survei harga satuan, rab dan realisasi pemb. gapura

52
1 2 3 4 5 6 7 8 9 10 11 12 ANALISA BANGUNAN 1 1 1 1 1 1 1 1 1 1 1 1 No Bahan Gal Pondasi Urugan Tanah Urugan Pasir Aanstamping as. Batu Kali 1: .Batu Bata 1/2, ester Dinding 1 Acian Dinding eton Sloof 15/2 Cat Dinding Volum Koef M3 Koef M3 Koef Vol M3 Koef Vol M3 Koef Vol M3 Koef Vol M2 Koef Vol M2 Koef Vol M2 Koef M2 Koef Vol M2 Koef Vol M2 17.20 12.00 0.00 0.16 17.20 29.80 0.00 0.00 61.20 0.00 0.00 1 - 6.1/41 5 - 6.2/181 8 - 6.9/598 9 - 6.4/745 1 Batu Belah 0.00 0.00 0.00 1.20 0.19 1.20 ### 0.00 0.00 0.00 0.00 0.00 0.00 20.83 2 Pasir Pasang 0.00 0.00 0.00 0.00 0.52 8.94 ### 1.28 ### 0.00 0.00 ### 1.10 ### 0.00 0.00 11.33 3 Kerikil Cor 2-3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ### 1.84 0.00 0.00 1.84 4 Bata Merah 0.00 0.00 0.00 0.00 0.00 ### ### 0 0.00 0.00 0.00 0.00 2,086.00 5 Semen PC 50 Kg 0.00 0.00 0.00 0.00 3.26 ### 0.23 6.85 0.12 0.00 0.07 0.00 ### ### ### 0.00 0.00 76.39 6 Besi Beton dia. 6 mm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ### 8.57 0.00 0.00 8.57 7 Besi Beton dia. 10 mm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ### ### 0.00 0.00 12.36 8 Kawat Bendrat 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ### 6.12 0.00 0.00 6.12 9 Paku 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ### 2.45 0.00 0.00 2.45 10 Papan Begisting 2/20-2 M 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ### ### 0.00 0.00 34.27 11 Batu Alam 15 x 15 cm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 12 Semen warna 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.94 0.00 0.00 0.00 13 Plamir Tembok 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.10 0.00 0.00 14 Cat Tembok 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.36 0.00 0.00 15 Kertas Gosok 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.10 0.00 0.00 16 17 Pekerja 1.00 ### 0.33 4.00 0.40 0.00 1.04 0.17 2.00 ### 0.40 ### 0.27 0.00 0.20 0.00 ### ### 0.80 0.00 0.03 0.00 116.16 18 Tukang batu 0.00 0.00 0.00 0.00 0.00 0.00 0.52 0.08 0.80 ### 0.13 3.97 0.20 0.00 0.13 0.00 ### 5.39 0.00 0.00 0.08 0.00 23.20 19 Tukang kayu 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ### 5.39 0.60 0.00 0.00 0.00 5.39 20 Tukang besi 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ### 5.39 0.00 0.00 0.00 0.00 5.39 Batu Alam 15 x 15 warna 2 - 6.9e/101 3 - 6.11/113 4 - 6.9/221 10 - 6.27/852 11 - 6.35/455 34 - 6.54b/1371 35- 6.14/2441

Upload: ab-ramlan

Post on 27-Oct-2015

961 views

Category:

Documents


26 download

TRANSCRIPT

Page 1: Survei Harga Satuan, Rab Dan Realisasi Pemb. Gapura

1 2 3 4 5 6 7 8 9 10 11 12 13ANALISA BANGUNAN 1 1 1 1 1 1 1 1 1 1 1 1 1

No Bahan

Gal Pondasi Urugan Tanah Urugan Pasir Aanstamping Pas. Batu Kali 1:4 Pas.Batu Bata 1/2, 1:4 Plester Dinding 1:4 Acian Dinding Beton Sloof 15/20 Cat Dinding

VolumeKoef

M3Koef

M3Koef

Vol M3Koef

Vol M3Koef

Vol M3Koef

Vol M2Koef

Vol M2Koef

Vol M2Koef

M2Koef

Vol M2Koef

Vol M2

17.20 12.00 0.00 0.16 17.20 29.80 0.00 0.00 61.20 0.00 0.001 - 6.1/41 2 - 6.9e/101 3 - 6.11/113 4 - 6.9/221 5 - 6.2/181 8 - 6.9/598 9 - 6.4/745 10 - 6.27/852 11 - 6.35/455 34 - 6.54b/1371 35-6.14/2441

1 Batu Belah 0.00 0.00 0.00 1.20 0.19 1.20 20.64 0.00 0.00 0.00 0.00 0.00 0.00 20.83 M3

2 Pasir Pasang 0.00 0.00 0.00 0.00 0.52 8.94 0.043 1.28 0.024 0.00 0.00 0.018 1.10 0.018 0.00 0.00 11.33 M3

3 Kerikil Cor 2-3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.030 1.84 0.00 0.00 1.84 M3

4 Bata Merah 0.00 0.00 0.00 0.00 0.00 70.00 2,086 0 0.00 0.00 0.00 0.00 2,086.00 Bh

5 Semen PC 50 Kg 0.00 0.00 0.00 0.00 3.26 56.07 0.23 6.85 0.12 0.00 0.07 0.00 0.220 13.46 0.186 0.00 0.00 76.39 Zak

6 Besi Beton dia. 6 mm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.140 8.57 0.00 0.00 8.57 Btg

7 Besi Beton dia. 10 mm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.202 12.36 0.00 0.00 12.36 Btg

8 Kawat Bendrat 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.100 6.12 0.00 0.00 6.12 Kg

9 Paku 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.040 2.45 0.00 0.00 2.45 Kg

10 Papan Begisting 2/20-2 M 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.560 34.27 0.00 0.00 34.27 Lbr

11 Batu Alam 15 x 15 cm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 M2

12 Semen warna 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.94 0.00 0.00 0.00 Kg

13 Plamir Tembok 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.10 0.00 0.00 Kg

14 Cat Tembok 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.36 0.00 0.00 Kg

15 Kertas Gosok 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.10 0.00 0.00 Lbr

16

17 Pekerja 1.00 17.20 0.33 4.00 0.40 0.00 1.04 0.17 2.00 34.40 0.40 11.92 0.27 0.00 0.20 0.00 0.792 48.47 0.80 0.00 0.03 0.00 116.16 HOK

