh 91.406 45.70 Rp 52,500.00 3
Kepala Tukang 0.0500 oh 91.406 4.57 Rp 55,000.00 3
Mandor 0.0100 oh 91.406 0.91 Rp 60,000.00 3
3 Pek. Tangga Utama
Bekisting
Pekerja 0.3392 oh 255.127 86.54 Rp 40,000.00 4
Tukang 0.3498 oh 255.127 89.24 Rp 52,500.00 4
Kepala Tukang 0.0351 oh 255.127 8.97 Rp 55,000.00 4
Mandor 0.0064 oh 255.127 1.63 Rp 60,000.00 4
Pembesian
Mandor 0.0003 oh 2834.997 0.85 Rp 60,000.00 3
Tukang Besi 0.0070 oh 2834.997 19.84 Rp 52,500.00 3
Pekerja Tak Terampil 0.0070 oh 2834.997 19.84 Rp 35,000.00 3
Kepala Tukang 0.0007 oh 2834.997 1.98 Rp 55,000.00 3
Ready Mix K-250
Pekerja tak terampil 1.5000 oh 13.910 20.87 Rp 35,000.00 3
Tukang 0.5000 oh 13.910 6.96 Rp 52,500.00 3
Kepala Tukang 0.0500 oh 13.910 0.70 Rp 55,000.00 3
Mandor 0.0100 oh 13.910 0.14 Rp 60,000.00 3
4 Pek. Lift Utama
Bekisting
Pekerja 0.3200 oh 150.320 48.10 Rp 40,000.00 4
Tukang 0.3300 oh 150.320 49.61 Rp 52,500.00 4
Kepala Tukang 0.0330 oh 150.320 4.96 Rp 55,000.00 4
Mandor 0.0060 oh 150.320 0.90 Rp 60,000.00 4
Pembesian
Mandor 0.0003 oh 1882.100 0.56 Rp 60,000.00 3
Tukang Besi 0.0070 oh 1882.100 13.17 Rp 52,500.00 3
Pekerja Tak Terampil 0.0070 oh 1882.100 13.17 Rp 35,000.00 3
Kepala Tukang 0.0007 oh 1882.100 1.32 Rp 55,000.00 3
Ready Mix K-250
Pekerja tak terampil 1.5000 oh 4.712 7.07 Rp 35,000.00 3
Tukang 0.5000 oh 4.712 2.36 Rp 52,500.00 3
Kepala Tukang 0.0500 oh 4.712 0.24 Rp 55,000.00 3
Mandor 0.0100 oh 4.712 0.05 Rp 60,000.00 3
5 Pek. Tangga Darurat
Bekisting
Pekerja 0.3392 oh 127.563 337.22 Rp 40,000.00 7
Tukang 0.3498 oh 127.563 44.62 Rp 52,500.00 7
Kepala Tukang 0.0351 oh 127.563 4.48 Rp 55,000.00 7
Mandor 0.0064 oh 127.563 0.82 Rp 60,000.00 7
Pembesian
Mandor 0.0003 oh 994.160 0.30 Rp 60,000.00 5
Tukang Besi 0.0070 oh 994.160 6.96 Rp 52,500.00 5
Pekerja Tak Terampil 0.0070 oh 994.160 6.96 Rp 35,000.00 5
Kepala Tukang 0.0007 oh 994.160 0.70 Rp 55,000.00 5
Ready Mix K-175
Pekerja tak terampil 1.5000 oh 4.878 7.32 Rp 35,000.00 7
Tukang 0.5000 oh 4.878 2.44 Rp 52,500.00 7
Kepala Tukang 0.0500 oh 4.878 0.24 Rp 55,000.00 7
Mandor 0.0100 oh 4.878 0.05 Rp 60,000.00 7
6 Pek. Plat
Bekisting
Pekerja 0.3200 oh 590.200 188.86 Rp 40,000.00 4
Tukang 0.3300 oh 590.200 194.77 Rp 52,500.00 4
Kepala Tukang 0.0330 oh 590.200 19.48 Rp 55,000.00 4
Mandor 0.0060 oh 590.200 3.54 Rp 60,000.00 4
Pembesian
Mandor 0.0003 oh 10774.772 3.23 Rp 60,000.00 3
Tukang Besi 0.0070 oh 10774.772 75.42 Rp 52,500.00 3
Pekerja Tak Terampil 0.0070 oh 10774.772 75.42 Rp 35,000.00 3
Kepala Tukang 0.0007 oh 10774.772 7.54 Rp 55,000.00 3
Ready mix K-250
Pekerja tak terampil 1.5000 oh 82.168 123.25 Rp 35,000.00 3
Tukang 0.5000 oh 82.168 41.08 Rp 52,500.00 3
Kepala Tukang 0.0500 oh 82.168 4.11 Rp 55,000.00 3
Mandor 0.0100 oh 82.168 0.82 Rp 60,000.00 3
E. LANTAI - III (di atas +8.50)
E.1. PEKERJAAN STRUKTUR
1 Beton Kolom
Bekisting
Pekerja 0.3000 oh 193.600 58.08 Rp 40,000.00 4
Tukang 0.3300 oh 193.600 63.89 Rp 52,500.00 4
Kepala Tukang 0.0330 oh 193.600 6.39 Rp 55,000.00 4
Mandor 0.0060 oh 193.600 1.16 Rp 60,000.00 4
Pembesian
Mandor 0.0003 oh 6213.939 1.86 Rp 60,000.00 3
Tukang Besi 0.0070 oh 6213.939 43.50 Rp 52,500.00 3
Pekerja Tak Terampil 0.0070 oh 6213.939 43.50 Rp 35,000.00 3
Kepala Tukang 0.0007 oh 6213.939 4.35 Rp 55,000.00 3
Ready Mix K-250
Pekerja tak terampil 1.5000 oh 22.520 33.78 Rp 35,000.00 3
Tukang 0.5000 oh 22.520 11.26 Rp 52,500.00 3
Kepala Tukang 0.0500 oh 22.520 1.13 Rp 55,000.00 3
Mandor 0.0100 oh 22.520 0.23 Rp 60,000.00 3
2 Beton Balok
Bekisting
Pekerja 0.3200 oh 473.165 151.41 Rp 40,000.00 7
Tukang 0.3300 oh 473.165 156.14 Rp 52,500.00 7
Kepala Tukang 0.0330 oh 473.165 15.61 Rp 55,000.00 7
Mandor 0.0060 oh 473.165 2.84 Rp 60,000.00 7
Pembesian
Mandor 0.0003 oh 19823.950 5.95 Rp 60,000.00 5
Tukang Besi 0.0070 oh 19823.950 138.77 Rp 52,500.00 5
Pekerja Tak Terampil 0.0070 oh 19823.950 138.77 Rp 35,000.00 5
Kepala Tukang 0.0007 oh 19823.950 13.88 Rp 55,000.00 5
Ready Mix K-250
Pekerja tak terampil 1.5000 oh 90.831 136.25 Rp 35,000.00 7
Tukang 0.5000 oh 90.831 45.42 Rp 52,500.00 7
Kepala Tukang 0.0500 oh 90.831 4.54 Rp 55,000.00 7
Mandor 0.0100 oh 90.831 0.91 Rp 60,000.00 7
3 Pek. Tangga Utama
Bekisting
Pekerja 0.3392 oh 262.148 88.92 Rp 40,000.00 7
Tukang 0.3498 oh 262.148 91.70 Rp 52,500.00 7
Kepala Tukang 0.0351 oh 262.148 9.21 Rp 55,000.00 7
Mandor 0.0064 oh 262.148 1.68 Rp 60,000.00 7
Pembesian
Mandor 0.0003 oh 2468.139 0.74 Rp 60,000.00 5
Tukang Besi 0.0070 oh 2468.139 17.28 Rp 52,500.00 5
Pekerja Tak Terampil 0.0070 oh 2468.139 17.28 Rp 35,000.00 5
Kepala Tukang 0.0007 oh 2468.139 1.73 Rp 55,000.00 5
Ready Mix K-250
Pekerja tak terampil 1.5000 oh 12.110 18.17 Rp 35,000.00 7
Tukang 0.5000 oh 12.110 6.06 Rp 52,500.00 7
Kepala Tukang 0.0500 oh 12.110 0.61 Rp 55,000.00 7
Mandor 0.0100 oh 12.110 0.12 Rp 60,000.00 7
4 Pek. Lift Utama
Bekisting
Pekerja 0.3200 oh 150.320 48.10 Rp 40,000.00 7
Tukang 0.3300 oh 150.320 49.61 Rp 52,500.00 7
Kepala Tukang 0.0330 oh 150.320 4.96 Rp 55,000.00 7
Mandor 0.0060 oh 150.320 0.90 Rp 60,000.00 7
Pembesian
Mandor 0.0003 oh 1063.073 0.32 Rp 60,000.00 5
Tukang Besi 0.0070 oh 1063.073 7.44 Rp 52,500.00 5
Pekerja Tak Terampil 0.0070 oh 1063.073 7.44 Rp 35,000.00 5
Kepala Tukang 0.0007 oh 1063.073 0.74 Rp 55,000.00 5
Ready Mix K-250
Pekerja tak terampil 1.5000 oh 5.216 7.82 Rp 35,000.00 7
Tukang 0.5000 oh 5.216 2.61 Rp 52,500.00 7
Kepala Tukang 0.0500 oh 5.216 0.26 Rp 55,000.00 7
Mandor 0.0100 oh 5.216 0.05 Rp 60,000.00 7
5 Pek. Tangga Darurat
Bekisting
Pekerja 0.3200 oh 234.061 74.90 Rp 40,000.00 7
Tukang 0.3300 oh 234.061 77.24 Rp 52,500.00 7
Kepala Tukang 0.0330 oh 234.061 7.72 Rp 55,000.00 7
Mandor 0.0060 oh 234.061 1.40 Rp 60,000.00 7
Pembesian
Mandor 0.0003 oh 734.667 0.22 Rp 60,000.00 5
Tukang Besi 0.0070 oh 734.667 5.14 Rp 52,500.00 5
Pekerja Tak Terampil 0.0070 oh 734.667 5.14 Rp 35,000.00 5
Kepala Tukang 0.0007 oh 734.667 0.51 Rp 55,000.00 5
Ready Mix K-175
Pekerja tak terampil 1.5000 oh 5.953 8.93 Rp 35,000.00 7
Tukang 0.5000 oh 5.953 2.98 Rp 52,500.00 7
Kepala Tukang 0.0500 oh 5.953 0.30 Rp 55,000.00 7
Mandor 0.0100 oh 5.953 0.06 Rp 60,000.00 7
6 Pek. Plat
Bekisting
Pekerja 0.3200 oh 494.200 158.14 Rp 40,000.00 4
Tukang 0.3300 oh 494.200 163.09 Rp 52,500.00 4
Kepala Tukang 0.0330 oh 494.200 16.31 Rp 55,000.00 4
Mandor 0.0060 oh 494.200 2.97 Rp 60,000.00 4
Pembesian
Mandor 0.0003 oh 10308.365 3.09 Rp 60,000.00 3
Tukang Besi 0.0070 oh 10308.365 72.16 Rp 52,500.00 3
Pekerja Tak Terampil 0.0070 oh 10308.365 72.16 Rp 35,000.00 3
Kepala Tukang 0.0007 oh 10308.365 7.22 Rp 55,000.00 3
Ready mix K-250
Pekerja tak terampil 1.5000 oh 78.611 117.92 Rp 35,000.00 3
Tukang 0.5000 oh 78.611 39.31 Rp 52,500.00 3
Kepala Tukang 0.0500 oh 78.611 3.93 Rp 55,000.00 3
Mandor 0.0100 oh 78.611 0.79 Rp 60,000.00 3
F. LANTAI - IV (di atas+12.50)
F.1. PEKERJAAN STRUKTUR
1 Beton Kolom
Bekisting
Pekerja 0.3000 oh 156.800 47.04 Rp 40,000.00 12
Tukang 0.3300 oh 156.800 51.74 Rp 52,500.00 12
Kepala Tukang 0.0330 oh 156.800 5.17 Rp 55,000.00 12
Mandor 0.0060 oh 156.800 0.94 Rp 60,000.00 12
Pembesian
Mandor 0.0003 oh 5114.786 1.53 Rp 60,000.00 5
Tukang Besi 0.0070 oh 5114.786 35.80 Rp 52,500.00 5
Pekerja Tak Terampil 0.0070 oh 5114.786 35.80 Rp 35,000.00 5
Kepala Tukang 0.0007 oh 5114.786 3.58 Rp 55,000.00 5
Ready Mix K-250
Pekerja tak terampil 1.5000 oh 18.520 27.78 Rp 35,000.00 9
Tukang 0.5000 oh 18.520 9.26 Rp 52,500.00 9
Kepala Tukang 0.0500 oh 18.520 0.93 Rp 55,000.00 9
Mandor 0.0100 oh 18.520 0.19 Rp 60,000.00 9
2 Beton Balok
Bekisting
Pekerja 0.3200 oh 301.382 96.44 Rp 40,000.00 12
Tukang 0.3300 oh 301.382 99.46 Rp 52,500.00 12
Kepala Tukang 0.0330 oh 301.382 9.95 Rp 55,000.00 12
Mandor 0.0060 oh 301.382 1.81 Rp 60,000.00 12
Pembesian
Mandor 0.0003 oh 16686.882 5.01 Rp 60,000.00 9
Tukang Besi 0.0070 oh 16686.882 116.81 Rp 52,500.00 9
Pekerja Tak Terampil 0.0070 oh 16686.882 116.81 Rp 35,000.00 9
Kepala Tukang 0.0007 oh 16686.882 11.68 Rp 55,000.00 9
Ready Mix K-250
Pekerja tak terampil 1.5000 oh 84.557 126.84 Rp 35,000.00 9
Tukang 0.5000 oh 84.557 42.28 Rp 52,500.00 9
Kepala Tukang 0.0500 oh 84.557 4.23 Rp 55,000.00 9
Mandor 0.0100 oh 84.557 0.85 Rp 60,000.00 9
3 Pek. Lisplank Atap
Bekisting
Pekerja 0.3200 oh 120.610 38.60 Rp 40,000.00 4
Tukang 0.3300 oh 120.610 39.80 Rp 52,500.00 4
Kepala Tukang 0.0330 oh 120.610 3.98 Rp 55,000.00 4
Mandor 0.0060 oh 120.610 0.72 Rp 60,000.00 4
Pembesian
Mandor 0.0003 oh 4271.891 1.28 Rp 60,000.00 3
Tukang Besi 0.0070 oh 4271.891 29.90 Rp 52,500.00 3
Pekerja Tak Terampil 0.0070 oh 4271.891 29.90 Rp 35,000.00 3
Kepala Tukang 0.0007 oh 4271.891 2.99 Rp 55,000.00 3
Ready Mix K-250
Pekerja tak terampil 1.5000 oh 32.005 48.01 Rp 35,000.00 3
Tukang 0.5000 oh 32.005 16.00 Rp 52,500.00 3
Kepala Tukang 0.0500 oh 32.005 1.60 Rp 55,000.00 3
Mandor 0.0100 oh 32.005 0.32 Rp 60,000.00 3
4 Pek. Tangga Utama
Bekisting
Pekerja 0.3392 oh 262.148 88.92 Rp 40,000.00 4
Tukang 0.3498 oh 262.148 91.70 Rp 52,500.00 4
Kepala Tukang 0.0351 oh 262.148 9.21 Rp 55,000.00 4
Mandor 0.0064 oh 262.148 1.68 Rp 60,000.00 4
Pembesian
Mandor 0.0003 oh 1930.896 0.58 Rp 60,000.00 3
Tukang Besi 0.0070 oh 1930.896 13.52 Rp 52,500.00 3
Pekerja Tak Terampil 0.0070 oh 1930.896 13.52 Rp 35,000.00 3
Kepala Tukang 0.0007 oh 1930.896 1.35 Rp 55,000.00 3
Ready Mix K-250
Pekerja tak terampil 1.5000 oh 9.474 14.21 Rp 35,000.00 3
Tukang 0.5000 oh 9.474 4.74 Rp 52,500.00 3
Kepala Tukang 0.0500 oh 9.474 0.47 Rp 55,000.00 3
Mandor 0.0100 oh 9.474 0.09 Rp 60,000.00 3
5 Pek. Lift Utama
Bekisting
Pekerja 0.3200 oh 150.320 48.10 Rp 40,000.00 4
Tukang 0.3300 oh 150.320 49.61 Rp 52,500.00 4
Kepala Tukang 0.0330 oh 150.320 4.96 Rp 55,000.00 4
Mandor 0.0060 oh 150.320 0.90 Rp 60,000.00 4
Pembesian
Mandor 0.0003 oh 1063.073 0.32 Rp 60,000.00 3
Tukang Besi 0.0070 oh 1063.073 7.44 Rp 52,500.00 3
Pekerja Tak Terampil 0.0070 oh 1063.073 7.44 Rp 35,000.00 3
Kepala Tukang 0.0007 oh 1063.073 0.74 Rp 55,000.00 3
Ready Mix K-250
Pekerja tak terampil 1.5000 oh 5.216 7.82 Rp 35,000.00 3
Tukang 0.5000 oh 5.216 2.61 Rp 52,500.00 3
Kepala Tukang 0.0500 oh 5.216 0.26 Rp 55,000.00 3
Mandor 0.0100 oh 5.216 0.05 Rp 60,000.00 3
6 Pek. Tangga Darurat
Bekisting
Pekerja 0.3200 oh 234.061 74.90 Rp 40,000.00 4
Tukang 0.3300 oh 234.061 77.24 Rp 52,500.00 4
Kepala Tukang 0.0330 oh 234.061 7.72 Rp 55,000.00 4
Mandor 0.0060 oh 234.061 1.40 Rp 60,000.00 4
Pembesian
Mandor 0.0003 oh 784.508 0.24 Rp 60,000.00 3
Tukang Besi 0.0070 oh 784.508 5.49 Rp 52,500.00 3
Pekerja Tak Terampil 0.0070 oh 784.508 5.49 Rp 35,000.00 3
Kepala Tukang 0.0007 oh 784.508 0.55 Rp 55,000.00 3
Ready Mix K-175
Pekerja tak terampil 1.5000 oh 5.065 7.60 Rp 35,000.00 3
Tukang 0.5000 oh 5.065 2.53 Rp 52,500.00 3
Kepala Tukang 0.0500 oh 5.065 0.25 Rp 55,000.00 3
Mandor 0.0100 oh 5.065 0.05 Rp 60,000.00 3
7 Pek. Plat
Bekisting
Pekerja 0.3200 oh 183.000 58.56 Rp 40,000.00 4
Tukang 0.3300 oh 183.000 60.39 Rp 52,500.00 4
Kepala Tukang 0.0330 oh 183.000 6.04 Rp 55,000.00 4
Mandor 0.0060 oh 183.000 1.10 Rp 60,000.00 4
Pembesian
Mandor 0.0003 oh 8591.247 2.58 Rp 60,000.00 3
Tukang Besi 0.0070 oh 8591.247 60.14 Rp 52,500.00 3
Pekerja Tak Terampil 0.0070 oh 8591.247 60.14 Rp 35,000.00 3
Kepala Tukang 0.0007 oh 8591.247 6.01 Rp 55,000.00 3
Ready mix K-250
Pekerja tak terampil 1.5000 oh 97.522 146.28 Rp 35,000.00 3
Tukang 0.5000 oh 97.522 48.76 Rp 52,500.00 3
Kepala Tukang 0.0500 oh 97.522 4.88 Rp 55,000.00 3
Mandor 0.0100 oh 97.522 0.98 Rp 60,000.00 3
G. LANTAI RUANG LIFT -V-(di atas+16.50)
G.1. PEKERJAAN STRUKTUR
1 Beton Kolom
Bekisting
Pekerja 0.3000 oh 29.170 8.75 Rp 40,000.00 12
Tukang 0.3300 oh 29.170 9.63 Rp 52,500.00 12
Kepala Tukang 0.0330 oh 29.170 0.96 Rp 55,000.00 12
Mandor 0.0060 oh 29.170 0.18 Rp 60,000.00 12
Pembesian
Mandor 0.0003 oh 1889.219 0.57 Rp 60,000.00 9
Tukang Besi 0.0070 oh 1889.219 13.22 Rp 52,500.00 9
Pekerja Tak Terampil 0.0070 oh 1889.219 13.22 Rp 35,000.00 9
Kepala Tukang 0.0007 oh 1889.219 1.32 Rp 55,000.00 9
Ready Mix K-250
Pekerja tak terampil 1.5000 oh 7.293 10.94 Rp 35,000.00 9
Tukang 0.5000 oh 7.293 3.65 Rp 52,500.00 9
Kepala Tukang 0.0500 oh 7.293 0.36 Rp 55,000.00 9
Mandor 0.0100 oh 7.293 0.07 Rp 60,000.00 9
2 Beton Balok
Bekisting
Pekerja 0.3200 oh 46.998 15.04 Rp 40,000.00 4
Tukang 0.3300 oh 46.998 15.51 Rp 52,500.00 4
Kepala Tukang 0.0330 oh 46.998 1.55 Rp 55,000.00 4
Mandor 0.0060 oh 46.998 0.28 Rp 60,000.00 4
Pembesian
Mandor 0.0003 oh 2500.526 0.75 Rp 60,000.00 3
Tukang Besi 0.0070 oh 2500.526 17.50 Rp 52,500.00 3
Pekerja Tak Terampil 0.0070 oh 2500.526 17.50 Rp 35,000.00 3
Kepala Tukang 0.0007 oh 2500.526 1.75 Rp 55,000.00 3
Ready Mix K-250
Pekerja tak terampil 1.5000 oh 11.750 17.62 Rp 35,000.00 3
Tukang 0.5000 oh 11.750 5.87 Rp 52,500.00 3
Kepala Tukang 0.0500 oh 11.750 0.59 Rp 55,000.00 3
Mandor 0.0100 oh 11.750 0.12 Rp 60,000.00 3
3 Pek. Plat
Bekisting
Pekerja 0.3200 oh 17.442 5.58 Rp 40,000.00 4
Tukang 0.3300 oh 17.442 5.76 Rp 52,500.00 4
Kepala Tukang 0.0330 oh 17.442 0.58 Rp 55,000.00 4
Mandor 0.0060 oh 17.442 0.10 Rp 60,000.00 4
Pembesian
Mandor 0.0003 oh 1143.593 0.34 Rp 60,000.00 3
Tukang Besi 0.0070 oh 1143.593 8.01 Rp 52,500.00 3
Pekerja Tak Terampil 0.0070 oh 1143.593 8.01 Rp 35,000.00 3
Kepala Tukang 0.0007 oh 1143.593 0.80 Rp 55,000.00 3
Ready mix K-250
Pekerja tak terampil 1.5000 oh 8.721 13.08 Rp 35,000.00 3
Tukang 0.5000 oh 8.721 4.36 Rp 52,500.00 3
Kepala Tukang 0.0500 oh 8.721 0.44 Rp 55,000.00 3
Mandor 0.0100 oh 8.721 0.09 Rp 60,000.00 3
TOTAL BIAYA PERCEPATAN DENGAN TAMABAH PEKERJA
PEKERJA DAN DURASI PEKERJAAN STRUKTUR
PEMBANGUNAN GEDUNG MENEJEMEN 4 LANTAI
RUMAH SAKIT UMUM DAERAH dr. SOEDONO MADIUN
JALAN Dr. SOETOMO No. 29 MADIUN - JAWA TIMUR
NORMAL PERCEPATANTambah
Total Dipakai VolHari
Vol Dipakai
Pekerja /Hari /Hari Pekerja Pekerja R
KE
TE
RL
AM
BA
TA
N P
RO
YE
K R
SU
P d
r. S
oed
ono
Mad
iun
Pekerja
Pekerja Tak t
Kepala Tukang
=
11 37 6 43 13
12 37 6 43 14
1 37 6 43 1
0 37 6 43 0
0 1189 5 1,427 0
8 1189 5 1,427 10 27
8 1189 5 1,427 10
1 1189 5 1,427 1 6160000
6 4 5 6 9 Pekerja
2 4 5 6 3 Tukang
0 4 5 6 0 Kepala tukan
0 4 5 6 0 Pekerja Tak t
Tukang Besi
Mandor
28 88 6 103 33 NO
29 88 6 103 34 1
3 88 6 103 3
1 88 6 103 1
1 3985 5 4782 1
28 3985 5 4782 33
28 3985 5 4782 33 2
3 3985 5 4782 3
28 19 5 26 39
9 19 5 26 13
1 19 5 26 1
0 19 5 26 0 3
KE
TE
RL
AM
BA
TA
N P
RO
YE
K R
SU
P d
r. S
oed
ono
Mad
iun
20 59 3 78 26
20 59 3 78 27
2 59 3 78 3 4
0 59 3 78 0
0 404 2 607 0
3 404 2 607 4
3 404 2 607 4
0 404 2 607 0 5
3 2 3 2 3
1 2 3 2 1
0 2 3 2 0
0 2 3 2 0
6
12 38 3 50 16
12 38 3 50 17
1 38 3 50 2
0 38 3 50 0 7
0 380 2 570 0
3 380 2 570 4
3 380 2 570 4
0 380 2 570 0
8
3 2 3 2 3
1 2 3 2 1
0 2 3 2 0
0 2 3 2 0
2 7 8 13 4
2 7 8 13 4 NO
0 7 8 13 0
0 7 8 13 0 1
2
0 132 6 308 0 3
1 132 6 308 2 4
1 132 6 308 2 5
0 132 6 308 0
KE
TE
RL
AM
BA
TA
N P
RO
YE
K R
SU
P d
r. S
oed
ono
Mad
iun
6
7
3 2 7 4 6 8
1 2 7 4 2 9
0 2 7 4 0 JUMLAH
0 2 7 4 0
27 84 6 98 31
28 84 6 98 32
3 84 6 98 3
1 84 6 98 1
1 2156 5 2587 1
15 2156 5 2587 18
15 2156 5 2587 18
2 2156 5 2587 2
21 14 5 20 30
7 14 5 20 10
1 14 5 20 1
0 14 5 20 0
18 60 3 81 24
20 60 3 81 27
2 60 3 81 3
0 60 3 81 0
1 2550 2 3826 1
18 2550 2 3826 27
18 2550 2 3826 27
2 2550 2 3826 3
12 8 3 8 12
4 8 3 8 4
0 8 3 8 0
0 8 3 8 0
49 152 3 202 65
KE
TE
RL
AM
BA
TA
N P
RO
YE
K R
SU
P d
r. S
oed
ono
Mad
iun
50 152 3 202 67
5 152 3 202 7
1 152 3 202 1
2 6664 2 9997 3
47 6664 2 9997 70
47 6664 2 9997 70
5 6664 2 9997 7
46 30 3 30 46
15 30 3 30 15
2 30 3 30 2
0 30 3 30 0
22 64 3 85 29
22 64 3 85 30
2 64 3 85 3
0 64 3 85 1
0 945 2 1417 0
7 945 2 1417 10
7 945 2 1417 10
1 945 2 1417 1
7 5 3 5 7
2 5 3 5 2
0 5 3 5 0
0 5 3 5 0
12 38 3 50 16
12 38 3 50 17
1 38 3 50 2
0 38 3 50 0
0 627 2 941 0
4 627 2 941 7
4 627 2 941 7
0 627 2 941 1
2 2 2 2 4
1 2 2 2 1
KE
TE
RL
AM
BA
TA
N P
RO
YE
K R
SU
P d
r. S
oed
ono
Mad
iun
0 2 2 2 0
0 2 2 2 0
48 142 6 166 56
6 18 6 21 7
1 18 6 21 1
0 18 6 21 0
0 199 3 331 0
1 199 3 331 2
1 199 3 331 2
0 199 3 331 0
1 1 4 1 2
0 1 4 1 1
0 1 4 1 0
0 1 4 1 0
47 148 3 197 63
49 148 3 197 65
5 148 3 197 6
1 148 3 197 1
1 3592 2 5387 2
25 3592 2 5387 38
25 3592 2 5387 38
3 3592 2 5387 4
41 27 3 27 41
14 27 3 27 14
1 27 3 27 1
0 27 3 27 0
No.
15 48 3 65 19 4 Rp 160,000.00 1
16 48 3 65 21 5 Rp 262,500.00 2
2 48 3 65 2 0 Rp - 3
0 48 3 65 0 0 Rp - 4
5
1 2071 2 3107 1 0 Rp - 6
14 2071 2 3107 22 7 Rp 367,500.00
14 2071 2 3107 22 7 Rp 245,000.00
1 2071 2 3107 2 1 Rp 55,000.00
11 8 3 8 11 0 Rp -
4 8 3 8 4 0 Rp -
0 8 3 8 0 0 Rp -
0 8 3 8 0 0 Rp -
22 68 6 79 25 3 Rp 120,000.00
22 68 6 79 26 4 Rp 210,000.00
2 68 6 79 3 1 Rp 55,000.00
0 68 6 79 0 0 Rp -
1 3965 4 4956 1 0 Rp -
28 3965 4 4956 35 7 Rp 367,500.00
28 3965 4 4956 35 7 Rp 245,000.00
3 3965 4 4956 3 0 Rp -
19 13 5 18 27 8 Rp 280,000.00
6 13 5 18 9 3 Rp 157,500.00
1 13 5 18 1 0 Rp -
0 13 5 18 0 0 Rp -
13 37 5 52 18 5 Rp 200,000.00
13 37 5 52 18 5 Rp 262,500.00
1 37 5 52 2 1 Rp 55,000.00
0 37 5 52 0 0 Rp -
0 494 4 617 0 0 Rp -
3 494 4 617 4 1 Rp 52,500.00
3 494 4 617 4 1 Rp 35,000.00
0 494 4 617 0 0 Rp -
3 2 5 2 4 1 Rp 35,000.00
1 2 5 2 1 0 Rp -
0 2 5 2 0 0 Rp -
0 2 5 2 0 0 Rp -
7 21 5 30 10 3 Rp 120,000.00
7 21 5 30 10 3 Rp 157,500.00
1 21 5 30 1 0 Rp -
0 21 5 30 0 0 Rp -
0 213 3 354 0 0 Rp -
1 213 3 354 2 1 Rp 52,500.00
1 213 3 354 2 1 Rp 35,000.00
0 213 3 354 0 0 Rp -
1 1 5 1 2 1 Rp 35,000.00
0 1 5 1 1 1 Rp 52,500.00
0 1 5 1 0 0 Rp -
0 1 5 1 0 0 Rp -
11 33 6 39 12 1 Rp 40,000.00
11 33 6 39 13 2 Rp 105,000.00
1 33 6 39 1 0 Rp -
0 33 6 39 0 0 Rp -
0 147 3 245 0 0 Rp -
1 147 3 245 2 1 Rp 52,500.00
1 147 3 245 2 1 Rp 35,000.00
0 147 3 245 0 0 Rp -
1 1 5 1 2 1 Rp 35,000.00
0 1 5 1 1 1 Rp 52,500.00
0 1 5 1 0 0 Rp -
0 1 5 1 0 0 Rp -
40 124 3 165 53 13 Rp 520,000.00
41 124 3 165 54 13 Rp 682,500.00
4 124 3 165 5 1 Rp 55,000.00
1 124 3 165 1 0 Rp -
1 3436 2 5154 2 1 Rp 60,000.00
24 3436 2 5154 36 12 Rp 630,000.00
24 3436 2 5154 36 12 Rp 420,000.00
2 3436 2 5154 4 2 Rp 110,000.00
39 26 3 26 39 0 Rp -
13 26 3 26 13 0 Rp -
1 26 3 26 1 0 Rp -
0 26 3 26 0 0 Rp -
4 13 10 16 5 1 Rp 40,000.00
4 13 10 16 5 1 Rp 52,500.00
0 13 10 16 1 1 Rp 55,000.00
0 13 10 16 0 0 Rp -
0 1023 4 1279 0 0 Rp -
7 1023 4 1279 9 2 Rp 105,000.00
7 1023 4 1279 9 2 Rp 70,000.00
1 1023 4 1279 1 0 Rp -
3 2 8 2 3 0 Rp -
1 2 8 2 1 0 Rp -
0 2 8 2 0 0 Rp -
0 2 8 2 0 0 Rp -
8 25 10 30 10 2 Rp 80,000.00
8 25 10 30 10 2 Rp 105,000.00
1 25 10 30 1 0 Rp -
0 25 10 30 0 0 Rp -
1 1854 8 2086 1 0 Rp -
13 1854 8 2086 15 2 Rp 105,000.00
13 1854 8 2086 15 2 Rp 70,000.00
1 1854 8 2086 1 0 Rp -
14 9 8 11 16 2 Rp 70,000.00
5 9 8 11 5 0 Rp -
0 9 8 11 1 1 Rp 55,000.00
0 9 8 11 0 0 Rp -
10 30 3 40 13 3 Rp 120,000.00
10 30 3 40 13 3 Rp 157,500.00
1 30 3 40 1 0 Rp -
0 30 3 40 0 0 Rp -
0 1424 2 2136 1 1 Rp 60,000.00
10 1424 2 2136 15 5 Rp 262,500.00
10 1424 2 2136 15 5 Rp 175,000.00
1 1424 2 2136 1 0 Rp -
16 11 2 16 24 8 Rp 280,000.00
5 11 2 16 8 3 Rp 157,500.00
1 11 2 16 1 0 Rp -
0 11 2 16 0 0 Rp -
22 66 3 87 30 8 Rp 320,000.00
23 66 3 87 31 8 Rp 420,000.00
2 66 3 87 3 1 Rp 55,000.00
0 66 3 87 1 1 Rp 60,000.00
0 644 2 965 0 0 Rp -
5 644 2 965 7 2 Rp 105,000.00
5 644 2 965 7 2 Rp 70,000.00
0 644 2 965 1 1 Rp 55,000.00
5 3 3 3 5 0 Rp -
2 3 3 3 2 0 Rp -
0 3 3 3 0 0 Rp -
0 3 3 3 0 0 Rp -
12 38 3 50 16 4 Rp 160,000.00
12 38 3 50 17 5 Rp 262,500.00
1 38 3 50 2 1 Rp 55,000.00
0 38 3 50 0 0 Rp -
0 354 2 532 0 0 Rp -
2 354 2 532 4 2 Rp 105,000.00
2 354 2 532 4 2 Rp 70,000.00
0 354 2 532 0 0 Rp -
3 2 2 3 4 1 Rp 35,000.00
1 2 2 3 1 0 Rp -
0 2 2 3 0 0 Rp -
0 2 2 3 0 0 Rp -
19 59 3 78 25 6 Rp 240,000.00
19 59 3 78 26 7 Rp 367,500.00
2 59 3 78 3 1 Rp 55,000.00
0 59 3 78 0 0 Rp -
0 262 2 392 0 0 Rp -
2 262 2 392 3 1 Rp 52,500.00
2 262 2 392 3 1 Rp 35,000.00
0 262 2 392 0 0 Rp -
3 2 2 3 4 1 Rp 35,000.00
1 2 2 3 1 0 Rp -
0 2 2 3 0 0 Rp -
0 2 2 3 0 0 Rp -
15 46 3 61 20 5 Rp 200,000.00
15 46 3 61 20 5 Rp 262,500.00
2 46 3 61 2 0 Rp -
0 46 3 61 0 0 Rp -
1 2864 2 4296 1 0 Rp -
20 2864 2 4296 30 10 Rp 525,000.00
20 2864 2 4296 30 10 Rp 350,000.00
2 2864 2 4296 3 1 Rp 55,000.00
49 33 3 33 49 0 Rp -
16 33 3 33 16 0 Rp -
2 33 3 33 2 0 Rp -
0 33 3 33 0 0 Rp -
1 2 10 3 1 0 Rp -
1 2 10 3 1 0 Rp -
0 2 10 3 0 0 Rp -
0 2 10 3 0 0 Rp -
0 210 8 236 0 0 Rp -
1 210 8 236 2 1 Rp 52,500.00
1 210 8 236 2 1 Rp 35,000.00
0 210 8 236 0 0 Rp -
1 1 5 1 2 1 Rp 35,000.00
0 1 5 1 1 1 Rp 52,500.00
0 1 5 1 0 0 Rp -
0 1 5 1 0 0 Rp -
4 12 3 16 5 1 Rp 40,000.00
4 12 3 16 5 1 Rp 52,500.00
0 12 3 16 1 1 Rp 55,000.00
0 12 3 16 0 0 Rp -
0 834 2 1250 0 0 Rp -
6 834 2 1250 9 3 Rp 157,500.00
6 834 2 1250 9 3 Rp 105,000.00
1 834 2 1250 1 0 Rp -
6 4 2 6 9 3 Rp 105,000.00
2 4 2 6 3 1 Rp 52,500.00
0 4 2 6 0 0 Rp -
0 4 2 6 0 0 Rp -
1 4 3 6 2 1 Rp 40,000.00
1 4 3 6 2 1 Rp 52,500.00
0 4 3 6 0 0 Rp -
0 4 3 6 0 0 Rp -
0 381 2 572 0 0 Rp -
3 381 2 572 4 1 Rp 52,500.00
3 381 2 572 4 1 Rp 35,000.00
0 381 2 572 0 0 Rp -
4 3 3 3 4 0 Rp -
1 3 3 3 1 0 Rp -
0 3 3 3 0 0 Rp -
0 3 3 3 0 0 Rp -
TOTAL BIAYA PERCEPATAN DENGAN TAMABAH PEKERJA Rp 13,307,500.00
80
#VALUE!
653
Kepala Tukang
295 6
R P
515 32 40 53
346 22 41 54
67 4 4 5
402 25 28 36
197 12 24 36
15 15 2 3
JENIS PEKERJA VOLUME HARGA
PEKERJA
UPAH LEMBUR/JAM Rp 5,000.00
1MINGGU 42
JUMLAH PEKERJA LEMBUR 53
TOTAL JAM LEMBUR 336
BIAYA 17808 Rp 89,040,000.00
PEKERJA TAK TERAMPIL 6.25
UPAH LEMBUR/JAM Rp 4,000.00
1MINGGU 42
JUMLAH PEKERJA LEMBUR 36
TOTAL JAM LEMBUR 336
BIAYA 12096 Rp 48,384,000.00
TUKANG BESI
UPAH LEMBUR/JAM Rp 6,000.00
1MINGGU 42
JUMLAH PEKERJA LEMBUR 36
TOTAL JAM LEMBUR 336
BIAYA 12096 Rp 72,576,000.00
MANDOR
UPAH LEMBUR/JAM Rp 8,000.00
1MINGGU 42
JUMLAH PEKERJA LEMBUR 3
TOTAL JAM LEMBUR 336
BIAYA 1008 Rp 8,064,000.00
KEPALA TUKANG
UPAH LEMBUR/JAM Rp 7,000.00
1MINGGU 42
JUMLAH PEKERJA LEMBUR 5
TOTAL JAM LEMBUR 336
BIAYA 1680 Rp 11,760,000.00
TUKANG
UPAH LEMBUR/JAM Rp 6,500.00
1MINGGU 42
JUMLAH PEKERJA LEMBUR 54
TOTAL JAM LEMBUR 336
BIAYA 18144 Rp 117,936,000.00
SURVEYOR
UPAH LEMBUR/JAM Rp 8,000.00
1MINGGU 42
JUMLAH PEKERJA LEMBUR 1
TOTAL JAM LEMBUR 336
BIAYA 336 Rp 2,688,000.00
ASISTEN SURVEYOR
UPAH LEMBUR/JAM Rp 6,000.00
1MINGGU 42
JUMLAH PEKERJA LEMBUR 2
TOTAL JAM LEMBUR 336
BIAYA 672 Rp 4,032,000.00
TOTAL BIAYA LEMBUR Rp 354,480,000.00
JENIS JUMLAH JUMLAH UPAH LEMBUR JUMLAH (Rp)
PEKERJA PEKERJA JAM LEMBUR /HARI /JAM (Rp)
Surveyor (Free Line) 1 6 Rp 8,000.00 Rp 48,000.00
2 6 Rp 6,000.00 Rp 72,000.00
Administrasi Keuangan 1 6 Rp 7,500.00 Rp 45,000.00
Mandor 3 6 Rp 6,500.00 Rp 117,000.00
Kepala Tukang 5 6 Rp 8,000.00 Rp 240,000.00
Asisten Surveyor (Free Line)
Tukang 54 6 Rp 6,000.00 Rp 1,944,000.00
Tukang besi 36 6 Rp 6,000.00 Rp 1,296,000.00
Pekerja Tak Terampil 36 6 Rp 5,000.00 Rp 1,080,000.00
Pekerja 53 6 Rp 4,000.00 Rp 1,272,000.00
JUMLAH Rp 2,466,000.00
Jenis Pekerja Jumlah
Mandor 3
Kepala Tukang 14
Tukang 80
Tukang Besi 58
Pekerja Tak Terampil 85
Pekerja 60
RENCANA ANGGARAN BIAYA ( RAB ) RENCANA STRUKTUR
PEMBANGUNAN GEDUNG MENEJEMEN 4 LANTAI
RUMAH SAKIT UMUM DAERAH dr. SOEDONO MADIUN
JALAN Dr. SOETOMO No. 29 MADIUN - JAWA TIMUR
No. URAIAN PEK. VOL.HARGA ( Rp. )
SATUAN JUMLAH
A. LANTAI - I (± 0.00)
A.1. PEK. STRUKTUR
1 Beton Kolom
Bekisting 260.800 Rp 155,230.50 Rp 40,484,114.40
Pembesian 7136.560 kg Rp 8,299.00 Rp 59,226,308.60
Ready Mix K-250 28.734 Rp 603,350.00 Rp 17,336,839.91
2 Beton Balok
Bekisting 618.622 Rp 136,592.50 Rp 84,499,125.54
Pembesian 23,911.90 kg Rp 8,299.00 Rp 198,444,831.87
Ready Mix K-250 131.457 Rp 603,350.00 Rp 79,314,415.03
3 Pek. Tangga Utama
Bekisting 234.061 Rp 117,030.51 Rp 27,392,281.71
Pembesian 1213.179 kg Rp 8,299.00 Rp 10,068,172.73
Ready Mix K-250 5.953 Rp 603,350.00 Rp 3,591,440.88
4 Pek. Lift Utama
Bekisting 150.320 Rp 107,762.25 Rp 16,198,820.74
Pembesian 1140.884 kg Rp 8,299.00 Rp 9,468,197.77
Ready Mix K-250 5.486 Rp 603,350.00 Rp 3,309,978.10
5 Pek. Ramp Beton
Bekisting 103.434 Rp 153,972.46 Rp 15,926,036.18
Pembesian 1846.631 kg Rp 8,299.00 Rp 15,325,186.52
Ready Mix K-175 28.203 Rp 542,150.00 Rp 15,290,467.89
6 Pek. Plat
Bekisting 590.200 Rp 150,592.50 Rp 88,879,693.50
Pembesian 12933.503 kg Rp 8,299.00 Rp 107,335,141.25
Ready mix K-250 98.630 Rp 603,350.00 Rp 59,508,651.84
Sub Total A. LANTAI - I (di atas ± 0.00) Rp 851,599,704.45
B. LANTAI - II (+ 4.50)
B.1. PEK. STRUKTUR
1 Beton Kolom
Bekisting 241.600 Rp 169,201.25 Rp 40,879,020.79
Pembesian 7651.197 kg Rp 9,045.91 Rp 69,212,035.47
Ready Mix K-250 24.320 Rp 657,651.50 Rp 15,994,084.48
2 Beton Balok
Bekisting 606.877 Rp 148,885.83 Rp 90,355,382.82
Pembesian 19993.060 kg Rp 9,045.91 Rp 180,855,417.10
Ready Mix K-250 91.406 Rp 657,651.50 Rp 60,113,523.19
SAT.
