ANALISA HARGA SATUAN PEKERJAAN
Kegiatan : Pemeliharaan Berkala
Pekerjaan : Pemeliharaan Berkala DI. Serayu, Paket 1
Item Pekerjaan : Galian Tanah dengan alat berat (standart)
Analisa : AHSP Permen PU.A.11.2.1
Satuan :
Harga Satuan : Rp 17,701.70
NO URAIAN PEKERJAAN Sat Kuantitas
I TENAGA KERJA
1 Pekerja jam 0.0590
2 Mandor jam 0.0059
II BAHAN
III PERALATAN
1 Biaya operasi Excavator (standart) jam 0.0295
I TOTAL BIAYA
II BIAYA UMUM & KEUNTUNGAN
III HARGA SATUAN PEKERJAAN
M3
Page 2 of 36
ANALISA HARGA SATUAN PEKERJAAN
Pemeliharaan Berkala DI. Serayu, Paket 1
Galian Tanah dengan alat berat (standart)
Harga Satuan Jumlah Harga
7,857.14 463.57
9,285.71 54.79
Sub Total I 518.36
Sub Total II -
527,934.15 15,574.06
Sub Total III 15,574.06
16,092.41
1,609.24
17,701.70
CV. FAHD ARSIETA
SULARSO, Amd
Direktur
LAMPIRAN A.11CONTOH PERHITUNGAN CARA MEKANIS
(informatif)
4) CONTOH AHSP GALI, ANGKUT MATERIAL/HASIL GALIAN DAN PEMADATAN
No Uraian
1 2
1 Galian tanah di Borrow Area (tidak termasuk beli tanah)
2 DT angkut material dari BA ke lokasi pekerjaan, jarak 1 km
3 Pemadatan tanah di lokasi pekerjaan
Jumlah Harga Satuan Pekerjaan
4.1 Galian tanah di Borrow Area (tidak termasuk beli tanah)
No Uraian
1 2
A Tenaga Kerja
1 Pekerja
2 Mandor
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
1 Biaya Operasi Exavator (Standard)
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
E Overhead + Profit (Contoh 15%)
F
4.2 DT angkut material dari BA ke lokasi pekerjaan, jarak 1 km
No Uraian
1 2
A Tenaga Kerja
Jumlah Harga Tenaga Kerja
B Bahan
Harga Satuan Pekerjaan per - m3 (D+E)
Jumlah Harga Bahan
C Peralatan
1 Biaya Operasi Dump truck
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
E Overhead + Profit (Contoh 15%)
F
4.3 Pemadatan tanah di lokasi pekerjaan
No Uraian
1 2A Tenaga Kerja1 Pekerja2 Mandor
Jumlah Harga Tenaga KerjaB Bahan
Jumlah Harga Bahan
C Peralatan
1 Biaya Operasi Buldozer2 Biaya Operasi Water Tank Truck3 Biaya Operasi Roller Vibro
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
E Overhead + Profit (Contoh 15%)
F
Harga Satuan Pekerjaan per - m3 (D+E)
Harga Satuan Pekerjaan per - m3 (D+E)
LAMPIRAN A.11CONTOH PERHITUNGAN CARA MEKANIS
(informatif)
4) CONTOH AHSP GALI, ANGKUT MATERIAL/HASIL GALIAN DAN PEMADATAN
Kode Satuan Koefisien Harga Satuan (Rp)
3 4 5 6 7
m3 1.00 18,943.20 18,943.20
m3 1.00 29,422.30 29,422.30
m3 1.00 21,297.90 21,297.90
Jumlah Harga Satuan Pekerjaan 69,663.40
Kode Satuan Koefisien Harga Satuan (Rp)
3 4 5 6 7
L.01 jam 0.0590 14,285.71 843.54
L.04 jam 0.0059 7,142.86 42.18
Jumlah Harga Tenaga Kerja 885.71
Jumlah Harga Bahan -
jam 0.0295 527,934.15 15,586.63
Jumlah Harga Peralatan 15,586.63
16,472.34
Overhead + Profit (Contoh 15%) 15% x D 2,470.85
18,943.20
DT angkut material dari BA ke lokasi pekerjaan, jarak 1 km
Kode Satuan Koefisien Harga Satuan (Rp)
3 4 5 6 7
Jumlah Harga Tenaga Kerja -
Jumlah (Rp)
Jumlah (Rp)
Jumlah (Rp)
Jumlah Harga Bahan -
jam 0.0872 293,273.76 25,584.64
Jumlah Harga Peralatan 25,584.64
25,584.64
Overhead + Profit (Contoh 15%) 15% x D 3,837.70
29,422.30
Kode Satuan Koefisien Harga Satuan (Rp)
3 4 5 6 7
L.01 jam 0.0356 7,142.86 253.97 L.04 jam 0.0036 10,714.29 38.10
Jumlah Harga Tenaga Kerja 292.06
Jumlah Harga Bahan -
