    Particulars of item

    UNIT NOS Length Breadth Height QTY Rate

    1

    R.D 158-290 Mt. cum 1 x 1 132.8 6.5 0.8 690.56

    cum 2 x 0.5 132.8 2.9 3 1155.36

    1845.92

    a) All kind of soil 80%1476.74 150

    b) Ordinary rock 20% 369.18 250

    2

    cum 1 x 1 132.8 15 0.25 498.00 350

    3

    cum 1 x 1 132.8 11.7 0.15 233.06 3000

    4

    Flair cum 2 x 2 10 0.85 2.8 95.20

    Taking 80% Qty 76.16 3200

    5

    Bed cum 1 x 1 132.8 11.2 0.35 520.58

    Walls cum 1 x 2 112.8 0.28 2.5 155.10

    Restoration/Remodelling of Sudha nallah/Spill channel RD. 158-290 Mt. of SHP Stage-IIIMashka.

    (WorkNo.14)

    BOQ

    Earth work in excavation over areas(exceeding 30 cm in depth, 1.5m inwidth as well as 10 sqm on plan)including disposal of excavated earth,and lift upto 1.5m disposed earth to beleveled and neatly dressed

    d) Dismantling concrete grouted stonepitching in aprons drains etc includingstacking of serviceable material anddisposal of unserviceable material,stacking/ disposal lead upto 100 meters

    P/L in cement concrete in kerbs, stepsand the live at or new grown levelexcluding the cost of centering andshuttering all works upto plinth level1:3:6 nallah aggregate (1 cement: 3coarse sand: 6 aggregate stone

    aggregate 20mm nominal size)

    Providing and laying in position cementconcrete of specified grade excludingthe cost of centering and shuttering all works upto plinth level:

    b) 1:2:4( 1 cement: 2 coarse sand: 4graded stone aggregate 20mm nominalsize) Nallah

    Providing and laying in positionspecified grade of reinforced cementconcrete excluding the cost ofcentering, shuttering, finishing andreinforcement all works upto plinthlevel.

    b) 1:1.5:3 (1 cement: 1.5 coarse sand:3 graded stone aggregate 20mmnominal size)

  • 8/6/2019 SUDHA NALLAH COMPARTIVE

    2/16

    Haunch cum 2 x 0.5 112.8 0.2 0.2 4.51

    680.19 7200

    8

    qty vide item no 5 No 1 x 1 680.19 8.2 5578 40

    9

    DESCRIPTIONDIA

    NOS

    10 12

    Bottam & Top Raft 10 885 X 2 X 1 11.80 20886

    10 96 X 2 X 1 132.7 25478.4

    Walls Horizantal bars 10 17 X 2 X 2 132.7 9023.6

    Walls Vertical upto 1.50m ht. 10 564 X 2 X 2 2.35 5301.6

    Walls Vertical upto 2.50m ht. 10 564 X 2 X 2 3.35 7557.6

    Flair Walls R.D.158-168M(Horz) 10 19 X 2 X 1 10.00 380

    Flair Walls R.D.158-168M(Ver.)) 10 67 X 2 X 1 3.4 455.6

    Flair Walls R.D.280-290M(Horz) 10 17 X 2 X 1 10 340

    Flair Walls R.D.280-290M(Ver.)) 10 67 X 2 X 1 3.15 422.1

    overlaps in walls 10 8 X 67 X 1 0.6 321.6

    overlaps in walls 10 2 X 78 X 9 0.6 842.4

    overlaps in bed 10 2 X 885 X 1 0.6 1062

    Haunch 10 2 X 410 X 1 1.2 984

    Chairs 12 1300 X 1 X 1 1.25 1625

    73054.9 1625

    0.62 0.89

    45294.0 1443

    46737 52

    10

    Add extra over items of reinforcementcement concrete (Beams/ columns/slabs/ tank) for supply and applicationof synthetic fibre (Polyester 12mmRecron 3.5 or equivalent) properlymixed with sand/ cement/ aggregates

    including casting of slab (with does of125gms per 50 kg of cement i.e. 0.25%by weight of cement or in ratio asspecified by manufactures specificationor as directed by the Engineer-in-charge