m2
m3
m2
m3
m2
m3
m2
m3
m2
m3
m2
m3
m2
m3
m2
m3
3 Pek. Tangga Utama
Bekisting 255.127 Rp 127,563.26 Rp 32,544,769.90
Pembesian 2834.997 kg Rp 8,920.02 Rp 25,288,216.66
Ready Mix K-250 13.910 Rp 657,651.50 Rp 9,147,932.37
4 Pek. Lift Utama
Bekisting 150.320 Rp 107,762.25 Rp 16,198,820.74
Pembesian 1882.100 kg Rp 8,299.00 Rp 15,619,547.90
Ready Mix K-250 4.712 Rp 657,651.50 Rp 3,098,853.87
5 Pek. Tangga Darurat
Bekisting 127.563 Rp 153,972.46 Rp 19,641,228.10
Pembesian 994.160 kg Rp 8,920.02 Rp 8,867,919.47
Ready Mix K-175 4.878 Rp 607,208.00 Rp 2,961,884.72
6 Pek. Plat
Bekisting 590.200 Rp 164,145.83 Rp 96,878,865.92
Pembesian 10774.772 kg Rp 8,299.00 Rp 89,419,832.89
Ready mix K-250 82.168 Rp 657,651.50 Rp 54,037,908.45
Sub Total B. LANTAI - II (di atas + 4.50) Rp 831,115,244.84
C. LANTAI - III (+8.50)
C.1. PEK. STRUKTUR
1 Beton Kolom
Bekisting 193.600 Rp 173,858.16 Rp 33,658,939.78
Pembesian 6213.939 kg Rp 9,294.88 Rp 57,757,815.47
Ready Mix K-250 22.520 Rp 675,752.00 Rp 15,217,935.04
2 Beton Balok
Bekisting 473.165 Rp 152,983.60 Rp 72,386,485.09
Pembesian 19823.950 kg Rp 9,294.88 Rp 184,261,232.19
Ready Mix K-250 90.831 Rp 675,752.00 Rp 61,379,223.15
3 Pek. Tangga Utama
Bekisting 262.148 Rp 153,972.46 Rp 40,363,624.72
Pembesian 2468.139 kg Rp 9,165.52 Rp 22,621,778.28
Ready Mix K-250 12.110 Rp 675,752.00 Rp 8,183,356.72
4 Pek. Lift Utama
Bekisting 150.320 Rp 118,753.68 Rp 17,851,053.25
Pembesian 1063.073 kg Rp 9,165.52 Rp 9,743,616.48
Ready Mix K-250 5.216 Rp 675,752.00 Rp 3,524,722.43
5 Pek. Tangga Darurat
Bekisting 234.061 Rp 153,972.46 Rp 36,038,950.64
Pembesian 734.667 kg Rp 9,165.52 Rp 6,733,600.52
Ready Mix K-175 5.953 Rp 607,208.00 Rp 3,614,405.62
6 Pek. Plat
Bekisting 494.200 Rp 168,663.60 Rp 83,353,551.12
Pembesian 10308.365 kg Rp 9,165.52 Rp 94,481,528.02
Ready mix K-250 78.611 Rp 675,752.00 Rp 53,121,675.62
Sub Total C. LANTAI - III (di atas +8.50) Rp 804,293,494.15
D. LANTAI - IV (+12.50)
m2
m3
m2
m3
m2
m3
m2
m3
m2
m3
m2
m3
m2
m3
m2
m3
m2
m3
m2
m3
D.1. PEK. STRUKTUR
1 Beton Kolom
Bekisting 156.800 Rp 176,186.62 Rp 27,626,061.62
Pembesian 5114.786 kg Rp 9,419.37 Rp 48,178,036.23
Ready Mix K-250 18.520 Rp 684,802.25 Rp 12,682,537.67
2 Beton Balok
Bekisting 301.382 Rp 155,032.49 Rp 46,724,001.15
Pembesian 16686.882 kg Rp 9,419.37 Rp 157,179,834.70
Ready Mix K-250 84.557 Rp 684,802.25 Rp 57,905,097.77
3 Pek. Lisplank
Bekisting 120.610 Rp 132,829.63 Rp 16,020,581.88
Pembesian 4271.891 kg Rp 9,419.37 Rp 40,238,504.81
Ready Mix K-250 32.005 Rp 684,802.25 Rp 21,917,096.01
4 Pek. Tangga Utama
Bekisting 262.148 Rp 132,829.63 Rp 34,821,068.51
Pembesian 1930.896 kg Rp 9,288.27 Rp 17,934,687.66
Ready Mix K-250 9.474 Rp 684,802.25 Rp 6,487,816.52
5 Pek. Lift Utama
Bekisting 150.320 Rp 132,829.63 Rp 19,966,950.24
Pembesian 1063.073 kg Rp 8,299.00 Rp 8,822,442.50
Ready Mix K-250 5.216 Rp 684,802.25 Rp 3,571,928.54
6 Pek. Tangga Darurat
Bekisting 234.061 Rp 153,972.46 Rp 36,038,950.64
Pembesian 784.508 kg Rp 8,299.00 Rp 6,510,629.72
Ready Mix K-175 5.065 Rp 615,340.25 Rp 3,116,698.37
7 Pek. Plat
Bekisting 183.000 Rp 170,922.49 Rp 31,278,815.21
Pembesian 8591.247 kg Rp 9,288.27 Rp 79,797,841.25
Ready mix K-250 97.522 Rp 684,802.25 Rp 66,782,956.32
Sub Total D. LANTAI - III (di atas +8.50) Rp 743,602,537.30
E. L. R.LIFT-V- (+16.50)
E.1. PEK. STRUKTUR
1 Beton Kolom
Bekisting 29.170 Rp 180,377.84 Rp 5,261,621.62
Pembesian 1889.219 kg Rp 9,643.44 Rp 18,218,564.37
Ready Mix K-250 7.293 Rp 701,092.70 Rp 5,112,718.51
2 Beton Balok
Bekisting 46.998 Rp 158,720.49 Rp 7,459,545.35
Pembesian 2500.526 kg Rp 9,643.44 Rp 24,113,666.37
Ready Mix K-250 11.750 Rp 701,092.70 Rp 8,237,488.68
3 Pek. Plat
Bekisting 17.442 Rp 174,988.49 Rp 3,052,149.16
Pembesian 1143.593 kg Rp 9,509.23 Rp 10,874,689.72
Ready mix K-250 8.721 Rp 701,092.70 Rp 6,114,229.44
Sub Total E. LANTAI - V- (di atas +12.50) Rp 88,444,673.22
m2
m3
m2
m3
m2
m3
m2
m3
m2
m3
m2
m3
m2
m3
m2
m3
m2
m3
m2
m3
Total Rp 3,319,055,653.95
-
-
-
-
-
RENCANA ANGGARAN BIAYA ( RAB ) RENCANA STRUKTUR
PEMBANGUNAN GEDUNG MENEJEMEN 4 LANTAI
RUMAH SAKIT UMUM DAERAH dr. SOEDONO MADIUN
JALAN Dr. SOETOMO No. 29 MADIUN - JAWA TIMUR
No. URAIAN PEK. VOL.HARGA ( Rp. )
SATUAN JUMLAH
A. LANTAI - I (± 0.00)
A.1. PEK. STRUKTUR
1 Beton Kolom
Bekisting 260.800 Rp 155,230.50 Rp 40,484,114.40
Pembesian 7136.560 kg Rp 8,299.00 Rp 59,226,308.60
Ready Mix K-250 28.734 Rp 603,350.00 Rp 17,336,839.91
2 Beton Balok
Bekisting 618.622 Rp 136,592.50 Rp 84,499,125.54
Pembesian 23,911.90 kg Rp 8,299.00 Rp 198,444,831.87
Ready Mix K-250 131.457 Rp 603,350.00 Rp 79,314,415.03
3 Pek. Tangga Utama
Bekisting 234.061 Rp 117,030.51 Rp 27,392,281.71
Pembesian 1213.179 kg Rp 8,299.00 Rp 10,068,172.73
Ready Mix K-250 5.953 Rp 603,350.00 Rp 3,591,440.88
4 Pek. Lift Utama
Bekisting 150.320 Rp 107,762.25 Rp 16,198,820.74
Pembesian 1140.884 kg Rp 8,299.00 Rp 9,468,197.77
Ready Mix K-250 5.486 Rp 603,350.00 Rp 3,309,978.10
5 Pek. Ramp Beton
Bekisting 103.434 Rp 153,972.46 Rp 15,926,036.18
Pembesian 1846.631 kg Rp 8,299.00 Rp 15,325,186.52
Ready Mix K-175 28.203 Rp 542,150.00 Rp 15,290,467.89
6 Pek. Plat
Bekisting 590.200 Rp 150,592.50 Rp 88,879,693.50
Pembesian 12933.503 kg Rp 8,299.00 Rp 107,335,141.25
Ready mix K-250 98.630 Rp 603,350.00 Rp 59,508,651.84
Sub Total A. LANTAI - I (di atas ± 0.00) Rp 851,599,704.45
B PENANGGULANGAN
Peneragan (lampu mercury) 15 Bj Rp 675,000.00 Rp 10,125,000.00
Peneragan (Kabel lampu mercury) 500 m Rp 22,500.00 Rp 11,250,000.00
Sub Total B Rp 21,375,000.00
C. LANTAI - II (+ 4.50)
C.1. PEK. STRUKTUR
1 Beton Kolom
Bekisting 241.600 Rp 169,201.25 Rp 40,879,020.79
Pembesian 7651.197 kg Rp 9,045.91 Rp 69,212,035.47
Ready Mix K-250 24.320 Rp 657,651.50 Rp 15,994,084.48
SAT.
m2
m3
m2
m3
m2
m3
m2
m3
m2
m3
m2
m3
m2
m3
2 Beton Balok
Bekisting 606.877 Rp 148,885.83 Rp 90,355,382.82
Pembesian 19993.060 kg Rp 9,045.91 Rp 180,855,417.10
Ready Mix K-250 91.406 Rp 657,651.50 Rp 60,113,523.19
3 Pek. Tangga Utama
Bekisting 255.127 Rp 127,563.26 Rp 32,544,769.90
Pembesian 2834.997 kg Rp 8,920.02 Rp 25,288,216.66
Ready Mix K-250 13.910 Rp 657,651.50 Rp 9,147,932.37
4 Pek. Lift Utama
Bekisting 150.320 Rp 107,762.25 Rp 16,198,820.74
Pembesian 1882.100 kg Rp 8,299.00 Rp 15,619,547.90
Ready Mix K-250 4.712 Rp 657,651.50 Rp 3,098,853.87
5 Pek. Tangga Darurat
Bekisting 127.563 Rp 153,972.46 Rp 19,641,228.10
Pembesian 994.160 kg Rp 8,920.02 Rp 8,867,919.47
Ready Mix K-175 4.878 Rp 607,208.00 Rp 2,961,884.72
6 Pek. Plat
Bekisting 590.200 Rp 164,145.83 Rp 96,878,865.92
Pembesian 10774.772 kg Rp 8,299.00 Rp 89,419,832.89
Ready mix K-250 82.168 Rp 657,651.50 Rp 54,037,908.45
Sub Total C. LANTAI - II (di atas + 4.50) Rp 831,115,244.84
D. LANTAI - III (+8.50)
D.1. PEK. STRUKTUR
1 Beton Kolom
Bekisting 193.600 Rp 173,858.16 Rp 33,658,939.78
Pembesian 6213.939 kg Rp 9,294.88 Rp 57,757,815.47
Ready Mix K-250 22.520 Rp 675,752.00 Rp 15,217,935.04
2 Beton Balok
Bekisting 473.165 Rp 152,983.60 Rp 72,386,485.09
Pembesian 19823.950 kg Rp 9,294.88 Rp 184,261,232.19
Ready Mix K-250 90.831 Rp 675,752.00 Rp 61,379,223.15
3 Pek. Tangga Utama
Bekisting 262.148 Rp 153,972.46 Rp 40,363,624.72
Pembesian 2468.139 kg Rp 9,165.52 Rp 22,621,778.28
Ready Mix K-250 12.110 Rp 675,752.00 Rp 8,183,356.72
4 Pek. Lift Utama
Bekisting 150.320 Rp 118,753.68 Rp 17,851,053.25
Pembesian 1063.073 kg Rp 9,165.52 Rp 9,743,616.48
Ready Mix K-250 5.216 Rp 675,752.00 Rp 3,524,722.43
5 Pek. Tangga Darurat
Bekisting 234.061 Rp 153,972.46 Rp 36,038,950.64
Pembesian 734.667 kg Rp 9,165.52 Rp 6,733,600.52
Ready Mix K-175 5.953 Rp 607,208.00 Rp 3,614,405.62
6 Pek. Plat
Bekisting 494.200 Rp 168,663.60 Rp 83,353,551.12
m2
m3
m2
m3
m2
m3
m2
m3
m2
m3
m2
m3
m2
m3
m2
m3
m2
m3
m2
m3
m2
Pembesian 10308.365 kg Rp 9,165.52 Rp 94,481,528.02
Ready mix K-250 78.611 Rp 675,752.00 Rp 53,121,675.62
Sub Total D. LANTAI - III (di atas +8.50) Rp 804,293,494.15
E. LANTAI - IV (+12.50)
E.1. PEK. STRUKTUR
1 Beton Kolom
Bekisting 156.800 Rp 176,186.62 Rp 27,626,061.62
Pembesian 5114.786 kg Rp 9,419.37 Rp 48,178,036.23
Ready Mix K-250 18.520 Rp 684,802.25 Rp 12,682,537.67
2 Beton Balok
Bekisting 301.382 Rp 155,032.49 Rp 46,724,001.15
Pembesian 16686.882 kg Rp 9,419.37 Rp 157,179,834.70
Ready Mix K-250 84.557 Rp 684,802.25 Rp 57,905,097.77
3 Pek. Lisplank
Bekisting 120.610 Rp 132,829.63 Rp 16,020,581.88
Pembesian 4271.891 kg Rp 9,419.37 Rp 40,238,504.81
Ready Mix K-250 32.005 Rp 684,802.25 Rp 21,917,096.01
4 Pek. Tangga Utama
Bekisting 262.148 Rp 132,829.63 Rp 34,821,068.51
Pembesian 1930.896 kg Rp 9,288.27 Rp 17,934,687.66
Ready Mix K-250 9.474 Rp 684,802.25 Rp 6,487,816.52
5 Pek. Lift Utama
Bekisting 150.320 Rp 132,829.63 Rp 19,966,950.24
Pembesian 1063.073 kg Rp 8,299.00 Rp 8,822,442.50
Ready Mix K-250 5.216 Rp 684,802.25 Rp 3,571,928.54
6 Pek. Tangga Darurat
Bekisting 234.061 Rp 153,972.46 Rp 36,038,950.64
Pembesian 784.508 kg Rp 8,299.00 Rp 6,510,629.72
Ready Mix K-175 5.065 Rp 615,340.25 Rp 3,116,698.37
7 Pek. Plat
Bekisting 183.000 Rp 170,922.49 Rp 31,278,815.21
Pembesian 8591.247 kg Rp 9,288.27 Rp 79,797,841.25
Ready mix K-250 97.522 Rp 684,802.25 Rp 66,782,956.32
Sub Total E. LANTAI - III (di atas +8.50) Rp 743,602,537.30
F. L. R.LIFT-V- (+16.50)
F.1. PEK. STRUKTUR
1 Beton Kolom
Bekisting 29.170 Rp 180,377.84 Rp 5,261,621.62
Pembesian 1889.219 kg Rp 9,643.44 Rp 18,218,564.37
Ready Mix K-250 7.293 Rp 701,092.70 Rp 5,112,718.51
2 Beton Balok
Bekisting 46.998 Rp 158,720.49 Rp 7,459,545.35
Pembesian 2500.526 kg Rp 9,643.44 Rp 24,113,666.37
Ready Mix K-250 11.750 Rp 701,092.70 Rp 8,237,488.68
3 Pek. Plat
m3
m2
m3
m2
m3
m2
m3
m2
m3
m2
m3
m2
m3
m2
m3
m2
m3
m2
m3
Bekisting 17.442 Rp 174,988.49 Rp 3,052,149.16
Pembesian 1143.593 kg Rp 9,509.23 Rp 10,874,689.72
Ready mix K-250 8.721 Rp 701,092.70 Rp 6,114,229.44
Sub Total F. LANTAI - V- (di atas +12.50) Rp 88,444,673.22
G. HARGA TOTAL LEMBUR Rp354,480,000.00
H. BIAYA OPERASIONAL ALAT BERAT Rp217,200,000.00
Total Rp 3,912,110,653.95
Rp 593,055,000.00
m2
m3
-
-
-
-
-
BOBOT RENCANA STRUKTUR
PEMBANGUNAN GEDUNG MENEJEMEN 4 LANTAI
RUMAH SAKIT UMUM DAERAH dr. SOEDONO MADIUN
JALAN Dr. SOETOMO No. 29 MADIUN - JAWA TIMUR
No. URAIAN PEKERJAAN
A. LANTAI - I (di atas ± 0.00)
A.1. PEKERJAAN STRUKTUR
1 Beton Kolom
Bekisting Rp 40,484,114.40 X 100% = 1.22%
Rp 3,319,055,653.95
Pembesian Rp 59,226,308.60 X 100% = 1.78%
Rp 3,319,055,653.95
Ready Mix K-250 Rp 17,336,839.91 X 100% = 0.52%
Rp 3,319,055,653.95
2 Beton Balok
Bekisting Rp 84,499,125.54 X 100% = 2.55%
Rp 3,319,055,653.95
Pembesian Rp 198,444,831.87 X 100% = 5.98%
Rp 3,319,055,653.95
Ready Mix K-250 Rp 79,314,415.03 X 100% = 2.39%
Rp 3,319,055,653.95
3 Pek. Tangga Utama
Bekisting Rp 27,392,281.71 X 100% = 0.83%
Rp 3,319,055,653.95
Pembesian Rp 10,068,172.73 X 100% = 0.30%
Rp 3,319,055,653.95
Ready Mix K-250 Rp 3,591,440.88 X 100% = 0.11%
Rp 3,319,055,653.95
4 Pek. Lift Utama
Bekisting Rp 16,198,820.74 X 100% = 0.49%
Rp 3,319,055,653.95
Pembesian Rp 9,468,197.77 X 100% = 0.29%
Rp 3,319,055,653.95
Ready Mix K-250 Rp 3,309,978.10 X 100% = 0.10%
Rp 3,319,055,653.95
5 Pek. Ramp Beton
Bekisting Rp 15,926,036.18 X 100% = 0.48%
Rp 3,319,055,653.95
Pembesian Rp 15,325,186.52 X 100% = 0.46%
Rp 3,319,055,653.95
Ready Mix K-175 Rp 15,290,467.89 X 100% = 0.46%
Rp 3,319,055,653.95
6 Pek. Plat
Bekisting Rp 88,879,693.50 X 100% = 2.68%
Rp 3,319,055,653.95
Pembesian Rp 107,335,141.25 X 100% = 3.23%
Rp 3,319,055,653.95
Ready mix K-250 Rp 59,508,651.84 X 100% = 1.79%
Rp 3,319,055,653.95
B. LANTAI - II (di atas + 4.50)
B.1. PEKERJAAN STRUKTUR
1 Beton Kolom
Bekisting Rp 40,879,020.79 X 100% = 1.23%
Rp 3,319,055,653.95
Pembesian Rp 69,212,035.47 X 100% = 2.09%
Rp 3,319,055,653.95
Ready Mix K-250 Rp 15,994,084.48 X 100% = 0.48%
Rp 3,319,055,653.95
2 Beton Balok
Bekisting Rp 90,355,382.82 X 100% = 2.72%
Rp 3,319,055,653.95
Pembesian Rp 180,855,417.10 X 100% = 5.45%
Rp 3,319,055,653.95
Ready Mix K-250 Rp 60,113,523.19 X 100% = 1.81%
Rp 3,319,055,653.95
3 Pek. Tangga Utama
Bekisting Rp 32,544,769.90 X 100% = 0.98%
Rp 3,319,055,653.95
Pembesian Rp 25,288,216.66 X 100% = 0.76%
Rp 3,319,055,653.95
Ready Mix K-250 Rp 9,147,932.37 X 100% = 0.28%
Rp 3,319,055,653.95
4 Pek. Lift Utama
Bekisting Rp 16,198,820.74 X 100% = 0.49%
Rp 3,319,055,653.95
Pembesian Rp 15,619,547.90 X 100% = 0.47%
Rp 3,319,055,653.95
Ready Mix K-250 Rp 3,098,853.87 X 100% = 0.09%
Rp 3,319,055,653.95
5 Pek. Tangga Darurat
Bekisting Rp 19,641,228.10 X 100% = 0.59%
Rp 3,319,055,653.95
Pembesian Rp 8,867,919.47 X 100% = 0.27%
Rp 3,319,055,653.95
Ready Mix K-175 Rp 2,961,884.72 X 100% = 0.09%
Rp 3,319,055,653.95
6 Pek. Plat
Bekisting Rp 96,878,865.92 X 100% = 2.92%
Rp 3,319,055,653.95
Pembesian Rp 89,419,832.89 X 100% = 2.69%
Rp 3,319,055,653.95
Ready mix K-250 Rp 54,037,908.45 X 100% = 1.63%
Rp 3,319,055,653.95
C. LANTAI - III (di atas +8.50)
C.1. PEKERJAAN STRUKTUR
1 Beton Kolom
Bekisting Rp 33,658,939.78 X 100% = 1.01%
Rp 3,319,055,653.95
Pembesian Rp 57,757,815.47 X 100% = 1.74%
Rp 3,319,055,653.95
Ready Mix K-250 Rp 15,217,935.04 X 100% = 0.46%
Rp 3,319,055,653.95
2 Beton Balok
Bekisting Rp 72,386,485.09 X 100% = 2.18%
Rp 3,319,055,653.95
Pembesian Rp 184,261,232.19 X 100% = 5.55%
Rp 3,319,055,653.95
Ready Mix K-250 Rp 61,379,223.15 X 100% = 1.85%
Rp 3,319,055,653.95
3 Pek. Tangga Utama
Bekisting Rp 40,363,624.72 X 100% = 1.22%
Rp 3,319,055,653.95
Pembesian Rp 22,621,778.28 X 100% = 0.68%
Rp 3,319,055,653.95
Ready Mix K-250 Rp 8,183,356.72 X 100% = 0.25%
Rp 3,319,055,653.95
4 Pek. Lift Utama
Bekisting Rp 17,851,053.25 X 100% = 0.54%
Rp 3,319,055,653.95
Pembesian Rp 9,743,616.48 X 100% = 0.29%
Rp 3,319,055,653.95
Ready Mix K-250 Rp 3,524,722.43 X 100% = 0.11%
Rp 3,319,055,653.95
5 Pek. Tangga Darurat
Bekisting Rp 36,038,950.64 X 100% = 1.09%
Rp 3,319,055,653.95
Pembesian Rp 6,733,600.52 X 100% = 0.20%
Rp 3,319,055,653.95
Ready Mix K-175 Rp 3,614,405.62 X 100% = 0.11%
Rp 3,319,055,653.95
6 Pek. Plat
Bekisting Rp 83,353,551.12 X 100% = 2.51%
Rp 3,319,055,653.95 X 100% = 2.51%
Pembesian Rp 94,481,528.02 X 100% = 2.85%
Rp 3,319,055,653.95
Ready mix K-250 Rp 53,121,675.62 X 100% = 1.60%
Rp 3,319,055,653.95
D. LANTAI - IV (di atas+12.50)
D.1. PEKERJAAN STRUKTUR
1 Beton Kolom
Bekisting Rp 27,626,061.62 X 100% = 0.83%
Rp 3,319,055,653.95
Pembesian Rp 48,178,036.23 X 100% = 1.45%
Rp 3,319,055,653.95
Ready Mix K-250 Rp 12,682,537.67 X 100% = 0.38%
Rp 3,319,055,653.95
2 Beton Balok
Bekisting Rp 46,724,001.15 X 100% = 1.41%
Rp 3,319,055,653.95
Pembesian Rp 157,179,834.70 X 100% = 4.74%
Rp 3,319,055,653.95
Ready Mix K-250 Rp 57,905,097.77 X 100% = 1.74%
Rp 3,319,055,653.95
3 Pek. Lisplank
Bekisting Rp 16,020,581.88 X 100% = 0.48%
Rp 3,319,055,653.95
Pembesian Rp 40,238,504.81 X 100% = 1.21%
Rp 3,319,055,653.95
Ready Mix K-250 Rp 21,917,096.01 X 100% = 0.66%
Rp 3,319,055,653.95
4 Pek. Tangga Utama
Bekisting Rp 34,821,068.51 X 100% = 1.05%
Rp 3,319,055,653.95
Pembesian Rp 17,934,687.66 X 100% = 0.54%
Rp 3,319,055,653.95
Ready Mix K-250 Rp 6,487,816.52 X 100% = 0.20%
Rp 3,319,055,653.95
5 Pek. Lift Utama
Bekisting Rp 19,966,950.24 X 100% = 0.60%
Rp 3,319,055,653.95
Pembesian Rp 8,822,442.50 X 100% = 0.27%
Rp 3,319,055,653.95
Ready Mix K-250 Rp 3,571,928.54 X 100% = 0.11%
Rp 3,319,055,653.95
6 Pek. Tangga Darurat
Bekisting Rp 36,038,950.64 X 100% = 1.09%
Rp 3,319,055,653.95
Pembesian Rp 6,510,629.72 X 100% = 0.20%
Rp 3,319,055,653.95
Ready Mix K-175 Rp 3,116,698.37 X 100% = 0.09%
Rp 3,319,055,653.95
7 Pek. Plat
Bekisting Rp 31,278,815.21 X 100% = 0.94%
Rp 3,319,055,653.95
Pembesian Rp 79,797,841.25 X 100% = 2.40%
Rp 3,319,055,653.95
Ready mix K-250 Rp 66,782,956.32 X 100% = 2.01%
Rp 3,319,055,653.95
E. LANTAI -R. LIFT V (di atas+16.50)
E.1. PEKERJAAN STRUKTUR
1 Beton Kolom
Bekisting Rp 5,261,621.62 X 100% = 0.16%
Rp 3,319,055,653.95
Pembesian Rp 18,218,564.37 X 100% = 0.55%
Rp 3,319,055,653.95
Ready Mix K-250 Rp 5,112,718.51 X 100% = 0.15%
Rp 3,319,055,653.95
2 Beton Balok
Bekisting Rp 7,459,545.35 X 100% = 0.22%
Rp 3,319,055,653.95
Pembesian Rp 24,113,666.37 X 100% = 0.73%
Rp 3,319,055,653.95
Ready Mix K-250 Rp 8,237,488.68 X 100% = 0.25%
Rp 3,319,055,653.95
3 Pek. Plat
Bekisting Rp 3,052,149.16 X 100% = 0.09%
Rp 3,319,055,653.95
Pembesian Rp 10,874,689.72 X 100% = 0.33%
Rp 3,319,055,653.95
Ready Mix K-250 Rp 6,114,229.44 X 100% = 0.18%
Rp 3,319,055,653.95
Total 100.00%
-
-
-
-
-
Page 199 of 334
KURVA S RENCANAPEMBANGUNAN GEDUNG MENEJEMEN 4 LANTAI 0.06% 0.58% 0.75% 0.92% 2.62% 3.90% 5.35% 5.50% 6.42% 6.48% 8.08% 7.25% 5.27% 5.19% 4.91% 4.75% 4.54% 4.54% 4.48% 4.47% 3.64% 3.64% 2.66% 2.95% 1.04%RUMAH SAKIT UMUM DAERAH dr. SOEDONO MADIUN 0.58% 0.58% 0.58% 0.60% 3.72% 3.85% 3.55% 6.28% 8.88% 8.88% 5.16% 5.27% 3.28% 4.97% 4.24% 5.69% 7.06% 3.45% 3.42% 5.53% 4.19% 2.75% 2.83% 3.41% 1.26%JALAN Dr. SOETOMO No. 29 MADIUN - JAWA TIMUR 0.58% 1.15% 1.73% 2.32% 6.04% 9.88% ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ###
No. URAIAN PEKERJAANBobot
Jangka Waktu Pelaksanaan = 180 HariSKALABulan Ke-1 Bulan Ke-2 Bulan Ke-3 Bulan Ke-4 Bulan Ke-5 Bulan Ke-6 Bulan Ke-7
% 17-23/01/1124-30/01/1131-06/02/1107-13/02/1114-20/02/1121-27/02/1128-06/03/1107-13/03/1114-20/03/1121-27/03/1128-03/04/1104-10/04/1111-17/04/1118-24/04/1125-01/05/1102-08/05/1109-15/05/1116-22/05/1123-29/05/1130-05/06/1106-12/06/1113-19/06/1120-26/06/1127-03/07/1104-10/07/11A. PEKERJAAN PENDAHULUAN 100.00%
A.1 PEKERJAAN PERSIAPAN2.30 0.58% 0.58% 0.58% 0.58%
A.2 PEKERJAAN TANAH0.04 0.02% 0.02%
A.3 PEKERJAAN URUGAN0.82 0.16% 0.16% 0.16% 0.16% 0.16%
B. PEK. SUB STRUKTUR DIBAWAH ±0.00B.1 PEKERJAAN PONDASI UTAMA 21.32 3.55% 3.55% 3.55% 3.55% 3.55% 3.55%
B.2 PEKERJAAN PONDASI PENDUKUNG 0.13 0.13%C. LANTAI - I -(Di atas ± 0.00)
C.1. PEKERJAAN SIPIL 12.71 2.54% 2.54% 2.54% 2.54% 2.54%C.3. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
C.3.1. PEKERJAAN ELEKTRIKAL 0.60 0.20% 0.20% 0.20%C.3.3. PEKERJAAN INSTALASI AIR
A INSTALASI TALANG VERTICAL 0.08 0.08%B. INSTALASI AIR KOTOR + KOTORAN CLOSET 0.11 0.06% 0.06%C. INSTALASI AIR BERSIH 0.25 0.25%
D. LANTAI - II - (DI ATAS + 4.50) 75.00%D.1. PEKERJAAN SIPIL 9.69 2.42% 2.42% 2.42% 2.42%
D.3. PEKERJAAN MEKANIKAL DAN ELEKTRIKALD.3.1. PEKERJAAN ELEKTRIKAL 0.45 0.45%D.3.3. PEKERJAAN INSTALASI AIR
A INSTALASI TALANG VERTICAL 0.08 0.08%B. INSTALASI AIR KOTOR + KOTORAN CLOSET 0.11 0.11%C. INSTALASI AIR BERSIH 0.26 0.26%
E. LANTAI - III - (DI ATAS + 8.50)E.1. PEKERJAAN SIPIL 8.65 1.73% 1.73% 1.73% 1.73% 1.73%
E.2 PEKERJAAN ARSITEKTURALE.2.1. PEKERJAAN PASANGAN DAN PLESTERAN 2.10 1.05% 1.05%E.2.2. PEKERJAAN LANTAI DAN PELAPIS DINDING 0.16 0.16%E.2.3. PEK. KOSEN PINTU,JENDELA,ASSES- KACA 0.70 0.70%E.2.4. PEKERJAAN PLAFOND 1.08 1.08%E.2.5. PEKERJAAN PENGECATAN 0.38 0.38%
E.3. PEKERJAAN MEKANIKAL DAN ELEKTRIKALE.3.1. PEKERJAAN ELEKTRIKAL 1.70 0.34% 0.34% 0.34% 0.34% 0.34%E.3.3. PEKERJAAN INSTALASI AIR
A INSTALASI TALANG VERTICAL 0.18 0.18% 50.00%B. INSTALASI AIR KOTOR + KOTORAN CLOSET 0.11 0.11%C. INSTALASI AIR BERSIH 0.25 0.25%
F. LANTAI - IV - (DI ATAS + 12.50)F.1. PEKERJAAN SIPIL 6.71 1.12% 1.12% 1.12% 1.12% 1.12% 1.12%
F.2 PEKERJAAN ARSITEKTURALF.2.1. PEKERJAAN PASANGAN DAN PLESTERAN 2.42 0.61% 0.61% 0.61% 0.61%F.2.2. PEKERJAAN LANTAI DAN PELAPIS DINDING 1.47 0.74% 0.74%F.2.3. PEKERJAAN KOSEN PINTU,JENDELA,ASSESORIES DAN KACA 2.68 2.68%F.2.4. PEKERJAAN PLAFOND 0.96 0.48% 0.48%F.2.5. PEKERJAAN PENGECATAN 0.41 0.41%F.2.6. PEKERJAAN SANITAIR / FIXTURE UNIT 0.16 0.08% 0.08%F.2.7. PEKERJAAN BESI 1.07 1.07%
F.3. PEKERJAAN MEKANIKAL DAN ELEKTRIKALF.3.1. PEKERJAAN ELEKTRIKAL 1.73 0.58% 0.58% 0.58%F.3.2 PEKERJAAN PENDINGIN RUANGAN / AIR CONDITION 2.24 2.24%F.3.3. PEKERJAAN INSTALASI AIR
A INSTALASI TALANG VERTICAL 0.46 0.46%B. INSTALASI AIR KOTOR + KOTORAN CLOSET 0.11 0.11% 25.00%C. INSTALASI AIR BERSIH 0.25 0.25%
F 3.4. PEKERJAAN INSTALASI INSTALASI KABEL TV 0.04 0.04%F.3.5. PEKERJAAN INSTALASI HYDRANT 0.77 0.26% 0.26% 0.26%F.3.6. PEKERJAAN INSTALASI TELP / PABX 0.20 0.10% 0.10%
F4. PEKERJAAN MEBELAIR DAN INTERIORG. LANTAI RUANG MESIN LIFT (+ 16.50)
G.1. PEKERJAAN SIPIL 1.18 0.30% 0.30% 0.30% 0.30%G.2 PEKERJAAN ARSITEKTURAL
G.2.1. PEKERJAAN PASANGAN DAN PLESTERAN 0.30 0.30%G.2.2. PEKERJAAN LANTAI DAN PELAPIS DINDING 1.01 1.01%G.2.3. PEKERJAAN KOSEN PINTU,JENDELA,ASSESORIES DAN KACA 1.67 1.67%G.2.4. PEKERJAAN PENGECATAN 0.24 0.24%G.2.5. PEKERJAAN BESI 0.17 0.17%G.2.6. PEKERJAAN BAJA DAN BESI 5.69 0.95% 0.95% 0.95% 0.95% 0.95% 0.95%
G.3. PEKERJAAN MEKANIKAL DAN ELEKTRIKALG.3.1. PEKERJAAN ELEKTRIKAL 0.08 0.08%G.3.2. PEKERJAAN INSTALASI PENANGKAL PETIR 0.24 0.24%
G.4. PEKERJAAN PLUMBING DAN SEPTICTANK + SUMUR RESAPAN 3.48 1.16% 1.16% 1.16% 0.00%
TOTAL PEKERJAAN (%) 100.00 DEVIASI (%) -0.49% -0.63% -0.82% -0.78% -4.04% -5.83% NOTE : PROGRESS MINGGUAN (%) 0.58% 0.58% 0.58% 0.60% 3.72% 3.85% 3.55% 6.28% 8.88% 8.88% 5.16% 5.27% 3.28% 4.97% 4.24% 5.69% 7.06% 3.45% 3.42% 5.53% 4.19% 2.75% 2.83% 3.41% 1.26% : RENCANA REALISASI PROGRESS MINGGUAN (%) 0.08% 0.44% 0.39% 0.63% 0.46% 2.06% : REALISASI
Keterangan
Page 200 of 334
PROGRESS MINGGUAN KOMULATIF (%) 0.58% 1.15% 1.73% 2.32% 6.04% 9.88% 13.44% 19.72% 28.60% 37.48% 42.65% 47.92% 51.20% 56.17% 60.40% 66.10% 73.16% 76.61% 80.02% 85.56% 89.74% 92.50% 95.33% 98.74% 99.99% REALISASI PROGRESS MINGGUAN KOMULATIF (%) 0.08% 0.52% 0.91% 1.54% 2.00% 4.05%
Surabaya, .......................... 2011PT.ANGGREK MERAH
ALBERTINUS WIDYANTODirektur Utama
Page 201 of 334
18.25
1 54.75
1 73.000000 KURANG !!!!
1 AHAAAAAA...
1 KURANG !!!!
1 AHAAAAAA...
1 KURANG !!!!
1 AHAAAAAA...
1 KURANG !!!!
AHAAAAAA...