18 Tukang batu 0.00 0.00 0.00 0.00 0.00 0.00 0.52 0.08 0.80 13.76 0.13 3.97 0.20 0.00 0.13 0.00 0.088 5.39 0.00 0.00 0.08 0.00 23.20 HOK

19 Tukang kayu 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.088 5.39 0.60 0.00 0.00 0.00 5.39 HOK

20 Tukang besi 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.088 5.39 0.00 0.00 0.00 0.00 5.39 HOK

Batu Alam 15 x 15 warna

Page 2: Survei Harga Satuan, Rab Dan Realisasi Pemb. Gapura

13 14 15 16 17 18 19 20 21 22 23 24 25 261 1 1 1 1 1 1 1 1 1 1 1 1

Page 3: Survei Harga Satuan, Rab Dan Realisasi Pemb. Gapura

26 27 28 29 30 31 32 33 34 35 36 37 38 391 1 1 1 1 1 1 1 1 1 1 1 1

Page 4: Survei Harga Satuan, Rab Dan Realisasi Pemb. Gapura

39 40 41 42 43 44 451 1 1 1 1 1

Page 5: Survei Harga Satuan, Rab Dan Realisasi Pemb. Gapura

54 #REF!

#REF!

Page 6: Survei Harga Satuan, Rab Dan Realisasi Pemb. Gapura

6

Page 7: Survei Harga Satuan, Rab Dan Realisasi Pemb. Gapura

RENCANA ANGGARAN BIAYA

Propinsi : Jawa Timur No. RAB : 01Kabupaten : Banyuwangi Program : PNPM-Pariwisata 2009Kecamatan : Glagah Jenis Kegiatan : Pemb.Pintu GerbangDesa : KEMIREN Ukuran / dimensi :

UraianVolume

Satuan SWADAYATotal Swadaya

B A H A N

1 Batu Belah 34.4 0.0 34.4 M3 85,000 2,923,150 0 2 Pasir Pasang 25.9 0.0 25.9 M3 95,200 2,466,632 0 3 Kerikil Cor 2-3 1.4 0.0 1.4 M3 165,000 232,650 0 4 Bata Merah 10,486.0 0.0 10,486.0 Bh 370 3,879,820 0 5 Semen PC 50 Kg 165.7 0.0 165.7 Zak 52,500 8,699,775 0 6 Besi Beton dia. 6 mm 18.8 0.0 18.8 Btg 27,500 515,625 0 7 Besi Beton dia. 10 mm 18.8 0.0 18.8 Btg 65,000 1,218,750 0 8 Kawat Bendrat 4.7 0.0 4.7 Kg 20,000 93,800 0 9 Paku 1.9 0.0 1.9 Kg 14,000 26,320 0 10 Papan Begisting 2/20-2 M 46.9 0.0 46.9 Lbr 12,000 562,560 0 11 Batu Alam 15 x 15 cm 45.6 0.0 45.6 M2 79,875 3,642,300 0 12 Semen warna 0.0 0.0 0.0 Kg - 0 0 13 Plamir Tembok 7.6 0.0 7.6 Kg 7,000 53,060 0 14 Cat Tembok 27.2 0.0 27.2 Kg 15,000 408,300 0 15 Kertas Gosok 7.6 0.0 7.6 Lbr 2,500 18,900 0 16 Papan Proyek 1.0 0.0 1.0 Unit I.c 200,000 200,000 0 17 Prasasti 1.0 0.0 1.0 Unit I.c 300,000 300,000 0

Sub Total 1 25,241,642 0 UPAH

1 Pekerja 282.0 80.0 202.0 HOK 25,000 5,049,250 2,000,000 2 Tukang 121.3 70.0 51.3 HOK 35,000 1,795,850 2,450,000

Sub Total 2 6,845,100 4,450,000 KONSTUKSI 0

1 Kontruksi Reklame 10.0 10.0 M' 590,000 5,900,000 0 Sub Total 3 5,900,000 0

TOTAL 37,986,742 4,450,000

Sumber Dana

Dari PNPM - MP 37,986,742 Swadaya 4,450,000

Swadaya Uang 0 Total 42,436,742

JUMLAH DIBULATKAN 42,400,000

Kategori Biaya

Harga Satuan (Rp)

Jumlah (Rp)Dana

PNPM MP

Page 8: Survei Harga Satuan, Rab Dan Realisasi Pemb. Gapura
Page 9: Survei Harga Satuan, Rab Dan Realisasi Pemb. Gapura
Page 10: Survei Harga Satuan, Rab Dan Realisasi Pemb. Gapura

HARGA SATUAN BAHAN-ALAT DAN UPAH KERJA

Propinsi : Jawa TimurKabupaten : BanyuwangiKecamatan : GlagahDesa : Kemiren

Uraian Satuan Harga Satuan (Rp)