    Perpack

    of125gms

    Reinforcement for RCC work includingstrengthening, cutting , bending,placing in position and binding allcomplete

    Mild steel and medium tensile steelbars

    BAR

    INMTRS

    LENGTH OF

    BAR IN MTRS

    Reinforcement for R.C.C. workincluding straightening, cutting,bending, placing in position and bindingall complete

    Centering and shuttering includingstrutting, propping etc and removal ofform work for R/wall, return walls.

  • 8/6/2019 SUDHA NALLAH COMPARTIVE

    3/16

    Foundation Sqm 1 x 2 132.8 0.5 132.80 150

    Walls Sqm 2 x 2 112.8 2.5 1128.00 200

    22

    1 x 1 132 20 2640.00 2.5

    28

    Sqm 1 x 9 10.35 0.35 32.60

    Sqm 2 x 9 2.5 0.28 12.60

    45.20 1000

    Rmt 1 x 9 15.5 139.5 1000

    kg 1 x 2 112.8 0.25 10.69 602.92 150

    32

    Cum 1 x 2 132.9 1.3 3 1036.62 45

    36

    i) 3 kims

    Qty vide item no.3 Cum 1 x 1 233.06 0.92 214.42

    Qty vide item no.4 Cum 1 x 1 76.16 0.92 70.07

    Qty vide item no.5 Cum 1 x 1 680.19 0.92 625.77

    910.26 80

    c) Soling stone

    i) 3 kms Cum 1 x 1 95.20 0.2 19.04 90

    MT 46.74 300

    a) Walls (any thickness) includingattached pilasters, buttresses, plinthand string courses etc.

    a) Clearing jungle including uprooting ofrank vegetation, grass brush wood,trees and saplings of girth upto 30cms

    measured at the height of 1M uptoground level and removal of rubbishupto a distance of 50m outside theperiphery of the area cleared

    100sqm

    a) Providing and fixing of 12mm thickbituminous mastic felt sheets in jointsbetween CC or in masonry structurebehind PVC seals including cost andcarriage of mastic felt and connectedcharges complete

    b) Providing and fitting of PVC waterstop with approved material shown inthe drawing as per specificationincluding cost and carriage of allmaterial labour , plant, machinery etcand including vulcanization of joints,fitting of water face site of the grount

    b) Providing and fixing of GI Sheets 16guage for construction joints includingall leads & lifts & carriage upto site forthe complete job.

    Filling of available earth in spacebehind RCC wall

    Carriage of materials by mechanicaltransport including loading, unloadingand stacking for an average lead

    b) sand, Stone, aggregate below 40mmnominal size)

    d) Steel/GI sheet(50 km lead fromBasohli (store) to site

  • 8/6/2019 SUDHA NALLAH COMPARTIVE

    4/16

    Qty vide item no.3 MT 1 x 1 233.06 4.4 51.27

    Qty vide item no.4 MT 1 x 1 76.16 6.4 24.37

    Qty vide item no.5 MT 1 x 1 680.19 8.2 278.88

    354.52 250

    e) Cement (50 km lead from Basohli(store) to site

    Total

  • 8/6/2019 SUDHA NALLAH COMPARTIVE

    5/16

    Particulars of item UNIT NOS Length Breadth Height QTY Rate

    1

    R.D 158-290 Mt. cum 1 x 1 132.8 6.5 0.8 690.56

    cum 2 x 0.5 132.8 2.9 3 1155.36

    1845.92

    a) All kind of soil 80% 1476.74 150

    b) Ordinary rock 20% 369.18 250

    2

    cum 1 x 1 132.8 15 0.25 498.00 350

    3

    cum 1 x 1 132.8 11.7 0.1 155.38 3000

    4

    Flair cum 2 x 2 10 0.85 2.8 95.20

    Taking 80% Qty 76.16 3200

    Restoration/Remodelling of Sudha nallah/Spill channel RD. 158-290 Mt. of SHP Stage-IIIMashka.