jam 0.0191 506,041.55 9,659.96 jam 0.0078 238,841.75 1,857.66 jam 0.0178 377,451.91 6,710.26
Jumlah Harga Peralatan 18,227.88
18,519.94
Overhead + Profit (Contoh 15%) 15% x D 2,777.99
21,297.90
Jumlah (Rp)
LAMPIRAN A.11CONTOH PERHITUNGAN CARA MEKANIS
(informatif)
ANALISIS BIAYA OPERASI ALAT BERAT UNTUK GALIAN TANAH, ANGKUTAN DUMP TRUCK DAN PEMADATAN
JENIS ALAT : Excavator, Dump Truck, Buldozer, Roller Vibro dan Water TankerSATUAN PEMBAYARAN : Rupiah/jam
No. U R A I A N
2. Merk / Tipe3. Tenaga4. Kapasitas5. Umur Ekonomis6. Jam Operasi Dalam 1 Tahun7. Harga Alat
B. BIAYA PASTI PER JAM KERJA1. Nilai Sisa Alat
Faktor Angsuran Modal
3. Biaya Pasti per Jam :a. Biaya Pengembalian Modal
b. Asuransi, dll.
Biaya Pasti per Jam G = (E + F)
C. BIAYA OPERASI PER JAM KERJA1. Bahan Bakar = (12%-15%) x Pw x Ms
2. Pelumas = (2.5%-3%) x Pw x Mp
3. Biaya bengkel = (6,25% - 8,75%)
4. Perawatan dan = (12,5%-17,5%) perbaikan
A. 1. URAIAN PERALATAN Jenis Peralatan
5. Operator = (m orang/jam) x U16. Pembantu operator = (n orang/jam) x U2
Biaya Operasi (per Jam) =
D. BIAYA OPERASI ALAT / JAM = (G + P)
E. LAIN - LAIN1. Bahan Bakar Premium (non subsidi)2. Bahan Bakar Solar (non subsidi)3. Minyak Pelumas
ANALISIS BIAYA OPERASI ALAT BERAT UNTUK GALIAN TANAH, ANGKUTAN DUMP TRUCK DAN PEMADATAN
JENIS ALAT : Excavator, Dump Truck, Buldozer, Roller Vibro dan Water Tanker
Perhitungan Biaya Operasi PeralatanKODE SATUAN
Dump Truck
- 80-140 HP 3-4 M3Pw HP 133.0 100.0 Cp - 0.9 4.0 A Tahun 5.0 5.0 W Jam 2,000 2,000 B Rp 934,000,000 360,000,000
C Rp 93,400,000 36,000,000
D - 0.26380 0.26380
E Rp/jam 110,874.08 42,735.19
F Rp/jam 934.00 360.00
G Rp/jam 111,808.08 43,095.19
H Rp/jam 175,560.00 120,000.00
I Rp/jam 116,375.00 75,000.00
J Rp/jam 29,187.50 11,250.00
K Rp/jam 65,375.00 22,500.00
Excavator (Standard)
M Rp/jam 19,785.71 14,285.71 L Rp/jam 9,842.86 7,142.86
P Rp/jam 416,126.07 250,178.57
S Rp/jam 527,934.15 293,273.76
Mb Liter 10,000.00 10,000.00 Ms Liter 11,000.00 10,000.00 Mp Liter 35,000.00 30,000.00
ANALISIS BIAYA OPERASI ALAT BERAT UNTUK GALIAN TANAH, ANGKUTAN DUMP TRUCK DAN PEMADATAN
URAIAN ANALISA HARGA SATUAN
Perhitungan Biaya Operasi Peralatan KETERANGAN
Bulldozer Roller Vibro Water Tank Truck
100-150 HP 5-8 Ton 3000-4500 L150.0 82.0 100.0
- 7.1 4,000.0 5.0 5.0 5.0
2,000 2,000 2,000 900,000,000 918,787,500 105,000,000
90,000,000 91,878,750 10,500,000 Suku bunga
0.26380 0.26380 0.26380 i =
106,837.98 109,068.22 12,464.43 Asuransi
900.00 918.79 105.00 p =
107,737.98 109,987.01 12,569.43
Koef. Biaya OP alat
180,000.00 98,400.00 120,000.00
112,500.00 61,500.00 75,000.00
28,125.00 28,712.11 3,281.25
56,250.00 57,424.22 6,562.50
14,285.71 14,285.71 14,285.71 7,142.86 7,142.86 7,142.86
398,303.57 267,464.90 226,272.32
506,041.55 377,451.91 238,841.75
10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 30,000.00 30,000.00 30,000.00
ANALISIS BIAYA OPERASI ALAT BERAT UNTUK GALIAN TANAH, ANGKUTAN DUMP TRUCK DAN PEMADATAN
URAIAN ANALISA HARGA SATUAN
KETERANGAN
Suku bunga10%
Asuransi0.2%
Koef. Biaya OP alat
###
2.50%
6.25%
###
ANALISIS PRODUKTIVITAS ALAT BERAT UNTUK GALIAN TANAH, ANGKUTAN DUMP TRUCK DAN PEMADATAN
JENIS PEKERJAAN : MENGGALI TANAH DI BORROW AREA DAN MENGANGKUT KE LOKASI PEKERJAAN DENGAN DUMPTRUCK
JARAK ANGKUT : 1 KmSATUAN PEMBAYARAN : M3
NO
I.1.