B A H A N1 Batu Belah M3 85,000 2 Pasir Pasang M3 95,200 3 Kerikil Cor 2-3 M3 165,000 4 Bata Merah Bh 370 5 Semen PC 50 Kg Zak 52,500 6 Besi Beton dia. 6 mm Btg 27,500 7 Besi Beton dia. 10 mm Btg 65,000 8 Kawat Bendrat Kg 20,000 9 Paku Kg 14,000

10 Papan Begisting 2/20-2 M M2 12,000 11 Batu Alam 15 x 15 cm M2 79,875 12 Semen warna Kg - 13 Plamir Tembok Kg 7,000 14 Cat Tembok Kg 15,000 15 Kertas Gosok Lbr 2,500 16 Papan Proyek Unit 200,000 17 Prasasti Unit 300,000

UPAH1 Pekerja HOK 25,000 2 Tukang HOK 35,000

KONSTRUKSI1 Kontruksi Reklame Unit 5,900,000

Kemiren, Oktober 2009Mengetahui

Fasilitator KETUA TPK

BAGUS PRATAMA NURDIANTO

Page 11: Survei Harga Satuan, Rab Dan Realisasi Pemb. Gapura

HARGA SATUAN BAHAN-ALAT DAN UPAH KERJA

Page 12: Survei Harga Satuan, Rab Dan Realisasi Pemb. Gapura

HASIL KESEPAKATAN HARGA SATUAN BAHAN

Propinsi : Jawa TimurKabupaten : BanyuwangiKecamatan : GlagahDesa : Kemiren

Uraian Satuan

Harga satuan hasil survei

Pemasok - 1Nama :Alamat :Telp :

B A H A N1 Batu Belah M3 85,000 2 Pasir Pasang M3 95,200 3 Kerikil Cor 2-3 M3 165,000 4 Bata Merah Bh 370 5 Semen PC 50 Kg Zak 52,500 6 Besi Beton dia. 6 mm Btg 27,500 7 Besi Beton dia. 10 mm Btg 65,000 8 Kawat Bendrat Kg 20,000 9 Paku Kg 14,000

10 Papan Begisting 2/20-2 M M2 12,000 11 Batu Alam 15 x 15 cm M2 79,875 12 Semen warna Kg - 13 Plamir Tembok Kg 7,000 14 Cat Tembok Kg 15,000 15 Kertas Gosok Lbr 2,500 16 Papan Proyek Unit 200,000 17 Prasasti Unit 300,000

UPAH1 Pekerja HOK 25,000 2 Tukang HOK 35,000

KONSTRUKSI1 Kontruksi Reklame Unit 5,900,000

Kemiren, Oktober 2009Mengetahui

Fasilitator Ketua TPK

BAGUS PRATAMA NURDIANTO

Harga Satuan

Kabupaten

Page 13: Survei Harga Satuan, Rab Dan Realisasi Pemb. Gapura

HASIL KESEPAKATAN HARGA SATUAN BAHAN

Kegiatan :

Tanggal Pelaksanaan Survei :

Harga satuan hasil survei Rekomendasi terendah yang di pilih bulan ini

Pemasok - 2 Pemasok - 3 Harga Satuan Nama PemasokNama : Nama : Nama :Alamat : Alamat : Alamat :Telp : Telp : Telp :

Kemiren, Oktober 2009

Ketua TPK

NURDIANTO

Page 14: Survei Harga Satuan, Rab Dan Realisasi Pemb. Gapura

HASIL KESEPAKATAN HARGA SATUAN BAHAN

Propinsi : Jawa TimurKabupaten : BanyuwangiKecamatan : GlagahDesa : Kemiren

Uraian Satuan

Harga satuan hasil survei

Pemasok - 1Nama :Alamat :Telp :

B A H A N1 Batu Belah M3 85,000 2 Pasir Pasang M3 95,200 3 Kerikil Cor 2-3 M3 165,000 4 Bata Merah Bh 370 5 Semen PC 50 Kg Zak 52,500 6 Besi Beton dia. 6 mm Btg 27,500 7 Besi Beton dia. 10 mm Btg 65,000 8 Kawat Bendrat Kg 20,000 9 Paku Kg 14,000

10 Papan Begisting 2/20-2 M M2 12,000 11 Batu Alam 15 x 15 cm M2 79,875 12 Semen warna Kg - 13 Plamir Tembok Kg 7,000 14 Cat Tembok Kg 15,000 15 Kertas Gosok Lbr 2,500 16 Papan Proyek Unit 200,000 17 Prasasti Unit 300,000

UPAH1 Pekerja HOK 25,000 2 Tukang HOK 35,000

KONSTRUKSI1 Kontruksi Reklame Unit 5,900,000

Kemiren, Oktober 2009Mengetahui

Fasilitator Ketua TPK

BAGUS PRATAMA NURDIANTO

Harga Satuan

Kabupaten

Page 15: Survei Harga Satuan, Rab Dan Realisasi Pemb. Gapura

HASIL KESEPAKATAN HARGA SATUAN BAHAN

Kegiatan :

Tanggal Pelaksanaan Survei :

Harga satuan hasil survei Rekomendasi terendah yang di pilih bulan ini

Pemasok - 2 Pemasok - 3 Harga Satuan Nama PemasokNama : Nama : Nama :Alamat : Alamat : Alamat :Telp : Telp : Telp :

Kemiren, Oktober 2009

Ketua TPK

NURDIANTO

Page 16: Survei Harga Satuan, Rab Dan Realisasi Pemb. Gapura

HASIL KESEPAKATAN HARGA SATUAN BAHAN

Propinsi : Jawa TimurKabupaten : BanyuwangiKecamatan : GlagahDesa : Kemiren

Uraian Satuan

Harga satuan hasil survei

Pemasok - 1Nama :Alamat :Telp :