    (WorkNo.14)

    BOQ

    Earth work in excavation over areas(exceeding 30 cm in depth, 1.5m inwidth as well as 10 sqm on plan)including disposal of excavated earth,and lift upto 1.5m disposed earth to beleveled and neatly dressed

    d) Dismantling concrete grouted stonepitching in aprons drains etc includingstacking of serviceable material anddisposal of unserviceable material,stacking/ disposal lead upto 100 meters

    P/L in cement concrete in kerbs, stepsand the live at or new grown levelexcluding the cost of centering andshuttering all works upto plinth level1:3:6 nallah aggregate (1 cement: 3coarse sand: 6 aggregate stoneaggregate 20mm nominal size)

    Providing and laying in position cementconcrete of specified grade excludingthe cost of centering and shuttering all works upto plinth level:

    b) 1:2:4( 1 cement: 2 coarse sand: 4graded stone aggregate 20mm nominalsize) Nallah

  • 8/6/2019 SUDHA NALLAH COMPARTIVE

    6/16

    5

    Bed cum 1 x 1 132.8 11 0.25 365.20

    Walls cum 1 x 2 112.8 0.2 2.5 112.80

    Haunch cum 2 x 0.5 112.8 0.2 0.2 4.51

    482.51 7200

    8

    qty vide item no 5 No 1 x 1 482.51 8.2 3957 40

    9

    DESCRIPTION

    DIA

    NOS

    10 12

    Bottam & Top Raft 10 885 X 2 X 1 11.80 20886

    10 96 X 2 X 1 132.7 25478.4

    Walls Horizantal bars 10 17 X 2 X 2 132.7 9023.6

    Walls Vertical upto 1.50m ht. 10 564 X 2 X 2 2.35 5301.6

    Walls Vertical upto 2.50m ht. 10 564 X 2 X 2 3.35 7557.6

    Flair Walls R.D.158-168M(Horz) 10 19 X 2 X 1 10.00 380Flair Walls R.D.158-168M(Ver.)) 10 67 X 2 X 1 3.4 455.6

    Flair Walls R.D.280-290M(Horz) 10 17 X 2 X 1 10 340

    Flair Walls R.D.280-290M(Ver.)) 10 67 X 2 X 1 3.15 422.1

    overlaps in walls 10 8 X 67 X 1 0.6 321.6

    overlaps in walls 10 2 X 78 X 9 0.6 842.4

    overlaps in bed 10 2 X 885 X 1 0.6 1062

    Haunch 10 2 X 410 X 1 1.2 984

    Chairs 12 1300 X 1 X 1 1.25 1625

    73054.9 1625

    Providing and laying in positionspecified grade of reinforced cementconcrete excluding the cost ofcentering, shuttering, finishing andreinforcement all works upto plinthlevel.

    b) 1:1.5:3 (1 cement: 1.5 coarse sand:3 graded stone aggregate 20mm

    nominal size)

    Add extra over items of reinforcementcement concrete (Beams/ columns/slabs/ tank) for supply and applicationof synthetic fibre (Polyester 12mmRecron 3.5 or equivalent) properlymixed with sand/ cement/ aggregatesincluding casting of slab (with does of125gms per 50 kg of cement i.e. 0.25%

    by weight of cement or in ratio asspecified by manufactures specificationor as directed by the Engineer-in-charge

    Perpack

    of125gms

    Reinforcement for RCC work includingstrengthening, cutting , bending,placing in position and binding allcomplete

    Mild steel and medium tensile steelbars

    BARIN

    MTRS

    TOTAL LENGTH OFBAR IN MTRS

    Reinforcement for R.C.C. workincluding straightening, cutting,bending, placing in position and bindingall complete