1 KURANG !!!!
1 AHAAAAAA...
1 KURANG !!!!
1 AHAAAAAA...
1 KURANG !!!!
1 AHAAAAAA...
1 KURANG !!!!
1 KURANG !!!!
1 KURANG !!!!
1 AHAAAAAA...
1 KURANG !!!!
1 AHAAAAAA...
1 KURANG !!!!
1 AHAAAAAA...
1 KURANG !!!!
1 KURANG !!!!
1 KURANG !!!!
1 AHAAAAAA...
1 KURANG !!!!
1 AHAAAAAA...
1 KURANG !!!!
1 KURANG !!!!
1 KURANG !!!!
1 KURANG !!!!
1 KURANG !!!!
1 AHAAAAAA...
1 KURANG !!!!
1 AHAAAAAA...
1 KURANG !!!!
1 KURANG !!!!
1 KURANG !!!!
1 AHAAAAAA...
1 KURANG !!!!
1 AHAAAAAA...
1 KURANG !!!!
1 KURANG !!!!
1 KURANG !!!!
1 KURANG !!!!
1 KURANG !!!!
1 KURANG !!!!
1 KURANG !!!!
1 AHAAAAAA...
1 KURANG !!!!
1 KURANG !!!!
1 AHAAAAAA...
1 KURANG !!!!
1 KURANG !!!!
1 KURANG !!!!
1 KURANG !!!!
1 KURANG !!!!
1 KURANG !!!!
1 AHAAAAAA...
1 AHAAAAAA...
1 KURANG !!!!
1 AHAAAAAA...
1 KURANG !!!!
1 KURANG !!!!
1 KURANG !!!!
1 KURANG !!!!
1 KURANG !!!!
1 KURANG !!!!
1 AHAAAAAA...
1 KURANG !!!!
1 KURANG !!!!
1 KURANG !!!!
PEKERJA DAN DURASI PEKERJAAN STRUKTURPEMBANGUNAN GEDUNG MENEJEMEN 4 LANTAI
RUMAH SAKIT UMUM DAERAH dr. SOEDONO MADIUNJALAN Dr. SOETOMO No. 29 MADIUN - JAWA TIMUR
No. URAIAN PEKERJAAN Koef. VOL.Pekerja Hari
/Hari Rencana
C. LANTAI - I (di atas ± 0.00)C.1. PEKERJAAN STRUKTUR
1 Beton Kolom Bekisting
Pekerja 0.3000 oh 260.800 78 7 Tukang 0.3300 oh 260.800 86 7 Kepala Tukang 0.0330 oh 260.800 9 7 Mandor 0.0060 oh 260.800 2 7
Pembesian Mandor 0.0003 oh 7136.560 2 6 Tukang Besi 0.0070 oh 7136.560 50 6 Pekerja Tak Terampil 0.0070 oh 7136.560 50 6 Kepala Tukang 0.0007 oh 7136.560 5 6
Ready Mix K-250 Pekerja tak terampil 1.5000 oh 28.734 43.10 7 Tukang 0.5000 oh 28.734 14.37 7 Kepala Tukang 0.0500 oh 28.734 1.44 7 Mandor 0.0100 oh 28.734 0.29 7
2 Beton BalokBekisting
Pekerja 0.3200 oh 618.622 197.96 7 Tukang 0.3300 oh 618.622 204.15 7 Kepala Tukang 0.0330 oh 618.622 20.41 7 Mandor 0.0060 oh 618.622 3.71 7
Pembesian Mandor 0.0003 oh 23911.897 7.17 6 Tukang Besi 0.0070 oh 23911.897 167.38 6 Pekerja Tak Terampil 0.0070 oh 23911.897 167.38 6 Kepala Tukang 0.0007 oh 23911.897 16.74 6
Ready Mix K-250 Pekerja tak terampil 1.5000 oh 131.457 197.19 7 Tukang 0.5000 oh 131.457 65.73 7 Kepala Tukang 0.0500 oh 131.457 6.57 7 Mandor 0.0100 oh 131.457 1.31 7
3 Pek. Tangga UtamaBekisting
Pekerja 0.3392 oh 234.061 79.39 4 Tukang 0.3498 oh 234.061 81.87 4 Kepala Tukang 0.0351 oh 234.061 8.23 4 Mandor 0.0064 oh 234.061 1.50 4
Pembesian Mandor 0.0003 oh 1213.179 0.36 3 Tukang Besi 0.0070 oh 1213.179 8.49 3 Pekerja Tak Terampil 0.0070 oh 1213.179 8.49 3 Kepala Tukang 0.0007 oh 1213.179 0.85 3
Ready Mix K-250 Pekerja tak terampil 1.5000 oh 5.953 8.93 3 Tukang 0.5000 oh 5.953 2.98 3 Kepala Tukang 0.0500 oh 5.953 0.30 3 Mandor 0.0100 oh 5.953 0.06 3
4 Pek. Lift UtamaBekisting
Pekerja 0.3200 oh 150.320 48.10 4 Tukang 0.3300 oh 150.320 49.61 4 Kepala Tukang 0.0330 oh 150.320 4.96 4 Mandor 0.0060 oh 150.320 0.90 4
Pembesian Mandor 0.0003 oh 1140.884 0.34 3 Tukang Besi 0.0070 oh 1140.884 7.99 3 Pekerja Tak Terampil 0.0070 oh 1140.884 7.99 3 Kepala Tukang 0.0007 oh 1140.884 0.80 3
Ready Mix K-250 Pekerja tak terampil 1.5000 oh 5.486 8.23 3 Tukang 0.5000 oh 5.486 2.74 3 Kepala Tukang 0.0500 oh 5.486 0.27 3 Mandor 0.0100 oh 5.486 0.05 3
5 Pek Ramp BetonBekisting
Pekerja 0.3200 oh 103.434 33.10 14 Tukang 0.3300 oh 103.434 34.13 14 Kepala Tukang 0.0330 oh 103.434 3.41 14 Mandor 0.0060 oh 103.434 0.62 14
Pembesian Mandor 0.0003 oh 1846.631 0.55 14 Tukang Besi 0.0070 oh 1846.631 12.93 14 Pekerja Tak Terampil 0.0070 oh 1846.631 12.93 14 Kepala Tukang 0.0007 oh 1846.631 1.29 14
Ready mix K-175 Pekerja tak terampil 1.5000 oh 28.203 42.31 14 Tukang 0.5000 oh 28.203 14.10 14 Kepala Tukang 0.0500 oh 28.203 1.41 14 Mandor 0.0100 oh 28.203 0.28 14
6 Pek. PlatBekisting
Pekerja 0.3200 oh 590.200 188.86 7 Tukang 0.3300 oh 590.200 194.77 7 Kepala Tukang 0.0330 oh 590.200 19.48 7 Mandor 0.0060 oh 590.200 3.54 7
Pembesian Mandor 0.0003 oh 12933.503 3.88 6 Tukang Besi 0.0070 oh 12933.503 90.53 6 Pekerja Tak Terampil 0.0070 oh 12933.503 90.53 6 Kepala Tukang 0.0007 oh 12933.503 9.05 6
Ready mix K-250 Pekerja tak terampil 1.5000 oh 98.630 147.95 7 Tukang 0.5000 oh 98.630 49.32 7 Kepala Tukang 0.0500 oh 98.630 4.93 7 Mandor 0.0100 oh 98.630 0.99 7
D. LANTAI - II (di atas + 4.50)D.1. PEKERJAAN STRUKTUR
1 Beton Kolom Bekisting
Pekerja 0.3000 oh 241.600 72.48 4 Tukang 0.3300 oh 241.600 79.73 4 Kepala Tukang 0.0330 oh 241.600 7.97 4 Mandor 0.0060 oh 241.600 1.45 4
Pembesian Mandor 0.0003 oh 7651.197 2.30 3 Tukang Besi 0.0070 oh 7651.197 53.56 3 Pekerja Tak Terampil 0.0070 oh 7651.197 53.56 3 Kepala Tukang 0.0007 oh 7651.197 5.36 3
Ready Mix K-250 Pekerja tak terampil 1.5000 oh 24.320 36.48 3 Tukang 0.5000 oh 24.320 12.16 3 Kepala Tukang 0.0500 oh 24.320 1.22 3 Mandor 0.0100 oh 24.320 0.24 3
2 Beton BalokBekisting
Pekerja 0.3200 oh 606.877 194.20 4
Tukang 0.3300 oh 606.877 200.27 4 Kepala Tukang 0.0330 oh 606.877 20.03 4 Mandor 0.0060 oh 606.877 3.64 4
Pembesian Mandor 0.0003 oh 19993.060 6.00 3 Tukang Besi 0.0070 oh 19993.060 139.95 3 Pekerja Tak Terampil 0.0070 oh 19993.060 139.95 3 Kepala Tukang 0.0007 oh 19993.060 14.00 3
Ready Mix K-250 Pekerja tak terampil 1.5000 oh 91.406 137.11 3 Tukang 0.5000 oh 91.406 45.70 3 Kepala Tukang 0.0500 oh 91.406 4.57 3 Mandor 0.0100 oh 91.406 0.91 3
3 Pek. Tangga UtamaBekisting
Pekerja 0.3392 oh 255.127 86.54 4 Tukang 0.3498 oh 255.127 89.24 4 Kepala Tukang 0.0351 oh 255.127 8.97 4 Mandor 0.0064 oh 255.127 1.63 4
Pembesian Mandor 0.0003 oh 2834.997 0.85 3 Tukang Besi 0.0070 oh 2834.997 19.84 3 Pekerja Tak Terampil 0.0070 oh 2834.997 19.84 3 Kepala Tukang 0.0007 oh 2834.997 1.98 3
Ready Mix K-250 Pekerja tak terampil 1.5000 oh 13.910 20.87 3 Tukang 0.5000 oh 13.910 6.96 3 Kepala Tukang 0.0500 oh 13.910 0.70 3 Mandor 0.0100 oh 13.910 0.14 3
4 Pek. Lift UtamaBekisting
Pekerja 0.3200 oh 150.320 48.10 4 Tukang 0.3300 oh 150.320 49.61 4 Kepala Tukang 0.0330 oh 150.320 4.96 4 Mandor 0.0060 oh 150.320 0.90 4
Pembesian Mandor 0.0003 oh 1882.100 0.56 3 Tukang Besi 0.0070 oh 1882.100 13.17 3 Pekerja Tak Terampil 0.0070 oh 1882.100 13.17 3 Kepala Tukang 0.0007 oh 1882.100 1.32 3
Ready Mix K-250 Pekerja tak terampil 1.5000 oh 4.712 7.07 3 Tukang 0.5000 oh 4.712 2.36 3
Kepala Tukang 0.0500 oh 4.712 0.24 3 Mandor 0.0100 oh 4.712 0.05 3
5 Pek. Tangga DaruratBekisting
Pekerja 0.3392 oh 127.563 337.22 7 Tukang 0.3498 oh 127.563 44.62 7 Kepala Tukang 0.0351 oh 127.563 4.48 7 Mandor 0.0064 oh 127.563 0.82 7
Pembesian Mandor 0.0003 oh 994.160 0.30 5 Tukang Besi 0.0070 oh 994.160 6.96 5 Pekerja Tak Terampil 0.0070 oh 994.160 6.96 5 Kepala Tukang 0.0007 oh 994.160 0.70 5
Ready Mix K-175 Pekerja tak terampil 1.5000 oh 4.878 7.32 7 Tukang 0.5000 oh 4.878 2.44 7 Kepala Tukang 0.0500 oh 4.878 0.24 7 Mandor 0.0100 oh 4.878 0.05 7
6 Pek. PlatBekisting
Pekerja 0.3200 oh 590.200 188.86 4 Tukang 0.3300 oh 590.200 194.77 4 Kepala Tukang 0.0330 oh 590.200 19.48 4 Mandor 0.0060 oh 590.200 3.54 4
Pembesian Mandor 0.0003 oh 10774.772 3.23 3 Tukang Besi 0.0070 oh 10774.772 75.42 3 Pekerja Tak Terampil 0.0070 oh 10774.772 75.42 3 Kepala Tukang 0.0007 oh 10774.772 7.54 3
Ready mix K-250 Pekerja tak terampil 1.5000 oh 82.168 123.25 3 Tukang 0.5000 oh 82.168 41.08 3 Kepala Tukang 0.0500 oh 82.168 4.11 3 Mandor 0.0100 oh 82.168 0.82 3
E. LANTAI - III (di atas +8.50)E.1. PEKERJAAN STRUKTUR
1 Beton Kolom Bekisting
Pekerja 0.3000 oh 193.600 58.08 4 Tukang 0.3300 oh 193.600 63.89 4 Kepala Tukang 0.0330 oh 193.600 6.39 4 Mandor 0.0060 oh 193.600 1.16 4
Pembesian Mandor 0.0003 oh 6213.939 1.86 3 Tukang Besi 0.0070 oh 6213.939 43.50 3 Pekerja Tak Terampil 0.0070 oh 6213.939 43.50 3 Kepala Tukang 0.0007 oh 6213.939 4.35 3
Ready Mix K-250 Pekerja tak terampil 1.5000 oh 22.520 33.78 3 Tukang 0.5000 oh 22.520 11.26 3 Kepala Tukang 0.0500 oh 22.520 1.13 3 Mandor 0.0100 oh 22.520 0.23 3
2 Beton BalokBekisting
Pekerja 0.3200 oh 473.165 151.41 7 Tukang 0.3300 oh 473.165 156.14 7 Kepala Tukang 0.0330 oh 473.165 15.61 7 Mandor 0.0060 oh 473.165 2.84 7
Pembesian Mandor 0.0003 oh 19823.950 5.95 5 Tukang Besi 0.0070 oh 19823.950 138.77 5 Pekerja Tak Terampil 0.0070 oh 19823.950 138.77 5 Kepala Tukang 0.0007 oh 19823.950 13.88 5
Ready Mix K-250 Pekerja tak terampil 1.5000 oh 90.831 136.25 7 Tukang 0.5000 oh 90.831 45.42 7 Kepala Tukang 0.0500 oh 90.831 4.54 7 Mandor 0.0100 oh 90.831 0.91 7
3 Pek. Tangga UtamaBekisting
Pekerja 0.3392 oh 262.148 88.92 7 Tukang 0.3498 oh 262.148 91.70 7 Kepala Tukang 0.0351 oh 262.148 9.21 7 Mandor 0.0064 oh 262.148 1.68 7
Pembesian Mandor 0.0003 oh 2468.139 0.74 5 Tukang Besi 0.0070 oh 2468.139 17.28 5 Pekerja Tak Terampil 0.0070 oh 2468.139 17.28 5 Kepala Tukang 0.0007 oh 2468.139 1.73 5
Ready Mix K-250 Pekerja tak terampil 1.5000 oh 12.110 18.17 7 Tukang 0.5000 oh 12.110 6.06 7 Kepala Tukang 0.0500 oh 12.110 0.61 7 Mandor 0.0100 oh 12.110 0.12 7
4 Pek. Lift UtamaBekisting
Pekerja 0.3200 oh 150.320 48.10 7 Tukang 0.3300 oh 150.320 49.61 7 Kepala Tukang 0.0330 oh 150.320 4.96 7 Mandor 0.0060 oh 150.320 0.90 7
Pembesian Mandor 0.0003 oh 1063.073 0.32 5 Tukang Besi 0.0070 oh 1063.073 7.44 5 Pekerja Tak Terampil 0.0070 oh 1063.073 7.44 5 Kepala Tukang 0.0007 oh 1063.073 0.74 5
Ready Mix K-250 Pekerja tak terampil 1.5000 oh 5.216 7.82 7 Tukang 0.5000 oh 5.216 2.61 7 Kepala Tukang 0.0500 oh 5.216 0.26 7 Mandor 0.0100 oh 5.216 0.05 7
5 Pek. Tangga DaruratBekisting
Pekerja 0.3200 oh 234.061 74.90 7 Tukang 0.3300 oh 234.061 77.24 7 Kepala Tukang 0.0330 oh 234.061 7.72 7 Mandor 0.0060 oh 234.061 1.40 7
Pembesian Mandor 0.0003 oh 734.667 0.22 5 Tukang Besi 0.0070 oh 734.667 5.14 5 Pekerja Tak Terampil 0.0070 oh 734.667 5.14 5 Kepala Tukang 0.0007 oh 734.667 0.51 5
Ready Mix K-175 Pekerja tak terampil 1.5000 oh 5.953 8.93 7 Tukang 0.5000 oh 5.953 2.98 7 Kepala Tukang 0.0500 oh 5.953 0.30 7 Mandor 0.0100 oh 5.953 0.06 7
6 Pek. PlatBekisting
Pekerja 0.3200 oh 494.200 158.14 4 Tukang 0.3300 oh 494.200 163.09 4 Kepala Tukang 0.0330 oh 494.200 16.31 4 Mandor 0.0060 oh 494.200 2.97 4
Pembesian Mandor 0.0003 oh 10308.365 3.09 3 Tukang Besi 0.0070 oh 10308.365 72.16 3 Pekerja Tak Terampil 0.0070 oh 10308.365 72.16 3 Kepala Tukang 0.0007 oh 10308.365 7.22 3
Ready mix K-250 Pekerja tak terampil 1.5000 oh 78.611 117.92 3 Tukang 0.5000 oh 78.611 39.31 3 Kepala Tukang 0.0500 oh 78.611 3.93 3 Mandor 0.0100 oh 78.611 0.79 3
F. LANTAI - IV (di atas+12.50)F.1. PEKERJAAN STRUKTUR
1 Beton Kolom Bekisting
Pekerja 0.3000 oh 156.800 47.04 12 Tukang 0.3300 oh 156.800 51.74 12 Kepala Tukang 0.0330 oh 156.800 5.17 12 Mandor 0.0060 oh 156.800 0.94 12
Pembesian Mandor 0.0003 oh 5114.786 1.53 5 Tukang Besi 0.0070 oh 5114.786 35.80 5 Pekerja Tak Terampil 0.0070 oh 5114.786 35.80 5 Kepala Tukang 0.0007 oh 5114.786 3.58 5
Ready Mix K-250 Pekerja tak terampil 1.5000 oh 18.520 27.78 9 Tukang 0.5000 oh 18.520 9.26 9 Kepala Tukang 0.0500 oh 18.520 0.93 9 Mandor 0.0100 oh 18.520 0.19 9
3 Beton BalokBekisting
Pekerja 0.3200 oh 301.382 96.44 12 Tukang 0.3300 oh 301.382 99.46 12 Kepala Tukang 0.0330 oh 301.382 9.95 12 Mandor 0.0060 oh 301.382 1.81 12
Pembesian Mandor 0.0003 oh 16686.882 5.01 9 Tukang Besi 0.0070 oh 16686.882 116.81 9 Pekerja Tak Terampil 0.0070 oh 16686.882 116.81 9 Kepala Tukang 0.0007 oh 16686.882 11.68 9
Ready Mix K-250 Pekerja tak terampil 1.5000 oh 84.557 126.84 9 Tukang 0.5000 oh 84.557 42.28 9 Kepala Tukang 0.0500 oh 84.557 4.23 9 Mandor 0.0100 oh 84.557 0.85 9
2 Pek. Lisplank AtapBekisting
Pekerja 0.3200 oh 120.610 38.60 4
Tukang 0.3300 oh 120.610 39.80 4 Kepala Tukang 0.0330 oh 120.610 3.98 4 Mandor 0.0060 oh 120.610 0.72 4
Pembesian Mandor 0.0003 oh 4271.891 1.28 3 Tukang Besi 0.0070 oh 4271.891 29.90 3 Pekerja Tak Terampil 0.0070 oh 4271.891 29.90 3 Kepala Tukang 0.0007 oh 4271.891 2.99 3
Ready Mix K-250 Pekerja tak terampil 1.5000 oh 32.005 48.01 3 Tukang 0.5000 oh 32.005 16.00 3 Kepala Tukang 0.0500 oh 32.005 1.60 3 Mandor 0.0100 oh 32.005 0.32 3
4 Pek. Tangga UtamaBekisting
Pekerja 0.3392 oh 262.148 88.92 4 Tukang 0.3498 oh 262.148 91.70 4 Kepala Tukang 0.0351 oh 262.148 9.21 4 Mandor 0.0064 oh 262.148 1.68 4
Pembesian Mandor 0.0003 oh 1930.896 0.58 3 Tukang Besi 0.0070 oh 1930.896 13.52 3 Pekerja Tak Terampil 0.0070 oh 1930.896 13.52 3 Kepala Tukang 0.0007 oh 1930.896 1.35 3
Ready Mix K-250 Pekerja tak terampil 1.5000 oh 9.474 14.21 3 Tukang 0.5000 oh 9.474 4.74 3 Kepala Tukang 0.0500 oh 9.474 0.47 3 Mandor 0.0100 oh 9.474 0.09 3
5 Pek. Lift UtamaBekisting
Pekerja 0.3200 oh 150.320 48.10 4 Tukang 0.3300 oh 150.320 49.61 4 Kepala Tukang 0.0330 oh 150.320 4.96 4 Mandor 0.0060 oh 150.320 0.90 4
Pembesian Mandor 0.0003 oh 1063.073 0.32 3 Tukang Besi 0.0070 oh 1063.073 7.44 3 Pekerja Tak Terampil 0.0070 oh 1063.073 7.44 3 Kepala Tukang 0.0007 oh 1063.073 0.74 3
Ready Mix K-250 Pekerja tak terampil 1.5000 oh 5.216 7.82 3 Tukang 0.5000 oh 5.216 2.61 3
Kepala Tukang 0.0500 oh 5.216 0.26 3 Mandor 0.0100 oh 5.216 0.05 3
6 Pek. Tangga DaruratBekisting
Pekerja 0.3200 oh 234.061 74.90 4 Tukang 0.3300 oh 234.061 77.24 4 Kepala Tukang 0.0330 oh 234.061 7.72 4 Mandor 0.0060 oh 234.061 1.40 4
Pembesian Mandor 0.0003 oh 784.508 0.24 3 Tukang Besi 0.0070 oh 784.508 5.49 3 Pekerja Tak Terampil 0.0070 oh 784.508 5.49 3 Kepala Tukang 0.0007 oh 784.508 0.55 3
Ready Mix K-175 Pekerja tak terampil 1.5000 oh 5.065 7.60 3 Tukang 0.5000 oh 5.065 2.53 3 Kepala Tukang 0.0500 oh 5.065 0.25 3 Mandor 0.0100 oh 5.065 0.05 3
7 Pek. PlatBekisting
Pekerja 0.3200 oh 183.000 58.56 4 Tukang 0.3300 oh 183.000 60.39 4 Kepala Tukang 0.0330 oh 183.000 6.04 4 Mandor 0.0060 oh 183.000 1.10 4
Pembesian Mandor 0.0003 oh 8591.247 2.58 3 Tukang Besi 0.0070 oh 8591.247 60.14 3 Pekerja Tak Terampil 0.0070 oh 8591.247 60.14 3 Kepala Tukang 0.0007 oh 8591.247 6.01 3
Ready mix K-250 Pekerja tak terampil 1.5000 oh 97.522 146.28 3 Tukang 0.5000 oh 97.522 48.76 3 Kepala Tukang 0.0500 oh 97.522 4.88 3 Mandor 0.0100 oh 97.522 0.98 3
G. LANTAI RUANG LIFT -V-(di atas+16.50)G.1. PEKERJAAN STRUKTUR
1 Beton Kolom Bekisting
Pekerja 0.3000 oh 29.170 8.75 12 Tukang 0.3300 oh 29.170 9.63 12 Kepala Tukang 0.0330 oh 29.170 0.96 12 Mandor 0.0060 oh 29.170 0.18 12
Pembesian Mandor 0.0003 oh 1889.219 0.57 9 Tukang Besi 0.0070 oh 1889.219 13.22 9 Pekerja Tak Terampil 0.0070 oh 1889.219 13.22 9 Kepala Tukang 0.0007 oh 1889.219 1.32 9
Ready Mix K-250 Pekerja tak terampil 1.5000 oh 7.293 10.94 9 Tukang 0.5000 oh 7.293 3.65 9 Kepala Tukang 0.0500 oh 7.293 0.36 9 Mandor 0.0100 oh 7.293 0.07 9
2 Beton BalokBekisting
Pekerja 0.3200 oh 46.998 15.04 4 Tukang 0.3300 oh 46.998 15.51 4 Kepala Tukang 0.0330 oh 46.998 1.55 4 Mandor 0.0060 oh 46.998 0.28 4
Pembesian Mandor 0.0003 oh 2500.526 0.75 3 Tukang Besi 0.0070 oh 2500.526 17.50 3 Pekerja Tak Terampil 0.0070 oh 2500.526 17.50 3 Kepala Tukang 0.0007 oh 2500.526 1.75 3
Ready Mix K-250 Pekerja tak terampil 1.5000 oh 11.750 17.62 3 Tukang 0.5000 oh 11.750 5.87 3 Kepala Tukang 0.0500 oh 11.750 0.59 3 Mandor 0.0100 oh 11.750 0.12 3
3 Pek. PlatBekisting
Pekerja 0.3200 oh 17.442 5.58 4 Tukang 0.3300 oh 17.442 5.76 4 Kepala Tukang 0.0330 oh 17.442 0.58 4 Mandor 0.0060 oh 17.442 0.10 4
Pembesian Mandor 0.0003 oh 1143.593 0.34 3 Tukang Besi 0.0070 oh 1143.593 8.01 3 Pekerja Tak Terampil 0.0070 oh 1143.593 8.01 3 Kepala Tukang 0.0007 oh 1143.593 0.80 3
Ready mix K-250 Pekerja tak terampil 1.5000 oh 8.721 13.08 3 Tukang 0.5000 oh 8.721 4.36 3 Kepala Tukang 0.0500 oh 8.721 0.44 3 Mandor 0.0100 oh 8.721 0.09 3
PEKERJA DAN DURASI PEKERJAAN STRUKTURPEMBANGUNAN GEDUNG MENEJEMEN 4 LANTAI
RUMAH SAKIT UMUM DAERAH dr. SOEDONO MADIUNJALAN Dr. SOETOMO No. 29 MADIUN - JAWA TIMUR
Dipakai Vol Hari Vol Dipakai Tambah Pekerja /Hari Percepatan /Hari Pekerja Pekerja
11 37 6 43 13 212 37 6 43 14 21 37 6 43 1 00 37 6 43 0 0
0 1189 5 1,427 0 08 1189 5 1,427 10 28 1189 5 1,427 10 21 1189 5 1,427 1 0
6 4 5 6 9 22 4 5 6 3 10 4 5 6 0 00 4 5 6 0 0
28 88 6 103 33 529 88 6 103 34 53 88 6 103 3 01 88 6 103 1 0
1 3985 5 4782 1 028 3985 5 4782 33 628 3985 5 4782 33 63 3985 5 4782 3 1
28 19 5 26 39 119 19 5 26 13 41 19 5 26 1 00 19 5 26 0 0
20 59 3 78 26 720 59 3 78 27 72 59 3 78 3 10 59 3 78 0 0
0 404 2 607 0 03 404 2 607 4 13 404 2 607 4 10 404 2 607 0 0
3 2 3 2 3 01 2 3 2 1 00 2 3 2 0 00 2 3 2 0 0
12 38 3 50 16 412 38 3 50 17 41 38 3 50 2 00 38 3 50 0 0
0 380 2 570 0 03 380 2 570 4 13 380 2 570 4 10 380 2 570 0 0
3 2 3 2 3 01 2 3 2 1 00 2 3 2 0 00 2 3 2 0 0
2 7 8 13 4 22 7 8 13 4 20 7 8 13 0 00 7 8 13 0 0
0 132 6 308 0 01 132 6 308 2 11 132 6 308 2 10 132 6 308 0 0
3 2 7 4 6 31 2 7 4 2 10 2 7 4 0 00 2 7 4 0 0
27 84 6 98 31 428 84 6 98 32 53 84 6 98 3 01 84 6 98 1 0
1 2156 5 2587 1 015 2156 5 2587 18 315 2156 5 2587 18 32 2156 5 2587 2 0
21 14 5 20 30 87 14 5 20 10 31 14 5 20 1 00 14 5 20 0 0
18 60 3 81 24 620 60 3 81 27 72 60 3 81 3 10 60 3 81 0 0
1 2550 2 3826 1 018 2550 2 3826 27 918 2550 2 3826 27 92 2550 2 3826 3 1
12 8 3 8 12 04 8 3 8 4 00 8 3 8 0 00 8 3 8 0 0
49 152 3 202 65 16
50 152 3 202 67 175 152 3 202 7 21 152 3 202 1 0
2 6664 2 9997 3 147 6664 2 9997 70 2347 6664 2 9997 70 235 6664 2 9997 7 2
46 30 3 30 46 015 30 3 30 15 02 30 3 30 2 00 30 3 30 0 0
22 64 3 85 29 722 64 3 85 30 72 64 3 85 3 10 64 3 85 1 1
0 945 2 1417 0 07 945 2 1417 10 37 945 2 1417 10 31 945 2 1417 1 0
7 5 3 5 7 02 5 3 5 2 00 5 3 5 0 00 5 3 5 0 0
12 38 3 50 16 412 38 3 50 17 41 38 3 50 2 00 38 3 50 0 0
0 627 2 941 0 04 627 2 941 7 24 627 2 941 7 20 627 2 941 1 1
2 2 2 2 4 11 2 2 2 1 0
0 2 2 2 0 00 2 2 2 0 0
48 142 6 166 56 86 18 6 21 7 11 18 6 21 1 00 18 6 21 0 0
0 199 3 331 0 01 199 3 331 2 11 199 3 331 2 10 199 3 331 0 0
1 1 4 1 2 10 1 4 1 1 10 1 4 1 0 00 1 4 1 0 0
47 148 3 197 63 1649 148 3 197 65 165 148 3 197 6 21 148 3 197 1 0
1 3592 2 5387 2 125 3592 2 5387 38 1325 3592 2 5387 38 133 3592 2 5387 4 1
41 27 3 27 41 014 27 3 27 14 01 27 3 27 1 00 27 3 27 0 0
15 48 3 65 19 516 48 3 65 21 52 48 3 65 2 10 48 3 65 0 0
1 2071 2 3107 1 014 2071 2 3107 22 714 2071 2 3107 22 71 2071 2 3107 2 1
11 8 3 8 11 04 8 3 8 4 00 8 3 8 0 00 8 3 8 0 0
22 68 6 79 25 422 68 6 79 26 42 68 6 79 3 00 68 6 79 0 0
1 3965 4 4956 1 028 3965 4 4956 35 728 3965 4 4956 35 73 3965 4 4956 3 1
19 13 5 18 27 86 13 5 18 9 31 13 5 18 1 00 13 5 18 0 0
13 37 5 52 18 513 37 5 52 18 51 37 5 52 2 10 37 5 52 0 0
0 494 4 617 0 03 494 4 617 4 13 494 4 617 4 10 494 4 617 0 0
3 2 5 2 4 11 2 5 2 1 00 2 5 2 0 00 2 5 2 0 0
7 21 5 30 10 37 21 5 30 10 31 21 5 30 1 00 21 5 30 0 0
0 213 3 354 0 01 213 3 354 2 11 213 3 354 2 10 213 3 354 0 0
1 1 5 1 2 00 1 5 1 1 10 1 5 1 0 00 1 5 1 0 0
11 33 6 39 12 211 33 6 39 13 21 33 6 39 1 00 33 6 39 0 0
0 147 3 245 0 01 147 3 245 2 11 147 3 245 2 10 147 3 245 0 0
1 1 5 1 2 10 1 5 1 1 10 1 5 1 0 00 1 5 1 0 0
40 124 3 165 53 1341 124 3 165 54 144 124 3 165 5 11 124 3 165 1 0
1 3436 2 5154 2 124 3436 2 5154 36 1224 3436 2 5154 36 122 3436 2 5154 4 1
39 26 3 26 39 013 26 3 26 13 01 26 3 26 1 00 26 3 26 0 0
4 13 10 16 5 14 13 10 16 5 10 13 10 16 1 10 13 10 16 0 0
0 1023 4 1279 0 07 1023 4 1279 9 27 1023 4 1279 9 21 1023 4 1279 1 0
3 2 8 2 3 01 2 8 2 1 00 2 8 2 0 00 2 8 2 0 0
8 25 10 30 10 28 25 10 30 10 21 25 10 30 1 00 25 10 30 0 0
1 1854 8 2086 1 013 1854 8 2086 15 213 1854 8 2086 15 21 1854 8 2086 1 0
14 9 8 11 16 25 9 8 11 5 10 9 8 11 1 10 9 8 11 0 0
10 30 3 40 13 3
10 30 3 40 13 31 30 3 40 1 00 30 3 40 0 0
0 1424 2 2136 1 110 1424 2 2136 15 510 1424 2 2136 15 51 1424 2 2136 1 0
16 11 2 16 24 85 11 2 16 8 31 11 2 16 1 00 11 2 16 0 0
22 66 3 87 30 723 66 3 87 31 82 66 3 87 3 10 66 3 87 1 1
0 644 2 965 0 05 644 2 965 7 25 644 2 965 7 20 644 2 965 1 1
5 3 5 2 3 -22 3 5 2 1 -10 3 5 2 0 00 3 5 2 0 0
12 38 3 50 16 412 38 3 50 17 41 38 3 50 2 00 38 3 50 0 0
0 354 2 532 0 02 354 2 532 4 12 354 2 532 4 10 354 2 532 0 0
3 2 2 3 4 11 2 2 3 1 0
0 2 2 3 0 00 2 2 3 0 0
19 59 3 78 25 619 59 3 78 26 62 59 3 78 3 10 59 3 78 0 0
0 262 2 392 0 02 262 2 392 3 12 262 2 392 3 10 262 2 392 0 0
3 2 2 3 4 11 2 2 3 1 00 2 2 3 0 00 2 2 3 0 0
15 46 3 61 20 515 46 3 61 20 52 46 3 61 2 10 46 3 61 0 0
1 2864 2 4296 1 020 2864 2 4296 30 1020 2864 2 4296 30 102 2864 2 4296 3 1
49 33 3 33 49 016 33 3 33 16 02 33 3 33 2 00 33 3 33 0 0
1 2 10 3 1 01 2 10 3 1 00 2 10 3 0 00 2 10 3 0 0
0 210 8 236 0 01 210 8 236 2 01 210 8 236 2 00 210 8 236 0 0
1 1 5 1 2 10 1 5 1 1 10 1 5 1 0 00 1 5 1 0 0
4 12 3 16 5 14 12 3 16 5 10 12 3 16 1 10 12 3 16 0 0
0 834 2 1250 0 06 834 2 1250 9 36 834 2 1250 9 31 834 2 1250 1 0
6 4 2 6 9 32 4 2 6 3 10 4 2 6 0 00 4 2 6 0 0
1 4 3 6 2 01 4 3 6 2 00 4 3 6 0 00 4 3 6 0 0
0 381 2 572 0 03 381 2 572 4 13 381 2 572 4 10 381 2 572 0 0
4 3 3 3 4 01 3 3 3 1 00 3 3 3 0 00 3 3 3 0 0
RKepala Tukang 80Pekerja 497Pekerja Tak terampil 653
27
BILL OF QUANTITY (BOQ) STRUKTUR
PROYEK PEMBANGUNAN GEDUNG MENEJEMEN 4 LANTAI
RUMAH SAKIT UMUM DAERAH dr. SOEDONO MADIUN
JALAN Dr. SOETOMO No. 29 MADIUN - JAWA TIMUR
LANTAI - I (di atas ± 0.00)
No. Uraian & Sketsa
1 KOLOM DAN BALOK
Beton K-250 untuk Kolom Utama 50/50 posisi CL. A type K1
Beton K-250 untuk Kolom Utama 50/50 posisi CL. B type K1
Beton K-250 untuk Kolom Utama 50/50 posisi CL. C type K1
Beton K-250 untuk Kolom Utama 50/50 posisi CL. D type K1
Beton K-250 untuk Kolom Utama 50/50 posisi CL. E type K1
Beton K-250 untuk Balok Utama 35/70 posisi CL. 1 type B1
Beton K-250 untuk Balok Utama 35/70 posisi CL. 2 type B1
Beton K-250 untuk Balok Utama 35/70 posisi CL. 3 type B1
Beton K-250 untuk Balok Utama 35/70 posisi CL. 4 type B1
Beton K-250 untuk Balok Utama 35/70 posisi CL. 5 type B1
Beton K-250 untuk Balok Utama 30/60 posisi CL. A type B2
Beton K-250 untuk Balok Utama 35/70 posisi CL. B type B1
Beton K-250 untuk Balok Utama 35/70 posisi CL. C type B1
Beton K-250 untuk Balok Utama 35/70 posisi CL. D type B1
Beton K-250 untuk Balok Utama 35/70 posisi CL. E type B1
Beton K-250 untuk Balok Anak 30/60 type B2
Beton K-250 untuk Balok Anak 20/40 type B3
Beton K-250 untuk Balok Anak 35/70 type B4
Beton K-250 untuk Balok Anak 20/30 type B5
Beton K-250 untuk Balok Anak 20/40 type B6
2 PEKERJAAN TANGGA UTAMA
Beton K-250 untuk Kolom 30/30 type K-2
Beton K-250 untuk Balok Utama 35/70 posisi CL. 3A type B1
Beton K-250 untuk Balok Anak 30/60 type B2
Beton K-250 untuk Plat lantai tangga T = 12 cm
3 PEKERJAAN LIFT UTAMA
Beton K-250 untuk Kolom 30/30 type K-2
Beton K-250 untuk Balok Anak 30/60 type B2
Beton K-250 untuk Balok Anak 20/40 type B3
4 PEKERJAAN RAMP BETON
Beton K-250 untuk Kolom 30/30 type K - 2
Beton K-250 untuk Balok Anak 20/40 type B3
Beton K-250 untuk Plat lantai tangga T = 12 cm
Beton Praktis K - 175 un. Kolom 15/15
Beton Praktis K - 175 un. Balok Ring 15/15 di atas Pas. Dinding
Beton Praktis K - 175 un. Balok Latei 15/15 di atas Kosen pas. Dinding
Beton Praktis K - 175 un. Canopy Jend (50x120x10) CL. B (4 - 5) -CL. 5
Beton Praktis K - 175 un. Balok 15/20 Canopy Jend CL. B (4 - 5) -CL. 5
5 PEKERJAAN PLAT
Beton K - 250 untuk Plat Terras tebal 10 cm uk. 1.25 x 16
Beton K-250 un Balok 20/40 type B3 di CL.E(2-3-4)plat teras +300(/4m)
Beton K-250 un untuk Plat lt II tebal 12 cm ( + 4.50 ) + Plat Rg. Tunggu
Beton K-250 un untuk Lisplang beton 10/80 atap ruang tunggu
LANTAI - II - (di atas + 4.50)
1 KOLOM DAN BALOK
Beton K-250 untuk Kolom Utama 50/50 posisi CL. A type K1
Beton K-250 untuk Kolom Utama 50/50 posisi CL. B type K1
Beton K-250 untuk Kolom Utama 50/50 posisi CL. C type K1
Beton K-250 untuk Kolom Utama 50/50 posisi CL. D type K1
Beton K-250 untuk Kolom Utama 50/50 posisi CL. E type K1
Beton K-250 untuk Balok Utama 35/70 posisi CL. 1 type B1
Beton K-250 untuk Balok Utama 35/70 posisi CL. 2 type B1
Beton K-250 untuk Balok Utama 35/70 posisi CL. 3 type B1
Beton K-250 untuk Balok Utama 35/70 posisi CL. 4 type B1
Beton K-250 untuk Balok Utama 35/70 posisi CL. 5 type B1
Beton K-250 untuk Balok Utama 35/70 posisi CL. B type B1
Beton K-250 untuk Balok Utama 35/70 posisi CL. C type B1
Beton K-250 untuk Balok Utama 35/70 posisi CL. D type B1
Beton K-250 untuk Balok Utama 35/70 posisi CL. E type B1
Beton K-250 untuk Balok Anak 30/60 type B2
Beton K-250 untuk Balok Anak 20/40 type B3
Beton K-250 untuk Balok Anak 35/70 type B4
Beton K-250 untuk Balok Anak 20/30 type B5
Beton K-250 untuk Balok Anak 20/40 type B6
2 PEKERJAAN TANGGA UTAMA
Beton K-250 untuk Kolom 30/30 type K-2
Beton K-250 untuk Balok Utama 35/70 posisi CL. 3A type B1
Beton K-250 untuk Balok Anak 30/60 type B2
Beton K-250 untuk Plat lantai tangga T = 12 cm
3 PEKERJAAN LIFT UTAMA
Beton K-250 untuk Kolom 30/30 type K - 2
Beton K-250 untuk Balok Anak 30/60 type B2
Beton K-250 untuk Balok Anak 20/40 type B3
4 PEKERJAAN TANGGA DARURAT
Beton K-250 untuk Kolom 20/40 type B3
Beton K-175 un. Ring Balustrade 15/15
Beton K-250 untuk Plat lantai tangga T = 12 cm
Beton Praktis K-175 un. Kolom 15/15
Beton Praktis K-175 un. Balok Ring 15/15 di atas Pas. Dinding
Beton Praktis K-175 un. Balok Latei 15/15 di atas Kusen Pas. Dinding
Beton Praktis K-175 un. Canopy Jend ( 50 x 120 x 10 ) CL. B (4-5)-CL. 5
Beton Praktis K-175 un. Balok 15/20 Canopy Jend CL. B (4-5)-CL. 5
5 PEKERJAAN PLAT
Beton K-250 untuk Plat lt 3 tebal 12 cm ( + 8.50 ) + Plat R. Tunggu
Beton K-250 untuk Lisplang beton 10/80 atap ruang tunggu
LANTAI - III - (di atas + 8.50)
1 KOLOM DAN BALOK
Beton K-250 untuk Kolom Utama 50/50 posisi CL. B type K1
Beton K-250 untuk Kolom Utama 50/50 posisi CL. C type K1
Beton K-250 untuk Kolom Utama 50/50 posisi CL. D type K1
Beton K-250 untuk Kolom Utama 50/50 posisi CL. E type K1
Beton K-250 untuk Balok Utama 35/70 posisi CL. 1 type B1
Beton K-250 untuk Balok Utama 35/70 posisi CL. 2 type B1
Beton K-250 untuk Balok Utama 35/70 posisi CL. 3 type B1
Beton K-250 untuk Balok Utama 35/70 posisi CL. 4 type B1
Beton K-250 untuk Balok Utama 35/70 posisi CL. 5 type B1
Beton K-250 untuk Balok Utama 35/70 posisi CL. B type B1
Beton K-250 untuk Balok Utama 35/70 posisi CL. C type B1
Beton K-250 untuk Balok Utama 35/70 posisi CL. D type B1
Beton K-250 untuk Balok Utama 35/70 posisi CL. E type B1
Beton K-250 untuk Balok Anak 30/60 type B2
Beton K-250 untuk Balok Anak 20/40 type B3
Beton K-250 untuk Balok Anak 35/70 type B4
Beton K-250 untuk Balok Anak 20/40 type B6
2 PEKERJAAN TANGGA UTAMA
Beton K-250 untuk Kolom 30/30 type K-2
Beton K-250 untuk Balok Utama 35/70 posisi CL. 3A type B1
Beton K-250 untuk Balok Anak 30/60 type B2
Beton K-250 untuk Plat lantai tangga T = 12 cm
3 PEKERJAAN LIFT UTAMA
Beton K-250 untuk Kolom 30/30 type K - 2
Beton K-250 untuk Balok Anak 30/60 type B2
Beton K-250 untuk Balok Anak 20/40 type B3
4 PEKERJAAN TANGGA DARURAT
Beton K-250 untuk Balok Anak 20/40 type B3
Beton K-175 un. Ring Bulustrade 15/15
Beton K-250 untuk Plat lantai tangga T = 12 cm
Beton Praktis K-175 un. Kolom 15/15
Beton Praktis K-175 un. Balok Ring 15/15 di atas Pas. Dinding
Beton Praktis K-175 un. Balok Latei 15/15 di atas Kosen Pas. Dinding
Beton Praktis K-175 un. Canopy Jend (50 x 120 x 10) CL. B (4-5) - CL. 5
Beton Praktis K-175 un. Balok 15/20 Canopy Jend CL. B (4-5) - CL. 5
5 PEKERJAAN PLAT
Beton K-250 untuk Plat Lantai 4 tebal 12 cm ( + 12.50 ) + Plat
Beton K-250 untuk Plat Lisplang beton 10/80 atap ruang tunggu
LANTAI - IV - (di atas + 12.50)
1 KOLOM DAN BALOK
Beton K-250 untuk Kolom Utama 50/50 posisi CL. B type K1
Beton K-250 untuk Kolom Utama 50/50 posisi CL. C type K1
Beton K-250 untuk Kolom Utama 50/50 posisi CL. D type K1
Beton K-250 untuk Kolom Utama 50/50 posisi CL. E type K1
Beton K-250 untuk Balok Utama 35/70 posisi CL. 1 type B1
Beton K-250 untuk Balok Utama 35/70 posisi CL. 2 type B1
Beton K-250 untuk Balok Utama 35/70 posisi CL. 3 type B1
Beton K-250 untuk Balok Utama 35/70 posisi CL. 5 type B1
Beton K-250 untuk Balok Utama 35/70 posisi CL. B type B1
Beton K-250 untuk Balok Utama 35/70 posisi CL. C type B1
Beton K-250 untuk Balok Utama 35/70 posisi CL. E type B1
Beton K-250 untuk Balok Anak 30/60 type B2
Beton K-250 untuk Balok Anak 20/40 type B3
2 PEKERJAAN LISPLANG ATAP + PENUTUP CLADDING WALL
Beton K-250 untuk Balok Anak 20/40 type B3 Konsol LisplangBeton K-250 untuk Balok Anak 20/40 type B3 LisplangBeton K-250 untuk plat lisplang/talang t=10 cm - U=1.50 m + 16.50Beton K-250 untuk plat penutup Clidding Wall t=10 cm + 17.30Beton K-175 un. Ring lisplank 15/15 + kolom 15/15
3 PEKERJAAN TANGGA UTAMA
Beton K-250 untuk Kolom 30/30 type K-2
Beton K-250 untuk Balok Utama 35/70 posisi CL. 3A type B1
Beton K-250 untuk Balok Anak 30/60 type B2
Beton K-250 untuk Plat lantai tangga T = 12 cm
4 PEKERJAAN LIFT UTAMA
Beton K-250 untuk Kolom 30/30 type K - 2
Beton K-250 untuk Balok Anak 30/60 type B2
Beton K-250 untuk Balok Anak 20/40 type B3
5 PEKERJAAN TANGGA DARURAT
Beton K-250 untuk Balok Anak 20/40 type B3
Beton K-175 un. Ring Bulustrade 15/15
Beton K-250 untuk Plat lantai tangga T = 12 cm
Beton Praktis K-175 un. Kolom 15/15
Beton Praktis K-175 un. Balok Ring 15/15 di atas Pas. Dinding
Beton Praktis K-175 un. Balok Latei 15/15 di atas Kosen Pas. Dinding
Beton Praktis K-175 un. Canopy Jend (50 x 120 x 10) CL. B (4-5) - CL. 5
Beton Praktis K-175 un. Balok 15/20 Canopy Jend CL. B (4-5) - CL. 5
5 PEKERJAAN PLAT
Beton K-250 untuk Plat lt atap tebal 12 cm ( + 16.50 )
PEKERJAAN LISPLANG ATAP + PENUTUP CLADDING WALL
Beton K-250 untuk Balok Anak 20/40 type B3 Konsol Lisplang
Beton K-250 untuk Balok Anak 20/40 type B3 Lisplang
Beton K-250 untuk plat lisplang/talang t=10 cm - U=1.50 m + 16.50
Beton K-250 untuk plat penutup Clidding Wall t=10 cm + 17.30
Beton K-175 un. Ring lisplank 15/15 + kolom 15/15
LANTAI RUANG LIFT (di atas + 16.50)
1 KOLOM DAN BALOK
Beton K-250 untuk Kolom Utama 50/50 posisi CL. B type K1
Beton K-250 untuk Kolom Utama 50/50 posisi CL. C type K1
Beton K-250 untuk Kolom Utama 30/30 posisi CL. 3 type K2
Beton K-250 untuk Balok Utama 35/70 posisi CL. B type B1
Beton K-250 untuk Balok Utama 35/70 posisi CL. C type B1
Beton K-250 untuk Balok Utama 35/70 posisi CL. 2 type B1
Beton K-250 untuk Balok Utama 35/70 posisi CL. 3 type B1
Beton K-250 untuk Balok Utama 35/70 posisi CL. 3.A type B1
Beton K-250 untuk Balok Utama 20/40 posisi CL. 2.A type B3
Beton K-250 untuk Balok Utama 20/40 posisi CL. 2C type B3
Beton K-250 untuk Balok Utama 30/60 posisi CL. B1 type B2
Beton K-250 untuk Balok Utama 20/40 posisi CL. B3 type B3
Beton Praktis K-175 un. Kolom 15/15
Beton Praktis K-175 un. Balok Latei 15/15 di atas Pas. Dinding
Beton Praktis K-175 un. Canopy Jend (50 x 120 x 10) CL. B (4-5) - CL. 5
Beton Praktis K-175 un. Balok 15/20 Canopy Jend CL. B (4-5) - CL. 5
2 PEKERJAAN PLAT
Beton K-250 untuk Plat lt atap tebal 12 cm ( + 20.52 )
Beton K-250 untuk talang kantong t=10 cm lebar 90 dan balok 15/20
BILL OF QUANTITY (BOQ) STRUKTUR
PROYEK PEMBANGUNAN GEDUNG MENEJEMEN 4 LANTAI
RUMAH SAKIT UMUM DAERAH dr. SOEDONO MADIUN
JALAN Dr. SOETOMO No. 29 MADIUN - JAWA TIMUR
Perhitungan Volume
0,50 x 0,50 x 4,50 x 3 ttk = 3.375
0,50 x 0,50 x 4,50 x 5 ttk = 5.625
0,50 x 0,50 x 4,50 x 5 ttk = 5.625
0,50 x 0,50 x 4,50 x 5 ttk = 5.625
0,50 x 0,50 x 4,50 x 5 ttk = 5.625 25.875 klm
0,35 x 0,70 x 23,8 = 5.831
0,35 x 0,70 x 23,8 = 5.831
0,35 x 0,70 x 23,8 = 5.831
0,35 x 0,70 x 18,5 = 4.533
0,35 x 0,70 x 17 = 4.165
0,30 x 0,60 x 16,8 = 3.024
0,35 x 0,70 x 32 = 7.840
0,35 x 0,70 x 32 = 7.840
0,35 x 0,70 x 33,5 = 8.208
0,35 x 0,70 x 33,5 = 8.208 59.560 b1
0,3 x 0,6 x ( 32 + 12 + 8 + 33,6 + 17 + 18,5 + 19,6 + 23,8 )= 29.610 29.610 b2
0,20 x 0,40 x (4,593+4,175+4,75+8,35)= 1.703 4.348 b3
0,35 x 0,70 x ((33,36 x 4) + 4,5 + (1,36 x 2) + 2,375)= 35.281
0,20 x 0,30 x (2,35*10)= 1.410
0,20 x 0,40 x (2,6 x 6)= 1.248 5.688
0,30 x 0,30 x 2,25 = 0.202
0,35 x 0,70 x 5,20 = 1.274
0,30 x 0,60 x 4 = 0.720
(5,25x1,5x0,12x2)+(0,18x0,3x0,5x1,5x22)+(0,2x0,4x3)+(0,35x0,7x3) 3.756
0,30 x 0,30 x 4,50 x 16 = 2.430
0,30 x 0,60 x 10,80 = 1.944
0,20 x 0,40 x 13,90 = 1.112
0.227
1.632
10.074
38 x 0,80 x 0,15 x 0,15 0.684
3.121
0.090
0.240
0.720
2.160
1.604
(686+88,82) x 0,12 = 92.978
1.888
0,50 x 0,50 x 4,00 x 3 ttk = 3.000
0,50 x 0,50 x 4,00 x 5 ttk = 5.000
0,50 x 0,50 x 4,00 x 5 ttk = 5.000
0,50 x 0,50 x 4,00 x 5 ttk = 5.000
0,50 x 0,50 x 4,00 x 5 ttk = 5.000
0,35 x 0,70 x 23,8 = 5.831 58.824 b1
0,35 x 0,70 x 23,8 = 5.831 29.610
0,35 x 0,70 x 23,8 = 5.831
0,35 x 0,70 x 18,5 = 4.533
0,35 x 0,70 x 17 = 4.165
0,35 x 0,70 x 32 = 7.840
0,35 x 0,70 x 32 = 7.840
0,35 x 0,70 x 32 = 7.840 92.680
0,35 x 0,70 x 32 = 7.840
0,3 x 0,6 x ( 32 + 12 + 8 + 33,6 + 17 + 18,5 + 19,6 + 23,8 ) 29.610
0,20 x 0,40 x ( 4,175 + 4,175 + 5,8 + 8,35 ) 1.800
0,35 x 0,70 x ( 2,55 + 1,34 ) 0.953
0,20 x 0,30 x ( 1.36 + 1.36 + 1.36 ) 0.245
0,20 x 0,40 x (2,6 x 6)= 1.248
0,30 x 0,30 x 4,00 x 6,00 = 2.160
0,35 x 0,70 x 5,20 = 1.274
0,30 x 0,60 x 4 = 0.720
( 5,1 x 1,5 x 0,12 x 2 ) + (( 0,18 x 0,3 ) x 0,5 ) x 1,5 x 22 9.756
0,30 x 0,30 x 4,00 x 6.00 = 2.160
0,30 x 0,60 x 8,00 = 1.440
0,20 x 0,40 x ( 8,40 + 5,50 ) = 1.112
0.560
0.180
2.480
0.162
0.656
0.360
0.240
0.240
669 x 0,12 = 80.280
1.888
0,50 x 0,50 x 4,00 x 5 ttk = 5.000
0,50 x 0,50 x 4,00 x 5 ttk = 5.000
0,50 x 0,50 x 4,00 x 5 ttk = 5.000
0,50 x 0,50 x 4,00 x 5 ttk = 5.000
0,35 x 0,70 x 23,8 = 5.831
0,35 x 0,70 x 23,8 = 5.831
0,35 x 0,70 x 23,8 = 5.831
0,35 x 0,70 x 18,5 = 4.533
0,35 x 0,70 x 17 = 4.165
0,35 x 0,70 x 32 = 7.840
0,35 x 0,70 x 32 = 7.840
0,35 x 0,70 x 32 = 7.840
0,35 x 0,70 x 32 = 7.840
0,3 x 0,6 x (33,5+12+8+16,8+16,8+ 23,8+10+6,8+18,5+17) 29.376
0,20 x 0,40 x (4,593+4,175+4,75+8,35)= 1.703
0,35 x 0,70 x ( 2,55 + 1,34 ) 0.953
0,20 x 0,40 x (2,6 x 6)= 1.248
0,30 x 0,30 x 4,00 = 0.360
0,35 x 0,70 x 5,20 = 1.274
0,30 x 0,60 x 4 = 0.720
( 5,1 x 1,5 x 0,12 x 2 ) + (( 0,18 x 0,3 ) x 0,5 ) x 1,5 x 22 9.756
0,30 x 0,30 x 4,00 x 6.00 = 2.160
0,30 x 0,60 x 10,80 = 1.944
0,20 x 0,40 x ( 8,40 + 5,50 ) = 1.112
0.560
0.180
2.680
0.162
0.335
0.180
0.240
0.480
639,36 x 0,12 = 76.723
1.888
0,50 x 0,50 x 4,00 x 5 ttk = 5.000 16.000
0,50 x 0,50 x 4,00 x 4 ttk = 4.000 2.520 18.520
0,50 x 0,50 x 4,00 x 2 ttk = 2.000
0,50 x 0,50 x 4,00 x 5 ttk = 5.000
0,35 x 0,70 x 17 = 4.165 40.915
0,35 x 0,70 x 17 = 4.165 84.557
0,35 x 0,70 x 18,5 = 4.533
0,35 x 0,70 x 18,5 = 4.533
0,35 x 0,70 x 32 = 7.840
0,35 x 0,70 x 32 = 7.840
0,35 x 0,70 x 32 = 7.840
0,3 x 0,6 x (3 + 8 + 2,8 ) 23.274
0,20 x 0,40 x ((3,42x2) + (19,2 x2) + 5,5 + (4,2x2) + 27 + (1,6 x 3)) = 7.246
0,20 x 0,40 x 1,50 x 3 ttk = 0.360 120.61
0,20 x 0,40 x 8 ttk = 0.640
Beton K-250 untuk plat lisplang/talang t=10 cm - U=1.50 m + 16.50 15.900
12.720
2.385
0.360
1.274
0.720
7.120
0,30 x 0,30 x 4,00 x 6.00 = 2.160
0,30 x 0,60 x 10,80 = 1.944
0,20 x 0,40 x ( 8,40 + 5,50 ) = 1.112
0,20 x 0,40 x 8,40 = 0.672
0,15 x 0,15 x 8,40 = 0.189
2.680
0.270
0.661
0.112
0.300
0.180
(574,386-12.797-0.74-7.545-7,333) x 0,12 = 65.517
0,20 x 0,40 x 1,50 x 3 ttk = 0.360
0,20 x 0,40 x 8 ttk = 0.640
15.900
12.720
2.385
0,50 x 0,50 x 4,00 x 2 ttk = 2.000 29.17
0,50 x 0,50 x 4,00 x 2 ttk = 2.000
0,30 x 0,30 x 4,00 x 6 ttk = 2.160
0,35 x 0,70 x 8 = 1.960
0,35 x 0,70 x 8 = 1.960
0,35 x 0,70 x 7 = 1.715
0,35 x 0,70 x 7 = 1.715
0,35 x 0,70 x 7 = 1.715
0,20 x 0,40 x 3,2 = 0.256
0,20 x 0,40 x 3,2 = 0.256
0,30 x 0,60 x 8 = 1.440
0,20 x 0,40 x 5,50 = 0.440
0.540
0.112
0.300
0.180
66,00 x 0,12 = 7.920
0.801
1.300
5.953
5.486
11.933
98.630
13.910
4.712
0.560
2.480
82.168
106.926
12.110
5.216
0.560
2.680
78.611
80.189
29.620
9.474
5.216
0.672
2.680
65.517
29.620
Pembesian
No. Uraian / Sket Gambar Dia.
Potongan Jumlah Satuan
Panj. Juml.Total Panjang
Btng KgPanj.
KOLOM LANTAI - I (di atas ± 0.00)
1. Kolom type K1 (uk. 50 x 50 cm) 23bh
D22 7.33 16 117.28 2697.44 229 8,049
D10 1.90 60 114.95 2643.85 224 1,630
D10 0.55 40 22.18 510.217 43 315
229,845
2. Kolom type K2 (uk. 30 x 30 cm) 16bh
D16 7.09 12 85.08 1361.28 115 2,148
D10 1.10 60 66.55 1064.8 90 656
44,878
Total jumlah 274.723
No. Uraian / Sket Gambar Dia.
Potongan Jumlah Satuan
Panj. Juml.Total Panjang
Btng KgPanj.
KOLOM LANTAI - II - (di atas + 4.50)
1. Kolom type K1 (uk. 50 x 50 cm) 23bh
D22 4.88 16 78.08 1795.84 152 5,359
D10 1.90 40 76.00 1748 148 1,078
D10
450
450
D10-300
450
D10
250
25
0
12 D16
16 D22
D10
450
45
0
16 D22
D10 0.55 27 14.67 337.333 29 208
152.82
2. Kolom type K2 (uk. 30 x 30 cm) 12bh
D16 4.64 12 55.68 668.16 57 1,055
D10 1.10 40 44.00 528 45 326
16.56
Total jumlah 169.376
No. Uraian / Sket Gambar Dia.
Potongan Jumlah Satuan
Panj. Juml.Total Panjang
Btng KgPanj.
