pemodelan sistem 2012-4
Post on 26-Feb-2018
232 Views
Preview:
TRANSCRIPT
-
7/25/2019 Pemodelan Sistem 2012-4
1/24
PEMODELAN
SISTEM***
-
7/25/2019 Pemodelan Sistem 2012-4
2/24
TAHAP-TAHAP PEMODELAN
Operation Research (Philips, Ravindran, Solberg, p.5)
Real
SystemModel
RealConclusions
ModelConclusions
The modeling Process
Formulation
Deduction
Interpretation
-
7/25/2019 Pemodelan Sistem 2012-4
3/24
TAHAP-TAHAP PEMODELAN
Operation Research (Philips, Ravindran, Solberg, p.6)
Real
SystemHypothesis
RealConclusions
Theory
The Scientific Method
Inductive
generalization
Verification
Application
Testing and
Revision
-
7/25/2019 Pemodelan Sistem 2012-4
4/24
Sumarizing problem
situations
Identifying problem
for analysis
Implementing
solution
Describing relevant
system
Establishing control
over solution
Validation and
performance testing
Analyzing sensitivity
of solution
Finding
preferred solution
Planning
implementation
Building a
mathematical model
Following up
Solution use
Formulation
Modeling
Implementation
OR/MS Methodology (Daellenbach, hal 90)
1
2
3
4
5
6
7
8
9
10
11
Project Proposal
Project Report
Documentation
& users manual
Solution audit
-
7/25/2019 Pemodelan Sistem 2012-4
5/24
Murthy, Page & Rodin, hal. 4
Problem Formulation
Mathematical Analysis
Interpretation of analysis
to obtain solution
Mathematical Description
Fig.1.1 Problem solving using mathematics
S
Step-1
Step-2
Step-3
Step-4
-
7/25/2019 Pemodelan Sistem 2012-4
6/24
Murthy, Page & Rodin, hal. 20
Real World
Simplification
System
characterization
Total system
description
Fig.3.1 Systems approach to real-world problem solving
Problem
Goal for
study
-
7/25/2019 Pemodelan Sistem 2012-4
7/24
Murthy, Page & Rodin, hal. 59
System
characterization
Analysis
Validation
Mathematical
model
Fig.4.2 Mathematical modeling process (simplified)
Mathematical
formulation
Make changes
Real world
problem
System
approach
System/
goal
Adequate mathematical
modelValidation
Step-1
Step-4
Step-3
Step-2
No adquate
Adequate
-
7/25/2019 Pemodelan Sistem 2012-4
8/24
TAHAP-TAHAP PEMODELAN
Murthy (1990):1. Problem/System Definition (the starting point)
- problem identification
- problem formulation
2. System Characterization3. Mathematical Modeling
- mathematical formulations
- analysis of mathematical formulations
4. Parameter Estimation
5.Validation
-
7/25/2019 Pemodelan Sistem 2012-4
9/24
PENDEFINISIAN MASALAH
1. Sumber dan munculnya permasalahan2.Asumsi
3. Identifikasi Masalah
4. Perumusan Masalah
-
7/25/2019 Pemodelan Sistem 2012-4
10/24
SUMBER DAN MUNCULNYA PERMASALAHAN
Dari knowledge: apa yang didapat dikuliah selama ini
A. Kurikuler:
1. Pengantar Bisnis dan Manajemen
-perbedaan karakter bisnis (model merger,
model sinergi)
-aspek sosial dan etika dalam lingkungan
bisnis (model pengembangan modal maya,penataan sistem sosial dan sistem etika
dalam perusahaan)
-
7/25/2019 Pemodelan Sistem 2012-4
11/24
SUMBER DAN MUNCULNYA PERMASALAHAN
-usaha mandiri dan pertner (model keputusan
analisis bersaing atau partner)
-model antisipasi perubahan regulasi bisnis
pada perusahaan klaster tertentu
2. Marketing&Customer Relationship Management
model CRM pada tahap-tahap dalamcustomer
life cycle
model pelayanan dan relasi berbasis CRM(pada industrijasaataumanufaktur)
model sistem dinamis CRM untuk horison ttt
-
7/25/2019 Pemodelan Sistem 2012-4
12/24
SUMBER DAN MUNCULNYA PERMASALAHAN
3.Riset operasi -formulasi model programa linier
-model transportasi dan distribusi
-model programa dinamis -model persaingan (game theory)
-model pohon keputusan
-model simulasi
-
7/25/2019 Pemodelan Sistem 2012-4
13/24
SUMBER DAN MUNCULNYA PERMASALAHAN