B A H A N1 Batu Belah M3 85,000 2 Pasir Pasang M3 95,200 3 Kerikil Cor 2-3 M3 165,000 4 Bata Merah Bh 370 5 Semen PC 50 Kg Zak 52,500 6 Besi Beton dia. 6 mm Btg 27,500 7 Besi Beton dia. 10 mm Btg 65,000 8 Kawat Bendrat Kg 20,000 9 Paku Kg 14,000

10 Papan Begisting 2/20-2 M M2 12,000 11 Batu Alam 15 x 15 cm M2 79,875 12 Semen warna Kg - 13 Plamir Tembok Kg 7,000 14 Cat Tembok Kg 15,000 15 Kertas Gosok Lbr 2,500 16 Papan Proyek Unit 200,000 17 Prasasti Unit 300,000

UPAH1 Pekerja HOK 25,000 2 Tukang HOK 35,000

KONSTRUKSI1 Kontruksi Reklame Unit 5,900,000

Kemiren, Oktober 2009Mengetahui

Fasilitator Ketua TPK

BAGUS PRATAMA NURDIANTO

Harga Satuan

Kabupaten

Page 17: Survei Harga Satuan, Rab Dan Realisasi Pemb. Gapura

HASIL KESEPAKATAN HARGA SATUAN BAHAN

Kegiatan :

Tanggal Pelaksanaan Survei :

Harga satuan hasil survei Rekomendasi terendah yang di pilih bulan ini

Pemasok - 2 Pemasok - 3 Harga Satuan Nama PemasokNama : Nama : Nama :Alamat : Alamat : Alamat :Telp : Telp : Telp :

Kemiren, Oktober 2009

Ketua TPK

NURDIANTO

Page 18: Survei Harga Satuan, Rab Dan Realisasi Pemb. Gapura

PROGRAM NASIONAL PEMBERDAYAN MASYARAKAT - PARIWISATA TAHUN 2009KECAMATAN GLAGAH KABUPATEN BANYUWANGI

RINCIAN PENGGUNAAN DANA

DESA : KEMIREN DANA : Rp 37,986,700 JENIS KEGIATAN : PEMBANGUNAN GAPURA ( PINTU GERBANG )VOLUME : 1 UNIT TOTAL BIAYA : Rp 37,986,700

NO Uraian

RENCANA ANGGARAN BIAYA REALISASI PENGGUNAAN DANA SISA

Ket

Volume

Satuan s/d Tahap Lalu Tahap Ini Jumlah (Rp) Volume Jumlah (Rp)

Total

Dari Dana

1 2 3 4 5 6 7 8 = 5 x 7 9 10 11 = 9 + 10 12 13 = 10 x 12 14 = 11 x 12 15 = 5 - 11 16 = 8 - 14 17BAHAN

1 Batu Belah 34.4 0.0 34.4 M' 85,000 2,923,150 - 20.8 20.8 70,000 1,458,100 1,458,100 13.6 1,465,050 2 Pasir Pasang 25.9 0.0 25.9 Bh 95,200 2,466,632 - 16.8 16.8 80,000 1,344,000 1,344,000 9.1 1,122,632 3 Kerikil Cor 2-3 1.4 0.0 1.4 Bh 165,000 232,650 - 1.8 1.8 165,000 303,600 303,600 -0.4 (70,950)4 Bata Merah 10,486.0 0.0 10,486.0 Bh 370 3,879,820 - 6,000.0 6,000.0 370 2,220,000 2,220,000 4486.0 1,659,820 5 Semen PC 50 Kg 165.7 0.0 165.7 Bh 52,500 8,699,775 - 70.0 70.0 52,500 3,675,000 3,675,000 95.7 5,024,775 6 Besi Beton dia. 6 mm 18.8 0.0 18.8 Bh 27,500 515,625 - 32.0 32.0 18,000 576,000 576,000 -13.3 (60,375)7 Besi Beton dia. 10 mm 18.8 0.0 18.8 Bh 65,000 1,218,750 - 39.0 39.0 33,000 1,287,000 1,287,000 -20.3 (68,250)8 Kawat Bendrat 4.7 0.0 4.7 Bh 20,000 93,800 - 1.0 1.0 15,000 15,000 15,000 3.7 78,800 9 Paku 1.9 0.0 1.9 Bh 14,000 26,320 - 1.0 1.0 14,000 14,000 14,000 0.9 12,320

10 Papan Begisting 2/20-2 M 46.9 0.0 46.9 Bh 12,000 562,560 - 26.0 26.0 12,000 312,000 312,000 20.9 250,560 11 Batu Alam 15 x 15 cm 45.6 0.0 45.6 Bh 79,875 3,642,300 - 0.0 - 79,875 0 0 45.6 3,642,300 12 Semen warna 0.0 0.0 0.0 Bh - 0 - 0.0 - - 0 0 0.0 - 13 Plamir Tembok 7.6 0.0 7.6 Bh 7,000 53,060 - 0.0 - 7,000 0 0 7.6 53,060 14 Cat Tembok 27.2 0.0 27.2 Bh 15,000 408,300 - 0.0 - 15,000 0 0 27.2 408,300 15 Kertas Gosok 7.6 0.0 7.6 Bh 2,500 18,900 - 0.0 - 2,500 0 0 7.6 18,900 16 Papan Proyek 1.0 0.0 1.0 Bh 200,000 200,000 - 0.0 - 200,000 0 0 1.0 200,000 17 Prasasti 1.0 0.0 1.0 Bh 300,000 300,000 - 0.0 - 300,000 0 0 1.0 300,000