BALOK LANTAI - II - (di atas + 4.50)
1. Balok type B1 (uk. 35 x 70 cm)
D19 241.00 5 1205 102 31,645
D19 60.25 10 602.5 51 15,823
D13 241.00 4 964 82 11,852
D19 180.75 3 542.25 46 14,240
D19 241.00 5 1205 102 31,645
Ø12 2.00 2,410 4820 408 50,492
Ø12 0.40 2,410 964 82 10,098
2. Balok type B2 (uk. 30 x 60 cm)
D19 101.70 5 508.5 43 13,354
D19 25.43 6 152.55 13 4,006
D13 101.70 4 406.8 34 5,001
D19 76.28 4 305.1 26 8,012
D10-300
450
D10
250
250
12 D16
5D19
5D19
4D13
5D19
3D19
5D19
300
65
0
300
Ø12
Ø12
5D19
3D19
4D13
3D19
4D19
4D19
D19 101.70 4 406.8 34 10,683
Ø12 1.70 1,017 1728.9 147 18,111
Ø12 0.35 1,017 355.95 30 3,729
3. Balok type B3 (uk. 20 x 40 cm)
D16 101.70 4 406.8 34 7,576
D16 25.43 4 101.7 9 1,894
D13 101.70 2 203.4 17 2,501
D16 76.28 2 152.55 13 2,841
D16 101.70 1 101.7 9 1,894
Ø10 1.08 678 732.24 62 5,327
4. Balok type B4 (uk. 35 x 70 cm)
D16 140.75 5 703.75 60 13,106
D16 35.19 10 351.875 30 6,553
D13 140.75 4 563 48 6,922
D16 105.56 5 527.8125 45 9,830
D16 140.75 5 703.75 60 13,106
Ø12 2.00 1,408 2815 239 29,489
Ø12 0.40 1,408 563 48 5,898
5. Balok type B5 (uk. 20 x 30 cm)
D16 22.95 4 91.8 8 1,710
D16 5.74 2 11.475 1 214
D16 17.21 1 17.2125 1 321
5D19
3D19
4D13
3D19
4D19
4D19
250
550
250
Ø12
Ø12
4D16
2D16
2D13
2D16
2D16
1D16
150
350
Ø10
5D16
5D16
4D13
5D16
5D16
5D16
300
65
0
300
Ø12
Ø12
4D16
1D16
1D16 1D16
2D16
D16 22.95 2 45.9 4 855
Ø10 0.88 229 201.96 17 1,469
6. Balok type B6 (uk. 20 x 40 cm)
D16 19.74 4 78.96 7 1,470
D16 4.94 6 29.61 3 551
D16 14.81 2 29.61 3 551
D13 19.74 2 39.48 3 735
Ø12 1.08 197 213.192 18 2,233
Total jumlah 345.738
No. Uraian / Sket Gambar Dia.
Potongan Jumlah Satuan
Panj. Juml.Total Panjang
Btng KgPanj.
KOLOM LANTAI - III - (di atas + 8.50)
1. Kolom type K1 (uk. 50 x 50 cm) 20bh
D22 4.88 16 78.08 1561.6 132 4,660
D10 1.90 40 76.00 1520 129 937
D10 0.55 27 14.67 293.333 25 181
115.55
2. Kolom type K2 (uk. 30 x 30 cm) 7bh
D16 4.64 12 55.68 389.76 33 615
D10 1.10 40 44.00 308 26 190
4D16
1D16
1D16 1D16
2D16
250
150
D10
4D16
2D16
3D16 3D16
2D13
350
150
Ø12
D10
450
45
0
D10-300
450
D10
250
250
12 D16
16 D22
5.64
Total jumlah 121.185
No. Uraian / Sket Gambar Dia.
Potongan Jumlah Satuan
Panj. Juml.Total Panjang
Btng KgPanj.
BALOK LANTAI - III - (di atas + 8.50)
1. Balok type B1 (uk. 35 x 70 cm)
D19 241.00 5 1205 102 31,645
D19 60.25 10 602.5 51 15,823
D13 241.00 4 964 82 11,852
D19 180.75 3 542.25 46 14,240
D19 241.00 5 1205 102 31,645
Ø12 2.00 2,410 4820 408 50,492
Ø12 0.40 2,410 964 82 10,098
2. Balok type B2 (uk. 30 x 60 cm)
D19 101.70 5 508.5 43 13,354
D19 25.43 6 152.55 13 4,006
D13 101.70 4 406.8 34 5,001
D19 76.28 4 305.1 26 8,012
D19 101.70 4 406.8 34 10,683
Ø12 1.70 1,017 1728.9 147 18,111
Ø12 0.35 1,017 355.95 30 3,729
3. Balok type B3 (uk. 20 x 40 cm)
D16 30.40 4 121.6 10 2,265
D10
250
250
5D19
5D19
4D13
5D19
3D19
5D19
300
65
0
300
Ø12
Ø12
5D19
3D19
4D13
3D19
4D19
4D19
250
550
250
Ø12
Ø12
4D16
2D16
2D13
2D16
2D16
1D16
D16 7.60 4 30.4 3 566
D13 30.40 2 60.8 5 747
D16 22.80 2 45.6 4 849
D16 30.40 1 30.4 3 566
Ø12 1.08 203 218.88 19 2,293
4. Balok type B4 (uk. 35 x 70 cm)
D16 5.50 5 27.5 2 512
D16 1.38 10 13.75 1 256
D13 5.50 4 22 2 270
D16 1.38 5 6.875 1 128
D16 5.50 5 27.5 2 512
Ø12 2.00 55 110 9 1,152
Ø12 0.40 55 22 2 230
5. Balok type B6 (uk. 20 x 40 cm)
D16 19.74 4 78.96 7 1,470
D16 4.94 6 29.61 3 551
D16 4.94 2 9.87 1 184
D16 19.74 2 39.48 3 735
Ø12 1.08 197 213.192 18 2,233
Total jumlah 244.216
No. Uraian / Sket Gambar Dia.
Potongan Jumlah Satuan
Panj. Juml.Total Panjang
Btng KgPanj.
KOLOM LANTAI - IV - (di atas + 12.50)
4D16
2D16
2D13
2D16
2D16
1D16
150
350
Ø10
5D16
5D16
4D13
5D16
5D16
5D16
300
65
0
300
Ø12
Ø12
4D16
2D16
3D16 3D16
2D13
350
150
Ø12
1. Kolom type K1 (uk. 50 x 50 cm) 16bh
D22 4.88 16 78.08 1249.28 106 3,728
D10 1.90 40 76.00 1216 103 750
D10 0.55 27 14.67 234.667 20 145
73.95
2. Kolom type K2 (uk. 30 x 30 cm) 7bh
D16 4.64 12 55.68 389.76 33 615
D10 1.10 40 44.00 308 26 190
5.64
Total jumlah 79.587
No. Uraian / Sket Gambar Dia.
Potongan Jumlah Satuan
Panj. Juml.Total Panjang
Btng KgPanj.
BALOK LANTAI - IV - (di atas + 12.50)
1. Balok type B1 (uk. 35 x 70 cm) - Tengah
D19 128.20 5 641 54 16,834
D19 32.05 10 320.5 27 8,417
D13 128.20 4 512.8 43 6,304
D19 96.15 3 288.45 24 7,575
D19 128.20 5 641 54 16,834
Ø12 2.00 1282 2564 217 26,859
Ø12 0.40 1282 512.8 43 5,372
D10
450
45
0
D10-300
450
D10
250
250
12 D16
16 D22
5D19
5D19
4D13
5D19
3D19
5D19
300
65
0
300
Ø12
Ø12
2. Balok type B1 (uk. 35 x 70 cm) - Tepi
D19 90.00 3 270 23 7,091
D19 22.50 4 90 8 2,364
D13 90.00 4 360 31 4,426
D19 67.50 2 135 11 3,545
D19 90.00 3 270 23 7,091
Ø12 2.00 900 1800 153 18,856
3. Balok type B2 (uk. 30 x 60 cm)
D19 130.80 5 654 55 17,175
D19 32.70 4 130.8 11 3,435
D13 130.80 4 523.2 44 6,432
D19 98.10 3 294.3 25 7,729
D19 130.80 4 523.2 44 13,740
Ø12 1.70 1308 2223.6 188 23,293
Ø12 0.35 1308 457.8 39 4,796
4. Balok type B3 (uk. 20 x 40 cm)
D16 25.70 4 102.8 9 1,914
D16 6.43 4 25.7 2 479
D13 25.70 2 51.4 4 632
D16 19.28 2 38.55 3 718
D16 25.70 1 25.7 2 479
Ø10 1.08 257 277.56 24 2,019
5D19
2D19
4D13
2D19
3D19
4D19
300
65
0
300
Ø12
Ø12
4D16
2D16
2D13
2D16
2D16
1D16
150
350
Ø10
250
55
0
250
Ø12
Ø12
3D19
2D19
4D13
2D19
2D19
3D19
300
65
0Ø12
5. Balok type B4 (uk. 35 x 70 cm)
D16 8.50 5 42.5 4 791
D16 2.13 10 21.25 2 396
D13 8.50 4 34 3 418
D16 6.38 5 31.875 3 594
D16 8.50 5 42.5 4 791
Ø12 2.00 85 170 14 1,781
Ø12 0.40 85 34 3 356
6. Balok type B5 (uk. 20 x 30 cm)
D16 4.94 4 19.76 2 368
D16 1.24 2 2.47 0 46
D16 3.71 1 3.705 0 69
D16 4.94 2 9.88 1 184
Ø10 0.88 49 43.472 4 316
7. Balok type B6 (uk. 20 x 40 cm)
D16 12.30 4 49.2 4 916
D16 3.08 6 18.45 2 344
D16 9.23 2 18.45 2 344
D13 12.30 2 24.6 2 458
Ø12 1.08 123 132.84 11 1,392
Total jumlah 223.972
No. Uraian / Sket Gambar Dia.
Potongan Jumlah Satuan
Panj. Juml.Total Panjang
Btng KgPanj.
KOLOM ATAP
5D16
5D16
4D13
5D16
5D16
5D16
300
65
0
300
Ø12
Ø12
4D16
1D16
1D16 1D16
2D16
250
150
D10
4D16
2D16
3D16 3D16
2D13
350
150
Ø12
1. Kolom type K1 (uk. 50 x 50 cm) 4bh
D22 4.88 16 78.08 312.32 26 932
D10 1.90 40 76.00 304 26 187
D10 0.55 27 14.67 58.667 5 36
4.62
2. Kolom type K2 (uk. 30 x 30 cm) 6bh
D16 4.64 12 55.68 334.08 28 527
D10 1.10 40 44.00 264 22 163
4.14
Total jumlah 8.762
No. Uraian / Sket Gambar Dia.
Potongan Jumlah Satuan
Panj. Juml.Total Panjang
Btng KgPanj.
BALOK (Atap)
1. Balok type B1 (uk. 35 x 70 cm) - Tepi
D19 128.00 3 384 33 10,084
D19 32.00 4 128 11 3,361
D13 128.00 4 512 43 6,295
D19 96.00 2 192 16 5,042
D19 128.00 3 384 33 10,084
Ø12 1.98 1067 2112 179 22,124
2. Balok type B1 (uk. 35 x 70 cm) - Tengah
D19 32.00 5 160 14 4,202
D10
450
45
0
D10-300
450
D10
250
250
12 D16
16 D22
3D19
2D19
4D13
2D19
2D19
3D19
300
65
0
Ø12
5D19
5D19
4D13
5D19
3D19
5D19
D19 8.00 10 80 7 2,101
D13 32.00 4 128 11 1,574
D19 24.00 3 72 6 1,891
D19 32.00 5 160 14 4,202
Ø12 2.00 320 640 54 6,704
Ø12 0.40 320 128 11 1,341
3. Balok type B2 (uk. 30 x 60 cm)
D19 27.50 3 82.5 7 2,167
D19 6.88 4 27.5 2 722
D13 27.50 4 110 9 1,352
D19 20.63 2 41.25 3 1,083
D19 27.50 3 82.5 7 2,167
Ø12 1.68 229 385 33 4,033
3. Balok type B3 (uk. 20 x 40 cm)
D16 137.50 4 550 47 10,243
D16 34.38 2 68.75 6 1,280
D13 137.50 2 275 23 3,381
D16 103.13 1 103.125 9 1,921
D16 137.50 4 550 47 10,243
Ø10 1.08 1375 1485 126 10,803
Total jumlah 128,401
3D19
2D19
4D13
2D19
2D19
3D19
250
550
Ø12
4D16
1D16
2D13
1D16
1D16
4D16
150
350
Ø10
5D19
5D19
4D13
5D19
3D19
5D19
300
65
0
300
Ø12
Ø12
No. Uraian / Sket Gambar Dia.
Potongan Jumlah Satuan
Panj. Juml.Total Panjang
Btng KgPanj.
TANGGA
1. Tangga darurat lt. 2 ke lt. 3 D16 6.56 23 150.834 13 2,809
D13 1.15 131 150.834 13 1,854
Ø10 0.76 115 87.4 7 636
2. Tangga darurat lt. 3 ke lt. 4 D16 6.56 23 150.834 13 2,809
D13 1.15 131 150.834 13 1,854
Ø10 0.76 115 87.4 7 636
3. Tangga lt. 1 ke lt. 2 D16 5.29 30 158.79 13 2,957
D13 1.50 106 158.7 13 1,951
Ø10 0.76 165 125.4 11 912
4. Tangga lt. 2 ke lt. 3 D16 5.29 30 158.79 13 2,957
D13 1.50 106 158.7 13 1,951
Ø10 0.76 165 125.4 11 912
5. Tangga lt. 3 ke lt. 4 D16 5.29 30 158.79 13 2,957
D13 1.50 106 158.7 13 1,951
Ø10 0.76 165 125.4 11 912
Total jumlah 28,060
No. Uraian / Sket Gambar Dia.
Potongan Jumlah Satuan
Panj. Juml.Total Panjang
Btng KgPanj.
PIT LIFT
1. D16 9.20 23 208.533 18 3,884
D16 6.30 23 142.8 12 2,659
D16 2.05 69 140.571 12 2,618
D13 6.20 14 89.9 8 1,105
D13 5.80 14 84.1 7 1,034
D16 6.90 38 262.2 22 4,883
D16 4.00 35 141.333 12 2,632
D16 2.05 61 124.171 11 2,312
D13 4.00 14 58 5 713
D13 3.60 14 52.2 4 642
Total jumlah 22,482
No. Uraian / Sket Gambar Dia.
Potongan Jumlah Satuan
Panj.Juml. Total Panjang
Btng KgPanj.
SLAB
1. Slab (lantai 2) Ø12 28.00 669.04 18735.170 1,588 196,262
Ø6 3.20 669.04 2140.301 181 5,605
2. Slab (lantai 3) Ø12 28.00 669.04 18735.170 1,588 196,262
Ø6 3.20 669.04 2140.301 181 5,605
3. Slab (lantai 4) Ø12 28.00 639.36 17904.039 1,517 187,555
Ø6 3.20 639.36 2045.353 173 5,357
4. Plat Atap Ø12 28.00 83.36 2334.335 198 24,453
Ø6 3.20 83.36 266.674 23 698
5. Atap Lift Ø12 28.00 66.00 1848.202 157 19,361
Ø6 3.20 66.00 211.138 18 553
Total jumlah 641,711
No. Uraian / Sket Gambar Dia.
Potongan Jumlah Satuan
Panj. Juml.Total Panjang
Btng KgPanj.
KOLOM ATAP
1. Kolom type K1 (uk. 50 x 50 cm) 4bh
D22 4.88 16 78.08 312.32 26 932
D10 1.90 40 76.00 304 26 187
D10 0.55 27 14.67 58.667 5 36
2. Kolom type K2 (uk. 30 x 30 cm) 6bh
D16 4.64 12 55.68 334.08 28 527
m2
D10
450
450
D10-300
450
D10
250
25
0
12 D16
16 D22
D10 1.10 40 44.00 264 22 163
Total jumlah 1,846
D10
250
25
0
9.99
250,726
Bekisting
LANTAI - I (di atas ± 0.00)
KOLOM
No. Kode Dimensi Luas Satuan Jumlah Luas Sat.
1 K1 50 50 8 23 184.00
2 K2 30 30 4.8 16 76.80
Total Kolom = 260.80
BALOK tebal plat lantai 12 cm `
No. Kode Dimensi Kel Panjang Luas Sat.
1 B1 35 70 1.51 (32*4)+(23,8*3)+18,5+17+5,2 240.10 362.55
2 B2 30 60 1.26 (32*2)+(16,8*2)+(23,8*2)+18,5+17 180.70 227.68
3 B3 20 40 0.76 (4,2*2)+5,5+8 21.90 16.64
4 B4 35 70 1.51 1,5+1,5+2,5 5.50 8.31
5 B5 20 30 0.56 ((3/4)*(22/7)*2,5)+0,25 6.14 3.44
6 B6 20 40 0.76 3*3+2,5 11.5 8.74
Total Balok = 618.62
PELAT LANTAI 1
No. Kode Dimensi (m) Luas Satuan (m2) jumlah Luas (m) Sat.
1 A 4 3.5 14 8 112.00
2 B 4 3.5 14 8 112.00
3 C 4 3 12 8 96.00
4 D 4 3.5 14 5 70.00
5 E 4 3.5 14 5 70.00
6 F 4 1.85 7.4 3 22.20
7 G 4 3 12 8 96.00
8 H 4 1.5 6 2 12.00
9 knn tangga 5.2 1 5.2 1 5.20
10 depan lift 4 1 4 2 8.00
11 kiri lift 5.2 2.5 11.125 1 11.13
Luas Pelat Lantai = 614.53
LANTAI - II - (di atas + 4.50
KOLOM Tinggi kolom 4 m
No. Kode Dimensi (cm) Luas Satuan (m2) Jumlah Luas (m2) Sat.
1 K1 50 50 8 23 184.00
2 K2 30 30 4.8 12 57.60
Total Kolom = 241.60
BALOK tebal Pelat lantai 12 cm
No. Kode Dimensi (cm) Kel Panjang Luas (m) Sat.
1 B1 35 70 1.51 (32*4)+(23,8*3)+18,5+17+5,2 240.10 362.55
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
2 B2 30 60 1.26 (32*2)+(16,8*2)+(23,8*2)+18,5+17 180.70 227.68
3 B3 20 40 0.76 (4,2*2)+5,5+8 21.90 16.64
Total Balok = 606.88
PELAT LANTAI 2
No. Kode Dimensi (m) Luas Satuan (m2) jumlah Luas (m) Sat.
1 A 4 3.5 14 8 112.00
2 B 4 3.5 14 8 112.00
3 C 4 3 12 8 96.00
4 D 4 3.5 14 5 70.00
5 E 4 3.5 14 5 70.00
6 F 4 1.85 7.4 3 22.20
7 G 4 3 12 8 96.00
8 H 4 1.5 6 2 12.00
9 knn tangga 5.2 1 5.2 1 5.20
10 depan lift 4 1 4 2 8.00
11 kiri lift 5.2 2.5 11.125 1 11.13
Luas Pelat Lantai 614.53
Luas Begesting Lantai 2 = 1463.00
LANTAI - III - (di atas + 8.50)
KOLOM
No. Kode Dimensi (cm) Luas Satuan (m2) Jumlah Luas (m) Sat.
1 K1 50 50 8 20 160.00
2 K2 30 30 4.8 7 33.60
Total Kolom = 193.60
BALOK tebal Pelat lantai 12 cm
No. Kode Dimensi (cm) Kel Panjang Luas (m) Sat.
1 B1 35 70 1.51 (32*4)+(17*3)+(18,5*2)+5,2 221.20 334.01
2 B2 30 60 0.78 32+33,5+(17*2)+18,5+10+2,8 130.80 102.02
3 B3 20 40 0.76 (4,2*2)+5,5+8 21.90 16.64
4 B4 35 70 1.51 1,5+1,5+2,5 5.50 8.31
5 B5 20 30 0.56 ((3/4)*(22/7)*2,5)+0,25 6.14 3.44
6 B6 20 40 0.76 3*3+2,5 11.5 8.74
Total Balok = 473.17
PELAT LANTAI 3
No. Kode Dimensi (cm) Luas Satuan (m2) jumlah Luas (m) Sat.
1 A 4 3.5 14 8 112.00
2 B 4 3.5 14 8 112.00
3 C 4 3 12 8 96.00
4 D 4 3.5 14 5 70.00
5 E 4 3.5 14 5 70.00
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
6 F 4 1.85 7.4 3 22.20
7 H 4 1.5 6 2 12.00
8 knn tangga 5.2 1 5.2 1 5.20
9 depan lift 4 1 4 2 8.00
10 kiri lift 5.2 2.5 11.125 1 11.13
Luas Pelat Lantai 518.53
Luas Begesting Lantai 3 = 1185.29
LANTAI - IV - (di atas + 12.50)
KOLOM
No. Kode Dimensi (cm) Jumlah Luas (m) Sat.
1 K1 50 50 8 16 128.00
2 K2 30 30 4.8 6 28.80
Total Kolom = 156.80
BALOK tebal Pelat lantai 12 cm
No. Kode Dimensi (cm) Kel Panjang Luas (m)
1 B1 35 70 1.51 (32*2)+12+(17*2)+(7*3) 131.00 197.81
2 B2 30 60 1.26 8+3+2,8 13.80 17.388
3 B3 20 40 0.76 (34*2)+(1,5*3)+(1*27)+(4,2*2)+5,5 113.40 86.184
301.38
PELAT LANTAI 4
No. Kode Dimensi (m) jumlah Luas (m)
1 I 4 1 4 14 56.00
2 J 3.5 1 3.5 8 28.00
3 K 3 1 3 2 6.00
4 L 1 1 1 4 4.00
5 M 1.5 4 6 2 12.00
6 N 11 7 77 1 77.00
Luas Begesting Lantai Atap = 183.00
LISPLANK
No. Kel Panjang Luas (m)
1 2.7 34+34+19+19+1 107 288.90
m2
m2
m2
m2
m2
m2
m2
Luas Satuan (m2)
m2
m2
m2
Luas Satuan (m2)
REKAPITULASI KEBUTUHAN BESIPROYEK PEMBANGUNAN GEDUNG MENEJEMEN 4 LANTAI
RUMAH SAKIT UMUM DAERAH dr. SOEDONO MADIUNJALAN Dr. SOETOMO No. 29 MADIUN - JAWA TIMUR
No. Uraian / Sket Gambar Dia. Jumlah Kg
1. Pondasi D22 413 14.538
2. Sloof D19 281 7.391D16 69 1.285D13 94 1.158D10 532 3.870Ø10 14 0.098Ø8 11 0.050
3. Kolom - Kolom lt. 1 D22 229 8.049
D16 115 2.148D10 358 2.601
- Kolom lt. 2 D22 152 5.359D16 57 1.055D10 221 1.611
- Kolom lt. 3 D22 132 4.660D16 33 0.615D10 180 1.308
- Kolom lt. 4 D22 106 3.728D16 33 0.615D10 149 1.084
- Kolom Atap D22 26 0.932D16 28 0.527D10 53 0.386
4. Balok - Balok lt. 2 D19 315 8.285
D16 284 5.294D13 184 2.268Ø12 971 10.174Ø10 79 0.576
- Balok lt. 3 D19 418 10.967D16 39 0.728
D13 123 1.514Ø12 715 7.486
- Balok lt. 4 D19 361 9.477D16 38 0.715D13 128 1.569Ø12 669 7.009Ø10 27 0.198
- Balok Atap D19 152 3.992D16 108 2.007D13 87 1.068Ø12 277 2.899Ø10 126 0.916
5. Slab - Slab lt. 2 Ø12 1,588 16.632
Ø6 181 0.475 - Slab lt. 3 Ø12 1,588 16.632
Ø6 181 0.475 - Slab lt. 4 Ø12 1,517 15.894
Ø6 173 0.454 - Plat Atap Ø12 198 2.072
Ø6 23 0.059Ø12 157 1.641
- Atap Lift Ø6 18 0.047
6. Pit Lift D16 86 1.609D13 24 0.296
7. Tangga D16 66 1.228D13 66 0.810Ø10 47 0.340
Rekapitulasi kebutuhan besi beton D22 1,111 39.128D19 1,604 56.468D16 1,005 35.389D13 742 26.114D10 1,567 55.190Ø12 8,229 289.742Ø10 322 11.325Ø8 12 0.418Ø6 609 21.456
No. Jenis Jumlah Jumlah Upah Lembur
Pekerja Pekerja Jam Lembur /Hari /Jam (Rp)
1 Surveyor (Free Line) 3 6 Rp 8,000.00 2 3 6 Rp 6,000.00
3 2 6 Rp 7,500.00 4 Mandor 4 6 Rp 6,500.00 5 Kepala Tukang
6 Tukang 24 6 Rp 6,000.00 7 Tukang besi 21 6 Rp 6,000.00 8 Pekerja9 Pekerja tak terampil
JUMLAH
Asisten Surveyor (Free Line)Administrasi Keuangan
Jumlah (Rp)
Rp 144,000.00 Rp 108,000.00
Rp 90,000.00 Rp 156,000.00
Rp 864,000.00 Rp 756,000.00
Rp 1,362,000.00
PEKERJA DAN DURASI PEKERJAAN STRUKTURPEMBANGUNAN GEDUNG MENEJEMEN 4 LANTAI
RUMAH SAKIT UMUM DAERAH dr. SOEDONO MADIUNJALAN Dr. SOETOMO No. 29 MADIUN - JAWA TIMUR
No. URAIAN PEKERJAAN Durasi Prodecesor
1 C. LANTAI - I (di atas ± 0.00)2 Beton Kolom 113 Pek. Bekisting 64 Pembesian 5 3ss+1d5 Ready Mix K-250 5 36 Beton Balok 117 Bekisting 68 Pembesian 5 7ss+1d9 Ready Mix K-250 5 7
10 Pek. Plat 1111 Bekisting 612 Pembesian 513 Ready mix K-250 514 Pek. Tangga Utama 615 Bekisting 316 Pembesian 217 Ready Mix K-250 318 Pek. Lift Utama 619 Bekisting 320 Pembesian 221 Ready Mix K-250 322 Pek Ramp Beton 1523 Bekisting 824 Pembesian 625 Ready mix K-175 726 D. LANTAI - II (di atas + 4.50)27 Beton Kolom 528 Bekisting 329 Pembesian 230 Ready Mix K-250 331 Beton Balok 532 Bekisting 333 Pembesian 234 Ready Mix K-250 335 Pek. Plat 636 Bekisting 3
37 Pembesian 238 Ready mix K-250 339 Pek. Tangga Utama 640 Bekisting 341 Pembesian 242 Ready Mix K-250 343 Pek. Lift Utama 544 Bekisting 345 Pembesian 246 Ready Mix K-250 247 Pek. Tangga Darurat 1048 Bekisting 649 Pembesian 350 Ready Mix K-175 451 E. LANTAI - III (di atas +8.50)52 Beton Kolom 653 Bekisting 354 Pembesian 255 Ready Mix K-250 356 Beton Balok 1157 Bekisting 658 Pembesian 459 Ready Mix K-250 560 Pek. Tangga Utama 1061 Bekisting 562 Pembesian 463 Ready Mix K-250 564 Pek. Lift Utama 1065 Bekisting 566 Pembesian 367 Ready Mix K-250 568 Pek. Tangga Darurat 1169 Bekisting 670 Pembesian 371 Ready Mix K-175 572 Pek. Plat 673 Bekisting 374 Pembesian 275 Ready mix K-250 376 F. LANTAI - IV (di atas+12.50)77 Beton Kolom 1878 Bekisting 1079 Pembesian 480 Ready Mix K-250 881 Beton Balok 18
82 Bekisting 1083 Pembesian 884 Ready Mix K-250 885 Pek. Lisplank 586 Bekisting 387 Pembesian 288 Ready Mix K-250 289 Pek. Tangga Utama 690 Bekisting 391 Pembesian 292 Ready Mix K-250 393 Pek. Lift Utama 594 Bekisting 395 Pembesian 296 Ready Mix K-250 297 Pek. Tangga Darurat 598 Bekisting 399 Pembesian 2
100 Ready Mix K-175 2101 Pek. Plat 6102 Bekisting 3103 Pembesian 2104 Ready mix K-250 3105 G. LANTAI R. LIFT-V-(di atas+12.50)106 Beton Kolom 15107 Bekisting 10108 Pembesian 8109 Ready Mix K-250 5110 Beton Balok 5111 Bekisting 3112 Pembesian 2113 Ready Mix K-250 2114 Pek. Plat 6115 Bekisting 3116 Pembesian 2117 Ready mix K-250 3
35
PEKERJA DAN DURASI PEKERJAAN STRUKTURPEMBANGUNAN GEDUNG MENEJEMEN 4 LANTAI
RUMAH SAKIT UMUM DAERAH dr. SOEDONO MADIUNJALAN Dr. SOETOMO No. 29 MADIUN - JAWA TIMUR
No. URAIAN PEKERJAAN Koef. VOL.Pekerja Hari
/Hari Rencana
C. LANTAI - I (di atas ± 0.00)C.1. PEKERJAAN STRUKTUR
1 Beton Kolom Bekisting
Pekerja 0.3000 oh 260.800 78 7 Tukang 0.3300 oh 260.800 86 7 Kepala Tukang 0.0330 oh 260.800 9 7 Mandor 0.0060 oh 260.800 2 7
Pembesian Mandor 0.0003 oh 7136.560 2 6 Tukang Besi 0.0070 oh 7136.560 50 6 Pekerja Tak Terampil 0.0070 oh 7136.560 50 6 Kepala Tukang 0.0007 oh 7136.560 5 6
Ready Mix K-250 Pekerja tak terampil 1.5000 oh 28.734 43.10 7 Tukang 0.5000 oh 28.734 14.37 7 Kepala Tukang 0.0500 oh 28.734 1.44 7 Mandor 0.0100 oh 28.734 0.29 7
2 Beton BalokBekisting
Pekerja 0.3200 oh 618.622 197.96 7 Tukang 0.3300 oh 618.622 204.15 7 Kepala Tukang 0.0330 oh 618.622 20.41 7 Mandor 0.0060 oh 618.622 3.71 7
Pembesian Mandor 0.0003 oh 23911.897 7.17 6 Tukang Besi 0.0070 oh 23911.897 167.38 6 Pekerja Tak Terampil 0.0070 oh 23911.897 167.38 6 Kepala Tukang 0.0007 oh 23911.897 16.74 6
Ready Mix K-250 Pekerja tak terampil 1.5000 oh 131.457 197.19 7 Tukang 0.5000 oh 131.457 65.73 7 Kepala Tukang 0.0500 oh 131.457 6.57 7 Mandor 0.0100 oh 131.457 1.31 7
3 Pek. Tangga UtamaBekisting
Pekerja 0.3392 oh 234.061 79.39 4 Tukang 0.3498 oh 234.061 81.87 4 Kepala Tukang 0.0351 oh 234.061 8.23 4 Mandor 0.0064 oh 234.061 1.50 4
Pembesian Mandor 0.0003 oh 1213.179 0.36 3 Tukang Besi 0.0070 oh 1213.179 8.49 3 Pekerja Tak Terampil 0.0070 oh 1213.179 8.49 3 Kepala Tukang 0.0007 oh 1213.179 0.85 3
Ready Mix K-250 Pekerja tak terampil 1.5000 oh 5.953 8.93 3 Tukang 0.5000 oh 5.953 2.98 3 Kepala Tukang 0.0500 oh 5.953 0.30 3 Mandor 0.0100 oh 5.953 0.06 3
4 Pek. Lift UtamaBekisting
Pekerja 0.3200 oh 150.320 48.10 4 Tukang 0.3300 oh 150.320 49.61 4 Kepala Tukang 0.0330 oh 150.320 4.96 4 Mandor 0.0060 oh 150.320 0.90 4
Pembesian Mandor 0.0003 oh 1140.884 0.34 3 Tukang Besi 0.0070 oh 1140.884 7.99 3 Pekerja Tak Terampil 0.0070 oh 1140.884 7.99 3 Kepala Tukang 0.0007 oh 1140.884 0.80 3
Ready Mix K-250 Pekerja tak terampil 1.5000 oh 5.486 8.23 3 Tukang 0.5000 oh 5.486 2.74 3 Kepala Tukang 0.0500 oh 5.486 0.27 3 Mandor 0.0100 oh 5.486 0.05 3
5 Pek Ramp BetonBekisting
Pekerja 0.3200 oh 103.434 33.10 14 Tukang 0.3300 oh 103.434 34.13 14 Kepala Tukang 0.0330 oh 103.434 3.41 14 Mandor 0.0060 oh 103.434 0.62 14
Pembesian Mandor 0.0003 oh 1846.631 0.55 14 Tukang Besi 0.0070 oh 1846.631 12.93 14 Pekerja Tak Terampil 0.0070 oh 1846.631 12.93 14 Kepala Tukang 0.0007 oh 1846.631 1.29 14
Ready mix K-175 Pekerja tak terampil 1.5000 oh 28.203 42.31 14 Tukang 0.5000 oh 28.203 14.10 14 Kepala Tukang 0.0500 oh 28.203 1.41 14 Mandor 0.0100 oh 28.203 0.28 14
6 Pek. PlatBekisting
Pekerja 0.3200 oh 590.200 188.86 7 Tukang 0.3300 oh 590.200 194.77 7 Kepala Tukang 0.0330 oh 590.200 19.48 7 Mandor 0.0060 oh 590.200 3.54 7
Pembesian Mandor 0.0003 oh 12933.503 3.88 6 Tukang Besi 0.0070 oh 12933.503 90.53 6 Pekerja Tak Terampil 0.0070 oh 12933.503 90.53 6 Kepala Tukang 0.0007 oh 12933.503 9.05 6
Ready mix K-250 Pekerja tak terampil 1.5000 oh 98.630 147.95 7 Tukang 0.5000 oh 98.630 49.32 7 Kepala Tukang 0.0500 oh 98.630 4.93 7 Mandor 0.0100 oh 98.630 0.99 7
D. LANTAI - II (di atas + 4.50)D.1. PEKERJAAN STRUKTUR
1 Beton Kolom Bekisting
Pekerja 0.3000 oh 241.600 72.48 4 Tukang 0.3300 oh 241.600 79.73 4 Kepala Tukang 0.0330 oh 241.600 7.97 4 Mandor 0.0060 oh 241.600 1.45 4
Pembesian Mandor 0.0003 oh 7651.197 2.30 3 Tukang Besi 0.0070 oh 7651.197 53.56 3 Pekerja Tak Terampil 0.0070 oh 7651.197 53.56 3 Kepala Tukang 0.0007 oh 7651.197 5.36 3
Ready Mix K-250 Pekerja tak terampil 1.5000 oh 24.320 36.48 3 Tukang 0.5000 oh 24.320 12.16 3 Kepala Tukang 0.0500 oh 24.320 1.22 3 Mandor 0.0100 oh 24.320 0.24 3
2 Beton BalokBekisting
Pekerja 0.3200 oh 606.877 194.20 4
Tukang 0.3300 oh 606.877 200.27 4 Kepala Tukang 0.0330 oh 606.877 20.03 4 Mandor 0.0060 oh 606.877 3.64 4
Pembesian Mandor 0.0003 oh 19993.060 6.00 3 Tukang Besi 0.0070 oh 19993.060 139.95 3 Pekerja Tak Terampil 0.0070 oh 19993.060 139.95 3 Kepala Tukang 0.0007 oh 19993.060 14.00 3
Ready Mix K-250 Pekerja tak terampil 1.5000 oh 91.406 137.11 3 Tukang 0.5000 oh 91.406 45.70 3 Kepala Tukang 0.0500 oh 91.406 4.57 3 Mandor 0.0100 oh 91.406 0.91 3
3 Pek. Tangga UtamaBekisting
Pekerja 0.3392 oh 255.127 86.54 4 Tukang 0.3498 oh 255.127 89.24 4 Kepala Tukang 0.0351 oh 255.127 8.97 4 Mandor 0.0064 oh 255.127 1.63 4
Pembesian Mandor 0.0003 oh 2834.997 0.85 3 Tukang Besi 0.0070 oh 2834.997 19.84 3 Pekerja Tak Terampil 0.0070 oh 2834.997 19.84 3 Kepala Tukang 0.0007 oh 2834.997 1.98 3
Ready Mix K-250 Pekerja tak terampil 1.5000 oh 13.910 20.87 3 Tukang 0.5000 oh 13.910 6.96 3 Kepala Tukang 0.0500 oh 13.910 0.70 3 Mandor 0.0100 oh 13.910 0.14 3
4 Pek. Lift UtamaBekisting
Pekerja 0.3200 oh 150.320 48.10 4 Tukang 0.3300 oh 150.320 49.61 4 Kepala Tukang 0.0330 oh 150.320 4.96 4 Mandor 0.0060 oh 150.320 0.90 4
Pembesian Mandor 0.0003 oh 1882.100 0.56 3 Tukang Besi 0.0070 oh 1882.100 13.17 3 Pekerja Tak Terampil 0.0070 oh 1882.100 13.17 3 Kepala Tukang 0.0007 oh 1882.100 1.32 3
Ready Mix K-250 Pekerja tak terampil 1.5000 oh 4.712 7.07 3 Tukang 0.5000 oh 4.712 2.36 3
Kepala Tukang 0.0500 oh 4.712 0.24 3 Mandor 0.0100 oh 4.712 0.05 3
5 Pek. Tangga DaruratBekisting
Pekerja 0.3392 oh 127.563 337.22 7 Tukang 0.3498 oh 127.563 44.62 7 Kepala Tukang 0.0351 oh 127.563 4.48 7 Mandor 0.0064 oh 127.563 0.82 7
Pembesian Mandor 0.0003 oh 994.160 0.30 5 Tukang Besi 0.0070 oh 994.160 6.96 5 Pekerja Tak Terampil 0.0070 oh 994.160 6.96 5 Kepala Tukang 0.0007 oh 994.160 0.70 5
Ready Mix K-175 Pekerja tak terampil 1.5000 oh 4.878 7.32 7 Tukang 0.5000 oh 4.878 2.44 7 Kepala Tukang 0.0500 oh 4.878 0.24 7 Mandor 0.0100 oh 4.878 0.05 7
6 Pek. PlatBekisting
Pekerja 0.3200 oh 590.200 188.86 4 Tukang 0.3300 oh 590.200 194.77 4 Kepala Tukang 0.0330 oh 590.200 19.48 4 Mandor 0.0060 oh 590.200 3.54 4
Pembesian Mandor 0.0003 oh 10774.772 3.23 3 Tukang Besi 0.0070 oh 10774.772 75.42 3 Pekerja Tak Terampil 0.0070 oh 10774.772 75.42 3 Kepala Tukang 0.0007 oh 10774.772 7.54 3
Ready mix K-250 Pekerja tak terampil 1.5000 oh 82.168 123.25 3 Tukang 0.5000 oh 82.168 41.08 3 Kepala Tukang 0.0500 oh 82.168 4.11 3 Mandor 0.0100 oh 82.168 0.82 3
E. LANTAI - III (di atas +8.50)E.1. PEKERJAAN STRUKTUR
1 Beton Kolom Bekisting
Pekerja 0.3000 oh 193.600 58.08 4 Tukang 0.3300 oh 193.600 63.89 4 Kepala Tukang 0.0330 oh 193.600 6.39 4 Mandor 0.0060 oh 193.600 1.16 4
Pembesian Mandor 0.0003 oh 6213.939 1.86 3 Tukang Besi 0.0070 oh 6213.939 43.50 3 Pekerja Tak Terampil 0.0070 oh 6213.939 43.50 3 Kepala Tukang 0.0007 oh 6213.939 4.35 3
