kurva s

Post on 16-Apr-2015

188 Views

Category:

Documents

20 Downloads

Preview:

Click to see full reader

DESCRIPTION

contoh kurva s

TRANSCRIPT

SATUAN KERJA : SNVT PELAKSANAAN JARINGAN PEMANFAATAN AIR SUMATERA - I

KEGIATAN : IRIGASI DAN RAWA-II

TAHUN ANGGARAN : 2012

SATUAN

1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4

0.175 0.175 0.175

0.046 0.046

0.134 0.134 0.134 0.134 0.134 0.134 0.134 0.134

II DAFTAR 2 : MATA PEMBAYARAN PEKERJAAN UTAMA

A PEKERJAAN SALURAN AIR

0.315 0.315

2.388 2.388 2.388 2.388 2.388 2.388 2.388 2.388

0.397 0.397 0.397 0.397

1.626 1.626 1.626 1.626

1.427 1.427 1.427 1.427 1.427

1.055 1.055 1.055 1.055

2.130 2.130 2.130 2.130 2.130 2.130 2.130 2.130 2.130 2.130 2.130

1.237 1.237 1.237 1.237

0.710 0.710

1.215 1.215

0.368 0.368

0.056 0.056 0.056 0.056 0.056 0.056 0.056 0.056 0.056 0.056 0.056

B PEKERJAAN BANGUNAN

0.033 0.033

0.110 0.110

0.014

1.689 1.689

0.327

0.238 0.238

0.705

0.494 0.494

0.023 0.023

10 Pintu sorong baja 2 (dua) draat stang/spindle 3 (tiga) set roda gigi

(pengadaan, sand blasting, printing, angkut dan pemasangan)

0.674 0.674

11 Pintu sorong baja 1 (satu) draat stang/spindle no gear

(pengadaan, sand blasting, printing, angkut dan pemasangan)

0.628 0.628

1.072 1.072

1.516 1.516

3.676 3.676

C

1.402 1.402 1.402

TOTAL BOBOT 3,264,323,119.48 100.00

Progres Rencana Mingguan (%) 0.18 0.22 0.36 2.70 2.39 2.39 2.39 2.39 4.01 4.01 5.57 5.37 3.61 4.67 4.80 3.37 4.46 3.77 4.63 4.66 3.85 4.67 3.08 10.47 8.98 1.40 1.40 0.18

Progres Rencana Komulatif Mingguan (%) 0.18 0.40 0.76 3.46 5.85 8.24 10.62 13.01 17.02 21.04 26.61 31.99 35.60 40.27 45.07 48.44 52.90 56.67 61.30 65.96 69.82 74.48 77.57 88.04 97.02 98.42 99.82 100.00

Banda Aceh, 02 Februari 2012

PT. USAHA SEJAHTERA MANIKAM

T. ALI BADRISYAH

Direktur Utama

SELUAS 83,15 HA (662 HA)

PEKERJAAN PEMBANGUNAN JARINGAN IRIGASI D.I. KRUENG JREUE/KEULILING PAKET-II

99,000,000.00

B=0,40 m; H=0,60 m; Ht =1,70 m Bh 8.00 240,000,000.00

2.00 70,000,000.00

Drain hole dia. 1,5" (lengkap ijuk)

B=1,00 m; H=1,20 m; Ht =2,30 m Bh 1.00 41,000,000.00

B=0,70 m; H=1,15 m; Ht =2,20 m Bh

Bh 100.00 1,520,700.00

B=1,50 m; H=1,20 m; Ht =2,30 m Bh 1.00 44,000,000.00

Pekerjaan Pembesian (besi polos) (upah + bahan) Kg 1,760.00 22,999,680.00

Bekesting M2 264.00 32,228,592.00

Plesteran 1 : 3, t = 15 mm M2 350.00 10,658,200.00 0.33

Beton K-175 M3 16.00 15,512,544.00 0.48

Urug Kembali M3 31.00 445,005.00 0.01

Pasangan batu 1 : 4 M3 213.00 110,255,190.00 3.38

Galian Tanah Biasa (MP) M3 50.00 2,165,600.00 0.07

Galian Tanah (AB) M3 277.50 7,190,580.00 0.22

12 Drain hole dia. 1,5" (lengkap ijuk) Bh 1,318.00 20,042,826.00 0.61

10 Pekerjaan Pembesian (besi polos) (upah + bahan) Kg 6,071.49 79,342,231.32 2.43

9 Beton K-225 M3 42.76 46,330,203.44 1.42

8 Plesteran 1 : 3, t = 15 mm M2 5,303.51 161,502,486.52 4.95

7 Pasangan batu 1 : 4 M3 1,477.59 764,844,911.70 23.43

6 Pembuangan tanah hasil galian diratakan M3 4,309.36 137,705,598.80 4.22

5 Timbunan tanah hasil galian (diangkut ± 250m) dan dipadatkan (AB) M3 7,746.17 232,834,377.86 7.13

1.59

4 Timbunan tanah hasil galian dipadatkan (AB) M3 7,325.29 212,352,831.81 6.51

Galian Tanah (AB) M3 24,064.07 623,548,181.84 19.10

3 Urug Kembali M3 3,609.61 51,815,951.55

0.63

BULAN - VII

1

2

I DAFTAR 1 : MATA PEMBAYARAN UMUM

2

3

4

5

6

Galian Tanah Biasa (MP)

JADWAL WAKTU PELAKSANAAN

NO. URAIAN KEGIATAN JUMLAH HARGA (Rp) BOBOT (%)

W A K T U P E L A K S A N A A N

KET.BULAN - I BULAN - II BULAN - III

KUANTITAS

9 0.05

1 Mobilisasi dan Demobilisasi 17,160,000.00 0.53

1 M3

2

B=0,5 m; H=1,00 m; Ht =2,20 m Bh 3.00

1 Gebalan Rumput

DAFTAR 3 : MATA PEMBAYARAN LAIN-LAIN

4.21M2 137,306,686.44

Barak Pekerja 3,000,000.00 0.09

Ls

Ls 1.00

3 Dewatering/Pengalihan Air 35,000,000.00 1.07

BULAN - VIBULAN - V

Ls

1.00

UKURAN BULAN - IV

1.26

4,786.54

1.00

474.70

1.35

20,560,206.40

8

7 0.70

7.35

3.03

2.14

0.99

11 Bekisting M2 196.60 24,000,534.80 0.74

100

90

80

70

60

50

40

30

20

10

0

top related