Sub Total 1 = 25,241,642 11,204,700 11,204,700 14,036,942 UPAH

1 Pekerja 282.0 80.0 202.0 HOK 25,000.0 5,049,250 72.0 72.0 22,500.0 1,620,000 1,620,000 130.0 3,429,250 2 Tukang 121.3 70.0 51.3 HOK 35,000.0 1,795,850 36.0 36.0 30,000.0 1,080,000 1,080,000 15.3 715,850

Sub Total 3 = 6,845,100 2,700,000 2,700,000 4,145,100 LAIN-LAIN

1 Konstruksi 10.0 10.0 590,000 5,900,000 0.0 536,000 0 0 5,900,000

Sub Total 4 5,900,000 0 0 5,900,000

Jumlah Total 37,986,742 13,904,700 13,904,700 24,082,042 JUMLAH DIBULATKAN 37,986,700 13,904,700 13,904,700 24,082,000

Kemiren, 05 Desember 2009Mengetahui Disetujui Dibuat OlehFasilitator KETUA TPK Kepala Desa KOORDINATOR KELOMPOK

BAGUS PRATAMA NURDIANTO A. A. Tahrim S. Ag AHMAD SUGITO

Harga Satuan (Rp)

Jumlah Total (Rp)

Jumlah Komulatif

Harga Satuan (Rp)

Jumlah Komulatif (Rp)

Dari Swaday

a

Page 19: Survei Harga Satuan, Rab Dan Realisasi Pemb. Gapura

KELOMPOK MASYARAKAT " DUREN ABANG " PLENGSENGANDESA KEMIREN - KEC. GLAGAH - KAB. BANYUWANGI

RINCIAN PENGGUNAAN DANA

DESA : KEMIRENJENIS KEGIATAN : PELENGSENGANVOLUME : 1 UNIT

NO Uraian RENCANA ANGGARAN BIAYA

Volume Satuan

Total1 2 3 4 5 6 = 3 x 5

BAHAN

1 Batu Belah 128.0 M3 70,000 8,960,000

2 Pasir Pasang 88.0 M3 80,000 7,040,000

3 Kerikil Cor 2-3 4.0 M3 175,000 700,000

4 Semen PC 50 Kg 212.0 Zak 55,000 11,660,000

5 Besi Beton dia. 12 mm 76.0 Lonjor 52,000 3,952,000

6 Kawat Bendrat 10.0 Kilogram 20,000 200,000

7 Papan Begisting 2/20-3 M 20.0 Buah 30,000 600,000

8 Usuk 5/7-2M 5.0 Lonjor 19,000 95,000

Sub Total 1 = 33,207,000

ALAT - ALAT

1 Arco 1.0 Unit 280,000 280,000

2 Cangkul 3.0 Buah 50,000 150,000

3 Sekrop 2.0 M3 40,000 80,000

4 Timba 17.0 Buah 4,000 68,000

5 Benang 15.0 Buah 1,000 15,000

Sub Total 2 = 593,000

Jumlah Total 33,800,000

KETUA TPK

NURDIANTO

Harga Satuan (Rp)

Jumlah Total (Rp)

Page 20: Survei Harga Satuan, Rab Dan Realisasi Pemb. Gapura

PROGRAM NASIONAL PEMBERDAYAN MASYARAKAT - PARIWISATA TAHUN 2009

KECAMATAN GLAGAH KABUPATEN BANYUWANGI

RINCIAN PENGGUNAAN DANA

DESA : KEMIREN

JENIS KEGIATAN : PEMBANGUNAN GAPURA ( PINTU GERBANG )

VOLUME : 1 UNIT

NO Uraian

RENCANA ANGGARAN BIAYA

Volume Satuan Harga Satuan (Rp) Jumlah Total (Rp)

Total

1 2 3 4 5 6 = 3 x 5

ALAT - ALAT

1 Arco 1.0 Unit 280,000 280,000

2 Cangkul 3.0 Bh 50,000 150,000

3 Sekrop 2.0 M3 40,000 80,000

4 Timba 17.0 Bh 4,000 68,000

5 Benang 15.0 Bh 1,000 15,000

Jumlah Total 593,000JUMLAH DIBULATKAN 33,800,000

KETUA TPK

NURDIANTO

Page 21: Survei Harga Satuan, Rab Dan Realisasi Pemb. Gapura

SANGGAR SENI ” SAYU GRINSING ”LINGKUNGAN JAJANG PENATU RT.001 RW.002 KELURAHAN KAMPUNG MELAYU

KEC. BANYUWANGI – KAB. BANYUWANGI

PENERIMAAN

NO Uraian Jumlah Total (Rp) NO

1 2 3 1

1 Terima uang dari Bupati 36,000,000

1

2

3

4

5

Jumlah 36,000,000 Jumlah

SANGGAR SENI ” SAYU GRINSING ”LINGKUNGAN JAJANG PENATU RT.001 RW.002 KELURAHAN KAMPUNG MELAYU

KEC. BANYUWANGI – KAB. BANYUWANGI

PENERIMAAN

NO Uraian Jumlah Total (Rp) NO

1 2 3 1

1 Terima uang dari Bupati 75,000,000

Page 22: Survei Harga Satuan, Rab Dan Realisasi Pemb. Gapura

1

2

3

4

5

6

Jumlah 75,000,000 Jumlah

SANGGAR SENI ” PELANGI BUDAYA ”LINGKUNGAN KRAJAN RT.005 RW.001 KELURAHAN KALIPURO

KEC. KALIPURO – KAB. BANYUWANGI

PENERIMAAN

NO Uraian Jumlah Total (Rp) NO

1 2 3 1

1 Terima uang dari Bupati 20,000,000

1

2

3

4

5

6

Page 23: Survei Harga Satuan, Rab Dan Realisasi Pemb. Gapura

7

Jumlah 20,000,000 Jumlah

Page 24: Survei Harga Satuan, Rab Dan Realisasi Pemb. Gapura

SANGGAR SENI ” SAYU GRINSING ”LINGKUNGAN JAJANG PENATU RT.001 RW.002 KELURAHAN KAMPUNG MELAYU

KEC. BANYUWANGI – KAB. BANYUWANGI

Uraian Jumlah Total (Rp)