Ready Mix K-250 Pekerja tak terampil 1.5000 oh 22.520 33.78 3 Tukang 0.5000 oh 22.520 11.26 3 Kepala Tukang 0.0500 oh 22.520 1.13 3 Mandor 0.0100 oh 22.520 0.23 3
2 Beton BalokBekisting
Pekerja 0.3200 oh 473.165 151.41 7 Tukang 0.3300 oh 473.165 156.14 7 Kepala Tukang 0.0330 oh 473.165 15.61 7 Mandor 0.0060 oh 473.165 2.84 7
Pembesian Mandor 0.0003 oh 19823.950 5.95 5 Tukang Besi 0.0070 oh 19823.950 138.77 5 Pekerja Tak Terampil 0.0070 oh 19823.950 138.77 5 Kepala Tukang 0.0007 oh 19823.950 13.88 5
Ready Mix K-250 Pekerja tak terampil 1.5000 oh 90.831 136.25 7 Tukang 0.5000 oh 90.831 45.42 7 Kepala Tukang 0.0500 oh 90.831 4.54 7 Mandor 0.0100 oh 90.831 0.91 7
3 Pek. Tangga UtamaBekisting
Pekerja 0.3392 oh 262.148 88.92 7 Tukang 0.3498 oh 262.148 91.70 7 Kepala Tukang 0.0351 oh 262.148 9.21 7 Mandor 0.0064 oh 262.148 1.68 7
Pembesian Mandor 0.0003 oh 2468.139 0.74 5 Tukang Besi 0.0070 oh 2468.139 17.28 5 Pekerja Tak Terampil 0.0070 oh 2468.139 17.28 5 Kepala Tukang 0.0007 oh 2468.139 1.73 5
Ready Mix K-250 Pekerja tak terampil 1.5000 oh 12.110 18.17 7 Tukang 0.5000 oh 12.110 6.06 7 Kepala Tukang 0.0500 oh 12.110 0.61 7 Mandor 0.0100 oh 12.110 0.12 7
4 Pek. Lift UtamaBekisting
Pekerja 0.3200 oh 150.320 48.10 7 Tukang 0.3300 oh 150.320 49.61 7 Kepala Tukang 0.0330 oh 150.320 4.96 7 Mandor 0.0060 oh 150.320 0.90 7
Pembesian Mandor 0.0003 oh 1063.073 0.32 5 Tukang Besi 0.0070 oh 1063.073 7.44 5 Pekerja Tak Terampil 0.0070 oh 1063.073 7.44 5 Kepala Tukang 0.0007 oh 1063.073 0.74 5
Ready Mix K-250 Pekerja tak terampil 1.5000 oh 5.216 7.82 7 Tukang 0.5000 oh 5.216 2.61 7 Kepala Tukang 0.0500 oh 5.216 0.26 7 Mandor 0.0100 oh 5.216 0.05 7
5 Pek. Tangga DaruratBekisting
Pekerja 0.3200 oh 234.061 74.90 7 Tukang 0.3300 oh 234.061 77.24 7 Kepala Tukang 0.0330 oh 234.061 7.72 7 Mandor 0.0060 oh 234.061 1.40 7
Pembesian Mandor 0.0003 oh 734.667 0.22 5 Tukang Besi 0.0070 oh 734.667 5.14 5 Pekerja Tak Terampil 0.0070 oh 734.667 5.14 5 Kepala Tukang 0.0007 oh 734.667 0.51 5
Ready Mix K-175 Pekerja tak terampil 1.5000 oh 5.953 8.93 7 Tukang 0.5000 oh 5.953 2.98 7 Kepala Tukang 0.0500 oh 5.953 0.30 7 Mandor 0.0100 oh 5.953 0.06 7
6 Pek. PlatBekisting
Pekerja 0.3200 oh 494.200 158.14 4 Tukang 0.3300 oh 494.200 163.09 4 Kepala Tukang 0.0330 oh 494.200 16.31 4 Mandor 0.0060 oh 494.200 2.97 4
Pembesian Mandor 0.0003 oh 10308.365 3.09 3 Tukang Besi 0.0070 oh 10308.365 72.16 3 Pekerja Tak Terampil 0.0070 oh 10308.365 72.16 3 Kepala Tukang 0.0007 oh 10308.365 7.22 3
Ready mix K-250 Pekerja tak terampil 1.5000 oh 78.611 117.92 3 Tukang 0.5000 oh 78.611 39.31 3 Kepala Tukang 0.0500 oh 78.611 3.93 3 Mandor 0.0100 oh 78.611 0.79 3
F. LANTAI - IV (di atas+12.50)F.1. PEKERJAAN STRUKTUR
1 Beton Kolom Bekisting
Pekerja 0.3000 oh 156.800 47.04 12 Tukang 0.3300 oh 156.800 51.74 12 Kepala Tukang 0.0330 oh 156.800 5.17 12 Mandor 0.0060 oh 156.800 0.94 12
Pembesian Mandor 0.0003 oh 5114.786 1.53 5 Tukang Besi 0.0070 oh 5114.786 35.80 5 Pekerja Tak Terampil 0.0070 oh 5114.786 35.80 5 Kepala Tukang 0.0007 oh 5114.786 3.58 5
Ready Mix K-250 Pekerja tak terampil 1.5000 oh 18.520 27.78 9 Tukang 0.5000 oh 18.520 9.26 9 Kepala Tukang 0.0500 oh 18.520 0.93 9 Mandor 0.0100 oh 18.520 0.19 9
3 Beton BalokBekisting
Pekerja 0.3200 oh 301.382 96.44 12 Tukang 0.3300 oh 301.382 99.46 12 Kepala Tukang 0.0330 oh 301.382 9.95 12 Mandor 0.0060 oh 301.382 1.81 12
Pembesian Mandor 0.0003 oh 16686.882 5.01 9 Tukang Besi 0.0070 oh 16686.882 116.81 9 Pekerja Tak Terampil 0.0070 oh 16686.882 116.81 9 Kepala Tukang 0.0007 oh 16686.882 11.68 9
Ready Mix K-250 Pekerja tak terampil 1.5000 oh 84.557 126.84 9 Tukang 0.5000 oh 84.557 42.28 9 Kepala Tukang 0.0500 oh 84.557 4.23 9 Mandor 0.0100 oh 84.557 0.85 9
2 Pek. Lisplank AtapBekisting
Pekerja 0.3200 oh 120.610 38.60 4
Tukang 0.3300 oh 120.610 39.80 4 Kepala Tukang 0.0330 oh 120.610 3.98 4 Mandor 0.0060 oh 120.610 0.72 4
Pembesian Mandor 0.0003 oh 4271.891 1.28 3 Tukang Besi 0.0070 oh 4271.891 29.90 3 Pekerja Tak Terampil 0.0070 oh 4271.891 29.90 3 Kepala Tukang 0.0007 oh 4271.891 2.99 3
Ready Mix K-250 Pekerja tak terampil 1.5000 oh 32.005 48.01 3 Tukang 0.5000 oh 32.005 16.00 3 Kepala Tukang 0.0500 oh 32.005 1.60 3 Mandor 0.0100 oh 32.005 0.32 3
4 Pek. Tangga UtamaBekisting
Pekerja 0.3392 oh 262.148 88.92 4 Tukang 0.3498 oh 262.148 91.70 4 Kepala Tukang 0.0351 oh 262.148 9.21 4 Mandor 0.0064 oh 262.148 1.68 4
Pembesian Mandor 0.0003 oh 1930.896 0.58 3 Tukang Besi 0.0070 oh 1930.896 13.52 3 Pekerja Tak Terampil 0.0070 oh 1930.896 13.52 3 Kepala Tukang 0.0007 oh 1930.896 1.35 3
Ready Mix K-250 Pekerja tak terampil 1.5000 oh 9.474 14.21 3 Tukang 0.5000 oh 9.474 4.74 3 Kepala Tukang 0.0500 oh 9.474 0.47 3 Mandor 0.0100 oh 9.474 0.09 3
5 Pek. Lift UtamaBekisting
Pekerja 0.3200 oh 150.320 48.10 4 Tukang 0.3300 oh 150.320 49.61 4 Kepala Tukang 0.0330 oh 150.320 4.96 4 Mandor 0.0060 oh 150.320 0.90 4
Pembesian Mandor 0.0003 oh 1063.073 0.32 3 Tukang Besi 0.0070 oh 1063.073 7.44 3 Pekerja Tak Terampil 0.0070 oh 1063.073 7.44 3 Kepala Tukang 0.0007 oh 1063.073 0.74 3
Ready Mix K-250 Pekerja tak terampil 1.5000 oh 5.216 7.82 3 Tukang 0.5000 oh 5.216 2.61 3
Kepala Tukang 0.0500 oh 5.216 0.26 3 Mandor 0.0100 oh 5.216 0.05 3
6 Pek. Tangga DaruratBekisting
Pekerja 0.3200 oh 234.061 74.90 4 Tukang 0.3300 oh 234.061 77.24 4 Kepala Tukang 0.0330 oh 234.061 7.72 4 Mandor 0.0060 oh 234.061 1.40 4
Pembesian Mandor 0.0003 oh 784.508 0.24 3 Tukang Besi 0.0070 oh 784.508 5.49 3 Pekerja Tak Terampil 0.0070 oh 784.508 5.49 3 Kepala Tukang 0.0007 oh 784.508 0.55 3
Ready Mix K-175 Pekerja tak terampil 1.5000 oh 5.065 7.60 3 Tukang 0.5000 oh 5.065 2.53 3 Kepala Tukang 0.0500 oh 5.065 0.25 3 Mandor 0.0100 oh 5.065 0.05 3
7 Pek. PlatBekisting
Pekerja 0.3200 oh 183.000 58.56 4 Tukang 0.3300 oh 183.000 60.39 4 Kepala Tukang 0.0330 oh 183.000 6.04 4 Mandor 0.0060 oh 183.000 1.10 4
Pembesian Mandor 0.0003 oh 8591.247 2.58 3 Tukang Besi 0.0070 oh 8591.247 60.14 3 Pekerja Tak Terampil 0.0070 oh 8591.247 60.14 3 Kepala Tukang 0.0007 oh 8591.247 6.01 3
Ready mix K-250 Pekerja tak terampil 1.5000 oh 97.522 146.28 3 Tukang 0.5000 oh 97.522 48.76 3 Kepala Tukang 0.0500 oh 97.522 4.88 3 Mandor 0.0100 oh 97.522 0.98 3
G. LANTAI RUANG LIFT -V-(di atas+16.50)G.1. PEKERJAAN STRUKTUR
1 Beton Kolom Bekisting
Pekerja 0.3000 oh 29.170 8.75 12 Tukang 0.3300 oh 29.170 9.63 12 Kepala Tukang 0.0330 oh 29.170 0.96 12 Mandor 0.0060 oh 29.170 0.18 12
Pembesian Mandor 0.0003 oh 1889.219 0.57 9 Tukang Besi 0.0070 oh 1889.219 13.22 9 Pekerja Tak Terampil 0.0070 oh 1889.219 13.22 9 Kepala Tukang 0.0007 oh 1889.219 1.32 9
Ready Mix K-250 Pekerja tak terampil 1.5000 oh 7.293 10.94 9 Tukang 0.5000 oh 7.293 3.65 9 Kepala Tukang 0.0500 oh 7.293 0.36 9 Mandor 0.0100 oh 7.293 0.07 9
2 Beton BalokBekisting
Pekerja 0.3200 oh 46.998 15.04 4 Tukang 0.3300 oh 46.998 15.51 4 Kepala Tukang 0.0330 oh 46.998 1.55 4 Mandor 0.0060 oh 46.998 0.28 4
Pembesian Mandor 0.0003 oh 2500.526 0.75 3 Tukang Besi 0.0070 oh 2500.526 17.50 3 Pekerja Tak Terampil 0.0070 oh 2500.526 17.50 3 Kepala Tukang 0.0007 oh 2500.526 1.75 3
Ready Mix K-250 Pekerja tak terampil 1.5000 oh 11.750 17.62 3 Tukang 0.5000 oh 11.750 5.87 3 Kepala Tukang 0.0500 oh 11.750 0.59 3 Mandor 0.0100 oh 11.750 0.12 3
3 Pek. PlatBekisting
Pekerja 0.3200 oh 17.442 5.58 4 Tukang 0.3300 oh 17.442 5.76 4 Kepala Tukang 0.0330 oh 17.442 0.58 4 Mandor 0.0060 oh 17.442 0.10 4
Pembesian Mandor 0.0003 oh 1143.593 0.34 3 Tukang Besi 0.0070 oh 1143.593 8.01 3 Pekerja Tak Terampil 0.0070 oh 1143.593 8.01 3 Kepala Tukang 0.0007 oh 1143.593 0.80 3
Ready mix K-250 Pekerja tak terampil 1.5000 oh 8.721 13.08 3 Tukang 0.5000 oh 8.721 4.36 3 Kepala Tukang 0.0500 oh 8.721 0.44 3 Mandor 0.0100 oh 8.721 0.09 3
PEKERJA DAN DURASI PEKERJAAN STRUKTURPEMBANGUNAN GEDUNG MENEJEMEN 4 LANTAI
RUMAH SAKIT UMUM DAERAH dr. SOEDONO MADIUNJALAN Dr. SOETOMO No. 29 MADIUN - JAWA TIMUR
Dipakai Vol Hari Vol Dipakai Tambah Pekerja /Hari Percepatan /Hari Pekerja Pekerja
11 37 6 43 13 212 37 6 43 14 21 37 6 43 1 00 37 6 43 0 0
0 1189 5 1,427 0 08 1189 5 1,427 10 28 1189 5 1,427 10 21 1189 5 1,427 1 0
6 4 5 6 9 22 4 5 6 3 10 4 5 6 0 00 4 5 6 0 0
28 88 6 103 33 529 88 6 103 34 53 88 6 103 3 01 88 6 103 1 0
1 3985 5 4782 1 028 3985 5 4782 33 628 3985 5 4782 33 63 3985 5 4782 3 1
28 19 5 26 39 119 19 5 26 13 41 19 5 26 1 00 19 5 26 0 0
20 59 3 78 26 720 59 3 78 27 72 59 3 78 3 10 59 3 78 0 0
0 404 2 607 0 03 404 2 607 4 13 404 2 607 4 10 404 2 607 0 0
3 2 3 2 3 01 2 3 2 1 00 2 3 2 0 00 2 3 2 0 0
12 38 3 50 16 412 38 3 50 17 41 38 3 50 2 00 38 3 50 0 0
0 380 2 570 0 03 380 2 570 4 13 380 2 570 4 10 380 2 570 0 0
3 2 3 2 3 01 2 3 2 1 00 2 3 2 0 00 2 3 2 0 0
2 7 8 13 4 22 7 8 13 4 20 7 8 13 0 00 7 8 13 0 0
0 132 6 308 0 01 132 6 308 2 11 132 6 308 2 10 132 6 308 0 0
3 2 7 4 6 31 2 7 4 2 10 2 7 4 0 00 2 7 4 0 0
27 84 6 98 31 428 84 6 98 32 53 84 6 98 3 01 84 6 98 1 0
1 2156 5 2587 1 015 2156 5 2587 18 315 2156 5 2587 18 32 2156 5 2587 2 0
21 14 5 20 30 87 14 5 20 10 31 14 5 20 1 00 14 5 20 0 0
18 60 3 81 24 620 60 3 81 27 72 60 3 81 3 10 60 3 81 0 0
1 2550 2 3826 1 018 2550 2 3826 27 918 2550 2 3826 27 92 2550 2 3826 3 1
12 8 3 8 12 04 8 3 8 4 00 8 3 8 0 00 8 3 8 0 0
49 152 3 202 65 16
50 152 3 202 67 175 152 3 202 7 21 152 3 202 1 0
2 6664 2 9997 3 147 6664 2 9997 70 2347 6664 2 9997 70 235 6664 2 9997 7 2
46 30 3 30 46 015 30 3 30 15 02 30 3 30 2 00 30 3 30 0 0
22 64 3 85 29 722 64 3 85 30 72 64 3 85 3 10 64 3 85 1 1
0 945 2 1417 0 07 945 2 1417 10 37 945 2 1417 10 31 945 2 1417 1 0
7 5 3 5 7 02 5 3 5 2 00 5 3 5 0 00 5 3 5 0 0
12 38 3 50 16 412 38 3 50 17 41 38 3 50 2 00 38 3 50 0 0
0 627 2 941 0 04 627 2 941 7 24 627 2 941 7 20 627 2 941 1 1
2 2 2 2 4 11 2 2 2 1 0
0 2 2 2 0 00 2 2 2 0 0
48 142 6 166 56 86 18 6 21 7 11 18 6 21 1 00 18 6 21 0 0
0 199 3 331 0 01 199 3 331 2 11 199 3 331 2 10 199 3 331 0 0
1 1 4 1 2 10 1 4 1 1 10 1 4 1 0 00 1 4 1 0 0
47 148 3 197 63 1649 148 3 197 65 165 148 3 197 6 21 148 3 197 1 0
1 3592 2 5387 2 125 3592 2 5387 38 1325 3592 2 5387 38 133 3592 2 5387 4 1
41 27 3 27 41 014 27 3 27 14 01 27 3 27 1 00 27 3 27 0 0
15 48 3 65 19 516 48 3 65 21 52 48 3 65 2 10 48 3 65 0 0
1 2071 2 3107 1 014 2071 2 3107 22 714 2071 2 3107 22 71 2071 2 3107 2 1
11 8 3 8 11 04 8 3 8 4 00 8 3 8 0 00 8 3 8 0 0
22 68 6 79 25 422 68 6 79 26 42 68 6 79 3 00 68 6 79 0 0
1 3965 4 4956 1 028 3965 4 4956 35 728 3965 4 4956 35 73 3965 4 4956 3 1
19 13 5 18 27 86 13 5 18 9 31 13 5 18 1 00 13 5 18 0 0
13 37 5 52 18 513 37 5 52 18 51 37 5 52 2 10 37 5 52 0 0
0 494 4 617 0 03 494 4 617 4 13 494 4 617 4 10 494 4 617 0 0
3 2 5 2 4 11 2 5 2 1 00 2 5 2 0 00 2 5 2 0 0
7 21 5 30 10 37 21 5 30 10 31 21 5 30 1 00 21 5 30 0 0
0 213 3 354 0 01 213 3 354 2 11 213 3 354 2 10 213 3 354 0 0
1 1 5 1 2 00 1 5 1 1 10 1 5 1 0 00 1 5 1 0 0
11 33 6 39 12 211 33 6 39 13 21 33 6 39 1 00 33 6 39 0 0
0 147 3 245 0 01 147 3 245 2 11 147 3 245 2 10 147 3 245 0 0
1 1 5 1 2 10 1 5 1 1 10 1 5 1 0 00 1 5 1 0 0
40 124 3 165 53 1341 124 3 165 54 144 124 3 165 5 11 124 3 165 1 0
1 3436 2 5154 2 124 3436 2 5154 36 1224 3436 2 5154 36 122 3436 2 5154 4 1
39 26 3 26 39 013 26 3 26 13 01 26 3 26 1 00 26 3 26 0 0
4 13 10 16 5 14 13 10 16 5 10 13 10 16 1 10 13 10 16 0 0
0 1023 4 1279 0 07 1023 4 1279 9 27 1023 4 1279 9 21 1023 4 1279 1 0
3 2 8 2 3 01 2 8 2 1 00 2 8 2 0 00 2 8 2 0 0
8 25 10 30 10 28 25 10 30 10 21 25 10 30 1 00 25 10 30 0 0
1 1854 8 2086 1 013 1854 8 2086 15 213 1854 8 2086 15 21 1854 8 2086 1 0
14 9 8 11 16 25 9 8 11 5 10 9 8 11 1 10 9 8 11 0 0
10 30 3 40 13 3
10 30 3 40 13 31 30 3 40 1 00 30 3 40 0 0
0 1424 2 2136 1 110 1424 2 2136 15 510 1424 2 2136 15 51 1424 2 2136 1 0
16 11 2 16 24 85 11 2 16 8 31 11 2 16 1 00 11 2 16 0 0
22 66 3 87 30 723 66 3 87 31 82 66 3 87 3 10 66 3 87 1 1
0 644 2 965 0 05 644 2 965 7 25 644 2 965 7 20 644 2 965 1 1
5 3 5 2 3 -22 3 5 2 1 -10 3 5 2 0 00 3 5 2 0 0
12 38 3 50 16 412 38 3 50 17 41 38 3 50 2 00 38 3 50 0 0
0 354 2 532 0 02 354 2 532 4 12 354 2 532 4 10 354 2 532 0 0
3 2 2 3 4 11 2 2 3 1 0
0 2 2 3 0 00 2 2 3 0 0
19 59 3 78 25 619 59 3 78 26 62 59 3 78 3 10 59 3 78 0 0
0 262 2 392 0 02 262 2 392 3 12 262 2 392 3 10 262 2 392 0 0
3 2 2 3 4 11 2 2 3 1 00 2 2 3 0 00 2 2 3 0 0
15 46 3 61 20 515 46 3 61 20 52 46 3 61 2 10 46 3 61 0 0
1 2864 2 4296 1 020 2864 2 4296 30 1020 2864 2 4296 30 102 2864 2 4296 3 1
49 33 3 33 49 016 33 3 33 16 02 33 3 33 2 00 33 3 33 0 0
1 2 10 3 1 01 2 10 3 1 00 2 10 3 0 00 2 10 3 0 0
0 210 8 236 0 01 210 8 236 2 01 210 8 236 2 00 210 8 236 0 0
1 1 5 1 2 10 1 5 1 1 10 1 5 1 0 00 1 5 1 0 0
4 12 3 16 5 14 12 3 16 5 10 12 3 16 1 10 12 3 16 0 0
0 834 2 1250 0 06 834 2 1250 9 36 834 2 1250 9 31 834 2 1250 1 0
6 4 2 6 9 32 4 2 6 3 10 4 2 6 0 00 4 2 6 0 0
1 4 3 6 2 01 4 3 6 2 00 4 3 6 0 00 4 3 6 0 0
0 381 2 572 0 03 381 2 572 4 13 381 2 572 4 10 381 2 572 0 0
4 3 3 3 4 01 3 3 3 1 00 3 3 3 0 00 3 3 3 0 0
RKepala Tukang 80Pekerja 497Pekerja Tak terampil 653
27
Page 290 of 334
KURVA S RENCANAPEMBANGUNAN GEDUNG MENEJEMEN 4 LANTAI 0.06% 0.58% 0.75% 0.92% 2.62% 3.90% 5.35% 5.50% 6.42% 6.48% 8.08% 7.25% 5.27% 5.19% 4.91% 4.75% 4.54% 4.54% 4.48% 4.47% 3.64% 3.64% 2.66% 2.95% 1.04%RUMAH SAKIT UMUM DAERAH dr. SOEDONO MADIUN 0.58% 0.58% 0.58% 0.60% 3.72% 3.85% 3.55% 6.28% 8.88% 8.88% 5.16% 5.27% 3.28% 4.97% 4.24% 5.69% 7.06% 3.45% 3.42% 5.53% 4.19% 2.75% 2.83% 3.41% 1.26%JALAN Dr. SOETOMO No. 29 MADIUN - JAWA TIMUR 0.58% 1.15% 1.73% 2.32% 6.04% 9.88% ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ###
No. URAIAN PEKERJAANBobot
Jangka Waktu Pelaksanaan = 180 HariSKALABulan Ke-1 Bulan Ke-2 Bulan Ke-3 Bulan Ke-4 Bulan Ke-5 Bulan Ke-6 Bulan Ke-7
% 17-23/01/1124-30/01/1131-06/02/1107-13/02/1114-20/02/1121-27/02/1128-06/03/1107-13/03/1114-20/03/1121-27/03/1128-03/04/1104-10/04/1111-17/04/1118-24/04/1125-01/05/1102-08/05/1109-15/05/1116-22/05/1123-29/05/1130-05/06/1106-12/06/1113-19/06/1120-26/06/1127-03/07/1104-10/07/11A. PEKERJAAN PENDAHULUAN 100.00%
A.1 PEKERJAAN PERSIAPAN2.30 0.58% 0.58% 0.58% 0.58%
A.2 PEKERJAAN TANAH0.04 0.02% 0.02%
A.3 PEKERJAAN URUGAN0.82 0.16% 0.16% 0.16% 0.16% 0.16%
B. PEK. SUB STRUKTUR DIBAWAH ±0.00B.1 PEKERJAAN PONDASI UTAMA 21.32 3.55% 3.55% 3.55% 3.55% 3.55% 3.55%
B.2 PEKERJAAN PONDASI PENDUKUNG 0.13 0.13%C. LANTAI - I -(Di atas ± 0.00)
C.1. PEKERJAAN SIPIL 12.71 2.54% 2.54% 2.54% 2.54% 2.54%C.3. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
C.3.1. PEKERJAAN ELEKTRIKAL 0.60 0.20% 0.20% 0.20%C.3.3. PEKERJAAN INSTALASI AIR
A INSTALASI TALANG VERTICAL 0.08 0.08%B. INSTALASI AIR KOTOR + KOTORAN CLOSET 0.11 0.06% 0.06%C. INSTALASI AIR BERSIH 0.25 0.25%
D. LANTAI - II - (DI ATAS + 4.50) 75.00%D.1. PEKERJAAN SIPIL 9.69 2.42% 2.42% 2.42% 2.42%
D.3. PEKERJAAN MEKANIKAL DAN ELEKTRIKALD.3.1. PEKERJAAN ELEKTRIKAL 0.45 0.45%D.3.3. PEKERJAAN INSTALASI AIR
A INSTALASI TALANG VERTICAL 0.08 0.08%B. INSTALASI AIR KOTOR + KOTORAN CLOSET 0.11 0.11%C. INSTALASI AIR BERSIH 0.26 0.26%
E. LANTAI - III - (DI ATAS + 8.50)E.1. PEKERJAAN SIPIL 8.65 1.73% 1.73% 1.73% 1.73% 1.73%
E.2 PEKERJAAN ARSITEKTURALE.2.1. PEKERJAAN PASANGAN DAN PLESTERAN 2.10 1.05% 1.05%E.2.2. PEKERJAAN LANTAI DAN PELAPIS DINDING 0.16 0.16%E.2.3. PEK. KOSEN PINTU,JENDELA,ASSES- KACA 0.70 0.70%E.2.4. PEKERJAAN PLAFOND 1.08 1.08%E.2.5. PEKERJAAN PENGECATAN 0.38 0.38%
E.3. PEKERJAAN MEKANIKAL DAN ELEKTRIKALE.3.1. PEKERJAAN ELEKTRIKAL 1.70 0.34% 0.34% 0.34% 0.34% 0.34%E.3.3. PEKERJAAN INSTALASI AIR
A INSTALASI TALANG VERTICAL 0.18 0.18% 50.00%B. INSTALASI AIR KOTOR + KOTORAN CLOSET 0.11 0.11%C. INSTALASI AIR BERSIH 0.25 0.25%
F. LANTAI - IV - (DI ATAS + 12.50)F.1. PEKERJAAN SIPIL 6.71 1.12% 1.12% 1.12% 1.12% 1.12% 1.12%
F.2 PEKERJAAN ARSITEKTURALF.2.1. PEKERJAAN PASANGAN DAN PLESTERAN 2.42 0.61% 0.61% 0.61% 0.61%F.2.2. PEKERJAAN LANTAI DAN PELAPIS DINDING 1.47 0.74% 0.74%F.2.3. PEKERJAAN KOSEN PINTU,JENDELA,ASSESORIES DAN KACA 2.68 2.68%F.2.4. PEKERJAAN PLAFOND 0.96 0.48% 0.48%F.2.5. PEKERJAAN PENGECATAN 0.41 0.41%F.2.6. PEKERJAAN SANITAIR / FIXTURE UNIT 0.16 0.08% 0.08%F.2.7. PEKERJAAN BESI 1.07 1.07%
F.3. PEKERJAAN MEKANIKAL DAN ELEKTRIKALF.3.1. PEKERJAAN ELEKTRIKAL 1.73 0.58% 0.58% 0.58%F.3.2 PEKERJAAN PENDINGIN RUANGAN / AIR CONDITION 2.24 2.24%F.3.3. PEKERJAAN INSTALASI AIR
A INSTALASI TALANG VERTICAL 0.46 0.46%B. INSTALASI AIR KOTOR + KOTORAN CLOSET 0.11 0.11% 25.00%C. INSTALASI AIR BERSIH 0.25 0.25%
F 3.4. PEKERJAAN INSTALASI INSTALASI KABEL TV 0.04 0.04%F.3.5. PEKERJAAN INSTALASI HYDRANT 0.77 0.26% 0.26% 0.26%F.3.6. PEKERJAAN INSTALASI TELP / PABX 0.20 0.10% 0.10%
F4. PEKERJAAN MEBELAIR DAN INTERIORG. LANTAI RUANG MESIN LIFT (+ 16.50)
G.1. PEKERJAAN SIPIL 1.18 0.30% 0.30% 0.30% 0.30%G.2 PEKERJAAN ARSITEKTURAL
G.2.1. PEKERJAAN PASANGAN DAN PLESTERAN 0.30 0.30%G.2.2. PEKERJAAN LANTAI DAN PELAPIS DINDING 1.01 1.01%G.2.3. PEKERJAAN KOSEN PINTU,JENDELA,ASSESORIES DAN KACA 1.67 1.67%G.2.4. PEKERJAAN PENGECATAN 0.24 0.24%G.2.5. PEKERJAAN BESI 0.17 0.17%G.2.6. PEKERJAAN BAJA DAN BESI 5.69 0.95% 0.95% 0.95% 0.95% 0.95% 0.95%
G.3. PEKERJAAN MEKANIKAL DAN ELEKTRIKALG.3.1. PEKERJAAN ELEKTRIKAL 0.08 0.08%G.3.2. PEKERJAAN INSTALASI PENANGKAL PETIR 0.24 0.24%
G.4. PEKERJAAN PLUMBING DAN SEPTICTANK + SUMUR RESAPAN 3.48 1.16% 1.16% 1.16% 0.00%
TOTAL PEKERJAAN (%) 100.00 DEVIASI (%) -0.49% -0.63% -0.82% -0.78% -4.04% -5.83% NOTE : PROGRESS MINGGUAN (%) 0.58% 0.58% 0.58% 0.60% 3.72% 3.85% 3.55% 6.28% 8.88% 8.88% 5.16% 5.27% 3.28% 4.97% 4.24% 5.69% 7.06% 3.45% 3.42% 5.53% 4.19% 2.75% 2.83% 3.41% 1.26% : RENCANA REALISASI PROGRESS MINGGUAN (%) 0.08% 0.44% 0.39% 0.63% 0.46% 2.06% : REALISASI
Keterangan
Chart Title
Page 291 of 334
PROGRESS MINGGUAN KOMULATIF (%) 0.58% 1.15% 1.73% 2.32% 6.04% 9.88% 13.44% 19.72% 28.60% 37.48% 42.65% 47.92% 51.20% 56.17% 60.40% 66.10% 73.16% 76.61% 80.02% 85.56% 89.74% 92.50% 95.33% 98.74% 99.99% REALISASI PROGRESS MINGGUAN KOMULATIF (%) 0.08% 0.52% 0.91% 1.54% 2.00% 4.05%
TIME SCHEDULEPEMBANGUNAN GEDUNG MENEJEMEN 4 LANTAI 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%RUMAH SAKIT UMUM DAERAH dr. SOEDONO MADIUN ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ###JALAN Dr. SOETOMO No. 29 MADIUN - JAWA TIMUR ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ###
No. URAIAN PEKERJAANBobot
Jangka Waktu Pelaksanaan = 180 HariSKALABulan Ke-1 Bulan Ke-2 Bulan Ke-3 Bulan Ke-4 Bulan Ke-5 Bulan Ke-6 Bulan Ke-7
% 17-23/01/1124-30/01/1131-06/02/1107-13/02/1114-20/02/1121-27/02/1128-06/03/1107-13/03/1114-20/03/1121-27/03/1128-03/04/1104-10/04/1111-17/04/1118-24/04/1125-01/05/1102-08/05/1109-15/05/1116-22/05/1123-29/05/1130-05/06/1106-12/06/1113-19/06/1120-26/06/1127-03/07/1104-10/07/11A. PEKERJAAN PENDAHULUAN 100.00%
A.1 PEKERJAAN PERSIAPAN#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
A.2 PEKERJAAN TANAH#DIV/0! #DIV/0! #DIV/0!
A.3 PEKERJAAN URUGAN#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
B. PEK. SUB STRUKTUR DIBAWAH ±0.00B.1 PEKERJAAN PONDASI UTAMA #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #VALUE!B.2 PEKERJAAN PONDASI PENDUKUNG #DIV/0! #DIV/0!
C. LANTAI - I -(Di atas ± 0.00)C.1. PEKERJAAN SIPIL #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
C.3. PEKERJAAN MEKANIKAL DAN ELEKTRIKALC.3.1. PEKERJAAN ELEKTRIKAL #DIV/0! #VALUE! #DIV/0! #DIV/0!C.3.3. PEKERJAAN INSTALASI AIR
A INSTALASI TALANG VERTICAL #DIV/0! #DIV/0!B. INSTALASI AIR KOTOR + KOTORAN CLOSET #DIV/0! #DIV/0! #DIV/0!C. INSTALASI AIR BERSIH #DIV/0! #DIV/0!
D. LANTAI - II - (DI ATAS + 4.50) 75.00%D.1. PEKERJAAN SIPIL #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
D.3. PEKERJAAN MEKANIKAL DAN ELEKTRIKALD.3.1. PEKERJAAN ELEKTRIKAL #DIV/0! #DIV/0!D.3.3. PEKERJAAN INSTALASI AIR
A INSTALASI TALANG VERTICAL #VALUE! #VALUE!B. INSTALASI AIR KOTOR + KOTORAN CLOSET #DIV/0! #DIV/0!C. INSTALASI AIR BERSIH #DIV/0! #DIV/0!
E. LANTAI - III - (DI ATAS + 8.50)E.1. PEKERJAAN SIPIL #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
E.2 PEKERJAAN ARSITEKTURALE.2.1. PEKERJAAN PASANGAN DAN PLESTERAN #DIV/0! #DIV/0! #DIV/0!E.2.2. PEKERJAAN LANTAI DAN PELAPIS DINDING #DIV/0! #DIV/0!E.2.3. PEK. KOSEN PINTU,JENDELA,ASSES- KACA #DIV/0! #DIV/0!E.2.4. PEKERJAAN PLAFOND #DIV/0! #DIV/0!E.2.5. PEKERJAAN PENGECATAN #DIV/0! #DIV/0!
E.3. PEKERJAAN MEKANIKAL DAN ELEKTRIKALE.3.1. PEKERJAAN ELEKTRIKAL #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!E.3.3. PEKERJAAN INSTALASI AIR
A INSTALASI TALANG VERTICAL #DIV/0! #DIV/0! 50.00%B. INSTALASI AIR KOTOR + KOTORAN CLOSET #DIV/0! #DIV/0!C. INSTALASI AIR BERSIH #DIV/0! #DIV/0!
F. LANTAI - IV - (DI ATAS + 12.50)F.1. PEKERJAAN SIPIL #DIV/0! #VALUE! #VALUE! #VALUE! #DIV/0! #DIV/0! #DIV/0!
F.2 PEKERJAAN ARSITEKTURALF.2.1. PEKERJAAN PASANGAN DAN PLESTERAN #DIV/0! #DIV/0! #DIV/0! #VALUE! #DIV/0!F.2.2. PEKERJAAN LANTAI DAN PELAPIS DINDING #DIV/0! #DIV/0! #DIV/0!F.2.3. PEKERJAAN KOSEN PINTU,JENDELA,ASSESORIES DAN KACA #DIV/0! #DIV/0!F.2.4. PEKERJAAN PLAFOND #DIV/0! #DIV/0! #DIV/0!F.2.5. PEKERJAAN PENGECATAN #DIV/0! #DIV/0!F.2.6. PEKERJAAN SANITAIR / FIXTURE UNIT #DIV/0! #VALUE! #VALUE!F.2.7. PEKERJAAN BESI #DIV/0! #DIV/0!
F.3. PEKERJAAN MEKANIKAL DAN ELEKTRIKALF.3.1. PEKERJAAN ELEKTRIKAL #DIV/0! #DIV/0! #DIV/0! #DIV/0!F.3.2 PEKERJAAN PENDINGIN RUANGAN / AIR CONDITION #DIV/0! #DIV/0!F.3.3. PEKERJAAN INSTALASI AIR
A INSTALASI TALANG VERTICAL #DIV/0! #DIV/0!B. INSTALASI AIR KOTOR + KOTORAN CLOSET #DIV/0! #DIV/0! 25.00%C. INSTALASI AIR BERSIH #DIV/0! #DIV/0!
F 3.4. PEKERJAAN INSTALASI INSTALASI KABEL TV #DIV/0! #DIV/0!F.3.5. PEKERJAAN INSTALASI HYDRANT #DIV/0! #DIV/0! #DIV/0! #DIV/0!F.3.6. PEKERJAAN INSTALASI TELP / PABX #DIV/0! #DIV/0! #DIV/0!
F4. PEKERJAAN MEBELAIR DAN INTERIORG. LANTAI RUANG MESIN LIFT (+ 16.50)
G.1. PEKERJAAN SIPIL #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!G.2 PEKERJAAN ARSITEKTURAL
G.2.1. PEKERJAAN PASANGAN DAN PLESTERAN #DIV/0! #DIV/0!G.2.2. PEKERJAAN LANTAI DAN PELAPIS DINDING #DIV/0! #DIV/0!G.2.3. PEKERJAAN KOSEN PINTU,JENDELA,ASSESORIES DAN KACA #DIV/0! #DIV/0!G.2.4. PEKERJAAN PENGECATAN #DIV/0! #DIV/0!G.2.5. PEKERJAAN BESI #DIV/0! #DIV/0!G.2.6. PEKERJAAN BAJA DAN BESI #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
G.3. PEKERJAAN MEKANIKAL DAN ELEKTRIKALG.3.1. PEKERJAAN ELEKTRIKAL #DIV/0! #DIV/0!G.3.2. PEKERJAAN INSTALASI PENANGKAL PETIR #DIV/0! #DIV/0!
G.4. PEKERJAAN PLUMBING DAN SEPTICTANK + SUMUR RESAPAN #DIV/0! #DIV/0! #DIV/0! #DIV/0! 0.00%
Keterangan
Chart Title
Page 292 of 334
TOTAL PEKERJAAN (%) #DIV/0! DEVIASI (%) #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! NOTE : PROGRESS MINGGUAN (%) #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! : RENCANA REALISASI PROGRESS MINGGUAN (%) 0.08% 0.44% 0.39% 0.63% 0.46% 2.06% : REALISASI PROGRESS MINGGUAN KOMULATIF (%) #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! REALISASI PROGRESS MINGGUAN KOMULATIF (%) 0.08% 0.52% 0.91% 1.54% 2.00% 4.05%
Surabaya, .......................... 2011PT.ANGGREK MERAH
ALBERTINUS WIDYANTODirektur Utama
Page 293 of 334
Page 294 of 334
18.25
1 54.75
1 73.000000 #DIV/0!
1 AHAAAAAA...
1 #DIV/0!
1 AHAAAAAA...
1 #DIV/0!
1 AHAAAAAA...
1 #DIV/0!
1 #DIV/0!
1 AHAAAAAA...
1 #DIV/0!
1 AHAAAAAA...
1 #VALUE!
1 AHAAAAAA...
1 #DIV/0!
1 #DIV/0!
1 #DIV/0!
1 AHAAAAAA...
1 #DIV/0!
1 AHAAAAAA...
1 #DIV/0!
1 AHAAAAAA...
1 #VALUE!
1 #DIV/0!
1 #DIV/0!
1 AHAAAAAA...
1 #DIV/0!
1 AHAAAAAA...
1 #DIV/0!
1 #DIV/0!
1 #DIV/0!
1 #DIV/0!
1 #DIV/0!
1 AHAAAAAA...
1 #DIV/0!
1 AHAAAAAA...
1 #DIV/0!
1 #DIV/0!
1 #DIV/0!
1 AHAAAAAA...
1 #VALUE!
1 AHAAAAAA...
1 #DIV/0!
1 #DIV/0!
1 #DIV/0!
1 #DIV/0!
1 #DIV/0!
1 #VALUE!
1 #DIV/0!
1 AHAAAAAA...
1 #DIV/0!
1 #DIV/0!
1 AHAAAAAA...
1 #DIV/0!
1 #DIV/0!
1 #DIV/0!
1 #DIV/0!
1 #DIV/0!
1 #DIV/0!
1 AHAAAAAA...
1 AHAAAAAA...
1 #DIV/0!
1 AHAAAAAA...
1 #DIV/0!
1 #DIV/0!
1 #DIV/0!
1 #DIV/0!
1 #DIV/0!
1 #DIV/0!
1 AHAAAAAA...
1 #DIV/0!
1 #DIV/0!
1 #DIV/0!
Page 295 of 334
ANALISA HARGA SATUAN PEKERJAANPROYEK PEMBANGUNAN GEDUNG MENEJEMEN 4 LANTAI
RUMAH SAKIT UMUM PROVINSI dr. SOEDONO MADIUNJALAN Dr. SOETOMO No. 29 MADIUN - JAWA TIMUR
No. Vol. URAIAN KOOEF St. Vol.