2.
3.4.
.
II.a.
b.
III.
JENIS PEKERJAAN : PEMADATANSATUAN PEMBAYARAN : M3
NO
I.1.2.3.4.
II.a.
b.
c.
III.
ANALISIS PRODUKTIVITAS ALAT BERAT UNTUK GALIAN TANAH, ANGKUTAN DUMP TRUCK DAN PEMADATAN
JENIS PEKERJAAN : MENGGALI TANAH DI BORROW AREA DAN MENGANGKUT KE LOKASI PEKERJAAN DENGAN DUMPTRUCK
JARAK ANGKUT : 1 KmSATUAN PEMBAYARAN : M3
U R A I A N KODE
ASUMSIJam kerja efektif per hari Tk
Faktor pengembangan tanah Fk
Jarak angkut LTahapan kerja.a. Excavator menggali tanah di borrow area, kemudian dimuat kedalam dump truck.b. Dump truck mengangkut material tanah ke lokasi pekerjaan.
ALATExcavator StandardKapasitas Bucket VFaktor Bucket FbFaktor Efisiensi Alat Fa
Waktu Siklus Ts1Menggali, swing dan memuat ke dump truck T. 1Swing kembali dan lain - lain T. 2
Ts.1
Kap. Produksi/jam = ( V x Fb x Fa x 60 ) / ( Ts.1 x Fk ) Q.1
Koefisien Alat/m3 = 1 / Q.1
Dump TruckKapasits Bak VFaktor Efisiensi Alat FaKecepatan rata-rata bermuatan v.1Kecepatan rata-rata kosong v.2
Waktu Siklus : Ts.2
Waktu tempuh isi = ( L : v.1 ) x 60 T.1Waktu tempuh kosong = ( L : v.2 ) x 60 T.2Muat = ( V : Q.1 ) x 60 T.3Lain-lain T.4
Ts.2
Kap. Produksi/jam = ( V x Fa x 60 ) / ( Ts.2 x Fk ) Q.2
Koefisien Alat/m3 = 1 / Q.2
TENAGAProduksi yang menentukan : Excavator Q.1Produksi / hari = Tk x Q.1 Q.1'Kebutuhan tenaga - Pekerja P - Mandor M
Koefisien Tenaga / m3 - Pekerja : ( Tk x P ) : Q.1' - Mandor : ( Tk x M ) : Q.1'
JENIS PEKERJAAN : PEMADATANSATUAN PEMBAYARAN : M3
U R A I A N KODE
ASUMSIJam kerja efektip per hari TkFaktor pengembangan tanah FkFaktor tanah lepas Fk1Tahapan kerja.a. Bulldozer menghampar dan meratakan tanahb. Tanah disiram air menggunakan water tanker truckc. Kemudian dipadatkan dengan vibratory roller.