2 3

Transportasi 2 bus AKAS @ Rp 5.000.000 10,000,000

Honor 84 orang @ Rp 200.000 16,800,000

Transport Latihan 84 orang @ Rp 10.000 X 5 Pertemuan 4,200,000

Mamirat latihan 84 orang @ Rp 5.000 X 5 Pertemuan 2,100,000

Pembuatan Mobil Hias 2,900,000

Jumlah 36,000,000

SANGGAR SENI ” SAYU GRINSING ”LINGKUNGAN JAJANG PENATU RT.001 RW.002 KELURAHAN KAMPUNG MELAYU

KEC. BANYUWANGI – KAB. BANYUWANGI

Uraian Jumlah Total (Rp)

2 3

Page 25: Survei Harga Satuan, Rab Dan Realisasi Pemb. Gapura

Pembuatan Passport, Visa dan Tiket 64,000,000

Honor 3 orang @ Rp 2.000.000 6,000,000

Transportasi ke Bandara Bali PP 2,000,000

Pembuatan Jas Batik 3 Stel @ Rp 750.000 2,250,000

Mamirat Latihan 3 bungkus @ Rp 5.000 X 10 150000

Transport latihan 3 orang @ Rp 20.000 X 10 600,000

Jumlah 75,000,000

SANGGAR SENI ” PELANGI BUDAYA ”LINGKUNGAN KRAJAN RT.005 RW.001 KELURAHAN KALIPURO

KEC. KALIPURO – KAB. BANYUWANGI

Uraian Jumlah Total (Rp)