PEKERJAAN PERSIAPAN DAN TANAH
1 M' PEMBUATAN BOUPLANK #REF!BAHAN
Kayu meranti papan 2/20 0.0042 m3 #REF! m3 Kayu meranti usuk 5/7 0.0039 m3 #REF! m3 Paku biasa 0.0200 kg #REF! kg
1 M2 PEMBERSIHAN LAPANGAN RINGAN
1 M2 PEMBERSIHAN LAPANGAN BERAT
1 Hr. UITZET DENGAN WATERPASS / THEODOLITHBAHAN
Sewa Theodolit 1.0000 set
1 M2 PEMBUATAN PAGAR SEMENTARA DARI SENG GELOMBANG, T= 2 M #REF!BAHAN
Dolken Kayu Gelam 8-10 / 400 cm 1.2500 btg #REF! btg PC 2.5000 kg #REF! kg Seng Gelombang 1.2000 lbr #REF! lbr Pasir beton 0.0050 m3 #REF! m3 Batu pecah 2-3 0.009 m3 #REF! m3 Kayu meranti 5/7 0.0720 m3 #REF! m3 Paku asbes 0.0600 kg #REF! kg Cat Meni Besi 0.0450 ltr #REF! ltr
1 M2 PEMBUATAN DIREKSI KEETBAHAN 72
Dolken Kayu gelam 8-10 / 400 cm 1.2500 btg 90 btg Kayu meranti 5/7 0.1800 m3 12.96 m3 Paku biasa 0.8500 kg 61.2 kg Besi plat strip 1.1000 kg 79.2 kg PC 35.000 kg 2520 kg Pasir pasang 0.1500 m3 10.8 m3 Pasir beton 0.1000 m3 7.2 m3 Batu pecah mesin 2/3 0.1500 m3 10.8 m3 Bata merah 30.0000 bh 2160 bh Seng gelombang BJLS 30 0.2500 lembr 18 lembr Kaca polos 3 mm 0.0800 m2 5.76 m2 Kunci tanam 0.1500 buah 10.8 buah Lapis triplex 4 mm 0.0600 lembr 4.32 lembr
1 M3 BONGKARAN BETON BERTULANG
1 M2 PEMBUATAN STEGGER BAMBU UNT ANDANGBAHAN
Bambu dia.6-8 cm / 600 cm 1.2500 btg Tali ijuk 0.2500 kg
1 M3 GALIAN TANAH KONSTRUKSI
1 M2 PERATAAN TANAH
1 M3 PENGANGKUTAN TANAH KELUAR PROYEK ALAT
Sewa Dumptruck 5 T ( Min. 5 jam ) 0.2500 jam
1 TTK PEMBUATAN LUBANG STROUS DIA.20-30 CM ALAT
Sewa alat bantu strouss pile 1.2000 jam
1 M3 GALIAN TANAH KERAS
1 M3 GALIAN TANAH LUMPUR
1 M3 GALIAN TANAH LUMPUR DENGAN ALAT ALAT
Sewa Dump Truck 5 T ( Min. 5 Jam ) 0.0740 jam Sewa Bucket dan Crane 0.0528 jam
1 M3 GALIAN TANAH DENGAN ALAT BERAT ALAT
Sewa Dump Truck 5 T ( Min. 5 Jam ) 0.0700 jam Sewa Escavator 0.0670 jam
1 M3 PENGURUGAN TANAH KEMBALI UNTUK BANGUNAN
1 M3 PENGURUGAN TANAH DENGAN PEMADATAN ALAT
Sewa alat bantu ( 1 set @ 3 alat ) 0.0213 jamBAHAN
Tanah Urug 1.2000 m3
1 M3 PENGURUGAN PASIR PADAT LANTAI I 1.0000 LANTAI II 1.0900 LANTAI III 1.1200 LANTAI IV 1.1350 LANTAI V 1.1620 LANTAI ATAP 1.1970
ALAT Sewa alat bantu ( 1 set @ 3 alat ) 0.0213 jam
BAHAN Pasir Urug 1.2000 m3
Page 296 of 334
1 M3 PENGURUGAN SIRTU PADAT ALAT
Sewa alat bantu ( 1 set @ 3 alat ) 0.0000 jamBAHAN
Sirtu 1.2000 m3
1 M3 PENGURUGAN PUDEL 1 Kp : 6 Ps ALAT
Sewa alat bantu ( 1 set @ 3 alat ) 0.0213 jamBAHAN
Kapur Pasang 0.1720 m3 Pasir Urug 1.028 m3
1 M3 PENGURUGAN SIRTU PADAT DENGAN PEMADATAN MENGGUNAKAN ALAT ALAT
Sewa Dump Truck 3,5 T 0.0880 jam Sewa Motor Grader 125-140 PK (min.5 Jam) 0.0080 jam Sewa Pneumatic Tire Roller (min.5 jam) 0.0040 jam Sewa Truck Tangki Air (min.5 jam) 0.0120 jam Sewa Vibrator Roller (min.5 Jam) 0.0120 jam Sewa Escavator 6 m3 0.0220 jam
BAHAN Sirtu 1.2000 m3
1 M3 PENGERUGAN SALURAN MANUAL ALAT
Sewa Truck klas 3 dalam kota 0.0100 jamBAHAN
Glansing 25 kg ( isi 150 kg sedimen) 12.0000 bh
1 M3 PENGERUGAN SALURAN DENGAN ALAT BERAT ALAT
Sewa Truck klas 3 dalam kota 0.0800 jam Sewa Bucket dan Crane / Graglin scrapper 0.1500 jam
1 M3 PENGURUGAN PASIR UNTUK PAVING BAHAN
Pasir Urug 1.2000 m3
1 M3 PENGURUGAN SIRTU UNTUK PAVING BAHAN
Sirtu 1.2000 m3
PEKERJAAN PONDASI
1 M2 PEMASANGAN TURAP PAPAN TEBAL 3 CM BAHAN
Kayu Meranti papan 3/30 0.0330 m3 Kayu Meranti Usuk 0.0210 m3 Paku Klem 0.3000 kg
1 M2 PEMASANGAN TURAP BAMBU TINGGI 1,5-2 M BAHAN
Bambu 10-12 cm 3.0000 btg Gedeg Guling 1.6500 m2 Kawat Ikat Beton 0.1090 kg
1M' PANCANG PILE + PENGADAAN PILE 35X35 - 16 m SISTIM INJECTION BAHAN
Tiang Panc. K-600, 30/30,L=16m' 1.0000 m' Join las 1.0000 m'
PERALATAN Alat bantu 0.2000 set Sewa Crane 0.1030 jm/hr Alat Injection 0.1030 jm/hr
1M' PANCANG PILE + PENGADAAN PILE 35X35 - 16 m SISTIM HAMMER BAHAN
Tiang Panc. K-600, 35X35,L=16m' 1.0000 m' Join Las 1.0000 titik
PERALATAN Alat bantu 0.2400 set Sewa Crane 0.1236 jm/hr Sewa Hammer Pancang 0.2266 jm/hr
1M3 PASANG PONDASI BATU KALI 1PC : 4PS BAHAN
Batu belah 15/20 1.2000 m3 PC 163.0000 kg Pasir Pasang 0.5200 m3
1M3 PASANG PONDASI BATU KALI 1PC : 5 PS BAHAN
Batu belah 15/20 1.2000 m3 PC 136.0000 kg Pasir Pasang 0.5440 m3
1M3 PASANG PONDASI BATU KOSONG / AANSTAMPENG T= 20 CM BAHAN
Batu belah 15/20 1.2000 m3 Pasir Urug 0.0000 m3
1 KG PASANGAN IJUK BAHAN
Ijuk 1.2000 kg
1 M3 PEMBUATAN LUBANG STROUSS Ǿ20 CM DALAM 3 M BAHAN
Alat Bantu Stroys Pile 1.2000 m3
1 M3 PEMBUATAN LUBANG STROUSS Ǿ30 CM DALAM 3 M BAHAN
Alat Bantu Stroys Pile 1.2000 m3
1M3 PEMAKAIAN SPESI CAMP.STROUS (1Pc:1,5Ps:2,5Kr) BAHAN
Page 297 of 334
Semen PC 358.0150 kg Pasir Cor 0.4882 m3 Batu Kerikil 0.8137 m3
PEKERJAAN STRUKTUR BETON
1 M2 PASANG BEKISTING UN. PONDASI BAHAN
Kayu Meranti 0.0400 m3 Paku Biasa 0.4000 kg Minyak Bekisting 0.1000 ltr
1 M2 PASANG BEKISTING UN. SLOOF + STRUKTUR PRAKTIS ( 3 kali pakai ) LANTAI I 1.0000 LANTAI II 1.0900 LANTAI III 1.1200 LANTAI IV 1.1350 LANTAI V 1.1620 LANTAI ATAP
BAHAN Kayu Meranti 0.0200 m3 Paku Biasa 0.3000 kg Minyak Bekisting 0.1000 ltr Multiplex 12 mm 0.1750 m2
1 M2 PASANG BEKISTING UNTUK KOLOM ( 3 kali pakai ) 260.8 LANTAI I 1.0000 LANTAI II 1.0900 LANTAI III 1.1200 LANTAI IV 1.1350 LANTAI V 1.1620
BAHAN Kayu Meranti 0.0200 m3 Paku Biasa 0.4000 kg Minyak Bekisting 0.2000 ltr Balok Kayu Kruing 0.0180 m3 Multiplex 12 mm 0.1400 lbr Kayu Dolken 8-10 cm 0.6670 btg
1 M2 PASANG BEKISTING UNTUK BALOK ( 3 kali pakai ) LANTAI I 1.0000 LANTAI II 1.0900 LANTAI III 1.1200 LANTAI IV 1.1350 LANTAI V 1.1620
BAHAN Kayu Meranti 0.0200 m3 Paku Biasa 0.4000 kg Minyak Bekisting 0.2000 ltr Balok Kayu Kruing 0.0180 m3 Multiplex 12 mm 0.1400 lbr Kayu stoot 2.0000 btg
1 M2 PASANG BEKISTING UNTUK LANTAI ( 3 kali pakai ) LANTAI I 1.0000 LANTAI II 1.0900 LANTAI III 1.1200 LANTAI IV 1.1350 LANTAI V 1.1620
BAHAN Kayu Meranti 0.0200 m3 Paku Biasa 0.4000 kg Minyak Bekisting 0.2000 ltr Balok Kayu Kruing 0.0180 m3 Multiplex 12 mm 0.1400 lbr Kayu stoot 3.0000 btg
1 M2 PASANG BEKISTING UNTUK TANGGA LANTAI I 1.0000 LANTAI II 1.0900 LANTAI III 1.1200 LANTAI IV 1.1350 LANTAI V 1.1620
BAHAN Kayu Meranti 0.0200 m3 Paku Biasa 0.4000 kg Minyak Bekisting 0.1500 ltr Balok Kayu Kruing 0.0180 m3 Multiplex 12 mm 0.1400 lbr Kayu stoot 0.6670 btg
1 KG PEMBESIAN BESI POLOS U-24 LANTAI I 1.0000 LANTAI II 1.0900 LANTAI III 1.1200 LANTAI IV 1.1350 LANTAI V 1.1620
BAHAN Besi beton ( Polos ) 1.0500 kg Kawat beton 0.0150 kg
1 KG PEMBESIAN BESI ULIR U-39 LANTAI I 1.0000 LANTAI II 1.0900 LANTAI III 1.1200 LANTAI IV 1.1350 LANTAI V 1.1620
BAHAN Besi beton Ulir 1.0500 kg Kawat beton 0.0150 kg
Page 298 of 334
1 KG PEMASANGAN WIREMESH BAHAN
Besi beton Polos 1.0200 kg Kawat beton 0.0050 kg
1 M2 MEMBUAT LANTAI KERJA BETON TUMBUK, 1 PC : 3 PS : 5 KR, TEBAL 5 CM LANTAI I 1.0000 LANTAI II 1.0900 LANTAI III 1.1200 LANTAI IV 1.1350 LANTAI V 1.1620
BAHAN PC 10.0000 kg Pasir Beton 0.0200 m3 Batu Pecah 2-3 0.0444 m3
1 M3 MEMBUAT BETON MUTU f'c=7,4 Mpa ( K-100), SLUMP (12+2) CM, W/C = 0.87BAHAN
PC 218.0000 kg Pasir Beton 0.0621 m3 Batu Pecah 2-3 0.7400 m3
1 M3 MEMBUAT BETON MUTU f'c= 14.5 Mpa ( K-175), SLUMP (12+2) CM, W/C = 0.6 LANTAI I 1.0000 LANTAI II 1.0900 LANTAI III 1.1200 LANTAI IV 1.1350 LANTAI V 1.1620
BAHAN PC 326.0000 kg Pasir Beton 0.5430 m3 Batu Pecah 2-3 0.7622 m3
1 M3 MEMBUAT BETON MUTU SITEMIX f'c= 21,7 Mpa ( K-250), SLUMP (12+2) CM, BAHAN
PC 384.0000 kg Pasir Beton 0.4343 m3 Batu Pecah 2-3 0.7636 m3
1 M3 BETON READYMIX K-175, BERIKUT POMPA : LANTAI I 1.0000 LANTAI II 1.0900 LANTAI III 1.1200 LANTAI IV 1.1350 LANTAI V 1.1620
BAHAN Beton Readymix K-175 1.0200 m3
PERALATAN Peralatan bantu ( pompa+vibrator+tes lab ) 0.0450 ls
1 M3 BETON READYMIX K-225, BERIKUT POMPA : LANTAI I 1.0000 LANTAI II 1.0900 LANTAI III 1.1200 LANTAI IV 1.1350 LANTAI V 1.1620
BAHAN Beton Readymix K-225 1.0200 m3 528000
PERALATAN Peralatan bantu ( pompa+vibrator+tes lab ) 0.0450 ls
1 M3 BETON READYMIX K-250, BERIKUT POMPA : LANTAI I 1.0000 LANTAI II 1.0900 LANTAI III 1.1200 LANTAI IV 1.1350 LANTAI V 1.1620
BAHAN BETON READYMIX K-250, BERIKUT POMPA : 1.0200 m3 526500
PERALATAN Peralatan bantu ( pompa+vibrator+tes lab ) 0.0450 ls
1 M3 MEMBUAT BETON STROUS DIA 20 CM Spesi Beton Strous 1.0000 m3 Besi polos 5 dia 10, Dia 6-150mm 80.0000 kg
1 M3 MEMBUAT BETON STROUS DIA 25 CM Spesi Beton Strous 1.0000 m3 Besi polos 6 dia 10, Dia 6-150mm 98.3300 kg
1 M3 MEMBUAT BETON STROUS DIA 30 CM Spesi Beton Strous 1.0000 m3 Besi polos 7 dia 10, Dia 6-150mm 105.0000 kg
1 M3 PEMBONGKARAN CETAKAN DAN PENYIRAMAN TENAGA
Pekerja / Buruh tak terampil 3.0000 oh
PEK.BETON DIBAWAH LANTAI ± 0.00
1 M3 Poer type P1/. (165x90x70) Pekerjaan Beton Struktur K-300 1.0000 m3 Pekerjaan Pembesian beton ulir #REF! kg Bekisting 2.0000 m2 Pembongkaran cetakan 0.1000 m3
1 M3 Poer type P2. (1750x1750x70) Pekerjaan Beton Struktur K-300 1.0000 m3 Pekerjaan Pembesian beton ulir #REF! kg Bekisting 2.0000 m2 Pembongkaran cetakan 0.1000 m3
Page 299 of 334
1 M3 Poer type P3. (2000x2000x70) Pekerjaan Beton Struktur K-300 1.0000 m3 Pekerjaan Pembesian beton ulir #REF! kg Bekisting 1.6670 m2 Pembongkaran cetakan 0.1000 m3
1 M3 Poer type P4/. (2400x2400x70) Pekerjaan Beton Struktur K-300 1.0000 m3 Pekerjaan Pembesian beton ulir #REF! kg Bekisting 1.5320 m2 Pembongkaran cetakan 0.1000 m3
1 M3 Poer type P5. (900X900X50) RAMP Pekerjaan Beton Struktur K-300 1.0000 m3 Pekerjaan Pembesian beton ulir #REF! kg Bekisting 1.6670 m2 Pembongkaran cetakan 0.1000 m3
1 M3 Poer type P2. (1750x1750x70) unt. TANGGA UTAMA Pekerjaan Beton Struktur K-300 1.0000 m3 Pekerjaan Pembesian beton ulir #REF! kg Bekisting 1.6670 m2 Pembongkaran cetakan 0.1000 m3
1 M3 Poer type P1/P7 (tangga). (165x90x70) UN.T.UTMA Pekerjaan Beton Struktur K-300 1.0000 m3 Pekerjaan Pembesian beton ulir #REF! kg Bekisting 1.6670 m2 Pembongkaran cetakan 0.1000 m3
1 M3 Poer type P4/. (2400x2400x70)g un.LIFT Pekerjaan Beton Struktur K-300 1.0000 m3 Pekerjaan Pembesian beton ulir #REF! kg Bekisting 1.2857 m2 Pembongkaran cetakan 0.1000 m3
1 M3 Poer type P1. (165x90x70) UN.LIFT Pekerjaan Beton Struktur K-300 1.0000 m3 Pekerjaan Pembesian beton ulir #REF! kg Bekisting 1.1667 m2 Pembongkaran cetakan 0.1000 m3
1 M3 BETON SLOOF 30/40 BESI ULIR TYPE S2 Pekerjaan Beton Struktur K-300 1.0000 m3 Pekerjaan Pembesian beton ulir #REF! kg Bekisting 6.6700 m2 Pembongkaran cetakan 0.1000 m3
1 M3 BETON SLOOF 40/60 BESI ULIR TYPE S1 Pekerjaan Beton Struktur K-300 1.0000 m3 Pekerjaan Pembesian beton ulir #REF! kg Bekisting 6.6700 m2 Pembongkaran cetakan 0.0000 m3
1 M3 BETON KOLOM UTAMA 50/50 BESI ULIR Pekerjaan Beton Struktur K-300 1.0000 m3 Pekerjaan Pembesian beton ulir #REF! kg Bekisting 7.3334 m2 Pembongkaran cetakan 0.0000 m3
1 M3 BETON KOLOM UTAMA 40/40 BESI ULIR UN.LIFT Pekerjaan Beton Struktur K-300 1.0000 m3 Pekerjaan Pembesian beton ulir #REF! kg Bekisting 6.6667 m2 Pembongkaran cetakan 0.0000 m3
1 M3 BETON KOLOM UTAMA 30/30 BESI ULIR Pekerjaan Beton Struktur K-300 1.0000 m3 Pekerjaan Pembesian beton ulir #REF! kg Bekisting 13.3330 m2 Pembongkaran cetakan 0.0000 m3
1 M3 BETON KOLOM PRAKTIS 15/15 K-175 BESI POLOS Pekerjaan Beton Struktur K-175 1.0000 m3 Pekerjaan Pembesian beton polos #REF! kg Bekisting 13.3700 m2 Pembongkaran cetakan 0.0000 m3
1 M3 BETON PLAT T=15 CM LIFT LANTAI/DINDING DASAR Pekerjaan Beton Struktur K-300 1.0000 m3 Pekerjaan Pembesian beton POLOS #REF! kg Bekisting 6.6670 m2 Pembongkaran cetakan 0.0000 m3
1 M3 BETON PONDASI PLAT LAJUR KHUSUS TANGGA Pekerjaan Beton Struktur K-300 1.0000 m3 Pekerjaan Pembesian beton ulir U-39 #REF! kg Bekisting 2.9952 m2 Pembongkaran cetakan 1.0000 m3
PEK. BETON DIATAS LANTAI.1 ( ± 0.00 )
1 M3 BETON KOLOM UTAMA 50/50 BESI ULIR Pekerjaan Beton Struktur K-250 1.0000 m3 Pekerjaan Pembesian beton ulir #REF! kg Bekisting 7.3334 m2 Pembongkaran cetakan 0.0000 m3
1 M3 BETON KOLOM UTAMA 40/40 BESI ULIR Pekerjaan Beton Struktur K-250 1.0000 m3 Pekerjaan Pembesian beton ulir #REF! kg Bekisting 6.6667 m2 Pembongkaran cetakan 0.0000 m3
1 M3 BETON KOLOM UTAMA 30/30 BESI ULIR
Page 300 of 334
Pekerjaan Beton Struktur K-250 1.0000 m3 Pekerjaan Pembesian beton ulir #REF! kg Bekisting 11.4286 m2 Pembongkaran cetakan 0.0000 m3
1 M3 BETON KOLOM PRAKTIS 15/15 K-175 BESI POLOS Pekerjaan Beton Struktur K-175 1.0000 m3 Pekerjaan Pembesian beton polos #REF! kg Bekisting 1.8690 m2 Pembongkaran cetakan 0.0000 m3
1 M3 BETON BALOK 35/70 K-250 BESI ULIR type B-1 Pekerjaan Beton Struktur K-250 1.0000 m3 Pekerjaan Pembesian beton ulir #REF! kg Bekisting 5.9810 m2 Pembongkaran cetakan 0.0000 m3
1 M3 BETON BALOK 30/60 K-250 BESI ULIR type B-2 Pekerjaan Beton Struktur K-250 1.0000 m3 Pekerjaan Pembesian beton ulir #REF! kg Bekisting 6.7692 m2 Pembongkaran cetakan 0.0000 m3
1 M3 BETON BALOK 20/40 K-250 BESI ULIR type B-3 Pekerjaan Beton Struktur K-250 1.0000 m3 ;..; #REF! kg Bekisting 6.7692 m2 Pembongkaran cetakan 0.0000 m3
1 M3 BETON BALOK 15/25 BESI POLOS Pekerjaan Beton Struktur K-225 1.0000 m3 Pekerjaan Pembesian beton Polos #REF! kg Bekisting 3.0814 m2 Pembongkaran cetakan 0.0000 m3
1 M3 BETON LANTAI BESI POLOS Pekerjaan Beton Struktur K-250 1.0000 m3 Pekerjaan Pembesian beton polos #REF! kg Bekisting 8.3333 m2 Pembongkaran cetakan 0.0000 m3
1 M3 BETON TANGGA BESI POLOS Pekerjaan Beton Struktur K-250 1.0000 m3 Pekerjaan Pembesian beton polos #REF! kg Bekisting 14.2175 m2 Pembongkaran cetakan 0.0000 m3
1 M3 BETON CANOPY JENDELA BESI POLOS Pekerjaan Beton Struktur K-225 1.0000 m3 Pekerjaan Pembesian beton polos #REF! kg Bekisting 1.1662 m2 Pembongkaran cetakan 0.0000 m3
PEK. BETON DIATAS LANTAI.2 ( + 4.50 )
1 M3 BETON KOLOM UTAMA 50/50 BESI ULIR Pekerjaan Beton Struktur K-300 1.0000 m3 Pekerjaan Pembesian beton ulir #REF! kg Bekisting 7.3334 m2 Pembongkaran cetakan 0.0000 m3
1 M3 BETON KOLOM UTAMA 40/40 BESI ULIR Pekerjaan Beton Struktur K-300 1.0000 m3 Pekerjaan Pembesian beton ulir #REF! kg Bekisting 6.6667 m2 Pembongkaran cetakan 0.0000 m3
1 M3 BETON KOLOM UTAMA 30/30 BESI ULIR Pekerjaan Beton Struktur K-300 1.0000 m3 Pekerjaan Pembesian beton ulir #REF! kg Bekisting 11.4286 m2 Pembongkaran cetakan 0.0000 m3
1 M3 BETON KOLOM PRAKTIS 15/15 K-175 BESI POLOS Pekerjaan Beton Struktur K-175 1.0000 m3 Pekerjaan Pembesian beton polos #REF! kg Bekisting 1.8690 m2 Pembongkaran cetakan 0.0000 m3
1 M3 BETON BALOK 35/70 K-300 BESI ULIR type B-1 Pekerjaan Beton Struktur K-300 1.0000 m3 Pekerjaan Pembesian beton ulir #REF! kg Bekisting 5.9810 m2 Pembongkaran cetakan 0.0000 m3
1 M3 BETON BALOK 30/60 K-300 BESI ULIR type B-2 Pekerjaan Beton Struktur K-300 1.0000 m3 Pekerjaan Pembesian beton ulir #REF! kg Bekisting 7.0400 m2 Pembongkaran cetakan 0.0000 m3
1 M3 BETON BALOK 20/40 K-300 BESI ULIR type B-3 Pekerjaan Beton Struktur K-300 1.0000 m3 Pekerjaan Pembesian beton ulir #REF! kg Bekisting 6.7692 m2 Pembongkaran cetakan 0.0000 m3
1 M3 BETON BALOK 15/25 BESI POLOS Pekerjaan Beton Struktur K-225 1.0000 m3 Pekerjaan Pembesian beton Polos #REF! kg Bekisting 3.2354 m2 Pembongkaran cetakan 0.0000 m3
1 M3 BETON LANTAI BESI POLOS
Page 301 of 334
Pekerjaan Beton Struktur K-300 1.0000 m3 Pekerjaan Pembesian beton polos #REF! kg Bekisting 8.3333 m2 Pembongkaran cetakan 0.0000 m3
1 M3 BETON TANGGA BESI POLOS Pekerjaan Beton Struktur K-300 1.0000 m3 Pekerjaan Pembesian beton polos #REF! kg Bekisting 14.2175 m2 Pembongkaran cetakan 0.0000 m3
1 M3 BETON CANOPY JENDELA BESI POLOS Pekerjaan Beton Struktur K-225 1.0000 m3 Pekerjaan Pembesian beton polos #REF! kg Bekisting 1.1662 m2 Pembongkaran cetakan 0.0000 m3
PEK. BETON DIATAS LANTAI.3 ( + 8.50 )
1 M3 BETON KOLOM UTAMA 50/50 BESI ULIR Pekerjaan Beton Struktur K-300 1.0000 m3 Pekerjaan Pembesian beton ulir #REF! kg Bekisting 7.3334 m2 Pembongkaran cetakan 0.0000 m3
1 M3 BETON KOLOM UTAMA 40/40 BESI ULIR Pekerjaan Beton Struktur K-300 1.0000 m3 Pekerjaan Pembesian beton ulir #REF! kg Bekisting 6.6667 m2 Pembongkaran cetakan 0.0000 m3
1 M3 BETON KOLOM UTAMA 30/30 BESI ULIR Pekerjaan Beton Struktur K-300 1.0000 m3 Pekerjaan Pembesian beton ulir #REF! kg Bekisting 11.4286 m2 Pembongkaran cetakan 0.0000 m3
1 M3 BETON KOLOM PRAKTIS 15/15 K-175 BESI POLOS Pekerjaan Beton Struktur K-175 1.0000 m3 Pekerjaan Pembesian beton polos #REF! kg Bekisting 1.8690 m2 Pembongkaran cetakan 0.0000 m3
1 M3 BETON BALOK 35/70 K-300 BESI ULIR type B-1 Pekerjaan Beton Struktur K-300 1.0000 m3 Pekerjaan Pembesian beton ulir #REF! kg Bekisting 5.9810 m2 Pembongkaran cetakan 0.0000 m3
1 M3 BETON BALOK 30/60 K-300 BESI ULIR type B-2 Pekerjaan Beton Struktur K-300 1.0000 m3 Pekerjaan Pembesian beton ulir #REF! kg Bekisting 7.0400 m2 Pembongkaran cetakan 0.0000 m3
1 M3 BETON BALOK 20/40 K-300 BESI ULIR type B-3 Pekerjaan Beton Struktur K-300 1.0000 m3 Pekerjaan Pembesian beton ulir #REF! kg Bekisting 6.7692 m2 Pembongkaran cetakan 0.0000 m3
1 M3 BETON BALOK 15/25 BESI POLOS Pekerjaan Beton Struktur K-225 1.0000 m3 Pekerjaan Pembesian beton Polos #REF! kg Bekisting 3.2354 m2 Pembongkaran cetakan 0.0000 m3
1 M3 BETON LANTAI BESI POLOS Pekerjaan Beton Struktur K-300 1.0000 m3 Pekerjaan Pembesian beton polos #REF! kg Bekisting 8.3333 m2 Pembongkaran cetakan 0.0000 m3
1 M3 BETON TANGGA BESI POLOS Pekerjaan Beton Struktur K-300 1.0000 m3 Pekerjaan Pembesian beton polos #REF! kg Bekisting 14.2175 m2 Pembongkaran cetakan 0.0000 m3
1 M3 BETON CANOPY JENDELA BESI POLOS Pekerjaan Beton Struktur K-225 1.0000 m3 Pekerjaan Pembesian beton polos #REF! kg Bekisting 1.1662 m2 Pembongkaran cetakan 0.0000 m3
PEK. BETON DIATAS LANTAI.4 ( + 12.50)
1 M3 BETON KOLOM UTAMA 50/50 BESI ULIR Pekerjaan Beton Struktur K-300 1.0000 m3 Pekerjaan Pembesian beton ulir #REF! kg Bekisting 7.3334 m2 Pembongkaran cetakan 0.0000 m3
1 M3 BETON KOLOM UTAMA 40/40 BESI ULIR Pekerjaan Beton Struktur K-300 1.0000 m3 Pekerjaan Pembesian beton ulir #REF! kg Bekisting 6.6667 m2 Pembongkaran cetakan 0.0000 m3
1 M3 BETON KOLOM UTAMA 30/30 BESI ULIR Pekerjaan Beton Struktur K-300 1.0000 m3 Pekerjaan Pembesian beton ulir #REF! kg Bekisting 11.4286 m2 Pembongkaran cetakan 0.0000 m3
Page 302 of 334
1 M3 BETON KOLOM PRAKTIS 15/15 K-175 BESI POLOS Pekerjaan Beton Struktur K-175 1.0000 m3 Pekerjaan Pembesian beton polos #REF! kg Bekisting 1.8690 m2 Pembongkaran cetakan 0.0000 m3
1 M3 BETON BALOK 35/70 K-300 BESI ULIR type B-1 Pekerjaan Beton Struktur K-300 1.0000 m3 Pekerjaan Pembesian beton ulir #REF! kg Bekisting 5.9810 m2 Pembongkaran cetakan 0.0000 m3
1 M3 BETON BALOK 30/60 K-300 BESI ULIR type B-2 Pekerjaan Beton Struktur K-300 1.0000 m3 Pekerjaan Pembesian beton ulir #REF! kg Bekisting 7.0400 m2 Pembongkaran cetakan 0.0000 m3
1 M3 BETON BALOK 20/40 K-300 BESI ULIR type B-3 Pekerjaan Beton Struktur K-300 1.0000 m3 Pekerjaan Pembesian beton ulir #REF! kg Bekisting 6.7692 m2 Pembongkaran cetakan 0.0000 m3
1 M3 BETON BALOK 15/25 BESI POLOS Pekerjaan Beton Struktur K-225 1.0000 m3 Pekerjaan Pembesian beton Polos #REF! kg Bekisting 3.2354 m2 Pembongkaran cetakan 0.0000 m3
1 M3 BETON LANTAI BESI POLOS Pekerjaan Beton Struktur K-300 1.0000 m3 Pekerjaan Pembesian beton polos #REF! kg Bekisting 8.3333 m2 Pembongkaran cetakan 0.0000 m3
1 M3 BETON TANGGA BESI POLOS Pekerjaan Beton Struktur K-300 1.0000 m3 Pekerjaan Pembesian beton polos #REF! kg Bekisting 14.2175 m2 Pembongkaran cetakan 0.0000 m3
1 M3 BETON CANOPY JENDELA BESI POLOS Pekerjaan Beton Struktur K-225 1.0000 m3 Pekerjaan Pembesian beton polos #REF! kg Bekisting 1.1662 m2 Pembongkaran cetakan 0.0000 m3
PEK. BETON DIATAS LANTAI.ATAP ( + 16.50 )
1 M3 BETON KOLOM UTAMA 50/50 BESI ULIR Pekerjaan Beton Struktur K-300 1.0000 m3 Pekerjaan Pembesian beton ulir #REF! kg Bekisting 7.3334 m2 Pembongkaran cetakan 0.0000 m3
1 M3 BETON KOLOM UTAMA 40/40 BESI ULIR Pekerjaan Beton Struktur K-300 1.0000 m3 Pekerjaan Pembesian beton ulir #REF! kg Bekisting 6.6667 m2 Pembongkaran cetakan 0.0000 m3
1 M3 BETON KOLOM UTAMA 30/30 BESI ULIR Pekerjaan Beton Struktur K-300 1.0000 m3 Pekerjaan Pembesian beton ulir #REF! kg Bekisting 11.4286 m2 Pembongkaran cetakan 0.0000 m3
1 M3 BETON KOLOM PRAKTIS 15/15 K-175 BESI POLOS Pekerjaan Beton Struktur K-175 1.0000 m3 Pekerjaan Pembesian beton polos #REF! kg Bekisting 1.8690 m2 Pembongkaran cetakan 0.0000 m3
1 M3 BETON BALOK 35/70 K-300 BESI ULIR type B-1 Pekerjaan Beton Struktur K-300 1.0000 m3 Pekerjaan Pembesian beton ulir #REF! kg Bekisting 5.9810 m2 Pembongkaran cetakan 0.0000 m3
1 M3 BETON BALOK 30/60 K-300 BESI ULIR type B-2 Pekerjaan Beton Struktur K-300 1.0000 m3 Pekerjaan Pembesian beton ulir #REF! kg Bekisting 7.0400 m2 Pembongkaran cetakan 0.0000 m3
1 M3 BETON BALOK 20/40 K-300 BESI ULIR type B-3 Pekerjaan Beton Struktur K-300 1.0000 m3 Pekerjaan Pembesian beton ulir #REF! kg Bekisting 6.7692 m2 Pembongkaran cetakan 0.0000 m3
1 M3 BETON BALOK 15/25 BESI POLOS Pekerjaan Beton Struktur K-225 1.0000 m3 Pekerjaan Pembesian beton Polos #REF! kg Bekisting 3.2354 m2 Pembongkaran cetakan 0.0000 m3
1 M3 BETON LANTAI BESI POLOS Pekerjaan Beton Struktur K-300 1.0000 m3 Pekerjaan Pembesian beton polos #REF! kg Bekisting 8.3333 m2 Pembongkaran cetakan 0.0000 m3
1 M3 BETON TANGGA BESI POLOS Pekerjaan Beton Struktur K-300 1.0000 m3
Page 303 of 334
Pekerjaan Pembesian beton polos #REF! kg Bekisting 14.2175 m2 Pembongkaran cetakan 0.0000 m3
1 M3 BETON CANOPY JENDELA BESI POLOS Pekerjaan Beton Struktur K-225 1.0000 m3 Pekerjaan Pembesian beton polos #REF! kg Bekisting 1.1662 m2 Pembongkaran cetakan 0.0000 m3
PEKERJAAN BETON RABAT DAN BETON LAIN
1 m2 BETON SCREED 1 : 3 Lantai Satu 1.0000 Lantai Dua 1.0900 Lantai Tiga 1.1200 Lantai Empat 1.1350 Lantai Lima 1.1620 Lantai Enam 1.1970 Lantai Tujuh 1.2360
BAHAN Semen PC/50 kg 10.0000 kg Pasir Beton I 0.0260 m3 Batu Koral Beton 0.0440 m3
1 M2 MEMBUAT LANTAI KERJA BAHAN
PC 10.0000 kg Pasir Beton 0.0200 m3 Batu kerikil 0.0444 m3
1 M3 CHIPPING & CONCRETING / JACKETING BAHAN
PC 43.2000 kg Pasir Pasang 0.4200 m3 Batu kerikil 0.7700 m3
ALAT Sewa Concrete Mixer 0.2520 jam Sewa Concrete Pump 0.0840 jam Sewa Concrete vibrator 1.0800 jam
1M' SALURAN BETON PRECAST (PABRIK) PENURUNAN DAN PEMASANGAN BAHAN
U.Guffer U.1000 K-350; besi 130 kg 0.4166 bh Cover 1000x1000x2400; besi 160 kg 0.4166 bh
ALAT Sewa Crane 0.1736 jam Sewa alat bantu 0.1000 jam
1M' PEMASANGAN SALURAN BUIS BETON Ǿ 1.00 M BAHAN
Buis Beton bulat ukuran 100x100 1.0000 bhALAT
Sewa alat bantu 0.1000 jam
PEKERJAAN BESI ( BAJA-PAGAR-PIPA )
1 KG PEK.PABRIKASI DAN PEMASANGAN BAJA ( ELEKTRODE ) BAHAN
Elektrode Baja 1.0000 kg Bahan bakar solar 0.0100 kg Pelumas 0.0010 kg
TENAGA Pekerja 0.0010 oh Tukang besi profil 0.0010 oh Kepala Tukang besi profil 0.0002 oh Operator Alat berat 0.0002 oh Pembantu operator 0.0002 oh Mandor 0.0001 oh
ALAT Sewa Welding Set 0.0700 jam
1 KG PEKERJAAN BESI PLAT BORDES BAHAN
Besi Plat Bordes 4"x8" Tebal 3 mm 1.1000 kg Pabrikasi ( 20 % ) 0.2000 kg
1 KG PEKERJAAN BESI PLAT TEBAL 2 MM BAHAN
Besi Plats 4"x8" Tebal 2 mm 1.1000 kg Pabrikasi ( 20 % ) 0.2000 kg
1 KG PEKERJAAN BESI PLAT STRIP BAHAN
Besi Plat Strip Uk. 30x30 mm 1.1000 kg Pabrikasi ( 20 % ) 0.2000 kg
1 KG PEKERJAAN BESI BAJA PROFIL WF ≤ 200 MM BAHAN
Besi Profil WF ≤200 mm 1.1000 kg Pabrikasi ( 20 % ) 0.2000 kg
1 KG PEKERJAAN BESI BAJA PROFIL WF ≥ 200 MM BAHAN
Besi Profil WF ≥ 200 mm 1.1000 kg Pabrikasi ( 20 % ) 0.2000 kg
1 KG PEKERJAAN BESI BAJA PROFIL C 100 - 150 MM BAHAN
Besi Profil C 100 mm - 150 mm 1.1000 kg Pabrikasi ( 20 % ) 0.2000 kg
1 M2 RANGKA ATAP GALVALUM / TRUSS TEBAL 0.8 MM
Page 304 of 334
BAHAN Rangka Galvalum Truss 0.8 mm 1.1000 m2
1 M2 RANGKA ATAP GALVALUM / TRUSS TEBAL 0.5 MM BAHAN
Rangka Galvalum Truss 0.5 mm 1.1000 m2
1 M2 PEMASANGAN PAGAR BESI Lantai Satu 1.0000 Lantai Dua 1.0900 Lantai Tiga 1.1200 Lantai Empat 1.1350 Lantai Lima 1.1620
BAHAN Pagar Besi Komplit Assesories 1.0000 m2
1 M2 PEMASANGAN PAGAR PANEL / FABRIKASI TINGGI 2.00 M BAHAN
Precast Pagar Panel 1.0000 m'
1 M2 PEMASANGAN TERALIS JENDELA BAHAN
Besi strip 0.0154 kg Elektride Baja 0.2000 kg
1 M' ONGKOS PEMASANGAN PIPA GALVANIS BAHAN
Sewa Welding Set 0.0210 hari Kawat Elektrode Baja 0.0060 Kg
1 M' PEKERJAAN BESI PIPA GALVANIS Ǿ 1,5" ( MEDIUM ) BAHAN
Besi Pipa Galvanis Ǿ1,5" ( Medium ) 1.0200 m'
1 M' PEKERJAAN BESI PIPA GALVANIS Ǿ 3" ( MEDIUM ) BAHAN
Besi Pipa Galvanis Ǿ 3" ( Medium ) 1.0200 m'
1 M' PEKERJAAN RAILLING TANGGA PIPA STAINLESS Lantai Satu 1.0000 Lantai Dua 1.0900 Lantai Tiga 1.1200 Lantai Empat 1.1350 Lantai Lima 1.1620 Lantai Enam 1.1970 Lantai Tujuh 1.2360
BAHAN Plat Tiang Railling Hot Deep Galvanis 1.5000 btg Pipa Stainless Steel Ø 13 mm 4.0000 m' Hand Railling Aluminium Ø 75mm 1.0000 m' Dinabol dia. 8mm 3.0000 buah Tutup Hand Railling 0.0500 buah Tutup Hand Railling ke dinding 0.0250 buah
1 M' HAND RAILLING ALUMUNIUM Ø 75 MM Lantai Satu 1.0000 Lantai Dua 1.0900 Lantai Tiga 1.1200 Lantai Empat 1.1350 Lantai Lima 1.1620 Lantai Enam 1.1970 Lantai Tujuh 1.2360
BAHAN Pipa Stainless Steel Ø 13 mm 4.0000 m' Hand Railling Aluminium Ø 75mm 1.0000 m' Dinabol dia. 8mm 3.0000 buah
1 M2 RAILLING BALKON DAN TERAAS BESI HOLLOW. Lantai Satu 1.0000 Lantai Dua 1.0900 Lantai Tiga 1.1200 Lantai Empat 1.1350 Lantai Lima 1.1620 Lantai Enam 1.1970 Lantai Tujuh 1.2360
BAHAN Besi Hollow 4/4 0.7500 btg Besi Hollow 2/4 2.5000 btg Pipa Galvanise Ø 2,5" 0.2500 btng Dinabol dia. 8mm 3.0000 buah Finishing cat Besi 1.9600 m2 Upah Pabrikasi & Stel 0.2000 %
PEKERJAAN DINDING DAN PLESTERAN
1 M2 PEMASANGAN 1/2 BATU BATA CAMP 1Pc : 2Ps. (TINGGI S/D 2.00M ) Lantai Satu 1.0000 Lantai Dua 1.0900 Lantai Tiga 1.1200 Lantai Empat 1.1350 Lantai Lima 1.1620 Lantai Enam 1.1970 Lantai Tujuh 1.2360
BAHAN Semen PC 19.1100 kg Pasir Pasang 0.0348 m3 Batu Bata lokal uk. 22 x 11 x 5 cm 52.0000 bh
1 M2 PEMASANGAN 1/2 BATU BATA CAMP 1Pc : 2Ps. (TINGGI 2.00 - 5.00 M ) Lantai Satu 1.0000 Lantai Dua 1.0900 Lantai Tiga 1.1200 Lantai Empat 1.1350 Lantai Lima 1.1620
Page 305 of 334
Lantai Enam 1.1970 Lantai Tujuh 1.2360
BAHAN Semen PC 17.1600 kg Pasir Pasang 0.0348 m3 Batu Bata lokal uk. 22 x 11 x 5 cm 52.0000 bh
1 M2 PEMASANGAN 1/2 BATU BATA CAMP 1Pc : 3Ps. (TINGGI S/D 2.00M ) Lantai Satu 1.0000 Lantai Dua 1.0900 Lantai Tiga 1.1200 Lantai Empat 1.1350 Lantai Lima 1.1620 Lantai Enam 1.1970 Lantai Tujuh 1.2360
BAHAN Semen PC 14.5150 kg Pasir Pasang 0.0396 m3 Batu Bata lokal uk. 22 x 11 x 5 cm 52.0000 bh
1 M2 PEMASANGAN 1/2 BATU BATA CAMP 1Pc : 3Ps. (TINGGI 2.00 - 5.00 M ) Lantai Satu 1.0000 Lantai Dua 1.0900 Lantai Tiga 1.1200 Lantai Empat 1.1350 Lantai Lima 1.1620 Lantai Enam 1.1970 Lantai Tujuh 1.2360
BAHAN Semen PC 14.5150 kg Pasir Pasang 0.0396 m3 Batu Bata lokal uk. 22 x 11 x 5 cm 52.0000 bh
1 M2 PEMASANGAN 1/2 BATU BATA CAMP 1Pc : 4Ps. (TINGGI S/D 2.00M ) Lantai Satu 1.0000 Lantai Dua 1.0900 Lantai Tiga 1.1200 Lantai Empat 1.1350 Lantai Lima 1.1620 Lantai Enam 1.1970 Lantai Tujuh 1.2360
BAHAN Semen PC 11.6850 kg Pasir Pasang 0.0425 m3 Batu Bata lokal uk. 22 x 11 x 5 cm 52.0000 bh
1 M2 PEMASANGAN 1/2 BATU BATA CAMP 1Pc :4Ps. (TINGGI 2.00 - 5.00 M ) Lantai Satu 1.0000 Lantai Dua 1.0900 Lantai Tiga 1.1200 Lantai Empat 1.1350 Lantai Lima 1.1620 Lantai Enam 1.1970 Lantai Tujuh 1.2360
BAHAN Semen PC 11.6850 kg Pasir Pasang 0.0425 m3 Batu Bata lokal uk. 22 x 11 x 5 cm 52.0000 bh
1 M2 PEMASANGAN 1/2 BATU BATA CAMP 1Pc : 5Ps. (TINGGI S/D 2.00M ) Lantai Satu 1.0000 Lantai Dua 1.0900 Lantai Tiga 1.1200 Lantai Empat 1.1350 Lantai Lima 1.1620 Lantai Enam 1.1970 Lantai Tujuh 1.2360
BAHAN Semen PC 9.9750 kg Pasir Pasang 0.0474 m3 Batu Bata lokal uk. 22 x 11 x 5 cm 52.0000 bh
1 M2 PEMASANGAN 1/2 BATU BATA CAMP 1Pc :5Ps. (TINGGI 2.00 - 5.00 M ) Lantai Satu 1.0000 Lantai Dua 1.0900 Lantai Tiga 1.1200 Lantai Empat 1.1350 Lantai Lima 1.1620 Lantai Enam 1.1970 Lantai Tujuh 1.2360
BAHAN Semen PC 9.9750 kg Pasir Pasang 0.0474 m3 Batu Bata lokal uk. 22 x 11 x 5 cm 52.0000 bh
1 M3 PASANGAN BATU MERAH KOSONGANBAHAN
Batu Bata lokal uk. 22 x 11 x 5 cm 755.0000 bh
1 M2 PLESTERAN CAMP 1Pc :2Ps. (TTEBAL 1 CM ) Lantai Satu 1.0000 Lantai Dua 1.0900 Lantai Tiga 1.1200 Lantai Empat 1.1350 Lantai Lima 1.1620 Lantai Enam 1.1970 Lantai Tujuh 1.2360
BAHAN Semen PC 6.2550 kg Pasir Pasang 0.0119 m3
Page 306 of 334
1 M2 PLESTERAN CAMP 1Pc :2Ps. (TTEBAL 1,5 CM ) Lantai Satu 1.0000 Lantai Dua 1.0900 Lantai Tiga 1.1200 Lantai Empat 1.1350 Lantai Lima 1.1620 Lantai Enam 1.1970 Lantai Tujuh 1.2360
BAHAN Semen PC 8.5000 kg Pasir Pasang 0.0171 m3
1 M2 PLESTERAN CAMP 1Pc :3Ps. (TTEBAL 1 CM ) Lantai Satu 1.0000 Lantai Dua 1.0900 Lantai Tiga 1.1200 Lantai Empat 1.1350 Lantai Lima 1.1620 Lantai Enam 1.1970 Lantai Tujuh 1.2360
BAHAN Semen PC 5.2000 kg Pasir Pasang 0.0130 m3
1 M2 PLESTERAN CAMP 1Pc :3Ps. (TTEBAL 1,5 CM ) Lantai Satu 1.0000 Lantai Dua 1.0900 Lantai Tiga 1.1200 Lantai Empat 1.1350 Lantai Lima 1.1620 Lantai Enam 1.1970 Lantai Tujuh 1.2360
BAHAN Semen PC 6.8200 kg Pasir Pasang 0.0200 m3
1 M2 PLESTERAN CAMP 1Pc :4Ps. (TTEBAL 1 CM ) Lantai Satu 1.0000 Lantai Dua 1.0900 Lantai Tiga 1.1200 Lantai Empat 1.1350 Lantai Lima 1.1620 Lantai Enam 1.1970 Lantai Tujuh 1.2360
BAHAN Semen PC 3.8150 kg Pasir Pasang 0.0139 m3
1 M2 PLESTERAN CAMP 1Pc :4Ps. (TTEBAL 1,5 CM ) Lantai Satu 1.0000 Lantai Dua 1.0900 Lantai Tiga 1.1200 Lantai Empat 1.1350 Lantai Lima 1.1620 Lantai Enam 1.1970 Lantai Tujuh 1.2360
BAHAN Semen PC 5.1500 kg Pasir Pasang 0.0215 m3
1 M2 MERAPIKAN PERMUKAAN PAS.DENGN SPESI 1Pc : 2 PsBAHAN
Semen PC 3.1300 kg Pasir Pasang 0.0060 m3
1 M' BENANGAN Lantai Satu 1.0000 Lantai Dua 1.0900 Lantai Tiga 1.1200 Lantai Empat 1.1350 Lantai Lima 1.1620 Lantai Enam 1.1970 Lantai Tujuh 1.2360
BAHAN Semen PC 1.2000 kg Pasir Pasang 0.0000 m3
1M2 PEKERJAAN ACIAN Lantai Satu 1.0000 Lantai Dua 1.0900 Lantai Tiga 1.1200 Lantai Empat 1.1350 Lantai Lima 1.1620 Lantai Enam 1.1970 Lantai Tujuh 1.2360
BAHAN PC 3.2500 kg
1M' KOL-KOLAN BAHAN
Pasir Pasang 0.0040 m3 PC 3.2500 kg
1M2 BERAPEN 1 PC : 5 PS, Tebal 15 mmBAHAN
PC 5.6700 kg Pasir Pasang 0.0230 m3
1M2 PLESTERAN BETON 1 PC : 3 PS tebal 15 mm
Page 307 of 334
Lantai Satu 1.0000 Lantai Dua 1.0900 Lantai Tiga 1.1200 Lantai Empat 1.1350 Lantai Lima 1.1620 Lantai Enam 1.1970 Lantai Tujuh 1.2360
BAHAN PC 7.0700 kg Pasir Pasang 0.0210 m3
1M2 PASANGAN GLASS BLOCK Lantai Satu 1.0000 Lantai Dua 1.0900 Lantai Tiga 1.1200 Lantai Empat 1.1350 Lantai Lima 1.1620 Lantai Enam 1.1970 Lantai Tujuh 1.2360
BAHAN Glass Block 25.0000 bh PC 5.0000 kg
1M2 PASANGAN BATACO BAHAN
Bataco tebal 10 cm 12.5000 bh PC 14.0000 kg Pasir Pasang 0.0420 kg
1M2 PASANGAN BATU KLINGKER BAHAN
Batu Klingker 52.5000 bh PC 6.2550 kg Pasir Pasang 0.0119 kg
1M2 PASANGAN BATU AMPYANG BAHAN