4.SIM -model SIM untuk perusahaan publik
-model SIM berbasis WEB
-model DSS -model Sistem Cerdas
-
7/25/2019 Pemodelan Sistem 2012-4
14/24
SUMBER DAN MUNCULNYA PERMASALAHAN
5.Disain Produk -model kandungan nilai produk berbasis
preferensi konsumen
-model QFD (quality function deployment)
untuk produk-produk PT. X
6. Ergonomi dan Pengukuran Kerja
-model produk x yang fleksibel
-model simulasi disain stasiun kerja
-
7/25/2019 Pemodelan Sistem 2012-4
15/24
SUMBER DAN MUNCULNYA PERMASALAHAN
7. PPP/PPC -model peramalan
-model inventori
-model keputusan penjualan dengan diskon
-model penjadwalan mesin
-model perencanaan proses berbasisfeature
-
7/25/2019 Pemodelan Sistem 2012-4
16/24
SUMBER DAN MUNCULNYA PERMASALAHAN
B.Perusahaan atau industri -model penyelesaian kasus di industri
-model komunikasi struktural
-model penggajian berbasis kinerja
-model perencanaan strategis perusahaan
berbasisbalanced scorecard
-
7/25/2019 Pemodelan Sistem 2012-4
17/24
PROCESSINPUT OUTPUT
PLANNING
CONTROL
Flow of Materials, Information and Cost
Flow of cost
Flow of materials
Flowof
i
nformation
Environment
-
7/25/2019 Pemodelan Sistem 2012-4
18/24
SUMBER DAN MUNCULNYA PERMASALAHAN
C. Lingkungan sekitar -model distribusi logistik pemilu
-model sistem penyajian informasi sosialisasipemilu
-model pembangunan UKM pasca bencana -model pengembangan kemampuan adaptasimasyarakat menghadapi krisis keuanganglobal
-model pembangunan ekonomi/industrirakyat saat krisis
-
7/25/2019 Pemodelan Sistem 2012-4
19/24
SUMBER DAN MUNCULNYA PERMASALAHAN
Ketidaksesuaian antara harapan dan
kenyataan
Adanya konflik
Adanya hambatanAdanya tujuan yang belum lengkap
Adanya keinginan yang belum terpenuhi
-
7/25/2019 Pemodelan Sistem 2012-4
20/24
PENDEFINISIAN MASALAH ASUMSI
Asumsi: manusia itu rasional. Maka manusia akanmakmur bila ada spesialisasi. Hasil akan baik bila
metodenya baik (Taylor).
Ternyata manusiatidak selalu rasional(Elton Mayo),
ada organisasinon formal(tim atau kebesamaan).Jadi manusia itu adalahmahluk sosialsehingga
muncul pendekatan baru yaituperilaku. Perilaku
mengubah asumsi-asumsi, bukanmaksimasiatau
minimasitetapioptimasiTeori perilaku memunculkan asumsi bahwa manusia
itu kompleks sehingga memunculkanpendekatan
sistem
-
7/25/2019 Pemodelan Sistem 2012-4
21/24
PENDEFINISIAN MASALAH ASUMSI
Syarat Asumsi:
1. Konsistensi
Suatu sistem atau model mempunyai asumsi2:
a. asumsi1
b. asumsi2
c. asumsi3
d. asumsi4
Keempat asumsi di atas harus tidak saling mengingkari
atau menggugurkan. Misal: asumsi4 merupakanpengingkaran asumsi1, maka salah satu dari
asumsi4 atau asumsi1 bukan merupakan asumsi
-
7/25/2019 Pemodelan Sistem 2012-4
22/24
PENDEFINISIAN MASALAH ASUMSI
Syarat Asumsi:
2. Independensi
Suatu sistem atau model mempunyai asumsi2:
a. asumsi1
b. asumsi2 c. asumsi3
d. asumsi4=f(asumsi1, asumsi2)
Setiap asumsiharus independen, bukan merupakan
bagian dari asumsi lain. Jadi asumsi-asumsi di atascukup asumsi1, asumsi2 dan asumsi3
-
7/25/2019 Pemodelan Sistem 2012-4
23/24
PENDEFINISIAN MASALAH ASUMSI
Syarat Asumsi:
3. Ekivalensi
Mengembangkan model dari model yang
sudah ada. Setiap model dibangun dengan
asumsi-asumsi sehingga dapat dibuat modelyang lebih umum.
-apakah model yang kita bangun lebih
umum dari model yang sudah ada??
-apakah model kita beda dengan yang sudah
ada, jika beda dimana letak perbedaannya?
-
7/25/2019 Pemodelan Sistem 2012-4
24/24
PENDEFINISIAN MASALAH ASUMSI
Syarat Asumsi:
4. Relevansi
Walaupun asumsi yang dibuat itu
independen, tetapi jika tidak mempengaruhi
model, maka asumsi tersebut dihapus saja.Jadi asumsi harus terlibat dalam
membentuk perilaku model
top related