tkdn

1

Click here to load reader

Upload: surianto-azmi

Post on 12-Dec-2015

33 views

Category:

Documents


5 download

DESCRIPTION

TKDN

TRANSCRIPT

Page 1: TKDN

RibuRp

%KDN

(1) (2) (3) (4) (5) (7) (8)BarangI. Material Langsung(Bahan baku)

1,104,737,512.25 1,104,737,512.25 90.909 90.91 1,104,737,512.25

II. Peralatan (Barang jadi)A. Sub Total BarangJasaIII. Manajemen Proyekdan PerekayasaanIV. Alat Kerja / FasilitasKerja

V. Konstruksi danFabrikasiVI. Jasa Umum 110,473,751.22 110,473,751.22 9.09 9.09 110,473,751.22B. Sub Total Jasa

C. TOTAL Biaya (A + B) 1,215,211,263.47 1,215,211,263.47 100.00 100.00 1,215,211,263.47

Formulir Rekapitulasi Perhitungan Tingkat Komponen Dalam Negeri (TKDN)

Uraian Pekerjaan Nilai Gabungan Barang/Jasa (Rp) TKDNDN LN Total Barang/ Jasa Gabungan

C. TOTAL Biaya (A + B) 1,215,211,263.47 1,215,211,263.47 100.00 100.00 1,215,211,263.47