Batu Ampyang 1.1000 m2 PC 12.5100 kg Pasir Pasang 0.0238 kg
1M2 PASANGAN BATU CANDI HITAM BAHAN
Batu Candi Hitam 1.1000 m2 PC 12.5100 kg Pasir Pasang 0.0238 kg
1M2 PASANGAN BATU GILANG Ex. JEMBER - ASIMETRIS BAHAN
Batu Gilang Ex. Jember 1.2000 m2 PC 12.5100 kg Pasir Pasang 0.0238 kg
1M2 PASANGAN BATU GILANG Ex. CIREBON - SIMETRIS BAHAN
Batu Gilang Ex. Cirebon 1.1000 m2 PC 12.5100 kg Pasir Pasang 0.0238 kg
1M2 PASANGAN BATU GILANG Ex. CIREBON - ASIMETRIS BAHAN
Batu Gilang Ex. Cirebon 1.2000 m2 PC 12.5100 kg Pasir Pasang 0.0238 kg
1M2 PASANGAN BATU BOBOS BAHAN
Batu Bobos uk. 10x20x1,5 1.0000 m2 PC 6.4800 kg Pasir Pasang 0.0210 kg
PEKERJAAN CAT-CATAN-W.PROOFING-W.PAPER
1M2 CAT TEMBOK INTERIOR DAN PLAFOND Lantai Satu 1.0000 Lantai Dua 1.0900 Lantai Tiga 1.1200 Lantai Empat 1.1350 Lantai Lima 1.1620 Lantai Enam 1.1970 Lantai Tujuh 1.2360
BAHAN Plamuur Tembok 0.1500 Kg Cat dasar 0.2000 lt Cat Dinding Interior Catylac 0.2600 Kg Roll Cat 0.0100 bh Kertas Gosok 0.5000 lbr Steigger 0.1500 lot
1M2 CAT TEMBOK EXTERIOR (WEATHERSHIELD) Lantai Satu 1.0000 Lantai Dua 1.0900 Lantai Tiga 1.1200 Lantai Empat 1.1350 Lantai Lima 1.1620 Lantai Enam 1.1970 Lantai Tujuh 1.2360
BAHAN Plamuur Tembok 0.1500 Kg Cat dasar 0.1000 lt
Page 308 of 334
Cat Dinding Exxterior Catylac 0.2600 Kg Roll Cat 0.0100 bh Kertas Gosok 0.5000 lbr Steigger 0.1500 lot
1M2 CAT MENI BESI / KAYU BAHAN
Cat Meni kayu / besi 0.8400 kg Minyak Cat 0.0440 kg
1M2 PENGCATAN 3X SERTA MENGGOSOK TANPA MENI ( BESI / KAYU ) BAHAN
Cat Besi 0.4250 kg Dempul 0.0800 kg Minyak Cat 0.0570 lmb Kertas Gosok 1.0000 lmb
1M2 POLITUR 2 X SAMPAI RATA BAHAN
Cerlax 0.0340 kg Spirtus 0.6600 ltr Kerta Gosok No. 150 0.5000 lmb
1M2 PEMASANGAN WALLPAPER BAHAN
Wall Paper lbar 55 cm 2.0000 m Lem 0.2000 kg
1M2 PELAPISAN WATERPROOFING BAHAN
Water Proofing 0.3500 kg Serat Fiber 1.0000 m2
1M2 PENGECATAN TEXTURE GRANITONE BAHAN
Texture GRANITONE 1.1000 m2 Peralatan ( 10 % dr Bahan ) 0.1000 ls
1M2 PELAPISAN WATERPROOFING MEMBRAN BAHAN
Water proofing bithuthene sheet 3000 1.0500 m2 Peralatan 1.0000 ls
1 M2 PENGECATAN MELAMINE NATURALBAHAN
WoodFiller 0.2000 kg Pewarna 0.5000 sct Kertas gosok No. 150 1.0000 lbr Kertas gosok No. 280 1.0000 lbr Shanding 0.5000 kg Clear doof 0.2000 kg Thinner A special 0.3700 kg Coumpound 0.2000 klng Sewa alat bantu ( 1 set @ 3 alat ) 1.0000 set
1 M2 PENGECATAN GENTING BARUBAHAN
Cat Genting 0.2000 kg
1M2 PENGECATAN KAYU BAHAN
Cat Kayu 0.4250 kg Minyak Cat 0.0570 ltr Kertas Gosok 1.0000 lmb
PEKERJAAN LANTAI
1 M2 PEMASANGAN GRANITE TILE 30X30 POLISH Pemasangan Lantai I 1.0000 Pemasangan Lantai II 1.0900 Pemasangan Lantai III 1.1200 Pemasangan Lantai IV 1.1350 Pemasangan Lantai V 1.1620 Pemasangan Lantai VI 1.1970 Pemasangan Lantai VII 1.2360
BAHAN PC 10.0000 kg Semen warna nut 1.5000 kg Pasir pasang 0.0450 m3 Granite Tile Ukuran 30 x 30 Polished 1.0000 m2
1 M2 PEMASANGAN GRANITE TILE 60X60 POLISH Pemasangan Lantai I 1.0000 Pemasangan Lantai II 1.0900 Pemasangan Lantai III 1.1200 Pemasangan Lantai IV 1.1350 Pemasangan Lantai V 1.1620 Pemasangan Lantai VI 1.1970 Pemasangan Lantai VII 1.2360
BAHAN PC 10.0000 kg Semen warna nut 1.5000 kg Pasir pasang 0.0450 m3 Granite Tile Ukuran 60 x 60 Polished 1.0000 m2
1 M2 PEMASANGAN UBIN KERAMIK 30x30 WARNA MOTIF Pemasangan Lantai I 1.0000 Pemasangan Lantai II 1.0900 Pemasangan Lantai III 1.1200 Pemasangan Lantai IV 1.1350 Pemasangan Lantai V 1.1620 Pemasangan Lantai VI 1.1970
Page 309 of 334
Pemasangan Lantai VII 1.2360BAHAN
PC 10.0000 kg Semen warna nut 1.5000 kg Pasir pasang 0.0450 m3 Keramik Lantai 30 x 30 Warna / Motif 1.0000 m2
1 M2 PEMASANGAN PELAPIS BATU CANDI Pemasangan Lantai I 1.0000 Pemasangan Lantai II 1.0900 Pemasangan Lantai III 1.1200 Pemasangan Lantai IV 1.1350 Pemasangan Lantai V 1.1620 Pemasangan Lantai VI 1.1970 Pemasangan Lantai VII 1.2360
BAHAN PC 10.0000 kg Semen warna nut 1.5000 kg Pasir pasang 0.0450 m3 Batu Candi 1.0000 m2
1 M2 PEMASANGAN UBIN KERAMIK 40X40 WARNA MOTIF Pemasangan Lantai I 1.0000 Pemasangan Lantai II 1.0900 Pemasangan Lantai III 1.1200 Pemasangan Lantai IV 1.1350 Pemasangan Lantai V 1.1620 Pemasangan Lantai VI 1.1970 Pemasangan Lantai VII 1.2360
BAHAN PC 10.0000 kg Semen warna nut 1.5000 kg Pasir pasang 0.0450 m3 Keramik Lantai 40 x 40 Warna / Motif 1.0000 m2
1 M2 PEMASANGAN PELAPIS DINDING CLADDING Ex. INDAL BAHAN
Bahan Cladding Ex. Indal 1.0500 m2 Paku baut 50.0000 bh Sewa alat pmbntu 1.0000 ls Rangka Hollow 1.0000 m2
1 M2 PEMASANGAN GARNITE TILE WARNA EX. ESSENZA 60X60 Pemasangan Lantai I 1.0000 Pemasangan Lantai II 1.0900 Pemasangan Lantai III 1.1200 Pemasangan Lantai IV 1.1350 Pemasangan Lantai V 1.1620 Pemasangan Lantai VI 1.1970 Pemasangan Lantai VII 1.2360
BAHAN PC 10.0000 kg Semen warna nut 1.5000 kg Pasir pasang 0.0450 m3 Ubin Granito warna Hitam Essenza 60 x 60 1.0000 m2
1 M2 PEMASANGAN MARMER 100 X 100 Pemasangan Lantai I 1.0000 Pemasangan Lantai II 1.0900 Pemasangan Lantai III 1.1200 Pemasangan Lantai IV 1.1350 Pemasangan Lantai V 1.1620 Pemasangan Lantai VI 1.1970 Pemasangan Lantai VII 1.2360
BAHAN PC 10.0000 kg Semen warna nut 1.5000 kg Pasir pasang 0.0450 m3 Marmer 100 x 100 1.0000 m2
1 M2 PEMASANGAN GRANIT IMPORT Pemasangan Lantai I 1.0000 Pemasangan Lantai II 1.0900 Pemasangan Lantai III 1.1200 Pemasangan Lantai IV 1.1350 Pemasangan Lantai V 1.1620 Pemasangan Lantai VI 1.1970 Pemasangan Lantai VII 1.2360
BAHAN PC 10.0000 kg Semen warna nut 1.5000 kg Pasir pasang 0.0450 m3 Batu GRANIT import Italy 1.0000 m2
1 M2 PASANG LANTAI KERAMIK 20 X 20 MOTIF Pemasangan Lantai I 1.0000 Pemasangan Lantai II 1.0900 Pemasangan Lantai III 1.1200 Pemasangan Lantai IV 1.1350 Pemasangan Lantai V 1.1620 Pemasangan Lantai VI 1.1970 Pemasangan Lantai VII 1.2360
BAHAN PC 3.3000 kg Semen warna nut 1.3400 kg Pasir pasang 0.0180 m3 Keramik Lantai 20/20 motif 1.0000 m2
1 M2 PASANG DINDING KERAMIK 20 X 25 MOTIF Pemasangan Lantai I 1.0000 Pemasangan Lantai II 1.0900 Pemasangan Lantai III 1.1200 Pemasangan Lantai IV 1.1350
Page 310 of 334
Pemasangan Lantai V 1.1620 Pemasangan Lantai VI 1.1970 Pemasangan Lantai VII 1.2360
BAHAN PC 3.3000 kg Semen warna nut 1.3400 kg Pasir pasang 0.0180 m3 Keramik Dinding 20 x 25 1.0000 m2
1 M' PASANG PLINT KERAMIK UKURAN 10X40 Pemasangan Lantai I 1.0000 Pemasangan Lantai II 1.0900 Pemasangan Lantai III 1.1200 Pemasangan Lantai IV 1.1350 Pemasangan Lantai V 1.1620 Pemasangan Lantai VI 1.1970 Pemasangan Lantai VII 1.2360
BAHAN PC 0.0330 kg Semen warna nut 0.1000 kg Pasir pasang 0.0032 m3 Plint Keramik Lantai 10 x 40 2.6600 bh
1 M2 PEMASANGAN METAL CLADDING WARNA BAHAN
Alat bantu 1.0000 ls Sealent 0.4000 klng Clidding Wall Colour + Rangka 1.1000 m2
1 M2 PEMASANGAN HARDENER FLOOR BAHAN
Floor Hardener 3.0000 kg
1 M2 PEMASANGAN LANTAI KARPET BAHAN
Karpet World Class 1.0500 m2 Lem 0.5000 kg
1 M2 PEMASANGAN LAPISAN FOAM UNTUK KARPET BAHAN
Foam Lapisan Karpet 1.0500 m2 Lem 0.3750 kg
1 M2 PEMASANGAN LANTAI KAYU ( GYMFLOOR) BAHAN
Gymfloor 1.0500 kg Lem 0.6000 m2
PEKERJAAN KUDA-KUDA, RENG USUK
1 M3 KUDA-KUDA KAYU JATI ( BENTANG MAX.7.00 M) BAHAN
Kayu Jati ( Balok 6/12 ) Ex. Malang 1.1000 m3 Besi Plat strip 15.0000 kg Paku Klem No.4 5.6000 kg
1 M3 KUDA-KUDA KAYU MERANTI ( BENTANG MAX.7.00 M) BAHAN
Kayu Balok Meranti 1.1000 m3 Besi Plat strip 15.0000 kg Paku Klem No.4 5.6000 kg
1 M3 GORDING KAYU KAMPER BAHAN
Kayu Kamper Balok 1.1000 m3 Besi Plat strip 15.0000 kg Paku Klem No.4 0.2000 kg
1 M2 PEMASANGAN RENG KAMPER / USUK KAMPER BAHAN
Kayu Kamper Reng 0.0039 m3 Kayu Kamper Usuk 0.0108 m3 Paku Reng 0.2000 kg
1 M2 PEMASANGAN RENG KAMPER / USUK MERANTI BAHAN
Kayu Kamper Reng 0.0039 m3 Kayu Meranti Usuk 0.0108 m3 Paku Reng 0.2000 kg
1 M2 PEMASANGAN RENG JATI / USUK KAMPER BAHAN
Kayu jatir Reng 0.0039 m3 Kayu Kamper Usuk 0.0108 m3 Paku Reng 0.2000 kg
PEKERJAAN PENUTUP ATAP
1 M2 PEMASANGAN GENTENG KARANGPILANG Ex. SURABAYA Lantai Satu 1.0000 Lantai Dua 1.0900 Lantai Tiga 1.1200 Lantai Empat 1.1350 Lantai Lima 1.1620
BAHAN Genteng Karangpilang ex. Surabaya 25.0000 bh
1 M2 PEMASANGAN GENTENG KERAMIK WARNA Ex.KIA BAHAN
Genteng Keramik Warna KIA 11.0000 bh
Page 311 of 334
1 M2 PEMASANGAN GENTENG KODOK GOOD YEARS BAHAN
Genteng Kodok Good Years 25.0000 bh
1 M2 PEMASANGAN ATAP POLY CARBONIT BAHAN
Polycarbonite 1.0000 m2
1 M' PEMASANGAN WUWUNG GENTENG KARANGPILANG Lantai Satu 1.0000 Lantai Dua 1.0900 Lantai Tiga 1.1200 Lantai Empat 1.1350 Lantai Lima 1.1620
BAHAN PC 11.8500 kg Pasir Pasang 0.0323 m3 Bubung Genteng Karangpilang ex. Surabaya 3.0000 bh
1 M' PEMASANGAN WUWUNG GENTENG KODOK GLAZUR BAHAN
PC 11.8500 kg Pasir Pasang 0.0323 m3 Bubung Genteng kodok glazur 3.0000 bh
1 M' PEMASANGAN WUWUNG GENTENG PELENTONG BESAR BAHAN
PC 11.8500 kg Pasir Pasang 0.0323 m3 Bubung Genteng Pelentong besar / super 3.0000 bh
1 M' PEMASANGAN WUWUNG GENTENG KARANGPILANG GEDUNG BERTINGKAT BAHAN
PC 11.8500 kg Pasir Pasang 0.0323 m3 Genteng kaca Palentong supr / besar 3.0000 bh
1 M2 ALUMINIUM FOIL / INSULATION BAHAN
Glass wol 0.0183 Rol Roof Mes 0.0153 Rol Alluminium foil /insulation double side 0.0611 Rol Allumunium Tape 0.0489 Rol
PEKERJAAN TALANG
1 M' PEMASANGAN TALANG SENG BJLS 40 ( LEBAR 90 CM ) BAHAN
Kayu Kamper ( Papan ) 2/30 0.0160 m3 Kayu KamperUsuk 0.0073 m3 Seng Talang BJLS 40 Lebar 90 cm 1.0000 m' Paku Sumbat 5.0000 bh
1 M' PEMASANGAN TALANG PEMBULUH PVC Ø 3" BAHAN
Pipa PVC Ø 3" 0.1667 lnjr Klem PVC 1.0000 buah
1 M' PEMASANGAN TALANG PEMBULUH PVC Ø 4 " BAHAN
Pipa PVC Ø 4 " 0.1667 lnjr Klem PVC 1.0000 buah
1 M' PEMASANGAN TALANG PEMBULUH PVC Ø 5 " BAHAN
Pipa PVC Ø 5 " 0.1667 lnjr Klem PVC 1.0000 buah
1 M' PEMASANGAN TALANG PEMBULUH PIPA GALVANIS Ø 3" BAHAN
Pipa Galvanis Ø 3" 0.1667 lnjr Klem Galvanis 1.0000 buah
1 M' PEMASANGAN TALANG PEMBULUH PIPA GALVANIS Ø 4 " BAHAN
Pipa Galvanis Ø 4 " 0.1667 lnjr Klem Galvanis 1.0000 buah
1 M' PEMASANGAN TALANG PEMBULUH PIPA GALVANIS Ø 5 " BAHAN
Pipa Galvanis Ø 5 " 0.1667 lnjr Klem Galvanis 1.0000 buah
1 M' PEMASANGAN LISPLANK KAYU JATI 2/30 BAHAN
Kayu Jati Papan ex. Malang 0.0099 m3 Paku Biasa 0.0500 kg
1 M' PEMASANGAN LISPLANK KAYU KAMPER 2/30 BAHAN
Kayu Papan kamper 0.0099 m3 Paku Biasa 0.0500 kg
1 BH BAK KONTROL 30X30 TINGGI 35 CM BAHAN
bata Merak 83.9120 bh Semen PC/50 kg 44.0000 Kg Pasir Pasang 0.0700 m3 Koral Beon 0.0700 m3 Besi beton 1.6000 Kg Pasir Beton 0.0600 m3
PEKERJAAN PLAFOND
Page 312 of 334
PEKERJAAN PLAFOND
1 M2 PEMASANGAN PLAFOND ASBES DATAR RANGKA KAYU KAMPER BAHAN
Kayu Balok Kamper 5/7 0.0116 m3 Asbes datar t= 4 mm 1.0500 m2 Paku Asbes 0.0324 kg Paku biasa 0.0300 kg
1 M2 PEMASANGAN PLAFOND ASBES DATAR RANGKA KAYU Kruing Lantai Satu 1.0000 Lantai Dua 1.0900 Lantai Tiga 1.1200 Lantai Empat 1.1350 Lantai Lima 1.1620
BAHAN Kayu Balok Kamper 5/7 0.0116 m3 Asbes 100x100x6 mm 1.0500 m2 Paku Asbes 0.0324 kg Paku biasa 0.0300 kg
1 M2 PEMASANGAN PLAFOND TRIPLEX RANGKA KAYU KAMPER BAHAN
Kayu Balok Kamper 5/7 0.0116 m3 Triplex 4 mm 0.3819 lbr Paku Triplex 0.0324 kg Paku biasa 0.0300 kg
1 M2 PEMASANGAN PLAFOND GYPSUM + RANGKA METAL FURING Lantai Satu 1.0000 Lantai Dua 1.0900 Lantai Tiga 1.1200 Lantai Empat 1.1350 Lantai Lima 1.1620 Lantai Enam 1.1970 Lantai Tujuh 1.2360
BAHAN Gypsumboard 122 x 244 t = 9 mm 0.3472Lembar Sekrup 11.0000 bh Rangka metal furing 0.9900 btg Stifenner 3.0000 btg Juster penggantung 4.0000 bh Joint Tape 0.8000 m' Jointing Compound 0.3000 Kg Steger 0.1000 ls
1 M2 PEMASANGAN PLAFOND KLASIBOARD TANPA RANGKA BAHAN
Kalsiboard 1,00x1,00 ex. Gresik 0.3819 lbr Sekrup 4.0000 bh
1 M2 PEMASANGAN PLAFOND LUAR KISI-KISI TANPA RANGKA BAHAN
Kayu Kamper Balok 0.0120 m3 Paku biasa 0.1400 kg
1 M2 PEMASANGAN RANGKA PLAFOND KAYU KAMPER BAHAN
Kayu Kamper Balok 0.0116 m3 Paku Klem 0.0308 kg
1 M2 PEMASANGAN RANGKA PLAFOND KAYU MERANTI BAHAN
Kayu Meranti r Balok 0.0116 m3 Paku Klem 0.0308 kg
1 M2 PEMASANGAN RANGKA PLAFOND BESI HOLLOW BAHAN
Besi Hollow 40/40 0.7500 m' Besi Hollow 20/20 2.0000 m' Paku sekrup 4.0000 bh
1 M2 PEMASANGAN LIST PLAFOND GYPSUM PROFIL 10 CM BAHAN
List Profil Gypsum, t = 5 - 10 cm 1.0000 m' Jointing Compound 0.1000 Kg Steger 0.1000 ls
PEKERJAAN KOSEN DAN PINTU
1 M3 KOSEN PINTU DAN JENDELA KAYU JATI Ex. MALANG BAHAN
Kayu Jati Balok 1.1000 m3 Paku Klem 1.2000 kg Lem Kayu 1.0000 kg
1 M3 KOSEN PINTU DAN JENDELA KAYU KAMPER Lantai Satu 1.0000 Lantai Dua 1.0900 Lantai Tiga 1.1200 Lantai Empat 1.1350 Lantai Lima 1.1620
BAHAN Kayu Kamper Balok 1.2000 m3 Paku Klem 1.2500 kg Lem Kayu 1.0000 kg
1 M' PASANG KOSEN PINTU DAN KOSEN JENDELA DARI ALUMINIUM Lantai Satu 1.0000 Lantai Dua 1.0900 Lantai Tiga 1.1200 Lantai Empat 1.1350 Lantai Lima 1.1620
Page 313 of 334
BAHAN Jendela alumunium putih ex. INDALEX 1.2000 m' Sealent 8.0000 m'
1 M2 DAUN PINTU PANIL JATI Ex. MALANG BAHAN
kayu Jati Papan 3 cm 0.0400 m3 Skrup 25.0000 bh
1 M2 DAUN PINTU PANIL KAMPER BAHAN
Kayu Kamper Papan 3 cm 0.0400 m3 Skrup 25.0000 bh
1 M2 PASANG PINTU PANIL (80X230) KAMPER + MULTIPLEX 9 MM + TEAKWOOD BAHAN
Kayu Papan Kamper 0.0291 m3 Multiplex 9 mm 0.6500 lmbr Teakwood Jati 4 mm 1.0000 lmbr Paku Triplex 0.2000 kg 22000 Lem Putih Fox 0.0500 kg Profil kayu 3.5000 m'
1 M2 PINTU / JENDELA KACA ALUMUNIUM BAHAN
Aluminium Jendela 4.0000 m' Sealent 0.1000 kg Kaca Polos tebal 5mm 0.6500 m'
1 M2 PINTU / JENDELA KACA PAPAN KAYU KAMPER BAHAN
Kayu Papan Kamper 0.0350 m3 Paku biasa 1.4000 m2 Kaca Polos tebal 5mm 0.3000 m2
1 M2 PASANG PINTU PLYWOOD RANGKAP RANGKA JATIBAHAN
Kayu Jati 0.0196 m3 Paku Biasa 0.0300 kg Lem Kayu 0.3000 ltr Plywood t=4mm 1.0000 lbr
1 M2 PASANG PINTU TEAKWOOD+ FORMIKA RANGKA KAMPER KISI UN. KMBAHAN
Kayu Kamper 0.0196 m3 Multiplex 9 mm 0.7000 m2 Teakwood Jati 4 mm + Formika 0.7000 m2 Pembuatan Kisis2 kayu kamper 0.3000 m2
1 M2 PASANG KACA MATI 5 MM BAHAN
Alat bantu 1.0000 m3 Sealent 0.4000 kg Kaca Gelap 5 mm 1.0000 m2
1 M2 PASANG KACA BURAM 5 MM BAHAN
Alat bantu 1.0000 m3 Sealent 0.4000 kg Kaca Buram tebal = 5 mm 1.0000 m2
1 M' PASANG PROFIL KAYU KAMPER 7 CM BAHAN
List Profil Kayu Kamper 1/7 1.0500 m' Paku biasa 0.0020 kg Lem Kayu 0.3000 ltr
1 M' PASANG PROFIL KAYU KAMPER 10 CM BAHAN
List Profil Kayu Kamper 1/10 1.0500 m' Paku biasa 0.0020 kg Lem Kayu 0.3000 ltr
1 M' PASANG PROFIL KAYU KAMPER 15 CM BAHAN
List Profil Kayu Kamper 1/15 1.0500 m' Paku biasa 0.0020 kg Lem Kayu 0.3000 ltr
1 M' PASANG PROFIL KAYU JATI 15 CM BAHAN
List kayu jati profil 1.5/15 1.0500 m' Paku biasa 0.0020 kg Lem Kayu 0.3000 ltr
1 M2 PASANG KACA STOPSOL BLUEGREY 6 MM BAHAN
Alat bantu 1.0000 ls Sealent 0.4000 klng Kaca Stopsol Blue Grey 6 mm 1.0500 m2
1 M2 PASANG KACA STOPSOL BLUEGREY 8 MM BAHAN
Alat bantu 1.0000 ls Sealent 0.4000 klng Kaca Stopsol Blue Grey 8 mm 1.0500 m2
1 M2 PASANG KACA TEMPERED 12 MM BAHAN
Alat bantu 1.0000 ls Sealent 0.4000 klng Kaca Temprd 12 mm 1.1000 m2
1 M2 PASANG KACA NACO TEBAL 5 MM RAYBEN BAHAN
Page 314 of 334
Krepyak Naco 10.0000 daun Kaca Rayben 5 mm 1.3600 m2 Sekrup 10.0000 kg
1 M2 METAL CLIDDING COLOUR BAHAN
Alat bantu 1.0000 ls Sealent 0.4000 klng Clidding Wall Colour + Rangka 1.2000 m2
1 M' PASANG KOSEN CURTAIN WALL ALUMINIUM BAHAN
Aluminium Curtain 1.1000 m' Sealent 2.0000 klng
1 UNIT PINTU FRAME LESS TEMPERED Kaca tempered 12 mm 3.7800 m2 Aluminium profil warna 4" 0.0000 m' Patch Fitting Handle SS Complete Dekkson+Floorhinge Dorma 2.0000 set Kunci Ex Dorma 2.0000 set Handel Stainless Steel 2.0000 set
PEKERJAAN PARTISI
1 M2 PARTISI DOUBLE TEAKWOOD BAHAN
Teakwood 3 mm 1.0000 lbr Kayu Kamper Usuk 0.0154 m3 Paku Klem 0.1000 kg
1 M2 PARTISI DOUBLE GYPSUM TEBAL 12 MM Lantai Satu 1.0000 Lantai Dua 1.0900 Lantai Tiga 1.1200 Lantai Empat 1.1350 Lantai Lima 1.1620 Lantai Enam 1.1970 Lantai Tujuh 1.2360
BAHAN Gypsum Board 12 mm 0.6944Lembar Skrup 22.0000 bh Hollow 2/4 0.5000 btg Hollow 4/4 1.0000 btg Skrup Fisher 2.0000 bh Joint Tape 2.0000 m' Jointing Compound 0.3000 Kg
PEKERJAAN ASSESORIES PINTU / JENDELA
1 BH PASANG KUNCI PINTU DOUBLE SLAAG SETARA LOGO - CISA BAHAN
Kunci Pintu (Lockcase) + double cylinder 1.0000 bh
1 BH PEMASANGAN KUNCI TANAM ANTIK BAHAN
Kunci Tanam antik 1.0000 bh
1 BH PEMASANGAN KUNCI TANAM SES BAHAN
Kunci SES 1.0000 bh
1 BH PEMASANGAN KUNCI TANAM SILENDER KM/WC BAHAN
Kunci Silinder 1.0000 bh
1 BH PEMASANGAN ENGSEL PINTU BAHAN
Engsel Pintu 1.0000 bh
1 BH PEMASANGAN ENGSEL JENDELA BAHAN
Engsel Jendela 1.0000 bh
1 BH PEMASANGAN GRENDEL PINTU BAHAN
Grendel pintu 1.0000 bh
1 BH PEMASANGAN GRENDEL PINTU 3" BAHAN
Grendel 3" ex. Muller 1.0000 bh
1 BH PEMASANGAN GRENDEL JENDELA KUNINGAN BAHAN
Grendel jendela kuningan 1.0000 bh
1 BH PEMASANGAN GRENDEL ESPANYOLET BAHAN
Grendel Espanyolet 1.0000 bh
1 BH PEMASANGAN HAK ANGIN BAHAN
Hak Angin 1.0000 bh
1 BH PASANG DOOR CLOSERBAHAN
Door Closer 1.0000 bh
PEKERJAAN INSTALASI LISTRIK
1 TTK PEMASANGAN TITIK STOP KONTAK GEDUNG BAHAN
Page 315 of 334
Stop Kontak Broco 1.0000 bh Kabel NYA 500 V 2 x 2,5 mm2 15.0000 m' Pipa Pralon 5/8 1.0000 ljr T Dos PVC 1.0000 bh
1 TTK PEMASANGAN TITIK LAMPU GEDUNG BAHAN
Isolator 4.0000 bh Kabel NYA 500 V 2 x 2,5 mm2 10.0000 m' Pipa Pralon 5/8 1.0000 ljr T Dos PVC 1.0000 bh Fitting Plafond 1.0000 bh
1 TTK PEMASANGAN TITIK LAMPU GEDUNG STOP KONTAK AC BAHAN
Isolator 5.0000 bh Kabel NYY Eterna Ø 2½" x 3 18.0000 m' Pipa Pralon Ø 5/8 2.0000 ljr Inbow Dos PVC Kontak 1.0000 bh
1 TTK PEMASANGAN SAKLAR TUNGGAL BAHAN
Saklar Tunggal Broco 1.0000 bh
1 TTK PEMASANGAN SAKLAR GANDA BAHAN
Saklar Ganda Broco 1.0000 bh
1 M' PEMASANGAN PVC UNTUK KABEL TANAM BAHAN
Pipa PVC Type AW Ø 2 " 0.2500 ljr
1 UNIT PEMASANGAN PANEL PENERANGAN JALAN UMUM ( PJU ) BAHAN
1 UNIT PEMASANGAN LAMPU HPS 70 W / 220 V LENGKAP BAHAN
Lampu HPS (Armature,Balas,Ignitor.Caps) 70 W/220 1.0000 bhALAT
Sewa Alat Bantu PJU 0.2500 jam
1 UNIT PEMASANGAN LAMPU HPS 150 W / 220 V LENGKAP BAHAN
Lampu HPS (Armature,Balas,Ignitor.Caps) 150 W/220 1.0000 bhALAT
Sewa Alat Bantu PJU 0.2500 jam
1 UNIT PEMASANGAN LAMPU HPS 250 W / 220 V LENGKAP BAHAN
Lampu HPS (Armature,Balas,Ignitor.Caps) 250 W / 220 1.0000 bhALAT
Sewa Alat Bantu PJU 0.2500 jam
1 UNIT PEMASANGAN LAMPU HPS 400 W / 220 V LENGKAP BAHAN
Lampu HPS (Armature,Balas,Ignitor.Caps) 400 W / 220 1.0000 bhALAT
Sewa Alat Bantu PJU 0.2500 jam
1 UNIT PEMASANGAN LAMPU MERCURY HPLN 80 WATT BAHAN
Bola lampu Mercury HPLN-220 V / 80 W 1.0000 bhALAT
Sewa Alat Bantu PJU 0.2500 jam
1 UNIT PEMASANGAN LAMPU MERCURY HPLN 200 WATT BAHAN
Bola lampu Mercury HPLN-220 V / 200 W 1.0000 bhALAT
Sewa Alat Bantu PJU 0.2500 jam
1 UNIT PEMASANGAN LAMPU NATRIUM 250 W / 220 V BAHAN
Lampu Natrium 250 W/ 220 V + Balast 1.0000 bhALAT
Sewa Alat Bantu PJU 0.2500 jam
1 UNIT PEMASANGAN LAMPU SOROT 250 W / 220 V BAHAN
Lampu Sorot (Armature,Balas,Ignitor.Caps) 250 watt 1.0000 bhALAT
Sewa Alat Bantu PJU 0.2500 jam
1 UNIT PEMASANGAN LAMPU SOROT 150 W / 220 V BAHAN
Lampu Sorot (Armature,Balas,Ignitor.Caps) 150 watt 1.0000 bhALAT
Sewa Alat Bantu PJU 0.2500 jam
1 UNIT PEMASANGAN TIAN OKTOGONAL 5 M SINGLE+FLANDERS BAHAN
Tiang Oktogonal Singgle Hot Dipped Galv + Flenders 5m 1.0000 unitALAT
Sewa Crane 0.5000 jam
1 UNIT PEMASANGAN TIAN OKTOGONAL 5 M DOUBLE + FLANDERS BAHAN
Tiang Oktogonal Double Hot Dipped Galv + Flenders 5m 1.0000 unitALAT
Sewa Crane 0.5000 jam
1 UNIT PEMASANGAN TIAN OKTOGONAL 7 M SINGLE + FLANDERS BAHAN
Tiang Oktogonal Singgle Hot Dipped Galv + Flenders 7 m 1.0000 unit
Page 316 of 334
ALAT Sewa Crane 0.5000 jam
1 UNIT PEMASANGAN TIAN OKTOGONAL 7 M DOUBLE + FLANDERS BAHAN
Tiang Oktogonal Double Hot Dipped Galv + Flenders 7 m 1.0000 unitALAT
Sewa Crane 0.5000 jam
1 UNIT PEMASANGAN TIAN OKTOGONAL 9 M SINGLE + FLANDERS BAHAN
Tiang Oktogonal Singgle Hot Dipped Galv + Flenders 9 m 1.0000 unitALAT
Sewa Crane 0.5000 jam
1 UNIT PEMASANGAN TIAN OKTOGONAL 9 M DOUBLE + FLANDERS BAHAN
Tiang Oktogonal Double Hot Dipped Galv + Flenders 9 m 1.0000 unitALAT
Sewa Crane 0.5000 jam
1 UNIT PEMASANGAN TIAN OKTOGONAL 12 M SINGLE + FLANDERS BAHAN
Tiang Oktogonal Singgle Hot Dipped Galv + Flenders 12 m 1.0000 unitALAT
Sewa Crane 0.5000 jam
1 UNIT PEMASANGAN TIAN OKTOGONAL 12 M DOUBLE + FLANDERS BAHAN
Tiang Oktogonal Double Hot Dipped Galv + Flenders 12 m 1.0000 unitALAT
Sewa Crane 0.5000 jam
1 UNIT PONDASI BIASA PJU 5 M - 7 M BAHAN
Angkur Besi D.16 10.9720 kg Pipa PVC Class D Ǿ 2 " 2.0000 m' Pasir Urug 0.0640 m3 Kayui Meranti Bekisting 0.0500 m3 Paku Reng 0.5000 kg PC 94.3750 kg Pasir Beton 1.1784 m3 Batu Pecah Mesin 2/3 0.0406 m3 Batu Pecah Mesin 1/2 0.1889 m3
ALAT Sewa Alat Bantu 0.1767 jam Sewa Vibrator Roller 0.0076 jam Sewa Concrete Mixer 0.0076 jam
1 UNIT PONDASI BIASA PJU 7 M - 9 M BAHAN
Angkur Besi D.19 10.9720 kg Pipa PVC Class D Ǿ 2 " 2.0000 m' Pasir Urug 0.0960 m3 Kayui Meranti Bekisting 0.0500 m3 Paku Reng 0.5000 kg PC 181.2950 kg Pasir Beton 0.3364 m3 Batu Pecah Mesin 2/3 0.0406 m3 Batu Pecah Mesin 1/2 0.3770 m3
ALAT Sewa Alat Bantu 0.2709 jam Sewa Vibrator Roller 0.0152 jam Sewa Concrete Mixer 0.0152 jam
1 UNIT PONDASI STROUSS PJU BAHAN
Angkur Besi D.19 10.9720 kg Besi beton 6 mm polos 9.5400 btg Kawat Beton 0.1735 kg Pipa PVC Class D Ǿ 2 " 2.0000 m' Pasir Urug 0.0960 m3 Kayui Meranti Bekisting 0.0500 m3 Paku Reng 0.5000 kg PC 219.2000 kg Pasir Beton 0.3364 m3 Batu Pecah Mesin 2/3 0.0406 m3 Batu Pecah Mesin 1/2 0.3770 m3
ALAT Sewa Alat Bantu 0.2709 jam Sewa alat strouss 1.2000 jam Sewa Vibrator Roller 0.0152 jam Sewa Concrete Mixer 0.0152 jam
PEKERJAAN SANITAIR / FICTURE UNIT
1 M' PEMASANGAN SALURAN Ǿ 40 SEGMEN BAHAN
Buis beton Ø 40 cm 1.0000 bh
1 M' PEMASANGAN SALURAN Ǿ 60 SEGMEN BAHAN
Buis beton Ø 60 cm 1.0000 bh
1 M' PEMASANGAN SALURAN Ǿ 80 SEGMEN BAHAN
Buis beton Ø 80 cm 1.0000 bh
1 M' PEMASANGAN SALURAN Ǿ 100 SEGMEN BAHAN
Buis beton Ø 100 cm 1.0000 bh
1 M' PEMASANGAN SALURAN U- Ǿ 20 SEGMEN BAHAN
Page 317 of 334
Buis beton U - Ø 20 cm 1.0000 bh
1 M' PEMASANGAN SALURAN U- Ǿ 30 SEGMEN BAHAN
Buis beton U - Ø 30 cm 1.0000 bh
1 M' PEMASANGAN PIPA AIR BERSIH Ǿ ½ " BAHAN
Pipa PVC Type AW Ø ½ " 1.1000 m' Lem PVC 0.1000 bh
1 M' PEMASANGAN PIPA AIR BERSIH Ǿ ¾ " BAHAN
Pipa PVC Type AW Ø ¾ " 1.1000 m' Lem PVC 0.1000 bh
1 M' PEMASANGAN PIPA AIR BERSIH Ǿ 1 " BAHAN
Pipa PVC Type AW Ø 1 " 1.1000 m' Lem PVC 0.1000 bh
1 M' PEMASANGAN PIPA AIR BERSIH Ǿ 1½ " BAHAN
Pipa PVC Type AW Ø 1½ " 1.1000 m' Lem PVC 0.1000 bh
1 M' PEMASANGAN PIPA AIR KOTOR Ǿ 1½ " BAHAN
Pipa PVC Type C Ø 1½ " 1.1000 m' Lem PVC 0.2000 bh
1 M' PEMASANGAN PIPA AIR KOTOR Ǿ 2 " BAHAN
Pipa PVC Type C Ø 2 " 1.1000 m' Lem PVC 0.2000 bh
1 M' PEMASANGAN PIPA AIR KOTOR Ǿ 3 " BAHAN
Pipa PVC Type C Ø 3 " 1.1000 m' Lem PVC 0.2000 bh
1 M' PEMASANGAN PIPA AIR KOTOR Ǿ 4 " BAHAN
Pipa PVC Type C Ø 4 " 1.1000 m' Lem PVC 0.2000 bh
1 BH PEMASANGAN KRAN AIR IMPORT BAHAN
Kran Air ؾ" 1.0000 bh Rol TBA 1.0000 roll
1 BH PEMASANGAN KRAN AIR LOKAL BAHAN
Kran Air ؽ" 1.0000 bh Rol TBA 1.0000 roll
1 BH PEMASANGAN CLOSET DUDUK Ex. INA BAHAN
Closet Duduk ex. INA 1.0000 bh
1 BH PEMASANGAN CLOSET DUDUK Ex. INA BAHAN
Closet Duduk Putih Porselin Komplit ex. INA 1.0000 bh
1 BH PEMASANGAN CLOSET DUDUK MONOBLOCK Ex. TOTO BAHAN
Closet Duduk Standard lengkap TOTO C 48 1.0000 bh
Perlengkapan ( 6% X Harga closet) 0.0600 ls
1 BH PEMASANGAN CLOSET JONGKOK Ex. INA BAHAN
Closet Jongkok putih ex. INA 1.0000 bh
1 BH PEMASANGAN CLOSET JONGKOK Ex. TOTO BAHAN
Closet Jongkok Warna ex. TOTO 1.0000 bh
1 BH PEMASANGAN WASHTAFEL BAHAN
Washtafel lokal besar 1.0000 bh Kran Air ( Import ) 1.0000 bh Flexible 60 cm 1.0000 m Knee PVC Ø 11/2 " 1.0000 bh Rol TBA 1.0000 rol Sifon Wasser 1.0000 set Waltermoor 1.0000 bh
1 BH PEMASANGAN WASHTAFEL Ex. TOTO BAHAN
Wastafel Meja Warna Standard Lengkap (L 546) 1.0000 bh Kran Air ( Import ) 1.0000 bh Flexible 60 cm 1.0000 m Knee PVC Ø 11/2 " 1.0000 bh Rol TBA 1.0000 rol
1 BH PEMASANGAN LUBANG AVOER BAHAN
Pipa PVC Type C Ø 2 " 0.5000 m Ijuk 0.0500 kg
1 BH URINOAR TYPE MUSLIM BAHAN
Urinoar Type Muslim 1.0000 Bh
Page 318 of 334
Perlengkapan ( 6% X Harga closet) 0.0600 ls Semen PC/50 kg 6.0000 Kg Pasir Pasang 0.0100 m3
1 BH PARTISI PENYEKAT URINOAR BAHAN
Patisi Penyekat Urinoir (TOTO A 100) 1.0000 Bh Perlengkapan ( 6% X Harga penyekat) 0.0600 ls
1 BH WASHTAFEL PADESTAL Lantai Satu 1.0000 Lantai Dua 1.0900 Lantai Tiga 1.1200 Lantai Empat 1.1350 Lantai Lima 1.1620 Lantai Enam 1.1970 Lantai Tujuh 1.2360
BAHAN Wastafel Gantung (L 237 V3) 1.0000 Bh Perlengkapan ( 12% X Harga washtafel) 0.1200 ls Semen PC/50 kg 6.0000 Kg Pasir Pasang 0.0100 m3
1 BH WASHTAFEL MEJA Lantai Satu 1.0000 Lantai Dua 1.0900 Lantai Tiga 1.1200 Lantai Empat 1.1350 Lantai Lima 1.1620 Lantai Enam 1.1970 Lantai Tujuh 1.2360
BAHAN Wastafel Meja Warna Standard Lengkap (L 546) 1.0000 Bh Perlengkapan ( 12% X Harga washtafel) 0.1200 ls Semen PC/50 kg 6.0000 Kg Pasir Pasang 0.0100 m3
1 BH SLOP SINK / SERVICE SINK Lantai Satu 1.0000 Lantai Dua 1.0900 Lantai Tiga 1.1200 Lantai Empat 1.1350 Lantai Lima 1.1620 Lantai Enam 1.1970 Lantai Tujuh 1.2360
BAHAN Slop Sink 1.0000 Bh Perlengkapan ( 12% X Harga washtafel) 0.1200 ls Semen PC/50 kg 6.0000 Kg Pasir Pasang 0.0100 m3
1 BH BAK MANDI FABER 0,3 M3 Lantai Satu 1.0000 Lantai Dua 1.0900 Lantai Tiga 1.1200 Lantai Empat 1.1350 Lantai Lima 1.1620 Lantai Enam 1.1970 Lantai Tujuh 1.2360
BAHAN Bak mandi fibergalss 1.0000 Bh Perlengkapan ( 18% X Harga washtafel) 0.1800 ls
1 BH KRAN AIR Ø 1/2 " ATAU Ø 3/4 " Lantai Satu 1.0000 Lantai Dua 1.0900 Lantai Tiga 1.1200 Lantai Empat 1.1350 Lantai Lima 1.1620 Lantai Enam 1.1970 Lantai Tujuh 1.2360
BAHAN Kran air Ø 1/2" atau Ø 3/4" (TOTO T23 B13) 1.0000 Bh SEAL TAPE 0.0250 Bh
1 BH KRAN SINK Lantai Satu 1.0000 Lantai Dua 1.0900 Lantai Tiga 1.1200 Lantai Empat 1.1350 Lantai Lima 1.1620 Lantai Enam 1.1970 Lantai Tujuh 1.2360
BAHAN Kran Sink 1.0000 Bh SEAL TAPE 0.0250 Bh
1 BH FLOOR DRAIN Lantai Satu 1.0000 Lantai Dua 1.0900 Lantai Tiga 1.1200 Lantai Empat 1.1350 Lantai Lima 1.1620 Lantai Enam 1.1970 Lantai Tujuh 1.2360
BAHAN Floor Drain (TOTO TX 1 B) 1.0000 Bh
1 BH SOAP HOLDER Lantai Satu 1.0000 Lantai Dua 1.0900 Lantai Tiga 1.1200 Lantai Empat 1.1350 Lantai Lima 1.1620 Lantai Enam 1.1970
Page 319 of 334
Lantai Tujuh 1.2360BAHAN
Soap Holder (TOTO S 11 N) 1.0000 Bh
1 BH TISSEU HOLDER Lantai Satu 1.0000 Lantai Dua 1.0900 Lantai Tiga 1.1200 Lantai Empat 1.1350 Lantai Lima 1.1620 Lantai Enam 1.1970 Lantai Tujuh 1.2360
BAHAN Tisue Holder (TS 116 R) 1.0000 Bh
1 BH JET WASHER Lantai Satu 1.0000 Lantai Dua 1.0900 Lantai Tiga 1.1200 Lantai Empat 1.1350 Lantai Lima 1.1620 Lantai Enam 1.1970 Lantai Tujuh 1.2360
BAHAN Jet Washer (TOTO TX 423 SVINCR) 1.0000 Bh
1 BH TEMPAT HANDUK (TOWELSHELF) SETARA TOTO TYPE TX.4A Lantai Satu 1.0000 Lantai Dua 1.0900 Lantai Tiga 1.1200 Lantai Empat 1.1350 Lantai Lima 1.1620 Lantai Enam 1.1970 Lantai Tujuh 1.2360
BAHAN Towel Shelf (TOTO TX 4 A) 1.0000 Bh
1 BH PEGANGAN (GRAB BAR) SETARA TOTO TYPE TX.3 A2 (550MM) Lantai Satu 1.0000 Lantai Dua 1.0900 Lantai Tiga 1.1200 Lantai Empat 1.1350 Lantai Lima 1.1620 Lantai Enam 1.1970 Lantai Tujuh 1.2360
BAHAN Grab Bar (TOTO TX3 A2) 1.0000 Bh
1 BH GANTUNGAN HANDUK (TOWEL RING) SETARA TOTO TYPE TS 115 S Lantai Satu 1.0000 Lantai Dua 1.0900 Lantai Tiga 1.1200 Lantai Empat 1.1350 Lantai Lima 1.1620 Lantai Enam 1.1970 Lantai Tujuh 1.2360
BAHAN Towel Ring (TOTO TS 115 S) 1.0000 Bh
1 BH KAIT PAKAIAN (DOUBLE ROBE HOOK) SETARA TOTO TYPE TS.118 WS Lantai Satu 1.0000 Lantai Dua 1.0900 Lantai Tiga 1.1200 Lantai Empat 1.1350 Lantai Lima 1.1620 Lantai Enam 1.1970 Lantai Tujuh 1.2360
BAHAN Double robe hook (TS 118 WS) 1.0000 Bh
1 BH PASANG KACA CERMIN 120 X 240 CM, T=5mm DI BEVEL 2 CM Lantai Satu 1.0000 Lantai Dua 1.0900 Lantai Tiga 1.1200 Lantai Empat 1.1350 Lantai Lima 1.1620 Lantai Enam 1.1970 Lantai Tujuh 1.2360
BAHAN Kaca Cermin 5 mm + Bevel 2 cm 2.8880 M2
1 BH BAK CUCI STAINLESS STEEL Lantai Satu 1.0000 Lantai Dua 1.0900 Lantai Tiga 1.1200 Lantai Empat 1.1350 Lantai Lima 1.1620 Lantai Enam 1.1970 Lantai Tujuh 1.2360
BAHAN Kitchen Zink Stainless Standard Lokal ( 1 Lobang ) 1.0000 Bh Perlengkapan ( 18% X Harga Bahan) 0.1000 ls
1 BH TOP TABLE BATU GRANITE Lantai Satu 1.0000 Lantai Dua 1.0900 Lantai Tiga 1.1200 Lantai Empat 1.1350 Lantai Lima 1.1620 Lantai Enam 1.1970 Lantai Tujuh 1.2360
BAHAN Batu GRANIT import Italy 1.0520 m2 Semen PC/50 kg 14.1500 Kg Pasir Pasang 0.0390 m3
Page 320 of 334
Semen Warna 2.0000 Kg
PEKERJAAN INFRASTRUKTUR
1 M2 PEMASANGAN PAVING T= 8 CM BAHAN
PAVINGST ( K.125 ) warna abu2 t=8cm 1.0500 m2
1 M2 PEMASANGAN PAVING T= 6 CM BAHAN
PAVINGST ( K.125 ) warna abu2 t=6cm 1.0500 m2
1 M2 PEMASANGAN PAVING T= 8 CM BAHAN
PAVINGST ( K.125 ) warna abu2 t=8cm 1.0500 m2
1 M2 PEMASANGAN GRESS BLOCK BAHAN
Gress Block Beton 10 x 40 x 60 cm 1.0500 m2
1 M' PEMASANGAN KANSTEEN BDCM BAHAN
PC 18.0000 kg Pasir Pasang 0.0010 m3 Kansteen BDCM 1.0000 m'
1 M' PEMASANGAN KANSTEEN TRAP BAHAN
PC 18.0000 kg Pasir Pasang 0.0010 m3 Kansteen 1.0000 m'
1 M2 PEMASANGAN STOPER / USKUP BAHAN
Pasir Pasang 0.0010 m3 Stoper / uskup tebal 6 cm 3.3400 bh
1 M2 PEMASANGAN STOPER / USKUP BAHAN
Pasir Pasang 0.0010 m3 Stoper / uskup tebal 8 cm 3.3400 bh
Page 321 of 334
TIME SCHEDULEPEMBANGUNAN GEDUNG MENEJEMEN 4 LANTAI 0.06% 0.58% 0.75% 0.92% 2.62% 3.90% 5.35% 5.50% 6.42% 6.48% 8.08% 7.25% 5.27% 5.19% 4.91% 4.75% 4.54% 4.54% 4.48% 4.47% 3.64% 3.64% 2.66% 2.95% 1.04%RUMAH SAKIT UMUM DAERAH dr. SOEDONO MADIUN 0.06% 0.58% 0.75% 0.92% 2.62% 3.90% 5.35% 5.50% 6.42% 6.48% 8.08% 7.25% 5.27% 5.19% 4.91% 4.75% 4.54% 4.54% 4.48% 4.47% 3.64% 3.64% 2.66% 2.95% 1.04%JALAN Dr. SOETOMO No. 29 MADIUN - JAWA TIMUR 0.06% 0.64% 1.40% 2.32% 4.94% 8.84% ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ###
No. URAIAN PEKERJAANBobot
Jangka Waktu Pelaksanaan = 180 HariSKALABulan Ke-1 Bulan Ke-2 Bulan Ke-3 Bulan Ke-4 Bulan Ke-5 Bulan Ke-6 Bulan Ke-7
% 17-23/01/1124-30/01/1131-06/02/1107-13/02/1114-20/02/1121-27/02/1128-06/03/1107-13/03/1114-20/03/1121-27/03/1128-03/04/1104-10/04/1111-17/04/1118-24/04/1125-01/05/1102-08/05/1109-15/05/1116-22/05/1123-29/05/1130-05/06/1106-12/06/1113-19/06/1120-26/06/1127-03/07/1104-10/07/11A. PEKERJAAN PENDAHULUAN 100.00%
A.1 PEKERJAAN PERSIAPAN2.30% 0.06% 0.58% 0.75% 0.90%
A.2 PEKERJAAN TANAH0.04% 0.02% 0.02%
A.3 PEKERJAAN URUGAN0.82% 0.02% 0.06% 0.20% 0.21% 0.33%
B. PEK. SUB STRUKTUR DIBAWAH ±0.00B.1 PEKERJAAN PONDASI UTAMA 21.32% 2.60% 3.71% 5.35% 4.99% 3.54% 1.13%B.2 PEKERJAAN PONDASI PENDUKUNG 0.13% 0.13%
C. LANTAI - I -(Di atas ± 0.00)C.1. PEKERJAAN SIPIL 12.71% 0.28% 1.92% 4.42% 4.59% 1.50%