ALATBulldozer 100 - 150 HP ( D 65 E-8 ).Jarak gusur DLebar blade LbTinggi blade TbFaktor blade FbKecepatan maju ( 0.75 x 3.7 km/jam = 2.8 km/jam) FKecepatan mundur ( 0.85 x 8.2 km/jam = 6.97 km/jam) R
Waktu ganti persneling ZFaktor efisiensi alat E
q
Waktu siklus = D/F + D/R + Z Ts.3
Produksi menggusur tanah = ( q x 60 x E x Fk1 )/Ts4 Q3
Produksi perataan tanah = ( q x 60 x E x Fk1 )/ 2Ts Q3( diperlukan 2 kali bolak balik )
Koefisien Alat/m3 = 1 / Q3
Water Tanker Truck 3000 - 4500 LVolume tangki air VKebutuhan air / m3 material padat WcPengisian tangki / jam nFaktor efisiensi alat Fa
Produksi / jam = ( V x n x Fa ) / Wc Q4
Koefisien Alat/m3 = 1 / Q4
Roller Vibro 5 - 8 Ton.Lebar Drum W1Kecepatan maju / mundur VTebal pemadatan HJumlah lintasan NEfisiensi kerja E
Lebar Efektif = 2.20 m - 0.20 m W
Produksi/jam = ( W x V x H x 1,000 x E ) / N Q5
Koefisien Alat/m3 = 1 / Q5
TENAGAProduksi yang menentukan : Vibratory Roller Q.5Produksi / hari = Tk x Q.1 Q.1'Kebutuhan tenaga - Pekerja P - Mandor M
Koefisien Tenaga / m3 - Pekerja : ( Tk x P ) : Q.1' - Mandor : ( Tk x M ) : Q.1'
Kap. Per siklus = Tb2 x Lb x Fb
ANALISIS PRODUKTIVITAS ALAT BERAT UNTUK GALIAN TANAH, ANGKUTAN DUMP TRUCK DAN PEMADATAN
JENIS PEKERJAAN : MENGGALI TANAH DI BORROW AREA DAN MENGANGKUT KE LOKASI PEKERJAAN DENGAN DUMPTRUCK
KOEF SATUAN KETERANGAN
7.00 jam
1.20
1.00 km
0.80 m30.70 Pemuatan sedang0.75 Baik
Menit0.37 Menit0.25 Menit0.62 Menit
33.87 m3/jam
0.0295 jam
4.00 m30.75 Baik
20.00 Km/jam30.00 Km/jam
Menit
3.00 Menit2.00 Menit7.09 Menit1.00 Menit
13.09 Menit
11.46 m3/jam
0.0872 jam
33.87 m3/jam237.10 m3/hari
2.00 orang0.20 orang
0.0590 jam0.0059 jam
KOEF SATUAN KETERANGAN
7.00 jam1.201.00
50.00 m3.415 m D.65 E-8
1.15 m0.80 Penggusuran sedang
46.67 m/menit116.17 m/menit
0.05 Menit0.75 Baik
3.61 m3
1.55 Menit
104.771 m3
52.385 m3
0.0191 jam
4.00 m30.07 m33.00 kali0.75 baik
128.57 m3
0.0078 jam
2.20 m1.50 Km/Jam0.20 m
8 Kali0.75 Baik
2.00 m
56.25 m3/jam
0.0178 jam
56.25 m3/jam393.75 m3/hari
2.00 orang0.20 orang
0.0356 jam0.0036 jam
DAFTAR HARGA SATUAN UPAH, BAHAN & PERALATAN
KEGIATAN : Pemeliharaan Berkala
PEKERJAAN : Pemeliharaan Berkala DI. Serayu, Paket 1
LOKASI : Kab. Cilacap
TAHUN ANGGARAN : 2015
NO URAIAN BAHAN
I UPAH
1 Pekerja/Tenaga
2 Tukang
3 Mandor
4 Kepala Tukang
II BAHAN
1 Batu belah 15/20
2 Batu belah 5/7
3 Tanah urug
4 Semen PC ( 50 Kg/Zak )
5 Split 2/3
6 Pasir ex merapi
7 Kawat Bendrat
8 Wiremesh dia. 6 mm
9 Multiplex 12 mm
10 Kaso 5/7
11 Paku usuk dan reng
13 Kawat ram 1 mm
II ALAT
1 Molen
DAFTAR HARGA SATUAN UPAH, BAHAN & PERALATAN
SATUAN HARGA (Rp) KETERANGAN
Orang/hari 55,000.00
Orang/hari 50,000.00
Orang/hari 65,000.00
Orang/hari 50,000.00
120,000.00
110,000.00
34,000.00
Zak 69,000.00
110,000.00
125,000.00
Kg 17,000.00
kg 15,000.00
lbr 125,000.00
1,000,000.00
Kg 16,800.00
14,000.00
hari 25,000.00
Kebumen, 9 Maret 2015 CV. FAHD ARSIETA
M3
M3
M3
M3
M3
M3
M2
SULARSO, Amd Direktur