2 3

Honor 25 Orang @ Rp 300.000 7,500,000

Mamirat Latihan 25 bungkus @ Rp 10.000 X 5 1,250,000

Transport latihan 25 orang @ Rp 20.000 X 5 2,500,000

Transport Bus 5,000,000

Sewa Pakaian 25 Stel @ Rp 50.000 1250000

Mamirat Perjalanan 25 bungkus @ Rp. 10.000 X 2 500,000

Page 26: Survei Harga Satuan, Rab Dan Realisasi Pemb. Gapura

Honor Perias 4 orang @ Rp 500.000 2,000,000

Jumlah 20,000,000

Page 27: Survei Harga Satuan, Rab Dan Realisasi Pemb. Gapura

7500000

Page 28: Survei Harga Satuan, Rab Dan Realisasi Pemb. Gapura

KELOMPOK MASYARAKAT " DUREN ABANG " PLENGSENGANDESA KEMIREN - KEC. GLAGAH - KAB. BANYUWANGI

RINCIAN PENGGUNAAN UNTUK BAHAN

DESA : KEMIRENPENGADAAN BAHAN : BATU BELAH

VOLUME

NO TANGGAL PENGANGKUT VOLUME SATUAN JUMLAH

1 29 Desember 2009 Slamet 4 Rp 70,000 Rp 280,000

2 29 Desember 2009 Slamet 4 Rp 70,000 Rp 280,000

3 29 Desember 2009 Slamet 4 Rp 70,000 Rp 280,000

4 29 Desember 2009 Yasin 4 Rp 70,000 Rp 280,000

5 29 Desember 2009 Yasin 4 Rp 70,000 Rp 280,000

6 29 Desember 2009 Yasin 4 Rp 70,000 Rp 280,000

7 29 Desember 2009 Yasin 4 Rp 70,000 Rp 280,000

8 29 Desember 2009 Yoyok 4 Rp 70,000 Rp 280,000

9 29 Desember 2009 Yoyok 4 Rp 70,000 Rp 280,000

10 29 Desember 2009 Yoyok 4 Rp 70,000 Rp 280,000

11 29 Desember 2009 Yoyok 4 Rp 70,000 Rp 280,000

12 30 Desember 2009 Slamet 4 Rp 70,000 Rp 280,000

13 30 Desember 2009 Slamet 4 Rp 70,000 Rp 280,000

14 30 Desember 2009 Slamet 4 Rp 70,000 Rp 280,000

15 30 Desember 2009 Yasin 4 Rp 70,000 Rp 280,000

16 30 Desember 2009 Yasin 4 Rp 70,000 Rp 280,000

17 30 Desember 2009 Yasin 4 Rp 70,000 Rp 280,000

18 30 Desember 2009 Yasin 4 Rp 70,000 Rp 280,000

19 30 Desember 2009 Yoyok 4 Rp 70,000 Rp 280,000

20 30 Desember 2009 Yoyok 4 Rp 70,000 Rp 280,000

21 30 Desember 2009 Yoyok 4 Rp 70,000 Rp 280,000

22 31 Desember 2009 Slamet 4 Rp 70,000 Rp 280,000

23 31 Desember 2009 Slamet 4 Rp 70,000 Rp 280,000

24 31 Desember 2009 Slamet 4 Rp 70,000 Rp 280,000

25 31 Desember 2009 Slamet 4 Rp 70,000 Rp 280,000

26 31 Desember 2009 Yasin 4 Rp 70,000 Rp 280,000

27 31 Desember 2009 Yasin 4 Rp 70,000 Rp 280,000

28 31 Desember 2009 Yasin 4 Rp 70,000 Rp 280,000

29 31 Desember 2009 Yasin 4 Rp 70,000 Rp 280,000

30 31 Desember 2009 Yoyok 4 Rp 70,000 Rp 280,000

31 31 Desember 2009 Yoyok 4 Rp 70,000 Rp 280,000

32 31 Desember 2009 Yoyok 4 Rp 70,000 Rp 280,000

Jumlah 128 Rp 8,960,000

KETUA POKMAS Banyuwangi, 6 Januari 2010DUREN ABANG Bendahara POKMAS

Duren Abang

NURDIYANTO AHMAD SUGITO

: 128 M3

HARGA SATUAN

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

Page 29: Survei Harga Satuan, Rab Dan Realisasi Pemb. Gapura

KELOMPOK MASYARAKAT " DUREN ABANG " PLENGSENGANDESA KEMIREN - KEC. GLAGAH - KAB. BANYUWANGI

RINCIAN PENGGUNAAN UNTUK BAHAN

DESA : KEMIRENPENGADAAN BAHAN : PASIR PASANG

VOLUME

NO TANGGAL PENGANGKUT VOLUME SATUAN JUMLAH

1 29 Desember 2009 Slamet 4 Rp 80,000 Rp 320,000

2 29 Desember 2009 Slamet 4 Rp 80,000 Rp 320,000

3 29 Desember 2009 Slamet 4 Rp 80,000 Rp 320,000

4 29 Desember 2009 Yasin 4 Rp 80,000 Rp 320,000

5 29 Desember 2009 Yasin 4 Rp 80,000 Rp 320,000

6 29 Desember 2009 Yoyok 4 Rp 80,000 Rp 320,000

7 29 Desember 2009 Yoyok 4 Rp 80,000 Rp 320,000

8 30 Desember 2009 Slamet 4 Rp 80,000 Rp 320,000

9 30 Desember 2009 Slamet 4 Rp 80,000 Rp 320,000

10 30 Desember 2009 Slamet 4 Rp 80,000 Rp 320,000

11 30 Desember 2009 Yasin 4 Rp 80,000 Rp 320,000

12 30 Desember 2009 Yasin 4 Rp 80,000 Rp 320,000

13 30 Desember 2009 Yoyok 4 Rp 80,000 Rp 320,000

14 30 Desember 2009 Yoyok 4 Rp 80,000 Rp 320,000

15 30 Desember 2009 Yoyok 4 Rp 80,000 Rp 320,000

16 31 Desember 2009 Slamet 4 Rp 80,000 Rp 320,000

17 31 Desember 2009 Slamet 4 Rp 80,000 Rp 320,000

18 31 Desember 2009 Yasin 4 Rp 80,000 Rp 320,000

19 31 Desember 2009 Yasin 4 Rp 80,000 Rp 320,000

20 31 Desember 2009 Yoyok 4 Rp 80,000 Rp 320,000

21 31 Desember 2009 Yoyok 4 Rp 80,000 Rp 320,000

22 31 Desember 2009 Yoyok 4 Rp 80,000 Rp 320,000

Jumlah 88 Rp 7,040,000

KETUA POKMAS Banyuwangi, 6 Januari 2010DUREN ABANG Bendahara POKMAS

Duren Abang

NURDIYANTO AHMAD SUGITO

: 88 M3

HARGA SATUAN

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

Page 30: Survei Harga Satuan, Rab Dan Realisasi Pemb. Gapura

KELOMPOK MASYARAKAT " DUREN ABANG " PLENGSENGANDESA KEMIREN - KEC. GLAGAH - KAB. BANYUWANGI

RINCIAN PENGGUNAAN UNTUK BAHAN