1 Pekerjaan beton K-250 untuk Kolom Utama 50/50 posisi Cl. A type K1 0.18% 0.09% 0.09%2 Pekerjaan beton K-250 untuk Kolom Utama 50/50 posisi Cl. B type K1 0.29% 0.15% 0.15%3 Pekerjaan beton K-250 untuk Kolom Utama 50/50 posisi Cl. C type K1 0.29% 0.15% 0.15%4 Pekerjaan beton K-250 untuk Kolom Utama 50/50 posisi Cl. D type K1 0.29% 0.15% 0.15%5 Pekerjaan beton K-250 untuk Kolom Utama 50/50 posisi Cl. E type K1 0.29% 0.15% 0.15%7 Pekerjaan Beton K-250 untuk Balok Utama 35/70 posisi Cl. 1 type B1 0.23% 0.12% 0.12%8 Pekerjaan Beton K-250 untuk Balok Utama 35/70 posisi Cl. 2 type B1 0.23% 0.12% 0.12%9 Pekerjaan Beton K-250 untuk Balok Utama 35/70 posisi Cl. 3 type B1 0.23% 0.12% 0.12%
10 Pekerjaan Beton K-250 untuk Balok Utama 35/70 posisi Cl. 4 type B1 0.18% 0.09% 0.09%11 Pekerjaan Beton K-250 untuk Balok Utama 35/70 posisi Cl. 5 type B1 0.17% 0.08% 0.08%12 Pekerjaan Beton K-250 untuk Balok Utama 30/60 posisi Cl. A type B2 0.14% 0.07% 0.07%13 Pekerjaan Beton K-250 untuk Balok Utama 35/70 posisi Cl. B type B1 0.31% 0.16% 0.16%14 Pekerjaan Beton K-250 untuk Balok Utama 35/70 posisi Cl. C type B1 0.31% 0.16% 0.16%15 Pekerjaan Beton K-250 untuk Balok Utama 35/70 posisi Cl. D type B1 0.33% 0.16% 0.16%16 Pekerjaan Beton K-250 untuk Balok Utama 35/70 posisi Cl. E type B1 0.33% 0.16% 0.16%17 Pekerjaan Beton K-250 untuk Balok Anak 30/60 type B2 1.44% 0.72% 0.72%18 PEKERJAAN TANGGA UTAMA
Pekerjaan Beton K-250 untuk Kolom 30/30 type K-2 0.01% 0.01%Pekerjaan Beton K-250 untuk Balok Utama 35/70 posisi Cl. 3A type B1 0.05% 0.05%Pekerjaan Beton K-250 untuk Balok Anak 30/60 type B2 0.03% 0.03%Pekerjaan Beton K-250 untuk Plat lantai tangga T=12 cm 0.36% 0.36%Pek. Pas. 1/2 bata 1 : 4 setinggi 80 cm di lantai Tangga sisi tengah 0.01% 0.01%Pek.Plesteran halus 1 : 4 0.01% 0.01%Pek. Acian 0.00% 0.00%Pek. Pengecatan 0.00% 0.00%Pek. Railling stailess steel Ø 2" tebal 2 mm 0.10% 0.10%
19 PEKERJAAN LIFT UTAMAPekerjaan Beton K-250 untuk Kolom 30/30 type K-2 0.15% 0.15%Pekerjaan Beton K-250 untuk Balok Anak 30/60 type B2 0.09% 0.09%Pekerjaan Beton K-250 untuk Balok Anak 20/40 type B3 0.04% 0.04%Pek. Pas. 1/2 bata 1 : 4 setinggi + 4.50 0.06% 0.03% 0.03%Pek.Plesteran halus 1 : 4 0.05% 0.02% 0.02%Pek. Acian 0.03% 0.03%
20 PEKERJAAN RAMP BETONPekerjaan Beton K-250 untuk Kolom 30/30 type K-2 0.01% 0.01%Pekerjaan Beton K-250 untuk Balok Anak 20/40 type B3 0.08% 0.08%Pekerjaan Beton K-250 untuk Plat lantai tangga T=12 cm 0.52% 0.52%Pek. Pas. 1/2 bata 1 : 4 setinggi 80 cm dari lantai Tangga sisi tengah 0.10% 0.05% 0.05%Pek.Plesteran halus 1 : 4 0.08% 0.04% 0.04%Pek. Acian 0.05% 0.05%Pek. Pengecatan 0.04% 0.04%Pek. Pagar Besi Kotak Finh. Cat EMCO 0.95% 0.95%
21 Pek. Beton Praktis K-175 un. Kolom 15/15 1.40% 1.40%22 Pek. Beton Praktis K-175 un. Balok Ring 15/15 di atas Pas. Dinding 0.08% 0.08%23 Pek. Beton Praktis K-175 un. Balok Latei 15/15 di atas Kosen pas.Ddn. 0.00% 0.00%24 Beton Praktis K-175 un.Canopy Jend (50x120x10) CL.B(4-5)-CL.5 0.01% 0.01%25 Beton Praktis K-175 un.Balok 15/20 Canopy Jend CL.B(4-5)-CL.5 0.02% 0.02%26 PEKERJAAN PENUTUP TERRAS CL.E ( 2-3-4 )
Pek Beton K-250 untuk Plat Terras tebal 10 cm uk. 1.25 x 16 0.08% 0.08%0.08% 0.08%
27 2.92% 1.46% 1.46%28 Pek Beton K-250 untuk Lisplang beton 10/80 atap ruang tunggu 0.05% 0.05%
C.3. PEKERJAAN MEKANIKAL DAN ELEKTRIKALC.3.1. PEKERJAAN ELEKTRIKAL 0.60% 0.32% 0.06% 0.22%C.3.3. PEKERJAAN INSTALASI AIR
A INSTALASI TALANG VERTICAL 0.08% 0.08%B. INSTALASI AIR KOTOR + KOTORAN CLOSET 0.11% 0.05% 0.06%C. INSTALASI AIR BERSIH 0.25% 0.25%
D. LANTAI - II - (DI ATAS + 4.50) 75.00%D.1. PEKERJAAN SIPIL 9.69% 0.43% 0.54% 3.27% 5.45%
1 Pekerjaan beton K-250 untuk Kolom Utama 50/50 posisi Cl. A type K1 0.17% 0.17%2 Pekerjaan beton K-250 untuk Kolom Utama 50/50 posisi Cl. B type K1 0.28% 0.28%3 Pekerjaan beton K-250 untuk Kolom Utama 50/50 posisi Cl. C type K1 0.28% 0.28%4 Pekerjaan beton K-250 untuk Kolom Utama 50/50 posisi Cl. D type K1 0.28% 0.28%5 Pekerjaan beton K-250 untuk Kolom Utama 50/50 posisi Cl. E type K1 0.28% 0.28%7 Pekerjaan Beton K-250 untuk Balok Utama 35/70 posisi Cl. 1 type B1 0.25% 0.25%8 Pekerjaan Beton K-250 untuk Balok Utama 35/70 posisi Cl. 2 type B1 0.25% 0.25%9 Pekerjaan Beton K-250 untuk Balok Utama 35/70 posisi Cl. 3 type B1 0.25% 0.25%
Keterangan
Beton K-250 un Balok 20/40 type B3 di Cl. E (2-3-4) plat teras +300( / 4 m)Pek Beton K-250 untuk Plat lt II tebal 12 cm ( + 4.50 )+Plat Rg. Tunggu
Page 322 of 334
10 Pekerjaan Beton K-250 untuk Balok Utama 35/70 posisi Cl. 4 type B1 0.20% 0.20%11 Pekerjaan Beton K-250 untuk Balok Utama 35/70 posisi Cl. 5 type B1 0.18% 0.18%12 Pekerjaan Beton K-250 untuk Balok Utama 35/70 posisi Cl. B type B1 0.34% 0.34%13 Pekerjaan Beton K-250 untuk Balok Utama 35/70 posisi Cl. C type B1 0.34% 0.34%14 Pekerjaan Beton K-250 untuk Balok Utama 35/70 posisi Cl. D type B1 0.34% 0.34%15 Pekerjaan Beton K-250 untuk Balok Utama 35/70 posisi Cl. E type B1 0.34% 0.34%16 Pekerjaan Beton K-250 untuk Balok Anak 30/60 type B2 1.65% 1.65%17 PEKERJAAN TANGGA UTAMA
Pekerjaan Beton K-250 untuk Kolom 30/30 type K-2 0.02% 0.02%Pekerjaan Beton K-250 untuk Balok Utama 35/70 posisi Cl. 3A type B1 0.06% 0.06%Pekerjaan Beton K-250 untuk Balok Anak 30/60 type B2 0.04% 0.04%Pekerjaan Beton K-250 untuk Plat lantai tangga T=12 cm 0.16% 0.16%Pek. Pas. 1/2 bata 1 : 4 setinggi 80 cm di lantai Tangga sisi tengah 0.01% 0.01%Pek.Plesteran halus 1 : 4 0.00% 0.00%Pek. Acian 0.00% 0.00%Pek. Pengecatan 0.00% 0.00%Pek. Railling stailess steel Ø 2" tebal 2 mm 0.07% 0.07%
18 PEKERJAAN LIFT UTAMAPekerjaan Beton K-250 untuk Kolom 30/30 type K-2 0.16% 0.16%Pekerjaan Beton K-250 untuk Balok Anak 30/60 type B2 0.07% 0.07%Pekerjaan Beton K-250 untuk Balok Anak 20/40 type B3 0.05% 0.05%Pek. Pas. 1/2 bata 1 : 4 setinggi + 4.00 0.07% 0.07%Pek.Plesteran halus 1 : 4 0.04% 0.04%Pek. Acian 0.03% 0.03%
19 PEKERJAAN TANGGA DARURATPekerjaan Beton K-250 untuk Balok Anak 20/40 type B3 0.03% 0.03%Pekerjaan Beton K-175 un. Ring Balustrade 15/15 0.00% 0.00%Pekerjaan Beton K-250 untuk Plat lantai tangga T=12 cm 0.14% 0.14%Pek. Pas. 1/2 bata 1 : 4 setinggi 80 cm di lantai Tangga sisi tengah 0.02% 0.02%Pek.Plesteran halus 1 : 4 0.01% 0.01%Pek. Acian 0.01% 0.01%Pek. Pengecatan 0.01% 0.01%
20 Pek. Beton Praktis K-175 un. Kolom 15/15 0.00% 0.00%21 Pek. Beton Praktis K-175 un. Balok Ring 15/15 di atas Pas. Dinding 0.02% 0.02%22 Pek. Beton Praktis K-175 un. Balok Latei 15/15 di atas Kosen pas.Ddn. 0.01% 0.01%23 Beton Praktis K-175 un.Canopy Jend (50x120x10) CL.B(4-5)-CL.5 0.01% 0.01%24 Beton Praktis K-175 un.Balok 15/20 Canopy Jend CL.B(4-5)-CL.5 0.01% 0.01%20 3.17% 3.17%25 Pek Beton K-250 untuk Lisplang beton 10/80 atap ruang tunggu 0.05% 0.05%
D.3. PEKERJAAN MEKANIKAL DAN ELEKTRIKALD.3.1. PEKERJAAN ELEKTRIKAL 0.45% 0.45%D.3.3. PEKERJAAN INSTALASI AIR
A INSTALASI TALANG VERTICAL 0.08% 0.08%B. INSTALASI AIR KOTOR + KOTORAN CLOSET 0.11% 0.11%C. INSTALASI AIR BERSIH 0.26% 0.26%
E. LANTAI - III - (DI ATAS + 8.50)E.1. PEKERJAAN SIPIL 8.65% 4.30% 1.06% 3.11% 0.08% 0.10%
1 Pekerjaan beton K-250 untuk Kolom Utama 50/50 posisi Cl. B type K1 0.29% 0.29%2 Pekerjaan beton K-250 untuk Kolom Utama 50/50 posisi Cl. C type K1 0.29% 0.29%3 Pekerjaan beton K-250 untuk Kolom Utama 50/50 posisi Cl. D type K1 0.29% 0.29%4 Pekerjaan beton K-250 untuk Kolom Utama 50/50 posisi Cl. E type K1 0.29% 0.29%7 Pekerjaan Beton K-250 untuk Balok Utama 35/70 posisi Cl. 1 type B1 0.19% 0.19%8 Pekerjaan Beton K-250 untuk Balok Utama 35/70 posisi Cl. 2 type B1 0.19% 0.19%9 Pekerjaan Beton K-250 untuk Balok Utama 35/70 posisi Cl. 3 type B1 0.20% 0.20%
10 Pekerjaan Beton K-250 untuk Balok Utama 35/70 posisi Cl. 4 type B1 0.20% 0.20%11 Pekerjaan Beton K-250 untuk Balok Utama 35/70 posisi Cl. 5 type B1 0.19% 0.19%12 Pekerjaan Beton K-250 untuk Balok Utama 35/70 posisi Cl. B type B1 0.35% 0.35%13 Pekerjaan Beton K-250 untuk Balok Utama 35/70 posisi Cl. C type B1 0.35% 0.35%14 Pekerjaan Beton K-250 untuk Balok Utama 35/70 posisi Cl. D type B1 0.35% 0.35%15 Pekerjaan Beton K-250 untuk Balok Utama 35/70 posisi Cl. E type B1 0.35% 0.35%16 Pekerjaan Beton K-250 untuk Balok Anak 30/60 type B2 1.25% 0.63% 0.63%12 PEKERJAAN TANGGA UTAMA
Pekerjaan Beton K-250 untuk Kolom 30/30 type K-2 0.02% 0.02%Pekerjaan Beton K-250 untuk Balok Utama 35/70 posisi Cl. 3A type B1 0.06% 0.06%Pekerjaan Beton K-250 untuk Balok Anak 30/60 type B2 0.04% 0.04%Pekerjaan Beton K-250 untuk Plat lantai tangga T=12 cm 0.16% 0.16%Pek. Pas. 1/2 bata 1 : 4 setinggi 80 cm di lantai Tangga sisi tengah 0.01% 0.01%Pek.Plesteran halus 1 : 4 0.00% 0.00%Pek. Acian 0.00% 0.00%Pek. Pengecatan 0.00% 0.00%Pek. Railling stailess steel Ø 2" tebal 2 mm 0.07% 0.07%
13 PEKERJAAN LIFT UTAMAPekerjaan Beton K-250 untuk Kolom 30/30 type K-2 0.15% 0.15%Pekerjaan Beton K-250 untuk Balok Anak 30/60 type B2 0.08% 0.08%Pekerjaan Beton K-250 untuk Balok Anak 20/40 type B3 0.05% 0.05%Pek. Pas. 1/2 bata 1 : 4 setinggi + 4.00 0.07% 0.07%Pek.Plesteran halus 1 : 4 0.05% 0.05%Pek. Acian 0.03% 0.03%Pek. Pasangan pelapis Muka Lift bahan Marmer 0.08% 0.08%Pek. Pasangan pelapis Muka Lift bahan Granit Import 0.02% 0.02%
14 PEKERJAAN TANGGA DARURATPekerjaan Beton K-250 untuk Balok Anak 20/40 type B3 0.03% 0.03%Pekerjaan Beton K-175 un. Ring Balustrade 15/15 0.00% 0.00%Pekerjaan Beton K-250 untuk Plat lantai tangga T=12 cm 0.15% 0.15%Pek. Pas. 1/2 bata 1 : 4 setinggi 80 cm di lantai Tangga sisi tengah 0.01% 0.01%Pek.Plesteran halus 1 : 4 0.01% 0.01%Pek. Acian 0.01% 0.01%Pek. Pengecatan 0.00% 0.00%
15 Pek. Beton Praktis K-175 un. Kolom 15/15 0.00% 0.00%16 Pek. Beton Praktis K-175 un. Balok Ring 15/15 di atas Pas. Dinding 0.01% 0.01%17 Pek. Beton Praktis K-175 un. Balok Latei 15/15 di atas Kosen pas.Ddn. 0.00% 0.00%18 Beton Praktis K-175 un.Canopy Jend (50x120x10) CL.B(4-5)-CL.5 0.01% 0.01%19 Beton Praktis K-175 un.Balok 15/20 Canopy Jend CL.B(4-5)-CL.5 0.01% 0.01%20 2.68% 2.68%21 Pek Beton K-250 untuk Lisplang beton 10/80 atap ruang tunggu 0.05% 0.05%
E.2 PEKERJAAN ARSITEKTURALE.2.1. PEKERJAAN PASANGAN DAN PLESTERAN 2.10% 0.46% 1.64%E.2.2. PEKERJAAN LANTAI DAN PELAPIS DINDING 0.16% 0.16%E.2.3. PEK. KOSEN PINTU,JENDELA,ASSES- KACA 0.70% 0.70%E.2.4. PEKERJAAN PLAFOND 1.08% 1.08%E.2.5. PEKERJAAN PENGECATAN 0.38% 0.38%
E.3. PEKERJAAN MEKANIKAL DAN ELEKTRIKALE.3.1. PEKERJAAN ELEKTRIKAL 1.70% 0.08% 0.60% 0.86% 0.12% 0.04%E.3.3. PEKERJAAN INSTALASI AIR
Pek Beton K-250 untuk Plat lt 3 tebal 12 cm ( + 8.50 )+Plat R.Tunggu
Pekerjaan Beton K-250 untuk Plat lantai 4 tebal 12 cm ( + 12.50 )+Plat
Page 323 of 334
A INSTALASI TALANG VERTICAL 0.18% 0.18% 50.00%B. INSTALASI AIR KOTOR + KOTORAN CLOSET 0.11% 0.11%C. INSTALASI AIR BERSIH 0.25% 0.25%
F. LANTAI - IV - (DI ATAS + 12.50)F.1. PEKERJAAN SIPIL 6.71% 0.33% 0.47% 0.47% 2.35% 3.02% 0.05%
1 Pekerjaan beton K-250 untuk Kolom Utama 50/50 posisi Cl. B type K1 0.30% 0.10% 0.10% 0.10%2 Pekerjaan beton K-250 untuk Kolom Utama 50/50 posisi Cl. C type K1 0.30% 0.10% 0.10% 0.10%3 Pekerjaan beton K-250 untuk Kolom Utama 50/50 posisi Cl. D type K1 0.12% 0.04% 0.04% 0.04%4 Pekerjaan beton K-250 untuk Kolom Utama 50/50 posisi Cl. E type K1 0.30% 0.10% 0.10% 0.10%5 Pekerjaan Beton K-250 untuk Balok Utama 35/70 posisi Cl. 1 type B1 0.19% 0.06% 0.06% 0.06%6 Pekerjaan Beton K-250 untuk Balok Utama 35/70 posisi Cl. 2 type B1 0.08% 0.03% 0.03% 0.03%7 Pekerjaan Beton K-250 untuk Balok Utama 35/70 posisi Cl. 3 type B1 0.15% 0.05% 0.05% 0.05%9 Pekerjaan Beton K-250 untuk Balok Utama 35/70 posisi Cl. 5 type B1 0.19% 0.19%
10 Pekerjaan Beton K-250 untuk Balok Utama 35/70 posisi Cl. B type B1 0.35% 0.35%11 Pekerjaan Beton K-250 untuk Balok Utama 35/70 posisi Cl. C type B1 0.12% 0.12%13 Pekerjaan Beton K-250 untuk Balok Utama 35/70 posisi Cl. E type B1 0.35% 0.35%14 Pekerjaan Beton K-250 untuk Balok Anak 30/60 type B2 0.29% 0.29%15 PEKERJAAN LISPLANG ATAP + PENUTUP CLADDING WALL
Pekerjaan Beton K-250 untuk Balok Anak 20/40 type B3 Konsol Lisplang 0.13% 0.13%Pekerjaan Beton K-250 untuk Balok Anak 20/40 type B3 Lisplang 0.46% 0.46%
0.68% 0.68%0.55% 0.55%
Pekerjaan Beton K-175 un. Ring lisplank 15/15 + kolom 15/15 0.07% 0.07%Pek. Pas. 1/2 bata 1 : 4 setinggi 80 cm pagar lisplang 0.10% 0.10%Pek.Plesteran halus 1 : 4 0.07% 0.07%Pek. Acian 0.04% 0.04%Pek. Pengecatan 0.03% 0.03%Waterprofing lantai type Membran / Sheet 0.10% 0.05% 0.05%
16 PEKERJAAN TANGGA UTAMAPekerjaan Beton K-250 untuk Kolom 30/30 type K-2 0.03% 0.03%Pekerjaan Beton K-250 untuk Balok Utama 35/70 posisi Cl. 3A type B1 0.06% 0.06%Pekerjaan Beton K-250 untuk Balok Anak 30/60 type B2 0.04% 0.04%Pekerjaan Beton K-250 untuk Plat lantai tangga T=12 cm 0.41% 0.41%Pek. Pas. 1/2 bata 1 : 4 setinggi 80 cm di lantai Tangga sisi tengah 0.01% 0.01%Pek.Plesteran halus 1 : 4 0.01% 0.01%Pek. Acian 0.00% 0.00%Pek. Pengecatan 0.00% 0.00%
17 PEKERJAAN LIFT UTAMAPekerjaan Beton K-250 untuk Kolom 30/30 type K-2 0.15% 0.15%Pekerjaan Beton K-250 untuk Balok Anak 30/60 type B2 0.03% 0.03%Pekerjaan Beton K-250 untuk Balok Anak 20/40 type B3 0.05% 0.05%Pek. Pas. 1/2 bata 1 : 4 setinggi + 4.00 0.07% 0.07%Pek.Plesteran halus 1 : 4 0.05% 0.05%Pek. Acian 0.03% 0.03%Pek. Pasangan pelapis Muka Lift bahan Marmer 0.08% 0.08%Pek. Pasangan pelapis Muka Lift bahan Granit Import 0.02% 0.02%
18 PEKERJAAN TANGGA DARURATPekerjaan Beton K-250 untuk Balok Anak 20/40 type B3 0.04% 0.04%Pekerjaan Beton K-175 un. Ring Balustrade 15/15 0.00% 0.00%Pekerjaan Beton K-250 untuk Plat lantai tangga T=12 cm 0.15% 0.15%Pek. Pas. 1/2 bata 1 : 4 setinggi 80 cm di lantai Tangga sisi tengah 0.02% 0.02%Pek.Plesteran halus 1 : 4 0.01% 0.01%Pek. Acian 0.01% 0.01%Pek. Pengecatan 0.01% 0.01%
19 Pek. Beton Praktis K-175 un. Kolom 15/15 0.01% 0.01%20 Pek. Beton Praktis K-175 un. Balok Ring 15/15 di atas Pas. Dinding 0.02% 0.02%21 Pek. Beton Praktis K-175 un. Balok Latei 15/15 di atas Kosen pas.Ddn. 0.00% 0.00%22 Beton Praktis K-175 un.Canopy Jend (50x120x10) CL.B(4-5)-CL.5 0.01% 0.01%23 Beton Praktis K-175 un.Balok 15/20 Canopy Jend CL.B(4-5)-CL.5 0.00% 0.00%24 0.40% 0.40%
F.2 PEKERJAAN ARSITEKTURALF.2.1. PEKERJAAN PASANGAN DAN PLESTERAN 2.42% 0.46% 0.84% 0.71% 0.40%F.2.2. PEKERJAAN LANTAI DAN PELAPIS DINDING 1.47% 0.18% 1.30%F.2.3. PEKERJAAN KOSEN PINTU,JENDELA,ASSESORIES DAN KACA 2.68% 2.68%F.2.4. PEKERJAAN PLAFOND 0.96% 0.49% 0.46%F.2.5. PEKERJAAN PENGECATAN 0.41% 0.41%F.2.6. PEKERJAAN SANITAIR / FIXTURE UNIT 0.16% 0.01% 0.14%F.2.7. PEKERJAAN BESI 1.07% 1.07%
F.3. PEKERJAAN MEKANIKAL DAN ELEKTRIKALF.3.1. PEKERJAAN ELEKTRIKAL 1.73% 1.65% 0.01% 0.06%F.3.2 PEKERJAAN PENDINGIN RUANGAN / AIR CONDITION 2.24% 2.24%F.3.3. PEKERJAAN INSTALASI AIR
A INSTALASI TALANG VERTICAL 0.46% 0.46%B. INSTALASI AIR KOTOR + KOTORAN CLOSET 0.11% 0.11% 25.00%C. INSTALASI AIR BERSIH 0.25% 0.25%
F 3.4. PEKERJAAN INSTALASI INSTALASI KABEL TV 0.04% 0.04%F.3.5. PEKERJAAN INSTALASI HYDRANT 0.77% 0.04% 0.01% 0.72%F.3.6. PEKERJAAN INSTALASI TELP / PABX 0.20% 0.10% 0.10%
F4. PEKERJAAN MEBELAIR DAN INTERIORG. LANTAI RUANG MESIN LIFT (+ 16.50)
G.1. PEKERJAAN SIPIL 1.18% 0.08% 0.08% 0.68% 0.35%1 Pekerjaan beton K-250 untuk Kolom Utama 50/50 posisi Cl. B type K1 0.12% 0.04% 0.04% 0.04%2 Pekerjaan beton K-250 untuk Kolom Utama 50/50 posisi Cl. C type K1 0.12% 0.04% 0.04% 0.04%3 Pekerjaan beton K-250 untuk Kolom Utama30/30 posisi Cl. 3 type K2 0.05% 0.05%4 Pekerjaan Beton K-250 untuk Balok Utama 35/70 posisi Cl. B type B1 0.09% 0.09%5 Pekerjaan Beton K-250 untuk Balok Utama 35/70 posisi Cl.C type B1 0.09% 0.09%6 Pekerjaan Beton K-250 untuk Balok Utama 35/70 posisi Cl. 2 type B1 0.08% 0.08%7 Pekerjaan Beton K-250 untuk Balok Utama 35/70 posisi Cl.3 type B1 0.08% 0.08%8 Pekerjaan Beton K-250 untuk Balok Utama 35/70 posisi Cl.3.A type B1 0.04% 0.04%9 Pekerjaan Beton K-250 untuk Balok Utama 20/40 posisi Cl.2.A type B3 0.01% 0.01%
10 Pekerjaan Beton K-250 untuk Balok Utama 20/40 posisi Cl.2C type B3 0.01% 0.01%11 Pekerjaan Beton K-250 untuk Balok Utama 30/60 posisi Cl.B1 type B2 0.08% 0.08%12 Pekerjaan Beton K-250 untuk Balok Utama 20/40 posisi Cl.B3 type B3 0.04% 0.04%13 Pek. Beton Praktis K-175 un. Kolom 15/15 0.02% 0.02%14 Pek. Beton Praktis K-175 un. Balok Latei 15/15 di atas Kosen pas.Ddn. 0.00% 0.00%15 Beton Praktis K-175 un.Canopy Jend (50x120x10) CL.B(4-5)-CL.5 0.01% 0.01%16 Beton Praktis K-175 un.Balok 15/20 Canopy Jend CL.B(4-5)-CL.5 0.00% 0.00%17 0.30% 0.30%16 Pek Beton K-250 untuk talang kantong t=10 cm lebar 90 dan balok 15/20 0.04% 0.04%
G.2 PEKERJAAN ARSITEKTURALG.2.1. PEKERJAAN PASANGAN DAN PLESTERAN 0.30% 0.30%G.2.2. PEKERJAAN LANTAI DAN PELAPIS DINDING 1.01% 1.01%G.2.3. PEKERJAAN KOSEN PINTU,JENDELA,ASSESORIES DAN KACA 1.67% 1.67%G.2.4. PEKERJAAN PENGECATAN 0.24% 0.24%
Pekerjaan Beton K-250 untuk plat lisplang/talang t=10 cm - U=1.50 m +.16.50Pekerjaan Beton K-250 untuk plat penutup Clidding Wall t=10 cm - +.17.30
Pek Beton K-250 untuk Plat lt atap tebal 12 cm ( + 16.50 )
Pek Beton K-250 untuk Plat lt tebal 12 cm ( + 20.52 )
Page 324 of 334
G.2.5. PEKERJAAN BESI 0.17% 0.17%G.2.6. PEKERJAAN BAJA DAN BESI 5.69% 0.71% 1.03% 2.49% 1.28% 0.16% 0.02%
G.3. PEKERJAAN MEKANIKAL DAN ELEKTRIKALG.3.1. PEKERJAAN ELEKTRIKAL 0.08% 0.08%G.3.2. PEKERJAAN INSTALASI PENANGKAL PETIR 0.24% 0.24%
G.4. PEKERJAAN PLUMBING DAN SEPTICTANK + SUMUR RESAPAN 3.47% 1.70% 0.83% 0.94% 0.00%
TOTAL PEKERJAAN (%) 100.00% DEVIASI (%) 0.02% -0.12% -0.49% -0.78% -2.94% -4.78% NOTE : PROGRESS MINGGUAN (%) 0.06% 0.58% 0.75% 0.92% 2.62% 3.90% 5.35% 5.50% 6.42% 6.48% 8.08% 7.25% 5.27% 5.19% 4.91% 4.75% 4.54% 4.54% 4.48% 4.47% 3.64% 3.64% 2.66% 2.95% 1.04% : RENCANA REALISASI PROGRESS MINGGUAN (%) 0.08% 0.44% 0.39% 0.63% 0.46% 2.06% : REALISASI PROGRESS MINGGUAN KOMULATIF (%) 0.06% 0.64% 1.40% 2.32% 4.94% 8.84% 14.18% 19.68% 26.11% 32.59% 40.67% 47.92% 53.19% 58.38% 63.29% 68.04% 72.58% 77.12% 81.60% 86.07% 89.71% 93.35% 96.01% 98.96% 100.00% REALISASI PROGRESS MINGGUAN KOMULATIF (%) 0.08% 0.52% 0.91% 1.54% 2.00% 4.05%
Surabaya, .......................... 2011-0.02% 0.12% 0.49% 0.78% 2.94% 4.78% PT.ANGGREK MERAH
ALBERTINUS WIDYANTODirektur Utama
Page 325 of 334
18.25
1 54.75
1 73.000000 AHAAAAAA...
1 AHAAAAAA...
1 AHAAAAAA...
1 AHAAAAAA...
1 AHAAAAAA...
1 AHAAAAAA...
1 AHAAAAAA...
1 AHAAAAAA...
1 AHAAAAAA...
1 AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
1 AHAAAAAA...
1 AHAAAAAA...
1 AHAAAAAA...
1 AHAAAAAA...
1 AHAAAAAA...
1 AHAAAAAA...
1 AHAAAAAA...
1 AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
Page 326 of 334
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
1 AHAAAAAA...
1 AHAAAAAA...
1 AHAAAAAA...
1 AHAAAAAA...
1 AHAAAAAA...
1 AHAAAAAA...
1 AHAAAAAA...
1 AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
1 AHAAAAAA...
1 AHAAAAAA...
1 AHAAAAAA...
1 AHAAAAAA...
1 AHAAAAAA...
1 AHAAAAAA...
1 AHAAAAAA...
1 AHAAAAAA...
1 AHAAAAAA...
Page 327 of 334
1 AHAAAAAA...
1 AHAAAAAA...
1 AHAAAAAA...
1 AHAAAAAA...
1 AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
1 AHAAAAAA...
1 AHAAAAAA...
1 AHAAAAAA...
1 AHAAAAAA...
1 AHAAAAAA...
1 AHAAAAAA...
1 AHAAAAAA...
1 AHAAAAAA...
1 AHAAAAAA...
1 AHAAAAAA...
1 AHAAAAAA...
1 AHAAAAAA...
1 AHAAAAAA...
1 AHAAAAAA...
1 AHAAAAAA...
1 AHAAAAAA...
1 AHAAAAAA...
1 AHAAAAAA...
1 AHAAAAAA...
1 AHAAAAAA...
1 AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
AHAAAAAA...
1 AHAAAAAA...
1 AHAAAAAA...
1 AHAAAAAA...
1 AHAAAAAA...
1 AHAAAAAA...
Page 328 of 334
1 AHAAAAAA...
1 AHAAAAAA...
1 AHAAAAAA...
1 AHAAAAAA...
1 AHAAAAAA...
1 AHAAAAAA...
Page 329 of 334
Kurva 'S' RencanaNo. URAIAN PEKERJAAN Durasi
BobotJangka Waktu Pelaksanaan = 180 Hari
Bulan Ke-1 Bulan Ke-2 Bulan Ke-3 Bulan Ke-4 Bulan Ke-5 Bulan Ke-6% 17-23/01/11 24-30/01/11 31-06/02/11 07-13/02/11 14-20/02/11 21-27/02/11 28-06/03/11 07-13/03/11 14-20/03/11 21-27/03/11 28-03/04/11 04-10/04/11 11-17/04/11 18-24/04/11 25-01/05/11 02-08/05/11 09-15/05/11 16-22/05/11 23-29/05/11 30-05/06/11 06-12/06/11 13-19/06/11
A. PEKERJAAN PENDAHULUANA.1 PEKERJAAN PERSIAPAN 4 2.30 0.575 0.575 0.575 0.575A.2 PEKERJAAN TANAH 2 0.04 0.020 0.020A.3 PEKERJAAN URUGAN 5 0.82 0.164 0.164 0.164 0.164 0.164
B. PEK. SUB STRUKTUR DIBAWAH ±0.00B.1 PEKERJAAN PONDASI UTAMA 6 21.3 3.550 3.550 3.550 3.550 3.550 3.550B.2 PEKERJAAN PONDASI PENDUKUNG 1 0.13 0.130
C. LANTAI - I -(Di atas ± 0.00)C.1. PEKERJAAN SIPIL 5 12.82 2.564 2.564 2.564 2.564 2.564
C.3. PEKERJAAN MEKANIKAL DAN ELEKTRIKALC.3.1. PEKERJAAN ELEKTRIKAL 3 0.59 0.197 0.197 0.197C.3.3. PEKERJAAN INSTALASI AIR 3 0.44 0.147 0.147 0.147
D. LANTAI - II - (DI ATAS + 4.50)D.1. PEKERJAAN SIPIL 4 9.68 2.420 2.420 2.420 2.420
D.3. PEKERJAAN MEKANIKAL DAN ELEKTRIKALD.3.1. PEKERJAAN ELEKTRIKAL 1 0.45 0.450D.3.3. PEKERJAAN INSTALASI AIR 2 0.46 0.230 0.230
E. LANTAI - III - (DI ATAS + 8.50)E.1. PEKERJAAN SIPIL 5 8.64 1.720 1.720 1.720 1.720 1.720
E.2 PEKERJAAN ARSITEKTURALE.2.1. PEKERJAAN PASANGAN DAN PLESTERAN 2 2.1 1.050 1.050E.2.2. PEKERJAAN LANTAI DAN PELAPIS DINDING 1 0.16 0.160E.2.3. PEK. KOSEN PINTU,JENDELA,ASSES- KACA 1 0.7 0.700E.2.4. PEKERJAAN PLAFOND 1 1.08 1.080E.2.5. PEKERJAAN PENGECATAN 1 0.38 0.380
E.3. PEKERJAAN MEKANIKAL DAN ELEKTRIKALE.3.1. PEKERJAAN ELEKTRIKAL 5 1.7 0.340 0.340 0.340 0.340 0.340E.3.3. PEKERJAAN INSTALASI AIR 3 0.45 0.150 0.150 0.150
F. LANTAI - IV - (DI ATAS + 12.50)F.1. PEKERJAAN SIPIL 6 6.7 1.124 1.124 1.124 1.124 1.124 1.124
F.2 PEKERJAAN ARSITEKTURALF.2.1. PEKERJAAN PASANGAN DAN PLESTERAN 4 2.41 0.605 0.605 0.605 0.605F.2.2. PEKERJAAN LANTAI DAN PELAPIS DINDING 2 1.47 0.735 0.735F.2.3. PEKERJAAN KOSEN PINTU,JENDELA,ASSESORIES DAN KACA 1 2.68 2.680F.2.4. PEKERJAAN PLAFOND 2 0.95 0.475 0.475F.2.5. PEKERJAAN PENGECATAN 1 0.42 0.420F.2.6. PEKERJAAN SANITAIR / FIXTURE UNIT 2 0.16F.2.7. PEKERJAAN BESI 1 1.07 1.070
F.3. PEKERJAAN MEKANIKAL DAN ELEKTRIKALF.3.1. PEKERJAAN ELEKTRIKAL 3 1.73 0.577F.3.2 PEKERJAAN PENDINGIN RUANGAN / AIR CONDITION 1 2.25F.3.3. PEKERJAAN INSTALASI AIR 2 0.82 0.410F 3.4. PEKERJAAN INSTALASI INSTALASI KABEL TV 1 0.04 0.040F.3.5. PEKERJAAN INSTALASI HYDRANT 3 0.77 0.250 0.250F.3.6. PEKERJAAN INSTALASI TELP / PABX 2 0.2
G. LANTAI RUANG MESIN LIFT (+ 16.50)G.1. PEKERJAAN SIPIL 4 1.18 0.295 0.295 0.295 0.295
G.2 PEKERJAAN ARSITEKTURALG.2.1. PEKERJAAN PASANGAN DAN PLESTERAN 1 0.35 0.350G.2.2. PEKERJAAN LANTAI DAN PELAPIS DINDING 1 1.01 1.010G.2.3. PEKERJAAN KOSEN PINTU,JENDELA,ASSESORIES DAN KACA 1 1.67G.2.4. PEKERJAAN PENGECATAN 1 0.24 0.240G.2.5. PEKERJAAN BESI 1 0.17G.2.6. PEKERJAAN BAJA DAN BESI 6 5.69 0.948 0.948 0.948 0.948 0.948 0.948
G.3. PEKERJAAN MEKANIKAL DAN ELEKTRIKALG.3.1. PEKERJAAN ELEKTRIKAL 1 0.08 0.080G.3.2. PEKERJAAN INSTALASI PENANGKAL PETIR 1 0.25
G.4. PEKERJAAN PLUMBING DAN SEPTICTANK + SUMUR RESAPAN 3 3.46 1.152 1.152
TOTAL PEKERJAAN (%) 100 Pelaksanaan (%) 0.58 0.58 0.58 0.60 3.71 3.84 3.55 6.30 8.89 8.89 5.18 5.13 3.37 5.02 4.17 5.18 4.26 4.40 3.58 5.55 6.24 2.75 Komulatif Pelaksanaan (%) 0.58 1.15 1.72 2.32 6.03 9.88 13.43 19.73 28.62 37.52 42.70 47.83 51.19 56.21 60.38 65.56 69.82 74.22 77.80 83.35 89.59 92.34
Kurva 'S' PercepatanNo. URAIAN PEKERJAAN
BobotJangka Waktu Pelaksanaan = 180 Hari
DurasiBulan Ke-1 Bulan Ke-2 Bulan Ke-3 Bulan Ke-4 Bulan Ke-5 Bulan Ke-6
% 17-23/01/11 24-30/01/11 31-06/02/11 07-13/02/11 14-20/02/11 21-27/02/11 28-06/03/11 07-13/03/11 14-20/03/11 21-27/03/11 28-03/04/11 04-10/04/11 11-17/04/11 18-24/04/11 25-01/05/11 02-08/05/11 09-15/05/11 16-22/05/11 23-29/05/11 30-05/06/11 06-12/06/11 13-19/06/11
A. PEKERJAAN PENDAHULUANA.1 PEKERJAAN PERSIAPAN 5 2.3 0.380 0.440 0.390 0.456 0.634A.2 PEKERJAAN TANAH 2 0.04 0.020 0.020A.3 PEKERJAAN URUGAN 4 0.82 0.084 0.097 0.320 0.320
B. PEK. SUB STRUKTUR DIBAWAH ±0.00B.1 PEKERJAAN PONDASI UTAMA 5 21.3 2.456 2.687 2.286 6.936 6.936B.2 PEKERJAAN PONDASI PENDUKUNG 1 0.13 0.130
C. LANTAI - I -(Di atas ± 0.00)C.1. PEKERJAAN SIPIL 4 12.82 3.205 3.205 3.205 3.205
C.3. PEKERJAAN MEKANIKAL DAN ELEKTRIKALC.3.1. PEKERJAAN ELEKTRIKAL 2 0.59 0.295 0.295C.3.3. PEKERJAAN INSTALASI AIR 2 0.44 0.220 0.220
D. LANTAI - II - (DI ATAS + 4.50)D.1. PEKERJAAN SIPIL 3 9.68 3.227 3.227 3.227
D.3. PEKERJAAN MEKANIKAL DAN ELEKTRIKALD.3.1. PEKERJAAN ELEKTRIKAL 1 0.45 0.450D.3.3. PEKERJAAN INSTALASI AIR 2 0.46 0.230 0.230
Page 330 of 334
E. LANTAI - III - (DI ATAS + 8.50)E.1. PEKERJAAN SIPIL 4 8.64 2.160 2.160 2.160 2.160
E.2 PEKERJAAN ARSITEKTURALE.2.1. PEKERJAAN PASANGAN DAN PLESTERAN 2 2.1 1.050 1.050E.2.2. PEKERJAAN LANTAI DAN PELAPIS DINDING 1 0.16 0.160E.2.3. PEK. KOSEN PINTU,JENDELA,ASSES- KACA 1 0.7 0.700E.2.4. PEKERJAAN PLAFOND 1 1.08 1.080E.2.5. PEKERJAAN PENGECATAN 1 0.38 0.380
E.3. PEKERJAAN MEKANIKAL DAN ELEKTRIKALE.3.1. PEKERJAAN ELEKTRIKAL 5 1.7 0.340 0.340 0.340 0.340 0.340E.3.3. PEKERJAAN INSTALASI AIR 3 0.45 0.150 0.150 0.150
F. LANTAI - IV - (DI ATAS + 12.50)F.1. PEKERJAAN SIPIL 5 6.7 1.345 1.345 1.345 1.345 1.345
F.2 PEKERJAAN ARSITEKTURALF.2.1. PEKERJAAN PASANGAN DAN PLESTERAN 4 2.41 0.603 0.603 0.603 0.603F.2.2. PEKERJAAN LANTAI DAN PELAPIS DINDING 2 1.47 0.735 0.735F.2.3. PEKERJAAN KOSEN PINTU,JENDELA,ASSESORIES DAN KACA 1 2.68 2.680F.2.4. PEKERJAAN PLAFOND 2 0.95 0.475 0.475F.2.5. PEKERJAAN PENGECATAN 1 0.42 0.420F.2.6. PEKERJAAN SANITAIR / FIXTURE UNIT 2 0.16F.2.7. PEKERJAAN BESI 1 1.07 1.070
F.3. PEKERJAAN MEKANIKAL DAN ELEKTRIKALF.3.1. PEKERJAAN ELEKTRIKAL 3 1.73 0.577F.3.2 PEKERJAAN PENDINGIN RUANGAN / AIR CONDITION 1 2.25F.3.3. PEKERJAAN INSTALASI AIR 2 0.82 0.410F 3.4. PEKERJAAN INSTALASI INSTALASI KABEL TV 1 0.04 0.040F.3.5. PEKERJAAN INSTALASI HYDRANT 3 0.77 0.250 0.250F.3.6. PEKERJAAN INSTALASI TELP / PABX 1 0.2
G. LANTAI RUANG MESIN LIFT (+ 16.50)G.1. PEKERJAAN SIPIL 3 1.18 0.393 0.393 0.393
G.2 PEKERJAAN ARSITEKTURALG.2.1. PEKERJAAN PASANGAN DAN PLESTERAN 1 0.35 0.350G.2.2. PEKERJAAN LANTAI DAN PELAPIS DINDING 1 1.01 1.010G.2.3. PEKERJAAN KOSEN PINTU,JENDELA,ASSESORIES DAN KACA 1 1.67G.2.4. PEKERJAAN PENGECATAN 1 0.24 0.240G.2.5. PEKERJAAN BESI 1 0.17G.2.6. PEKERJAAN BAJA DAN BESI 6 5.68 0.947 0.947 0.947 0.947 0.947 0.947
G.3. PEKERJAAN MEKANIKAL DAN ELEKTRIKALG.3.1. PEKERJAAN ELEKTRIKAL 1 0.08 0.080G.3.2. PEKERJAAN INSTALASI PENANGKAL PETIR 1 0.25
G.4. PEKERJAAN PLUMBING DAN SEPTICTANK + SUMUR RESAPAN 2 3.46 1.152 1.152
TOTAL PEKERJAAN (%) 100 Pelaksanaan (%) 0.38 0.44 0.39 0.48 3.17 2.91 2.29 10.48 10.76 6.95 7.10 5.39 3.21 5.54 4.83 3.55 4.58 4.72 3.79 4.42 4.22 2.74 Komulatif Pelaksanaan (%) 0.38 0.82 1.21 1.69 4.86 7.77 10.06 20.54 31.30 38.24 45.34 50.73 53.94 59.48 64.31 67.86 72.44 77.16 80.95 85.37 89.59 92.34
Kurva 'S' KeterlambatanNo. URAIAN PEKERJAAN
BobotJangka Waktu Pelaksanaan = 180 Hari
DurasiBulan Ke-1 Bulan Ke-2 Bulan Ke-3 Bulan Ke-4 Bulan Ke-5 Bulan Ke-6
% 17-23/01/11 24-30/01/11 31-06/02/11 07-13/02/11 14-20/02/11 21-27/02/11 28-06/03/11 07-13/03/11 14-20/03/11 21-27/03/11 28-03/04/11 04-10/04/11 11-17/04/11 18-24/04/11 25-01/05/11 02-08/05/11 09-15/05/11 16-22/05/11 23-29/05/11 30-05/06/11 06-12/06/11 13-19/06/11
A. PEKERJAAN PENDAHULUANA.1 PEKERJAAN PERSIAPAN 5 2.3 0.380 0.440 0.390 0.456 0.634A.2 PEKERJAAN TANAH 2 0.04 0.020 0.020A.3 PEKERJAAN URUGAN 4 0.82 0.084 0.097 0.320 0.320
B. PEK. SUB STRUKTUR DIBAWAH ±0.00B.1 PEKERJAAN PONDASI UTAMA 5 21.3 2.456 2.687 2.286 6.936 6.936B.2 PEKERJAAN PONDASI PENDUKUNG 1 0.13 0.130
C. LANTAI - I -(Di atas ± 0.00)C.1. PEKERJAAN SIPIL 4 12.82 3.205 3.205 3.205 3.205
C.3. PEKERJAAN MEKANIKAL DAN ELEKTRIKALC.3.1. PEKERJAAN ELEKTRIKAL 2 0.59 0.295 0.295C.3.3. PEKERJAAN INSTALASI AIR 2 0.44 0.220 0.220
D. LANTAI - II - (DI ATAS + 4.50)D.1. PEKERJAAN SIPIL 3 9.68 3.227 3.227 3.227
D.3. PEKERJAAN MEKANIKAL DAN ELEKTRIKALD.3.1. PEKERJAAN ELEKTRIKAL 1 0.45 0.450D.3.3. PEKERJAAN INSTALASI AIR 2 0.46 0.230 0.230
E. LANTAI - III - (DI ATAS + 8.50)E.1. PEKERJAAN SIPIL 4 8.64 2.160 2.160 2.160 2.160
E.2 PEKERJAAN ARSITEKTURALE.2.1. PEKERJAAN PASANGAN DAN PLESTERAN 2 2.1 1.050 1.050E.2.2. PEKERJAAN LANTAI DAN PELAPIS DINDING 1 0.16 0.160E.2.3. PEK. KOSEN PINTU,JENDELA,ASSES- KACA 1 0.7 0.700E.2.4. PEKERJAAN PLAFOND 1 1.08 1.080E.2.5. PEKERJAAN PENGECATAN 1 0.38 0.380
E.3. PEKERJAAN MEKANIKAL DAN ELEKTRIKALE.3.1. PEKERJAAN ELEKTRIKAL 5 1.7 0.340 0.340 0.340 0.340 0.340E.3.3. PEKERJAAN INSTALASI AIR 3 0.45 0.150 0.150 0.150
F. LANTAI - IV - (DI ATAS + 12.50)F.1. PEKERJAAN SIPIL 5 6.7 1.345 1.345 1.345 1.345 1.345
F.2 PEKERJAAN ARSITEKTURALF.2.1. PEKERJAAN PASANGAN DAN PLESTERAN 4 2.41 0.603 0.603 0.603 0.603F.2.2. PEKERJAAN LANTAI DAN PELAPIS DINDING 2 1.47 0.735 0.735F.2.3. PEKERJAAN KOSEN PINTU,JENDELA,ASSESORIES DAN KACA 1 2.68 2.680F.2.4. PEKERJAAN PLAFOND 2 0.95 0.475 0.475F.2.5. PEKERJAAN PENGECATAN 1 0.42 0.420F.2.6. PEKERJAAN SANITAIR / FIXTURE UNIT 2 0.16F.2.7. PEKERJAAN BESI 1 1.07 1.070
F.3. PEKERJAAN MEKANIKAL DAN ELEKTRIKALF.3.1. PEKERJAAN ELEKTRIKAL 3 1.73 0.577F.3.2 PEKERJAAN PENDINGIN RUANGAN / AIR CONDITION 1 2.25F.3.3. PEKERJAAN INSTALASI AIR 2 0.82 0.410F 3.4. PEKERJAAN INSTALASI INSTALASI KABEL TV 1 0.04 0.040F.3.5. PEKERJAAN INSTALASI HYDRANT 3 0.77 0.250 0.250F.3.6. PEKERJAAN INSTALASI TELP / PABX 1 0.2
G. LANTAI RUANG MESIN LIFT (+ 16.50)G.1. PEKERJAAN SIPIL 3 1.18 0.393 0.393 0.393
G.2 PEKERJAAN ARSITEKTURALG.2.1. PEKERJAAN PASANGAN DAN PLESTERAN 1 0.35 0.350G.2.2. PEKERJAAN LANTAI DAN PELAPIS DINDING 1 1.01 1.010G.2.3. PEKERJAAN KOSEN PINTU,JENDELA,ASSESORIES DAN KACA 1 1.67G.2.4. PEKERJAAN PENGECATAN 1 0.24 0.240
Page 331 of 334
G.2.5. PEKERJAAN BESI 1 0.17G.2.6. PEKERJAAN BAJA DAN BESI 6 5.68 0.947 0.947 0.947 0.947 0.947 0.947
G.3. PEKERJAAN MEKANIKAL DAN ELEKTRIKALG.3.1. PEKERJAAN ELEKTRIKAL 1 0.08 0.080G.3.2. PEKERJAAN INSTALASI PENANGKAL PETIR 1 0.25
G.4. PEKERJAAN PLUMBING DAN SEPTICTANK + SUMUR RESAPAN 2 3.46 1.152 1.152
TOTAL PEKERJAAN (%) 100 Pelaksanaan (%) 0.38 0.44 0.39 0.48 3.17 2.91 2.29 10.48 10.76 6.95 7.10 5.39 3.21 5.54 4.83 3.55 4.58 4.72 3.79 4.42 4.22 2.74 Komulatif Pelaksanaan (%) 0.38 0.82 1.21 1.69 4.86 7.77 10.06 20.54 31.30 38.24 45.34 50.73 53.94 59.48 64.31 67.86 72.44 77.16 80.95 85.37 89.59 92.34
Page 332 of 334
Kurva 'S' RencanaJangka Waktu Pelaksanaan = 180 Hari
Bulan Ke-6 Bulan Ke-720-26/06/11 27-03/07/11 04-10/07/11
0.080 0.080
0.577 0.5772.250
0.410
0.2500.100 0.100
1.670
0.170
0.2501.152
2.99 3.43 1.2595.32 98.75 100.00
Kurva 'S' PercepatanJangka Waktu Pelaksanaan = 180 Hari
Bulan Ke-6 Bulan Ke-720-26/06/11 27-03/07/11 04-10/07/11
Page 333 of 334
0.080 0.080
0.577 0.5772.250
0.410
0.2500.100 0.100
1.670
0.170
0.2501.152
2.99 3.43 1.2595.32 98.75 100.00
Kurva 'S' KeterlambatanJangka Waktu Pelaksanaan = 180 Hari
Bulan Ke-6 Bulan Ke-720-26/06/11 27-03/07/11 04-10/07/11
0.080 0.080
0.577 0.5772.250
0.410
0.2500.100 0.100
1.670
Page 334 of 334
0.170
0.2501.152
2.99 3.43 1.2595.32 98.75 100.00