  • 8/6/2019 SUDHA NALLAH COMPARTIVE

    7/16

    0.62 0.89

    45294.0 1443

    46737.0 52

    10

    Foundation Sqm 1 x 2 132.8 0.5 132.80 150

    Walls Sqm 2 x 2 112.8 2.5 1128.00 200

    22

    1 x 1 132 20 2640.00 2.5

    28

    Sqm 1 x 9 10.35 0.35 32.60

    Sqm 2 x 9 2.5 0.28 12.60

    45.20 1000

    Rmt 1 x 9 15.5 139.5 1000

    kg 1 x 2 112.8 0.25 10.69 602.92 150

    32

    Cum 1 x 2 132.9 1.3 3 1036.62 45

    36

    i) 3 kims

    Qty vide item no.3Cum 1 x 1 155.38 0.92 142.95

    Qty vide item no.4 Cum 1 x 1 76.16 0.92 70.07

    Centering and shuttering includingstrutting, propping etc and removal ofform work for R/wall, return walls.

    a) Walls (any thickness) including

    attached pilasters, buttresses, plinthand string courses etc.

    a) Clearing jungle including uprooting ofrank vegetation, grass brush wood,trees and saplings of girth upto 30cmsmeasured at the height of 1M uptoground level and removal of rubbishupto a distance of 50m outside theperiphery of the area cleared

    100sqm

    a) Providing and fixing of 12mm thickbituminous mastic felt sheets in jointsbetween CC or in masonry structurebehind PVC seals including cost andcarriage of mastic felt and connectedcharges complete

    b) Providing and fitting of PVC waterstop with approved material shown in

    the drawing as per specificationincluding cost and carriage of allmaterial labour , plant, machinery etcand including vulcanization of joints,fitting of water face site of the grount

    b) Providing and fixing of GI Sheets 16guage for construction joints includingall leads & lifts & carriage upto site forthe complete job.

    Filling of available earth in space

    behind RCC wall

    Carriage of materials by mechanicaltransport including loading, unloadingand stacking for an average lead

    b) sand, Stone, aggregate below 40mmnominal size)

  • 8/6/2019 SUDHA NALLAH COMPARTIVE

    8/16

    Qty vide item no.5 Cum 1 x 1 482.51 0.92 443.91

    656.92 80

    c) Soling stone

    i) 3 kms Cum 1 x 1 95.20 0.2 19.04 90

    MT 46.74 300

    Qty vide item no.3 MT 1 x 1 155.38 4.4 34.18

    Qty vide item no.4 MT 1 x 1 76.16 6.4 24.37

    Qty vide item no.5 MT 1 x 1 482.51 8.2 197.83

    256.38 250

    d) Steel/GI sheet(50 km lead fromBasohli (store) to site

    e) Cement (50 km lead from Basohli

    (store) to site

    Total

  • 8/6/2019 SUDHA NALLAH COMPARTIVE

    9/16

    Amount

    221510.4

    92296

    174300

    699192

    243712

    at

  • 8/6/2019 SUDHA NALLAH COMPARTIVE

    10/16

    ###

    ###

    ###

  • 8/6/2019 SUDHA NALLAH COMPARTIVE

    11/16

    19920

    225600

    6600

    45202.5

    139500

    90437.4

    46647.9

    72820.72

    1713.6

    14021.11

  • 8/6/2019 SUDHA NALLAH COMPARTIVE

    12/16

  • 8/6/2019 SUDHA NALLAH COMPARTIVE

    13/16

    Amount

    221510.4

    92296

    174300

    466128

    243712

    at

  • 8/6/2019 SUDHA NALLAH COMPARTIVE

    14/16

    ###

    ###

  • 8/6/2019 SUDHA NALLAH COMPARTIVE

    15/16

    ###

    19920

    225600

    6600

    45202.5

    139500

    90437.4

    46647.9

  • 8/6/2019 SUDHA NALLAH COMPARTIVE

    16/16

    52553.93

    1713.6

    14021.11

    64095.96

    ###