DESA : KEMIRENPENGADAAN BAHAN : KRIKIL COR 2-3

VOLUME

NO TANGGAL PENGANGKUT VOLUME SATUAN JUMLAH

1 29 Desember 2009 MAD 4 Rp 175,000 Rp 700,000

Jumlah 4 Rp 700,000

KETUA POKMAS Banyuwangi, 6 Januari 2010DUREN ABANG Bendahara POKMAS

Duren Abang

NURDIYANTO AHMAD SUGITO

: 4 M3

HARGA SATUAN

M3

Page 31: Survei Harga Satuan, Rab Dan Realisasi Pemb. Gapura

KELOMPOK MASYARAKAT " DUREN ABANG " PLENGSENGANDESA KEMIREN - KEC. GLAGAH - KAB. BANYUWANGI

RINCIAN PENGGUNAAN UNTUK BAHAN

DESA : KEMIRENPENGADAAN BAHAN : SEMEN PC 50 KgVOLUME : 212 Zak

NO TANGGAL PENGANGKUT VOLUME SATUAN JUMLAH

1 29 Desember 2009 Toko Bangunan 212 Zak Rp 55,000 Rp 11,660,000 Pondok Tresno

Jumlah 212 Rp 11,660,000

KETUA POKMAS Banyuwangi, 6 Januari 2010DUREN ABANG Bendahara POKMAS

Duren Abang

NURDIYANTO AHMAD SUGITO

HARGA SATUAN

Page 32: Survei Harga Satuan, Rab Dan Realisasi Pemb. Gapura

KELOMPOK MASYARAKAT " DUREN ABANG " PLENGSENGANDESA KEMIREN - KEC. GLAGAH - KAB. BANYUWANGI

RINCIAN PENGGUNAAN UNTUK BAHAN

DESA : KEMIRENPENGADAAN BAHAN : Besi Beton Diameter 12 mmVOLUME : 76 Lonjor

NO TANGGAL PENGANGKUT VOLUME SATUAN JUMLAH

1 29 Desember 2009 Toko Bangunan 76 Lonjor Rp 52,000 Rp 3,952,000 Pondok Tresno

Jumlah 76 Rp 3,952,000

KETUA POKMAS Banyuwangi, 6 Januari 2010DUREN ABANG Bendahara POKMAS

Duren Abang

NURDIYANTO AHMAD SUGITO

HARGA SATUAN

Page 33: Survei Harga Satuan, Rab Dan Realisasi Pemb. Gapura

KELOMPOK MASYARAKAT " DUREN ABANG " PLENGSENGANDESA KEMIREN - KEC. GLAGAH - KAB. BANYUWANGI

RINCIAN PENGGUNAAN UNTUK BAHAN

DESA : KEMIRENPENGADAAN BAHAN : Kawat BendratVOLUME : 10 Kg

NO TANGGAL PENGANGKUT VOLUME SATUAN JUMLAH

1 29 Desember 2009 Toko Bangunan 10 Kg Rp 20,000 Rp 200,000 Pondok Tresno

Jumlah 10 Rp 200,000

KETUA POKMAS Banyuwangi, 6 Januari 2010DUREN ABANG Bendahara POKMAS

Duren Abang

NURDIYANTO AHMAD SUGITO

HARGA SATUAN

Page 34: Survei Harga Satuan, Rab Dan Realisasi Pemb. Gapura

KELOMPOK MASYARAKAT " DUREN ABANG " PLENGSENGANDESA KEMIREN - KEC. GLAGAH - KAB. BANYUWANGI

RINCIAN PENGGUNAAN UNTUK BAHAN

DESA : KEMIRENPENGADAAN BAHAN : Papan Begisting 2/20-3 MVOLUME : 20 Buah

NO TANGGAL PENGANGKUT VOLUME SATUAN JUMLAH

1 29 Desember 2009 Toko Bangunan 20 Buah Rp 30,000 Rp 600,000 Pondok Tresno

Jumlah 20 Rp 600,000

KETUA POKMAS Banyuwangi, 6 Januari 2010DUREN ABANG Bendahara POKMAS

Duren Abang

NURDIYANTO AHMAD SUGITO

HARGA SATUAN

Page 35: Survei Harga Satuan, Rab Dan Realisasi Pemb. Gapura

KELOMPOK MASYARAKAT " DUREN ABANG " PLENGSENGANDESA KEMIREN - KEC. GLAGAH - KAB. BANYUWANGI

RINCIAN PENGGUNAAN UNTUK BAHAN

DESA : KEMIRENPENGADAAN BAHAN : Usuk 5/7-2 MVOLUME : 5 Lonjor

NO TANGGAL PENGANGKUT VOLUME SATUAN JUMLAH

1 29 Desember 2009 Toko Bangunan 5 Lonjor Rp 19,000 Rp 95,000 Pondok Tresno

Jumlah 5 Rp 95,000

KETUA POKMAS Banyuwangi, 6 Januari 2010DUREN ABANG Bendahara POKMAS

Duren Abang

NURDIYANTO AHMAD SUGITO

HARGA SATUAN

Page 36: Survei Harga Satuan, Rab Dan Realisasi Pemb. Gapura

KELOMPOK MASYARAKAT " DUREN ABANG " PLENGSENGANDESA KEMIREN - KEC. GLAGAH - KAB. BANYUWANGI

RINCIAN PENGGUNAAN UNTUK ALAT - ALAT

DESA : KEMIRENJENIS KEGIATAN : PENGADAAN ALAT - ALATVOLUME : -

NO TANGGAL ALAT - ALAT VOLUME SATUAN JUMLAH

1 29 Desember 2009 Arco 1 Unit 280,000 Rp 280,000

Cangkul 3 Buah 50,000 Rp 150,000

Sekrop 2 M3 40,000 Rp 80,000

Timba 17 Buah 4,000 Rp 68,000

Benang 15 Buah 1,000 Rp 15,000

Jumlah 38 Rp 593,000

KETUA POKMAS Banyuwangi, 6 Januari 2010DUREN ABANG Bendahara POKMAS

Duren Abang

NURDIYANTO AHMAD SUGITO

HARGA SATUAN

Page 37: Survei Harga Satuan, Rab Dan Realisasi Pemb. Gapura

Rp 840,000 Rp 840,000 Rp 960,000 Rp 1,120,000 Rp 1,120,000 Rp 1,800,000 Rp 640,000

Rp 1,760,000

Page 38: Survei Harga Satuan, Rab Dan Realisasi Pemb. Gapura

SANGGAR SENI ” SAYU GRINSING ”LINGKUNGAN JAJANG PENATU RT.001 RW.002 KELURAHAN KAMPUNG MELAYU

KEC. BANYUWANGI – KAB. BANYUWANGI

PENERIMAAN

NO Uraian Jumlah Total (Rp) NO

1 2 3 1

1 Terima uang dari Bupati 36,000,000 12345

Jumlah 36,000,000 Jumlah

Page 39: Survei Harga Satuan, Rab Dan Realisasi Pemb. Gapura

SANGGAR SENI ” SAYU GRINSING ”LINGKUNGAN JAJANG PENATU RT.001 RW.002 KELURAHAN KAMPUNG MELAYU

KEC. BANYUWANGI – KAB. BANYUWANGI

Uraian Jumlah Total (Rp)

2 3

Transportasi 2 b 10,000,000Honor 84 orang @ 16,800,000Transport Latihan 4,200,000Mamirat latihan 8 2,100,000Pembuatan Mobil 2900000

Jumlah 36,000,000